JP2019080442A - Wire tensioning device - Google Patents
Wire tensioning device Download PDFInfo
- Publication number
- JP2019080442A JP2019080442A JP2017206415A JP2017206415A JP2019080442A JP 2019080442 A JP2019080442 A JP 2019080442A JP 2017206415 A JP2017206415 A JP 2017206415A JP 2017206415 A JP2017206415 A JP 2017206415A JP 2019080442 A JP2019080442 A JP 2019080442A
- Authority
- JP
- Japan
- Prior art keywords
- screw shaft
- wire
- overhead ground
- ground wire
- wire tensioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 6
- 230000002093 peripheral effect Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 7
- 238000005491 wire drawing Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000002452 interceptive effect Effects 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
本発明は、電柱間に渡される架空地線を張り替える際に用いられる張線装置に関するものである。 BACKGROUND OF THE INVENTION Field of the Invention The present invention relates to a wire extension apparatus used when replacing overhead ground wires passed between utility poles.
電柱間に架設されたメッセンジャーワイヤーに沿ってスパイラルハンガーと呼ばれる螺旋状のケーブル支持具を配置し、このスパイラルハンガーをガイドとして内側にガイドワイヤーを通すことにより、電柱間にケーブルを渡す延設方法が知られている。この具体例を、図5に示す。 By arranging a spiral cable support called a spiral hanger along the messenger wire installed between the utility poles and passing the guide wire inside with the spiral hanger as a guide, a method of extending the cables between the utility poles is available. Are known. A specific example of this is shown in FIG.
図5は、上述のような従来の延設方法を示している。2本の電柱100の間にメッセンジャーワイヤー101が張設されており、このメッセンジャーワイヤー101に螺旋状に巻き付けるようにスパイラルハンガー102が配置されている。スパイラルハンガー102は、図5から分かるように、メッセンジャーワイヤー101との間に隙間を設けて巻き付けられている。 FIG. 5 shows a conventional extension method as described above. A messenger wire 101 is stretched between the two power poles 100, and a spiral hanger 102 is disposed so as to spirally wrap around the messenger wire 101. The spiral hanger 102 is wound with a gap provided between it and the messenger wire 101, as can be seen from FIG.
2本の電柱100間にケーブルを渡す際、先ず、上述のメッセンジャーワイヤー101とスパイラルハンガー102との間の隙間にガイドワイヤー103が通される。このとき、ガイドワイヤー103がスパイラルハンガー102から外れないように、ガイドワイヤー103の先端には、先導具104が取り付けられている。この先導具104により、スパイラルハンガー102から外れることなく安定して進むことができる。 When passing the cable between the two utility poles 100, first, the guide wire 103 is passed through the gap between the messenger wire 101 and the spiral hanger 102 described above. At this time, the leading tool 104 is attached to the tip of the guide wire 103 so that the guide wire 103 does not come off the spiral hanger 102. The leading tool 104 can stably advance without coming off the spiral hanger 102.
このようにして電柱100間に渡したガイドワイヤー103の先端に、延設されるケーブルの先端が連結される。そして、ガイドワイヤー103を引き戻すことにより、ケーブルを電柱100間に渡すことが可能となる。このような技術については、特許文献1に記載がある。 Thus, the tip of the cable extended is connected to the tip of the guide wire 103 passed between the utility poles 100. Then, by pulling back the guide wire 103, the cable can be passed between the power poles 100. Patent Document 1 describes such a technique.
上述のような方法を用いると、延設すべきケーブルを下方に垂れ下がらせることなく確実に電柱間に渡すことができるので、下方の設備などと干渉することなく安全に作業を行うことができる。 By using the method as described above, since the cable to be extended can be reliably passed between the utility poles without hanging down, it is possible to work safely without interfering with the equipment below. .
ところで、高圧配電線の幹線部分及び幹線部分と連系する5径間以上の分岐部分には、雷害対策を目的とした架空地線(GW:グランドワイヤー)が施設されている。 By the way, overhead ground wire (GW: ground wire) for the purpose of measures against lightning damage is installed at a trunk portion of the high voltage distribution line and at a branch portion of five or more spans connected with the trunk portion.
この架空地線は、電柱頭部に取り付けられた架空地線取付金物の先端に施設される。この架空地線を張り替える際、上述のようなスパイラルハンガーを利用した方法を用いることができる。 This overhead ground wire is installed at the tip of the overhead ground wire fitting attached to the top of the utility pole. When replacing the overhead ground line, the method using the spiral hanger as described above can be used.
この電柱頭部で架空地線取付金物に張力を生じさせた状態で架空地線を保持するための張線装置については、特許文献2に記載がある。 The tensioning device for holding the overhead ground wire in a state in which the overhead ground wire attachment metal is tensioned at the top of the power pole is described in Patent Document 2.
