JP2017222996A - Column-beam junction structure - Google Patents

Column-beam junction structure Download PDF

Info

Publication number
JP2017222996A
JP2017222996A JP2016117389A JP2016117389A JP2017222996A JP 2017222996 A JP2017222996 A JP 2017222996A JP 2016117389 A JP2016117389 A JP 2016117389A JP 2016117389 A JP2016117389 A JP 2016117389A JP 2017222996 A JP2017222996 A JP 2017222996A
Authority
JP
Japan
Prior art keywords
column
joint
concrete
joining member
joining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2016117389A
Other languages
Japanese (ja)
Inventor
悟史 掛
Satoshi Kake
悟史 掛
裕次 石川
Yuji Ishikawa
裕次 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2016117389A priority Critical patent/JP2017222996A/en
Publication of JP2017222996A publication Critical patent/JP2017222996A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a structure that prevents the destruction of a column-beam junction caused by deterioration of adhesion between concrete and a main reinforcement.SOLUTION: A column-beam junction structure includes a junction 10 having an arranged column main reinforcement 22 of a reinforced concrete column 20 and an arranged beam main reinforcement 32 of a reinforced concrete beam 30, and a bearing member (mechanical joint 40) to produce a bearing force, disposed on the column main reinforcement 22 or the beam main reinforcement 32.SELECTED DRAWING: Figure 1

Description

本発明は、柱梁の接合部構造に関する。   The present invention relates to a joint structure of column beams.

特許文献1に示された柱梁仕口部構造では、柱梁仕口部(柱梁接合部)に打設されるコンクリートに繊維補強材を混入してコンクリートの強度を向上させている。   In the column beam joint structure disclosed in Patent Document 1, fiber reinforcing material is mixed into the concrete cast in the column beam joint (column beam joint) to improve the strength of the concrete.

特開平10−8551号公報Japanese Patent Laid-Open No. 10-8551

しかし、コンクリートの強度を向上させても、柱と梁の曲げ耐力比が小さい場合、梁の曲げ降伏が早期に発生し、その後接合部内まで主筋降伏が進展し、接合部を立面視したとき接合部の隅部を対角上に結んだ対角線に沿って斜めひび割れが発生して接合部が破壊されることがある。   However, even if the strength of the concrete is improved, if the bending strength ratio between the column and the beam is small, the bending yield of the beam occurs early, and then the main bar yield progresses into the joint, and the joint is viewed from an elevation. An oblique crack may occur along a diagonal line connecting the corners of the joint portion diagonally, and the joint portion may be destroyed.

本発明は上記事実を考慮して、柱梁の接合部の斜めひび割れの発生を抑制することを目的とする。   In view of the above fact, an object of the present invention is to suppress the occurrence of oblique cracks at the joints of column beams.

請求項1に記載の柱梁の接合部構造は、コンクリート製柱の柱主筋とコンクリート製梁の梁主筋とが配筋された接合部と、前記接合部の外側から前記接合部へプレストレスを与える鋼製部材と、を有する。   The joint structure of the column beam according to claim 1, wherein the column main bar of the concrete column and the beam main bar of the concrete beam are arranged, and prestress is applied from the outside of the joint to the joint. A steel member to be provided.

請求項1に記載の柱梁の接合部構造では、接合部へプレストレスを与えることにより、接合部のコンクリートが圧縮される。このため、接合部の斜めひび割れを抑制することができる。   In the joint structure of the column beam according to claim 1, the concrete of the joint is compressed by applying prestress to the joint. For this reason, the diagonal crack of a junction part can be suppressed.

請求項2に記載の柱梁の接合部構造は、前記接合部は、前記コンクリート製柱及び前記コンクリート製梁が接合されるプレキャストコンクリート製の接合部材とされている。   In the column beam joint structure according to claim 2, the joint is a precast concrete joint member to which the concrete pillar and the concrete beam are joined.

請求項2に記載の柱梁の接合部構造では、プレストレスが与えられた接合部材はプレキャストコンクリート製とされ、コンクリート製柱及びコンクリート製梁と別部材とされている。このため、プレストレスが与えられた接合部を現場で効率よく施工できる。また、接合部だけに効率的にプレストレスを与えられる。   In the column beam joint structure according to claim 2, the prestressed joint member is made of precast concrete, and is separate from the concrete pillar and the concrete beam. For this reason, the joint part to which prestress is given can be efficiently constructed on site. In addition, prestress can be efficiently applied only to the joint.

請求項3に記載の柱梁の接合部構造は、前記コンクリート製柱、前記コンクリート製梁はプレキャストコンクリート製とされている。   The joint structure of the column beam according to claim 3 is such that the concrete column and the concrete beam are made of precast concrete.

請求項3に記載の柱梁の接合部構造では、架構がプレキャストコンクリートで形成され、接合部材にはプレストレスが与えられている。このため、現場打ちコンクリート作業を省略し、接合部の斜めひび割れが抑制された架構を効率よく形成することができる。   In the column beam joint structure according to claim 3, the frame is formed of precast concrete, and prestress is applied to the joint member. For this reason, the cast-in-place concrete work can be omitted, and a frame in which oblique cracks at the joints are suppressed can be efficiently formed.

