JP2019065524A - Building unit, unit building and method of construction of unit building - Google Patents

Building unit, unit building and method of construction of unit building Download PDF

Info

Publication number
JP2019065524A
JP2019065524A JP2017190519A JP2017190519A JP2019065524A JP 2019065524 A JP2019065524 A JP 2019065524A JP 2017190519 A JP2017190519 A JP 2017190519A JP 2017190519 A JP2017190519 A JP 2017190519A JP 2019065524 A JP2019065524 A JP 2019065524A
Authority
JP
Japan
Prior art keywords
unit
building
temporary
temporary beam
door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2017190519A
Other languages
Japanese (ja)
Inventor
俊 菊地
Takashi Kikuchi
俊 菊地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2017190519A priority Critical patent/JP2019065524A/en
Publication of JP2019065524A publication Critical patent/JP2019065524A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

To provide a building unit, a unit building, and a method for constructing a unit building in which temporary beams can be provided with a door provided.SOLUTION: A building unit (entrance unit 20) in which a skeleton body is formed by a plurality of beam materials (first floor girder 22, ceiling girder 25) and column material (column 21), comprises: a plurality of short beams (second floor girder 23, third floor girder 24) arranged at intervals at the position of one side where the beam of the skeleton body (first floor girder 22, ceiling girder 25) is arranged; and a detachable temporary beam (first temporary beams 31, second temporary beams 35) disposed between the short beams. The temporary beams (the first temporary beams 31 and the second temporary beams 35) are disposed inside the skeleton body, and a door (the entrance door 70) is disposed between the short beams.SELECTED DRAWING: Figure 9

Description

本発明は、玄関ドアを有する建物ユニット、ユニット建物及びユニット建物の構築方法に関するものである。   The present invention relates to a building unit having a front door, a unit building, and a method of constructing a unit building.

従来、建物ユニットは、工場付けされて建築地で取り外し可能な仮梁を設け、輸送時及び建築地での据付時に要求される剛性を確保することが知られている(例えば、特許文献1参照)。   Heretofore, it has been known that a building unit is factory-fitted and provided with a temporary beam which can be removed at a building site to ensure the rigidity required for transportation and installation at a building site (for example, see Patent Document 1) ).

特開平9−125523号公報Japanese Patent Application Laid-Open No. 9-125523

しかしながら、特許文献1に記載された建物ユニットは、骨組みとなる梁材の一辺に沿って、仮梁を設ける構成である。そのため、梁材に沿って設けられるドアを設けた状態で、仮梁を設けることができない、という問題がある。   However, the building unit described in Patent Document 1 is configured to provide a temporary beam along one side of a beam serving as a framework. Therefore, there is a problem that the temporary beam can not be provided in the state where the door provided along the beam material is provided.

そこで、本発明は、ドアを設けた状態で、仮梁を設けることができる建物ユニット、ユニット建物及びユニット建物の構築方法を提供することを目的としている。   Then, an object of this invention is to provide the construction method of a building unit, a unit building, and a unit building which can provide a temporary beam in the state which provided the door.

前記目的を達成するために、本発明の建物ユニット及びユニット建物は、複数の梁材と柱材とによって骨組体が形成された建物ユニットであって、前記骨組体の前記梁材が配置される一辺の位置において、間隔をおいて配置される複数の短梁と、前記短梁間に配置され、着脱可能な仮梁と、を備え、前記仮梁は、前記骨組体の内側に配置され、前記短梁間には、ドアが配置されることを特徴とする。   In order to achieve the above object, the building unit and unit building of the present invention is a building unit in which a framework is formed by a plurality of beams and columns, and the beams of the framework are disposed. At a position of one side, it comprises a plurality of short beams arranged at intervals, and a temporary beam which is arranged between the short beams and is detachable, and the temporary beam is arranged inside the skeleton, A door is disposed between the short beams.

ここで、本発明の建物ユニット及びユニット建物は、前記仮梁は、第1仮梁と、第2仮梁と、で構成され、前記第1仮梁は、前記短梁の端部の側面間を接続し、前記第2仮梁は、前記第1仮梁に直交する方向に向けて設けられても良い。   Here, in the building unit and the unit building according to the present invention, the temporary beam is composed of a first temporary beam and a second temporary beam, and the first temporary beam is between the side surfaces of the ends of the short beams. And the second temporary beam may be provided in a direction perpendicular to the first temporary beam.

また、本発明の建物ユニット及びユニット建物は、前記短梁は、3本配置され、前記短梁間には、2つの前記ドアが配置されて良い。   In the building unit and the unit building according to the present invention, three short beams may be disposed, and two of the doors may be disposed between the short beams.

また、本発明の建物ユニット及びユニット建物は、3本の前記短梁のうち、中央の短梁と、該中央の短梁と対峙する前記梁材と、を支持する支持梁を有しても良い。   Further, the building unit and the unit building according to the present invention may have a supporting beam for supporting the central short beam and the beam facing the central short beam among the three short beams. good.

また、本発明のユニット建物の構築方法は、複数の梁材と柱材とによって骨組体が形成された建物ユニットを備えるユニット建物の構築方法であって、前記梁材に切欠部を設ける切欠部設置工程と、前記切欠部を補強する仮梁を前記骨組体の内側に取り付ける仮梁取付工程と、前記切欠部にドアを取り付けるドア取付工程と、前記建物ユニットを所定の位置に設置して固定する設置・固定工程と、前記仮梁を前記建物ユニットから脱離する仮梁脱離工程と、を含むことを特徴とする。   Further, a method of constructing a unit building according to the present invention is a method of constructing a unit building including a building unit in which a frame body is formed by a plurality of beams and columns, and a notch portion provided with a notch in the beams Installation process, temporary beam installation process for attaching a temporary beam reinforcing the notch section to the inside of the framework, door installation process for attaching a door to the notch section, installation and fixing the building unit at a predetermined position And a temporary beam detachment step of detaching the temporary beam from the building unit.

このように構成された本発明の建物ユニット及びユニット建物は、ドアを設けた状態で、仮梁を設けることができ、建築ユニットを搬送したり、建築ユニットを施工現場で所定の場所に据え付けたりする際に、建築ユニットに外力が作用しても、ドアが変形してしまうことを防止する。   The thus constructed building unit and unit building of the present invention can be provided with temporary beams with the door provided, transport the building unit, or install the building unit at a predetermined place at the construction site Even when an external force acts on the building unit, the door is prevented from being deformed.

