JP2017077092A - Utility grid interconnection system - Google Patents

Utility grid interconnection system Download PDF

Info

Publication number
JP2017077092A
JP2017077092A JP2015203375A JP2015203375A JP2017077092A JP 2017077092 A JP2017077092 A JP 2017077092A JP 2015203375 A JP2015203375 A JP 2015203375A JP 2015203375 A JP2015203375 A JP 2015203375A JP 2017077092 A JP2017077092 A JP 2017077092A
Authority
JP
Japan
Prior art keywords
power
converter
storage battery
switch
connection switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2015203375A
Other languages
Japanese (ja)
Inventor
渡辺 均
Hitoshi Watanabe
均 渡辺
直晃 荻野
Naoaki Ogino
直晃 荻野
内田 丈
Jo Uchida
丈 内田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maxell Holdings Ltd
Original Assignee
Hitachi Maxell Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Maxell Ltd filed Critical Hitachi Maxell Ltd
Priority to JP2015203375A priority Critical patent/JP2017077092A/en
Publication of JP2017077092A publication Critical patent/JP2017077092A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To facilitate the accumulation of electricity without wasting power even in such a situation that the output of the power to a power system is suppressed.SOLUTION: A utility grid interconnection system 10 comprises: a power conditioner 6 connected to a power-generation part 1 operable to generate a DC power; a DC connection switch 5; a storage battery 2; a DC/DC converter 3; and a control part 15. The DC connection switch 5 is connected to a node in a DC path of the power conditioner 6. The storage battery 2 is connected to the node of the DC path of the power conditioner 6 through the DC connection switch 5 and the DC/DC converter 3. When receives an instruction for suppressing the power output to a power system 9, the control part 15 turns on the DC connection switch 5.SELECTED DRAWING: Figure 1

Description

本発明は、電力系統と発電装置を接続する系統連系システムに関する。   The present invention relates to a grid interconnection system that connects a power system and a power generation device.

近年、電力系統により供給される電力を利用する住宅等の電力需要施設において、太陽光発電装置等の発電設備が設けられるようになっている。例えば、太陽光発電装置で発電された電力は、パワーコンディショナにより交流の電力に変換された後、宅内家電等の負荷に供給されたり、電力系統へ戻されたりする。   2. Description of the Related Art In recent years, power generation facilities such as solar power generation devices have been provided in power demand facilities such as houses that use power supplied by a power system. For example, the power generated by the solar power generation device is converted into AC power by a power conditioner, and then supplied to a load such as a home appliance or returned to the power system.

一例として、特開2011−10412号公報(特許文献1)では、商用系統の給電ラインが停電しても、蓄電池及び太陽電池により重要負荷に継続して電力供給を行うことができる自立運転制御システムが開示されている。   As an example, Japanese Patent Application Laid-Open No. 2011-10412 (Patent Document 1) discloses a self-sustained operation control system capable of continuously supplying power to an important load by a storage battery and a solar battery even if a power supply line of a commercial system fails. Is disclosed.

また、特開2011―229368号公報(特許文献2)には、蓄電池の直流の電力を交流の電力に変換して各負荷へ出力する双方向DCAC変換部を含む制御装置が開示されている。双方向DCAC変換部と各負荷との間の配線に系統が接続される。この制御装置は、系統からの配線に流れる電流量に基づいて双方向DCAC変換器の交流電力の出力量を増減することにより、電力が蓄電池から系統へ流れ出ることを防止する。これは、蓄電池の電力を電力系統に戻すことが認められていないという制度上の問題に対処する技術である。   Japanese Patent Application Laid-Open No. 2011-229368 (Patent Document 2) discloses a control device including a bidirectional DCAC conversion unit that converts DC power of a storage battery into AC power and outputs the AC power to each load. A system is connected to the wiring between the bidirectional DCAC converter and each load. This control device prevents the electric power from flowing from the storage battery to the system by increasing or decreasing the output amount of the AC power of the bidirectional DCAC converter based on the amount of current flowing through the wiring from the system. This is a technology that addresses the institutional problem that it is not allowed to return the storage battery power to the power grid.

特開2011−10412号公報JP 2011-10412 A 特開2011―229368号公報JP 2011-229368 A

上記特開2011−10412号公報(特許文献1)に記載の従来技術では、商用系統の給電ラインに電力スイッチを介して重要負荷が接続される。電力スイッチと重要負荷との接続ラインにインバータを介して蓄電池が接続され、この接続ラインにさらに、パワーコンディショナを介して太陽光電池が接続される。この構成では、太陽光電池から蓄電池へ至る経路には、パワーコンディショナとインバータが配置される。そのため、太陽光電池から蓄電池へ充電しようとすると、太陽光電池の直流電力をパワーコンディショナで交流電力に変換し、この交流電力を直流に変換して蓄電池へ供給する必要がある。ここで、変換ロスが生じる。また、パワーコンディショナから負荷へ供給する電力には上限が設定されることがある。発電された電力のうち上限を超える電力は捨てられる。そのため、太陽光電池から蓄電池への電力供給では、エネルギー効率が低下する。   In the prior art described in Japanese Patent Application Laid-Open No. 2011-10412 (Patent Document 1), an important load is connected to a commercial power supply line via a power switch. A storage battery is connected to a connection line between the power switch and the important load via an inverter, and a solar battery is further connected to the connection line via a power conditioner. In this configuration, a power conditioner and an inverter are arranged on the path from the solar battery to the storage battery. Therefore, when it is going to charge from a solar cell to a storage battery, it is necessary to convert the direct current power of a solar cell into alternating current power with a power conditioner, and to convert this alternating current power into direct current and to supply to a storage battery. Here, conversion loss occurs. Moreover, an upper limit may be set for the power supplied from the power conditioner to the load. Of the generated power, the power exceeding the upper limit is discarded. For this reason, energy efficiency is reduced in the power supply from the solar battery to the storage battery.

また、上記従来技術では、電力系統への電力出力(逆潮流)を抑制すべき状況が発生した場合に、太陽光電池で発電された電力のうち負荷で消費できない余剰分を有効に利用することは想定されていない。そのため、太陽光電池で発電された電力に余剰があるものの、電力系統への出力ができない場合は、余剰分を捨てることになる。今後、住宅における発電装置の普及が進むと、電力系統への電力供給過剰が発生しやすくなる。その結果、例えば、各住宅の太陽光発電等から電力系統への出力を抑制しなければいけない状況が発生しやすくなる。   Moreover, in the said prior art, when the condition which should suppress the electric power output (reverse power flow) to an electric power grid | system has occurred, the surplus part which cannot be consumed with load among the electric power generated with the photovoltaic cell is used effectively. It is not assumed. For this reason, when there is a surplus in the power generated by the solar battery, but the power cannot be output to the power system, the surplus is discarded. In the future, as the power generation devices in homes become more widespread, excessive power supply to the power system tends to occur. As a result, for example, a situation in which the output from the solar power generation or the like of each house to the power system is likely to occur.

そこで、本願は、電力系統への電力出力が抑制される状況においても、電力を捨てずに効率よく蓄電することが容易にできる系統連系システムを開示する。   Therefore, the present application discloses a grid interconnection system that can easily store power efficiently without discarding power even in a situation where power output to the power system is suppressed.

本発明の実施形態における系統連系システムは、パワーコンディショナと、直流接続スイッチと、蓄電池と、DC/DC変換器と、制御部とを備える。前記パワーコンディショナは、直流電力を発電する発電部に接続され、前記発電部で発電された直流電力を交流電力に変換し、変換した交流電力を電力系統及び/又は負荷に出力する。前記直流接続スイッチは、前記パワーコンディショナの直流経路におけるノードに接続される。前記蓄電池は、前記直流接続スイッチを介して、前記パワーコンディショナの前記直流経路のノードに接続される。前記DC/DC変換器は、前記蓄電池と前記直流接続スイッチとの間に接続される。前記制御部は、前記電力系統への電力出力の抑制指令を外部機器から受けた場合に前記直流接続スイッチをオンにして、前記DC/DC変換器を制御することにより、前記発電部で発電された電力の少なくとも一部を前記蓄電池に充電可能とする。   The grid connection system in the embodiment of the present invention includes a power conditioner, a DC connection switch, a storage battery, a DC / DC converter, and a control unit. The power conditioner is connected to a power generation unit that generates DC power, converts the DC power generated by the power generation unit into AC power, and outputs the converted AC power to a power system and / or a load. The DC connection switch is connected to a node in a DC path of the power conditioner. The storage battery is connected to a node of the DC path of the power conditioner via the DC connection switch. The DC / DC converter is connected between the storage battery and the DC connection switch. When the control unit receives a command to suppress power output to the power system from an external device, the control unit turns on the DC connection switch to control the DC / DC converter, thereby generating power in the power generation unit. The storage battery can be charged with at least part of the electric power.

本願開示によれば、電力系統への電力出力が抑制される状況においても、電力を捨てずに蓄電することが容易になる。   According to the present disclosure, it is easy to store power without throwing away power even in a situation where power output to the power system is suppressed.

図1は、実施形態1における系統連系システムの構成例を示す図である。FIG. 1 is a diagram illustrating a configuration example of a grid interconnection system according to the first embodiment. 図2は、太陽光パネルで発電した電力を電力系統へ出力する場合(ケース1)の電力の流れを示す図である。FIG. 2 is a diagram illustrating the flow of power when power generated by the solar panel is output to the power system (case 1). 図3は、太陽光パネル及び電力系統からの電力を、宅内家電及び重要負荷へ供給する場合(ケース2)の電力の流れを示す図である。FIG. 3 is a diagram illustrating the flow of power when supplying power from the solar panel and the power system to home appliances and important loads (case 2). 図4は、出力抑制指令を受けた場合(ケース3)の電力の流れを示す図である。FIG. 4 is a diagram illustrating a flow of electric power when an output suppression command is received (case 3). 図5は、太陽光パネルで発電していない時に、蓄電池から宅内家電及び重要負荷へ電力を供給する場合(ケース4)の電力の流れを示す図である。FIG. 5 is a diagram showing the flow of power when power is supplied from the storage battery to the home appliance and the important load when the solar panel is not generating power (case 4). 図6は、電力系統の停電中に、太陽光パネルが発電している場合(ケース5)の電力の流れを示す図である。FIG. 6 is a diagram showing the flow of power when the solar panel is generating power during a power failure of the power system (case 5). 図7は、電力系統の停電中に、太陽光パネルが発電していない場合(ケース6)の電力の流れを示す図である。FIG. 7 is a diagram illustrating a flow of electric power when the solar panel is not generating power during a power outage (case 6). 図8は、電力系統の電力を、宅内家電H及び重要負荷Rに供給するとともに、蓄電池に充電する場合(ケース7)の電力の流れを示す図である。FIG. 8 is a diagram showing the flow of power when supplying power from the power system to the home appliance H and the important load R and charging the storage battery (case 7). 図9は、実施形態2における系統連系システムの構成例を示す図である。FIG. 9 is a diagram illustrating a configuration example of a grid interconnection system according to the second embodiment. 図10は、実施形態3における系統連系システムの構成例を示す図である。FIG. 10 is a diagram illustrating a configuration example of a grid interconnection system according to the third embodiment. 図11は、図1に系統連系システムを、第2重要負荷を接続可能な形態に変更した変形例を示す図である。FIG. 11 is a diagram illustrating a modified example in which the grid interconnection system in FIG. 1 is changed to a form in which the second important load can be connected.

