JP2017133782A - Air Conditioning System - Google Patents

Air Conditioning System Download PDF

Info

Publication number
JP2017133782A
JP2017133782A JP2016015381A JP2016015381A JP2017133782A JP 2017133782 A JP2017133782 A JP 2017133782A JP 2016015381 A JP2016015381 A JP 2016015381A JP 2016015381 A JP2016015381 A JP 2016015381A JP 2017133782 A JP2017133782 A JP 2017133782A
Authority
JP
Japan
Prior art keywords
air
blower
space
control device
conditioning system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016015381A
Other languages
Japanese (ja)
Other versions
JP6355660B2 (en
Inventor
芸青 范
Yunqing Fan
芸青 范
恵美 竹田
Emi Takeda
恵美 竹田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2016015381A priority Critical patent/JP6355660B2/en
Publication of JP2017133782A publication Critical patent/JP2017133782A/en
Application granted granted Critical
Publication of JP6355660B2 publication Critical patent/JP6355660B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an air conditioning system that can efficiently control temperature in a space that is not subject to control of an air conditioning device.SOLUTION: An air conditioning system comprises: an air conditioning device arranged in a first space in a building; a suction port provided in a floor or a wall of the first space; a blowing port provided in a floor or a wall of a second space in the building; an air blowing device for sucking air in the first space from the suction port, and blowing it to the second space from the blowing port; and a control device for controlling the air conditioning device and the air blowing device. The control device causes the air conditioning device and the air blowing device to operate in cooperation.SELECTED DRAWING: Figure 1

Description

本発明は、空調装置と送風装置とを備える空気調和システムに関するものである。   The present invention relates to an air conditioning system including an air conditioner and a blower.

従来、リビングなどの居住空間で空調された空気を用いて、洗面所などの非居住空間の空調を行うシステムが知られている。例えば、特許文献1には、リビングの床に吸込み口、洗面脱衣室の床に吹出し口をそれぞれ備え、当該吸込み口と吹出し口とが天井または床下空間部においてダクトで連通接続される空気調和システムが開示される。特許文献1のシステムでは、吹出し口に直結されるファンによって、リビングの空気がダクトを通って洗面脱衣室内に送り込まれることにより、冬期には洗面脱衣室を暖房でき、夏季には洗面脱衣室を冷房できる。   2. Description of the Related Art Conventionally, a system that performs air conditioning in a non-residential space such as a washroom using air conditioned in a living space such as a living room is known. For example, Patent Document 1 discloses an air conditioning system in which a suction port is provided on the floor of a living room and a blow-off port is provided on the floor of a wash-dressing room, and the suction port and the discharge port are connected to each other by a duct in a ceiling or under-floor space. Is disclosed. In the system of Patent Document 1, the living room air is sent through the duct into the bathroom undressing room by a fan directly connected to the outlet, so that the bathroom undressing room can be heated in winter and the bathroom undressing room is opened in summer. Can be cooled.

特開2004−257709号公報(段落[0022]、図2参照)Japanese Patent Laying-Open No. 2004-257709 (see paragraph [0022], FIG. 2)

しかしながら、特許文献1に記載の空気調和システムでは、熱ロスが発生し、効率的に暖気または冷気を洗面脱衣室に送ることができていない。   However, in the air conditioning system described in Patent Document 1, heat loss occurs, and warm air or cold air cannot be efficiently sent to the bathroom undressing room.

本発明は、上記のような課題を解決するためになされたもので、空調装置の制御対象外の空間の温度を効率的に制御することができる空気調和システムを提供することを目的とする。   The present invention has been made to solve the above-described problems, and an object of the present invention is to provide an air conditioning system capable of efficiently controlling the temperature of a space outside the control target of an air conditioner.

本発明に係る空気調和システムは、建物内の第一空間に配置される空調装置と、第一空間の床または壁に設けられる吸込み口と、建物内の第二空間の床または壁に設けられる吹出し口と、吸込み口から第一空間の空気を吸込み、吹出し口から第二空間へ吹出す送風装置と、空調装置および送風装置を制御する制御装置と、を備え、制御装置は、空調装置と送風装置とを連携して動作させるものである。   The air conditioning system according to the present invention is provided in an air conditioner disposed in a first space in a building, a suction port provided in a floor or wall of the first space, and a floor or wall of a second space in the building. A blower port, a blower that sucks air in the first space from the suction port, and blows the air from the blower port to the second space, and a control device that controls the air conditioner and the blower. The air blower is operated in cooperation.

本発明の空気調和システムによれば、空調される第一空間の空気を、第二空間の床または壁に設けられた吹出し口から吹出すことで、空調装置の制御対象外の空間である、例えば洗面所、トイレなどの第二空間の快適性を向上させることができる。さらに、空調装置と送風装置とを連携して動作させることで、第一空間の温度を制御することに加え、第一空間の冷暖気を効率的に第二空間に送ることができる。   According to the air conditioning system of the present invention, the air in the first space to be air-conditioned is a space outside the control target of the air conditioner by blowing out the air from the outlet provided in the floor or wall of the second space. For example, the comfort of the second space such as a washroom and a toilet can be improved. Furthermore, by operating the air conditioner and the air blower in cooperation with each other, in addition to controlling the temperature of the first space, it is possible to efficiently send the cooling / warming air of the first space to the second space.

実施の形態1における空気調和システムを備える住宅の断面模式図である。It is a cross-sectional schematic diagram of a house provided with the air conditioning system in Embodiment 1. 実施の形態1の空気調和システムにおける各機器の配置を示す平面模式図である。FIG. 3 is a schematic plan view showing the arrangement of each device in the air conditioning system of Embodiment 1. 実施の形態1における空調装置の一例を示す図である。It is a figure which shows an example of the air conditioning apparatus in Embodiment 1. FIG. 実施の形態1の空気調和システムにおける制御システムの一例を示す図である。It is a figure which shows an example of the control system in the air conditioning system of Embodiment 1. FIG. (a)は実施の形態1における暖房時の弱風量制御による第二空間の気流分布の一例を示す図であり、(b)は暖房時の弱風量制御による第二空間の温度勾配を示す図である。(A) is a figure which shows an example of the airflow distribution of the 2nd space by the weak air volume control at the time of heating in Embodiment 1, (b) is a figure which shows the temperature gradient of the 2nd space by the weak air volume control at the time of heating. It is. (a)は実施の形態1における冷房時の弱風量制御による第二空間の気流分布の一例を示す図であり、(b)は冷房時の弱風量制御による第二空間の温度勾配を示す図である。(A) is a figure which shows an example of the airflow distribution of the 2nd space by the weak air volume control at the time of cooling in Embodiment 1, (b) is a figure which shows the temperature gradient of the 2nd space by the weak air volume control at the time of cooling It is. 第一優先制御および第二優先制御における制御内容を示す図である。It is a figure which shows the control content in 1st priority control and 2nd priority control. 第一優先制御時の空気の流れを示す断面模式図である。It is a cross-sectional schematic diagram which shows the flow of the air at the time of 1st priority control. 第二優先制御時の空気の流れを示す断面模式図である。It is a cross-sectional schematic diagram which shows the flow of the air at the time of 2nd priority control. 暖房時の指定時刻制御を説明する図であり、(a)は第二居住域の温度変化を示し、(b)は第一居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining the designated time control at the time of heating, (a) shows the temperature change of a 2nd living area, (b) shows the temperature change of a 1st living area, (c) is an indoor unit and an air blower The operation state is shown. 冷房時の指定時刻制御を説明する図であり、(a)は第二居住域の温度変化を示し、(b)は第一居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining the designated time control at the time of air-conditioning, (a) shows the temperature change of a 2nd living area, (b) shows the temperature change of a 1st living area, (c) is an indoor unit and an air blower The operation state is shown. 起床前予暖制御を説明する図であり、(a)は第二居住域の温度変化を示し、(b)は第一居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining prewarming prewarming control, (a) shows the temperature change of the 2nd living area, (b) shows the temperature change of the 1st living area, (c) is an indoor unit and an air blower. Indicates the operating state. 起床前予冷制御を説明する図であり、(a)は第二居住域の温度変化を示し、(b)は第一居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining pre-wake-up pre-cooling control, (a) shows the temperature change of a 2nd living area, (b) shows the temperature change of a 1st living area, (c) is operation of an indoor unit and an air blower. Indicates the state. 第一居住域の温度を目標温度とする場合の帰宅前予暖制御を説明する図であり、(a)は第二居住域の温度変化を示し、(b)は第一居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining the prewarming control before going home when the temperature of a 1st living area is made into target temperature, (a) shows the temperature change of a 2nd living area, (b) is the temperature change of a 1st living area. (C) shows the operating state of the indoor unit and the blower. 第一居住域の温度を目標温度とする場合の帰宅前予冷制御を説明する図であり、(a)は第二居住域の温度変化を示し、(b)は第一居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining the precooling control before going home when the temperature of a 1st living area is made into target temperature, (a) shows the temperature change of a 2nd living area, (b) shows the temperature change of a 1st living area. (C) shows the operating state of the indoor unit and the blower. 第二居住域の温度を目標温度とする場合の帰宅前予暖制御を説明する図であり、(a)は第二居住域の温度変化を示し、(b)は第一居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining the prewarming control before going home when the temperature of a 2nd living area is made into target temperature, (a) shows the temperature change of a 2nd living area, (b) is the temperature change of a 1st living area. (C) shows the operating state of the indoor unit and the blower. 第二居住域の温度を目標温度とする場合の帰宅前予冷制御を説明する図であり、(a)は第二居住域の温度変化を示し、(b)は第一居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining the precooling control before going home when the temperature of a 2nd living area is made into target temperature, (a) shows the temperature change of a 2nd living area, (b) shows the temperature change of a 1st living area. (C) shows the operating state of the indoor unit and the blower. 暖房時の入浴時刻制御を説明する図であり、(a)は第一居住域の温度変化を示し、(b)は第二居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining the bathing time control at the time of heating, (a) shows the temperature change of a 1st living area, (b) shows the temperature change of a 2nd living area, (c) is an indoor unit and an air blower. The operation state is shown. 暖房時の入浴時刻制御における入浴時刻前の空気の流れを示す断面模式図である。It is a cross-sectional schematic diagram which shows the flow of the air before the bathing time in the bathing time control at the time of heating. 暖房時の入浴時刻制御における入浴中の空気の流れを示す断面模式図である。It is a cross-sectional schematic diagram which shows the flow of the air during bathing in the bathing time control at the time of heating. 暖房時の入浴時刻制御における入浴後の空気の流れを示す断面模式図である。It is a cross-sectional schematic diagram which shows the flow of the air after bathing in the bathing time control at the time of heating. 冷房時の入浴時刻制御を説明する図であり、(a)は第一居住域の温度変化を示し、(b)は第二居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining bathing time control at the time of air conditioning, (a) shows the temperature change of the 1st living area, (b) shows the temperature change of the 2nd living area, (c) is an indoor unit and a blower The operation state is shown. 暖房時の就寝時刻制御を説明する図であり、(a)は第一居住域の温度変化を示し、(b)は第二居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining the bedtime control at the time of heating, (a) shows the temperature change of a 1st living area, (b) shows the temperature change of a 2nd living area, (c) is an indoor unit and an air blower. The operation state is shown. 冷房時の就寝時刻制御を説明する図であり、(a)は第一居住域の温度変化を示し、(b)は第二居住域の温度変化を示し、(c)は室内機および送風装置の運転状態を示す。It is a figure explaining the bedtime control at the time of air-conditioning, (a) shows the temperature change of a 1st living area, (b) shows the temperature change of a 2nd living area, (c) is an indoor unit and an air blower The operation state is shown. 実施の形態2における吹出し口を第二空間の壁に配置した場合を示す断面模式図である。It is a cross-sectional schematic diagram which shows the case where the blower outlet in Embodiment 2 is arrange | positioned in the wall of 2nd space. (a)は実施の形態2における暖房時の弱風量制御による第二空間の気流分布の一例を示す図であり、(b)は暖房時の弱風量制御による第二空間の温度勾配を示す図である。(A) is a figure which shows an example of the airflow distribution of the 2nd space by the weak air volume control at the time of heating in Embodiment 2, (b) is a figure which shows the temperature gradient of the 2nd space by the weak air volume control at the time of heating. It is. (a)は実施の形態2における冷房時の中風量制御による第二空間の気流分布の一例を示す図であり、(b)は冷房時の弱風量制御による第二空間の温度勾配を示す図である。(A) is a figure which shows an example of the airflow distribution of the 2nd space by the medium air volume control at the time of air_conditioning | cooling in Embodiment 2, (b) is a figure which shows the temperature gradient of the 2nd space by the weak air volume control at the time of air_conditioning | cooling. It is. 実施の形態3の空気調和システムにおける各機器の配置を示す平面模式図である。FIG. 6 is a schematic plan view showing the arrangement of devices in the air conditioning system of Embodiment 3. 実施の形態3の空気調和システムにおける空気の流れを示す断面模式図である。6 is a schematic cross-sectional view showing the air flow in the air-conditioning system of Embodiment 3. FIG. 実施の形態3の変形例として、吹出し口を第二居住域の壁に配置した場合を示す断面模式図である。It is a cross-sectional schematic diagram which shows the case where the blower outlet is arrange | positioned in the wall of a 2nd living area as a modification of Embodiment 3. FIG. 実施の形態4の空気調和システムにおける各機器の配置を示す平面模式図である。FIG. 10 is a schematic plan view showing the arrangement of devices in the air conditioning system of Embodiment 4. 実施の形態4の空気調和システムにおける空気の流れを示す断面模式図である。6 is a schematic cross-sectional view showing the air flow in the air conditioning system of Embodiment 4. FIG. 実施の形態4の変形例として、吹出し口を第二居住域の壁に配置した場合を示す断面模式図である。It is a cross-sectional schematic diagram which shows the case where a blower outlet is arrange | positioned in the wall of a 2nd living area as a modification of Embodiment 4. FIG. 実施の形態5の空気調和システムにおける各機器の配置を示す平面模式図である。FIG. 10 is a schematic plan view showing the arrangement of devices in the air conditioning system of Embodiment 5. 実施の形態5の空気調和システムにおける空気の流れを示す断面模式図である。FIG. 10 is a schematic cross-sectional view showing the air flow in the air-conditioning system of Embodiment 5. 実施の形態6の空気調和システムにおける各機器の配置を示す平面模式図である。FIG. 10 is a schematic plan view showing the arrangement of devices in the air conditioning system of Embodiment 6. 実施の形態6の空気調和システムにおける空気の流れを示す断面模式図である。FIG. 10 is a schematic cross-sectional view showing the air flow in the air conditioning system of the sixth embodiment. 変形例の空気調和システムにおける各機器の配置を示す平面模式図である。It is a plane schematic diagram which shows arrangement | positioning of each apparatus in the air conditioning system of a modification.