また、本発明の建物ユニット及びユニット建物は、前記仮梁は、第1仮梁と、第2仮梁と、で構成されることで、ドアを設けた状態で、第1仮梁及び第2仮梁を設けることができ、建物ユニットを搬送したり、建物ユニットを施工現場で所定の場所に据え付けたりする際に、建物ユニットに外力が作用しても、ドアが変形してしまうことを防止する。   Further, in the building unit and the unit building according to the present invention, the temporary beam is configured by the first temporary beam and the second temporary beam, and in a state in which the door is provided, the first temporary beam and the second beam are provided. Temporary beams can be provided to prevent the door from being deformed even when external force is applied to the building unit when transporting the building unit or installing the building unit at a predetermined place at a construction site Do.

また、本発明の建物ユニット及びユニット建物は、前記短梁は、3本配置され、前記短梁間には、2つの前記ドアが配置されることで、2つのドアを、1つの建物ユニットに設けた状態で、仮梁を設けることができ、ドアの変形を防止し、玄関の配置位置の制約を低減し、スペースを有効活用することができる。   In the building unit and the unit building according to the present invention, three short beams are arranged, and two doors are arranged between the short beams, so that two doors are provided in one building unit. In this state, a temporary beam can be provided to prevent deformation of the door, reduce restrictions on the placement position of the entrance, and make effective use of space.

また、本発明の建物ユニット及びユニット建物は、3本の前記短梁のうち、中央の短梁と、該中央の短梁と対峙する前記梁材と、を支持する支持梁を有することで、玄関たたきを阻害することなく、梁材を支持する支持梁を設けることができ、建物ユニットの剛性を高めることができる。   Further, the building unit and the unit building according to the present invention have a supporting beam for supporting the central short beam and the beam facing the central short beam among the three short beams, It is possible to provide a support beam for supporting the beam without disturbing the entrance strike and to increase the rigidity of the building unit.

また、本発明のユニット建物の構築方法は、切欠部設置工程と、仮梁取付工程と、ドア取付工程と、設置・固定工程と、仮梁脱離工程と、を含むことで、ドアを設けた状態で、仮梁を設けることができ、建物ユニットを搬送したり、建物ユニットを施工現場で所定の場所に据え付けたりする際に、建物ユニットに外力が作用しても、ドアが変形してしまうことを防止する。   In addition, the method of constructing a unit building according to the present invention is provided with a door by including a notch installation step, a temporary beam attachment step, a door attachment step, an installation / fixation step, and a temporary beam detachment step. In this state, temporary beams can be provided, and when the building unit is transported or the building unit is installed at a predetermined place at a construction site, the door is deformed even if an external force acts on the building unit. To prevent it from

実施例1の建物ユニットの構成を示す斜視図である。FIG. 1 is a perspective view showing the configuration of a building unit of a first embodiment. 実施例1の玄関ユニットの構成を示す分解斜視図である。FIG. 5 is an exploded perspective view showing the configuration of the entrance unit of the first embodiment. 実施例1の仮梁の構成を示す分解斜視図である。FIG. 2 is an exploded perspective view showing the configuration of a temporary beam of Example 1; 実施例1の仮梁の構成を示す分解斜視図である。FIG. 2 is an exploded perspective view showing the configuration of a temporary beam of Example 1; 実施例1のドアの構成を示す分解斜視図である。FIG. 2 is an exploded perspective view showing the configuration of the door of the first embodiment. 実施例1のドアの構成を示す断面図である。FIG. 2 is a cross-sectional view showing the configuration of the door of Example 1; 実施例1の玄関ユニットの設置・固定工程を説明する説明図である。FIG. 8 is an explanatory view for explaining an installation and fixing process of the entrance unit of the first embodiment. 実施例1の玄関ユニットの設置・固定工程を説明する説明図である。FIG. 8 is an explanatory view for explaining an installation and fixing process of the entrance unit of the first embodiment. 実施例1の玄関ユニットの仮梁脱離工程を説明する説明図である。FIG. 8 is an explanatory view for explaining a temporary beam detachment step of the entrance unit of the first embodiment.

以下、本開示による建物ユニット、ユニット建物及びユニット建物の構築方法を実現する実施形態を、図面に示す実施例1に基づいて説明する。   Hereinafter, an embodiment for realizing a building unit, a unit building, and a method of constructing a unit building according to the present disclosure will be described based on Example 1 shown in the drawings.

まず、構成を説明する。
実施例1における建物ユニット及びユニット建物は、工場で製造される複数の建物ユニットを施工現場で連結するユニット建物としての2世帯住宅に適用する。以下、実施例1の構成を、「建物ユニットの構成」、「玄関ユニット建物の構成」、「仮梁の構成」、「ユニット建物の組立の手順」に分けて説明する。
First, the configuration will be described.
The building unit and the unit building in the first embodiment are applied to a two-family house as a unit building in which a plurality of building units manufactured in a factory are connected at a construction site. Hereinafter, the configuration of the first embodiment will be described by being divided into “configuration of building unit”, “configuration of entrance unit building”, “configuration of temporary beam”, and “procedure of assembly of unit building”.

[建物ユニットの構成]
図1は、実施例1の建物ユニットの構成を示す斜視図である。以下、図1に基づいて、実施例1の建物ユニットの構成を説明する。
[Building unit configuration]
FIG. 1 is a perspective view showing the structure of a building unit according to a first embodiment. Hereinafter, based on FIG. 1, the structure of the building unit of Example 1 is demonstrated.

ユニット建物1は、図1に示すように、基礎2の上に、1階部分の建物ユニット10と、2階部分の建物ユニット10Aと、屋根パネル5とを組み付けて構築されている。1階部分の建物ユニット10の1つは、玄関ユニット20を構成する。   As shown in FIG. 1, the unit building 1 is constructed by assembling the building unit 10 on the first floor, the building unit 10A on the second floor, and the roof panel 5 on the foundation 2. One of the building units 10 on the first floor constitutes the entrance unit 20.

[玄関ユニット建物の構成]
図2は、実施例1の玄関ユニットの構成を示す分解斜視図である。以下、図2に基づいて、実施例1の玄関ユニットの構成を説明する。
[Configuration of entrance unit building]
FIG. 2 is an exploded perspective view showing the configuration of the entrance unit of the first embodiment. Hereinafter, based on FIG. 2, the structure of the entrance unit of Example 1 is demonstrated.

玄関ユニット20は、柱材としての柱21と、梁材としての第1床大梁22と、短梁としての第2床大梁23と、短梁としての第3床大梁24と、支持梁としての第1床小梁26と、第2床小梁27と、第3床小梁28と、梁材としての天井大梁25と、仮梁としての第1仮梁31と、仮梁としての第2仮梁35と、外壁15と、ドアとしての玄関ドア70と、から構成される。   The entrance unit 20 includes a column 21 as a pillar, a first floor girder 22 as a beam, a second floor girder 23 as a short beam, a third floor girder 24 as a short beam, and a support beam. A first floor beam 26, a second floor beam 27, a third floor beam 28, a ceiling beam 25 as a beam material, a first temporary beam 31 as a temporary beam, and a second as a temporary beam The temporary beam 35, the outer wall 15, and the entrance door 70 as a door are comprised.

