JP2017139919A - Power management device and power management program - Google Patents

Power management device and power management program Download PDF

Info

Publication number
JP2017139919A
JP2017139919A JP2016020579A JP2016020579A JP2017139919A JP 2017139919 A JP2017139919 A JP 2017139919A JP 2016020579 A JP2016020579 A JP 2016020579A JP 2016020579 A JP2016020579 A JP 2016020579A JP 2017139919 A JP2017139919 A JP 2017139919A
Authority
JP
Japan
Prior art keywords
target
power
power consumption
information
power management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016020579A
Other languages
Japanese (ja)
Other versions
JP6597354B2 (en
Inventor
東 秀訓
Hidekuni Azuma
秀訓 東
マハディ ベヘラネゲラド
Behrangrad Mahdi
マハディ ベヘラネゲラド
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Electric Industries Ltd
Original Assignee
Sumitomo Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Electric Industries Ltd filed Critical Sumitomo Electric Industries Ltd
Priority to JP2016020579A priority Critical patent/JP6597354B2/en
Publication of JP2017139919A publication Critical patent/JP2017139919A/en
Application granted granted Critical
Publication of JP6597354B2 publication Critical patent/JP6597354B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a power management device and power management program, capable of making power consumption in a power demand facility be suppressed more securely.SOLUTION: A power management device comprises: an acquisition unit for acquiring first target information showing a target of power consumption in a power demand facility and first measurement information showing a result of measurement of the power consumption in the power demand facility; and a determination unit for determining achievement of the target on the basis of the first target information and the first measurement information. The acquisition unit, when it is determined by the determination unit that the target is not achieved, acquires second target information showing a target of power consumption for each of a plurality of areas in the power demand facility and acquires second measurement information showing a result of measurement of the power consumption in each of the plurality of areas. The power management device also comprises a display control unit that on the basis of the second target information and the second measurement information, performs control of displaying a content enabling determination on target achievement of power consumption in units of the areas.SELECTED DRAWING: Figure 4

Description

本発明は、電力管理装置および電力管理プログラムに関し、特に、電力需要施設における電力消費を抑制する電力管理装置および電力管理プログラムに関する。   The present invention relates to a power management apparatus and a power management program, and more particularly to a power management apparatus and a power management program that suppress power consumption in a power demand facility.

従来、電力需給が逼迫している場合等に一般家庭およびオフィス等の電力需要施設における電力消費が抑制されるように、電力需要施設における電力消費を管理するシステムが開発されている。   2. Description of the Related Art Conventionally, a system for managing power consumption in a power demand facility has been developed so that power consumption in a power demand facility such as a general home and an office is suppressed when the power supply and demand is tight.

たとえば、特許文献1(特開2012−205358号公報)には、以下のような技術が開示されている。すなわち、電力管理システムは、予め登録された複数の参加者を含むコミュニティに関する参加者リストを保持する保持部と、電力削減制御の実行の要否を判定する判定部と、電力削減制御の実行が必要であると判定部が判定した場合に、参加者リストに含まれている複数の参加者の中から、電力削減制御の対象となる一以上の対象者を選定する選定部と、選定部によって選定された対象者に関して、電力削減制御を実行する制御部と、電力削減制御が実行された対象者に対して、削減電力に基づく特典を付与する付与部とを備える。   For example, Patent Document 1 (Japanese Patent Laid-Open No. 2012-205358) discloses the following technique. That is, the power management system includes a holding unit that holds a participant list related to a community including a plurality of registered participants, a determination unit that determines whether or not to execute power reduction control, and execution of power reduction control. When the determination unit determines that it is necessary, a selection unit that selects one or more target persons to be subjected to power reduction control from a plurality of participants included in the participant list, and a selection unit With respect to the selected target person, the control part which performs power reduction control, and the provision part which provides the privilege based on reduced power with respect to the target person by which power reduction control was performed are provided.

また、節電を目的として、ビル等の電力需要施設へのBEMS(Building Energy Management System)の導入が行われている。   Also, for the purpose of power saving, BEMS (Building Energy Management System) has been introduced into power demand facilities such as buildings.

BEMSとは、電力需要施設における消費電力量を監視し、電力需要施設における機器または設備等の運転状態を管理することによって、電力需要施設における電力消費の抑制を図るためのシステムである。   BEMS is a system for monitoring power consumption in a power demand facility and managing the operation state of equipment or equipment in the power demand facility to suppress power consumption in the power demand facility.

BEMSは、たとえばアグリゲータと呼ばれる事業者によって導入される。アグリゲータは、BEMSを導入した電力需要施設に対してエネルギー管理支援サービスを提供する。   BEMS is introduced by an operator called an aggregator, for example. The aggregator provides an energy management support service to a power demand facility in which BEMS is introduced.

特開2012−205358号公報JP 2012-205358 A 特開2013−161144号公報JP 2013-161144 A

電力会社および系統運用会社等の系統側事業者は、多くの電力需要施設にBEMSが導入されることにより、全体的な電力需要を広範囲に調整することが容易となる。   Grid-side operators such as power companies and grid management companies can easily adjust the overall power demand in a wide range by introducing BEMS in many power demand facilities.

たとえば、系統側事業者は、電力需給の逼迫が予測される場合に、アグリゲータに対して予め節電要請を行なう。そして、アグリゲータは、電力需要施設における電力管理装置に対して節電要請を行なう。   For example, the grid-side business operator makes a power-saving request to the aggregator in advance when tightness of power supply and demand is predicted. Then, the aggregator makes a power saving request to the power management apparatus in the power demand facility.

しかしながら、アグリゲータが節電要請を行っても、節電要請の対象期間において当該節電要請に従った電力消費の抑制が需要家の電力需要施設において行われない場合がある。このような場合、十分な節電が行われなくなり、電力需給が逼迫してしまうことがある。   However, even if the aggregator makes a power saving request, there is a case where power consumption is not suppressed in the power demand facility of the consumer in the target period of the power saving request. In such a case, sufficient power saving may not be performed, and power supply and demand may be tight.

この発明は、上述の課題を解決するためになされたもので、その目的は、電力需要施設における電力消費の抑制をより確実に行わせることが可能な電力管理装置および電力管理プログラムを提供することである。   The present invention has been made to solve the above-described problems, and an object thereof is to provide a power management apparatus and a power management program capable of more reliably suppressing power consumption in a power demand facility. It is.

(1)上記課題を解決するために、この発明のある局面に係わる電力管理装置は、電力管理装置であって、電力需要施設における消費電力の目標を示す第1目標情報、および前記電力需要施設における消費電力の計測結果を示す第1計測情報を取得する取得部と、前記取得部によって取得された前記第1目標情報および前記第1計測情報に基づいて、前記目標の達成を判断する判断部とを備え、前記取得部は、前記目標が達成されていないと前記判断部によって判断された場合、前記電力需要施設の複数のエリアにおける各々の消費電力の目標を示す第2目標情報を取得し、かつ前記複数のエリアの各々の消費電力の計測結果を示す第2計測情報を取得し、前記電力管理装置は、さらに、前記取得部によって取得された前記第2目標情報および前記第2計測情報に基づいて、前記エリア単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う表示制御部を備える。   (1) In order to solve the above-described problem, a power management apparatus according to an aspect of the present invention is a power management apparatus, and includes first target information indicating a target of power consumption in a power demand facility, and the power demand facility. An acquisition unit that acquires first measurement information indicating a measurement result of power consumption in the system, and a determination unit that determines the achievement of the target based on the first target information and the first measurement information acquired by the acquisition unit When the determination unit determines that the target is not achieved, the acquisition unit acquires second target information indicating each power consumption target in the plurality of areas of the power demand facility. And the 2nd measurement information which shows the measurement result of the power consumption of each of these areas is acquired, and the power management device further contains the 2nd target information and the 2nd target information which were acquired by the acquisition part. On the basis of the second measurement information, and a display control unit that performs control to display the possible content judgment on the achievement of the goals of power consumption in the area units.

(8)上記課題を解決するために、この発明のある局面に係わる電力管理プログラムは、電力管理装置において用いられる電力管理プログラムであって、コンピュータを、電力需要施設における消費電力の目標を示す第1目標情報、および前記電力需要施設における消費電力の計測結果を示す第1計測情報を取得する取得部と、前記取得部によって取得された前記第1目標情報および前記第1計測情報に基づいて、前記目標の達成を判断する判断部と、として機能させるためのプログラムであり、前記取得部は、前記目標が達成されていないと前記判断部によって判断された場合、前記電力需要施設の複数のエリアにおける各々の消費電力の目標を示す第2目標情報を取得し、かつ前記複数のエリアの各々の消費電力の計測結果を示す第2計測情報を取得し、さらに、コンピュータを、前記取得部によって取得された前記第2目標情報および前記第2計測情報に基づいて、前記エリア単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う表示制御部、として機能させるためのプログラムである。   (8) In order to solve the above-described problem, a power management program according to an aspect of the present invention is a power management program used in a power management device, and is a computer that indicates a target of power consumption in a power demand facility. Based on the first target information and the first measurement information indicating the measurement result of the power consumption in the power demand facility, the first target information and the first measurement information acquired by the acquisition unit, A program for functioning as a determination unit that determines achievement of the target, and when the determination unit determines that the target is not achieved, the acquisition unit is configured to include a plurality of areas of the power demand facility. 2nd meter which acquires the 2nd target information which shows each power consumption target in, and shows the measurement result of each power consumption of said a plurality of areas Information that allows the computer to make a determination regarding achievement of the power consumption target in the area unit based on the second target information and the second measurement information acquired by the acquisition unit; It is a program for functioning as a display control unit that performs display control.

本発明は、このような特徴的な処理部を備える電力管理装置として実現することができるだけでなく、電力管理装置を備える電力管理システムとして実現したり、かかる特徴的な処理をステップとする方法として実現したり、電力管理装置の一部または全部を実現する半導体集積回路として実現したりすることができる。   The present invention can be realized not only as a power management apparatus including such a characteristic processing unit, but also as a power management system including the power management apparatus, or as a method using such characteristic processing as a step. Or a semiconductor integrated circuit that realizes part or all of the power management apparatus.

本発明によれば、電力需要施設における電力消費の抑制をより確実に行わせることができる。   According to the present invention, it is possible to more reliably suppress power consumption in a power demand facility.

図1は、本発明の実施の形態に係る電力管理システムの構成を示す図である。FIG. 1 is a diagram showing a configuration of a power management system according to an embodiment of the present invention. 図2は、本発明の実施の形態に係る電力管理システムにおける電力需要施設の一例を示す図である。FIG. 2 is a diagram illustrating an example of a power demand facility in the power management system according to the embodiment of the present invention. 図3は、本発明の実施の形態に係る電力需要施設におけるフロアエリアの一例を示す図である。FIG. 3 is a diagram showing an example of a floor area in the power demand facility according to the embodiment of the present invention. 図4は、本発明の実施の形態に係る電力管理システムにおける電力管理装置の構成を示す図である。FIG. 4 is a diagram showing the configuration of the power management apparatus in the power management system according to the embodiment of the present invention. 図5は、本発明の実施の形態に係る電力管理システムにおいて、表示装置に表示された画面の一例を示す図である。FIG. 5 is a diagram showing an example of a screen displayed on the display device in the power management system according to the embodiment of the present invention. 図6は、本発明の実施の形態に係る電力管理システムにおいて、表示装置に表示された画面の他の例を示す図である。FIG. 6 is a diagram showing another example of a screen displayed on the display device in the power management system according to the embodiment of the present invention. 図7は、本発明の実施の形態に係る電力管理装置が指示情報の処理を行う際の動作手順を定めたフローチャートである。FIG. 7 is a flowchart defining an operation procedure when the power management apparatus according to the embodiment of the present invention processes instruction information.

最初に、本発明の実施形態の内容を列記して説明する。   First, the contents of the embodiment of the present invention will be listed and described.

