JP2017108523A - Conveyance carriage and power distribution board installation method - Google Patents

Conveyance carriage and power distribution board installation method Download PDF

Info

Publication number
JP2017108523A
JP2017108523A JP2015240227A JP2015240227A JP2017108523A JP 2017108523 A JP2017108523 A JP 2017108523A JP 2015240227 A JP2015240227 A JP 2015240227A JP 2015240227 A JP2015240227 A JP 2015240227A JP 2017108523 A JP2017108523 A JP 2017108523A
Authority
JP
Japan
Prior art keywords
switchboard
support plate
plate
screw shaft
distribution board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2015240227A
Other languages
Japanese (ja)
Inventor
大士 井ノ口
Hiroshi Inokuchi
大士 井ノ口
裕治 俵
Yuji Tawara
裕治 俵
隆 中村
Takashi Nakamura
隆 中村
登志子 山野上
Toshiko Yamanoue
登志子 山野上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2015240227A priority Critical patent/JP2017108523A/en
Publication of JP2017108523A publication Critical patent/JP2017108523A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Trip Switchboards (AREA)

Abstract

PROBLEM TO BE SOLVED: To suppress the vibration of a power distribution board when the power distribution board is transferred from a carriage to a cradle.SOLUTION: A conveyance carriage 10 includes: a first support plate 12 of a rectangular shape, on which a power distribution board 90 is loaded in a fallen state; a running wheel 16 provided on the first support plate 12; a second support plate 18 erected at an end part of the short side of the first support plate 12; a side plate 20 erected at an end part of the long side of the first support plate 12; a screw shaft 42 which is screwed into a screw hole 40 disposed on the side plate 20 to penetrate through the side plate 20; and a dab part 50 disposed at the tip of the screw shaft 42 to be dabbed on the power distribution board 90.SELECTED DRAWING: Figure 1

Description

本発明は、配電盤の据付又は撤去の際に用いる搬送台車に関するとともに、その搬送台車を利用した配電盤の据付方法に関する。   The present invention relates to a transporting carriage used when installing or removing a power distribution board, and also relates to a method for installing the power distribution board using the transporting truck.

特許文献1には、レール上の架台上に配電盤を載置して、その架台をレールに沿って走行させることによって配電盤を搬送し、これにより配電盤の据付を行う技術が開示されている。   Patent Document 1 discloses a technology in which a distribution board is placed on a rack on a rail, and the rack is transported by running the rack along the rail, thereby installing the distribution board.

特許文献2には、配電盤(遮断器)の搬入搬出用のハンドリングリフタが開示されている。ハンドリングリフタについて具体的に説明すると、マストが手押し車式の台車上に立設され、荷台付きの昇降台がそのマストに沿って昇降可能に支持され、滑車がマストの上端部に設けられ、巻取器がマストの下部に設けられ、巻取器から繰り出されたワイヤが滑車によって折り返されて昇降台に連結されている。そして、遮断室内に配電盤(遮断器)を搬入する場合は、地上で配電盤を荷台に載置した後に、巻取器によって昇降台及び荷台とともに配電盤を上昇させ、続いて、荷台からキャビネット内に搬入する。一方、遮断室から配電盤を搬出する場合には、搬入の場合と逆の手順になる。   Patent Document 2 discloses a handling lifter for carrying in / out a switchboard (breaker). The handling lifter will be described in detail. The mast is erected on a handcart type carriage, a lifting platform with a loading platform is supported so as to be movable up and down along the mast, and a pulley is provided at the upper end of the mast. A take-up device is provided at the lower portion of the mast, and a wire fed from the take-up device is folded back by a pulley and connected to a lifting platform. And when carrying a switchboard (breaker) into the shutoff room, after placing the switchboard on the loading platform on the ground, the switchboard is lifted together with the lifting platform and the loading platform by the winder, and then carried into the cabinet from the loading platform. To do. On the other hand, when unloading the switchboard from the shut-off room, the procedure is the reverse of that for loading.

特許文献3には、配電盤の下部にジャッキが設けられ、配電盤の撤去時にジャッキによって配電盤を持ち上げる技術が開示されている。配電盤を持ち上げれば、ケーブルが露出するので、そのケーブルをその配電盤から切り離して、そのケーブルを新設の配電盤に接続することができる。   Patent Document 3 discloses a technique in which a jack is provided at the lower part of the switchboard, and the switchboard is lifted by the jack when the switchboard is removed. Lifting the switchboard exposes the cable so that it can be disconnected from the switchboard and connected to the new switchboard.

特許文献4には、ねじ直動機構を格納室の床面に設置し、ねじ直動機構のボルトの先端部に設けられたフック状部材を配電盤(遮断器)に引っ掛け、ボルトを回転させることによって配電盤を引き出したり、押し入れたりする技術が開示されている。   In Patent Document 4, a screw linear motion mechanism is installed on the floor surface of a storage chamber, and a hook-like member provided at the tip of a bolt of the screw linear motion mechanism is hooked on a switchboard (breaker) to rotate the bolt. Discloses a technique for pulling out or pushing in a switchboard.

実登3010360号公報Noto 3010360 gazette 特開2000−184525号公報JP 2000-184525 A 特開2007−097340号公報JP 2007-097340 A 特開2012−222897号公報JP 2012-222897 A

ところで、特許文献1,2に記載の技術では、配電盤を台(特許文献1では架台、特許文献2では荷台)から設置位置に移載する際に、作業者が手作業で配電盤を運ぶので、配電盤が揺れてしまう。そのため、配電盤が隣接の既設配電盤に当たったり、配電盤の振動が隣接の既設配電盤に伝達したりしてしまう。
特許文献3に記載の技術でも、配電盤を新たな配電盤に取り替える際に、隣接の既設配電盤に振動や衝撃を与えてしまう虞がある。
特許文献4に記載の技術でも、配電盤を格納室内の床面に載置する際に、配電盤が揺れることによって、隣接の既設配電盤に振動や衝撃を与えてしまう。
そこで、本発明は、上記事情に鑑みてなされたものである。本発明の目的は、配電盤を台車から架台に移し替える場合に、配電盤の振動を抑えることにある。
By the way, in the techniques described in Patent Documents 1 and 2, when the switchboard is transferred from the platform (the gantry in Patent Document 1 and the loading platform in Patent Document 2) to the installation position, the operator manually carries the switchboard. The switchboard shakes. Therefore, the switchboard hits an adjacent existing switchboard, or vibration of the switchboard is transmitted to the adjacent existing switchboard.
Even in the technique described in Patent Document 3, there is a possibility that vibration or impact may be applied to an adjacent existing switchboard when the switchboard is replaced with a new switchboard.
Even in the technique described in Patent Document 4, when the switchboard is placed on the floor surface in the storage room, the switchboard shakes, thereby causing vibration or impact to the adjacent existing switchboard.
Therefore, the present invention has been made in view of the above circumstances. An object of the present invention is to suppress vibration of a distribution board when the distribution board is moved from a carriage to a gantry.