本発明の実施形態における系統連系システムは、パワーコンディショナと、直流接続スイッチと、蓄電池と、DC/DC変換器と、制御部とを備える。前記パワーコンディショナは、直流電力を発電する発電部に接続され、前記発電部で発電された直流電力を交流電力に変換し、変換した交流電力を電力系統及び/又は負荷に出力する。前記直流接続スイッチは、前記パワーコンディショナの直流経路におけるノードに接続される。前記蓄電池は、前記直流接続スイッチを介して、前記パワーコンディショナの前記直流経路のノードに接続される。前記DC/DC変換器は、前記蓄電池と前記直流接続スイッチとの間に接続される。前記制御部は、前記電力系統への電力出力の抑制指令を外部機器から受けた場合に前記直流接続スイッチをオンにして、前記DC/DC変換器を制御することにより、前記発電部で発電された電力の少なくとも一部を前記蓄電池に充電可能とする。   The grid connection system in the embodiment of the present invention includes a power conditioner, a DC connection switch, a storage battery, a DC / DC converter, and a control unit. The power conditioner is connected to a power generation unit that generates DC power, converts the DC power generated by the power generation unit into AC power, and outputs the converted AC power to a power system and / or a load. The DC connection switch is connected to a node in a DC path of the power conditioner. The storage battery is connected to a node of the DC path of the power conditioner via the DC connection switch. The DC / DC converter is connected between the storage battery and the DC connection switch. When the control unit receives a command to suppress power output to the power system from an external device, the control unit turns on the DC connection switch to control the DC / DC converter, thereby generating power in the power generation unit. The storage battery can be charged with at least part of the electric power.

上記構成によれば、電力系統への電力出力の抑制指令を受けた場合は、直流接続スイッチがオンとなり、発電部と蓄電池とが直流経路で接続される。この状態で蓄電池に接続されたDC/DC変換器を制御することにより、発電部から蓄電池2への充電量を制御することができる。その結果、発電部から蓄電池へ、直流経路で効率よく電力を供給できる。すなわち、電力系統への電力出力が抑制される状況においても、電力を捨てずに効率よく蓄電することが容易になる。   According to the above configuration, when a command to suppress power output to the power system is received, the DC connection switch is turned on, and the power generation unit and the storage battery are connected by a DC path. By controlling the DC / DC converter connected to the storage battery in this state, the amount of charge from the power generation unit to the storage battery 2 can be controlled. As a result, power can be efficiently supplied from the power generation unit to the storage battery through a DC path. That is, even in a situation where power output to the power system is suppressed, it is easy to efficiently store power without throwing away power.

前記制御部は、前記発電部で発電された電力を前記電力系統へ出力する時に、前記直流接続スイッチをオフにすることができる。これにより、売電時には、蓄電池とパワーコンディショナの直流経路との間の接続が切られる。そのため、売電時に、蓄電池の電力がパワーコンディショナを通じて系統へ出力するのを容易に防止することができる。   The control unit can turn off the DC connection switch when outputting the electric power generated by the power generation unit to the power system. Thereby, the connection between a storage battery and the DC path of a power conditioner is cut off at the time of power sale. Therefore, it is possible to easily prevent the power of the storage battery from being output to the system through the power conditioner at the time of power sale.

前記制御部は、前記電力系統への電力出力の抑制指令を外部機器から受けた場合に前記直流接続スイッチをオンにして、前記DC/DC変換器に加えて前記パワーコンディショナも制御することにより、前記発電部で発電された電力を前記負荷へ供給するとともに前記蓄電池に充電することができる。   The control unit turns on the DC connection switch when receiving a command to suppress power output to the power system from an external device, and controls the power conditioner in addition to the DC / DC converter. The electric power generated by the power generation unit can be supplied to the load and the storage battery can be charged.

上記構成では、電力系統へ電力を出力できない状況において、DC/DC変換器及びパワーコンディショナの制御により、発電部から負荷への電力供給と、発電部から蓄電池への電力供給とを同時に行うことができる。また、前記DC/DC変換器により、発電部から蓄電池への充電量を制御できる。そのため、例えば、発電部で発電された電力のうち負荷で消費しない分を蓄電池に充電することが可能になる。その結果、発電部で発電された電力の余剰分を効率よく蓄電することができる。   In the above configuration, in a situation where power cannot be output to the power system, power supply from the power generation unit to the load and power supply from the power generation unit to the storage battery are simultaneously performed by control of the DC / DC converter and the power conditioner. Can do. The amount of charge from the power generation unit to the storage battery can be controlled by the DC / DC converter. Therefore, for example, it becomes possible to charge the storage battery for the amount of power generated by the power generation unit that is not consumed by the load. As a result, it is possible to efficiently store the surplus power generated by the power generation unit.

上記系統連系システムは、スイッチと、DC/AC変換器とをさらに備えてもよい。前記スイッチは、前記電力系統と重要負荷との間の接続と、前記重要負荷と前記蓄電池との間の接続とを切り替える。DC/AC変換器は、前記DC/DC変換器及び前記直流接続スイッチの間のノードと、前記スイッチとの間に配置され、前記蓄電池からの直流電力を交流電力に変換する。前記電力系統の電圧が閾値を下回った場合に、前記スイッチは、前記重要負荷と前記蓄電池との間を接続する状態となり、前記蓄電池から前記DC/DC変換器及び前記DC/AC変換器を介して、前記重要負荷へ交流電力が供給される。   The grid interconnection system may further include a switch and a DC / AC converter. The switch switches a connection between the power system and an important load and a connection between the important load and the storage battery. The DC / AC converter is disposed between a node between the DC / DC converter and the DC connection switch and the switch, and converts DC power from the storage battery into AC power. When the voltage of the power system falls below a threshold value, the switch is in a state of connecting between the important load and the storage battery, and from the storage battery via the DC / DC converter and the DC / AC converter. Thus, AC power is supplied to the important load.

スイッチにより、電力系統の電圧低下(例えば、停電)が検出された場合、瞬時に、負荷と電力系統を切り離し、負荷と蓄電池とを接続することができる。また、DC/DC変換器と直流接続スイッチとの間のノードと、スイッチとの間に、DC/AC変換器が配置される。これにより、停電時には、蓄電池からの直流電力をDC/DC変換器及びDC/AC変換器で、適切な交流電力に変換して重要負荷に供給することができる。すなわち、電力系統の電圧低下時でも安定した電力を供給する無停電電源が構成される。そのため、発電部と蓄電池との直流経路による接続を可能にしつつも、同じ蓄電池を用いて無停電電源を構成することができる。   When a voltage drop (for example, power failure) of the power system is detected by the switch, the load and the power system can be instantaneously disconnected and the load and the storage battery can be connected. In addition, a DC / AC converter is disposed between a node between the DC / DC converter and the DC connection switch and the switch. Thereby, at the time of a power failure, the direct current power from a storage battery can be converted into suitable alternating current power with a DC / DC converter and a DC / AC converter, and can be supplied to an important load. That is, an uninterruptible power supply that supplies stable power even when the voltage of the power system is lowered is configured. Therefore, the uninterruptible power supply can be configured using the same storage battery while enabling connection between the power generation unit and the storage battery through a DC path.

また、上記構成では、蓄電値とスイッチとの間にはDC/DC変換器及びDC/AC変換器が配置され、これらのDC/DC変換器及びDC/AC変換器の間のノードが、直流接続スイッチを介してパワーコンディショナの直流経路に接続される。そのため、停電時には、直流接続スイッチをオフにして、蓄電池からの直流電力をDC/AC変換器で交流に変換して重要負荷に供給するモードと、直流接続スイッチをオンにして、発電部の電力を蓄電池に供給しながら、蓄電池から重要負荷へ電力を供給するモードとの両方の動作が可能になる。   In the above configuration, a DC / DC converter and a DC / AC converter are arranged between the storage value and the switch, and a node between these DC / DC converter and DC / AC converter is a direct current. It is connected to the DC path of the inverter through a connection switch. Therefore, at the time of a power failure, the DC connection switch is turned off, the DC power from the storage battery is converted to AC by the DC / AC converter and supplied to the important load, and the DC connection switch is turned on to Both of the operations in the mode of supplying electric power from the storage battery to the important load can be performed while supplying the storage battery.

上記系統連系システムは、前記電力系統と、前記DC/DC変換器との間に接続され、前記電力系統の交流電力を、直流電力に変換して前記DC/DC変換器へ出力するAC/DC変換器をさらに備えてもよい。これにより、例えば、発電部から蓄電池へ供給される電力が十分でない場合に、電力系統から蓄電池へ電力を供給することができる。なお、前記DC/AC変換器及び前記AC/DC変換器は、1つの双方向インバータで構成されてもよい。   The grid interconnection system is connected between the power system and the DC / DC converter, and converts AC power of the power system into DC power and outputs it to the DC / DC converter. A DC converter may be further provided. Thereby, for example, when the power supplied from the power generation unit to the storage battery is not sufficient, the power can be supplied from the power system to the storage battery. The DC / AC converter and the AC / DC converter may be composed of one bidirectional inverter.

以下、図面を参照し、本発明の実施の形態を詳しく説明する。図中同一または相当部分には同一符号を付してその説明は繰り返さない。なお、説明を分かりやすくするために、以下で参照する図面においては、構成が簡略化または模式化して示されたり、一部の構成部材が省略されたりしている。また、各図に示された構成部材間の寸法比は、必ずしも実際の寸法比を示すものではない。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals and description thereof will not be repeated. In addition, in order to make the explanation easy to understand, in the drawings referred to below, the configuration is shown in a simplified or schematic manner, or some components are omitted. Further, the dimensional ratio between the constituent members shown in each drawing does not necessarily indicate an actual dimensional ratio.