(1)本発明の実施の形態に係る電力管理装置は、電力管理装置であって、電力需要施設における消費電力の目標を示す第1目標情報、および前記電力需要施設における消費電力の計測結果を示す第1計測情報を取得する取得部と、前記取得部によって取得された前記第1目標情報および前記第1計測情報に基づいて、前記目標の達成を判断する判断部とを備え、前記取得部は、前記目標が達成されていないと前記判断部によって判断された場合、前記電力需要施設の複数のエリアにおける各々の消費電力の目標を示す第2目標情報を取得し、かつ前記複数のエリアの各々の消費電力の計測結果を示す第2計測情報を取得し、前記電力管理装置は、さらに、前記取得部によって取得された前記第2目標情報および前記第2計測情報に基づいて、前記エリア単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う表示制御部を備える。   (1) A power management apparatus according to an embodiment of the present invention is a power management apparatus, and includes first target information indicating a target of power consumption in a power demand facility, and a measurement result of power consumption in the power demand facility. An acquisition unit that acquires first measurement information to be shown; and a determination unit that determines the achievement of the target based on the first target information and the first measurement information acquired by the acquisition unit, the acquisition unit If the determination unit determines that the target is not achieved, obtains second target information indicating each power consumption target in the plurality of areas of the power demand facility, and The second measurement information indicating the measurement result of each power consumption is acquired, and the power management apparatus is further based on the second target information and the second measurement information acquired by the acquisition unit. Comprising a display control unit that performs control to display the possible content judgment on the achievement of the goals of power consumption in the area units.

このように、電力需要施設における消費電力の目標が達成されていない場合において、エリア単位での消費電力の目標の達成に関する内容を表示することにより、各エリアにおけるユーザは、自己が位置するエリアにおける消費電力の目標の達成状況等を認識することができる。これにより、たとえば、あるエリアにおける消費電力の目標が未達成である場合、ユーザが当該目標を達成するための行動を起こす可能性を高めることができる。したがって、電力需要施設における電力消費の抑制をより確実に行わせることができる。   In this way, when the power consumption target in the power demand facility is not achieved, by displaying the contents related to the achievement of the power consumption target in the area unit, the user in each area It is possible to recognize the achievement status of the power consumption target. Thereby, for example, when the target of power consumption in a certain area is not achieved, it is possible to increase the possibility that the user will take action to achieve the target. Therefore, it is possible to more reliably suppress power consumption in the power demand facility.

(2)好ましくは、前記取得部は、消費電力の目標が未達成の前記エリアが存在する場合、前記エリアにおける1または複数の機器の消費電力の目標を示す第3目標情報を取得し、かつ前記機器の消費電力の計測結果を示す第3計測情報を取得し、前記表示制御部は、前記取得部によって取得された前記第3目標情報および前記第3計測情報に基づいて、前記機器単位または前記機器を含むグループ単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う。   (2) Preferably, when there is the area where the power consumption target has not been achieved, the acquisition unit acquires third target information indicating a power consumption target of one or more devices in the area, and 3rd measurement information which shows the measurement result of the power consumption of the apparatus is acquired, and the display control part is based on the 3rd target information and the 3rd measurement information which were acquired by the acquisition part. Control is performed to display contents that can be determined regarding achievement of the power consumption target for each group including the device.

このような構成により、ユーザは、消費電力の目標が未達成のエリアにおける機器に対して機器単位またはグループ単位での行動等を起こすことができるので、当該エリアにおける消費電力の目標を達成する可能性を高めることができる。   With this configuration, the user can take actions in units of devices or groups for devices in areas where the target of power consumption has not been achieved, so it is possible to achieve the target of power consumption in that area. Can increase the sex.

(3)好ましくは、前記取得部は、消費電力の目標が未達成の前記エリアが存在する場合、前記エリアにおける1または複数の機器の消費電力の目標を示す第3目標情報を取得し、かつ前記機器の消費電力の計測結果を示す第3計測情報を取得し、前記電力管理装置は、さらに、前記取得部によって取得された前記第3目標情報および前記第3計測情報に基づいて、前記第3目標情報の示す目標が未達成の前記機器、または前記機器を含むグループにおける前記機器の動作を、前記目標が達成できるように変更する機器制御を行う機器制御部を備える。   (3) Preferably, when there is the area where the power consumption target has not been achieved, the acquisition unit acquires third target information indicating a power consumption target of one or more devices in the area, and Third measurement information indicating a measurement result of the power consumption of the device is acquired, and the power management apparatus further includes the third measurement information based on the third target information and the third measurement information acquired by the acquisition unit. (3) A device control unit that performs device control to change the operation of the device in a group that includes the device or the device that has not achieved the target indicated by the target information so that the target can be achieved.

このように、消費電力の目標が未達成のエリアにおける機器に対して機器単位またはグループ単位で機器制御が行われる構成により、当該エリアにおける消費電力の目標を自動的かつ確実に達成することができる。   As described above, with the configuration in which device control is performed on a device or group basis for devices in an area where the power consumption target has not yet been achieved, the power consumption target in the area can be achieved automatically and reliably. .

(4)好ましくは、前記内容は、消費電力の目標を達成するためのアドバイスを含む。   (4) Preferably, the said content includes the advice for achieving the target of power consumption.

このような構成により、ユーザは、消費電力の目標が未達成のエリアにおいて、当該目標を達成するための行動の具体的な内容を上記アドバイスから認識することができるので、当該エリアにおける消費電力の目標を達成する可能性をより高めることができる。   With such a configuration, in an area where the power consumption target has not been achieved, the user can recognize the specific content of the action for achieving the target from the above advice. You can increase your chances of achieving your goals.

(5)好ましくは、前記第1目標情報は、DR(Demand Response)における目標を示し、前記電力管理装置は、さらに、前記第1目標情報に基づいて前記第2目標情報を作成する目標作成部を備える。   (5) Preferably, the first target information indicates a target in DR (Demand Response), and the power management apparatus further generates the second target information based on the first target information. Is provided.

このような構成により、たとえば、DRにおける目標が達成されるように第2目標情報を作成することができるので、DRにおける目標が達成される可能性を高めることができる。   With such a configuration, for example, the second target information can be created such that the target in DR is achieved, so that the possibility that the target in DR will be achieved can be increased.

(6)好ましくは、前記取得部は、さらに、前記電力需要施設に対応する気象情報を取得し、前記表示制御部は、前記取得部によって取得された前記気象情報にさらに基づいて、消費電力の目標を達成するためのアドバイスを表示する制御を行う。   (6) Preferably, the acquisition unit further acquires weather information corresponding to the power demand facility, and the display control unit further calculates power consumption based on the weather information acquired by the acquisition unit. Control to display advice to achieve the goal.

このような構成により、節電可能な消費電力が気象状況に応じて変化する場合においても、適切なアドバイスを表示することができるので、当該エリアにおける消費電力の目標を達成する可能性をより高めることができる。   With such a configuration, even when the power consumption that can be saved changes according to weather conditions, it is possible to display appropriate advice, so that the possibility of achieving the power consumption target in the area is further increased. Can do.

(7)より好ましくは、前記取得部は、さらに、前記電力需要施設に対応する気象情報を取得し、前記機器制御部は、前記取得部によって取得された前記気象情報にさらに基づいて前記機器制御を行う。   (7) More preferably, the acquisition unit further acquires weather information corresponding to the power demand facility, and the device control unit further controls the device based on the weather information acquired by the acquisition unit. I do.

このような構成により、節電可能な消費電力が気象状況に応じて変化する場合においても適切な機器制御を行うことができるので、当該エリアにおける消費電力の目標を自動的かつより確実に達成することができる。   With such a configuration, even when the power consumption that can be saved changes according to weather conditions, it is possible to perform appropriate device control, so that the target of power consumption in the area can be achieved automatically and more reliably. Can do.

(8)本発明の実施の形態に係る電力管理プログラムは、電力管理装置において用いられる電力管理プログラムであって、コンピュータを、電力需要施設における消費電力の目標を示す第1目標情報、および前記電力需要施設における消費電力の計測結果を示す第1計測情報を取得する取得部と、前記取得部によって取得された前記第1目標情報および前記第1計測情報に基づいて、前記目標の達成を判断する判断部と、として機能させるためのプログラムであり、前記取得部は、前記目標が達成されていないと前記判断部によって判断された場合、前記電力需要施設の複数のエリアにおける各々の消費電力の目標を示す第2目標情報を取得し、かつ前記複数のエリアの各々の消費電力の計測結果を示す第2計測情報を取得し、さらに、コンピュータを、前記取得部によって取得された前記第2目標情報および前記第2計測情報に基づいて、前記エリア単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う表示制御部、として機能させるためのプログラムである。   (8) A power management program according to an embodiment of the present invention is a power management program used in a power management apparatus, and includes a computer, first target information indicating a target of power consumption in a power demand facility, and the power Based on the acquisition part which acquires the 1st measurement information which shows the measurement result of the power consumption in a demand facility, and the 1st target information and the 1st measurement information which were acquired by the acquisition part, the achievement of the target is judged. And a program for causing the determination unit to function as a target of each power consumption in a plurality of areas of the power demand facility when the determination unit determines that the target is not achieved. And second measurement information indicating the measurement result of the power consumption of each of the plurality of areas. Display control for controlling the content of the computer so that it is possible to determine whether the power consumption target has been achieved in units of areas based on the second target information and the second measurement information acquired by the acquisition unit This is a program for functioning as a part.

このように、電力需要施設における消費電力の目標が達成されていない場合において、エリア単位での消費電力の目標の達成に関する内容を表示することにより、各エリアにおけるユーザは、自己が位置するエリアにおける消費電力の目標の達成状況等を認識することができる。これにより、たとえば、あるエリアにおける消費電力の目標が未達成である場合、ユーザが当該目標を達成するための行動を起こす可能性を高めることができる。したがって、電力需要施設における電力消費の抑制をより確実に行わせることができる。   In this way, when the power consumption target in the power demand facility is not achieved, by displaying the contents related to the achievement of the power consumption target in the area unit, the user in each area It is possible to recognize the achievement status of the power consumption target. Thereby, for example, when the target of power consumption in a certain area is not achieved, it is possible to increase the possibility that the user will take action to achieve the target. Therefore, it is possible to more reliably suppress power consumption in the power demand facility.

以下、本発明の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。また、以下に記載する実施の形態の少なくとも一部を任意に組み合わせてもよい。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals and description thereof will not be repeated. Moreover, you may combine arbitrarily at least one part of embodiment described below.

[構成および基本動作]
図1は、本発明の実施の形態に係る電力管理システムの構成を示す図である。
[Configuration and basic operation]
FIG. 1 is a diagram showing a configuration of a power management system according to an embodiment of the present invention.

図1を参照して、電力管理システム301は、系統側管理装置151と、電力消費管理装置131と、3つの電力管理装置101とを備える。   With reference to FIG. 1, the power management system 301 includes a system-side management device 151, a power consumption management device 131, and three power management devices 101.

図1では、3つの電力管理装置101を代表的に示しているが、さらに多数または少数の電力管理装置101が設けられてもよい。   In FIG. 1, three power management apparatuses 101 are representatively shown, but a larger or smaller number of power management apparatuses 101 may be provided.

系統側管理装置151は、電力系統側である電力会社または系統運用会社等によって運用され、電力消費に関する電力管理情報を含むDR(Demand Response)要請信号を電力消費管理装置131へ送信する。電力管理情報は、たとえば、電力消費の抑制の対象期間(以下、DR期間とも称する。)の開始タイミングであるDR開始タイミングおよびDR期間の長さ、ならびに依頼電力量、電力消費の削減依頼量または削減レベルの少なくともいずれか一つを含む。なお、電力管理情報には、DR期間の長さの代わりに、DR期間の終了タイミングであるDR終了タイミングが含まれていてもよい。   The grid-side management device 151 is operated by a power company or a grid operating company on the power grid side, and transmits a DR (Demand Response) request signal including power management information related to power consumption to the power consumption management device 131. The power management information includes, for example, the DR start timing and the length of the DR period, which are the start timing of the power consumption suppression target period (hereinafter also referred to as the DR period), the requested power amount, the power consumption reduction request amount, or Includes at least one of the reduction levels. Note that the power management information may include a DR end timing, which is a DR period end timing, instead of the DR period length.

電力消費管理装置131は、たとえばアグリゲータによって運用され、1または複数の電力管理装置101と通信を行なうことにより、1または複数の電力需要施設201における電力消費を管理する。電力消費管理装置131は、たとえば、電力管理装置101が設けられる電力需要施設201から遠隔の場所に設置されることが多い。   The power consumption management device 131 is operated by, for example, an aggregator, and manages power consumption in one or more power demanding facilities 201 by communicating with one or more power management devices 101. For example, the power consumption management device 131 is often installed at a location remote from the power demand facility 201 where the power management device 101 is provided.

