JP2018052301A - Power supply system for electric vehicle - Google Patents

Power supply system for electric vehicle Download PDF

Info

Publication number
JP2018052301A
JP2018052301A JP2016190673A JP2016190673A JP2018052301A JP 2018052301 A JP2018052301 A JP 2018052301A JP 2016190673 A JP2016190673 A JP 2016190673A JP 2016190673 A JP2016190673 A JP 2016190673A JP 2018052301 A JP2018052301 A JP 2018052301A
Authority
JP
Japan
Prior art keywords
voltage
vehicle
storage device
power storage
feeder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016190673A
Other languages
Japanese (ja)
Other versions
JP6813322B2 (en
Inventor
康介 熊谷
Kosuke Kumagai
康介 熊谷
徹夫 藤田
Tetsuo Fujita
徹夫 藤田
慎 橋本
Makoto Hashimoto
慎 橋本
佐藤 春雄
Haruo Sato
春雄 佐藤
雅士 中平
Masashi Nakahira
雅士 中平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2016190673A priority Critical patent/JP6813322B2/en
Publication of JP2018052301A publication Critical patent/JP2018052301A/en
Application granted granted Critical
Publication of JP6813322B2 publication Critical patent/JP6813322B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce damage to a battery by decreasing the frequency of charging/discharging switching by executing necessary discharging in a sure manner while avoiding unnecessary discharging in a storage type power storage device.SOLUTION: A power supply system for an electric vehicle includes: vehicle position determination means for determining whether or not a traveling vehicle is present in a predetermined section between a plurality of transformer stations and a power storage device based on position information on the traveling vehicle; pantograph point voltage acquisition means for acquiring a voltage value at a contact point of a pantograph of a traveling vehicle using a prescribed table or a prescribed formula when it is determined that a traveling vehicle is present in any of the prescribed sections; pantograph point voltage determination means for determining whether or not the acquired pantograph point voltage value is lower than a prescribed voltage value; and feeder voltage determination means for determining whether or not a feeder voltage is lower than a specified voltage value. When the pantograph point voltage is determined to be lower than the predetermined prescribed voltage, and the feeder voltage is determined to be lower than the specified voltage value, a command to give an instruction to execute discharging is output to the power storage device.SELECTED DRAWING: Figure 2

Description

この発明は、電気車への電力供給システムに関し、特に変電所間に電力貯蔵装置が設けられている電力供給システムにおける電力貯蔵装置の制御技術に関するものである。   The present invention relates to a power supply system for an electric vehicle, and more particularly to a control technique for a power storage device in a power supply system in which a power storage device is provided between substations.

電気鉄道においては、沿線に適当な距離をおいて変電所が設けられている。変電所は、断路器や遮断器、変圧器、整流器などの多種多様な機器を備えており、設備が大掛かりであってメンテナンスも必要である。そのため、設備を簡素化したいという要望があり、電池(バッテリー)を用いた電力貯蔵装置により受電設備を省略する技術が着目されている。
一方、近年、電気鉄道においては、変電所から電力の供給を受けるき電線に接触する車両のパンタグラフの電圧(以下、パンタ点電圧)が低下すると加速力が低下してダイヤ通りの運行ができなくなってしまうので、き電電圧の低下を補償したり、電気車の回生ブレーキによって発生した回生電力のうち余剰電力を回収するために、電力回収装置や電力貯蔵装置を設けることが行われている。
In electric railways, substations are provided at an appropriate distance along the railway. Substations are equipped with a wide variety of equipment, such as disconnectors, circuit breakers, transformers, and rectifiers. The facilities are large and require maintenance. For this reason, there is a demand for simplifying the equipment, and attention is paid to a technique for omitting the power receiving equipment by a power storage device using a battery.
On the other hand, in recent years, in electric railways, if the voltage of the pantograph of the vehicle that contacts the feeder line that receives power supply from the substation (hereinafter referred to as the punter point voltage) decreases, the acceleration force decreases and it becomes impossible to operate as scheduled. Therefore, a power recovery device and a power storage device are provided in order to compensate for a decrease in feeding voltage and to recover surplus power from the regenerative power generated by the regenerative brake of the electric vehicle.

従来、電力回収装置や電力貯蔵装置において、き電線に流れる電流を検出したり変電所近傍のき電線の電圧(母線電圧)を検出して、検出したき電線電流値が所定値を超えたとき、あるいは、検出したき電線電圧値が所定値を下回ったときに放電を行い、逆の場合に充電を行うという制御をするようにした発明がある(例えば、特許文献1、2参照)。   Conventionally, in a power recovery device or power storage device, when the current flowing in the feeder line is detected or the voltage of the feeder line (bus voltage) near the substation is detected, the detected feeder current value exceeds a predetermined value Alternatively, there is an invention in which discharging is performed when the detected feeder voltage value falls below a predetermined value, and charging is performed in the opposite case (see, for example, Patent Documents 1 and 2).

特開2012−180078号公報JP 2012-180078 A 特開2011−155716号公報JP 2011-155716 A 特開平11−91414号公報Japanese Patent Laid-Open No. 11-91414

上記特許文献1の電力回収装置や特許文献2の電力貯蔵装置における充放電制御は、パンタ点電圧の如何にかかわらず、単にき電線の電流や電圧を検出して行うものであるため、設定によっては頻繁に充放電の切替えが発生する。ここで、特許文献2の電力貯蔵装置のように、電力貯蔵媒体としてキャパシタを用いるものにおいては頻繁な充放電はそれほど問題とならないが、電力の貯蔵に電池を使用する電力貯蔵装置においては、頻繁な充放電が電池にダメージを与えてしまい、電池寿命が短くなるという課題がある。   The charge / discharge control in the power recovery device of Patent Document 1 and the power storage device of Patent Document 2 is performed simply by detecting the current and voltage of the feeder, regardless of the pant point voltage. Frequently switches between charge and discharge. Here, in the case of using a capacitor as a power storage medium like the power storage device of Patent Document 2, frequent charge / discharge is not a problem, but in a power storage device using a battery for storing power, it is frequently used. There is a problem that the charging / discharging damages the battery and shortens the battery life.

また、従来、電気鉄道の直流電力供給システムにおいて、列車位置情報と予め記憶されている線路条件とから運転状態(力行、惰行、回生)を判断して変電所のサイリスタを制御し、パンタ点電圧の低下を補償するとともに回生電力を有効に利用するようにした発明も提案されている(特許文献3参照)。
しかしながら、特許文献3の発明は、頻繁な切替えがそれほど問題とならない変電所のサイリスタを制御するものであり、電力貯蔵装置に適用した場合に頻繁な充放電によって電池がダメージを受けるという課題については記載されていない。
ここで、電気鉄道の直流電力供給システムに電力貯蔵装置を適用する場合における本発明の具体的な課題について説明する。
Conventionally, in a DC power supply system for an electric railway, the operation state (power running, coasting, regeneration) is determined from train position information and pre-stored track conditions, and the thyristor of the substation is controlled, and the punter voltage There has also been proposed an invention that compensates for the decrease in power consumption and uses the regenerative power effectively (see Patent Document 3).
However, the invention of Patent Document 3 controls a thyristor in a substation where frequent switching is not a significant problem. Regarding the problem that a battery is damaged by frequent charging and discharging when applied to a power storage device. Not listed.
Here, the specific subject of this invention in the case of applying an electric power storage apparatus to the direct-current power supply system of an electric railway is demonstrated.

電気車の消費電力が最も多くなるのは、駅を出発して加速(力行運転)する時である。一方、2つの変電所Xと変電所Zの間に複数の駅が設けられている場合、同一の電気車が駅を出発して加速する際の消費電力は毎回ほぼ同一であるとすると、図8(A)に示すように、変電所Xまたは変電所Zから遠い駅を電気車Tが出発して加速する際のパンタ点電圧(破線イ)は、き電線の抵抗成分による大きな電圧降下があるため、図8(B)に示すように、変電所X(または変電所Z)に近い駅を電気車Tが出発して加速する際のパンタ点電圧(実線ハ)よりも低くなり、基準電圧(例えば、1100V)を下回ることがある。この場合、き電電圧を補償する必要がある。図8(A)において、実線ロは電力貯蔵装置(バッテリーポスト)を放電させることにより電圧補償をした場合のき電電圧の分布を示す。   The electric vehicle consumes the most power when it leaves the station and accelerates (powering operation). On the other hand, if a plurality of stations are provided between two substations X and Z, the power consumption when the same electric vehicle departs from the station and accelerates is almost the same every time. As shown in FIG. 8 (A), when the electric vehicle T starts and accelerates at a station far from the substation X or Z, the punter voltage (dashed line a) is a large voltage drop due to the resistance component of the feeder line. Therefore, as shown in FIG. 8 (B), the voltage is lower than the punter voltage (solid line C) when the electric vehicle T starts and accelerates at a station near the substation X (or substation Z), May fall below voltage (eg, 1100V). In this case, it is necessary to compensate the feeding voltage. In FIG. 8A, a solid line B shows a distribution of feeding voltage when voltage compensation is performed by discharging the power storage device (battery post).