以上の課題を解決すべく、搬送台車は、配電盤が載置される支持板と、前記支持板に設けられた走行車輪と、前記支持板に立設された側板と、前記側板に設けられたねじ穴に螺合して、前記側板を貫通したねじ軸と、前記ねじ軸の先端に設けられ、前記配電盤に押し当てられる押し当て部と、を備える。   In order to solve the above-described problems, the carriage is provided on the support plate on which the switchboard is placed, the traveling wheel provided on the support plate, the side plate provided upright on the support plate, and the side plate. A screw shaft that is screwed into the screw hole and penetrates the side plate; and a pressing portion that is provided at a tip of the screw shaft and is pressed against the switchboard.

従って、ねじ軸の回転によって配電盤を徐々に押し出して、その配電盤を据え付けることができるので、配電盤の振動を防止することができる。そのため、配電盤に隣接する既設配電盤に振動を与えずに済み、既設配電盤の誤動作を防止することができる。   Therefore, since the switchboard can be gradually pushed out by rotation of the screw shaft and the switchboard can be installed, vibration of the switchboard can be prevented. Therefore, it is not necessary to give vibration to the existing switchboard adjacent to the switchboard, and malfunction of the existing switchboard can be prevented.

前述の搬送台車が、前記支持板に立設された第二支持板を更に備え、前記支持板が長方形に設けられ、前記配電盤が倒伏した状態で前記支持板に載置され、前記第二支持板が前記支持板の短辺側の端部に立設され、前記側板が前記支持板の長辺側の端部に立設されている。
また、この搬送台車を用いて配電盤を架台上に据え付ける方法であって、前記架台の脇において前記第二支持板を下向きにするよう前記搬送台車を起こし上げ、前記配電盤を立てた状態に前記第二支持板に載置して、前記第二支持板を前記架台の高さに合わせた後、前記ねじ軸を回転して前記押し当て部によって前記配電盤を前記第二支持板から前記架台の上に押し出す。
The transport carriage described above further includes a second support plate erected on the support plate, the support plate is provided in a rectangular shape, and is placed on the support plate with the switchboard lying down, and the second support plate The plate is erected on the end portion on the short side of the support plate, and the side plate is erected on the end portion on the long side of the support plate.
Further, a method of installing a distribution board on a gantry using the conveyance carriage, wherein the conveyance carriage is raised so that the second support plate faces downward on the side of the gantry, and the distribution board is erected in the upright state. After placing the second support plate on the two support plates and adjusting the height of the gantry, the screw shaft is rotated and the switchboard is moved from the second support plate onto the gantry by the pressing portion. Extrude into.

よって、配電盤を倒伏させた状態で支持板に載置することができるので、搬送台車によって配電盤を安定して搬送することができる。
また、第二支持板が支持板の短辺側端部に立設されているので、第二支持板を下向きにするよう搬送台車を起こし上げれば、配電盤を立てた状態で別の台に載置しなくても済む。従って、搬送台車を起こし上げれば、簡単に配電盤を立てた状態にすることができる。
また、ねじ軸の回転によって配電盤を徐々に押し出して第二支持板から架台に移載することができるので、配電盤の振動を防止することができる。そのため、配電盤に隣接する既設配電盤に振動を与えずに済み、既設配電盤の誤動作を防止することができる。
Therefore, since the switchboard can be placed on the support plate in a lying state, the switchboard can be stably transported by the transport carriage.
In addition, since the second support plate is erected on the short side end of the support plate, if the transport carriage is raised so that the second support plate faces downward, it is mounted on another stand with the switchboard upright. There is no need to place it. Therefore, if the carrier cart is raised, the switchboard can be easily set up.
Moreover, since the switchboard can be gradually pushed out by rotation of the screw shaft and transferred from the second support plate to the gantry, vibration of the switchboard can be prevented. Therefore, it is not necessary to give vibration to the existing switchboard adjacent to the switchboard, and malfunction of the existing switchboard can be prevented.

前述の搬送台車が、前記押し当て部に設けられたフックを更に備える。   The aforementioned transport carriage further includes a hook provided on the pressing portion.

第二支持板を下向きにするようにして搬送台車を架台の近くに配置して、第二支持板を架台の高さに合わせ、架台上に載置された配電盤にフックを引っ掛ければ、ねじ軸の回転によって配電盤を引いて、その配電盤を第二支持板に移載することができる。   If the transport carriage is placed close to the mount with the second support plate facing down, the second support plate is adjusted to the height of the mount, and the hook is hooked on the switchboard placed on the mount. The switchboard can be pulled by rotating the shaft, and the switchboard can be transferred to the second support plate.

前述の搬送台車が、前記ねじ軸のうち、前記側板に関して前記押し当て部の反対側の部位に設けられたハンドルを更に備える。   The above-described transport carriage further includes a handle provided at a portion of the screw shaft opposite to the pressing portion with respect to the side plate.

従って、ハンドルを握って、ハンドル及びねじ軸を回転させれば、比較的弱い力でもねじ軸を回転することができ、配電盤をスムーズに移動させることができる。   Therefore, if the handle and the screw shaft are rotated by holding the handle, the screw shaft can be rotated even with a relatively weak force, and the switchboard can be moved smoothly.

本発明によれば、ねじ軸の回転によって配電盤を徐々に押し出して、配電盤の振動を防止することができる。   ADVANTAGE OF THE INVENTION According to this invention, a switchboard can be gradually extruded by rotation of a screw shaft, and the vibration of a switchboard can be prevented.

搬送台車の斜視図である。It is a perspective view of a conveyance trolley. 搬送台車の側板の断面図である。It is sectional drawing of the side plate of a conveyance trolley. 架台としてのチャンネルベース側から見て示した搬送台車の側面図である。It is the side view of the conveyance trolley shown seeing from the channel base side as a mount. 図3の見る方向に対して直交する方向に向かって見て示した図面である。FIG. 4 is a drawing viewed in a direction orthogonal to the viewing direction of FIG. 3. 変形例の搬送台車を示した図面である。It is drawing which showed the conveyance trolley | bogie of the modification. 第2実施形態の搬送台車の側板の断面図である。It is sectional drawing of the side plate of the conveyance trolley | bogie of 2nd Embodiment.

以下、図面を参照して、本発明の実施形態について説明する。但し、以下に述べる実施形態には、本発明を実施するために技術的に好ましい種々の限定が付されているので、本発明の範囲を以下の実施形態及び図示例に限定するものではない。   Embodiments of the present invention will be described below with reference to the drawings. However, the embodiments described below are provided with various technically preferable limitations for carrying out the present invention, and the scope of the present invention is not limited to the following embodiments and illustrated examples.