しかしながら、架空地線の張り替え作業において上述の張線装置を用いる際、張線方向が一定であるとは限らない。加えて、電柱頭部の周辺の設備も様々であり、それらの設備との干渉を避けながら安全に作業を行うことが困難な場合も生じ得る。このため、作業条件を一定に保ち、且つ周辺設備との干渉を避けるためには、張力に対して偏りをなくすと共に、張線装置をコンパクトに設計することが望まれる。 However, when using the above-described stringing device in the overhead ground wire relining work, the tensioning direction is not necessarily constant. In addition, there are various facilities around the power pole head, and it may be difficult to work safely while avoiding interference with the facilities. For this reason, in order to keep the working conditions constant and to avoid interference with peripheral equipment, it is desirable to make the tensioning device compact while eliminating the bias against tension.
そこで、本発明は、張線方向が異なる場合であっても一定の作業条件を保つことができるとともに、周辺の設備との干渉が生じにくい張線装置を提供することを目的とする。 Therefore, an object of the present invention is to provide a stretching apparatus that can maintain constant working conditions even when the stretching directions are different and that is less likely to cause interference with peripheral equipment.
上記目的を達成するために、本発明の張線装置は、架空地線の張り替えに用いられる張線装置であって、掴線器が揺動可能に連結されるベース部と、前記ベース部に対して螺合されて送りネジ機構を構成しているネジ軸と、傘歯車によって前記ネジ軸に連結された入力軸と、前記ネジ軸の延長線上に配置され、架空地線取付金物を挟持するクランプ部とを備えたことを特徴とする。 In order to achieve the above object, the stringing apparatus of the present invention is a stringing apparatus used for reattaching an overhead ground wire, and a base part to which a gripper is swingably connected, and the base part It is disposed on the extension of the screw shaft screwed together to form a feed screw mechanism, an input shaft connected to the screw shaft by a bevel gear, and an overhead ground wire attachment metal And a clamp portion.
また、本発明の張線装置は、上記の構成に加えて、前記入力軸は、水平方向に対向して2つ配置されていることを特徴とする。 Furthermore, in addition to the above-described configuration, in the wire stretching apparatus according to the present invention, two of the input shafts are disposed to face each other in the horizontal direction.
また、本発明の張線装置は、上記の構成に加えて、2つの前記入力軸は、それぞれが、前記ネジ軸と一体に設けられている共通のマイタ歯車に対して連結されていることを特徴とする。 Further, in addition to the above configuration, in the wire stretching apparatus according to the present invention, the two input shafts are each connected to a common miter gear integrally provided with the screw shaft. It features.
以上のように、本発明によれば、ネジ軸の延長線上にクランプ部が配置されているので、ネジ軸に沿って動くベース部に取り付けられた掴線器と架空地線取付金物の中心を一致させるように設置することができる。これにより、張線操作においてバランスを崩すことなく安定して作業を行うことが可能となる。 As described above, according to the present invention, since the clamp portion is disposed on the extension line of the screw shaft, the center of the grasper attached to the base portion moving along the screw shaft and the overhead ground wire attachment are It can be installed to match. Thereby, it becomes possible to work stably without breaking the balance in the stringing operation.
また、本発明によれば、上記効果に加えて、2つの入力軸が水平方向へ対向して配置されているので、作業するのに適切な方向から高所作業車のバケットを接近させることができる。 Further, according to the present invention, in addition to the above-mentioned effects, since the two input shafts are disposed to face each other in the horizontal direction, it is possible to make the bucket of the high-level work vehicle approach from an appropriate direction to work. it can.
加えて、電柱の一方の側の架空地線を取り替えた後、続けて反対側の架空地線を取り替えるため、張線方向を反転させて設置しても、高所作業車を移動することなく同じ高所作業車のバケットで、すなわち、ほぼ同様の操作環境で作業を行うことが可能となる。 In addition, even after replacing the overhead ground wire on one side of the utility pole, and then replacing the overhead ground wire on the other side, the installation direction of the wire is reversed, and the elevator car is not moved. It will be possible to work with the buckets of the same aerial work vehicle, i.e. in a substantially similar operating environment.
また、本発明によれば、上記効果に加えて、2つの入力軸は、それぞれが、ネジ軸に設けられたマイタ歯車を共用するように接続されているので、張線方向を反転させて設置しても、同じ回転方向に入力することによって張線操作を行うことができる。これにより、張線方向によって作業者が錯誤を生じる恐れがなく、人為ミスを防いで安全性の向上が図られる。 Further, according to the present invention, in addition to the above effects, the two input shafts are connected to share the miter gear provided on the screw shaft, so the tensioning direction is reversed and installed. Even if the input is in the same direction of rotation, the stringing operation can be performed. As a result, there is no possibility that the worker will make an error by the tension line direction, and human error can be prevented to improve the safety.
以下、本発明の実施の形態にかかる張線装置について図を用いて説明する。 DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a wire drawing apparatus according to an embodiment of the present invention will be described using the drawings.
図1は、本発明の張線装置1の全体斜視図である。張線装置1は、架空地線を掴持する掴線器2と、掴線器2をスライドさせるスライド部10と、自身を電柱側に固定するためのクランプ部20とから構成されている。 FIG. 1 is an overall perspective view of the stretch wire device 1 of the present invention. The wire stretching apparatus 1 includes a gripping wire 2 for gripping an overhead ground wire, a slide portion 10 for sliding the gripping wire 2 and a clamp portion 20 for fixing itself to the pole.