さらに、ある駅から2台の電気車が逆方向すなわち上り方向と下り方向へ同時に発車する際には、パンタ点電圧はさらに落ち込むこととなる。また、各電気車へ電力を供給するき電線の電圧は、対象区間を走行する電気車の数や走行状態によっても変動する。
電気車の位置を考慮せずに、単にき電線の電流や電圧を検出して電力貯蔵装置における充放電を行う従来の一般的な制御方式では、変電所Xまたは変電所Zから遠い駅を電気車が出発して加速する場合も、変電所Xまたは変電所Zに近い駅を電気車が出発して加速する場合も、測定値が規定値を下回ると一律に電力貯蔵装置を放電してき電電圧を高める制御が行われることとなる。
Furthermore, when two electric cars depart from a certain station in the opposite direction, that is, in the upward direction and the downward direction at the same time, the punter point voltage further decreases. In addition, the voltage of the feeder that supplies electric power to each electric vehicle varies depending on the number of electric vehicles traveling in the target section and the traveling state.
In the conventional general control method in which the current and voltage of the feeder line are simply detected and the electric power storage device is charged and discharged without considering the position of the electric vehicle, the station far from the substation X or the substation Z is electrically connected. Whether the car departs and accelerates, or the electric car departs and accelerates at a station near substation X or substation Z, the power storage device is discharged uniformly when the measured value falls below the specified value. Control to increase the value will be performed.

本発明者は、き電線による電力供給について鋭意検討した結果、上述したように、変電所Xまたは変電所Zに近い駅を電気車が出発して加速する際のパンタ点電圧は、規定値以下にならない場合があるにもかかわらず、従来の一般的な制御方式を適用すると、そのような場合にも電力貯蔵装置の放電が行われるため、充放電の頻度が高くなって電池の性能劣化の進みが早まるという課題があることを見い出した。更に、不要な充放電により電力損失が増加するので、省エネルギーの観点からも望ましくない。かといって、充放電開始の設定値を高めに設定して運用すると、必要なときに電池が放電しない恐れがある。   As a result of intensive studies on the power supply by feeders, the present inventor, as described above, has a punter voltage that is less than a specified value when an electric vehicle starts and accelerates at a station near the substation X or the substation Z. However, if the conventional general control method is applied, the power storage device is discharged even in such a case, so that the frequency of charging / discharging becomes high and the performance of the battery deteriorates. I found out that there was a problem of progress. Furthermore, since power loss increases due to unnecessary charging / discharging, it is not desirable from the viewpoint of energy saving. However, if the charging / discharging start set value is set to a high value, the battery may not be discharged when necessary.

本発明は上記のような背景の下になされたもので、蓄電式の電力貯蔵装置を備えた鉄道の電力供給システムにおいて、不要な放電を回避しつつ必要な放電は確実に実行することで、充放電切替え回数を減らして電池のダメージを低減し、装置の寿命を長くすることができる電力貯蔵装置の制御技術を提供することを目的とする。
本発明の他の目的は、鉄道の電力供給システムにおける電源設備のトータルコストを低減することができる電力貯蔵装置の制御技術を提供することにある。
The present invention was made in the background as described above, and in a railway power supply system equipped with a storage-type power storage device, the necessary discharge is reliably performed while avoiding unnecessary discharge, An object of the present invention is to provide a control technique for a power storage device that can reduce the number of times of charge / discharge switching to reduce battery damage and extend the life of the device.
Another object of the present invention is to provide a power storage device control technique capable of reducing the total cost of power supply facilities in a railway power supply system.

上記目的を達成するため本発明は、
複数の変電所といずれか2つの変電所間に配備された電力貯蔵装置と、
前記変電所または電力貯蔵装置からき電線を介して電力を受ける走行車両の位置情報を受けて前記電力貯蔵装置の放電または非放電を示す指令を前記電力貯蔵装置に対して出力可能な電力貯蔵装置用制御装置と、
前記電力貯蔵装置の近傍のき電線電圧値を検出するき電線電圧検出手段と、
を備え、き電線を介して走行車両へ電力を供給する電力供給システムであって、
前記電力貯蔵装置用制御装置は、
走行車両の位置情報に基づいて、前記複数の変電所と前記電力貯蔵装置との間の所定区間内に当該走行車両が存在するか否か判定する車両位置判定手段と、
前記車両位置判定手段によりいずれかの前記所定区間に走行車両が存在すると判断した場合に、所定のテーブルまたは所定の計算式に用いて当該走行車両のパンタグラフの接触点の電圧値を取得するパンタ点電圧取得手段と、
前記パンタ点電圧取得手段によって取得されたパンタ点電圧が所定の電圧値よりも低いか否か判定するパンタ点電圧判定手段と、
前記き電線電圧検出手段によって検出されたき電線電圧が規定電圧値よりも低いか否か判定するき電線電圧判定手段と、
を備え、前記車両位置判定手段によってパンタ点電圧が予め定められた所定電圧よりも低いと判定され、かつ前記き電線電圧判定手段によって前記き電線電圧が前記規定電圧値よりも低いと判定された場合に、前記電力貯蔵装置へ放電を指示する指令を出力するようにしたものである。
In order to achieve the above object, the present invention
A plurality of substations and a power storage device arranged between any two substations;
For a power storage device capable of receiving a position information of a traveling vehicle that receives power from the substation or the power storage device via a feeder and outputting a command indicating discharge or non-discharge of the power storage device to the power storage device A control device;
A feeder voltage detection means for detecting a feeder voltage value in the vicinity of the power storage device;
An electric power supply system for supplying electric power to a traveling vehicle via a feeder line,
The power storage device control device comprises:
Vehicle position determination means for determining whether or not the traveling vehicle exists in a predetermined section between the plurality of substations and the power storage device based on position information of the traveling vehicle;
When the vehicle position determination means determines that a traveling vehicle is present in any one of the predetermined sections, the punter point obtains the voltage value of the contact point of the pantograph of the traveling vehicle using a predetermined table or a predetermined calculation formula Voltage acquisition means;
Punter point voltage determination means for determining whether or not the punter point voltage acquired by the punter point voltage acquisition means is lower than a predetermined voltage value;
Feeder voltage determination means for judging whether the feeder voltage detected by the feeder voltage detection means is lower than a specified voltage value;
And the vehicle position determination means determines that the punter point voltage is lower than a predetermined voltage, and the feeder voltage determination means determines that the feeder voltage is lower than the specified voltage value. In this case, a command for instructing the power storage device to discharge is output.

上記した手段によれば、車両が駅近傍のような加速運転をする所定区間に在線すると判定した場合に、テーブルを用いてパンタ点電圧を取得し、電力貯蔵装置(バッテリー)を放電させて電圧補償するか否かを決定し、放電または非放電を示す指令を前記電力貯蔵装置に対して出力可能であるので、比較的簡単なロジック制御で電力貯蔵装置(バッテリー)に対して放電または非放電の指令を生成し出力することができ、電池のダメージを低減することができる。また、計算式を用いてパンタ点電圧を取得するようにした場合には、運行状況に応じてより精度の高い放電指令を出力することができる。   According to the above-described means, when it is determined that the vehicle is in a predetermined section where acceleration operation is performed such as in the vicinity of the station, a punter point voltage is obtained using a table, and the power storage device (battery) is discharged to generate a voltage. Since it is possible to determine whether to compensate and to output a command indicating discharge or non-discharge to the power storage device, the power storage device (battery) is discharged or non-discharged with relatively simple logic control. Can be generated and output, and battery damage can be reduced. Moreover, when a punter point voltage is acquired using a calculation formula, a discharge command with higher accuracy can be output in accordance with the operation status.

さらに、走行車両の位置情報の他に車両識別情報を電力貯蔵装置用制御装置へ送信することにより、電力貯蔵装置用制御装置は車両識別情報を用いて運用ダイヤ等から走行車両の車両数を把握することができ、車両数に応じた電流値を知りその電流値に応じてより正確なパンタ点電圧を取得して放電の要否を決定することが可能となる。そのため、不要な放電を回避しつつ必要な放電は確実に実行することができ、充放電切替え回数を減らして電池のダメージを低減し、装置の寿命を長くすることができる。また、既存の中間変電所の受変電設備を省略し代わりに電力貯蔵装置を設けた簡素な設備であるバッテリーポストに置き換えることで、鉄道の電力供給システムにおける電源設備のトータルコストを低減することができるようになる。   Further, by transmitting vehicle identification information to the power storage device control device in addition to the position information of the traveling vehicle, the power storage device control device grasps the number of traveling vehicles from the operation diagram using the vehicle identification information. It is possible to know the current value according to the number of vehicles, acquire a more accurate punter point voltage according to the current value, and determine the necessity of discharge. Therefore, it is possible to reliably perform necessary discharge while avoiding unnecessary discharge, reduce the number of charge / discharge switching, reduce battery damage, and extend the life of the apparatus. In addition, it is possible to reduce the total cost of the power supply equipment in the railway power supply system by omitting the existing substation equipment of the intermediate substation and replacing it with a battery post that is a simple equipment provided with a power storage device instead. become able to.

ここで、前記走行車両は、GPS信号を受信可能なGPS受信機のような位置情報受信装置と、当該車両の識別情報を記憶する記憶手段と、前記位置情報受信装置により受信した緯度経度情報に基づく車両位置情報および前記識別情報を送信可能な無線通信手段とを備えるようにすると良い。
現在既設の路線を走行している車両にはGPS受信機を搭載したものがあるので、新たにGPS機能を有する装置を搭載したり、既設の車載装置に機能(ハードウェア)を追加することなく、電力貯蔵装置の制御機能を備えた電力供給システムを低コストで実現することができる。
Here, the traveling vehicle includes a position information receiving device such as a GPS receiver capable of receiving GPS signals, storage means for storing identification information of the vehicle, and latitude / longitude information received by the position information receiving device. The vehicle position information based and the wireless communication means capable of transmitting the identification information may be provided.
Some vehicles that are currently running on existing routes are equipped with GPS receivers, so without newly installing a device having a GPS function or adding a function (hardware) to an existing in-vehicle device In addition, a power supply system having a control function of the power storage device can be realized at low cost.