以下、本発明の実施の形態について、図面を用いて詳細に説明する。なお、以下の実施の形態における具体的な各種設定例は一例を示すものであり、これらに限定されるものではない。また、以下の説明において、「システム」とは、複数の装置で構成される装置全体を表す。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. In addition, the concrete various setting examples in the following embodiment show an example, and are not limited to these. Further, in the following description, “system” represents the entire apparatus including a plurality of apparatuses.

実施の形態1.
図1は、本発明の実施の形態1における空気調和システムを備える住宅1の断面模式図である。また、図2は、本実施の形態の空気調和システムにおける各機器の配置を示す平面模式図である。図1に示すように、本実施の形態の空気調和システムは、2階建ての住宅などに設置される。また、図2に示すように、住宅1には、リビング2、トイレ5、洗面所6および浴室7がある。リビング2の外側の壁には、空調装置100の室内機103が設置される。室内機103は、冷房、暖房、除湿、加湿、保湿または送風などの運転モードにて、リビング2を空調する。室内機103の運転/停止、風向きおよび風量などは、集中制御装置202によって制御される。本実施の形態において、リビング2のように室内機103が設置され、室内機103によって直接空調が行われる空間を第一空間11という。また、トイレ5、洗面所6および浴室7のように、室内機103が設置されていない空間を第二空間12という。さらに、第一空間11における、床から高さ1.4mまでの範囲を第一居住域13という。また、第二空間12における、床から高さ1.4mまでの範囲を第二居住域14という。
Embodiment 1 FIG.
FIG. 1 is a schematic cross-sectional view of a house 1 including an air conditioning system according to Embodiment 1 of the present invention. FIG. 2 is a schematic plan view showing the arrangement of each device in the air conditioning system of the present embodiment. As shown in FIG. 1, the air conditioning system of the present embodiment is installed in a two-story house or the like. As shown in FIG. 2, the house 1 includes a living room 2, a toilet 5, a washroom 6, and a bathroom 7. The indoor unit 103 of the air conditioner 100 is installed on the outer wall of the living room 2. The indoor unit 103 air-conditions the living room 2 in an operation mode such as cooling, heating, dehumidification, humidification, moisture retention, or air blowing. The central controller 202 controls the operation / stop of the indoor unit 103, the wind direction, the air volume, and the like. In the present embodiment, a space in which the indoor unit 103 is installed like the living room 2 and is directly air-conditioned by the indoor unit 103 is referred to as a first space 11. A space where the indoor unit 103 is not installed, such as the toilet 5, the washroom 6, and the bathroom 7, is referred to as a second space 12. Furthermore, a range from the floor to a height of 1.4 m in the first space 11 is referred to as a first living area 13. A range from the floor to a height of 1.4 m in the second space 12 is referred to as a second living area 14.

図1および図2に示すように、リビング2の床には、ライン形状の吸込み口105が設けられる。本実施の形態では、2個の吸込み口105が、室内機103の真下近傍および第二空間12側の壁の近傍にそれぞれ配置される。また、リビング2の床下には、送風装置102が設けられる。送風装置102は、ダクト107を介して吸込み口105と連通している。送風装置102は、回転駆動されて空気流を発生する送風ファンを備える。送風装置102が運転することにより、第一空間11の空気が吸込み口105から吸込まれる。また、リビング2の外側の壁の上部または天井には、外気を室内に給気するため、2個の給気装置9が設けられる。送風装置102の運転/停止および風量(風速)、ならびに給気装置9の運転/停止および風量は、集中制御装置202によって制御される。   As shown in FIGS. 1 and 2, a line-shaped suction port 105 is provided on the floor of the living room 2. In the present embodiment, the two suction ports 105 are respectively arranged in the vicinity immediately below the indoor unit 103 and in the vicinity of the wall on the second space 12 side. A blower 102 is provided under the floor of the living room 2. The air blower 102 communicates with the suction port 105 through the duct 107. The blower 102 includes a blower fan that is rotationally driven to generate an air flow. When the blower 102 is operated, the air in the first space 11 is sucked from the suction port 105. In addition, two air supply devices 9 are provided on the top or ceiling of the outside wall of the living room 2 in order to supply outside air into the room. The central control device 202 controls the operation / stop and air volume (wind speed) of the blower 102 and the operation / stop and air volume of the air supply device 9.

トイレ5および洗面所6の床には、矩形状の吹出し口106が設けられる。図2に示すように、本実施の形態では、トイレ5の床における第一空間11側の隅に1個の吹出し口106が配置され、洗面所6の床における第一空間11側の隅および外側の隅に、それぞれ吹出し口106が配置される。吹出し口106は、ダクト107を介して送風装置102と連通している。送風装置102が運転することにより、第一空間11の空気が、吸込み口105から吸込まれ、吹出し口106から吹出される。さらに、トイレ5、洗面所6、浴室7の外側の壁の上部または天井には、室内の空気を排気するための排気装置10がそれぞれ設けられる。排気装置10の運転/停止および風量は、集中制御装置202によって制御される。リビング2の給気装置9によって取り込まれた空気は、リビング2を通過して、トイレ5、洗面所6および浴室7へと流れ、排気装置10によって外へと排出される。これにより、トイレ5、洗面所6、浴室7で発生する臭気など汚染空気がリビング2へ流入することを防いでいる。   A rectangular outlet 106 is provided on the floors of the toilet 5 and the washroom 6. As shown in FIG. 2, in this Embodiment, the one outlet 106 is arrange | positioned in the corner by the side of the 1st space 11 in the floor of the toilet 5, and the corner by the side of the 1st space 11 in the floor of the toilet 6 Air outlets 106 are respectively arranged at the outer corners. The air outlet 106 communicates with the air blower 102 via the duct 107. When the blower 102 is operated, the air in the first space 11 is sucked from the suction port 105 and blown from the blower port 106. Further, an exhaust device 10 for exhausting indoor air is provided on the upper or ceiling of the outer wall of the toilet 5, the washroom 6, and the bathroom 7, respectively. The central control device 202 controls the operation / stop of the exhaust device 10 and the air volume. The air taken in by the air supply device 9 in the living room 2 passes through the living room 2, flows to the toilet 5, the washroom 6, and the bathroom 7, and is discharged outside by the exhaust device 10. Thereby, contaminated air such as odor generated in the toilet 5, the washroom 6, and the bathroom 7 is prevented from flowing into the living room 2.

本実施の形態では、第一居住域13の床に設置されたライン形の吸込み口105によって、第一居住域13の一定範囲の有効な冷暖気を吸込み、第二居住域14の床の隅から吹き出すことで、第二空間12の床面から高さ0.2m以内で、冷たいまたは暖かい空気層を形成することができる。また、床の隅に吹出し口106を設けることで、送風装置102に連繋されるダクト107のコスト低減を提供しつつ、トイレ5や洗面所6など排水システムと同じレイアウトが使用できる。さらに、人体に直接気流を当てないため、快適性も向上する。   In the present embodiment, effective cooling / heating air in a certain range of the first living area 13 is sucked by the line-shaped suction port 105 installed on the floor of the first living area 13, and the corner of the floor of the second living area 14 is drawn. By blowing out, a cold or warm air layer can be formed within a height of 0.2 m from the floor surface of the second space 12. Further, by providing the outlet 106 at the corner of the floor, the same layout as the drainage system such as the toilet 5 and the washroom 6 can be used while providing cost reduction of the duct 107 connected to the blower 102. Furthermore, comfort is also improved because no airflow is directly applied to the human body.

図3は、本実施の形態における空調装置100の一例を示す図である。本実施の形態の空調装置100は、リビング2に配置される室内機103と、住宅1の外に配置される室外機104とを備える。室内機103は、室内送風機113および室内熱交換器115を備え、冷房、暖房、除湿、加湿、保湿または送風などの運転モードにて空調を行う。室外機104は、室外送風機114、室外熱交換器116、膨張弁117、四方弁118、および圧縮機119を備える。圧縮機119、四方弁118、室内熱交換器115、膨張弁117および室外熱交換器116が環状に冷媒配管120で接続されることで冷媒回路が構成される。そして、冷媒回路の内部を冷媒が圧縮と膨張を繰り返しながら循環することで、ヒートポンプが形成され、住宅1に暖気または冷気を供給する。   FIG. 3 is a diagram illustrating an example of the air conditioner 100 according to the present embodiment. The air conditioner 100 according to the present embodiment includes an indoor unit 103 arranged in the living room 2 and an outdoor unit 104 arranged outside the house 1. The indoor unit 103 includes an indoor blower 113 and an indoor heat exchanger 115, and performs air conditioning in an operation mode such as cooling, heating, dehumidification, humidification, moisture retention, or air blowing. The outdoor unit 104 includes an outdoor blower 114, an outdoor heat exchanger 116, an expansion valve 117, a four-way valve 118, and a compressor 119. The refrigerant circuit is configured by connecting the compressor 119, the four-way valve 118, the indoor heat exchanger 115, the expansion valve 117, and the outdoor heat exchanger 116 in an annular manner through the refrigerant pipe 120. And a heat pump is formed because a refrigerant circulates inside a refrigerant circuit, repeating compression and expansion, and warm air or cold air is supplied to house 1.

図4は、本実施の形態の空気調和システムにおける制御システムの一例を示す図である。図4に示すように、本実施の形態の制御システムは、集中制御装置202と、集中制御装置202に接続される表示操作装置201、空調制御装置203、送風制御装置204、給気制御装置205および排気制御装置206とを備える。空調制御装置203は空調装置100の室内機103と接続される。送風制御装置204は送風装置102と接続される。給気制御装置205は給気装置9と接続される。排気制御装置206は排気装置10と接続される。各制御装置間、および各制御装置と各制御対象装置との間は、有線または無線通信で接続され、制御指令や機器情報などが相互に伝達される。集中制御装置202、空調制御装置203、送風制御装置204、給気制御装置205および排気制御装置206は、専用のハードウェア、またはメモリ(図示せず)に格納されるプログラムを実行するCPU(Central Processing Unit、中央処理装置、処理装置、演算装置、マイクロプロセッサ、マイクロコンピュータ、プロセッサともいう)で構成される。   FIG. 4 is a diagram showing an example of a control system in the air conditioning system of the present embodiment. As shown in FIG. 4, the control system according to the present embodiment includes a central control device 202, a display operation device 201 connected to the central control device 202, an air conditioning control device 203, a blower control device 204, and an air supply control device 205. And an exhaust control device 206. The air conditioning control device 203 is connected to the indoor unit 103 of the air conditioning device 100. The air blowing control device 204 is connected to the air blowing device 102. The air supply control device 205 is connected to the air supply device 9. The exhaust control device 206 is connected to the exhaust device 10. Each control device and between each control device and each control target device are connected by wired or wireless communication, and control commands, device information, and the like are transmitted to each other. The central control device 202, the air conditioning control device 203, the air blow control device 204, the air supply control device 205, and the exhaust control device 206 are CPUs (Central) that execute programs stored in dedicated hardware or memory (not shown). Processing Unit, Central Processing Unit, Processing Unit, Arithmetic Unit, Microprocessor, Microcomputer, and Processor).

表示操作装置201は、例えばリモコンであり、空気調和システムの使用者によって操作されるとともに、空気調和システムの運転情報等を表示する。表示操作装置201から入力される情報は、集中制御装置202に送られる。表示操作装置201から入力される情報は、例えば、空調装置100と送風装置102との連携制御の実行または解除に関する指示、空調装置100および送風装置102を複数備える場合は、これらの中から連携させる機器を選択する指示、および空調装置100と送風装置102との連携制御のスケジュールなどである。   The display operation device 201 is, for example, a remote controller, and is operated by a user of the air conditioning system and displays operation information of the air conditioning system. Information input from the display operation device 201 is sent to the central control device 202. The information input from the display / operation device 201 includes, for example, instructions regarding execution or cancellation of cooperative control between the air conditioner 100 and the air blower 102, and when there are a plurality of air conditioners 100 and air blowers 102, they are associated with each other. For example, an instruction to select a device and a schedule for cooperative control between the air conditioner 100 and the blower 102 are included.

集中制御装置202は、例えばHEMS(Home Energy Management System)コントローラであり、表示操作装置201から入力された情報、および図示しないメモリに記憶される制御プログラムに従って、空調制御装置203、送風制御装置204、給気制御装置205および排気制御装置206へ制御指令を送るとともに、空調制御装置203、送風制御装置204、給気制御装置205および排気制御装置206から各機器の運転情報およびセンサ情報などを受信する。   The central control device 202 is, for example, a HEMS (Home Energy Management System) controller, and according to information input from the display operation device 201 and a control program stored in a memory (not shown), the air conditioning control device 203, the air blow control device 204, A control command is sent to the air supply control device 205 and the exhaust control device 206, and operation information and sensor information of each device are received from the air conditioning control device 203, the air supply control device 204, the air supply control device 205, and the exhaust control device 206. .