先ず、スライド部10の構成から説明する。 First, the configuration of the slide unit 10 will be described.
スライド部10のスライド機構には、送りネジ機構が用いられている。1本のネジ軸13と並行に2本のガイドバー14が配置されている。ネジ軸13はベース部11の中央に螺合によって貫通配置されている。また、2本のガイドバー14は、同様にベース部11に対して、ネジ軸13の螺合位置を挟んだ両側に、摺動可能に貫通配置されている。これにより、ネジ軸13の軸回転操作によってベース部11を、ネジ軸13の長手方向にスライドさせることができる。 A feed screw mechanism is used for the slide mechanism of the slide unit 10. Two guide bars 14 are disposed in parallel with one screw shaft 13. The screw shaft 13 is screwed and disposed at the center of the base portion 11. Similarly, the two guide bars 14 are slidably disposed on both sides of the screwing position of the screw shaft 13 with respect to the base portion 11. Thus, the base portion 11 can be slid in the longitudinal direction of the screw shaft 13 by the rotation operation of the screw shaft 13.
ベース部11上には、支持アーム12が立設されている。この支持アーム12に対して、掴線器2が上方へ揺動可能となるように連結されている。 A support arm 12 is provided upright on the base portion 11. The holding wire 2 is connected to the support arm 12 so as to be able to swing upward.
続いて、クランプ部20の構成を説明する。 Subsequently, the configuration of the clamp unit 20 will be described.
クランプ部20は、ネジ軸13の延長線上に配置されているので、固定対象をネジ軸13の延長線上に合わせて設置することができる。クランプ部20は、平面視で略コの字型に形成されている部分と、このコの字型の開口部分を開閉する開閉フレーム22とによって形成されている。開閉フレーム22は、ノブ25を緩めた状態で軸支ボルト15を中心とした回動により開閉することができる。また、開閉フレーム22には、押圧ボルト23が内側に向けて貫通配置されており、押圧ボルト23の先端に押圧板24が連結されている。これにより、把持対象に圧接固定することができる。なお、押圧板24は押圧ボルト23に対して相対回転自在に取り付けられており、且つ、図1に示したように円板状に形成されている。これにより、上述のコの字型の部分の内壁に押圧板24が干渉することなく開閉フレーム22の開閉操作を行うことができる。加えて、押圧ボルト23の軸回転に対して押圧板24が供回りした場合であっても、同様に、上記コの字型の部分の内壁との干渉を防止できるので、押圧ボルト23による締め付け動作をスムーズに行うことができる。 The clamp unit 20 is disposed on the extension of the screw shaft 13, so that the object to be fixed can be aligned on the extension of the screw shaft 13. The clamp portion 20 is formed of a portion formed in a substantially U shape in a plan view and an open / close frame 22 for opening and closing the U-shaped opening portion. The open / close frame 22 can be opened and closed by turning around the pivot support bolt 15 in a state where the knob 25 is loosened. Further, in the opening / closing frame 22, the pressing bolt 23 is disposed so as to pass through toward the inside, and the pressing plate 24 is connected to the tip of the pressing bolt 23. Thus, the object to be gripped can be press-fixed. The pressing plate 24 is attached so as to be rotatable relative to the pressing bolt 23, and is formed in a disc shape as shown in FIG. Thereby, the opening / closing operation of the opening / closing frame 22 can be performed without the pressing plate 24 interfering with the inner wall of the above-mentioned U-shaped portion. In addition, even in the case where the pressing plate 24 rotates in response to the axial rotation of the pressing bolt 23, interference with the inner wall of the U-shaped portion can be similarly prevented. Operation can be performed smoothly.
クランプ部20の側方には、ネジ軸13の長手方向に直交する水平方向に、2つの入力軸21が対向配置されている。これら入力軸21の少なくとも一方からの回転入力によって、ネジ軸13が回転操作される。この回転伝達機構については、後に説明する。 Two input shafts 21 are disposed opposite to each other in the horizontal direction orthogonal to the longitudinal direction of the screw shaft 13 on the side of the clamp portion 20. The screw shaft 13 is rotated by rotational input from at least one of the input shafts 21. The rotation transmission mechanism will be described later.
図2は、図1の張線装置1の使用状態を示す図である。 FIG. 2 is a view showing a state of use of the stretching apparatus 1 of FIG.
