JP2018025309A - Hydraulic circuit for loader - Google Patents

Hydraulic circuit for loader Download PDF

Info

Publication number
JP2018025309A
JP2018025309A JP2017214911A JP2017214911A JP2018025309A JP 2018025309 A JP2018025309 A JP 2018025309A JP 2017214911 A JP2017214911 A JP 2017214911A JP 2017214911 A JP2017214911 A JP 2017214911A JP 2018025309 A JP2018025309 A JP 2018025309A
Authority
JP
Japan
Prior art keywords
valve
direction switching
pressure oil
switching valve
bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017214911A
Other languages
Japanese (ja)
Other versions
JP6434112B2 (en
Inventor
まゆ 笹岡
Mayu Sasaoka
まゆ 笹岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nabtesco Corp
Original Assignee
Nabtesco Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nabtesco Corp filed Critical Nabtesco Corp
Priority to JP2017214911A priority Critical patent/JP6434112B2/en
Publication of JP2018025309A publication Critical patent/JP2018025309A/en
Application granted granted Critical
Publication of JP6434112B2 publication Critical patent/JP6434112B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a hydraulic circuit of a circuit constitution capable of improving operability of an optional attachment mounted on a loader in comparison with a conventional one.SOLUTION: In a hydraulic circuit 1, an optional direction change-over valve 6 is disposed at an upstream side with respect to an arm direction change-over valve 7 and a bucket direction change-over valve 8. Further a circuit is constituted to supply hydraulic oil to the optional direction change-over valve 6 from a hydraulic oil supply passage 22 branched from an unload passage 21 at an upstream side with respect to the optional direction change-over valve 6, to supply hydraulic oil to the arm direction change-over valve 7 from a hydraulic pressure supply passage 23 branched from the unload passage 21 between the optional direction change-over valve 6 and the arm direction change-over valve 7, and to supply hydraulic oil to the bucket direction change-over valve 8 from a hydraulic oil supply passage 24 branched from the unload passage 21 between the optional direction change-over valve 6 and the bucket direction change-over valve 8.SELECTED DRAWING: Figure 1

Description

本発明は、少なくともバケット、アーム、およびオプションアタッチメントが取り付けられるローダーの油圧回路に関する。   The present invention relates to a hydraulic circuit of a loader to which at least a bucket, an arm, and an optional attachment are attached.

この種の技術としては、例えば特許文献1に記載されたものがある。特許文献1に記載のローダーの油圧回路は、油圧ポンプに接続されるアンロード通路に、その上流側から順に、ブーム用方向切換弁、バケット用方向切換弁、およびサービス弁が直列配置された油圧回路である。なお、ブーム用方向切換弁は、ブームシリンダを動作させるための弁であり、バケット用方向切換弁は、バケットシリンダを動作させるための弁である。サービス弁は、オプションシリンダを動作させるための弁である。   As this type of technology, for example, there is one described in Patent Document 1. In the loader hydraulic circuit described in Patent Document 1, a boom direction switching valve, a bucket direction switching valve, and a service valve are arranged in series in an unload passage connected to a hydraulic pump in order from the upstream side. Circuit. The boom direction switching valve is a valve for operating the boom cylinder, and the bucket direction switching valve is a valve for operating the bucket cylinder. The service valve is a valve for operating the optional cylinder.

特開2011−208693号公報JP 2011-208693 A

特許文献1に記載のオプションシリンダは往復動作するものであるが、例えば、草刈用の回転刃のような回転するアタッチメントをオプションアタッチメントとしてローダーに取り付けているとする。この場合、オプションアクチュエータは、シリンダのような往復動作するものではなく、回転動作する油圧モータとなる。   The option cylinder described in Patent Document 1 reciprocates. For example, it is assumed that a rotating attachment such as a rotary blade for mowing is attached to the loader as an option attachment. In this case, the optional actuator does not reciprocate like a cylinder but a hydraulic motor that rotates.

このようなローダーにおいて、ブームまたはバケットと、草刈用の回転刃(オプションアタッチメント)とを同時操作したとする。このとき、特許文献1に記載の油圧回路のように、ブーム用方向切換弁、およびバケット用方向切換弁よりも下流側にサービス弁を配置していると、サービス弁よりもブーム用方向切換弁・バケット用方向切換弁へ圧油が流れやすい。   In such a loader, it is assumed that the boom or bucket and the rotary blade (option attachment) for mowing are simultaneously operated. At this time, if the service valve is disposed downstream of the boom direction switching valve and the bucket direction switching valve as in the hydraulic circuit described in Patent Document 1, the boom direction switching valve is located more than the service valve.・ Pressure oil can easily flow to the bucket direction switching valve.

このような油圧回路であると、熟練した操縦者であれば、回転刃の回転速度を調整することができるが、操作に不慣れな操縦者は、思うように回転刃の回転速度を調整することができないことがある。   With such a hydraulic circuit, a skilled operator can adjust the rotation speed of the rotary blade, but an operator unfamiliar with the operation can adjust the rotation speed of the rotary blade as desired. May not be possible.

本発明は、上記実情に鑑みてなされたものであって、その目的は、ローダーに取り付けられたオプションアタッチメントの操作性を従来よりも向上させることができる回路構成の油圧回路を提供することである。   The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a hydraulic circuit having a circuit configuration capable of improving the operability of an optional attachment attached to a loader as compared with the conventional one. .