本発明によると、柱梁の接合部の斜めひび割れの発生を抑制することができる。   According to this invention, generation | occurrence | production of the diagonal crack of the junction part of a column beam can be suppressed.

本発明の第1実施形態に係る柱梁の接合部構造が適用された柱梁の接合部を示す断面図である。It is sectional drawing which shows the junction part of the column beam to which the junction part structure of the column beam which concerns on 1st Embodiment of this invention was applied. 本発明の第1実施形態に係る柱梁の接合部構造において、梁主筋を接続するスリーブが接合部材に埋設された例を示す断面図である。It is sectional drawing which shows the example by which the sleeve which connects a beam main reinforcement was embed | buried under the joining member in the junction part structure of the column beam which concerns on 1st Embodiment of this invention. 本発明の第2実施形態に係る柱梁の接合部構造が適用された柱梁の接合部を示す断面図である。It is sectional drawing which shows the junction part of the column beam to which the junction part structure of the column beam which concerns on 2nd Embodiment of this invention was applied. 本発明の第2実施形態に係る柱梁の接合部構造において、PC鋼棒が接合部材を上下方向に貫通した例を示す断面図である。It is sectional drawing which shows the example which the PC steel bar penetrated the joining member to the up-down direction in the junction part structure of the column beam which concerns on 2nd Embodiment of this invention. 本発明の第3実施形態に係る柱梁の接合部構造が適用された柱梁の接合部を示す断面図である。It is sectional drawing which shows the junction part of the column beam to which the junction part structure of the column beam which concerns on 3rd Embodiment of this invention was applied.

[第1実施形態]
(構成)
図1に示すように、第1実施形態に係る柱梁の接合部構造は、鉄筋コンクリート製の柱20と鉄筋コンクリート製の梁30とを接合する接合部材(仕口部材)10に適用される。接合部材10、柱20及び梁30はそれぞれプレキャストコンクリートで形成され、柱20は接合部材10の下部に接合された下柱部材20Aと、接合部材10の上部に接合された上柱部材20Bとで形成され、梁30は接合部材10の両側にそれぞれ接合された梁部材30A、30Bで形成されている。
[First Embodiment]
(Constitution)
As shown in FIG. 1, the column beam joint structure according to the first embodiment is applied to a joint member (joint member) 10 that joins a reinforced concrete column 20 and a reinforced concrete beam 30. The joining member 10, the column 20, and the beam 30 are each formed of precast concrete, and the column 20 includes a lower column member 20 </ b> A joined to the lower part of the joining member 10 and an upper pillar member 20 </ b> B joined to the upper part of the joining member 10. The beam 30 is formed by beam members 30 </ b> A and 30 </ b> B bonded to both sides of the bonding member 10.

なお、図1において接合部材10と下柱部材20A、接合部材10と上柱部材20Bはそれぞれ隙間を空けて配置されているが、この隙間には後述するスリーブ50、52へ充填される図示しないグラウト材が充填され、これにより接合部材10、下柱部材20A及び上柱部材20Bが接合されている。   In FIG. 1, the joining member 10 and the lower column member 20 </ b> A, and the joining member 10 and the upper column member 20 </ b> B are arranged with a gap therebetween, but the gap is filled in sleeves 50 and 52 (not shown). The grout material is filled, and thereby the joining member 10, the lower pillar member 20A, and the upper pillar member 20B are joined.

同様に、図1において接合部材10と梁部材30A、接合部材10と梁部材30Bはそれぞれ隙間を空けて配置されているが、この隙間には後述するスリーブ54へ充填される図示しないグラウト材が充填され、これにより接合部材10、梁部材30A及び梁部材30Bが接合されている。   Similarly, in FIG. 1, the joining member 10 and the beam member 30 </ b> A, and the joining member 10 and the beam member 30 </ b> B are arranged with a gap therebetween, and a grout material (not shown) filled in a sleeve 54 described later is placed in this gap. Filling is performed, whereby the joining member 10, the beam member 30A, and the beam member 30B are joined.

接合部材10の上下方向(鉛直方向)の中央部には、プレストレスが与えられたPC鋼棒40が埋設されている。PC鋼棒40は接合部材10を左右方向(略水平方向)に貫通し、両端部が接合部材10の側面に形成されたコッター10Aから突出して、定着板42に固定されている。これにより、接合部材10に左右からプレストレスが与えられる。   A pre-stressed PC steel rod 40 is embedded in the central portion of the joining member 10 in the vertical direction (vertical direction). The PC steel bar 40 penetrates the joining member 10 in the left-right direction (substantially horizontal direction), and both ends protrude from a cotter 10 </ b> A formed on the side surface of the joining member 10 and are fixed to the fixing plate 42. Thereby, prestress is given to the joining member 10 from right and left.