電柱100の上端には、架空地線取付金物37が設置されており、この架空地線取付金物37の上端に、交換される旧架空地線33が架設されている様子が示されている。この旧架空地線33を新架空地線34(図中に二点鎖線で表示。)に張り替えるために、上述の張線装置1が用いられる。張線装置1は、クランプ部20(図1参照)によって架空地線取付金物37に固定されている。旧架空地線33の周りには、スパイラルハンガー35が巻き付けられている。このスパイラルハンガー35は、新架空地線34が張設される隣接した電柱(図示せず)との間に、ガイドのために配置される。 An overhead ground wire attachment hardware 37 is installed at the upper end of the power pole 100, and it is shown that the old overhead ground wire 33 to be replaced is constructed at the upper end of the overhead ground wire attachment hardware 37. In order to replace the old overhead ground line 33 with a new overhead ground line 34 (indicated by a two-dot chain line in the figure), the above-described stretch line device 1 is used. The wire drawing apparatus 1 is fixed to the overhead ground wire attachment hardware 37 by a clamp unit 20 (see FIG. 1). A spiral hanger 35 is wound around the old overhead ground wire 33. The spiral hanger 35 is disposed for guiding between the adjacent utility poles (not shown) on which the new overhead ground wire 34 is stretched.
新架空地線34は、電柱100の下方から引き上げられる。この引き上げの際に、高圧線36との干渉を避けるために、新架空地線34は、支持棒30、31によって高圧線36から離間した位置に支持されたガイドパイプ32内を通される。そして、引き上げられた新架空地線34の先端が、スパイラルハンガー35内を通して隣接する電柱側へ送られる。 The new overhead ground line 34 is pulled up from below the utility pole 100. At the time of pulling up, in order to avoid interference with the high voltage wire 36, the new overhead ground wire 34 is passed through a guide pipe 32 supported at a position separated from the high voltage wire 36 by the support rods 30, 31. Then, the tip of the new overhead ground wire 34 pulled up is sent through the inside of the spiral hanger 35 to the adjacent power pole side.
このようにして隣接する電柱側に接続された新架空地線34は、架空地線取付金物37に固定された張線装置1によって張り上げられる。 The new overhead ground wire 34 connected to the adjacent utility pole side in this manner is lifted by the stretch wire device 1 fixed to the overhead ground wire attachment bracket 37.
ここで、張線装置1の平面図を図3に示す。 Here, a plan view of the stretching apparatus 1 is shown in FIG.
図3に示すように、本発明の張線装置1は、平面視において略中央にネジ軸13が設けられている。そして、このネジ軸13の直上で架空地線を掴持できるように、掴線器2が連結されている。 As shown in FIG. 3, in the wire stretching apparatus 1 of the present invention, a screw shaft 13 is provided substantially at the center in a plan view. And, the grasper 2 is connected so that the overhead ground line can be gripped immediately above the screw shaft 13.
さらに、ネジ軸13の延長線上には、上述のようにクランプ部20が設けられている。このように構成されているので、張設される新架空地線34が架空地線取付金物37(図2参照)の直上から外れることなく、張線装置1の掴線器2がスライド操作される。 Furthermore, on the extension of the screw shaft 13, the clamp portion 20 is provided as described above. Since it is comprised in this way, the gripping wire device 2 of the wire stretching apparatus 1 is slide-operated, without the new overhead ground wire 34 to be tensioned being released from immediately above the overhead wire attachment fitting 37 (see FIG. 2). Ru.
したがって、張力を増減させる過程において、その反力によって張線装置1を架空地線取付金物37の周りに回転させるような力が生じることがなく、安定して作業を行うことが可能である。 Therefore, in the process of increasing or decreasing the tension, the reaction force does not generate a force that causes the stretching wire device 1 to rotate around the overhead ground wire attachment hardware 37, and it is possible to work stably.
図3には、ネジ軸13及び掴線器2と、クランプ部20の中心を通る線に一点鎖線を重ねて表している。 In FIG. 3, a dashed dotted line is superimposed on a line passing through the center of the screw shaft 13, the grip wire 2, and the clamp unit 20.
また、上述のように、張線装置1は平面視において対称に構成されており、何れの側にも入力軸21が設けられているので、作業者は何れの側からも作業を行うことが可能である。作業が行われる環境によっては、電線、配電機器、建屋、樹木等が近接もしくは輻輳している場合も想定されるが、2つの入力軸21を備えているので、作業自由度の向上が図られる。これは、同じ位置で張線装置1を反転させて用いる際にも有利である。 Further, as described above, since the stretching apparatus 1 is configured to be symmetrical in plan view and the input shaft 21 is provided on either side, the worker can work from either side. It is possible. Depending on the environment in which the work is performed, it may be assumed that wires, distribution equipment, buildings, trees, etc. are in close proximity or congested, but since two input shafts 21 are provided, working freedom can be improved. . This is also advantageous when reversing and using the stretch wire device 1 at the same position.
次に、張線装置1の内部構造を図4に示す。なお、ここでは、全体の構成が分かる程度に、図1の張線装置1を模式的に平面図で表しており、説明の便宜のため、掴線器2やその他の細かな構成については図示を省略している。 Next, the internal structure of the wire drawing apparatus 1 is shown in FIG. Here, the stretching apparatus 1 of FIG. 1 is schematically represented in a plan view to the extent that the entire configuration can be understood, and for the convenience of description, the grasper 2 and other detailed configurations are illustrated. Is omitted.
