JP2017089316A - Drainage system - Google Patents

Drainage system Download PDF

Info

Publication number
JP2017089316A
JP2017089316A JP2015223435A JP2015223435A JP2017089316A JP 2017089316 A JP2017089316 A JP 2017089316A JP 2015223435 A JP2015223435 A JP 2015223435A JP 2015223435 A JP2015223435 A JP 2015223435A JP 2017089316 A JP2017089316 A JP 2017089316A
Authority
JP
Japan
Prior art keywords
drainage
pipe
upstream
drainage system
drain pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015223435A
Other languages
Japanese (ja)
Other versions
JP6713264B2 (en
Inventor
富久志 森山
Fukushi Moriyama
富久志 森山
浩身 大沼
Hiromi Onuma
浩身 大沼
康之 大道
Yasuyuki Omichi
康之 大道
智嗣 宮道
Tomotsugu Miyamichi
智嗣 宮道
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Tokyo Tatemono Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Tokyo Tatemono Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd, Tokyo Tatemono Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2015223435A priority Critical patent/JP6713264B2/en
Publication of JP2017089316A publication Critical patent/JP2017089316A/en
Application granted granted Critical
Publication of JP6713264B2 publication Critical patent/JP6713264B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)
  • Sewage (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a drainage system capable of temporarily storing drainage at times of emergency such as torrential rainfall and a disaster without requiring a special operation, and draining the stored drainage to a main sewer pipe when the emergency time is finished, without using a pump or other equipment.SOLUTION: A drainage system 1A includes: a drainage pipe 6 provided between a drainage instrument 2 and a main sewer pipe for connecting the drainage instrument 2 with the main sewer pipe; a check valve 8 provided on the drainage pipe 6; and a storage part 10 provided on an upstream-side drainage pipe 6A located between the drainage instrument 2 and the check valve 8. A bottom part on an inner side of the storage part 10 is located higher than a bottom edge of an inner peripheral surface of a downstream-side drainage pipe 6B located between the check valve 8 and the main sewer pipe. An edge part on the downstream side of the storage part 10 is located at a same height position with an edge part on an upstream side of the storage part 10 or lower than the edge part on the upstream side of the storage part 10. A top surface on an inner side of the storage part 10 is located lower than a sealing water surface 22 of a trap 20 of the drainage instrument 2.SELECTED DRAWING: Figure 2

Description

本発明は、汚水を一時的に貯留する排水システムに関する。   The present invention relates to a drainage system for temporarily storing sewage.

一般に、マンション等の建物には、各家庭のトイレ、台所、洗面、風呂及び洗濯等の衛生器具や排水器具から排水される排水を公共下水道(下水本管)に流すための排水システムが設けられている。この種の排水システムは、排水器具と下水本管とを接続する排水管を備えている。該排水管には、点検及び清掃のためにます等が設けられる場合がある。ますは、地上から地面に対して略垂直に掘られ、排水管に接続されている。即ち、ますは地面及び排水管に開口するように設けられている。   In general, buildings such as condominiums are equipped with a drainage system for draining wastewater from sanitary and drainage equipment such as toilets, kitchens, washbasins, baths, and laundry in each household to the public sewer (sewage main). ing. This type of drainage system includes a drainage pipe that connects a drainage device and a sewage main pipe. The drainage pipe may be provided with a gutter for inspection and cleaning. First, it is dug from the ground approximately perpendicular to the ground and connected to the drain. That is, it is provided so that it may open to the ground and a drain pipe.

ところが、集中豪雨が発生すると、雨水と汚水が合流する合流方式の排水配管では下水の流れが激しくなり、排水管内の下水の水位が上昇し、排水管で下水の逆流が起こる。水位の上昇がより進むと、ますからも下水が溢れ出す。
例えば、集中豪雨の初期には、下水の水位は下流側の排水管内に位置している。集中豪雨の中期には、排水管に流出する下水の水量が増え、下水が上流側の排水管内に到達するとともに、建物の排水器具からの排水も排水管内に留まり、排水管内の空気や臭いが建物内に出てくることになる。集中豪雨の末期には、下水及び排水の水位がさらに高まり、上流側に留まる排水管内の水量が増えるので、最悪の場合、下水や排水が排水器具から建物内に溢れ出すという事態が起こる。
However, when a torrential rain occurs, the flow of sewage becomes intense in the drainage piping of the confluence system where rainwater and sewage merge, the sewage level in the drainage pipe rises, and the sewage flows backward in the drainage pipe. As the water level rises further, sewage will overflow.
For example, in the early period of torrential rain, the sewage level is located in the downstream drainage pipe. In the middle of the torrential rain, the amount of sewage flowing out to the drain pipe increases, and the sewage reaches the upstream drain pipe, and the drainage from the building drainage equipment also stays in the drain pipe, causing air and odor in the drain pipe. It will come out in the building. At the end of the torrential rain, the water level of sewage and drainage further increases, and the amount of water in the drain pipe staying upstream increases. In the worst case, sewage and drainage overflow from the drainage equipment into the building.

排水システムにおいては、上記のような下水及び排水の建物内への流入を防ぐために、下水及び排水の水位や流量を適宜制御する、又は流路を切り替える等の様々な工夫がなされている。
例えば、特許文献1には、第1流出管路と、第2流出管路と、他の第1流出管路と、貯留手段と、汚水ますと、を備えた汚水排出システムが開示されている。第1流出管路の一方の端部は排水設備(排水器具)に接続され、第2流出管路の一方の端部は下水本管に接続されている。他の第1流出管路の一方の端部は他の排水設備(排水器具)に接続され、他の第1流出管路の他方の端部は第2流出管路に接続されている。また、汚水ますは、ます本体と、切替手段と、を有する。ます本体は、上方に開口する点検口と、第1流出管路の他方の端部が接続された流入口と、第2流出管路の他方の端部が接続された第1流出口と、貯留手段に接続された第2流出口と、を有する。そして、切替手段は、ます本体に設けられ、流入口から第2流出口へ汚水が流れないように流入口と第1流出口とを連通させる第1の切替位置と、流入口から第1流出口へ汚水が流れないように流入口と第2流出口とを連通させる第2の切替位置との間で位置変更可能とされている。
In the drainage system, in order to prevent the inflow of sewage and drainage into the building as described above, various contrivances such as appropriately controlling the water level and flow rate of sewage and drainage or switching the flow path have been made.
For example, Patent Document 1 discloses a sewage discharge system including a first outflow pipe, a second outflow pipe, another first outflow pipe, a storage unit, and a sewage basin. . One end of the first outflow pipe is connected to a drainage facility (drainage device), and one end of the second outflow pipe is connected to the sewage main pipe. One end of the other first outflow pipe is connected to another drainage facility (drainage device), and the other end of the other first outflow pipe is connected to the second outflow pipe. Further, the sewage masu has a main body and switching means. The main body has an inspection port that opens upward, an inlet connected to the other end of the first outlet pipe, a first outlet connected to the other end of the second outlet pipe, A second outlet connected to the storage means. The switching means is further provided in the main body, and a first switching position for communicating the inlet and the first outlet so that sewage does not flow from the inlet to the second outlet, and the first flow from the inlet to the first outlet. The position can be changed between a second switching position where the inflow port and the second outflow port are communicated so that sewage does not flow to the outlet.

また、特許文献2には、開口部及び非常用排水貯留槽を備える建物用排水システムが開示されている。開口部は、建物内で生じた排水を下水本管まで搬送する排水管に設けられ、下水本管が使用できない非常時に下方に向かって開口される。非常用排水貯留槽は、前記非常時に開口部から流出した排水を貯留するための構成要素である。   Patent Document 2 discloses a building drainage system including an opening and an emergency drainage storage tank. The opening is provided in a drain pipe that conveys wastewater generated in the building to the sewage main, and is opened downward in an emergency when the sewage main cannot be used. The emergency drainage tank is a component for storing drainage that has flowed out of the opening in the emergency.

特許第5643913号公報Japanese Patent No. 5634913 特開2014−080852号公報JP 2014-080852 A

上記の特許文献1,2に記載の排水システムでは、災害発生等の非常時に排水を蓄えられる貯留部(即ち、貯留手段及び非常用排水貯留槽)が排水管よりも下方の位置に設けられている。このような貯留部では、非常時に、排水管に設けられた汚水ますや継手等を操作することによって貯留部に排水が流入し、貯留される。さらに、非常時終了後には、貯留された排水が貯留部から排水管内にポンプアップされることによって排水管内を流下し、下水本管に流される。   In the drainage systems described in Patent Documents 1 and 2 above, a storage unit (that is, a storage unit and an emergency drainage storage tank) that stores drainage in the event of an emergency such as a disaster is provided at a position below the drainpipe. Yes. In such a reservoir, wastewater flows into the reservoir and is stored by operating a sewage tank or a joint provided in the drain pipe in an emergency. Furthermore, after the end of the emergency, the stored wastewater is pumped up from the storage portion into the drainage pipe, and then flows down in the drainage pipe and then into the sewer main.

しかしながら、上記説明した従来の排水システムにおいては、非常時に汚水ますや継手等を操作する必要があり、手間がかかるという問題があった。また、排水を貯留部からポンプアップするための装置が必要であり、構成が複雑になるという問題があった。   However, the conventional drainage system described above has a problem that it is necessary to operate a sewage drain or a joint in an emergency, which takes time. Moreover, the apparatus for pumping up waste_water | drain from a storage part is required, and there existed a problem that a structure became complicated.

本発明は、上記事情を鑑みてなされたものであり、集中豪雨や災害発生等の非常時に特別な操作を必要とせず、一時的に排水を貯留することができ、且つ、非常時終了後にポンプ等の装置を使用することなく、簡単な構造で、非常時に貯留していた排水を下水本管に排出可能な排水システムを提供する。   The present invention has been made in view of the above circumstances, and does not require special operation in the event of an emergency such as torrential rain or a disaster, can temporarily store drainage, and can be pumped after the emergency ends. A drainage system capable of discharging wastewater stored in an emergency to a sewage main pipe with a simple structure without using a device such as the above.

本発明に係る排水システムは、建物の排水器具下水本管との間に設けられる排水システムであって、前記排水器具と前記下水本管とを接続する排水管と、前記排水管に設けられた逆流防止弁と、前記排水器具と前記逆流防止弁との間に位置する上流側排水管に設けられた貯留部と、を備え、前記貯留部の内側の底部は前記逆流防止弁と前記下水本管との間に位置する下流側排水管の内周面の底端よりも高い位置に配置され、前記貯留部は水平、又は、上流から下流に向かうに従い、下向きとなる下り勾配に配置され、前記貯留部の内側の上面は前記排水器具のトラップの封水面よりも低い位置に配置されていることを特徴とする。   A drainage system according to the present invention is a drainage system provided between a drainage sewage main of a building, the drainage pipe connecting the drainage equipment and the sewage main, and the drainage pipe. A backflow prevention valve, and a reservoir provided in an upstream drain pipe located between the drainage device and the backflow prevention valve, and the bottom inside the reservoir is the backflow prevention valve and the sewage book Arranged at a position higher than the bottom end of the inner peripheral surface of the downstream drainage pipe located between the pipe and the storage part is arranged in a horizontal or downward slope as it goes from upstream to downstream, The upper surface inside the storage part is arranged at a position lower than the sealing surface of the trap of the drainage device.