[実施形態1]
(システムの構成例)
図1は、実施形態1における系統連系システムの構成例を示す図である。図1に示す系統連系システム10は、発電部の一例である太陽光パネル1を、電力系統9に接続するためのシステムである。系統連系システム10は、太陽光パネル1を電力系統9と連系させる連系部Aと、電力を蓄える蓄電部Bを有する。連系部Aは、太陽光パネル1に接続されるMPPT(Maximum Power Point Tracking)11、パワーコンディショナ6、及び解列スイッチ8を含む。解列スイッチ8は、分電盤4に接続される。分電盤4には、電力系統9及び宅内家電H(負荷の一例)が接続される。
[Embodiment 1]
(System configuration example)
FIG. 1 is a diagram illustrating a configuration example of a grid interconnection system according to the first embodiment. A grid interconnection system 10 illustrated in FIG. 1 is a system for connecting a solar panel 1 which is an example of a power generation unit to a power grid 9. The grid interconnection system 10 includes a grid connection part A that connects the solar panel 1 to the power grid 9 and a power storage part B that stores power. The interconnection part A includes an MPPT (Maximum Power Point Tracking) 11, a power conditioner 6, and a disconnect switch 8 connected to the solar panel 1. The disconnect switch 8 is connected to the distribution board 4. The distribution board 4 is connected to the power system 9 and the home appliance H (an example of a load).

<蓄電部Bの構成例>
系統連系システム10の蓄電部Bは、太陽光パネル1及び電力系統9からの電力を蓄電し、電力系統9の低電圧時(例えば、停電時)には、重要負荷Rへ電力を供給する。本実施形態では、この蓄電部Bは、無停電電源(UPS)を構成する。蓄電部Bは、蓄電池2、DC/DC変換器3、直流接続スイッチ5、AC/DC変換器12、DC/AC変換器13、及びUPSスイッチ7を含む。
<Configuration example of power storage unit B>
The power storage unit B of the grid connection system 10 stores power from the solar panel 1 and the power system 9 and supplies power to the important load R when the power system 9 is at a low voltage (for example, during a power failure). . In the present embodiment, the power storage unit B constitutes an uninterruptible power supply (UPS). The power storage unit B includes a storage battery 2, a DC / DC converter 3, a DC connection switch 5, an AC / DC converter 12, a DC / AC converter 13, and a UPS switch 7.

DC/DC変換器3は、蓄電池2に接続される。直流接続スイッチ5は、DC/DC変換器3とパワーコンディショナ6の直流経路との間に配置される。
AC/DC変換器12及びDC/AC変換器13は、UPSスイッチ7と、DC/DC変換器3及び直流接続スイッチ5の間のノードとの間に並列に接続される。AC/DC変換器12及びUPSスイッチ7の間のノードは、分電盤4を介して電力系統9に接続される。UPSスイッチ7は、重要負荷Rに接続される。
The DC / DC converter 3 is connected to the storage battery 2. The DC connection switch 5 is disposed between the DC / DC converter 3 and the DC path of the power conditioner 6.
The AC / DC converter 12 and the DC / AC converter 13 are connected in parallel between the UPS switch 7 and a node between the DC / DC converter 3 and the DC connection switch 5. A node between the AC / DC converter 12 and the UPS switch 7 is connected to the power system 9 via the distribution board 4. The UPS switch 7 is connected to the important load R.

DC/DC変換器3は、例えば、双方向DC/DCコンバータで構成することができる。DC/DC変換器3は、太陽光パネル1からMPPT11を経て蓄電池2へ入力される直流電圧、又は電力系統9からAC/DC変換器12を経て蓄電池2へ入力される直流電圧を、蓄電池2に適した直流電圧に変換する。DC/DC変換器3は、蓄電池2から出力される直流電圧を、パワーコンディショナ6又はDC/AC変換器13に適した直流電圧に変換する。   The DC / DC converter 3 can be composed of, for example, a bidirectional DC / DC converter. The DC / DC converter 3 converts the DC voltage input from the solar panel 1 through the MPPT 11 to the storage battery 2 or the DC voltage input from the power system 9 through the AC / DC converter 12 into the storage battery 2. Convert to DC voltage suitable for The DC / DC converter 3 converts the DC voltage output from the storage battery 2 into a DC voltage suitable for the power conditioner 6 or the DC / AC converter 13.

DC/DC変換器3は、例えば、コイルと、コイルに流れる電流のオン/オフを繰り返すスイッチング素子を含む昇圧回路及び降圧回路を含む。スイッチング素子のオン/オフ時間の比(デューティ)を制御することにより、出力電圧を変化させる。これにより、蓄電池2へ入力される電力量(充電量)又は蓄電池2から出力される電力量(放電量)を調整することができる。すなわち、DC/DC変換器3は、蓄電池2の充電及び放電を制御することができる。   The DC / DC converter 3 includes, for example, a step-up circuit and a step-down circuit including a coil and a switching element that repeatedly turns on and off a current flowing in the coil. The output voltage is changed by controlling the ratio (duty) of the on / off time of the switching element. Thereby, the electric energy (charge amount) input into the storage battery 2 or the electric energy (discharge amount) output from the storage battery 2 can be adjusted. That is, the DC / DC converter 3 can control charging and discharging of the storage battery 2.

DC/AC変換器13は、蓄電池2からDC/DC変換器3を介して出力される直流電力を交流電力に変換し、重要負荷Rへ供給する。DC/AC変換器13は、例えば、インバータで構成される。AC/DC変換器12は、電力系統9からの交流電力を直流電力に変換し、DC/DC変換器3を介して蓄電池2へ供給する。AC/DC変換器12は、例えば、整流器で構成される。   The DC / AC converter 13 converts DC power output from the storage battery 2 via the DC / DC converter 3 into AC power and supplies the AC power to the important load R. The DC / AC converter 13 is composed of an inverter, for example. The AC / DC converter 12 converts AC power from the power system 9 into DC power and supplies it to the storage battery 2 via the DC / DC converter 3. The AC / DC converter 12 is composed of a rectifier, for example.

UPSスイッチ7は、電力系統9と重要負荷Rとの間の接続と、重要負荷Rと蓄電池2との間の接続とを切り替えるものである。すなわち、UPSスイッチ7は、分電盤4から入力された電力系統9の交流電力から得られる交流電力を重要負荷Rへ供給する外部電力供給モードと、蓄電池2を電源とする直流電力をDC/AC変換器13が交流に変換することにより得られる交流電力を重要負荷Rへ供給する電池電力供給モードとを切り替える。   The UPS switch 7 switches a connection between the power system 9 and the important load R and a connection between the important load R and the storage battery 2. That is, the UPS switch 7 supplies DC / DC power from the external power supply mode for supplying the AC power obtained from the AC power of the power system 9 input from the distribution board 4 to the important load R, and DC power using the storage battery 2 as a power source. The battery power supply mode for supplying the AC power obtained by the AC converter 13 to AC is supplied to the important load R is switched.

無停電電源の動作方式は、特定のものに限定されないが、例えば、系統連系システム10を、常時商用給電方式で動作させることができる。常時商用給電方式では、電力系統9から交流電力が正常に供給されるとき(正常時)は、UPSスイッチ7を、分電盤4と重要負荷Rとを接続する状態にして、電力系統9の交流電力を重要負荷Rへ供給する。このとき、AC/DC変換器12により電力系統9の交流電力を直流電力に変換して蓄電池2を充電することができる。   The operation method of the uninterruptible power supply is not limited to a specific one, but for example, the grid interconnection system 10 can be always operated by a commercial power supply method. In the normal commercial power supply method, when AC power is normally supplied from the power system 9 (normally), the UPS switch 7 is connected to the distribution board 4 and the important load R so that the power system 9 AC power is supplied to the important load R. At this time, the AC / DC converter 12 can convert the AC power of the power system 9 into DC power to charge the storage battery 2.

常時商用給電方式の場合、異常時において電力系統9における低電圧状態(例えば、停電)が検出されると、UPSスイッチ7は、重要負荷Rと電力系統9(分電盤4)との接続を切断して、重要負荷RとDC/AC変換器13との接続に切り替える。これにより、重要負荷Rは、DC/AC変換器13を介して蓄電池2と接続される。DC/AC変換器13は、UPSスイッチ7により接続が切り替わるとすぐに動作を開始し、蓄電池2からの直流電力を交流電力に変換して重要負荷Rへ供給する。なお、電力系統9の停電時には、解列スイッチ8の切り替えによって、太陽光パネル1、パワーコンディショナ6は、電力系統9から切り離される。パワーコンディショナ6は、動作を停止する。   In the case of the constant commercial power supply method, when a low voltage state (for example, a power failure) is detected in the power system 9 at the time of abnormality, the UPS switch 7 connects the important load R and the power system 9 (distribution panel 4). Disconnect and switch to the connection between the important load R and the DC / AC converter 13. Thereby, the important load R is connected to the storage battery 2 via the DC / AC converter 13. The DC / AC converter 13 starts operation as soon as the connection is switched by the UPS switch 7, converts the DC power from the storage battery 2 to AC power, and supplies it to the important load R. At the time of a power failure in the power system 9, the solar panel 1 and the power conditioner 6 are disconnected from the power system 9 by switching the disconnect switch 8. The power conditioner 6 stops its operation.

常時商用給電方式の他、例えば、常時インバータ給電方式で蓄電システムを動作させることもできる。常時インバータ給電方式では、正常時に、UPSスイッチ7をDC/AC変換器13と重要負荷Rとを接続する状態にしておき、電力系統9の交流電力を、AC/DC変換器12及びDC/AC変換器13を介して、重要負荷Rへ供給する。この場合、AC/DC変換器12が、電力系統9の交流電力を直流電力に変換して蓄電池2へ充電するとともに、蓄電池2からの直流電力を、DC/AC変換部13が、交流電力に変換して重要負荷Rへ出力する。電力系統9の異常時には、蓄電池2からの電力が重要負荷Rに供給される。これにより、電力系統9の交流電力よりも、電圧変動が小さく、サージ電圧やノイズ電圧が抑制された電力を、重要負荷Rへ供給することが可能になる。   In addition to the constant commercial power supply method, for example, the power storage system can be operated by a constant inverter power supply method. In the normal inverter feeding method, the UPS switch 7 is kept in a state where the DC / AC converter 13 and the important load R are connected in a normal state, and the AC power of the power system 9 is supplied to the AC / DC converter 12 and the DC / AC. It is supplied to the important load R through the converter 13. In this case, the AC / DC converter 12 converts AC power of the power system 9 into DC power and charges the storage battery 2, and the DC / AC conversion unit 13 converts the DC power from the storage battery 2 into AC power. Convert and output to the important load R. When the power system 9 is abnormal, the power from the storage battery 2 is supplied to the important load R. As a result, it is possible to supply the critical load R with power in which voltage fluctuation is smaller than that of the AC power of the power system 9 and surge voltage and noise voltage are suppressed.

常時インバータ給電方式では、AC/DC変換器12又はDC/AC変換器13が、故障又は点検等により動作を停止した時、UPSスイッチ7は、重要負荷RとDC/AC変換器13との接続を切断して、重要負荷Rと電力系統9(分電盤4)との接続に切り替える。   In the constant inverter power supply system, when the AC / DC converter 12 or the DC / AC converter 13 stops operating due to a failure or inspection, the UPS switch 7 connects the important load R and the DC / AC converter 13. Is switched to connection between the important load R and the power system 9 (distribution panel 4).

