JP2017057602A - Shield excavation machine and operation control method for shield jack thereof - Google Patents

Shield excavation machine and operation control method for shield jack thereof Download PDF

Info

Publication number
JP2017057602A
JP2017057602A JP2015182104A JP2015182104A JP2017057602A JP 2017057602 A JP2017057602 A JP 2017057602A JP 2015182104 A JP2015182104 A JP 2015182104A JP 2015182104 A JP2015182104 A JP 2015182104A JP 2017057602 A JP2017057602 A JP 2017057602A
Authority
JP
Japan
Prior art keywords
group
propulsion
propulsion jacks
jacks
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015182104A
Other languages
Japanese (ja)
Other versions
JP6426571B2 (en
Inventor
克智 清水
Katsutomo Shimizu
克智 清水
福田 昌弘
Masahiro Fukuda
昌弘 福田
岩住 知一
Tomokazu Iwazumi
知一 岩住
吉隆 紀伊
Yoshitaka Kii
吉隆 紀伊
寿 溝田
Hisashi Mizota
寿 溝田
千明 宇留島
Chiaki Urushima
千明 宇留島
恭一 佐川
Kyoichi Sagawa
恭一 佐川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2015182104A priority Critical patent/JP6426571B2/en
Publication of JP2017057602A publication Critical patent/JP2017057602A/en
Application granted granted Critical
Publication of JP6426571B2 publication Critical patent/JP6426571B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To curb generation of vibration of a shield excavation machine as a whole.SOLUTION: A shield excavation machine 1 comprises: an excavation machine body 2; a plurality of shield jacks 15 which are arranged on an outer edge line (circumference C) of the excavation machine body, extendable and capable of moving the excavation machine body 2 forward when extended; a vibration measuring section which measures vibration of the excavation machine body 2; and a control section which controls operation of the plurality of shield jacks 15. The plurality of shield jacks 15 are divided into groups G1 to G12. When a measurement value of the vibration of the excavation machine body 2 becomes not less than a predetermined value while all the plurality of shield jacks 15 are in the middle of being extended, the control section controls the operation of the plurality of shield jacks 15 group by group in a predetermined order in a manner that stops extension or shortens extension lengths of shield jacks 15 and extends the stopped or shortened shield jacks 15 in a group.SELECTED DRAWING: Figure 2

Description

本発明は、トンネルの構築に用いられるシールド掘進機、及び、その推進ジャッキの作動を制御する方法に関する。   The present invention relates to a shield machine used for tunnel construction and a method for controlling the operation of its propulsion jack.

上下水道、共同溝、道路、鉄道などの管路として用いられるシールドトンネルは、シールド工法により構築される。
シールド工法ではシールド掘進機が用いられる。シールド掘進機の本体(掘進機本体)は、例えば、その外殻をなす筒状のスキンプレートと、このスキンプレートの前端部(切羽側端部)に設けられて地山を掘削するカッタヘッドと、を備える。また、シールド掘進機は、掘進機本体の周縁線上に配置されて伸縮可能な推進ジャッキを備える。
Shield tunnels used as pipelines for water and sewage systems, common ditches, roads, railways, etc. are constructed by the shield method.
In the shield method, a shield machine is used. The main body of the shield machine (the machine body) includes, for example, a cylindrical skin plate that forms an outer shell thereof, and a cutter head that is provided at the front end (face side end) of the skin plate and excavates natural ground . The shield machine includes a propulsion jack that is disposed on a peripheral line of the machine body and can be expanded and contracted.