また、望ましくは、前記テーブルは、車両在線区間情報と車両数とを指標として、前記2つの変電所の最低送出電圧値と当該車両在線区間までのき電線抵抗値と在線する走行車両の最大電流値とに基づいて予め算出されたパンタ点電圧を参照可能に形成され、
前記電力貯蔵装置用制御装置は、前記車両の位置情報と、走行車両から得られる車両識別情報に基づいて取得した車両数と、に基づいて前記テーブルを参照してパンタ点電圧を取得するように構成する。
かかる構成によれば、テーブルを用いて容易に走行車両の車両数に応じたパンタ点電圧を取得して、電力貯蔵装置(バッテリー)に対して放電または非放電を示す指令を生成し出力することができ、電池のダメージを低減することができる。
Preferably, the table uses the vehicle existing line section information and the number of vehicles as indices, and the minimum transmission voltage value of the two substations, the feeder resistance value to the vehicle existing line section, and the maximum current of the traveling vehicle in the line. The punter point voltage calculated in advance based on the value is formed so that it can be referred to,
The power storage device control device refers to the table based on the position information of the vehicle and the number of vehicles acquired based on the vehicle identification information obtained from the traveling vehicle so as to acquire the punter point voltage. Configure.
According to such a configuration, a punter point voltage corresponding to the number of traveling vehicles can be easily obtained using a table, and a command indicating discharge or non-discharge can be generated and output to the power storage device (battery). Battery damage can be reduced.

さらに、望ましくは、前記走行車両は、当該車両の走行加速度を検出可能な加速度検出手段をさらに備え、前記無線通信手段によって、前記加速度検出手段によって検出された加速度情報と前記車両位置情報と前記識別情報とを送信するように構成する。
かかる構成によれば、車両の加速度が分かるので、車両が加速運転中か否かをより正確に把握して、最適なタイミングで電力貯蔵装置(バッテリー)に対して放電または非放電を示す指令を生成し出力することができる。
Further preferably, the traveling vehicle further includes an acceleration detection unit capable of detecting a traveling acceleration of the vehicle, and the wireless communication unit detects the acceleration information detected by the acceleration detection unit, the vehicle position information, and the identification. Configured to transmit information.
According to such a configuration, since the acceleration of the vehicle is known, it is possible to grasp more accurately whether or not the vehicle is in an accelerating operation, and issue a command indicating discharge or non-discharge to the power storage device (battery) at an optimal timing. Can be generated and output.

また、望ましくは、前記所定区間は、駅近傍の車両が加速運転する区間とする。
かかる構成によれば、駅近傍の所定範囲では停車中の車両が発車する際に加速運転することは分かっているので、駅間全体にわたってパンタ点電圧を格納したテーブルデータを用意しておく必要がなく、テーブルを作成する作業負担を減らすとともに、データを記憶する記憶装置の容量を削減することができる。
Preferably, the predetermined section is a section in which a vehicle near the station is accelerated.
According to such a configuration, since it is known that acceleration operation is performed when a stopped vehicle departs in a predetermined range near the station, it is necessary to prepare table data storing the punter voltage across the entire station. Therefore, it is possible to reduce the work load for creating the table and reduce the capacity of the storage device for storing data.

本発明によれば、蓄電式の電力貯蔵装置を備えた鉄道の電力供給システムにおいて、不要な放電を回避しつつ必要な放電は確実に実行することで、充放電切替え回数を減らして電池のダメージを低減し、装置の寿命を長くすることができる。また、不要な電力損失を抑制できるので、省エネルギー性にも優れている。さらに、鉄道の電力供給システムにおける電源設備のトータルコストを低減することができるという効果がある。   According to the present invention, in a railway power supply system equipped with an electricity storage type power storage device, the necessary discharge is reliably performed while avoiding unnecessary discharge, thereby reducing the number of times of charge / discharge switching and damaging the battery. And the life of the apparatus can be extended. Moreover, since unnecessary power loss can be suppressed, it is excellent in energy saving. Furthermore, there is an effect that the total cost of the power supply equipment in the railway power supply system can be reduced.

本発明に係る電力貯蔵装置を用いた電力供給システムの一構成例を示すシステム構成図である。It is a system configuration figure showing an example of 1 composition of a power supply system using a power storage device concerning the present invention. 実施形態に係る電力貯蔵装置の制御系の構成を示すシステム構成図である。It is a system configuration figure showing the composition of the control system of the power storage device concerning an embodiment. 実施形態に係る電力貯蔵装置用制御装置における制御手順の一例を示すフローチャートである。It is a flowchart which shows an example of the control procedure in the control apparatus for electric power storage apparatuses which concerns on embodiment. 実施形態に係る電力貯蔵装置用制御装置におけるパンタ点電圧を取得するためのテーブルの一例を示す図である。It is a figure which shows an example of the table for acquiring the punter point voltage in the control apparatus for electric power storage apparatuses which concerns on embodiment. 電力貯蔵装置用制御装置における制御手順の他の例を示すフローチャートである。It is a flowchart which shows the other example of the control procedure in the control apparatus for electric power storage apparatuses. 電力貯蔵装置用制御装置における制御手順の変形例を示すフローチャートである。It is a flowchart which shows the modification of the control procedure in the control apparatus for electric power storage apparatuses. 電力貯蔵装置用制御装置における制御手順のさらに他の変形例を示すフローチャートである。It is a flowchart which shows the further another modification of the control procedure in the control apparatus for electric power storage apparatuses. 電気鉄道の電力供給システムの変電所間における列車の位置とき電線電圧との関係を示すもので、(A)はパンタ点電圧が基準電圧を下回る場合の説明図、(B)はパンタ点電圧が基準電圧を下回らない場合の説明図である。It shows the relationship between the position of the train between the substations of the electric railway power supply system and the electric wire voltage. (A) is an explanatory diagram when the punter point voltage is lower than the reference voltage, and (B) is the punter point voltage. It is explanatory drawing when not less than a reference voltage.

以下、図面を参照しつつ、本発明に係る変電所間の電力貯蔵装置の制御システムおよび制御方法の実施形態について説明する。図1は、本発明を適用して有効な電気車への電力供給システムの一例を示すシステム構成図である。
なお、電車線には直流き電方式と交流き電方式とがあるが、図1に示すものは直流き電方式の電車線である。また、図1には、2つの変電所間のき電線を取り出して示しているが、他の変電所間も図1と同様に構成することができる。
Hereinafter, embodiments of a control system and a control method for a power storage device between substations according to the present invention will be described with reference to the drawings. FIG. 1 is a system configuration diagram showing an example of a power supply system to an electric vehicle effective by applying the present invention.
Although there are a DC feeding system and an AC feeding system for the train line, the one shown in FIG. 1 is a DC feeding system train line. Moreover, although the feeder line between two substations is taken out and shown in FIG. 1, it can also comprise between other substations similarly to FIG.

図1に示すように、2つの変電所XとZとの間の任意の地点に蓄電池を電力貯蔵媒体とする電力貯蔵装置10を有する蓄電式変電所Yが設けられ、変電所Xと蓄電式変電所Yとの間および蓄電式変電所Yと変電所Zとの間に、両端からそれぞれ直流電力(例えばDC1500V系)が供給されるき電線50A,50Bが敷設されている。蓄電式変電所Yは、変電所XとZとの中間地点に設けるのが理想的であるが、2つの変電所X,Zの中間地点から一方の変電所に偏った地点に設けられても良い。   As shown in FIG. 1, a storage type substation Y having a power storage device 10 using a storage battery as a power storage medium is provided at an arbitrary point between two substations X and Z, and the substation X and the storage type Between the substation Y and between the storage type substation Y and the substation Z, feeders 50A and 50B to which direct current power (for example, DC 1500 V system) is supplied from both ends are laid. Ideally, the storage-type substation Y is provided at a midpoint between the substations X and Z, but even if it is provided at a location that is biased to one substation from the midpoint between the two substations X and Z. good.

図2は、本発明に係る変電所間の電力貯蔵装置の制御システムの一実施形態を示す。
図2に示すように、本実施形態の電力貯蔵装置の制御システムは、電力貯蔵装置10と、各列車Tに搭載された車載装置20と、車載装置20から無線で送信されたデータを無線基地局Bを介して受信する変電所用運行状況管理装置30と、電力貯蔵装置10へ制御データ(充放電指令)を送信する電力貯蔵装置用制御装置40などから構成されている。
このうち電力貯蔵装置10は、蓄電池11と、該蓄電池11の充放電切替えスイッチ12と、当該切替えスイッチ12をオン、オフ駆動する駆動回路(DRV)13およびその制御装置(CNT)14などを備えている。
FIG. 2 shows an embodiment of a control system for a power storage device between substations according to the present invention.
As shown in FIG. 2, the control system for the power storage device of this embodiment includes a power storage device 10, an in-vehicle device 20 mounted on each train T, and data transmitted wirelessly from the in-vehicle device 20 to a wireless base. It comprises a substation operation status management device 30 that is received via the station B, a power storage device control device 40 that transmits control data (charge / discharge command) to the power storage device 10, and the like.
Among these, the power storage device 10 includes a storage battery 11, a charge / discharge changeover switch 12 of the storage battery 11, a drive circuit (DRV) 13 that drives the changeover switch 12 on and off, and a control device (CNT) 14 thereof. ing.