なお、本実施形態においてPC鋼棒40は、コンクリート製の接合部材10を左右方向に貫通する図示しないシース管に通され、その後緊張力が与えられてグラウト材でシース管内に固定されている(所謂ポストテンション方式)。   In the present embodiment, the PC steel rod 40 is passed through a sheath tube (not shown) penetrating the concrete joining member 10 in the left-right direction, and then tension is applied and fixed in the sheath tube with a grout material ( So-called post-tension system).

但し本発明の実施形態はこれに限らず、PC鋼棒40はプレテンション方式によってプレストレスを与えてもよい。すなわち、接合部材10を形成するコンクリートCの打設時に、予め緊張力が与えられたPC鋼棒40を配置しておき、コンクリートCの硬化後に接合部材10から突出したPC鋼棒40を切断することでPC鋼棒40にプレストレスを与えてもよい。このようにしてPC鋼棒40にプレストレスを与えることで、定着板42を省略することができる。   However, the embodiment of the present invention is not limited to this, and the PC steel bar 40 may be prestressed by a pretension method. That is, when the concrete C forming the joining member 10 is placed, the PC steel bar 40 to which tension is applied in advance is disposed, and the PC steel bar 40 protruding from the joining member 10 after the concrete C is hardened is cut. Thus, the PC steel rod 40 may be prestressed. Thus, the fixing plate 42 can be omitted by prestressing the PC steel bar 40.

なお、以下に説明する第2、第3実施形態に係る柱梁の接合部構造においても、PC鋼棒のプレストレス導入にあたっては、ポストテンション方式、プレテンション方式の何れかを選択することができる。なお、本実施形態及び第2、第3実施形態に係る柱梁の接合部構造におけるPC鋼棒は本発明における鋼製部材の一例であり、鋼製部材としてはPC鋼線、PC鋼より線、その他プレストレスを与えることができる材質を用いることができる。   In addition, in the column beam joint structures according to the second and third embodiments described below, either the post-tension method or the pre-tension method can be selected for the prestress introduction of the PC steel rod. . Note that the PC steel bar in the column beam joint structure according to the present embodiment and the second and third embodiments is an example of a steel member in the present invention, and the steel member is a PC steel wire or a PC steel wire. Other materials that can give prestress can be used.

接合部材10には柱主筋22及び梁主筋32が配筋されている。具体的には、接合部材10を上下方向に貫通するスリーブ50を、上柱部材20Bの下端面から突出した柱主筋22Aが貫通し、この柱主筋22Aの先端部が、下柱部材20Aの上端面に開口したスリーブ52に挿入されている。スリーブ52の反対側の開口部には柱主筋22Bが挿入されている。スリーブ50、スリーブ52にはグラウト材が充填されており、これにより柱主筋22A、22Bが接続されている。   Column main bars 22 and beam main bars 32 are arranged in the joining member 10. Specifically, the column main reinforcement 22A protruding from the lower end surface of the upper column member 20B passes through the sleeve 50 penetrating the joining member 10 in the vertical direction, and the tip of the column main reinforcement 22A is located above the lower column member 20A. The sleeve 52 is opened at the end face. The column main reinforcement 22B is inserted into the opening on the opposite side of the sleeve 52. The sleeve 50 and the sleeve 52 are filled with a grout material, whereby the column main bars 22A and 22B are connected.

また、梁主筋32Aは接合部材10を左右方向に貫通し、梁主筋32Aの両端部は接合部材10から突出し、それぞれ梁部材30A、30Bの端面に開口するスリーブ54に挿入されている。スリーブ54の反対側の開口部には梁主筋32Bが挿入されている。スリーブ54にはグラウト材が充填されており、これにより梁主筋32A、32Bが接続されている。   The main beam 32A penetrates the joining member 10 in the left-right direction, and both end portions of the main beam 32A protrude from the joining member 10 and are inserted into sleeves 54 opened at the end surfaces of the beam members 30A and 30B, respectively. The main beam bar 32B is inserted into the opening on the opposite side of the sleeve. The sleeve 54 is filled with a grout material, thereby connecting the beam main bars 32A and 32B.

なお、本実施形態においては梁主筋32Aの両端部が接合部材10から突出しているものとしたが、本発明の実施形態はこれに限らない。例えば図2に示すように、接合部材10にスリーブ56を埋設し、このスリーブ56の一方の開口部に接合部材19に埋設された梁主筋32Aの端部を挿入してもよい。この場合、梁部材30Aの端面から梁主筋32Bが突出し、スリーブ56の他方の開口部に挿入される。   In addition, in this embodiment, although the both ends of the beam main reinforcement 32A shall protrude from the joining member 10, embodiment of this invention is not restricted to this. For example, as shown in FIG. 2, a sleeve 56 may be embedded in the joining member 10, and an end portion of the beam main bar 32 </ b> A embedded in the joining member 19 may be inserted into one opening of the sleeve 56. In this case, the beam main bar 32B protrudes from the end face of the beam member 30A and is inserted into the other opening of the sleeve 56.