シールド工法では、例えば、地山に発進立坑と到達立坑とを構築し、発進立坑から到達立坑へ向けてシールド掘進機で地山を掘削しながら、スキンプレートの後部(テール部)の内方で次々にセグメントをトンネル周方向に組み立ててセグメントリングを構築すると共に、隣接するセグメントリング同士をトンネル軸方向で連結することで円筒状の覆工体を構築する。この工法では、シールド掘進機は、推進ジャッキを伸長させることで、その後方の既設セグメントリングを後方へ押圧し、その反力として発生する推力によって、地山を掘削しながら前進する。
このようなシールド掘進機は特許文献1に開示されている。
In the shield method, for example, a start shaft and a reach shaft are constructed in the ground, and the ground is excavated with a shield machine from the start shaft to the reach shaft, while inside the rear part (tail part) of the skin plate. One after another, the segments are assembled in the circumferential direction of the tunnel to construct a segment ring, and adjacent segment rings are connected in the tunnel axis direction to construct a cylindrical lining body. In this construction method, the shield machine extends the propulsion jack, pushes the existing segment ring behind it, and advances while excavating the natural ground by the thrust generated as the reaction force.
Such a shield machine is disclosed in Patent Document 1.

特開2015−030994号公報JP, 2015-030994, A

ところで、近年、セグメントの組立工程での時間短縮を目的として、幅(トンネル軸方向での長さ)が長いセグメント(例えば幅が1.5m〜2mのセグメント)が用いられている。このセグメントの拡幅化に伴って、推進ジャッキの長さが長くなってきており、また、推進ジャッキの伸縮範囲も大きくなってきている。この結果、推進ジャッキの伸長時に推進ジャッキに作用する圧縮荷重、曲げ荷重、ねじり荷重などにより、推進ジャッキ(特にロッド)に変形(例えば弾性変形)が発生し、これに起因してシールド掘進機の全体が振動する現象が発生していた。また、この振動は、トンネル施工場所の近隣の住宅などに伝わりかねず、ひいては、近隣の住民の生活環境に悪影響を及ぼすおそれがあった。   By the way, in recent years, a segment having a long width (length in the tunnel axis direction) (for example, a segment having a width of 1.5 m to 2 m) is used for the purpose of shortening the time in the segment assembling process. Along with the widening of this segment, the length of the propulsion jack is increasing, and the expansion / contraction range of the propulsion jack is also increasing. As a result, deformation (for example, elastic deformation) occurs in the propulsion jack (especially rod) due to compressive load, bending load, torsional load, etc. acting on the propulsion jack when the propulsion jack is extended. The phenomenon that the whole vibrates occurred. In addition, this vibration may be transmitted to a house near the tunnel construction site, which may adversely affect the living environment of the nearby residents.

また、推進ジャッキの伸長時に、推進ジャッキからの押圧力が既設のセグメントに伝達される際に、推進ジャッキの偏芯量を低減させるために、及び、セグメントに作用する偏荷重を抑制するために、1つのスプレッダに対して2つの推進ジャッキが取り付けられた、いわゆるツインジャッキが採用され得る(特許文献1の図3参照)。   In order to reduce the eccentric amount of the propulsion jack and to suppress the eccentric load acting on the segment when the pushing force from the propulsion jack is transmitted to the existing segment when the propulsion jack is extended. A so-called twin jack in which two propulsion jacks are attached to one spreader can be employed (see FIG. 3 of Patent Document 1).

しかしながら、このツインジャッキを採用すると、推進ジャッキのロッド径が細くなるため、剛性が低下する。それゆえ、推進ジャッキの伸長時における推進ジャッキ(特にロッド)の変形量が増大し、ひいては、シールド掘進機の全体での振動を助長しかねなかった。   However, when this twin jack is adopted, the rod diameter of the propulsion jack becomes thin, and the rigidity is lowered. Therefore, the amount of deformation of the propulsion jack (particularly the rod) when the propulsion jack is extended increases, and as a result, vibration of the entire shield machine can be promoted.

本発明は、このような実状に鑑み、シールド掘進機の全体での振動の発生を抑制することを目的とする。   In view of such a situation, an object of the present invention is to suppress generation of vibration in the entire shield machine.