たとえば、電力消費管理装置131は、系統側管理装置151からDR要請信号を受信すると、受信したDR要請信号に含まれる電力管理情報に基づいて、電力消費に関する指示情報を1または複数の電力管理装置101に送信する。   For example, when the power consumption management apparatus 131 receives a DR request signal from the system-side management apparatus 151, the power consumption management apparatus 131 provides instruction information regarding power consumption based on the power management information included in the received DR request signal. 101.

より詳細には、電力消費管理装置131は、たとえば、電力管理情報に基づいて、電力消費を抑制すべき節電期間、および抑制すべき電力量である抑制量を示す指示情報を1または複数の電力管理装置101へ送信する。なお、節電目標は、抑制すべき電力量に限らず、削減率または削減割合等であってもよい。   More specifically, the power consumption management device 131 displays, for example, instruction information indicating a power saving period in which power consumption should be suppressed and a suppression amount that is a power amount to be suppressed, based on the power management information. Transmit to the management apparatus 101. The power saving target is not limited to the amount of power to be suppressed, and may be a reduction rate or a reduction rate.

[電力需要施設]
図2は、本発明の実施の形態に係る電力管理システムにおける電力需要施設の一例を示す図である。
[Power demand facility]
FIG. 2 is a diagram illustrating an example of a power demand facility in the power management system according to the embodiment of the present invention.

図2を参照して、電力需要施設201は、受電設備12と、施設計測装置13と、3つのフロアエリア21と、電力管理装置101とを含む。   With reference to FIG. 2, the power demand facility 201 includes a power receiving facility 12, a facility measuring device 13, three floor areas 21, and a power management device 101.

図2では、3つのフロアエリア21を代表的に示しているが、さらに多数または少数のフロアエリア21が設けられてもよい。   In FIG. 2, three floor areas 21 are representatively shown, but a larger or smaller number of floor areas 21 may be provided.

この例では、電力需要施設201は、たとえばビルである。3つのフロアエリア21は、たとえば、当該ビルにおける1階(1F)、2階(2F)および3階(3F)の各フロアである。   In this example, the power demand facility 201 is, for example, a building. The three floor areas 21 are, for example, the first floor (1F), the second floor (2F), and the third floor (3F) of the building.

電力管理装置101は、電力会社から電力の供給を受けるビル、工場または一般家庭等の電力需要施設201において用いられる。この例では、電力管理装置101は、電力需要施設201ごとに1つ設けられる。なお、電力管理装置101は、電力需要施設201ごとに複数設けられてもよいし、複数の電力需要施設201において1つ設けられてもよい。電力会社は、たとえば発電事業者または電力小売り事業者である。   The power management apparatus 101 is used in a power demand facility 201 such as a building, a factory, or a general household that receives power supply from a power company. In this example, one power management apparatus 101 is provided for each power demand facility 201. Note that a plurality of power management apparatuses 101 may be provided for each power demand facility 201, or one power management apparatus 101 may be provided in the plurality of power demand facilities 201. The power company is, for example, a power generation company or a power retailer.

受電設備12は、電力線PL経由で系統から受ける電力を、電力需要施設201における各フロアエリア21へ電力線PL経由で分配する。   The power receiving facility 12 distributes the power received from the system via the power line PL to each floor area 21 in the power demand facility 201 via the power line PL.

施設計測装置13は、電力需要施設201における消費電力を計測する。より詳細には、施設計測装置13は、たとえば、クランプ型の電流センサ14を用いて、受電設備12が系統からの電力を受けるための電力線PLを流れる電流を測定し、測定結果に基づいて電力需要施設201における消費電力を周期的に計測する。   The facility measuring device 13 measures the power consumption in the power demand facility 201. More specifically, the facility measuring apparatus 13 uses a clamp-type current sensor 14 to measure the current flowing through the power line PL for the power receiving facility 12 to receive power from the system, and based on the measurement result, the power is measured. The power consumption in the demand facility 201 is periodically measured.

施設計測装置13は、計測結果を示す第1計測情報を作成して内部ネットワーク11経由で電力管理装置101へ送信する。   The facility measurement device 13 creates first measurement information indicating the measurement result and transmits the first measurement information to the power management device 101 via the internal network 11.

また、施設計測装置13は、電力需要施設201における各フロアエリア21の消費電力を計測する。より詳細には、施設計測装置13は、たとえば、電流センサ14を用いて、受電設備12と各フロアエリア21とをそれぞれ接続する電力線PLを流れる電流を測定し、測定結果に基づいて電力需要施設201における各フロアエリア21の消費電力を周期的に計測する。   Moreover, the facility measuring device 13 measures the power consumption of each floor area 21 in the power demand facility 201. More specifically, the facility measuring apparatus 13 uses, for example, the current sensor 14 to measure the current flowing through the power line PL that connects the power receiving facility 12 and each floor area 21, and based on the measurement result, the power demand facility The power consumption of each floor area 21 in 201 is periodically measured.

施設計測装置13は、計測結果を示す第2計測情報を作成して内部ネットワーク11経由で電力管理装置101へ送信する。   The facility measurement apparatus 13 creates second measurement information indicating the measurement result and transmits the second measurement information to the power management apparatus 101 via the internal network 11.

なお、施設計測装置13は、電力需要施設201における消費電力、および各フロアエリア21の消費電力の少なくともいずれか一方を不定期に計測してもよい。   In addition, the facility measuring device 13 may irregularly measure at least one of the power consumption in the power demand facility 201 and the power consumption in each floor area 21.

図3は、本発明の実施の形態に係る電力需要施設におけるフロアエリアの一例を示す図である。   FIG. 3 is a diagram showing an example of a floor area in the power demand facility according to the embodiment of the present invention.

図3を参照して、フロアエリア21には、たとえば、制御装置22と、複数の機器23と、表示装置25と、機器計測装置26とが設けられる。図3では、複数の機器23を示しているが、1つの機器23が設けられてもよい。   With reference to FIG. 3, for example, a control device 22, a plurality of devices 23, a display device 25, and a device measuring device 26 are provided in the floor area 21. In FIG. 3, a plurality of devices 23 are shown, but one device 23 may be provided.

電力管理装置101は、電力需要施設201における1または複数の機器23を制御可能である。機器23は、空調装置および照明装置等の電気機器である。   The power management apparatus 101 can control one or a plurality of devices 23 in the power demand facility 201. The device 23 is an electrical device such as an air conditioner and a lighting device.

より詳細には、電力管理装置101は、たとえば、制御装置22を介して機器23の動作を制御することによって消費電力の削減を図るためのBEMS(Building Energy Management System)またはHEMS(Home Energy Management System)等のシステムにおいて用いられる装置であり、たとえばアグリゲータによって導入される。   More specifically, the power management apparatus 101 controls, for example, the operation of the device 23 via the control apparatus 22 to reduce power consumption by a BEMS (Building Energy Management System) or a HEMS (Home Energy Management System). ) Etc., and is introduced by, for example, an aggregator.

制御装置22は、たとえば複数の機器23を制御する。より詳細には、制御装置22は、電力管理装置101から内部ネットワーク11経由で制御命令を受信すると、受信した制御命令に従って、1つの機器23の個別制御、および機器23群の統括制御を行う。   The control device 22 controls a plurality of devices 23, for example. More specifically, when receiving a control command from the power management apparatus 101 via the internal network 11, the control device 22 performs individual control of one device 23 and overall control of the device 23 group according to the received control command.

この例では、制御装置22は、制御命令に従って、各照明装置を個別制御し、また、空調装置群を統括制御する。   In this example, the control device 22 individually controls each lighting device according to the control command, and performs overall control of the air conditioning device group.

また、制御装置22は、電力管理装置101から内部ネットワーク11経由で動作状況報告要求を受信すると、制御対象の機器23および機器23群の動作状態を取得し、取得した動作状態を示す動作状況情報を作成して電力管理装置101へ送信する。   When the control device 22 receives the operation status report request from the power management device 101 via the internal network 11, the control device 22 acquires the operation status of the control target device 23 and the device 23 group, and the operation status information indicating the acquired operation status. Is transmitted to the power management apparatus 101.

この例では、照明装置の動作状態は、当該照明装置のオンまたはオフである。また、空調装置群の動作状態は、当該空調装置群のオンまたはオフ、および設定温度である。   In this example, the operating state of the lighting device is on or off of the lighting device. The operating state of the air conditioner group is ON or OFF of the air conditioner group and a set temperature.

機器計測装置26は、フロアエリア21における機器23および機器23群の消費電力を計測する。より詳細には、機器計測装置26は、たとえば、電流センサ14を用いて、受電設備12と機器23および機器23群とをそれぞれ接続する電力線PLを流れる電流を測定し、測定結果に基づいてフロアエリア21における機器23および機器23群の消費電力を周期的に計測する。   The equipment measuring device 26 measures the power consumption of the equipment 23 and the equipment 23 group in the floor area 21. More specifically, the equipment measuring device 26 uses the current sensor 14, for example, to measure the current flowing through the power line PL that connects the power receiving facility 12, the equipment 23, and the equipment 23 group, and based on the measurement result, The power consumption of the device 23 and the device 23 group in the area 21 is periodically measured.

機器計測装置26は、計測結果を示す第3計測情報を作成して内部ネットワーク11経由で電力管理装置101へ送信する。   The device measurement device 26 creates third measurement information indicating the measurement result and transmits the third measurement information to the power management device 101 via the internal network 11.

なお、機器計測装置26は、フロアエリア21における機器23の消費電力および機器23群の消費電力の少なくともいずれか一方を不定期に計測してもよい。   Note that the device measurement device 26 may irregularly measure at least one of the power consumption of the device 23 and the power consumption of the device 23 group in the floor area 21.

[電力管理装置の構成]
図4は、本発明の実施の形態に係る電力管理システムにおける電力管理装置の構成を示す図である。
[Configuration of power management device]
FIG. 4 is a diagram showing the configuration of the power management apparatus in the power management system according to the embodiment of the present invention.

図4を参照して、電力管理装置101は、通信処理部(取得部)41と、判断部42と、表示制御部43と、機器制御部44と、目標作成部45と、記憶部46とを備える。   Referring to FIG. 4, the power management apparatus 101 includes a communication processing unit (acquisition unit) 41, a determination unit 42, a display control unit 43, a device control unit 44, a target creation unit 45, and a storage unit 46. Is provided.

通信処理部41は、内部ネットワーク11経由で施設計測装置13、制御装置22、表示装置25および機器計測装置26と情報の送受信を行うことが可能である。また、通信処理部41は、インターネット10経由で電力消費管理装置131と情報の送受信を行うことが可能である。   The communication processing unit 41 can transmit / receive information to / from the facility measurement device 13, the control device 22, the display device 25, and the device measurement device 26 via the internal network 11. Further, the communication processing unit 41 can exchange information with the power consumption management device 131 via the Internet 10.

記憶部46は、電力需要施設201の消費電力の履歴を示す施設履歴情報、電力需要施設201の消費電力の目標の履歴を示す施設目標履歴情報、および当該電力需要施設201における各フロアの消費電力の履歴を示すフロア履歴情報を保持する。   The storage unit 46 includes facility history information indicating a history of power consumption of the power demand facility 201, facility target history information indicating a history of power consumption target of the power demand facility 201, and power consumption of each floor in the power demand facility 201. The floor history information indicating the history of is stored.

通信処理部41は、電力需要施設201における消費電力の計測結果を示す第1計測情報を取得する。   The communication processing unit 41 acquires first measurement information indicating a measurement result of power consumption in the power demand facility 201.

より詳細には、通信処理部41は、内部ネットワーク11経由で施設計測装置13から第1計測情報を受信すると、受信した第1計測情報の内容を、記憶部46が保持する施設履歴情報に加えることにより当該施設履歴情報を更新する。   More specifically, when the communication processing unit 41 receives the first measurement information from the facility measurement device 13 via the internal network 11, the communication processing unit 41 adds the content of the received first measurement information to the facility history information held by the storage unit 46. The facility history information is updated.