なお、このように接合部材10にスリーブ56を埋設し、接合部材10の内部で梁主筋32を接続する構成は、以下で説明する図3〜5に示す第2、第3実施形態に係る接合部構造に適用してもよい。   In addition, the structure which embeds the sleeve 56 in the joining member 10 in this way and connects the beam main reinforcement 32 inside the joining member 10 is the joining which concerns on 2nd, 3rd embodiment shown to FIGS. 3-5 demonstrated below. You may apply to a partial structure.

また、本実施形態においては、接合部材10のスリーブ50を上柱部材20Bの下端面から突出した柱主筋22Aが貫通している(所謂逆挿し工法)が、本発明の実施形態はこれに限らない。例えば下柱部材20Aの上端面から柱主筋22Bを突出させ、この柱主筋22Bが、接合部材10のスリーブ50を貫通するものとしてもよい(所謂順挿し工法)。この場合、上柱部材20Bの下端面にスリーブ52を埋設し、このスリーブ52に柱主筋22Bを挿入する。   In the present embodiment, the column main reinforcement 22A protruding from the lower end surface of the upper column member 20B passes through the sleeve 50 of the joining member 10 (so-called reverse insertion method), but the embodiment of the present invention is not limited thereto. Absent. For example, the column main bar 22B may protrude from the upper end surface of the lower column member 20A, and the column main bar 22B may penetrate the sleeve 50 of the joining member 10 (so-called forward insertion method). In this case, a sleeve 52 is embedded in the lower end surface of the upper column member 20 </ b> B, and the column main bar 22 </ b> B is inserted into the sleeve 52.

なお、以下に説明する第2実施形態に係る柱梁の接合部構造においても、柱主筋の配設方法に関しては、逆挿し工法、順挿し工法の何れかを選択することができる。   In the column beam joint structure according to the second embodiment described below, either the reverse insertion method or the forward insertion method can be selected as the column main bar arrangement method.

(作用・効果)
第1実施形態に係る柱梁の接合部構造によると、接合部材10のコンクリートCが、PC鋼棒40によりプレストレスが与えられている。このため、図1に示すように、例えば梁30に曲げモーメントMが作用して梁主筋32が引張力Nを受けた際、コンクリートCは梁主筋32との付着力により引張力を受けるが、プレストレス力により圧縮されているので、ひび割れが発生しにくい。例えば、接合部材10の対角線Kに沿って接合部材10の中央部に発生するひび割れCR1や、接合部材10の角部に発生するひび割れCR2を抑制できる。
(Action / Effect)
According to the column beam joint structure according to the first embodiment, the concrete C of the joining member 10 is prestressed by the PC steel rod 40. Therefore, as shown in FIG. 1, for example, when the bending moment M acts on the beam 30 and the beam main bar 32 receives the tensile force N, the concrete C receives a tensile force due to the adhesive force with the beam main bar 32. Since it is compressed by the prestressing force, it is difficult for cracks to occur. For example, it is possible to suppress a crack CR <b> 1 generated at the center of the bonding member 10 along the diagonal line K of the bonding member 10 and a crack CR <b> 2 generated at the corner of the bonding member 10.

また、プレストレスを与えられる接合部材10は、柱20及び梁30と別部材とされている。このため、接合部材10に効率的にプレストレスを与えられる。   Further, the joining member 10 to which prestress is applied is a separate member from the column 20 and the beam 30. For this reason, prestress is efficiently given to the joining member 10.

さらに、接合部材10、柱20及び梁30はプレキャストコンクリートで形成されている。このため、接合部材10に斜めひび割れが発生しにくい架構を効率よく形成することができる。   Furthermore, the joining member 10, the column 20, and the beam 30 are formed of precast concrete. For this reason, it is possible to efficiently form a frame in which oblique cracks are unlikely to occur in the joining member 10.

なお、本実施形態においては、プレストレスが与えられたPC鋼棒40は、接合部材10の上下方向の中央部に設けられているが、本発明の実施形態はこれに限らず、梁主筋32の内側であればどの部分に埋設してもよく、埋設する本数も任意に選択することができる。例えば接合部材10の上下方向の中央部だけではなく、該中央部と梁主筋32との間にも埋設できる。このようにすれば接合部材10に作用する圧縮力が大きくなるので、ひび割れCR1、CR2を抑制する効果を高めることができる。   In the present embodiment, the PC steel bar 40 to which prestress is applied is provided at the center in the vertical direction of the joining member 10, but the embodiment of the present invention is not limited to this, and the beam main bar 32. As long as it is inside, it may be embedded in any part, and the number to be embedded can be arbitrarily selected. For example, not only the center part of the joining member 10 in the vertical direction but also the center part and the beam main bar 32 can be embedded. In this way, since the compressive force acting on the joining member 10 is increased, the effect of suppressing cracks CR1 and CR2 can be enhanced.