また、車載装置20は、移動局としてのデジタル無線通信装置21と、GPS(全地球無線測位システム:Global Positioning System)信号を受信可能なGPS受信機のような位置情報受信装置22と、識別情報として編成ごとに付与されている編成番号や列車番号、鉄道GIS(Geographic Information System)の情報(線区名、線路名、キロ程と緯度経度との関係を示す情報)等を記憶する記憶装置(メモリ)23とを備え、位置情報受信装置22で受信したGPS信号等に基づく位置情報および識別情報としての列車番号または編成番号を、デジタル無線通信装置21によって無線基地局Bを介して変電所用運行状況管理装置30へ送信する。   The in-vehicle device 20 includes a digital wireless communication device 21 as a mobile station, a position information receiving device 22 such as a GPS receiver capable of receiving a GPS (Global Positioning System) signal, and identification information. A storage device that stores the organization number and train number assigned to each organization as well as information on the railway GIS (Geographic Information System) (information indicating the relationship between the line name, track name, kilometer and latitude / longitude), etc. A train) or train number as identification information based on the GPS signal received by the location information receiving device 22 and the identification information via the radio base station B by the digital radio communication device 21 It transmits to the status management apparatus 30.

なお、「編成」とは複数の車両を連結し連結した状態で運用するものを意味し、それらを区別するために付与されるのが編成番号である。一方、「列車番号」とは、時刻表(ダイヤ)上で列車を区別するために付与される番号である。複数の編成を併結したり分割したりして運用されることがあり、併結した状態で運用される際も分割した状態で運用される際も、運用ダイヤ上では、1つの列車番号が付与される。列車番号は、乗務員が指定された列車に乗務する際に、車載装置20に入力もしくは伝送され記憶装置(メモリ)23に記憶される。   The “knitting” means that a plurality of vehicles are connected and operated in a connected state, and a knitting number is assigned to distinguish them. On the other hand, the “train number” is a number assigned to distinguish trains on the timetable (diamond). Multiple trains may be operated in combination or divided, and one train number is assigned on the operation diagram when operating in a combined state or in a divided state. The The train number is input or transmitted to the in-vehicle device 20 and stored in the storage device (memory) 23 when the crew member is on the designated train.

位置情報受信装置22としては、GPS受信機能の他に、加速度検出機能やGPS情報(緯度経度情報)に基づいて上記鉄道GIS情報を参照してキロ程値を算出する機能を有する装置を用いるのが良い。GPS受信機は、例えば1秒のような間隔でGPS信号を受信可能なものを使用する。また、GPS受信機の代わりに、GNSS(全地球衛星測位システム:Global Navigation Satellite System)やQZSS(準天頂衛星システム:Quasi Zenith Satellite System)その他の位置測位手段を用いても良い。変電所用運行状況管理装置30と電力貯蔵装置用制御装置40との間は、無線でも良いが、本実施形態では、有線(ケーブル)でデータ送受信可能に接続されている。   As the position information receiving device 22, in addition to the GPS receiving function, a device having a function for calculating a kilometer value by referring to the railroad GIS information based on an acceleration detecting function and GPS information (latitude / longitude information) is used. Is good. A GPS receiver that can receive GPS signals at intervals such as 1 second is used. Instead of the GPS receiver, GNSS (Global Navigation Satellite System), QZSS (Quasi Zenith Satellite System), or other position positioning means may be used. The operation status management device 30 for the substation and the control device 40 for the power storage device may be wireless, but in the present embodiment, they are connected so as to be able to transmit and receive data by wire (cable).

電力貯蔵装置用制御装置40は、変電所用運行状況管理装置30から運行状況を取得する運行状況取得機能と、充放電モードを決定するモード決定機能と、決定したモードに応じて電力貯蔵装置10へ制御データを送信する通信機能を備える。また、電力貯蔵装置用制御装置40には、電力貯蔵装置10の近傍のき電線50A(または50B)の電圧値を検出する電圧検出器41からの検出信号が入力されている。
上記のような機能を有する電力貯蔵装置用制御装置40は、一般的な制御装置と同様な構成を有する装置、例えばマイクロプロセッサおよび該マイクロプロセッサが実行するプログラムや参照テーブルなどの固定データを格納した記憶装置、液晶表示パネルやランプなどの出力装置を備えたコンピュータ装置(サーバを含む)を使用して構成することができる。かかるコンピュータ装置のハードウェア構成自体は自明であるのでその図示は省略する。
The power storage device control device 40 is connected to the power storage device 10 according to the operation status acquisition function for acquiring the operation status from the operation status management device 30 for the substation, the mode determination function for determining the charge / discharge mode, and the determined mode. A communication function for transmitting control data is provided. In addition, a detection signal from the voltage detector 41 that detects the voltage value of the feeder 50 </ b> A (or 50 </ b> B) in the vicinity of the power storage device 10 is input to the power storage device control device 40.
The power storage device control device 40 having the above-described function stores a device having the same configuration as a general control device, for example, a microprocessor and a fixed data such as a program executed by the microprocessor and a reference table. A computer device (including a server) including an output device such as a storage device, a liquid crystal display panel, or a lamp can be used. Since the hardware configuration itself of such a computer device is self-evident, its illustration is omitted.

本実施形態の電力貯蔵装置の制御システムは、変電所から列車の在線位置までの距離およびパンタ点電流によってパンタ点までの電圧降下が異なること、列車の車両数が異なれば加速時(力行運転時)の消費電力が異なること、を前提条件として、電力貯蔵装置用制御装置40が、走行する列車の位置をリアルタイムで把握して、列車の位置および車両数から各列車のパンタ点電圧を推測し、得られたパンタ点電圧とそのときの変電所の母線電圧(き電線電圧)とに応じて電力貯蔵装置10の充放電制御を行うように構成されている。   The control system of the power storage device according to the present embodiment is such that the voltage drop to the punter point varies depending on the distance from the substation to the train line position and the punter point current, and if the number of train vehicles varies, ), The power storage device control device 40 grasps the position of the traveling train in real time and estimates the punter point voltage of each train from the train position and the number of vehicles. The power storage device 10 is configured to perform charging / discharging control according to the obtained punter point voltage and the bus voltage (feeding wire voltage) of the substation at that time.

次に、電力貯蔵装置用制御装置40および制御装置(CNT)14による充放電制御の手順の一例について、図3のフローチャートを用いて説明する。
電力貯蔵装置用制御装置40は、先ず列車に搭載されている車載装置20から所定の間隔(GPSの場合、例えば1秒間隔)で送られてくる位置情報および列車番号または編成番号を受信し、受信バッファに保持する(ステップS1)。次に、受信した位置情報および列車番号または編成番号を読み込んで位置情報から当該蓄電式変電所Yと隣接の変電所XまたはZとの間に列車が在線しているか否か判定する(ステップS2,S3)。ここで、列車が在線していない(No)と判定すると、ステップS6へ移行して、充電指令を電力貯蔵装置10の制御装置(CNT)14へ送り、ステップS2へ戻る。
Next, an example of a charge / discharge control procedure by the power storage device control device 40 and the control device (CNT) 14 will be described with reference to the flowchart of FIG.
The power storage device control device 40 first receives the position information and the train number or train number sent from the in-vehicle device 20 mounted on the train at a predetermined interval (for example, 1 second interval in the case of GPS), It holds in the reception buffer (step S1). Next, the received position information and train number or train number are read, and it is determined from the position information whether a train is present between the storage substation Y and the adjacent substation X or Z (step S2). , S3). If it is determined that the train is not present (No), the process proceeds to step S6, a charge command is sent to the control device (CNT) 14 of the power storage device 10, and the process returns to step S2.

また、上記ステップS3で、当該変電所Yと変電所XまたはZとの間に列車が在線している(Yes)と判定すると、ステップS7へ進み、隣接の変電所XおよびZの母線電圧(設定値)を記憶装置から読み込む。続いて、隣接の変電所の母線電圧とステップS2で読み込んだ列車位置情報に基づいて、テーブルを参照もしくは所定の計算式を用いて当該列車のパンタ点電圧を求める(ステップS8)。そして、得られたパンタ点電圧が、所定の電圧値(例えば1100V)以下、すなわち電圧補償が必要な電圧であると想定されるか否か判断する(ステップS9)。   If it is determined in step S3 that a train is present between the substation Y and the substation X or Z (Yes), the process proceeds to step S7, and the bus voltage (in the adjacent substations X and Z) ( Setting value) is read from the storage device. Subsequently, based on the bus voltage of the adjacent substation and the train position information read in step S2, the punter point voltage of the train is obtained by referring to the table or using a predetermined calculation formula (step S8). Then, it is determined whether or not the obtained punter point voltage is assumed to be a predetermined voltage value (for example, 1100 V) or less, that is, a voltage that requires voltage compensation (step S9).