また、通信処理部41は、内部ネットワーク11経由で施設計測装置13から第2計測情報を受信すると、受信した第2計測情報の内容を、記憶部46が保持するフロア履歴情報に加えることにより当該フロア履歴情報を更新する。   Further, when the communication processing unit 41 receives the second measurement information from the facility measurement device 13 via the internal network 11, the communication processing unit 41 adds the content of the received second measurement information to the floor history information held by the storage unit 46. Update floor history information.

通信処理部41は、電力需要施設201における消費電力の目標を示す第1目標情報を取得する。ここで、第1目標情報は、たとえば、DR(Demand Response)における目標を示す。   The communication processing unit 41 acquires first target information indicating a target of power consumption in the power demand facility 201. Here, the first target information indicates, for example, a target in DR (Demand Response).

たとえば、通信処理部41は、インターネット10経由で電力消費管理装置131から指示情報を受信すると、受信した指示情報に基づいて、電力需要施設201における消費電力の目標(以下、施設目標とも称する。)を設定する。   For example, when the communication processing unit 41 receives instruction information from the power consumption management apparatus 131 via the Internet 10, the target of power consumption in the power demanding facility 201 (hereinafter also referred to as a facility target) is based on the received instruction information. Set.

具体的には、通信処理部41は、たとえば、指示情報の示す抑制量を節電期間の長さで除した値を施設目標に設定するとともに、設定した施設目標を、記憶部46が保持する施設目標履歴情報に加えることにより当該施設目標履歴情報を更新する。   Specifically, the communication processing unit 41 sets, for example, a value obtained by dividing the suppression amount indicated by the instruction information by the length of the power saving period as a facility target, and a facility in which the storage unit 46 holds the set facility target The facility target history information is updated by adding to the target history information.

通信処理部41は、設定した施設目標を示す第1目標情報を作成して判断部42へ出力するとともに、施設計測装置13から受信する各第1計測情報のうちの最新の第1計測情報を判断部42へ出力する。   The communication processing unit 41 creates first target information indicating the set facility target and outputs the first target information to the determination unit 42, and the latest first measurement information among the first measurement information received from the facility measurement device 13. The data is output to the determination unit 42.

判断部42は、通信処理部41によって取得された第1目標情報および第1計測情報に基づいて、施設目標の達成を判断する。   The determination unit 42 determines the achievement of the facility target based on the first target information and the first measurement information acquired by the communication processing unit 41.

より詳細には、判断部42は、通信処理部41から第1目標情報および第1計測情報を受けると、第1目標情報の示す施設目標と第1計測情報の示す消費電力とを比較する。   More specifically, when receiving the first target information and the first measurement information from the communication processing unit 41, the determination unit 42 compares the facility target indicated by the first target information with the power consumption indicated by the first measurement information.

判断部42は、当該消費電力が施設目標より小さい場合、施設目標が達成されたと判断する。一方、判断部42は、当該消費電力が施設目標以上である場合、施設目標が達成されていないと判断する。判断部42は、判断結果を通信処理部41へ出力する。   If the power consumption is smaller than the facility target, the determining unit 42 determines that the facility target has been achieved. On the other hand, the determination unit 42 determines that the facility target is not achieved when the power consumption is equal to or greater than the facility target. The determination unit 42 outputs the determination result to the communication processing unit 41.

通信処理部41は、施設目標が達成されていないと判断部42によって判断された場合、電力需要施設201の複数のフロアエリア21における各々の消費電力の目標(以下、エリア目標とも称する。)を示す第2目標情報を取得し、かつ複数のフロアエリア21の各々の消費電力の計測結果を示す第2計測情報を取得する。   When the determination unit 42 determines that the facility target has not been achieved, the communication processing unit 41 sets each power consumption target (hereinafter also referred to as an area target) in the plurality of floor areas 21 of the power demand facility 201. The second target information is acquired, and the second measurement information indicating the measurement result of the power consumption of each of the plurality of floor areas 21 is acquired.

より詳細には、通信処理部41は、判断部42から受ける判断結果が、施設目標が達成されていないことを示す場合、第1目標情報および指示情報を目標作成部45へ出力する。   More specifically, when the determination result received from the determination unit 42 indicates that the facility goal has not been achieved, the communication processing unit 41 outputs the first target information and the instruction information to the target creation unit 45.

目標作成部45は、たとえば、第1目標情報に基づいて第2目標情報を作成する。   For example, the target creation unit 45 creates second target information based on the first target information.

より詳細には、目標作成部45は、通信処理部41から第1目標情報および指示情報を受けると、受けた第1目標情報および指示情報、ならびに記憶部46が保持するフロア履歴情報に基づいてエリア目標を設定する。   More specifically, upon receiving the first target information and the instruction information from the communication processing unit 41, the target creation unit 45, based on the received first target information and instruction information, and the floor history information held by the storage unit 46. Set area goals.

たとえば、目標作成部45は、指示情報の示す節電期間と同じ時間帯の電力需要施設201における各フロアエリア21の各々の消費電力の過去5日間分の平均を算出し、算出した各平均、および第1目標情報の示す施設目標に基づいて各フロアエリア21のエリア目標を設定する。ここで、各フロアエリア21のエリア目標の合計は、たとえば施設目標と同じ値となる。   For example, the target creation unit 45 calculates the average of the power consumption of each floor area 21 in the power demand facility 201 in the same time zone as the power saving period indicated by the instruction information for the past five days, An area target for each floor area 21 is set based on the facility target indicated by the first target information. Here, the total area target of each floor area 21 is the same value as the facility target, for example.

なお、目標作成部45は、節電期間と同じ時間帯の電力需要施設201における各フロアエリア21の各々の消費電力の昨年の同月における平均をそれぞれ算出し、算出した結果および施設目標に基づいてエリア目標を設定してもよい。   The target creation unit 45 calculates the average of the power consumption of each floor area 21 in the power demand facility 201 in the same time zone as the power saving period in the same month last year, and based on the calculated result and the facility target A goal may be set.

目標作成部45は、設定したエリア目標を示す第2目標情報を作成し、作成した第2目標情報を通信処理部41へ出力する。   The target creation unit 45 creates second target information indicating the set area target, and outputs the created second target information to the communication processing unit 41.

通信処理部41は、目標作成部45から第2目標情報を受けると、施設計測装置13から受信する各第2計測情報のうちの最新の第2計測情報を取得する。そして、通信処理部41は、第2目標情報および第2計測情報に基づいて、消費電力の目標が未達成のフロアエリア21(以下、未達成エリアとも称する。)が存在するか否かを判断する。   When the communication processing unit 41 receives the second target information from the target creation unit 45, the communication processing unit 41 acquires the latest second measurement information among the second measurement information received from the facility measurement device 13. Based on the second target information and the second measurement information, the communication processing unit 41 determines whether or not there is a floor area 21 in which the power consumption target has not been achieved (hereinafter also referred to as an unachieved area). To do.

通信処理部41は、たとえば、未達成エリアが存在すると判断した場合、当該未達成エリアにおける1または複数の機器23の消費電力の目標(以下、機器目標とも称する。)を示す第3目標情報を取得し、かつ当該機器23の消費電力の計測結果を示す第3計測情報を取得する。   For example, when the communication processing unit 41 determines that an unachieved area exists, the communication processing unit 41 sets third target information indicating a power consumption target (hereinafter also referred to as a device target) of one or more devices 23 in the unachieved area. The third measurement information is acquired and the measurement result of the power consumption of the device 23 is acquired.

より詳細には、通信処理部41は、動作状況報告要求を未達成エリアにおける制御装置22へ内部ネットワーク11経由で送信する。そして、通信処理部41は、動作状況報告要求に対する応答である動作状況情報を当該制御装置22から受信すると、受信した動作状況情報から各機器23の動作状態MS1を取得する。   More specifically, the communication processing unit 41 transmits an operation status report request to the control device 22 in the unachieved area via the internal network 11. And the communication processing part 41 will acquire the operation state MS1 of each apparatus 23 from the received operation condition information, if the operation condition information which is a response with respect to an operation condition report request | requirement is received from the said control apparatus 22.

通信処理部41は、取得した動作状態MS1、および未達成エリアのエリア目標に基づいて機器目標を設定し、設定した機器目標を示す第3目標情報を作成する。ここで、未達成エリアの各機器目標の合計は、たとえば未達成エリアのエリア目標と同じ値となる。   The communication processing unit 41 sets a device target based on the acquired operation state MS1 and the area target of the unachieved area, and creates third target information indicating the set device target. Here, the total of the device targets in the unachieved area is the same value as the area target in the unachieved area, for example.

通信処理部41は、第1目標情報、第1計測情報、第2目標情報および第2計測情報、ならびに作成した第3目標情報、および未達成エリアにおける機器計測装置26から受信する各第3計測情報のうちの最新の第3計測情報を表示制御部43へ出力する。   The communication processing unit 41 receives the first target information, the first measurement information, the second target information, the second measurement information, the created third target information, and each third measurement received from the device measurement device 26 in the unachieved area. The latest third measurement information of the information is output to the display control unit 43.

図5は、本発明の実施の形態に係る電力管理システムにおいて、表示装置に表示された画面の一例を示す図である。   FIG. 5 is a diagram showing an example of a screen displayed on the display device in the power management system according to the embodiment of the present invention.

図5を参照して、表示制御部43は、第2目標情報および第2計測情報に基づいて、エリア単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う。   Referring to FIG. 5, display control unit 43 performs control to display contents that can be determined regarding achievement of the target of power consumption in area units based on the second target information and the second measurement information.

たとえば、表示制御部43は、通信処理部41によって取得された第3目標情報および第3計測情報に基づいて、機器23単位または機器23を含むグループ単位での消費電力の機器目標の達成に関する判断が可能な内容を表示する制御を行う。当該内容は、たとえば、消費電力の目標を達成するためのアドバイスを含む。   For example, the display control unit 43 determines the achievement of the device target of power consumption in units of devices 23 or in groups including the devices 23 based on the third target information and the third measurement information acquired by the communication processing unit 41. Control to display possible contents. The content includes, for example, advice for achieving the power consumption target.

詳細には、表示制御部43は、通信処理部41から第1目標情報、第1計測情報、第2目標情報、第2計測情報、第3目標情報および第3計測情報を受けると、受けたこれらの情報に基づいて、画面Sc1を表示するための画面情報Sci1を作成する。   Specifically, the display control unit 43 receives the first target information, the first measurement information, the second target information, the second measurement information, the third target information, and the third measurement information from the communication processing unit 41. Based on these pieces of information, screen information Sci1 for displaying the screen Sc1 is created.

より詳細には、表示制御部43は、第2目標情報に基づいて、画面Sc1の領域Rg1において、各フロアエリア21におけるフロア目標を示すアイコンIc2を描画する。   More specifically, the display control unit 43 draws an icon Ic2 indicating a floor target in each floor area 21 in the region Rg1 of the screen Sc1 based on the second target information.

また、表示制御部43は、第2計測情報に基づいて、画面Sc1の領域Rg1において、各フロアエリア21における消費電力を示すアイコンIc1を描画する。   Further, the display control unit 43 draws an icon Ic1 indicating the power consumption in each floor area 21 in the region Rg1 of the screen Sc1 based on the second measurement information.

また、電力管理装置101は、第2目標情報および第2計測情報に基づいて、画面Sc1の領域Rg1において、1Fのフロアおよび2Fのフロアにおける節電の達成を示すアイコンIc3、ならびに3Fのフロアにおける節電の未達成を示すアイコンIc4を描画する。   Further, based on the second target information and the second measurement information, the power management apparatus 101 displays, in the region Rg1 of the screen Sc1, an icon Ic3 indicating achievement of power saving on the 1F floor and the 2F floor, and power saving on the 3F floor. The icon Ic4 indicating the unachieved is drawn.

なお、電力管理装置101は、アイコンIc1〜Ic4を描画する代わりに、当該アイコンの示す内容を文字列によって画面Sc1に描画してもよい。   Note that the power management apparatus 101 may draw the contents indicated by the icons on the screen Sc1 using a character string instead of drawing the icons Ic1 to Ic4.

また、表示制御部43は、第3目標情報および第3計測情報に基づいて、画面Sc1の領域Rg2において、機器23単位または機器23を含むグループ単位での消費電力の目標を達成するためのアドバイスを描画する。   In addition, the display control unit 43 provides advice for achieving the power consumption target in units of devices 23 or in groups including the devices 23 in the region Rg2 of the screen Sc1 based on the third target information and the third measurement information. Draw.