図4(a)は、2つの入力軸21のそれぞれに傘歯車27、28が対向して設けられており、これらの傘歯車27、28が、ネジ軸13に設けられた傘歯車26に連結された構成を示している。このように構成されているので、対向する2つの入力軸21の何れからもネジ軸13を操作することができる。 In FIG. 4A, bevel gears 27 and 28 are provided opposite to each of the two input shafts 21, and these bevel gears 27 and 28 are connected to a bevel gear 26 provided on the screw shaft 13. Shows the configured configuration. Since it is constituted in this way, screw axis 13 can be operated from either of two opposing input shafts 21.
また、ネジ軸13の傘歯車26を共用しているので、張力を増大させる側へ向かう回転方向は、何れの入力軸21に対しても同じである。したがって、張線装置1を反転させて用いる場合や、作業位置が入れ替わる場合であっても、逆操作を行うなどの作業者の錯誤が生じ難い構成となっている。これにより、人為ミスの発生を防ぐことができる。 Further, since the bevel gear 26 of the screw shaft 13 is shared, the rotational direction toward the side in which the tension is increased is the same for any input shaft 21. Therefore, even when the wire drawing apparatus 1 is reversed and used, or even when the work position is changed, the operator is less likely to make mistakes such as performing the reverse operation. This can prevent the occurrence of human error.
なお、ここで説明した傘歯車26〜28は、十分な力の伝達が可能であれば、コンパクトに構成できるという理由から、マイタギアを用いるのが望ましい。しかし、スペース上の規制がなく、操作性を重視するのであれば、ベベルギアであっても構わない。 In addition, as for the bevel gears 26-28 demonstrated here, if sufficient transmission of force is possible, it is desirable to use a miter gear from the reason that it can be comprised compactly. However, if there is no restriction on space and emphasis is placed on operability, bevel gears may be used.
図4(a)の構成に限らず、以下に説明する図4(b)、(c)の構成を採用することも可能である。 Not limited to the configuration of FIG. 4A, it is also possible to adopt the configurations of FIGS. 4B and 4C described below.
図4(b)は、ネジ軸13に設けられる傘歯車29とは逆向きに配置されている。その他の構成については、図4(a)と同様である。 FIG. 4B is disposed in the opposite direction to the bevel gear 29 provided on the screw shaft 13. The other configuration is the same as that shown in FIG.
図4(c)は、ネジ軸13側に、2つの対向する傘歯車26、29が設けられている。このうち、傘歯車26に対しては、入力軸21aの傘歯車27が連結されており、傘歯車29に対しては、入力軸21bの傘歯車28が連結されている。図4(c)の構成の場合、図4(a)、(b)の構成とは異なり、入力軸21a、21bの回転方向は、張力の変化に対して同じではない。したがって、作業中に入力軸21a、21bを変える場合は、逆操作で対応する必要がある。しかし、ラチェット工具などを用いて往復動作により操作する場合は、力を加える向きと張力の変化する向きとが一致するので、直感的に作業を行うことができる。 In FIG. 4 (c), two opposing bevel gears 26 and 29 are provided on the screw shaft 13 side. Among these, the bevel gear 27 of the input shaft 21 a is coupled to the bevel gear 26, and the bevel gear 28 of the input shaft 21 b is coupled to the bevel gear 29. In the case of the configuration of FIG. 4C, unlike the configurations of FIGS. 4A and 4B, the rotational directions of the input shafts 21a and 21b are not the same with respect to the change in tension. Therefore, when changing the input shafts 21a and 21b during work, it is necessary to cope with the reverse operation. However, in the case of operating by reciprocation using a ratchet tool or the like, the direction in which the force is applied matches the direction in which the tension changes, so the operation can be performed intuitively.
なお、上記の実施の形態に示した構成は、本発明の一例であり、以下のような変形例も含まれる。 The configuration shown in the above embodiment is an example of the present invention, and the following modifications are also included.
上記実施の形態では、ガイドバー14をネジ軸13の側方に配置した構成を例として示したが、掴線器2と干渉しない位置であれば、下方や上方に配置することも可能である。また、バランスをとれる構成であれば、2本構成に限らず、1本又は3本以上であっても構わない。 In the above embodiment, the configuration in which the guide bar 14 is disposed to the side of the screw shaft 13 is shown as an example, but it may be disposed below or above as long as the position does not interfere with the grip wire 2 . Moreover, if it is the structure which can be balanced, it may be 1 or 3 or more in addition to 2 structure.
また、上記実施の形態では、クランプ部20の開口の向きが、ネジ軸13の延長方向になるように形成されている構成を例として示した。しかし、ネジ軸13の延長線上に把持対象を収容し、固定できる構成であれば、開口は、ネジ軸13に直交する方向に形成されていても構わない。 Moreover, in the said embodiment, direction of the opening of the clamp part 20 showed as an example the structure currently formed so that the extension direction of the screw shaft 13 may be. However, the opening may be formed in the direction orthogonal to the screw shaft 13 as long as the object to be gripped can be accommodated and fixed on the extension of the screw shaft 13.