<連系部Aの構成例>
MPPT11は、太陽光パネル1の発電を効率よく出力するための回路である。MPPT11は、例えば、MPPT制御により太陽光パネルの電圧及び電流を最適化するとともに後段への出力電圧を調節する昇圧回路を有する。なお、MPPT11におけるMPPT制御は、後段の回路で兼用することが可能である。例えば、MPPT11をパワーコンディショナ6の一部とすることもできる。
<Configuration example of interconnected part A>
The MPPT 11 is a circuit for efficiently outputting the power generation of the solar panel 1. The MPPT 11 includes, for example, a booster circuit that optimizes the voltage and current of the solar panel by MPPT control and adjusts the output voltage to the subsequent stage. Note that MPPT control in the MPPT 11 can be shared by a circuit in the subsequent stage. For example, the MPPT 11 can be a part of the power conditioner 6.

パワーコンディショナ6は、太陽光パネル1で発電された直流電力を交流電力に変換し、電力系統9及び宅内家電Hに供給する装置である。パワーコンディショナ6は、太陽光パネル1と、電力系統9との間に接続される。パワーコンディショナ6は、例えば、太陽光パネル1から出力された直流電力を電力系統9の交流電力に変換するインバータ(連系INV)、及び、インバータで変換された交流電力にフィルタ処理を施すフィルタ回路を有する。   The power conditioner 6 is a device that converts DC power generated by the solar panel 1 into AC power and supplies the AC power to the power system 9 and the home appliance H. The power conditioner 6 is connected between the solar panel 1 and the power system 9. The power conditioner 6 includes, for example, an inverter (interconnection INV) that converts DC power output from the solar panel 1 into AC power of the power system 9, and a filter that performs filtering on the AC power converted by the inverter It has a circuit.

パワーコンディショナ6の直流経路のノードには、直流接続スイッチ5の一方端が接続される。直流接続スイッチ5の他方端は、DC/DC変換器3を介して、蓄電池2に接続される。直流接続スイッチ5は、蓄電池2と太陽光パネル1とを直流で接続する配線の接続/非接続を切り替える。直流接続スイッチ5は、例えば、リレー、FET又はIGBT等により構成することができる。   One end of the DC connection switch 5 is connected to a node of the DC path of the power conditioner 6. The other end of the DC connection switch 5 is connected to the storage battery 2 via the DC / DC converter 3. The DC connection switch 5 switches connection / disconnection of the wiring that connects the storage battery 2 and the solar panel 1 with a direct current. The DC connection switch 5 can be configured by, for example, a relay, FET, IGBT, or the like.

図1に示す例では、直流接続スイッチ5は、MPPT11の昇圧回路と、パワーコンディショナ6のインバータとの間の直流経路に接続されている。これに対して、太陽光パネル1とMPPT11の昇圧回路との間の直流経路に直流接続スイッチ5を接続することもできる。   In the example shown in FIG. 1, the DC connection switch 5 is connected to a DC path between the booster circuit of the MPPT 11 and the inverter of the power conditioner 6. On the other hand, the DC connection switch 5 can also be connected to the DC path between the solar panel 1 and the booster circuit of the MPPT 11.

<制御部の構成例>
系統連系システム10は、直流接続スイッチ5及びDC/DC変換器3を制御する制御部15を備える。また、系統連系システム10には、電力系統9に対する売電量及び買電量、太陽光パネル1の発電量、宅内家電の消費電力をそれぞれ測定するためのセンサ14が設けられる。センサ14は、電流センサ及び電圧センサを含んでもよい。
<Configuration example of control unit>
The grid interconnection system 10 includes a control unit 15 that controls the DC connection switch 5 and the DC / DC converter 3. The grid interconnection system 10 is provided with sensors 14 for measuring the amount of power sold and purchased for the power system 9, the amount of power generated by the solar panel 1, and the power consumption of home appliances. The sensor 14 may include a current sensor and a voltage sensor.

制御部15は、ネットワークNを介して外部機器と通信する通信機器17に接続される。通信機器17を介して、制御部15は、外部機器の一例である管理装置16からの系統連系に関する制御情報を取得することができる。管理装置16は、電力系統9の状態(例えば、電力系統9における電力の需要と供給等)に基づく制御情報を、電力系統9に連系する複数のシステム(系統連系システム10を含む)に対して送信する。管理装置16は、例えば、電力系統を管理する電力会社が設置するサーバとすることができる。制御情報には、例えば、電力系統9への電力の出力をしないように要請する出力抑制指令及び、電力出力抑制を解除する旨の解除指令等が含まれる。   The control unit 15 is connected to a communication device 17 that communicates with an external device via the network N. The control unit 15 can acquire control information related to grid connection from the management device 16 which is an example of an external device via the communication device 17. The management device 16 transfers control information based on the state of the power system 9 (for example, power demand and supply in the power system 9) to a plurality of systems (including the system interconnection system 10) linked to the power system 9. Send to. The management device 16 can be, for example, a server installed by a power company that manages the power system. The control information includes, for example, an output suppression command for requesting not to output power to the power grid 9, a release command for canceling power output suppression, and the like.

制御部15は、センサ14の測定結果及び外部機器から取得した制御情報に基づいて、直流接続スイッチ5及びDC/DC変換器3等を制御する。   The control unit 15 controls the DC connection switch 5, the DC / DC converter 3, and the like based on the measurement result of the sensor 14 and the control information acquired from the external device.

例えば、制御部15は、分電盤4と電力系統9とを結ぶ配線に設けられたセンサ14から、電力系統9から電力を使用中(すなわち買電中)か、電力系統9へ電力を出力中(売電中、逆潮流中)か、を判断することができる。制御部15は、売電中は、直流接続スイッチ5をオフにする。これにより、売電中は、蓄電池2から電力系統9へ電力を出力できないようにすることができる。   For example, the control unit 15 is using power from the power system 9 (that is, during power purchase) or outputs power to the power system 9 from the sensor 14 provided in the wiring connecting the distribution board 4 and the power system 9. It can be judged whether it is medium (during power sale or reverse power flow). The controller 15 turns off the DC connection switch 5 during power sale. Thereby, it is possible to prevent power from being output from the storage battery 2 to the power system 9 during power sale.

通信機器17が、管理装置16からネットワークNを介して出力抑制指令を受けた場合、通信機器17は、制御部15へ出力抑制指令を出力する。制御部15は、出力抑制指令を受けると、直流接続スイッチ5をオンにする。これにより、太陽光パネル1で発電された電力を、直流経路を介して効率よく蓄電池2へ充電することが可能になる。また、制御部15は、DC/DC変換器3を制御して、太陽光パネル1で発電された電力の少なくとも一部を蓄電池2に充電可能な状態にする。すなわち、制御部15は、太陽光パネル1で発電された電力のうち接続される負荷(宅内家電H及び重要負荷R)で消費されない余剰分を、蓄電池2に充電するようDC/DC変換器3を動作させる。   When the communication device 17 receives an output suppression command from the management device 16 via the network N, the communication device 17 outputs an output suppression command to the control unit 15. When receiving the output suppression command, the control unit 15 turns on the DC connection switch 5. Thereby, it becomes possible to efficiently charge the storage battery 2 with the electric power generated by the solar panel 1 through the DC path. Further, the control unit 15 controls the DC / DC converter 3 so that at least a part of the electric power generated by the solar panel 1 can be charged in the storage battery 2. That is, the control unit 15 causes the DC / DC converter 3 to charge the storage battery 2 with the surplus that is not consumed by the connected loads (the home appliance H and the important load R) among the electric power generated by the solar panel 1. To work.

なお、制御部15が出力抑制指令に応じて直流接続スイッチ5をオンにするタイミングは、出力抑制指令の受信時に限られない。制御部15は、例えば、出力抑制指令を受けてから解除指令を受けるまでの間で、太陽光パネル1で発電された電力に余剰が生じた時に直流接続スイッチ5をオンにしてもよい。すなわち、出力抑制指令を受けた場合であっても、太陽光パネル1で発電されていない場合や、発電量に余剰がない場合は、直流接続スイッチ5をオフにしてもよい。   Note that the timing at which the control unit 15 turns on the DC connection switch 5 according to the output suppression command is not limited to when the output suppression command is received. For example, the controller 15 may turn on the DC connection switch 5 when surplus is generated in the power generated by the solar panel 1 from when the output suppression command is received until when the release command is received. That is, even when an output suppression command is received, the DC connection switch 5 may be turned off when the solar panel 1 is not generating power or when there is no surplus in power generation.

制御部15は、出力抑制指令を受けた場合、DC/DC変換器3に加えてパワーコンディショナ6も制御して、太陽光パネル1で発電された電力を宅内家電H及び重要負荷Rへ供給するとともに、これらの負荷で消費されない余剰分の電力を蓄電池2に充電することができる。   When receiving the output suppression command, the control unit 15 controls the power conditioner 6 in addition to the DC / DC converter 3 to supply the electric power generated by the solar panel 1 to the home appliance H and the important load R. In addition, it is possible to charge the storage battery 2 with surplus power that is not consumed by these loads.

例えば、制御部15は、センサ14で検出される宅内家電Hの消費電力及び太陽光パネル1の発電電力の推定値から、余剰分の電力を算出することができる。一例として、太陽光パネル1の発電電力から宅内家電Hの消費電力を差し引いた値を余剰分の電力とすることができる。制御部15は、算出された余剰分の電力がDC/DC変換器3を通じて蓄電池2に供給されるよう、DC/DC変換器3の動作を制御する。なお、制御部15は、パワーコンディショナ6及びDC/DC変換器3の動作を制御して、両者の電力量を調整することもできる。   For example, the control unit 15 can calculate the surplus power from the power consumption of the home appliance H detected by the sensor 14 and the estimated value of the generated power of the solar panel 1. As an example, a value obtained by subtracting the power consumption of the home appliance H from the generated power of the solar panel 1 can be used as the surplus power. The control unit 15 controls the operation of the DC / DC converter 3 so that the calculated surplus power is supplied to the storage battery 2 through the DC / DC converter 3. In addition, the control part 15 can also control operation | movement of the power conditioner 6 and the DC / DC converter 3, and can adjust both electric energy.

太陽光パネル1のある時刻における発電電力すなわち発電可能な量の推定値は、例えば、過去の同時刻の発電量を用いて計算することができる。一例として、前日の同時刻の発電量、又は、前日までの所定期間における発電量の各時刻の平均値を、推定値とすることができる。また、推定値の計算に過去の日射量のデータを用いることもできる。或いは、発電電力の推定のための特殊な回路を設けることもできる。   The generated power at a certain time of the solar panel 1, that is, the estimated value of the amount that can be generated can be calculated using, for example, the past power generation amount at the same time. As an example, the power generation amount at the same time of the previous day or the average value of the power generation amount at each time in a predetermined period until the previous day can be used as the estimated value. Moreover, the data of the past solar radiation amount can also be used for calculation of an estimated value. Alternatively, a special circuit for estimating the generated power can be provided.

