JP2017145637A - Opening and closing device - Google Patents

Opening and closing device Download PDF

Info

Publication number
JP2017145637A
JP2017145637A JP2016028907A JP2016028907A JP2017145637A JP 2017145637 A JP2017145637 A JP 2017145637A JP 2016028907 A JP2016028907 A JP 2016028907A JP 2016028907 A JP2016028907 A JP 2016028907A JP 2017145637 A JP2017145637 A JP 2017145637A
Authority
JP
Japan
Prior art keywords
cylindrical body
rod
pin
door
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2016028907A
Other languages
Japanese (ja)
Inventor
慧 疋田
Kei Hikida
慧 疋田
佐々木 清治
Seiji Sasaki
清治 佐々木
恒司 峰
Tsuneji Mine
恒司 峰
尚 芹田
Hisashi Serita
尚 芹田
弘樹 小椋
Hiroki Ogura
弘樹 小椋
明宏 石関
Akihiro Ishizeki
明宏 石関
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOOL DEPOT KK
Nippon Telegraph and Telephone East Corp
Original Assignee
TOOL DEPOT KK
Nippon Telegraph and Telephone East Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOOL DEPOT KK, Nippon Telegraph and Telephone East Corp filed Critical TOOL DEPOT KK
Priority to JP2016028907A priority Critical patent/JP2017145637A/en
Publication of JP2017145637A publication Critical patent/JP2017145637A/en
Pending legal-status Critical Current

Links

Landscapes

  • Operating, Guiding And Securing Of Roll- Type Closing Members (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an opening and closing device capable of facilitating opening and closing work of a door installed on the ceiling or the like.SOLUTION: An opening and closing device according to an embodiment includes an operation rod 2 extending toward the ceiling, and a turning mechanism 10 provided on a distal end in an extension direction of the operation rod 2. The turning mechanism 10 includes a rod coaxially provided on the distal end of the operation rod 2 and having a screw driver part 12 on a distal end in a side separated from the operation rod 2, a cylindrical body having an inside diameter larger than a pin 112 and into which the rod is slidably inserted, and a first spring 14 provided between the cylindrical body and the operation rod 2 and energizing the cylindrical body to the operation rod 2 from a base end on the operation rod 2 side toward the distal end.SELECTED DRAWING: Figure 3

Description

本発明は、天井に設置された点検口等の扉の開け閉めに用いる開閉装置に関する。   The present invention relates to an opening / closing device used for opening and closing a door such as an inspection port installed on a ceiling.

店舗等の高い天井に設置されている点検口等は、扉により塞がれている。扉は、係止機構により天井と係止されている。従来、作業者は、点検口等の開閉が必要な場合には、梯子または作業台車等を用いて天井へ接近して作業を行っていた(例えば、特許文献1を参照)。   An inspection port or the like installed on a high ceiling of a store or the like is blocked by a door. The door is locked to the ceiling by a locking mechanism. Conventionally, when an operator needs to open and close an inspection port or the like, the worker has been working by approaching the ceiling using a ladder or a work cart (see, for example, Patent Document 1).

特開平8−232460号公報JP-A-8-232460

しかしながら、梯子の上での作業は、作業者の落下の危険を伴う。また、点検口が複数ある場合には、何度も梯子の登り降りを繰り返す必要があり、作業負担が大きい。   However, the work on the ladder involves the danger of the operator falling. In addition, when there are a plurality of inspection ports, it is necessary to repeat climbing up and down the ladder many times, and the work load is large.

そこで、本発明は、天井に設置されている扉の開閉作業を容易にできる開閉装置を提供することを目的とする。   Then, an object of this invention is to provide the opening / closing apparatus which can make the opening / closing operation | work of the door installed in the ceiling easy.

一実施形態に係る開閉装置は、天井に配置される扉の表面から床方向に突出したピン、およびピンの回動により扉を解放可能にする第1位置と扉を天井に係止する第2位置との間で移動する係止板を有する係止機構のピンを回動して係止板を第1位置と第2位置へ選択的に移動させる開閉装置であって、天井へ向かって延びる操作棒と、操作棒の延出方向の先端に設けられる回動機構と、を備え、回動機構は、操作棒の先端に同軸に設けられ、操作棒と離間する側の先端にねじ回し部を有する棒と、ピンよりも大きな内径を有し、棒をスライド可能に挿通した円筒体と、円筒体および操作棒の間に設けられ、操作棒に対して円筒体を棒の操作棒側の基端から先端へ向かう方向へ付勢する第1バネと、を有する。   The opening / closing apparatus according to an embodiment includes a pin protruding in a floor direction from a surface of a door disposed on the ceiling, a first position enabling the door to be released by rotation of the pin, and a second position for locking the door to the ceiling. An opening / closing device that rotates a pin of a locking mechanism having a locking plate that moves between positions to selectively move the locking plate to a first position and a second position, and extends toward the ceiling An operation rod, and a rotation mechanism provided at the distal end of the operation rod in the extending direction. The rotation mechanism is provided coaxially at the distal end of the operation rod, and is screwed at the distal end on the side away from the operation rod. A rod having an inner diameter larger than that of the pin and slidably inserted through the rod, and provided between the cylinder and the operation rod. A first spring that biases in a direction from the proximal end toward the distal end.

本発明によれば、高所に設置されている扉の開閉作業を容易にできる開閉装置を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the opening / closing apparatus which can open / close the door installed in the high place easily can be provided.

図1は、実施形態に係る開閉装置の斜視図である。FIG. 1 is a perspective view of the switchgear according to the embodiment. 図2は、図1とは別の角度から開閉装置をみた斜視図である。FIG. 2 is a perspective view of the opening / closing device viewed from an angle different from that of FIG. 図3は、図1の開閉装置の要部を切断した状態を示す断面概略図である。FIG. 3 is a schematic cross-sectional view showing a state in which a main part of the switchgear of FIG. 1 is cut. 図4は、図3の開閉装置を操作した状態を示す断面概略図である。FIG. 4 is a schematic cross-sectional view showing a state where the opening / closing device of FIG. 3 is operated. 図5は、一般的な点検口の扉の構造を示す説明図である。FIG. 5 is an explanatory view showing the structure of a general inspection door.