上記排水システムによれば、排水管に逆流防止弁が設けられているので、非常時に下流側排水管における下水の水位が上昇しても、下水が上流側排水管には流入せず、下水の逆流が止められる。通常時のように、下水の水位が下水本管内に位置している場合には、排水器具からの排水が上流側排水管から下流側排水管に流れ、この流動は妨げられることなく、下水本管へと円滑に流れる。
また、上記排水システムによれば、上流側排水管に貯留部があるので、排水器具からの排水が非常時終了まで一時的に貯留される。非常時にも、貯留部の貯留量と上流側排水管の容量との合計分の排水を留めておくことができるので、排水器具が使用可能とされる。
また、上記排水システムによれば、貯留部の内側底端の高さが下流側排水管の内周面の底端よりも高い位置に配置されているので、下水及び排水の水位が下がり逆流防止弁が快方された際に、貯留部に貯留された排水が、特別な操作やポンプ等の装置等を用いることなく、下水本管に向かって、高低差によって自然に流下する。
また、上記排水システムによれば、貯留部内は上流から下流にかけて下降するように設けられているので、排水が貯留部内に滞留しない。
従って、非常時には逆流防止弁によって上流側排水管内の下水の水位上昇を抑えるとともに、一時的に排水を貯留部に貯留することができる。また、非常時終了後には、高低差を活かして自然原理によって排水を貯留部から排出させることができる。
According to the above drainage system, since the backflow prevention valve is provided in the drainage pipe, even if the sewage water level in the downstream drainage pipe rises in an emergency, the sewage does not flow into the upstream drainage pipe, Backflow is stopped. When the sewage level is located in the sewage main pipe as usual, the drainage from the drainage device flows from the upstream drain pipe to the downstream drain pipe, and this flow is not hindered. It flows smoothly into the tube.
Moreover, according to the said drainage system, since there exists a storage part in an upstream drainage pipe, the waste_water | drain from a drainage device is temporarily stored until the end of emergency. Even in an emergency, the total amount of drainage of the storage amount of the storage part and the capacity of the upstream drainage pipe can be kept, so that the drainage device can be used.
Further, according to the drainage system, the height of the inner bottom end of the storage portion is arranged at a position higher than the bottom end of the inner peripheral surface of the downstream drainage pipe, so that the water level of sewage and drainage is lowered to prevent backflow. When the valve is relieved, the wastewater stored in the storage part naturally flows down to the sewage main pipe by the height difference without using a special operation or a device such as a pump.
Moreover, according to the said drainage system, since the inside of the storage part is provided so that it may descend | fall from upstream to downstream, waste water does not stay in a storage part.
Accordingly, in an emergency, the backflow prevention valve can suppress the rise in the level of sewage in the upstream drain pipe and temporarily store the drainage in the reservoir. In addition, after the end of the emergency, drainage can be discharged from the storage part by the natural principle using the height difference.

本発明に係る排水システムでは、前記貯留部の上流側の上端部には、前記貯留部の内部に前記排水器具からの排水を流入させる流入口が形成され、前記貯留部の下流側の底端部には、前記貯留部の内部から前記排水を流出させる流出口が形成されていることが好ましい。
上記排水システムによれば、排水管の途中に貯留部が設けられ、排水器具からの排水が貯留部の上端部から貯留部の内部に流入するとともに、貯留部の底端部から貯留部の外部へ流出する。従って、貯留部に通気管を接続しなくても、排水の流動が滞ることなく、貯留部の容量がより有効に活用される。
In the drainage system according to the present invention, an inlet for allowing the drainage from the drainage device to flow into the interior of the reservoir is formed at the upper end on the upstream side of the reservoir, and the bottom end on the downstream side of the reservoir It is preferable that an outflow port through which the drainage flows out from the inside of the storage part is formed in the part.
According to the drainage system, the storage unit is provided in the middle of the drain pipe, and drainage from the drainage device flows into the storage unit from the upper end of the storage unit, and from the bottom end of the storage unit to the outside of the storage unit. Spill to Therefore, the capacity of the reservoir can be more effectively utilized without stagnation of the flow of drainage without connecting a vent pipe to the reservoir.

本発明に係る排水システムでは、前記貯留部は前記上流側排水管の長手方向の一部を径方向に拡大させることで設けられ、前記貯留部をなす拡大部の上側に通気管が接続されていることが好ましい。
上記排水システムによれば、貯留部と排水管(即ち、上流側排水管)とが軸線を共通にして配置されているので、貯留部の容量が確保されるとともに、排水システム全体の省スペース化が図られる。また、排水の排出高さも従来と同様にし、下流側排水管を下水本管に接続することができるため、建物の改修時にも、上記排水システムを使用することができる。
In the drainage system according to the present invention, the storage part is provided by expanding a part of the longitudinal direction of the upstream drain pipe in the radial direction, and a ventilation pipe is connected to the upper side of the expansion part forming the storage part. Preferably it is.
According to the drainage system, the storage section and the drain pipe (that is, the upstream drain pipe) are arranged with a common axis, so that the capacity of the storage section is ensured and the entire drainage system is saved. Is planned. Moreover, since the discharge height of the waste water is the same as the conventional one and the downstream drain pipe can be connected to the sewage main pipe, the above drainage system can be used even when the building is renovated.

本発明に係る排水システムでは、前記上流側排水管には、上り勾配を有する配管を有する分岐管が設けられ、前記分岐管は前記貯留部の底部に接続され、前記貯留部の上側に通気管が接続されていることが好ましい。
上記排水システムによれば、貯留部が上流側排水管の上方に配置され、貯留部の下部に分岐管が接続されているので、通常時には排水が貯留部に流入しない。そのため、貯留部でのごみ詰まりの発生や汚物・雑物の堆積を抑制することができる。また、排水の排出高さも従来と同様にし、下流側排水管を下水本管に接続することができるため、建物の改修時にも、上記排水システムを使用することができる。
In the drainage system according to the present invention, the upstream drain pipe is provided with a branch pipe having a pipe having an ascending slope, the branch pipe is connected to a bottom portion of the storage section, and a ventilation pipe is provided above the storage section. Are preferably connected.
According to the above drainage system, the reservoir is disposed above the upstream drain pipe, and the branch pipe is connected to the lower part of the reservoir, so that the drainage does not normally flow into the reservoir. Therefore, generation | occurrence | production of the garbage clogging in a storage part and accumulation of filth and miscellaneous matters can be suppressed. Moreover, since the discharge height of the waste water is the same as the conventional one and the downstream drain pipe can be connected to the sewage main pipe, the above drainage system can be used even when the building is renovated.

本発明に係る排水システムでは、前記上流側排水管には、上り勾配の分岐管が設けられ、前記分岐管は、開閉弁を備えると共に、前記貯留部は、前記上流側排水管の側方又は上方に設けられ、前記分岐管は、一端が前記上流側排水管に接続され、他端が前記一端の接続部分よりも上流側で前記貯留部の下流側端部に接続され、前記貯留部の略最上部に通気兼流入管が接続されていることが好ましい。
また、本発明に係る排水システムでは、前記貯留部の内側の上面の高さは、前記トラップの封水面の高さより低い位置であることが好ましい。
さらに、通常時には開閉弁を閉めることが好ましく、通気兼流入管が前記トラップ封水面より僅かに低い位置に設けられていることが好ましい。
上記排水システムによれば、貯留部が上流側排水管の側方に配置され、その部分の上流側排水管の高さと貯留部の高さが揃う。また、排水システムの上流側の厚み寸法を抑えることができる。
そして、上記排水システムによれば、逆流防止弁の作動後に排水器具からの排水で排水管内が満水になった後に、排水が通気兼流入管を通って貯留部に流入し、貯留部内に貯留される。また、通常時や非常時でも排水器具からの排水が少ない場合には貯留部に排水が流れ込まないので、貯留部でのごみ詰まりの発生や汚物・雑物の堆積を更に抑制することができる。また、貯留部に排水が流れ込んだ後には、開閉弁をあけて排水するが、その際に弁を開く時間を制約が少なく、作業がし易くなる。
In the drainage system according to the present invention, the upstream drain pipe is provided with an ascending branch pipe, the branch pipe is provided with an on-off valve, and the storage portion is located on the side of the upstream drain pipe or Provided on the upper side, and one end of the branch pipe is connected to the upstream drain pipe, and the other end is connected to the downstream end of the storage section on the upstream side of the connection portion of the one end. It is preferable that a ventilation / inflow pipe is connected to the substantially uppermost part.
In the drainage system according to the present invention, it is preferable that the height of the upper surface inside the reservoir is lower than the height of the sealing surface of the trap.
Further, it is preferable to close the on-off valve in normal times, and it is preferable that the ventilation / inflow pipe is provided at a position slightly lower than the trap sealing surface.
According to the above drainage system, the storage part is arranged on the side of the upstream drain pipe, and the height of the upstream drain pipe and the height of the storage part are aligned. Further, the thickness dimension on the upstream side of the drainage system can be suppressed.
According to the drainage system, after the backflow prevention valve is activated, the drainage pipe is filled with drainage from the drainage device, and then the drainage flows into the storage section through the ventilation / inflow pipe and is stored in the storage section. The In addition, since wastewater does not flow into the storage section when there is little drainage from the drainage device even during normal times or in an emergency, it is possible to further suppress the occurrence of clogging in the storage section and the accumulation of filth and other impurities. Moreover, after drainage flows into the storage part, the drainage is performed by opening the on-off valve. However, the time for opening the valve at that time is less restricted, and the operation becomes easier.

本発明によれば、集中豪雨や災害発生等の非常時に特別な操作を必要とせず、一時的に排水を貯留することができ、且つ、非常時終了後にポンプ等の装置を使用することなく、簡単な構造で、非常時に貯留していた排水を下水本管に排出可能な排水システムが提供される。   According to the present invention, no special operation is required in an emergency such as torrential rain or disaster occurrence, and wastewater can be temporarily stored, and without using a device such as a pump after the end of the emergency, A drainage system with a simple structure and capable of discharging wastewater stored in an emergency to the sewer main is provided.

本発明の排水システムの概要を示す断面図である。It is sectional drawing which shows the outline | summary of the drainage system of this invention. 本発明の第一実施形態に係る排水システムの断面図である。It is sectional drawing of the drainage system which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る排水システムの貯留部の側面図である。It is a side view of the storage part of the drainage system concerning a first embodiment of the present invention. 本発明の第一実施形態に係る排水システムの貯留部の下流側から見た背面図である。It is the rear view seen from the downstream of the storage part of the drainage system concerning a first embodiment of the present invention. 本発明の第二実施形態に係る排水システムの断面図である。It is sectional drawing of the drainage system which concerns on 2nd embodiment of this invention. 本発明の第二実施形態に係る排水システムの貯留部を示す図であって、(a)は側面図であり、(b)は(a)に示すX−X線で矢視した断面図である。It is a figure which shows the storage part of the drainage system which concerns on 2nd embodiment of this invention, Comprising: (a) is a side view, (b) is sectional drawing which looked at the XX line shown to (a). is there. 本発明の第二実施形態に係る排水システムの貯留部の第一変形例の側面図である。It is a side view of the 1st modification of the storage part of the drainage system concerning a second embodiment of the present invention. 本発明の第三実施形態に係る排水システムの貯留部の側面図である。It is a side view of the storage part of the drainage system concerning a third embodiment of the present invention. 本発明の第四実施形態に係る排水システムの断面図である。It is sectional drawing of the drainage system which concerns on 4th embodiment of this invention. 本発明の第四実施形態に係る排水システムの貯留部の側面図である。It is a side view of the storage part of the drainage system concerning a fourth embodiment of the present invention. 本発明の第五実施形態に係る排水システムの側方から見た断面図である。It is sectional drawing seen from the side of the drainage system which concerns on 5th embodiment of this invention. 本発明の第五実施形態に係る排水システムの上方から見た断面図である。It is sectional drawing seen from the upper direction of the drainage system which concerns on 5th embodiment of this invention. 本発明の第五実施形態に係る排水システムの貯留部の側面図である。It is a side view of the storage part of the drainage system concerning a fifth embodiment of the present invention.