なお、直流接続スイッチ5の動作は、上記例に限られない。制御部15は、例えば、売電中でない場合、及び、売電抑制指令を受けていない場合には、太陽光パネル1による発電量、時間帯、電力系統9の状態等に応じて、直流接続スイッチ5を制御することができる。   The operation of the DC connection switch 5 is not limited to the above example. For example, when the power is not being sold or when the power sale suppression command is not received, the control unit 15 performs direct current connection according to the amount of power generated by the solar panel 1, the time zone, the state of the power system 9, and the like. The switch 5 can be controlled.

制御部15は、例えば、外部機器からの出力抑制指令又はセンサ14の検出結果に基づく制御信号に基づいて、直流接続スイッチ5及びDC/DC変換器3を制御する制御回路で構成することができる。或いは、制御部15は、メモリに記録されたプログラムを実行するプロセッサ(マイコン)を含んでもよい。制御部15への出力抑制指令及びセンサ14の検出結果の伝送方式は、物理層、論理層を含め特定のものに限られない。   The control unit 15 can be configured by a control circuit that controls the DC connection switch 5 and the DC / DC converter 3 based on, for example, a control signal based on an output suppression command from an external device or a detection result of the sensor 14. . Alternatively, the control unit 15 may include a processor (microcomputer) that executes a program recorded in the memory. The transmission method of the output suppression command to the control unit 15 and the detection result of the sensor 14 is not limited to a specific one including the physical layer and the logical layer.

また、制御部15は、パワーコンディショナ6、宅内家電H、重要負荷Rその他の機器を制御する制御装置の一部であってもよい。例えば、系統連系システム10に、HEMS(Home Energy Management System)等のエネルギー管理システムを導入することができる。この場合、例えば、管理装置16をHEMS管理サーバとし、制御部15が含まれる制御装置をHEMSコントローラとすることもできる。HEMSの通信プロトコルとしては、例えば、SEP2.0(Smart Energy Profile 2.0)、ECHONET Lite等が挙げられる。   Moreover, the control part 15 may be a part of control apparatus which controls the power conditioner 6, the household appliance H, the important load R, and other apparatuses. For example, an energy management system such as HEMS (Home Energy Management System) can be introduced into the grid interconnection system 10. In this case, for example, the management device 16 may be a HEMS management server, and the control device including the control unit 15 may be a HEMS controller. Examples of the HEMS communication protocol include SEP 2.0 (Smart Energy Profile 2.0), ECHONET Lite, and the like.

以上のように、図1に示す系統連系システム10では、連系部Aの直流経路と、蓄電部Bの直流経路とが、直流接続スイッチ5を介して接続される。この構成は、太陽光パネル1から蓄電池2への直流経路を介しての効率のよい電力供給を可能にし、さらに、この蓄電池2を用いたUPS構築を可能にする。また、売電抑制時には、太陽光パネル1から蓄電池2への余剰電力の充電が可能になる。さらに、売電時には、蓄電池2から電力系統9への電力出力を防止することができる。   As described above, in the grid interconnection system 10 illustrated in FIG. 1, the DC path of the interconnection unit A and the DC path of the power storage unit B are connected via the DC connection switch 5. This configuration enables efficient power supply from the solar panel 1 to the storage battery 2 via a DC path, and further enables UPS construction using the storage battery 2. In addition, when power sales are suppressed, surplus power can be charged from the solar panel 1 to the storage battery 2. Furthermore, the power output from the storage battery 2 to the electric power system 9 can be prevented during power sale.

(システムの動作例)
次に、図2〜図8を参照し、図1に示す系統連系システム10の動作例を説明する。以下では、一例として、系統連系システム10の蓄電システムが、常時商用給電方式で動作する場合について説明する。なお、図2〜図8では、見やすくするため、制御部15及びセンサ14の図示を省略している。
(System operation example)
Next, an operation example of the grid interconnection system 10 shown in FIG. 1 will be described with reference to FIGS. Below, the case where the electrical storage system of the grid connection system 10 operate | moves by a commercial power supply system as an example is demonstrated. 2-8, illustration of the control part 15 and the sensor 14 is abbreviate | omitted for easy visibility.

<ケース1:太陽光発電、売電時>
図2は、太陽光パネル1で発電した電力を電力系統9へ出力(売電)する場合の電力の流れを示す図である。太陽光パネル1で発電した電力は、MPPT11、パワーコンディショナ6、及び分電盤4を通って、宅内家電H及び重要負荷Rへ供給される。宅内家電H及び重要負荷Rで消費されない余剰分は、電力系統9へ出力(売電)される。例えば、太陽光パネル1の発電量が5kWで、宅内家電H及び重要負荷Rの消費電力が2kWの場合、3kW分は、余剰となり売電される。
<Case 1: At the time of solar power generation and power sale>
FIG. 2 is a diagram illustrating a flow of electric power when the electric power generated by the solar panel 1 is output (power sale) to the electric power system 9. The electric power generated by the solar panel 1 is supplied to the home appliance H and the important load R through the MPPT 11, the power conditioner 6, and the distribution board 4. The surplus that is not consumed by the home appliance H and the important load R is output (sold) to the power system 9. For example, when the amount of power generated by the solar panel 1 is 5 kW and the power consumption of the home appliance H and the important load R is 2 kW, the remaining 3 kW is surplus and sold.

この場合、電力系統9へ電力を出力しているので、直流接続スイッチ5はオフになるよう制御される。例えば、制御部15は、分電盤4と電力系統9とを接続する配線において、電力(電流)が分電盤4から電力系統9の方へ流れている間は、直流接続スイッチ5をオフにすることができる。すなわち、売電が開始されると直流接続スイッチ5をオフにし、売電が終了すると直流接続スイッチ5をオンにするよう制御することができる。これにより、売電中は、蓄電池2からの電力が電力系統9へ出力されるのを防ぐことができる。   In this case, since electric power is output to the electric power system 9, the DC connection switch 5 is controlled to be turned off. For example, the controller 15 turns off the DC connection switch 5 while power (current) is flowing from the distribution board 4 toward the power system 9 in the wiring connecting the distribution board 4 and the power system 9. Can be. That is, it is possible to control to turn off the DC connection switch 5 when the power sale is started and to turn on the DC connection switch 5 when the power sale is completed. Thereby, it is possible to prevent the power from the storage battery 2 from being output to the power system 9 during power sale.

なお、図2に示す例では、蓄電池2は、充電、放電いずれも行っていないので、DC/DC変換器3、AC/DC変換器12、及びDC/AC変換器13は、動作を停止している。   In the example shown in FIG. 2, the storage battery 2 is neither charged nor discharged, so the DC / DC converter 3, the AC / DC converter 12, and the DC / AC converter 13 stop operating. ing.

<ケース2:太陽光発電、買電時>
図3は、太陽光パネル1で発電した電力及び電力系統9からの電力を、宅内家電H及び重要負荷Rへ供給する場合の電力の流れを示す図である。太陽光パネル1で発電した電力は、MPPT11、パワーコンディショナ6、及び分電盤4を通って、宅内家電H及び重要負荷Rへ供給される。また、電力系統9の電力も、分電盤4を通って、宅内家電H及び重要負荷Rへ供給される。すなわち、宅内家電H及び重要負荷Rで消費される電力のうち太陽光パネル1で発電される電力では足りない不足分が、電力系統9から入力(買電)される。例えば、宅内家電H及び重要負荷Rの消費電力が2kWで、太陽光パネル1の発電量が1kWの場合、不足分の1kWが、電力系統9から入力される。
<Case 2: Solar power generation, when purchasing electricity>
FIG. 3 is a diagram illustrating a flow of power when the power generated by the solar panel 1 and the power from the power system 9 are supplied to the home appliance H and the important load R. The electric power generated by the solar panel 1 is supplied to the home appliance H and the important load R through the MPPT 11, the power conditioner 6, and the distribution board 4. Further, the electric power of the electric power system 9 is also supplied to the home appliance H and the important load R through the distribution board 4. That is, a shortage of power consumed by the solar panel 1 out of the power consumed by the home appliance H and the important load R is input (purchased) from the power system 9. For example, when the power consumption of the home appliance H and the important load R is 2 kW, and the power generation amount of the solar panel 1 is 1 kW, the shortage of 1 kW is input from the power system 9.

なお、図3に示す例では、蓄電池2は、充電、放電いずれも行っていないので、DC/DC変換器3、AC/DC変換器12、及びDC/AC変換器13は、動作を停止している。直流接続スイッチ5はオフになっている。しかし、このケース2では、電力系統9へ電力を出力していないため、直流接続スイッチ5はオンにしてもよい。   In the example shown in FIG. 3, the storage battery 2 is neither charged nor discharged, so the DC / DC converter 3, the AC / DC converter 12, and the DC / AC converter 13 stop operating. ing. The DC connection switch 5 is off. However, in this case 2, since no power is output to the power system 9, the DC connection switch 5 may be turned on.

例えば、直流接続スイッチ5をオンにして、DC/DC変換器3を動作させ、蓄電池2の電力を、パワーコンディショナ6へ出力することもできる。この場合、太陽光パネル1の発電量の不足分を、蓄電池2から出力される電力で補うことができる。蓄電池2からパワーコンディショナ6へ電力を出力する場合は、電力系統9へ余剰電力が出力(売電)されないよう、DC/DC変換器3により蓄電池2の放電量を調整することができる。   For example, the DC connection switch 5 can be turned on, the DC / DC converter 3 can be operated, and the power of the storage battery 2 can be output to the power conditioner 6. In this case, the shortage of the power generation amount of the solar panel 1 can be supplemented with the power output from the storage battery 2. When power is output from the storage battery 2 to the power conditioner 6, the discharge amount of the storage battery 2 can be adjusted by the DC / DC converter 3 so that excess power is not output (sold) to the power system 9.