始めに、開閉装置1について説明する前に、図5を用いて一般的な点検口の扉100について説明する。   First, before describing the opening / closing device 1, a general inspection door 100 will be described with reference to FIG.

ビルのオフィスや商業施設の天井200の裏には、多種多様な配線が設けられている。これらの配線は、例えば、天井200と屋根との間、いわゆる天井裏に収容されている。   A wide variety of wirings are provided behind the ceiling 200 of a building office or commercial facility. These wirings are accommodated, for example, in the so-called ceiling behind between the ceiling 200 and the roof.

配線の交換、または、点検等が必要な場合には、作業者は、点検口から必要な配線にアクセスし、作業をする。一般的にオフィスビル等においては、通常、点検口は、扉100により閉じられている(図5参照)。   When the wiring needs to be replaced or inspected, the worker accesses the necessary wiring from the inspection port and works. In general, in an office building or the like, the inspection port is normally closed by a door 100 (see FIG. 5).

扉100は、例えば、天井200の約50センチ四方の点検口の内側に嵌め込まれ、点検口を塞いでいる。一般的に、扉100は、点検口の1辺に設けたヒンジ300を介して、天井200と連結されている。そして、扉100は、図5に示すように、ヒンジ300が設けられている辺と反対側の端辺に点検口を開閉する扉100の係止機構110を備えている。   For example, the door 100 is fitted inside an inspection port approximately 50 cm square on the ceiling 200 to block the inspection port. In general, the door 100 is connected to the ceiling 200 via a hinge 300 provided on one side of the inspection port. And the door 100 is provided with the latching mechanism 110 of the door 100 which opens and closes an inspection port in the edge side on the opposite side to the edge | side in which the hinge 300 is provided, as shown in FIG.

係止機構110は、扉100を扉表面101から図示しない裏面まで厚み方向に貫通したピン112と、扉100の裏面側に突出したピン112の後端に固定される係止板114とを有している。ピン112の扉表面101側の先端には、溝116が設けられる。溝116は、例えば、マイナスドライバーを用いて、ピン112を回動させるために設けられる。係止板114は、図5に示すように、例えば、長方形の板である。係止板114の一端側は、ピン112の後端に固定される。   The locking mechanism 110 has a pin 112 that penetrates the door 100 in the thickness direction from the door surface 101 to the back surface (not shown), and a locking plate 114 that is fixed to the rear end of the pin 112 protruding to the back surface side of the door 100. doing. A groove 116 is provided at the tip of the pin 112 on the door surface 101 side. The groove 116 is provided to rotate the pin 112 using, for example, a flathead screwdriver. As shown in FIG. 5, the locking plate 114 is, for example, a rectangular plate. One end side of the locking plate 114 is fixed to the rear end of the pin 112.

続いて、係止機構110の動作について図5を用いて説明する。
扉100に係止機構110が無い場合には、扉100は、その自重によりヒンジ300を回動中心として重力方向に回動する。これにより、扉100は、天井面201に対して鉛直に垂れ下がる。係止機構110は、扉100を天井200と平行な状態に維持するためのものである。
Next, the operation of the locking mechanism 110 will be described with reference to FIG.
When the door 100 does not have the locking mechanism 110, the door 100 rotates in the gravity direction with the hinge 300 as a rotation center by its own weight. As a result, the door 100 hangs vertically with respect to the ceiling surface 201. The locking mechanism 110 is for maintaining the door 100 in a state parallel to the ceiling 200.

係止機構110の係止板114は、ピン112の回動動作と連動して、図5において点線で示す第1位置114aと一点鎖線で示す第2位置114bに選択的に移動可能である。係止板114は、ピン112を中心として360度回転可能にすることもできる。   The locking plate 114 of the locking mechanism 110 can be selectively moved to a first position 114a indicated by a dotted line in FIG. 5 and a second position 114b indicated by a one-dot chain line in FIG. The locking plate 114 can be rotated 360 degrees around the pin 112.

すなわち、第1位置114aとは、係止板114の回動先端部が扉100と重なる位置にある場合のことである。言い換えれば、係止板114が第1位置114aにある場合、扉100は、天井200に対して係止されていない。このため、扉100は、上述のように重力により垂れ下がり、点検口が開く。   That is, the first position 114 a is a case where the rotation tip of the locking plate 114 is in a position where it overlaps the door 100. In other words, when the locking plate 114 is in the first position 114a, the door 100 is not locked to the ceiling 200. For this reason, the door 100 hangs down by gravity as described above, and the inspection port is opened.

一方、第2位置114bとは、係止板114の回動先端が天井200側にせり出した位置にある状態のことである。すなわち、扉100を天井200と平行になる位置で支持した状態で、係止板114が第2位置114bにある場合、扉100は、天井200の縁202によって係止され、天井200と平行な状態で保持される。この状態で、点検口は扉100によって塞がれる。   On the other hand, the second position 114b is a state in which the rotation tip of the locking plate 114 is in a position protruding to the ceiling 200 side. That is, when the locking plate 114 is in the second position 114b in a state where the door 100 is supported at a position parallel to the ceiling 200, the door 100 is locked by the edge 202 of the ceiling 200 and parallel to the ceiling 200. Held in a state. In this state, the inspection port is closed by the door 100.

図1は、実施形態に係る開閉装置1を示す斜視図である。図2は、図1とは別の角度からみた開閉装置1の斜視図である。図3は、開閉装置1の要部を回転軸Cに沿って切断した状態を示す断面概略図である。図4は、図3の開閉装置1を操作した状態を示す断面概略図である。なお、図3および図4は、回動機構10の動作を説明する説明図であるため、支持機構30については、図示を省略している。   FIG. 1 is a perspective view showing an opening / closing device 1 according to the embodiment. FIG. 2 is a perspective view of the opening / closing device 1 seen from an angle different from that of FIG. FIG. 3 is a schematic cross-sectional view showing a state in which the main part of the opening / closing device 1 is cut along the rotation axis C. FIG. 4 is a schematic cross-sectional view showing a state where the opening / closing device 1 of FIG. 3 is operated. 3 and 4 are explanatory diagrams for explaining the operation of the rotation mechanism 10, and therefore the illustration of the support mechanism 30 is omitted.