また、上記実施の形態では、入力軸21がネジ軸13と直交し、且つ水平方向に対向して配置されている構成を例として示した。しかし、平面視においてバランスを崩さない構成であれば、入力軸は少なくとも1つあれば十分であり、また、水平方向に配置する必要もない。 Further, in the above embodiment, the configuration in which the input shaft 21 is disposed to be orthogonal to the screw shaft 13 and to be opposed horizontally is shown as an example. However, in the configuration in which the balance is not broken in plan view, at least one input shaft is sufficient, and it is not necessary to arrange in the horizontal direction.
また、上記実施の形態では、支持アーム12が、水平方向で且つ、ネジ軸13に対して直角方向へ移動可能となるようにベース部11に取り付けられている構成であっても構わない。もしくは、支持アーム12が、ネジ軸13に対して直角方向へ首振り可能となるようにベース部11に連結され、その首振り角度が調整可能に構成されていても構わない。 In the above embodiment, the support arm 12 may be attached to the base portion 11 so as to be movable in the horizontal direction and in the direction perpendicular to the screw shaft 13. Alternatively, the support arm 12 may be connected to the base portion 11 so as to be able to swing in the direction perpendicular to the screw shaft 13, and the swing angle may be adjusted.
配電線の架空地線という社会インフラの経年劣化が進行し、取り替えが必要になってくるが、本発明の張線装置により、容易に架空地線を取り替えることができる。 Although the aging of the social infrastructure of the overhead ground wire of the distribution line progresses and replacement becomes necessary, the overhead wire of the present invention can be easily replaced.
また、本発明の張線装置は、クランプ部と掴線器の中心位置が平面視で一致しているので、張設される線材と取付対象とが干渉しない環境であれば、建築現場における親綱の張設作業など、広い分野で利用することが可能である。 Moreover, since the center position of a clamp part and a holding wire device corresponds in planar view in the stretch line apparatus of this invention, if it is the environment where the wire rod stretched and an installation object do not interfere, the parent in a construction site It can be used in a wide range of fields, such as rope tensioning work.
1 張線装置
2 掴線器
10 スライド部
11 ベース部
12 支持アーム
13 ネジ軸
14 ガイドバー
15 軸支ボルト
20 クランプ部
21、21a、21b 入力軸
22 開閉フレーム
23 押圧ボルト
24 押圧板
25 ノブ
26、27、28、29 傘歯車
30、31 支持棒
32 ガイドパイプ
33 旧架空地線
34 新架空地線
35 スパイラルハンガー
36 高圧線
37 架空地線取付金物
100 電柱
101 メッセンジャーワイヤー
102 スパイラルハンガー
103 ガイドワイヤー
104 先導具
DESCRIPTION OF SYMBOLS 1 Stretching wire device 2 Grab wire 10 Slide part 11 Base part 12 Support arm 13 Screw shaft 14 Guide bar 15 Support bolt 20 Clamp part 21, 21a, 21b Input shaft 22 Open and close frame 23 Press bolt 24 Press plate 25 Knob 26 Knob 26, 27, 28 and 29 Umbrella gear 30, 31 Support rod 32 Guide pipe 33 Old overhead ground wire 34 New overhead ground wire 35 Spiral hanger 36 High-tension wire 37 Overhead ground wire attachment hardware 100 Power pole 101 Messenger wire 102 Spiral hanger 103 Guide wire 104 Lead Tool
Claims (3)
掴線器が揺動可能に連結されるベース部と、
前記ベース部に対して螺合されて送りネジ機構を構成しているネジ軸と、
傘歯車によって前記ネジ軸に連結された入力軸と、
前記ネジ軸の延長線上に配置され、架空地線取付金物を挟持するクランプ部と
を備えたことを特徴とする張線装置。 It is a stringing machine used for the replacement of the overhead ground line,
A base portion to which the grip wire is pivotably connected;
A screw shaft screwed to the base portion to constitute a feed screw mechanism;
An input shaft connected to the screw shaft by a bevel gear;
And a clamp unit disposed on an extension of the screw shaft and clamping an overhead ground wire fitting.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017206415A JP6893665B2 (en) | 2017-10-25 | 2017-10-25 | Wire tensioning device |
JP2021087441A JP7076744B2 (en) | 2017-10-25 | 2021-05-25 | How to replace the overhead ground wire |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017206415A JP6893665B2 (en) | 2017-10-25 | 2017-10-25 | Wire tensioning device |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2021087441A Division JP7076744B2 (en) | 2017-10-25 | 2021-05-25 | How to replace the overhead ground wire |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2019080442A true JP2019080442A (en) | 2019-05-23 |
JP6893665B2 JP6893665B2 (en) | 2021-06-23 |
Family
ID=66628933
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2017206415A Active JP6893665B2 (en) | 2017-10-25 | 2017-10-25 | Wire tensioning device |
JP2021087441A Active JP7076744B2 (en) | 2017-10-25 | 2021-05-25 | How to replace the overhead ground wire |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2021087441A Active JP7076744B2 (en) | 2017-10-25 | 2021-05-25 | How to replace the overhead ground wire |
Country Status (1)
Country | Link |
---|---|