〔第1の実施の形態〕
図1は配電盤の搬送台車10の斜視図である。
この搬送台車10は、建物の床(又は基礎、以下同じ。)上に設置されたチャンネルベース上に配電盤を据え付ける時に利用される。
[First Embodiment]
FIG. 1 is a perspective view of a transport cart 10 of a switchboard.
The transport carriage 10 is used when installing a switchboard on a channel base installed on the floor (or foundation, the same applies hereinafter) of a building.

この搬送台車10は第一支持板12、走行車輪16、第二支持板18、側板20、可動板26、抑え板30、ねじ軸42、ハンドル44及び押し当て治具50等を備える。   The transport carriage 10 includes a first support plate 12, a traveling wheel 16, a second support plate 18, a side plate 20, a movable plate 26, a holding plate 30, a screw shaft 42, a handle 44, a pressing jig 50, and the like.

第一支持板12が長方形平板状に形作られている。第一支持板12の上面には、例えばゴム製或いは発泡樹脂製のクッションシート14が貼着されている。クッションシート14上には配電盤が倒伏した状態で載置され、クッションシート14によって配電盤が保護される。   The first support plate 12 is formed in a rectangular flat plate shape. For example, a cushion sheet 14 made of rubber or foamed resin is attached to the upper surface of the first support plate 12. The switchboard is placed on the cushion sheet 14 in a lying state, and the switchboard is protected by the cushion sheet 14.

第一支持板12の下面の4つの角部近傍には4つの走行車輪16がそれぞれ取り付けられている。これら走行車輪16は例えば自在キャスターである。
第一支持板12の一方の短辺側の端部には、長方形又は正方形の平板状の第二支持板18の下端部が接合され、第二支持板18が第一支持板12に対して垂直に立てられた状態に設けられている。第二支持板18が床に向いた状態となるように搬送台車10が立てられると、配電盤が起立した状態で第二支持板18上に載置される。
Four traveling wheels 16 are attached in the vicinity of the four corners on the lower surface of the first support plate 12. These traveling wheels 16 are, for example, free casters.
A lower end portion of a rectangular or square flat plate-like second support plate 18 is joined to an end portion on one short side of the first support plate 12, and the second support plate 18 is attached to the first support plate 12. It is provided in a vertically standing state. When the transport carriage 10 is erected so that the second support plate 18 faces the floor, the distribution board is placed on the second support plate 18 in a standing state.

第一支持板12の一方の長辺側の端部には、長方形平板状の側板20の下端部が接合され、その側板20が第一支持板12に対して垂直に立てられた状態に設けられている。側板20の一方の短辺側の端部が第二支持板18に接合されている。側板20の内側の面には、ゴム製或いは発泡樹脂製のクッションシート22が貼着されている。第一支持板12又は第二支持板18に載置された配電盤がクッションシート22によって保護される。   A lower end portion of a rectangular flat plate 20 is joined to an end of one long side of the first support plate 12, and the side plate 20 is provided in a state where the side plate 20 stands vertically with respect to the first support plate 12. It has been. An end portion on one short side of the side plate 20 is joined to the second support plate 18. A cushion sheet 22 made of rubber or foamed resin is attached to the inner surface of the side plate 20. The switchboard placed on the first support plate 12 or the second support plate 18 is protected by the cushion sheet 22.

第二支持板18の内側の面(この面は、搬送台車10が立てられると、上方に向く面である。)には、複数のレール24が取り付けられている。これらレール24は、側板20に対して垂直な方向に延びた帯板状に形作られている。第二支持板18が床に向いた状態となるように搬送台車10が立てられると、配電盤がレール24上に支持される。   A plurality of rails 24 are attached to the inner surface of the second support plate 18 (this surface faces upward when the transport carriage 10 is stood). These rails 24 are formed in a strip shape extending in a direction perpendicular to the side plate 20. When the transport carriage 10 is erected so that the second support plate 18 faces the floor, the switchboard is supported on the rail 24.

第二支持板18の側板20とは反対側の端部には、可動板26がヒンジによって連結されている。可動板26と第二支持板18を連結するヒンジの軸は第一支持板12に対して垂直であるとともに、側板20に対して平行である。可動板26の可動域は、可動板26が第二支持板18から側板20の反対側へ延長した状態から、可動板26が第二支持板18に対して垂直な状態までである。   A movable plate 26 is connected to the end of the second support plate 18 opposite to the side plate 20 by a hinge. The axis of the hinge connecting the movable plate 26 and the second support plate 18 is perpendicular to the first support plate 12 and parallel to the side plate 20. The movable range of the movable plate 26 is from a state in which the movable plate 26 extends from the second support plate 18 to the opposite side of the side plate 20 to a state in which the movable plate 26 is perpendicular to the second support plate 18.

可動板26の一方の面(この面は、可動板26が第二支持板18に対して垂直な状態であると、側板20に対向する面である。)には、複数のレール28が取り付けられている。これらレール28は、可動板26と第二支持板18を連結するヒンジの軸の径方向に延びた帯板状に形作られている。可動板26が第二支持板18から側板20の反対側へ延長した状態では、レール28とレール24が一直線状に並ぶ。   A plurality of rails 28 are attached to one surface of the movable plate 26 (this surface is a surface facing the side plate 20 when the movable plate 26 is perpendicular to the second support plate 18). It has been. These rails 28 are formed in a strip shape extending in the radial direction of the axis of the hinge connecting the movable plate 26 and the second support plate 18. In a state where the movable plate 26 extends from the second support plate 18 to the opposite side of the side plate 20, the rail 28 and the rail 24 are aligned in a straight line.

側板20の第一支持板12とは反対側の端部には抑え板30が連結され、この抑え板30が第一支持板12に対向する。抑え板30は第二支持板18から離れた位置に配置されている。この抑え板30は側板20に対して着脱可能である。抑え板30の第一支持板12に対向する面には、クッションシート32が貼着されている。   A holding plate 30 is connected to the end of the side plate 20 opposite to the first support plate 12, and the holding plate 30 faces the first support plate 12. The holding plate 30 is disposed at a position away from the second support plate 18. The holding plate 30 can be attached to and detached from the side plate 20. A cushion sheet 32 is attached to the surface of the holding plate 30 that faces the first support plate 12.

図2に示すように、側板20には、二つのねじ穴40(図2では、一方のねじ穴40を図示)が側板20を貫通するように設けられ、これらねじ穴40にねじ軸42がそれぞれねじ締めされることによって、ねじ軸42が側板20を貫通している(図1参照)。図1に示すように、ねじ軸42の基端には、ホイール材によって構成されるハンドル44が設けられている。このハンドル44を握ってハンドル44及びねじ軸42を回転させることによって、ねじ軸42を軸方向に移動させることができる。   As shown in FIG. 2, the side plate 20 is provided with two screw holes 40 (one screw hole 40 is shown in FIG. 2) so as to penetrate the side plate 20, and a screw shaft 42 is provided in these screw holes 40. By screwing each, the screw shaft 42 penetrates the side plate 20 (see FIG. 1). As shown in FIG. 1, a handle 44 made of a wheel material is provided at the proximal end of the screw shaft 42. By grasping the handle 44 and rotating the handle 44 and the screw shaft 42, the screw shaft 42 can be moved in the axial direction.