柱21は、四角筒状の鋼製の柱で形成される。柱21は、矩形状の4隅に立設される。   The column 21 is formed of a square cylindrical steel column. The pillars 21 are erected at four rectangular corners.

第1床大梁22は、角型U状の鋼材で形成される。第1床大梁22は、3つ設けられる。第1床大梁22は、柱21の下端部で、矩形の辺のうち3辺を架け渡す。   The first floor girder 22 is formed of a square U-shaped steel material. Three first floor cross beams 22 are provided. The first floor girder 22 spans three sides of the rectangular side at the lower end of the column 21.

第2床大梁23は、角型U状の鋼材で形成される。第2床大梁23は、両端部が閉じられており、1面が開口した箱形を形成する。第2床大梁23は、2つ設けられる。第2床大梁23は、柱21の下端部で、矩形の辺のうち1辺に沿って配置される。各第2床大梁23の一方端は、柱21に接続される。   The second floor girder 23 is formed of a square U-shaped steel material. The second floor girder 23 is closed at both ends and forms a box shape having one side open. Two second floor cross beams 23 are provided. The second floor girder 23 is disposed at one of the lower sides of the column 21 along one of the sides of the rectangle. One end of each second floor cross beam 23 is connected to the column 21.

第3床大梁24は、角型U状の鋼材で形成される。第3床大梁24は、両端部が閉じられており、1面が開口した箱形を形成する。第3床大梁24は、1つ形成される。第3床大梁24は、柱21の下端部で、矩形の辺のうち1辺に沿って配置される。第3床大梁24は、2つの第2床大梁23の間に配置される。すなわち、第2床大梁23と第3床大梁24は、玄関ユニット20の骨組体の梁材が配置される一辺の位置において、間隔をおいて配置される。   The third floor girder 24 is formed of a square U-shaped steel material. The third floor girder 24 is closed at both ends and forms a box shape having one side open. One third floor cross beam 24 is formed. The third floor girder 24 is disposed at one of the lower sides of the column 21 along one of the sides of the rectangle. The third floor cross beam 24 is disposed between the two second floor cross beams 23. That is, the second floor girder 23 and the third floor girder 24 are spaced apart at the position of one side where the beam of the framework of the entrance unit 20 is disposed.

第2床大梁23と第3床大梁24との間は、玄関ドア70が取り付けられる切欠部29を構成する。すなわち、切欠部29は、梁材の一辺に、第2床大梁23及び第3床大梁24によって、2か所に形成される。   Between the second floor girder 23 and the third floor girder 24, a notch 29 to which the entrance door 70 is attached is formed. That is, the notches 29 are formed in two places by the second floor girder 23 and the third floor girder 24 on one side of the beam.

第1床小梁26は、四角筒状の鋼材で形成される。第1床小梁26は、1つ形成される。第1床小梁26は、矩形状の長辺の第1床大梁22の中央と、第3床大梁24の中央とを連結する。すなわち、第1床小梁26は、第3床大梁24と、これに対峙する第1床大梁22との間に架け渡される。   The first floor beam 26 is formed of a square cylindrical steel material. One first floor beam 26 is formed. The first floor cross beam 26 connects the center of the first floor cross beam 22 having a rectangular long side and the center of the third floor cross beam 24. That is, the first floor girder 26 is bridged between the third floor girder 24 and the first floor girder 22 opposed thereto.

第2床小梁27は、四角筒状の鋼材で形成される。第2床小梁27は、2つ形成される。第2床小梁27は、矩形状の短辺の第1床大梁22の中央と、第1床小梁26の中央とを接続する。   The second floor beam 27 is formed of a square cylindrical steel material. Two second floor beams 27 are formed. The second floor cross beam 27 connects the center of the first floor cross beam 22 having a rectangular short side and the center of the first floor cross beam 26.

第3床小梁28は、四角筒状の鋼材で形成される。第3床小梁28は、6つ形成される。第3床小梁28は、矩形状の長辺の第1床大梁22と、第2床小梁27とを接続する。   The third floor beam 28 is formed of a square tubular steel material. Six third floor beams 28 are formed. The third floor girder 28 connects the first floor girder 22 having a rectangular long side and the second floor girder 27.

天井大梁25は、角型U状の鋼材で形成される。天井大梁25は、4つ設けられる。天井大梁25は、柱21の下端部で、矩形の辺に沿って連結する。   The ceiling cross beam 25 is formed of a square U-shaped steel material. Four ceiling beams 25 are provided. The ceiling girder 25 is connected at the lower end of the column 21 along the side of the rectangle.

第1仮梁31は、2つ設けられる。第1仮梁31は、第2床大梁23と、第3床大梁24との間に配置される。第1仮梁31は、第2床大梁23の他方端の側面と、第3床大梁24の一方端の側面と、を接続する。すなわち、第1仮梁31は、第2床大梁23と第3床大梁24とによって形成される切欠部29を補強する。   Two first temporary beams 31 are provided. The first temporary beam 31 is disposed between the second floor girder 23 and the third floor girder 24. The first temporary beam 31 connects the side surface of the other end of the second floor girder 23 and the side surface of one end of the third floor girder 24. That is, the first temporary beam 31 reinforces the notch 29 formed by the second floor girder 23 and the third floor girder 24.

第2仮梁35は、4つ設けられる。第2仮梁35は、第2床大梁23と、第3床大梁24との間に配置される。第2仮梁35は、第1仮梁31と直交する方向に設けられ、第2床小梁27と第1仮梁31とを接続する。すなわち、第2仮梁35は、第1仮梁31を支持することで、第2床大梁23と第3床大梁24とによって形成される切欠部29を補強する。   Four second temporary beams 35 are provided. The second temporary beam 35 is disposed between the second floor girder 23 and the third floor girder 24. The second temporary beam 35 is provided in a direction orthogonal to the first temporary beam 31, and connects the second floor beam 27 and the first temporary beam 31. That is, the second temporary beam 35 supports the first temporary beam 31 to reinforce the notch 29 formed by the second floor girder 23 and the third floor girder 24.

柱21と、第1床大梁22と、天井大梁25とは、玄関ユニット20の骨組体を形成する。すなわち、複数の梁材と柱材とによって、玄関ユニット20の骨組体を形成する。   The pillars 21, the first floor girder 22, and the ceiling girder 25 form a framework of the entrance unit 20. That is, the framework of the entrance unit 20 is formed by the plurality of beams and columns.