具体的には、集中制御装置202から空調制御装置203へは、運転/停止、運転モード、目標温度、風量および風向などに関する指令が送られる。そして、集中制御装置202から送風制御装置204、給気制御装置205および排気制御装置206へは、空調装置100との連携に関する運転/停止、風量などの指令が送られる。また、空調制御装置203、送風制御装置204、給気制御装置205および排気制御装置206から集中制御装置202へ送られるセンサ情報としては、室内温度、室内湿度、室内風速、室内空気圧力、外気温度、外気湿度、外気風速、外気圧力、ヒートポンプの冷媒温度(配管温度)、冷媒圧力、壁温度、照度、日射、在室情報、画像情報、CO濃度、VOC濃度、粉塵濃度および臭気濃度などがある。 Specifically, commands relating to operation / stop, operation mode, target temperature, air volume, wind direction, and the like are sent from the centralized control device 202 to the air conditioning control device 203. Then, commands such as operation / stop and air volume related to the cooperation with the air conditioner 100 are sent from the centralized control device 202 to the air blow control device 204, the air supply control device 205, and the exhaust control device 206. Further, sensor information sent from the air conditioning control device 203, the air blow control device 204, the air supply control device 205, and the exhaust control device 206 to the central control device 202 includes indoor temperature, indoor humidity, indoor wind speed, indoor air pressure, and outside air temperature. , Outside air humidity, outside air speed, outside air pressure, heat pump refrigerant temperature (pipe temperature), refrigerant pressure, wall temperature, illuminance, solar radiation, occupancy information, image information, CO 2 concentration, VOC concentration, dust concentration and odor concentration, etc. is there.

本実施の形態の集中制御装置202は、空調装置100の室内機103と送風装置102とを連携して動作させ、室内機103によって第一空間11に供給される冷暖気を、吸込み口105から吸込み、吹出し口106から第二空間12に吹出す。これにより、住宅1内の温度差を削減することができる。以下に、本実施の形態の集中制御装置202によって実施される連携制御について説明する。連携制御において、集中制御装置202は、空調装置100の風量および風向きと、送風装置102の風量とを対応付けて制御する。   Centralized control device 202 of the present embodiment operates indoor unit 103 and air blower 102 of air conditioner 100 in cooperation with each other, and cools and warms air supplied to first space 11 by indoor unit 103 from suction port 105. Suction and blow out from the outlet 106 to the second space 12. Thereby, the temperature difference in the house 1 can be reduced. Below, the cooperation control implemented by the centralized control apparatus 202 of this Embodiment is demonstrated. In the cooperative control, the central control device 202 controls the air volume and direction of the air conditioner 100 in association with the air volume of the blower 102.

(制御例1:弱風量制御)
集中制御装置202は、連携制御として、室内機103が冷房運転または暖房運転をしている場合、送風装置102の風量を「弱」に設定する。ここで、送風装置102の風量が「弱」に設定される場合、吹出し口106から風速0.5m/s以下(例えば0.1〜0.5m/s)の低速で空気が吹出される。図5(a)は、暖房時の弱風量制御による第二空間12の気流分布の一例を示す図であり、図5(b)は、暖房時の弱風量制御による第二空間12の温度勾配を示す図である。本制御では、室内機103から吹出される暖気は、第一空間11の吸込み口105から吸込まれ、吹出し口106から、低速で吹出される。このように、第二空間12の床から目標温度よりも高温の空気を低速で吹出すことで、床面付近(例えば床面から高さ0.1〜0.2mまで)に空気層が形成され、温められた空気の浮力を換気の駆動力として利用し、サーマルプルーム(自然対流ジェット)を発生させることができる。そして、暖気を第二居住域14まで溜めるのと同時に、細菌、ウイルスなど汚染物質を温度勾配により上昇気流で排出することができる。また、このとき、第二空間12の天井または壁上部に設置された排気装置10を運転することで、汚染された空気を天井まで上昇させ、天井面に沿って流し、排気装置10に流入させることができる。これにより、効率よく第二空間12の居住域(すなわち第二居住域14)を空調するとともに第二空間12を換気することができる。
(Control example 1: Weak air flow control)
When the indoor unit 103 is performing a cooling operation or a heating operation, the central control device 202 sets the air volume of the blower 102 to “weak” as cooperative control. Here, when the air volume of the blower 102 is set to “weak”, air is blown out from the blowout port 106 at a low speed of 0.5 m / s or less (for example, 0.1 to 0.5 m / s). FIG. 5A is a diagram showing an example of airflow distribution in the second space 12 by the weak air flow control during heating, and FIG. 5B is a temperature gradient in the second space 12 by the weak air flow control during heating. FIG. In this control, the warm air blown from the indoor unit 103 is sucked from the suction port 105 of the first space 11 and blown from the blower port 106 at a low speed. Thus, an air layer is formed near the floor surface (for example, from the floor surface to a height of 0.1 to 0.2 m) by blowing air having a temperature higher than the target temperature at a low speed from the floor of the second space 12. Then, the buoyancy of the warmed air can be used as a driving force for ventilation to generate a thermal plume (natural convection jet). And while accumulating warm air to the 2nd living area 14, contaminants, such as bacteria and a virus, can be discharged | emitted by a rising airflow by a temperature gradient. At this time, by operating the exhaust device 10 installed on the ceiling or upper wall of the second space 12, the contaminated air is raised to the ceiling, flows along the ceiling surface, and flows into the exhaust device 10. be able to. Thereby, the living area (that is, the second living area 14) of the second space 12 can be efficiently air-conditioned and the second space 12 can be ventilated.

図6(a)は、冷房時の弱風量制御による第二空間12の気流分布の一例を示す図であり、図6(b)は、冷房時の弱風量制御による第二空間12の温度勾配を示す図である。本制御では、室内機103から吹出される冷気は、第一空間11の吸込み口105から吸込まれ、吹出し口106から低速で吹出される。吹出し口106から低速で冷気を吹出すことにより、第二空間12に不均一な冷気分布が形成され、効果的に汚染物質を除去することができる。また、高密度の新鮮な冷気が第二空間12の床付近に溜まり、その冷気が第二居住域14の温度境界層を保つと同時に、汚染物質を押し上げることができる。   FIG. 6A is a diagram illustrating an example of an airflow distribution in the second space 12 by the weak air flow control during cooling, and FIG. 6B is a temperature gradient in the second space 12 by the weak air flow control during cooling. FIG. In this control, the cold air blown from the indoor unit 103 is sucked from the suction port 105 of the first space 11 and blown from the blower port 106 at a low speed. By blowing cool air from the air outlet 106 at a low speed, a non-uniform cold air distribution is formed in the second space 12, and contaminants can be effectively removed. In addition, high-density fresh cool air accumulates in the vicinity of the floor of the second space 12, and the cool air can keep the temperature boundary layer of the second living area 14 and at the same time push up the pollutants.

(制御例2:第一優先制御/第二優先制御)
集中制御装置202は、連携制御として、第一居住域13の温度が目標温度に到達することを優先する第一優先制御と、第二居住域14の温度が目標温度に到達することを優先する第二優先制御と、を実行する。第一優先制御および第二優先制御の何れを実行するかは、表示操作装置201から入力されるスケジュール、または各制御装置から送信されるセンサ情報に基づいて選択される。
(Control example 2: first priority control / second priority control)
The centralized control device 202 gives priority to the first priority control that prioritizes the temperature of the first living area 13 reaching the target temperature and the temperature of the second living area 14 reaching the target temperature as linked control. And second priority control. Whether to execute the first priority control or the second priority control is selected based on a schedule input from the display operation device 201 or sensor information transmitted from each control device.

図7は、第一優先制御および第二優先制御における制御内容を示す図である。図7に示すように、集中制御装置202は、第一優先制御の場合、室内機103の吹出し方向を遠端向きに設定し、送風装置102の風量を「弱」に設定する。ここで、「遠端向き」とは、室内機103のルーバの角度を45°〜70°とすることである。なお、ルーバの角度は、床面に対して鉛直方向を0°とし、床面と平行な方向を90°とする。また、集中制御装置202は、第二優先制御の場合、室内機103の吹出し方向を真下向きに設定し、送風装置102の風量を「強」に設定する。ここで、「真下向き」とは、室内機103のルーバの角度を30°以内とすることであり、送風装置102の風量が「強」に設定された場合、吹出し口106から風速1.0m/s以上で空気が吹出される。   FIG. 7 is a diagram illustrating control contents in the first priority control and the second priority control. As shown in FIG. 7, in the case of the first priority control, the centralized control device 202 sets the blowing direction of the indoor unit 103 to the far end and sets the air volume of the blower 102 to “weak”. Here, “toward the far end” means that the angle of the louver of the indoor unit 103 is 45 ° to 70 °. The louver angle is 0 ° in the vertical direction with respect to the floor surface, and 90 ° in the direction parallel to the floor surface. Further, in the case of the second priority control, the central control device 202 sets the blowing direction of the indoor unit 103 to be directly downward, and sets the air volume of the blower device 102 to “strong”. Here, “directly downward” means that the angle of the louver of the indoor unit 103 is within 30 °, and when the air volume of the blower 102 is set to “strong”, the wind speed 1.0 m from the outlet 106. Air is blown out at / s or more.

図8は、第一優先制御時の空気の流れを示す断面模式図である。図8に示すように、第一優先制御では、室内機103の風向きが遠端向きに設定される。そして、送風装置102が運転されると、第一居住域13の床において、第二空間12の近傍に配置された吸込み口105によって、室内機103が吹出す冷暖気が吸込まれる。これにより、吸込み口105と吹出し口106を接続するダクト107の圧損を低減すること、および送風装置102が備えるファンの電力を削減することができる。また、第二空間12の床に設置された吹出し口106から、低速で冷暖気が吹出される。これにより、第一居住域13の室温は、第二居住域14の室温よりも早く目標温度まで到達する。生活シーンに応じて、第一優先制御を実行することで、第一空間11の室温を優先的に制御でき、第一空間11の快適性が向上する。   FIG. 8 is a schematic cross-sectional view showing the air flow during the first priority control. As shown in FIG. 8, in the first priority control, the wind direction of the indoor unit 103 is set to the far end direction. And if the air blower 102 is drive | operated, the warm air which the indoor unit 103 will blow in will be inhaled by the suction inlet 105 arrange | positioned in the vicinity of the 2nd space 12 in the floor of the 1st living area 13. FIG. Thereby, the pressure loss of the duct 107 which connects the suction inlet 105 and the blower outlet 106 can be reduced, and the electric power of the fan with which the air blower 102 is provided can be reduced. Cooling / warming air is blown out at a low speed from the blowout port 106 installed on the floor of the second space 12. Thereby, the room temperature of the first living area 13 reaches the target temperature earlier than the room temperature of the second living area 14. By executing the first priority control according to the life scene, the room temperature of the first space 11 can be preferentially controlled, and the comfort of the first space 11 is improved.

図9は、第二優先制御時の空気の流れを示す断面模式図である。図9に示すように、第二優先制御では、室内機103の風向きが真下向きに設定される。そして、送風装置102が運転されると、第一居住域13の床において、室内機103の真下近傍に配置された吸込み口105によって、室内機103が吹出す冷暖気が吸込まれる。これにより、室内機103が吹出した空気を、効率良く吸込み口105に届けることができる。また、第二空間12の床に設置された吹出し口106から、強い風速で冷暖気が吹出される。これにより、第二居住域14の室温は、第一居住域13の室温よりも早く目標温度まで到達する。生活シーンに応じて、第二優先制御を実行することで、第二空間12の室温を優先的に制御でき、第二空間12の快適性が向上する。   FIG. 9 is a schematic cross-sectional view showing the air flow during the second priority control. As shown in FIG. 9, in the second priority control, the wind direction of the indoor unit 103 is set to be directly downward. And if the air blower 102 is drive | operated, the warm / warm air which the indoor unit 103 will blow in will be sucked in the floor of the 1st living area 13 by the suction inlet 105 arrange | positioned just under the indoor unit 103. FIG. Thereby, the air blown out by the indoor unit 103 can be efficiently delivered to the suction port 105. Cooling / warming air is blown out at a strong wind speed from the blowout opening 106 installed on the floor of the second space 12. Accordingly, the room temperature of the second living area 14 reaches the target temperature earlier than the room temperature of the first living area 13. By executing the second priority control according to the life scene, the room temperature of the second space 12 can be preferentially controlled, and the comfort of the second space 12 is improved.

(制御例3:指定時刻制御)
集中制御装置202は、表示操作装置201から入力される指定時刻に従って、室内機103および送風装置102を連携制御する。図10は、暖房時の指定時刻制御を説明する図である。図10(a)は、第二居住域14の温度変化を示し、図10(b)は、第一居住域13の温度変化を示し、図10(c)は、室内機103および送風装置102の運転状態を示す。本制御例では、指定時刻として、室内機103の運転開始時刻と停止時刻とが指定され、集中制御装置202に記憶される。
(Control example 3: specified time control)
The centralized control device 202 controls the indoor unit 103 and the blower device 102 in accordance with the specified time input from the display operation device 201. FIG. 10 is a diagram for explaining the designated time control during heating. FIG. 10A shows the temperature change of the second living area 14, FIG. 10B shows the temperature change of the first living area 13, and FIG. 10C shows the indoor unit 103 and the blower 102. The operation state is shown. In this control example, the operation start time and stop time of the indoor unit 103 are specified as the specified time and stored in the centralized control device 202.

集中制御装置202は、指定された運転開始時刻になると、空調制御装置203へ運転開始指令を送り、室内機103の暖房運転を開始する。同時に集中制御装置202は、送風制御装置204へ運転開始指令を送り、室内機103と連動して送風装置102の運転を開始する。これにより、第一居住域13に暖気が供給されるとともに、吸込み口105から吸込まれた暖気が吹出し口106から第二居住域14に供給され、第一居住域13および第二居住域14の温度が目標温度まで上昇する。また、集中制御装置202は、指定された運転停止時刻になると、空調制御装置203へ停止指令を送り、室内機103の暖房運転を停止する。同時に集中制御装置202は、送風制御装置204へ停止指令を送り、室内機103と連動して送風装置102を停止する。   When the designated operation start time is reached, the central control device 202 sends an operation start command to the air conditioning control device 203 and starts the heating operation of the indoor unit 103. At the same time, the central control device 202 sends an operation start command to the air blow control device 204 and starts operation of the air blow device 102 in conjunction with the indoor unit 103. As a result, warm air is supplied to the first living area 13, and warm air sucked from the suction port 105 is supplied from the outlet 106 to the second living area 14, and the first living area 13 and the second living area 14 The temperature rises to the target temperature. Further, when the designated operation stop time is reached, the central control device 202 sends a stop command to the air conditioning control device 203 to stop the heating operation of the indoor unit 103. At the same time, the central control device 202 sends a stop command to the blower control device 204 and stops the blower device 102 in conjunction with the indoor unit 103.