以下、本発明を適用した排水システムの実施形態について、図面を参照して説明する。なお、以下の説明で用いる図面は模式的なものであり、長さ、幅、及び厚みの比率等は実際のものと同一とは限らず、適宜変更することができる。   Hereinafter, an embodiment of a drainage system to which the present invention is applied will be described with reference to the drawings. The drawings used in the following description are schematic, and the length, width, thickness ratio, and the like are not necessarily the same as the actual ones, and can be changed as appropriate.

本発明を適用した排水システム1は、図1に示すように、例えばマンション等の集合住宅(建物)Bの地下スペース(所謂、ピット)及び地中等に設置される。このようなマンションでは、最下階住戸排水が最下階より上の階の排水立て管系統に合流する最下階合流排水方式と、最下階以外の階からの排水立て管と最下階の排水立て管とが別系統とされている最下階単独排水方式がある。通常、最下階面FLは地面GLより高い位置にあるが、地形等により最下階面FLが地面GLより低い位置になることがあり、この場合に特に集中豪雨の際に最下階の排水器具から下水が溢れ出しやすいため、逆流防止弁8が設けられている。
最下階単独排水方式が採用されている場合、排水システム1は、最下階の排水器具2と地中に埋設されている下水本管4との間に設置されている。排水システム1は、排水器具2と下水本管4とを接続する排水管6と、排水管6に設けられた逆流防止弁8と、貯留部10と、を備えている。なお、排水管6には、地上からの雨水排水用の排水管7が連結されている。
以下、排水システム1の実施形態について、詳しく説明する。
As shown in FIG. 1, the drainage system 1 to which the present invention is applied is installed in an underground space (so-called pit), underground, or the like of an apartment house (building) B such as an apartment. In such an apartment, the lowest floor unit drainage system joins the drainage pipe system on the floor above the lowest floor, and the drainage pipe and bottom floor from floors other than the bottom floor. There is a single floor drainage system that is separate from the drainage standpipe. Usually, the lowest floor FL is at a position higher than the ground GL, but the bottom floor FL may be lower than the ground GL due to topography or the like. In this case, particularly in the case of heavy rain, Since sewage tends to overflow from the drainage device, a backflow prevention valve 8 is provided.
When the lowermost floor single drainage system is adopted, the drainage system 1 is installed between the lowermost drainage device 2 and the sewage main pipe 4 buried in the ground. The drainage system 1 includes a drainage pipe 6 that connects the drainage device 2 and the sewage main pipe 4, a backflow prevention valve 8 provided in the drainage pipe 6, and a storage unit 10. The drain pipe 6 is connected with a drain pipe 7 for draining rainwater from the ground.
Hereinafter, an embodiment of the drainage system 1 will be described in detail.

(第一実施形態)
先ず、本発明を適用した第一実施形態について説明する。
図2は、第一実施形態に係る排水システム1Aの断面図である。
図2に示すように、排水システム1Aは、マンション(建物)Bの排水器具2と不図示の下水本管4との間に設けられている。排水器具2は、図1に例示するようなトイレに限定されず、台所、洗面、風呂、洗濯パン等に備え付けられている排水器具が該当し、複数設けられていることが多い。
(First embodiment)
First, a first embodiment to which the present invention is applied will be described.
FIG. 2 is a cross-sectional view of the drainage system 1A according to the first embodiment.
As shown in FIG. 2, the drainage system 1 </ b> A is provided between a drainage device 2 of an apartment (building) B and a sewage main pipe 4 (not shown). The drainage device 2 is not limited to the toilet illustrated in FIG. 1, and corresponds to a drainage device provided in a kitchen, a bathroom, a bath, a washing pan, and the like, and a plurality of drainage devices are often provided.

排水器具2にはトラップ20が設けられている。トラップ20は、下水や排水の臭いが排水器具2から建物Bの内部に漏れ出すことを防ぐ目的で使用される。   The drainage device 2 is provided with a trap 20. The trap 20 is used for the purpose of preventing the smell of sewage or drainage from leaking from the drainage device 2 into the building B.

排水システム1Aは、排水管6と、逆流防止弁8と、貯留部10と、を備えている。   The drainage system 1 </ b> A includes a drainage pipe 6, a backflow prevention valve 8, and a storage unit 10.

排水管6は、排水器具2と不図示の下水本管4とを接続する管材で構成されている。具体的には、排水管6は、排水器具2から下水本管4に向けて下降し、上流から下流に従い、下向きとなる下り勾配に、配置されている。排水管6の下降深さや下り勾配は、マンションBの地下スペースの大きさに合わせて設定されている。
該管材は、例えば長尺な樹脂製若しくは金属製の管から所定の長さで切り出すことで得られる部材である。該管材を構成する材料としては、樹脂製の場合には例えばポリプロピレン(PP)、ポリエチレン(PE)、ポリ塩化ビニル(PVC)等が挙げられ、金属製の場合には例えば鋳鉄等が挙げられる。さらに、該管材として、硬質ポリ塩化ビニル樹脂を鋳鉄管の内面に積層した塩化ビニルライニング鋼管(DVLP)や、硬質ポリ塩化ビニル樹脂管の外面に耐火性のセメントモルタルを積層した耐火二層管を使用してもよい。
The drain pipe 6 is composed of a pipe material that connects the drainage device 2 and a sewage main pipe 4 (not shown). Specifically, the drain pipe 6 descends from the drainage device 2 toward the sewage main pipe 4 and is arranged in a downward slope that goes downward from upstream to downstream. The descending depth and descending slope of the drain pipe 6 are set in accordance with the size of the underground space of the apartment B.
The tube material is a member obtained by cutting out a predetermined length from a long resin or metal tube, for example. Examples of the material constituting the pipe material include polypropylene (PP), polyethylene (PE), polyvinyl chloride (PVC) and the like in the case of resin, and cast iron and the like in the case of metal. Furthermore, as the pipe material, a polyvinyl chloride lining steel pipe (DVLP) in which hard polyvinyl chloride resin is laminated on the inner surface of a cast iron pipe, and a fire-resistant two-layer pipe in which fire resistant cement mortar is laminated on the outer surface of the hard polyvinyl chloride resin pipe. May be used.

逆流防止弁8は、排水管6の長手方向に沿って、マス9の下流側近傍の位置で排水管6に取り付けられている。逆流防止弁8は、下水本管4内の下水が排水器具2に流出することを防ぐための弁であり、下水の背圧によって不図示の弁体が逆流を防止する形で作動する。従って、下水の水位が多少上昇した場合であっても、下水は逆流防止弁8より上流側へは流れない。なお、逆流防止弁8は、基礎付近のマンションB内部の位置に設けられていてもよい(図5等参照)。
以下では、逆流防止弁8より上流側の排水管6(即ち、排水器具2と逆流防止弁8との間に位置する排水管6)を上流側排水管6Aとし、逆流防止弁8より下流側の排水管6(即ち、逆流防止弁8と下水本管4との間に位置する排水管6)を下流側排水管6Bとする。なお、図1では、上流側排水管6Aと下流側排水管6Bの範囲を明示するため、それぞれ線種を変えて示している。
The backflow prevention valve 8 is attached to the drain pipe 6 at a position near the downstream side of the mass 9 along the longitudinal direction of the drain pipe 6. The backflow prevention valve 8 is a valve for preventing the sewage in the sewage main pipe 4 from flowing out into the drainage device 2, and the valve body (not shown) is operated in a manner to prevent backflow due to the back pressure of the sewage. Therefore, even if the sewage water level rises somewhat, the sewage does not flow upstream from the backflow prevention valve 8. In addition, the backflow prevention valve 8 may be provided at a position inside the apartment B near the foundation (see FIG. 5 and the like).
Hereinafter, the drain pipe 6 upstream of the backflow prevention valve 8 (that is, the drain pipe 6 positioned between the drainage device 2 and the backflow prevention valve 8) is referred to as an upstream drain pipe 6A, and downstream of the backflow prevention valve 8. The drainage pipe 6 (that is, the drainage pipe 6 positioned between the backflow prevention valve 8 and the sewage main pipe 4) is defined as a downstream drainage pipe 6B. In FIG. 1, in order to clearly show the ranges of the upstream drain pipe 6A and the downstream drain pipe 6B, the line types are respectively changed.

貯留部10は、上流側排水管6Aに設けられ、下水の水位上昇等によって逆流防止弁8が閉じた際に、排水器具2からの排水を一時的に貯留する。   The reservoir 10 is provided in the upstream drain pipe 6A, and temporarily stores drainage from the drainage device 2 when the backflow prevention valve 8 is closed due to a rise in the level of sewage.

図3は、貯留部10の側面図である。図3に示すように、貯留部10は、貯水槽12を備えている。貯水槽12は、管体14と、管体14の上流側端部の開口面を塞ぐ蓋部15Aと、管体14の上流側端部の開口面を塞ぐ蓋部15Bと、を備えている。貯水槽12の満水面はトラップ20の封水面22より低い位置に配置されている。   FIG. 3 is a side view of the storage unit 10. As shown in FIG. 3, the storage unit 10 includes a water storage tank 12. The water storage tank 12 includes a tube body 14, a lid portion 15 </ b> A that closes the opening surface of the upstream end portion of the tube body 14, and a lid portion 15 </ b> B that closes the opening surface of the upstream end portion of the tube body 14. . The full water surface of the water storage tank 12 is disposed at a position lower than the sealing surface 22 of the trap 20.

管体14は、例えば長尺な樹脂管から所定の長さで切り出すことで得られる樹脂製の部材である。管体14の上面には、貯留部10の上側の空気を排出し、排水を貯留するための通気管24が接続されている。また、管体14の上面には、貯水槽12の内部の清掃及び点検等を行うための掃除口26が管体14の周方向外側に突出するように設けられている。掃除口26は使用時以外には適当な蓋体によって閉じられている。なお、図2では、通気管24及び掃除口26の図示を省略する。
管体14の長さ及び直径によって、貯水槽12の容量、即ち貯留部10の容量が決まる。従って、管体14の長さ及び直径は、これらの容量、さらには排水器具2からの排水量及びマンションBの地下スペース等の設置条件を勘案して適切に設定されることが好ましい。貯留部10の容量としては、例えば50L以上100L以下とされているが、特に限定されない。
管体14を構成する樹脂としては、例えばPP、PE、PVC等が挙げられる。
The tube body 14 is a resin member obtained by cutting out a predetermined length from a long resin tube, for example. A vent pipe 24 is connected to the upper surface of the tube body 14 to discharge the air above the reservoir 10 and store the drainage. Further, a cleaning port 26 for cleaning and checking the inside of the water storage tank 12 is provided on the upper surface of the tube body 14 so as to protrude outward in the circumferential direction of the tube body 14. The cleaning port 26 is closed by an appropriate lid except when in use. In addition, illustration of the vent pipe 24 and the cleaning port 26 is abbreviate | omitted in FIG.
Depending on the length and diameter of the tube body 14, the capacity of the water tank 12, that is, the capacity of the reservoir 10 is determined. Therefore, it is preferable that the length and diameter of the tubular body 14 are appropriately set in consideration of these capacities, the amount of drainage from the drainage device 2, and the installation conditions such as the underground space of the apartment B. The capacity of the storage unit 10 is, for example, 50 L or more and 100 L or less, but is not particularly limited.
As resin which comprises the pipe body 14, PP, PE, PVC etc. are mentioned, for example.

