JP2017112792A - Capacitor deterioration diagnostic method and power conversion device - Google Patents

Capacitor deterioration diagnostic method and power conversion device Download PDF

Info

Publication number
JP2017112792A
JP2017112792A JP2015247349A JP2015247349A JP2017112792A JP 2017112792 A JP2017112792 A JP 2017112792A JP 2015247349 A JP2015247349 A JP 2015247349A JP 2015247349 A JP2015247349 A JP 2015247349A JP 2017112792 A JP2017112792 A JP 2017112792A
Authority
JP
Japan
Prior art keywords
capacitor
voltage
power
main circuit
inverter main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2015247349A
Other languages
Japanese (ja)
Inventor
江桁 劉
Koko Ryu
江桁 劉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuji Electric Co Ltd
Original Assignee
Fuji Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Electric Co Ltd filed Critical Fuji Electric Co Ltd
Priority to JP2015247349A priority Critical patent/JP2017112792A/en
Publication of JP2017112792A publication Critical patent/JP2017112792A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Inverter Devices (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a technology for inexpensively and accurately implementing deterioration diagnosis of a capacitor connected in parallel to an inverter for converting DC power supplied from a DC power supply to AC power to output the AC power to a load.SOLUTION: A deterioration diagnostic method for a capacitor connected in parallel to an inverter main circuit for converting DC power supplied from a DC power supply to AC power before outputting the AC power includes: a first step of making the capacitor discharge electricity until inter-plate voltage of capacitors 30_1 and 30_2 becomes a predetermined value; and a second step of calculating capacitance of the capacitors on the basis of a variation in the inter-plate voltage at the time of discharge of the capacitors 30_1 and 30_2. According to the deterioration diagnostic method for the capacitor, a power conversion device 1 performs deterioration diagnosis of the capacitors 30_1 and 30_2.SELECTED DRAWING: Figure 1

Description

本発明は、コンデンサの劣化診断技術に関し、特にインバータに供給される直流電力を平滑化するためのコンデンサの劣化診断技術に関する。   The present invention relates to a capacitor deterioration diagnosis technique, and more particularly to a capacitor deterioration diagnosis technique for smoothing DC power supplied to an inverter.

インバータは、バッテリ等の直流電源から供給される直流電力を交流電力に変換して電動機等の負荷に供給する電力変換装置である。インバータに与えられる直流電力を平滑化するために、直流電源からみてインバータにはコンデンサ(以下、「平滑化コンデンサ」と呼ぶ)が並列接続されている。平滑化コンデンサに劣化(具体的には、静電容量の低下)が生じると、インバータに供給される直流電力のリップルが増加し、インバータの正常な動作に支障を来す虞がある。そこで、平滑化コンデンサの劣化を診断する技術が各種提案されている。   The inverter is a power conversion device that converts DC power supplied from a DC power source such as a battery into AC power and supplies the AC power to a load such as an electric motor. In order to smooth the DC power applied to the inverter, a capacitor (hereinafter referred to as “smoothing capacitor”) is connected in parallel to the inverter as viewed from the DC power source. When the smoothing capacitor deteriorates (specifically, the capacitance decreases), the ripple of the DC power supplied to the inverter increases, which may hinder the normal operation of the inverter. Therefore, various techniques for diagnosing deterioration of the smoothing capacitor have been proposed.

特許文献1には、スイッチと抵抗を直列接続してなる放電装置を有する劣化故障診断装置が開示されている。この放電装置は、劣化診断の対象となるコンデンサに並列接続される。劣化診断の際には、バッテリからインバータへの電力供給を停止し、放電装置のスイッチをONする。この状態では、コンデンサの放電電流が放電装置の抵抗に流れ、コンデンサの極板間電圧がバッテリ電圧から徐々に低下する。放電開始からコンデンサの極板間電圧が所定電圧になるまでの時間(放電時間)を計測し、これを事前に測定した未劣化のコンデンサの放電時間と比較することで、コンデンサの劣化を診断する。   Patent Document 1 discloses a deterioration failure diagnosis apparatus having a discharge device in which a switch and a resistor are connected in series. This discharge device is connected in parallel to a capacitor to be subjected to deterioration diagnosis. In the deterioration diagnosis, power supply from the battery to the inverter is stopped, and the switch of the discharge device is turned on. In this state, the discharge current of the capacitor flows through the resistance of the discharge device, and the voltage between the electrode plates of the capacitor gradually decreases from the battery voltage. Capacitor degradation is diagnosed by measuring the time (discharge time) from the start of discharge until the voltage between the capacitor plates reaches the specified voltage, and comparing this with the previously measured discharge time of the undegraded capacitor. .

特許文献2には、平滑化コンデンサの極板間電圧を昇圧完了レベルまで昇圧する昇圧回路と、平滑化コンデンサに並列接続された抵抗とを有するパワーコンディショナ装置が開示されている。劣化診断の際には、パワーコンディショナ装置は、まず昇圧回路による昇圧を行い、昇圧完了レベルまでの昇圧が完了すると、コンデンサを放電させ、その放電電流を抵抗に流す。パワーコンディショナ装置は、放電開始からコンデンサの極板間電圧が基準電圧値になるまでの放電時間を計測し、これを事前に測定した未劣化のコンデンサの放電時間(基準放電時間)と比較することで、コンデンサの劣化を診断する。   Patent Document 2 discloses a power conditioner device having a booster circuit that boosts the voltage between the plates of the smoothing capacitor to a boosting completion level and a resistor connected in parallel to the smoothing capacitor. At the time of deterioration diagnosis, the power conditioner device first performs boosting by the boosting circuit, and when the boosting to the boosting completion level is completed, the capacitor is discharged and the discharge current flows through the resistor. The power conditioner measures the discharge time from the start of discharge until the voltage between the capacitor plates reaches the reference voltage value, and compares this with the previously measured discharge time of the undegraded capacitor (reference discharge time). Thus, the deterioration of the capacitor is diagnosed.

特開平6−38360号公報JP-A-6-38360 特開2008−43061号公報JP 2008-43061A

しかし、特許文献1および2に記載の技術によると、放電装置や昇圧回路の設置分だけコストが増加する。また、特許文献1および2に記載の技術のように、放電時間に基づきコンデンサの劣化診断を行うと、次のような問題が生じる。   However, according to the techniques described in Patent Documents 1 and 2, the cost increases by the amount of installation of the discharge device and the booster circuit. Further, when the capacitor deterioration diagnosis is performed based on the discharge time as in the techniques described in Patent Documents 1 and 2, the following problems occur.

放電時間は外部環境(例えば、周囲温度)の影響を受けやすく、周囲温度が著しく高い(低い)環境下で劣化診断を行った場合、通常の温度条件下(例えば、室温)で劣化診断を行った場合とは異なる放電時間が計測される可能性がある。   The discharge time is easily affected by the external environment (for example, ambient temperature), and when the degradation diagnosis is performed in an environment where the ambient temperature is extremely high (low), the degradation diagnosis is performed under normal temperature conditions (for example, room temperature). There is a possibility that a different discharge time may be measured.

また、電動機を駆動する電力変換装置の他に、電力回生装置が設けられている場合には、回生電流等の影響により、コンデンサの極板間電圧が変動する場合がある。仮に、上記極板間電圧の変動が放電開始時刻に発生した場合、放電開始時刻におけるコンデンサの極板間電圧がバッテリ電圧(特許文献1)または昇圧完了レベル(特許文献2)からずれることになる。   Further, when a power regeneration device is provided in addition to the power conversion device that drives the electric motor, the voltage between the electrode plates of the capacitor may fluctuate due to the influence of the regeneration current or the like. If the fluctuation of the voltage between the electrode plates occurs at the discharge start time, the voltage between the electrode plates of the capacitor at the discharge start time deviates from the battery voltage (Patent Document 1) or the boosting completion level (Patent Document 2). .

図5は、コンデンサの放電特性を示す図である。図5において、縦軸は基準電圧値を100とした場合のコンデンサの極板間電圧を示し、横軸は時間を示す。図5に示す例では、時刻0秒(放電開始時刻)におけるコンデンサの極板間電圧は、ケース1よりもケース2の方が低くなっている。図5に示すように、コンデンサの極板間電圧が基準電圧値に到達するまでの放電時間は、ケース2の方が短い。このように、放電時間は放電開始時刻におけるコンデンサの極板間電圧に依存する。従って、放電開始時刻におけるコンデンサの極板間電圧がバッテリ電圧(特許文献1)または昇圧完了レベル(特許文献2)からずれると、計測した放電時間に上記ずれ分に応じた誤差が含まれることになる。   FIG. 5 is a diagram showing the discharge characteristics of the capacitor. In FIG. 5, the vertical axis indicates the voltage between the capacitor plates when the reference voltage value is 100, and the horizontal axis indicates time. In the example shown in FIG. 5, the voltage between the electrode plates of the capacitor at time 0 seconds (discharge start time) is lower in case 2 than in case 1. As shown in FIG. 5, the discharge time until the voltage between the electrode plates of the capacitor reaches the reference voltage value is shorter in case 2. Thus, the discharge time depends on the voltage between the electrodes of the capacitor at the discharge start time. Therefore, when the voltage between the electrode plates of the capacitor at the discharge start time deviates from the battery voltage (Patent Document 1) or the boosting completion level (Patent Document 2), the measured discharge time includes an error corresponding to the deviation. Become.