外壁15は、玄関ユニット20の骨組体の一側面に取り付けられる。すなわち、外壁15は、柱21と、第2床大梁23と、第3床大梁24と、天井大梁25とで形成される平面の外側に取り付けられる。   The outer wall 15 is attached to one side of the frame of the entrance unit 20. That is, the outer wall 15 is attached to the outside of the plane formed by the pillars 21, the second floor girder 23, the third floor girder 24, and the ceiling girder 25.

玄関ドア70は、ドア本体71と、ドア枠72から形成される。玄関ドア70は、第2床大梁23と第3床大梁24に沿って配置される。すなわち、玄関ドア70は、第1仮梁31より、玄関ユニット20の骨組体の外側に配置される。   The entrance door 70 is formed of a door body 71 and a door frame 72. The entrance door 70 is disposed along the second floor cross beam 23 and the third floor cross beam 24. That is, the entrance door 70 is disposed outside the skeleton of the entrance unit 20 by the first temporary beam 31.

[仮梁の構成]
図3は、実施例1の仮梁の構成を示す分解斜視図である。図4は、実施例1の仮梁の構成を示す分解斜視図である。以下、図3及び図4に基づいて、実施例1の仮梁の構成を説明する。
[Structure of temporary beam]
FIG. 3 is an exploded perspective view showing the configuration of the temporary beam of the first embodiment. FIG. 4 is an exploded perspective view showing the configuration of the temporary beam of the first embodiment. Hereinafter, based on FIG.3 and FIG.4, the structure of the temporary beam of Example 1 is demonstrated.

第1仮梁31は、図3に示すように、第1仮梁本体32と、仮梁接続部33と、を備える。   As shown in FIG. 3, the first temporary beam 31 includes a first temporary beam main body 32 and a temporary beam connection portion 33.

第1仮梁本体32は、角型U状の鋼材で形成される。第1仮梁本体32には、第2仮梁35を第1仮梁31に取り付ける4つの取付孔32aを有する。   The first temporary beam main body 32 is formed of a square U-shaped steel material. The first temporary beam main body 32 has four attachment holes 32 a for attaching the second temporary beam 35 to the first temporary beam 31.

仮梁接続部33は、第1仮梁本体32の両端部に、L字状の鋼材で形成される。仮梁接続部33には、第1仮梁31を、第2床大梁23及び第3床大梁24に取り付ける2つの取付孔33aを有する。   The temporary beam connection portion 33 is formed of L-shaped steel material at both end portions of the first temporary beam main body 32. The temporary beam connection portion 33 has two attachment holes 33 a for attaching the first temporary beam 31 to the second floor girder 23 and the third floor girder 24.

第2床大梁23及び第3床大梁24は、ブラケット50を有する。ブラケット50は、角型U状の鋼材で形成される。ブラケット50は、第2床大梁23又は第3床大梁24の開口部の一部を塞ぐように、溶接等によって、第2床大梁23又は第3床大梁24に取り付けられる。ブラケット50には、第1仮梁31を第2床大梁23又は第3床大梁24に取り付ける2つの取付孔50aを有する。   The second floor girder 23 and the third floor girder 24 have a bracket 50. The bracket 50 is formed of a square U-shaped steel material. The bracket 50 is attached to the second floor cross beam 23 or the third floor cross beam 24 by welding or the like so as to close a part of the opening of the second floor cross beam 23 or the third floor cross beam 24. The bracket 50 has two attachment holes 50 a for attaching the first temporary beam 31 to the second floor girder 23 or the third floor girder 24.

そして、ボルト等の締結部材40が、第1仮梁31の仮梁接続部33の取付孔33aと、ブラケット50の取付孔50aと、に挿入され、ナット等に締結されることで、第1仮梁31は、第2床大梁23と第3床大梁24とに取り付けられる。すなわち、第1仮梁31は、第2床大梁23の端部の側面と、第3床大梁24の端部の側面とに、着脱可能に設けられる。また、第1仮梁31は、玄関ユニット20の内側に配置される。   Then, a fastening member 40 such as a bolt is inserted into the attachment hole 33a of the temporary beam connection portion 33 of the first temporary beam 31 and the attachment hole 50a of the bracket 50, and is fastened to a nut or the like. The temporary beam 31 is attached to the second floor girder 23 and the third floor girder 24. That is, the first temporary beam 31 is detachably provided on the side surface of the end of the second floor girder 23 and the side surface of the end of the third floor girder 24. Further, the first temporary beam 31 is disposed inside the entrance unit 20.

第2仮梁35は、図3及び図4に示すように、第2仮梁本体36と、第1フランジ37と、第2フランジ38と、を有する。   The second temporary beam 35 has a second temporary beam main body 36, a first flange 37, and a second flange 38, as shown in FIGS. 3 and 4.

第2仮梁本体36は、四角筒状の鋼材で形成される。第1フランジ37は、第2仮梁本体36の一方端に、矩形の板状の鋼材で形成される。第1フランジ37には、第2仮梁35を第1仮梁31に取り付ける2つの取付孔37aが設けられる。   The second temporary beam main body 36 is formed of a square cylindrical steel material. The first flange 37 is formed of a rectangular plate-like steel material at one end of the second temporary beam main body 36. The first flange 37 is provided with two attachment holes 37 a for attaching the second temporary beam 35 to the first temporary beam 31.

第2フランジ38は、第2仮梁本体36の他方端に、矩形の板状の鋼材で形成される。第2フランジ38には、第2仮梁35を第2床小梁27に取り付ける4つの取付孔38aが設けられる。第2床小梁27には、第2仮梁35を第2床小梁27に取り付ける4つの取付孔27aが設けられる。   The second flange 38 is formed at the other end of the second temporary beam main body 36 with a rectangular plate-like steel material. The second flange 38 is provided with four attachment holes 38 a for attaching the second temporary beam 35 to the second floor beam 27. The second floor beam 27 is provided with four attachment holes 27 a for attaching the second temporary beam 35 to the second floor beam 27.

そして、ボルト等の締結部材40が、第2仮梁35の第1フランジ37の取付孔37aと、第1仮梁31の第1仮梁本体32の取付孔32aと、に挿入され、ナット等に締結されることで、第2仮梁35は、第1仮梁31に取り付けられる。また、ボルト等の締結部材40が、第2仮梁35の第2フランジ38の取付孔38aと、第2床小梁27の取付孔27aと、に挿入され、ナット等に締結されることで、第2仮梁35は、第2床小梁27に取り付けられる。   Then, a fastening member 40 such as a bolt is inserted into the mounting hole 37 a of the first flange 37 of the second temporary beam 35 and the mounting hole 32 a of the first temporary beam main body 32 of the first temporary beam 31. The second temporary beam 35 is attached to the first temporary beam 31. In addition, a fastening member 40 such as a bolt is inserted into the mounting hole 38a of the second flange 38 of the second temporary beam 35 and the mounting hole 27a of the second floor beam 27, and is fastened to a nut or the like. The second temporary beam 35 is attached to the second floor beam 27.