ねじ軸42の先端には、押し当て治具50が設けられている。この押し当て治具50が配電盤に接触し、ねじ軸42がその回転によって側板20の内側へ突き出ていくと、配電板が押し当て治具50によって押される。ここで、ねじ軸42が押し当て治具50に対して相対的に回転可能であり、押し当て治具50が配電盤に押し当たった状態でねじ軸42が回転しても、押し当て治具50は回転しない。押し当て治具50はねじ軸42に対して着脱可能である。   A pressing jig 50 is provided at the tip of the screw shaft 42. When the pressing jig 50 comes into contact with the switchboard and the screw shaft 42 protrudes to the inside of the side plate 20 by the rotation, the distribution board is pressed by the pressing jig 50. Here, even if the screw shaft 42 rotates relative to the pressing jig 50 and the pressing jig 50 is pressed against the switchboard, the pressing jig 50 rotates. Does not rotate. The pressing jig 50 can be attached to and detached from the screw shaft 42.

図2に示すように、押し当て治具50はベース板52、ボールベアリング54及び複数の弾性部材56を有する。ベース板52の一方の面には、装着凹部53が形成されており、ベース板52の他方の面には、例えばゴム弾性材又は発泡樹脂材からなる弾性部材56が凸状に設けられている。装着凹部53にはボールベアリング54が取り付けられている。ねじ軸42の先端がボールベアリング54に嵌め込まれ、ねじ軸42のラジアル荷重及びアキシアル荷重がボールベアリング54に支持される。また、ねじ軸42はボールベアリング54から引き抜き可能である。   As shown in FIG. 2, the pressing jig 50 includes a base plate 52, a ball bearing 54, and a plurality of elastic members 56. A mounting recess 53 is formed on one surface of the base plate 52, and an elastic member 56 made of, for example, a rubber elastic material or a foamed resin material is provided on the other surface of the base plate 52 in a convex shape. . A ball bearing 54 is attached to the mounting recess 53. The tip of the screw shaft 42 is fitted into the ball bearing 54, and the radial load and the axial load of the screw shaft 42 are supported by the ball bearing 54. The screw shaft 42 can be pulled out from the ball bearing 54.

側板20の内側の面(起立状態の可動板26に対向する面)のうちねじ穴40の周囲には、枠状の支持部58が突出した状態に設けられている。ベース板52が側板20の内側の面に当接した状態では、ベース板52が支持部58の内側に嵌め込まれ、支持部58がベース板52を支持する。   Around the screw hole 40 in the inner surface of the side plate 20 (the surface facing the upright movable plate 26), a frame-shaped support portion 58 is provided in a protruding state. When the base plate 52 is in contact with the inner surface of the side plate 20, the base plate 52 is fitted inside the support portion 58, and the support portion 58 supports the base plate 52.

続いて、図3及び図4を参照して、搬送台車10の使用方法について説明する。併せて、搬送台車10を用いて、建物の床96上に設置されたチャンネルベース98上に配電盤90を据え付ける方法について説明する。   Subsequently, a method of using the transport carriage 10 will be described with reference to FIGS. 3 and 4. In addition, a method for installing the switchboard 90 on the channel base 98 installed on the floor 96 of the building using the transport carriage 10 will be described.

まず、第一支持板12を伏せた状態にし、走行車輪16によって搬送台車10が走行可能な状態にする。
次に、抑え板30を側板20から取り外す。
次に、押し当て治具50をねじ軸42から取り外す。そして、ハンドル44を握って、ハンドル44及びねじ軸42を回転することによってねじ軸42をねじ穴40から取り外す。
次に、配電盤90の底面を第二支持板18に対向させるようにして、且つ、配電盤90の前面又は後面を側板20に対向させるようにして、配電盤90を第一支持板12上に倒伏させる。こうして、配電盤90を横にした状態で第一支持板12上に載置する。なお、この際、配電盤90の底面をレール24に接触させてもよい。また、配電盤90の前面又は後面をクッションシート22に接触させてもよい。
First, the first support plate 12 is turned down, and the transport carriage 10 is made ready to travel by the traveling wheels 16.
Next, the holding plate 30 is removed from the side plate 20.
Next, the pressing jig 50 is removed from the screw shaft 42. Then, the screw shaft 42 is removed from the screw hole 40 by grasping the handle 44 and rotating the handle 44 and the screw shaft 42.
Next, the switchboard 90 is laid down on the first support plate 12 so that the bottom surface of the switchboard 90 faces the second support plate 18 and the front or rear surface of the switchboard 90 faces the side plate 20. . Thus, the switchboard 90 is placed on the first support plate 12 in a horizontal state. At this time, the bottom surface of the switchboard 90 may be brought into contact with the rail 24. Further, the front surface or the rear surface of the switchboard 90 may be brought into contact with the cushion sheet 22.

次に、可動板26をヒンジの軸回りに回転させて、可動板26を側板20に対向させる。そうすると、配電盤90が可動板26と側板20の間に配置される。
次に、抑え板30を側板20に取り付け、抑え板30を第一支持板12に対向させる。そうすると、配電盤90が抑え板30と第一支持板12の間に配置される。
Next, the movable plate 26 is rotated around the hinge axis so that the movable plate 26 faces the side plate 20. Then, the switchboard 90 is disposed between the movable plate 26 and the side plate 20.
Next, the holding plate 30 is attached to the side plate 20, and the holding plate 30 is opposed to the first support plate 12. Then, the switchboard 90 is disposed between the holding plate 30 and the first support plate 12.

そして、人力で搬送台車10を走行させ、配電盤90をチャンネルベース98の周囲にまで搬送する。また、図3に示すように、チャンネルベース98の脇の床96上にジャッキ94を準備する。   Then, the conveyance carriage 10 is caused to travel by human power, and the switchboard 90 is conveyed to the periphery of the channel base 98. Further, as shown in FIG. 3, a jack 94 is prepared on a floor 96 beside the channel base 98.

次に、図3に示すように、第二支持板18を下方に向けるようにして搬送台車10を起こし上げつつ、第二支持板18をジャッキ94上に支持する。こうして、搬送台車10をジャッキ94上に載置するとともに、配電盤90を第二支持板18上に載置する。搬送台車10を起こし上げる際に、配電盤90が抑え板30によって支えられ、配電盤90の転倒を防止することができる。   Next, as shown in FIG. 3, the second support plate 18 is supported on the jack 94 while raising the transport carriage 10 with the second support plate 18 facing downward. Thus, the transport carriage 10 is placed on the jack 94 and the switchboard 90 is placed on the second support plate 18. When raising the transport carriage 10, the switchboard 90 is supported by the restraining plate 30, and the switchboard 90 can be prevented from falling.