以上説明したように、放電時間に基づきコンデンサの劣化診断を行う態様では、コンデンサの劣化を精度良く診断することができない場合がある。   As described above, in the aspect in which the capacitor deterioration diagnosis is performed based on the discharge time, the capacitor deterioration may not be accurately diagnosed.

この発明は、以上のような事情に鑑みてなされたものであり、直流電源から供給される直流電力を交流電力に変換して負荷に出力するインバータに並列接続されるコンデンサの劣化診断を低コスト、かつ、高精度で実現する技術を提供することを目的とする。   The present invention has been made in view of the above circumstances, and is capable of low-cost degradation diagnosis of capacitors connected in parallel to an inverter that converts DC power supplied from a DC power source into AC power and outputs the AC power to a load. And it aims at providing the technique implement | achieved with high precision.

上記課題を解決するために本発明は、直流電源から供給される直流電力を交流電力に変換して負荷に出力するインバータ主回路に並列接続されたコンデンサの劣化診断方法であって、前記コンデンサの極板間電圧が所定値になるまで前記コンデンサを放電させる第1のステップと、前記コンデンサの放電時における極板間電圧の変化量に基づき前記コンデンサの容量を算出する第2のステップと、を含むコンデンサの劣化診断方法を提供する。   In order to solve the above problems, the present invention is a method for diagnosing deterioration of a capacitor connected in parallel to an inverter main circuit that converts DC power supplied from a DC power source into AC power and outputs the AC power to a load. A first step of discharging the capacitor until the voltage between the electrode plates reaches a predetermined value; and a second step of calculating the capacitance of the capacitor based on the amount of change in the voltage between the electrode plates when the capacitor is discharged. A method for diagnosing deterioration of a capacitor is provided.

例えば、上記負荷が電動機である場合、すなわち電動機を駆動するインバータに並列接続されるコンデンサの劣化診断に本発明を適用する場合、第1のステップでは、インバータ主回路から電動機へ供給する交流電流のq軸成分を0にしつつ上記コンデンサを放電させる。この場合、電動機にはd軸成分(d軸電流)のみを有する交流電流が出力される。電動機に流れた交流電流(d軸電流)のほとんどは、電動機のステータ巻線の巻線抵抗においてジュール熱として消費される。q軸成分がないため、トルクは発生しないからである。このジュール熱として消費される電力と放電に伴うコンデンサの静電エネルギーの変化量はほぼ等しくなる。コンデンサの静電エネルギーの変化量は、コンデンサの極板間電圧の変化量とコンデンサの容量とに基づき算出される。従って、ステータ巻線における消費電力の値を求めれば、上記極板間電圧の変化量を用いてコンデンサの容量を算出することが可能となる。そして、このようにして算出された容量を、例えば事前に測定された未劣化のコンデンサの容量と比較することにより、コンデンサの劣化を診断することができる。   For example, when the load is an electric motor, that is, when the present invention is applied to the deterioration diagnosis of a capacitor connected in parallel to an inverter that drives the electric motor, in the first step, the AC current supplied from the inverter main circuit to the electric motor is The capacitor is discharged while the q-axis component is set to zero. In this case, an alternating current having only a d-axis component (d-axis current) is output to the electric motor. Most of the alternating current (d-axis current) flowing to the motor is consumed as Joule heat in the winding resistance of the stator winding of the motor. This is because no torque is generated because there is no q-axis component. The amount of change in the electrostatic energy of the capacitor accompanying the electric power consumed as the Joule heat and the discharge is almost equal. The amount of change in the electrostatic energy of the capacitor is calculated based on the amount of change in the voltage between the electrode plates of the capacitor and the capacitance of the capacitor. Therefore, if the value of the power consumption in the stator winding is obtained, the capacitance of the capacitor can be calculated using the amount of change in the voltage between the plates. Then, by comparing the capacity calculated in this way with, for example, the capacity of an undegraded capacitor measured in advance, the deterioration of the capacitor can be diagnosed.

また、コンデンサからインバータ主回路に流れ込んだ電流と、コンデンサの極板間電圧とに基づいて算出した電力を静電エネルギーの変化量とみなしてコンデンサの容量を算出しても良い。このような態様であれば、インバータ主回路による駆動制御の対象の負荷が電動機である場合は勿論、電動機以外の機器の場合であっても当該インバータ主回路に並列接続されるコンデンサの劣化診断を行うことが可能になる。インバータ主回路から負荷に流れ込んだ電流とその電圧の各々の計測値に基づいて算出した電力を静電エネルギーの変化量とみなしてコンデンサの容量を算出する場合も同様である。   Further, the capacitance of the capacitor may be calculated by regarding the electric power calculated based on the current flowing from the capacitor to the inverter main circuit and the voltage between the plates of the capacitor as the amount of change in electrostatic energy. In this manner, the deterioration diagnosis of the capacitor connected in parallel to the inverter main circuit is performed not only when the load subject to drive control by the inverter main circuit is an electric motor but also when the load is a device other than the electric motor. It becomes possible to do. The same applies to the case of calculating the capacitance of the capacitor by regarding the electric power calculated based on the measured values of the current flowing into the load from the inverter main circuit and the voltage as the amount of change in electrostatic energy.

上記いずれの態様であっても、コンデンサの容量は、第1のステップの開始時点および第1のステップの終了時点間のコンデンサの極板間電圧の変化量から算出される。従って、放電開始時刻におけるコンデンサの極板間電圧がどのような値であっても、その影響を受けてコンデンサの劣化診断の精度が落ちることはない。つまり、本発明によれば、直流電源から供給される直流電力を交流電力に変換して負荷に出力するインバータに並列接続されるコンデンサの劣化診断を従来よりも高い精度で行うことが可能になる。   In any of the above aspects, the capacitance of the capacitor is calculated from the amount of change in the voltage between the electrode plates of the capacitor between the start time of the first step and the end time of the first step. Therefore, any value of the voltage between the capacitor plates at the discharge start time is not affected, and the accuracy of the capacitor deterioration diagnosis does not deteriorate. That is, according to the present invention, it is possible to perform deterioration diagnosis of a capacitor connected in parallel to an inverter that converts DC power supplied from a DC power supply into AC power and outputs it to a load with higher accuracy than before. .

また、本発明によれば、特許文献1に記載の技術のように放電電流を消費させるための抵抗を別途用意する必要はなく、特許文献2に記載の技術のように昇圧回路を別途用意する必要もない。従って、本発明によれば、特許文献1や特許文献2に記載の技術を用いる場合に比較して、コストを削減することができる。   Further, according to the present invention, it is not necessary to separately prepare a resistor for consuming the discharge current as in the technique described in Patent Document 1, and a booster circuit is separately prepared as in the technique described in Patent Document 2. There is no need. Therefore, according to the present invention, the cost can be reduced as compared with the case where the techniques described in Patent Document 1 and Patent Document 2 are used.

以上説明したように、本発明によれば、低コスト、かつ、高精度でコンデンサの劣化診断を実現することができる。   As described above, according to the present invention, it is possible to realize deterioration diagnosis of a capacitor with low cost and high accuracy.

本発明の第1実施形態である電力変換装置1の構成を示す回路図である。It is a circuit diagram showing composition of power converter 1 which is a 1st embodiment of the present invention. 同実施形態における電力変換装置1の変形例である電力変換装置1Aの構成を示す回路図である。It is a circuit diagram showing the composition of power converter 1A which is a modification of power converter 1 in the embodiment. 本発明の第2実施形態である電力変換装置1Cの構成を示す回路図である。It is a circuit diagram which shows the structure of 1 C of power converter devices which are 2nd Embodiment of this invention. 本発明の第3実施形態である電力変換装置1Dの構成を示す回路図である。It is a circuit diagram which shows the structure of power converter device 1D which is 3rd Embodiment of this invention. コンデンサの放電特性を示す図である。It is a figure which shows the discharge characteristic of a capacitor | condenser.