次に、上記ステップS9の判定で、電圧補償が必要な電圧である(Yes)と判断すると、ステップS10へ進み、当該蓄電式変電所Yの母線電圧を検出する電圧検出器41の計測値を読み込む。そして、その電圧計測値が予め規定された電圧値(例えば1210V)以下であるか否か判定する(ステップS11)。ここで、当該蓄電式変電所Yの電圧計測値が予め規定された電圧値以下である(Yes)と判断すると、ステップS12へ進み、放電指令を電力貯蔵装置10の制御装置(CNT)14へ送り、ステップS2へ戻る。   Next, if it is determined in step S9 that the voltage needs voltage compensation (Yes), the process proceeds to step S10, and the measured value of the voltage detector 41 that detects the bus voltage of the storage substation Y is calculated. Read. Then, it is determined whether or not the voltage measurement value is equal to or less than a predetermined voltage value (for example, 1210 V) (step S11). Here, if it is determined that the voltage measurement value of the power storage type substation Y is equal to or less than a predetermined voltage value (Yes), the process proceeds to step S12, and the discharge command is sent to the control device (CNT) 14 of the power storage device 10. Return to step S2.

一方、ステップS11で、電圧計測値が予め規定された電圧値以下でない(No)と判定すると、ステップS13へ移行して放電を待機する指令(ロック指令)を電力貯蔵装置10の制御装置14へ送り、ステップS16へ進み、充電指令を電力貯蔵装置10の制御装置(CNT)14へ送り、ステップS2へ戻る。
また、上記ステップS9で、電圧補償が必要な電圧でない(No)と判定した場合も、ステップS16へ進み、充電指令を電力貯蔵装置10の制御装置(CNT)14へ送り、ステップS2へ戻る。このような充電指令により、SOC(充電率)が所定の範囲内(例えば30%〜50%)に収まるように充放電制御が行われる。
On the other hand, if it is determined in step S11 that the voltage measurement value is not less than or equal to the predetermined voltage value (No), the process proceeds to step S13 and a command for waiting for discharge (lock command) is sent to the control device 14 of the power storage device 10. The process proceeds to step S16, a charge command is sent to the control device (CNT) 14 of the power storage device 10, and the process returns to step S2.
If it is determined in step S9 that the voltage does not require voltage compensation (No), the process proceeds to step S16, a charge command is sent to the control device (CNT) 14 of the power storage device 10, and the process returns to step S2. By such a charge command, charge / discharge control is performed so that the SOC (charge rate) falls within a predetermined range (for example, 30% to 50%).

図4には、ステップS8で使用するテーブルの一例が示されている。図4のテーブルは、ある線区の一部の区間において、実際のダイヤに基づいて、その区間に列車が在線する場合に、列車位置と車両数とから列車の負荷電流値を決定するとともに、そのときのその区間の列車在線数から、各列車のパンタ点電圧Vpおよび蓄電式変電所Yの近傍でのき電線電圧(バッテリオフ時)を、次式
Vp=Vss−IA×RA
を用いて計算によって求めたものである。なお、上式において、Vssは変電所の送り出し電圧、IAは各力行列車Aのパンタ点消費電流、RAは変電所から着目点(力行列車Aの位置)までの抵抗であり、RAはき電線の単位長さ当たりの抵抗値と変電所−着目点間距離との積で与えられる。
FIG. 4 shows an example of the table used in step S8. The table of FIG. 4 determines the load current value of the train from the train position and the number of vehicles when a train is present in the section in a section of a certain section based on an actual diagram. From the number of trains in that section at that time, the punter point voltage Vp of each train and the feeder voltage in the vicinity of the storage substation Y (when the battery is off) are expressed by the following formula: Vp = Vss−IA × RA
Is obtained by calculation using. In the above equation, Vss is the substation delivery voltage, IA is the current consumption of the punter point of each power train A, RA is the resistance from the substation to the point of interest (position of power train A), and RA feeder The product of the resistance value per unit length and the distance between the substation and the point of interest.

また、図4のテーブルにおいて、変電所X,Zの電圧(例えば1500V)は、各変電所の近傍における母線電圧の実測値の最低電圧値としている。電圧値が記載されている列車位置は、各駅から例えば300mまでの範囲であり、この範囲では加速(力行運転)を行うことで大きな電流が流れるとみなして、「所定区間」の在線扱いとしている。さらに、各列車の消費電流IAは、フルノッチの際の最大電流値(スペック値)を採用して計算を行なっている。図3のフローチャートに従った制御で実際に放電指令が出力されるまでに多少遅れ(タイムラグ)が発生するが、各列車が「所定区間」に入ると直ぐに最大電流が流れるわけではないので、上記タイムラグがあっても、電力貯蔵装置10の放電によるき電電圧補償動作が遅れることはない。また、GPS受信機の場合、1秒おきの位置情報取得となるため位置情報取得の遅れも発生するが、「所定区間」を広めに設定しておくことで、安定したき電電圧の補償が可能となる。   In the table of FIG. 4, the voltage (for example, 1500 V) at the substations X and Z is the lowest voltage value of the measured value of the bus voltage in the vicinity of each substation. The train position where the voltage value is described is in a range from each station to, for example, 300 m. In this range, it is considered that a large current flows by accelerating (powering operation) and is treated as a “predetermined section” on-line. . Furthermore, the current consumption IA of each train is calculated by adopting the maximum current value (spec value) at the time of full notch. Although there is a slight delay (time lag) before the discharge command is actually output in the control according to the flowchart of FIG. 3, the maximum current does not flow immediately when each train enters the “predetermined section”. Even if there is a time lag, the feeding voltage compensation operation due to the discharge of the power storage device 10 is not delayed. In addition, in the case of a GPS receiver, since position information acquisition is performed every second, there is a delay in position information acquisition. However, by setting the “predetermined section” wider, stable power supply voltage compensation can be achieved. It becomes possible.

各列車の電流は、2つの変電所X,Zから供給されるので、変電所X,Zの送り出し電圧をVss、変電所Xからの電流をIAx、変電所Zからの電流をIAz、変電所Xから列車Aまでのき電線の抵抗をRAx、変電所Zから列車Aまでのき電線の抵抗をRAzとおくと、
Vp=Vss−IAx×RAx
Vp=Vss−IAz×RAz
IAx+IAz=IA
の連立方程式を立てることができ、この連立方程式を解くことでVpを算出することができる。同様に、変電所X,Z間に2以上の列車が在線している場合にも、それぞれの列車について連立方程式を立てて解くことによってパンタ点電圧Vpを算出することができる。
Since the current of each train is supplied from the two substations X and Z, the sending voltage of the substations X and Z is Vss, the current from the substation X is IAx, the current from the substation Z is IAz, and the substation If the resistance of the feeder from X to train A is RAx, and the resistance of the feeder from substation Z to train A is RAz,
Vp = Vss−IAx × RAx
Vp = Vss−IAz × RAz
IAx + IAz = IA
These simultaneous equations can be established, and Vp can be calculated by solving these simultaneous equations. Similarly, when there are two or more trains between the substations X and Z, the punter point voltage Vp can be calculated by solving simultaneous equations for each train.

図4のテーブルにおいて、空欄は列車が対象区間に在線していないことを意味している。また、F欄とG欄の○印は電力貯蔵装置10を放電状態にさせる放電指令を出力することを意味し、×印は電力貯蔵装置10を放電状態にさせる放電指令を出力しないことを意味する。F欄は本発明を適用した場合における放電指令の出力の有る無しを、またG欄は単にき電線の電流や変電所の母線電圧を検出して電力貯蔵装置の放電制御を行う従来の一般的な制御方式を適用した場合における放電指令の出力の有る無しを表わしている。
図4のF欄とG欄を比較すると、項番2−5、2−7、3−1、3−2の場合、従来方式を適用した場合には放電指令が出力されるところが、本発明を適用した場合には放電指令が出力されないので、充放電の切換え回数が少なくなることが分かる。
In the table of FIG. 4, a blank means that the train is not on the target section. In the F column and G column, a circle indicates that a discharge command for causing the power storage device 10 to be in a discharge state is output, and a cross indicates that a discharge command for causing the power storage device 10 to be in a discharge state is not output. To do. The F column is used to control the discharge of the power storage device by simply detecting whether or not the discharge command is output when the present invention is applied, and the G column simply detecting the current of the feeder and the bus voltage of the substation. This indicates whether or not there is an output of a discharge command when a simple control method is applied.
Comparing column F and column G in FIG. 4, in the case of item numbers 2-5, 2-7, 3-1, 3-2, the discharge command is output when the conventional method is applied. It can be seen that since the discharge command is not output when the is applied, the number of times of switching between charge and discharge is reduced.

図4においては、項番1−1〜1−6は設定区間内に1台の列車が在線している場合、項番2−1〜2−10は設定区間内に2台の列車が在線している場合、項番3−1〜3−3は設定区間内に3台の列車が在線している場合、項番4−1は設定区間内に4台の列車が在線している場合、をそれぞれ表わしている。例えば、項番1−1のB駅の欄の数値「1301(V)」は、B駅を出発してA駅へ向う列車のパンタ点電圧を表わし、項番1−2のB駅の欄の数値「1272(V)」は、B駅を出発してC駅へ向う列車のパンタ点電圧を表わしている。項番1−1と1−2のいずれも、対象区間(X−Z)には1列車しか在線していないので、比較的高い電圧値となっている。この場合、いずれも放電指令は出力されない(F欄参照)。   In FIG. 4, items 1-1 to 1-6 have one train in the set section, and items 2-1 to 2-10 have two trains in the set section. If item number 3-1 to 3-3 are present, three trains are present in the set section, and item number 4-1 is present when four trains are present in the set section. , Respectively. For example, the numerical value “1301 (V)” in the column B of the item number 1-1 represents the punter point voltage of the train leaving the station B and going to the station A, and the column of the station B in the item number 1-2. The numerical value “1272 (V)” represents the punter point voltage of the train leaving B station and heading to C station. Since both item numbers 1-1 and 1-2 have only one train in the target section (XZ), the voltage values are relatively high. In this case, no discharge command is output (see column F).