本発明は、油圧ポンプに接続されるアンロード通路と、前記油圧ポンプからの圧油をアームアクチュエータへ給排するアーム用方向切換弁と、前記油圧ポンプからの圧油をバケットアクチュエータへ給排するバケット用方向切換弁と、前記油圧ポンプからの圧油をオプションアクチュエータへ給排するオプション用方向切換弁と、を備えるローダー用油圧回路である。ここで、前記オプション用方向切換弁は、前記アーム用方向切換弁および前記バケット用方向切換弁よりも上流側の前記アンロード通路に配置されている。また、前記オプション用方向切換弁には、当該オプション用方向切換弁よりも上流側の前記アンロード通路から分岐したオプション用圧油供給通路から圧油が供給され、前記アーム用方向切換弁には、前記オプション用方向切換弁と当該アーム用方向切換弁との間の前記アンロード通路から分岐したアーム用圧油供給通路から圧油が供給され、前記バケット用方向切換弁には、前記オプション用方向切換弁と当該バケット用方向切換弁との間の前記アンロード通路から分岐したバケット用圧油供給通路から圧油が供給されるように回路構成されている。   The present invention provides an unload passage connected to a hydraulic pump, an arm direction switching valve for supplying and discharging pressure oil from the hydraulic pump to an arm actuator, and supplying and discharging pressure oil from the hydraulic pump to a bucket actuator. A loader hydraulic circuit comprising: a bucket direction switching valve; and an option direction switching valve for supplying and discharging pressure oil from the hydraulic pump to an option actuator. Here, the option direction switching valve is disposed in the unload passage on the upstream side of the arm direction switching valve and the bucket direction switching valve. The option directional control valve is supplied with pressure oil from an option pressure oil supply passage branched from the unload passage on the upstream side of the option directional control valve. The pressure oil is supplied from the arm pressure oil supply passage branched from the unload passage between the option direction switching valve and the arm direction switching valve. The circuit is configured so that the pressure oil is supplied from the bucket pressure oil supply passage branched from the unload passage between the direction switching valve and the bucket direction switching valve.

本発明の油圧回路によれば、アーム用方向切換弁またはバケット用方向切換弁へ圧油が流れることよりも、オプション用方向切換弁へ圧油が流れることのほうが優先されるので、アーム用方向切換弁またはバケット用方向切換弁の動作よりも、オプション用方向切換弁の動作の方が優先される。これにより、ローダーに取り付けられたオプションアタッチメントの操作性を従来よりも向上させることができる。   According to the hydraulic circuit of the present invention, since the pressure oil flows to the option direction switching valve has priority over the pressure oil flowing to the arm direction switching valve or the bucket direction switching valve, the arm direction The operation of the optional directional control valve is prioritized over the operation of the directional control valve or bucket directional control valve. Thereby, the operativity of the option attachment attached to the loader can be improved compared with the past.

本発明の一実施形態に係るローダー用の多連方向切換弁の油圧回路図である。1 is a hydraulic circuit diagram of a multiple direction switching valve for a loader according to an embodiment of the present invention. 図1に示す油圧回路のうちの上部の拡大図であり、オプション用方向切換弁に関しては、そのスプールのストローク中間域の状態を点線で示している。FIG. 2 is an enlarged view of an upper portion of the hydraulic circuit shown in FIG. 1, and regarding the optional directional control valve, the state of the stroke intermediate region of the spool is indicated by a dotted line. オプション用方向切換弁のスプールが、図2に示すストローク中間域からフルストロークの位置まで移動したときの状態を示す油圧回路図である。FIG. 3 is a hydraulic circuit diagram showing a state when a spool of an option direction switching valve has moved from an intermediate stroke area shown in FIG. 2 to a full stroke position.

以下、本発明を実施するための形態について図面を参照しつつ説明する。   Hereinafter, embodiments for carrying out the present invention will be described with reference to the drawings.

(油圧回路の回路構成)
図1〜3を参照しつつ、本発明の一実施形態に係るローダー用の多連方向切換弁の油圧回路1について説明する。油圧回路1は、油圧ポンプ2に接続されるアンロード通路21に直列配置された複数の方向切換弁6、7、8を備える油圧回路である。なお、図1に示す油圧回路1は、直列配置された複数の方向切換弁6、7、8を備える多連方向切換弁として把握することもできる。この場合、符号1で示すのが多連方向切換弁である。
(Circuit configuration of hydraulic circuit)
With reference to FIGS. 1 to 3, a hydraulic circuit 1 for a loader multiple direction switching valve according to an embodiment of the present invention will be described. The hydraulic circuit 1 is a hydraulic circuit including a plurality of directional control valves 6, 7, 8 arranged in series in an unload passage 21 connected to the hydraulic pump 2. The hydraulic circuit 1 shown in FIG. 1 can also be grasped as a multiple directional switching valve including a plurality of directional switching valves 6, 7, 8 arranged in series. In this case, reference numeral 1 denotes a multiple direction switching valve.

ここで、図示を省略するローダーは、ローダー本体の前部に取り付けられるアーム、アームの先端部に取り付けられるバケットなどのアタッチメントを備えている。本実施形態の油圧回路1が適用されるローダーには、これらのアタッチメント以外に、オプションのアタッチメントが取り付けられる。オプションのアタッチメントとしては、例えば、草刈用の回転刃、ドリルを挙げることができる。以下の説明では、オプションのアタッチメントとして、草刈用の回転刃をローダーに取り付けていることとする。なお、オプションのアタッチメントは、草刈用の回転刃、ドリルに限定されるものではない。   Here, the loader (not shown) includes an attachment such as an arm attached to the front portion of the loader body and a bucket attached to the tip portion of the arm. In addition to these attachments, an optional attachment is attached to the loader to which the hydraulic circuit 1 of the present embodiment is applied. Examples of the optional attachment include a mowing rotary blade and a drill. In the following description, a rotary blade for mowing is attached to the loader as an optional attachment. The optional attachment is not limited to the rotary blade and drill for mowing.