図11は、冷房時の指定時刻制御を説明する図である。図11(a)は、第二居住域14の温度変化を示し、図11(b)は、第一居住域13の温度変化を示し、図11(c)は、室内機103および送風装置102の運転状態を示す。図10に示す暖房時と同様に、集中制御装置202は、指定された運転開始時刻になると、空調制御装置203へ運転開始指令を送り、室内機103の冷房運転を開始する。同時に集中制御装置202は、送風制御装置204へ運転開始指令を送り、室内機103と連動して送風装置102の運転を開始する。これにより、第一居住域13に冷気が供給されるとともに、吸込み口105から吸込まれた冷気が吹出し口106から第二居住域14に供給され、第一居住域13および第二居住域14の温度が目標温度まで低下する。また、集中制御装置202は、指定された運転停止時刻になると、空調制御装置203へ停止指令を送り、室内機103の暖房運転を停止する。同時に集中制御装置202は、送風制御装置204へ停止指令を送り、室内機103と連動して送風装置102を停止する。   FIG. 11 is a diagram for explaining the specified time control during cooling. 11A shows the temperature change of the second living area 14, FIG. 11B shows the temperature change of the first living area 13, and FIG. 11C shows the indoor unit 103 and the blower 102. The operation state is shown. Similar to the heating shown in FIG. 10, the centralized control device 202 sends an operation start command to the air conditioning control device 203 at the designated operation start time, and starts the cooling operation of the indoor unit 103. At the same time, the central control device 202 sends an operation start command to the air blow control device 204 and starts operation of the air blow device 102 in conjunction with the indoor unit 103. As a result, cold air is supplied to the first living area 13, and cold air sucked from the suction port 105 is supplied from the outlet 106 to the second living area 14, and the first living area 13 and the second living area 14. The temperature drops to the target temperature. Further, when the designated operation stop time is reached, the central control device 202 sends a stop command to the air conditioning control device 203 to stop the heating operation of the indoor unit 103. At the same time, the central control device 202 sends a stop command to the blower control device 204 and stops the blower device 102 in conjunction with the indoor unit 103.

(制御例4)
また、集中制御装置202は、表示操作装置201を介して設定されるスケジュールに従って、室内機103および送風装置102を連携制御する。設定されるスケジュールは、起床時刻、外出時刻、帰宅時刻、入浴時刻および就寝時刻などがあり、集中制御装置202に記憶される。
(Control example 4)
The centralized control device 202 controls the indoor unit 103 and the blower device 102 in accordance with a schedule set via the display operation device 201. The set schedule includes a wake-up time, a going-out time, a return time, a bathing time, a bedtime, and the like, and is stored in the central control device 202.

(制御例4−1:起床前予暖/予冷制御)
例えば、集中制御装置202は、スケジュールに設定される起床時刻よりも前に、室内機103および送風装置102の運転を開始し、室内機103から供給される冷暖気によって、第一居住域13および第二居住域14を予暖または予冷する。
(Control example 4-1: Prewarming / precooling control before waking up)
For example, the centralized control device 202 starts the operation of the indoor unit 103 and the blower device 102 before the wake-up time set in the schedule, and the first living area 13 and the warming / warming air supplied from the indoor unit 103 The second living area 14 is pre-heated or pre-cooled.

図12は、起床前予暖制御を説明する図である。図12(a)は、第二居住域14の温度変化を示し、図12(b)は、第一居住域13の温度変化を示し、図12(c)は、室内機103および送風装置102の運転状態を示す。集中制御装置202は、指定された起床時刻よりも所定時間(例えば30分)前の予暖時刻になると、空調制御装置203へ運転開始指令を送り、室内機103の暖房運転を開始する。同時に集中制御装置202は、送風制御装置204へ運転開始指令を送り、室内機103と連動して送風装置102の運転を開始する。また、このとき、洗面所6などの第二居住域14の温度を目標温度にすることを優先するため、第二優先制御が実施される。詳しくは、図9に示すように、室内機103の吹出し方向が真下(ルーバ30°以内)向きに設定され、送風装置102の風量が「強」に設定される。また、室内機103の風量も「強」に設定される。これにより、第二居住域14が優先して暖房される。   FIG. 12 is a diagram for explaining pre-wake-up pre-warming control. 12A shows the temperature change of the second living area 14, FIG. 12B shows the temperature change of the first living area 13, and FIG. 12C shows the indoor unit 103 and the blower 102. The operation state is shown. The centralized control device 202 sends an operation start command to the air-conditioning control device 203 at a pre-warming time that is a predetermined time (for example, 30 minutes) before the designated wake-up time, and starts the heating operation of the indoor unit 103. At the same time, the central control device 202 sends an operation start command to the air blow control device 204 and starts operation of the air blow device 102 in conjunction with the indoor unit 103. At this time, the second priority control is performed in order to prioritize setting the temperature of the second living area 14 such as the washroom 6 to the target temperature. Specifically, as shown in FIG. 9, the blowing direction of the indoor unit 103 is set to be directly below (within louvers of 30 °), and the air volume of the blower 102 is set to “strong”. The air volume of the indoor unit 103 is also set to “strong”. Thereby, the 2nd residence area 14 is heated preferentially.

そして、第二居住域14の温度が目標温度に到達した場合、集中制御装置202は、送風制御装置204へ送風装置102の風量を「弱」へ変更する指令を送り、送風装置102の風量を低下させる。また、第一居住域13の温度が目標温度に到達した場合、集中制御装置202は、空調制御装置203へ室内機103の風量を「弱」へ変更する指令を送り、室内機103の風量を低下させる。また、集中制御装置202は、起床時刻から所定時間(例えば30時間)が経過した場合、送風制御装置204へ停止指令を送り、送風装置102を停止させる。一方、集中制御装置202は、第一居住域13の温度が目標温度の許容範囲内を維持するように、室内機103の風量を「弱」としたまま運転を継続する。そして、集中制御装置202は、外出時刻になると、空調制御装置203へ停止指令を送り、室内機103の暖房運転を停止させる。   When the temperature of the second living area 14 reaches the target temperature, the central control device 202 sends an instruction to change the air volume of the air blower 102 to “weak” to the air blow control device 204, and the air flow of the air blower 102 is reduced. Reduce. Further, when the temperature of the first living area 13 reaches the target temperature, the central control device 202 sends a command to the air conditioning control device 203 to change the air volume of the indoor unit 103 to “weak”, and the air volume of the indoor unit 103 is reduced. Reduce. In addition, when a predetermined time (for example, 30 hours) has elapsed from the wake-up time, the central control device 202 sends a stop command to the blower control device 204 to stop the blower 102. On the other hand, the centralized control device 202 continues the operation while keeping the air volume of the indoor unit 103 “weak” so that the temperature of the first living area 13 is maintained within the allowable range of the target temperature. Then, when it is time to go out, the central control device 202 sends a stop command to the air conditioning control device 203 to stop the heating operation of the indoor unit 103.

図13は、起床前予冷制御を説明する図である。図13(a)は、第二居住域14の温度変化を示し、図13(b)は、第一居住域13の温度変化を示し、図13(c)は、室内機103および送風装置102の運転状態を示す。暖房時と同様に、集中制御装置202は、指定された起床時刻よりも所定時間(例えば30分)前の予冷時刻になると、空調制御装置203へ運転開始指令を送り、室内機103の冷房運転を開始する。同時に集中制御装置202は、送風制御装置204へ運転開始指令を送り、室内機103と連動して送風装置102の運転を開始する。また、このとき、暖房時と同様に、第二優先制御が実施される。詳しくは、図9に示すように、室内機103の吹出し方向が真下(ルーバ30°以内)向きに設定され、送風装置102の風量が「強」に設定される。また、室内機103の風量も「強」に設定される。これにより、第二居住域14が優先して冷房される。   FIG. 13 is a diagram illustrating pre-wake-up precooling control. 13A shows the temperature change of the second living area 14, FIG. 13B shows the temperature change of the first living area 13, and FIG. 13C shows the indoor unit 103 and the blower 102. The operation state is shown. As in the case of heating, the central control device 202 sends an operation start command to the air conditioning control device 203 at a pre-cooling time that is a predetermined time (for example, 30 minutes) before the designated wake-up time, so that the cooling operation of the indoor unit 103 is performed. To start. At the same time, the central control device 202 sends an operation start command to the air blow control device 204 and starts operation of the air blow device 102 in conjunction with the indoor unit 103. At this time, the second priority control is performed as in the case of heating. Specifically, as shown in FIG. 9, the blowing direction of the indoor unit 103 is set to be directly below (within louvers of 30 °), and the air volume of the blower 102 is set to “strong”. The air volume of the indoor unit 103 is also set to “strong”. Thereby, the second residential area 14 is preferentially cooled.

そして、第二居住域14の温度が目標温度に到達した場合、集中制御装置202は、暖房時と同様に、送風制御装置204へ送風装置102の風量を「弱」へ変更する指令を送り、送風装置102の風量を低下させる。また、第一居住域13の温度が目標温度に到達した場合、集中制御装置202は、空調制御装置203へ室内機103の風量を「弱」へ変更する指令を送り、室内機103の風量を低下させる。また、集中制御装置202は、起床時刻から所定時間が経過した場合、送風制御装置204へ停止指令を送り、送風装置102を停止させる。一方、集中制御装置202は、第一居住域13の温度が目標温度の許容範囲内を維持するように、室内機103の風量を「弱」としたまま運転を継続する。そして、集中制御装置202は、外出時刻になると、空調制御装置203へ停止指令を送り、室内機103の冷房運転を停止させる。   And when the temperature of the 2nd living area 14 reaches | attains target temperature, the central control apparatus 202 sends the command which changes the air volume of the air blower 102 to "weak" to the air blow control apparatus 204 similarly to the time of heating, The air volume of the blower 102 is reduced. Further, when the temperature of the first living area 13 reaches the target temperature, the central control device 202 sends a command to the air conditioning control device 203 to change the air volume of the indoor unit 103 to “weak”, and the air volume of the indoor unit 103 is reduced. Reduce. In addition, when a predetermined time has elapsed from the wake-up time, the central control device 202 sends a stop command to the blower control device 204 to stop the blower 102. On the other hand, the centralized control device 202 continues the operation while keeping the air volume of the indoor unit 103 “weak” so that the temperature of the first living area 13 is maintained within the allowable range of the target temperature. Then, when it is time to go out, the central control device 202 sends a stop command to the air conditioning control device 203 to stop the cooling operation of the indoor unit 103.

上記のような起床前予暖/予冷制御を行うことで、冬期には第一居住域13から第二居住域14まで暖房することができ、夏季には第一居住域13から第二居住域14まで冷房することができ、快適性が向上する。同時に、室内機103の風量および風向き、ならびに送風装置102の風量を制御し、効率の良い気流の流れを提供することで、省エネと快適性を両立することができる。   By performing the pre-warming pre-warming / pre-cooling control as described above, it is possible to heat from the first living area 13 to the second living area 14 in the winter, and in the summer, from the first living area 13 to the second living area. It can be cooled to 14 and comfort is improved. At the same time, by controlling the air volume and direction of the indoor unit 103 and the air volume of the blower 102 and providing an efficient air flow, both energy saving and comfort can be achieved.

(制御例4−2:帰宅前予暖/予冷制御)
また、集中制御装置202は、スケジュールに設定される帰宅時刻よりも前に室内機103および送風装置102の運転を開始し、室内機103から供給される冷暖気によって、第一居住域13および第二居住域14を予暖または予冷する。なお、帰宅前の予暖/予冷制御においては、第一居住域13の温度を目標温度とする場合(図14、図15)と、第一居住域13および第二居住域14の温度を目標温度とする場合(図16、図17)の2パターンがある。
(Control example 4-2: Prewarming / precooling control before returning home)
The centralized control device 202 starts the operation of the indoor unit 103 and the blower device 102 before the return time set in the schedule, and the first residential area 13 and the Pre-warm or pre-cool the second living area 14. In the preheating / precooling control before returning home, the temperature of the first living area 13 and the second living area 14 are set as targets when the temperature of the first living area 13 is set as the target temperature (FIGS. 14 and 15). There are two patterns for the case of temperature (FIGS. 16 and 17).

図14は、第一居住域13の温度を目標温度とする場合の帰宅前予暖制御を説明する図である。図14(a)は、第二居住域14の温度変化を示し、図14(b)は、第一居住域13の温度変化を示し、図14(c)は、室内機103および送風装置102の運転状態を示す。集中制御装置202は、指定された帰宅時刻よりも所定時間(例えば30分)前の予暖時刻になると、空調制御装置203へ運転開始指令を送り、室内機103の暖房運転を開始する。同時に集中制御装置202は、送風制御装置204へ運転開始指令を送り、室内機103と連動して送風装置102の運転を開始する。また、このとき、リビング2などにおける第一居住域13の温度が目標温度に到達することと、省エネの実現とを両立させるため、第一優先制御を実行する。詳しくは、図8に示すように室内機103の吹出し方向が遠端(ルーバ45〜70°)向きに設定され、送風装置102の風量が「弱」に設定される。また、室内機103の風量も「弱」に設定される。これにより、第一居住域13が優先して暖房される。   FIG. 14 is a diagram for explaining preheating control before returning home when the temperature of the first living area 13 is set as the target temperature. 14A shows the temperature change of the second living area 14, FIG. 14B shows the temperature change of the first living area 13, and FIG. 14C shows the indoor unit 103 and the blower 102. The operation state is shown. The centralized control device 202 sends an operation start command to the air conditioning control device 203 and starts the heating operation of the indoor unit 103 at a pre-warming time that is a predetermined time (for example, 30 minutes) before the designated return home time. At the same time, the central control device 202 sends an operation start command to the air blow control device 204 and starts operation of the air blow device 102 in conjunction with the indoor unit 103. At this time, the first priority control is executed in order to make the temperature of the first living area 13 in the living room 2 reach the target temperature and achieve energy saving. Specifically, as shown in FIG. 8, the blowing direction of the indoor unit 103 is set to the far end (louver 45 to 70 °) direction, and the air volume of the blower 102 is set to “weak”. The air volume of the indoor unit 103 is also set to “weak”. Thereby, the 1st residence area 13 is heated preferentially.