項番2−3のC駅の欄の数値「992(V)」と「1001(V)」は、C駅を出発してB駅へ向う列車のパンタ点電圧と、C駅を出発してD駅へ向う列車のパンタ点電圧を表わしている。この場合、パンタ点電圧は1100V以下であるとともに、蓄電式変電所Yの母線電圧は「1079(V)」であり、規定電圧(例えば1210V)よりも低いので、放電指令が出力されることとなる(F欄参照)。   The numerical values “992 (V)” and “1001 (V)” in the column “C station” of No. 2-3 are the punt point voltage of the train that leaves C station and heads to B station, It represents the punter point voltage of the train going to D station. In this case, the punter point voltage is 1100 V or less, and the bus voltage of the storage substation Y is “1079 (V)”, which is lower than the specified voltage (for example, 1210 V). (See column F).

なお、図4のテーブルの各項番における在線列車数とその位置および各列車の車両数は、運用ダイヤ情報から抽出することができる。また、実際に図3のフローチャートに従った制御を行う際には、車載装置20から受信した列車番号を用いて運用ダイヤを参照して車両数を抽出して、図4のテーブルの項番を決定し、当該テーブルを参照してパンタ点電圧を取得して放電指令の出力の要否を判断することができる。列車番号の代わりに編成番号を用いて運用表を参照して車両数を抽出することも可能である。   It should be noted that the number of trains on each line in the item numbers of the table in FIG. Further, when the control according to the flowchart of FIG. 3 is actually performed, the number of vehicles is extracted by referring to the operation diagram using the train number received from the in-vehicle device 20, and the item number of the table of FIG. It is possible to determine and determine whether or not it is necessary to output the discharge command by referring to the table and acquiring the punter point voltage. It is also possible to extract the number of vehicles by referring to the operation table using the train number instead of the train number.

図4のテーブルを参照すると、パンタ点電圧が1100V以下となりかつパンタ点電圧と蓄電式変電所Yの電圧との差が最も大きくなるのは、項番3−3の場合(C駅の変電所Y側の882V)で、その電位差は96Vであることが分かる。従って、パンタ点電圧が1100V以下になったとしても、そのときの蓄電式変電所Yの電圧が1196V以上であれば、パンタ点電圧は1100V以下にはならないと予想される。
つまり、余裕を見て蓄電式変電所Yの電圧が1210V以上であれば、A駅〜E駅間を走行する列車のパンタ点電圧が1100V以下になることはないと言える。
Referring to the table in FIG. 4, the punter point voltage is 1100 V or less and the difference between the punter point voltage and the voltage of the storage type substation Y is the largest in the case of item number 3-3 (substation at station C). It can be seen that the potential difference is 96 V at 882 V on the Y side. Therefore, even if the punter point voltage becomes 1100 V or less, if the voltage of the power storage substation Y at that time is 1196 V or more, the punter point voltage is not expected to be 1100 V or less.
That is, it can be said that if the voltage of the power storage substation Y is 1210V or more with a margin, the punter voltage of the train traveling between the A station and the E station will not be 1100V or less.

図3のフローチャートにおいては、ステップS9でパンタ点電圧が所定の電圧値(例えば1100V)以下か否か判定し、ステップS11で蓄電式変電所Yの母線電圧を検出する電圧検出器41の計測値が予め規定された電圧値(例えば1210V)以下であるか否か判定して、1210V以下であれば放電指令を出力し、1210V以下でなければ放電指令を出力しないようにしている。
これにより、電力貯蔵装置10の無駄な放電を回避しつつ、必要な場合には放電させて、パンタ点電圧が1100V以下になって充分な加速度が得られなくなるのを防止することができる。
In the flowchart of FIG. 3, in step S9, it is determined whether or not the punter point voltage is equal to or lower than a predetermined voltage value (for example, 1100V), and in step S11, the measured value of the voltage detector 41 that detects the bus voltage of the storage type substation Y. Is determined to be less than or equal to a predetermined voltage value (for example, 1210V), a discharge command is output if it is 1210V or less, and a discharge command is not output unless it is 1210V or less.
Thereby, while avoiding useless discharge of the power storage device 10, it is possible to prevent the power from being discharged when necessary and to prevent the punter point voltage from becoming 1100 V or less and obtaining sufficient acceleration.

なお、ステップS9における所定電圧値は走行する車両に用いられているモータの特性に応じて、またステップS11における規定電圧値は本発明を適用とする区間の条件(変電所間距離や駅の位置等)に応じて適宜決定すればよい。
また、電気車の運転は、通常、加速(力行運転)−惰行−再加速−制動(回生)−停止の順に行われる。駅中間付近において再度フルノッチの力行運転がなされると想定される場合には、駅中間付近を在線扱い範囲と設定して計算を行い、図4のテーブルに追加しても良い。
The predetermined voltage value in step S9 depends on the characteristics of the motor used in the traveling vehicle, and the specified voltage value in step S11 is the condition of the section to which the present invention is applied (distance between substations and station position). Etc.) as appropriate.
In addition, the operation of the electric vehicle is normally performed in the order of acceleration (powering operation) -coasting-re-acceleration-braking (regeneration) -stop. When it is assumed that a full-notch power running operation is performed again near the middle of the station, calculation may be performed by setting the vicinity of the middle of the station as the current line handling range, and may be added to the table of FIG.

(変形例)
ところで、図3のフローチャートにおいては、各列車の車載装置から受信した位置情報と、受信した列車番号(または編成番号)を用いて運用ダイヤ(または運用表)を参照して取得した車両数とを用いて、図4のテーブルを参照してパンタ点電圧を取得しているが、以下に述べるような計算式を用いてパンタ点電圧を算出することも可能である。
パンタ点電圧を算出する計算式の第1の例は、次式で表わされる。具体的には、ステップS1で受信した加速度情報に基づいて加速度値>>0の場合に力行車両と判断して、次式
Vp=Vss−IA(n)×RA
を用いてパンタ点電圧Vpを算出する。
(Modification)
By the way, in the flowchart of FIG. 3, the positional information received from the in-vehicle device of each train and the number of vehicles acquired by referring to the operation diagram (or operation table) using the received train number (or train number). The punter point voltage is acquired with reference to the table of FIG. 4, but it is also possible to calculate the punter point voltage using a calculation formula as described below.
A first example of a calculation formula for calculating the punter point voltage is represented by the following formula. Specifically, based on the acceleration information received in step S1, when the acceleration value >> 0, it is determined that the vehicle is a powering vehicle, and the following formula Vp = Vss−IA (n) × RA
Is used to calculate the punter point voltage Vp.

ここで、Vssは変電所の送出し電圧(実測に基づく最低値)、RAは変電所から力行車Aまでの電車線抵抗(レール抵抗を含む)、IA(n)は力行車Aが消費する電流で車両数nを変数とする関数によって決定される値であることを意味している。車両数nは、ステップS1で受信した列車番号情報(または編成番号情報)を用いて運用ダイヤ(または運用表)に基づいて運用表を参照して決定することができる。
変電所Xからの電流IA(n)xによる電圧降下を含んだパンタ点電圧と、変電所Zからの電流IA(n) zによる電圧降下を含んだパンタ点電圧について、上式を立て、IAx+IAz=IAを含む連立方程式を解くことでパンタ点電圧Vpを算出することができる。
Here, Vss is the transmission voltage of the substation (the lowest value based on actual measurement), RA is the resistance of the train line (including rail resistance) from the substation to the powering vehicle A, and IA (n) is consumed by the powering vehicle A. This means that the current value is determined by a function having the number of vehicles n as a variable. The number of vehicles n can be determined by referring to the operation table based on the operation diagram (or operation table) using the train number information (or train number information) received in step S1.
For the punter point voltage including the voltage drop due to the current IA (n) x from the substation X and the punter point voltage including the voltage drop due to the current IA (n) z from the substation Z, the above formula is established and IAx + IAz = Pantor point voltage Vp can be calculated by solving simultaneous equations including IA.

パンタ点電圧Vpを算出する計算式の第2の例は、次式で表わされる。
Vp=Vss−IA(a,n)×RA
ここで、IA(a,n)は、ステップS1で受信した加速度情報(加速度値a)および車両数nを変数とする関数であることを意味する。IA(a,n)は、車両に用いられるモータの性能や単位編成の重量等によって変わるので、具体例の説明は省略する。
なお、上記ステップS8で、計算式を使用してするパンタ点電圧VApを算出する点以外の処理は、図3のフローチャートと同じで良い。
A second example of a calculation formula for calculating the punter point voltage Vp is expressed by the following formula.
Vp = Vss-IA (a, n) × RA
Here, IA (a, n) means a function having the acceleration information (acceleration value a) and the number of vehicles n received in step S1 as variables. Since IA (a, n) varies depending on the performance of the motor used in the vehicle, the weight of the unit knitting, and the like, description of a specific example is omitted.
The processing other than the point of calculating the punter point voltage VAp using the calculation formula in step S8 may be the same as the flowchart of FIG.