具体的には、表示制御部43は、領域Rg3において、機器23を含むグループ単位での消費電力の目標を達成するためのアドバイスを描画する。また、表示制御部43は、領域Rg4において、機器23単位での消費電力の目標を達成するためのアドバイスを描画する。   Specifically, the display control unit 43 draws advice for achieving the power consumption target for each group including the device 23 in the region Rg3. In addition, the display control unit 43 draws advice for achieving the power consumption target for each device 23 in the region Rg4.

表示制御部43は、作成した画面情報Sci1を通信処理部41へ出力する。通信処理部41は、表示制御部43から画面情報Sci1を受けると、受けた画面情報Sci1を内部ネットワーク11経由で各フロアエリア21における表示装置25へ送信する。   The display control unit 43 outputs the created screen information Sci1 to the communication processing unit 41. Upon receiving the screen information Sci1 from the display control unit 43, the communication processing unit 41 transmits the received screen information Sci1 to the display device 25 in each floor area 21 via the internal network 11.

再び図3を参照して、各フロアエリア21における表示装置25は、たとえばサイネージとして機能し、電力管理装置101から画面情報Sci1を受信すると、受信した画面情報Sci1に基づいて画面Sc1を表示する。   Referring to FIG. 3 again, the display devices 25 in each floor area 21 function as, for example, signage, and when receiving the screen information Sci1 from the power management apparatus 101, display the screen Sc1 based on the received screen information Sci1.

これにより、未達成エリアにおけるユーザは、表示装置25に表示された画面Sc1から、自己が位置するフロアエリア21において節電目標が達成されていないことを認識することができる。そして、ユーザは、自己が位置するフロアエリア21における空調装置群の設定温度を28℃に上げるべきであること、および当該フロアエリア21における照明装置の半分に相当する、照明番号が1〜5の照明装置を消灯すべきであることを認識することができるので、ユーザの実際の節電行動につなげることができる。   Thereby, the user in the unachieved area can recognize from the screen Sc1 displayed on the display device 25 that the power saving target is not achieved in the floor area 21 where the user is located. And a user should raise the preset temperature of the air-conditioner group in the floor area 21 in which he is located to 28 degreeC, and the illumination number is 1-5 equivalent to the half of the illuminating device in the said floor area 21. Since it can be recognized that the lighting device should be turned off, it can be connected to the user's actual power saving behavior.

再び図4を参照して、通信処理部41は、未達成エリアが存在すると判断した後、第2目標情報、および機器計測装置26から新たに受信する第2計測情報に基づいて、当該未達成エリアにおいて、消費電力の目標が達成されるか否かを監視する。   Referring to FIG. 4 again, after determining that the unachieved area exists, the communication processing unit 41 performs the unachieved based on the second target information and the second measurement information newly received from the device measuring device 26. In the area, it is monitored whether the power consumption target is achieved.

通信処理部41は、たとえば、第1目標情報、第1計測情報、第2目標情報、第2計測情報、第3目標情報および第3計測情報を表示制御部43へ出力してから所定時間経過しても、当該未達成エリアにおいて消費電力の目標が達成されない場合、未達成エリアにおける各機器23を強制的に制御する必要があると判断する。   For example, the communication processing unit 41 outputs the first target information, the first measurement information, the second target information, the second measurement information, the third target information, and the third measurement information to the display control unit 43 for a predetermined time. Even when the power consumption target is not achieved in the unachieved area, it is determined that it is necessary to forcibly control the devices 23 in the unachieved area.

そして、通信処理部41は、第3目標情報および第3計測情報を機器制御部44へ出力する。   Then, the communication processing unit 41 outputs the third target information and the third measurement information to the device control unit 44.

機器制御部44は、たとえば、通信処理部41によって取得された第3目標情報および第3計測情報に基づいて、第3目標情報の示す機器目標が未達成の機器23、または機器23を含むグループにおける機器23の動作を、当該機器目標が達成できるように変更する機器制御を行う。   For example, the device control unit 44 is based on the third target information and the third measurement information acquired by the communication processing unit 41, and the device 23 or the group including the devices 23 in which the device target indicated by the third target information is not achieved. The device control is performed to change the operation of the device 23 so that the device target can be achieved.

より詳細には、機器制御部44は、通信処理部41から第3目標情報および第3計測情報を受けると、受けた第3目標情報および第3計測情報に基づいて、未達成エリアにおける空調装置群の設定温度を28℃に設定し、かつ未達成エリアにおける照明の半分を消灯するための制御命令を作成し、作成した制御命令を通信処理部41へ出力する。   More specifically, when the device control unit 44 receives the third target information and the third measurement information from the communication processing unit 41, the air conditioner in the unachieved area based on the received third target information and the third measurement information. The set temperature of the group is set to 28 ° C., and a control command for turning off half of the illumination in the unachieved area is created, and the created control command is output to the communication processing unit 41.

通信処理部41は、機器制御部44から制御命令を受けると、受けた制御命令を内部ネットワーク11経由で未達成エリアにおける制御装置22へ送信する。   When receiving the control command from the device control unit 44, the communication processing unit 41 transmits the received control command to the control device 22 in the unachieved area via the internal network 11.

再び図3を参照して、未達成エリアにおける制御装置22は、電力管理装置101から制御命令を受信すると、受信した制御命令に従って、空調装置群の設定温度を28℃に設定し、かつ照明番号が1〜5の照明装置を消灯する制御を行う。   Referring again to FIG. 3, when control device 22 in the unachieved area receives the control command from power management device 101, it sets the set temperature of the air conditioner group to 28 ° C. according to the received control command, and the illumination number. Performs control to turn off the lighting devices 1 to 5.

これにより、未達成エリアにおける各機器23は、制御装置22によって強制的に出力を弱められたり、またオフされたりするので、未達成エリアにおいて消費電力の目標が達成される可能性を高めることができる。   Thereby, since the output of each device 23 in the unachieved area is forcibly weakened or turned off by the control device 22, the possibility that the power consumption target is achieved in the unachieved area can be increased. it can.

再び図4を参照して、通信処理部41は、たとえば機器制御が行われることにより未達成エリアにおける消費電力の目標が達成された場合、エリア目標が未達成のフロアエリア21が存在しないと判断し、第1目標情報、第1計測情報、第2目標情報および第2計測情報、ならびに記憶部46が保持する施設履歴情報および施設目標履歴情報を表示制御部43へ出力する。   Referring to FIG. 4 again, communication processing unit 41 determines that there is no floor area 21 in which the area target is not achieved, for example, when the power consumption target in the unachieved area is achieved by performing device control. Then, the first target information, the first measurement information, the second target information and the second measurement information, and the facility history information and the facility target history information held in the storage unit 46 are output to the display control unit 43.

図6は、本発明の実施の形態に係る電力管理システムにおいて、表示装置に表示された画面の他の例を示す図である。   FIG. 6 is a diagram showing another example of a screen displayed on the display device in the power management system according to the embodiment of the present invention.

図6を参照して、表示制御部43は、通信処理部41から第1目標情報、第1計測情報、第2目標情報、第2計測情報、施設履歴情報および施設目標履歴情報を受けると、受けたこれらの情報に基づいて、画面Sc2を表示するための画面情報Sci2を作成する。   With reference to FIG. 6, when the display control unit 43 receives the first target information, the first measurement information, the second target information, the second measurement information, the facility history information, and the facility target history information from the communication processing unit 41, Based on the received information, screen information Sci2 for displaying the screen Sc2 is created.

より詳細には、表示制御部43は、第2目標情報および第2計測情報に基づいて、画面Sc2の領域Rg1において、各フロアエリア21における消費電力を示すアイコンIc1、各フロアエリア21におけるフロア目標を示すアイコンIc2、および各フロアにおける節電の達成を示すアイコンIc3を描画する。   More specifically, the display control unit 43 displays the icon Ic1 indicating the power consumption in each floor area 21 and the floor target in each floor area 21 in the region Rg1 of the screen Sc2 based on the second target information and the second measurement information. And an icon Ic3 indicating achievement of power saving on each floor.

また、表示制御部43は、第1目標情報、第1計測情報、施設履歴情報および施設目標履歴情報に基づいて、画面Sc2の領域Rg5において、電力需要施設201における消費電力の時間推移、および施設目標の時間推移を示すグラフを描画する。   In addition, the display control unit 43 sets the time transition of the power consumption in the power demand facility 201 and the facility in the region Rg5 of the screen Sc2 based on the first target information, the first measurement information, the facility history information, and the facility target history information. Draw a graph showing the target time transition.

表示制御部43は、作成した画面情報Sci2を通信処理部41および内部ネットワーク11経由で各フロアエリア21における表示装置25へ送信する。   The display control unit 43 transmits the created screen information Sci2 to the display device 25 in each floor area 21 via the communication processing unit 41 and the internal network 11.

再び図3を参照して、各フロアエリア21における表示装置25は、電力管理装置101から画面情報Sci2を受信すると、受信した画面情報Sci2に基づいて画面Sc2を表示する。   Referring to FIG. 3 again, when receiving the screen information Sci2 from the power management apparatus 101, the display device 25 in each floor area 21 displays the screen Sc2 based on the received screen information Sci2.

これにより、各フロアエリア21に位置するユーザは、表示装置25に表示された画面Sc2から、電力需要施設201における各フロアエリア21における節電状況が良好であることを認識することができる。   Thereby, the user located in each floor area 21 can recognize from the screen Sc2 displayed on the display device 25 that the power saving situation in each floor area 21 in the power demand facility 201 is good.

[電力管理装置の変形例]
機器23単位または機器23を含むグループ単位での消費電力の機器目標の達成に関する判断が可能な内容を表示装置25に表示したり、また機器制御を行ったりしても、外気温または日照量等の気象条件によっては、消費電力の節減が十分に行われない場合がある。
[Modification of power management device]
Even if the contents that can be judged on the achievement of the device target of the power consumption in the unit unit of the device 23 or the group including the device 23 are displayed on the display device 25 or the device is controlled, the outside air temperature, the amount of sunlight, etc. Depending on the weather conditions, power consumption may not be saved sufficiently.

そこで、電力管理装置101の変形例では、以下のような構成および動作により、このような課題を解決する。   Therefore, in the modified example of the power management apparatus 101, such a problem is solved by the following configuration and operation.

電力管理装置101の変形例における通信処理部41は、たとえば、電力需要施設201に対応する気象情報を取得する、具体的にはインターネット10経由で収集する。   The communication processing unit 41 in the modification of the power management apparatus 101 acquires, for example, weather information corresponding to the power demand facility 201, and specifically collects it via the Internet 10.

より詳細には、通信処理部41は、たとえば、節電期間における電力需要施設201周辺の外気温、および電力需要施設201における日照量を示す気象情報をインターネット10経由で収集する。   More specifically, for example, the communication processing unit 41 collects weather information indicating the outside temperature around the power demand facility 201 during the power saving period and the amount of sunlight in the power demand facility 201 via the Internet 10.

通信処理部41は、たとえば、未達成エリアが存在すると判断した場合、第1目標情報、第1計測情報、第2目標情報、第2計測情報、第3目標情報および第3計測情報、ならびに収集した気象情報を表示制御部43へ出力する。   For example, when the communication processing unit 41 determines that there is an unachieved area, the first target information, the first measurement information, the second target information, the second measurement information, the third target information and the third measurement information, and the collection The weather information is output to the display control unit 43.

表示制御部43は、たとえば、通信処理部41によって取得された気象情報にさらに基づいて、消費電力の目標を達成するためのアドバイスを表示する制御を行う。   For example, the display control unit 43 performs control to display advice for achieving the target of power consumption based further on the weather information acquired by the communication processing unit 41.

より詳細には、たとえば、空調装置群の消費電力は、外気温および日照量に応じて変化するので、表示制御部43は、図5に示す領域Rg3におけるアドバイスを気象情報にさらに基づいて描画する。   More specifically, for example, since the power consumption of the air conditioner group changes according to the outside air temperature and the amount of sunlight, the display control unit 43 draws the advice in the region Rg3 shown in FIG. 5 further based on the weather information. .