蓋部15A,15Bは、管体14の上流側端部及び下流側端部にそれぞれ外嵌されている。蓋部15A,15Bは有頂筒状に形成されており、閉塞板16をなす天壁と、側壁17と、をそれぞれ備えている。蓋部15A,15Bの側壁17,17の内周面は、管体14の両端部に当接するとともに融着又は接着により、管体14に接合されている。
蓋部15A,15Bを構成する素材としては、例えばPP、PE、PVC,合成ゴムが挙げられる。
なお、通気管24は蓋部15A又は蓋部15Bの閉塞板16に接続されていてもよい。また、掃除口26は蓋部15A又は蓋部15Bの閉塞板16から管体14の長手方向に沿って突出するように設けられていてもよい。
The lid portions 15A and 15B are fitted on the upstream end portion and the downstream end portion of the tube body 14, respectively. The lid portions 15A and 15B are formed in a cylindrical shape with a top, and each include a top wall that forms the closing plate 16 and a side wall 17. The inner peripheral surfaces of the side walls 17 and 17 of the lid portions 15A and 15B are in contact with both ends of the tube body 14 and are joined to the tube body 14 by fusion or adhesion.
Examples of the material constituting the lid portions 15A and 15B include PP, PE, PVC, and synthetic rubber.
The vent pipe 24 may be connected to the closing plate 16 of the lid portion 15A or the lid portion 15B. Further, the cleaning port 26 may be provided so as to protrude along the longitudinal direction of the tube body 14 from the closing plate 16 of the lid portion 15A or the lid portion 15B.

図4は、下流側から見た貯留部10の背面図である。図示していないが、蓋部15Aの閉塞板16の底部には、排水器具2から排出される排水を貯水槽12内に流入させるための流入口18Aが設けられている。流入口18Aには上流側排水管6Aの下流側端部が接続されている。また、図4に示すように、蓋部15Bの閉塞板16の底部には、貯水槽12の内部に貯留された排水を貯水槽12の内部から流出させるための流出口18Bが設けられている。流出口18Bには下流側排水管6Bの上流側端部が接続されている。   FIG. 4 is a rear view of the storage unit 10 as viewed from the downstream side. Although not shown, an inlet 18A for allowing the drainage discharged from the drainage device 2 to flow into the water storage tank 12 is provided at the bottom of the closing plate 16 of the lid 15A. The downstream end of the upstream drain pipe 6A is connected to the inflow port 18A. Further, as shown in FIG. 4, an outlet 18 </ b> B is provided at the bottom of the closing plate 16 of the lid 15 </ b> B for draining the wastewater stored in the water storage tank 12 from the water storage tank 12. . The upstream end of the downstream drain pipe 6B is connected to the outlet 18B.

上記説明した貯水槽12を備えた貯留部10の内側の底部は、下流側排水管6Bの内周面の底端よりも高い位置に配置されている。また、貯留部10は水平に、又は図2に示すように上流から下流に従い、下向きとなるとともに、排水管6の下り勾配に略一致した下り勾配に、配置されている。
なお、貯留部10は既設の排水管6の上流側排水管6Aの所定の位置を切断して、後付によって設置されていてもよい。
The bottom part inside the storage part 10 provided with the water tank 12 demonstrated above is arrange | positioned in the position higher than the bottom end of the internal peripheral surface of the downstream drainage pipe 6B. In addition, the storage unit 10 is disposed horizontally or downwardly from upstream to downstream as shown in FIG. 2 and at a downward slope substantially matching the downward slope of the drain pipe 6.
In addition, the storage part 10 may cut | disconnect the predetermined position of the upstream drainage pipe 6A of the existing drainage pipe 6, and may be installed by the retrofit.

次いで、排水システム1Aにおける通常時及び非常時の排水方法について説明する。
通常時には、下水は下水本管4内を流れており、下水の水位は少なくとも下水本管4内に位置しているため、逆流防止弁8は開いている。一方、排水は、排水器具2から上流側排水管6Aに流入し、貯留部10及び逆流防止弁8を通って、下流側排水管6Bに流入し、最終的には下水本管4に排水される。
Next, normal and emergency drainage methods in the drainage system 1A will be described.
Normally, the sewage flows in the sewage main pipe 4 and the water level of the sewage is at least in the sewage main pipe 4, so that the backflow prevention valve 8 is open. On the other hand, the drainage flows from the drainage device 2 into the upstream drainage pipe 6A, passes through the storage portion 10 and the backflow prevention valve 8, and flows into the downstream drainage pipe 6B, and finally drained into the sewage main pipe 4. The

集中豪雨や自然災害等が発生した際の非常時には、雨水等の流入等によって下水本管4内の水量が急増し、下水が下流側排水管6B内を上流側に向かって流れ出す。下水の水位が上昇して、逆流防止弁8の位置に達すると、逆流防止弁8が下流側からの下水の水圧によって閉じる。これにより、下水の逆流防止弁8よりも上流側への流出が抑えられる。   In an emergency when a torrential rain or a natural disaster occurs, the amount of water in the sewage main pipe 4 rapidly increases due to the inflow of rainwater or the like, and the sewage flows toward the upstream side in the downstream drainage pipe 6B. When the sewage water level rises and reaches the position of the backflow prevention valve 8, the backflow prevention valve 8 is closed by the water pressure of the sewage from the downstream side. Thereby, the outflow to the upstream rather than the backflow prevention valve 8 of a sewage is suppressed.

一方、非常時における排水は、上述のように逆流防止弁8が閉じているので、逆流防止弁8よりも下流側に流れることはできず、逆流防止弁8よりも上流側、即ち上流側排水管6A、貯留部10の内部に留められる。具体的には、排水は排水器具2から上流側排水管6A内を通って、流入口18Aから貯水槽12の内部に流入する。逆流防止弁8と貯留部10との間の上流側排水管6A内の容量以下の排水は、貯水槽12の流出口18Bから下流側に流出し、逆流防止弁8と貯留部10との間の上流側排水管6A内に貯留される。逆流防止弁8と貯留部10との間の上流側排水管6A内の容量以上の排水は、流入口18Aから貯水槽12の内部に流入し、貯水槽12の内部に貯留される。貯水槽12では所定の容量が確保されているので、その容量以内の範囲であれば、このような非常時であっても排水器具2を使用することができる。   On the other hand, since the backflow prevention valve 8 is closed as described above, the emergency drainage cannot flow downstream from the backflow prevention valve 8, and is upstream of the backflow prevention valve 8, that is, upstream drainage. The pipe 6 </ b> A is retained inside the storage unit 10. Specifically, the wastewater flows from the drainage device 2 through the upstream drainage pipe 6 </ b> A and flows into the water storage tank 12 through the inlet 18 </ b> A. Waste water below the capacity in the upstream drain pipe 6 </ b> A between the backflow prevention valve 8 and the storage portion 10 flows downstream from the outlet 18 </ b> B of the water storage tank 12, and between the backflow prevention valve 8 and the storage portion 10. Is stored in the upstream drain pipe 6A. Wastewater that exceeds the capacity in the upstream drain pipe 6 </ b> A between the backflow prevention valve 8 and the storage unit 10 flows into the water tank 12 from the inlet 18 </ b> A and is stored in the water tank 12. Since the water storage tank 12 has a predetermined capacity, the drainage device 2 can be used even in such an emergency as long as it is within the capacity.

非常時終了後には、下水の水位は少なくとも下流側排水管6B内に戻るため、逆流防止弁8が開く。排水管6及び貯留部10は上流から下流に従い、下向きとなる下り勾配に配置されていることから、下水が下水本管4に流れ、逆流防止弁8と貯留部10との間の上流側排水管6A内に貯留されていた排水が逆流防止弁8及び下流側排水管6Bを通って、速やかに、下水本管4に流れる。さらに、貯留部10の貯水槽12の内部に貯留されていた排水も流出口18Bから下流側に流出し、逆流防止弁8及び下流側排水管6Bを通って、速やかに、下水本管4に流れる。
その後は、上記説明した通常時の排水方法と同様に、排水処理される。
After the end of the emergency, the sewage level returns to at least the downstream drain pipe 6B, so the backflow prevention valve 8 opens. Since the drain pipe 6 and the storage section 10 are arranged in a downward slope that goes downward from upstream to downstream, the sewage flows into the sewage main pipe 4 and the upstream drainage between the backflow prevention valve 8 and the storage section 10. The wastewater stored in the pipe 6A flows through the backflow prevention valve 8 and the downstream drainage pipe 6B to the sewage main pipe 4 promptly. Furthermore, the wastewater stored in the water storage tank 12 of the storage unit 10 also flows out from the outlet 18B to the downstream side, and quickly passes through the backflow prevention valve 8 and the downstream side drainage pipe 6B to the sewage main pipe 4 immediately. Flowing.
Thereafter, the wastewater treatment is performed in the same manner as the above-described normal drainage method.

以上説明したように、第一実施形態に係る排水システム1Aでは、排水管6に逆流防止弁8が設けられているので、非常時に下流側排水管6Bにおける下水の水位が上昇しても、下水が上流側排水管6Aには流入せず、下水の下流から上流への水圧のみで下水の逆流(即ち、排水器具2から建物内への流出)が止められる。また、通常時のように、下水の水位が下水道本管内に位置している場合には、排水器具2からの排水が上流側排水管6Aから下流側排水管6Bを通って、下水本管4へと円滑に流れる。   As described above, in the drainage system 1A according to the first embodiment, since the backflow prevention valve 8 is provided in the drainage pipe 6, even if the level of sewage in the downstream drainage pipe 6B rises in an emergency, However, the reverse flow of the sewage (that is, the outflow from the drainage device 2 into the building) is stopped only by the water pressure from the downstream to the upstream of the sewage. Further, when the sewage water level is located in the sewer main as in normal times, the drainage from the drainage device 2 passes from the upstream drainage pipe 6A through the downstream drainage pipe 6B, and into the sewage main pipe 4. Flows smoothly.