すなわち、第2仮梁35は、切欠部29に設けられた第1仮梁31と、第2床小梁27とに着脱可能に設けられる。また、第2仮梁35は、玄関ユニット20の内側に配置される。   That is, the second temporary beam 35 is detachably provided to the first temporary beam 31 provided in the notch 29 and the second floor beam 27. In addition, the second temporary beam 35 is disposed inside the entrance unit 20.

[ドアの構成]
図5は、実施例1のドアの構成を示す分解斜視図である。図6は、実施例1のドアの構成を示す断面図である。以下、図5及び図6に基づいて、実施例1のドアの構成を説明する。
[Door configuration]
FIG. 5 is an exploded perspective view showing the configuration of the door of the first embodiment. FIG. 6 is a cross-sectional view showing the configuration of the door of the first embodiment. Hereinafter, based on FIG.5 and FIG.6, the structure of the door of Example 1 is demonstrated.

玄関ドア70は、図5及び図6に示すように、ドア本体71と、ドア枠72と、ドアヒンジ73とから形成される。ドア本体は、ドアヒンジ73を介してドア枠72に設置され、開閉可能とする。   The entrance door 70 is formed of a door main body 71, a door frame 72, and a door hinge 73, as shown in FIGS. The door body is installed on the door frame 72 through the door hinge 73 and can be opened and closed.

ドア枠72は、玄関ドア70を外壁に取り付ける取付孔72aを有する。外壁15には、外壁15の縁に設けられた外壁ブラケット16が設けられる。外壁ブラケット16は、玄関ドア70を外壁15に取り付ける取付孔16aを有する。   The door frame 72 has a mounting hole 72a for attaching the front door 70 to the outer wall. The outer wall 15 is provided with an outer wall bracket 16 provided at the edge of the outer wall 15. The outer wall bracket 16 has a mounting hole 16 a for attaching the front door 70 to the outer wall 15.

そして、ボルト等の締結部材45が、ドア枠72の取付孔72aと、外壁ブラケット16の取付孔16aと、に挿入され、ナット等に締結されることで、玄関ドア70が外壁15に取り付けられ、切欠部29に設置される。   The entrance door 70 is attached to the outer wall 15 by inserting the fastening member 45 such as a bolt into the attachment hole 72a of the door frame 72 and the attachment hole 16a of the outer wall bracket 16 and fastening to a nut or the like. , Installed in the notch 29.

[ユニット建物の組立の手順]
次に、ユニット建物の組立の手順を説明する。図7は、実施例1の玄関ユニットの設置・固定工程を説明する説明図である。図8は、実施例1の玄関ユニットの設置・固定工程を説明する説明図である。図9は、実施例1の玄関ユニットの仮梁脱離工程を説明する説明図である。以下、図2〜図9に基づいて、実施例1のユニット建物の組立手順を説明する。
[Step of assembling unit building]
Next, the procedure for assembling the unit building will be described. FIG. 7 is an explanatory view for explaining the installation and fixing process of the entrance unit of the first embodiment. FIG. 8 is an explanatory view for explaining the installation and fixing process of the entrance unit of the first embodiment. FIG. 9 is an explanatory view for explaining the temporary beam detachment step of the entrance unit of the first embodiment. Hereafter, the assembly procedure of the unit building of Example 1 is demonstrated based on FIGS. 2-9.

ユニット建物1は、「切欠部設置工程」、「仮梁取付工程」、「ドア取付工程」、「設置・固定工程」、「仮梁脱離工程」を経て行われる。   The unit building 1 is performed through the “notch installation process”, the “temporary beam installation process”, the “door installation process”, the “installation / fixing process”, and the “temporary beam detachment process”.

(切欠部設置工程)
切欠部設置工程は、図2に示すように、工場で玄関ユニット20が製造される工程で、第2床大梁23と第3床大梁24を玄関ユニット20の骨組体として形成することで、第2床大梁23と第3床大梁24との間に切欠部29を設ける。
(Notch installation process)
In the notch installation step, as shown in FIG. 2, the second floor girder 23 and the third floor girder 24 are formed as a framework of the entrance unit 20 in the process of manufacturing the entrance unit 20 at the factory. A notch 29 is provided between the second floor girder 23 and the third floor girder 24.

(仮梁取付工程)
仮梁取付工程では、図3及び図4に示すように、工場で玄関ユニット20が製造される工程で、第1仮梁31及び第2仮梁35が玄関ユニット20に取り付けられる。
(Provisional beam attachment process)
In the temporary beam attachment process, as shown in FIGS. 3 and 4, the first temporary beam 31 and the second temporary beam 35 are attached to the front door unit 20 in the process of manufacturing the front door unit 20 at a factory.

(ドア取付工程)
ドア取付工程では、図5及び図6に示すように、工場で玄関ユニット20が製造される工程で、玄関ユニット20に取り付けられた外壁15の外壁ブラケット16に、玄関ドア70が取り付けられ、切欠部29に設置される。ドア取付工程後に、玄関ユニット20は、ユニット建物1の施工現場に搬送される。
(Door installation process)
In the door mounting process, as shown in FIGS. 5 and 6, in the process of manufacturing the entrance unit 20 at the factory, the entrance door 70 is attached to the outer wall bracket 16 of the outer wall 15 attached to the entrance unit 20. It is installed in the unit 29. After the door mounting process, the entrance unit 20 is transported to the construction site of the unit building 1.

(設置・固定工程)
設置・固定工程では、図7に示すように、施工現場で、玄関ユニット20が、例えばクレーン等により、基礎2の上に設置される。基礎2の上には、玄関ドア70を基礎2に固定するためのL字フレーム6が、アンカーボルト3によって固定されている。基礎2に囲まれた玄関部分には、玄関たたき(玄関土間)4が設けられている。基礎2の上に設置された玄関ユニット20は、基礎2に設けられたアンカーボルト3によって、基礎2に固定される。この際、図8に示すように、玄関ユニット20に取り付けられた玄関ドア70のドア枠72は、L字フレームにボルト等の締結部材45によって固定される。
(Installation and fixing process)
In the installation and fixing process, as shown in FIG. 7, at the construction site, the entrance unit 20 is installed on the foundation 2 by, for example, a crane or the like. On the base 2, an L-shaped frame 6 for fixing the front door 70 to the base 2 is fixed by an anchor bolt 3. At the entrance part surrounded by the foundation 2, a entrance tap 4 (entry hall) is provided. The entrance unit 20 installed on the base 2 is fixed to the base 2 by an anchor bolt 3 provided on the base 2. At this time, as shown in FIG. 8, the door frame 72 of the entrance door 70 attached to the entrance unit 20 is fixed to the L-shaped frame by a fastening member 45 such as a bolt.