開閉装置1は、図1に示すように、操作棒2の先端に固定されている。
操作棒2は、例えば、複数の円筒部材を伸縮自在に連結した棒状部材である。
このような構成を有する操作棒2は、床から扉100が設けられた天井200までの高さに合わせて、伸縮量を調整することができる。操作棒2の材料としては、軽量であって、ある程度の強度を有していることが好ましい。操作棒2の材料としては、例えば、樹脂材料やFRP等を採用することができる。
As shown in FIG. 1, the opening / closing device 1 is fixed to the tip of the operation rod 2.
The operation rod 2 is, for example, a rod-like member in which a plurality of cylindrical members are connected to be stretchable.
The operation rod 2 having such a configuration can adjust the amount of expansion / contraction according to the height from the floor to the ceiling 200 where the door 100 is provided. The material of the operating rod 2 is preferably lightweight and has a certain degree of strength. As a material for the operation rod 2, for example, a resin material, FRP, or the like can be employed.

続いて、操作棒2の先端に固定される開閉装置1について説明する。
開閉装置1は、図1に示すように、大きく2つの部材から構成される。1つは、ピン112を回すための回動機構10である。もう1つは、扉100を支持するための支持機構30である。
Next, the opening / closing device 1 fixed to the tip of the operation rod 2 will be described.
As shown in FIG. 1, the opening / closing device 1 is mainly composed of two members. One is a rotation mechanism 10 for rotating the pin 112. The other is a support mechanism 30 for supporting the door 100.

回動機構10は、図1および図3に示すように、細長い棒11と、この棒11の先端部に設けられたねじ回し部12と、この棒11の基端部に設けられた第1軸体13aと、を有する。また、回動機構10は、第1軸体13aの周囲を囲むように配置された第1バネ14と、棒11の回転軸Cと同軸に設けられ、第1バネ14の先端と当接し、棒11に沿って往復動可能に設けられた第1円筒体15とを有する。
さらに、回動機構10は、第1円筒体15の外径よりも大きな内径を備える第2円筒体16を備える。第2円筒体16は、第1円筒体15の外側の所定の位置に支持される。
As shown in FIGS. 1 and 3, the rotating mechanism 10 includes an elongated rod 11, a screwdriver 12 provided at the distal end of the rod 11, and a first end provided at the proximal end of the rod 11. And a shaft body 13a. The rotating mechanism 10 is provided coaxially with the first spring 14 disposed so as to surround the first shaft body 13a and the rotation axis C of the rod 11, and contacts the tip of the first spring 14. And a first cylindrical body 15 provided so as to be capable of reciprocating along the rod 11.
Further, the rotation mechanism 10 includes a second cylindrical body 16 having an inner diameter larger than the outer diameter of the first cylindrical body 15. The second cylindrical body 16 is supported at a predetermined position outside the first cylindrical body 15.

棒11は、例えば、細長い金属性の剛体である。そして、棒11の先端に設けられるねじ回し部12は、上述したピン112の溝116に嵌合する形状を有している。本実施形態においては、ねじ回し部12は、マイナスドライバーの先端と同じ形状をしている。なお、扉100に設けられたピン112を回動可能であれば、ねじ回し部12の形状は、マイナスドライバーの先端部の形状に限らない。   The rod 11 is, for example, an elongated metal rigid body. And the screwdriver 12 provided in the front-end | tip of the stick | rod 11 has a shape fitted to the groove | channel 116 of the pin 112 mentioned above. In the present embodiment, the screw driver 12 has the same shape as the tip of the minus driver. As long as the pin 112 provided on the door 100 can be rotated, the shape of the screwdriver 12 is not limited to the shape of the tip of the minus driver.

第1軸体13aの操作棒2と反対側の先端には、棒11の基端が固定される。一方、第1軸体13aの基端部には、第2軸体13bが同軸に固定される。図1に示すように、第1軸体13aは、例えば、第2軸体13bよりも細い円柱状の棒状部材である。第1軸体13aと第2軸体13bとの間には段部130を有している。   The proximal end of the rod 11 is fixed to the distal end of the first shaft body 13a opposite to the operation rod 2. On the other hand, the second shaft body 13b is coaxially fixed to the proximal end portion of the first shaft body 13a. As shown in FIG. 1, the 1st shaft body 13a is a column-shaped rod-shaped member thinner than the 2nd shaft body 13b, for example. A step portion 130 is provided between the first shaft body 13a and the second shaft body 13b.

第1バネ14は、圧縮ばねである。第1バネ14は、第1軸体13aの外周に巻き付けられるように配置される。第1バネ14の図示下端は、図3に示すように、段部130と当接する。すなわち、第1バネ14は、第1円筒体15と第2軸体13bとの間に設けられ、第1円筒体15を第1軸体13aの基端から先端へ向かう方向へ付勢する。   The first spring 14 is a compression spring. The first spring 14 is disposed so as to be wound around the outer periphery of the first shaft body 13a. As shown in FIG. 3, the lower end of the first spring 14 is in contact with the stepped portion 130. That is, the first spring 14 is provided between the first cylindrical body 15 and the second shaft body 13b, and biases the first cylindrical body 15 in the direction from the base end to the tip end of the first shaft body 13a.

第1円筒体15は、第1軸体13aの外径よりも大きな内径を有する。第1円筒体15は、図3に示すように、第1軸体13aと同軸に配置され、第1軸体13aの周りを囲むように配置される。また、第1円筒体15の基端(図示下端)は、第1バネ14の先端(図示上端)と当接する。   The first cylindrical body 15 has an inner diameter larger than the outer diameter of the first shaft body 13a. As shown in FIG. 3, the first cylindrical body 15 is disposed coaxially with the first shaft body 13a and is disposed so as to surround the first shaft body 13a. Further, the base end (the lower end in the figure) of the first cylindrical body 15 abuts on the tip end (the upper end in the figure) of the first spring 14.