そして、第一居住域13の温度が目標温度に到達した場合、集中制御装置202は、空調制御装置203へ、室内機103の吹出し方向を真下(ルーバ30°以内)向きに変更する指令を送る。これにより、室内機103の風向きが真下に変更され、第二居住域14に暖気が送られる。   And when the temperature of the 1st living area 13 reaches | attains target temperature, the centralized control apparatus 202 sends the instruction | command which changes the blowing direction of the indoor unit 103 to the direct downward (within louver 30 degrees) direction to the air-conditioning control apparatus 203. . As a result, the wind direction of the indoor unit 103 is changed directly below, and warm air is sent to the second living area 14.

図15は、第一居住域13の温度を目標温度とする場合の帰宅前予冷制御を説明する図である。図15(a)は、第二居住域14の温度変化を示し、図15(b)は、第一居住域13の温度変化を示し、図15(c)は、室内機103および送風装置102の運転状態を示す。暖房時と同様に、集中制御装置202は、指定された帰宅時刻よりも所定時間(例えば30分)前の予冷時刻になると、空調制御装置203へ運転開始指令を送り、室内機103の冷房運転を開始する。同時に集中制御装置202は、送風制御装置204へ運転開始指令を送り、室内機103と連動して送風装置102の運転を開始する。また、このとき、暖房時と同様に、第一優先制御が実施される。詳しくは、図8に示すように室内機103の吹出し方向が遠端(ルーバ45〜70°)向きに設定され、送風装置102の風量が「弱」に設定される。また、室内機103の風量も「弱」に設定される。これにより、第一居住域13が優先して暖房される。   FIG. 15 is a diagram for explaining pre-cooling control before returning when the temperature of the first living area 13 is set as the target temperature. FIG. 15A shows the temperature change of the second living area 14, FIG. 15B shows the temperature change of the first living area 13, and FIG. 15C shows the indoor unit 103 and the blower 102. The operation state is shown. As in the case of heating, the centralized control device 202 sends an operation start command to the air conditioning control device 203 at a pre-cooling time that is a predetermined time (for example, 30 minutes) before the designated return home time, so that the cooling operation of the indoor unit 103 is performed. To start. At the same time, the central control device 202 sends an operation start command to the air blow control device 204 and starts operation of the air blow device 102 in conjunction with the indoor unit 103. At this time, the first priority control is performed as in the heating. Specifically, as shown in FIG. 8, the blowing direction of the indoor unit 103 is set to the far end (louver 45 to 70 °) direction, and the air volume of the blower 102 is set to “weak”. The air volume of the indoor unit 103 is also set to “weak”. Thereby, the 1st residence area 13 is heated preferentially.

そして、第一居住域13の温度が目標温度に到達した場合、集中制御装置202は、空調制御装置203へ、室内機103の吹出し方向を真下(ルーバ30°以内)向きに変更する指令を送る。これにより、室内機103の風向きが真下に変更され、第二居住域14に冷気が送られる。   And when the temperature of the 1st living area 13 reaches | attains target temperature, the centralized control apparatus 202 sends the instruction | command which changes the blowing direction of the indoor unit 103 to the direct downward (within louver 30 degrees) direction to the air-conditioning control apparatus 203. . As a result, the wind direction of the indoor unit 103 is changed directly below, and cool air is sent to the second living area 14.

図16は、第二居住域14の温度を目標温度とする場合の帰宅前予暖制御を説明する図である。図16(a)は、第二居住域14の温度変化を示し、図16(b)は、第一居住域13の温度変化を示し、図16(c)は、室内機103および送風装置102の運転状態を示す。集中制御装置202は、指定された帰宅時刻よりも所定時間(例えば30分)前の予暖時刻になると、空調制御装置203へ運転開始指令を送り、室内機103の暖房運転を開始する。同時に集中制御装置202は、送風制御装置204へ運転開始指令を送り、室内機103と連動して送風装置102の運転を開始する。また、このとき、室内機103の吹出し方向は遠端(ルーバ45〜70°)向きに設定され、室内機103の風量および送風装置102の風量は「弱」に設定される(第一優先制御)。   FIG. 16 is a diagram for explaining pre-warming control before returning when the temperature of the second living area 14 is set as the target temperature. FIG. 16A shows the temperature change of the second living area 14, FIG. 16B shows the temperature change of the first living area 13, and FIG. 16C shows the indoor unit 103 and the blower 102. The operation state is shown. The centralized control device 202 sends an operation start command to the air conditioning control device 203 and starts the heating operation of the indoor unit 103 at a pre-warming time that is a predetermined time (for example, 30 minutes) before the designated return home time. At the same time, the central control device 202 sends an operation start command to the air blow control device 204 and starts operation of the air blow device 102 in conjunction with the indoor unit 103. At this time, the blowing direction of the indoor unit 103 is set to the far end (louver 45 to 70 °), and the air volume of the indoor unit 103 and the air volume of the blower 102 are set to “weak” (first priority control). ).

そして、第一居住域13の予暖時間を短縮するために、集中制御装置202は、室内機103の運転開始から所定の時間が経過した場合、空調制御装置203へ室内機103の風量を「強」へ変更する指令を送り、室内機103の風量を上昇させる。そして、第一居住域13の温度が目標温度に到達した場合、集中制御装置202は、空調制御装置203へ、室内機103の風量を「弱」へ変更するとともに、吹出し方向を真下(ルーバ30°以内)向きに変更する指令を送る。これにより、室内機103の風量を低下させ、風向きが真下に変更される。同時に、集中制御装置202は、送風制御装置204へ送風装置102の風量を「強」に変更する指令を送る。これにより、第二居住域14の温度が目標温度に到達する。   In order to shorten the pre-warming time of the first living area 13, the central control device 202 sends the air volume of the indoor unit 103 to the air conditioning control device 203 when a predetermined time has elapsed since the start of the operation of the indoor unit 103. A command to change to “strong” is sent, and the air volume of the indoor unit 103 is increased. When the temperature of the first living area 13 reaches the target temperature, the central control device 202 changes the air volume of the indoor unit 103 to “weak” to the air-conditioning control device 203 and the blowout direction directly below (louver 30). Within °) Send a command to change the direction. As a result, the air volume of the indoor unit 103 is reduced and the wind direction is changed directly below. At the same time, the centralized control device 202 sends a command for changing the air volume of the blower 102 to “strong” to the blower controller 204. Thereby, the temperature of the second living area 14 reaches the target temperature.

図17は、第二居住域14の温度を目標温度とする場合の帰宅前予冷制御を説明する図である。図17(a)は、第二居住域14の温度変化を示し、図17(b)は、第一居住域13の温度変化を示し、図17(c)は、室内機103および送風装置102の運転状態を示す。集中制御装置202は、指定された帰宅時刻よりも所定時間(例えば30分)前の予冷時刻になると、空調制御装置203へ運転開始指令を送り、室内機103の冷房運転を開始する。同時に集中制御装置202は、送風制御装置204へ運転開始指令を送り、室内機103と連動して送風装置102の運転を開始する。また、このとき、室内機103の吹出し方向は遠端(ルーバ45〜70°)向きに設定され、室内機103の風量および送風装置102の風量は「弱」に設定される(第一優先制御)。   FIG. 17 is a diagram for explaining pre-cooling control before returning when the temperature of the second living area 14 is set as the target temperature. FIG. 17A shows the temperature change of the second living area 14, FIG. 17B shows the temperature change of the first living area 13, and FIG. 17C shows the indoor unit 103 and the blower 102. The operation state is shown. The centralized control device 202 sends an operation start command to the air conditioning control device 203 and starts the cooling operation of the indoor unit 103 at a precooling time that is a predetermined time (for example, 30 minutes) before the designated return home time. At the same time, the central control device 202 sends an operation start command to the air blow control device 204 and starts operation of the air blow device 102 in conjunction with the indoor unit 103. At this time, the blowing direction of the indoor unit 103 is set to the far end (louver 45 to 70 °), and the air volume of the indoor unit 103 and the air volume of the blower 102 are set to “weak” (first priority control). ).

そして、第一居住域13の予冷時間を短縮するために、集中制御装置202は、室内機103の運転開始から所定の時間が経過した場合、空調制御装置203へ室内機103の風量を「強」へ変更する指令を送り、室内機103の風量を上昇させる。そして、第一居住域13の温度が目標温度に到達した場合、集中制御装置202は、空調制御装置203へ、室内機103の風量を「弱」へ変更するとともに、吹出し方向を真下(ルーバ30°以内)向きに変更する指令を送る。これにより、室内機103の風量を低下させ、風向きが真下に変更される。同時に、集中制御装置202は、送風制御装置204へ送風装置102の風量を「強」に変更する指令を送る。これにより、第二居住域14の温度が目標温度に到達する。   Then, in order to shorten the pre-cooling time of the first living area 13, the centralized control device 202 increases the air volume of the indoor unit 103 to the air conditioning control device 203 when a predetermined time has elapsed from the start of the operation of the indoor unit 103. To change the air volume of the indoor unit 103. When the temperature of the first living area 13 reaches the target temperature, the central control device 202 changes the air volume of the indoor unit 103 to “weak” to the air-conditioning control device 203 and the blowout direction directly below (louver 30). Within °) Send a command to change the direction. As a result, the air volume of the indoor unit 103 is reduced and the wind direction is changed directly below. At the same time, the centralized control device 202 sends a command for changing the air volume of the blower 102 to “strong” to the blower controller 204. Thereby, the temperature of the second living area 14 reaches the target temperature.

上記のような帰宅前予暖/予冷制御を行うことで、帰宅時には第一居住域13および第二居住域14が暖房または冷房されているため、快適性が向上する。また、最初に第一居住域13を予暖または予冷し、送風装置102を用いて、第一居住域13の空気を吸込んで第二居住域14に吹出すことで、効率良く第二居住域14を予暖または予冷することができ、省エネと快適性を両立することができる。   By performing the pre-warming / pre-cooling control before returning as described above, since the first living area 13 and the second living area 14 are heated or cooled when returning, comfort is improved. In addition, the first living area 13 is first pre-heated or pre-cooled, and the air in the first living area 13 is sucked and blown out to the second living area 14 by using the blower 102, so that the second living area is efficiently obtained. 14 can be preheated or precooled, and both energy saving and comfort can be achieved.

(制御例4−3:入浴時刻制御)
集中制御装置202は、スケジュールに設定される入浴時刻に従って、室内機103および送風装置102を連携制御する。
(Control example 4-3: Bathing time control)
The centralized control device 202 controls the indoor unit 103 and the blower device 102 in accordance with the bathing time set in the schedule.

図18は、暖房時の入浴時刻制御を説明する図である。図18(a)は、第一居住域13の温度変化を示し、図18(b)は、第二居住域14の温度変化を示し、図18(c)は、室内機103および送風装置102の運転状態を示す。なお、入浴時刻制御開始時において、室内機103は風量「弱」で暖房運転しているものとする。集中制御装置202は、指定された入浴時刻よりも所定時間(例えば30分)前の予暖時刻になると、送風制御装置204へ運転開始指令を送り、送風装置102の運転を開始する。また、このとき、洗面所6など第二居住域14の温度が目標温度に到達することを優先するため、第二優先制御が実施される。詳しくは、室内機103の吹出し方向は真下(ルーバ30°以内)向きに設定され、室内機103および送風装置102の風量は「強」に設定される。これにより、洗面所6などの第二居住域14が予暖される。   FIG. 18 is a diagram illustrating bathing time control during heating. 18A shows the temperature change of the first living area 13, FIG. 18B shows the temperature change of the second living area 14, and FIG. 18C shows the indoor unit 103 and the blower 102. The operation state is shown. Note that, at the start of bathing time control, the indoor unit 103 is assumed to be performing a heating operation with an air volume “weak”. The central control device 202 sends an operation start command to the air blow control device 204 and starts operation of the air blow device 102 at a pre-warming time that is a predetermined time (for example, 30 minutes) before the designated bathing time. At this time, since priority is given to the temperature of the second living area 14 such as the washroom 6 reaching the target temperature, the second priority control is performed. Specifically, the blowing direction of the indoor unit 103 is set to be directly downward (within louver 30 °), and the air volumes of the indoor unit 103 and the blower 102 are set to “strong”. Thereby, the second living area 14 such as the washroom 6 is preheated.

そして、第二居住域14の温度が目標温度に到達すると、集中制御装置202は、送風制御装置204へ送風装置102の風量を「弱」に変更する指令を送り、送風装置102の風量を低下させる。同時に、集中制御装置202は、空調制御装置203へ、室内機103の風量を「弱」へ変更するとともに、吹出し方向を自動向きに変更する指令を送る。ここで、自動向きとは、ルーバの角度を30〜60°とすることである。その後、第一居住域13の温度が安定すると、集中制御装置202は、送風制御装置204へ、ファンの回転方向を反転させる指令を送る。同時に、集中制御装置202は、空調制御装置203へ風量を「弱」へ変更するとともに、吹出し方向を遠端(ルーバ45〜70°)向きに変更する指令を送る。これにより、第二居住域14の空気が、吹出し口106から吸込まれ、吸込み口105から第一居住域13へ吹き出される。   When the temperature of the second living area 14 reaches the target temperature, the central control device 202 sends an instruction to change the air volume of the air blower 102 to “weak” to the air blow control device 204 to reduce the air volume of the air blower 102. Let At the same time, the central control device 202 sends a command to the air conditioning control device 203 to change the air volume of the indoor unit 103 to “weak” and to change the blowing direction to the automatic direction. Here, the automatic orientation means that the angle of the louver is 30 to 60 °. After that, when the temperature of the first living area 13 is stabilized, the central control device 202 sends a command to the fan control device 204 to reverse the rotation direction of the fan. At the same time, the central control device 202 sends a command to the air conditioning control device 203 to change the air volume to “weak” and to change the blowing direction to the far end (louver 45 to 70 °). As a result, the air in the second living area 14 is sucked in from the outlet 106 and blown out from the inlet 105 to the first living area 13.

そして、入浴時刻から所定の時間が経過した場合、集中制御装置202は、送風制御装置204へ送風装置102を停止する指令を送る。一方、室内機103は、第一居住域13の温度が目標温度の許容範囲内で変化する間、風量「弱」で暖房運転を継続する。   When a predetermined time has elapsed from the bathing time, the central control device 202 sends a command to stop the blower 102 to the blower control device 204. On the other hand, the indoor unit 103 continues the heating operation with the air volume “weak” while the temperature of the first living area 13 changes within the allowable range of the target temperature.