次に、ジャッキ94によって搬送台車10及び配電盤90を持ち上げ、第二支持板18をチャンネルベース98の高さに合わせる。
次に、可動板26をヒンジの軸回りに回転させて、可動板26を倒伏させる。そうすると、可動板26がチャンネルベース98上に支持されて、第二支持板18とチャンネルベース98の間に掛け渡された状態となる。
Next, the transport carriage 10 and the switchboard 90 are lifted by the jack 94, and the second support plate 18 is adjusted to the height of the channel base 98.
Next, the movable plate 26 is rotated around the axis of the hinge, and the movable plate 26 is laid down. As a result, the movable plate 26 is supported on the channel base 98 and is stretched between the second support plate 18 and the channel base 98.

次に、図4に示すように、配電盤90をレール24に沿って位置Aから位置Bにスライドさせて、配電盤90を側板20から離間させる。そうすると、配電盤90と側板20の間隔が広がる。
次に、押し当て治具50を配電盤90と側板20の間に入れて、押し当て治具50のベース板52を支持部58の内側に嵌め込める。そうすると、押し当て治具50のベース板52が支持部58に支持される。
Next, as shown in FIG. 4, the switchboard 90 is slid along the rail 24 from position A to position B, and the switchboard 90 is separated from the side plate 20. If it does so, the space | interval of the switchboard 90 and the side plate 20 will spread.
Next, the pressing jig 50 is inserted between the switchboard 90 and the side plate 20, and the base plate 52 of the pressing jig 50 is fitted inside the support portion 58. Then, the base plate 52 of the pressing jig 50 is supported by the support portion 58.

次に、ねじ軸42の先端を側板20の外側からねじ穴40に差し込む。そして、ハンドル44を握って、ハンドル44及びねじ軸42を回転させることによって、ねじ軸42をねじ穴40にねじ締めする。そうすると、ねじ軸42の先端が装着凹部53内のボールベアリング54に挿入されて、ねじ軸42と押し当て治具50が連結される。   Next, the tip of the screw shaft 42 is inserted into the screw hole 40 from the outside of the side plate 20. Then, by grasping the handle 44 and rotating the handle 44 and the screw shaft 42, the screw shaft 42 is screwed into the screw hole 40. Then, the tip of the screw shaft 42 is inserted into the ball bearing 54 in the mounting recess 53, and the screw shaft 42 and the pressing jig 50 are connected.

更にハンドル44及びねじ軸42を回転させることによって、押し当て治具50の弾性部材37を配電盤90に押し当てる。更にハンドル44及びねじ軸42を回転させるによって、押し当て治具50によって配電盤90を押し出し、配電盤90をレール24及びレール28に沿ってスライドさせる。配電盤90を押し出している際には、配電盤90の転倒を防止するべく、反対側から配電盤90を支える。
そして、配電盤90の全体をチャンネルベース98上の所定の据付位置(図4に示す位置C)にまで移動したら、ハンドル44の回転を停止する。
Furthermore, the elastic member 37 of the pressing jig 50 is pressed against the switchboard 90 by rotating the handle 44 and the screw shaft 42. Further, by rotating the handle 44 and the screw shaft 42, the switchboard 90 is pushed out by the pressing jig 50, and the switchboard 90 is slid along the rail 24 and the rail 28. When the switchboard 90 is pushed out, the switchboard 90 is supported from the opposite side in order to prevent the switchboard 90 from overturning.
When the entire switchboard 90 is moved to a predetermined installation position on the channel base 98 (position C shown in FIG. 4), the rotation of the handle 44 is stopped.

次に、ジャッキ等によって配電盤90を可動板26のレール28から持ち上げる。そして、搬送台車10の第二支持板18をジャッキ94上でスライドさせることによって、可動板34を配電盤90とチャンネルベース98の間から抜き出す。そして、ジャッキ等による配電盤90の持ち上げを解除して、配電盤90をチャンネルベース98上に降ろす。
次に、搬送台車10をジャッキ94から降ろして、第一支持板12を伏せた状態にし、走行車輪16を床96に接触させる。
Next, the switchboard 90 is lifted from the rail 28 of the movable plate 26 by a jack or the like. Then, the movable plate 34 is extracted from between the switchboard 90 and the channel base 98 by sliding the second support plate 18 of the transport carriage 10 on the jack 94. Then, lifting the switchboard 90 by a jack or the like is released, and the switchboard 90 is lowered onto the channel base 98.
Next, the transport carriage 10 is lowered from the jack 94 so that the first support plate 12 is turned down, and the traveling wheels 16 are brought into contact with the floor 96.

以上の実施の形態は次のような利点・効果を奏する。
(1) 配電盤90を倒伏させた状態で第一支持板12上に載置するので、配電盤90を安定して搬送することができる。
The above embodiment has the following advantages and effects.
(1) Since the switchboard 90 is placed on the first support plate 12 in a lying state, the switchboard 90 can be stably conveyed.

(2) 第二支持板18が立てられた状態で第一支持板12に接合されているので、配電盤90をチャンネルベース98の脇にまで搬送した後に、配電盤90を立てた状態で別の台に移載する必要がなくなる。つまり、簡単に配電盤90を立てた状態に簡単にすることができる。 (2) Since the second support plate 18 is joined to the first support plate 12 in an upright state, after the switchboard 90 is transported to the side of the channel base 98, another stand is placed with the switchboard 90 in the upright state. No need to transfer to That is, it is possible to easily make the switchboard 90 upright.

(3) ねじ軸42及びハンドル44の回転によって配電盤90を徐々に押し出すので、配電盤90の振動を防止することができる。そのため、配電盤90に隣接する既設配電盤に振動を与えずに済み、既設配電盤の誤動作を防止することができる。 (3) Since the switchboard 90 is gradually pushed out by the rotation of the screw shaft 42 and the handle 44, vibration of the switchboard 90 can be prevented. Therefore, it is not necessary to give vibration to the existing switchboard adjacent to the switchboard 90, and malfunction of the existing switchboard can be prevented.

(4) 搬送台車10を利用して、配電盤90の搬送行程と、配電盤90の起立行程と、チャンネルベース98への配電盤90の移載行程とからなる一連の工程を簡易且つ滞りなく行うことができる。 (4) A series of steps including the transfer process of the switchboard 90, the standing process of the switchboard 90, and the transfer process of the switchboard 90 to the channel base 98 can be performed easily and without any delay using the transfer cart 10. it can.