図示を省略するアームは、アームシリンダ4(アームアクチュエータ)によって動作させられ、アームシリンダ4のヘッド側室4aに圧油が供給されることで上昇し、ロッド側室4bに圧油が供給されることで下降する。バケットは、バケットシリンダ5(バケットアクチュエータ)によって動作させられ、バケットシリンダ5のヘッド側室5aに圧油が供給されることでダンプ(前傾方向)し、ロッド側室5bに圧油が供給されることですくい方向(後傾方向)に動作する。回転刃は、油圧モータ3(オプションアクチュエータ)によって動作させられ、油圧モータ3に圧油が供給されることで回転する。   The arm (not shown) is operated by the arm cylinder 4 (arm actuator), and ascends when the pressure oil is supplied to the head side chamber 4a of the arm cylinder 4, and the pressure oil is supplied to the rod side chamber 4b. Descend. The bucket is operated by a bucket cylinder 5 (bucket actuator), and is dumped (forward-inclined direction) when pressure oil is supplied to the head side chamber 5a of the bucket cylinder 5, and the pressure oil is supplied to the rod side chamber 5b. Operates in the rake direction (backward direction). The rotary blade is operated by a hydraulic motor 3 (optional actuator), and rotates when pressure oil is supplied to the hydraulic motor 3.

図1に示すように、本実施形態の油圧回路1は、アーム用方向切換弁7と、バケット用方向切換弁8と、オプション用方向切換弁6と、分配弁9と、流量調整弁10とを備えている。そして油圧回路1は、油圧ポンプ2、アームを動作させるアームシリンダ4、バケットを作動させるバケットシリンダ5、回転刃を回転させる油圧モータ3、および油が戻るタンク13と接続される回路である。   As shown in FIG. 1, the hydraulic circuit 1 of this embodiment includes an arm direction switching valve 7, a bucket direction switching valve 8, an option direction switching valve 6, a distribution valve 9, and a flow rate adjustment valve 10. It has. The hydraulic circuit 1 is a circuit connected to the hydraulic pump 2, the arm cylinder 4 for operating the arm, the bucket cylinder 5 for operating the bucket, the hydraulic motor 3 for rotating the rotary blade, and the tank 13 for returning the oil.

ここで、オプション用方向切換弁6は、アーム用方向切換弁7およびバケット用方向切換弁8よりも上流側のアンロード通路21に配置されている。アーム用方向切換弁7は、バケット用方向切換弁8よりも上流側のアンロード通路21に配置されている。なお、アーム用方向切換弁7をバケット用方向切換弁8よりも下流側のアンロード通路21に配置してもよい。   Here, the option direction switching valve 6 is arranged in the unload passage 21 upstream of the arm direction switching valve 7 and the bucket direction switching valve 8. The arm direction switching valve 7 is disposed in the unload passage 21 on the upstream side of the bucket direction switching valve 8. The arm direction switching valve 7 may be arranged in the unload passage 21 on the downstream side of the bucket direction switching valve 8.

また、分配弁9は、オプション用方向切換弁6よりも上流側のアンロード通路21に配置されている。なお、分配弁9は、本発明の油圧回路を構成する一要素として設けることが好ましいが、必須の構成要素ではない。   The distribution valve 9 is disposed in the unload passage 21 on the upstream side of the option direction switching valve 6. In addition, although it is preferable to provide the distribution valve 9 as one element which comprises the hydraulic circuit of this invention, it is not an essential component.

オプション用方向切換弁6および分配弁9よりも上流側のアンロード通路21と、オプション用方向切換弁6とアーム用方向切換弁7との間のアンロード通路21とは、バイパス通路25で接続されている。このバイパス通路25に流量調整弁10が配置されている。なお、オプション用方向切換弁6および分配弁9よりも上流側のアンロード通路21と、アーム用方向切換弁7とバケット用方向切換弁8との間のアンロード通路21とを、バイパス通路25で接続し、このバイパス通路25に流量調整弁10を配置してもよい。   The unload passage 21 upstream of the option direction switching valve 6 and the distribution valve 9 and the unload passage 21 between the option direction switching valve 6 and the arm direction switching valve 7 are connected by a bypass passage 25. Has been. The flow rate adjusting valve 10 is disposed in the bypass passage 25. An unload passage 21 upstream of the option direction switching valve 6 and the distribution valve 9 and an unload passage 21 between the arm direction switching valve 7 and the bucket direction switching valve 8 are connected to the bypass passage 25. And the flow rate adjusting valve 10 may be disposed in the bypass passage 25.

また、アーム用方向切換弁7をバケット用方向切換弁8よりも下流側のアンロード通路21に配置した場合は、例えば、オプション用方向切換弁6および分配弁9よりも上流側のアンロード通路21と、オプション用方向切換弁6とバケット用方向切換弁8との間のアンロード通路21とをバイパス通路25で接続し、このバイパス通路25に流量調整弁10を配置する。オプション用方向切換弁6および分配弁9よりも上流側のアンロード通路21と、バケット用方向切換弁8とアーム用方向切換弁7との間のアンロード通路21とをバイパス通路25で接続し、このバイパス通路25に流量調整弁10を配置してもよい。なお、バイパス通路25および流量調整弁10は、本発明の油圧回路を構成する一要素として設けることが好ましいが、必須の構成要素ではない。   When the arm direction switching valve 7 is disposed in the unload passage 21 on the downstream side of the bucket direction switching valve 8, for example, the unload passage on the upstream side of the option direction switching valve 6 and the distribution valve 9 is used. 21 and an unload passage 21 between the option direction switching valve 6 and the bucket direction switching valve 8 are connected by a bypass passage 25, and the flow rate adjusting valve 10 is disposed in the bypass passage 25. An unload passage 21 upstream of the option direction switching valve 6 and the distribution valve 9 and an unload passage 21 between the bucket direction switching valve 8 and the arm direction switching valve 7 are connected by a bypass passage 25. The flow rate adjusting valve 10 may be disposed in the bypass passage 25. In addition, although it is preferable to provide the bypass passage 25 and the flow rate adjustment valve 10 as one element which comprises the hydraulic circuit of this invention, it is not an essential component.