具体的には、たとえば、気象情報の示す外気温が低い場合、空調装置群の設定温度を高く設定しても空調装置群の消費電力の節減が十分に行われないことが多い。この場合、表示制御部43は、図5に示す領域Rg3において、「1.空調装置群の設定温度を28℃に設定して下さい。」の代わりに「1.空調装置群をオフして下さい。」を描画する。   Specifically, for example, when the outside temperature indicated by the weather information is low, the power consumption of the air conditioner group is often not sufficiently reduced even if the set temperature of the air conditioner group is set high. In this case, the display control unit 43 turns OFF the air conditioner group in place of “1. Set the set temperature of the air conditioner group to 28 ° C.” in the region Rg3 shown in FIG. . "

一方、たとえば、気象情報の示す外気温が高い場合、空調装置群の設定温度を高く設定すると空調装置群の消費電力の節減が十分に行われることが多い。この場合、表示制御部43は、図5に示すように、領域Rg3において「1.空調装置群の設定温度を28℃に設定して下さい。」を描画する。   On the other hand, for example, when the outside air temperature indicated by the weather information is high, if the set temperature of the air conditioner group is set high, the power consumption of the air conditioner group is often sufficiently reduced. In this case, as shown in FIG. 5, the display control unit 43 draws “1. Set the set temperature of the air conditioner group to 28 ° C.” in the region Rg3.

また、たとえば、気象情報の示す日照量が多い場合、空調装置群の設定温度を維持しても窓部を遮光することにより空調装置群の消費電力の節減が十分に行われることが多い。この場合、表示制御部43は、図5に示す領域Rg3において、「1.空調装置群の設定温度を28℃に設定して下さい。」の代わりに「1.カーテンを閉めて下さい。」を描画する。   For example, when the amount of sunlight indicated by the weather information is large, the power consumption of the air conditioner group is often sufficiently reduced by shielding the window even if the set temperature of the air conditioner group is maintained. In this case, the display control unit 43 displays “1. Please close the curtain” instead of “1. Set the set temperature of the air conditioner group to 28 ° C.” in the region Rg3 shown in FIG. draw.

通信処理部41は、たとえば、第1目標情報、第1計測情報、第2目標情報、第2計測情報、第3目標情報、第3計測情報および気象情報を表示制御部43へ出力してから所定時間経過しても、上記未達成エリアにおいて消費電力の目標が達成されない場合、未達成エリアにおける各機器23を強制的に制御する必要があると判断する。   For example, the communication processing unit 41 outputs the first target information, the first measurement information, the second target information, the second measurement information, the third target information, the third measurement information, and the weather information to the display control unit 43. If the power consumption target is not achieved in the unachieved area even after a predetermined time has elapsed, it is determined that it is necessary to forcibly control each device 23 in the unachieved area.

そして、通信処理部41は、第3目標情報、第3計測情報および気象情報を機器制御部44へ出力する。   Then, the communication processing unit 41 outputs the third target information, the third measurement information, and the weather information to the device control unit 44.

空調装置群の消費電力は、上述したように外気温および日照量に応じて変化するので、機器制御部44は、たとえば、通信処理部41によって取得された気象情報にさらに基づいて機器制御を行う。   Since the power consumption of the air conditioner group changes according to the outside air temperature and the amount of sunlight as described above, the device control unit 44 performs device control based on weather information acquired by the communication processing unit 41, for example. .

より詳細には、機器制御部44は、通信処理部41から第3目標情報、第3計測情報および気象情報を受けると、受けた第3目標情報、第3計測情報および気象情報に基づいて、以下の処理を行う。   More specifically, upon receiving the third target information, the third measurement information, and the weather information from the communication processing unit 41, the device control unit 44, based on the received third target information, the third measurement information, and the weather information, The following processing is performed.

すなわち、機器制御部44は、気象情報の示す外気温が低い場合、未達成エリアにおける空調装置群をオフさせ、かつ未達成エリアにおける照明の半分を消灯するための制御命令を作成し、作成した制御命令を通信処理部41へ出力する。   That is, the device control unit 44 creates and creates a control command for turning off the air conditioner group in the unachieved area and turning off half of the lighting in the unachieved area when the outside temperature indicated by the weather information is low A control command is output to the communication processing unit 41.

また、機器制御部44は、気象情報の示す外気温が高い場合、未達成エリアにおける空調装置群の設定温度を28℃に設定し、かつ未達成エリアにおける照明の半分を消灯するための制御命令を作成し、作成した制御命令を通信処理部41へ出力する。   In addition, when the outside temperature indicated by the weather information is high, the device control unit 44 sets the set temperature of the air conditioner group in the unachieved area to 28 ° C. and controls to turn off half of the lighting in the unachieved area And the generated control command is output to the communication processing unit 41.

通信処理部41は、機器制御部44から制御命令を受けると、受けた制御命令を内部ネットワーク11経由で未達成エリアにおける制御装置22へ送信する。   When receiving the control command from the device control unit 44, the communication processing unit 41 transmits the received control command to the control device 22 in the unachieved area via the internal network 11.

[動作]
電力管理システム301における各装置は、コンピュータを備え、当該コンピュータにおけるCPU等の演算処理部は、以下のシーケンス図またはフローチャートの各ステップの一部または全部を含むプログラムを図示しないメモリからそれぞれ読み出して実行する。これら複数の装置のプログラムは、それぞれ、外部からインストールすることができる。これら複数の装置のプログラムは、それぞれ、記録媒体に格納された状態で流通する。
[Operation]
Each device in the power management system 301 includes a computer, and an arithmetic processing unit such as a CPU in the computer reads and executes a program including a part or all of each step of the following sequence diagram or flowchart from a memory (not shown). To do. Each of the programs of the plurality of apparatuses can be installed from the outside. The programs of the plurality of apparatuses are distributed while being stored in a recording medium.

図7は、本発明の実施の形態に係る電力管理装置が指示情報の処理を行う際の動作手順を定めたフローチャートである。   FIG. 7 is a flowchart defining an operation procedure when the power management apparatus according to the embodiment of the present invention processes instruction information.

図7を参照して、電力管理装置101が、電力消費管理装置131から指示情報を受信した状況を想定する。   With reference to FIG. 7, a situation is assumed in which power management apparatus 101 receives instruction information from power consumption management apparatus 131.

まず、電力管理装置101は、電力消費管理装置131から受信した指示情報に基づいて施設目標を設定し、設定した施設目標を示す第1目標情報を作成する。また、電力管理装置101は、施設計測装置13から受信する各第1計測情報のうちの最新の第1計測情報を取得する(ステップS102)。   First, the power management apparatus 101 sets a facility target based on the instruction information received from the power consumption management apparatus 131, and creates first target information indicating the set facility target. In addition, the power management apparatus 101 acquires the latest first measurement information among the first measurement information received from the facility measurement apparatus 13 (step S102).

次に、電力管理装置101は、第1目標情報の示す施設目標と第1計測情報の示す消費電力とを比較し、第1計測情報の示す消費電力が施設目標以上である場合(ステップS104でNO)、以下の処理を行う。   Next, the power management apparatus 101 compares the facility target indicated by the first target information with the power consumption indicated by the first measurement information, and if the power consumption indicated by the first measurement information is greater than or equal to the facility target (in step S104). NO), the following processing is performed.

すなわち、電力管理装置101は、施設目標が達成されていないと判断し、第1目標情報、指示情報およびフロア履歴情報に基づいてエリア目標を設定し、設定したエリア目標を示す第2目標情報を作成する。また、電力管理装置101は、施設計測装置13から受信する各第2計測情報のうちの最新の第2計測情報を取得する(ステップS106)。   That is, the power management apparatus 101 determines that the facility target has not been achieved, sets the area target based on the first target information, the instruction information, and the floor history information, and sets the second target information indicating the set area target. create. In addition, the power management apparatus 101 acquires the latest second measurement information among the second measurement information received from the facility measurement apparatus 13 (step S106).

次に、電力管理装置101は、第2目標情報および第2計測情報に基づいて未達成エリアを特定する(ステップS108)。   Next, the power management apparatus 101 identifies an unachieved area based on the second target information and the second measurement information (step S108).

次に、電力管理装置101は、特定した未達成エリアにおける各機器23の動作状態MS1を取得する(ステップS110)。   Next, the power management apparatus 101 acquires the operation state MS1 of each device 23 in the identified unachieved area (step S110).

次に、電力管理装置101は、取得した動作状態MS1、および未達成エリアのエリア目標に基づいて機器目標を設定し、設定した機器目標を示す第3目標情報を作成する。また、電力管理装置101は、未達成エリアにおける機器計測装置26から受信する各第3計測情報のうちの最新の第3計測情報を取得する(ステップS112)。   Next, the power management apparatus 101 sets a device target based on the acquired operation state MS1 and the area target of the unachieved area, and creates third target information indicating the set device target. In addition, the power management apparatus 101 acquires the latest third measurement information among the third measurement information received from the device measurement apparatus 26 in the unachieved area (step S112).

次に、電力管理装置101は、第1目標情報、第1計測情報、第2目標情報、第2計測情報、第3目標情報および第3計測情報に基づいて、画面Sc1を表示装置25に表示させる(ステップS114)。   Next, the power management apparatus 101 displays the screen Sc1 on the display device 25 based on the first target information, the first measurement information, the second target information, the second measurement information, the third target information, and the third measurement information. (Step S114).

次に、電力管理装置101は、画面Sc1を表示装置25に表示させてから所定時間が経過するまで待機する(ステップS116)。   Next, the power management apparatus 101 waits until a predetermined time elapses after the screen Sc1 is displayed on the display device 25 (step S116).

次に、電力管理装置101は、未達成エリアにおいてエリア目標が達成されない場合(ステップS118でNO)、機器制御を実行する(ステップS120)。   Next, when the area target is not achieved in the unachieved area (NO in step S118), the power management apparatus 101 executes device control (step S120).

次に、電力管理装置101は、制御対象の未達成エリアにおける各機器23の動作状態MS1を再び取得する(ステップS110)。   Next, the power management apparatus 101 acquires again the operation state MS1 of each device 23 in the unachieved area to be controlled (step S110).

一方、電力管理装置101は、第1計測情報の示す消費電力が施設目標より小さいか(ステップS104でYES)、または未達成エリアにおいてエリア目標が達成されると(ステップS118でYES)、指示情報の処理を終了する。   On the other hand, when the power consumption indicated by the first measurement information is smaller than the facility target (YES in step S104) or the area target is achieved in the unachieved area (YES in step S118), the power management apparatus 101 indicates the instruction information. Terminate the process.

なお、本発明の実施の形態に係る通信処理部41は、電力消費管理装置131から受信する指示情報に基づいて第1目標情報を作成する構成であるとしたが、これに限定するものではない。通信処理部41は、取得部として、たとえば電力需要施設201における省エネルギーを実現するための消費電力の目標を示す第1目標情報を外部または第1目標情報が保持された記憶部46から取得する構成であってもよい。   Although the communication processing unit 41 according to the embodiment of the present invention is configured to create the first target information based on the instruction information received from the power consumption management device 131, the present invention is not limited to this. . The communication processing unit 41 is configured to acquire, as an acquisition unit, for example, first target information indicating a target of power consumption for realizing energy saving in the power demand facility 201 from the outside or the storage unit 46 in which the first target information is held. It may be.

また、本発明の実施の形態に係る電力管理装置101は、第1目標情報に基づいて第2目標情報を作成する目標作成部45を備える構成であるとしたが、これに限定するものではない。電力管理装置101は、目標作成部45を備えず、第2目標情報を取得する取得部を備える構成であってもよい。   Moreover, although the power management apparatus 101 according to the embodiment of the present invention is configured to include the target creation unit 45 that creates the second target information based on the first target information, it is not limited thereto. . The power management apparatus 101 may be configured not to include the target creation unit 45 but to include an acquisition unit that acquires the second target information.

ところで、電力会社および系統運用会社等の系統側事業者は、多くの電力需要施設にBEMSが導入されることにより、全体的な電力需要を広範囲に調整することが容易となる。   By the way, system operators such as power companies and system operation companies can easily adjust the overall power demand in a wide range by introducing BEMS in many power demand facilities.

たとえば、系統側事業者は、電力需給の逼迫が予測される場合に、アグリゲータに対して予め節電要請を行なう。そして、アグリゲータは、電力需要施設における電力管理装置に対して節電要請を行なう。   For example, the grid-side business operator makes a power-saving request to the aggregator in advance when tightness of power supply and demand is predicted. Then, the aggregator makes a power saving request to the power management apparatus in the power demand facility.