JP (2) | JP6893665B2 (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110459986A (en) * | 2019-09-17 | 2019-11-15 | 国网山东省电力公司烟台市福山区供电公司 | A kind of power scheduling power grid construction stretching machine |
CN110635397A (en) * | 2019-08-31 | 2019-12-31 | 徐承玉 | End fixing device for power transmission line wire |
CN110783876A (en) * | 2019-11-04 | 2020-02-11 | 国网河南省电力公司偃师市供电公司 | Tension device of power transmission line |
CN110797801A (en) * | 2019-11-20 | 2020-02-14 | 国网山东省电力公司烟台市牟平区供电公司 | Electric power construction tensioner bullwheel |
CN111564802A (en) * | 2020-06-16 | 2020-08-21 | 安徽博晟亿电力科技有限公司 | Compression-resistant deformation-resistant electric power fitting and production method thereof |
CN112003033A (en) * | 2020-08-26 | 2020-11-27 | 李德元 | Puncture wire clamp safe live-line ignition device with traveling mechanism and use method thereof |
CN112290459A (en) * | 2020-11-10 | 2021-01-29 | 广东电网有限责任公司 | Cable tightener |
CN112436434A (en) * | 2020-11-07 | 2021-03-02 | 国网山东省电力公司烟台供电公司 | Electric power construction tensioner bullwheel |
CN112838544A (en) * | 2020-12-31 | 2021-05-25 | 广东和星建设工程有限公司 | Power grid wire erecting device and using method thereof |
CN113739974A (en) * | 2021-08-11 | 2021-12-03 | 中国电建集团山东电力建设第一工程有限公司 | Tension-adjustable stay wire joint and stay wire foundation of all-steel stay wire tower |
CN113991541A (en) * | 2021-11-25 | 2022-01-28 | 国网河南省电力公司卢氏县供电公司 | Tensioning force adjustable electric power construction tensioner bullwheel |
CN114899756A (en) * | 2022-05-16 | 2022-08-12 | 国网山东省电力公司广饶县供电公司 | Unmanned aerial vehicle installation formula high altitude anti-falling device for power transmission line |
CN117013472A (en) * | 2023-10-07 | 2023-11-07 | 国网山东省电力公司冠县供电公司 | Wind-proof device for power transmission line |
CN117096776A (en) * | 2023-10-20 | 2023-11-21 | 国网山东省电力公司宁阳县供电公司 | Wire tightener for installing power engineering cable |
CN117410918A (en) * | 2023-12-14 | 2024-01-16 | 山西永强电气有限公司 | Electric power stay wire fitting |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04207A (en) * | 1990-04-13 | 1992-01-06 | Kyushu Electric Power Co Inc | Cable stretcher |
JP2000228808A (en) * | 1999-02-04 | 2000-08-15 | Chudenko Corp | Tool and method for re-stringing overhead ground wire |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6570451B2 (en) | 2016-01-12 | 2019-09-04 | 北陸電力株式会社 | Wire tension device and method for replacing overhead ground wire using the same |
-
2017
- 2017-10-25 JP JP2017206415A patent/JP6893665B2/en active Active
-
2021
- 2021-05-25 JP JP2021087441A patent/JP7076744B2/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04207A (en) * | 1990-04-13 | 1992-01-06 | Kyushu Electric Power Co Inc | Cable stretcher |
JP2000228808A (en) * | 1999-02-04 | 2000-08-15 | Chudenko Corp | Tool and method for re-stringing overhead ground wire |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110635397A (en) * | 2019-08-31 | 2019-12-31 | 徐承玉 | End fixing device for power transmission line wire |
CN110459986B (en) * | 2019-09-17 | 2020-12-22 | 国网山东省电力公司烟台市福山区供电公司 | Electric power dispatching electric wire netting construction is with leading a machine |
CN110459986A (en) * | 2019-09-17 | 2019-11-15 | 国网山东省电力公司烟台市福山区供电公司 | A kind of power scheduling power grid construction stretching machine |
CN110783876A (en) * | 2019-11-04 | 2020-02-11 | 国网河南省电力公司偃师市供电公司 | Tension device of power transmission line |
CN110797801A (en) * | 2019-11-20 | 2020-02-14 | 国网山东省电力公司烟台市牟平区供电公司 | Electric power construction tensioner bullwheel |
CN111564802A (en) * | 2020-06-16 | 2020-08-21 | 安徽博晟亿电力科技有限公司 | Compression-resistant deformation-resistant electric power fitting and production method thereof |
CN111564802B (en) * | 2020-06-16 | 2021-07-16 | 安徽博晟亿电力科技有限公司 | Compression-resistant deformation-resistant electric power fitting and production method thereof |
CN112003033A (en) * | 2020-08-26 | 2020-11-27 | 李德元 | Puncture wire clamp safe live-line ignition device with traveling mechanism and use method thereof |
CN112003033B (en) * | 2020-08-26 | 2021-10-08 | 李德元 | Puncture wire clamp safe live-line ignition device with traveling mechanism and use method thereof |
CN112436434A (en) * | 2020-11-07 | 2021-03-02 | 国网山东省电力公司烟台供电公司 | Electric power construction tensioner bullwheel |
CN112436434B (en) * | 2020-11-07 | 2022-06-24 | 国网山东省电力公司烟台供电公司 | Electric power construction tensioner bullwheel |
