JP2018135669A - Steel beam lateral reinforcement rigid structure and method of connecting beam slab of building - Google Patents

Steel beam lateral reinforcement rigid structure and method of connecting beam slab of building Download PDF

Info

Publication number
JP2018135669A
JP2018135669A JP2017030171A JP2017030171A JP2018135669A JP 2018135669 A JP2018135669 A JP 2018135669A JP 2017030171 A JP2017030171 A JP 2017030171A JP 2017030171 A JP2017030171 A JP 2017030171A JP 2018135669 A JP2018135669 A JP 2018135669A
Authority
JP
Japan
Prior art keywords
steel beam
slab
steel
lateral stiffening
lateral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017030171A
Other languages
Japanese (ja)
Other versions
JP6749265B2 (en
Inventor
輝久 甲田
Teruhisa Koda
輝久 甲田
研三 森岡
Kenzo Morioka
研三 森岡
知己 小林
Tomoki Kobayashi
知己 小林
浩之 原田
Hiroyuki Harada
浩之 原田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Mitsui Construction Co Ltd
Original Assignee
Sumitomo Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Mitsui Construction Co Ltd filed Critical Sumitomo Mitsui Construction Co Ltd
Priority to JP2017030171A priority Critical patent/JP6749265B2/en
Publication of JP2018135669A publication Critical patent/JP2018135669A/en
Application granted granted Critical
Publication of JP6749265B2 publication Critical patent/JP6749265B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a lateral reinforcement rigid structure of a steel beam easy-to-work and capable of preventing an increase in steel frame amount or processing labor for steel beam.SOLUTION: The lateral reinforcement rigid structure includes a first lateral reinforcement steel member 20 which is disposed at a portion of a steel beam 3 in an axial direction and fixed to a slab 4. The first lateral reinforcement steel member 20 includes right and left side reinforcement steel parts 21, 21. The right and left side reinforcement steel parts 21, 21 include: right and left attached plate members 22, 22 extending parallel to each other in the axial direction and a vertical direction of the steel beam 3, interposing an upper flange 11 therebetween from right and left, and being fixed to a lower flange 12; right and left overhang plate members 23, 23 extending in the axial direction and a horizontal direction of the steel beam 3 while extending outward from upper ends of the right and left attached plate members 22, 22; and a fixed member (25) extending from the upper plane of the overhang plate member 23 and fixed to the slab 4.SELECTED DRAWING: Figure 2

Description

本開示は、鉄骨梁の横補剛構造、及び建物の鉄骨梁の横剛性を補完するための梁スラブ結合方法に関する。   The present disclosure relates to a lateral stiffening structure for a steel beam and a beam slab coupling method for complementing the lateral stiffness of a steel beam in a building.

国交省監修の「2015年度建築物の構造関係技術基準解説書」(以下、技術基準解説書と呼ぶ)では、鉄骨造の大梁に対して保有耐力横補剛の必要性が示されている。保有耐力横補剛とは、梁材の両端が全塑性状態に至った後、十分な回転能力を発揮する材の両端部はもちろん、それ以外の弾塑性領域の部分においても横座屈を生じないような剛性を補完することをいう。   The “2015 Technical Report on Structural Standards for Buildings” (hereinafter referred to as “Technical Standards Manual”), supervised by the Ministry of Land, Infrastructure, Transport and Tourism, shows the necessity of retained lateral strength for steel beams. Holding strength lateral stiffening means that after both ends of the beam material have reached a fully plastic state, not only the both end portions of the material that exhibit sufficient rotational capacity, but also other elastic-plastic region portions do not cause lateral buckling. Complementing such rigidity.

鉄骨梁とその上方の鉄筋コンクリート製のスラブとは、通常、頭付きスタッドにより緊結される。スタッドは鉄骨梁の上フランジの上面に溶接され、スラブから伝わる水平力はスタッドを介して鉄骨梁に伝達される。鉄骨梁が強軸回りに曲げを受け、圧縮側が面外へはらみだす現象が横座屈である。技術基準解説書では、横座屈を抑制する方法として、小梁や方杖による補剛方法が奨励されている。   The steel beam and the slab made of reinforced concrete above the steel beam are usually fastened by a headed stud. The stud is welded to the upper surface of the upper flange of the steel beam, and the horizontal force transmitted from the slab is transmitted to the steel beam through the stud. Lateral buckling is a phenomenon in which the steel beam is bent around the strong axis and the compression side protrudes out of the plane. In the technical standard manual, stiffening methods using a small beam or a cane are encouraged as a method of suppressing lateral buckling.

これを受ける形で様々な発明が提案されている。例えば、特許文献1では、小梁や座屈止め鋼材を設けずに、鉄骨大梁自体にスチフナ(補強プレート)を取り付ける構造が提案されている。特許文献2では、鉄骨梁に所定間隔で取り付ける左右の補強プレートの少なくとも一方を、上フランジを避けて上フランジの上面よりも上方に突出させ、床スラブの補強鉄筋に定着させることで横座屈を防止する構造が提案されている。特許文献3では、鉄骨梁に横座屈を防止する横座屈補剛材を取り付けずに、鉄骨梁に設けられた鉄筋コンクリートスラブが、鉄骨梁の横移動を拘束するのに必要とされる本数以上のスタッドによりフランジと接合され、鉄骨梁の回転変形を拘束する捩り剛性を備える構造が提案されている。   In response to this, various inventions have been proposed. For example, Patent Document 1 proposes a structure in which a stiffener (reinforcing plate) is attached to a steel frame beam itself without providing a small beam or a buckling prevention steel material. In Patent Document 2, at least one of the left and right reinforcing plates attached to the steel beam at a predetermined interval protrudes upward from the upper surface of the upper flange while avoiding the upper flange, and is fixed to the reinforcing bar of the floor slab, thereby causing lateral buckling. Preventing structures have been proposed. In Patent Document 3, a reinforced concrete slab provided on a steel beam without attaching a lateral buckling stiffener to prevent lateral buckling to the steel beam exceeds the number required for restraining the lateral movement of the steel beam. A structure having a torsional rigidity that is joined to a flange by a stud and restricts rotational deformation of a steel beam has been proposed.

特開平9−256459号公報Japanese Patent Laid-Open No. 9-256659 特開2004−218321号公報JP 2004-218321 A 特開2012−12788号公報JP 2012-12788 A

しかしながら、特許文献1の構造では、鉄骨大梁がスラブに接合されておらず、スチフナが取り付けられた鉄骨大梁の剛性自体で横座屈を防止しなければならないため、鉄骨大梁の断面寸法が大きくなる。特許文献2の構造では、鉄骨梁が補強プレートによって床スラブに接合され、鉄骨梁の横座屈が床スラブによっても抑制されるが、補強プレートの加工手間や取付手間(床スラブの補強鉄筋の組立手間)が増えるため、コストが増大する。特許文献3の構造では、鉄骨量は増加しないが、スタッドの本数が多くなるため、スタッドが取り付けられた鉄骨梁の加工手間が増える。   However, in the structure of Patent Document 1, the steel large beam is not joined to the slab, and lateral buckling must be prevented by the rigidity of the steel large beam to which the stiffener is attached, so that the cross-sectional dimension of the steel large beam is increased. In the structure of Patent Document 2, the steel beam is joined to the floor slab by the reinforcing plate, and the lateral buckling of the steel beam is also suppressed by the floor slab. Cost) increases. In the structure of Patent Document 3, the amount of steel frame does not increase, but the number of studs increases, so that the labor of processing the steel beam to which the studs are attached increases.

また、特許文献1〜3の構造は、建物を新築する際に採用することはできるが、既設建物の鉄骨梁の横剛性を補完する改修工事に採用することは難しい。即ち、特許文献1の構造では、鉄骨大梁の全体を交換する必要が生じる。特許文献2の構造では、下面側から床スラブを斫って、補強プレートを補強鉄筋に定着させる必要がある上、補強プレートを既存の鉄骨梁に接合するための溶接作業が必要になり、防火上好ましくない。特許文献3の構造では、スタッドを設けるために、鉄骨梁の上面の略全面にわたってスラブを撤去して再構築しなければならない。   Moreover, although the structure of patent documents 1-3 can be employ | adopted when building a new building, it is difficult to employ | adopt for the repair construction which complements the lateral rigidity of the steel beam of an existing building. That is, in the structure of Patent Document 1, it is necessary to replace the entire steel beam. In the structure of Patent Document 2, it is necessary to wind the floor slab from the lower surface side and fix the reinforcing plate to the reinforcing steel bar, and further, welding work for joining the reinforcing plate to the existing steel beam is required. Not preferable. In the structure of Patent Document 3, in order to provide the stud, the slab must be removed and reconstructed over substantially the entire upper surface of the steel beam.

本発明は、このような背景に鑑み、鉄骨量の増大及び鉄骨梁の加工手間の増大を抑制でき、且つ施工が容易な鉄骨梁の横補剛構造を提供することを第1の課題とする。また、本発明は、既設建物にも適用可能な鉄骨梁の横剛性を補完するための梁スラブ結合方法を提供することを第2の課題とする。   In view of such a background, it is a first object of the present invention to provide a transverse stiffening structure for a steel beam that can suppress an increase in the amount of steel and an increase in labor for processing the steel beam and that is easy to construct. . Moreover, this invention makes it the 2nd subject to provide the beam slab coupling | bonding method for complementing the lateral rigidity of the steel beam applicable also to an existing building.

上記第1の課題を解決するために、本発明に係る鉄骨梁(3)の横補剛構造のある態様は、上フランジ(11)、下フランジ(12)、及び前記上フランジと前記下フランジとを連結するウェブ(13)を有し、両端が1対の柱(2、2)に接合された鉄骨梁(3)と、前記鉄骨梁の上に構築されたスラブ(4)と、前記鉄骨梁の軸方向の一部に設けられ、前記スラブに固定される横補剛部材(20、40、50、60)とを備え、前記横補剛部材が、前記上フランジ及び前記下フランジのそれぞれの左右の側面に沿って設けられた左右の側部補剛部(21・21)を含み、左右の前記側部補剛部が、前記鉄骨梁の軸方向及び鉛直方向に互いに平行に延在し、前記上フランジを左右から挟むと共に前記下フランジに固定される左右の添板部(22・22)と、前記鉄骨梁の軸方向及び水平方向に延在し、左右の前記添板部の上端部から外方へ張り出す左右の外張出板部(23・23)と、各外張出板部の上面から延出し、前記スラブに固定される固定部材(25、55)とを含むことを特徴とする。   In order to solve the first problem, the aspect of the lateral stiffening structure of the steel beam (3) according to the present invention includes an upper flange (11), a lower flange (12), and the upper flange and the lower flange. A steel beam (3) having both ends joined to a pair of columns (2, 2), a slab (4) constructed on the steel beam, A lateral stiffening member (20, 40, 50, 60) provided on a part of the steel beam in the axial direction and fixed to the slab, wherein the lateral stiffening member includes the upper flange and the lower flange. Including left and right side stiffening portions (21, 21) provided along the respective left and right side surfaces, the left and right side stiffening portions extend in parallel to each other in the axial direction and the vertical direction of the steel beam. Left and right accessory plate parts that sandwich the upper flange from the left and right and are fixed to the lower flange ( 2 and 22), and left and right outer projecting plate portions (23 and 23) extending in the axial direction and the horizontal direction of the steel beam and projecting outward from the upper end portions of the left and right accessory plates, It includes a fixing member (25, 55) that extends from the upper surface of the overhang plate portion and is fixed to the slab.

この構成によれば、固定部材及び左右の外張出板部を介してスラブに固定された両添板部により、上フランジは左右から挟まれることでスラブに一体化され、下フランジは固定されることでスラブに一体化される。これにより鉄骨梁の横剛性が補完される。また、横補剛部材は鉄骨梁の軸方向の一部だけに設けられるため、鉄骨量の増大が抑制され、鉄骨梁の加工手間の増大も抑制される。また、固定部材をスラブに固定すればよいため、容易な施工も可能である。   According to this configuration, the upper flange is integrated with the slab by being sandwiched from the left and right by the fixing plate and the both slabs fixed to the slab via the left and right outer projecting plates, and the lower flange is fixed. Is integrated into the slab. This complements the lateral stiffness of the steel beam. Further, since the lateral stiffening member is provided only in a part of the steel beam in the axial direction, an increase in the amount of the steel frame is suppressed, and an increase in the labor of processing the steel beam is also suppressed. Moreover, since it is only necessary to fix the fixing member to the slab, easy construction is also possible.