[第2実施形態]
(構成)
図3に示すように、第2実施形態に係る柱梁の接合部構造は、鉄筋コンクリート製の柱20と鉄筋コンクリート製の梁60とを接合する接合部材(仕口部材)70に適用される。
[Second Embodiment]
(Constitution)
As shown in FIG. 3, the column beam joint structure according to the second embodiment is applied to a joining member (joint member) 70 that joins a reinforced concrete column 20 and a reinforced concrete beam 60.

接合部材70、柱20及び梁60はそれぞれプレキャストコンクリートで形成され、柱20は接合部材70の下部に接合された下柱部材20Aと、接合部材70の上部に接合された上柱部材20Bとで形成され、梁60は接合部材70の両側に接合された梁部材60A、60Bで形成されている。   The joining member 70, the pillar 20 and the beam 60 are each formed of precast concrete, and the pillar 20 is composed of a lower pillar member 20A joined to the lower part of the joining member 70 and an upper pillar member 20B joined to the upper part of the joining member 70. The beam 60 is formed by beam members 60 </ b> A and 60 </ b> B bonded to both sides of the bonding member 70.

接合部材70は、下柱部材20A及び上柱部材20Bが接合される柱接合部70Aと、梁部材60A、60Bが接合される梁接合部70Bとを含んで構成されている。   The joining member 70 includes a column joining portion 70A to which the lower pillar member 20A and the upper pillar member 20B are joined, and a beam joining portion 70B to which the beam members 60A and 60B are joined.

接合部材70の上下方向(鉛直方向)の中央部には、プレストレスが与えられたPC鋼棒40が埋設されている。PC鋼棒40は接合部材10を左右方向(略水平方向)に貫通し、両端部が接合部材70の側面に形成されたコッター70Cから突出して、定着板42に固定されている。これにより、接合部材70に左右からプレストレスが与えられる。   A pre-stressed PC steel rod 40 is embedded in the central portion of the joining member 70 in the vertical direction (vertical direction). The PC steel bar 40 penetrates the joining member 10 in the left-right direction (substantially horizontal direction), and both ends protrude from a cotter 70 </ b> C formed on the side surface of the joining member 70 and are fixed to the fixing plate 42. Thereby, prestress is given to the joining member 70 from the left and right.

その他の構成は第1実施形態に係る柱梁の接合部構造と等しく、説明は省略する。なお、接合部材70、柱20及び梁60の隙間にはグラウト材が充填されており、接合部材70、柱20及び梁60が一体化した状態で、接合部材70の梁接合部70Bは梁60の端部を形成している。   The other configuration is the same as the column beam joint structure according to the first embodiment, and a description thereof will be omitted. The gap between the joining member 70, the column 20 and the beam 60 is filled with a grout material. With the joining member 70, the column 20 and the beam 60 integrated, the beam joining portion 70B of the joining member 70 is the beam 60. Is formed.

(効果)
第2実施形態に係る柱梁の接合部構造によると、梁60の端部(梁接合部70B)と一体化された接合部材70のコンクリートCが、PC鋼棒40によりプレストレスが与えられて圧縮されている。
(effect)
According to the column beam joint structure according to the second embodiment, the concrete C of the joint member 70 integrated with the end of the beam 60 (beam joint 70B) is prestressed by the PC steel rod 40. It is compressed.

このため、図3に示すように、例えば梁60に曲げモーメントMが作用して梁主筋32が引張力Nを受けた際、コンクリートCは梁主筋32との付着力により引張力を受けるが、ひび割れが発生しにくい。   Therefore, as shown in FIG. 3, for example, when the bending moment M acts on the beam 60 and the beam main bar 32 receives the tensile force N, the concrete C receives a tensile force due to the adhesive force with the beam main bar 32. Cracks are unlikely to occur.

例えば、柱接合部70Aの対角線Kに沿って柱接合部70Aの中央部に発生するひび割れCR1や、柱接合部70Aの角部に発生するひび割れCR2を抑制できる。また、梁60の端部(梁接合部70B)に発生するひび割れCR3を抑制できる。   For example, it is possible to suppress crack CR1 generated at the center of the column joint 70A along the diagonal line K of the column joint 70A and crack CR2 generated at the corner of the column joint 70A. Moreover, the crack CR3 which generate | occur | produces in the edge part (beam joining part 70B) of the beam 60 can be suppressed.