<ケース3:出力(売電)抑制指令時>
図4は、電力系統9への電力の出力(売電)を抑制する旨の指令(出力抑制指令)を受けた場合の系統連系システム10における電力の流れを示す図である。出力抑制指令を受けているため、直流接続スイッチ5はオンにされる。太陽光パネル1で発電した電力は、MPPT11、パワーコンディショナ6、及び分電盤4を通って、宅内家電H及び重要負荷Rへ供給される。宅内家電H及び重要負荷Rで消費されない余剰分は、直流接続スイッチ5及びDC/DC変換器3を通って、蓄電池2へ充電される。例えば、太陽光パネル1の発電量が5kWで、宅内家電H及び重要負荷Rの消費電力が2kWの場合、3kW分は、余剰となり、蓄電池2へ充電される。
<Case 3: At the time of output (power sale) suppression command>
FIG. 4 is a diagram illustrating the flow of power in the grid interconnection system 10 when receiving a command (output suppression command) for suppressing power output (power sale) to the power system 9. Since the output suppression command is received, the DC connection switch 5 is turned on. The electric power generated by the solar panel 1 is supplied to the home appliance H and the important load R through the MPPT 11, the power conditioner 6, and the distribution board 4. The surplus that is not consumed by the home appliance H and the important load R is charged to the storage battery 2 through the DC connection switch 5 and the DC / DC converter 3. For example, when the power generation amount of the solar panel 1 is 5 kW and the power consumption of the home appliance H and the important load R is 2 kW, 3 kW is surplus and the storage battery 2 is charged.

直流接続スイッチ5は、出力抑制指令を受け、かつ太陽光パネル1で発電された電力が宅内家電H及び重要負荷Rで消費される電力より多い場合に、オンになっていればよい。直流接続スイッチ5をオンにするタイミングや、出力抑制指令が解除された後、どのタイミングでオフにするかは、特に限定されない。   The DC connection switch 5 only needs to be turned on when it receives an output suppression command and the power generated by the solar panel 1 is greater than the power consumed by the home appliance H and the important load R. The timing for turning on the DC connection switch 5 and the timing for turning it off after the output suppression command is released are not particularly limited.

図4に示す例は、太陽光パネル1の発電量に余剰がある場合である。これに対して、出力抑制指令を受けている時に、太陽光パネル1の発電量が、宅内家電H及び重要負荷Rの消費電力より少ない場合は、不足分の電力を、電力系統9又は蓄電池2の電力で補うことができる。蓄電池2の電力で不足分を補う場合、直流接続スイッチ5をオンにしてDC/DC変換器3及びパワーコンディショナ6を動作させる。これにより、蓄電池2の電力が、DC/DC変換器3及びパワーコンディショナ6を介して宅内家電H及び重要負荷Rへ出力される。   The example shown in FIG. 4 is a case where there is a surplus in the power generation amount of the solar panel 1. On the other hand, when the power generation amount of the solar panel 1 is smaller than the power consumption of the home appliance H and the important load R when receiving the output suppression command, the shortage of power is supplied to the power system 9 or the storage battery 2. Can be supplemented with When the shortage is compensated for by the power of the storage battery 2, the DC connection switch 5 is turned on to operate the DC / DC converter 3 and the power conditioner 6. Thereby, the electric power of the storage battery 2 is output to the home appliance H and the important load R via the DC / DC converter 3 and the power conditioner 6.

なお、図4に示す例では、電力系統9から蓄電池2へ及び蓄電池2から重要負荷Rへの電力供給は行われていないため、AC/DC変換器12及びDC/AC変換器13は、動作を停止している。   In the example shown in FIG. 4, since power is not supplied from the power system 9 to the storage battery 2 and from the storage battery 2 to the important load R, the AC / DC converter 12 and the DC / AC converter 13 operate. Has stopped.

<ケース4:太陽光発電無し、蓄電池放電時>
図5は、太陽光パネル1で発電していない時に、蓄電池2から宅内家電H及び重要負荷Rへ電力を供給する場合の、電力の流れを示す図である。図5に示すケースは、例えば、朝、夕の電力系統9の消費電力が増加する時間に、夜間に蓄電した蓄電池2を放電(ピークシフト放電)するケースである。この場合、直流接続スイッチ5はオンの状態で、DC/DC変換器3が動作し、蓄電池2の電力が、パワーコンディショナ6へ出力される。蓄電池2の電力は、パワーコンディショナ6、分電盤4を介して、宅内家電H及び重要負荷Rへ供給される。このとき、蓄電池2の電力が電力系統9へ出力しないように、DC/DC変換器3又はパワーコンディショナ6のインバータで、出力電力が調整される。
<Case 4: No photovoltaic power generation, battery discharge>
FIG. 5 is a diagram illustrating the flow of power when power is supplied from the storage battery 2 to the home appliance H and the important load R when the solar panel 1 is not generating power. The case shown in FIG. 5 is a case where the storage battery 2 stored at night is discharged (peak shift discharge) during the time when the power consumption of the power system 9 increases in the morning and evening, for example. In this case, the DC connection switch 5 is on, the DC / DC converter 3 operates, and the power of the storage battery 2 is output to the power conditioner 6. The electric power of the storage battery 2 is supplied to the home appliance H and the important load R via the power conditioner 6 and the distribution board 4. At this time, the output power is adjusted by the DC / DC converter 3 or the inverter of the power conditioner 6 so that the power of the storage battery 2 is not output to the power system 9.

図5に示す例では、太陽光パネル1で発電していないため、MPPT11は動作していない。また、電力系統9から蓄電池2へ及び蓄電池2から重要負荷Rへの電力供給は行われていないため、AC/DC変換器12及びDC/AC変換器13は、動作を停止している。   In the example shown in FIG. 5, since the solar panel 1 is not generating electric power, the MPPT 11 is not operating. Moreover, since the electric power supply from the electric power grid | system 9 to the storage battery 2 and the important load R from the storage battery 2 is not performed, the AC / DC converter 12 and the DC / AC converter 13 have stopped operation | movement.

<ケース5:停電、太陽光発電時>
図6は、電力系統9の停電中に、太陽光パネル1が発電している場合の、電力の流れを示す図である。停電が発生すると解列スイッチ8がオフになり、太陽光パネル1、MPPT11及びパワーコンディショナ6は、電力系統9から解列する。停電発生時、電力系統9の電圧が所定の閾値を下回ると、UPSスイッチ7が、電力系統9と重要負荷Rとの接続から、蓄電池2と重要負荷Rとの接続に、瞬時に切り替わる。UPSスイッチ7の切り替わりと略同時に、DC/AC変換器13が動作を開始し、蓄電池2から重要負荷Rへ電力が供給される。これにより、停電が発生しても、重要負荷Rには途切れることなく電力供給が継続される。
<Case 5: Power outage, solar power generation>
FIG. 6 is a diagram illustrating a flow of electric power when the solar panel 1 is generating power during a power failure of the electric power system 9. When a power failure occurs, the disconnect switch 8 is turned off, and the solar panel 1, the MPPT 11, and the power conditioner 6 are disconnected from the power system 9. When a power failure occurs and the voltage of the power system 9 falls below a predetermined threshold value, the UPS switch 7 is instantaneously switched from the connection between the power system 9 and the important load R to the connection between the storage battery 2 and the important load R. At substantially the same time as the switching of the UPS switch 7, the DC / AC converter 13 starts operating, and power is supplied from the storage battery 2 to the important load R. Thereby, even if a power failure occurs, the power supply to the important load R is continued without interruption.

停電時において太陽光パネル1が発電している場合、直流接続スイッチ5はオンとなるよう制御される。これにより、太陽光パネル1で発電した電力を、直流経路を介して効率よく蓄電池2へ充電することができる。このとき、パワーコンディショナ6のインバータは、動作を停止していてもよい。例えば、太陽光パネル1で発電された電力を、重要負荷Rへ供給し、余剰電力の少なくとも一部を蓄電値2へ充電することができる。この場合、余剰電力は、太陽光パネル1の発電可能な量(推定値)から宅内消費電力を差し引いた値となる。DC/DC変換器3は、太陽光パネル1の余剰電力分を特電池2へ充電するよう、充電量を制御することができる。なお、停電時には、太陽光パネル1で発電した電力を全て蓄電池2へ充電することもできる。   When the solar panel 1 is generating power during a power failure, the DC connection switch 5 is controlled to be turned on. Thereby, the electric power generated by the solar panel 1 can be efficiently charged to the storage battery 2 via the direct current path. At this time, the inverter of the power conditioner 6 may stop operating. For example, the electric power generated by the solar panel 1 can be supplied to the important load R and at least a part of the surplus power can be charged to the stored value 2. In this case, the surplus power is a value obtained by subtracting in-home power consumption from the amount (estimated value) that can be generated by the solar panel 1. The DC / DC converter 3 can control the amount of charge so that the extra power of the solar panel 1 is charged to the special battery 2. In addition, at the time of a power failure, all the electric power generated with the solar panel 1 can also be charged to the storage battery 2.

<ケース6:停電、太陽光発電無し>
図7は、電力系統9の停電中に、太陽光パネル1が発電していない場合の、電力の流れを示す図である。停電時で、太陽光パネル1が発電していない場合(例えば、夜間等)、直流接続スイッチ5はオフになるよう制御される。蓄電池2から放電される電力は、DC/DC変換器3、DC/AC変換器13を経て交流電力に変換され、重要負荷Rに供給される。太陽光パネル1が発電していないので、MPPT11、パワーコンディショナ6は動作を停止している。
<Case 6: No power failure, no solar power>
FIG. 7 is a diagram illustrating a flow of electric power when the solar panel 1 is not generating power during a power failure of the electric power system 9. When the solar panel 1 is not generating power during a power failure (for example, at night), the DC connection switch 5 is controlled to be turned off. The electric power discharged from the storage battery 2 is converted into AC power through the DC / DC converter 3 and the DC / AC converter 13 and supplied to the important load R. Since the solar panel 1 is not generating power, the operation of the MPPT 11 and the power conditioner 6 is stopped.

<ケース7:電力系統から蓄電池へ充電時>
図8は、電力系統9の電力を、宅内家電H及び重要負荷Rに供給するとともに、蓄電池2に充電する場合の、電力の流れを示す図である。このケースでは、太陽光パネル1による発電は行われていない。例えば、昼間の太陽光パネル1で発電した電力による充電が不十分であった場合に、夜間に蓄電池2へ追加充電するケースが想定される。この場合、AC/DC変換器12が動作して電力系統9の交流電力を直流電力に変換し、DC/DC変換器3へ供給する。この場合、直流接続スイッチ5はオフになるよう制御される。これにより、AC/DC変換器12から出力される直流電力がパワーコンディショナ6又はMPPT11へ流れるのを防ぐことができる。太陽光パネル1による発電は行われていないため、MPPT11及びパワーコンディショナ6の動作は停止している。
<Case 7: Charging from power system to storage battery>
FIG. 8 is a diagram showing the flow of power when the power of the power system 9 is supplied to the home appliance H and the important load R and the storage battery 2 is charged. In this case, power generation by the solar panel 1 is not performed. For example, when charging with power generated by the solar panel 1 in the daytime is insufficient, a case in which the storage battery 2 is additionally charged at night is assumed. In this case, the AC / DC converter 12 operates to convert the AC power of the power system 9 into DC power and supply it to the DC / DC converter 3. In this case, the DC connection switch 5 is controlled to be turned off. Thereby, it is possible to prevent the DC power output from the AC / DC converter 12 from flowing to the power conditioner 6 or the MPPT 11. Since power generation by the solar panel 1 is not performed, the operations of the MPPT 11 and the power conditioner 6 are stopped.