また、上記構成において、左右の前記側部補剛部(21・21)が、前記鉄骨梁(3)の軸線方向に直交して延在し、左右の前記添板部(22・22)と左右の前記外張出板部(23・23)との対応するもの同士に溶接された少なくとも1対の左右のスチフナ(26・26)を更に含むとよい。   In the above configuration, the left and right side stiffening portions (21, 21) extend perpendicular to the axial direction of the steel beam (3), and the left and right auxiliary plate portions (22, 22) It is preferable to further include at least one pair of left and right stiffeners (26, 26) welded to corresponding ones of the left and right outer projecting plate portions (23, 23).

この構成によれば、添板部が補強され、添板部の外張出板部に対する倒れが抑制されるため、下フランジの倒れが効果的に抑制される。   According to this configuration, the accessory plate portion is reinforced and the fall of the accessory plate portion with respect to the overhanging plate portion is suppressed, so that the lower flange is effectively prevented from falling.

また、上記構成において、左右の前記添板部(22・22)の上端が、前記上フランジ(11)の対応する左右の側端に溶接されているとよい。   Moreover, the said structure WHEREIN: The upper end of the said right and left said board part (22 * 22) is good to be welded to the right and left side edge to which the said upper flange (11) respond | corresponds.

この構成によれば、添板部と上フランジとが一体化されることで、鉄骨梁及び左右の添板部が箱形断面形状をなすため、鉄骨梁が効果的に横補剛される。   According to this configuration, the steel plate beam and the left and right accessory plate portions have a box-shaped cross-sectional shape by integrating the accessory plate portion and the upper flange, so that the steel beam is effectively laterally stiffened.

また、上記構成において、左右の前記添板部(22・22)の下端が、前記下フランジ(12)の対応する左右の側端に溶接されているとよい。   Moreover, the said structure WHEREIN: The lower end of the said left and right said board part (22 * 22) is good to be welded to the corresponding left and right side edge of the said lower flange (12).

この構成によれば、鉄骨量の増大を抑制しながら添板部を下フランジに固定できる。   According to this configuration, the accessory plate portion can be fixed to the lower flange while suppressing an increase in the amount of steel frame.

また、上記構成において、前記横補剛部材(40、50、60)が、左右の前記添板部(22・22)の下端から内方へ張り出し、ボルト・ナット(42)によって前記下フランジ(12)に締結された内張出板部(41、61)を更に含み、左右の前記添板部が前記内張出板部を介して前記下フランジに固定されているとよい。   In the above configuration, the lateral stiffening member (40, 50, 60) protrudes inward from the lower ends of the left and right accessory plates (22, 22), and the lower flange (42) is formed by bolts and nuts (42). 12) It is good to further include a lining plate portion (41, 61) fastened to 12), and the left and right auxiliary plate portions are fixed to the lower flange via the lining plate portion.

この構成によれば、溶接を行うことなく添板部を下フランジに固定できる。そのため、スラブが既に構築された鉄骨梁に対して横補剛部材を固定する際に防火上の問題が生じない。   According to this configuration, the accessory plate portion can be fixed to the lower flange without welding. Therefore, there is no fire prevention problem when fixing the lateral stiffening member to the steel beam on which the slab has already been constructed.

また、上記構成において、前記固定部材が、前記外張出板部(23)の上面に植設され、前記スラブに埋設された頭付きスタッド(25)であるとよい。   Moreover, the said structure WHEREIN: It is good for the said fixing member to be the stud with a head (25) implanted by the upper surface of the said overhang | projection board part (23) and embed | buried under the said slab.

この構成によれば、固定部材の外張出板部への固定が容易である。   According to this configuration, the fixing member can be easily fixed to the overhanging plate portion.

また、上記構成において、前記固定部材が、前記外張出板部(23)を貫通するように設けられ、前記スラブ(4)に固定されたアンカーボルト(55)であるとよい。   Moreover, the said structure WHEREIN: It is good for the said fixing member to be the anchor bolt (55) provided so that the said overhang | projection board part (23) might be penetrated and fixed to the said slab (4).

この構成によれば、既設のスラブに対し横補剛部材を容易に固定できる。   According to this configuration, the lateral stiffening member can be easily fixed to the existing slab.

また、上記構成において、前記鉄骨梁(3)が、軸方向の両端部に配置される1対の端部鉄骨(3A・3A)、軸方向の中間部に配置される中間鉄骨(3B)、及び各端部鉄骨と前記中間鉄骨とを連結する複数のスプライスプレート(31)とを有し、前記横補剛部材(30、70)が、複数の前記スプライスプレートのうち、前記上フランジ(11)に接合され、前記上フランジよりも左右に延出する延出部(34・34、74・74)を有する第1スプライスプレート(31A、71A)と、前記延出部の上面に植設され、前記スラブに埋設された複数の頭付きスタッド(35)とを更に含むとよい。   In the above configuration, the steel beam (3) includes a pair of end steel frames (3A, 3A) disposed at both axial end portions, an intermediate steel frame (3B) disposed at the axial intermediate portion, And a plurality of splice plates (31) for connecting each end steel frame and the intermediate steel frame, wherein the lateral stiffening member (30, 70) is the upper flange (11) of the plurality of splice plates. ) And a first splice plate (31A, 71A) having extending portions (34, 34, 74, 74) extending from the upper flange to the left and right, and being implanted on the upper surface of the extending portion. And a plurality of headed studs (35) embedded in the slab.

この構成によれば、第1スプライスプレートが頭付きスタッドによってスラブに固定されることにより、上フランジがスラブに一体化されるため、鉄骨梁の横剛性が一層堅固になる。また、横補剛部材に第1スプライスプレートが利用されることにより、鉄骨量の増大が抑制され、鉄骨梁や第1スプライスプレートの加工手間の増大も抑制される。また、取り付けに別途の作業を要しないため、施工も容易である。   According to this configuration, the first splice plate is fixed to the slab by the headed stud, whereby the upper flange is integrated with the slab, so that the lateral rigidity of the steel beam is further increased. In addition, by using the first splice plate for the lateral stiffening member, an increase in the amount of steel frame is suppressed, and an increase in labor for processing the steel beam and the first splice plate is also suppressed. In addition, installation is easy because no additional work is required for installation.

また、上記第1の課題を解決するために、本発明に係る鉄骨梁(3)の横補剛構造の他の態様は、上フランジ(11)、下フランジ(12)、及び前記上フランジと前記下フランジとを連結するウェブ(13)を有し、両端が1対の柱(2、2)に接合された鉄骨梁(3)と、前記鉄骨梁の上に構築されたスラブ(4)と、前記鉄骨梁の軸方向の一部に設けられ、前記スラブに固定される横補剛部材(30、70)とを備え、前記鉄骨梁が、軸方向の両端部に配置される1対の端部鉄骨(3A・3A)、軸方向の中間部に配置される中間鉄骨(3B)、及び各端部鉄骨と前記中間鉄骨とを連結する複数のスプライスプレート(31、71)とを有し、前記横補剛部材が、複数の前記スプライスプレートのうち、前記上フランジに接合され、前記上フランジよりも左右に延出する延出部(34・34、74・74)を有する第1スプライスプレート(31A、71A・71A)と、前記延出部の上面に植設され、前記スラブに埋設された複数の頭付きスタッド(35)とを含むことを特徴とする。   In order to solve the first problem, another aspect of the lateral stiffening structure of the steel beam (3) according to the present invention includes an upper flange (11), a lower flange (12), and the upper flange. A steel beam (3) having a web (13) connecting the lower flange and having both ends joined to a pair of columns (2, 2), and a slab (4) constructed on the steel beam And a horizontal stiffening member (30, 70) provided in a part of the steel beam in the axial direction and fixed to the slab, and the steel beam is disposed at both ends in the axial direction. End steel frames (3A, 3A), an intermediate steel frame (3B) disposed in the axially intermediate portion, and a plurality of splice plates (31, 71) for connecting the end steel frames to the intermediate steel frames. And the lateral stiffening member is joined to the upper flange of the plurality of splice plates, A first splice plate (31A, 71A, 71A) having extending portions (34, 34, 74, 74) extending left and right from the upper flange, and being implanted on the upper surface of the extending portion; A plurality of studs with heads (35) embedded therein.

この構成によれば、第1スプライスプレートが頭付きスタッドによってスラブに固定されることにより、上フランジがスラブに一体化され、これにより鉄骨梁の横剛性が補完される。また、第1スプライスプレートが利用されることにより、鉄骨量の増大が抑制され、鉄骨梁や第1スプライスプレートの加工手間の増大も抑制される。また、施工も容易である。   According to this configuration, the first splice plate is fixed to the slab by the headed stud, so that the upper flange is integrated with the slab, thereby supplementing the lateral rigidity of the steel beam. In addition, by using the first splice plate, an increase in the amount of steel frame is suppressed, and an increase in labor for processing the steel beam and the first splice plate is also suppressed. Construction is also easy.

上記第2の課題を解決するために、本発明に係る梁スラブ結合方法のある態様は、上フランジ(11)、下フランジ(12)、及び前記上フランジと前記下フランジとを連結するウェブ(13)を有し、両端が1対の柱(2、2)に接合された鉄骨梁(3)と、前記鉄骨梁の上に構築されたスラブ(4)とを有する建物(1)の梁スラブ結合方法であって、互いに平行に延在する左右の添板部(22、22)、左右の前記添板部の上端部から外方へ水平に張り出す左右の外張出板部(23、23)、及び、左右の前記添板部の下端から内方へ張り出す内張出板部(41、61)を有する横補剛部材(40、50、60)を用意するステップ(図7(C)、図9(C))と、前記横補剛部材を前記鉄骨梁に装着し、左右の前記添板部に前記上フランジ及び前記下フランジを左右から挟ませるステップ(図7(C)、図9(C))と、ボルト・ナット(42)によって前記内張出板部を前記下フランジに締結するステップ(図7(B)、(C)、図9(B)、(C))と、固定部材(25、55)によって左右の前記外張出板部を前記スラブに固定するステップ(図7(B)、(D)、図9(B)、(D))とを備えることを特徴とする。   In order to solve the second problem, an aspect of the beam slab coupling method according to the present invention includes an upper flange (11), a lower flange (12), and a web that connects the upper flange and the lower flange ( 13) A beam of a building (1) having a steel beam (3) having both ends joined to a pair of columns (2, 2) and a slab (4) constructed on the steel beam In this slab coupling method, left and right accessory plates (22, 22) extending in parallel with each other, and left and right extension plates (23) horizontally projecting outward from the upper ends of the left and right accessory plates , 23) and a step of preparing a lateral stiffening member (40, 50, 60) having an inwardly projecting plate portion (41, 61) projecting inward from the lower ends of the left and right accessory plate portions (FIG. 7). (C), FIG. 9 (C)) and the lateral stiffening member are attached to the steel beam, and the upper frame is attached to the left and right accessory plates. A step (FIG. 7C, FIG. 9C) for clamping the flange and the lower flange from the right and left, and a step of fastening the lining plate portion to the lower flange by a bolt and a nut (42) (FIG. 7). (B), (C), FIG. 9 (B), (C)) and the step of fixing the left and right outer projecting plate portions to the slab by the fixing members (25, 55) (FIG. 7 (B), (D) and FIG. 9 (B), (D)).

この構成によれば、鉄骨梁に下方から装着した横補剛部材を下フランジに固定すると共にスラブに固定することができ、これによりスラブが上に構築された鉄骨梁の横剛性を補完することができる。従って、既設建物にも適用可能である。   According to this configuration, the lateral stiffening member attached to the steel beam from below can be fixed to the lower flange and fixed to the slab, thereby complementing the lateral rigidity of the steel beam on which the slab is built. Can do. Therefore, it can be applied to existing buildings.

このように本発明によれば、鉄骨量の増大及び鉄骨梁の加工手間の増大を抑制でき、且つ施工が容易な鉄骨梁の横補剛構造、並びに、建物の鉄骨梁の横剛性を補完するための梁スラブ結合方法を提供することができる。   As described above, according to the present invention, it is possible to suppress an increase in the amount of steel frames and an increase in labor for processing the steel beams, and to complement the lateral stiffening structure of the steel beams that is easy to construct, and the lateral rigidity of the steel beams in the building. A beam slab coupling method can be provided.