なお、本実施形態においては、プレストレスが与えられたPC鋼棒40は、接合部材70の上下方向の中央部に設けられているが、本発明の実施形態はこれに限らず、梁主筋32の内側であればどの部分に埋設してもよい。例えば接合部材70の上下方向の中央部だけではなく、該中央部と梁主筋32との間にも埋設できる。このようにすれば接合部材70に作用する圧縮力が大きくなるので、ひび割れCR1、CR2を抑制する効果を高めることができる。また、梁の曲げの中立軸よりも引張側に、プレストレスが与えられたPC鋼棒40を配置すれば、ひび割れCR3を抑制する効果がさらに高くなる。   In this embodiment, the prestressed PC steel bar 40 is provided at the center of the joining member 70 in the vertical direction. However, the embodiment of the present invention is not limited to this, and the beam main bar 32. It may be embedded in any part as long as it is inside. For example, not only the vertical central portion of the joining member 70 but also the central portion and the beam main bar 32 can be embedded. In this way, since the compressive force acting on the joining member 70 is increased, the effect of suppressing the cracks CR1 and CR2 can be enhanced. Moreover, if the PC steel bar 40 to which prestress is applied is arranged on the tension side of the neutral axis of the beam, the effect of suppressing the crack CR3 is further enhanced.

また、本実施形態においては、プレストレスが与えられたPC鋼棒40が接合部材70を左右方向(略水平方向)に貫通しているものとしたが、本発明の実施形態はこれに限らない。例えば図4に示すように、プレストレスが与えられたPC鋼棒44を、接合部材70を上下方向(略鉛直方向)に貫通させてもよい。このような構成によっても、例えば柱20に曲げモーメントMが作用して柱主筋22が引張力Nを受けた際、コンクリートCは柱主筋22との付着力により引張力を受けるが、接合部70Aの対角線Kに沿って接合部70Aの中央部に発生するひび割れCR1や、接合部70Aの角部に発生するひび割れCR2を抑制できる。さらに、接合部材70を左右方向(略水平方向)に貫通するPC鋼棒40と、上下方向(略鉛直方向)に貫通するPC鋼棒44とを、同時に用いてもよい。このようにすれば、ひび割れCR1やひび割れCR2を抑制する効果をさらに高めることができる。   In the present embodiment, the prestressed PC steel bar 40 penetrates the joining member 70 in the left-right direction (substantially horizontal direction). However, the embodiment of the present invention is not limited to this. . For example, as shown in FIG. 4, a pre-stressed PC steel rod 44 may be passed through the joining member 70 in the vertical direction (substantially vertical direction). Even with such a configuration, for example, when the bending moment M acts on the column 20 and the column main reinforcement 22 receives the tensile force N, the concrete C receives the tensile force due to the adhesive force with the column main reinforcement 22, but the joint 70A. The crack CR1 generated at the central portion of the joint portion 70A along the diagonal line K and the crack CR2 generated at the corner portion of the joint portion 70A can be suppressed. Furthermore, you may use simultaneously the PC steel bar 40 which penetrates the joining member 70 in the left-right direction (substantially horizontal direction), and the PC steel bar 44 which penetrates the up-down direction (substantially vertical direction). If it does in this way, the effect which controls crack CR1 and crack CR2 can further be heightened.

なお、このようにプレストレスが与えられたPC鋼棒44を接合部材70の上下方向(略鉛直方向)に貫通させる構成は、図1、図2に示した第1実施形態に係る柱梁の接合部材10に適用してもよい。このような構成によっても、接合部材10のひび割れを抑制することができる。   The configuration in which the pre-stressed PC steel bar 44 is penetrated in the vertical direction (substantially vertical direction) of the joining member 70 is the column beam according to the first embodiment shown in FIGS. You may apply to the joining member 10. FIG. Even with such a configuration, the cracking of the joining member 10 can be suppressed.

[第3実施形態]
(構成)
図5に示すように、第3実施形態に係る柱梁の接合部構造は、鉄筋コンクリート製の柱80と鉄筋コンクリート製の梁30とを接合する接合部(仕口部)80Aに適用される。
[Third Embodiment]
(Constitution)
As shown in FIG. 5, the column beam joint structure according to the third embodiment is applied to a joint (joint part) 80 </ b> A that joins a reinforced concrete column 80 and a reinforced concrete beam 30.

柱80及び梁30はそれぞれプレキャストコンクリートで形成され、柱80は梁30の梁部材30A、30Bが接合される接合部80Aと、接合部80Aの上下に一体的に形成された柱部80Bとで構成されている。   The column 80 and the beam 30 are each formed of precast concrete, and the column 80 includes a joint 80A to which the beam members 30A and 30B of the beam 30 are joined and a column 80B integrally formed above and below the joint 80A. It is configured.

接合部80Aの上下方向(鉛直方向)の中央部には、プレストレスが与えられたPC鋼棒40が埋設されている。PC鋼棒40は接合部材10を左右方向(略水平方向)に貫通し、両端部が接合部80Aの側面から突出して、定着板42に固定されている。これにより、接合部80Aに左右からプレストレスが与えられる。   A pre-stressed PC steel rod 40 is embedded in the central portion in the vertical direction (vertical direction) of the joint 80A. The PC steel rod 40 penetrates the joining member 10 in the left-right direction (substantially horizontal direction), and both end portions protrude from the side surface of the joining portion 80A and are fixed to the fixing plate 42. As a result, prestress is applied to the joint 80A from the left and right.