<アーム用方向切換弁>
アーム用方向切換弁7は、油圧ポンプ2からの圧油をアームシリンダ4へ給排する3位置の方向切換弁である。このアーム用方向切換弁7には、オプション用方向切換弁6と当該アーム用方向切換弁7との間のアンロード通路21から分岐した圧油供給通路23(アーム用圧油供給通路)から圧油が供給される。
<Direction switching valve for arm>
The arm direction switching valve 7 is a three-position direction switching valve that supplies and discharges the pressure oil from the hydraulic pump 2 to and from the arm cylinder 4. The arm direction switching valve 7 is supplied with pressure from a pressure oil supply passage 23 (arm pressure oil supply passage) branched from an unload passage 21 between the option direction switching valve 6 and the arm direction switching valve 7. Oil is supplied.

<バケット用方向切換弁>
バケット用方向切換弁8は、油圧ポンプ2からの圧油をバケットシリンダ5へ給排する3位置の方向切換弁である。このバケット用方向切換弁8には、アーム用方向切換弁7と当該バケット用方向切換弁8との間のアンロード通路21から分岐した圧油供給通路24(バケット用圧油供給通路)から圧油が供給される。
<Buck direction switch>
The bucket direction switching valve 8 is a three-position direction switching valve that supplies and discharges the pressure oil from the hydraulic pump 2 to the bucket cylinder 5. The bucket direction switching valve 8 is supplied with pressure from a pressure oil supply passage 24 (bucket pressure oil supply passage) branched from an unload passage 21 between the arm direction switching valve 7 and the bucket direction switching valve 8. Oil is supplied.

<オプション用方向切換弁>
オプション用方向切換弁6は、油圧ポンプ2からの圧油を油圧モータ3へ給排する3位置の方向切換弁である。このオプション用方向切換弁6には、当該オプション用方向切換弁6よりも上流側のアンロード通路21から分配弁9を介して分岐した圧油供給通路22(オプション用圧油供給通路)から圧油が供給される。なお、分配弁9を設けない場合、圧油供給通路22(オプション用圧油供給通路)は、オプション用方向切換弁6よりも上流側のアンロード通路21から直接分岐させられる。
<Optional directional valve>
The option direction switching valve 6 is a three-position direction switching valve that supplies and discharges the hydraulic oil from the hydraulic pump 2 to and from the hydraulic motor 3. The option directional control valve 6 is supplied with pressure from a pressure oil supply passage 22 (option pressure oil supply passage) branched from the unload passage 21 upstream of the option directional control valve 6 via the distribution valve 9. Oil is supplied. When the distribution valve 9 is not provided, the pressure oil supply passage 22 (option pressure oil supply passage) is directly branched from the unload passage 21 upstream of the option direction switching valve 6.

<分配弁>
分配弁9は、油圧モータ3の負荷圧に応じて、アンロード通路21に流れる圧油と、圧油供給通路22に流れる圧油との流量配分を変更するように構成されている3位置の弁である。分配弁9の一方(位置9c側)の室には、油圧モータ3への圧油供給通路22の圧力(油圧ポンプ2のポンプ圧力、分配弁9とオプション用方向切換弁6との間の油圧の圧力)が入力され、分配弁9の他方(位置9a側)の室には、オプション用方向切換弁6が位置6b(中立位置)にあるときはタンク通路25の圧力が入力される(図1参照)。また、分配弁9の他方(位置9a側)の室には、バネ26が配置されている。
<Distributing valve>
The distribution valve 9 is configured to change the flow distribution between the pressure oil flowing in the unload passage 21 and the pressure oil flowing in the pressure oil supply passage 22 in accordance with the load pressure of the hydraulic motor 3. It is a valve. In one chamber (position 9 c side) of the distribution valve 9, the pressure of the hydraulic oil supply passage 22 to the hydraulic motor 3 (pump pressure of the hydraulic pump 2, hydraulic pressure between the distribution valve 9 and the optional directional switching valve 6 is provided. The pressure of the tank passage 25 is input to the other chamber (position 9a side) of the distribution valve 9 when the optional directional control valve 6 is in the position 6b (neutral position) (FIG. 1). A spring 26 is disposed in the other chamber (position 9a side) of the distribution valve 9.

図3に示したように、オプション用方向切換弁6が位置6aまたは位置6c(フルストローク位置)にあるときは、分配弁9の他方(位置9a側)の室には、油圧モータ3の負荷圧力が入力される。また、図2に示したように、オプション用方向切換弁6がストローク中間域6x、6yにあるときも、分配弁9の他方(位置9a側)の室には、油圧モータ3の負荷圧力が入力される。   As shown in FIG. 3, when the optional directional control valve 6 is in the position 6a or the position 6c (full stroke position), the other valve (position 9a side) of the distribution valve 9 is placed in the load of the hydraulic motor 3. Pressure is input. Further, as shown in FIG. 2, even when the optional directional control valve 6 is in the stroke intermediate region 6x, 6y, the load pressure of the hydraulic motor 3 remains in the other chamber (position 9a side) of the distribution valve 9. Entered.