(5) レール24,28上で配電盤90をスライドさせるので、動摩擦を低減することができる。つまり、配電盤90の底面全体がレール24,28に接触するわけではないので、配電盤90の底面とレール24,28の接触面積を抑えることができ、配電盤90をスムーズにスライドさせることができる。 (5) Since the switchboard 90 is slid on the rails 24 and 28, dynamic friction can be reduced. That is, since the entire bottom surface of the switchboard 90 does not contact the rails 24 and 28, the contact area between the bottom surface of the switchboard 90 and the rails 24 and 28 can be suppressed, and the switchboard 90 can be smoothly slid.

(6) 抑え板30が第一支持板12に対向するので、搬送台車10を起こし上げる際や配電盤90を押し当て50によって押し出す際に配電盤90の転倒を防止することができる。更に、抑え板30にクッションシート32が貼着されているので、配電盤90がクッションシート32に接触しても配電盤90を保護することができる。 (6) Since the holding plate 30 faces the first support plate 12, it is possible to prevent the switchboard 90 from being overturned when the transport carriage 10 is raised or when the switchboard 90 is pushed out by the pressing 50. Furthermore, since the cushion sheet 32 is adhered to the holding plate 30, the switchboard 90 can be protected even if the switchboard 90 contacts the cushion sheet 32.

(7) ねじ軸42にハンドル44が取り付けられているので、比較的弱い力でもねじ軸42を回転させることができ、配電盤90をスムーズに押し出すことができる。 (7) Since the handle 44 is attached to the screw shaft 42, the screw shaft 42 can be rotated even with a relatively weak force, and the switchboard 90 can be pushed out smoothly.

(8) 押し当て治具50をねじ軸42から取り外すことができるので、ねじ軸42をねじ穴40から抜くことができる。そのため、搬送台車10の走行の際に、ねじ軸42が邪魔にならない。 (8) Since the pressing jig 50 can be removed from the screw shaft 42, the screw shaft 42 can be removed from the screw hole 40. Therefore, the screw shaft 42 does not get in the way when the transport carriage 10 travels.

なお、図5に示すように、第二支持板18の下面に複数の走行車輪17が設けられていてもよい。この場合、第二支持板18を下方に向けるようにして搬送台車10を起こし上げた状態で、且つ、配電盤90を第二支持板18上に立てた状態にして、搬送台車10を走行させることができる。   As shown in FIG. 5, a plurality of traveling wheels 17 may be provided on the lower surface of the second support plate 18. In this case, the transport carriage 10 is caused to travel with the transport cart 10 raised with the second support plate 18 facing downward and with the switchboard 90 standing on the second support plate 18. Can do.

〔第2の実施の形態〕
第2実施形態では、第1実施形態の押し当て治具50を図6に示すような押し当て治具60に代えて、その押し当て治具60をねじ軸42に取り付ける。第2実施形態の搬送台車は第1実施形態の搬送台車10と対比して押し当て治具60のみが相違するので、以下では押し当て治具60について詳細に説明する。なお、第1実施形態と第2実施形態の間で互いに対応する部分が同一に設けられている場合には、これら対応する部分に同一の符号を付す。
[Second Embodiment]
In the second embodiment, the pressing jig 50 of the first embodiment is replaced with a pressing jig 60 as shown in FIG. 6, and the pressing jig 60 is attached to the screw shaft 42. Since the conveyance carriage of the second embodiment is different from the conveyance carriage 10 of the first embodiment only in the pressing jig 60, the pressing jig 60 will be described in detail below. In addition, when the part which mutually respond | corresponds between 1st Embodiment and 2nd Embodiment is provided the same, the same code | symbol is attached | subjected to these corresponding parts.

配電盤の据付の際には、押し当て治具60が第一実施形態の押し当て治具50と同様に配電盤に押し当てられる。一方、配電盤の撤去の際には、この押し当て治具60に設けられたフック65が配電盤に引っ掛かる。   When installing the distribution board, the pressing jig 60 is pressed against the distribution board in the same manner as the pressing jig 50 of the first embodiment. On the other hand, when the switchboard is removed, the hook 65 provided on the pressing jig 60 is hooked on the switchboard.

ここで、押し当て治具60は押し当て治具50と同様にベース板62、ボールベアリング64及び弾性部材66を有する。押し当て治具50のベース板52と同様に、ベース板62の一方の面に装着凹部63が形成され、その装着凹部63にボールベアリング64が取り付けられている。ねじ軸42の先端がボールベアリング64に嵌め込まれ、ねじ軸42のラジアル荷重及びアキシアル荷重がボールベアリング64に支持される。なお、ねじ軸42の先端がボールベアリング64に嵌め込まれた状態ではロック機構等によってねじ42がボールベアリング64から抜けないようになるが、そのロック機構のロックを解除するとねじ軸42がボールベアリング64から引き抜き可能となる。   Here, like the pressing jig 50, the pressing jig 60 includes a base plate 62, a ball bearing 64, and an elastic member 66. Similar to the base plate 52 of the pressing jig 50, a mounting recess 63 is formed on one surface of the base plate 62, and a ball bearing 64 is attached to the mounting recess 63. The tip of the screw shaft 42 is fitted into the ball bearing 64, and the radial load and the axial load of the screw shaft 42 are supported by the ball bearing 64. When the tip of the screw shaft 42 is fitted in the ball bearing 64, the screw 42 is prevented from being removed from the ball bearing 64 by a lock mechanism or the like, but when the lock mechanism is unlocked, the screw shaft 42 is moved to the ball bearing 64. It can be pulled out from.

ベース板62の他方の面にシート状の弾性部材66が貼着されている。配電盤の据付の際には、弾性部材66が上述の押し当て治具50の弾性部材56と同様に配電盤に押し付けられる。つまり、この押し当て治具60を用いた場合の配電盤の据付方法は押し当て治具50を用いた場合の配電盤の据付方法と同様である。   A sheet-like elastic member 66 is attached to the other surface of the base plate 62. When the switchboard is installed, the elastic member 66 is pressed against the switchboard in the same manner as the elastic member 56 of the pressing jig 50 described above. That is, the switchboard installation method when this pressing jig 60 is used is the same as the switchboard installation method when the pressing jig 50 is used.

ベース板62の縁部には、フック65がねじ軸42の周方向に向けて突出するように設けられている。   A hook 65 is provided at the edge of the base plate 62 so as to protrude in the circumferential direction of the screw shaft 42.