しかしながら、アグリゲータが節電要請を行っても、節電要請の対象期間において当該節電要請に従った電力消費の抑制が需要家の電力需要施設において行われない場合がある。このような場合、十分な節電が行われなくなり、電力需給が逼迫してしまうことがある。   However, even if the aggregator makes a power saving request, there is a case where power consumption is not suppressed in the power demand facility of the consumer in the target period of the power saving request. In such a case, sufficient power saving may not be performed, and power supply and demand may be tight.

これに対して、本発明の実施の形態に係る電力管理装置では、通信処理部41は、電力需要施設201における消費電力の目標である施設目標を示す第1目標情報、および電力需要施設201における消費電力の計測結果を示す第1計測情報を取得する。判断部42は、通信処理部41によって取得された第1目標情報および第1計測情報に基づいて、施設目標の達成を判断する。通信処理部41は、施設目標が達成されていないと判断部42によって判断された場合、電力需要施設201の複数のフロアエリア21における各々の消費電力の目標であるエリア目標を示す第2目標情報を取得し、かつ複数のフロアエリア21の各々の消費電力の計測結果を示す第2計測情報を取得する。そして、表示制御部43は、通信処理部41によって取得された第2目標情報および第2計測情報に基づいて、フロアエリア21単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う。   On the other hand, in the power management apparatus according to the embodiment of the present invention, the communication processing unit 41 includes first target information indicating a facility target that is a power consumption target in the power demand facility 201, and the power demand facility 201. First measurement information indicating a measurement result of power consumption is acquired. The determination unit 42 determines the achievement of the facility target based on the first target information and the first measurement information acquired by the communication processing unit 41. The communication processing unit 41, when it is determined by the determination unit 42 that the facility target has not been achieved, second target information indicating an area target that is a target of each power consumption in the plurality of floor areas 21 of the power demand facility 201 And the second measurement information indicating the measurement result of the power consumption of each of the plurality of floor areas 21 is acquired. And the display control part 43 displays the content which can be judged about achievement of the target of the power consumption in floor area 21 unit based on the 2nd target information and 2nd measurement information acquired by the communication processing part 41. Take control.

このように、電力需要施設201における消費電力の目標が達成されていない場合において、フロアエリア21単位での消費電力の目標の達成に関する内容を表示することにより、各フロアエリア21におけるユーザは、自己が位置するフロアエリア21における消費電力の目標の達成状況等を認識することができる。これにより、たとえば、あるフロアエリア21における消費電力の目標が未達成である場合、ユーザが当該目標を達成するための行動を起こす可能性を高めることができる。したがって、電力需要施設における電力消費の抑制をより確実に行わせることができる。   Thus, when the target of power consumption in the power demand facility 201 is not achieved, by displaying the contents related to the achievement of the target of power consumption in the floor area 21 unit, the user in each floor area 21 can The achievement status of the target of power consumption in the floor area 21 where is located can be recognized. Thereby, for example, when the target of power consumption in a certain floor area 21 has not been achieved, it is possible to increase the possibility that the user takes action to achieve the target. Therefore, it is possible to more reliably suppress power consumption in the power demand facility.

また、本発明の実施の形態に係る電力管理装置では、通信処理部41は、消費電力の目標が未達成のフロアエリア21が存在する場合、フロアエリア21における1または複数の機器23の消費電力の目標である機器目標を示す第3目標情報を取得し、かつ機器23の消費電力の計測結果を示す第3計測情報を取得する。そして、表示制御部43は、通信処理部41によって取得された第3目標情報および第3計測情報に基づいて、機器23単位または機器23を含むグループ単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う。   In the power management apparatus according to the embodiment of the present invention, the communication processing unit 41 uses the power consumption of one or more devices 23 in the floor area 21 when there is a floor area 21 where the power consumption target has not been achieved. 3rd target information which shows the equipment target which is a target of this, and 3rd measurement information which shows the measurement result of the power consumption of the apparatus 23 is acquired. Based on the third target information and the third measurement information acquired by the communication processing unit 41, the display control unit 43 makes a determination regarding the achievement of the power consumption target in units of devices 23 or in units of groups including the devices 23. Control the display of possible contents.

このような構成により、ユーザは、消費電力の目標が未達成のフロアエリア21における機器23に対して機器単位またはグループ単位での行動等を起こすことができるので、当該フロアエリア21における消費電力の目標を達成する可能性を高めることができる。   With this configuration, the user can take actions in units of equipment or groups on the equipment 23 in the floor area 21 where the power consumption target has not yet been achieved. Increase your chances of achieving your goals.

また、本発明の実施の形態に係る電力管理装置では、通信処理部41は、消費電力の目標が未達成のフロアエリア21が存在する場合、フロアエリア21における1または複数の機器23の消費電力の目標を示す第3目標情報を取得し、かつ機器23の消費電力の計測結果を示す第3計測情報を取得する。そして、機器制御部44は、通信処理部41によって取得された第3目標情報および第3計測情報に基づいて、第3目標情報の示す機器目標が未達成の機器23、または機器23を含むグループにおける当該機器23の動作を、機器目標が達成できるように変更する機器制御を行う。   In the power management apparatus according to the embodiment of the present invention, the communication processing unit 41 uses the power consumption of one or more devices 23 in the floor area 21 when there is a floor area 21 where the power consumption target has not been achieved. 3rd target information which shows this target, and 3rd measurement information which shows the measurement result of the power consumption of the apparatus 23 is acquired. Then, the device control unit 44, based on the third target information and the third measurement information acquired by the communication processing unit 41, the device 23 that the device target indicated by the third target information is not achieved, or a group including the device 23 The device control is performed so that the operation of the device 23 is changed so that the device target can be achieved.

このように、消費電力の目標が未達成のフロアエリア21における機器23に対して機器単位またはグループ単位で機器制御が行われる構成により、当該フロアエリア21における消費電力の目標を自動的かつ確実に達成することができる。   As described above, the device power control in the floor area 21 is automatically and reliably performed by the configuration in which the device control is performed on the device 23 or the group basis on the device 23 in the floor area 21 where the power consumption target is not achieved. Can be achieved.

また、本発明の実施の形態に係る電力管理装置では、上記内容は、消費電力の目標を達成するためのアドバイスを含む。   Further, in the power management apparatus according to the embodiment of the present invention, the above content includes advice for achieving the power consumption target.

このような構成により、ユーザは、消費電力の目標が未達成のフロアエリア21において、当該目標を達成するための行動の具体的な内容を上記アドバイスから認識することができるので、当該フロアエリア21における消費電力の目標を達成する可能性をより高めることができる。   With such a configuration, the user can recognize the specific content of the action for achieving the target in the floor area 21 where the power consumption target is not achieved, from the advice. It is possible to further increase the possibility of achieving the power consumption target.

また、本発明の実施の形態に係る電力管理装置では、第1目標情報は、DRにおける目標を示す。そして、目標作成部45は、第1目標情報に基づいて第2目標情報を作成する。   In the power management apparatus according to the embodiment of the present invention, the first target information indicates a target in DR. Then, the target creation unit 45 creates second target information based on the first target information.

このような構成により、たとえば、DRにおける目標が達成されるように第2目標情報を作成することができるので、DRにおける目標が達成される可能性を高めることができる。   With such a configuration, for example, the second target information can be created such that the target in DR is achieved, so that the possibility that the target in DR will be achieved can be increased.

また、本発明の実施の形態に係る電力管理装置では、通信処理部41は、さらに、電力需要施設201に対応する気象情報を取得する。そして、表示制御部43は、通信処理部41によって取得された気象情報にさらに基づいて、消費電力の目標を達成するためのアドバイスを表示する制御を行う。   In the power management apparatus according to the embodiment of the present invention, the communication processing unit 41 further acquires weather information corresponding to the power demand facility 201. And the display control part 43 performs control which displays the advice for achieving the target of power consumption further based on the weather information acquired by the communication process part 41. FIG.

このような構成により、節電可能な消費電力が気象状況に応じて変化する場合においても、適切なアドバイスを表示することができるので、当該フロアエリア21における消費電力の目標を達成する可能性をより高めることができる。   With such a configuration, even when the power consumption that can be saved changes according to the weather conditions, it is possible to display appropriate advice, so that the possibility of achieving the target of power consumption in the floor area 21 is further increased. Can be increased.

また、本発明の実施の形態に係る電力管理装置では、通信処理部41は、さらに、電力需要施設201に対応する気象情報を取得する。そして、機器制御部44は、通信処理部41によって取得された気象情報にさらに基づいて機器制御を行う。   In the power management apparatus according to the embodiment of the present invention, the communication processing unit 41 further acquires weather information corresponding to the power demand facility 201. Then, the device control unit 44 performs device control based further on the weather information acquired by the communication processing unit 41.

このような構成により、節電可能な消費電力が気象状況に応じて変化する場合においても適切な機器制御を行うことができるので、当該フロアエリア21における消費電力の目標を自動的かつより確実に達成することができる。   With such a configuration, even when the power consumption that can be saved changes according to the weather conditions, it is possible to perform appropriate device control, so that the power consumption target in the floor area 21 can be achieved automatically and more reliably. can do.

上記実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記説明ではなく特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。   The above embodiment should be considered as illustrative in all points and not restrictive. The scope of the present invention is defined by the terms of the claims, rather than the description above, and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims.

以上の説明は、以下に付記する特徴を含む。   The above description includes the following features.

[付記1]
電力管理装置であって、
電力需要施設における消費電力の目標を示す第1目標情報、および前記電力需要施設における消費電力の計測結果を示す第1計測情報を取得する取得部と、
前記取得部によって取得された前記第1目標情報および前記第1計測情報に基づいて、前記目標の達成を判断する判断部とを備え、
前記取得部は、前記目標が達成されていないと前記判断部によって判断された場合、前記電力需要施設の複数のエリアにおける各々の消費電力の目標を示す第2目標情報を取得し、かつ前記複数のエリアの各々の消費電力の計測結果を示す第2計測情報を取得し、
前記電力管理装置は、さらに、
前記取得部によって取得された前記第2目標情報および前記第2計測情報に基づいて、前記エリア単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う表示制御部を備え、
前記電力需要施設は、ビル、工場または一般家庭であり、
前記取得部は、電力消費を抑制すべき節電期間、および抑制すべき電力量である抑制量を示す指示情報を上位装置から取得し、取得した前記指示情報に基づいて、前記電力需要施設における消費電力の目標である施設目標を設定し、
前記判断部は、前記第1計測情報の示す消費電力の計測結果が前記施設目標より小さい場合、前記施設目標が達成されたと判断し、
前記判断部は、前記第1計測情報の示す消費電力の計測結果が前記施設目標以上である場合、前記施設目標が達成されていないと判断し、
前記表示制御部は、前記第2目標情報に基づいて、前記複数のエリアにおける各々の消費電力の目標を示すアイコンを表示する制御を行い、前記第2計測情報に基づいて、前記複数のエリアの各々の消費電力の計測結果を示すアイコンを表示する制御を行い、かつ前記第2目標情報および前記第2計測情報に基づいて、前記複数のエリアの各々の節電の達成を示すアイコン、および節電の未達成を示すアイコンの少なくともいずれか一方を表示する制御を行う、電力管理装置。
[Appendix 1]
A power management device,
An acquisition unit that acquires first target information indicating a target of power consumption in a power demand facility, and first measurement information indicating a measurement result of power consumption in the power demand facility;
A determination unit that determines the achievement of the target based on the first target information and the first measurement information acquired by the acquisition unit;
When the determination unit determines that the target is not achieved, the acquisition unit acquires second target information indicating each power consumption target in a plurality of areas of the power demand facility, and the plurality 2nd measurement information which shows the measurement result of power consumption of each area of
The power management device further includes:
A display control unit that performs control to display content that can be determined for achieving the power consumption target in the area unit based on the second target information and the second measurement information acquired by the acquisition unit; ,
The power demand facility is a building, a factory or a general household,
The acquisition unit acquires instruction information indicating a power saving period in which power consumption should be suppressed and a suppression amount that is a power amount to be suppressed from a host device, and based on the acquired instruction information, consumption in the power demand facility Set facility goals, which are the targets of electricity,
The determination unit determines that the facility target is achieved when a measurement result of power consumption indicated by the first measurement information is smaller than the facility target;
The determination unit determines that the facility target is not achieved when a measurement result of power consumption indicated by the first measurement information is equal to or greater than the facility target;
The display control unit performs control to display an icon indicating each power consumption target in the plurality of areas based on the second target information, and based on the second measurement information, displays the plurality of areas. Control is performed to display an icon indicating the measurement result of each power consumption, and an icon indicating achievement of power saving in each of the plurality of areas based on the second target information and the second measurement information, and power saving A power management apparatus that performs control to display at least one of icons indicating unachieved.