<流量調整弁>
流量調整弁10は、バイパス通路25に所定量の圧油が流れることを許容するように構成されている弁である。この流量調整弁10は、バイパス通路25に設けられた可変絞り11と、可変絞り11の前後の圧力が入力され、当該可変絞り11の前後差圧を一定に保持するバイパス弁12とで構成される。バイパス弁12の一方(位置12b側)の室には、バイパス通路25のうちの可変絞り11の上流側の圧力が入力され、バイパス弁12の他方(位置12a側)の室には、可変絞り11の下流側の圧力が入力されている。また、バイパス弁12の他方(位置12a側)の室には、バネ27が配置されている。
<Flow control valve>
The flow rate adjusting valve 10 is a valve configured to allow a predetermined amount of pressure oil to flow through the bypass passage 25. The flow rate adjusting valve 10 includes a variable throttle 11 provided in the bypass passage 25 and a bypass valve 12 to which the pressure before and after the variable throttle 11 is input and the differential pressure across the variable throttle 11 is kept constant. The The pressure on the upstream side of the variable throttle 11 in the bypass passage 25 is input to one (position 12 b side) chamber of the bypass valve 12, and the variable throttle is input to the other chamber (position 12 a side) of the bypass valve 12. 11 downstream pressure is input. A spring 27 is disposed in the other chamber (position 12 a side) of the bypass valve 12.

(油圧回路の動作(作用・効果))
(オプション用方向切換弁6が中立位置(位置6b)にあるとき)
油圧回路1の動作について説明する。まず、操縦者が、回転刃を回転させる油圧モータ3を操作していない、すなわち、オプション用方向切換弁6を操作していないとする。このとき、オプション用方向切換弁6は、中立位置(位置6b)にある(図1参照)。この場合、分配弁9の一方(位置9c側)の室と、他方(位置9a側)の室とにそれぞれ作用する油圧の差圧が、バネ26のバネ力よりも大きくなるので、分配弁9は位置9cに移動する。そのため、油圧ポンプ2からの圧油は、アンロード通路21を流れる。
(Hydraulic circuit operation (action / effect))
(When the optional directional control valve 6 is in the neutral position (position 6b))
The operation of the hydraulic circuit 1 will be described. First, it is assumed that the operator does not operate the hydraulic motor 3 that rotates the rotary blade, that is, does not operate the option direction switching valve 6. At this time, the option direction switching valve 6 is in a neutral position (position 6b) (see FIG. 1). In this case, the differential pressure between the hydraulic pressures acting on one (position 9c side) chamber and the other (position 9a side) chamber of the distribution valve 9 is larger than the spring force of the spring 26. Moves to position 9c. Therefore, the pressure oil from the hydraulic pump 2 flows through the unload passage 21.

(オプション用方向切換弁6がストローク中間域6x、6yにあるとき)
操縦者が、アームを動かすアームシリンダ4と、回転刃を回転させる油圧モータ3とを同時操作した、すなわち、アーム用方向切換弁7と、オプション用方向切換弁6とを同時操作したとする。なお、オプション用方向切換弁6は、フルストローク位置ではなく、図2に示したように、ストローク中間域6x(または6y)にあるとする(図2参照)。このとき、オプション用方向切換弁6に対してアーム用方向切換弁7よりも上流側のアンロード通路21から分岐した圧油供給通路22から圧油が供給されるため、アーム用方向切換弁7へ圧油が流れることよりも、オプション用方向切換弁6へ圧油が流れることのほうが優先される。その結果、アーム用方向切換弁7の動作よりも、オプション用方向切換弁6の動作の方が優先される。これにより、ローダーに取り付けられた回転刃の操作性は従来よりも向上する。なお、操縦者が、バケットシリンダ5と油圧モータ3とを同時操作した場合についても同様の作用・効果がある(オプション用方向切換弁6がフルストローク位置にあるときも同様)。
(When the optional directional control valve 6 is in the stroke intermediate region 6x, 6y)
It is assumed that the operator simultaneously operates the arm cylinder 4 that moves the arm and the hydraulic motor 3 that rotates the rotary blade, that is, the arm direction switching valve 7 and the option direction switching valve 6 are simultaneously operated. It is assumed that the optional directional control valve 6 is not in the full stroke position but in the stroke intermediate region 6x (or 6y) as shown in FIG. At this time, pressure oil is supplied from the pressure oil supply passage 22 branched from the unload passage 21 upstream of the arm direction switching valve 7 to the option direction switching valve 6. The flow of pressure oil to the optional directional control valve 6 is prioritized over the flow of pressure oil. As a result, the operation of the option direction switching valve 6 has priority over the operation of the arm direction switching valve 7. Thereby, the operativity of the rotary blade attached to the loader is improved as compared with the prior art. Note that the same action and effect are obtained when the operator simultaneously operates the bucket cylinder 5 and the hydraulic motor 3 (the same applies when the optional directional switching valve 6 is at the full stroke position).

ここで、分配弁9は、圧油供給通路22の圧力(油圧ポンプ2のポンプ圧力、分配弁9とオプション用方向切換弁6との間の油圧の圧力)と、油圧モータ3の負荷圧力(オプション用方向切換弁6の絞り28の下流側の圧力)との差圧が、バネ26のバネ力と等しくなる位置(位置9a、9b、9c間のどこかの位置)でバランスする。   Here, the distribution valve 9 includes the pressure in the pressure oil supply passage 22 (pump pressure of the hydraulic pump 2, hydraulic pressure between the distribution valve 9 and the optional directional switching valve 6), and the load pressure ( The differential pressure with respect to the pressure on the downstream side of the restrictor 28 of the option direction switching valve 6 is balanced at a position (any position between the positions 9a, 9b, 9c) equal to the spring force of the spring 26.