その他の構成は第1実施形態に係る柱梁の接合部構造と等しく、説明は省略する。   The other configuration is the same as the column beam joint structure according to the first embodiment, and a description thereof will be omitted.

(作用・効果)
第3実施形態に係る柱梁の接合部構造によると、接合部80AのコンクリートCが、PC鋼棒40によりプレストレスが与えられて圧縮されている。このため、図5に示すように、例えば梁30に曲げモーメントMが作用して梁主筋32が引張力Nを受けた際、コンクリートCは梁主筋32との付着力により引張力を受けるが、ひび割れが発生しにくい。例えば、接合部80Aの対角線Kに沿って接合部80Aの中央部に発生するひび割れCR1や、接合部材10の角部に発生するひび割れCR2を抑制できる。
(Action / Effect)
According to the column beam joint structure according to the third embodiment, the concrete C of the joint 80A is compressed by being prestressed by the PC steel rod 40. For this reason, as shown in FIG. 5, for example, when the bending moment M acts on the beam 30 and the beam main bar 32 receives the tensile force N, the concrete C receives a tensile force due to the adhesive force with the beam main bar 32. Cracks are unlikely to occur. For example, it is possible to suppress crack CR1 that occurs at the center of the joint 80A along the diagonal K of the joint 80A and crack CR2 that occurs at the corner of the joint member 10.

なお、本実施形態においては柱80がプレキャストコンクリートで形成されているが、本発明の実施形態はこれに限らない。例えば柱80を現場打ちコンクリートで形成し、この柱80にプレキャストコンクリート製の梁部材30A、30Bを接合してもよい。この場合、PC鋼棒40は、コンクリート製の柱80を左右方向に貫通する図示しないシース管に通され、その後緊張力が与えられてグラウト材でシース管内に固定される。   In addition, in this embodiment, although the pillar 80 is formed with precast concrete, embodiment of this invention is not restricted to this. For example, the pillar 80 may be formed of cast-in-place concrete, and beam members 30A and 30B made of precast concrete may be joined to the pillar 80. In this case, the PC steel rod 40 is passed through a sheath tube (not shown) penetrating the concrete column 80 in the left-right direction, and thereafter, tension is applied and fixed in the sheath tube with a grout material.

このように、第1、第2実施形態に係る下柱部材20A、上柱部材20B(図1等参照)、第1実施形態に係る梁部材30A、30B(図1等参照)、第2実施形態に係る梁部材60A、60B(図3等参照)等は適宜現場打ちコンクリートで形成することができる。   As described above, the lower pillar member 20A and the upper pillar member 20B (see FIG. 1 and the like) according to the first and second embodiments, the beam members 30A and 30B (see FIG. 1 and the like) according to the first embodiment, and the second implementation. The beam members 60A and 60B (see FIG. 3 and the like) according to the form can be appropriately formed with cast-in-place concrete.

また、本実施形態においては、プレストレスが与えられたPC鋼棒40は、接合部80Aの上下方向の中央部に設けられているが、本発明の実施形態はこれに限らず、梁主筋32の内側であればどの部分に埋設してもよい。例えば接合部80Aの上下方向の中央部だけではなく、該中央部と梁主筋32との間にも埋設できる。このようにすれば接合部80Aに作用する圧縮力が大きくなるので、ひび割れCR1、CR2を抑制する効果を高めることができる。   In the present embodiment, the PC steel bar 40 to which prestress is applied is provided at the center in the vertical direction of the joint 80A. However, the embodiment of the present invention is not limited to this, and the beam main bar 32 is provided. It may be embedded in any part as long as it is inside. For example, it can be embedded not only in the vertical center of the joint 80A but also between the central and the beam main bar 32. In this way, since the compressive force acting on the joint 80A is increased, the effect of suppressing the cracks CR1 and CR2 can be enhanced.

10 接合部材(接合部)
20、80 柱(鉄筋コンクリート製柱)
22 柱主筋
30、60 梁(鉄筋コンクリート製梁)
32 梁主筋
70A、80A 接合部
10 Joining member (joining part)
20, 80 columns (reinforced concrete columns)
22 Column main bars 30, 60 Beams (steel reinforced concrete beams)
32 Beam main bars 70A, 80A Joint

Claims (3)

コンクリート製柱の柱主筋とコンクリート製梁の梁主筋とが配筋された接合部と、
前記接合部の外側から前記接合部へプレストレスを与える鋼製部材と、
を有する柱梁の接合部構造。
A joint in which the column main reinforcement of the concrete column and the beam main reinforcement of the concrete beam are arranged;
A steel member that applies prestress to the joint from the outside of the joint; and
Column beam joint structure with
前記接合部は、前記コンクリート製柱及び前記コンクリート製梁が接合されるプレキャストコンクリート製の接合部材とされた、請求項1に記載の柱梁の接合部構造。   2. The column beam joint structure according to claim 1, wherein the joint is a precast concrete joint member to which the concrete pillar and the concrete beam are joined. 前記コンクリート製柱、前記コンクリート製梁はプレキャストコンクリート製とされた、請求項2に記載の柱梁の接合部構造。   The joint structure of column beams according to claim 2, wherein the concrete columns and the concrete beams are made of precast concrete.
JP2016117389A 2016-06-13 2016-06-13 Column-beam junction structure Pending JP2017222996A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016117389A JP2017222996A (en) 2016-06-13 2016-06-13 Column-beam junction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016117389A JP2017222996A (en) 2016-06-13 2016-06-13 Column-beam junction structure