第2円筒体16は、第1円筒体15の外径よりも大きな内径を有し、第1円筒体15の第1バネ14と当接する側と反対側の先端面15c(図示上端面)を囲むように第1円筒体15に固定される。図2および図3に示すように、第2円筒体16は、第2円筒体16の外周面16aから内周面16bまで貫通するねじ孔を有する。固定ねじ17は、外周面16a側から第1円筒体15の外周面15aに向かってねじ込まれ、その先端が第1円筒体15の外周面15aと当接し、第2円筒体16を第1円筒体15の軸方向の任意の位置に固定する。   The second cylindrical body 16 has an inner diameter larger than the outer diameter of the first cylindrical body 15, and has a tip surface 15 c (upper end surface in the drawing) opposite to the side of the first cylindrical body 15 in contact with the first spring 14. It is fixed to the first cylindrical body 15 so as to surround it. As shown in FIGS. 2 and 3, the second cylindrical body 16 has a screw hole penetrating from the outer peripheral surface 16 a to the inner peripheral surface 16 b of the second cylindrical body 16. The fixing screw 17 is screwed from the outer peripheral surface 16a side toward the outer peripheral surface 15a of the first cylindrical body 15, and the tip thereof abuts on the outer peripheral surface 15a of the first cylindrical body 15, and the second cylindrical body 16 is brought into contact with the first cylinder. The body 15 is fixed at an arbitrary position in the axial direction.

第2円筒体16の第1円筒体15に対する軸方向の固定位置は、ピン112の扉表面101からの突出量に応じて調整可能である。言い換えれば、第1円筒体15の先端面15cが第2円筒体16の先端面16cよりもピン112の突出量だけ窪む位置で第2円筒体16が第1円筒体15に固定される。   The fixed position in the axial direction of the second cylindrical body 16 with respect to the first cylindrical body 15 can be adjusted according to the protruding amount of the pin 112 from the door surface 101. In other words, the second cylindrical body 16 is fixed to the first cylindrical body 15 at a position where the distal end surface 15 c of the first cylindrical body 15 is recessed from the distal end surface 16 c of the second cylindrical body 16 by the protruding amount of the pin 112.

すなわち、第2円筒体16は、ピン112を第2円筒体16の内側に納めることができ、且つ、第1円筒体15に挿通配置されたねじ回し部12とピン112の溝116を嵌合するためのガイドとして機能することができれば、その内径は限定されない。   That is, the second cylindrical body 16 can fit the pin 112 inside the second cylindrical body 16, and fits the screw thread portion 12 inserted through the first cylindrical body 15 and the groove 116 of the pin 112. The inner diameter is not limited as long as it can function as a guide for this purpose.

第2円筒体16の先端面16cに軸方向の力が操作棒2の方向に加わると、図4に示すように、第2円筒体16と固定された第1円筒体15を支持する第1バネ14がこの力に負けて圧縮される。言い換えれば、第2円筒体16の先端面16cが天井200の扉100に押し付けられると、図4に示すように、ねじ回し部12が第1円筒体15の先端面15cよりも突出する。ねじ回し部12の移動量は、第1バネ14の圧縮量によって変わる。一方、上述の軸方向の力が無くなると(第2円筒体16の先端面16cを扉100から離すと)、第1バネ14の復元力により第1円筒体15、および、第2円筒体16は、図3に示す位置に戻る。   When an axial force is applied to the distal end surface 16c of the second cylindrical body 16 in the direction of the operation rod 2, the first cylindrical body 15 fixed to the second cylindrical body 16 is supported as shown in FIG. The spring 14 is compressed against this force. In other words, when the distal end surface 16 c of the second cylindrical body 16 is pressed against the door 100 of the ceiling 200, the screw driver 12 protrudes from the distal end surface 15 c of the first cylindrical body 15 as shown in FIG. 4. The amount of movement of the screwdriver 12 varies depending on the amount of compression of the first spring 14. On the other hand, when the axial force described above disappears (when the distal end surface 16c of the second cylindrical body 16 is separated from the door 100), the first cylindrical body 15 and the second cylindrical body 16 are restored by the restoring force of the first spring 14. Returns to the position shown in FIG.

続いて、支持機構30について図1および図2を用いて説明する。
支持機構30は、図1に示すように、第2軸体13bの外周に巻きつくように配置される第2バネ31と、第2バネ31の棒11側に設けた第1支持部32と、第1支持部32の棒11側に設けた、第2支持部33を備える。
Next, the support mechanism 30 will be described with reference to FIGS. 1 and 2.
As shown in FIG. 1, the support mechanism 30 includes a second spring 31 disposed so as to wrap around the outer periphery of the second shaft body 13 b, and a first support portion 32 provided on the rod 11 side of the second spring 31. The 2nd support part 33 provided in the stick | rod 11 side of the 1st support part 32 is provided.

第2バネ31は、図1に示すように、第1支持部32の図示下端と操作棒2の先端の間において、第1支持部32を支持する。第2バネ31は、操作棒2に対して第1支持部32を操作棒2側の基端から第1支持部32の先端へ向かう方向へ付勢する。本実施形態において、第2バネ31は、圧縮ばねである。   As shown in FIG. 1, the second spring 31 supports the first support portion 32 between the illustrated lower end of the first support portion 32 and the tip of the operation rod 2. The second spring 31 biases the first support portion 32 against the operation rod 2 in a direction from the proximal end on the operation rod 2 side toward the distal end of the first support portion 32. In the present embodiment, the second spring 31 is a compression spring.

第1支持部32は、例えば、2つの外径の異なる円筒体を2つ組み合わせた部材である。第1支持部32は、第2軸体13bの外側に同軸に配置され、第2バネ31の図示上端と当接する位置に配置される。本実施形態においては、第1部分32aの操作棒2側の基端と第2バネ31の一端が当接する。   The 1st support part 32 is a member which combined two cylindrical bodies with two different outer diameters, for example. The first support portion 32 is coaxially disposed outside the second shaft body 13 b and is disposed at a position where it abuts on the upper end of the second spring 31 in the figure. In the present embodiment, the proximal end of the first portion 32a on the operation rod 2 side and one end of the second spring 31 abut.

第2支持部33は、第2円筒体16よりも大きな外径を有するかご型の部材である。   The second support portion 33 is a cage member having an outer diameter larger than that of the second cylindrical body 16.

第2支持部33は、第2部分32bの先端面32cの外径よりも大きな外径を有する第1リング33aと、第1リング33aよりも大きな外径を有する第2リング33bと、第2リング33bよりもさらに大きな外径を有する第3リング33cと、固定部材34と、を有する。   The second support portion 33 includes a first ring 33a having an outer diameter larger than the outer diameter of the distal end surface 32c of the second portion 32b, a second ring 33b having an outer diameter larger than the first ring 33a, and a second A third ring 33c having an outer diameter larger than that of the ring 33b and a fixing member 34 are included.