(仮梁脱離工程)
仮梁脱離工程では、図9に示すように、施工現場で、第1仮梁31及び第2仮梁35が玄関ユニット20から取り外される。
(Provisional beam detachment process)
In the temporary beam detachment step, as shown in FIG. 9, the first temporary beam 31 and the second temporary beam 35 are removed from the entrance unit 20 at the construction site.

次に、作用を説明する。
実施例1の建物ユニット、ユニット建物及びユニット建物の構築方法における作用を説明する。
Next, the operation will be described.
The operation of the building unit, the unit building, and the method for constructing the unit building according to the first embodiment will be described.

[比較作用]
例えば、仮梁を使用しないで、玄関ドアを取り付けた玄関ユニットを、施工現場に搬送し、施工現場で所定の場所に据え付ける場合を比較例とする。
[Comparison effect]
For example, without using a temporary beam, the case where the entrance unit attached with the entrance door is transported to the construction site and installed at a predetermined place at the construction site is taken as a comparative example.

ところで、玄関ドアは、ドア本体がドア枠に対して開閉する。そのため、少しでもドア枠が変形すると、ドア本体の開閉動作に支障をきたす虞がある。   By the way, in the front door, the door body opens and closes with respect to the door frame. Therefore, if the door frame is deformed even a little, there is a possibility that the opening and closing operation of the door body may be disturbed.

比較例の場合、玄関ユニットを搬送したり、玄関ユニットを施工現場で所定の場所に据え付けたりする際に、玄関ユニットに外力が作用し、ドア枠が変形してしまう、という課題がある。   In the case of the comparative example, when transporting the entrance unit or installing the entrance unit at a predetermined place at a construction site, there is a problem that an external force acts on the entrance unit and the door frame is deformed.

これに対し、実施例1の建物ユニット(玄関ユニット20)又はユニット建物1は、複数の梁材(第1床大梁22,天井大梁25)と柱材(柱21)とによって骨組体が形成された建物ユニット(玄関ユニット20)であって、骨組体の梁材(第1床大梁22,天井大梁25)が配置される一辺の位置において、間隔をおいて配置される複数の短梁(第2床大梁23,第3床大梁24)と、短梁間に配置され、着脱可能な仮梁(第1仮梁31,第2仮梁35)と、を備え、仮梁(第1仮梁31,第2仮梁35)は、骨組体の内側に配置され、短梁間には、ドア(玄関ドア70)が配置される(図2)。   On the other hand, in the building unit of the first embodiment (entry unit 20) or unit building 1, a skeleton is formed by a plurality of beam members (the first floor girder 22, the ceiling girder 25) and columns (pillars 21). A plurality of short beams (the first floor unit beam 22 and the ceiling beam 25), which are arranged at a distance, A temporary beam (first temporary beam 31) comprising a second floor large beam 23, a third floor large beam 24), and temporary beams (first temporary beams 31, second temporary beams 35) disposed between the short beams and removable. , The second temporary beam 35) is disposed inside the framework, and the door (the entrance door 70) is disposed between the short beams (FIG. 2).

これにより、玄関ドア70を設けた状態で、仮梁を設けることができる。そのため、玄関ユニット20を搬送したり、玄関ユニット20を施工現場で所定の場所に据え付けたりする際に、玄関ユニット20に外力が作用しても、ドア枠72が変形してしまうことを防止する。   Thus, the temporary beam can be provided in the state where the entrance door 70 is provided. Therefore, when transporting the entrance unit 20 or installing the entrance unit 20 at a predetermined place at a construction site, the door frame 72 is prevented from being deformed even if an external force acts on the entrance unit 20. .

実施例1の建物ユニット(玄関ユニット20)又はユニット建物1は、仮梁は、第1仮梁31と、第2仮梁35と、で構成され、第1仮梁31は、短梁(第2床大梁23,第3床大梁24)の端部の側面間を接続し、第2仮梁35は、第1仮梁31に直交する方向に向けて設けられる(図2)。   In the building unit (entrance unit 20) or the unit building 1 according to the first embodiment, the temporary beam is composed of the first temporary beam 31 and the second temporary beam 35, and the first temporary beam 31 is a short beam (first The side surfaces of the end portions of the second floor girder 23 and the third floor girder 24 are connected, and the second temporary beam 35 is provided in the direction orthogonal to the first temporary beam 31 (FIG. 2).

これにより、玄関ドア70を設けた状態で、第1仮梁31及び第2仮梁35を設けることができる。そのため、玄関ユニット20を搬送したり、玄関ユニット20を施工現場で所定の場所に据え付けたりする際に、玄関ユニット20に外力が作用しても、ドア枠72が変形してしまうことを防止する。   Thereby, the first temporary beam 31 and the second temporary beam 35 can be provided in the state where the front door 70 is provided. Therefore, when transporting the entrance unit 20 or installing the entrance unit 20 at a predetermined place at a construction site, the door frame 72 is prevented from being deformed even if an external force acts on the entrance unit 20. .

例えば、2世帯住宅のように、ユニット建物に玄関を2つ設ける場合、ドア枠の変形を防止するために、各玄関ドアを別々の建物ユニットに取り付ける必要がある。そのため、玄関を設ける位置に制約ができてしまい、スペースを有効活用することができない、という課題がある。   For example, when providing two entrances in a unit building as in a two-family house, it is necessary to attach each entrance door to a separate building unit in order to prevent deformation of the door frame. Therefore, there is a problem that the position where the entrance is provided can be restricted, and the space can not be used effectively.

これに対し、実施例1の建物ユニット(玄関ユニット20)又はユニット建物1は、短梁(第2床大梁23,第3床大梁24)は、3本配置され、短梁間には、2つのドア(玄関ドア70)が配置される(図2)。   On the other hand, in the building unit (entry unit 20) or unit building 1 of the first embodiment, three short beams (second floor girder 23, third floor girder 24) are arranged, and two short beams are provided between the short beams. A door (front door 70) is arranged (FIG. 2).

これにより、2つの玄関ドア70を、1つの玄関ユニット20に設けた状態で、仮梁を設けることができる。そのため、ドア枠72の変形を防止して、1つ玄関ユニット20に2つの玄関ドア70を設置することができる。その結果、玄関の配置位置の制約を低減し、スペースを有効活用することができる。   Thereby, a temporary beam can be provided in the state which provided two entrance doors 70 in one entrance unit 20. As shown in FIG. Therefore, deformation of the door frame 72 can be prevented, and two entrance doors 70 can be installed in one entrance unit 20. As a result, restrictions on the placement of the entrance can be reduced, and space can be used effectively.