次に、充放電制御の他の例について、図5〜図7のフローチャートを用いて説明する。これらのフローチャートは、基本的な手順は図3のフローチャートとほぼ同じで、一部の手順を変更したものである。
このうち図5のフローチャートは、図3のフローチャートにステップS4,S5,S14,S15を追加したもので、ステップS3で列車が在線していない(No)と判定すると、ステップS4へ移行して蓄電池11の電圧値を読み込んでSOC(充電率)を算出し、蓄電池11の充電率が予め規定されている値よりも高いか否かすなわち充電量が不足していないか否か判定する(ステップS5)。そして、充電量が不足していない(No)と判定すると、ステップS2へ戻る。一方、ステップS5で、充電量が不足している(Yes)と判定すると、ステップS6’へ進み、急速充電指令を電力貯蔵装置10の制御装置(CNT)14へ送り、ステップS2へ戻るようにしている。
Next, another example of charge / discharge control will be described with reference to the flowcharts of FIGS. In these flowcharts, the basic procedure is almost the same as the flowchart of FIG. 3, and a part of the procedure is changed.
Among these, the flowchart of FIG. 5 is obtained by adding steps S4, S5, S14, and S15 to the flowchart of FIG. 3. If it is determined in step S3 that the train is not present (No), the process proceeds to step S4 and the storage battery is stored. 11 is read to calculate the SOC (charge rate), and it is determined whether or not the charge rate of the storage battery 11 is higher than a predetermined value, that is, whether or not the charge amount is insufficient (step S5). ). And if it determines with the charge amount not being insufficient (No), it will return to step S2. On the other hand, if it is determined in step S5 that the amount of charge is insufficient (Yes), the process proceeds to step S6 ′, a quick charge command is sent to the control device (CNT) 14 of the power storage device 10, and the process returns to step S2. ing.

また、上記ステップS9で、電圧補償が必要な電圧でない(No)と判定した場合にはステップS14へ移行して、蓄電池11の電圧値を読み込んでSOC(充電率)を算出し、蓄電池11の充電率が予め規定されている値よりも高いか否かすなわち充電量が不足していないか否か判定する(ステップS15)。そして、充電量が不足していない(No)と判定すると、ステップS2へ戻る。一方、ステップS15で、充電量が不足している(Yes)と判定すると、ステップS16’へ進み、低速充電指令を電力貯蔵装置10の制御装置(CNT)14へ送り、ステップS2へ戻る。ステップS13’で放電をロック(禁止)した後は、ステップS14へ移行するようにしている。   If it is determined in step S9 that the voltage does not require voltage compensation (No), the process proceeds to step S14, and the voltage value of the storage battery 11 is read to calculate the SOC (charge rate). It is determined whether or not the charging rate is higher than a predetermined value, that is, whether or not the charging amount is insufficient (step S15). And if it determines with the charge amount not being insufficient (No), it will return to step S2. On the other hand, if it is determined in step S15 that the amount of charge is insufficient (Yes), the process proceeds to step S16 ', a low-speed charging command is sent to the control device (CNT) 14 of the power storage device 10, and the process returns to step S2. After the discharge is locked (prohibited) in step S13 ', the process proceeds to step S14.

図6のフローチャートは、図5のフローチャートにおけるステップS10の蓄電式変電所Yの母線電圧の計測値を読み込む処理を、ステップS2の次に行うとともに、図5のフローチャートにおける隣接変電所間の在線の有無の判定処理(ステップS3)と急速充電指令(ステップS6’)を、ステップS15の次に実行するように変更したものである。そして、ステップS3で隣接変電所間の在線がない(No)と判定した場合に、ステップS6’へ進んで急速充電指令を電力貯蔵装置10の制御装置(CNT)14へ送り、隣接変電所間の在線がある(Yes)と判定した場合に、ステップS16’へ進んで低速充電指令を送るようにしている。ステップS10の変電所Yの母線電圧読込み処理は、ステップS2の前、またはステップS7の後でも良く、S2,S7,S10の読込みはどのような順序であっても良い。   In the flowchart of FIG. 6, the process of reading the measured value of the bus voltage of the storage substation Y in step S10 in the flowchart of FIG. 5 is performed after step S2, and the presence line between adjacent substations in the flowchart of FIG. The presence / absence determination process (step S3) and the quick charge command (step S6 ′) are changed to be executed next to step S15. And when it determines with there being no standing line between adjacent substations by step S3 (No), it progresses to step S6 'and sends a quick charge command to the control apparatus (CNT) 14 of the power storage device 10, and between adjacent substations. When it is determined that there is an existing line (Yes), the process proceeds to step S16 ′ to send a low-speed charging command. The bus voltage reading process of the substation Y in step S10 may be performed before step S2 or after step S7, and the reading of S2, S7, and S10 may be in any order.

図7のフローチャートは、図6のフローチャートにおけるステップS11の蓄電式変電所Yの母線電圧の計測値が規定値以下か否かの判定処理とステップS13’の放電ロックを省略し、ステップS9の次に、必要放電量の計算処理(ステップS17)および放電パターンの判別処理(ステップS18)を行うように変更するとともに、図6のフローチャートにおけるステップS15の次の隣接変電所間の在線の有無の判定処理(ステップS3)の代わりに、力行列車の接近の有無を判定するステップS19を設けたものである。そして、このステップS19で、力行列車の接近がない(No)と判定した場合に、ステップS6’へ進んで急速充電指令を電力貯蔵装置10の制御装置(CNT)14へ送り、力行列車の接近がある(Yes)と判定した場合に、ステップS16’へ進んで低速充電指令を送るようにしている。   The flowchart of FIG. 7 omits the determination process of whether or not the measured value of the bus voltage of the power storage substation Y in step S11 in the flowchart of FIG. 6 is equal to or less than the specified value and the discharge lock in step S13 ′. In addition, the calculation process (step S17) of the required discharge amount and the determination process (step S18) of the discharge pattern are performed, and the presence / absence of the presence line between the adjacent substations in step S15 in the flowchart of FIG. 6 is determined. Instead of the process (step S3), step S19 for determining whether or not the power train is approaching is provided. If it is determined in step S19 that the power train is not approaching (No), the process proceeds to step S6 ′ to send a quick charge command to the control device (CNT) 14 of the power storage device 10 to approach the power train. If it is determined that there is (Yes), the process proceeds to step S16 ′ to send a low-speed charging command.

以上本発明者によってなされた発明を実施形態に基づき具体的に説明したが、本発明は前記実施形態に限定されるものではない。例えば、前記実施形態では、中間の変電所を蓄電式変電所に置き換える場合について説明したが、新たに線路を敷設し沿線に変動所を配備する場合にも適用することができる。
また、前記実施形態では、列車位置情報を取得するため車両に位置情報受信装置を搭載したものについて説明したが、列車位置は軌道回路を使用しても取得することができるので、車載の位置情報受信装置は省略したシステムを構築することも可能である。
Although the invention made by the present inventor has been specifically described based on the embodiment, the present invention is not limited to the embodiment. For example, in the above-described embodiment, the case where an intermediate substation is replaced with a storage substation has been described. However, the present invention can also be applied to a case where a new line is laid and a substation is provided along the line.
Moreover, in the said embodiment, although what installed the positional information receiver in the vehicle in order to acquire train position information was demonstrated, since a train position can be acquired also using a track circuit, in-vehicle positional information It is also possible to construct a system in which the receiving device is omitted.

また、前記実施形態では、変電所用運行状況管理装置30を介在させたシステムついて説明したが、変電所用運行状況管理装置30を省略して車載装置20から基地局を介して電力貯蔵装置用制御装置40へ、列車位置情報(GPS情報)や列車番号、編成番号等のデータを送信するようにシステムを構成することも可能である。また、車載装置20から電力貯蔵装置用制御装置40へ列車番号または編成番号を送信する代わりに、車両数情報を送信するようにしても良い。   Moreover, although the said embodiment demonstrated the system which interposed the operation condition management apparatus 30 for substations, the operation condition management apparatus 30 for substations was abbreviate | omitted and the control apparatus for electric power storage apparatuses via the base station from the vehicle equipment 20 It is also possible to configure the system to transmit train position information (GPS information), train number, train number, and other data to 40. Instead of transmitting the train number or the composition number from the in-vehicle device 20 to the power storage device control device 40, the vehicle number information may be transmitted.