また、排水システム1Aでは、上流側排水管6Aに貯留部10が設けられているので、排水器具2からの排水が非常時終了まで一時的に貯留される。また、貯留部10の貯留量(即ち、容量)と上流側排水管6Aの容量との合計分の排水を留めておくことができるので、非常時にも排水器具2を使用することができる。
また、排水システム1Aでは、貯留部10の内側底端の高さが下流側排水管6Bの内周面の底端よりも高い位置に配置されているので、貯留部10に貯留された排水及び下水を、弁やバルブの制御等の特別な操作を行う、又はポンプ等の装置等を用いることなく、下水本管4に向かって、高低差のみを活かして自然に流下させることができる。
また、排水システム1Aでは、貯留部10の内部が上流から下流にかけて下降するように、貯水槽12が下り勾配で設置されていることで、排水を貯留部10の内部に滞留させずに、円滑に下流側に流出させることができる。
上記のように、集中豪雨や災害発生等の非常時に特別な操作を必要とせず、一時的に排水を貯留部10等に貯留することができ、且つ、非常時終了後にポンプアップ用の装置を使用することなく、簡単な構造で、非常時に貯留していた排水を下水本管4に排出することができる。また、排水をます等の貯留部からポンプアップするための装置を不要とすることで、該装置のメンテナンスと維持費用が発生することもなく、排水コストを抑えることもできる。
Moreover, in the drainage system 1A, since the storage unit 10 is provided in the upstream drain pipe 6A, the drainage from the drainage device 2 is temporarily stored until the end of the emergency. Moreover, since the drainage of the sum total of the storage amount (namely, capacity | capacitance) of the storage part 10 and the capacity | capacitance of 6 A of upstream drainage pipes can be stopped, the drainage device 2 can be used also at the time of emergency.
Moreover, in the drainage system 1A, since the height of the inner bottom end of the storage unit 10 is arranged at a position higher than the bottom end of the inner peripheral surface of the downstream drain pipe 6B, the drainage stored in the storage unit 10 and The sewage can be made to flow naturally toward the sewage main pipe 4 by utilizing only the height difference without performing a special operation such as control of a valve or a valve or using a device such as a pump.
Further, in the drainage system 1A, the water storage tank 12 is installed with a downward slope so that the inside of the storage unit 10 descends from the upstream to the downstream, so that the drainage is not retained in the storage unit 10 and smooth. To the downstream side.
As described above, no special operation is required in the event of an emergency such as torrential rain or disaster, and the wastewater can be temporarily stored in the storage unit 10 and the pump-up device can be installed after the end of the emergency. Without being used, the wastewater stored in an emergency can be discharged to the sewage main pipe 4 with a simple structure. Further, by eliminating the need for a device for pumping up the drainage from the storage part such as the drainage, maintenance and maintenance costs for the device are not generated, and the drainage cost can be suppressed.

(第二実施形態)
次いで、本発明を適用した第二実施形態について説明する。
なお、以下では、第二実施形態に係る排水システムの構成要素及び排水方法において、第一実施形態に係る排水システム1Aの構成要素及び排水方法と同一の構成要素及び工程については、その説明を省略し、排水システム1Aの構成要素及び排水方法と異なる点について説明する。また、図5から図7に示す第二実施形態に係る排水システムの構成要素において、排水システム1Aの構成要素と同一の構成要素については、同一の符号を付し、その説明を省略する。
(Second embodiment)
Next, a second embodiment to which the present invention is applied will be described.
In the following description, in the components and drainage method of the drainage system according to the second embodiment, the description of the same components and steps as those of the drainage system 1A according to the first embodiment is omitted. The differences between the components of the drainage system 1A and the drainage method will be described. Moreover, in the component of the drainage system which concerns on 2nd embodiment shown in FIGS. 5-7, about the component same as the component of drainage system 1A, the same code | symbol is attached | subjected and the description is abbreviate | omitted.

図5は、第二実施形態に係る排水システム1Bの断面図である。図6は、排水システム1Bの貯留部10を示す図であって、(a)は側面図であり、(b)は(a)に示すX−X線で矢視した断面図である。なお、第二実施形態の排水システム1Bにおいては、逆流防止弁8は、基礎付近のマンションB内部の位置に設けられている。   FIG. 5 is a cross-sectional view of a drainage system 1B according to the second embodiment. 6A and 6B are views showing the storage unit 10 of the drainage system 1B, where FIG. 6A is a side view, and FIG. 6B is a cross-sectional view taken along line XX shown in FIG. In the drainage system 1B of the second embodiment, the backflow prevention valve 8 is provided at a position inside the apartment B near the foundation.

図5及び図6(a)に示すように、第二実施形態の排水システム1Bにおいては、貯留部10を構成する貯水槽12の流入口18Aが蓋部15Aの閉塞板16の上部に設けられている。即ち、上流側排水管6Aの下流側端部は貯水槽12の上流側の上部に接続されている。
また、貯水槽12の内部には、流入口18Aの底端部と下流側の貯水槽12の内部底面とに係止されたガイド部28が傾斜するように設けられている。閉塞板16の板面方向に対するガイド部28の傾斜角度(内角)は、例えば30度程度とされている。ガイド部28が設けられた貯水槽12の角部(即ち、貯水槽12の上流側底端部)には排水や下水が進入しない。
As shown in FIGS. 5 and 6 (a), in the drainage system 1B of the second embodiment, the inlet 18A of the water storage tank 12 constituting the storage unit 10 is provided on the top of the closing plate 16 of the lid 15A. ing. That is, the downstream end of the upstream drain pipe 6 </ b> A is connected to the upper part on the upstream side of the water storage tank 12.
In addition, a guide portion 28 that is engaged with the bottom end portion of the inflow port 18A and the inner bottom surface of the downstream water storage tank 12 is provided in the water storage tank 12 so as to be inclined. The inclination angle (inner angle) of the guide portion 28 with respect to the plate surface direction of the closing plate 16 is, for example, about 30 degrees. Drainage or sewage does not enter the corner of the water storage tank 12 provided with the guide portion 28 (that is, the bottom end on the upstream side of the water storage tank 12).

蓋部15A,15Bは、フランジと、側壁17と、を備えた例えばTSフランジ等のフランジ部材62と、閉塞板16をなす板部材64と、を備えている。フランジ部材62と板部材64との間には、例えばパッキン19が設けられている。フランジ部材62、パッキン19及び板部材64はボルト及びナットで固定されている。板部材64,64にはそれぞれ、上流側排水管6A又は下流側排水管6Bが溶接等で接続されている。   The lid portions 15 </ b> A and 15 </ b> B include a flange member 62 such as a TS flange including a flange and a side wall 17, and a plate member 64 that forms the closing plate 16. For example, a packing 19 is provided between the flange member 62 and the plate member 64. The flange member 62, the packing 19, and the plate member 64 are fixed with bolts and nuts. The upstream drain pipe 6A or the downstream drain pipe 6B is connected to the plate members 64, 64 by welding or the like.

図6(b)に示すように、貯留部10の断面にインバート68を設けることで、通常時には排水がインバート68内(即ち、インバート68に形成された凹部69内)を流れるため、よりスムーズな排水が可能となる。なお、図6(a)では、インバート68の図示は省略する。   As shown in FIG. 6B, by providing the invert 68 in the cross section of the reservoir 10, the drainage normally flows in the invert 68 (that is, in the recess 69 formed in the invert 68). Drainage is possible. In addition, illustration of the invert 68 is abbreviate | omitted in Fig.6 (a).

排水システム1Bにおける通常時及び非常時の排水方法は、基本的には、排水システム1Aにおける通常時及び非常時の排水方法と同様である。
非常時において、逆流防止弁8と貯留部10との間の上流側排水管6A内の容量以上の排水は、排水器具2から上流側排水管6A内を通って、流入口18Aから貯水槽12の内部に流入する。この際、排水は流入口18Aからガイド部28の上面に沿って円滑に、且つ加速して流入し、貯水槽12の内部に貯留される。
非常時終了後には、貯水槽12の内部に貯留されていた排水がガイド部28の上面及び貯水槽12の内面の底部に沿って流れ、流出口18Bから下流側に流出し、逆流防止弁8及び下流側排水管6Bを通って、速やかに、下水本管4に流れる。
The normal and emergency drainage methods in the drainage system 1B are basically the same as the normal and emergency drainage methods in the drainage system 1A.
In an emergency, drainage exceeding the capacity in the upstream drain pipe 6A between the backflow prevention valve 8 and the reservoir 10 passes from the drainage device 2 through the upstream drain pipe 6A and from the inlet 18A to the water storage tank 12. Flows into the interior. At this time, the wastewater flows smoothly and accelerated along the upper surface of the guide portion 28 from the inlet 18 </ b> A and is stored in the water storage tank 12.
After the end of the emergency, the wastewater stored in the water storage tank 12 flows along the upper surface of the guide portion 28 and the bottom of the inner surface of the water storage tank 12, and flows out downstream from the outlet 18B. And immediately flows into the sewage main pipe 4 through the downstream drain pipe 6B.

以上説明した第二実施形態に係る排水システム1Bによれば、第一実施形態に係る排水システム1Aと同様に、集中豪雨や災害発生等の非常時に特別な操作を必要とせず、一時的に排水を貯留部10等に貯留することができ、且つ、非常時終了後にポンプアップ用の装置を使用することなく、簡単な構造で、非常時に貯留していた排水を下水本管4に排出することができる。   According to the drainage system 1B according to the second embodiment described above, similar to the drainage system 1A according to the first embodiment, no special operation is required in the event of an emergency such as torrential rain or disaster occurrence, and the drainage system is temporarily drained. Can be stored in the storage unit 10 etc., and the wastewater stored in an emergency can be discharged to the sewage main pipe 4 with a simple structure without using a pump-up device after the end of the emergency. Can do.

また、排水システム1Bでは、排水管6(即ち、上流側排水管6A)の途中に貯留部10が設けられ、排水器具2からの排水が貯留部10の上端部から貯留部10の内部に流入するとともに、貯留部10の底端部から貯留部10の外部へ流出する。従って、貯留部10に通気管24を接続しなくても、排水の流動が滞ることなく、貯留部10の容量がより有効に活用される。   Moreover, in the drainage system 1B, the storage part 10 is provided in the middle of the drain pipe 6 (namely, upstream drain pipe 6A), and the waste_water | drain from the drainage device 2 flows into the inside of the storage part 10 from the upper end part of the storage part 10. FIG. At the same time, it flows out from the bottom end of the reservoir 10 to the outside of the reservoir 10. Therefore, even if the vent pipe 24 is not connected to the storage unit 10, the capacity of the storage unit 10 is more effectively utilized without the flow of drainage being delayed.

また、排水システム1Bでは、貯留部10を簡易に構成することができる。例えば、貯水槽12に通気管24を接続する必要はない。
また、排水システム1Bでは、貯水槽12の内部にガイド部28が設けられているので、流入口18Aから貯水槽内に流入する排水が上流から下流に向かう方向に加速される。このように加速された排水が常に貯水槽12の内面の底部を流れているので、貯水槽12、即ち貯留部10の清掃作業やメンテナンス頻度を低減できる。
Moreover, in the drainage system 1B, the storage part 10 can be comprised simply. For example, it is not necessary to connect the vent pipe 24 to the water storage tank 12.
Moreover, in the drainage system 1B, since the guide part 28 is provided in the inside of the water storage tank 12, the waste_water | drain which flows in into a water storage tank from 18 A of inlet_port | entrances is accelerated in the direction which goes downstream. Since the accelerated drainage always flows through the bottom of the inner surface of the water storage tank 12, the cleaning operation and maintenance frequency of the water storage tank 12, that is, the storage section 10 can be reduced.

なお、貯留部10を構成する貯水槽12の変形例として、貯水ますが挙げられる。図7は貯留部10を構成する貯水ます30の模式図である。図7に示す貯水ます30は、貯留部10を構成する貯水ますの一例であって、その形態は図7に示すように限定されるものではなく、任意に変更することができる。
貯水ます30は、上面及び底面が平面視略円形とされ、比較的高さ寸法の低い円柱体を平置きした状態で配置される。従って、流入口18A及び流出口18Bは貯水ます30の側壁に形成されている。
このような貯水ます30を用いれば、流入口18A及び流出口18Bの形成位置を側壁に沿って任意に設定することができ、上流側及び下流側からそれぞれ貯水ます30に接続する上流側排水管6Aが平面視において互いに平行ではない場合にも、貯水ます30に対して容易に接続することができる。
In addition, as a modified example of the water storage tank 12 that constitutes the storage unit 10, water storage can be cited. FIG. 7 is a schematic diagram of a water storage tank 30 constituting the storage unit 10. The water storage tank 30 shown in FIG. 7 is an example of the water storage water constituting the storage unit 10, and the form thereof is not limited as shown in FIG. 7 and can be arbitrarily changed.
The water storage tank 30 has a top surface and a bottom surface that are substantially circular in a plan view, and is disposed in a state where a cylindrical body having a relatively low height is placed flat. Accordingly, the inflow port 18A and the outflow port 18B are formed on the side wall of the reservoir 30.
If such a reservoir 30 is used, the formation positions of the inlet 18A and the outlet 18B can be arbitrarily set along the side wall, and the upstream drain pipe connected to the reservoir 30 from the upstream side and the downstream side, respectively. Even when 6A are not parallel to each other in plan view, it can be easily connected to the reservoir 30.