<第1実施形態>
以下、図面を参照し、この発明の実施形態について説明する。
図1は本発明の第1実施形態である電力変換装置1の構成を示す回路図である。電力変換装置1は、直流電源であるバッテリ10から供給される直流電力を交流電力に変換して負荷である電動機(本実施形態では、電気自動車のモータ)に供給するインバータである。図1に示すように、電力変換装置1は、電動機Mを駆動するインバータ主回路40と、バッテリ10およびインバータ主回路40間の高電位側直流母線の途中に介挿されたスイッチ20と、インバータ主回路40に対して並列接続されたコンデンサ30_1および30_2と、インバータ主回路40の入力側に接続された電圧検出センサ50と、インバータ主回路40の出力側に介挿された電流検出センサ60と、制御部70とにより構成されている。
<First Embodiment>
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 is a circuit diagram showing a configuration of a power conversion device 1 according to the first embodiment of the present invention. The power conversion apparatus 1 is an inverter that converts DC power supplied from a battery 10 that is a DC power source into AC power and supplies the AC power to a motor (a motor of an electric vehicle in the present embodiment). As shown in FIG. 1, the power converter 1 includes an inverter main circuit 40 that drives an electric motor M, a switch 20 that is inserted in the middle of a high-potential side DC bus between the battery 10 and the inverter main circuit 40, and an inverter Capacitors 30_1 and 30_2 connected in parallel to the main circuit 40, a voltage detection sensor 50 connected to the input side of the inverter main circuit 40, and a current detection sensor 60 interposed on the output side of the inverter main circuit 40 , And the control unit 70.

コンデンサ30_1および30_2は、バッテリ10が出力する直流電力を平滑化するための平滑化コンデンサである。本実施形態におけるコンデンサ30_1および30_2は電解コンデンサであり、コンデンサ30_1の容量をC1、コンデンサ30_2の容量をC2とすると、コンデンサ30_1および30_2の合成容量はC1+C2(以下、「C」と表記)となる。   Capacitors 30_1 and 30_2 are smoothing capacitors for smoothing DC power output from the battery 10. Capacitors 30_1 and 30_2 in this embodiment are electrolytic capacitors. When the capacitance of the capacitor 30_1 is C1, and the capacitance of the capacitor 30_2 is C2, the combined capacitance of the capacitors 30_1 and 30_2 is C1 + C2 (hereinafter referred to as “C”). .

インバータ主回路40は、周知のインバータと同様、IGBT等の複数のスイッチング素子およびフライホイールダイオードの組を用いて構成されたブリッジ回路である。これらスイッチング素子のオン/オフ制御は、制御部70から送信されるスイッチング信号によって行われ、これによりコンデンサ30_1および30_2により平滑化された直流電力は3相交流電力に変換される。   The inverter main circuit 40 is a bridge circuit configured by using a set of a plurality of switching elements such as IGBTs and flywheel diodes as in the case of a known inverter. On / off control of these switching elements is performed by a switching signal transmitted from the control unit 70, whereby the DC power smoothed by the capacitors 30_1 and 30_2 is converted into three-phase AC power.

電圧検出センサ50は、コンデンサ30_1および30_2の極板間電圧を測定し、その電圧値に応じた検出信号を制御部70(電圧検出部72)に出力する。電流検出センサ60は、インバータ主回路40が出力する2相(u相、w相)の交流電流を検出し、その電流値に応じた検出信号を制御部70(インバータ制御部71)に出力する。   Voltage detection sensor 50 measures the voltage between the electrodes of capacitors 30_1 and 30_2 and outputs a detection signal corresponding to the voltage value to control unit 70 (voltage detection unit 72). The current detection sensor 60 detects a two-phase (u-phase, w-phase) alternating current output by the inverter main circuit 40 and outputs a detection signal corresponding to the current value to the control unit 70 (inverter control unit 71). .

制御部70は、例えばCPUであり、記憶部(図示略)に記憶されたプログラムを実行することにより、インバータ制御部71と、電圧検出部72と、容量算出部73と、劣化判定部74として機能する。   The control unit 70 is, for example, a CPU, and executes an inverter control unit 71, a voltage detection unit 72, a capacity calculation unit 73, and a deterioration determination unit 74 by executing a program stored in a storage unit (not shown). Function.

インバータ制御部71は、インバータ主回路40を構成する各スイッチング素子をスイッチングし、インバータ主回路40を駆動する。より詳細には、インバータ制御部71は、図示しないVCU(Vehicle Control Unit)から送信される電圧指令値(d軸電圧指令値vd*およびq軸電圧指令値vq*)に基づき生成したスイッチング信号を各スイッチング素子に出力する。   The inverter control unit 71 switches each switching element constituting the inverter main circuit 40 and drives the inverter main circuit 40. More specifically, inverter control unit 71 generates a switching signal generated based on voltage command values (d-axis voltage command value vd * and q-axis voltage command value vq *) transmitted from a VCU (Vehicle Control Unit) (not shown). Output to each switching element.

インバータ主回路40の駆動時、インバータ制御部71は、コンデンサ30_1および30_2の劣化診断を割り込みで開始する。この処理は、例えば、一定時間間隔で、或いはユーザ等により劣化診断の開始の指示が与えられたことを契機として行われる。インバータ制御部71は、例えば上記劣化診断の開始の指示を受信すると、スイッチ20に図示しない制御信号(開放信号)を送信し、スイッチ20を開放させる。   When the inverter main circuit 40 is driven, the inverter control unit 71 starts the deterioration diagnosis of the capacitors 30_1 and 30_2 by interruption. This process is performed, for example, at regular time intervals or when an instruction to start deterioration diagnosis is given by the user or the like. For example, when receiving the instruction to start the deterioration diagnosis, the inverter control unit 71 transmits a control signal (open signal) (not shown) to the switch 20 to open the switch 20.

スイッチ20の開放を契機として、バッテリ10からインバータ主回路40への電力供給が遮断されると、コンデンサ30_1および30_2の放電が開始する。このとき、インバータ制御部71は、タイマー等を起動させて計時を開始する。インバータ制御部71は、コンデンサ30_1および30_2の極板間電圧が所定の閾値電圧Vthに到達した時点でスイッチ20に図示しない制御信号(閉塞信号)を送信し、スイッチ20を閉塞させる。これにより、バッテリ10からインバータ主回路40への電力供給が再開し、コンデンサ30_1および30_2の放電が停止する。   When the power supply from the battery 10 to the inverter main circuit 40 is interrupted by the opening of the switch 20, the capacitors 30_1 and 30_2 start to be discharged. At this time, the inverter control part 71 starts a timer etc. and starts time measurement. The inverter control unit 71 transmits a control signal (blocking signal) (not shown) to the switch 20 when the voltage between the plates of the capacitors 30_1 and 30_2 reaches a predetermined threshold voltage Vth, thereby blocking the switch 20. Thereby, the power supply from the battery 10 to the inverter main circuit 40 is resumed, and the discharge of the capacitors 30_1 and 30_2 is stopped.

スイッチ20が開放している間、コンデンサ30_1および30_2の極板間電圧が電圧検出センサ50で検出され、その検出信号が電圧検出部72に出力される。電圧検出部72は、受け取った検出信号にA/D変換を施し、その電圧波形を表す電圧波形サンプル列Vを容量算出部73に送信する。コンデンサ30_1および30_2の放電電流は、インバータ主回路40で交流電流に変換され、電動機Mのステータ巻線に出力される。本実施形態では、インバータ制御部71はインバータ主回路40に対して次のような制御を行い、ステータ巻線に出力される交流電流を制御する。   While the switch 20 is open, the voltage between the electrodes 30_1 and 30_2 is detected by the voltage detection sensor 50, and the detection signal is output to the voltage detection unit 72. The voltage detection unit 72 performs A / D conversion on the received detection signal, and transmits a voltage waveform sample string V representing the voltage waveform to the capacitance calculation unit 73. The discharge currents of the capacitors 30_1 and 30_2 are converted into an alternating current by the inverter main circuit 40 and output to the stator winding of the electric motor M. In the present embodiment, the inverter control unit 71 controls the inverter main circuit 40 as follows to control the alternating current output to the stator winding.

インバータ制御部71は、劣化診断の実行時とその他の場合(以下、通常動作時)とでは異なる制御を行う。より詳細に説明すると、通常動作時のインバータ制御部71は、図示しないVCUから電流指令値(q軸電流指令値iq*およびd軸電流指令値id*)を受け取ると、電流検出センサ60から出力される検出信号の表す電流値のq軸成分iqおよびd軸成分idが、それぞれq軸電流指令値iq*およびd軸電流指令値id*に一致するようにスイッチング信号を生成し、インバータ主回路40の各スイッチング素子に送信する。   The inverter control unit 71 performs different control between execution of deterioration diagnosis and other cases (hereinafter, normal operation). More specifically, when receiving a current command value (q-axis current command value iq * and d-axis current command value id *) from a VCU (not shown), the inverter control unit 71 during normal operation outputs from the current detection sensor 60. The switching signal is generated so that the q-axis component iq and the d-axis component id of the current value represented by the detected signal coincide with the q-axis current command value iq * and the d-axis current command value id *, respectively, and the inverter main circuit Transmit to 40 switching elements.