<油圧モータ3の負荷圧力が高くなった場合>
分配弁9の位置9a側の室の圧力が高くなり、分配弁9は位置9a側に移動する。分配弁9は、アンロード通路21へ流れる通路面積を小さくする方向へ移動するため、圧油供給通路22の圧力(油圧ポンプ2のポンプ圧力、分配弁9とオプション用方向切換弁6との間の油圧の圧力)は高くなる。分配弁9の一方(位置9c側)の室と、他方(位置9a側)の室とにそれぞれ作用する油圧の差圧が、バネ26のバネ力と等しくなる位置で分配弁9はバランスする。
<When the load pressure of the hydraulic motor 3 increases>
The pressure in the chamber on the position 9a side of the distribution valve 9 increases, and the distribution valve 9 moves to the position 9a side. Since the distribution valve 9 moves in a direction to reduce the passage area flowing to the unload passage 21, the pressure in the pressure oil supply passage 22 (pump pressure of the hydraulic pump 2, between the distribution valve 9 and the optional directional switching valve 6). The hydraulic pressure) increases. The distribution valve 9 balances at a position where the differential pressure between the hydraulic pressures acting on one (position 9 c side) chamber and the other (position 9 a side) chamber of the distribution valve 9 becomes equal to the spring force of the spring 26.

<油圧モータ3の負荷圧力が低くなった場合>
分配弁9の位置9a側の室の圧力が低くなり、分配弁9は位置9c側に移動する。分配弁9は、アンロード通路21へ流れる通路面積を大きくする方向へ移動するため、圧油供給通路22の圧力(油圧ポンプ2のポンプ圧力、分配弁9とオプション用方向切換弁6との間の油圧の圧力)は低くなる。分配弁9の一方(位置9c側)の室と、他方(位置9a側)の室とにそれぞれ作用する油圧の差圧が、バネ26のバネ力と等しくなる位置で分配弁9はバランスする。
<When the load pressure of the hydraulic motor 3 becomes low>
The pressure in the chamber on the position 9a side of the distribution valve 9 decreases, and the distribution valve 9 moves to the position 9c side. Since the distribution valve 9 moves in the direction of increasing the passage area flowing to the unload passage 21, the pressure in the pressure oil supply passage 22 (pump pressure of the hydraulic pump 2, between the distribution valve 9 and the directional switching valve 6 for options) The hydraulic pressure is reduced. The distribution valve 9 balances at a position where the differential pressure between the hydraulic pressures acting on one (position 9 c side) chamber and the other (position 9 a side) chamber of the distribution valve 9 becomes equal to the spring force of the spring 26.

このように、オプション用方向切換弁6の絞り28の前後の差圧が、分配弁9により常に一定に制御されることにより、油圧モータ3の負荷圧が変動しても(油圧モータ3の負荷圧に応じて)、一定の流量の圧油が油圧モータ3へ供給される(アンロード通路21に流れる圧油と、圧油供給通路22に流れる圧油との流量配分が変更される)。   Thus, even if the load pressure of the hydraulic motor 3 fluctuates because the differential pressure before and after the throttle 28 of the optional directional control valve 6 is constantly controlled by the distributing valve 9 (load of the hydraulic motor 3). According to the pressure, a constant flow rate of pressure oil is supplied to the hydraulic motor 3 (the flow rate distribution between the pressure oil flowing in the unload passage 21 and the pressure oil flowing in the pressure oil supply passage 22 is changed).

なお、絞り28は、オプション用方向切換弁6がストローク中間域6xにあることで、圧油の通路が絞られて形成される。   The throttle 28 is formed by narrowing the passage of pressure oil because the option direction switching valve 6 is in the stroke intermediate region 6x.

(オプション用方向切換弁6がフルストローク位置(位置6a、6c)にあるとき)
ここで、操縦者が、オプション用方向切換弁6をフルストローク位置にしたとする(図3参照)。本実施形態では、フルストローク位置(位置6a)におけるオプション用方向切換弁6のメータイン側開口面積が絞られていないこととしている。この場合、オプション用方向切換弁6の圧油通過前後の圧力差は、分配弁9のバネ26のクラッキング力よりも小さくなる。そのため、分配弁9は位置9aとなり、分配弁9下流側のアンロード通路21へ圧油が流れなくなる。油圧ポンプ2からの圧油は、全流量、オプション用方向切換弁6に流入する。
(When the optional directional control valve 6 is at the full stroke position (positions 6a and 6c))
Here, it is assumed that the operator sets the option direction switching valve 6 to the full stroke position (see FIG. 3). In the present embodiment, the meter-in side opening area of the optional directional control valve 6 at the full stroke position (position 6a) is not reduced. In this case, the pressure difference before and after the pressure oil passing through the option direction switching valve 6 becomes smaller than the cracking force of the spring 26 of the distribution valve 9. Therefore, the distribution valve 9 is in the position 9a, and the pressure oil does not flow to the unload passage 21 on the downstream side of the distribution valve 9. The pressure oil from the hydraulic pump 2 flows into the directional switching valve 6 for the entire flow rate and option.

なお、フルストローク位置(位置6a)におけるオプション用方向切換弁6のメータイン側開口面積が絞られている(絞りが設けられている)場合は、分配弁9は、オプション用方向切換弁6がストローク中間域6xにあるとき(図2参照)と同様の動きをする(フルストローク位置(位置6c)についても同様)。   In addition, when the meter-in side opening area of the optional directional control valve 6 at the full stroke position (position 6a) is throttled (a throttle is provided), the distribution directional valve 6 is stroked by the optional directional control valve 6. The same movement as in the intermediate zone 6x (see FIG. 2) is performed (the same applies to the full stroke position (position 6c)).