第1リング33aは、第2軸体13bと同軸に設けられる。第1リング33aは、第2部分32bとほぼ同一平面上に配置される。第2リング33bは、第2軸体13bと同軸に設けられる。第2リング33bは、第1リング33aの図示上方に第1リング33aとほぼ平行になるように所定の間隔を空けて配置される。第3リング33cは、第2軸体13bと同軸に設けられる。第3リング33cは、第1リング33aおよび第2リング33bとほぼ平行になるように所定の間隔を空けて配置される。   The first ring 33a is provided coaxially with the second shaft body 13b. The first ring 33a is disposed substantially on the same plane as the second portion 32b. The second ring 33b is provided coaxially with the second shaft body 13b. The second ring 33b is disposed above the first ring 33a with a predetermined interval so as to be substantially parallel to the first ring 33a. The third ring 33c is provided coaxially with the second shaft body 13b. The third ring 33c is disposed at a predetermined interval so as to be substantially parallel to the first ring 33a and the second ring 33b.

固定部材34は、第1支持部32から断面U字状に立ち上がるように固定される。固定部材34は、上述の第1リング33a、第2リング33b、および第3リング33cを所定の間隔を空けて固定するために設けられる。すなわち、第2支持部33は、全体として、半球状のかご型に形成される。さらに、本実施形態に係る第2支持部33は、第3リング33cの一部に2つの段部33dを有している。   The fixing member 34 is fixed so as to rise from the first support portion 32 in a U-shaped cross section. The fixing member 34 is provided to fix the first ring 33a, the second ring 33b, and the third ring 33c described above at a predetermined interval. That is, the second support portion 33 is formed in a hemispherical cage shape as a whole. Furthermore, the 2nd support part 33 which concerns on this embodiment has two step parts 33d in a part of 3rd ring 33c.

第1リング33a、第2リング33b、および第3リング33cの相互の軸方向の配置間隔は、本実施形態に限らず、第2支持部33の構造上の強度または、操作性等を考慮して適宜設計することができる。   The arrangement intervals of the first ring 33a, the second ring 33b, and the third ring 33c in the axial direction are not limited to the present embodiment, and the structural strength or operability of the second support portion 33 is taken into consideration. Can be designed as appropriate.

上記の構成を備える支持機構30は、回転軸Cに沿って第3リング33cを扉100に押し付ける方向の力が係ると、第2支持部33と固定された第1支持部32を支持する第2バネ31がこの力に負けて圧縮される。また、第3リング33cを扉100から離間させると、第2バネ31の付勢力により第1支持部32、および、第2支持部33は、図1に示す位置に戻る。   The support mechanism 30 having the above configuration supports the first support portion 32 that is fixed to the second support portion 33 when a force in the direction of pressing the third ring 33c against the door 100 along the rotation axis C is applied. The two springs 31 are compressed against this force. Further, when the third ring 33 c is separated from the door 100, the first support portion 32 and the second support portion 33 are returned to the positions shown in FIG. 1 by the urging force of the second spring 31.

次に、本実施形態に係る開閉装置1を用いた扉100の開閉操作について説明する。   Next, the opening / closing operation | movement of the door 100 using the opening / closing apparatus 1 which concerns on this embodiment is demonstrated.

初めに、作業者は、操作棒2の先端に開閉装置1を取り付ける。作業者は、先端に開閉装置1が取り付けられた操作棒2を、天井200の扉100へ向けて伸ばす。   First, the operator attaches the opening / closing device 1 to the tip of the operation rod 2. The operator extends the operation rod 2 having the opening / closing device 1 attached to the tip thereof toward the door 100 of the ceiling 200.

作業者は、開閉装置1の第2支持部33の第3リング33cの内側に扉100のピン112が入るように操作棒2を操作する。作業者は、ピン112が第2円筒体16の内周側に収まるように、さらに操作棒2の位置を調整し、第2円筒体16の内周側にピン112を収容する。作業者は、さらに、ピン112の中心軸と第2円筒体16の軸とが重なるように開閉装置1の位置を微調整する。ここで、ピン112は、第2円筒体16の内周側に収容されている。このため、ピン112は、扉100と先端面16cとの間にピン112の突出量を超える隙間ができない限り、第2円筒体16の内周側の範囲から外れることがない。すなわち、作業者は、第2円筒体16の内径の範囲において、ピン112の位置をねじ回し部12の位置に合わせて調整すればよい。   The operator operates the operation rod 2 so that the pin 112 of the door 100 enters inside the third ring 33 c of the second support portion 33 of the opening / closing device 1. The operator further adjusts the position of the operation rod 2 so that the pin 112 fits on the inner peripheral side of the second cylindrical body 16, and accommodates the pin 112 on the inner peripheral side of the second cylindrical body 16. The operator further finely adjusts the position of the opening / closing device 1 so that the central axis of the pin 112 and the axis of the second cylindrical body 16 overlap. Here, the pin 112 is accommodated on the inner peripheral side of the second cylindrical body 16. For this reason, the pin 112 does not deviate from the inner peripheral side range of the second cylindrical body 16 as long as there is no gap exceeding the protruding amount of the pin 112 between the door 100 and the tip surface 16c. That is, the operator may adjust the position of the pin 112 in accordance with the position of the screw driver 12 within the range of the inner diameter of the second cylindrical body 16.

作業者は、ピン112の位置をねじ回し部12に伝わる振動で感じたら、ピン112の端面にねじ回し部12を当接させた状態で、操作棒2を回動する。操作棒2が回動すると、ねじ回し部12も一緒に回動する。操作棒2を所定の角度回動させた時点において、ねじ回し部12とピン112のねじ回し用の溝116が係合する。   When the operator feels the position of the pin 112 by the vibration transmitted to the screwing portion 12, the operator rotates the operating rod 2 with the screwing portion 12 in contact with the end face of the pin 112. When the operating rod 2 rotates, the screw driver 12 also rotates together. When the operating rod 2 is rotated by a predetermined angle, the screw driver 12 and the screw driving groove 116 of the pin 112 are engaged.