これに対して劣化診断の実行時のインバータ制御部71はVCUから与えられた電流指令値にかかわらず、q軸電流指令値iq*を0に、d軸電流指令値id*を所定値Id*としてインバータ主回路40のスイッチング制御を行う。上記各電流指令値に基づき生成されたスイッチング信号により、インバータ主回路40における各スイッチング素子のオン/オフ制御が行われるため、電動機Mのステータ巻線には、q軸電流iqが出力されることはなく、d軸電流指令値id*=Id*で指定された一定の電流値のd軸電流idのみ出力される。   On the other hand, the inverter control unit 71 at the time of executing the deterioration diagnosis sets the q-axis current command value iq * to 0 and the d-axis current command value id * to the predetermined value Id * regardless of the current command value given from the VCU. Switching control of the inverter main circuit 40 is performed. Since the on / off control of each switching element in the inverter main circuit 40 is performed by the switching signal generated based on each current command value, the q-axis current iq is output to the stator winding of the motor M. No, only the d-axis current id having a constant current value specified by the d-axis current command value id * = Id * is output.

ステータ巻線に放電電流(d軸電流)が流れるに連れてコンデンサ30_1および30_2の静電エネルギーは減少する。放電開始時点からコンデンサ30_1および30_2の極板間電圧が閾値電圧Vthまで減少した場合、その間のコンデンサ30_1および30_2の静電エネルギーの変化量Eは次式のように表される。すなわち、放電開始時刻におけるコンデンサ30_1および30_2の静電エネルギーと、閾値電圧Vthに到達した時刻(放電開始時刻を起算点とした時刻であり、以下、この時刻を「時刻T」と呼ぶ)におけるコンデンサ30_1および30_2の静電エネルギーとの差が、上記静電エネルギーの変化量となる。なお、次式において、V0は放電開始時刻におけるコンデンサ30_1および30_2の極板間電圧を表す。

Figure 2017112792
……(1) As the discharge current (d-axis current) flows through the stator winding, the electrostatic energy of the capacitors 30_1 and 30_2 decreases. When the voltage between the electrode plates of the capacitors 30_1 and 30_2 decreases to the threshold voltage Vth from the discharge start time, the change amount E of the electrostatic energy of the capacitors 30_1 and 30_2 during that time is expressed by the following equation. In other words, the electrostatic energy of the capacitors 30_1 and 30_2 at the discharge start time and the time at which the threshold voltage Vth is reached (this is the time starting from the discharge start time, hereinafter referred to as “time T”). The difference between the electrostatic energy of 30_1 and 30_2 is the amount of change in the electrostatic energy. In the following equation, V0 represents the voltage between the electrodes of the capacitors 30_1 and 30_2 at the discharge start time.
Figure 2017112792
...... (1)

ここで、(1)式を変形すると、次式で示すように、コンデンサ30_1および30_2の容量(合成容量)Cが算出される。本実施形態では、次式に基づき算出される容量Cの値に基づき、コンデンサ30_1および30_2の劣化診断が行われる。

Figure 2017112792
……(2) Here, when the equation (1) is modified, the capacitance (combined capacitance) C of the capacitors 30_1 and 30_2 is calculated as shown in the following equation. In the present embodiment, the deterioration diagnosis of the capacitors 30_1 and 30_2 is performed based on the value of the capacitance C calculated based on the following equation.
Figure 2017112792
(2)

(2)式において、閾値電圧Vthとして、予め記憶部(図示略)に格納された閾値電圧Vthを示すデータが用いられる。また、V0として、電圧検出部72から受け取った電圧波形サンプル列Vの先頭のサンプル(放電開始時刻におけるサンプル)のサンプル値が用いられる。また、Eとして、次に示す算出方法に従って算出された値が用いられる。   In the equation (2), data indicating the threshold voltage Vth stored in advance in a storage unit (not shown) is used as the threshold voltage Vth. Further, as V0, the sample value of the first sample (sample at the discharge start time) of the voltage waveform sample string V received from the voltage detector 72 is used. Further, as E, a value calculated according to the following calculation method is used.

放電に伴い変化したコンデンサ30_1および30_2の極板間電圧に応じたエネルギーEは、負荷や他の回路等で消費される。より詳細には、電動機Mへ供給される電力の一部はトルクに変換され、残りはジュール熱として消費される。電動機Mにおけるトルクの発生に寄与するのは、q軸成分のみであり、d軸成分は寄与しない。本実施形態では、劣化診断の間、q軸成分が0となるようにインバータ主回路40のスイッチング制御が行われる。つまり、コンデンサ30_1および30_2の静電エネルギーの変化分は、すべてジュール熱として消費される。   The energy E corresponding to the voltage between the plates of the capacitors 30_1 and 30_2 that has changed along with the discharge is consumed by the load, other circuits, and the like. More specifically, a part of the electric power supplied to the electric motor M is converted into torque, and the rest is consumed as Joule heat. Only the q-axis component contributes to the generation of torque in the electric motor M, and the d-axis component does not contribute. In the present embodiment, switching control of the inverter main circuit 40 is performed so that the q-axis component becomes 0 during the deterioration diagnosis. That is, the change in electrostatic energy of the capacitors 30_1 and 30_2 is all consumed as Joule heat.

ステータ巻線(巻線抵抗R)における消費電力は、コンデンサ30_1および30_2の極板間電圧が閾値電圧Vthとなるまでに要した時間Tを用いて次式で表さる。

Figure 2017112792
……(3) The power consumption in the stator winding (winding resistance R) is expressed by the following equation using the time T required until the voltage between the plates of the capacitors 30_1 and 30_2 becomes the threshold voltage Vth.
Figure 2017112792
...... (3)

容量算出部73は、(3)式に従ってEを算出する。より詳細には、容量算出部73は、記憶部からステータ巻線の巻線抵抗値Rの値を読み出し、インバータ制御部71からd軸電流指令値Id*およびTの各値を受け取り、上記各値を(3)式に代入してEを算出する。そして、容量算出部73は、記憶部から閾値電圧Vthの値を読み出し、電圧検出部72から受け取った電圧波形サンプル列Vから先頭のサンプル値V0を取り出し、上記各値および上記Eの算出結果を(2)式に代入してコンデンサ30_1および30_2の容量Cを算出する。そして、容量算出部73は、その算出結果を劣化判定部74に与える。   The capacity calculation unit 73 calculates E according to equation (3). More specifically, the capacity calculation unit 73 reads the value of the winding resistance value R of the stator winding from the storage unit, receives each value of the d-axis current command value Id * and T from the inverter control unit 71, and E is calculated by substituting the value into equation (3). Then, the capacity calculation unit 73 reads the value of the threshold voltage Vth from the storage unit, extracts the first sample value V0 from the voltage waveform sample sequence V received from the voltage detection unit 72, and calculates the above values and the calculation result of E. Substituting into the equation (2), the capacitance C of the capacitors 30_1 and 30_2 is calculated. Then, the capacity calculation unit 73 gives the calculation result to the deterioration determination unit 74.

劣化判定部74は、容量算出部73から受け取ったコンデンサ30_1および30_2の容量の算出結果と、事前に測定された未劣化のコンデンサ30_1および30_2の容量とを比較し、その比較結果に基づきコンデンサ30_1および30_2の劣化の有無を判定する。例えば、算出されたコンデンサ30_1および30_2の容量Cが未劣化の状態に比べて小さい場合、コンデンサ30_1または/および30_2が劣化しているとして、その旨を示す判定結果信号をVCU等へ出力する。   The deterioration determination unit 74 compares the calculation results of the capacities of the capacitors 30_1 and 30_2 received from the capacity calculation unit 73 with the capacities of the undegraded capacitors 30_1 and 30_2 measured in advance, and based on the comparison result, the capacitor 30_1. And the presence or absence of degradation of 30_2 is determined. For example, when the calculated capacitance C of the capacitors 30_1 and 30_2 is smaller than that in the undegraded state, it is determined that the capacitor 30_1 or / and 30_2 has deteriorated, and a determination result signal indicating that is output to the VCU or the like.

以上、本実施形態では、電動機Mのトルクの発生に寄与しないd軸電流のみ電動機Mに出力されるため、電動機に流れた交流電流(d軸電流)のほとんどは、ステータ巻線の巻線抵抗でジュール熱として消費される。従って、このジュール熱として消費される電力を(2)式におけるコンデンサの静電エネルギーの変化量とみなして平滑化コンデンサの容量を算出することができる。そして、このようにして算出された容量に基づきその劣化を判定することにより、高精度で平滑化コンデンサの劣化診断を行うことが可能となる。   As described above, in the present embodiment, since only the d-axis current that does not contribute to the generation of torque of the motor M is output to the motor M, most of the alternating current (d-axis current) flowing to the motor is the winding resistance of the stator winding. Is consumed as Joule heat. Therefore, it is possible to calculate the capacitance of the smoothing capacitor by regarding the electric power consumed as Joule heat as the amount of change in the electrostatic energy of the capacitor in the equation (2). Then, by determining the deterioration based on the capacity thus calculated, it is possible to perform the deterioration diagnosis of the smoothing capacitor with high accuracy.