図19は、暖房時の入浴時刻制御における入浴時刻前の空気の流れを示す断面模式図である。図20は、暖房時の入浴時刻制御における入浴中の空気の流れを示す断面模式図である。図21は、暖房時の入浴時刻制御における入浴後の空気の流れを示す断面模式図である。図19〜図21において、気流を矢印で示している。図19に示すように、入浴時刻前の予暖時刻になると、送風装置102が運転され、第一居住域13の有効な暖気が第二居住域14まで導入される。このとき、室内機103の吹出し方向は真下(ルーバ30°以内)向きであり、送風装置102は室内機103と同様に風量「強」に設定される。   FIG. 19 is a schematic cross-sectional view showing the air flow before the bathing time in the bathing time control during heating. FIG. 20 is a schematic cross-sectional view showing the flow of air during bathing in bathing time control during heating. FIG. 21 is a schematic cross-sectional view showing the flow of air after bathing in bathing time control during heating. In FIGS. 19 to 21, the airflow is indicated by arrows. As shown in FIG. 19, when the prewarming time before the bathing time is reached, the blower 102 is operated, and effective warm air in the first living area 13 is introduced to the second living area 14. At this time, the blowing direction of the indoor unit 103 is directly below (within 30 ° of the louver), and the blower 102 is set to “strong” in the same manner as the indoor unit 103.

また、図20に示すように、入浴中は、室内機103の吹出し方向は自動(ルーバ30〜60°)向きであり、送風装置102は室内機103と同じ風量「弱」に設定される。さらに、図21に示すように、入浴後は、室内機103の吹出し方向は遠端(ルーバ45〜70°)向きにされるとともに、送風装置102の送風方向が反転され、第二居住域14の空気が第一居住域13に導入される。なお、入浴後、送風装置102の送風方向を反転させるタイミングは、集中制御装置202が記憶する入浴時刻と第二居住域14に設置された温度センサによって決定されてもよい。   As shown in FIG. 20, during bathing, the blowing direction of the indoor unit 103 is automatic (louver 30 to 60 °), and the air blower 102 is set to the same air volume “weak” as the indoor unit 103. Furthermore, as shown in FIG. 21, after bathing, the blowing direction of the indoor unit 103 is directed to the far end (louver 45 to 70 °) and the blowing direction of the blowing device 102 is reversed, so that the second living area 14. Air is introduced into the first living area 13. In addition, the timing which reverses the ventilation direction of the air blower 102 after bathing may be determined by the bathing time which the centralized control apparatus 202 memorize | stores, and the temperature sensor installed in the 2nd living area 14.

図22は、冷房時の入浴時刻制御を説明する図である。図22(a)は、第一居住域13の温度変化を示し、図22(b)は、第二居住域14の温度変化を示し、図22(c)は、室内機103および送風装置102の運転状態を示す。なお、入浴時刻制御開始時において、室内機103は風量「弱」で冷房運転しているものとする。集中制御装置202は、指定された入浴時刻よりも所定時間(例えば30分)前の予冷時刻になると、送風制御装置204へ運転開始指令を送り、送風装置102の運転を開始する。また、このとき、洗面所6など第二居住域14の温度が目標温度に到達することを優先するため、第二優先制御が実施される。詳しくは、室内機103の吹出し方向は真下(ルーバ30°以内)向きに設定され、室内機103および送風装置102の風量は「強」に設定される。これにより、洗面所6などの第二居住域14が予冷される。   FIG. 22 is a diagram for explaining bathing time control during cooling. 22A shows the temperature change of the first living area 13, FIG. 22B shows the temperature change of the second living area 14, and FIG. 22C shows the indoor unit 103 and the blower 102. The operation state is shown. Note that at the start of bathing time control, the indoor unit 103 is assumed to be performing a cooling operation with an air volume of “low”. The central control device 202 sends an operation start command to the air blow control device 204 and starts operation of the air blow device 102 when a pre-cooling time that is a predetermined time (for example, 30 minutes) before the designated bathing time. At this time, since priority is given to the temperature of the second living area 14 such as the washroom 6 reaching the target temperature, the second priority control is performed. Specifically, the blowing direction of the indoor unit 103 is set to be directly downward (within louver 30 °), and the air volumes of the indoor unit 103 and the blower 102 are set to “strong”. Thereby, the second residential area 14 such as the washroom 6 is pre-cooled.

そして、第二居住域14の温度が目標温度に到達すると、集中制御装置202は、送風制御装置204へ送風装置102の風量を「弱」に変更する指令を送り、送風装置102の風量を低下させる。同時に、集中制御装置202は、空調制御装置203へ室内機103の風量を「弱」へ変更するとともに、吹出し方向を自動(ルーバ30〜60°)向きに変更する指令を送る。そして、入浴時刻から所定時間が経過した場合、集中制御装置202は、送風制御装置204へ送風装置102を停止する指令を送る。一方、室内機103は、第一居住域13の温度が目標温度の許容範囲内で変化する間、風量「弱」で冷房を継続する。   When the temperature of the second living area 14 reaches the target temperature, the central control device 202 sends an instruction to change the air volume of the air blower 102 to “weak” to the air blow control device 204 to reduce the air volume of the air blower 102. Let At the same time, the centralized control device 202 sends a command to the air conditioning control device 203 to change the air volume of the indoor unit 103 to “weak” and to change the blowing direction to automatic (louver 30 to 60 °). When a predetermined time has elapsed since the bathing time, the central control device 202 sends a command to stop the blower 102 to the blower control device 204. On the other hand, the indoor unit 103 continues cooling with the air volume “weak” while the temperature of the first living area 13 changes within the allowable range of the target temperature.

上記のような入浴時刻制御を行うことで、入浴時には第二居住域14が暖房または冷房されているため、快適性が向上する。また、冬期、入浴前後に送風装置102の風向きを反転させることで、入浴前には第二居住域14を温めるとともに、入浴後には第二居住域14の高い湿度の空気を搬送して第一居住域13を加湿することができ、快適性がさらに向上する。   By performing the bathing time control as described above, the comfort is improved because the second living area 14 is heated or cooled during bathing. Further, by reversing the wind direction of the blower 102 before and after bathing in the winter, the second living area 14 is warmed before bathing, and after bathing, high humidity air in the second living area 14 is conveyed to the first. The living area 13 can be humidified, and comfort is further improved.

(制御例4−4:就寝時刻制御)
また、集中制御装置202は、スケジュールに設定される就寝時刻となった場合に、室内機103を停止する。
(Control Example 4-4: Bedtime control)
In addition, the central control device 202 stops the indoor unit 103 when the bedtime set in the schedule is reached.

図23は、暖房時の就寝時刻制御を説明する図である。図23(a)は、第一居住域13の温度変化を示し、図23(b)は、第二居住域14の温度変化を示し、図23(c)は、室内機103および送風装置102の運転状態を示す。集中制御装置202は、指定された就寝時刻になると、空調制御装置203へ運転停止指令を送り、室内機103の暖房運転を停止する。なお、就寝時刻制御の開始時において、送風装置102が運転している場合は、集中制御装置202は、同時に送風制御装置204へ送風装置102を停止する指令を送り、室内機103と連動させて送風装置102を停止させる。   FIG. 23 is a diagram for explaining bedtime control during heating. FIG. 23A shows the temperature change of the first living area 13, FIG. 23B shows the temperature change of the second living area 14, and FIG. 23C shows the indoor unit 103 and the blower 102. The operation state is shown. The central control device 202 sends an operation stop command to the air conditioning control device 203 at the designated bedtime, and stops the heating operation of the indoor unit 103. When the air blower 102 is operating at the start of bedtime control, the central control device 202 sends a command to stop the air blower 102 to the air blow control device 204 at the same time, and is linked to the indoor unit 103. The blower 102 is stopped.

図24は、冷房時の就寝時刻制御を説明する図である。図24(a)は、第一居住域13の温度変化を示し、図24(b)は、第二居住域14の温度変化を示し、図24(c)は、室内機103および送風装置102の運転状態を示す。集中制御装置202は、指定された就寝時刻になると、空調制御装置203へ運転停止指令を送り、室内機103の冷房運転を停止する。なお、就寝時刻制御の開始時において、送風装置102が運転している場合は、集中制御装置202は、同時に送風制御装置204へ送風装置102を停止する指令を送り、室内機103と連動させて送風装置102を停止させる。   FIG. 24 is a diagram for explaining bedtime control during cooling. FIG. 24A shows the temperature change of the first living area 13, FIG. 24B shows the temperature change of the second living area 14, and FIG. 24C shows the indoor unit 103 and the blower 102. The operation state is shown. The central control device 202 sends an operation stop command to the air conditioning control device 203 at the designated bedtime, and stops the cooling operation of the indoor unit 103. When the air blower 102 is operating at the start of bedtime control, the central control device 202 sends a command to stop the air blower 102 to the air blow control device 204 at the same time, and is linked to the indoor unit 103. The blower 102 is stopped.

上記のように、本実施の形態によると、室内機103を備える第一空間11だけでなく、空調装置100の制御対象空間外であるトイレ5、洗面所6などの第二空間12の快適性を向上させることができる。さらに、室内機103と送風装置102とを連携して動作させるよう風量や風向きを制御することで、熱ロスの発生を抑制するとともに、効率的に冷暖気を第二空間12に送ることができる。また、これにより、空調装置100および送風装置102の消費電力の増加も抑制される。   As described above, according to the present embodiment, not only the first space 11 including the indoor unit 103 but also the comfort of the second space 12 such as the toilet 5 and the washroom 6 that are outside the control target space of the air conditioner 100. Can be improved. Furthermore, by controlling the air volume and direction so that the indoor unit 103 and the air blower 102 are operated in cooperation, generation of heat loss can be suppressed and cooling / warming air can be efficiently sent to the second space 12. . Thereby, the increase in the power consumption of the air conditioner 100 and the air blower 102 is also suppressed.

実施の形態2.
次に、本発明の実施の形態2について説明する。実施の形態2では、第二空間12に設けられる吹出し口106が、第二空間12の床ではなく、壁に設けられる点において、実施の形態1と相違する。空気調和システムのその他の構成については実施の形態1と同じである。
Embodiment 2. FIG.
Next, a second embodiment of the present invention will be described. The second embodiment is different from the first embodiment in that the outlet 106 provided in the second space 12 is provided not on the floor of the second space 12 but on the wall. Other configurations of the air conditioning system are the same as those in the first embodiment.

図25は、吹出し口106を第二空間12の壁に配置した場合を示す断面模式図である。吹出し口106は、第二空間12の第一空間11側の壁に配置される。より詳しくは、吹出し口106は、第二居住域14の壁、すなわち床から1.4m以内に配置される。そして、集中制御装置202は、室内機103が暖房運転をしている場合、実施の形態1と同様の弱風量制御を行う。図26(a)は、本実施の形態における暖房時の弱風量制御による第二空間12の気流分布の一例を示す図であり、図26(b)は、暖房時の弱風量制御による第二空間12の温度勾配を示す図である。実施の形態1と同様に、室内機103から吹出される暖気は、第一空間11の吸込み口105から吸込まれ、吹出し口106から低速(例えば0.1〜0.5m/s)で吹出される。上下温度差による上昇気流を利用することにより、第二居住域14に良好な空気質を提供することができる。また、第二空間12に、室内発熱体(人)がいる場合、サーマルプルームが生じ、高効率な換気が実現できるため、搬送動力を削減することができる。   FIG. 25 is a schematic cross-sectional view showing a case where the outlet 106 is arranged on the wall of the second space 12. The outlet 106 is arranged on the wall of the second space 12 on the first space 11 side. More specifically, the outlet 106 is disposed within 1.4 m from the wall of the second living area 14, that is, the floor. Then, when the indoor unit 103 is in the heating operation, the central control device 202 performs the same weak air volume control as that in the first embodiment. Fig.26 (a) is a figure which shows an example of the airflow distribution of the 2nd space 12 by the weak air volume control at the time of heating in this Embodiment, FIG.26 (b) is a 2nd by the weak air volume control at the time of heating. FIG. 6 is a diagram showing a temperature gradient in the space 12. As in the first embodiment, the warm air blown from the indoor unit 103 is sucked from the suction port 105 of the first space 11 and blown from the blower port 106 at a low speed (for example, 0.1 to 0.5 m / s). The A good air quality can be provided to the second living area 14 by using the updraft caused by the difference in temperature between the upper and lower sides. In addition, when there is an indoor heating element (person) in the second space 12, a thermal plume is generated, and highly efficient ventilation can be realized, so that the conveyance power can be reduced.

また、集中制御装置202は、室内機103が冷房運転をしている場合、送風装置102の風量を「中」に設定する。ここで、送風装置102の風量が「中」に設定された場合、吹出し口106から風速1.0m/s以下(例えば0.5〜1.0m/s)の中速で空気が吹出される。図27(a)は、冷房時の中風量制御による第二空間12の気流分布の一例を示す図であり、図27(b)は、冷房時の中風量制御による第二空間12の温度勾配を示す図である。中風量制御では、室内機103から吹出される冷気は、第一空間11の吸込み口105から吸込まれ、吹出し口106から、中速で吹出される。これにより、床付近温度成層を形成し、ピストンフローに近い換気を実現できる。また、排気温度を室温より高くするので空調風量を小さくすることができ、健康で快適な環境と省エネルギーを両立させることが可能になる。なお、別の実施の形態として、吸込み口105を第一空間11の壁であって、第一居住域13の壁に設ける構成としてもよい。   The central control device 202 sets the air volume of the blower 102 to “medium” when the indoor unit 103 is in the cooling operation. Here, when the air volume of the blower 102 is set to “medium”, air is blown out from the blowout port 106 at a medium speed of 1.0 m / s or less (for example, 0.5 to 1.0 m / s). . FIG. 27A is a diagram showing an example of the airflow distribution in the second space 12 by the medium air flow control during cooling, and FIG. 27B is the temperature gradient of the second space 12 by the medium air flow control during cooling. FIG. In the medium air volume control, the cold air blown from the indoor unit 103 is sucked from the suction port 105 of the first space 11 and is blown from the blow port 106 at a medium speed. Thereby, near-floor temperature stratification is formed, and ventilation close to the piston flow can be realized. In addition, since the exhaust temperature is higher than room temperature, the air-conditioning air volume can be reduced, and it is possible to achieve both a healthy and comfortable environment and energy saving. As another embodiment, the suction port 105 may be provided on the wall of the first space 11 and on the wall of the first living area 13.