この押し当て治具60を用いた場合の配電盤の撤去方法について説明する。なお、参考図として図4を参照するが、図4に示す押し当て治具50が押し当て治具60に変更される。また、配電盤90の撤去前には、配電盤90がチャンネルベース98上に載置されている。
まず、搬送台車10をチャンネルベース98の周囲にまで搬送する。また、チャンネルベース98の前の床96上にジャッキ94を準備する。
次に、第二支持板18を下方に向けるようにして搬送台車10を起こし上げつつ、第二支持板18をジャッキ94上に支持する。そして、ジャッキ94によって搬送台車10を持ち上げて、第二支持板18をチャンネルベース98の高さに合わせる。
A method for removing the switchboard when this pressing jig 60 is used will be described. In addition, although FIG. 4 is referred as a reference drawing, the pressing jig 50 shown in FIG. In addition, the switchboard 90 is placed on the channel base 98 before the switchboard 90 is removed.
First, the transport carriage 10 is transported to the periphery of the channel base 98. A jack 94 is prepared on the floor 96 in front of the channel base 98.
Next, the second support plate 18 is supported on the jack 94 while raising the transport carriage 10 with the second support plate 18 facing downward. Then, the transport carriage 10 is lifted by the jack 94 and the second support plate 18 is adjusted to the height of the channel base 98.

次に、可動板26をヒンジの軸回りに回転させて、可動板26を倒伏させる。この際、可動板26がチャンネルベース98上の配電盤90に当たらないようにする。
次に、ジャッキ等によって配電盤90をチャンネルベース98から持ち上げる。そして、搬送台車10の第二支持板18をジャッキ94上でスライドさせることによって、可動板26を配電盤90とチャンネルベース98の間に差し込む。そして、ジャッキ等による配電盤90の持ち上げを解除して、配電盤90を可動板26のレール28上に降ろす(図4に示す位置C参照)。
Next, the movable plate 26 is rotated around the axis of the hinge, and the movable plate 26 is laid down. At this time, the movable plate 26 is prevented from hitting the switchboard 90 on the channel base 98.
Next, the switchboard 90 is lifted from the channel base 98 by a jack or the like. Then, the movable plate 26 is inserted between the switchboard 90 and the channel base 98 by sliding the second support plate 18 of the transport carriage 10 on the jack 94. Then, lifting of the distribution board 90 by a jack or the like is released, and the distribution board 90 is lowered onto the rail 28 of the movable plate 26 (see position C shown in FIG. 4).

次に、押し当て治具60のフック65を配電盤90に引っ掛ける。
次に、ねじ軸42の先端を側板20の外側からねじ穴40に差し込む。そして、ハンドル44及びねじ軸42を回転させて、ねじ軸42の先端を押し当て治具60のボールベアリング54に挿入して、ねじ軸42の先端に押し当て治具60を連結する。
Next, the hook 65 of the pressing jig 60 is hooked on the switchboard 90.
Next, the tip of the screw shaft 42 is inserted into the screw hole 40 from the outside of the side plate 20. Then, the handle 44 and the screw shaft 42 are rotated, the tip of the screw shaft 42 is inserted into the ball bearing 54 of the pressing jig 60, and the pressing jig 60 is connected to the tip of the screw shaft 42.

次に、ハンドル44を握って、ハンドル44及びねじ軸42を反対に回転させる。そうすると、押し当て治具60が側板20に近づき、押し当て治具60によって配電盤90を側板20側へスライドさせる。そして、配電盤90の全体がレール24上にまで移動したら、ハンドル44の回転を停止する。   Next, the handle 44 is grasped and the handle 44 and the screw shaft 42 are rotated in the opposite directions. Then, the pressing jig 60 approaches the side plate 20, and the switchboard 90 is slid toward the side plate 20 by the pressing jig 60. And if the switchboard 90 whole moves to the rail 24, rotation of the handle | steering-wheel 44 will be stopped.

次に、可動板26をヒンジの軸回りに回転させて、可動板26を起立させる。次に、ジャッキ34を下げる。
そして、搬送台車10をジャッキ34から床96に降ろす。具体的には、搬送台車10の第一支持板12を下にするようにして、搬送台車10を倒し、走行車輪16を床96に接触させる。搬送台車10を倒すことによって、配電盤90を倒伏した状態で第一支持板12上に載置することができる。
Next, the movable plate 26 is rotated around the hinge axis to erect the movable plate 26. Next, the jack 34 is lowered.
Then, the transport carriage 10 is lowered from the jack 34 to the floor 96. Specifically, with the first support plate 12 of the transport cart 10 facing down, the transport cart 10 is tilted and the traveling wheels 16 are brought into contact with the floor 96. By tilting the transport carriage 10, the switchboard 90 can be placed on the first support plate 12 in a lying state.

次に、ハンドル44及びねじ軸42を回転させて、ねじ軸42の先端を押し当て治具60のベース板62の装着凹部53から引き抜く。更なるねじ軸42の回転によってねじ軸42をねじ穴40から引き抜く。そして、押し当て治具60を配電盤90と側板20の間から取り出す。
次に、搬送台車10を走行させ、配電盤90を建物の外にまで搬送する。
Next, the handle 44 and the screw shaft 42 are rotated, and the tip of the screw shaft 42 is pulled out from the mounting recess 53 of the base plate 62 of the pressing jig 60. The screw shaft 42 is pulled out from the screw hole 40 by further rotation of the screw shaft 42. Then, the pressing jig 60 is taken out from between the switchboard 90 and the side plate 20.
Next, the transport cart 10 is run to transport the switchboard 90 to the outside of the building.

本実施形態においても、搬送台車10を利用して、チャンネルベース98から第二支持板18への配電盤90の移載行程と、配電盤90の倒伏行程と、チャンネルベース98への配電盤90の移載行程とからなる一連の工程を簡易且つ滞りなく行うことができる。   Also in this embodiment, the transfer cart 90 is used to transfer the distribution board 90 from the channel base 98 to the second support plate 18, the overturning process of the distribution board 90, and the distribution board 90 is transferred to the channel base 98. A series of steps including a process can be performed easily and without delay.

10…搬送台車, 12…第一支持板, 14…クッションシート, 16…走行車輪, 18…第二支持板, 20…側板, 22…クッションシート, 24…レール, 26…可動板, 28…レール, 30…抑え板, 32…クッションシート, 34…ジャッキ, 34…可動板, 40…ねじ穴, 42…ねじ軸, 44…ハンドル, 50…押し当て治具, 52…ベース板, 53…装着凹部, 54…ボールベアリング, 56…弾性部材, 58…支持部, 60…押し当て治具, 62…ベース板, 63…装着凹部, 64…ボールベアリング, 65…フック, 66…弾性部材, 90…配電盤, 94…ジャッキ, 96…床, 98…チャンネルベース(架台) DESCRIPTION OF SYMBOLS 10 ... Conveyance cart, 12 ... First support plate, 14 ... Cushion seat, 16 ... Traveling wheel, 18 ... Second support plate, 20 ... Side plate, 22 ... Cushion seat, 24 ... Rail, 26 ... Movable plate, 28 ... Rail , 30 ... Holding plate, 32 ... Cushion seat, 34 ... Jack, 34 ... Movable plate, 40 ... Screw hole, 42 ... Screw shaft, 44 ... Handle, 50 ... Pushing jig, 52 ... Base plate, 53 ... Mounting recess , 54 ... Ball bearing, 56 ... Elastic member, 58 ... Supporting part, 60 ... Pushing jig, 62 ... Base plate, 63 ... Mounting recess, 64 ... Ball bearing, 65 ... Hook, 66 ... Elastic member, 90 ... Switchboard , 94 ... jack, 96 ... floor, 98 ... channel base (frame)