また、(1)式に示すように、コンデンサ30_1および30_2の容量Cは、放電開始時点および閾値電圧Vthに到達した時点間のコンデンサ30_1および30_2の極板間電圧から算出される。従って、放電開始時刻におけるコンデンサ30_1および30_2の極板間電圧がどのような値であっても、その影響を受けてコンデンサの劣化診断の精度が落ちることはない。   Further, as shown in the equation (1), the capacitance C of the capacitors 30_1 and 30_2 is calculated from the voltage between the plates of the capacitors 30_1 and 30_2 between the discharge start time and the time when the threshold voltage Vth is reached. Therefore, any value of the voltage between the electrodes 30_1 and 30_2 at the discharge start time will not be affected by the deterioration diagnosis accuracy of the capacitor.

また、本実施形態によれば、特許文献1に記載の技術のように放電電流を消費させるための抵抗を別途用意する必要はなく、特許文献2に記載の技術のように昇圧回路を別途用意する必要もない。従って、特許文献1や特許文献2に記載の技術を用いる場合に比較して、コストを削減することができる。   Further, according to the present embodiment, it is not necessary to separately prepare a resistor for consuming the discharge current as in the technique described in Patent Document 1, and a booster circuit is separately prepared as in the technique described in Patent Document 2. There is no need to do. Therefore, the cost can be reduced as compared with the case where the techniques described in Patent Document 1 and Patent Document 2 are used.

以上より、本実施形態によれば、高精度、かつ、低コストでコンデンサの劣化診断を実現することが可能となる。   As described above, according to the present embodiment, it is possible to realize capacitor deterioration diagnosis with high accuracy and low cost.

加えて、本実施形態によれば、(3)式に示すように簡単な演算により巻線抵抗における消費電力が算出される。このため、コンデンサ30_1および30_2の容量Cの算出時に制御部70にかかる処理負荷を低減することができる。   In addition, according to the present embodiment, the power consumption in the winding resistance is calculated by a simple calculation as shown in Equation (3). For this reason, it is possible to reduce the processing load applied to the control unit 70 when calculating the capacitance C of the capacitors 30_1 and 30_2.

また、本実施形態によれば、閾値電圧Vthの設定値をバッテリ電圧に近い値に設定し、コンデンサの放電期間を短くすることにより、劣化診断に要する時間を短縮することができる。ただし、この場合、(2)式の右辺の分母の演算時に桁落ちが発生し得るため、劣化診断の精度および時間に応じて閾値電圧Vthを好適な値に設定することが望ましい。なお、上記実施形態では、コンデンサ30_1および30_2の極板間電圧が所定の閾値電圧Vthに達するまでコンデンサ30_1および30_2を放電させたが、コンデンサ30_1および30_2を予め定められた一定時間に亘って放電させ、放電開始時点の極板間電圧と、一定時間経過後の極板間電圧と、当該一定時間における巻線抵抗の消費電力とからコンデンサ30_1および30_2の容量Cを求めても良い。   Further, according to the present embodiment, the time required for the deterioration diagnosis can be shortened by setting the threshold voltage Vth to a value close to the battery voltage and shortening the discharge period of the capacitor. In this case, however, a digit loss may occur during the calculation of the denominator of the right side of equation (2). Therefore, it is desirable to set the threshold voltage Vth to a suitable value according to the accuracy and time of deterioration diagnosis. In the above embodiment, the capacitors 30_1 and 30_2 are discharged until the voltage between the plates of the capacitors 30_1 and 30_2 reaches a predetermined threshold voltage Vth. However, the capacitors 30_1 and 30_2 are discharged over a predetermined time. The capacitance C of the capacitors 30_1 and 30_2 may be obtained from the voltage between the electrode plates at the start of discharge, the voltage between the electrode plates after a certain time has elapsed, and the power consumption of the winding resistance during the certain time.

また、本実施形態によれば、コンデンサの劣化のみならず、コンデンサの回路基板からの脱落や接触不良を検出することも可能となる。   In addition, according to the present embodiment, it is possible to detect not only the deterioration of the capacitor but also the falling off of the capacitor from the circuit board and the contact failure.

<第1実施形態の変形例1>
図2は、本発明の第1実施形態の変形例である電力変換装置1Aの構成を示す回路図である。ステータ巻線の巻線抵抗には温度依存性があり、周囲温度が著しく高い(低い)環境化で劣化診断を行う場合、その巻線抵抗値が変動する。本変形例に示す電力変換装置1Aは、ステータ巻線の巻線抵抗値の変動を補正する機能を備えている。
<Variation 1 of the first embodiment>
FIG. 2 is a circuit diagram showing a configuration of a power conversion device 1A that is a modification of the first embodiment of the present invention. The winding resistance of the stator winding has temperature dependence, and when the deterioration diagnosis is performed in an environment where the ambient temperature is extremely high (low), the winding resistance value varies. The power conversion device 1A shown in the present modification has a function of correcting fluctuations in the winding resistance value of the stator winding.

図2と図1を対比すれば明らかように、電力変換装置1Aは、温度検出センサ90を有する点と、制御部70に代えて制御部70Aを有する点が電力変換装置1と異なる。制御部70Aは、容量算出部73に代えて容量算出部73Aを有する点が制御部70と異なる。温度検出センサ90は、ステータ巻線の温度を検出し、その温度に応じた検出信号を容量算出部73Aに出力する。容量算出部73Aは、温度検出センサ90から受け取った検出信号の表す温度を特定し、その温度に基づきステータ巻線の巻線抵抗値を補正する。具体的には、容量算出部73Aは、複数の温度に対応付けて、その温度における巻線抵抗値を格納したテーブルを有しており、検出信号の示す温度に最も近い温度と対応付けて上記テーブルに格納されている巻線抵抗値を読み出すことで上記補正を行う。そして、容量算出部73Aは、補正後の巻線抵抗値を用いて(2)および(3)式に示す演算を行う。なお、温度検出センサ90を外部要素としてもよい。   As apparent from a comparison between FIG. 2 and FIG. 1, the power conversion device 1 </ b> A is different from the power conversion device 1 in that it includes a temperature detection sensor 90 and in that it includes a control unit 70 </ b> A instead of the control unit 70. The control unit 70A is different from the control unit 70 in that the control unit 70A includes a capacity calculation unit 73A instead of the capacity calculation unit 73. The temperature detection sensor 90 detects the temperature of the stator winding and outputs a detection signal corresponding to the temperature to the capacity calculation unit 73A. The capacity calculation unit 73A identifies the temperature represented by the detection signal received from the temperature detection sensor 90, and corrects the winding resistance value of the stator winding based on the temperature. Specifically, the capacity calculation unit 73A has a table in which winding resistance values at the temperatures are stored in association with a plurality of temperatures, and is associated with the temperature closest to the temperature indicated by the detection signal. The above correction is performed by reading the winding resistance value stored in the table. And the capacity | capacitance calculation part 73A performs the calculation shown to (2) and (3) Formula using the coil | winding resistance value after correction | amendment. The temperature detection sensor 90 may be an external element.

本実施形態によれば、ステータ巻線の巻線抵抗値の変動分に応じた誤差を含むことなく、平滑化コンデンサの容量を算出することができる。   According to the present embodiment, it is possible to calculate the capacity of the smoothing capacitor without including an error corresponding to the variation of the winding resistance value of the stator winding.

<第1実施形態の変形例2>
上記実施形態において、厳密には、放電時におけるコンデンサ30_1および30_2の静電エネルギーの変化分は、ステータ巻線の巻線抵抗でジュール熱として消費される他、インバータ主回路40においてもジュール熱として消費される。本変形例に示す電力変換装置は、インバータ主回路40の消費電力を算出する機能を備えている。
<Modification 2 of the first embodiment>
Strictly speaking, in the above embodiment, the change in electrostatic energy of the capacitors 30_1 and 30_2 at the time of discharging is consumed as Joule heat by the winding resistance of the stator winding, and also as Joule heat in the inverter main circuit 40. Is consumed. The power conversion device shown in this modification has a function of calculating the power consumption of the inverter main circuit 40.

本変形例の電力変換装置1Aの容量算出部73Aは、周知の方法により、インバータ主回路40の消費電力E’(例えば、インバータ主回路40を構成する各スイッチング素子のドレイン損失の総和)を算出する。そして、容量算出部73Aは、次式に従って、コンデンサ30_1および30_2の容量Cを算出する。

Figure 2017112792
……(4) The capacity calculation unit 73A of the power conversion device 1A of the present modification calculates the power consumption E ′ of the inverter main circuit 40 (for example, the sum of drain losses of the switching elements constituting the inverter main circuit 40) by a known method. To do. And capacity calculation part 73A calculates capacity C of capacitors 30_1 and 30_2 according to a following formula.
Figure 2017112792
...... (4)

本実施形態によれば、インバータ主回路40の消費電力により放電時におけるコンデンサ30_1および30_2の静電エネルギーの変化量Eを補正し、補正後の上記変化量に基づきコンデンサ30_1および30_2の容量Cを算出するため、より高い精度で劣化診断を行うことができる。   According to the present embodiment, the change amount E of the electrostatic energy of the capacitors 30_1 and 30_2 at the time of discharging is corrected by the power consumption of the inverter main circuit 40, and the capacitance C of the capacitors 30_1 and 30_2 is set based on the corrected change amount. Since the calculation is performed, the deterioration diagnosis can be performed with higher accuracy.