第1実施形態に係る横補剛構造が適用された建物の概略平面図Schematic plan view of a building to which the lateral stiffening structure according to the first embodiment is applied 図1中のII−II断面図II-II sectional view in FIG. 図2中のIII−III断面図III-III sectional view in FIG. 図1中のIV−IV断面図IV-IV sectional view in Fig. 1 図4中のV−V断面図VV sectional view in FIG. 第2実施形態に係る横補剛構造の図2に対応する断面図Sectional drawing corresponding to FIG. 2 of the lateral stiffening structure which concerns on 2nd Embodiment 第2実施形態に係る横補剛構造を既設の建物に適用する場合の施工手順の説明図Explanatory drawing of the construction procedure in the case of applying the horizontal stiffening structure which concerns on 2nd Embodiment to the existing building 第3実施形態に係る横補剛構造の図2に対応する断面図Sectional drawing corresponding to FIG. 2 of the lateral stiffening structure which concerns on 3rd Embodiment 第3実施形態に係る横補剛構造を既設の建物に適用する場合の施工手順の説明図Explanatory drawing of the construction procedure in the case of applying the horizontal stiffening structure concerning 3rd Embodiment to the existing building 第4実施形態に係る横補剛構造の図2に対応する断面図Sectional drawing corresponding to FIG. 2 of the lateral stiffening structure which concerns on 4th Embodiment 第5実施形態に係る横補剛構造の図2に対応する断面図Sectional drawing corresponding to FIG. 2 of the lateral stiffening structure which concerns on 5th Embodiment

以下、図面を参照して、本発明の実施形態について詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

≪第1実施形態≫
まず、図1〜図5を参照して第1実施形態について説明する。図1は、本発明に係る横補剛構造が適用された建物1の概略平面図である。図1に示されるように、建物1は、平面視で互いに直交するX方向及びY方向に並べられた複数の柱2を有している。図示例では、建物1は、Y方向に柱2が2列に並べられ、X方向に柱2が4列以上に並べられた板状建物とされている。柱2は、鉄骨造であってもよく、鉄骨鉄筋コンクリート造であってもよい。X方向及びY方向に互いに隣接する各対の柱2、2間には、両端が1対の柱2、2に接合された鉄骨梁3が階層ごとに架け渡されている。柱2の間隔は、X方向に比べてY方向において長くなっており、Y方向に延在する鉄骨梁3はX方向に延在する鉄骨梁3よりも長くなっている。X軸方向に延在する2本の鉄骨梁3の間には、Y軸方向に延在して両端が1対の鉄骨梁3に接合された鉄骨からなる2本の小梁10が架け渡されている。
<< First Embodiment >>
First, a first embodiment will be described with reference to FIGS. FIG. 1 is a schematic plan view of a building 1 to which a lateral stiffening structure according to the present invention is applied. As shown in FIG. 1, the building 1 has a plurality of pillars 2 arranged in the X direction and the Y direction orthogonal to each other in plan view. In the illustrated example, the building 1 is a plate-like building in which pillars 2 are arranged in two rows in the Y direction and pillars 2 are arranged in four or more rows in the X direction. The column 2 may be a steel frame structure or a steel frame reinforced concrete structure. Between each pair of pillars 2 and 2 adjacent to each other in the X direction and the Y direction, steel beams 3 having both ends joined to the pair of pillars 2 and 2 are bridged for each layer. The interval between the columns 2 is longer in the Y direction than in the X direction, and the steel beam 3 extending in the Y direction is longer than the steel beam 3 extending in the X direction. Between the two steel beams 3 extending in the X-axis direction, two small beams 10 extending from the Y-axis direction and having both ends joined to the pair of steel beams 3 are bridged. Has been.

Y方向に延在する鉄骨梁3は、軸方向の両端部に配置される1対の端部鉄骨3A、3Aと、軸方向の中間部に配置され、両端部鉄骨3A、3Aの柱2と相反する側の端部に接合された中間鉄骨3Bとにより構成されている。両端部鉄骨3A、3Aは互いに同じ長さとされており、中間鉄骨3Bは、端部鉄骨3Aの8倍〜6倍程度の長さとされている。即ち、鉄骨梁3の両端部から軸方向長さの1/10〜1/8程度の位置に継手が設けられている。これら継手の位置には、鉄骨梁3の横座屈を防止するための第2横補剛部材30が設けられている。また、中間鉄骨3Bの両端部からその軸方向長さの1/8〜1/6の位置には、鉄骨梁3の横座屈を防止するための第1横補剛部材20が設けられている。即ち、第1横補剛部材20は、鉄骨梁3の両端部から軸方向長さの1/5〜1/4程度の位置に設けられている。   The steel beam 3 extending in the Y direction includes a pair of end steel frames 3A and 3A arranged at both end portions in the axial direction, and a column 2 of the both end steel frames 3A and 3A arranged in the middle portion in the axial direction. It is comprised by the intermediate steel frame 3B joined to the edge part of the opposite side. Both end steel frames 3A and 3A have the same length, and the intermediate steel frame 3B has a length of about 8 to 6 times the end steel frame 3A. That is, a joint is provided at a position about 1/10 to 1/8 of the axial length from both ends of the steel beam 3. At the positions of these joints, a second lateral stiffening member 30 for preventing lateral buckling of the steel beam 3 is provided. Moreover, the 1st horizontal stiffening member 20 for preventing the lateral buckling of the steel beam 3 is provided in the position of 1/8-1/6 of the axial direction length from the both ends of the intermediate steel frame 3B. . That is, the first lateral stiffening member 20 is provided at a position about 1/5 to 1/4 of the axial length from both ends of the steel beam 3.

なお、第1横補剛部材20は、2つの第1横補剛部材20の間にも例えば等間隔に設けられていてもよい。他の実施形態では、第1横補剛部材20が設けられず、第2横補剛部材30のみが鉄骨梁3の継手の位置に設けられていてもよい。また、他の実施形態では、鉄骨梁3が継手を有しない1本の鉄骨から構成されていてもよい。この場合には、鉄骨梁3の両端部から軸方向長さの1/10〜1/8程度の位置にも、第2横補剛部材30の代わりに第1横補剛部材20が設けられる。或いは、1対の第1横補剛部材20のみが鉄骨梁3の両端部から軸方向長さの1/10〜1/4程度の位置に設けられてもよい。   In addition, the 1st horizontal stiffening member 20 may be provided between the two 1st horizontal stiffening members 20, for example at equal intervals. In another embodiment, the first lateral stiffening member 20 may not be provided, and only the second lateral stiffening member 30 may be provided at the joint position of the steel beam 3. Moreover, in other embodiment, the steel beam 3 may be comprised from one steel frame which does not have a joint. In this case, the first lateral stiffening member 20 is provided in place of the second lateral stiffening member 30 at positions about 1/10 to 1/8 of the axial length from both ends of the steel beam 3. . Alternatively, only the pair of first lateral stiffening members 20 may be provided at positions about 1/10 to 1/4 of the axial length from both ends of the steel beam 3.

図2は、図1中のII−II断面図であり、図3は、図2に示される横補剛構造の側面を示す、図2中のIII−III断面図である。図2及び図3に示されるように、各階の鉄骨梁3の上には鉄筋コンクリート製のスラブ4が構築されている。スラブ4は、鉄筋コンクリート製であり、場所打ちのコンクリート5によって形成される。上記のように第1横補剛部材20のみが設けられる場合は、スラブ4はプレキャストコンクリート製の床版の配置により形成されてもよい。なお、図2では、コンクリート5にハッチングが付されているが、コンクリート5を透視した如く、断面に現れない部材も示されている。   2 is a cross-sectional view taken along the line II-II in FIG. 1, and FIG. 3 is a cross-sectional view taken along the line III-III in FIG. 2, showing a side surface of the lateral stiffening structure shown in FIG. As shown in FIGS. 2 and 3, a slab 4 made of reinforced concrete is constructed on the steel beam 3 on each floor. The slab 4 is made of reinforced concrete and is formed by cast-in-place concrete 5. When only the 1st horizontal stiffening member 20 is provided as mentioned above, the slab 4 may be formed by arrangement | positioning of the floor slab made from precast concrete. In FIG. 2, although the concrete 5 is hatched, members that do not appear in the cross section as seen through the concrete 5 are also shown.

本実施形態のスラブ4は、X方向に延在する複数の主筋6及びY方向に延在する複数の配力筋7からそれぞれなる下端筋8及び上端筋9を備えるダブル配筋とされている。他の実施形態では、スラブ4はシングル配筋とされてもよい。また、図示例のスラブ4は、撤去された図示外の型枠を用いて構築されており、コンクリート5が下面に露出しているが、デッキプレートを用いてコンクリート5を打設し、スラブ4がデッキプレートと一体に構築されてデッキプレートを含んでいてもよい。   The slab 4 of the present embodiment is a double reinforcing bar having a lower reinforcing bar 8 and an upper reinforcing bar 9 each consisting of a plurality of main reinforcing bars 6 extending in the X direction and a plurality of distributing bars 7 extending in the Y direction. . In other embodiments, the slab 4 may be a single bar arrangement. Moreover, although the slab 4 of the example of illustration is constructed | assembled using the removed formwork which is not shown in figure, the concrete 5 is exposed to the lower surface, the concrete 5 is cast using a deck plate, and the slab 4 May be constructed integrally with the deck plate and include the deck plate.

鉄骨梁3は、I形鋼から形成され、上フランジ11、下フランジ12、及び上フランジ11と下フランジ12とを連結するウェブ13を有している。鉄骨梁3の軸方向における所定の位置には、上フランジ11の上面から上方に延出するように植設された複数の頭付きスタッド15が、本実施形態では2列に設けられ、コンクリート5に埋設されてスラブ4に固定されている。また、鉄骨梁3の軸方向における所定の位置には、ウェブ13の左右の両側に対に設けられて上フランジ11と下フランジ12とウェブ13とを互いに連結するスチフナ16が設けられている。   The steel beam 3 is formed of I-shaped steel and has an upper flange 11, a lower flange 12, and a web 13 that connects the upper flange 11 and the lower flange 12. In a predetermined position in the axial direction of the steel beam 3, a plurality of studs with heads 15 planted so as to extend upward from the upper surface of the upper flange 11 are provided in two rows in the present embodiment, and the concrete 5 Embedded in and fixed to the slab 4. Further, stiffeners 16 are provided at predetermined positions in the axial direction of the steel beam 3 so as to be coupled to the upper flange 11, the lower flange 12, and the web 13 in pairs on the left and right sides of the web 13.

第1横補剛部材20は、鉄骨梁3の上フランジ11及び下フランジ12のそれぞれの左右の側面に沿って設けられた左右の側部補剛部21、21によって構成されている。左右の側部補剛部21、21は、鋼板を加工して形成されており、鉄骨梁3の軸方向及び鉛直方向に互いに平行に延在し、上フランジ11及び下フランジ12のそれぞれの左右の側面に沿って配置された左右の添板部22、22を有している。左右の添板部22、22は、上フランジ11及び下フランジ12を左右から挟むように配置され、溶接により上フランジ11及び下フランジ12に固定されている。各添板部22の上端は上フランジ11の上面に一致し、下端は下フランジ12の下面に一致している。これにより、鉄骨梁3は、上フランジ11、下フランジ12、及び左右の添板部22、22によって箱形断面形状とされている。   The first lateral stiffening member 20 includes left and right side stiffening portions 21 and 21 provided along the left and right side surfaces of the upper flange 11 and the lower flange 12 of the steel beam 3. The left and right side stiffening portions 21, 21 are formed by processing a steel plate, extend parallel to each other in the axial direction and the vertical direction of the steel beam 3, and the left and right sides of the upper flange 11 and the lower flange 12, respectively. The left and right accessory plate portions 22 and 22 are disposed along the side surfaces of the two. The left and right accessory plates 22 and 22 are arranged so as to sandwich the upper flange 11 and the lower flange 12 from the left and right, and are fixed to the upper flange 11 and the lower flange 12 by welding. The upper end of each accessory plate portion 22 coincides with the upper surface of the upper flange 11, and the lower end coincides with the lower surface of the lower flange 12. Thereby, the steel beam 3 is made into the box-shaped cross-sectional shape by the upper flange 11, the lower flange 12, and the left and right accessory plates 22,22.