実施例1の建物ユニット(玄関ユニット20)又はユニット建物1は3本の短梁(第2床大梁23,第3床大梁24)のうち、中央の短梁(第3床大梁24)と、中央の短梁(第3床大梁24)と対峙する梁材(第1床大梁22)と、を支持する支持梁(第1床小梁26)を有する(図2)。   The building unit of the first embodiment (entry unit 20) or unit building 1 has a central short beam (third floor large beam 24) among three short beams (second floor large beam 23, third floor large beam 24), A support beam (first floor girder 26) for supporting a central short beam (third floor girder 24) and a beam (first floor girder 22) facing each other (FIG. 2).

これにより、玄関たたき4を阻害することなく、梁材(第1床大梁22,第3床大梁24)を支持する支持梁(第1床小梁26)を設けることができる。そのため、玄関たたき4を阻害することなく玄関ユニット20の剛性を高めることができる。   Thereby, the support beam (the first floor girder 26) for supporting the beam (the first floor girder 22, the third floor girder 24) can be provided without blocking the door tap 4. Therefore, the rigidity of the entrance unit 20 can be enhanced without blocking the entrance tap 4.

実施例1のユニット建物1の構築方法は、複数の梁材(第1床大梁22,天井大梁25)と柱材(柱21)とによって骨組体が形成された建物ユニット(玄関ユニット20)を備えるユニット建物1の構築方法であって、梁材(第1床大梁22,天井大梁25)に切欠部29を設ける切欠部設置工程と、切欠部29を補強する仮梁(第1仮梁31,第2仮梁35)を骨組体の内側に取り付ける仮梁取付工程と、切欠部29にドア(玄関ドア70)を取り付けるドア取付工程と、建物ユニット(玄関ユニット20)を所定の位置に設置して固定する設置・固定工程と、仮梁(第1仮梁31,第2仮梁35)を建物ユニット(玄関ユニット20)から脱離する仮梁脱離工程と、を含む(図2〜図9)。   The construction method of the unit building 1 according to the first embodiment includes a building unit (entry unit 20) in which a frame body is formed by a plurality of beams (the first floor girder 22, the ceiling girder 25) and columns (pillars 21). It is a construction method of the unit building 1 which is provided, and it is a notch part installation process which provides notch part 29 in beam material (the 1st floor girder 22, ceiling girder 25), and temporary beam (the 1st temporary girder 31) , The second temporary beam 35) attached to the inside of the framework, the door attachment process for attaching the door (the entrance door 70) to the notch 29, and the building unit (the entrance unit 20) at a predetermined position Installation / fixing step of fixing and fixing, and a temporary beam separating step of separating the temporary beam (the first temporary beam 31, the second temporary beam 35) from the building unit (the entrance unit 20) (FIGS. Figure 9).

これにより、玄関ドア70を設けた状態で、仮梁を設けることができる。そのため、玄関ユニット20を搬送したり、玄関ユニット20を施工現場で所定の場所に据え付けたりする際に、玄関ユニット20に外力が作用しても、ドア枠72が変形してしまうことを防止する。   Thus, the temporary beam can be provided in the state where the entrance door 70 is provided. Therefore, when transporting the entrance unit 20 or installing the entrance unit 20 at a predetermined place at a construction site, the door frame 72 is prevented from being deformed even if an external force acts on the entrance unit 20. .

以上、本開示の収容容器用架台を実施例1に基づき説明してきた。しかし、具体的な構成については、この実施例に限られるものではなく、特許請求の範囲の各請求項に係る発明の要旨を逸脱しない限り、設計の変更や追加等は許容される。   In the above, the storage container gantry of the present disclosure has been described based on the first embodiment. However, the specific configuration is not limited to this embodiment, and changes and additions in design are permitted without departing from the scope of the invention as claimed in the claims.

実施例1では、1つの玄関ユニット20に2つの玄関ドア70を設ける例を示した。しかし、1つの玄関ユニットに、1つの玄関ドアを設けても良い。   In Example 1, the example which provides two entrance doors 70 in one entrance unit 20 was shown. However, one front door unit may be provided with one front door.

実施例1では、仮梁取付工程の後に、ドア取付工程を実施する例を示した。しかし、ドア取付工程の後に、仮梁取付工程を実施しても良い。   In Example 1, the example which implements a door attachment process was shown after the temporary beam attachment process. However, the temporary beam attachment step may be performed after the door attachment step.

実施例1では、仮梁が玄関ドア70を直接固定しない例を示した。しかし、ボルト等の締結部材によって、仮梁を玄関ドアに着脱可能に直接固定しても良い。   In the first embodiment, the temporary beam does not directly fix the front door 70. However, the temporary beam may be directly and removably fixed to the entrance door by a fastening member such as a bolt.

実施例1では、1つの第1仮梁31に対して、2本の第2仮梁35を設ける例を示した。しかし、1つの第1仮梁対して、1本の第2仮梁を設けても良いし、3本以上の第2仮梁を設けても良い。   In the first embodiment, an example in which two second temporary beams 35 are provided for one first temporary beam 31 is shown. However, one second temporary beam may be provided for one first temporary beam, or three or more second temporary beams may be provided.

実施例1では、第1仮梁31及び第2仮梁35を補強する補強材を設けていない例を示した。しかし、第1仮梁又は第2仮梁は、第1仮梁又は第2仮梁を補強する補強材を設けても良い。   In Example 1, the example which has not provided the reinforcing material which reinforces the 1st temporary beam 31 and the 2nd temporary beam 35 was shown. However, the first temporary beam or the second temporary beam may be provided with a reinforcing material for reinforcing the first temporary beam or the second temporary beam.

実施例1では、建物ユニット、ユニット建物及びユニット建物の構築方法を2世帯住宅に適用する例をしめした。しかし、建物ユニット、ユニット建物及びユニット建物の構築方法としては、1世帯住宅や集合住宅に適用しても良い。   In Example 1, the building unit, the unit building, and the method of constructing the unit building are applied to a two-family house. However, as a construction method of a building unit, a unit building, and a unit building, you may apply to a one-family house and an apartment house.