(第三実施形態)
次いで、本発明を適用した第三実施形態について説明する。
なお、以下では、第三実施形態に係る排水システムの構成要素及び排水方法において、第一実施形態に係る排水システム1Aの構成要素及び排水方法と同一の構成要素及び工程については、その説明を省略し、排水システム1Aの構成要素及び排水方法と異なる点について説明する。また、図8に示す第三実施形態に係る排水システムの構成要素において、排水システム1Aの構成要素と同一の構成要素については、同一の符号を付し、その説明を省略する。
(Third embodiment)
Next, a third embodiment to which the present invention is applied will be described.
In the following description, in the components and drainage method of the drainage system according to the third embodiment, descriptions of the same components and steps as those of the drainage system 1A according to the first embodiment are omitted. The differences between the components of the drainage system 1A and the drainage method will be described. Moreover, in the component of the drainage system which concerns on 3rd embodiment shown in FIG. 8, about the component same as the component of drainage system 1A, the same code | symbol is attached | subjected and the description is abbreviate | omitted.

図8は、第三実施形態に係る排水システム(図示略)の貯留部10の側面図である。なお、第三実施形態の排水システムにおいては、逆流防止弁8は、基礎付近のマンションB内部の位置に設けられている。
図8に示すように、第三実施形態の排水システムの貯留部10は、上流側排水管6Aの長手方向の一部を径方向に拡大させることで、上流側排水管6Aと一体的に形成されている。
FIG. 8 is a side view of the reservoir 10 of the drainage system (not shown) according to the third embodiment. In the drainage system of the third embodiment, the backflow prevention valve 8 is provided at a position inside the apartment B near the foundation.
As shown in FIG. 8, the storage part 10 of the drainage system of the third embodiment is formed integrally with the upstream drainage pipe 6A by expanding a part of the longitudinal direction of the upstream drainage pipe 6A in the radial direction. Has been.

以上説明した第三実施形態に係る排水システムによれば、第一実施形態に係る排水システム1Aと同様に、集中豪雨や災害発生等の非常時に特別な操作を必要とせず、一時的に排水を貯留部10等に貯留することができ、且つ、非常時終了後にポンプアップ用の装置を使用することなく、簡単な構造で、非常時に貯留していた排水を下水本管4に排出することができる。   According to the drainage system according to the third embodiment described above, similarly to the drainage system 1A according to the first embodiment, no special operation is required in an emergency such as torrential rain or disaster occurrence, and the drainage is temporarily performed. The waste water stored in the emergency can be discharged to the sewage main pipe 4 with a simple structure without using a pump-up device after the emergency ends, and can be stored in the storage unit 10 or the like. it can.

また、第三実施形態に係る排水システムの貯留部10では、貯留部10と上流側排水管6Aとが軸線を互いに平行にして配置されているので、貯留部10の容量が確保されるとともに、排水システム全体の省スペース化が図られる。また、排水の排出高さも従来と同様にし、下流側排水管を下水本管4に接続することができる。マンションBの改修時にも、上記排水システムを使用することができる。   Further, in the storage unit 10 of the drainage system according to the third embodiment, the storage unit 10 and the upstream drain pipe 6A are arranged with the axes parallel to each other, so that the capacity of the storage unit 10 is ensured, Space saving of the entire drainage system is achieved. Further, the discharge height of the drainage is made the same as the conventional one, and the downstream drainage pipe can be connected to the sewage main pipe 4. The drainage system can also be used when the apartment B is renovated.

(第四実施形態)
次いで、本発明を適用した第四実施形態について説明する。
なお、以下では、第四実施形態に係る排水システムの構成要素及び排水方法において、第一実施形態に係る排水システム1Aの構成要素及び排水方法と同一の構成要素及び工程については、その説明を省略し、排水システム1Aの構成要素及び排水方法と異なる点について説明する。また、図9及び図10に示す第四実施形態に係る排水システムの構成要素において、排水システム1Aの構成要素と同一の構成要素については、同一の符号を付し、その説明を省略する。
(Fourth embodiment)
Next, a fourth embodiment to which the present invention is applied will be described.
In the following, in the components and drainage method of the drainage system according to the fourth embodiment, the description of the same components and steps as those of the drainage system 1A according to the first embodiment is omitted. The differences between the components of the drainage system 1A and the drainage method will be described. Moreover, in the component of the drainage system which concerns on 4th embodiment shown in FIG.9 and FIG.10, about the component same as the component of drainage system 1A, the same code | symbol is attached | subjected and the description is abbreviate | omitted.

図9は、第四実施形態に係る排水システム1Dの断面図である。図10は、排水システム1Dの貯留部10の側面図である。なお、第四実施形態の排水システム1Dにおいては、逆流防止弁8は、基礎付近のマンションB内部の位置に設けられている。
図9及び図10に示すように、上流側排水管6Aには、上り勾配の上流側分岐管(分岐管)40及び下流側分岐管(分岐管)42が設けられている。そして、流入流出口(流入口、流出口)21A及び流入流出口(流入口、流出口)21Bが貯水槽12の下部に形成されている。
上流側分岐管40及び下流側分岐管42は、それぞれ分岐サドルとともに、貯留部10の貯水槽12の底部に接続されている。また、貯留部10の貯水槽12の上側には、通気管24が接続され、掃除口26が形成されている。なお、上流側分岐管40は省略してもよい。
FIG. 9 is a cross-sectional view of a drainage system 1D according to the fourth embodiment. FIG. 10 is a side view of the storage unit 10 of the drainage system 1D. In the drainage system 1D of the fourth embodiment, the backflow prevention valve 8 is provided at a position inside the apartment B near the foundation.
As shown in FIGS. 9 and 10, the upstream drain pipe 6 </ b> A is provided with an upstream branch pipe (branch pipe) 40 and a downstream branch pipe (branch pipe) 42 having an upward slope. An inlet / outlet (inlet / outlet) 21 </ b> A and an inlet / outlet (inlet / outlet) 21 </ b> B are formed in the lower part of the water storage tank 12.
The upstream branch pipe 40 and the downstream branch pipe 42 are connected to the bottom of the water storage tank 12 of the storage section 10 together with the branch saddle. In addition, a ventilation pipe 24 is connected to the upper side of the water storage tank 12 of the storage unit 10, and a cleaning port 26 is formed. The upstream branch pipe 40 may be omitted.

排水システム1Dにおける通常時及び非常時の排水方法は、基本的には、排水システム1Aにおける通常時及び非常時の排水方法と同様である。
非常時において、逆流防止弁8と貯留部10との間の上流側排水管6A内の容量以上の排水は、先ず、排水器具2から上流側排水管6A及び下流側分岐管42の内部を通って、流入流出口21Bから貯水槽12の内部に流入する。その後、排水は、より上流側の上流側排水管6A及び上流側分岐管40の内部を通って、流入流出口21Bから貯水槽12の内部に流入する。従って、排水の水位が貯水槽12の深さ方向に上昇しながら、排水が貯水槽12の内部に貯留される。
非常時終了後には、貯水槽12の内部に貯留されていた排水は上流側分岐管40の流入流出口21A及び下流側分岐管42の流入流出口21Bからこれらの分岐管内を通って、上流側排水管6Aに流出し、逆流防止弁8及び下流側排水管6Bを通って、速やかに、下水本管4に流れる。
The normal and emergency drainage methods in the drainage system 1D are basically the same as the normal and emergency drainage methods in the drainage system 1A.
In an emergency, drainage exceeding the capacity in the upstream drain pipe 6A between the backflow prevention valve 8 and the reservoir 10 first passes through the drainage device 2 and the inside of the upstream drain pipe 6A and the downstream branch pipe 42. Then, it flows into the water storage tank 12 from the inflow / outflow port 21B. Thereafter, the wastewater flows into the water storage tank 12 from the inflow / outflow port 21 </ b> B through the upstream drainage pipe 6 </ b> A and the upstream branch pipe 40 on the upstream side. Accordingly, the waste water is stored inside the water storage tank 12 while the water level of the waste water rises in the depth direction of the water storage tank 12.
After the end of the emergency, the wastewater stored in the water storage tank 12 passes from the inflow / outflow port 21A of the upstream branch pipe 40 and the inflow / outflow port 21B of the downstream branch pipe 42 to the upstream side. It flows out into the drain pipe 6A, and immediately flows into the sewage main pipe 4 through the backflow prevention valve 8 and the downstream drain pipe 6B.

以上説明した第四実施形態に係る排水システム1Dによれば、第一実施形態に係る排水システム1Aと同様に、集中豪雨や災害発生等の非常時に特別な操作を必要とせず、一時的に排水を貯留部10等に貯留することができ、且つ、非常時終了後にポンプアップ用の装置を使用することなく、簡単な構造で、非常時に貯留していた排水を下水本管4に排出することができる。   According to the drainage system 1D according to the fourth embodiment described above, similarly to the drainage system 1A according to the first embodiment, no special operation is required in the event of an emergency such as torrential rain or disaster occurrence, and the drainage system is temporarily drained. Can be stored in the storage unit 10 etc., and the wastewater stored in an emergency can be discharged to the sewage main pipe 4 with a simple structure without using a pump-up device after the end of the emergency. Can do.

また、排水システム1Dでは、貯留部10が上流側排水管6Aの上方に配置され、貯留部10の下部に上流側分岐管40及び下流側分岐管42が接続されているので、通常時には排水が貯留部10に流入しない。そのため、貯留部10でのごみ詰まりの発生や汚物・雑物の堆積をより抑制することができる。また、排水の排出高さも従来と同様にし、下流側排水管6Bを下水本管4に接続することができる。即ち、既設の排水管に貯留部10を追加設置し易い。排水システム1Dの深さ方向の寸法を抑えることもできる。さらに、マンションBの改修時にも、排水システム1Dを使用することができる。なお、第四実施形態では流入流出口21A,21Bを備えているが、通気管24を備えている場合には、いずれか一方でも排水の流入・流出が可能であるため、流入流出口21A,21Bの何れか一方のみを備える構成としてもよい。   Further, in the drainage system 1D, the storage section 10 is disposed above the upstream drain pipe 6A, and the upstream branch pipe 40 and the downstream branch pipe 42 are connected to the lower part of the storage section 10, so that the drainage is normally discharged. It does not flow into the reservoir 10. Therefore, generation | occurrence | production of the garbage clogging in the storage part 10 and accumulation of filth and a miscellaneous substance can be suppressed more. Further, the discharge height of the drainage is the same as that in the conventional case, and the downstream drainage pipe 6B can be connected to the sewage main pipe 4. That is, it is easy to additionally install the storage unit 10 in the existing drain pipe. The depth direction dimension of the drainage system 1D can also be suppressed. Furthermore, the drainage system 1D can be used when the apartment B is renovated. In the fourth embodiment, the inflow / outflow ports 21A and 21B are provided. However, in the case where the vent pipe 24 is provided, any one of the inflow / outflows of the drainage can be used. It is good also as a structure provided only with either one of 21B.