各添板部22の上端部には、鉄骨梁3の軸方向及び水平方向に延在し、添板部22から外方へ張り出す外張出板部23が一体に形成されている。外張出板部23は、上面が上フランジ11の上面と同じ高さに位置するように配置されている。外張出板部23は、鉄骨梁3の軸方向において添板部22と同じ長さに形成されている。   At the upper end portion of each accessory plate portion 22, an externally extending plate portion 23 that extends in the axial direction and the horizontal direction of the steel beam 3 and projects outward from the accessory plate portion 22 is integrally formed. The outer projecting plate portion 23 is arranged so that the upper surface is positioned at the same height as the upper surface of the upper flange 11. The overhang plate portion 23 is formed to have the same length as the accessory plate portion 22 in the axial direction of the steel beam 3.

各外張出板部23の上面には、複数の頭付きスタッド25が植設されている。本実施形態では、各外張出板部23の上面に対し、鉄骨梁3の幅方向に2列、長手方向に2列、合計4つの頭付きスタッド25が上方へ延出するように設けられている。外張出板部23上にはスラブ4が構築されており、頭付きスタッド25はコンクリート5に埋設されることによってスラブ4に固定されている。   A plurality of studs with heads 25 are planted on the upper surface of each overhang plate portion 23. In the present embodiment, a total of four headed studs 25 are provided on the upper surface of each overhang plate portion 23 so as to extend upward in two rows in the width direction of the steel beam 3 and two rows in the longitudinal direction. ing. The slab 4 is constructed on the overhanging plate portion 23, and the headed stud 25 is fixed to the slab 4 by being embedded in the concrete 5.

左右の対応する外張出板部23及び添板部22には、鉄骨梁3の横剛性を補完すべく外張出板部23を補強する左右1対の横補剛スチフナ26、26が接合されている。各横補剛スチフナ26は、図3に示されるように、添板部22及び外張出板部23の長さ方向の中間に配置されて鉄骨梁3の軸線に直交して延在している。他の実施形態では、各外張出板部23について、頭付きスタッド25に対応する位置や、外張出板部23の長さ方向の両端部等に2箇所に2対の横補剛スチフナ26が設けられてもよい。   A pair of left and right lateral stiffening stiffeners 26 and 26 that reinforce the externally extending plate part 23 to complement the lateral rigidity of the steel beam 3 are joined to the corresponding externally extending plate part 23 and the accessory plate part 22 on the left and right sides. Has been. As shown in FIG. 3, each lateral stiffener stiffener 26 is arranged in the middle of the longitudinal direction of the splicing plate portion 22 and the overhanging plate portion 23 and extends perpendicular to the axis of the steel beam 3. Yes. In another embodiment, two pairs of lateral stiffening stiffeners are provided at two locations on each of the overhanging plate portions 23, such as at positions corresponding to the headed studs 25 or both ends in the length direction of the overhanging plate portion 23. 26 may be provided.

図4は、図1中のIV−IV断面図であり、図5は、図4に示される横補剛構造の側面を示す、図4中のV−V断面図ある。図4及び図5に示されるように、鉄骨梁3を構成する端部鉄骨3Aと中間鉄骨3Bとは、複数のスプライスプレート31(31A〜31E)によって互いに接合されている。   4 is a cross-sectional view taken along the line IV-IV in FIG. 1, and FIG. 5 is a cross-sectional view taken along the line V-V in FIG. 4 showing the side surface of the lateral stiffening structure shown in FIG. As shown in FIGS. 4 and 5, the end steel frame 3A and the intermediate steel frame 3B constituting the steel beam 3 are joined to each other by a plurality of splice plates 31 (31A to 31E).

具体的には、端部鉄骨3A及び中間鉄骨3Bの上フランジ11は、上フランジ11上に配置された1枚の第1スプライスプレート31Aと、上フランジ11下のウェブ13の左右に配置された2枚の第2スプライスプレート31Bとが複数のボルト・ナット32によって締結されることにより互いに接合されている。端部鉄骨3A及び中間鉄骨3Bの下フランジ12は、下フランジ12上のウェブ13の左右に配置された2枚の第3スプライスプレート31Cと、下フランジ12下に配置された1枚の第4スプライスプレート31Dとが複数のボルト・ナット32によって締結されることにより互いに接合されている。端部鉄骨3A及び中間鉄骨3Bのウェブ13は、ウェブ13の左右に配置された2枚の第5スプライスプレート31Eが複数のボルト・ナット32によって締結されることにより互いに接合されている。   Specifically, the upper flanges 11 of the end steel frame 3A and the intermediate steel frame 3B are disposed on the left and right sides of the first splice plate 31A disposed on the upper flange 11 and the web 13 below the upper flange 11. The two second splice plates 31 </ b> B are joined to each other by being fastened by a plurality of bolts and nuts 32. The lower flange 12 of the end steel frame 3 </ b> A and the intermediate steel frame 3 </ b> B includes two third splice plates 31 </ b> C arranged on the left and right of the web 13 on the lower flange 12, and one fourth fourth plate arranged below the lower flange 12. The splice plate 31D is joined to each other by being fastened by a plurality of bolts and nuts 32. The webs 13 of the end steel frame 3 </ b> A and the intermediate steel frame 3 </ b> B are joined to each other by fastening two fifth splice plates 31 </ b> E arranged on the left and right sides of the web 13 with a plurality of bolts and nuts 32.

第2スプライスプレート31B及び第3スプライスプレート31Cは、上フランジ11及び下フランジ12のウェブ13からの張出し寸法と同程度の幅を有している。第4スプライスプレート31Dは下フランジ12の幅と同程度の幅を有し、第5スプライスプレート31Eはウェブ13の高さよりも小さな高さを有している。一方、第1スプライスプレート31Aは、上フランジ11の幅よりも大きな幅を有しており、上フランジ11から左右に張り出している。言い換えれば、第1スプライスプレート31Aは、上フランジ11の接合に必要な上フランジ11と同じ幅の接合部33と、接合部33の左右の両端から上フランジ11よりも外方へ延出する左右の延出部34、34とを有している。   The 2nd splice plate 31B and the 3rd splice plate 31C have the width | variety comparable as the overhang | projection dimension from the web 13 of the upper flange 11 and the lower flange 12. FIG. The fourth splice plate 31 </ b> D has a width approximately equal to the width of the lower flange 12, and the fifth splice plate 31 </ b> E has a height smaller than the height of the web 13. On the other hand, the first splice plate 31 </ b> A has a width larger than the width of the upper flange 11 and projects from the upper flange 11 to the left and right. In other words, the first splice plate 31A includes a joint 33 having the same width as that of the upper flange 11 necessary for joining the upper flange 11, and left and right extending outward from the upper flange 11 from the left and right ends of the joint 33. Extending portions 34, 34.

第1スプライスプレート31Aの左右の延出部34、34の上面には、複数の頭付きスタッド35が植設されている。本実施形態では、各延出部34の上面に対し、鉄骨梁3の幅方向に2列、長手方向に4列、合計8つの頭付きスタッド35が上方へ延出するように設けられている。第1スプライスプレート31A上にはスラブ4が構築されており、頭付きスタッド35はコンクリート5に埋設されることによってスラブ4に固定されている。即ち、鉄骨梁3の部材同士を接合するために上フランジ11の上面に接合される第1スプライスプレート31Aが、鉄骨梁3の横剛性を補完するための第2横補剛部材30を兼ねている。   A plurality of headed studs 35 are implanted on the upper surfaces of the left and right extending portions 34, 34 of the first splice plate 31A. In the present embodiment, a total of eight headed studs 35 are provided to extend upward from the upper surface of each extending portion 34 in two rows in the width direction of the steel beam 3 and four rows in the longitudinal direction. . The slab 4 is constructed on the first splice plate 31 </ b> A, and the headed stud 35 is fixed to the slab 4 by being embedded in the concrete 5. That is, the first splice plate 31 </ b> A joined to the upper surface of the upper flange 11 to join the members of the steel beam 3 also serves as the second lateral stiffening member 30 for complementing the lateral rigidity of the steel beam 3. Yes.

このように、図2に示される第1横補剛部材20及び図4に示される第2横補剛部材30は、上フランジ11よりも大きな幅を有し、鉄骨梁3の上面に設けられた頭付きスタッド15よりも外側に配置された頭付きスタッド25、35によってスラブ4に固定されている。これにより、鉄骨梁3とスラブ4との固定度(一体性)が増し、鉄骨梁3の捩り剛性が向上している。   As described above, the first lateral stiffening member 20 shown in FIG. 2 and the second lateral stiffening member 30 shown in FIG. 4 have a larger width than the upper flange 11 and are provided on the upper surface of the steel beam 3. It is fixed to the slab 4 by headed studs 25 and 35 arranged outside the headed stud 15. Thereby, the fixing degree (integration) of the steel beam 3 and the slab 4 is increased, and the torsional rigidity of the steel beam 3 is improved.

このような建物1を新たに構築する場合、第2横補剛部材30が溶接された2つの端部鉄骨3A、3Aを対応する柱2に接合し、中間鉄骨3Bを両端部鉄骨3A、3A間に配置してその両端部をそれぞれ第2横補剛部材30によって両端部鉄骨3A、3Aに接合することで、鉄骨梁3を2つの柱2、2間に架設する。その後、スラブ4のコンクリート5を打設して全てのスタッドを埋設してスラブ4に固定することで鉄骨梁3をスラブ4に一体化する。   When such a building 1 is newly constructed, the two end steel frames 3A and 3A to which the second lateral stiffening members 30 are welded are joined to the corresponding columns 2, and the intermediate steel frame 3B is connected to the both end steel frames 3A and 3A. The steel beam 3 is installed between the two pillars 2 and 2 by being arranged between them and joining the both ends thereof to the steel frames 3 </ b> A and 3 </ b> A by the second lateral stiffening members 30. Thereafter, the concrete 5 of the slab 4 is cast and all the studs are buried and fixed to the slab 4, thereby integrating the steel beam 3 into the slab 4.

次に、このように構成された鉄骨梁3の横補剛構造の作用効果について説明する。   Next, the effect of the lateral stiffening structure of the steel beam 3 configured as described above will be described.

図1に示されるように、両端が1対の柱2、2に接合され、その上にスラブ4が構築された鉄骨梁3の横補剛構造では、第1横補剛部材20が鉄骨梁3の軸方向の一部に設けられてスラブ4に固定されている。図2に示されるように、第1横補剛部材20は、上フランジ11及び下フランジ12のそれぞれの左右の側面に沿って設けられた左右の側部補剛部21、21を含んでいる。左右の側部補剛部21、21は、鉄骨梁3の軸方向及び鉛直方向に互いに平行に延在し、上フランジ11を左右から挟むと共に下フランジ12に固定される左右の添板部22、22と、鉄骨梁3の軸方向及び水平方向に延在し、左右の添板部22、22の上端部から外方へ張り出す左右の外張出板部23、23と、各外張出板部23の上面から延出し、スラブ4に固定される固定部材である頭付きスタッド25とを含んでいる。   As shown in FIG. 1, in the lateral stiffening structure of a steel beam 3 in which both ends are joined to a pair of columns 2 and 2 and a slab 4 is constructed thereon, the first lateral stiffening member 20 is a steel beam. 3 is fixed to the slab 4 in a part of the axial direction. As shown in FIG. 2, the first lateral stiffening member 20 includes left and right side stiffening portions 21, 21 provided along the left and right side surfaces of the upper flange 11 and the lower flange 12. . The left and right side stiffening portions 21, 21 extend in parallel to each other in the axial direction and the vertical direction of the steel beam 3, sandwich the upper flange 11 from the left and right, and are fixed to the lower flange 12. 22, left and right outer projecting plate portions 23, 23 extending in the axial direction and the horizontal direction of the steel beam 3, and projecting outward from the upper ends of the left and right accessory plates 22, 22, It includes a headed stud 25 that is a fixing member that extends from the upper surface of the output plate portion 23 and is fixed to the slab 4.