CN112290459A (en) * | 2020-11-10 | 2021-01-29 | 广东电网有限责任公司 | Cable tightener |
CN112838544A (en) * | 2020-12-31 | 2021-05-25 | 广东和星建设工程有限公司 | Power grid wire erecting device and using method thereof |
CN113739974A (en) * | 2021-08-11 | 2021-12-03 | 中国电建集团山东电力建设第一工程有限公司 | Tension-adjustable stay wire joint and stay wire foundation of all-steel stay wire tower |
WO2023016238A1 (en) * | 2021-08-11 | 2023-02-16 | 中国电建集团山东电力建设第一工程有限公司 | Tension-adjustable pull wire joint and all-steel pull wire tower pull wire foundation |
CN113739974B (en) * | 2021-08-11 | 2023-10-20 | 中国电建集团山东电力建设第一工程有限公司 | Tension-adjustable stay wire connector and all-steel stay wire tower stay wire foundation |
CN113991541A (en) * | 2021-11-25 | 2022-01-28 | 国网河南省电力公司卢氏县供电公司 | Tensioning force adjustable electric power construction tensioner bullwheel |
CN114899756A (en) * | 2022-05-16 | 2022-08-12 | 国网山东省电力公司广饶县供电公司 | Unmanned aerial vehicle installation formula high altitude anti-falling device for power transmission line |
CN117013472A (en) * | 2023-10-07 | 2023-11-07 | 国网山东省电力公司冠县供电公司 | Wind-proof device for power transmission line |
CN117013472B (en) * | 2023-10-07 | 2024-02-02 | 国网山东省电力公司冠县供电公司 | Wind-proof device for power transmission line |
CN117096776A (en) * | 2023-10-20 | 2023-11-21 | 国网山东省电力公司宁阳县供电公司 | Wire tightener for installing power engineering cable |
CN117096776B (en) * | 2023-10-20 | 2024-01-19 | 国网山东省电力公司宁阳县供电公司 | Wire tightener for installing power engineering cable |
CN117410918A (en) * | 2023-12-14 | 2024-01-16 | 山西永强电气有限公司 | Electric power stay wire fitting |
CN117410918B (en) * | 2023-12-14 | 2024-02-20 | 山西永强电气有限公司 | Electric power stay wire fitting |
Also Published As
Publication number | Publication date |
---|---|
JP6893665B2 (en) | 2021-06-23 |
JP7076744B2 (en) | 2022-05-30 |
JP2021121175A (en) | 2021-08-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2019080442A (en) | Wire tensioning device | |
KR101850531B1 (en) | By-pass cable terminal apparatus | |
AU2002303016B2 (en) | Electric wire removing roller for LP insulator and power distribution method of construction | |
JP5850800B2 (en) | Grabber | |
JP6671656B2 (en) | Wire temporary support tool | |
KR102327599B1 (en) | Trap type live wire terminal insulation cap and indirect live wire insulation method of jumper wire using the same | |
KR20200131332A (en) | Insulator separation method, and columnar suspension device, insulator support device, large telegraph pole fixture and hanging/suspension tool used in this method | |
JP6570451B2 (en) | Wire tension device and method for replacing overhead ground wire using the same | |
KR101684662B1 (en) | A device for prevention of aerial distribution line | |
US20240055841A1 (en) | Conductor Trimmer | |
KR20200099566A (en) | Insulator separation method and direction conversion device used in this method, columnar suspension device, insulator support device and large telegraph pole fixture | |
CN110932182A (en) | Tightening device for mounting electric wires and cables | |
JP2014241688A (en) | Scaffold for work | |
JP2003189433A (en) | Distribution line construction method and tool used therefor | |
CN215816854U (en) | Line mechanism is walked to portable of circuit mediation | |
WO2019087825A1 (en) | Wire gripper | |
KR20200005231A (en) | Grounding apparatus for powre transmission line | |
CN108899805A (en) | A kind of Multifunctional clamp of transmission line of electricity replacement deep bid diameter glass insulator | |
CN212063260U (en) | Cable laying is with fixed clamping device | |
JP2015010430A (en) | Scaffold board with baseboard device | |
CN105262005A (en) | Auxiliary supporting device for pole overhead ground wire and OPGW optical cable | |
JP2006508375A (en) | Equipment crane, especially camera crane | |
JP2008053592A (en) | Transformer guiding tool for guiding lifted transformer | |
CN218449190U (en) | Auxiliary erecting tool for power transmission line | |
CN114665286B (en) | Pneumatic loading angle adjustable high-voltage electric ground rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200709 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210405 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210427 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210525 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6893665 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |