JP2018068020A - Power-demand suppression-possible quantity calculating device and method, and power-demand suppression system - Google Patents

Power-demand suppression-possible quantity calculating device and method, and power-demand suppression system Download PDF

Info

Publication number
JP2018068020A
JP2018068020A JP2016204870A JP2016204870A JP2018068020A JP 2018068020 A JP2018068020 A JP 2018068020A JP 2016204870 A JP2016204870 A JP 2016204870A JP 2016204870 A JP2016204870 A JP 2016204870A JP 2018068020 A JP2018068020 A JP 2018068020A
Authority
JP
Japan
Prior art keywords
energy
amount
energy storage
power demand
facility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2016204870A
Other languages
Japanese (ja)
Inventor
良和 石井
Yoshikazu Ishii
良和 石井
安藤 慎輔
Shinsuke Ando
慎輔 安藤
高橋 宏文
Hirofumi Takahashi
宏文 高橋
隆文 江原
Takafumi Ebara
隆文 江原
裕丈 石井
Hirotake Ishii
裕丈 石井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2016204870A priority Critical patent/JP2018068020A/en
Publication of JP2018068020A publication Critical patent/JP2018068020A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To achieve calculation of suppression-possible quantity of power demand with relative ease and high reliability.SOLUTION: A power-demand suppression-possible quantity calculating device 10 that calculates suppression-possible quantity of power demand includes: a state detecting part 102 that detects a use state of energy consumption facilities 12; a first calculating part 101 that calculates integrated energy consumption of the energy consumption facilities in association with the use state concerning function maintenance duration that is preliminarily set; and a second calculating part 103 that calculates available stored energy quantity, which is the stored energy quantity of an energy storing device 11 associated with the energy consumption facilities, according to the use state from stored energy quantity and the integrated energy consumption associated with the use state, and calculates the suppression-possible quantity of the power demand based on time variation of the energy consumption and the available stored energy quantity in the energy consumption facilities.SELECTED DRAWING: Figure 1

Description

本発明は電力需要抑制可能量計算装置および方法、電力需要抑制システムに関する。   The present invention relates to a power demand controllable amount calculation device and method, and a power demand control system.

電力需給の逼迫した時間帯に需要家が電力需要を節約すれば、その節約した分だけ発電所の出力が増加したのと同等の効果を得られる。そこで、近年、需要家での需要削減をネガワット発電などと呼び、市場での取り引きが着目されている。   If customers save power demand during times when power supply and demand is tight, the same effect as if the output of the power plant has increased by that amount. Therefore, in recent years, demand reduction at consumers is called negative power generation and attention is being paid to market transactions.

ネガワット取引において入札したネガワット量の達成確率を向上する方法としては、特許文献1が知られている。特許文献1では、過去の実績に基づいて、運転スケジュール最適化を行わなかった場合の使用電力量であるベースラインを決め、ベースラインからの抑制量とその達成確率を高める工夫について述べている。   Patent Document 1 is known as a method for improving the achievement probability of the amount of negawatt bid in the negawatt transaction. Patent Document 1 describes a device for determining a baseline, which is the amount of power used when operation schedule optimization is not performed based on past results, and for increasing the amount of suppression from the baseline and its achievement probability.

特開2016−057972号公報JP, 2006-057972, A

特許文献1では、通常時に使用する電気エネルギを運用変更によって抑制するため、機器のエネルギ特性、インセンティブ単価、設備設定値、設備により消費または生産される電気エネルギ量などの、各種情報に基づく最適化が必要である。   In Patent Document 1, in order to suppress electric energy used during normal operation by operation change, optimization based on various information such as energy characteristics of equipment, incentive unit price, equipment set value, electric energy consumed or produced by equipment, etc. is necessary.

このためには、ネガワット取引に参加する各設備について、精度の高い設備情報などを取得する必要がある。したがって、多くの設備について精度の高い情報をそれぞれ収集し、きめ細かく運用を変更するのは現実的ではない。さらに、従来技術では、ネガワット取引に参加する各設備で本当にどれだけの電気エネルギを節約できたのかを客観的に確認する手段がないため、ネガワット取引の発注者にベースラインを認定してもらう必要もあり、手間がかかる。   For this purpose, it is necessary to acquire highly accurate facility information and the like for each facility participating in the negawatt transaction. Therefore, it is not realistic to collect highly accurate information for many facilities and change the operation in detail. In addition, with the prior art, there is no way to objectively check how much electrical energy was saved at each facility participating in the negawatt transaction, so it is necessary to have the negotiator trader certify the baseline. It takes time and effort.

本発明は上述の課題に鑑みてなされたもので、その目的は、比較的簡単かつ高い信頼性をもって電力需要の抑制可能量を計算できるようにした電力需要抑制可能量計算装置および方法、電力需要抑制システムを提供することにある。本発明の他の目的は、エネルギ消費設備に対応づけられる蓄エネルギ装置を有効利用することで、比較的簡単かつ高い信頼性をもって電力需要の抑制可能量を計算できるようにした電力需要抑制可能量計算装置および方法、電力需要抑制システムを提供することにある。   The present invention has been made in view of the above-described problems, and an object of the present invention is to provide a power demand controllable amount calculation device and method capable of calculating a power demand controllable amount with relatively simple and high reliability, and a power demand. It is to provide a suppression system. Another object of the present invention is to make it possible to calculate the amount of power demand that can be restrained relatively easily and with high reliability by effectively using an energy storage device associated with the energy consuming equipment. It is to provide a calculation apparatus and method, and a power demand suppression system.

上記課題を解決すべく、本発明に従う電力需要抑制可能量計算装置は、電力需要の抑制可能量を計算する電力需要抑制可能量計算装置であって、エネルギ消費設備の利用状態を検出する状態検出部と、エネルギ消費設備の積算エネルギ消費量を、予め設定される機能維持所要時間について、利用状態に関連付けて計算する第1計算部と、エネルギ消費設備に対応づけられる蓄エネルギ装置の蓄エネルギ量であって、利用状態に関連付けられた蓄エネルギ量と積算エネルギ消費量とから利用可能な蓄エネルギ量を利用状態に応じて計算し、エネルギ消費設備でのエネルギ消費量の時間変化と利用可能な蓄エネルギ量とに基づいて、電力需要の抑制可能量を計算する第2計算部と、を備える。   In order to solve the above-described problem, a power demand restrainable amount calculation device according to the present invention is a power demand restrainable amount calculation device that calculates a power demand restrainable amount, and a state detection that detects a usage state of an energy consuming facility. Unit, a first calculation unit that calculates an accumulated energy consumption amount of the energy consumption facility in association with a use state for a preset function maintenance time, and an energy storage amount of the energy storage device associated with the energy consumption facility The amount of stored energy that can be used is calculated according to the state of use from the amount of stored energy associated with the state of use and the accumulated energy consumption. A second calculator that calculates an amount of power demand that can be suppressed based on the amount of stored energy.

本発明によれば、エネルギ消費設備の利用状態に関連付けられた蓄エネルギ量と、エネルギ消費設備における積算エネルギ消費量とから、利用可能な蓄エネルギ量を利用状態に応じて計算することができる。これにより、本発明によれば、エネルギ消費設備でのエネルギ消費量の時間変化と利用可能な蓄エネルギ量とに基づいて、電力需要の抑制可能量を計算することができる。   ADVANTAGE OF THE INVENTION According to this invention, the available energy storage amount can be calculated according to a utilization state from the energy storage amount linked | related with the utilization state of an energy consumption facility, and the integrated energy consumption amount in an energy consumption facility. Thus, according to the present invention, it is possible to calculate the amount of power demand that can be suppressed based on the temporal change of the energy consumption amount in the energy consumption facility and the available stored energy amount.

電力需要抑制可能量計算装置を含むシステム全体ののブロック図。The block diagram of the whole system containing an electric power demand controllable amount calculation apparatus. 蓄エネルギ装置に蓄積されるエネルギ量の変化を示すグラフ。The graph which shows the change of the energy amount accumulate | stored in an energy storage apparatus. エネルギ消費設備のエネルギ消費量を計測する様子を示すグラフ。The graph which shows a mode that the energy consumption of an energy consumption facility is measured. 計測値を記憶する仕組みを示す説明図。Explanatory drawing which shows the mechanism which memorize | stores a measured value. サービス利用状態を検出する方法の例を示す説明図。Explanatory drawing which shows the example of the method of detecting a service utilization state. モデル化部により生成される回帰モデルの例を示す説明図。Explanatory drawing which shows the example of the regression model produced | generated by the modeling part. 未利用の蓄エネルギ量を計算する方法を示す説明図。Explanatory drawing which shows the method of calculating the amount of unused energy storage. ネガワット取引市場への入札を説明する図。The figure explaining the bid to a negawatt trading market. 第2実施例に係り、電力需要抑制可能量計算装置を含むシステム全体のブロック図。The block diagram of the whole system which concerns on 2nd Example and contains a power demand controllable amount calculation apparatus. 使用形態の異なる複数の蓄エネルギ装置を組み合わせることでネガワット取引に入札する様子を示す説明図。Explanatory drawing which shows a mode that it bids for a negawatt transaction by combining the some energy storage apparatus from which a usage form differs. 抑制可能プロファイルの例を示す説明図。Explanatory drawing which shows the example of a suppression possible profile. 統合化システムの処理を示すフローチャート。The flowchart which shows the process of an integrated system. 第3実施例に係り、電力需要抑制可能量計算装置を含むシステム全体のブロック図。The block diagram of the whole system which concerns on 3rd Example and contains a power demand controllable amount calculation apparatus. 第4実施例に係り、踏切警報装置の持つ蓄エネルギ装置を利用する場合の説明図。Explanatory drawing in the case of using the energy storage device which a 4th Example concerns and has in a level crossing warning device.

以下、図面に基づいて、本発明の実施の形態を説明する。本実施形態では、サービス利用状態ごとに消費エネルギ量および蓄エネルギ量を求め、蓄エネルギ装置からのエネルギ放出によって系統負荷を抑制する(電力需要を抑制する)。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the present embodiment, the amount of energy consumed and the amount of stored energy are obtained for each service usage state, and the system load is suppressed (the power demand is suppressed) by releasing the energy from the energy storage device.

本実施形態では、もともとは電力需要の抑制のために設けられたのではない蓄エネルギ設備を、電力需要の抑制にも利用する。本実施形態では、電力需要抑制の専用装置ではない蓄エネルギ装置を用いて電力需要の抑制を図るため、使用形態の異なる複数の蓄エネルギ装置を組み合わせて用いる必要がある。   In the present embodiment, an energy storage facility that is not originally provided for suppressing power demand is also used for suppressing power demand. In the present embodiment, in order to suppress power demand using an energy storage device that is not a dedicated device for suppressing power demand, it is necessary to use a plurality of energy storage devices having different usage patterns in combination.

したがって、多種多様な蓄エネルギ装置を連携させ得る本実施形態では、それら蓄エネルギ装置のそれぞれについて精度の高い情報を収集して複雑なモデルを作成することは、特に難しい。そこで、本実施形態では、蓄エネルギ装置と蓄エネルギ装置が対応づけられるエネルギ消費設備とに関して計測可能な情報に基づいて、簡便かつ正確に電力需要抑制可能量を計算する。   Therefore, in this embodiment in which a wide variety of energy storage devices can be linked, it is particularly difficult to create a complicated model by collecting highly accurate information about each of the energy storage devices. Therefore, in the present embodiment, the amount of power demand that can be suppressed is calculated simply and accurately based on information that can be measured with respect to the energy storage device and the energy consuming equipment with which the energy storage device is associated.

本実施形態の電力需要抑制可能量計算装置10は、エネルギ消費設備12について予め設定された機能維持所要時間内での余剰蓄エネルギ量(利用可能な蓄エネルギ量)を、エネルギ消費設備12の利用状態を表すサービス利用状態データD2の値と関連付けてモデル化する手段103を備える。モデル化する手段103は、エネルギ消費設備12におけるエネルギ消費のうち、蓄エネルギ設備11が代替可能な部分のエネルギ消費の時間変化と余剰蓄エネルギ量とから系統負荷抑制可能量(電力需要抑制可能量)を推定する。実際の抑制量は、蓄エネルギ設備11の放出する放エネルギ量、または蓄エネルギ装置11の蓄積するエネルギ量の抑制量として計測することができる。   The power demand controllable amount calculation apparatus 10 according to the present embodiment uses the surplus energy storage amount (available energy storage amount) within the time required for maintaining the function set in advance for the energy consumption facility 12 as the use of the energy consumption facility 12. Means 103 is provided for modeling in association with the value of the service usage state data D2 representing the state. The modeling means 103 is a system load suppression possible amount (a power demand suppression possible amount) from the time change of the energy consumption of the portion of the energy consumption facility 12 that can be replaced by the energy storage facility 11 and the surplus energy storage amount. ). The actual amount of suppression can be measured as the amount of energy released by the energy storage facility 11 or the amount of energy stored by the energy storage device 11.

本実施形態によれば、複雑かつ正確なモデルを作成することなく、電力系統への負荷の抑制量を計測値から決定することができる。さらに、本実施形態によれば、負荷抑制の実際の実施量も計測結果を基に決めることができる。以下の説明では、需要抑制を負荷抑制と呼ぶ場合がある。   According to the present embodiment, it is possible to determine the amount of suppression of the load on the power system from the measured value without creating a complicated and accurate model. Furthermore, according to this embodiment, the actual amount of load suppression can also be determined based on the measurement result. In the following description, demand suppression may be referred to as load suppression.

図1は、電力需要抑制システムの全体概要を示す。電力需要抑制システムは、例えばプロシューマ1を含む。プロシューマ1は、プロデューサとコンシューマを合成した概念である。本実施例では、系統2への電力需要の抑制を生産できる消費者という意味で、プロシューマという言葉を用いる。   FIG. 1 shows an overall outline of a power demand control system. The power demand suppression system includes a prosumer 1, for example. Prosumer 1 is a concept that combines producers and consumers. In this embodiment, the word prosumer is used in the sense of a consumer who can produce a reduction in power demand to the grid 2.

プロシューマ1は、例えば、デマンド調整力診断装置10と、蓄エネルギ設備11と、エネルギ消費設備12とを備える。先に蓄エネルギ設備11およびエネルギ消費設備12について説明する。蓄エネルギ設備11は「蓄エネルギ装置」の例であり、本実施例では電力を一次エネルギとして貯蔵する。本実施例のエネルギ消費設備12は、電力を一次エネルギとしてサービスを提供する設備である。   The prosumer 1 includes, for example, a demand adjusting force diagnosis device 10, an energy storage facility 11, and an energy consumption facility 12. The energy storage facility 11 and the energy consumption facility 12 will be described first. The energy storage facility 11 is an example of an “energy storage device”, and in this embodiment, electric power is stored as primary energy. The energy consuming facility 12 of this embodiment is a facility that provides services using electric power as primary energy.

例えば、エネルギ消費設備12は携帯電話基地局であり、蓄エネルギ設備11は携帯基地局に設けられるバッテリ装置である。さらに例えば、エネルギ消費設備12は、電気エネルギを利用して湯(熱エネルギ)を生成し、その湯をタンクに貯蔵し、貯蔵した湯を必要に応じて提供する、電気給湯機のような設備である。この場合、エネルギ消費設備12は、蓄エネルギ設備11を兼ねる。エネルギ消費設備12および蓄エネルギ設備11は、上述の例に限らない。本実施例は種々の設備に適用可能である。   For example, the energy consuming equipment 12 is a mobile phone base station, and the energy storage equipment 11 is a battery device provided in the mobile base station. Further, for example, the energy consuming equipment 12 is an equipment such as an electric water heater that generates hot water (thermal energy) using electric energy, stores the hot water in a tank, and provides the stored hot water as needed. It is. In this case, the energy consuming equipment 12 also serves as the energy storage equipment 11. The energy consumption facility 12 and the energy storage facility 11 are not limited to the above-described examples. This embodiment can be applied to various facilities.

蓄エネルギ設備11は、スイッチ22を介して受電設備21に接続される。エネルギ消費設備12は、スイッチ23を介して受電設備21に接続される。系統2の電力は、受電設備21等を介して、蓄エネルギ設備11とエネルギ消費設備12に供給される。蓄エネルギ設備11は、系統2の電力を利用してエネルギを蓄積する。   The energy storage facility 11 is connected to the power receiving facility 21 via the switch 22. The energy consuming equipment 12 is connected to the power receiving equipment 21 via the switch 23. The power of the grid 2 is supplied to the energy storage facility 11 and the energy consumption facility 12 through the power receiving facility 21 and the like. The energy storage facility 11 stores energy using the power of the grid 2.

蓄エネルギ設備11は、電気エネルギを蓄えてもよいし、あるいは、熱エネルギや運動エネルギなどに変換して蓄えてもよい。エネルギ消費設備12は、系統2の電力を利用して機能を提供してもよいし、あるいは停電時等には蓄エネルギ設備11から供給されるエネルギを用いて機能を提供してもよい。蓄エネルギ設備11からエネルギ消費設備へのエネルギ供給を点線で示す。   The energy storage facility 11 may store electrical energy, or may store it by converting it into heat energy, kinetic energy, or the like. The energy consuming facility 12 may provide a function using the power of the grid 2 or may provide a function using energy supplied from the energy storage facility 11 at the time of a power failure or the like. Energy supply from the energy storage facility 11 to the energy consuming facility is indicated by a dotted line.

デマンド調整力診断装置10は、プロシューマ1において抑制可能な電力需要(デマンド調整力)を計算する装置である。デマンド調整力診断装置10は、「電力需要抑制可能量計算装置」の例である。デマンド調整力診断装置10は、マイクロプロセッサ、メモリ、補助記憶装置、入出力インターフェース回路、通信インターフェース回路(いずれも不図示)などを含む計算機を利用して生成される。   The demand adjustment force diagnostic device 10 is a device that calculates power demand (demand adjustment force) that can be suppressed in the prosumer 1. The demand adjusting power diagnostic device 10 is an example of a “power demand restrainable amount calculating device”. The demand adjusting ability diagnostic apparatus 10 is generated using a computer including a microprocessor, a memory, an auxiliary storage device, an input / output interface circuit, a communication interface circuit (all not shown), and the like.

デマンド調整力診断装置10は、例えば、対象エネルギ消費量積算部101、サービス利用状態検出部102、モデル化部103、通信部104を備える。   The demand adjustment capability diagnosis apparatus 10 includes, for example, a target energy consumption accumulation unit 101, a service usage state detection unit 102, a modeling unit 103, and a communication unit 104.

対象エネルギ消費量積算部101は、スイッチ13を介して、蓄エネルギ設備11またはエネルギ消費設備12のいずれかに接続される。対象エネルギ消費量積算部101は、蓄エネルギ設備11を常用で用いる場合の対象エネルギ消費量、または、蓄エネルギ設備11をエネルギ消費設備12の非常用電源として用いる場合の対象エネルギ消費量を、計測値D3として取得する。   The target energy consumption accumulation unit 101 is connected to either the energy storage facility 11 or the energy consumption facility 12 via the switch 13. The target energy consumption integrating unit 101 measures the target energy consumption when the energy storage facility 11 is used regularly, or the target energy consumption when the energy storage facility 11 is used as an emergency power source of the energy consumption facility 12. Obtained as value D3.

そして、対象エネルギ消費量積算部101は、予め定められたエネルギ消費設備12の機能維持所要時間について、対象エネルギ消費量を積算する。つまり、対象エネルギ消費量積算部101は、定められた機能維持所要時間だけエネルギ消費設備12が機能を維持するために必要となるエネルギ量を、計測値D3を積算して求める。   Then, the target energy consumption integration unit 101 integrates the target energy consumption for a predetermined function maintenance time of the energy consumption facility 12. That is, the target energy consumption accumulation unit 101 obtains the amount of energy required for the energy consumption facility 12 to maintain the function for the predetermined function maintenance required time by integrating the measured value D3.

エネルギ消費設備12の機能維持所要時間とは、停電時においても、その設備12が機能(サービス)を維持すべき時間である。機能維持所要時間は、エネルギ消費設備12の種類や仕様などに応じて事前に設定される。機能維持所要時間は、規則で定められる場合もあるし、設備のベンダーが自主的に設定している場合もある。例えば、電気給湯機のような日常的に使用される設備の場合、機能維持所要時間は24時間のように長く設定されるであろう。これに対し、携帯基地局の非常用電源の場合、停電のような非常時に使用されるため、機能維持所要時間は数時間程度に設定されるであろう。機能維持所要時間については、図2で後述する。   The time required for maintaining the function of the energy consuming facility 12 is the time that the facility 12 should maintain the function (service) even in the event of a power failure. The function maintenance time is set in advance according to the type and specifications of the energy consuming equipment 12. The time required for maintaining the function may be determined by regulations, or may be set voluntarily by the equipment vendor. For example, in the case of equipment used on a daily basis such as an electric water heater, the function maintenance time will be set as long as 24 hours. On the other hand, in the case of an emergency power source for a mobile base station, it is used in an emergency such as a power failure, so the time required for maintaining the function will be set to several hours. The function maintenance time will be described later with reference to FIG.

サービス利用状態検出部102は、「状態検出部」の例である。サービス利用状態検出部102は、エネルギ消費設備12の提供するサービスに関する情報D1を取得し、そのサービス情報D1を分析することにより、サービス利用状態を検出する。サービス利用状態検出部102は、予め定義された複数の段階のいずれにサービス利用状態が属するかを分類することもできる。   The service usage state detection unit 102 is an example of a “state detection unit”. The service usage state detection unit 102 acquires information D1 related to the service provided by the energy consuming equipment 12, and analyzes the service information D1 to detect the service usage state. The service usage status detection unit 102 can also classify to which of a plurality of predefined stages the service usage status belongs.

サービスとは、エネルギ消費設備12が提供する機能であり、例えば携帯電話基地局の場合は通信サービスが該当する。蓄エネルギ設備11およびエネルギ消費設備12が電気給湯機の場合、湯の提供がサービスとなる。踏切に設置される警報遮断機の場合は、バーの昇降と警報音の鳴動がサービスとなる。サービス利用状態検出部102は、必要に応じて例えば、気象データを配信するサーバなどのような情報供給源から情報を取得して利用することもできる。   The service is a function provided by the energy consuming equipment 12, and corresponds to a communication service in the case of a mobile phone base station, for example. When the energy storage facility 11 and the energy consumption facility 12 are electric water heaters, the provision of hot water is a service. In the case of an alarm breaker installed at a railroad crossing, raising and lowering a bar and sounding an alarm sound are services. The service use state detection unit 102 can acquire and use information from an information supply source such as a server that distributes weather data, for example, as necessary.

モデル化部103は、対象エネルギ消費量積算部101の計算結果である対象エネルギの消費積算値D4(以下、積算値D4とも呼ぶ)と、サービス利用状態検出部102のサービス利用状態の分類結果であるサービス利用状態データD2とを関連付けてモデルを生成する。モデル化部103は、利用可能な蓄エネルギ量を計算する機能1031を備えることもできる。   The modeling unit 103 includes a target energy consumption integrated value D4 (hereinafter also referred to as an integrated value D4), which is a calculation result of the target energy consumption integrating unit 101, and a service usage state classification result of the service usage state detecting unit 102. A model is generated by associating with certain service usage state data D2. The modeling unit 103 can also include a function 1031 for calculating an available energy storage amount.

前述したモデルの形成例を説明する。例えば、サービスを利用するユーザ数が少ない場合、エネルギ消費量は少なくて済むため、消費するエネルギの積算値も小さくなる。これに対し、ユーザ数が多い場合、エネルギ消費量は増加するため、消費するエネルギの積算値も大きくなる。   An example of forming the above model will be described. For example, when the number of users who use the service is small, the amount of energy consumed is small, so the integrated value of energy consumed is also small. On the other hand, when the number of users is large, the amount of energy consumption increases, so the integrated value of energy consumed also increases.

図2を用いて、機能維持所要時間tfを説明する。図2(a)は、蓄エネルギ設備11を常用で用いる場合の例を示す。図2(b)は、蓄エネルギ設備11を非常用で用いる場合の例を示す。   The function maintenance time tf will be described with reference to FIG. Fig.2 (a) shows the example in the case of using the energy storage equipment 11 by regular use. FIG.2 (b) shows the example in the case of using the energy storage equipment 11 for emergency.

本実施例における常用とは、エネルギを蓄える時期とエネルギを放出する時期とを繰り返すサイクルがある場合をいう。以下では、エネルギを蓄えることを蓄エネルギ、エネルギを放出することを放エネルギと呼ぶ場合がある。   The regular use in the present embodiment refers to a case where there is a cycle in which energy is stored and energy is released. Hereinafter, storing energy may be referred to as storing energy, and releasing energy may be referred to as releasing energy.

図2(a)に示すように、例えば電気給湯機は、電気料金の安い深夜から早朝の時間帯にかけて、系統2からの電力を用いて熱エネルギとしての湯を生成し、蓄えておく(T0−T1)。図2では、蓄えられたエネルギ量に符号ESを付している。その後の時間帯(T1−T2)で、電気給湯機は、熱エネルギとしての湯をユーザへ供給する。   As shown in FIG. 2 (a), for example, an electric water heater generates hot water as heat energy using the electric power from the grid 2 from midnight to early morning when the electricity rate is low and stores it (T0). -T1). In FIG. 2, the stored energy amount is marked with a symbol ES. In the subsequent time zone (T1-T2), the electric water heater supplies hot water as heat energy to the user.

このように、エネルギを蓄積する時期とエネルギを放出する時期とが所定の運転サイクルで繰り返す場合を常用と呼ぶ。   As described above, a case where the time for storing energy and the time for releasing energy are repeated in a predetermined operation cycle is called normal use.

常用される蓄エネルギ設備11の場合、蓄エネルギおよび放エネルギは、おおよそ決まった時刻あるいは時間帯に実施される。例えば、常用される蓄エネルギ設備11は、一日の中、時刻T1(例えば午前7時)までに満杯状態ESまでエネルギを蓄え、その後、時刻T2(例えば翌日の午前7時)までに放エネルギと蓄エネルギを実施する。   In the case of the energy storage equipment 11 that is regularly used, the energy storage and the energy release are carried out at approximately determined times or time zones. For example, the energy storage equipment 11 that is used regularly stores energy up to a full state ES by time T1 (for example, 7:00 am) during the day, and then releases energy by time T2 (for example, 7:00 am on the following day). And implement energy storage.

これに対し、風力発電設備の出力安定化などに用いるバッテリ装置は、日常的に用いられるものであるが、明確な運転サイクルを持たず天候に大きく左右される。本実施例では、明確な運転サイクルを持たない蓄エネルギ設備11については、対象としない。   On the other hand, a battery device used for stabilizing the output of a wind power generation facility is used on a daily basis, but does not have a clear operation cycle and greatly depends on the weather. In this embodiment, the energy storage equipment 11 that does not have a clear operation cycle is not a target.

常用される蓄エネルギ設備11の場合、機能維持所要時間tfは、蓄エネルギ設備11の運転サイクルの時間的な長さ(サービス提供時間)に相当する。   In the case of the energy storage equipment 11 that is regularly used, the function maintenance required time tf corresponds to the time length (service provision time) of the operation cycle of the energy storage equipment 11.

一方、蓄エネルギ設備11を非常用に用いる場合、図2(b)に示すように、任意の時刻T0から一定の期間、エネルギ消費設備12の機能を維持できることが必要となる。非常用の蓄エネルギ装置11は、例えば停電時に、一定の時間だけ照明を点灯したり、計算機などの重要負荷の機能を維持したり、通信サービスの継続を提供したりといった用途で使用される。   On the other hand, when the energy storage facility 11 is used for an emergency, as shown in FIG. 2B, it is necessary to be able to maintain the function of the energy consuming facility 12 for a certain period from an arbitrary time T0. The emergency energy storage device 11 is used for such purposes as turning on the light for a certain period of time, maintaining the function of an important load such as a computer, or providing continuation of communication services during a power failure, for example.

モデル化部103は、サービス利用状態検出部102により分類された時間帯毎のサービス利用状態データD2の値と、対象エネルギ消費D3の積算値D4とを取得する。モデル化部103は、サービス利用状態データD2と、蓄エネルギ設備11の最大エネルギ容量または計測した蓄エネルギ量から積算値D4を差し引いて得た余剰蓄エネルギ量とを、組として記憶する。そして、モデル化部103は、組として記録した過去データを基に、テーブル化する。テーブル化には、例えば、関数によるフィッティングを用いてもよいし、または、サービス利用状態データD2を離散化して各離散値に対する余剰蓄エネルギ量を対応させてテーブル化してもよい。上述の余剰蓄エネルギ量は、「利用可能な蓄エネルギ量」に該当する。   The modeling unit 103 acquires the value of the service usage state data D2 for each time period classified by the service usage state detection unit 102 and the integrated value D4 of the target energy consumption D3. The modeling unit 103 stores the service usage state data D2 and the surplus energy storage amount obtained by subtracting the integrated value D4 from the maximum energy capacity of the energy storage facility 11 or the measured energy storage amount. Then, the modeling unit 103 creates a table based on the past data recorded as a set. For example, fitting by a function may be used for tabulation, or the service use state data D2 may be discretized and the amount of surplus stored energy corresponding to each discrete value may be tabulated. The above-described surplus energy storage amount corresponds to “available energy storage amount”.

デマンド調整力診断装置10は、エネルギ消費設備12のサービス利用状態データD2と、モデル化部103で構築したモデルとに基づいて、系統2の電力需要を抑制可能な量(ネガワット量)を計算する。プロシューマ1は、計算された抑制可能量をネガワット取引市場に入札する。取引市場を含む例は、他の実施例で後述する。なお、入札時の価格は、蓄エネルギ設備11の運用に伴うコストから決定することができる。   The demand adjustment power diagnostic device 10 calculates an amount (negative wattage) capable of suppressing the power demand of the grid 2 based on the service usage state data D2 of the energy consuming equipment 12 and the model constructed by the modeling unit 103. . Prosumer 1 bids the calculated restrainable amount on the negawatt trading market. An example including a trading market will be described later in another embodiment. The price at the time of bidding can be determined from the cost associated with the operation of the energy storage facility 11.

系統2に対する電力需要の抑制は、以下のようにして実現できる。一つは、エネルギ消費設備12へのエネルギ供給元を系統2から蓄エネルギ設備11へ切り替えることにより、エネルギ消費設備12が系統2からの電力を消費しないようにする方法である。他の一つは、蓄エネルギ設備11の蓄エネルギ動作を停止させることで、蓄エネルギ設備11が系統2の電力を消費するのを抑制する方法である。蓄エネルギ設備11と系統2との接続または遮断は、スイッチ22が制御する。エネルギ消費設備12と系統2との接続または遮断は、スイッチ23が制御する。なお、図示は省略するが、蓄エネルギ設備11からエネルギ消費設備12へのエネルギ供給を制御するための装置(例えば、スイッチや制御弁等)をプロシューマ1は備える。   Suppression of power demand for the grid 2 can be realized as follows. One is a method of preventing the energy consuming facility 12 from consuming electric power from the system 2 by switching the energy supply source to the energy consuming facility 12 from the system 2 to the energy storage facility 11. The other one is a method of suppressing the energy storage facility 11 from consuming the power of the grid 2 by stopping the energy storage operation of the energy storage facility 11. The switch 22 controls connection or disconnection between the energy storage equipment 11 and the grid 2. The switch 23 controls connection or disconnection between the energy consuming equipment 12 and the grid 2. In addition, although illustration is abbreviate | omitted, the prosumer 1 is equipped with the apparatus (for example, switch, control valve, etc.) for controlling the energy supply from the energy storage equipment 11 to the energy consumption equipment 12.

上述の構成により、本実施例では、プロシューマ1のエネルギ消費設備12がユーザへ提供するサービスに影響を与えない範囲で、プロシューマ1の有する蓄エネルギ設備11に蓄積されたエネルギを、いわゆるネガワット取引に利用することができる。   With the above-described configuration, in the present embodiment, the energy stored in the energy storage facility 11 of the prosumer 1 is used for so-called negawatt transactions within a range that does not affect the service provided by the energy consumption facility 12 of the prosumer 1 to the user. Can be used.

さらに本実施例では、ネガワット取引の対象である抑制量(ネガワット量)は、蓄エネルギ設備11およびエネルギ消費設備12に対する計測結果から客観的に求めることができる。このため、本実施例では、従来技術のように電力需要の抑制対策を全く実施しない場合の仮定の数値であるベースラインを計算する手間がいらず、客観的で説得力のある電力需要の抑制量を簡便に計算することができる。   Furthermore, in this embodiment, the suppression amount (negative wattage amount) that is the subject of the negative wattage transaction can be objectively determined from the measurement results for the energy storage facility 11 and the energy consumption facility 12. For this reason, in this embodiment, there is no need to calculate a baseline, which is a hypothetical value when power demand suppression measures are not implemented at all as in the prior art, and objective and persuasive power demand suppression The amount can be calculated conveniently.

具体的には、蓄エネルギ設備11からエネルギ消費設備12へ供給されるエネルギ量(放エネルギ量)、あるいは、蓄エネルギ設備11への蓄エネルギを停止した時点の蓄エネルギ量のいずれかと、蓄エネルギ設備11の効率とを考慮することで、電力需要の抑制量を計算できる。   Specifically, either the amount of energy supplied from the energy storage facility 11 to the energy consumption facility 12 (amount of energy released) or the amount of energy stored when the energy storage to the energy storage facility 11 is stopped, and the energy storage By taking into account the efficiency of the facility 11, the amount of suppression of power demand can be calculated.

対象エネルギ消費積算部101について、図3および図4を用いて説明する。   The target energy consumption integrating unit 101 will be described with reference to FIGS. 3 and 4.

図3に示すように、対象エネルギ消費積算部101は、対象エネルギ消費D3の計測結果を基に、現在時刻TCから機能維持所要時間tfよりも前の時刻を開始時刻として、機能維持所要時間tfの間に必要となる対象エネルギの消費量を計算する。   As shown in FIG. 3, the target energy consumption integrating unit 101 uses the time before the function maintenance required time tf from the current time TC as the start time based on the measurement result of the target energy consumption D3. The consumption of the target energy required during the period is calculated.

デマンド調整力診断装置10は、計測周期と機能維持所要時間tfとから、下記の数式1で決まるデータ数を格納することのできる記憶手段を有する。その記憶手段の容量が、数式1で決まるデータ数分の合計データ量に一致する場合、最新の計測値の格納位置を記憶する手段も設け、古いデータを書き換えるようにして記憶手段を利用する。   The demand adjusting force diagnosis apparatus 10 includes a storage unit that can store the number of data determined by the following Equation 1 from the measurement cycle and the function maintenance required time tf. When the capacity of the storage means coincides with the total data amount corresponding to the number of data determined by Equation 1, means for storing the storage position of the latest measurement value is also provided, and the storage means is used so as to rewrite old data.

図4は、記憶手段を、古いデータから順番に上書きして使用するリングバッファのように構成する場合を示す。この場合、記憶手段に記録された全てのデータの合計が、時々刻々の対象エネルギ消費D3を積算した値D4となる。   FIG. 4 shows a case where the storage means is configured as a ring buffer that is used by overwriting in order from the old data. In this case, the sum of all data recorded in the storage means is a value D4 obtained by integrating the target energy consumption D3 every moment.

データ数=機能維持所要時間/計測周期・・・(数式1)     Number of data = time required for function maintenance / measurement cycle (Formula 1)

図5を用いて、サービス利用状態検出部102について説明する。サービス利用状態検出部102は、エネルギ消費設備12の利用状態を検出するサービス情報D1を定期的または不定期に取得する。サービス利用状態検出部102は、取得したサービス情報D1を予め定めた区間で離散化し、エネルギ消費設備12の利用状態を分類する。サービス利用状態検出部102は、その分類結果をサービス利用状態データD2として、モデル化部103に提供する。   The service usage state detection unit 102 will be described with reference to FIG. The service usage state detection unit 102 acquires service information D1 for detecting the usage state of the energy consuming equipment 12 regularly or irregularly. The service usage state detection unit 102 discretizes the acquired service information D1 in a predetermined section, and classifies the usage state of the energy consuming equipment 12. The service usage state detection unit 102 provides the classification result to the modeling unit 103 as service usage state data D2.

サービス利用状態検出部102は、前述した対象エネルギ消費積算部101と同様に、機能維持所要時間tf内の平均値としてサービス利用状態データD2を算出し、モデル化部103へ送付してもよい。サービス利用状態検出部102は、予め区間を定める代わりに、過去の機能維持所要時間tfよりも十分長い期間のサービス情報D1を分析することで、さびる利用状態データD2を算出してもよい。例えば、サービス利用状態検出部102は、サービス情報D1の取る値のヒストグラムを作り、これが一定割合になるように分割してもよい。図5では、サービス情報D1をスカラー量として示したが、ベクトル量であってもよい。   Similar to the target energy consumption integration unit 101 described above, the service usage state detection unit 102 may calculate the service usage state data D2 as an average value within the function maintenance required time tf and send it to the modeling unit 103. The service usage state detection unit 102 may calculate the rusting usage state data D2 by analyzing the service information D1 for a period sufficiently longer than the past function maintenance required time tf instead of determining the section in advance. For example, the service usage state detection unit 102 may create a histogram of the values taken by the service information D1 and divide the histogram so that it has a certain ratio. In FIG. 5, the service information D1 is shown as a scalar quantity, but it may be a vector quantity.

図6を用いて、モデル化部103について説明する。モデル化部103では、サービス利用状態検出部102の分類結果であるサービス利用状態データD2と、対象エネルギ消費積算部101の積算値D4とを用いて、サービス利用状態データD2に対する余剰蓄エネルギ量を計算するモデルを構築する。以下、サービス利用状態データD2を分類結果D2と呼ぶことがある。   The modeling unit 103 will be described with reference to FIG. The modeling unit 103 uses the service usage state data D2 that is the classification result of the service usage state detection unit 102 and the integrated value D4 of the target energy consumption integration unit 101 to calculate the surplus energy storage amount for the service usage state data D2. Build a model to calculate. Hereinafter, the service use state data D2 may be referred to as a classification result D2.

蓄エネルギ設備11が非常用設備の場合、モデル化部103は、数式2にしたがって、蓄エネルギ設備容量から対象エネルギ消費の積算値D4を差し引くことで余剰蓄エネルギ量を算出する。非常用設備の場合は、満蓄状態である可能性が高いため、蓄エネルギ設備容量を計算の基礎に用いる。   When the energy storage facility 11 is an emergency facility, the modeling unit 103 calculates the surplus energy storage amount by subtracting the integrated value D4 of the target energy consumption from the energy storage facility capacity according to Equation 2. In the case of emergency facilities, there is a high possibility that the facility is fully stored, so the energy storage facility capacity is used as the basis of calculation.

Max(蓄エネルギ設備容量−調整係数×対象エネルギ消費積算値,0)・・・(数式2)     Max (energy storage equipment capacity-adjustment coefficient x target energy consumption integrated value, 0) (Equation 2)

ここで、蓄エネルギ設備容量とは、蓄エネルギ設備11に蓄積可能なエネルギ量の最大値である。調整係数については後述する。Maxとは、(蓄エネルギ設備容量−調整係数×対象エネルギ消費積算値)と0とを比較し、いずれか大きい方を選択する関数である。したがって、数式2は、0以上の値を余剰蓄エネルギ量として出力し、マイナスの値を出力しない。   Here, the energy storage facility capacity is the maximum amount of energy that can be stored in the energy storage facility 11. The adjustment coefficient will be described later. Max is a function that compares (energy storage facility capacity−adjustment coefficient × target energy consumption integrated value) with 0 and selects the larger one. Therefore, Formula 2 outputs a value of 0 or more as the surplus energy storage amount and does not output a negative value.

蓄エネルギ設備11が常用の場合、モデル化部103は、数式3にしたがって、直近のサイクル開始時点での蓄エネルギ量から対象エネルギ消費の積算値D4を差し引くことで余剰蓄エネルギ量を算出する。常用設備の場合は、満蓄状態の手前、例えば60〜90%程度の蓄エネルギ状態で使用される可能性が高いため、最新サイクルの開始時点で蓄積されているエネルギ量を計算の基礎として使用する。   When the energy storage facility 11 is in regular use, the modeling unit 103 calculates the surplus energy storage amount by subtracting the integrated value D4 of the target energy consumption from the energy storage amount at the most recent cycle start time according to Equation 3. In the case of regular equipment, there is a high possibility that it will be used in the energy storage state before the fully stored state, for example, about 60 to 90%, so the amount of energy stored at the start of the latest cycle is used as the basis of calculation. To do.

Max(最新の蓄エネルギ量−調整係数×対象エネルギ消費積算値,0)・・・(数式3)     Max (Latest energy storage amount−Adjustment coefficient × Target energy consumption integrated value, 0) (Equation 3)

モデル化部103は、数式2または数式3から得た機能維持所要時間内での余剰蓄エネルギ量を、サービス利用状態検出部102の分類結果D2を説明変数として、モデルを生成する。モデル化の方法には複数ある。   The modeling unit 103 generates a model using the surplus energy storage amount within the required function maintenance time obtained from Equation 2 or Equation 3 using the classification result D2 of the service usage state detection unit 102 as an explanatory variable. There are multiple modeling methods.

図6(a)に示すように、対象エネルギ消費積算部101の積算値D4を回帰することでモデル化してもよい。図6(b)に示すように、サービス利用状態検出部102の分類結果D2が離散的な値となる場合は、各分類結果D2に対して、対象エネルギ消費積算部101の積算値D4の平均値と分散などを、テーブルの形で管理してもよい。   As shown in FIG. 6A, modeling may be performed by regressing the integrated value D4 of the target energy consumption integrating unit 101. As shown in FIG. 6B, when the classification result D2 of the service usage state detection unit 102 is a discrete value, the average of the integration values D4 of the target energy consumption integration unit 101 for each classification result D2. Values and variances may be managed in the form of a table.

蓄エネルギ設備11が非常用設備である場合、対象エネルギ消費積算部101の積算値D4と、サービス利用状態の分類結果D2との間の相関が弱い場合もあり得る。この場合は、分類結果D2に基づいて、分類値に応じた0以上の値をとる調整係数を設定し、対象エネルギ消費積算値D4に調整係数を掛けて、予め調整するようにしてもよい。   When the energy storage facility 11 is an emergency facility, the correlation between the integrated value D4 of the target energy consumption integrating unit 101 and the service use state classification result D2 may be weak. In this case, an adjustment coefficient that takes a value of 0 or more according to the classification value may be set based on the classification result D2, and the target energy consumption integrated value D4 may be multiplied by the adjustment coefficient to be adjusted in advance.

調整係数設定の考え方は、蓄エネルギ設備11を有するエネルギ消費設備12が提供するサービスの種類や内容に依存するため、後述の実施例で具体例を示す。ここでは一般論を述べる。   Since the concept of the adjustment coefficient setting depends on the type and content of the service provided by the energy consuming facility 12 having the energy storage facility 11, a specific example will be shown in an example described later. Here is a general discussion.

非常用の蓄エネルギ設備11の場合、エネルギ消費設備12が非常時に消費するエネルギを蓄エネルギ設備11からの放エネルギで賄う。そこで、非常用の蓄エネルギ設備11を活用する場合は、非常用の蓄エネルギ設備11が必要とする蓄エネルギ量が低下して、無駄な蓄エネルギをしないように調整をする。   In the case of the emergency energy storage facility 11, the energy consumed by the energy consumption facility 12 is covered by the energy released from the energy storage facility 11. Therefore, when the emergency energy storage facility 11 is utilized, adjustment is made so that the energy storage amount required by the emergency energy storage facility 11 is reduced and unnecessary energy storage is not performed.

一方、常用の蓄エネルギ設備11では、蓄エネルギ設備11にエネルギを蓄える際に、系統からの電力を消費する。したがって、蓄エネルギを抑制できれば、系統負荷も抑制することができる。そこで、常用の蓄エネルギ設備11では、蓄エネルギ時に、系統からの電力を消費し過ぎることのないように調整する必要がある。   On the other hand, the regular energy storage facility 11 consumes power from the system when energy is stored in the energy storage facility 11. Therefore, if energy storage can be suppressed, system load can also be suppressed. Therefore, the regular energy storage facility 11 needs to be adjusted so as not to consume too much power from the system during energy storage.

調整係数が「1」の場合は調整なし、調整係数が「0.5」の場合は対象エネルギ消費が半分であると見なし、余剰蓄エネルギ量を多く考えることに対応する。例えば、暫定的に調整係数を設定し、エネルギ消費設備12の提供するサービスに支障が生じる事態が生じた場合に、調整係数を「1」に近づけるように運用してもよい。   When the adjustment coefficient is “1”, there is no adjustment, and when the adjustment coefficient is “0.5”, it is considered that the target energy consumption is halved, and this corresponds to considering a large amount of surplus energy storage. For example, an adjustment coefficient may be temporarily set, and the operation may be performed so that the adjustment coefficient approaches “1” when a problem occurs in the service provided by the energy consuming equipment 12.

第1の場合として、放エネルギによるネガワット提供中、または、放エネルギ後の蓄エネルギ完了前に、サービス利用状態が変化して、調整係数を「1」と設定した状態に遷移した場合は、サービスに支障が生じる事態の一様態である。この第1の場合、実害が発生しない段階であるから、例えば調整係数を「0.5」から「0.75」に上げ、さらに「0.75」から「0.875」あげたりするように、調整係数を徐々に「1」に近づければよい。   In the first case, when the service usage state changes during the provision of negative wattage by releasing energy or before the completion of energy storage after releasing energy, the service is changed to the state where the adjustment coefficient is set to “1”. It is a uniform situation that causes trouble. In this first case, since no actual harm occurs, for example, the adjustment coefficient is increased from “0.5” to “0.75” and further increased from “0.75” to “0.875”. The adjustment coefficient may be gradually brought closer to “1”.

第2の場合として、放エネルギ中、または放エネルギ後の蓄エネルギ完了前に、サービスを維持するための放エネルギが必要な事態が発生する場合は、サービスに支障が生じる事態の他の一様態である。この場合、調整係数を「1」に再設定してもよい。   As a second case, when a situation in which energy is required to maintain the service occurs during the energy release or before the completion of the energy storage after the energy release, another aspect of the situation in which the service is disturbed It is. In this case, the adjustment coefficient may be reset to “1”.

逆に一定期間の間、第1の場合が発生しないときは、調整係数の変更を停止する。若しくは、調整係数を現在値よりも小さくしてもよい。さらに第1の場合が発生したときは、エネルギ消費設備12のネガワット提供を中止してもよい。   Conversely, when the first case does not occur for a certain period, the change of the adjustment coefficient is stopped. Alternatively, the adjustment coefficient may be smaller than the current value. Furthermore, when the 1st case generate | occur | produces, you may stop providing the negative wattage of the energy consumption equipment 12. FIG.

図7,図8を用いてネガワット取引市場への入札について説明する。デマンド調整力診断装置10は、電力を一次エネルギとするエネルギ消費設備12の電力消費量を定期的に計測する。前述のように、過去のデータを用いてモデル化部103で求めた、サービス利用状態検出部102の分類結果毎の余剰蓄エネルギ量を基に、実施可能なネガワット量を計算する。   Bidding on the negawatt trading market will be described with reference to FIGS. The demand adjusting force diagnosis apparatus 10 periodically measures the power consumption of the energy consuming equipment 12 using power as primary energy. As described above, the feasible negative wattage amount is calculated based on the surplus energy storage amount for each classification result of the service usage state detection unit 102 obtained by the modeling unit 103 using the past data.

非常用の蓄エネルギ設備11の場合、図7に示すように、現時点での消費電力量Pと余剰蓄エネルギ量(電力換算値)とを基に、ネガワット取引の直近の単位時間帯T3(時間幅TN)における実施可能ネガワット量を、下記の数式4に従い計算する。   In the case of the emergency energy storage facility 11, as shown in FIG. 7, based on the current power consumption P and surplus energy storage (electric power conversion value), the nearest unit time zone T3 (hour The feasible negative wattage in the width TN) is calculated according to the following Equation 4.

min(電力換算した余剰蓄エネルギ量/TN,P)・・・(数式4)     min (Power surplus energy storage amount / TN, P) (Formula 4)

数式4は、電力換算した余剰蓄エネルギ量と現時点での消費電力量Pのうち、いずれか小さい方の値を出力する。   Formula 4 outputs the smaller one of the surplus energy storage amount converted into electric power and the current power consumption amount P.

なお、実施可能ネガワット量は、継続的なデータの計測に基づいて計算するが、サービス利用状態データD2の値と時間帯とが同じでも、毎回の計算結果が常に同じになるわけではない。このため、統計的な処理をして、ネガワット取引量を決める必要がある。   Although the feasible negative wattage is calculated based on continuous data measurement, even if the value of the service usage state data D2 and the time zone are the same, the calculation results are not always the same. For this reason, it is necessary to determine the negawatt trading volume through statistical processing.

データのバラツキ具合を示す情報として、時刻毎の各サービス利用状態分類値D2に対する平均値と分散のような値を計算して得る。ネガワット取引が成立した場合に、確実にネガワットを実施する観点から、小さい側のασ値を用いて、実施可能ネガワット量をスカラー値としても良い。   As information indicating the degree of data variation, values such as an average value and a variance for each service use state classification value D2 for each time are calculated. When negawatt trading is established, the negawatt amount that can be implemented may be a scalar value by using the ασ value on the smaller side from the viewpoint of reliably carrying out the negawatt.

ここで、αは正の値であり、例えば2σなら97.5%以上の確率で達成可能な実施可能ネガワット量に対応する。あるいは分位数および最小値などを用いても良い。例えば4分位の場合、下から1/4分位数の値を用いると云った方法がある。   Here, α is a positive value. For example, 2σ corresponds to the feasible negative wattage that can be achieved with a probability of 97.5% or more. Alternatively, quantiles and minimum values may be used. For example, in the case of the quartile, there is a method in which the value of the quartile is used from the bottom.

過去の同じ分類結果D2に対して、エネルギ消費設備12の電力消費量の平均値や最大値などの統計データを紐づけて管理してもよい。そして、このように管理した過去データに基づいて、現時点から直近のネガワット取引時間帯T3だけでなく、さらに先のネガワット取引時間帯T4や、さらにそれ以降の時刻に対してのネガワット取引計画を事前に作成してもよい。   Statistical data such as an average value and a maximum value of the power consumption of the energy consuming equipment 12 may be associated with the same past classification result D2 and managed. Then, based on the past data managed in this way, not only the latest negawatt trading time zone T3 from the current time, but also the previous negawatt trading time zone T4 and further negawatt trading plans for the later time in advance. You may create it.

ところで、ネガワット取引に応じると、蓄エネルギ設備11の余剰蓄エネルギ量は減少する。このため、ネガワット取引の実施以降、蓄エネルギ運転に戻るまでの間、複数の時間帯でそれぞれネガワット取引を行う場合は、最初の時間帯以降では、それ以前の時間帯での実施可能ネガワット量を余剰蓄エネルギ量から差し引いて、数式4と同様にして計算すればよい。   By the way, if it corresponds to a negawatt transaction, the surplus energy storage amount of the energy storage equipment 11 will decrease. For this reason, when negawatt transactions are performed in multiple time periods after the execution of negawatt transactions and before returning to energy storage operation, the amount of negawatts that can be implemented in the previous time period is determined after the first time period. What is necessary is just to calculate in the same manner as Expression 4 by subtracting from the surplus energy storage amount.

常用の蓄エネルギ設備11の場合について図2(a)と図8を用いて説明する。図2(a)における余剰蓄エネルギ量は、蓄エネルギ運転を開始する直前の時刻での蓄エネルギ量である。図2(a)の例では、時刻T0での蓄エネルギ量で、ほとんど余剰エネルギが無い。ネガワット取引では、蓄エネルギと放エネルギのサイクルの中で、蓄エネルギ動作を途中で中止することで実現する。   The case of the regular energy storage equipment 11 will be described with reference to FIGS. The surplus energy storage amount in FIG. 2A is the energy storage amount at the time immediately before starting the energy storage operation. In the example of FIG. 2 (a), there is almost no surplus energy in the amount of stored energy at time T0. In the negawatt transaction, the energy storage operation is interrupted in the middle of the cycle of energy storage and energy release.

サービス利用状態検出部102の分類結果D2によって、余剰蓄エネルギ量や図8に示すような蓄エネルギ設備11の消費電力が違ってくる。図2(a)の場合とは異なり、余剰蓄エネルギ量が存在する場合、余剰蓄エネルギ量に相当する量を蓄エネルギする際の消費電力量がネガワット量(系統の電力消費の抑制代)となる。   Depending on the classification result D2 of the service utilization state detection unit 102, the surplus energy storage amount and the power consumption of the energy storage facility 11 as shown in FIG. 8 vary. Unlike the case of FIG. 2 (a), when there is a surplus energy storage amount, the amount of power consumed when storing the amount corresponding to the surplus energy storage amount is a negative wattage amount (the power consumption suppression cost of the system). Become.

サービス利用状態検出部102のある分類結果D2における蓄エネルギ量と電力量とが図2(a)および図8に示す場合であると仮定して、以下、余剰蓄エネルギ量から実施可能ネガワット量を求める処理について説明する。   Assuming that the energy storage amount and the power amount in a certain classification result D2 of the service use state detection unit 102 are the cases shown in FIG. 2A and FIG. The processing to be calculated will be described.

図2(a)に示すサイクル内で製造した蓄エネルギ量ESが、図8の同じ時間帯における消費電力で製造した蓄エネルギ量であるとみなすことができる。この部分の電力消費を図8ではハッチングして示す。   It can be considered that the energy storage amount ES manufactured within the cycle shown in FIG. 2A is the energy storage amount manufactured with the power consumption in the same time zone of FIG. The power consumption of this portion is shown hatched in FIG.

なお、消費電力において全ての時間共通する負荷があるような場合、それを取り除いて計算してもよい。図8のハッチングした部分の電力消費量をPSとすると、下記の数式5のようにして、余剰蓄エネルギ量(未利用蓄エネルギ量〜を電力に換算できる。   If there is a load that is common to all times in power consumption, it may be calculated by removing it. Assuming that the power consumption of the hatched portion in FIG. 8 is PS, the surplus energy storage amount (unused storage energy amount ˜) can be converted into power as shown in Equation 5 below.

なお、これは非常用の蓄エネルギ設備11の場合も同様である。非常用の蓄エネルギ設備11の場合、放エネルギ直後などの蓄エネルギ実施時に、その蓄エネルギで消費する電力(系統からの電力)を計測して、この計測値をPSとする。そして、蓄エネルギ設備11の容量をESとして換算すればよい。   This also applies to the emergency energy storage facility 11. In the case of the emergency energy storage facility 11, the power consumed by the stored energy (power from the system) is measured at the time of energy storage such as immediately after the release of energy, and this measured value is defined as PS. And what is necessary is just to convert the capacity | capacitance of the energy storage equipment 11 as ES.

電力換算余剰蓄エネルギ量=(PS/ES)*余剰蓄エネルギ量・・・(数式5)   Power conversion surplus energy storage amount = (PS / ES) * Surplus energy storage amount (Formula 5)

常用の蓄エネルギ設備11でネガワット取引を行う場合、ネガワット取引実施時のサービス利用状態検出部102の分類結果D2に対応した、電力換算余剰蓄エネルギ量と蓄エネルギ設備11の消費電力データとを用いて、未利用分を割り当てる。ネガワット価格の高い時間帯から、非常用の蓄エネルギ設備11の場合と同様に、割り当てれば良い。   When performing a negawatt transaction with the regular energy storage facility 11, the power-converted surplus energy amount and the power consumption data of the energy storage facility 11 corresponding to the classification result D2 of the service utilization state detection unit 102 at the time of the negawatt transaction are used. Allocate unused portion. As in the case of the emergency energy storage equipment 11, it may be allocated from a time zone with a high negative wattage price.

ネガワット取引が成立した場合、約定した取引について、前述のような制御を実施し、系統2への電力負荷を抑制する。実施した電力系統の負荷抑制量は、蓄エネルギ設備11に設置された計測手段により計測した放エネルギ量や、蓄エネルギ量の推移から蓄エネルギの打ち切り時点の蓄エネルギ量と、制御を行なった場合の蓄エネルギ量の差とから計算することができる。   When a negawatt transaction is established, the above-described control is performed on the contracted transaction, and the power load on the grid 2 is suppressed. The implemented load suppression amount of the power system is the amount of energy released by the measuring means installed in the energy storage facility 11 or the amount of stored energy at the time when the stored energy is cut off from the transition of the stored energy amount, and the control is performed. It can be calculated from the difference in the amount of stored energy.

なお、常用の蓄エネルギ設備11については、サイクル運転をすることを前提としているため、次の蓄エネルギ時の最大蓄エネルギ量や設備の容量との差を取れば良い。   In addition, about the regular energy storage equipment 11, since it is premised on carrying out a cycle driving | operation, what is necessary is just to take the difference with the largest energy storage amount at the time of the next energy storage, or the capacity | capacitance of an installation.

デマンド調整力診断装置10は、蓄エネルギ設備11をネガワット取引に使用した場合、非常用であるか常用であるかに関わらず、蓄エネルギを実施する。蓄エネルギ完了までの所要時間と蓄エネルギに使用した電力量とについて、それぞれ記録しておく。デマンド調整力診断装置10は、過去の実績と比較して大きなかい離がある場合、その後のネガワット取引計画時に、余剰蓄エネルギ量とは無関係に、リフレッシュのための放エネルギの実施を計画しても良い。   When the energy storage facility 11 is used for a negawatt transaction, the demand adjusting power diagnostic device 10 performs energy storage regardless of whether it is emergency or regular. The time required to complete energy storage and the amount of power used for energy storage are recorded respectively. If there is a large difference compared with the past results, the demand adjusting power diagnostic device 10 may plan to execute energy release for refreshing regardless of the surplus energy storage amount when planning the subsequent negawatt transaction. good.

さらに、デマンド調整力診断装置10は、蓄エネルギ設備11の寿命が短いと判断できる場合、更新の手続きを行った上で、更新日の前日等、更新が近いタイミングでは、リフレッシュのための放エネルギと同様に、深い深度に達する放エネルギの実施を計画してもよい。   Further, when it can be determined that the life of the energy storage facility 11 is short, the demand adjusting power diagnostic device 10 performs the update procedure and then releases the energy for refresh at a timing near the update, such as the day before the update date. As with, it may be planned to implement energy release reaching a deep depth.

定期的にまたは不定期に所定の放エネルギを実行することで、蓄エネルギ設備11の運転状態を適正に保ちつつ、実施可能ネガワット量を増やすことができる。   By executing predetermined energy release regularly or irregularly, it is possible to increase the amount of negawatt that can be implemented while maintaining the operating state of the energy storage facility 11 properly.

過去の実績と比較してリフレッシュや更新をするか否かを判定方法を説明する。時間が過去の平均値よりも所定の時間以上長くなったり、電力消費が過去の平均値よりも所定量以上大きくなったりした場合に、リフレッシュや更新を実行すればよい。所定時間や所定量は、類似の蓄エネルギ設備11の劣化データなどを基に決めればよい。   A method for determining whether or not refreshing or updating is performed in comparison with past results will be described. When the time becomes longer than the past average value by a predetermined time or when the power consumption becomes larger than the past average value by a predetermined amount or more, refresh or update may be executed. The predetermined time and the predetermined amount may be determined based on deterioration data of similar energy storage equipment 11 or the like.

本実施例によれば、複雑かつ正確なモデルを作成することなく、電力系統2への負荷の抑制量を計測値から決定できる。さらに、本実施例によれば、実際に達成されたネガワット量を蓄エネルギ設備11やエネルギ消費設備12に対する客観的な計測結果を基に測定することができる。   According to the present embodiment, the amount of suppression of the load on the power system 2 can be determined from the measured value without creating a complicated and accurate model. Furthermore, according to the present embodiment, the actually achieved negative wattage can be measured based on objective measurement results for the energy storage equipment 11 and the energy consumption equipment 12.

図9〜図12を用いて第2実施例を説明する。本実施例を含む以下の各実施例は、第1実施例の変形例に相当するため、第1実施例との差異を中心に説明する。本実施例では、複数のプロシューマ1を管理してネガワット取引の計画を立案する統合化システム3と、ネガワット取引を管理する電力取引市場システム4を例示する。   A second embodiment will be described with reference to FIGS. Each of the following embodiments, including the present embodiment, corresponds to a modification of the first embodiment, and therefore the description will focus on differences from the first embodiment. In the present embodiment, an integrated system 3 for managing a plurality of prosumers 1 and planning a negawatt transaction and an electric power transaction market system 4 for managing the negawatt transaction are illustrated.

図9は、本実施例に係るシステム全体の構成図である。本実施例の各プロシューマ1は、通信ネットワークCNを介して統合化システム3に接続されている。「統合化部」としての統合化システム3は、通信ネットワークCNを介して、電力取引市場システム4に接続されている。なお、統合化システム3と各プロシューマ1を接続する通信ネットワークと、統合化システム3と電力取引市場システム4を接続する通信ネットワークは異なってもよいし、図9に示すように共通してもよい。   FIG. 9 is a configuration diagram of the entire system according to the present embodiment. Each prosumer 1 of the present embodiment is connected to the integrated system 3 via the communication network CN. The integration system 3 as an “integration unit” is connected to the power trading market system 4 via the communication network CN. Note that the communication network connecting the integrated system 3 and each prosumer 1 and the communication network connecting the integrated system 3 and the power trading market system 4 may be different, or may be common as shown in FIG. .

統合化システム3は、コンピュータシステムとして構成されており、例えば、需要抑制計画作成部31、プロファイル管理部32、通信部33を備える。通信部33は通信ネットワークCNを介して他の計算機10,4と通信する機能である。需要抑制計画作成部31は、複数のプロシューマ1のネガワット達成能力を統合することで、ネガワット量を実現するための計画を立案する機能である。プロファイル管理部32は、各プロシューマ1のデマンド調整力診断装置10から取得する抑制可能プロファイルD5を管理する機能である。   The integrated system 3 is configured as a computer system, and includes, for example, a demand suppression plan creation unit 31, a profile management unit 32, and a communication unit 33. The communication unit 33 has a function of communicating with the other computers 10 and 4 via the communication network CN. The demand restraint plan creation unit 31 is a function for drafting a plan for realizing the negative wattage amount by integrating the negative wattage achievement ability of the plurality of prosumers 1. The profile management unit 32 is a function for managing the suppressable profile D5 acquired from the demand adjusting force diagnosis device 10 of each prosumer 1.

電力取引市場システム4は、ネガワット取引を管理するコンピュータである。その詳細は割愛するが、通信機能や取引管理機能などを備える。   The power trading market system 4 is a computer that manages negawatt trading. Although the details are omitted, it has a communication function and a transaction management function.

各プロシューマ1のデマンド調整力診断装置10は、モデル化部103で構築したサービス利用状態データD2とその時の実施可能ネガワット量との関係を示すモデルを、抑制可能プロファイルD5として、統合化システム3へそれぞれ通知する。さらに、各プロシューマ1のデマンド調整力診断装置10は、図9では図示を省略するが、その時々のサービス利用状態検出部102の分類結果D2も統合化システム3へそれぞれ通知する。   The demand adjustment capability diagnosis device 10 of each prosumer 1 uses the model indicating the relationship between the service usage state data D2 constructed by the modeling unit 103 and the amount of negawatts that can be implemented at that time as the suppressable profile D5 to the integrated system 3. Notify each. Further, although not shown in FIG. 9, the demand adjustment capability diagnosis device 10 of each prosumer 1 also notifies the integrated system 3 of the classification result D2 of the service usage state detection unit 102 at that time.

統合化システム3は、各プロシューマ1のデマンド調整力診断装置10から通知された抑制可能プロファイルD5とサービス利用状態データD2とから、各プロシューマ1で実施可能なネガワット量を計算し、ネガワット取引市場に入札する。   The integrated system 3 calculates the amount of negative watts that can be implemented in each prosumer 1 from the suppressable profile D5 and the service usage state data D2 that are notified from the demand adjustment capability diagnosis device 10 of each prosumer 1, and enters the negawatt trading market. Bid.

図9では図示を省略するが、気象データなどを供給する情報供給源を統合化システム3に接続し、統合化システム3が一括して気象データを取得して、各デマンド調整力診断装置10に配信してもよい。各プロシューマ1のデマンド調整力診断装置10でそれぞれ気象データを取得するのは効率が悪く、経済性が低いためである。   Although not shown in FIG. 9, an information supply source that supplies weather data and the like is connected to the integrated system 3, and the integrated system 3 collects the weather data in a lump and sends it to each demand adjusting force diagnosis device 10. You may distribute. The reason why the demand adjustment force diagnosis device 10 of each prosumer 1 acquires the weather data is that the efficiency is low and the economic efficiency is low.

各デマンド調整力診断装置10のサービス利用状態検出部102は、サービス情報D1や制御情報のほかに、統合化システム3からの情報も用いて、サービス利用状態データD2を算出することができる。   The service usage state detection unit 102 of each demand adjusting power diagnosis apparatus 10 can calculate the service usage state data D2 by using information from the integrated system 3 in addition to the service information D1 and the control information.

各デマンド調整力診断装置10から抑制可能プロファイルD5を統合化システム3へ送信する代わりに、抑制可能プロファイルD5を算出するために必要な元データを、各デマンド調整力診断装置10から統合化システム3へ送信してもよい。統合化システム3は、受信した元データを用いて、サービス利用状態検出部102やモデル化部103が実施する処理を行ってもよい。   Instead of transmitting the suppressable profile D5 from each demand adjusting force diagnostic device 10 to the integrated system 3, the original data necessary for calculating the suppressable profile D5 is transmitted from each demand adjusting force diagnostic device 10 to the integrated system 3. May be sent to. The integrated system 3 may perform processing performed by the service usage state detection unit 102 and the modeling unit 103 using the received original data.

デマンド調整力診断装置10の持つ機能の一部を統合化システム3に移した場合でも、蓄エネルギ設備11を有するエネルギ消費設備12が持つセンサの情報や制御情報以外の情報も活用した、抑制可能プロファイルD5を生成することができる。   Even when a part of the functions of the demand adjusting force diagnostic device 10 is transferred to the integrated system 3, it is possible to suppress information other than the sensor information and control information of the energy consuming facility 12 having the energy storage facility 11. A profile D5 can be generated.

図10に、複数の非常用の蓄エネルギ設備11を連携させてネガワット取引に臨む場合を示す。図10に示す例は、放エネルギの後で蓄エネルギを実施するような単純構成の非常用の蓄エネルギ設備11を複数組み合わせることで、ネガワット量を確保する。   FIG. 10 shows a case where a plurality of emergency energy storage facilities 11 are linked to face a negawatt transaction. The example shown in FIG. 10 secures the amount of negative wattage by combining a plurality of emergency energy storage facilities 11 having a simple configuration that performs energy storage after energy release.

図10に示すように、複数の蓄エネルギ設備11の放エネルギを組み合わせることで、放エネルギに対するリバウンド(蓄エネルギ)をネガワット取引の需要の乏しい時間帯に移すことができる。また、放エネルギによるネガワット量の供給が少なかったり、ネガワット取引の単位時間幅より短い時間で放エネルギを行うような設備11であったりした場合でも、複数組み合わせることでネガワット取引に活用することができる。   As shown in FIG. 10, by combining the released energy of a plurality of energy storage facilities 11, rebound (stored energy) with respect to the released energy can be moved to a time zone where demand for negawatt transactions is scarce. Further, even when the supply of negative wattage due to energy release is small or the facility 11 is such that the energy is released in a time shorter than the unit time width of the negative wattage transaction, it can be used for negative wattage transactions by combining a plurality. .

余剰蓄エネルギ量の調整を行ったなどの理由で、一部の蓄エネルギ設備11のネガワット量の供給が停止される場合、デマンド調整力診断装置10は、その事象の発生とそこまでの放エネルギ量とを電力量に換算して、統合化システム3に通知する。   When the supply of the negative wattage of some of the energy storage facilities 11 is stopped, for example, due to the adjustment of the surplus energy storage amount, the demand adjustment force diagnosis device 10 generates the event and the energy released to that point. The amount is converted into the amount of electric power and notified to the integrated system 3.

これにより、統合化システム3は、蓄エネルギ設備11によるネガワット供給予定量と実績との差から、必要となるネガワット供給量を計算する。統合化システム3は、ネガワット供給可能な別の蓄エネルギ設備11をネガワット取引に参加させることで、系統2に対するネガワット供給を継続することができる。なお、換算には、数式5で述べた係数(PS/ES)を用いればよい。さらに変換効率を考慮してもよい。   Thereby, the integrated system 3 calculates the required negative wattage supply amount from the difference between the planned negative wattage supply amount by the energy storage facility 11 and the actual results. The integrated system 3 can continue the negative watt supply to the grid | system 2 by making another energy storage equipment 11 which can supply a negative watt participate in a negative watt transaction. For the conversion, the coefficient (PS / ES) described in Equation 5 may be used. Further, conversion efficiency may be taken into consideration.

コストは、各設備11のコスト情報を放エネルギ量で重み付けして計算する。ネガワット取引を落札できた場合、統合化システム3は、各プロシューマ1のデマンド調整力診断装置10に指令D6を送信する。指令D6は、対応する入札の計算で決定した配分で、各プロシューマ1における抑制量や抑制実行時間などを含む。   The cost is calculated by weighting the cost information of each facility 11 with the amount of energy released. If the negawatt transaction is successful, the integrated system 3 transmits a command D6 to the demand adjusting force diagnosis device 10 of each prosumer 1. The command D6 is an allocation determined by calculation of a corresponding bid, and includes a suppression amount and a suppression execution time in each prosumer 1.

図11に、抑制可能プロファイルD5の構成例を示す。プロファイルD5は、サービス利用状態の分類値D2に応じて、時間帯ごとの実施可能ネガワット量をテーブル化したデータとする。   FIG. 11 shows a configuration example of the suppressible profile D5. The profile D5 is data in which the feasible negative wattage for each time zone is tabulated according to the service use state classification value D2.

各プロシューマ1のデマンド調整力診断装置10は、抑制実施後に、放エネルギ量または、蓄エネルギ打ち切り時の蓄エネルギ量と、予定していた蓄エネルギ量との差を、統合化システム3に通知する。統合化システム3は、通知された情報に基づいてネガワット取引を清算する。   The demand adjustment force diagnostic device 10 of each prosumer 1 notifies the integrated system 3 of the difference between the amount of released energy or the amount of stored energy when the stored energy is terminated and the planned amount of stored energy after the suppression is performed. . The integrated system 3 settles the negawatt transaction based on the notified information.

図11では、時間帯毎を横軸として、実施可能ネガワット量を示すが、土曜・日曜・祝日、金曜や祝日の前日、月曜日や連休明けの日などでは、通常と異なる特徴を示す。このような条件も識別できるようにプロファイルD5を構成してもよい。   In FIG. 11, the amount of negawatt that can be implemented is shown with the time axis as the horizontal axis, but on Saturdays, Sundays, and holidays, Fridays and the days before holidays, Mondays and the day after holidays, different characteristics are shown. The profile D5 may be configured so that such conditions can also be identified.

なお、抑制可能プロファイルD5とサービス利用状態データD2とをデマンド調整力診断装置10から統合化システム3へ通知する代わりに、その時々のサービス利用状態データD2に応じた抑制可能量だけを統合化システム3に通知してもよい。このようにすれば、統合化システム3では、各プロシューマ1のデマンド調整力診断装置10からの抑制可能プロファイルD5を記憶する必要がなくなるため、統合化システム3の記憶容量および計算量を減らすことができる。   Instead of notifying the controllable profile D5 and the service usage status data D2 from the demand adjusting power diagnosis device 10 to the integrated system 3, only the suppression possible amount corresponding to the service usage status data D2 at that time is integrated. 3 may be notified. In this way, the integrated system 3 does not need to store the suppressable profile D5 from the demand adjusting force diagnosis device 10 of each prosumer 1, so that the storage capacity and calculation amount of the integrated system 3 can be reduced. it can.

図11に示すデータを、帳票に出力したり、画面に表示したりしてもよい。なお、統合化システム3を持たないシステムの場合、例えばログ情報や、特別なIPアドレスなどで、デマンド調整力診断装置10が提供するHTMLサービスなどを通じて、画面に表示してもよい。あるいは、デマンド調整力診断装置10内にデータを記録しておき、必要に応じ保守端末装置などから、記録したデータを取り出せるようにしてもよい。   The data shown in FIG. 11 may be output to a form or displayed on a screen. In the case of a system that does not have the integrated system 3, for example, the log information or a special IP address may be displayed on the screen through an HTML service provided by the demand adjustment capability diagnosis apparatus 10. Alternatively, data may be recorded in the demand adjusting force diagnostic device 10 so that the recorded data can be taken out from a maintenance terminal device or the like as necessary.

実施可能ネガワット量ではなく、対象エネルギ消費積算部101の積算値D4を、サービス利用状態の分類値D2に対して記録しておき、ログや画面としてシステムの保守や監査などの際に表示できるようにしてもよい。   The integrated value D4 of the target energy consumption integrating unit 101, not the feasible negative wattage amount, is recorded with respect to the service use state classification value D2, and can be displayed as a log or screen during system maintenance or auditing. It may be.

なお、第1実施例では、リフレッシュを行う場合、過去の実績との比較による方式について説明したが、本実施例では、複数の蓄エネルギ設備11の情報が集約されるため、他の同種設備の実績と比較して時間が長い場合や、消費電力が大きい場合にリフレッシュさせるようにしてもよい。   In addition, in 1st Example, when performing refresh, although the system by the comparison with the past performance was demonstrated, in this Example, since the information of the several energy storage equipment 11 is aggregated, other similar kind of facilities are also shown. You may make it refresh when time is long compared with a performance, or when power consumption is large.

図12は、統合化システム3の処理の例を示すフローチャートである。統合化システム3の通信部33は、通信ネットワークCNを介して、各プロシューマ1のデマンド調整力診断装置10から情報を取得する(S10)。取得する情報には、上述したプロファイルD5などを含む。取得したプロファイルD5は、プロファイル管理部32によって記憶され、管理される。   FIG. 12 is a flowchart illustrating an example of processing of the integrated system 3. The communication unit 33 of the integrated system 3 acquires information from the demand adjustment capability diagnosis device 10 of each prosumer 1 via the communication network CN (S10). The information to be acquired includes the above-described profile D5 and the like. The acquired profile D5 is stored and managed by the profile management unit 32.

需要抑制計画作成部31は、通信部33および通信ネットワークCNを介して、電力取引市場システム4からネガワット取引の入札情報を取得する(S11)。   The demand restraint plan creation unit 31 acquires bid information on the negawatt transaction from the power transaction market system 4 via the communication unit 33 and the communication network CN (S11).

需要抑制計画作成部31は、必要とされている電力需要の抑制に貢献しうる設備11を選択し(S12)、選択した設備11を持つプロシューマ1に対してネガワット取引に参加するか問い合わせる(S13)。   The demand restraint plan creation unit 31 selects the equipment 11 that can contribute to restraining the required power demand (S12), and inquires of the prosumer 1 having the selected equipment 11 whether to participate in the negawatt transaction (S13). ).

需要抑制計画作成部31は、ネガワット取引に参加するプロシューマ1の持つ蓄エネルギ設備11の組み合わせ(ネガワット実行時期やネガワット量)を計算し(S14)、電力取引市場システム4へ応札情報を送信する(S15)。   The demand restraint plan creation unit 31 calculates a combination of the energy storage facilities 11 of the prosumer 1 participating in the negawatt transaction (negative watt execution time and negative wattage amount) (S14), and transmits bid information to the power transaction market system 4 ( S15).

需要抑制計画作成部31は、電力取引市場でネガワット取引が成立すると、ネガワット取引に参加する各プロシューマ1のデマンド調整力診断装置10に対し、需要抑制の実行時期(ネガワット実行時期)や抑制量(ネガワット量)を指示する(S16)。   When a negawatt transaction is established in the power trading market, the demand restraint plan creation unit 31 performs a demand restraint execution time (negawatt execution time) and a restraint amount (a negawatt execution time) with respect to the demand adjusting power diagnosis device 10 of each prosumer 1 participating in the negawatt trade. The negative wattage) is designated (S16).

このように構成される本実施例では、複数の設備11を適宜組み合わせることで、ネガワット取引に臨むことができる。   In the present embodiment configured as described above, a negawatt transaction can be started by appropriately combining a plurality of facilities 11.

図13を用いて第3実施例を説明する。本実施例では、第1実施例で述べた対象エネルギ消費積算部101の代わりに、対象エネルギ消費推定部101Aを用いる。本実施例は、第2実施例と組み合わせることが可能である。対象エネルギ消費積算部101を有するプロシューマ1と、対象エネルギ消費推定部101Aを有するプロシューマ1とが混在するシステムを統合化システム3が管理する構成でもよい。   A third embodiment will be described with reference to FIG. In the present embodiment, a target energy consumption estimation unit 101A is used instead of the target energy consumption integration unit 101 described in the first embodiment. This embodiment can be combined with the second embodiment. The integrated system 3 may be configured to manage a system in which the prosumer 1 having the target energy consumption integrating unit 101 and the prosumer 1 having the target energy consumption estimating unit 101A are mixed.

対象エネルギ消費推定部101Aは、計測した瞬時の対象エネルギD3の消費速度を計測し、この計測値に機能維持所要時間を掛けることで、対象エネルギ消費D3の積算値D4を推定する。   The target energy consumption estimation unit 101A measures the measured instantaneous consumption speed of the target energy D3, and estimates the integrated value D4 of the target energy consumption D3 by multiplying this measured value by the time required for maintaining the function.

このように構成される本実施例も第1実施例と同様の作用効果を奏する。本実施例では、対象エネルギ消費量を積算する必要がないため、第1実施例よりも短時間で、積算値D4を推定することができる。   Configuring this embodiment like this also achieves the same operational effects as the first embodiment. In the present embodiment, since it is not necessary to integrate the target energy consumption, the integrated value D4 can be estimated in a shorter time than in the first embodiment.

図14を用いて、第4実施例を説明する。本実施例では、鉄道の踏切警報装置に適用する場合を説明する。本実施例は上述した第1〜第3実施例のいずれとも組み合わせ可能である。   A fourth embodiment will be described with reference to FIG. In this embodiment, a case where the present invention is applied to a railroad crossing warning device will be described. This embodiment can be combined with any of the first to third embodiments described above.

鉄道の踏切の本来の機能は、線路上を走行する車両の通過に合わせて、道路交通を遮断することである。鉄道の踏切警報装置における蓄エネルギ設備11は蓄電池であり、その用途は停電などの非常時にも踏切による遮断サービスの維持と、そのことを周囲に知らせる警報サービスを維持とにある。なお、踏切の上げ下げには電力を消費するが、上げた状態または下げた状態の維持については電力の消費はない。   The original function of railroad crossings is to block road traffic in line with the passage of vehicles traveling on the railroad. The energy storage equipment 11 in the railroad crossing warning device is a storage battery, and its use is to maintain a shut-off service by a railroad crossing even in the event of an emergency such as a power failure and to maintain an alarm service that informs the surroundings. Note that power is consumed for raising and lowering the railroad crossing, but there is no power consumption for maintaining the raised or lowered state.

踏切警報装置の場合、サービス利用状態データD2は、例えば、予め定めた時間間隔において、同一の蓄電池が非常用電力を供給する1つないし複数の踏切に最も近い線路上を走行する車両の進行方向まで考慮した距離や当該時間帯のダイヤの密度、あるいは時間帯そのもの、あるいは、その時間帯での気象や災害などである。   In the case of a railroad crossing warning device, the service usage state data D2 is, for example, the traveling direction of a vehicle traveling on a track closest to one or more railroad crossings where the same storage battery supplies emergency power at a predetermined time interval. Distance, time zone density, time zone itself, or weather or disaster in that time zone.

線路上を走行する車両までの距離やダイヤの密度は、踏切警報装置が提供すべきサービスの指標と言えるものの一例であり、気象条件や災害情報は、踏切警報装置の蓄エネルギ設備11の重要性に関する指標の一例である。   The distance to the vehicle traveling on the track and the density of the diamond are examples of services that should be provided by the railroad crossing alarm device, and weather conditions and disaster information are the importance of the energy storage facility 11 of the railroad crossing alarm device. It is an example of the parameter | index regarding.

踏切警報装置と線路上を走行する車両までの距離が遠く離れていたり、ダイヤが粗で、翌日まで線路上を走行する車両がない場合などでは、踏切警報装置の機能を維持する必要に乏しい。このような安全性に影響がない場合にまで、停電に備えて蓄電池を満蓄にしておく必要はない。   When the distance between the railroad crossing alarm device and the vehicle traveling on the track is far away, or when the schedule is rough and there is no vehicle traveling on the rail until the next day, it is not necessary to maintain the function of the railroad crossing alarm device. The storage battery need not be fully stored in preparation for a power failure until such safety is not affected.

線路の土砂崩れや津波による線路の浸水などの場合のように、線路上を走行する車両の走行が長期間停止せざるをえない場合も、復旧ないしその見通しが立つまで、踏切警報装置の機能を維持する必要はない。この場合、踏切警報装置にから所定距離内に車両が存在するとしても、蓄電池を満蓄状態にして電力系統2(配電系統)の停電に備える必要性はない。一方、雷雨の可能性が高いような気象条件では、線路敷設エリアの電力系統2が停電するリスクが高くなる。この場合、踏切警報装置の蓄電池は満蓄状態であることが望ましい。   Even if the vehicle traveling on the track has to stop for a long period of time, such as in the case of track landslides or flooding of the track due to a tsunami, the function of the railroad crossing warning device can be There is no need to maintain. In this case, even if a vehicle exists within a predetermined distance from the railroad crossing warning device, there is no need to prepare for a power failure of the power system 2 (distribution system) by setting the storage battery to a fully stored state. On the other hand, in a weather condition where the possibility of a thunderstorm is high, there is a high risk that the power system 2 in the track laying area will be out of power. In this case, it is desirable that the storage battery of the railroad crossing warning device is in a fully stored state.

本実施例では、踏切警報装置の特性を踏まえて、調整係数を設定する。本実施例を第1実施例と組み合わせる場合、対象エネルギ消費積算部101の出力に対する調整係数の設定例としては、在線位置から踏切区間までの距離が所定値を上回る場合や、災害で列車が通過する可能性がないことが分かる場合は、調整係数を「0」とすればよい。さらに気象条件から電力系統2の停電の確率が高い状態の場合は、距離によらず、調整係数を「1」とすればよい。   In this embodiment, the adjustment coefficient is set based on the characteristics of the crossing warning device. When this embodiment is combined with the first embodiment, examples of setting an adjustment coefficient for the output of the target energy consumption integrating unit 101 include a case where the distance from the current line position to the railroad crossing section exceeds a predetermined value, or a train passes due to a disaster. If it is found that there is no possibility of the adjustment, the adjustment coefficient may be set to “0”. Furthermore, when the probability of a power failure in the power system 2 is high due to weather conditions, the adjustment coefficient may be set to “1” regardless of the distance.

図14は、4つの踏切での電力消費の例を示している。消費電力の時間差は、踏切間の距離に依存する。この例は、同時に複数の踏切が遮断サービスおよび警報サービスを提供することがない例を示すが、実際には必ずしもその限りではない。   FIG. 14 shows an example of power consumption at four railroad crossings. The time difference in power consumption depends on the distance between level crossings. Although this example shows an example in which a plurality of level crossings do not provide a blocking service and an alarm service at the same time, this is not necessarily the case.

線路を走行する車両の進行方向も考慮した踏切区間までの距離が一定値を下回った場合、当該地域の電力系統2の停電に対して踏切の作動を考慮する必要がある。本実施例を第3実施例と組み合わせる場合、対象エネルギ消費推定部101Aでは、図14に示した警報サービスによる消費電力、ないし、遮断サービスと警報サービスによる消費の平均値を電力消費(単位時間当たりの電力消費量)から計算し、線路上を走行する車両が当該踏切区間を通過するまでの時間と掛け合わせることで、必要な電力量を計算する。   When the distance to the level crossing section that takes into account the traveling direction of the vehicle traveling on the track is below a certain value, it is necessary to consider the operation of the level crossing for a power failure of the power system 2 in the area. When this embodiment is combined with the third embodiment, the target energy consumption estimation unit 101A calculates the power consumption (per unit time) based on the power consumption by the alarm service shown in FIG. Power consumption), and the necessary amount of power is calculated by multiplying the time required for the vehicle traveling on the track to pass through the railroad crossing section.

Whrメータで計測している場合は、ある期間の消費電力量を計測し、鉄道ダイヤから決まる通過本数と、走行速度と通過する車両の長さと、軌道回路の単位長さから決まる各踏切での遮断継続時間とから、下記の数式6、数式7にしたがって、踏切通過中の踏切警報装置における消費電力を推定すればよい。   When measuring with a Whr meter, measure the power consumption for a certain period, and at each level crossing determined by the number of passes determined by the railway diagram, the running speed and the length of the passing vehicle, and the unit length of the track circuit From the interruption duration time, the power consumption in the level crossing warning device passing through the level crossing may be estimated according to the following formulas 6 and 7.

消費電力=ある期間の消費電力量/(一定期間での通過車両数*ある期間の踏切稼働時間)・・・(数式6)   Power consumption = Power consumption in a certain period / (Number of passing vehicles in a certain period * Level crossing operation time in a certain period) (Equation 6)

ある期間の踏切稼働時間=Σ((車両長+単位軌道回路長)/踏切通過時の車両速度))・・・(数式7)   Level crossing operating time for a certain period = Σ ((vehicle length + unit track circuit length) / vehicle speed when passing through level crossing)) (Equation 7)

都市部などダイヤが混雑している地域においては、踏切警報装置の消費電力の積算値を時間帯間に積算した値そのものを使用してもよい。   In areas such as urban areas where the schedule is congested, a value obtained by integrating the integrated value of the power consumption of the railroad crossing warning device during the time period may be used.

このように構成される本実施例も第1実施例と同様の作用効果を奏する。さらに本実施例では、踏切警報装置のバッテリを有効利用してネガワット取引を実行できる。   Configuring this embodiment like this also achieves the same operational effects as the first embodiment. Furthermore, in this embodiment, the negawatt transaction can be executed by effectively using the battery of the railroad crossing warning device.

第5実施例では、第1実施例〜第3実施例を携帯電話の基地局に適用する場合について説明する。携帯基地局の本来の機能は、携帯端末に対していつでも通信できる環境を提供することである。また携帯基地局における蓄エネルギ設備11は蓄電池であり、その用途は停電などの非常時にも通信サービスを維持することにある。   In the fifth embodiment, a case where the first to third embodiments are applied to a mobile phone base station will be described. The original function of a mobile base station is to provide an environment in which communication can be made with a mobile terminal at any time. Moreover, the energy storage equipment 11 in the mobile base station is a storage battery, and its use is to maintain communication services in the event of an emergency such as a power failure.

サービス利用状態データD2は、蓄エネルギ設備11を有するエネルギ消費設備12が本来の機能を果たす際の指標に関するデータである。携帯基地局の場合は、例えば、予め定めた時間間隔における、携帯基地局が通信サービスを提供するセル内に存在する端末の数、あるいは通信を行った端末の数、あるいはその時間帯での気象条件(気温、湿度、降水量、降雪量、積雪量)などである。   The service utilization state data D2 is data relating to an index when the energy consuming facility 12 having the energy storage facility 11 performs an original function. In the case of a mobile base station, for example, at a predetermined time interval, the number of terminals present in a cell to which the mobile base station provides communication service, the number of terminals that have performed communication, or weather in that time zone Conditions (temperature, humidity, precipitation, snowfall, snowfall).

セル内の端末数や通信を行った端末数は、携帯基地局が提供すべきサービスの指標の一例である。気象条件は、携帯基地局の蓄エネルギ設備11の重要性に関する指標の一例である。   The number of terminals in a cell and the number of terminals that have performed communication are examples of services that should be provided by the mobile base station. The weather condition is an example of an index related to the importance of the energy storage facility 11 of the mobile base station.

例えばセル内にある端末数や通信を行う端末数が少ない場合(例えば0台)、停電時に携帯基地局の機能を維持する必要はないため、停電に備えて蓄電池を満蓄状態にしておく必要はない。また例えば、積雪量がゼロ、降雪量もゼロ、さらに降水量もゼロである場合、系統2に停電が生じる可能性は低い。この場合、たとえセル内に一定数の端末が存在したり、通信を行う実績があったりしたとしても、蓄電池を満蓄状態にして停電に備える必要性は少ない。一方、例えば気温が30度前後以上から急激に低下するような場合や、雷雨の可能性が高い場合は、停電のリスクは高くなるため、蓄電池は満蓄状態であることが望ましい。   For example, when the number of terminals in a cell or the number of terminals that communicate is small (for example, 0), it is not necessary to maintain the function of the mobile base station at the time of a power failure, so the storage battery needs to be fully charged in preparation for a power failure There is no. For example, when the amount of snow is zero, the amount of snowfall is zero, and the amount of precipitation is zero, the possibility of a power failure in the grid 2 is low. In this case, even if a certain number of terminals exist in the cell or there is a record of performing communication, there is little need to prepare the storage battery for a power outage in a fully stored state. On the other hand, for example, when the temperature suddenly drops from about 30 ° C. or higher, or when the possibility of a thunderstorm is high, the risk of a power failure increases, so it is desirable that the storage battery is fully charged.

本実施例では、上述した携帯電話基地局の蓄電池の使用形態を踏まえて、調整係数を設定する。対象エネルギ消費積算部101の出力に対する調整係数の設定例として、セル内端末数が「0」であるなら、調整係数も「0」に設定すればよい。セル内端末数と通話確率の積を一定期間の実績に対して0〜1で正規化した値を使うなどしてもよい。気象条件から雷雨の確率が高い状態の場合は、セル内端末数や通話確率にかかわらず、調整係数を「1」に設定すればよい。なお、前述した調整方法で調整係数を掛けることが前提となるが、気象条件から停電の確率が低い場合は、調整係数を「0.5」等の低めの値に設定してもよい。   In the present embodiment, the adjustment coefficient is set in consideration of the use form of the storage battery of the mobile phone base station described above. As an example of setting the adjustment coefficient for the output of the target energy consumption integrating unit 101, if the number of terminals in the cell is “0”, the adjustment coefficient may be set to “0”. For example, a value obtained by normalizing the product of the number of terminals in the cell and the call probability to 0 to 1 for a certain period of time may be used. When the probability of thunderstorms is high due to weather conditions, the adjustment coefficient may be set to “1” regardless of the number of terminals in the cell and the call probability. Although it is assumed that the adjustment coefficient is multiplied by the adjustment method described above, if the probability of a power failure is low due to weather conditions, the adjustment coefficient may be set to a low value such as “0.5”.

第6実施例では、第1実施例〜第3実施例を、家庭用の電気式温水設備に適用する場合を説明する。   In the sixth embodiment, a case where the first to third embodiments are applied to a domestic electric hot water facility will be described.

電気式温水設備の本来の機能は、日々に消費される温水を提供することである。また温水供給設備における蓄エネルギ設備11は蓄熱槽である。   The original function of the electric hot water facility is to provide hot water consumed daily. The energy storage facility 11 in the hot water supply facility is a heat storage tank.

電気式温水設備の場合のサービス利用状態データD2は、温水設備の製造した温水を消費する日々の人員の数や気温などである。調理機器や娯楽機器、情報機器、空調設備の使用状況などを用いてもよい。人員は、例えば、電気式温水設備を設置した場所のWiFiの接続端末数などから判別することができる。   The service use state data D2 in the case of an electric hot water facility is the number of daily personnel who consume the hot water manufactured by the hot water facility, the temperature, and the like. Cooking equipment, entertainment equipment, information equipment, use status of air conditioning equipment, and the like may be used. Personnel can be determined from, for example, the number of WiFi connected terminals at the place where the electric hot water facility is installed.

調理機器の使用電力やテレビなどの娯楽機器、パーソナルコンピュータなどの情報機器、エアコンディショナなどの空調機器の使用状況が前後数日、あるいは前年同時期と異なる場合は、特異なイベントを実施している可能性がある。この場合、温水消費のパターンが予測しづらい状況にあると考えることができる。   If the usage of cooking appliances, entertainment equipment such as TV, information equipment such as personal computers, and air conditioning equipment such as air conditioners are different from the previous or next days or the same period of the previous year, a special event is held. There is a possibility. In this case, it can be considered that the hot water consumption pattern is difficult to predict.

常用の蓄エネルギ設備の調整方法は、前述したように、非常用の蓄エネルギ設備とは異なり、実績以上に蓄エネルギ設備11が利用される可能性を考慮する必要がある。   As described above, the adjustment method for the regular energy storage facility is different from the emergency energy storage facility, and it is necessary to consider the possibility that the energy storage facility 11 is used more than the actual results.

本実施例では、このような点を特性を踏まえて、調整係数を設定する。対象エネルギ消費積算部101の出力に対する調整係数の設定例としては、調理機器などの使用電力が頻度の少ない消費形態となっている場合、調整係数を「2」などの「1」よりも大きな値に設定すればよい。   In the present embodiment, the adjustment coefficient is set based on such characteristics as described above. As an example of setting the adjustment coefficient for the output of the target energy consumption integrating unit 101, when the power consumption of the cooking appliance or the like is a low consumption form, the adjustment coefficient is a value larger than “1” such as “2”. Should be set.

第7実施例では、第1実施例〜第3実施例2を、オフィスなどで使用するUPS(Uninterruptible Power Supply)装置に適用する場合を説明する。   In the seventh embodiment, a case will be described in which the first to third embodiments 2 are applied to a UPS (Uninterruptible Power Supply) apparatus used in an office or the like.

UPS装置の本来の機能は、系統2の電力がなくなった場合にも、一定の時間、業務を継続できるように電源を供給することである。UPS装置における蓄エネルギ設備11は蓄電池である。   The original function of the UPS device is to supply power so that the business can be continued for a certain time even when the power of the grid 2 is lost. The energy storage facility 11 in the UPS device is a storage battery.

UPS装置の場合、例えば、予め定めた時間間隔において、予め定めた機器の稼働状況や気象条件がサービス利用状態データD2となる。サービスの対象となる設備数は、UPS装置が提供すべきサービスの指標の一例である。気象条件は、UPS装置の蓄エネルギ設備11の重要性に関する指標の一例である。   In the case of a UPS device, for example, at a predetermined time interval, the operation status and weather conditions of a predetermined device become the service usage state data D2. The number of facilities to be serviced is an example of an index of services to be provided by the UPS device. The weather condition is an example of an index related to the importance of the energy storage facility 11 of the UPS device.

サービス対象の設備が少ない場合(例えば0台)、UPS装置の機能を維持する必要はないため、停電に備えて蓄電池を満蓄状態にしておく必要はない。気象条件が安定しているなら、停電の生じる可能性は低いため、サービス対象の機器が一定数以上ある場合でも、蓄電池を満蓄状態にして停電に備える必要性は少ない。これに対し、気象が不安定な場合、雷雨の可能性が高く、停電リスクは高くなるため、蓄電池は満蓄状態であることが望ましい。   When there are few facilities to be serviced (for example, 0), it is not necessary to maintain the function of the UPS device, so it is not necessary to keep the storage battery fully charged in preparation for a power failure. If the weather conditions are stable, the possibility of a power outage is low, so even if there are more than a certain number of devices to be serviced, there is little need to prepare a storage battery for a power outage. On the other hand, when the weather is unstable, the possibility of a thunderstorm is high and the risk of power outage is high. Therefore, it is desirable that the storage battery is fully stored.

本実施例では、このような特性を踏まえて、調整係数を設定する。対象エネルギ消費積算部101の出力に対する調整係数の設定例としては、設備数が「0」なら調整係数も「0」に設定すればよい。設備数の一定期間の実績に対して0〜1で正規化した値を使うなどしてもよい。   In the present embodiment, the adjustment coefficient is set based on such characteristics. As an example of setting the adjustment coefficient for the output of the target energy consumption integrating unit 101, if the number of facilities is “0”, the adjustment coefficient may be set to “0”. You may use the value normalized by 0-1 with respect to the performance of the fixed number of facilities.