(実施形態の効果)
本実施形態における系統連系システム10では、パワーコンディショナ6の直流経路と、蓄電池2のDC/DC変換器3とが直流接続スイッチ5を介してつながっている。そのため、太陽光パネル1による発電量の余剰分を、直流線路を介して効率よく蓄電池2へ充電できる。また、売電時には、直流接続スイッチ5をオフにして蓄電池2から電力系統9へ電力を出力しないようできる。電力系統9への電力出力の抑制(売電抑制)が必要な時は、直流接続スイッチ5をオンにして、太陽光パネル1による発電量の余剰分を蓄電池2へ充電することができる。また、売電しない場合は、直流接続スイッチ5をオンにして蓄電池2を放電することにより、パワーコンディショナ6を介して、宅内家電H及び重要負荷Rに蓄電池2から電力を供給することもできる。これにより、例えば、ピークシフトが可能になる。
(Effect of embodiment)
In the grid interconnection system 10 according to the present embodiment, the DC path of the power conditioner 6 and the DC / DC converter 3 of the storage battery 2 are connected via the DC connection switch 5. Therefore, the surplus of the amount of power generated by the solar panel 1 can be efficiently charged to the storage battery 2 via the DC line. Further, at the time of selling power, the DC connection switch 5 can be turned off so that power is not output from the storage battery 2 to the power system 9. When it is necessary to suppress power output to the power system 9 (suppression of power sale), the DC connection switch 5 can be turned on to charge the storage battery 2 with the surplus of the amount of power generated by the solar panel 1. When the power is not sold, the storage battery 2 can be discharged by turning on the DC connection switch 5 to supply power from the storage battery 2 to the home appliance H and the important load R via the power conditioner 6. . Thereby, for example, peak shift becomes possible.

系統連系システム10は、さらに、電力系統9及び重要負荷R間の接続と、重要負荷R及び蓄電池2間の接続とを切り替えるUPSスイッチ7を備える。UPSスイッチ7と、DC/DC変換器3及び直流接続スイッチ5間のノードとの間に、蓄電池2からの直流電力を交流電力に変換するDC/AC変換器13が配置される。これにより、安定した交流電力を供給するUPSを構成することができる。蓄電池2は、太陽光パネル1で発電された電力を効率よく充電できるとともに、電力系統9の電圧低下時にも、途切れることなく安定して重要負荷に電力を供給することができる。   The grid interconnection system 10 further includes a UPS switch 7 that switches a connection between the power system 9 and the important load R and a connection between the important load R and the storage battery 2. Between the UPS switch 7 and a node between the DC / DC converter 3 and the DC connection switch 5, a DC / AC converter 13 that converts DC power from the storage battery 2 into AC power is disposed. Thereby, UPS which supplies the stable alternating current power can be comprised. The storage battery 2 can efficiently charge the power generated by the solar panel 1 and can stably supply power to an important load without interruption even when the voltage of the power system 9 is lowered.

また、系統連系システム10は、電力系統9の交流電力を直流電力に変換してDC/DC変換器3へ出力するAC/DC変換器12を備える。これにより、電力系統9の電力を蓄電池2に充電することができる。すなわち、太陽光パネル1の電力、及び、電力系統9からの電力のいずれも蓄電池1に充電することができる。例えば、太陽光パネル1で発電される電力では蓄電池2に十分に充電できない場合に、電力系統9の電力を蓄電池2に充電することができる。その結果、UPSの電源としての残量を確保できる。その他、太陽光パネル1の電力による充電と、電力系統9の電力による充電とを組み合わせることで、ピークシフト制御、及び蓄電池2の消耗を鑑みた充電制御等が可能になる。   The grid interconnection system 10 includes an AC / DC converter 12 that converts AC power of the power system 9 into DC power and outputs the DC power to the DC / DC converter 3. Thereby, the electric power of the electric power grid | system 9 can be charged to the storage battery 2. FIG. That is, both the electric power of the solar panel 1 and the electric power from the electric power system 9 can charge the storage battery 1. For example, when the power generated by the solar panel 1 cannot sufficiently charge the storage battery 2, the power of the power system 9 can be charged to the storage battery 2. As a result, the remaining amount as the power source of the UPS can be secured. In addition, by combining charging with the power of the solar panel 1 and charging with the power of the power grid 9, peak shift control, charging control in consideration of the consumption of the storage battery 2, and the like can be performed.

[実施形態2]
図9は、実施形態2における系統連系システムの構成例を示す図である。図9において、図1と同じ部分には同じ符号を付している。図9に示す系統連系システム10aでは、図1のAC/DC変換器12及びDC/AC変換器13の代わりに、双方向インバータ19が配置される。双方向インバータ19を用いることで、装置の小型化が容易になる。
[Embodiment 2]
FIG. 9 is a diagram illustrating a configuration example of a grid interconnection system according to the second embodiment. In FIG. 9, the same parts as those in FIG. In the grid interconnection system 10a shown in FIG. 9, a bidirectional inverter 19 is arranged instead of the AC / DC converter 12 and the DC / AC converter 13 of FIG. By using the bidirectional inverter 19, it is easy to reduce the size of the apparatus.

双方向インバータ19は、UPSスイッチ7と、DC/DC変換器3との間に配置される。UPSスイッチ7は、分電盤4を介して系統電力9と接続される第1端子7a、双方向インバータ19と接続される第2端子7b、及び重要負荷Rに接続される第3端子7cを有する。第1端子7aは、スイッチ18を介して双方向インバータ19とも接続されている。すなわち、スイッチ18と第1端子7aとの間のノードは、分電盤4(系統電力9)に接続されている。   The bidirectional inverter 19 is disposed between the UPS switch 7 and the DC / DC converter 3. The UPS switch 7 includes a first terminal 7a connected to the system power 9 via the distribution board 4, a second terminal 7b connected to the bidirectional inverter 19, and a third terminal 7c connected to the important load R. Have. The first terminal 7 a is also connected to the bidirectional inverter 19 via the switch 18. That is, the node between the switch 18 and the first terminal 7a is connected to the distribution board 4 (system power 9).

双方向インバータ19は、電力系統9から入力された交流電力を直流電力に変換して蓄電池2へ供給するとともに、蓄電池2から出力された直流電力を交流電力に変換して、重要負荷Rへ供給する。なお、双方向インバータ19から出力される交流電流は、電力系統9の交流電流の周波数に同期していなくてもよい。   The bidirectional inverter 19 converts AC power input from the power system 9 into DC power and supplies it to the storage battery 2, and converts DC power output from the storage battery 2 into AC power and supplies it to the important load R To do. Note that the alternating current output from the bidirectional inverter 19 may not be synchronized with the frequency of the alternating current in the power system 9.

電力系統9の電圧が正常な時は、UPSスイッチ7は、第1端子7aと第3端子7cを接続する状態となっている。すなわち、電力系統9の交流電力が重要負荷Rに供給される状態となっている。電力系統9の電力を蓄電池2へ充電する際には、スイッチ18がオンになる。停電等の異常時に、電力系統9の低電圧状態が検出されると、UPSスイッチ7は、第2端子7bと第3端子7cとを接続する状態に瞬時に切り替わるとともに、スイッチ18がオフになる。これにより、電力系統9と蓄電池2とをすばやく切り離すことができる。また、蓄電池2から放電された直流電力が、双方向インバータ19で交流に変換され、重要負荷Rに供給される。   When the voltage of the power system 9 is normal, the UPS switch 7 is in a state of connecting the first terminal 7a and the third terminal 7c. That is, the AC power of the power system 9 is in a state of being supplied to the important load R. When charging the storage battery 2 with electric power from the electric power system 9, the switch 18 is turned on. When a low voltage state of the power system 9 is detected during an abnormality such as a power failure, the UPS switch 7 is instantaneously switched to a state in which the second terminal 7b and the third terminal 7c are connected, and the switch 18 is turned off. . Thereby, the electric power grid | system 9 and the storage battery 2 can be isolate | separated quickly. Further, the DC power discharged from the storage battery 2 is converted into AC by the bidirectional inverter 19 and supplied to the important load R.

系統連系システム10aのその他の動作は、実施形態1における系統連系システム10と同様に実行することができる。   Other operations of the grid interconnection system 10a can be executed in the same manner as the grid interconnection system 10 in the first embodiment.

[実施形態3]
図10は、実施形態3における系統連系システムの構成例を示す図である。図10において、図1と同じ部分には同じ符号を付している。図10に示す系統連系システム10bでは、図1のAC/DC変換器12が除去されている。これにより、装置の小型化が容易になる。また、パワーコンディショナ6aには、双方向インバータが用いられる。これにより、電力系統9からの電力を、パワーコンディショナ6aを介して、蓄電池2へ充電することができる。
[Embodiment 3]
FIG. 10 is a diagram illustrating a configuration example of a grid interconnection system according to the third embodiment. 10, the same parts as those in FIG. 1 are denoted by the same reference numerals. In the grid interconnection system 10b shown in FIG. 10, the AC / DC converter 12 of FIG. 1 is removed. This facilitates downsizing of the device. Moreover, a bidirectional inverter is used for the power conditioner 6a. Thereby, the electric power from the electric power grid | system 9 can be charged to the storage battery 2 via the power conditioner 6a.

例えば、太陽光パネル1が発電していない時に、パワーコンディショナ6aの双方向インバータを駆動して、電力系統9の交流電力を直流に変換してDC/DC変換器3へ出力することができる。この時、直流接続スイッチ5はオンにする。これにより、例えば、実施形態1におけるケース7と同様に、夜間等に電力系統9の電力を蓄電池2に充電することが可能になる。系統連系システム10bのその他の動作は、実施形態1における系統連系システム10と同様に実行することができる。   For example, when the solar panel 1 is not generating power, the bidirectional inverter of the power conditioner 6a can be driven to convert the AC power of the power system 9 into DC and output it to the DC / DC converter 3. . At this time, the DC connection switch 5 is turned on. Thereby, for example, as in the case 7 in the first embodiment, it is possible to charge the storage battery 2 with power from the power system 9 at night or the like. Other operations of the grid interconnection system 10b can be executed in the same manner as the grid interconnection system 10 in the first embodiment.

以上、本発明の実施形態について説明した。上記実施形態1〜3における系統連系システム10、10a、10bは、発電部(太陽光パネル1)の電力を効率よく蓄電できる蓄電池をUPSとして機能させることができる。また、宅内家電H及び重要負荷R等の負荷に対して、電力系統9、発電部及び蓄電池2のいずれからも電力を供給することができる。蓄電池2には、発電部のみならず電力系統9からの電力も充電することができる。さらに、停電時には、発電部の電力を全て蓄電池2に充電することができる。   The embodiment of the present invention has been described above. The grid interconnection systems 10, 10a, and 10b in the first to third embodiments can cause a storage battery that can efficiently store the power of the power generation unit (solar panel 1) to function as a UPS. Moreover, electric power can be supplied from any of the electric power system 9, the power generation unit, and the storage battery 2 to loads such as the home appliance H and the important load R. The storage battery 2 can be charged not only with the power generation unit but also with power from the power system 9. Furthermore, at the time of a power failure, all the electric power of a power generation part can be charged to the storage battery 2. FIG.