作業者は、ねじ回し部12の先端がピン112の溝116に係合したことを操作棒2を伝導する振動等で感じたら、更に大きく一方向に操作棒2を回動させる。これにより、ピン112が回動され、図5に矢印bで示すように、係止板114が第2位置114bから第1位置114aへ回動する。   When the operator feels that the tip of the screwdriver 12 is engaged with the groove 116 of the pin 112 by vibrations conducted through the operation rod 2, the operator rotates the operation rod 2 in one direction further. As a result, the pin 112 is rotated, and the locking plate 114 is rotated from the second position 114b to the first position 114a as indicated by an arrow b in FIG.

作業者は、係止板114が第1位置114aへ移動したことを、操作棒2へ伝わる振動等で感じたら、天井方向への押圧をやめて、扉100を支える。
作業者は、ゆっくりと開閉装置1を床へ向かって下げる。扉100は、第2支持部33の第3リング33c上に支持されながら、ゆっくりと下方へ移動し、点検口が開らかれる。
When the operator feels that the locking plate 114 has moved to the first position 114 a by vibrations transmitted to the operation rod 2, the worker stops pressing the ceiling and supports the door 100.
The operator slowly lowers the opening / closing device 1 toward the floor. The door 100 moves slowly downward while being supported on the third ring 33c of the second support portion 33, and the inspection port is opened.

また、本実施形態においては、第2支持部33の第3リング33cに段部33dが設けられている。このため、この段部33dを用いて、扉100の係止機構110が設けられた側の一辺を支えることにより、滑ることなく扉100を開くことが可能である。本実施形態においては、段部33dは、第3リング33cの2ヶ所に設けられている。段部33dの第3リング33c上の位置については特に定められていない。   In the present embodiment, a step portion 33 d is provided on the third ring 33 c of the second support portion 33. For this reason, it is possible to open the door 100 without slipping by using this step portion 33d to support one side of the door 100 where the locking mechanism 110 is provided. In this embodiment, the step part 33d is provided in two places of the 3rd ring 33c. The position of the step portion 33d on the third ring 33c is not particularly defined.

次に、扉100を閉じるときの操作について説明する。なお、扉100を開けるときの操作と同じ操作については、その詳細な説明を省略する。   Next, an operation for closing the door 100 will be described. The detailed description of the same operation as that for opening the door 100 is omitted.

作業者は、開閉装置1が取り付けられた操作棒2とは別の図示しない操作棒2の先端に天井の素材を傷つけないスポンジ部材等を取り付けた第2操作棒を準備する。
作業者は、第2操作棒を操作して、点検口を塞ぐように、扉100を動かす。作業者は、扉100が天井200と平行になった状態で、第2操作棒の伸縮量を調整し、床と扉100との間で第2操作棒を突っ張り、扉100を仮固定する。
作業者は、開閉装置1が取り付けられている操作棒2を伸ばし、第1位置114aから第2位置114bへピン112を回動する。なお、開閉装置1によるピン112の回動動作についての詳細な説明については、上記の扉100を開くときの動作と同じであるため省略する。
The operator prepares a second operating rod in which a sponge member or the like that does not damage the ceiling material is attached to the tip of an operating rod 2 (not shown) different from the operating rod 2 to which the opening / closing device 1 is attached.
The operator operates the second operation rod and moves the door 100 so as to close the inspection port. In a state where the door 100 is parallel to the ceiling 200, the operator adjusts the amount of expansion / contraction of the second operation rod, stretches the second operation rod between the floor and the door 100, and temporarily fixes the door 100.
The operator extends the operation rod 2 to which the opening / closing device 1 is attached and rotates the pin 112 from the first position 114a to the second position 114b. In addition, since it is the same as the operation | movement at the time of opening said door 100 about detailed description about the rotation operation | movement of the pin 112 by the opening / closing apparatus 1, it abbreviate | omits.

作業者は、係止板114が第2位置114bへ回動したことを、操作棒2へ伝わる振動等で感じたら、開閉装置1を扉100から離す。続いて、床と扉100との間で突っ張っている第2操作棒を取り外して、扉100の閉め操作を終了する。   When the operator feels that the locking plate 114 has rotated to the second position 114 b by vibration transmitted to the operation rod 2, the operator separates the opening / closing device 1 from the door 100. Subsequently, the second operation rod that is stretched between the floor and the door 100 is removed, and the closing operation of the door 100 is finished.

このような構成を有する開閉装置1は、高所に設置されている扉100のピン112を地上から容易に回すことができる。すなわち、ピン112よりもわずかに大きな内径を有する第2円筒体16を有していることにより、作業者とピン112との物理的な距離が離れている場合であっても、小さなピン112に、第2円筒体16を被せることができる。そして、第2円筒体16の内周に囲まれたピン112は、ねじ回し部12と容易に位置合わせをすることができる。   The switchgear 1 having such a configuration can easily turn the pin 112 of the door 100 installed at a high place from the ground. That is, by having the second cylindrical body 16 having an inner diameter slightly larger than that of the pin 112, even if the physical distance between the worker and the pin 112 is long, the small pin 112 The second cylindrical body 16 can be covered. The pin 112 surrounded by the inner periphery of the second cylindrical body 16 can be easily aligned with the screw driver 12.

開閉装置1は、支持機構30を有している。このため、扉100を開くときにおいて、係止板114を第1位置114aに回動したときに、扉100の重さが第2円筒体16に集中的に係ることを防ぐことができる。   The opening / closing device 1 has a support mechanism 30. For this reason, when the door 100 is opened, the weight of the door 100 can be prevented from being concentrated on the second cylindrical body 16 when the locking plate 114 is rotated to the first position 114a.

また、支持機構30の第2支持部33の第3リング33cは、段部33dを備えている。このため、扉100の縁は、第2支持部33と係合しやすい。このため、作業者は、扉100の重さを感じたら、段部33dに扉100の縁を誘導した後、ゆっくりと扉100を開くことができる。   Further, the third ring 33 c of the second support portion 33 of the support mechanism 30 includes a step portion 33 d. For this reason, the edge of the door 100 is easily engaged with the second support portion 33. For this reason, when the operator feels the weight of the door 100, the operator can slowly open the door 100 after guiding the edge of the door 100 to the step 33d.