Publications (1)

Publication Number Publication Date
JP2017222996A true JP2017222996A (en) 2017-12-21

Family

ID=60686776

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016117389A Pending JP2017222996A (en) 2016-06-13 2016-06-13 Column-beam junction structure

Country Status (1)

Country Link
JP (1) JP2017222996A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021021205A (en) * 2019-07-25 2021-02-18 株式会社竹中工務店 Column-beam joint structure
JP2021042644A (en) * 2019-09-13 2021-03-18 黒沢建設株式会社 Pre-stress introduction method of three axial compression column-beam connection
JP2021085150A (en) * 2019-11-25 2021-06-03 黒沢建設株式会社 Pc foundation structure and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265548A (en) * 1999-03-18 2000-09-26 Taisei Corp Structure of joining part of column and beam and construction method for frame
US6327825B1 (en) * 2000-04-24 2001-12-11 Charles Pankow Builders Ltd. Method and apparatus for use in positioning high-strength cables within a precast moment resisting frame
JP2004316322A (en) * 2003-04-18 2004-11-11 Takenaka Komuten Co Ltd Construction method of column-beam skeleton by precast concrete member

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265548A (en) * 1999-03-18 2000-09-26 Taisei Corp Structure of joining part of column and beam and construction method for frame
US6327825B1 (en) * 2000-04-24 2001-12-11 Charles Pankow Builders Ltd. Method and apparatus for use in positioning high-strength cables within a precast moment resisting frame
JP2004316322A (en) * 2003-04-18 2004-11-11 Takenaka Komuten Co Ltd Construction method of column-beam skeleton by precast concrete member

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021021205A (en) * 2019-07-25 2021-02-18 株式会社竹中工務店 Column-beam joint structure
JP7314467B2 (en) 2019-07-25 2023-07-26 株式会社竹中工務店 Column-beam connection structure
JP2021042644A (en) * 2019-09-13 2021-03-18 黒沢建設株式会社 Pre-stress introduction method of three axial compression column-beam connection
KR20210031809A (en) * 2019-09-13 2021-03-23 구로사와 겐세츠 가부시키가이샤 Method of introducing prestress to beam-column joint in triaxial compression
KR102571298B1 (en) 2019-09-13 2023-08-25 구로사와 겐세츠 가부시키가이샤 Method of introducing prestress to beam-column joint in triaxial compression
JP2021085150A (en) * 2019-11-25 2021-06-03 黒沢建設株式会社 Pc foundation structure and construction method thereof

Similar Documents

Publication Publication Date Title
JP6171070B1 (en) Method of joining concrete columns and steel beams
KR101136926B1 (en) Composite beam by prestressed concrete filled tube
JP5946041B2 (en) Column beam connection structure, column beam connection method, and precast concrete stigma member
JP6375195B2 (en) Widened PC slab structure and widening method of existing PC slab
JP2017222996A (en) Column-beam junction structure
JP2021071026A (en) Column-beam joint structure
JP5916364B2 (en) Method for improving shear strength of reinforced concrete beams
JP2008025221A (en) Elevated structure constructed by jointing pier stud of pc structure and steel box girder together
JP5602455B2 (en) Beam members and building structures
JP2017190629A (en) Joint structure of precast member
JP6660719B2 (en) Method of constructing beam-column joint-column joint structure, ramen viaduct and beam-column joint-column joint structure
KR20160015101A (en) Methods of increasing the sectional resisting force for negative moment acting at the end part of beam in case of repair or remodeling
JP6428027B2 (en) Column rebar connection panel and rebar structure
JP5658966B2 (en) Composite beam, composite beam joint structure, and composite beam joint method
KR100767145B1 (en) Construction method of prestressed concrete temporary bridge that can be assembled and dismantled using lateral steel wire
JP2010084503A (en) Structure and method for joining concrete column and steel-frame beam
JP2015025314A (en) Construction method for precast concrete skeleton
JP6918469B2 (en) Construction method of precast member, erection structure of precast member, erection structure of precast member
JP4447632B2 (en) Beam and beam-column joint structure and method of joining the same
JP2011064012A (en) Brace, aseismatic structure and building
JP2007077628A (en) Joint structure of joint and its construction method
JP6839921B2 (en) Column-beam joint structure
JP2009108500A (en) Precast beam construction method, precast beam, precast beam joint structure, and building
JP2007211450A (en) Structure for joining precast column and steel-frame beam together
JP2007211496A (en) Prestressed structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190325

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200303

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200416

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20201006