そのため本発明に係るシールド掘進機の第1の態様は、掘進機本体と、掘進機本体の周縁線上に配置されて伸縮可能であり、かつ、伸長時に掘進機本体を前進させることが可能な複数の推進ジャッキと、掘進機本体の振動を測定する振動測定部と、複数の推進ジャッキの作動を制御する制御部と、を有する。複数の推進ジャッキは複数のグループに分けられている。制御部は、全ての複数の推進ジャッキが伸長している途中で、掘進機本体の振動の測定値が所定値以上になると、所定の順番でグループごとに、該グループを構成する推進ジャッキの伸長の停止又は短縮と、この停止又は短縮された推進ジャッキの伸長とを行うように、複数の推進ジャッキの作動を制御する。   Therefore, the first aspect of the shield machine according to the present invention includes a machine body, a plurality of the machine that can be expanded and contracted by being arranged on the peripheral line of the machine, and can advance the machine when it is extended. A propulsion jack, a vibration measuring unit that measures the vibration of the excavator main body, and a control unit that controls the operation of the plurality of propulsion jacks. Multiple propulsion jacks are divided into multiple groups. When the measured value of the vibration of the excavator main body exceeds a predetermined value while all the plurality of propulsion jacks are extended, the control unit extends the propulsion jacks constituting the group in a predetermined order for each group. The operation of the plurality of propulsion jacks is controlled so as to stop or shorten the engine and to extend the propulsion jacks that have been stopped or shortened.

本発明に係るシールド掘進機の第2の態様は、掘進機本体と、掘進機本体の周縁線上に配置されて伸縮可能であり、かつ、伸長時に掘進機本体を前進させることが可能な複数の推進ジャッキと、掘進機本体の振動を測定する振動測定部と、複数の推進ジャッキの作動を制御する制御部と、を有する。複数の推進ジャッキは複数のグループに分けられている。制御部は、全ての複数の推進ジャッキが伸長している途中で、掘進機本体の振動の測定値が所定値以上になると、まず、全ての複数の推進ジャッキの伸長の停止を行い、次に、所定の順番でグループごとに、該グループを構成する推進ジャッキの短縮と、この短縮された推進ジャッキの伸長とを行うように、複数の推進ジャッキの作動を制御する。   A second aspect of the shield machine according to the present invention includes an excavator main body, a plurality of the excavator main body, and a plurality of the excavator main body that are disposed on a peripheral line of the excavator main body and can be expanded and contracted, and the excavator main body can be advanced when extended. It has a propulsion jack, a vibration measuring unit that measures the vibration of the excavator main body, and a control unit that controls the operation of the plural propulsion jacks. Multiple propulsion jacks are divided into multiple groups. When the measured value of the vibration of the excavator main body exceeds a predetermined value while all the plurality of propulsion jacks are being extended, the control unit first stops the extension of all the plurality of propulsion jacks, and then The operation of the plurality of propulsion jacks is controlled so as to shorten the propulsion jacks constituting the group and extend the shortened propulsion jacks for each group in a predetermined order.

本発明に係るシールド掘進機における推進ジャッキの作動制御方法の第1の態様において、シールド掘進機は、掘進機本体と、掘進機本体の周縁線上に配置されて伸縮可能であり、かつ、伸長時に掘進機本体を前進させることが可能な複数の推進ジャッキと、を有する。当該推進ジャッキの作動制御方法の第1の態様では、複数の推進ジャッキを複数のグループに分ける。また、当該推進ジャッキの作動制御方法の第1の態様では、全ての複数の推進ジャッキが伸長している途中で、掘進機本体の振動の度合いが所定の閾値以上になると、所定の順番でグループごとに、該グループを構成する推進ジャッキの伸長の停止又は短縮と、この停止又は短縮された推進ジャッキの伸長とを行うように、複数の推進ジャッキの作動を制御する。   In the first aspect of the operation control method of the propulsion jack in the shield machine according to the present invention, the shield machine is disposed on the digging machine body and the peripheral line of the machine, and can be expanded and contracted. A plurality of propulsion jacks capable of moving the excavator body forward. In the first aspect of the operation control method for the propulsion jack, the plurality of propulsion jacks are divided into a plurality of groups. Further, in the first aspect of the operation control method of the propulsion jack, when all the plurality of propulsion jacks are being extended and the degree of vibration of the excavator main body exceeds a predetermined threshold value, the grouping is performed in a predetermined order. Every time, the operation of the plurality of propulsion jacks is controlled so as to stop or shorten the extension of the propulsion jacks constituting the group and to extend the propulsion jacks that are stopped or shortened.