<分配弁の効果>
油圧回路1に分配弁9を配置したことにより、油圧ポンプ2から供給される圧油を、油圧モータ3に作用する負荷圧の変化にかかわらず、オプション用方向切換弁6の操作量に応じた一定の流量で油圧モータ3に流しつつ、所定流量以上の圧油をアームシリンダ4またはバケットシリンダ5に流すことができる。
<Effect of distribution valve>
By disposing the distribution valve 9 in the hydraulic circuit 1, the pressure oil supplied from the hydraulic pump 2 corresponds to the operation amount of the option direction switching valve 6 regardless of the change of the load pressure acting on the hydraulic motor 3. While flowing to the hydraulic motor 3 at a constant flow rate, pressure oil of a predetermined flow rate or more can flow to the arm cylinder 4 or the bucket cylinder 5.

<流量調整弁の作用・効果>
また、本実施形態では、油圧回路1に、前記したバイパス通路25および流量調整弁10を設けている。操縦者が、アーム用方向切換弁7と、オプション用方向切換弁6とを同時操作したとする。そして、アームシリンダ4に作用する負荷圧が変化したとする。このとき、アームシリンダ4に作用する負荷圧が変化したとしても、バイパス通路25に設けられた可変絞り11の前後差圧がバイパス弁12により一定に保持されるので、余剰油はアンロード通路21からタンク13に戻る。すなわち、バイパス通路25および流量調整弁10を油圧回路1に設けたことで、油圧ポンプ2から供給される圧油を、アームシリンダ4に作用する負荷圧の変化にかかわらず、アーム用方向切換弁7の操作量に応じた一定の流量でアームシリンダ4に流すことができる。なお、操縦者が、バケットシリンダ5と油圧モータ3とを同時操作した場合についても同様の作用・効果がある。
<Operation and effect of flow control valve>
In the present embodiment, the bypass circuit 25 and the flow rate adjusting valve 10 are provided in the hydraulic circuit 1. It is assumed that the operator operates the arm direction switching valve 7 and the option direction switching valve 6 simultaneously. Then, it is assumed that the load pressure acting on the arm cylinder 4 has changed. At this time, even if the load pressure acting on the arm cylinder 4 changes, the differential pressure across the variable throttle 11 provided in the bypass passage 25 is kept constant by the bypass valve 12, so that excess oil is unloaded from the unload passage 21. To return to tank 13. That is, by providing the bypass passage 25 and the flow rate adjusting valve 10 in the hydraulic circuit 1, the pressure oil supplied from the hydraulic pump 2 can be supplied to the arm direction switching valve regardless of the change in the load pressure acting on the arm cylinder 4. 7 can flow through the arm cylinder 4 at a constant flow rate corresponding to the amount of operation. It should be noted that the same actions and effects are obtained when the operator operates the bucket cylinder 5 and the hydraulic motor 3 simultaneously.

また、絞りを可変としたことで(可変絞り11)、アームシリンダ4(またはバケットシリンダ5)と、油圧モータ3との同時操作時、アームシリンダ4(またはバケットシリンダ5)への圧油の供給量のバランスを任意に変更することができる。   Further, by making the throttle variable (variable throttle 11), pressure oil is supplied to the arm cylinder 4 (or bucket cylinder 5) when the arm cylinder 4 (or bucket cylinder 5) and the hydraulic motor 3 are operated simultaneously. The balance of quantity can be changed arbitrarily.

1:油圧回路(ローダー用油圧回路)
2:油圧ポンプ
3:油圧モータ(オプションアクチュエータ)
4:アームシリンダ(アームアクチュエータ)
5:バケットシリンダ(バケットアクチュエータ)
6:オプション用方向切換弁
7:アーム用方向切換弁
8:バケット用方向切換弁
9:分配弁
10:流量調整弁
11:可変絞り
12:バイパス弁
13:タンク
21:アンロード通路
22:圧油供給通路(オプション用圧油供給通路)
23:圧油供給通路(アーム用圧油供給通路)
24:圧油供給通路(バケット用圧油供給通路)
25:バイパス通路
1: Hydraulic circuit (hydraulic circuit for loader)
2: Hydraulic pump 3: Hydraulic motor (optional actuator)
4: Arm cylinder (arm actuator)
5: Bucket cylinder (bucket actuator)
6: Direction switching valve for option 7: Direction switching valve for arm 8: Direction switching valve for bucket 9: Distribution valve 10: Flow rate adjusting valve 11: Variable throttle 12: Bypass valve 13: Tank 21: Unload passage 22: Pressure oil Supply passage (optional pressure oil supply passage)
23: Pressure oil supply passage (pressure oil supply passage for arm)
24: Pressure oil supply passage (pressure oil supply passage for bucket)
25: Bypass passage

Claims (1)