各設備の稼働状況に応じて電力消費を計測しておき、稼働計画に基づいて、稼働する機器消費電力の計測結果を組み合わせることで、対象エネルギ消費を推定してもよい。さらに気象条件から停電の確率が高い状態の場合は、稼働設備数に係らず、調整係数を「1」に設定にすればよい。前述した調整方法で調整係数を掛けることが前提となるが、気象条件から停電の発生する確率が低い場合は、調整係数を「0.5」等の低めの値に設定してもよい。   The target energy consumption may be estimated by measuring the power consumption according to the operation status of each facility and combining the measurement results of the operating device power consumption based on the operation plan. Furthermore, when the probability of a power outage is high due to weather conditions, the adjustment coefficient may be set to “1” regardless of the number of operating facilities. Although it is assumed that the adjustment coefficient is multiplied by the adjustment method described above, the adjustment coefficient may be set to a low value such as “0.5” when the probability of a power failure occurring is low due to weather conditions.

なお、本発明は、上述した実施形態に限定されない。当業者であれば、本発明の範囲内で、種々の追加や変更等を行うことができる。上述の実施形態において、添付図面に図示した構成例に限定されない。本発明の目的を達成する範囲内で、実施形態の構成や処理方法は適宜変更することが可能である。   In addition, this invention is not limited to embodiment mentioned above. A person skilled in the art can make various additions and changes within the scope of the present invention. In the above-described embodiment, the present invention is not limited to the configuration example illustrated in the accompanying drawings. The configuration and processing method of the embodiment can be changed as appropriate within the scope of achieving the object of the present invention.

また、本発明の各構成要素は、任意に取捨選択することができ、取捨選択した構成を具備する発明も本発明に含まれる。さらに特許請求の範囲に記載された構成は、特許請求の範囲で明示している組合せ以外にも組み合わせることができる。   Moreover, each component of the present invention can be arbitrarily selected, and an invention having a selected configuration is also included in the present invention. Further, the configurations described in the claims can be combined with combinations other than those specified in the claims.

1:プロシューマ、2:系統、3:統合化システム3、4:電力取引市場システム、10:デマンド調整力診断装置、11:蓄エネルギ設備、12:エネルギ消費設備、101:対象エネルギ消費量積算部、101A:対象エネルギ消費量推定部、102:サービス利用状態検出部、103:モデル化部   1: Prosumer, 2: System, 3: Integrated system 3, 4: Electricity trading market system, 10: Demand adjustment power diagnosis device, 11: Energy storage facility, 12: Energy consumption facility, 101: Target energy consumption integration unit 101A: target energy consumption estimation unit, 102: service usage state detection unit, 103: modeling unit

Claims (8)

電力需要の抑制可能量を計算する電力需要抑制可能量計算装置であって、
エネルギ消費設備の利用状態を検出する状態検出部と、
前記エネルギ消費設備の積算エネルギ消費量を、予め設定される機能維持所要時間について、前記利用状態に関連付けて計算する第1計算部と、
前記エネルギ消費設備に対応づけられる蓄エネルギ装置の蓄エネルギ量であって、前記利用状態に関連付けられた蓄エネルギ量と前記積算エネルギ消費量とから利用可能な蓄エネルギ量を前記利用状態に応じて計算し、前記エネルギ消費設備でのエネルギ消費量の時間変化と前記利用可能な蓄エネルギ量とに基づいて、電力需要の抑制可能量を計算する第2計算部と、
を備える電力需要抑制可能量計算装置。
A power demand controllable amount calculation device for calculating a power demand controllable amount,
A state detection unit for detecting the usage state of the energy consuming equipment;
A first calculation unit that calculates an accumulated energy consumption amount of the energy consumption facility in association with the use state for a preset function maintenance time;
An energy storage amount of an energy storage device associated with the energy consuming facility, wherein an energy storage amount that can be used from the energy storage amount associated with the use state and the accumulated energy consumption amount is determined according to the use state. A second calculating unit that calculates and calculates an amount of power demand that can be suppressed based on a temporal change in energy consumption at the energy consuming facility and the available energy storage amount;
A power demand controllable amount calculation device comprising:
前記エネルギ消費設備は電気エネルギを消費する設備であり、
前記蓄エネルギ装置は電気エネルギを蓄積して所定の場合に前記エネルギ消費設備へ供給する装置である、
請求項1に記載の電力需要抑制可能量計算装置。
The energy consuming equipment is equipment that consumes electrical energy,
The energy storage device is a device that stores electrical energy and supplies the energy consumption equipment to the energy consuming equipment in a predetermined case.
The power demand controllable amount calculation device according to claim 1.
前記エネルギ消費設備は電気エネルギを利用して発生させた熱エネルギを貯蔵し、かつ要求に応じて熱エネルギを放出するものである、
請求項1に記載の電力需要抑制可能量計算装置。
The energy consuming equipment stores heat energy generated by using electric energy and releases heat energy as required.
The power demand controllable amount calculation device according to claim 1.
前記状態検出部が検出した前記利用状態、前記第1計算部が計算した前記積算エネルギ消費量、または前記第2計算部が計算した前記電力需要の抑制可能量のうち少なくともいずれか一つを出力する出力部を備える、
請求項1〜3のいずれか一項に記載の電力需要抑制可能量計算装置。
Output at least one of the usage state detected by the state detection unit, the accumulated energy consumption calculated by the first calculation unit, or the power demand suppression amount calculated by the second calculation unit Including an output unit
The electric power demand suppression possible amount calculation apparatus as described in any one of Claims 1-3.
前記エネルギ消費設備はそれぞれ複数ずつ存在し、
出力部を介して前記各エネルギ消費設備に関する前記利用状態および前記電力需要の抑制可能量を取得する統合化部をさらに備え、
前記統合化部は、前記各利用状態および前記電力需要の抑制可能量に基づいて、前記各エネルギ消費設備の中から所定のエネルギ消費設備を選択し、選択した所定のエネルギ消費設備に対して電力需要の抑制を指示する、
請求項1に記載の電力需要抑制可能量計算装置。
There are a plurality of each of the energy consuming equipment,
And further comprising an integration unit for acquiring the use state and the power demand controllable amount related to each energy consuming facility via the output unit,
The integration unit selects a predetermined energy consuming facility from the energy consuming facilities based on each usage state and the amount of power demand that can be suppressed, and supplies power to the selected predetermined energy consuming facility. Instructing to reduce demand,
The power demand controllable amount calculation device according to claim 1.
前記状態検出部は、前記エネルギ消費設備の利用状態を予め設定される段階ごとに分類し、その分類結果を前記利用状態として出力する、
請求項1に記載の電力需要抑制可能量計算装置。
The state detection unit classifies the use state of the energy consuming equipment for each preset stage, and outputs the classification result as the use state.
The power demand controllable amount calculation device according to claim 1.
電力需要の抑制可能量を計算機で計算する方法であって、
エネルギ消費設備の利用状態を検出し、
前記エネルギ消費設備の積算エネルギ消費量を、予め設定される機能維持所要時間について、前記利用状態に関連付けて計算し、
前記エネルギ消費設備に対応づけられる蓄エネルギ装置の蓄エネルギ量であって、前記利用状態に関連付けられた蓄エネルギ量と前記積算エネルギ消費量とから利用可能な蓄エネルギ量を前記利用状態に応じて計算し、
前記エネルギ消費設備でのエネルギ消費量の時間変化と前記利用可能な蓄エネルギ量とに基づいて、電力需要の抑制可能量を計算する、
電力需要抑制可能量計算方法。
A method of calculating the amount of power demand that can be suppressed by a computer,
Detect the usage status of energy consuming equipment,
The accumulated energy consumption amount of the energy consuming equipment is calculated in relation to the use state for a preset function maintenance time,
An energy storage amount of an energy storage device associated with the energy consuming facility, wherein an energy storage amount that can be used from the energy storage amount associated with the use state and the accumulated energy consumption amount is determined according to the use state. Calculate
Based on the time change of the energy consumption at the energy consuming facility and the available energy storage amount, the amount of power demand that can be suppressed is calculated.
A method for calculating the amount of power demand that can be suppressed.
電力需要を抑制する電力需要抑制システムであって、
複数のエネルギ消費設備を管理対象とし、電力需要の抑制可能量を計算する複数の電力需要抑制可能量計算装置と、
前記各電力需要抑制可能量計算装置に通信可能に接続された計画立案装置と、
を備え、
前記各電力需要抑制可能量計算装置は、
前記各エネルギ消費設備の利用状態を検出する状態検出部と、
前記各エネルギ消費設備の積算エネルギ消費量を、予め設定される機能維持所要時間について、前記利用状態に関連付けて計算する第1計算部と、
前記各エネルギ消費設備に対応づけられる蓄エネルギ装置の蓄エネルギ量であって、前記利用状態に関連付けられた蓄エネルギ量と前記積算エネルギ消費量とから利用可能な蓄エネルギ量を前記利用状態に応じて計算し、前記各エネルギ消費設備でのエネルギ消費量の時間変化と前記利用可能な蓄エネルギ量とに基づいて、電力需要の抑制可能量を計算する第2計算部と、
を備え、
前記計画立案装置は、
前記各電力需要抑制可能量計算装置から前記利用状態および前記電力需要の抑制可能量を取得し、
前記取得した利用状態および前記電力需要の抑制可能量に基づいて、前記各エネルギ消費設備の中から所定のエネルギ消費設備を選択し、
前記選択した所定のエネルギ消費設備に対して参加の可否を問合せ、
前記所定のエネルギ消費設備のうち参加を表明したエネルギ消費設備に対して、電力需要の抑制を指示する、
電力需要抑制システム。
A power demand control system that suppresses power demand,
A plurality of power demand controllable amount calculation devices for calculating a power demand controllable amount with a plurality of energy consuming facilities as management targets;
A planning device that is communicably connected to each power demand controllable amount calculation device;
With
Each power demand suppression possible amount calculation device,
A state detection unit for detecting a use state of each energy consuming facility;
A first calculation unit that calculates an accumulated energy consumption amount of each of the energy consumption facilities in association with the use state for a preset function maintenance time;
An energy storage amount of an energy storage device associated with each energy consuming facility, wherein an energy storage amount that can be used from the energy storage amount associated with the use state and the accumulated energy consumption amount is determined according to the use state. A second calculation unit that calculates an amount of power demand that can be suppressed based on a temporal change in energy consumption in each energy consuming facility and the available energy storage amount;
With
The planning device is
Obtain the usage state and the power demand restrainable amount from each power demand restrainable amount calculation device,
Based on the acquired usage state and the amount of power demand that can be suppressed, a predetermined energy consuming facility is selected from the energy consuming facilities,
Queries whether or not to participate in the selected predetermined energy consuming equipment,
Instructing the energy consumption facility that has announced participation among the predetermined energy consumption facilities to suppress power demand,
Electric power demand control system.
JP2016204870A 2016-10-19 2016-10-19 Power-demand suppression-possible quantity calculating device and method, and power-demand suppression system Pending JP2018068020A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016204870A JP2018068020A (en) 2016-10-19 2016-10-19 Power-demand suppression-possible quantity calculating device and method, and power-demand suppression system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016204870A JP2018068020A (en) 2016-10-19 2016-10-19 Power-demand suppression-possible quantity calculating device and method, and power-demand suppression system

Publications (1)

Publication Number Publication Date
JP2018068020A true JP2018068020A (en) 2018-04-26

Family

ID=62086430

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016204870A Pending JP2018068020A (en) 2016-10-19 2016-10-19 Power-demand suppression-possible quantity calculating device and method, and power-demand suppression system

Country Status (1)

Country Link
JP (1) JP2018068020A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021052546A (en) * 2019-09-26 2021-04-01 東京電力ホールディングス株式会社 Negawatt trading support device, negawatt trading system, and negawatt trading method
JPWO2021038881A1 (en) * 2019-08-30 2021-12-02 三菱電機株式会社 Air conditioner

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2021038881A1 (en) * 2019-08-30 2021-12-02 三菱電機株式会社 Air conditioner
JP7090814B2 (en) 2019-08-30 2022-06-24 三菱電機株式会社 Air conditioner
JP2021052546A (en) * 2019-09-26 2021-04-01 東京電力ホールディングス株式会社 Negawatt trading support device, negawatt trading system, and negawatt trading method
JP7331587B2 (en) 2019-09-26 2023-08-23 東京電力ホールディングス株式会社 Negawatt trading support device, negawatt trading system and negawatt trading method

Similar Documents

Publication Publication Date Title
USRE46093E1 (en) Energy reduction
Callaway et al. Achieving controllability of electric loads
EP2359457B1 (en) Energy reduction
CA2749770C (en) Optimization of microgrid energy use and distribution
EP1668450B1 (en) Wide-area electrical demand and supply management
WO2012096050A1 (en) Reserve power-supplying capacity transaction system and reserve power-supplying capacity transaction method
US20100145884A1 (en) Energy savings aggregation
KR101904831B1 (en) Intellgent building management system and method for controlling thereof
Heylen et al. Fairness and inequality in power system reliability: Summarizing indices
Diawuo et al. Assessment of multiple-based demand response actions for peak residential electricity reduction in Ghana
US10778028B2 (en) Power information management system, management method, computer-readable storage medium, power information management server, communication terminal, and power system
US20120179596A1 (en) Power reserve margin trading system and power reserve margin trading method
JP2005185016A (en) Electric power information processing system
JP2018068020A (en) Power-demand suppression-possible quantity calculating device and method, and power-demand suppression system
JP7011991B2 (en) Power demand adjustment system and its method
JP6900563B1 (en) Demand adjustment server and demand adjustment system
KR102350298B1 (en) Energy management system and management method therefor
CN114037113B (en) Intelligent water meter control method, device and system, storage medium and cloud computing center
JP2023083813A (en) Power management system, power management device, power management method and computer program
JP2013246806A (en) Power meter server and computer program