<第2実施形態>
図3は、本発明の第2実施形態である電力変換装置1Cの構成を示す回路図である。周知の通り、電力変換装置のなかには、バッテリから電力変換装置へ流れ込む電流を電流検出センサで検出し、その検出結果に応じた処理を実行するものがある。以下では、この種の電力変換装置に好適な機能を備えた電力変換装置1Cについて示す。
Second Embodiment
FIG. 3 is a circuit diagram showing a configuration of a power conversion device 1C according to the second embodiment of the present invention. As is well known, some power conversion devices detect current flowing from the battery into the power conversion device with a current detection sensor and execute processing according to the detection result. Below, it shows about 1C of power converter devices provided with the function suitable for this kind of power converter device.

図1と図3とを対比すれば明らかなように、電力変換装置1Cは、電流検出センサ100を有する点と、制御部70に代えて制御部70Cを有する点が電力変換装置1と異なる。制御部70Cは、容量算出部73に代えて容量算出部73Cを有する点が制御部70と異なる。電流検出センサ100は、バッテリ10からインバータ主回路40へ流れ込む電流の経路の途中に設けられており、当該経路を流れる電流を検出し、その電流値に応じた検出信号を制御部70C(容量算出部73C)に出力する。   As apparent from a comparison between FIG. 1 and FIG. 3, the power conversion device 1 </ b> C is different from the power conversion device 1 in that it includes the current detection sensor 100 and in that it includes a control unit 70 </ b> C instead of the control unit 70. The control unit 70 </ b> C is different from the control unit 70 in that it includes a capacity calculation unit 73 </ b> C instead of the capacity calculation unit 73. The current detection sensor 100 is provided in the middle of the path of the current flowing from the battery 10 to the inverter main circuit 40, detects the current flowing through the path, and outputs a detection signal corresponding to the current value to the control unit 70C (capacity calculation). Part 73C).

容量算出部73Cは、上記検出信号にA/D変換を施し、その電流波形を表す電流波形サンプル列Iを取得する。そして、容量算出部73Cは、次式に従って、放電時におけるコンデンサ30_1および30_2の静電エネルギーの変化量Eを算出する。次式における積分区間はt=0〜Tであり、i(t)およびv(t)の各値は、上記経路を流れる電流の電流値およびその電圧値(コンデンサ30_1および30_2の極板間電圧)を示す。容量算出部73Cは、電流波形サンプル列Iおよび電圧波形サンプル列Vの各々について、同じ時刻のサンプル同士の積を算出し、当該積の総和を算出する。そして、容量算出部73Cは、上記算出結果を(3)式におけるEに替えて(2)式に代入し、コンデンサ30_1および30_2の容量Cを算出する。

Figure 2017112792
……(5) The capacity calculation unit 73C performs A / D conversion on the detection signal, and acquires a current waveform sample string I representing the current waveform. And capacity calculation part 73C calculates change amount E of electrostatic energy of capacitors 30_1 and 30_2 at the time of discharge according to the following formula. The integration interval in the following equation is t = 0 to T, and each value of i (t) and v (t) is the current value of the current flowing through the path and the voltage value thereof (the voltage between the plates of the capacitors 30_1 and 30_2). ). The capacity calculation unit 73C calculates the product of the samples at the same time for each of the current waveform sample sequence I and the voltage waveform sample sequence V, and calculates the sum of the products. And the capacity | capacitance calculation part 73C substitutes the said calculation result to (2) Formula instead of E in (3) Formula, and calculates the capacity | capacitance C of the capacitors 30_1 and 30_2.
Figure 2017112792
...... (5)

本実施形態によれば、バッテリ10からインバータ主回路40へ流れ込む電流およびコンデンサ30_1および30_2の極板間電圧に基づき容量C(すなわち、両者の合成容量)を算出するため、インバータ主回路40の消費電力や、その出力側にあるステータ巻線の巻線抵抗値の変動に起因する誤差を考慮する必要がない。また、劣化診断を電動機Mの制御と並列に行うことができるため、劣化診断の高速化を図ることも可能となる。また、バッテリから電力変換装置へ流れ込む電流を検出する電流検出センサを備えた電力変換装置であれば、その電流検出センサをコンデンサの劣化診断用のセンサとして有効利用することができる。   According to the present embodiment, since the capacity C (that is, the combined capacity of both) is calculated based on the current flowing from the battery 10 to the inverter main circuit 40 and the voltage between the electrodes 30_1 and 30_2, the consumption of the inverter main circuit 40 There is no need to take into account errors caused by fluctuations in power and the winding resistance value of the stator winding on the output side. Further, since the deterioration diagnosis can be performed in parallel with the control of the electric motor M, the deterioration diagnosis can be speeded up. Moreover, if it is a power converter device provided with the current detection sensor which detects the electric current which flows into a power converter device from a battery, the current detection sensor can be used effectively as a sensor for deterioration diagnosis of a capacitor.

<第3実施形態>
図4は、本発明の第3実施形態である電力変換装置1Dの構成を示す回路図である。周知の通り、電力変換装置のなかには、インバータから電動機に印加される電圧を電圧検出センサで検出し、その検出結果に応じた処理を実行するものがある。以下では、この種の電力変換装置に好適な機能を備えた電力変換装置1Dについて示す。
<Third Embodiment>
FIG. 4 is a circuit diagram showing a configuration of a power conversion device 1D according to the third embodiment of the present invention. As is well known, some power conversion devices detect a voltage applied to an electric motor from an inverter with a voltage detection sensor and execute a process according to the detection result. Below, power converter 1D provided with the function suitable for this kind of power converter is shown.

図1と図4を対比すれば明らかなように、電力変換装置1Dは、電圧検出センサ110を有する点と、制御部70に代えて制御部70Dを有する点が電力変換装置1と異なる。制御部70Dは、インバータ制御部71に代えてインバータ制御部71Dを有する点と、容量算出部73に代えて容量算出部73Dを有する点が制御部70と異なる。電圧検出センサ110は、インバータ主回路40から電動機Mへ流れ込む電流の経路の途中に設けられており、当該経路を流れる2相(u相、w相)の交流電流の電圧を検出し、その電圧値に応じた検出信号を容量算出部73Dに出力する。インバータ制御部71Dは、電流波形サンプル列Ioutを容量算出部73Dに与える。   As is clear from a comparison between FIG. 1 and FIG. 4, the power conversion device 1 </ b> D is different from the power conversion device 1 in that it includes the voltage detection sensor 110 and in that it includes a control unit 70 </ b> D instead of the control unit 70. The control unit 70 </ b> D is different from the control unit 70 in that it has an inverter control unit 71 </ b> D instead of the inverter control unit 71, and has a capacity calculation unit 73 </ b> D instead of the capacity calculation unit 73. The voltage detection sensor 110 is provided in the middle of the path of the current flowing from the inverter main circuit 40 to the motor M, detects the voltage of the two-phase (u-phase, w-phase) alternating current flowing through the path, and the voltage A detection signal corresponding to the value is output to the capacity calculation unit 73D. The inverter control unit 71D provides the current waveform sample sequence Iout to the capacity calculation unit 73D.

容量算出部73Dは、電圧検出センサ110から出力される検出信号にA/D変換を施し、その電圧波形を表す電圧波形サンプル列Voutを取得する。そして、容量算出部73Dは、次式に従って、放電時におけるコンデンサ30_1および30_2の静電エネルギーの変化量Eを算出する。次式における積分区間はt=0〜Tであり、iout(t)およびvout(t)の各値は、上記経路を流れる交流電流およびその電圧値を示す。容量算出部73Dは、電流波形サンプル列Ioutおよび電圧波形サンプル列Voutの各々について、同じ時刻のサンプル同士の積を算出し、当該積の総和を算出する。そして、容量算出部73Dは、上記算出結果を(3)式におけるEに替えて(2)式に代入し、コンデンサ30_1および30_2の容量Cを算出する。

Figure 2017112792
……(6) The capacitance calculation unit 73D performs A / D conversion on the detection signal output from the voltage detection sensor 110, and acquires a voltage waveform sample string Vout representing the voltage waveform. And capacity calculation part 73D calculates change amount E of electrostatic energy of capacitors 30_1 and 30_2 at the time of discharge according to a following formula. The integration interval in the following equation is t = 0 to T, and each value of iout (t) and vout (t) indicates an alternating current flowing through the path and its voltage value. The capacity calculation unit 73D calculates the product of the samples at the same time for each of the current waveform sample sequence Iout and the voltage waveform sample sequence Vout, and calculates the sum of the products. Then, the capacitance calculation unit 73D calculates the capacitance C of the capacitors 30_1 and 30_2 by substituting the calculation result into Eq. (2) instead of E in Eq. (3).
Figure 2017112792
...... (6)

本実施形態によれば、インバータ主回路40から電動機Mへ流れ込む電流およびその電圧に基づいて平滑化コンデンサの容量を算出するため、その出力先であるステータ巻線の巻線抵抗値の変動に起因する誤差を考慮する必要がない。また、劣化診断を電動機Mの制御と並列に行うことができるため、劣化診断の高速化を図ることも可能となる。また、インバータから電動機Mに印加される電圧を検出する電圧検出センサを備えた電力変換装置であれば、その電圧検出センサをコンデンサの劣化診断用のセンサとして有効利用することができる。   According to the present embodiment, since the capacity of the smoothing capacitor is calculated based on the current flowing from the inverter main circuit 40 to the motor M and the voltage thereof, it is caused by the fluctuation of the winding resistance value of the stator winding that is the output destination. There is no need to take into account errors. Further, since the deterioration diagnosis can be performed in parallel with the control of the electric motor M, the deterioration diagnosis can be speeded up. Moreover, if it is a power converter device provided with the voltage detection sensor which detects the voltage applied to the electric motor M from an inverter, the voltage detection sensor can be used effectively as a sensor for a deterioration diagnosis of a capacitor | condenser.