(第五実施形態)
次いで、本発明を適用した第五実施形態について説明する。
なお、以下では、第五実施形態に係る排水システムの構成要素及び排水方法において、第一実施形態に係る排水システム1Aの構成要素及び排水方法と同一の構成要素及び工程については、その説明を省略し、排水システム1Aの構成要素及び排水方法と異なる点について説明する。また、図11から図13に示す第五実施形態に係る排水システムの構成要素において、排水システム1Aの構成要素と同一の構成要素については、同一の符号を付し、その説明を省略する。
(Fifth embodiment)
Next, a fifth embodiment to which the present invention is applied will be described.
In the following description, in the components and drainage method of the drainage system according to the fifth embodiment, descriptions of the same components and steps as those of the drainage system 1A according to the first embodiment are omitted. The differences between the components of the drainage system 1A and the drainage method will be described. Moreover, in the component of the drainage system which concerns on 5th embodiment shown in FIGS. 11-13, about the component same as the component of drainage system 1A, the same code | symbol is attached | subjected and the description is abbreviate | omitted.

図11は、第五実施形態に係る排水システム1Eの側方からの断面図である。図12は、排水システム1Eの上方からの断面図である。図13は、排水システム1Eの貯留部10の側面図である。なお、第五実施形態の排水システム1Eにおいては、逆流防止弁8は、基礎付近のマンションB内部の位置に設けられている。   FIG. 11 is a cross-sectional view from the side of the drainage system 1E according to the fifth embodiment. FIG. 12 is a cross-sectional view from above of the drainage system 1E. FIG. 13 is a side view of the storage unit 10 of the drainage system 1E. In the drainage system 1E of the fifth embodiment, the backflow prevention valve 8 is provided at a position inside the apartment B near the foundation.

図11から図13に示すように、上流側排水管6Aには、上り勾配の上流側分岐管(分岐管、通気兼流入管)50及び下流側分岐管(分岐管)52が設けられている。図12に示すように、下流側分岐管(分岐管)52は、貯留部10の貯水槽12の蓋部15Bの閉塞板16(側部)に接続されるとともに、開閉弁54を備えている。
上流側分岐管50は、上流側排水管6Aから上方に立ち上がり、下流側へ屈曲した後、立ち下がって貯留部10の貯水槽12の上流側の上面であって、略最上部に補強部材とともに接続されている。一方、下流側分岐管52は、下り勾配で配置されるとともに、図13に示すように、貯留部10の貯水槽12の下流側底部から下流方向に延在し、逆流防止弁8よりも上流側の上流側排水管6Aに接続されている。
また、貯留部10の貯水槽12の内側の上面はトラップ20の封水面22より低い位置に配置されている。
As shown in FIG. 11 to FIG. 13, the upstream drain pipe 6 </ b> A is provided with an upstream branch pipe (branch pipe, ventilation / inflow pipe) 50 and a downstream branch pipe (branch pipe) 52 having an upward slope. . As shown in FIG. 12, the downstream branch pipe (branch pipe) 52 is connected to the closing plate 16 (side part) of the lid part 15 </ b> B of the water storage tank 12 of the storage part 10 and includes an opening / closing valve 54. .
The upstream branch pipe 50 rises upward from the upstream drain pipe 6 </ b> A, bends downstream, and then falls and is an upper surface on the upstream side of the water storage tank 12 of the storage unit 10, with a reinforcing member substantially at the top. It is connected. On the other hand, the downstream branch pipe 52 is arranged with a downward slope, and as shown in FIG. 13, extends downstream from the downstream bottom of the water storage tank 12 of the reservoir 10 and is upstream of the backflow prevention valve 8. Is connected to the upstream drain pipe 6A.
Further, the upper surface inside the water storage tank 12 of the storage unit 10 is arranged at a position lower than the sealing surface 22 of the trap 20.

貯水槽12においては、上流側の蓋部15Aは、排水システム1Aの貯留部10を構成する貯水槽12の蓋部15Aと同様の構成になっている。一方、下流側の蓋部15Bは、排水システム1Bの貯留部10を構成する貯水槽12の蓋部15Bと同様の構成になっている。
また、管体14の下流側の上面には、掃除口26が管体14の周方向外側に突出するように設けられている。
In the water storage tank 12, the lid 15A on the upstream side has the same configuration as the lid 15A of the water storage tank 12 that constitutes the storage 10 of the drainage system 1A. On the other hand, the lid portion 15B on the downstream side has the same configuration as the lid portion 15B of the water storage tank 12 constituting the storage portion 10 of the drainage system 1B.
A cleaning port 26 is provided on the upper surface on the downstream side of the tube body 14 so as to protrude outward in the circumferential direction of the tube body 14.

排水システム1Eにおける通常時及び非常時の排水方法は、基本的には、排水システム1Aにおける通常時及び非常時の排水方法と同様である。
非常時では、開閉弁54を閉めている場合には、逆流防止弁8と貯留部10との間の上流側排水管6A内の容量以上の排水は、先ず、下流側の上流側排水管6A及び下流側分岐管52の内部を通って、貯水槽12の方に排水が流れる。開閉弁54を閉めているので、排水が貯水槽12の内部へ流入しない。その後、排水が排水器具2から上流側排水管6A及び上流側分岐管50の内部を通って、流入口18Aから貯水槽12の内部に流入する。
非常時終了後には、開閉弁54を開けることで、貯水槽12の内部に貯留されていた排水は流出口18Bから下流側分岐管52の内部を通って、上流側排水管6Aに流出し、逆流防止弁8及び下流側排水管6Bを通って、速やかに、下水本管4に流れる。
The normal and emergency drainage methods in the drainage system 1E are basically the same as the normal and emergency drainage methods in the drainage system 1A.
In an emergency, when the on-off valve 54 is closed, drainage exceeding the capacity in the upstream drain pipe 6A between the backflow prevention valve 8 and the reservoir 10 is first of all the downstream upstream drain pipe 6A. And the waste water flows toward the water storage tank 12 through the inside of the downstream branch pipe 52. Since the on-off valve 54 is closed, the drainage does not flow into the water storage tank 12. Thereafter, the wastewater flows from the drainage device 2 through the upstream drain pipe 6 </ b> A and the upstream branch pipe 50 and flows into the water storage tank 12 through the inlet 18 </ b> A.
After the emergency end, by opening the on-off valve 54, the wastewater stored in the water storage tank 12 flows from the outlet 18B through the downstream branch pipe 52 to the upstream drain pipe 6A. It flows to the sewage main pipe 4 promptly through the backflow prevention valve 8 and the downstream drain pipe 6B.

以上説明した第四実施形態に係る排水システム1Eによれば、第一実施形態に係る排水システム1Aと同様に、集中豪雨や災害発生等の非常時に特別な操作を必要とせず、一時的に排水を貯留部10等に貯留することができ、且つ、非常時終了後にポンプアップ用の装置を使用することなく、最低限の弁操作だけで非常時に貯留していた排水を下水本管4に排出することができる。前記弁操作は、例えば貯留部10からの排水時は弁を開き、排水後に弁を閉じる操作を示す。   According to the drainage system 1E according to the fourth embodiment described above, similarly to the drainage system 1A according to the first embodiment, no special operation is required in an emergency such as a heavy rain or a disaster, and the drainage system is temporarily drained. Can be stored in the storage unit 10 and the wastewater stored in an emergency is discharged to the sewage main pipe 4 with a minimum valve operation without using a pump-up device after the end of the emergency. can do. The valve operation indicates an operation of opening the valve when draining from the storage unit 10 and closing the valve after draining, for example.

また、排水システム1Eでは、貯留部10が上流側排水管6Aの側方に配置され、その部分の上流側排水管6Aの高さと貯留部10の高さが略同等となる。また、排水システム1Eの上流側の厚み寸法を抑えることができる。
また、排水システム1Eによれば、逆流防止弁8の作動後に排水器具2からの排水で上流側排水管6A内が満水になった後に、排水が上流側分岐管50を通って貯留部10に流入し、貯留部10に貯留される。また、上流側分岐管50が上流側排水管6Aから略垂直に立ち上がっているので、通常時には貯留部10に排水が流れ込まず、非常時でも短時間集中豪雨等ならば貯留部10への流入がないため、貯留部10でのごみ詰まりの発生や汚物・雑物の堆積を抑制することができる。
Moreover, in the drainage system 1E, the storage part 10 is arrange | positioned at the side of 6 A of upstream drainage pipes, and the height of the upstream drainage pipe 6A of the part and the height of the storage part 10 become substantially equivalent. Moreover, the thickness dimension of the upstream of the drainage system 1E can be suppressed.
Further, according to the drainage system 1E, after the backflow prevention valve 8 is operated, the drainage from the drainage device 2 becomes full in the upstream drainage pipe 6A, and then the drainage passes through the upstream branch pipe 50 to the storage unit 10. It flows in and is stored in the storage unit 10. In addition, since the upstream branch pipe 50 rises substantially vertically from the upstream drain pipe 6A, the drainage does not flow into the storage section 10 at normal times, and in the event of an emergency rain for a short period of time, inflow into the storage section 10 occurs. Therefore, generation | occurrence | production of the clogging in the storage part 10 and accumulation | storage of a filth and a miscellaneous matter can be suppressed.

以上、本発明の好ましい実施形態について詳述したが、本発明は係る特定の実施形態に限定されるものではなく、特許請求の範囲内に記載された本発明の要旨の範囲内において、種々の変形・変更が可能である。
たとえば、上記の第一実施形態の排水システム1Aについては貯留部10が上流側排水管6Aとは別体であるものとして説明したが、第三実施形態の排水システムの貯留部10のように、貯留部10は上流側排水管6Aと一体的に形成されていてもよい。
また、貯水槽12や貯水ます30の選択、流入口18A及び流出口18Bの設置位置等は上記の実施形態で説明した例に限定されず、適宜変更することができる。
The preferred embodiments of the present invention have been described in detail above. However, the present invention is not limited to the specific embodiments, and various modifications are possible within the scope of the gist of the present invention described in the claims. Deformation / change is possible.
For example, for the drainage system 1A of the first embodiment described above, the storage unit 10 has been described as being separate from the upstream drainage pipe 6A, but like the storage unit 10 of the drainage system of the third embodiment, The reservoir 10 may be formed integrally with the upstream drain pipe 6A.
Moreover, the selection of the water storage tank 12 and the water storage tank 30, the installation positions of the inlet 18A and the outlet 18B, etc. are not limited to the examples described in the above embodiment, and can be changed as appropriate.