実施の形態3.
次に、本発明の実施の形態3について説明する。実施の形態3では、第二空間12に設けられる吹出し口106の配置が実施の形態1と相違する。空気調和システムのその他の構成については実施の形態1と同じである。
Embodiment 3 FIG.
Next, a third embodiment of the present invention will be described. In the third embodiment, the arrangement of the outlets 106 provided in the second space 12 is different from that in the first embodiment. Other configurations of the air conditioning system are the same as those in the first embodiment.

図28は、本実施の形態の空気調和システムにおける各機器の配置を示す平面模式図である。また、図29は、本実施の形態の空気調和システムにおける空気の流れを示す断面模式図である。図28に示すように、本実施の形態では、トイレ5および洗面所6の床面の中央に矩形の吹出し口106を設ける。本実施の形態の空気調和システムでは、第一居住域13の床に設置されたライン形の吸込み口105によって、第一居住域13における一定範囲の有効な冷暖気を吸込み、第二居住域14の床面の中央から低速で吹出す。これにより、換気効率が向上する。また、トイレ5および洗面所6の床の中央から吹出すことで、図29において矢印で示すように、冷暖気が床上0.2m以内に充満し、サーマルプルームを生じることができる。   FIG. 28 is a schematic plan view showing the arrangement of devices in the air conditioning system of the present embodiment. FIG. 29 is a schematic cross-sectional view showing the air flow in the air conditioning system of the present embodiment. As shown in FIG. 28, in the present embodiment, a rectangular outlet 106 is provided in the center of the floor surface of the toilet 5 and the washroom 6. In the air conditioning system according to the present embodiment, a range of effective cool / warm air in the first living area 13 is sucked by the line-shaped suction port 105 installed on the floor of the first living area 13, and the second living area 14. Blow out from the center of the floor at low speed. Thereby, ventilation efficiency improves. Moreover, by blowing out from the center of the floor of the toilet 5 and the washroom 6, as shown by the arrow in FIG. 29, the cool / warm air is filled within 0.2 m above the floor, and a thermal plume can be generated.

また、図30は、本実施の形態の変形例として、吹出し口106を第二居住域14の壁に配置した場合を示す断面模式図である。この場合、吹出し口106は、第二居住域14の内側の壁の中央に配置され、吸込み口105によって吸込まれた冷暖気を第二居住域14の壁の中央から低速で吹出す。これにより、上記と同様に換気効率が向上する。   FIG. 30 is a schematic cross-sectional view showing a case where the outlet 106 is arranged on the wall of the second living area 14 as a modification of the present embodiment. In this case, the air outlet 106 is arranged at the center of the inner wall of the second living area 14, and blows out the cool / warm air sucked by the air inlet 105 from the center of the wall of the second living area 14 at a low speed. Thereby, ventilation efficiency improves like the above.

実施の形態4.
次に、本発明の実施の形態4について説明する。実施の形態4では、第二空間12に設けられる吹出し口106の形状および配置が実施の形態1と相違する。空気調和システムのその他の構成については実施の形態1と同じである。
Embodiment 4 FIG.
Next, a fourth embodiment of the present invention will be described. In the fourth embodiment, the shape and arrangement of the outlet 106 provided in the second space 12 are different from those in the first embodiment. Other configurations of the air conditioning system are the same as those in the first embodiment.

図31は、本実施の形態の空気調和システムにおける各機器の配置を示す平面模式図である。また、図32は、本実施の形態の空気調和システムにおける空気の流れを示す断面模式図である。図31に示すように、本実施の形態では、トイレ5および洗面所6の床にライン形の吹出し口106Aが設けられる。また、ライン形の吹出し口106Aは、トイレ5と洗面所6の間の壁に沿って配置される。本実施の形態の空気調和システムでは、第一居住域13の床に設置されたライン形の吸込み口105によって、第一居住域13における一定範囲の有効な冷暖気を吸込み、第二居住域14の壁付近に配置された吹出し口106Aから低速で吹出す。これにより、吹出し口106Aで冷たいまたは暖かい空気を層流に形成し、冷暖気は汚染物や臭気を壁に沿わせて天井付近の排気装置10に搬送できる。   FIG. 31 is a schematic plan view showing the arrangement of devices in the air conditioning system of the present embodiment. FIG. 32 is a schematic cross-sectional view showing the air flow in the air conditioning system of the present embodiment. As shown in FIG. 31, in the present embodiment, a line-shaped outlet 106 </ b> A is provided on the floors of the toilet 5 and the washroom 6. The line-shaped outlet 106 </ b> A is disposed along the wall between the toilet 5 and the washroom 6. In the air conditioning system according to the present embodiment, a range of effective cool / warm air in the first living area 13 is sucked by the line-shaped suction port 105 installed on the floor of the first living area 13, and the second living area 14. It blows out at low speed from the blowout opening 106A arrange | positioned in the vicinity of the wall. As a result, cold or warm air is formed in a laminar flow at the outlet 106A, and the cool / warm air can convey contaminants and odors along the wall to the exhaust device 10 near the ceiling.

図33は、本実施の形態の変形例として、吹出し口106Aを第二居住域14の壁に配置した場合を示す断面模式図である。この場合、吹出し口106Aは、トイレ5と洗面所6の間の壁に配置され、吸込み口105によって吸込まれた冷暖気を第二居住域14の壁の中央から低速で吹出す。この場合も、吹出し口106Aで冷たいまたは暖かい空気を層流に形成し、冷暖気は汚染物や臭気を壁に沿わせて天井付近の排気装置10に搬送できる。   FIG. 33 is a schematic cross-sectional view showing a case where the outlet 106A is arranged on the wall of the second living area 14 as a modification of the present embodiment. In this case, the air outlet 106 </ b> A is arranged on the wall between the toilet 5 and the washroom 6, and blows out the cool and warm air sucked in by the air inlet 105 from the center of the wall of the second living area 14 at a low speed. Also in this case, cold or warm air is formed in a laminar flow at the outlet 106A, and the cool / warm air can carry contaminants and odors along the wall to the exhaust device 10 near the ceiling.

実施の形態5.
次に、本発明の実施の形態5について説明する。実施の形態5では、第一空間11に設けられる吸込み口105の形状が実施の形態4と相違する。空気調和システムのその他の構成については実施の形態4と同じである。
Embodiment 5. FIG.
Next, a fifth embodiment of the present invention will be described. In the fifth embodiment, the shape of the suction port 105 provided in the first space 11 is different from that of the fourth embodiment. Other configurations of the air conditioning system are the same as those in the fourth embodiment.

図34は、本実施の形態の空気調和システムにおける各機器の配置を示す平面模式図である。また、図35は、本実施の形態の空気調和システムにおける空気の流れを示す断面模式図である。図34に示すように、本実施の形態では、第一居住域13の床の室内機103の真下近傍および第二空間12側の壁の近傍に丸形の吸込み口105Aがそれぞれ設けられ、トイレ5および洗面所6の床にライン形の吹出し口106Aが設けられる。また、ライン形の吹出し口106Aは、トイレ5と洗面所6の間の壁にそって配置される。本実施の形態の空気調和システムでは、第一居住域13の床に設置された丸形の吸込み口105Aによって、第一居住域13の一定範囲における有効な冷暖気を吸込み、第二居住域14の壁付近に低速で吹出す。このように、吸込み口105Aを丸形とすることで、均一なボルテックス・フロー(渦流)を吸込み、送風装置102のダクト107の圧損を低減するとともに、第一居住域13の温度勾配が与える影響が抑制される。また、吹出し口106Aで冷たいまたは暖かい空気を層流に形成し、気流は矢印によって、冷暖気は汚染物や臭気を壁に沿わせて天井付近の排気装置10に搬送できる。   FIG. 34 is a schematic plan view showing the arrangement of devices in the air conditioning system of the present embodiment. FIG. 35 is a schematic cross-sectional view showing the air flow in the air conditioning system of the present embodiment. As shown in FIG. 34, in the present embodiment, round suction ports 105A are provided near the floor of the indoor unit 103 on the floor of the first living area 13 and near the wall on the second space 12 side. A line-shaped air outlet 106A is provided on the floors of 5 and the washroom 6. The line-shaped outlet 106 </ b> A is arranged along the wall between the toilet 5 and the washroom 6. In the air conditioning system of the present embodiment, effective cooling / heating air in a certain range of the first living area 13 is sucked by the circular suction port 105A installed on the floor of the first living area 13, and the second living area 14. Blows out at low speed near the wall Thus, by making the suction port 105A round, the uniform vortex flow (vortex) is sucked, the pressure loss of the duct 107 of the blower 102 is reduced, and the temperature gradient of the first living area 13 has an influence. Is suppressed. Further, cold or warm air can be formed into a laminar flow at the outlet 106A, and the air current can be conveyed to the exhaust device 10 near the ceiling along the walls by the arrows, and the warm air can be conveyed along the walls with contaminants and odors.

実施の形態6.
次に、本発明の実施の形態6について説明する。実施の形態6では、第二空間12に設けられる吹出し口106の形状および配置が実施の形態1と相違する。空気調和システムのその他の構成については実施の形態1と同じである。
Embodiment 6 FIG.
Next, a sixth embodiment of the present invention will be described. In the sixth embodiment, the shape and arrangement of the air outlet 106 provided in the second space 12 are different from those in the first embodiment. Other configurations of the air conditioning system are the same as those in the first embodiment.

図36は、本実施の形態の空気調和システムにおける各機器の配置を示す平面模式図である。また、図37は、本実施の形態の空気調和システムにおける空気の流れを示す断面模式図である。図36に示すように、本実施の形態では、第二居住域14の床の中央に丸形の吹出し口106Bが設けられる。本実施の形態の空気調和システムでは、第一居住域13の床に設置されたライン形の吸込み口105によって、第一居住域13の一定範囲における有効な冷暖気を吸込み、第二居住域14の床の中央から低速で導入する。このように、吹出し口106Bを丸形とすることで、冷たいまたは暖かい空気をジェットフローに形成し、第二居住域14の全体に送風可能になる。これにより、冷暖気利用効率が向上し、暖房/冷房時間を短くできる。また、本実施の形態の変形例として、丸形の吹出し口106Bを第二居住域14の壁に設けてもよい。   FIG. 36 is a schematic plan view showing the arrangement of each device in the air conditioning system of the present embodiment. FIG. 37 is a schematic cross-sectional view showing the air flow in the air-conditioning system of the present embodiment. As shown in FIG. 36, in the present embodiment, a round outlet 106B is provided in the center of the floor of the second living area 14. In the air conditioning system of the present embodiment, effective cool / warm air in a certain range of the first living area 13 is sucked by the line-shaped suction port 105 installed on the floor of the first living area 13, and the second living area 14. Introduce at low speed from the center of the floor. Thus, by making the outlet 106 </ b> B round, cold or warm air is formed in the jet flow, and the entire second living area 14 can be blown. Thereby, the cooling / warming utilization efficiency is improved, and the heating / cooling time can be shortened. As a modification of the present embodiment, a round outlet 106B may be provided on the wall of the second living area 14.

以上が本発明の実施の形態の説明であるが、本発明は、上記の実施の形態の構成に限定されるものではなく、その技術的思想の範囲内で様々な変形または組み合わせが可能である。例えば、上記実施の形態では、空気調和システムを2階建ての住宅1に設置する場合を例に説明したが、これに限定されるものではなく、集合住宅やオフィスビルなどの様々な建物に設置してもよい。   The above is the description of the embodiment of the present invention. However, the present invention is not limited to the configuration of the above-described embodiment, and various modifications or combinations are possible within the scope of the technical idea. . For example, in the above embodiment, the case where the air conditioning system is installed in the two-story house 1 has been described as an example. However, the present invention is not limited to this and is installed in various buildings such as an apartment house and an office building. May be.

また、住宅1の図2に示される部屋以外の部屋に空気調和システムの各装置を配置してもよい。例えば、キッチン8に吹出し口106を備えるとともに、複数の送風装置102を備えてもよい。図38は、本変形例の空気調和システムにおける各機器の配置を示す平面模式図である。図38に示すように、本変形例では、第二空間12であるキッチン8の床の隅に、二つの吹出し口106が配置される。また、キッチン8の外側の壁には給気装置9および排気装置10が配置される。また、本変形例では、リビング2の吸込み口105から吸込まれた空気を、キッチン8の吹出し口106から吹き出すための送風装置102Aをさらに備える。集中制御装置202は、実施の形態1の制御例1〜4のように、複数の送風装置102および102Aと室内機103とを連携制御することができる。また、住宅1の寝室に室内機103を備え、集中制御装置202が、複数の室内機103の運転状態や生活シーンに応じて、複数の送風装置102、102Aと複数の室内機103との連携制御を行ってもよい。   Moreover, you may arrange | position each apparatus of an air conditioning system in rooms other than the room shown by FIG. For example, the kitchen 8 may include the outlet 106 and may include a plurality of blowers 102. FIG. 38 is a schematic plan view showing the arrangement of each device in the air conditioning system of the present modification. As shown in FIG. 38, in this modification, two outlets 106 are arranged at the corner of the floor of the kitchen 8 that is the second space 12. An air supply device 9 and an exhaust device 10 are disposed on the outer wall of the kitchen 8. Moreover, in this modification, 102 A of air blowers for blowing out the air sucked from the suction inlet 105 of the living room 2 from the outlet 106 of the kitchen 8 are further provided. The centralized control device 202 can cooperatively control the plurality of blower devices 102 and 102A and the indoor unit 103 as in the control examples 1 to 4 of the first embodiment. Also, the bedroom 1 of the house 1 includes the indoor unit 103, and the central control device 202 cooperates with the plurality of air blowers 102 and 102A and the plurality of indoor units 103 in accordance with the operation state and the life scene of the plurality of indoor units 103. Control may be performed.