このように、頭付きスタッド25及び左右の外張出板部23、23を介してスラブ4に固定された両添板部22、22により、上フランジ11は左右から挟まれることでスラブ4に一体化され、下フランジ12は固定されることでスラブ4に一体化される。これにより鉄骨梁3の横剛性が補完される。また、第1横補剛部材20は鉄骨梁3の軸方向の一部だけに設けられるため、鉄骨量の増大が抑制され、鉄骨梁3の加工手間の増大も抑制される。また、固定部材である頭付きスタッド25をスラブ4に固定すればよいため、施工も容易である。   In this manner, the upper flange 11 is sandwiched from the left and right by the slab 4 by the both side plate portions 22 and 22 fixed to the slab 4 via the headed stud 25 and the left and right outer projecting plate portions 23 and 23. The lower flange 12 is fixed and integrated with the slab 4. Thereby, the lateral rigidity of the steel beam 3 is complemented. Moreover, since the 1st horizontal stiffening member 20 is provided only in a part of axial direction of the steel beam 3, the increase in the amount of steel frames is suppressed and the increase in the work effort of the steel beam 3 is also suppressed. Moreover, since the stud 25 with a head which is a fixing member should just be fixed to the slab 4, construction is also easy.

本実施形態では、左右の側部補剛部21、21は、鉄骨梁3の軸線方向に直交して延在し、左右の添板部22、22と左右の外張出板部23、23との対応するもの同士に溶接された少なくとも1対の左右の横補剛スチフナ26、26を更に含んでいる。これにより、添板部22が補強され、添板部22の外張出板部23に対する倒れが抑制されるため、下フランジ12の倒れが効果的に抑制される。   In the present embodiment, the left and right side stiffening portions 21, 21 extend perpendicular to the axial direction of the steel beam 3, and the left and right accessory plates 22, 22 and the left and right extension plate portions 23, 23. And at least one pair of left and right lateral stiffeners 26, 26 welded to their counterparts. Thereby, since the board part 22 is reinforced and the fall of the board part 22 with respect to the overhanging board part 23 is suppressed, the fall of the lower flange 12 is effectively suppressed.

本実施形態では、左右の添板部22、22の上端が、上フランジ11の対応する左右の側端に溶接されている。このように添板部22と上フランジ11とが一体化されることで、鉄骨梁3及び左右の添板部22、22が箱形断面形状をなすため、鉄骨梁3が効果的に横補剛される。   In the present embodiment, the upper ends of the left and right accessory plate portions 22, 22 are welded to the corresponding left and right side ends of the upper flange 11. By integrating the accessory plate portion 22 and the upper flange 11 in this manner, the steel beam 3 and the left and right accessory plate portions 22 and 22 have a box-shaped cross-sectional shape, so that the steel beam 3 is effectively laterally compensated. Be stiff.

本実施形態では、左右の添板部22、22の下端が、下フランジ12の対応する左右の側端に溶接されている。これにより、鉄骨量の増大を抑制しながら添板部22が下フランジ12に固定される。   In the present embodiment, the lower ends of the left and right accessory plates 22, 22 are welded to the corresponding left and right side ends of the lower flange 12. As a result, the accessory plate portion 22 is fixed to the lower flange 12 while suppressing an increase in the amount of steel frame.

本実施形態では、外張出板部23をスラブ4に固定する固定部材が、外張出板部23、23の上面に植設され、スラブ4に埋設された頭付きスタッド25である。そのため、固定部材の外張出板部23への固定が容易である。   In the present embodiment, the fixing member that fixes the overhanging plate portion 23 to the slab 4 is the headed stud 25 that is implanted on the upper surface of the overhanging plate portions 23 and 23 and embedded in the slab 4. For this reason, it is easy to fix the fixing member to the overhanging plate portion 23.

図1に示されるように、本実施形態では、鉄骨梁3が、軸方向の両端部に配置される1対の端部鉄骨3A、3A、軸方向の中間部に配置される中間鉄骨3B、及び各端部鉄骨3Aと前記中間鉄骨3Bとを連結する複数のスプライスプレート31(図4)とを有している。図4に示されるように、第2横補剛部材30は、複数のスプライスプレート31のうち、上フランジ11の上面に接合され、上フランジ11よりも左右に延出する延出部34、34を有する第1スプライスプレート31Aと、延出部34、34の上面に植設され、スラブ4に埋設された複数の頭付きスタッド35とにより構成されている。このように、第1スプライスプレート31Aが頭付きスタッド35によってスラブ4に固定されることにより、上フランジ11がスラブ4に一体化されるため、鉄骨梁3の横剛性が一層堅固になる。また、第2横補剛部材30に第1スプライスプレート31Aが利用されることにより、鉄骨量の増大が抑制され、鉄骨梁3や第1スプライスプレート31Aの加工手間の増大も抑制される。また、取り付けに別途の作業を要しないため、施工も容易である。   As shown in FIG. 1, in the present embodiment, the steel beam 3 includes a pair of end steel frames 3A and 3A disposed at both axial end portions, an intermediate steel frame 3B disposed at an axial intermediate portion, And a plurality of splice plates 31 (FIG. 4) for connecting each end steel frame 3A and the intermediate steel frame 3B. As shown in FIG. 4, the second lateral stiffening member 30 is joined to the upper surface of the upper flange 11 among the plurality of splice plates 31 and extends to the left and right of the upper flange 11. The first splice plate 31 </ b> A having a plurality of headed studs 35 embedded in the slab 4 and embedded in the upper surfaces of the extending portions 34, 34. Thus, since the upper flange 11 is integrated with the slab 4 by fixing the first splice plate 31A to the slab 4 by the headed stud 35, the lateral rigidity of the steel beam 3 is further increased. Further, by using the first splice plate 31A for the second lateral stiffening member 30, an increase in the amount of the steel frame is suppressed, and an increase in the processing effort of the steel beam 3 and the first splice plate 31A is also suppressed. In addition, installation is easy because no additional work is required for installation.

このように本実施形態では、鉄骨梁3の軸方向の一部に設けられ、スラブ4に固定される第2横補剛部材30が、上フランジ11よりも左右に延出する延出部34、34を有する第1スプライスプレート31Aと、延出部34、34の上面に植設され、スラブ4に埋設された複数の頭付きスタッド25とを含んでいる。このように、第1スプライスプレート31Aが頭付きスタッド25によってスラブ4に固定されることにより、上フランジ11がスラブ4に一体化され、これにより鉄骨梁3の横剛性が補完される。また、第1スプライスプレート31Aが利用されることにより、鉄骨量の増大が抑制され、鉄骨梁3や第1スプライスプレート31Aの加工手間の増大も抑制される。また、施工も容易である。   As described above, in the present embodiment, the second lateral stiffening member 30 provided on a part of the steel beam 3 in the axial direction and fixed to the slab 4 extends from the upper flange 11 to the left and right. , 34 and a plurality of headed studs 25 embedded in the upper surface of the extending portions 34, 34 and embedded in the slab 4. In this way, the first splice plate 31A is fixed to the slab 4 by the headed stud 25, whereby the upper flange 11 is integrated with the slab 4, thereby complementing the lateral rigidity of the steel beam 3. Further, by using the first splice plate 31A, an increase in the amount of the steel frame is suppressed, and an increase in labor for processing the steel beam 3 and the first splice plate 31A is also suppressed. Construction is also easy.

≪第2実施形態≫
次に、図6及び図7を参照して第2実施形態に係る横補剛構造について説明する。なお、第1実施形態と形態又は機能が同一又は同様の要素には同一の符号を付し、重複する説明は省略する。以下に示す第3実施形態においても同様とする。
<< Second Embodiment >>
Next, a lateral stiffening structure according to the second embodiment will be described with reference to FIGS. 6 and 7. In addition, the same code | symbol is attached | subjected to the element which is the same or the same as that of 1st Embodiment, or a function, and the overlapping description is abbreviate | omitted. The same applies to the third embodiment described below.

図6に示されるように、本実施形態の鉄骨梁3の横補剛構造では、第1横補剛部材40が第1実施形態の第1横補剛部材20と異なっている。具体的には、第1横補剛部材40は、左右の側部補剛部21に加え、左右の添板部22、22の下端から内方へ張り出す内張出板部41を更に有している。内張出板部41は、左右の添板部22、22の下端を連結する1枚の連結板によって構成されている。内張出板部41の適所には、ボルトを挿通するための貫通孔41aが適所に形成されている。鉄骨梁3の下フランジ12にも、内張出板部41の貫通孔41aに対応する位置に貫通孔12aが形成されている。内張出板部41は、貫通孔41a、12aに挿通されたボルト・ナット42によって下フランジ12に締結されている。   As shown in FIG. 6, in the lateral stiffening structure of the steel beam 3 of the present embodiment, the first lateral stiffening member 40 is different from the first lateral stiffening member 20 of the first embodiment. More specifically, the first lateral stiffening member 40 further includes an overhanging plate portion 41 that projects inwardly from the lower ends of the left and right side plate portions 22, 22 in addition to the left and right side stiffening portions 21. doing. The lining plate portion 41 is constituted by a single connecting plate that connects the lower ends of the left and right accessory plate portions 22, 22. A through hole 41a for inserting a bolt is formed at a proper position in the lining plate portion 41. A through hole 12 a is also formed in the lower flange 12 of the steel beam 3 at a position corresponding to the through hole 41 a of the lining plate portion 41. The lining plate portion 41 is fastened to the lower flange 12 by bolts and nuts 42 inserted through the through holes 41a and 12a.

建物1を新たに構築する場合、工場で鉄骨梁3を加工する際に、第1横補剛部材40を端部鉄骨3Aに取り付けておくとよい。この場合、左右の添板部22、22の下端は、内張出板部41を介して下フランジ12に固定されるため、添板部22を下フランジ12に溶接する必要はない。一方、左右の添板部22、22の上端は、上フランジ11に溶接されるとよい。鉄骨梁3を2本の柱2、2間に架け渡した後、コンクリート5を打設して頭付きスタッド25をスラブ4に固定することで鉄骨梁3をスラブ4に一体化する。   When the building 1 is newly constructed, the first lateral stiffening member 40 may be attached to the end steel frame 3A when the steel beam 3 is processed at the factory. In this case, since the lower ends of the left and right accessory plate portions 22, 22 are fixed to the lower flange 12 via the lining plate portion 41, it is not necessary to weld the accessory plate portion 22 to the lower flange 12. On the other hand, the upper ends of the left and right accessory plate portions 22, 22 are preferably welded to the upper flange 11. After the steel beam 3 is bridged between the two columns 2, 2, the concrete beam 5 is placed and the headed stud 25 is fixed to the slab 4 to integrate the steel beam 3 with the slab 4.

一方、建物1が、鉄骨梁3の上にスラブ4が既に構築された既設建物である場合には、第1横補剛部材40は、図7に示される手順で鉄骨梁3及びスラブ4に取り付けられる。なお、この場合は第1実施形態で説明した第2横補剛部材30を設けることはできないため、第1横補剛部材40のみが設けられる。   On the other hand, when the building 1 is an existing building in which the slab 4 has already been constructed on the steel beam 3, the first lateral stiffening member 40 is attached to the steel beam 3 and the slab 4 by the procedure shown in FIG. It is attached. In this case, since the second lateral stiffening member 30 described in the first embodiment cannot be provided, only the first lateral stiffening member 40 is provided.

図7(A)に示されるように、既設の建物1では、鉄骨梁3の上に既にスラブ4が構築されている。そこで、図7(B)に示されるように、まずはスラブ4の頭付きスタッド25を設けるべき位置周辺部のコンクリート5をブレーカーやピック等の工具を用いて上面側から斫る。また、下フランジ12のボルト・ナット42を設けるべき位置に貫通孔12aを穿設する。なお、コンクリート5の斫り作業及び下フランジ12の穿孔作業は、どちらが先であってもよい。   As shown in FIG. 7A, the slab 4 has already been constructed on the steel beam 3 in the existing building 1. Therefore, as shown in FIG. 7B, first, the concrete 5 around the position where the headed stud 25 of the slab 4 should be provided is beaten from the upper surface side using a tool such as a breaker or a pick. Further, a through hole 12a is formed at a position where the bolt / nut 42 of the lower flange 12 is to be provided. Note that either the turning operation of the concrete 5 or the drilling operation of the lower flange 12 may be performed first.