1,1A,1B,1D,1E…排水システム、2…排水器具、4…下水本管、6…排水管、6A…上流側排水管、6B…下流側排水管、8…逆流防止弁、10…貯留部、18A…流入口、18B…流出口、20…トラップ、21A,21B…流入流出口(流入口、流出口)、22…封水面、24…通気管、40…上流側分岐管(分岐管)、42…下流側分岐管(分岐管)、50…上流側分岐管(分岐管、通気兼流入管)、52…下流側分岐管(分岐管)、54…開閉弁   DESCRIPTION OF SYMBOLS 1,1A, 1B, 1D, 1E ... Drainage system, 2 ... Drainage device, 4 ... Sewage main pipe, 6 ... Drainage pipe, 6A ... Upstream drainage pipe, 6B ... Downstream drainage pipe, 8 ... Backflow prevention valve, 10 DESCRIPTION OF SYMBOLS ... Storage part, 18A ... Inlet, 18B ... Outlet, 20 ... Trap, 21A, 21B ... Inflow / outlet (inlet / outlet), 22 ... Sealed surface, 24 ... Vent pipe, 40 ... Upstream branch pipe ( Branch pipe), 42 ... downstream branch pipe (branch pipe), 50 ... upstream branch pipe (branch pipe, ventilation / inflow pipe), 52 ... downstream branch pipe (branch pipe), 54 ... on-off valve

Claims (6)

建物の排水器具と下水本管との間に設けられる排水システムであって、
前記排水器具と前記下水本管とを接続する排水管と、
前記排水管に設けられた逆流防止弁と、
前記排水器具と前記逆流防止弁との間に位置する上流側排水管に設けられた貯留部と、を備え、
前記貯留部の内側の底部は、前記逆流防止弁と前記下水本管との間に位置する下流側排水管の内周面の底端よりも高い位置に配置され、
前記貯留部は水平、又は、上流から下流に向かうに従い、下向きとなる下り勾配に配置され、
前記貯留部の内側の上面は前記排水器具のトラップの封水面よりも低い位置に配置されている排水システム。
A drainage system provided between a building drainage device and a sewage main,
A drain pipe connecting the drainage device and the sewage main pipe,
A check valve provided in the drain pipe;
A reservoir provided in an upstream drain pipe located between the drainage device and the backflow prevention valve;
The bottom part inside the storage part is disposed at a position higher than the bottom end of the inner peripheral surface of the downstream drain pipe located between the backflow prevention valve and the sewage main pipe,
The storage part is arranged in a downward slope that is downward, as it goes horizontally or from upstream to downstream,
The drainage system by which the upper surface inside the said storage part is arrange | positioned in the position lower than the sealing surface of the trap of the said drainage instrument.
前記貯留部の上流側の上端部には、前記貯留部の内部に前記排水器具からの排水を流入させる流入口が形成され、
前記貯留部の下流側の底端部には、前記貯留部の内部から前記排水を流出させる流出口が形成されている請求項1に記載の排水システム。
At the upper end on the upstream side of the storage part, an inflow port is formed to allow the drainage from the drainage device to flow into the storage part,
The drainage system according to claim 1, wherein an outlet for allowing the drainage to flow out from the inside of the reservoir is formed at a bottom end portion on the downstream side of the reservoir.
前記貯留部は前記上流側排水管の長手方向の一部を径方向に拡大させることで設けられ、
前記貯留部をなす拡大部の上側に通気管が接続されている請求項1に記載の排水システム。
The storage section is provided by expanding a part of the longitudinal direction of the upstream drain pipe in the radial direction,
The drainage system according to claim 1, wherein a vent pipe is connected to an upper side of the enlarged portion forming the storage portion.
前記上流側排水管には、上り勾配の分岐管が設けられ、
前記分岐管は前記貯留部の底部に接続され、前記貯留部の上側に通気管が接続されている請求項1に記載の排水システム。
The upstream drain pipe is provided with an upslope branch pipe,
The drainage system according to claim 1, wherein the branch pipe is connected to a bottom portion of the storage section, and a vent pipe is connected to the upper side of the storage section.
前記上流側排水管には、上り勾配の分岐管が設けられ、
前記分岐管は、開閉弁を備えると共に、前記貯留部は、前記上流側排水管の側方又は上方に設けられ、
前記分岐管は、一端が前記上流側排水管に接続され、他端が前記一端の接続部分よりも上流側で前記貯留部の下流側端部に接続され、
前記貯留部の略最上部に通気兼流入管が接続されている請求項1に記載の排水システム。
The upstream drain pipe is provided with an upslope branch pipe,
The branch pipe includes an on-off valve, and the storage portion is provided on the side or upper side of the upstream drain pipe,
One end of the branch pipe is connected to the upstream drain pipe, and the other end is connected to the downstream end of the storage section on the upstream side of the connection portion of the one end.
The drainage system according to claim 1, wherein a ventilation and inflow pipe is connected to a substantially uppermost part of the storage part.
前記貯留部の内側の上面の高さは、前記トラップの封水面の高さより低い位置である請求項5に記載の排水システム。

The drainage system according to claim 5, wherein a height of an upper surface inside the storage unit is lower than a height of a sealing surface of the trap.

JP2015223435A 2015-11-13 2015-11-13 Drainage system Active JP6713264B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015223435A JP6713264B2 (en) 2015-11-13 2015-11-13 Drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015223435A JP6713264B2 (en) 2015-11-13 2015-11-13 Drainage system

Publications (2)

Publication Number Publication Date
JP2017089316A true JP2017089316A (en) 2017-05-25
JP6713264B2 JP6713264B2 (en) 2020-06-24

Family

ID=58767309

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015223435A Active JP6713264B2 (en) 2015-11-13 2015-11-13 Drainage system

Country Status (1)

Country Link
JP (1) JP6713264B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020020172A (en) * 2018-08-01 2020-02-06 積水化学工業株式会社 Drain pipe and rainwater drain device
JP2020048946A (en) * 2018-09-27 2020-04-02 アロン化成株式会社 Toilet system for disaster time
CN111677062A (en) * 2020-06-17 2020-09-18 中国建筑设计研究院有限公司 Building drainage system
CN111677081A (en) * 2020-06-17 2020-09-18 中国建筑设计研究院有限公司 Fault alarm non-return drainage system and non-return drainage method
CN111677085A (en) * 2020-06-17 2020-09-18 中国建筑设计研究院有限公司 Downstream pipeline backwater alarming non-return drainage system and non-return drainage method
JP2021095673A (en) * 2019-12-13 2021-06-24 株式会社ブリヂストン Pipe trap, and waste water pipe structure
CN114164847A (en) * 2021-11-11 2022-03-11 北京城建集团有限责任公司 Emergency drainage system and method for underground building
JP7249608B1 (en) 2022-09-30 2023-03-31 良彦 田中 drainage system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0725055U (en) * 1993-10-14 1995-05-12 弘進ゴム株式会社 Rainwater storage device
JP2003206557A (en) * 2001-11-07 2003-07-25 Maezawa Kasei Ind Co Ltd Drain pipe device
JP2004084993A (en) * 2002-08-23 2004-03-18 Hitachi Plant Eng & Constr Co Ltd Exhaust device
JP2005188060A (en) * 2003-12-24 2005-07-14 Sekisui Chem Co Ltd Rainwater storage system for dwelling house
JP2006257695A (en) * 2005-03-16 2006-09-28 Shinko Kenzai Kk Reverse flow prevention device
JP2007332634A (en) * 2006-06-14 2007-12-27 Taisei Corp Exhausting/scavenging apparatus in draining facility
JP2009299308A (en) * 2008-06-11 2009-12-24 Sekisui Chem Co Ltd Back flow preventing structure and drainage facility
JP2014066097A (en) * 2012-09-27 2014-04-17 Kubota-C. I Co Ltd Drainage system for building

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0725055U (en) * 1993-10-14 1995-05-12 弘進ゴム株式会社 Rainwater storage device
JP2003206557A (en) * 2001-11-07 2003-07-25 Maezawa Kasei Ind Co Ltd Drain pipe device
JP2004084993A (en) * 2002-08-23 2004-03-18 Hitachi Plant Eng & Constr Co Ltd Exhaust device
JP2005188060A (en) * 2003-12-24 2005-07-14 Sekisui Chem Co Ltd Rainwater storage system for dwelling house
JP2006257695A (en) * 2005-03-16 2006-09-28 Shinko Kenzai Kk Reverse flow prevention device
JP2007332634A (en) * 2006-06-14 2007-12-27 Taisei Corp Exhausting/scavenging apparatus in draining facility
JP2009299308A (en) * 2008-06-11 2009-12-24 Sekisui Chem Co Ltd Back flow preventing structure and drainage facility
JP2014066097A (en) * 2012-09-27 2014-04-17 Kubota-C. I Co Ltd Drainage system for building

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7136624B2 (en) 2018-08-01 2022-09-13 積水化学工業株式会社 Drains and storm drains
JP2020020172A (en) * 2018-08-01 2020-02-06 積水化学工業株式会社 Drain pipe and rainwater drain device
JP2020048946A (en) * 2018-09-27 2020-04-02 アロン化成株式会社 Toilet system for disaster time
JP7108510B2 (en) 2018-09-27 2022-07-28 アロン化成株式会社 Emergency toilet system
JP2021095673A (en) * 2019-12-13 2021-06-24 株式会社ブリヂストン Pipe trap, and waste water pipe structure
CN111677081B (en) * 2020-06-17 2021-07-20 中国建筑设计研究院有限公司 Fault alarm non-return drainage system and non-return drainage method
CN111677085A (en) * 2020-06-17 2020-09-18 中国建筑设计研究院有限公司 Downstream pipeline backwater alarming non-return drainage system and non-return drainage method
CN111677085B (en) * 2020-06-17 2021-09-10 中国建筑设计研究院有限公司 Downstream pipeline backwater alarming non-return drainage system and non-return drainage method
CN111677062B (en) * 2020-06-17 2021-09-14 中国建筑设计研究院有限公司 Building drainage system
CN111677081A (en) * 2020-06-17 2020-09-18 中国建筑设计研究院有限公司 Fault alarm non-return drainage system and non-return drainage method
CN111677062A (en) * 2020-06-17 2020-09-18 中国建筑设计研究院有限公司 Building drainage system
CN114164847A (en) * 2021-11-11 2022-03-11 北京城建集团有限责任公司 Emergency drainage system and method for underground building
CN114164847B (en) * 2021-11-11 2023-09-15 北京城建集团有限责任公司 Emergency drainage system and method for underground building
JP7249608B1 (en) 2022-09-30 2023-03-31 良彦 田中 drainage system
JP2024051344A (en) * 2022-09-30 2024-04-11 良彦 田中 Drainage System

Also Published As

Publication number Publication date
JP6713264B2 (en) 2020-06-24

Similar Documents

Publication Publication Date Title
JP6713264B2 (en) Drainage system
JP6085135B2 (en) Drainage system for buildings and drainage basin used therefor
CA2678710C (en) Sewer overflow relief device
CN101821461B (en) Cistern
US9822520B2 (en) Toilet with flushable overflow drain
JP2004293223A (en) Piping structure for temporary toilet and its system
JP6949759B2 (en) Plumbing equipment for temporary toilets
JP2014070335A (en) Movable type toilet device
JP5716122B2 (en) Sewage discharge system
JP6333526B2 (en) Piping unit for temporary toilet installation
JP5997997B2 (en) Building drainage system
JP5324853B2 (en) Siphon drainage system
CN112031084A (en) Building pre-buried swirler for drainage
CN205206021U (en) Intelligent lifting means of sewage integration
CN103628556A (en) Urban and rural high-pressure water discharging system capable of preventing back flow
JP2018204197A (en) Catch basin
CN207700292U (en) Same-layer drainage system based on HDPE
JP6320597B2 (en) Drain pipe piping structure
JP2009150220A (en) Drain pipe structure
JPH0612570U (en) Sewage crushing pumping device
CN206360053U (en) A kind of plumbing integration module
JP2022090943A (en) Siphon drainage system and construction method thereof
US304841A (en) meyer
MX2007006242A (en) Toilet overflow control.
Bachmann et al. I Resi

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151210

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180608

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190328

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190402

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190528

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20191023

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20191212

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200512

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200603

R150 Certificate of patent or registration of utility model

Ref document number: 6713264

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250