<第3実施形態の変形例>
ところで、インバータから電動機Mに印加される電圧を検出する電圧検出センサを有さない電力変換装置には上記第3実施形態に示した技術を適用することはできない。そこで、以下では、インバータから電動機Mに印加される電圧を検出する電圧検出センサを有さない電力変換装置への本発明の適用例について示す。
<Modification of Third Embodiment>
By the way, the technique shown in the third embodiment cannot be applied to a power converter that does not have a voltage detection sensor that detects a voltage applied to the motor M from the inverter. Therefore, in the following, an application example of the present invention to a power conversion device that does not have a voltage detection sensor that detects a voltage applied to the motor M from the inverter will be described.

インバータから電動機Mに印加される電圧を検出する電圧検出センサを有さない電力変換装置の場合、インバータ制御部71Dには、d軸電圧指令値vd*を示すデータを容量算出部73Dに与える処理を実行させる。容量算出部73Dは、次式に従って、放電時におけるコンデンサ30_1および30_2の静電エネルギーの変化量Eを算出する。次式における積分区間はt=0〜Tであり、容量算出部73Dは、電流波形サンプル列Ioutの各サンプルとd軸電圧指令値vd*との積和を算出する。そして、容量算出部73Dは、上記算出結果を(3)式におけるEに替えて(2)式に代入し、コンデンサ30_1および30_2の容量Cを算出する。

Figure 2017112792
……(7) In the case of a power conversion device that does not have a voltage detection sensor that detects a voltage applied from the inverter to the motor M, the inverter control unit 71D is provided with data indicating the d-axis voltage command value vd * to the capacity calculation unit 73D. Is executed. The capacity calculation unit 73D calculates the change amount E of the electrostatic energy of the capacitors 30_1 and 30_2 during discharging according to the following equation. The integration interval in the following equation is t = 0 to T, and the capacity calculation unit 73D calculates the sum of products of each sample of the current waveform sample sequence Iout and the d-axis voltage command value vd *. Then, the capacitance calculation unit 73D calculates the capacitance C of the capacitors 30_1 and 30_2 by substituting the calculation result into Eq. (2) instead of E in Eq. (3).
Figure 2017112792
...... (7)

本実施形態によれば、インバータから電動機Mに印加される電圧を検出する電圧検出センサを有さない電力変換装置であっても、上記センサを別途設けることなくコンデンサの劣化診断を行うことができる。また、劣化診断を電動機Mの制御と並列に行うことができるため、劣化診断の高速化を図ることも可能となる。   According to this embodiment, even in a power conversion device that does not have a voltage detection sensor that detects a voltage applied from the inverter to the motor M, the deterioration of the capacitor can be diagnosed without providing the sensor separately. . Further, since the deterioration diagnosis can be performed in parallel with the control of the electric motor M, the deterioration diagnosis can be speeded up.

<他の実施形態>
以上、この発明の各実施形態について説明したが、この発明には他にも実施形態が考えられる。例えば、以下の通りである。
<Other embodiments>
As mentioned above, although each embodiment of this invention was described, other embodiment can be considered to this invention. For example, it is as follows.

(1)上記第3実施形態に、第1実施形態の変形例2に記載の発明を適用してもよい。 (1) The invention described in Modification 2 of the first embodiment may be applied to the third embodiment.

(2)上記各実施形態では、コンデンサ30_1および30_2を含む電力変換装置への本発明の適用例について説明したが、コンデンサ30_1および30_2を外部要素としてもよい。また、上記実施形態では、コンデンサ30_1とコンデンサ30_2が、バッテリ10からインバータ主回路40へ供給される直流電力を平滑化する平滑化コンデンサの役割を担っていたが、当該平滑化コンデンサを1つの容量素子で構成してもよく、3つ以上の容量素子で構成してもよい。 (2) In each of the above embodiments, the application example of the present invention to the power conversion device including the capacitors 30_1 and 30_2 has been described. However, the capacitors 30_1 and 30_2 may be external elements. Moreover, in the said embodiment, although the capacitor | condenser 30_1 and the capacitor | condenser 30_2 played the role of the smoothing capacitor which smoothes the direct-current power supplied from the battery 10 to the inverter main circuit 40, the said smoothing capacitor is carried out to one capacity | capacitance. It may be constituted by an element or may be constituted by three or more capacitive elements.

(3)上記各実施形態において、制御部70の各部の機能をハードウェアで実現してもよい。 (3) In each of the above embodiments, the function of each unit of the control unit 70 may be realized by hardware.

(4)上記第2および第3実施形態では、インバータ主回路40の駆動対象である負荷を電動機としたが、上記負荷は電動機に限定されるものではなく、電動機以外の負荷をインバータ主回路40の駆動対象としてもよい。 (4) In the second and third embodiments, the load that is the drive target of the inverter main circuit 40 is an electric motor. However, the load is not limited to the electric motor, and a load other than the electric motor is connected to the inverter main circuit 40. It is good also as a drive object.

1,1A,1C,1D…電力変換装置、10…バッテリ、20…スイッチ、30_1,30_2…コンデンサ、40…インバータ主回路、50,110…電圧検出センサ、60,100…電流検出センサ、70…制御部、71,71D…インバータ制御部、72…電圧検出部、73,73A,73C,73D…容量算出部、74…劣化判定部、90…温度検出センサ。 DESCRIPTION OF SYMBOLS 1,1A, 1C, 1D ... Power converter, 10 ... Battery, 20 ... Switch, 30_1, 30_2 ... Capacitor, 40 ... Inverter main circuit, 50, 110 ... Voltage detection sensor, 60, 100 ... Current detection sensor, 70 ... Control unit, 71, 71D ... Inverter control unit, 72 ... Voltage detection unit, 73, 73A, 73C, 73D ... Capacity calculation unit, 74 ... Degradation determination unit, 90 ... Temperature detection sensor.

Claims (9)