10 電力貯蔵装置
20 車載装置
21 デジタル無線通信装置
22 位置情報受信装置(GPS受信機)
30 変電所用運行状況管理装置
40 電力貯蔵装置用制御装置
X,Z 変電所
Y 蓄電式変電所
DESCRIPTION OF SYMBOLS 10 Power storage device 20 In-vehicle device 21 Digital wireless communication device 22 Location information receiving device (GPS receiver)
30 Operation status management device for substations 40 Control device for power storage devices X and Z substations Y Storage-type substations

Claims (4)

複数の変電所といずれか2つの変電所間に配備された電力貯蔵装置と、
前記変電所または電力貯蔵装置からき電線を介して電力を受ける走行車両の位置情報を受けて前記電力貯蔵装置の放電または非放電を示す指令を前記電力貯蔵装置に対して出力可能な電力貯蔵装置用制御装置と、
前記電力貯蔵装置の近傍のき電線電圧値を検出するき電線電圧検出手段と、
を備え、き電線を介して走行車両へ電力を供給する電力供給システムであって、
前記電力貯蔵装置用制御装置は、
走行車両の位置情報に基づいて、前記複数の変電所と前記電力貯蔵装置との間の所定区間内に当該走行車両が存在するか否か判定する車両位置判定手段と、
前記車両位置判定手段によりいずれかの前記所定区間に走行車両が存在すると判断した場合に、所定のテーブルまたは所定の計算式に用いて当該走行車両のパンタグラフの接触点の電圧値を取得するパンタ点電圧取得手段と、
前記パンタ点電圧取得手段によって取得されたパンタ点電圧が所定の電圧値よりも低いか否か判定するパンタ点電圧判定手段と、
前記き電線電圧検出手段によって検出されたき電線電圧が規定電圧値よりも低いか否か判定するき電線電圧判定手段と、
を備え、前記車両位置判定手段によってパンタ点電圧が予め定められた所定電圧よりも低いと判定され、かつ前記き電線電圧判定手段によって前記き電線電圧が前記規定電圧値よりも低いと判定された場合に、前記電力貯蔵装置へ放電を指示する指令を出力することを特徴とする電気車への電力供給システム。
A plurality of substations and a power storage device arranged between any two substations;
For a power storage device capable of receiving a position information of a traveling vehicle that receives power from the substation or the power storage device via a feeder and outputting a command indicating discharge or non-discharge of the power storage device to the power storage device A control device;
A feeder voltage detection means for detecting a feeder voltage value in the vicinity of the power storage device;
An electric power supply system for supplying electric power to a traveling vehicle via a feeder line,
The power storage device control device comprises:
Vehicle position determination means for determining whether or not the traveling vehicle exists in a predetermined section between the plurality of substations and the power storage device based on position information of the traveling vehicle;
When the vehicle position determination means determines that a traveling vehicle is present in any one of the predetermined sections, the punter point obtains the voltage value of the contact point of the pantograph of the traveling vehicle using a predetermined table or a predetermined calculation formula Voltage acquisition means;
Punter point voltage determination means for determining whether or not the punter point voltage acquired by the punter point voltage acquisition means is lower than a predetermined voltage value;
Feeder voltage determination means for judging whether the feeder voltage detected by the feeder voltage detection means is lower than a specified voltage value;
And the vehicle position determination means determines that the punter point voltage is lower than a predetermined voltage, and the feeder voltage determination means determines that the feeder voltage is lower than the specified voltage value. A power supply system for an electric vehicle that outputs a command for instructing the electric power storage device to discharge.
前記テーブルは、車両在線区間情報と車両数とを指標として、前記2つの変電所の最低送出電圧値と当該車両在線区間までのき電線抵抗値と在線する走行車両の最大電流値とに基づいて予め算出されたパンタ点電圧を参照可能に形成され、
前記電力貯蔵装置用制御装置は、
前記車両の位置情報と、走行車両から得られる車両識別情報に基づいて取得した車両数と、に基づいて前記テーブルを参照してパンタ点電圧を取得することを特徴とする請求項1に記載の電気車への電力供給システム。
The table is based on the minimum output voltage value of the two substations, the feeder resistance value up to the vehicle existing line section, and the maximum current value of the traveling vehicle in the line, using vehicle existing line section information and the number of vehicles as indices. It is formed to be able to refer to the pre-calculated punter point voltage,
The power storage device control device comprises:
The punter point voltage is acquired by referring to the table based on the position information of the vehicle and the number of vehicles acquired based on vehicle identification information obtained from a traveling vehicle. Power supply system for electric vehicles.
前記走行車両は、当該車両の識別情報を記憶する記憶手段と、当該車両の走行加速度を検出可能な加速度検出手段とをさらに備え、前記無線通信手段によって、前記加速度検出手段によって検出された加速度情報と前記車両の位置情報と前記車両の識別情報とを送信することを特徴とする請求項1または2に記載の電気車への電力供給システム。   The traveling vehicle further includes storage means for storing identification information of the vehicle and acceleration detection means capable of detecting the traveling acceleration of the vehicle, and the acceleration information detected by the acceleration detection means by the wireless communication means. The position information of the vehicle and the identification information of the vehicle are transmitted, and the power supply system to the electric vehicle according to claim 1 or 2. 前記所定区間は、駅近傍の車両が加速運転する区間であることを特徴とする請求項1〜3のいずれかに記載の電気車への電力供給システム。   The electric power supply system for an electric vehicle according to any one of claims 1 to 3, wherein the predetermined section is a section in which a vehicle in the vicinity of the station is accelerated.
JP2016190673A 2016-09-29 2016-09-29 Power supply system for electric cars Active JP6813322B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016190673A JP6813322B2 (en) 2016-09-29 2016-09-29 Power supply system for electric cars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016190673A JP6813322B2 (en) 2016-09-29 2016-09-29 Power supply system for electric cars

Publications (2)

Publication Number Publication Date
JP2018052301A true JP2018052301A (en) 2018-04-05
JP6813322B2 JP6813322B2 (en) 2021-01-13

Family

ID=61835095

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016190673A Active JP6813322B2 (en) 2016-09-29 2016-09-29 Power supply system for electric cars

Country Status (1)

Country Link
JP (1) JP6813322B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110361180A (en) * 2019-07-25 2019-10-22 中南大学 Intelligent train pantograph military service performance dynamic monitoring and appraisal procedure and its system
JP2020037321A (en) * 2018-09-04 2020-03-12 株式会社日立製作所 Power supply system and power supply method
JP2020046192A (en) * 2018-09-14 2020-03-26 東日本旅客鉄道株式会社 Deterioration diagnostic system and deterioration diagnostic method of wire
JP2020090125A (en) * 2018-12-04 2020-06-11 東日本旅客鉄道株式会社 Voltage drop visualization device for DC feeding system
JP2020137144A (en) * 2019-02-12 2020-08-31 富士電機株式会社 Charge/discharge control device and train traffic system
KR20220057349A (en) * 2020-10-29 2022-05-09 한국과학기술원 Method and communication system for control of dynamic wireless power transfer for electric vehicle

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020037321A (en) * 2018-09-04 2020-03-12 株式会社日立製作所 Power supply system and power supply method
JP7120853B2 (en) 2018-09-04 2022-08-17 株式会社日立製作所 Power supply system and power supply method
JP2020046192A (en) * 2018-09-14 2020-03-26 東日本旅客鉄道株式会社 Deterioration diagnostic system and deterioration diagnostic method of wire
JP2020090125A (en) * 2018-12-04 2020-06-11 東日本旅客鉄道株式会社 Voltage drop visualization device for DC feeding system
JP7150583B2 (en) 2018-12-04 2022-10-11 東日本旅客鉄道株式会社 Voltage drop visualization device for DC feeding system
JP2020137144A (en) * 2019-02-12 2020-08-31 富士電機株式会社 Charge/discharge control device and train traffic system
JP7234675B2 (en) 2019-02-12 2023-03-08 富士電機株式会社 Charge/discharge control device and train traffic system
CN110361180A (en) * 2019-07-25 2019-10-22 中南大学 Intelligent train pantograph military service performance dynamic monitoring and appraisal procedure and its system
CN110361180B (en) * 2019-07-25 2021-01-26 中南大学 Intelligent train pantograph service performance dynamic monitoring and evaluating method and system
KR20220057349A (en) * 2020-10-29 2022-05-09 한국과학기술원 Method and communication system for control of dynamic wireless power transfer for electric vehicle
KR102604541B1 (en) * 2020-10-29 2023-11-22 한국과학기술원 Method and communication system for control of dynamic wireless power transfer for electric vehicle

Also Published As

Publication number Publication date
JP6813322B2 (en) 2021-01-13

Similar Documents

Publication Publication Date Title
JP6813322B2 (en) Power supply system for electric cars
JP6334780B2 (en) Charge management planning system and method thereof, discharge management planning system and method thereof, and computer program
JP5621898B2 (en) Information provision device
CN102849091B (en) Train sensor unit, train position induction system and method thereof
CN103308052B (en) Charge point notification system and car-mounted device
JP6047827B2 (en) Operation control device, operation control method, and control program
JP5044341B2 (en) Power storage device
WO2013099171A1 (en) Transportation management device, transportation management system, and control program
JP5350990B2 (en) Wireless level crossing alarm control device and system
US20160347204A1 (en) Train-energy control system, ground device, and on-board device
JPWO2010026622A1 (en) Charging system for overhead line-less transportation system
JP7215351B2 (en) On-the-go power supply system and electric vehicle
JP2013020346A (en) Power distribution presentation system and power distribution presentation method
JP2012152018A (en) Information processing system, and transmitter and receiver constituting the system
JP2014193095A (en) Non-contact power supply system
JP2012040954A (en) System for supplying electric power for electric railroad
JP2013027159A (en) Charging system
CN104379388A (en) Electrically driven rail vehicle
CN110087968B (en) Vehicle communication system
JP2012040955A (en) Power system for electric railway
KR101497345B1 (en) Method and system for compensation of railway power load using a fuel battery train
JP2016090485A (en) Power storage controller and vehicle drive system carrying the same
JP5952174B2 (en) Mobile power management system
WO2021181495A1 (en) Train control system
CN108068640A (en) A kind of double source trolleybus method for controlling power supply and device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190801

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200716

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200728

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200907

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200928

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20201215

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201217

R150 Certificate of patent or registration of utility model

Ref document number: 6813322

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250