また、開閉装置1は、ねじ回し部12が第2円筒体16の先端面16cから突出していない。このため天井200に向けて操作棒2を操作したときに、誤って、天井200のボードをねじ回し部12で傷付けることを防ぐことができる。   Further, in the opening / closing device 1, the screwdriver 12 does not protrude from the tip surface 16 c of the second cylindrical body 16. For this reason, when operating the operating rod 2 toward the ceiling 200, it is possible to prevent the board of the ceiling 200 from being damaged by the screwdriver 12 by mistake.

また、支持機構30は、回動機構10に対して回動可能に支持されている。このため、支持機構30は、回動機構10がピン112を回すために回動されたときにも、回動機構10と連動することなく、扉100を支持することができる。   The support mechanism 30 is supported so as to be rotatable with respect to the rotation mechanism 10. For this reason, the support mechanism 30 can support the door 100 without interlocking with the rotation mechanism 10 even when the rotation mechanism 10 is rotated to rotate the pin 112.

なお、本発明はこの実施形態に限定されるものではない。
例えば、支持機構30の第2支持部33は、円環形状に限られず、扉100の支持機能を備えていれば他の形状とすることもできる。
Note that the present invention is not limited to this embodiment.
For example, the second support portion 33 of the support mechanism 30 is not limited to an annular shape, and may have other shapes as long as it has a support function for the door 100.

また、本実施形態においては、第2円筒体16をピン112の位置決め用の部材としているが位置決め用の部材はこれに限られない。例えば、第1円筒体15の内径をピン112の直径に合わせて適宜設計することもできる。すなわち、第1円筒体15の内径をピン112が入る径とすることにより、第2円筒体16の内周側に収容したピン112をさらに第1円筒体15の内周側に収容することにより、ピン112の移動範囲を規制して、より確実にねじ回し部12と嵌合しやすくすることも可能である。   In the present embodiment, the second cylindrical body 16 is used as a member for positioning the pin 112, but the member for positioning is not limited to this. For example, the inner diameter of the first cylindrical body 15 can be appropriately designed according to the diameter of the pin 112. That is, by setting the inner diameter of the first cylindrical body 15 to the diameter into which the pin 112 enters, the pin 112 accommodated on the inner peripheral side of the second cylindrical body 16 is further accommodated on the inner peripheral side of the first cylindrical body 15. It is also possible to regulate the movement range of the pin 112 to make it easier to fit the screwdriver 12 more reliably.

本実施形態においては、第1円筒体15または第2円筒体16は、金属により形成されているが、第1円筒体15または第2円筒体16の材料はこれに限らず、例えば、樹脂材料、ゴム材料等を採用することも可能である。   In the present embodiment, the first cylindrical body 15 or the second cylindrical body 16 is made of metal, but the material of the first cylindrical body 15 or the second cylindrical body 16 is not limited to this, for example, a resin material It is also possible to employ a rubber material or the like.

また、第1バネ14および第2バネ31として、圧縮ばねを用いているが、これに限らず、例えば、他の弾性体に置き換えることも可能である。
また、本実施形態においては、棒11、第1軸体13a、および、第2軸体13bを別部材として記載しているが、全て一体に構成することも可能である。
Moreover, although the compression spring is used as the 1st spring 14 and the 2nd spring 31, it is not restricted to this, For example, it can replace with another elastic body.
Further, in the present embodiment, the rod 11, the first shaft body 13a, and the second shaft body 13b are described as separate members, but they can all be integrally formed.

また、本実施形態においては、点検口に取り付けられる扉の開閉をするための開閉装置に本発明を適用した場合について説明したが、これに限らず、床からの作業が困難な天井等に取り付けられている部材を回動させる装置全般に本発明を用いることができる。
この他、本発明の要旨を逸脱しない範囲で種々変形実施が可能であるのはもちろんである。
Moreover, in this embodiment, although the case where this invention was applied to the opening / closing apparatus for opening and closing the door attached to an inspection port was demonstrated, it is not restricted to this but is attached to the ceiling etc. where the work from a floor is difficult The present invention can be applied to all devices for rotating a member that is mounted.
Of course, various modifications can be made without departing from the scope of the present invention.

1…開閉装置、2…操作棒、10…回動機構、11…棒、12…ねじ回し部、13a…第1軸体、13b…第2軸体、14…第1バネ、15…第1円筒体、15a…外周面、15c…先端面、16…第2円筒体、16a…外周面、16b…内周面、16c…先端面、17…固定ねじ、30…支持機構、31…第2バネ、32…第1支持部、32a…第1部分、32b…第2部分、32c…先端面、33…第2支持部、33a…第1リング、33b…第2リング、33c…第3リング、33d…段部、100…扉、101…扉表面、110…係止機構、112…ピン、114…係止板、114a…第1位置、114b…第2位置、116…溝、200…天井、201…天井面、202…縁。 DESCRIPTION OF SYMBOLS 1 ... Opening / closing device, 2 ... Operation rod, 10 ... Turning mechanism, 11 ... Rod, 12 ... Screwdriver, 13a ... First shaft body, 13b ... Second shaft body, 14 ... First spring, 15 ... First Cylindrical body, 15a ... outer peripheral surface, 15c ... tip surface, 16 ... second cylindrical body, 16a ... outer peripheral surface, 16b ... inner peripheral surface, 16c ... tip surface, 17 ... fixing screw, 30 ... support mechanism, 31 ... second Spring 32, first support portion 32 a, first portion 32 b, second portion 32 c, tip surface 33, second support portion 33 a, first ring 33 b, second ring 33 c, third ring 33d ... Stepped portion, 100 ... Door, 101 ... Door surface, 110 ... Locking mechanism, 112 ... Pin, 114 ... Locking plate, 114a ... First position, 114b ... Second position, 116 ... Groove, 200 ... Ceiling 201 ... ceiling surface, 202 ... edge.