Claims (5)

配電盤が載置される支持板と、
前記支持板に設けられた走行車輪と、
前記支持板に立設された側板と、
前記側板に設けられたねじ穴に螺合して、前記側板を貫通したねじ軸と、
前記ねじ軸の先端に設けられ、前記配電盤に押し当てられる押し当て部と、を備えることを特徴とする搬送台車。
A support plate on which the switchboard is placed;
Traveling wheels provided on the support plate;
A side plate erected on the support plate;
A screw shaft that is screwed into a screw hole provided in the side plate and penetrates the side plate;
And a pressing portion provided at a tip of the screw shaft and pressed against the switchboard.
前記支持板に立設された第二支持板を更に備え、
前記支持板が長方形に設けられ、前記配電盤が倒伏した状態で前記支持板に載置され、
前記第二支持板が前記支持板の短辺側の端部に立設され、
前記側板が前記支持板の長辺側の端部に立設されていることを特徴とする請求項1に記載の搬送台車。
A second support plate erected on the support plate;
The support plate is provided in a rectangular shape, and the switchboard is placed on the support plate in a lying state,
The second support plate is erected on the end portion on the short side of the support plate,
The conveyance cart according to claim 1, wherein the side plate is erected at an end portion on a long side of the support plate.
前記押し当て部に設けられたフックを更に備えることを特徴とする請求項1又は2に記載の搬送台車。   The conveyance cart according to claim 1, further comprising a hook provided in the pressing portion. 前記ねじ軸のうち、前記側板に関して前記押し当て部の反対側の部位に設けられたハンドルを更に備えることを特徴とする請求項1から3の何れか一項に記載の搬送台車。   The conveyance carriage according to any one of claims 1 to 3, further comprising a handle provided at a portion of the screw shaft opposite to the pressing portion with respect to the side plate. 請求項2に記載の搬送台車を用いて配電盤を架台上に据え付ける方法であって、
前記架台の脇において前記第二支持板を下向きにするよう前記搬送台車を起こし上げ、前記配電盤を立てた状態に前記第二支持板に載置して、前記第二支持板を前記架台の高さに合わせた後、前記ねじ軸を回転して前記押し当て部によって前記配電盤を前記第二支持板から前記架台の上に押し出すことを特徴とする配電盤の据付方法。
A method of installing a switchboard on a gantry using the transport carriage according to claim 2,
The transport carriage is raised so that the second support plate faces down on the side of the gantry, and the switchboard is placed on the second support plate in a standing state, and the second support plate is placed at a height of the gantry. Then, after the screw shaft is rotated, the switchboard is pushed out from the second support plate onto the mount by the pressing portion.
JP2015240227A 2015-12-09 2015-12-09 Conveyance carriage and power distribution board installation method Pending JP2017108523A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015240227A JP2017108523A (en) 2015-12-09 2015-12-09 Conveyance carriage and power distribution board installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015240227A JP2017108523A (en) 2015-12-09 2015-12-09 Conveyance carriage and power distribution board installation method

Publications (1)

Publication Number Publication Date
JP2017108523A true JP2017108523A (en) 2017-06-15

Family

ID=59061096

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015240227A Pending JP2017108523A (en) 2015-12-09 2015-12-09 Conveyance carriage and power distribution board installation method

Country Status (1)

Country Link
JP (1) JP2017108523A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109159441A (en) * 2018-08-06 2019-01-08 天津顺济德科技有限公司 A kind of high-speed rail power distribution cabinet dummy plate method
CN112563954A (en) * 2020-11-23 2021-03-26 国网山东省电力公司惠民县供电公司 Intelligent operation and detection device for high-voltage switch handcart
CN113675771A (en) * 2021-08-20 2021-11-19 河南省中原智能电气科技有限公司 Power distribution cabinet assembling and transferring system
CN115549283A (en) * 2022-10-27 2022-12-30 国家电网有限公司 Dual-power-supply fast switching ring main unit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109159441A (en) * 2018-08-06 2019-01-08 天津顺济德科技有限公司 A kind of high-speed rail power distribution cabinet dummy plate method
CN112563954A (en) * 2020-11-23 2021-03-26 国网山东省电力公司惠民县供电公司 Intelligent operation and detection device for high-voltage switch handcart
CN113675771A (en) * 2021-08-20 2021-11-19 河南省中原智能电气科技有限公司 Power distribution cabinet assembling and transferring system
CN113675771B (en) * 2021-08-20 2024-04-09 河南省中原智能电气科技有限公司 Power distribution cabinet assembling and transferring system
CN115549283A (en) * 2022-10-27 2022-12-30 国家电网有限公司 Dual-power-supply fast switching ring main unit
CN115549283B (en) * 2022-10-27 2023-05-26 国家电网有限公司 Ring main unit with dual power supplies capable of being rapidly switched

Similar Documents

Publication Publication Date Title
JP2017108523A (en) Conveyance carriage and power distribution board installation method
US8398013B2 (en) Cable reel device
KR200439624Y1 (en) Gas tank car
US10112519B2 (en) Sliding loading lifting system and method of use
US8882115B1 (en) Manual cart for transportation of electronic equipment within a data center
JP2009107759A (en) Baggage stacking apparatus by movable lifter
JP2008230554A (en) Self-traveling conveying truck
EP3466844A1 (en) A shuttle for delivering and retrieving goods, a storage system with a shuttle and methods associated therewith
CN103481935A (en) Cart for conveying barrel-shaped articles
NL2003485C2 (en) Transfer car, and a method of machining a panel in a flat bed machine.
JP5491584B2 (en) Turning device
CN110803433B (en) Shelf device and loading assembly
JP2011095203A (en) Vehicle inspection device
CN105236102A (en) Ground drag chain trolley
JP2008100793A (en) Rising assisting device of carrying object
JP2015157684A (en) Carrier truck
CN220641252U (en) Handling frame device for storage
JP6133819B2 (en) Mounting table device
CN211543620U (en) Crane support leg base plate conveying device
JPH046985Y2 (en)
CN220518339U (en) Logistics conveying and transferring equipment
CN217892877U (en) Building engineering electrical equipment handling device
CN211617746U (en) Material management turnover vehicle
CN217477329U (en) Server rack-loading vehicle
CN217498601U (en) Warehouse carrying equipment