直流電源から供給される直流電力を交流電力に変換して負荷に出力するインバータ主回路に並列接続されたコンデンサの劣化診断方法であって、
前記コンデンサの極板間電圧が所定値になるまで前記コンデンサを放電させる第1のステップと、
前記コンデンサの放電時における極板間電圧の変化量に基づき前記コンデンサの容量を算出する第2のステップと、
を含むコンデンサの劣化診断方法。
A method for diagnosing deterioration of a capacitor connected in parallel to an inverter main circuit that converts DC power supplied from a DC power source into AC power and outputs it to a load,
A first step of discharging the capacitor until the voltage between the plates of the capacitor reaches a predetermined value;
A second step of calculating the capacitance of the capacitor based on the amount of change in the voltage between the electrodes during discharge of the capacitor;
Degradation diagnosis method for capacitors including
前記負荷は電動機であり、
前記第1のステップでは、前記インバータ主回路から出力される交流電流のq軸成分が0となるように制御しつつ、前記コンデンサを放電させ、
前記第2のステップでは、前記交流電流のd軸成分と、前記コンデンサの極板間電圧が所定値となるまでの時間と、ステータ巻線の巻線抵抗値とに基づき算出した当該ステータ巻線における消費電力を前記コンデンサの静電エネルギーの変化量とみなして前記コンデンサの容量を算出することを特徴とする請求項1に記載のコンデンサの劣化診断方法。
The load is an electric motor;
In the first step, while controlling the q-axis component of the alternating current output from the inverter main circuit to be 0, the capacitor is discharged,
In the second step, the stator winding calculated based on the d-axis component of the alternating current, the time until the voltage between the plates of the capacitor reaches a predetermined value, and the winding resistance value of the stator winding 2. The capacitor deterioration diagnosis method according to claim 1, wherein the capacitance of the capacitor is calculated by regarding the power consumption of the capacitor as the amount of change in electrostatic energy of the capacitor.
前記第1のステップでは、前記交流電流のd軸成分が一定となるように制御することを特徴とする請求項2に記載のコンデンサの劣化診断方法。   3. The capacitor deterioration diagnosis method according to claim 2, wherein in the first step, control is performed so that a d-axis component of the alternating current is constant. 前記第2のステップでは、前記ステータ巻線の温度を検出し、当該温度に基づき前記ステータ巻線の巻線抵抗値を補正することを特徴とする請求項3に記載のコンデンサの劣化診断方法。   4. The capacitor deterioration diagnosis method according to claim 3, wherein in the second step, the temperature of the stator winding is detected, and the winding resistance value of the stator winding is corrected based on the temperature. 前記第2のステップでは、前記コンデンサから前記インバータ主回路に流れ込む電流と、前記コンデンサの極板間電圧とに基づき算出した電力を前記コンデンサの静電エネルギーの変化量とみなして前記コンデンサの容量を算出することを特徴とする請求項1に記載のコンデンサの劣化診断方法。   In the second step, the power calculated based on the current flowing from the capacitor to the inverter main circuit and the voltage between the plates of the capacitor is regarded as the amount of change in the electrostatic energy of the capacitor, and the capacitance of the capacitor is determined. The capacitor deterioration diagnosis method according to claim 1, wherein the capacitor deterioration diagnosis method is performed. 前記第2のステップでは、前記インバータ主回路から前記負荷へ流れる電流とその電圧の各々の計測値に基づき算出した電力を前記コンデンサの静電エネルギーの変化量とみなして前記コンデンサの容量を算出することを特徴とする請求項1に記載のコンデンサの劣化診断方法。   In the second step, the capacity of the capacitor is calculated by regarding the power calculated based on the measured values of the current flowing from the inverter main circuit to the load and the voltage thereof as the amount of change in the electrostatic energy of the capacitor. The capacitor deterioration diagnosis method according to claim 1. 前記第2のステップでは、前記インバータ主回路から前記負荷へ流れる電流と前記インバータ主回路の出力電圧指令値とに基づき算出した電力を前記コンデンサの静電エネルギーの変化量とみなして前記コンデンサの容量を算出することを特徴とする請求項1に記載のコンデンサの劣化診断方法。   In the second step, the power calculated based on the current flowing from the inverter main circuit to the load and the output voltage command value of the inverter main circuit is regarded as the amount of change in electrostatic energy of the capacitor, and the capacitance of the capacitor The capacitor deterioration diagnosis method according to claim 1, wherein: 前記第2のステップでは、前記インバータ主回路の消費電力の分、前記コンデンサの静電エネルギーの変化量を補正することを特徴とする請求項2〜4、6または7のいずれか1の請求項に記載のコンデンサの劣化診断方法。   The said 2nd step correct | amends the variation | change_quantity of the electrostatic energy of the said capacitor | condenser by the part of the power consumption of the said inverter main circuit, The claim of any one of Claims 2-4, 6 or 7 characterized by the above-mentioned. Degradation diagnosis method for capacitors as described in 1. 直流電源から供給される直流電力を交流電力に変換して負荷に出力するインバータ主回路を有し、コンデンサが並列接続された電力変換装置であって、
前記コンデンサの極板間電圧を検出し、その極板間電圧値に応じた検出信号を出力する電圧検出センサと、
前記コンデンサの極板間電圧が所定値になるまで前記コンデンサを放電するよう前記インバータ主回路を制御するインバータ制御部と、
前記検出信号を入力し、当該検出信号の表す前記コンデンサの放電時における極板間電圧の変化量に基づき前記コンデンサの容量を算出する容量算出部と、
を有する電力変換装置。
A power conversion device having an inverter main circuit that converts DC power supplied from a DC power source into AC power and outputs it to a load, and a capacitor connected in parallel,
A voltage detection sensor for detecting a voltage between the plates of the capacitor and outputting a detection signal corresponding to the voltage value between the plates;
An inverter control unit for controlling the inverter main circuit to discharge the capacitor until the voltage between the plates of the capacitor reaches a predetermined value;
A capacitance calculation unit that inputs the detection signal and calculates the capacitance of the capacitor based on the amount of change in the voltage between the electrode plates during the discharge of the capacitor represented by the detection signal;
A power conversion device.
JP2015247349A 2015-12-18 2015-12-18 Capacitor deterioration diagnostic method and power conversion device Withdrawn JP2017112792A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015247349A JP2017112792A (en) 2015-12-18 2015-12-18 Capacitor deterioration diagnostic method and power conversion device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015247349A JP2017112792A (en) 2015-12-18 2015-12-18 Capacitor deterioration diagnostic method and power conversion device

Publications (1)

Publication Number Publication Date
JP2017112792A true JP2017112792A (en) 2017-06-22

Family

ID=59080467

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015247349A Withdrawn JP2017112792A (en) 2015-12-18 2015-12-18 Capacitor deterioration diagnostic method and power conversion device

Country Status (1)

Country Link
JP (1) JP2017112792A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019067857A (en) * 2017-09-29 2019-04-25 三菱電機株式会社 Power conversion device
CN114008907A (en) * 2019-07-16 2022-02-01 株式会社日立产机*** Power conversion device and degradation diagnosis system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007288955A (en) * 2006-04-19 2007-11-01 Hitachi Industrial Equipment Systems Co Ltd Power conversion device
JP2008094342A (en) * 2006-10-16 2008-04-24 Jtekt Corp Electric power steering device
JP2014011952A (en) * 2012-07-02 2014-01-20 Lsis Co Ltd Diagnostic system for inverter dc link capacitor
JP2014033566A (en) * 2012-08-06 2014-02-20 Denso Corp Controller for rotary machine
US20150130273A1 (en) * 2013-11-12 2015-05-14 Ford Global Technologies, Llc Dc link capacitance measurement for electric vehicle drivetrain

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007288955A (en) * 2006-04-19 2007-11-01 Hitachi Industrial Equipment Systems Co Ltd Power conversion device
JP2008094342A (en) * 2006-10-16 2008-04-24 Jtekt Corp Electric power steering device
JP2014011952A (en) * 2012-07-02 2014-01-20 Lsis Co Ltd Diagnostic system for inverter dc link capacitor
JP2014033566A (en) * 2012-08-06 2014-02-20 Denso Corp Controller for rotary machine
US20150130273A1 (en) * 2013-11-12 2015-05-14 Ford Global Technologies, Llc Dc link capacitance measurement for electric vehicle drivetrain

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019067857A (en) * 2017-09-29 2019-04-25 三菱電機株式会社 Power conversion device
US10438874B2 (en) 2017-09-29 2019-10-08 Mitsubishi Electric Corporation Power conversion device
CN114008907A (en) * 2019-07-16 2022-02-01 株式会社日立产机*** Power conversion device and degradation diagnosis system
CN114008907B (en) * 2019-07-16 2024-03-08 株式会社日立产机*** Power conversion device and degradation diagnosis system

Similar Documents

Publication Publication Date Title
JP5837534B2 (en) DC link capacitor diagnostic device for inverter
KR101668174B1 (en) Electric motor control device
US11874339B2 (en) Insulation resistance determination apparatus
JP6232935B2 (en) Power supply apparatus and abnormality determination method for power supply apparatus
US20200363480A1 (en) Method and assessment unit for determining the remaining service life of a capacitor, and system
EP2887526B1 (en) Method and power converter for determining cell capacitor degradation in a converter cell
EP3637115B1 (en) Method and apparatus for detecting capacitance value of filter capacitor in inverter
JP2018093596A (en) Controller of motor system and method for determining temperature detection state
JP2015204709A (en) Motor driving device with fault detection function for insulation resistance deterioration detection part of motor, and fault detection method
JP6603294B2 (en) Motor driving device and measuring method
US10439504B2 (en) Power converter device and control method thereof
JP2018183006A (en) Power conversion device and abnormality detection method
JP2017112792A (en) Capacitor deterioration diagnostic method and power conversion device
JP2008172862A (en) Controller of polyphase rotary electric machine
JP6568189B2 (en) Motor driving device and measuring method
CN110391754B (en) Power conversion device and abnormality detection method
JP6029540B2 (en) Solar cell control device and solar cell control method
JP2006304456A (en) Power converter
JP4069373B2 (en) Capacitor life diagnosis apparatus and capacitor life diagnosis method
JP6603295B2 (en) Motor driving device and measuring method
JP2010107405A (en) Passive element parameter measuring device
JP6599015B2 (en) Power measuring apparatus and power measuring method
JP7322493B2 (en) Inverter device and inverter control program
JP6375888B2 (en) Initial charging completion determination method, initial charging completion determination circuit, and power conversion device in power conversion device
CN113098361A (en) Driving system, control method and control device of alternating current motor and vehicle

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20181114

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190912

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190924

A761 Written withdrawal of application

Free format text: JAPANESE INTERMEDIATE CODE: A761

Effective date: 20191224