その後、図7(C)に示されるように、第1横補剛部材40を、鉄骨梁3の軸方向の所定位置において、左右の側部補剛部21、21が上フランジ11及び下フランジ12のそれぞれの左右の側面に沿う所定の位置に配置し、ボルト・ナット42を用いて内張出板部41を下フランジ12に締結することで第1横補剛部材40を固定する。最後に、図7(D)に示されるように、スラブ4の斫られた部分に、頭付きスタッド25を埋設するようにコンクリート5を打設して頭付きスタッド25をスラブ4に固定する。これにより、上フランジ11及び下フランジ12が頭付きスタッド25及び左右の側部補剛部21、21によってスラブ4に固定され、鉄骨梁3の横剛性が補完される。   Thereafter, as shown in FIG. 7C, the left and right side stiffening portions 21 and 21 are connected to the upper flange 11 and the lower flange at a predetermined position in the axial direction of the steel beam 3. The first lateral stiffening member 40 is fixed by fastening the lining plate portion 41 to the lower flange 12 using bolts and nuts 42, arranged at predetermined positions along the left and right side surfaces of each of the 12. Finally, as shown in FIG. 7 (D), the concrete 5 is placed in the beaten portion of the slab 4 so that the headed stud 25 is embedded, and the headed stud 25 is fixed to the slab 4. Thereby, the upper flange 11 and the lower flange 12 are fixed to the slab 4 by the headed stud 25 and the left and right side stiffening portions 21, 21, and the lateral rigidity of the steel beam 3 is complemented.

このように本実施形態では、第1横補剛部材40が、左右の添板部22、22の下端から内方に張り出して左右の添板部22、22の下端を連結し、ボルト・ナット42によって下フランジ12に締結された内張出板部41を更に含み、左右の添板部22、22が内張出板部41を介して下フランジ12に固定されている。そのため、溶接を行うことなく添板部22を下フランジ12に固定することができる。従って、スラブ4が既に構築された鉄骨梁3に対して第1横補剛部材40を固定する際に、防火上の問題が生じることがない。   As described above, in the present embodiment, the first lateral stiffening member 40 projects inwardly from the lower ends of the left and right accessory plates 22, 22 to connect the lower ends of the left and right accessory plates 22, 22, and bolts and nuts Further, a lining plate portion 41 fastened to the lower flange 12 by 42 is included, and the left and right accessory plate portions 22, 22 are fixed to the lower flange 12 via the lining plate portion 41. Therefore, the accessory plate portion 22 can be fixed to the lower flange 12 without performing welding. Therefore, when the first lateral stiffening member 40 is fixed to the steel beam 3 on which the slab 4 has already been constructed, there is no problem in fire prevention.

また、建物1の鉄骨梁3の横剛性を補完する梁スラブ結合方法は、図7(C)に示されるように、左右の添板部22、22、左右の外張出板部23、23及び内張出板部41を有する第1横補剛部材40を用意するステップと、第1横補剛部材40を鉄骨梁3に下方から装着し、左右の添板部22、22に上フランジ11及び下フランジ12を左右から挟ませるステップと、図7(B)、(C)に示されるように、ボルト・ナット42によって内張出板部41を下フランジ12に締結するステップと、図7(B)、(D)に示されるように、頭付きスタッド25によって左右の外張出板部23、23をスラブ4に固定するステップとを備える。このように、鉄骨梁3に下方から装着した第1横補剛部材40を下フランジ12に固定すると共に頭付きスタッド25によってスラブ4に固定することにより、スラブ4が上に構築された鉄骨梁3の横剛性を補完することができる。従って、既設建物にも適用可能である。   Further, as shown in FIG. 7C, the beam slab coupling method for complementing the lateral rigidity of the steel beam 3 of the building 1 is as follows: left and right accessory plates 22 and 22, and left and right extension plate portions 23 and 23. And a step of preparing the first lateral stiffening member 40 having the lining plate portion 41, the first lateral stiffening member 40 is mounted on the steel beam 3 from below, and the left and right attachment plate portions 22, 22 have upper flanges 11 and the lower flange 12 are sandwiched from the left and right, and as shown in FIGS. 7B and 7C, a bolt / nut 42 is used to fasten the overhanging plate portion 41 to the lower flange 12, and 7 (B) and 7 (D), the left and right outer projecting plate portions 23 and 23 are fixed to the slab 4 by the headed stud 25. Thus, the 1st horizontal stiffening member 40 with which the steel beam 3 was mounted | worn from the bottom is fixed to the lower flange 12, and it is fixed to the slab 4 with the headed stud 25, The steel beam by which the slab 4 was constructed | assembled upwards 3 lateral rigidity can be complemented. Therefore, it can be applied to existing buildings.

≪第3実施形態≫
次に、図8及び図9を参照して第3実施形態に係る横補剛構造について説明する。
«Third embodiment»
Next, a lateral stiffening structure according to the third embodiment will be described with reference to FIGS. 8 and 9.

図8は、第3実施形態に係る横補剛構造の図2に対応する断面図である。図8に示されるように、本実施形態の鉄骨梁3の横補剛構造においても、第1横補剛部材50が上記実施形態の第1横補剛部材20、40と異なっている。具体的には、左右の外張出板部23、23には頭付きスタッド25が設けられておらず、第1横補剛部材50は、スラブ4に固定されたアンカーボルト55によって左右の外張出板部23、23をスラブ4に締結されることによってスラブ4に固定されている。   FIG. 8 is a cross-sectional view corresponding to FIG. 2 of the lateral stiffening structure according to the third embodiment. As shown in FIG. 8, also in the lateral stiffening structure of the steel beam 3 of the present embodiment, the first lateral stiffening member 50 is different from the first lateral stiffening members 20 and 40 of the above embodiment. Specifically, the left and right outer projecting plate portions 23, 23 are not provided with headed studs 25, and the first lateral stiffening member 50 is fixed to the left and right outer sides by anchor bolts 55 fixed to the slab 4. The projecting plate portions 23 and 23 are fastened to the slab 4 by being fastened to the slab 4.

本実施形態の横補剛構造においては、建物1が新設される場合であっても、既設である場合であっても、スラブ4が鉄骨梁3の上に構築された状態で第1横補剛部材50が取り付けられる点で共通している。そのため、いずれの場合であっても、第1横補剛部材50は、図9に示される手順で鉄骨梁3及びスラブ4に取り付けられる。即ち、図9(A)に示されるように、建物1では、鉄骨梁3の上に既にスラブ4が構築されている。そこで、図9(B)に示されるように、スラブ4のアンカーボルト55を配置すべき位置に下面側から孔4aを穿設する。この孔4aは通常、有底孔として形成される。これと共に、下フランジ12に貫通孔12aを穿設する。建物1を新設する場合、この貫通孔12aは予め工場で穿設しておくとよく、この場合には図9(A)に示される状態で貫通孔12aが形成されている。   In the lateral stiffening structure of the present embodiment, the first lateral compensation is performed with the slab 4 built on the steel beam 3 regardless of whether the building 1 is newly installed or is already installed. This is common in that the rigid member 50 is attached. Therefore, in either case, the first lateral stiffening member 50 is attached to the steel beam 3 and the slab 4 by the procedure shown in FIG. That is, as shown in FIG. 9A, the slab 4 is already constructed on the steel beam 3 in the building 1. Therefore, as shown in FIG. 9B, a hole 4a is formed from the lower surface side at a position where the anchor bolt 55 of the slab 4 is to be disposed. The hole 4a is usually formed as a bottomed hole. At the same time, a through hole 12 a is formed in the lower flange 12. When the building 1 is newly provided, the through-hole 12a is preferably made in advance in the factory. In this case, the through-hole 12a is formed in the state shown in FIG. 9A.

次に、図9(C)に示されるように、第1横補剛部材50を、鉄骨梁3の軸方向の所定位置において、左右の側部補剛部21、21が上フランジ11及び下フランジ12のそれぞれの左右の側面に沿う所定の位置に配置し、ボルト・ナット42を用いて下フランジ12に固定する。なお、外張出板部23のアンカーボルト55を配置すべき位置、及び内張出板部41のボルト・ナット42を配置すべき位置には、予め貫通孔23a、41aを穿設しておく。なお、図9(B)においてスラブ4に孔4aを穿設する際には、先に第1横補剛部材50を所定位置に配置して、外張出板部23の貫通孔23aを利用してスラブ4に孔4aを穿設してもよい。   Next, as shown in FIG. 9C, the left and right side stiffening portions 21, 21 are connected to the upper flange 11 and the lower side at a predetermined position in the axial direction of the steel beam 3. It arrange | positions in the predetermined position along each right and left side surface of the flange 12, and it fixes to the lower flange 12 using the volt | bolt nut 42. FIG. It should be noted that through holes 23a and 41a are formed in advance at positions where the anchor bolts 55 of the outer projecting plate portion 23 are to be disposed and positions where the bolts and nuts 42 of the inner projecting plate portion 41 are to be disposed. . 9B, when the hole 4a is formed in the slab 4, the first lateral stiffening member 50 is first arranged at a predetermined position, and the through-hole 23a of the outer projecting plate portion 23 is used. Then, the hole 4a may be formed in the slab 4.

最後に、図9(D)に示されるように、スラブ4の孔4aにアンカーボルト55を固定し、アンカーボルト55によって外張出板部23をスラブ4に固定する。具体的には、樹脂系の接着剤が封入されたカプセルをスラブ4の孔4aに挿入し、打撃や回転を加えながらアンカーボルト55を孔4aに下方から挿入してカプセルを破壊することで、カプセルから供給される接着剤によってアンカーボルト55をスラブに固定する。アンカーボルト55の固定後にナットをアンカーボルト55に螺合させることで外張出板部23をスラブ4に締結する。これにより、鉄骨梁3の上フランジ11及び下フランジ12がアンカーボルト55及び左右の側部補剛部21、21によってスラブ4に固定され、鉄骨梁3の横剛性が補完される。   Finally, as shown in FIG. 9D, the anchor bolt 55 is fixed to the hole 4 a of the slab 4, and the overhang plate portion 23 is fixed to the slab 4 by the anchor bolt 55. Specifically, by inserting a capsule encapsulating a resin-based adhesive into the hole 4a of the slab 4, and inserting the anchor bolt 55 into the hole 4a from below while breaking or rotating, destroying the capsule, The anchor bolt 55 is fixed to the slab by an adhesive supplied from the capsule. After the anchor bolt 55 is fixed, the outer projecting plate portion 23 is fastened to the slab 4 by screwing the nut into the anchor bolt 55. Thereby, the upper flange 11 and the lower flange 12 of the steel beam 3 are fixed to the slab 4 by the anchor bolt 55 and the left and right side stiffening portions 21, 21, and the lateral rigidity of the steel beam 3 is supplemented.

他の実施形態では、アンカーボルト55がスリーブを有し、打ち込みによる楔の効果によってスリーブを拡径させる打ち込み式アンカーボルトであってもよい。   In another embodiment, the anchor bolt 55 may have a sleeve, and may be a drive-in type anchor bolt that expands the diameter of the sleeve by the effect of a wedge by driving-in.

このようにして構築される鉄骨梁3の横補剛構造及び梁スラブ結合方法では、上記実施形態で説明した効果の他、次のような作用効果が得られる。   In the lateral stiffening structure and the beam slab coupling method of the steel beam 3 constructed as described above, the following operational effects can be obtained in addition to the effects described in the above embodiment.

即ち、本実施形態の横補剛構造では、図8に示されるように、外張出板部23をスラブ4に固定する固定部材が、外張出板部23を貫通するように設けられ、スラブ4に固定されたアンカーボルト55である。そのため、既設のスラブ4に対し第1横補剛部材50を容易に固定することができる。   That is, in the lateral stiffening structure of the present embodiment, as shown in FIG. 8, a fixing member that fixes the overhanging plate portion 23 to the slab 4 is provided so as to penetrate the overhanging plate portion 23. The anchor bolt 55 is fixed to the slab 4. Therefore, the first lateral stiffening member 50 can be easily fixed to the existing slab 4.