本発明の実施形態は、上記実施形態1〜3に限られない。発電部は、太陽光パネル1に限られない。発電部は、例えば、風力発電装置又は燃料電池等であってもよい。また、系統連系システムの設置場所は、住宅に限られず、例えば、店舗、オフィス、事業所等の商業施設や、工場、農場等の生産施設等に系統連系システムを設置することができる。   Embodiment of this invention is not restricted to the said Embodiment 1-3. The power generation unit is not limited to the solar panel 1. The power generation unit may be, for example, a wind power generator or a fuel cell. The installation location of the grid interconnection system is not limited to a house, and for example, the grid interconnection system can be installed in a commercial facility such as a store, an office, or a business facility, or a production facility such as a factory or a farm.

UPSスイッチ7とDC/DC変換器3との間の電力変換手段は、上記例に限られず、様々な形態の変換器を用いることができる。また、UPSと負荷との接続形態も上記例に限られない。例えば、正常時に電力系統9の交流電力を供給する第1重要負荷に加えて、正常時に蓄電池2に接続されたインバータで変換された交流電力を供給する第2重要負荷を系統連系システムに接続することができる。   The power conversion means between the UPS switch 7 and the DC / DC converter 3 is not limited to the above example, and various types of converters can be used. The connection form between the UPS and the load is not limited to the above example. For example, in addition to the first important load that supplies AC power of the power system 9 during normal operation, the second important load that supplies AC power converted by an inverter connected to the storage battery 2 during normal operation is connected to the grid interconnection system. can do.

図11は、図1に系統連系システム10を、第2重要負荷を接続可能な形態に変更した変形例を示す図である。図11に示す例では、DC/AC変換器13に、さらに、第2重要負荷R2が接続される。この場合、正常時において、AC/DC変換器12及びDC/AC変換器13が動作し、第2重要負荷R2に、安定した交流電力を供給することができる。   FIG. 11 is a diagram illustrating a modification in which the grid interconnection system 10 is changed to a configuration in which the second important load can be connected to the system illustrated in FIG. In the example shown in FIG. 11, the second important load R <b> 2 is further connected to the DC / AC converter 13. In this case, the AC / DC converter 12 and the DC / AC converter 13 operate in a normal state, and stable AC power can be supplied to the second important load R2.

1 太陽光パネル(発電部の一例)
2 蓄電池
3 DC/DC変換器
5 直流接続スイッチ
6 パワーコンディショナ
7 UPSスイッチ
9 電力系統
10、10a、10b 系統連系システム
12 AC/DC変換器
13 DC/AC変換器
14 センサ
15 制御部
1 Solar panel (an example of a power generation unit)
2 Storage Battery 3 DC / DC Converter 5 DC Connection Switch 6 Power Conditioner 7 UPS Switch 9 Power System 10, 10a, 10b System Interconnection System 12 AC / DC Converter 13 DC / AC Converter 14 Sensor 15 Control Unit

Claims (5)

直流電力を発電する発電部に接続され、前記発電部で発電された直流電力を交流電力に変換し、変換した交流電力を電力系統及び/又は負荷に出力するパワーコンディショナと、
前記パワーコンディショナの直流経路におけるノードに接続される直流接続スイッチと、
前記直流接続スイッチを介して、前記パワーコンディショナの前記直流経路のノードに接続される蓄電池と、
前記蓄電池と前記直流接続スイッチとの間に接続されるDC/DC変換器と、
前記電力系統への電力出力の抑制指令を外部機器から受けた場合に前記直流接続スイッチをオンにして、前記DC/DC変換器を制御することにより、前記発電部で発電された電力の少なくとも一部を前記蓄電池に充電可能とする制御部とを備える、系統連系システム。
A power conditioner that is connected to a power generation unit that generates DC power, converts the DC power generated by the power generation unit into AC power, and outputs the converted AC power to a power system and / or a load;
A DC connection switch connected to a node in a DC path of the inverter;
A storage battery connected to a node of the DC path of the power conditioner via the DC connection switch;
A DC / DC converter connected between the storage battery and the DC connection switch;
When a command to suppress power output to the power system is received from an external device, the DC connection switch is turned on and the DC / DC converter is controlled, thereby at least one of the power generated by the power generation unit. A grid interconnection system comprising: a control unit that enables charging of the storage battery to the storage battery.
前記制御部は、前記発電部で発電された電力を前記電力系統へ出力する時に前記直流接続スイッチをオフにする、請求項1に記載の系統連系システム。   The grid interconnection system according to claim 1, wherein the control unit turns off the DC connection switch when outputting the power generated by the power generation unit to the power system. 前記制御部は、前記電力系統への電力出力の抑制指令を外部機器から受けた場合に前記直流接続スイッチをオンにして、前記DC/DC変換器に加えて前記パワーコンディショナも制御することにより、前記発電部で発電された電力を、前記負荷へ供給するとともに前記蓄電池に充電する、請求項1又は2に記載の系統連系システム。   The control unit turns on the DC connection switch when receiving a command to suppress power output to the power system from an external device, and controls the power conditioner in addition to the DC / DC converter. The grid interconnection system according to claim 1 or 2, wherein the power generated by the power generation unit is supplied to the load and the storage battery is charged. 前記電力系統と重要負荷との間の接続と、前記重要負荷と前記蓄電池との間の接続とを切り替えるスイッチと、
前記DC/DC変換器及び前記直流接続スイッチの間のノードと、前記スイッチとの間に配置され、前記蓄電池からの直流電力を交流電力に変換するDC/AC変換器とをさらに備え、
前記電力系統の電圧が閾値を下回った場合に、前記スイッチは、前記重要負荷と前記蓄電池との間を接続する状態となり、前記蓄電池から前記DC/DC変換器及び前記DC/AC変換器を介して、前記重要負荷へ交流電力が供給される、請求項1〜3のいずれか1項に記載の系統連系システム。
A switch for switching a connection between the power system and an important load, and a connection between the important load and the storage battery;
A node between the DC / DC converter and the DC connection switch, and a DC / AC converter that is arranged between the switch and converts DC power from the storage battery into AC power;
When the voltage of the power system falls below a threshold value, the switch is in a state of connecting between the important load and the storage battery, and from the storage battery via the DC / DC converter and the DC / AC converter. The grid interconnection system according to any one of claims 1 to 3, wherein AC power is supplied to the important load.
前記電力系統と、前記DC/DC変換器との間に接続され、前記電力系統の交流電力を、直流電力に変換して前記DC/DC変換器へ出力するAC/DC変換器をさらに備える、請求項4に記載の系統連系システム。   An AC / DC converter connected between the power system and the DC / DC converter and converting AC power of the power system into DC power and outputting the DC power to the DC / DC converter; The grid connection system according to claim 4.
JP2015203375A 2015-10-15 2015-10-15 Utility grid interconnection system Pending JP2017077092A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015203375A JP2017077092A (en) 2015-10-15 2015-10-15 Utility grid interconnection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015203375A JP2017077092A (en) 2015-10-15 2015-10-15 Utility grid interconnection system

Publications (1)

Publication Number Publication Date
JP2017077092A true JP2017077092A (en) 2017-04-20

Family

ID=58549827

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015203375A Pending JP2017077092A (en) 2015-10-15 2015-10-15 Utility grid interconnection system

Country Status (1)

Country Link
JP (1) JP2017077092A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019033601A (en) * 2017-08-08 2019-02-28 大阪瓦斯株式会社 Distributed power supply system
JP2020010531A (en) * 2018-07-10 2020-01-16 住友電気工業株式会社 Power storage device, photovoltaic generation power storage system and storage battery charging method
JP6766971B1 (en) * 2019-07-03 2020-10-14 東芝三菱電機産業システム株式会社 Power system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013051833A (en) * 2011-08-31 2013-03-14 Nichicon Corp Multiple power conditioner system
JP2013078191A (en) * 2011-09-30 2013-04-25 Sanyo Electric Co Ltd Power distribution system
JP2014187876A (en) * 2010-12-13 2014-10-02 Panasonic Corp Power control apparatus and power control system using the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014187876A (en) * 2010-12-13 2014-10-02 Panasonic Corp Power control apparatus and power control system using the same
JP2013051833A (en) * 2011-08-31 2013-03-14 Nichicon Corp Multiple power conditioner system
JP2013078191A (en) * 2011-09-30 2013-04-25 Sanyo Electric Co Ltd Power distribution system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019033601A (en) * 2017-08-08 2019-02-28 大阪瓦斯株式会社 Distributed power supply system
JP2020010531A (en) * 2018-07-10 2020-01-16 住友電気工業株式会社 Power storage device, photovoltaic generation power storage system and storage battery charging method
JP7119668B2 (en) 2018-07-10 2022-08-17 住友電気工業株式会社 Power storage device, solar power generation power storage system, and storage battery charging method
JP6766971B1 (en) * 2019-07-03 2020-10-14 東芝三菱電機産業システム株式会社 Power system
WO2021001965A1 (en) * 2019-07-03 2021-01-07 東芝三菱電機産業システム株式会社 Power system

Similar Documents

Publication Publication Date Title
JP5481760B2 (en) Power system
KR101116430B1 (en) Energy Storage System
JP5655167B2 (en) Power management apparatus and program
KR20140074361A (en) Power conditioner system and power-storage power conditioner
JP2011078215A (en) Power distribution system
US20120235492A1 (en) Power supply system
JP6568992B2 (en) Power management apparatus, power management system, and power management method
JP2011250673A (en) Energy controller and control method
JP5475387B2 (en) Power supply optimization device for power supply system
JP6194527B2 (en) Grid interconnection power supply
TW201351846A (en) System, method, and apparatus for powering equipment during a low voltage event
JP6574651B2 (en) Power control device
JP5373528B2 (en) Power distribution equipment
JP2017077092A (en) Utility grid interconnection system
JP2015233403A (en) Power charging and feeding apparatus
JP2011078237A (en) Power supply system
JP2014131422A (en) Power supply system, and power conditioner
JP2013063010A (en) Power supply device
JP2011062067A (en) Dc power distribution system
JP2015122841A (en) Power storage system and power generation system
JPH10248180A (en) Power converting apparatus
JP6168854B2 (en) Grid interconnection device
JP2016123241A (en) Power conditioner
JP6475515B2 (en) Power converter and power management system
JP2015080375A (en) Power conversion device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180730

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190415

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190423

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20191105