また、吸込み口105および吹出し口106の形状は、矩形、丸形、ライン形に限定されるものではなく、半丸形または円筒型などであってもよい。さらに、吸込み口105および吹出し口106の数および配置も、上記実施の形態に限定されるものではなく、室内の広さおよびレイアウトに応じて、任意の数をすることができる。   Moreover, the shape of the suction inlet 105 and the blower outlet 106 is not limited to a rectangle, a round shape, and a line shape, A semicircle shape or a cylindrical shape etc. may be sufficient. Furthermore, the number and arrangement of the inlets 105 and the outlets 106 are not limited to the above-described embodiment, and can be any number according to the size and layout of the room.

1 住宅、2 リビング、5 トイレ、6 洗面所、7 浴室、8 キッチン、9 給気装置、10 排気装置、11 第一空間、12 第二空間、13 第一居住域、14 第二居住域、100 空調装置、102、102A 送風装置、103 室内機、104 室外機、105、105A 吸込み口、106、106A、106B 吹出し口、107 ダクト、113 室内送風機、114 室外送風機、115 室内熱交換器、116 室外熱交換器、117 膨張弁、118 四方弁、119 圧縮機、120 冷媒配管、201 表示操作装置、202 集中制御装置、203 空調制御装置、204 送風制御装置、205 給気制御装置、206 排気制御装置。   DESCRIPTION OF SYMBOLS 1 Housing, 2 Living, 5 Toilet, 6 Toilet, 7 Bathroom, 8 Kitchen, 9 Air supply apparatus, 10 Exhaust apparatus, 11 1st space, 12 2nd space, 13 1st living area, 14 2nd living area, DESCRIPTION OF SYMBOLS 100 Air conditioner, 102, 102A Blower, 103 Indoor unit, 104 Outdoor unit, 105, 105A Inlet, 106, 106A, 106B Outlet, 107 Duct, 113 Indoor fan, 114 Outdoor fan, 115 Indoor heat exchanger, 116 Outdoor heat exchanger, 117 expansion valve, 118 four-way valve, 119 compressor, 120 refrigerant piping, 201 display operation device, 202 central control device, 203 air conditioning control device, 204 air blow control device, 205 air supply control device, 206 exhaust control apparatus.

Claims (17)

建物内の第一空間に配置される空調装置と、
前記第一空間の床または壁に設けられる吸込み口と、
前記建物内の第二空間の床または壁に設けられる吹出し口と、
前記吸込み口から前記第一空間の空気を吸込み、前記吹出し口から前記第二空間へ吹出す送風装置と、
前記空調装置および前記送風装置を制御する制御装置と、を備え、
前記制御装置は、前記空調装置と前記送風装置とを連携して動作させることを特徴とする空気調和システム。
An air conditioner arranged in the first space in the building;
A suction port provided in the floor or wall of the first space;
An outlet provided in the floor or wall of the second space in the building;
An air blower that sucks air in the first space from the suction port and blows out the air from the outlet to the second space;
A controller for controlling the air conditioner and the blower,
The said control apparatus operates the said air conditioner and the said air blower in cooperation, The air conditioning system characterized by the above-mentioned.
前記制御装置は、前記空調装置の風量および風向きと、前記送風装置の風量とを対応付けて制御することを特徴とする請求項1に記載の空気調和システム。   The air conditioning system according to claim 1, wherein the control device controls the air volume and direction of the air conditioner in association with the air volume of the blower. 前記第二空間の天井または上部の壁に設けられる排気装置をさらに備え、
前記吹出し口は、前記第二空間の床に設けられるものであり、
前記制御装置は、
前記空調装置が暖房運転または冷房運転している場合は、前記吹出し口から風速0.5m/s以下で空気が吹出すよう前記送風装置の風量を制御し、
前記第二空間の汚染物質を前記排気装置から排気することを特徴とする請求項1または2に記載の空気調和システム。
An exhaust device provided on the ceiling or upper wall of the second space;
The outlet is provided on the floor of the second space,
The controller is
When the air conditioner is heating or cooling, the air volume of the blower is controlled so that air is blown out at a wind speed of 0.5 m / s or less from the outlet,
The air conditioning system according to claim 1 or 2, wherein contaminants in the second space are exhausted from the exhaust device.
前記第二空間の天井または上部の壁に設けられる排気装置をさらに備え、
前記吹出し口は、前記第二空間の壁に設けられるものであり、
前記制御装置は、
前記空調装置が暖房運転または冷房運転している場合は、前記吹出し口から風速1.0m/s以下で空気が吹出すよう前記送風装置の風量を制御し、
前記第二空間の汚染物質を前記排気装置から排気することを特徴とする請求項1または2に記載の空気調和システム。
An exhaust device provided on the ceiling or upper wall of the second space;
The outlet is provided on the wall of the second space,
The controller is
When the air conditioner is heating or cooling, the air volume of the blower is controlled so that air is blown out at a wind speed of 1.0 m / s or less from the outlet.
The air conditioning system according to claim 1 or 2, wherein contaminants in the second space are exhausted from the exhaust device.
前記制御装置は、
前記空調装置が暖房運転している場合は、前記吹出し口から風速0.5m/s以下で空気が吹出すよう前記送風装置の風量を制御し、
前記空調装置が冷房運転している場合は、前記吹出し口から風速0.5〜1.0m/sで空気が吹出すよう前記送風装置の風量を制御することを特徴とする請求項4に記載の空気調和システム。
The controller is
When the air conditioner is in heating operation, the air volume of the blower is controlled so that air is blown out from the outlet at a wind speed of 0.5 m / s or less,
The air volume of the air blower is controlled so that air blows out at a wind speed of 0.5 to 1.0 m / s from the air outlet when the air conditioner is in cooling operation. Air conditioning system.
前記吹出し口は、前記第二空間の床から高さ1.4m以内の壁に設けられることを特徴とする請求項1または2に記載の空気調和システム。   The air conditioning system according to claim 1 or 2, wherein the outlet is provided on a wall having a height of 1.4 m or less from the floor of the second space. 前記制御装置は、
前記空調装置の風向きを遠端向きに制御するとともに、前記送風装置の風量を弱に制御する第一優先制御と、
前記空調装置の風向きを真下向きにするとともに、前記送風装置の風量を強に制御する第二優先制御と、を実行することを特徴とする請求項1〜6の何れか一項に記載の空気調和システム。
The controller is
While controlling the air direction of the air conditioner toward the far end, the first priority control for weakly controlling the air volume of the blower, and
The air according to any one of claims 1 to 6, wherein a second priority control is performed to make the air direction of the air conditioner direct downward and to strongly control the air volume of the blower. Harmony system.
前記制御装置は、
起床時刻、外出時刻、帰宅時刻、入浴時刻または就寝時刻の少なくとも何れか一つが設定されるスケジュールを記憶するものであり、
前記スケジュールに応じて前記第一優先制御または前記第二優先制御の何れかを実行することを特徴とする請求項7に記載の空気調和システム。
The controller is
It stores a schedule in which at least one of wake-up time, going-out time, return time, bathing time or bedtime is set,
8. The air conditioning system according to claim 7, wherein either the first priority control or the second priority control is executed according to the schedule.
前記制御装置は、
前記起床時刻よりも前の予暖時刻または予冷時刻に、前記空調装置および前記送風装置の運転を開始し、前記第二優先制御を実行することを特徴とする請求項8に記載の空気調和システム。
The controller is
9. The air conditioning system according to claim 8, wherein the operation of the air conditioner and the blower is started at a pre-warming time or a pre-cooling time before the wake-up time, and the second priority control is executed. .
前記制御装置は、前記外出時刻になると、前記空調装置および前記送風装置を停止することを特徴とする請求項9に記載の空気調和システム。   The air conditioning system according to claim 9, wherein the control device stops the air conditioner and the blower when the time of going out is reached. 前記制御装置は、前記帰宅時刻よりも前の予暖時刻または予冷時刻に、前記空調装置および前記送風装置の運転を開始し、前記第一優先制御を実行することを特徴とする請求項8〜10の何れか一項に記載の空気調和システム。   The said control apparatus starts the operation | movement of the said air conditioner and the said air blower at the pre-warming time or the pre-cooling time before the said time to go home, and performs said 1st priority control. The air conditioning system according to any one of 10. 前記制御装置は、前記入浴時刻よりも前の予暖時刻または予冷時刻に、前記第二優先制御を実行することを特徴とする請求項8〜11の何れか一項に記載の空気調和システム。   The air conditioning system according to any one of claims 8 to 11, wherein the control device executes the second priority control at a pre-warming time or a pre-cooling time before the bathing time. 前記制御装置は、前記空調装置が暖房運転をしている場合であって、前記第二優先制御を実行した後に前記第一空間の温度が安定した場合、前記空調装置の風向きを遠端向きに変更し、前記送風装置の回転方向を反転させることを特徴とする請求項12に記載の空気調和システム。   In the case where the air conditioner is in a heating operation and the temperature of the first space is stabilized after the second priority control is performed, the control device sets the air direction of the air conditioner toward the far end. It changes and reverses the rotation direction of the said air blower, The air conditioning system of Claim 12 characterized by the above-mentioned. 前記制御装置は、前記入浴時刻から予め設定された時間が経過した場合、前記送風装置を停止することを特徴とする請求項12または13に記載の空気調和システム。   The air conditioning system according to claim 12 or 13, wherein the control device stops the blower when a preset time has elapsed from the bathing time. 前記制御装置は、前記就寝時刻になると、前記空調装置および前記送風装置を停止することを特徴とする請求項8〜14の何れか一項に記載の空気調和システム。   The air conditioning system according to any one of claims 8 to 14, wherein the control device stops the air conditioner and the blower at the bedtime. 前記吸込み口および前記吹出し口は、矩形、丸形、半丸形、円筒型またはライン形であることを特徴とする請求項1〜15の何れか一項に記載の空気調和システム。   The air conditioning system according to any one of claims 1 to 15, wherein the inlet and the outlet are rectangular, round, semi-round, cylindrical, or line-shaped. 前記送風装置は、前記第二空間の床下に設置されることを特徴とする請求項1〜16の何れか一項に記載の空気調和システム。   The air conditioning system according to any one of claims 1 to 16, wherein the blower is installed under the floor of the second space.
JP2016015381A 2016-01-29 2016-01-29 Air conditioning system Active JP6355660B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016015381A JP6355660B2 (en) 2016-01-29 2016-01-29 Air conditioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016015381A JP6355660B2 (en) 2016-01-29 2016-01-29 Air conditioning system

Publications (2)

Publication Number Publication Date
JP2017133782A true JP2017133782A (en) 2017-08-03
JP6355660B2 JP6355660B2 (en) 2018-07-11

Family

ID=59502758

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016015381A Active JP6355660B2 (en) 2016-01-29 2016-01-29 Air conditioning system

Country Status (1)

Country Link
JP (1) JP6355660B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019007688A (en) * 2017-06-26 2019-01-17 大和ハウス工業株式会社 Air conditioning system
WO2019064616A1 (en) * 2017-09-29 2019-04-04 シャープ株式会社 Network system
KR20200102634A (en) * 2019-02-22 2020-09-01 이찬영 Bathroom and kitchen ventilation
JP7443941B2 (en) 2020-06-02 2024-03-06 三菱電機株式会社 ventilation system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004257709A (en) * 2003-02-27 2004-09-16 Daiwa House Ind Co Ltd Air conditioning system for rest/dressing room
WO2015190001A1 (en) * 2014-06-13 2015-12-17 三菱電機株式会社 Air-conditioning system
WO2015189899A1 (en) * 2014-06-09 2015-12-17 三菱電機株式会社 Air-conditioning system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004257709A (en) * 2003-02-27 2004-09-16 Daiwa House Ind Co Ltd Air conditioning system for rest/dressing room
WO2015189899A1 (en) * 2014-06-09 2015-12-17 三菱電機株式会社 Air-conditioning system
WO2015190001A1 (en) * 2014-06-13 2015-12-17 三菱電機株式会社 Air-conditioning system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019007688A (en) * 2017-06-26 2019-01-17 大和ハウス工業株式会社 Air conditioning system
JP7103761B2 (en) 2017-06-26 2022-07-20 大和ハウス工業株式会社 Air conditioning system
WO2019064616A1 (en) * 2017-09-29 2019-04-04 シャープ株式会社 Network system
CN111094861A (en) * 2017-09-29 2020-05-01 夏普株式会社 Network system
JPWO2019064616A1 (en) * 2017-09-29 2020-09-10 シャープ株式会社 Network system
KR20200102634A (en) * 2019-02-22 2020-09-01 이찬영 Bathroom and kitchen ventilation
KR102211956B1 (en) * 2019-02-22 2021-02-03 이찬영 Bathroom and kitchen ventilation
JP7443941B2 (en) 2020-06-02 2024-03-06 三菱電機株式会社 ventilation system

Also Published As

Publication number Publication date
JP6355660B2 (en) 2018-07-11

Similar Documents

Publication Publication Date Title
CN110023686B (en) Heat exchange type ventilator
JP6253774B2 (en) Air conditioning system
JP2010159905A (en) Air-conditioning system
JP5525312B2 (en) Ventilation air conditioning system and building
JP6253459B2 (en) Ventilator for air conditioning
JP6355660B2 (en) Air conditioning system
JP2004354040A (en) Ventilation and air conditioning system
JP2009192101A (en) Displacement air conditioning system
CN112567179B (en) Air conditioning system and air conditioning system controller
US10788225B2 (en) Air-conditioning system, controller, and program
JP6234569B2 (en) Air conditioning system
CN104913413A (en) Integrated energy-saving building heating/cooling system by efficient air circulation technology
JP2022168057A (en) air conditioning system
JP2015117929A (en) Air-conditioning system control device, air-conditioning system and building
JP2013181671A (en) Air conditioner
JP6288138B2 (en) Control device
WO2017170491A1 (en) Control device, air conditioning system, air conditioning method, and program
JP2011179807A (en) Air conditioning system and building
JP2023025275A (en) air conditioning system
JP2013137189A (en) Air conditioning system
WO2022004265A1 (en) Air conditioning system
JP5249837B2 (en) Ventilation air conditioning system and building
JP2011112239A (en) Ventilation air-conditioning system and building
JP2016033424A (en) In-house air conditioning system
CN213872960U (en) Super-silent non-wind-sense healthy and comfortable household central air-conditioning heating system

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20171129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171205

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180201

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180515

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180612

R150 Certificate of patent or registration of utility model

Ref document number: 6355660

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250