1 ユニット建物
10 建物ユニット
20 玄関ユニット(建物ユニットの一例)
21 柱(柱材)
22 第1床大梁(梁材の一例)
23 第2床大梁(短梁の一例)
24 第3床大梁(短梁の一例)
25 天井大梁(梁材の一例)
26 第1床小梁(支持梁の一例)
29 切欠部
31 第1仮梁(仮梁の一例)
32 第2仮梁(仮梁の一例)
70 玄関ドア(ドアの一例)
1 unit building 10 building unit 20 entrance unit (example of building unit)
21 pillar (pillar)
22 1st floor girder (an example of beam material)
23 Second floor girder (an example of short beam)
24 3rd floor girder (an example of short beam)
25 ceiling girder (example of beam material)
26 1st floor beam (example of support beam)
29 notch 31 first temporary beam (example of temporary beam)
32 Second temporary beam (example of temporary beam)
70 front door (example of door)

Claims (6)

複数の梁材と柱材とによって骨組体が形成された建物ユニットであって、
前記骨組体の前記梁材が配置される一辺の位置において、間隔をおいて配置される複数の短梁と、
前記短梁間に配置され、着脱可能な仮梁と、を備え、
前記仮梁は、前記骨組体の内側に配置され、
前記短梁間には、ドアが配置される
ことを特徴とする建物ユニット。
A building unit in which a frame body is formed by a plurality of beams and columns,
A plurality of short beams arranged at intervals at the position of one side where the beam of the framework is arranged;
The temporary beam disposed between the short beams and removable;
The temporary beam is disposed inside the skeleton,
A building unit characterized in that a door is disposed between the short beams.
前記仮梁は、第1仮梁と、第2仮梁と、で構成され、
前記第1仮梁は、前記短梁の端部の側面間を接続し、
前記第2仮梁は、前記第1仮梁に直交する方向に向けて設けられる
ことを特徴とする、請求項1に記載の建物ユニット。
The temporary beam is composed of a first temporary beam and a second temporary beam,
The first temporary beam connects between the side surfaces of the end portion of the short beam,
The building unit according to claim 1, wherein the second temporary beam is provided in a direction orthogonal to the first temporary beam.
前記短梁は、3本配置され、
前記短梁間には、2つの前記ドアが配置される
ことを特徴とする、請求項1又は2に記載の建物ユニット。
Three short beams are arranged,
The building unit according to claim 1, wherein two the doors are disposed between the short cross beams.
3本の前記短梁のうち、中央の短梁と、該中央の短梁と対峙する前記梁材と、を支持する支持梁を有する
ことを特徴とする請求項3に記載の建物ユニット。
The building unit according to claim 3, further comprising a support beam for supporting the central short beam and the beam facing the central short beam among the three short beams.
請求項1〜4の何れか一項に記載の建物ユニットを備えるユニット建物。   A unit building provided with the building unit according to any one of claims 1 to 4. 複数の梁材と柱材とによって骨組体が形成された建物ユニットを備えるユニット建物の構築方法であって、
前記梁材に切欠部を設ける切欠部設置工程と、
前記切欠部を補強する仮梁を前記骨組体の内側に取り付ける仮梁取付工程と、
前記切欠部にドアを取り付けるドア取付工程と、
前記建物ユニットを所定の位置に設置して固定する設置・固定工程と、
前記仮梁を前記建物ユニットから脱離する仮梁脱離工程と、を含む
ことを特徴とするユニット建物の構築方法。
A method of constructing a unit building comprising a building unit in which a frame body is formed by a plurality of beams and columns.
A notch setting step of providing a notch in the beam;
Attaching a temporary beam for reinforcing the notched portion to the inside of the frame body;
A door mounting step of mounting a door in the cutout portion;
An installation / fixing step of installing and fixing the building unit at a predetermined position;
And a temporary beam detachment step of detaching the temporary beam from the building unit.
JP2017190519A 2017-09-29 2017-09-29 Building unit, unit building and method of construction of unit building Pending JP2019065524A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017190519A JP2019065524A (en) 2017-09-29 2017-09-29 Building unit, unit building and method of construction of unit building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017190519A JP2019065524A (en) 2017-09-29 2017-09-29 Building unit, unit building and method of construction of unit building

Publications (1)

Publication Number Publication Date
JP2019065524A true JP2019065524A (en) 2019-04-25

Family

ID=66340293

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017190519A Pending JP2019065524A (en) 2017-09-29 2017-09-29 Building unit, unit building and method of construction of unit building

Country Status (1)

Country Link
JP (1) JP2019065524A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5913501U (en) * 1982-07-19 1984-01-27 積水化学工業株式会社 housing unit
JPS60119836A (en) * 1983-12-02 1985-06-27 積水化学工業株式会社 Hanging structure of building unit
JPH04202933A (en) * 1990-11-29 1992-07-23 Sekisui Chem Co Ltd Temporary reinforcing girder for building unit
JPH04306336A (en) * 1991-04-04 1992-10-29 Sekisui Chem Co Ltd Temporary reinforcing structure for building unit
US6299008B1 (en) * 1999-09-28 2001-10-09 Boh Environmental, Llc Transport and storage system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5913501U (en) * 1982-07-19 1984-01-27 積水化学工業株式会社 housing unit
JPS60119836A (en) * 1983-12-02 1985-06-27 積水化学工業株式会社 Hanging structure of building unit
JPH04202933A (en) * 1990-11-29 1992-07-23 Sekisui Chem Co Ltd Temporary reinforcing girder for building unit
JPH04306336A (en) * 1991-04-04 1992-10-29 Sekisui Chem Co Ltd Temporary reinforcing structure for building unit
US6299008B1 (en) * 1999-09-28 2001-10-09 Boh Environmental, Llc Transport and storage system

Similar Documents

Publication Publication Date Title
JP4400833B2 (en) Seismic reinforcement method and reinforcement piece
JP2008002091A5 (en)
JP2019065524A (en) Building unit, unit building and method of construction of unit building
JP2013057242A (en) Unit building
JP4427601B1 (en) Suspended sound barrier construction
JP4163329B2 (en) Building units and unit buildings
JP5439084B2 (en) Fixing structure of bay window and its construction method
JP7128084B2 (en) roof unit
JP5149128B2 (en) Sash frame mounting method
KR102238507B1 (en) Modular building that can be fastened indoors
JP4691202B1 (en) Building reinforcement structure
JP6715514B2 (en) Building unit
JP7013014B2 (en) Booth foundation structure
JP2007009694A (en) Unit building
JP6697763B2 (en) Building unit manufacturing method
JP2001055806A (en) Floor panel
JP2892167B2 (en) Entrance unit
JP3810869B2 (en) Entrance fence unit and its mounting method
JP2024056572A (en) Small unit and method of transporting small unit
JP2021075930A (en) Balcony fixing structure
JP2002357005A (en) Rebuilding method for building
JP3802715B2 (en) Mounting structure of reinforced temporary material in room box
JP2001040771A (en) Box type building construction method
JP2006266050A (en) Turnable panel installation method for wooden building (for structural and non-structural panels)
JPH0813618A (en) Unit building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200615

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210427

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210511

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20211102