Claims (6)

天井に配置される扉の表面から床方向に突出したピン、および前記ピンの回動により前記扉を解放可能にする第1位置と前記扉を前記天井に係止する第2位置との間で移動する係止板を有する係止機構の前記ピンを回動して前記係止板を前記第1位置と前記第2位置へ選択的に移動させる開閉装置であって、
前記天井へ向かって延びる操作棒と、
前記操作棒の延出方向の先端に設けられる回動機構と、を備え、
前記回動機構は、
前記操作棒の前記先端に同軸に設けられ、前記操作棒と離間する側の先端にねじ回し部を有する棒と、
前記ピンよりも大きな内径を有し、前記棒をスライド可能に挿通した円筒体と、
前記円筒体および前記操作棒の間に設けられ、前記操作棒に対して前記円筒体を前記棒の前記操作棒側の基端から前記先端へ向かう方向へ付勢する第1バネと、
を有する開閉装置。
A pin protruding in the floor direction from the surface of the door disposed on the ceiling, and a first position where the door can be released by rotation of the pin and a second position where the door is locked to the ceiling An opening / closing device that rotates the pin of a locking mechanism having a moving locking plate to selectively move the locking plate to the first position and the second position,
An operating rod extending toward the ceiling;
A rotation mechanism provided at the tip in the extending direction of the operation rod,
The rotation mechanism is
A rod provided coaxially at the tip of the operating rod, and having a screwdriver at the tip of the side away from the operating rod;
A cylindrical body having an inner diameter larger than that of the pin and slidably inserted through the rod;
A first spring that is provided between the cylindrical body and the operating rod and biases the cylindrical body from the proximal end of the rod toward the distal end of the rod with respect to the operating rod;
Opening and closing device.
前記円筒体は、前記ピンの周囲を囲む段部が設けられていることを特徴とする請求項1に記載の開閉装置。   The switchgear according to claim 1, wherein the cylindrical body is provided with a step portion surrounding the periphery of the pin. 前記円筒体は、前記棒をスライド可能に挿通する第1円筒体と、
前記第1円筒体の外周に設けられ、前記ピンの直径よりも大きな内径を備え、前記第1円筒体の前記第1バネと当接する側と反対側の端面を周方向に囲む位置で前記第1円筒体に固定される第2円筒体と、
を備えることを特徴とする請求項1に記載の開閉装置。
The cylindrical body includes a first cylindrical body slidably inserted through the rod,
The first cylindrical body is provided on the outer periphery, has an inner diameter larger than the diameter of the pin, and surrounds the end surface of the first cylindrical body opposite to the side in contact with the first spring in the circumferential direction. A second cylinder fixed to one cylinder;
The switchgear according to claim 1, further comprising:
前記第2円筒体には、前記第2円筒体の外周面と内周面を貫通し、前記第1円筒体の外周面と当接する固定ねじを備えていることを特徴とする請求項3に記載の開閉装置。   The said 2nd cylindrical body is provided with the fixing screw which penetrates the outer peripheral surface and inner peripheral surface of the said 2nd cylindrical body, and contact | abuts with the outer peripheral surface of the said 1st cylindrical body. The switchgear described. 前記棒に回動自在に支持され、前記第2円筒体の周囲を囲む支持部と、前記棒に沿って設けられ、前記支持部を往復動可能に支持する第2バネと、を備えることを特徴とする請求項4に記載の開閉装置。   A support portion rotatably supported by the rod and surrounding the periphery of the second cylindrical body; and a second spring provided along the rod and reciprocally supporting the support portion. The switchgear according to claim 4, wherein 前記支持部は、その一部に段部を備えていることを特徴とする請求項5に記載の開閉装置。   The switchgear according to claim 5, wherein the support part includes a stepped part.
JP2016028907A 2016-02-18 2016-02-18 Opening and closing device Pending JP2017145637A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016028907A JP2017145637A (en) 2016-02-18 2016-02-18 Opening and closing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016028907A JP2017145637A (en) 2016-02-18 2016-02-18 Opening and closing device

Publications (1)

Publication Number Publication Date
JP2017145637A true JP2017145637A (en) 2017-08-24

Family

ID=59682104

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016028907A Pending JP2017145637A (en) 2016-02-18 2016-02-18 Opening and closing device

Country Status (1)

Country Link
JP (1) JP2017145637A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6407397B1 (en) * 2017-12-13 2018-10-17 東日本電信電話株式会社 Inspection opening / closing tool
JP6464250B1 (en) * 2017-12-11 2019-02-06 東日本電信電話株式会社 Inspection opening / closing tool

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6464250B1 (en) * 2017-12-11 2019-02-06 東日本電信電話株式会社 Inspection opening / closing tool
JP6407397B1 (en) * 2017-12-13 2018-10-17 東日本電信電話株式会社 Inspection opening / closing tool
JP2019105088A (en) * 2017-12-13 2019-06-27 東日本電信電話株式会社 Inspection port opening/closing device

Similar Documents

Publication Publication Date Title
US8418290B2 (en) Motorized bed preventing a person from being jammed
US20120240690A1 (en) Binding force testing device
ATE459302T1 (en) SCREW AND ROD FIXING ASSEMBLY AND DEVICE
JP2017145637A (en) Opening and closing device
AU2015222919A1 (en) Apparatus and method of attachment of a payload
WO2011083615A1 (en) Support device and leg device
EP3278745A3 (en) Adapter assemblies for surgical devices
JP2019002566A (en) Joint
US9410658B2 (en) Projector adjustment mechanism
JP6820000B2 (en) Wafer expansion device
MX2018001220A (en) Combination device for lockout and partial stroke test of valve actuators.
RU2014132836A (en) ACTIVE DEVICE FOR FIXING USEFUL LOADS PREVIOUSLY TO THE HOUSING IN THE SPACE SHIP ORBIT
CN110044382B (en) Remote locking mechanism and connector
US11351406B2 (en) Anchoring stick
KR100936081B1 (en) Apparatus for fixing cable
US9829148B2 (en) Rotatable platter for a monitor having a passage for wiring and a stopper
US8813326B2 (en) Compression apparatus and methods for use thereof
KR20160064635A (en) Apparatus for adjusting height of machine tool control panel apparatus
ES2547284A1 (en) Device for sealing boxes, useful for mounting the device and procedure for assembly (Machine-translation by Google Translate, not legally binding)
PE20190847A1 (en) APPARATUS TO SUPPORT AN EXPLOSIVE DEVICE
US20150306758A1 (en) Power tool and accessory device thereof
JP6464250B1 (en) Inspection opening / closing tool
JP6407397B1 (en) Inspection opening / closing tool
JP6359291B2 (en) Hinge device
FR3060038B1 (en) INVIOLABLE OPERATING DEVICE FOR WATER DISTRIBUTION EQUIPMENT AND WATER DISTRIBUTION EQUIPMENT PROVIDED WITH SUCH A DEVICE