油圧ポンプに接続されるアンロード通路と、
前記油圧ポンプからの圧油をアームアクチュエータへ給排するアーム用方向切換弁と、
前記油圧ポンプからの圧油をバケットアクチュエータへ給排するバケット用方向切換弁と、
前記油圧ポンプからの圧油をオプションアクチュエータへ給排するオプション用方向切換弁と、を備え、
前記オプション用方向切換弁が、前記アーム用方向切換弁および前記バケット用方向切換弁よりも上流側に配置されるローダー用油圧回路において、
前記オプション用方向切換弁には、前記アーム用方向切換弁および前記バケット用方向切換弁よりも上流側の前記アンロード通路から分配弁を介して分岐したオプション用圧油供給通路から圧油が供給され、
前記アーム用方向切換弁には、前記分配弁と当該アーム用方向切換弁との間の前記アンロード通路から分岐したアーム用圧油供給通路から圧油が供給され、
前記バケット用方向切換弁には、前記分配弁と当該バケット用方向切換弁との間の前記アンロード通路から分岐したバケット用圧油供給通路から圧油が供給され、
前記分配弁の一方の室には、前記オプション用圧油供給通路の圧力が入力され、
前記分配弁の他方の室には、バネが配置されるとともに、前記オプション用方向切換弁が中立位置にあるときはタンク通路の圧力が入力され、前記オプション用方向切換弁がフルストローク位置にあるときは前記オプションアクチュエータの負荷圧力が入力され、
前記分配弁は、前記オプションアクチュエータの負荷圧力に応じて、前記アンロード通路に流れる圧油と、前記オプション用圧油供給通路に流れる圧油との流量配分を変更することを特徴とする、ローダー用油圧回路。
An unload passage connected to the hydraulic pump;
An arm direction switching valve for supplying and discharging pressure oil from the hydraulic pump to an arm actuator;
A bucket direction switching valve for supplying and discharging pressure oil from the hydraulic pump to a bucket actuator;
An optional directional control valve for supplying and discharging pressure oil from the hydraulic pump to an optional actuator,
In the loader hydraulic circuit in which the optional directional control valve is disposed upstream of the arm directional control valve and the bucket directional control valve,
The option direction switching valve is supplied with pressure oil from an option pressure oil supply passage branched from the unload passage upstream of the arm direction switching valve and the bucket direction switching valve via a distribution valve. And
The arm direction switching valve is supplied with pressure oil from the arm pressure oil supply passage branched from the unload passage between the distribution valve and the arm direction switching valve,
The bucket direction switching valve is supplied with pressure oil from a bucket pressure oil supply passage branched from the unload passage between the distribution valve and the bucket direction switching valve,
The pressure of the optional pressure oil supply passage is input to one chamber of the distribution valve,
A spring is disposed in the other chamber of the distribution valve, and when the optional directional control valve is in the neutral position, the pressure of the tank passage is input, and the optional directional control valve is in the full stroke position. When the load pressure of the optional actuator is input,
The distribution valve changes a flow rate distribution between the pressure oil flowing in the unload passage and the pressure oil flowing in the option pressure oil supply passage according to a load pressure of the option actuator. Hydraulic circuit for
JP2017214911A 2017-11-07 2017-11-07 Hydraulic circuit for loader Active JP6434112B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017214911A JP6434112B2 (en) 2017-11-07 2017-11-07 Hydraulic circuit for loader

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017214911A JP6434112B2 (en) 2017-11-07 2017-11-07 Hydraulic circuit for loader

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2014014106A Division JP6294682B2 (en) 2014-01-29 2014-01-29 Hydraulic circuit for loader

Publications (2)

Publication Number Publication Date
JP2018025309A true JP2018025309A (en) 2018-02-15
JP6434112B2 JP6434112B2 (en) 2018-12-05

Family

ID=61195369

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017214911A Active JP6434112B2 (en) 2017-11-07 2017-11-07 Hydraulic circuit for loader

Country Status (1)

Country Link
JP (1) JP6434112B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000136803A (en) * 1998-11-04 2000-05-16 Tcm Corp Tandem hydraulic circuit
JP2009299852A (en) * 2008-06-16 2009-12-24 Nabtesco Corp Multiple direction switching valve having packet parallel moving function
JP2010270528A (en) * 2009-05-22 2010-12-02 Kubota Corp Working machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000136803A (en) * 1998-11-04 2000-05-16 Tcm Corp Tandem hydraulic circuit
JP2009299852A (en) * 2008-06-16 2009-12-24 Nabtesco Corp Multiple direction switching valve having packet parallel moving function
JP2010270528A (en) * 2009-05-22 2010-12-02 Kubota Corp Working machine

Also Published As

Publication number Publication date
JP6434112B2 (en) 2018-12-05

Similar Documents

Publication Publication Date Title
JP5184773B2 (en) Hydraulic system with pressure compensation valve
US10393151B2 (en) Hydraulic drive system for working machine
US10676897B2 (en) Construction machine
JP2017020604A (en) Hydraulic actuator control circuit
KR20130124432A (en) Hydraulic control device with load pressure reduction and hydraulic valve block therefor
JP2016075358A (en) Hydraulic control device for construction machine
JP2017089865A (en) Hydraulic driving device
JP2019124227A (en) Hydraulic circuit
US8701396B2 (en) Hydraulic system
JP6294682B2 (en) Hydraulic circuit for loader
CN110998034A (en) Excavator
KR101846030B1 (en) control device for construction machine
KR102425743B1 (en) Construction machinery and method for controlling the construction machinery
JP6476074B2 (en) Work machine
JP6434112B2 (en) Hydraulic circuit for loader
US6581506B1 (en) Method and device for controlling supply of working fluid
JP2012162917A (en) Hydraulic circuit of hydraulic shovel
JP2019528415A (en) Construction machine control system and construction machine control method
JP4454967B2 (en) Shunt mechanism and valve device
JP2003090302A (en) Hydraulic control circuit of construction machine
JP2010065733A (en) Hydraulic control circuit for working machine
US11078932B2 (en) Hydraulic machine
US7926411B2 (en) Valve control unit
JP3952472B2 (en) Control valve for hydraulic actuator in construction machinery
JP4859432B2 (en) Forklift control circuit

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181030

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181107

R150 Certificate of patent or registration of utility model

Ref document number: 6434112

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250