10 インターネット
11 内部ネットワーク
12 受電設備
13 施設計測装置
14 電流センサ
21 フロアエリア
22 制御装置
23 機器
25 表示装置
26 機器計測装置
41 通信処理部(取得部)
42 判断部
43 表示制御部
44 機器制御部
45 目標作成部
46 記憶部
101 電力管理装置
131 電力消費管理装置
151 系統側管理装置
201 電力需要施設
301 電力管理システム
DESCRIPTION OF SYMBOLS 10 Internet 11 Internal network 12 Power receiving equipment 13 Facility measuring device 14 Current sensor 21 Floor area 22 Control device 23 Equipment 25 Display device 26 Equipment measuring device 41 Communication processing part (acquisition part)
DESCRIPTION OF SYMBOLS 42 Judgment part 43 Display control part 44 Equipment control part 45 Target preparation part 46 Storage part 101 Power management apparatus 131 Power consumption management apparatus 151 System side management apparatus 201 Power demand facility 301 Power management system

Claims (8)

電力管理装置であって、
電力需要施設における消費電力の目標を示す第1目標情報、および前記電力需要施設における消費電力の計測結果を示す第1計測情報を取得する取得部と、
前記取得部によって取得された前記第1目標情報および前記第1計測情報に基づいて、前記目標の達成を判断する判断部とを備え、
前記取得部は、前記目標が達成されていないと前記判断部によって判断された場合、前記電力需要施設の複数のエリアにおける各々の消費電力の目標を示す第2目標情報を取得し、かつ前記複数のエリアの各々の消費電力の計測結果を示す第2計測情報を取得し、
前記電力管理装置は、さらに、
前記取得部によって取得された前記第2目標情報および前記第2計測情報に基づいて、前記エリア単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う表示制御部を備える、電力管理装置。
A power management device,
An acquisition unit that acquires first target information indicating a target of power consumption in a power demand facility, and first measurement information indicating a measurement result of power consumption in the power demand facility;
A determination unit that determines the achievement of the target based on the first target information and the first measurement information acquired by the acquisition unit;
When the determination unit determines that the target is not achieved, the acquisition unit acquires second target information indicating each power consumption target in a plurality of areas of the power demand facility, and the plurality 2nd measurement information which shows the measurement result of power consumption of each area of
The power management device further includes:
A display control unit configured to perform control to display content capable of being determined regarding achievement of the power consumption target for each area based on the second target information and the second measurement information acquired by the acquisition unit; , Power management device.
前記取得部は、消費電力の目標が未達成の前記エリアが存在する場合、前記エリアにおける1または複数の機器の消費電力の目標を示す第3目標情報を取得し、かつ前記機器の消費電力の計測結果を示す第3計測情報を取得し、
前記表示制御部は、前記取得部によって取得された前記第3目標情報および前記第3計測情報に基づいて、前記機器単位または前記機器を含むグループ単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う、請求項1に記載の電力管理装置。
The acquisition unit acquires third target information indicating a power consumption target of one or a plurality of devices in the area when there is the area where the power consumption target is not achieved, and the power consumption of the device Acquire third measurement information indicating the measurement result,
The display control unit can make a determination regarding achievement of a target of power consumption in the device unit or in a group unit including the device, based on the third target information and the third measurement information acquired by the acquisition unit. The power management apparatus according to claim 1, wherein control for displaying various contents is performed.
前記取得部は、消費電力の目標が未達成の前記エリアが存在する場合、前記エリアにおける1または複数の機器の消費電力の目標を示す第3目標情報を取得し、かつ前記機器の消費電力の計測結果を示す第3計測情報を取得し、
前記電力管理装置は、さらに、
前記取得部によって取得された前記第3目標情報および前記第3計測情報に基づいて、前記第3目標情報の示す目標が未達成の前記機器、または前記機器を含むグループにおける前記機器の動作を、前記目標が達成できるように変更する機器制御を行う機器制御部を備える、請求項1または請求項2に記載の電力管理装置。
The acquisition unit acquires third target information indicating a power consumption target of one or a plurality of devices in the area when there is the area where the power consumption target is not achieved, and the power consumption of the device Acquire third measurement information indicating the measurement result,
The power management device further includes:
Based on the third target information and the third measurement information acquired by the acquisition unit, the operation of the device in the group that includes the device or the device that has not achieved the target indicated by the third target information, The power management apparatus according to claim 1, further comprising a device control unit that performs device control to be changed so that the target can be achieved.
前記内容は、消費電力の目標を達成するためのアドバイスを含む、請求項1から請求項3のいずれか1項に記載の電力管理装置。   The power management apparatus according to any one of claims 1 to 3, wherein the content includes advice for achieving a target of power consumption. 前記第1目標情報は、DR(Demand Response)における目標を示し、
前記電力管理装置は、さらに、
前記第1目標情報に基づいて前記第2目標情報を作成する目標作成部を備える、請求項1から請求項4のいずれか1項に記載の電力管理装置。
The first target information indicates a target in DR (Demand Response),
The power management device further includes:
The power management apparatus according to claim 1, further comprising a target creation unit that creates the second target information based on the first target information.
前記取得部は、さらに、前記電力需要施設に対応する気象情報を取得し、
前記表示制御部は、前記取得部によって取得された前記気象情報にさらに基づいて、消費電力の目標を達成するためのアドバイスを表示する制御を行う、請求項1から請求項5のいずれか1項に記載の電力管理装置。
The acquisition unit further acquires weather information corresponding to the power demand facility,
The said display control part performs control which displays the advice for achieving the target of power consumption further based on the said weather information acquired by the said acquisition part. The power management device described in 1.
前記取得部は、さらに、前記電力需要施設に対応する気象情報を取得し、
前記機器制御部は、前記取得部によって取得された前記気象情報にさらに基づいて前記機器制御を行う、請求項3に記載の電力管理装置。
The acquisition unit further acquires weather information corresponding to the power demand facility,
The power management apparatus according to claim 3, wherein the device control unit performs the device control based on the weather information acquired by the acquisition unit.
電力管理装置において用いられる電力管理プログラムであって、
コンピュータを、
電力需要施設における消費電力の目標を示す第1目標情報、および前記電力需要施設における消費電力の計測結果を示す第1計測情報を取得する取得部と、
前記取得部によって取得された前記第1目標情報および前記第1計測情報に基づいて、前記目標の達成を判断する判断部と、
として機能させるためのプログラムであり、
前記取得部は、前記目標が達成されていないと前記判断部によって判断された場合、前記電力需要施設の複数のエリアにおける各々の消費電力の目標を示す第2目標情報を取得し、かつ前記複数のエリアの各々の消費電力の計測結果を示す第2計測情報を取得し、
さらに、コンピュータを、
前記取得部によって取得された前記第2目標情報および前記第2計測情報に基づいて、前記エリア単位での消費電力の目標の達成に関する判断が可能な内容を表示する制御を行う表示制御部、
として機能させるための、電力管理プログラム。
A power management program used in a power management device,
Computer
An acquisition unit that acquires first target information indicating a target of power consumption in a power demand facility, and first measurement information indicating a measurement result of power consumption in the power demand facility;
A determination unit that determines the achievement of the target based on the first target information and the first measurement information acquired by the acquisition unit;
As a program to function as
When the determination unit determines that the target is not achieved, the acquisition unit acquires second target information indicating each power consumption target in a plurality of areas of the power demand facility, and the plurality 2nd measurement information which shows the measurement result of power consumption of each area of
In addition, the computer
A display control unit that performs control to display content that can be determined regarding achievement of the target of power consumption in each area based on the second target information and the second measurement information acquired by the acquisition unit;
Power management program to function as
JP2016020579A 2016-02-05 2016-02-05 Power management apparatus and power management program Active JP6597354B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016020579A JP6597354B2 (en) 2016-02-05 2016-02-05 Power management apparatus and power management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016020579A JP6597354B2 (en) 2016-02-05 2016-02-05 Power management apparatus and power management program

Publications (2)

Publication Number Publication Date
JP2017139919A true JP2017139919A (en) 2017-08-10
JP6597354B2 JP6597354B2 (en) 2019-10-30

Family

ID=59566163

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016020579A Active JP6597354B2 (en) 2016-02-05 2016-02-05 Power management apparatus and power management program

Country Status (1)

Country Link
JP (1) JP6597354B2 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008253103A (en) * 2007-03-30 2008-10-16 Nippon Oil Corp System and method for power management
JP2009070339A (en) * 2007-09-18 2009-04-02 Denso Facilities Corp Energy consumption information announcing system
JP2011135745A (en) * 2009-12-25 2011-07-07 Panasonic Electric Works Co Ltd Energy saving promotion system
JP2011152043A (en) * 2007-03-19 2011-08-04 Sanyo Electric Co Ltd Device for control of cold storage equipment
JP2013038887A (en) * 2011-08-08 2013-02-21 Misawa Homes Co Ltd Information provision system
JP2014087126A (en) * 2012-10-22 2014-05-12 Sharp Corp Power management device, method for controlling power management device, and control program for power management device
JP2015057001A (en) * 2013-09-13 2015-03-23 アズビル株式会社 Power suppression control device and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011152043A (en) * 2007-03-19 2011-08-04 Sanyo Electric Co Ltd Device for control of cold storage equipment
JP2008253103A (en) * 2007-03-30 2008-10-16 Nippon Oil Corp System and method for power management
JP2009070339A (en) * 2007-09-18 2009-04-02 Denso Facilities Corp Energy consumption information announcing system
JP2011135745A (en) * 2009-12-25 2011-07-07 Panasonic Electric Works Co Ltd Energy saving promotion system
JP2013038887A (en) * 2011-08-08 2013-02-21 Misawa Homes Co Ltd Information provision system
JP2014087126A (en) * 2012-10-22 2014-05-12 Sharp Corp Power management device, method for controlling power management device, and control program for power management device
JP2015057001A (en) * 2013-09-13 2015-03-23 アズビル株式会社 Power suppression control device and method

Also Published As

Publication number Publication date
JP6597354B2 (en) 2019-10-30

Similar Documents

Publication Publication Date Title
EP2701262B1 (en) Power control device, control system, and control method
US9946288B2 (en) Energy management system, terminal device, display control method, and program
JP2009204188A (en) Environment control system
JP2010146268A (en) Electric energy monitoring system, management server, and electric energy monitoring method
JP5063653B2 (en) Support system, support method, and program
JP2018048774A (en) Information providing system, information providing method and control program
WO2014091784A1 (en) Energy-management server, energy-management method, and program
JP2011248568A (en) Energy management system
JP5383525B2 (en) Facility management apparatus and facility management method
JP2017126328A (en) Method for controlling information terminal, program, and information terminal
KR20120076659A (en) Load control method for load contol apparatus
JP2015170048A (en) Information processor and information processing system
JP2022173297A (en) Device state notification control device, device state notification system, device state notification method, and program
JP5592730B2 (en) Electricity price visualization device
JP2011210097A (en) Energy-saving diagnosis system
JP6846633B2 (en) Information distribution system, information distribution method and program
KR101668630B1 (en) Device, system and method for smart control using gps, recording medium for performing the method
JP6276142B2 (en) Air conditioning control support system and method
JP5508250B2 (en) Energy saving support device
JP2011106698A (en) Equipment item control device
JP6597354B2 (en) Power management apparatus and power management program
CN112578680A (en) Electrical equipment monitoring and management system, method and readable storage medium
JP2016015850A (en) Power consumption management device, power consumption management system, power consumption management method and power consumption management program
JP5197716B2 (en) Power display system and power display method
JP2014238221A (en) Air conditioning system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180821

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190524

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190604

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190729

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190903

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190916

R150 Certificate of patent or registration of utility model

Ref document number: 6597354

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250