また、建物1の鉄骨梁3の横剛性を補完する梁スラブ結合方法は、図9(C)に示されるように、左右の添板部22、22、左右の外張出板部23、23及び内張出板部41を有する第1横補剛部材50を用意するステップと、第1横補剛部材50を鉄骨梁3に下方から装着し、左右の添板部22、22に上フランジ11及び下フランジ12を左右から挟ませるステップと、図9(B)、(D)に示されるように、ボルト・ナット42によって内張出板部41を下フランジ12に締結するステップと、図9(B)、(D)に示されるように、アンカーボルト55によって左右の外張出板部23、23をスラブ4に固定するステップとを備える。このように、鉄骨梁3に下方から装着した第1横補剛部材50を下フランジ12に固定すると共にアンカーボルト55によってスラブ4に固定することにより、スラブ4が上に構築された鉄骨梁3の横剛性を補完することができる。従って、既設建物にも適用可能である。   Further, as shown in FIG. 9C, the beam slab coupling method for complementing the lateral rigidity of the steel beam 3 of the building 1 is a left and right accessory plate portion 22, 22, and a left and right extension plate portion 23, 23. And a step of preparing the first lateral stiffening member 50 having the lining plate portion 41, the first lateral stiffening member 50 is attached to the steel beam 3 from below, and the left and right accessory plate portions 22, 22 have upper flanges 11 and the lower flange 12 are sandwiched from the left and right, and as shown in FIGS. 9B and 9D, a bolt / nut 42 is used to fasten the overhanging plate portion 41 to the lower flange 12, and 9 (B), (D), and fixing the left and right outer projecting plate portions 23, 23 to the slab 4 with anchor bolts 55. In this way, the first lateral stiffening member 50 attached to the steel beam 3 from below is fixed to the lower flange 12 and fixed to the slab 4 by the anchor bolt 55, whereby the steel beam 3 in which the slab 4 is built up. It is possible to complement the lateral rigidity of the. Therefore, it can be applied to existing buildings.

≪第4実施形態≫
次に、図10を参照して第4実施形態に係る横補剛構造について説明する。
<< Fourth Embodiment >>
Next, a lateral stiffening structure according to the fourth embodiment will be described with reference to FIG.

図10は、第4実施形態に係る横補剛構造の図2に対応する断面図である。図10に示されるように、本実施形態の鉄骨梁3の横補剛構造においても、第1横補剛部材60が上記実施形態の第1横補剛部材20、40、50と異なっている。具体的には、第1横補剛部材60は、左右の側部補剛部21に加え、左右の添板部22、22のそれぞれの下部から内方へ張り出し、下フランジ12に固定される2枚の内張出板部61を更に有している。各内張出板部61の適所には、ボルトを挿通するための貫通孔61aが適所に形成されている。鉄骨梁3の下フランジ12にも、内張出板部61の貫通孔61aに対応する位置に貫通孔12aが形成されている。内張出板部61は、貫通孔61a、12aに挿通されたボルト・ナット42によって下フランジ12の下面に締結されている。他の実施形態では、内張出板部61が下フランジ12の上面に締結されてもよい。   FIG. 10 is a cross-sectional view corresponding to FIG. 2 of the lateral stiffening structure according to the fourth embodiment. As shown in FIG. 10, also in the lateral stiffening structure of the steel beam 3 of the present embodiment, the first lateral stiffening member 60 is different from the first lateral stiffening members 20, 40, 50 of the above embodiment. . Specifically, the first lateral stiffening member 60 projects inwardly from the lower portions of the left and right side plate portions 22, 22 in addition to the left and right side stiffening portions 21 and is fixed to the lower flange 12. Two lining plate portions 61 are further provided. Through holes 61a for inserting bolts are formed at appropriate positions in the lining plate portions 61, respectively. A through hole 12 a is also formed in the lower flange 12 of the steel beam 3 at a position corresponding to the through hole 61 a of the lining plate portion 61. The lining plate portion 61 is fastened to the lower surface of the lower flange 12 by bolts and nuts 42 inserted through the through holes 61a and 12a. In another embodiment, the lining plate portion 61 may be fastened to the upper surface of the lower flange 12.

本実施形態の第1横補剛部材60の構築手順は、第2実施形態の第1横補剛部材40の構築手順と同様である。そのため、ここでは詳細な説明は省略する。本実施形態においても、第2実施形態の第1横補剛部材40と同様の作用効果が得られる。また、頭付きスタッド25の代わりにアンカーボルト55が左右の外張出板部23、23が設けられ、第3実施形態と同様の手順で第1横補剛部材60が構築されてもよい。これにより、第3実施形態の第1横補剛部材50と同様の作用効果が得られる。   The construction procedure of the first lateral stiffening member 60 of the present embodiment is the same as the construction procedure of the first lateral stiffening member 40 of the second embodiment. Therefore, detailed description is omitted here. Also in this embodiment, the same operation and effect as the first lateral stiffening member 40 of the second embodiment can be obtained. Moreover, the anchor bolt 55 may be provided with the left and right outer projecting plate portions 23, 23 instead of the headed stud 25, and the first lateral stiffening member 60 may be constructed in the same procedure as in the third embodiment. Thereby, the effect similar to the 1st horizontal stiffening member 50 of 3rd Embodiment is acquired.

≪第5実施形態≫
最後に、図11を参照して第5実施形態に係る横補剛構造について説明する。
«Fifth embodiment»
Finally, a lateral stiffening structure according to the fifth embodiment will be described with reference to FIG.

図11は、第5実施形態に係る横補剛構造の図4に対応する断面図である。図11に示されるように、本実施形態の鉄骨梁3の横補剛構造においては、第2横補剛部材70が上記実施形態の第2横補剛部材30と異なっている。具体的には、端部鉄骨3A及び中間鉄骨3Bの上フランジ11は、上フランジ11下のウェブ13の左右に配置された2枚の第1スプライスプレート71Aと、上フランジ11上に配置された1枚の第2スプライスプレート71Bとが複数のボルト・ナット32によって締結されることにより互いに接合されており、各第1スプライスプレート71Aが、上フランジ11のウェブ13からの張出し寸法よりも大きな幅を有し、上フランジ11から対応する左右の外方に張り出している。言い換えれば、各第1スプライスプレート71Aは、上フランジ11の接合に必要な上フランジ11のウェブ13からの張出し寸法と同じ幅の接合部73と、接合部73のウェブ13と相反する側の端部から上フランジ11よりも外方へ延出する延出部74とを有している。   FIG. 11 is a cross-sectional view corresponding to FIG. 4 of the lateral stiffening structure according to the fifth embodiment. As shown in FIG. 11, in the lateral stiffening structure of the steel beam 3 of the present embodiment, the second lateral stiffening member 70 is different from the second lateral stiffening member 30 of the above embodiment. Specifically, the upper flange 11 of the end steel frame 3 </ b> A and the intermediate steel frame 3 </ b> B is disposed on the upper flange 11 and the two first splice plates 71 </ b> A disposed on the left and right of the web 13 below the upper flange 11. One second splice plate 71B is joined to each other by being fastened by a plurality of bolts and nuts 32, and each first splice plate 71A has a width larger than the projecting dimension of the upper flange 11 from the web 13. And protrudes from the upper flange 11 to the corresponding left and right outwards. In other words, each first splice plate 71A includes a joint 73 having the same width as the overhanging dimension of the upper flange 11 from the web 13 necessary for joining the upper flange 11, and an end of the joint 73 on the side opposite to the web 13. And an extending portion 74 extending outward from the upper flange 11 from the portion.

各第1スプライスプレート71Aの延出部74の上面には、複数の頭付きスタッド35が植設されている。第1スプライスプレート71A上には、各延出部74の幅と同程度の幅をもって下方へ突出する左右の突出部4bが第1スプライスプレート71Aに至るようにスラブ4が構築されており、頭付きスタッド35はコンクリート5に埋設されることによってスラブ4に固定されている。即ち、鉄骨梁3の部材同士を接合するために上フランジ11の下面に接合される第1スプライスプレート71Aが、鉄骨梁3の横剛性を補完するための第2横補剛部材70を兼ねている。   A plurality of studs with heads 35 are planted on the upper surface of the extending portion 74 of each first splice plate 71A. On the first splice plate 71A, the slab 4 is constructed so that the left and right projecting portions 4b projecting downward with the same width as each extending portion 74 reach the first splice plate 71A. The stud 35 is fixed to the slab 4 by being embedded in the concrete 5. That is, the first splice plate 71A joined to the lower surface of the upper flange 11 in order to join the members of the steel beam 3 also serves as the second lateral stiffening member 70 for complementing the lateral rigidity of the steel beam 3. Yes.

本実施形態においても、第1実施形態の第2横補剛部材30と同様の作用効果が得られる。また、第1実施形態に比べ、スラブ4における、第1スプライスプレート71Aの拡幅によるコンクリート5の断面欠損が小さくなる。   Also in this embodiment, the same operation and effect as the second lateral stiffening member 30 of the first embodiment can be obtained. Further, compared to the first embodiment, the cross-sectional defect of the concrete 5 due to the widening of the first splice plate 71A in the slab 4 is reduced.

以上で具体的実施形態の説明を終えるが、本発明は上記実施形態に限定されることなく幅広く変形実施することができる。例えば、各部材や部位の具体的構成や配置、数量、角度など、本発明の趣旨を逸脱しない範囲であれば適宜変更可能である。また、上記実施形態の構成の一部や施工方法の一部を適宜組み合わせたり、適宜取捨したりしてもよい。更に、上記実施形態に示した各構成要素は必ずしも全てが必須ではなく、適宜選択することができる。   Although the description of the specific embodiment is finished as described above, the present invention is not limited to the above embodiment and can be widely modified. For example, the specific configuration, arrangement, quantity, angle, and the like of each member or part can be changed as appropriate without departing from the spirit of the present invention. Further, a part of the configuration of the above embodiment and a part of the construction method may be appropriately combined or appropriately discarded. Furthermore, all the constituent elements shown in the above embodiment are not necessarily essential, and can be appropriately selected.

1 建物
2 柱
3 鉄骨梁
3A 端部鉄骨
3B 中間鉄骨
4 スラブ
11 上フランジ
12 下フランジ
13 ウェブ
20 第1横補剛部材
21 側部補剛部
22 添板部
23 外張出板部
25 頭付きスタッド(固定部材)
26 横補剛スチフナ
30 第2横補剛部材
31(31A〜31E) スプライスプレート
31A 第1スプライスプレート
34 延出部
35 頭付きスタッド
40 第1横補剛部材
41 内張出板部
42 ボルト・ナット
50 第1横補剛部材
55 アンカーボルト(固定部材)
60 第1横補剛部材
61 内張出板部
70 第2横補剛部材
71A 第1スプライスプレート
74 延出部
DESCRIPTION OF SYMBOLS 1 Building 2 Column 3 Steel beam 3A End steel frame 3B Intermediate steel frame 4 Slab 11 Upper flange 12 Lower flange 13 Web 20 1st horizontal stiffening member 21 Side stiffening part 22 Attached plate part 23 Outboard plate part 25 With head Stud (fixing member)
26 Lateral stiffener 30 Second lateral stiffening member 31 (31A to 31E) Splice plate 31A First splice plate 34 Extension part 35 Stud with head 40 First lateral stiffening member 41 Stretch plate part 42 Bolt / nut 50 First lateral stiffening member 55 Anchor bolt (fixing member)
60 First lateral stiffening member 61 Lined plate part 70 Second lateral stiffening member 71A First splice plate 74 Extension part

Claims (10)

上フランジ、下フランジ、及び前記上フランジと前記下フランジとを連結するウェブを有し、両端が1対の柱に接合された鉄骨梁と、
前記鉄骨梁の上に構築されたスラブと、
前記鉄骨梁の軸方向の一部に設けられ、前記スラブに固定される横補剛部材とを備え、
前記横補剛部材が、前記上フランジ及び前記下フランジのそれぞれの左右の側面に沿って設けられた左右の側部補剛部を含み、
左右の前記側部補剛部が、
前記鉄骨梁の軸方向及び鉛直方向に互いに平行に延在し、前記上フランジを左右から挟むと共に前記下フランジに固定される左右の添板部と、
前記鉄骨梁の軸方向及び水平方向に延在し、左右の前記添板部の上端部から外方へ張り出す左右の外張出板部と、
各外張出板部の上面から延出し、前記スラブに固定される固定部材とを含むことを特徴とする前記鉄骨梁の横補剛構造。
An upper flange, a lower flange, and a steel beam having a web connecting the upper flange and the lower flange, and both ends joined to a pair of columns;
A slab built on the steel beam;
A lateral stiffening member provided in a part of the steel beam in the axial direction and fixed to the slab;
The lateral stiffening member includes left and right side stiffening portions provided along the left and right side surfaces of the upper flange and the lower flange,
The left and right side stiffeners are
Left and right accessory plates that extend parallel to each other in the axial direction and the vertical direction of the steel beam, sandwich the upper flange from the left and right, and are fixed to the lower flange;
The left and right outer projecting plate portions extending in the axial direction and the horizontal direction of the steel beam and projecting outward from the upper end portions of the left and right accessory plates,
A lateral stiffening structure for a steel beam, comprising: a fixing member extending from an upper surface of each overhanging plate portion and fixed to the slab.
左右の前記側部補剛部が、前記鉄骨梁の軸線方向に直交して延在し、左右の前記添板部と左右の前記外張出板部との対応するもの同士に溶接された少なくとも1対の左右のスチフナを更に含むことを特徴とする請求項1に記載の前記鉄骨梁の横補剛構造。   The left and right side stiffening portions extend at right angles to the axial direction of the steel beam, and are welded to corresponding ones of the left and right auxiliary plate portions and the left and right outer projecting plate portions. The lateral stiffening structure for a steel beam according to claim 1, further comprising a pair of left and right stiffeners. 左右の前記添板部の上端が、前記上フランジの対応する左右の側端に溶接されていることを特徴とする請求項1又は請求項2に記載の前記鉄骨梁の横補剛構造。   The lateral stiffening structure for a steel beam according to claim 1 or 2, wherein upper ends of the left and right accessory plates are welded to corresponding left and right side ends of the upper flange. 左右の前記添板部の下端が、前記下フランジの対応する左右の側端に溶接されていることを特徴とする請求項1〜請求項3のいずれかに記載の前記鉄骨梁の横補剛構造。   The lateral stiffening of the steel beam according to any one of claims 1 to 3, wherein lower ends of the left and right accessory plates are welded to corresponding left and right side ends of the lower flange. Construction. 前記横補剛部材が、左右の前記添板部の下端から内方へ張り出し、ボルト・ナットによって前記下フランジに締結された内張出板部を更に含み、
左右の前記添板部が前記内張出板部を介して前記下フランジに固定されていることを特徴とする請求項1〜請求項3のいずれかに記載の前記鉄骨梁の横補剛構造。
The lateral stiffening member further protrudes inward from the lower ends of the left and right accessory plate portions, and further includes an inner extension plate portion fastened to the lower flange by bolts and nuts,
The lateral stiffening structure for a steel beam according to any one of claims 1 to 3, wherein the left and right accessory plate portions are fixed to the lower flange via the lining plate portion. .
前記固定部材が、前記外張出板部の上面に植設され、前記スラブに埋設された頭付きスタッドであることを特徴とする請求項1〜請求項5のいずれかに記載の前記鉄骨梁の横補剛構造。   The steel beam according to any one of claims 1 to 5, wherein the fixing member is a stud with a head embedded in an upper surface of the overhanging plate portion and embedded in the slab. Lateral stiffening structure. 前記固定部材が、前記外張出板部を貫通するように設けられ、前記スラブに固定されたアンカーボルトであることを特徴とする請求項1〜請求項5のいずれかに記載の前記鉄骨梁の横補剛構造。   The steel beam according to any one of claims 1 to 5, wherein the fixing member is an anchor bolt that is provided so as to penetrate the outer projecting plate portion and is fixed to the slab. Lateral stiffening structure. 前記鉄骨梁が、軸方向の両端部に配置される1対の端部鉄骨、軸方向の中間部に配置される中間鉄骨、及び各端部鉄骨と前記中間鉄骨とを連結する複数のスプライスプレートとを有し、
前記横補剛部材が、
複数の前記スプライスプレートのうち、前記上フランジに接合され、前記上フランジよりも左右に延出する延出部を有する第1スプライスプレートと、
前記延出部の上面に植設され、前記スラブに埋設された複数の頭付きスタッドとを更に含むことを特徴とする請求項1〜請求項6のいずれかに記載の前記鉄骨梁の横補剛構造。
The steel beam is a pair of end steel frames disposed at both axial end portions, an intermediate steel frame disposed at the axial intermediate portion, and a plurality of splice plates that connect each end steel frame to the intermediate steel frame And
The lateral stiffening member is
Of the plurality of splice plates, a first splice plate having an extending portion that is joined to the upper flange and extends to the left and right than the upper flange;
The lateral complement of the steel beam according to any one of claims 1 to 6, further comprising a plurality of studs with heads embedded in an upper surface of the extension portion and embedded in the slab. Rigid structure.
上フランジ、下フランジ、及び前記上フランジと前記下フランジとを連結するウェブを有し、両端が1対の柱に接合された鉄骨梁と、
前記鉄骨梁の上に構築されたスラブと、
前記鉄骨梁の軸方向の一部に設けられ、前記スラブに固定される横補剛部材とを備え、
前記鉄骨梁が、軸方向の両端部に配置される1対の端部鉄骨、軸方向の中間部に配置される中間鉄骨、及び各端部鉄骨と前記中間鉄骨とを連結する複数のスプライスプレートとを有し、
前記横補剛部材が、
複数の前記スプライスプレートのうち、前記上フランジに接合され、前記上フランジよりも左右に延出する延出部を有する第1スプライスプレートと、
前記延出部の上面に植設され、前記スラブに埋設された複数の頭付きスタッドとを含むことを特徴とする前記鉄骨梁の横補剛構造。
An upper flange, a lower flange, and a steel beam having a web connecting the upper flange and the lower flange, and both ends joined to a pair of columns;
A slab built on the steel beam;
A lateral stiffening member provided in a part of the steel beam in the axial direction and fixed to the slab;
The steel beam is a pair of end steel frames disposed at both axial end portions, an intermediate steel frame disposed at the axial intermediate portion, and a plurality of splice plates that connect each end steel frame to the intermediate steel frame And
The lateral stiffening member is
Of the plurality of splice plates, a first splice plate having an extending portion that is joined to the upper flange and extends to the left and right than the upper flange;
A lateral stiffening structure for a steel beam comprising a plurality of studs with heads embedded in an upper surface of the extension part and embedded in the slab.
上フランジ、下フランジ、及び前記上フランジと前記下フランジとを連結するウェブを有し、両端が1対の柱に接合された鉄骨梁と、前記鉄骨梁の上に構築されたスラブとを有する建物の梁スラブ結合方法であって、
互いに平行に延在する左右の添板部、左右の前記添板部の上端部から外方へ水平に張り出す左右の外張出板部、及び、左右の前記添板部の下端から内方へ張り出す内張出板部を有する横補剛部材を用意するステップと、
前記横補剛部材を前記鉄骨梁に装着し、左右の前記添板部に前記上フランジ及び前記下フランジを左右から挟ませるステップと、
ボルト・ナットによって前記内張出板部を前記下フランジに締結するステップと、
固定部材によって左右の前記外張出板部を前記スラブに固定するステップとを備えることを特徴とする前記建物の梁スラブ結合方法。
An upper flange, a lower flange, and a steel beam having a web connecting the upper flange and the lower flange and having both ends joined to a pair of columns, and a slab constructed on the steel beam A beam slab connection method for a building,
Left and right accessory plate portions extending in parallel to each other, left and right outer extension plate portions extending horizontally outward from the upper end portions of the left and right accessory plate portions, and inward from the lower ends of the left and right accessory plate portions Preparing a lateral stiffening member having a lining plate portion projecting to the surface;
Attaching the lateral stiffening member to the steel beam, and sandwiching the upper flange and the lower flange from the left and right to the left and right plate parts;
Fastening the lining plate portion to the lower flange with bolts and nuts;
And fixing the left and right outer projecting plate portions to the slab with a fixing member.
JP2017030171A 2017-02-21 2017-02-21 Lateral stiffening structure of steel beam and beam slab connection method of building Active JP6749265B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017030171A JP6749265B2 (en) 2017-02-21 2017-02-21 Lateral stiffening structure of steel beam and beam slab connection method of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017030171A JP6749265B2 (en) 2017-02-21 2017-02-21 Lateral stiffening structure of steel beam and beam slab connection method of building

Publications (2)

Publication Number Publication Date
JP2018135669A true JP2018135669A (en) 2018-08-30
JP6749265B2 JP6749265B2 (en) 2020-09-02

Family

ID=63366029

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017030171A Active JP6749265B2 (en) 2017-02-21 2017-02-21 Lateral stiffening structure of steel beam and beam slab connection method of building

Country Status (1)

Country Link
JP (1) JP6749265B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200027604A (en) * 2018-09-04 2020-03-13 삼성물산 주식회사 Non-Welding Hybrid Bonded Connection Between Steel Beam and Construction Method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10183838A (en) * 1996-12-26 1998-07-14 Natl House Ind Co Ltd Floor support structure
JP2005350906A (en) * 2004-06-09 2005-12-22 Nippon Steel Corp Beam-column joining structure
JP2015067978A (en) * 2013-09-27 2015-04-13 大和ハウス工業株式会社 Lateral buckling stiffening structure of steel frame beam
JP2016121475A (en) * 2014-12-25 2016-07-07 株式会社巴コーポレーション Local buckling prevention structure of iron frame member and structure framework applied with the structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10183838A (en) * 1996-12-26 1998-07-14 Natl House Ind Co Ltd Floor support structure
JP2005350906A (en) * 2004-06-09 2005-12-22 Nippon Steel Corp Beam-column joining structure
JP2015067978A (en) * 2013-09-27 2015-04-13 大和ハウス工業株式会社 Lateral buckling stiffening structure of steel frame beam
JP2016121475A (en) * 2014-12-25 2016-07-07 株式会社巴コーポレーション Local buckling prevention structure of iron frame member and structure framework applied with the structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200027604A (en) * 2018-09-04 2020-03-13 삼성물산 주식회사 Non-Welding Hybrid Bonded Connection Between Steel Beam and Construction Method thereof
KR102174782B1 (en) * 2018-09-04 2020-11-06 삼성물산(주) Non-Welding Hybrid Bonded Connection Between Steel Beam and Construction Method thereof

Also Published As

Publication number Publication date
JP6749265B2 (en) 2020-09-02

Similar Documents

Publication Publication Date Title
JP5946041B2 (en) Column beam connection structure, column beam connection method, and precast concrete stigma member
KR101168763B1 (en) Composite bridge construction method
JP2012077471A (en) Joint structure of precast members and concrete precast members
JP4092873B2 (en) Structure of beam member and joint part of beam member and column member
JP2006037648A (en) Structure for joining column and beam together
JP2010007235A (en) Corrugated steel plate mounting structure, and building with the same
JP6944789B2 (en) Lateral stiffening structure of steel beam and beam slab connection method of building
JP4830647B2 (en) Beam-column joint structure
JP2018135669A (en) Steel beam lateral reinforcement rigid structure and method of connecting beam slab of building
KR100631363B1 (en) Panel zone system of y shape tied column reinforced with high tension bolts
JP5767782B2 (en) Bridge main girder connection structure
JP6432786B2 (en) Beam material load bearing structure and beam material repair method
JP4577004B2 (en) Construction method for building frames consisting of steel-concrete composite beams and SRC columns
JP5268470B2 (en) How to lift a rebar basket
JP5144182B2 (en) Seismic reinforcement structure and seismic reinforcement method for existing buildings
JP2014105547A (en) Structure for fixing precast floor slab
JP4307109B2 (en) Beam-column joint structure
JP7412244B2 (en) cloth foundation
JP2008291567A (en) Connection structure between reinforced concrete column and steel beams
JP6567368B2 (en) Reinforcement structure and reinforcement method for existing columns
JPH08302619A (en) Joint structure for composite members
KR20180026286A (en) Grid precast concrete structure and constructing method thereof
JP2009281011A (en) Joint structure of concrete building, and its construction method
JPH1122007A (en) Joining structure of steel pipe column and reinforced concrete beam
JP6633940B2 (en) Reinforcement structure of column and beam frame

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190919

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200716

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200804

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200811

R150 Certificate of patent or registration of utility model

Ref document number: 6749265

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250