本発明に係るシールド掘進機における推進ジャッキの作動制御方法の第2の態様において、シールド掘進機は、掘進機本体と、掘進機本体の周縁線上に配置されて伸縮可能であり、かつ、伸長時に掘進機本体を前進させることが可能な複数の推進ジャッキと、を有する。当該推進ジャッキの作動制御方法の第2の態様では、複数の推進ジャッキを複数のグループに分ける。また、当該推進ジャッキの作動制御方法の第2の態様では、全ての複数の推進ジャッキが伸長している途中で、掘進機本体の振動の度合いが所定の閾値以上になると、まず、全ての複数の推進ジャッキの伸長の停止を行い、次に、所定の順番でグループごとに、該グループを構成する推進ジャッキの短縮と、この短縮された推進ジャッキの伸長とを行うように、複数の推進ジャッキの作動を制御する。   In the second aspect of the method for controlling the operation of the propulsion jack in the shield machine according to the present invention, the shield machine is arranged on the peripheral line of the machine body and the machine body, and can be expanded and contracted. A plurality of propulsion jacks capable of moving the excavator body forward. In the second aspect of the operation control method for the propulsion jack, the plurality of propulsion jacks are divided into a plurality of groups. Further, in the second aspect of the operation control method of the propulsion jack, when all of the plurality of propulsion jacks are extended, when the degree of vibration of the excavator main body exceeds a predetermined threshold, A plurality of propulsion jacks so that the propulsion jacks constituting the group and the shortened propulsion jacks are elongated for each group in a predetermined order. Control the operation of

本発明の前記第1の態様によれば、全ての複数の推進ジャッキが伸長している途中で、掘進機本体の振動の測定値が所定値以上になると(換言すれば、掘進機本体の振動の度合いが所定の閾値以上になると)、所定の順番でグループごとに、該グループを構成する推進ジャッキの伸長の停止又は短縮と、この停止又は短縮された推進ジャッキの伸長とを行うように、複数の推進ジャッキの作動を制御する。これにより、全ての複数の推進ジャッキが伸長している途中において、所定の順番でグループごとに、推進ジャッキの停止又は短縮を行って、当該推進ジャッキに作用する荷重を緩和することができるので、推進ジャッキの変形に起因するシールド掘進機の全体での振動の発生を抑制することができる。   According to the first aspect of the present invention, when the measured value of the vibration of the excavator body becomes equal to or greater than a predetermined value while all the plurality of propulsion jacks are extended (in other words, the vibration of the excavator body). When the degree of is equal to or greater than a predetermined threshold), for each group in a predetermined order, stop or shorten the extension of the propulsion jack constituting the group, and extend the stop or shortened propulsion jack, Control the operation of multiple propulsion jacks. Thereby, while all of the plurality of propulsion jacks are extended, it is possible to reduce the load acting on the propulsion jacks by stopping or shortening the propulsion jacks for each group in a predetermined order. Generation of vibrations in the entire shield machine due to deformation of the propulsion jack can be suppressed.

本発明の前記第2の態様によれば、全ての複数の推進ジャッキが伸長している途中で、掘進機本体の振動の測定値が所定値以上になると(換言すれば、掘進機本体の振動の度合いが所定の閾値以上になると)、まず、全ての複数の推進ジャッキの伸長の停止を行い、次に、所定の順番でグループごとに、該グループを構成する推進ジャッキの短縮と、この短縮された推進ジャッキの伸長とを行うように、複数の推進ジャッキの作動を制御する。これにより、全ての複数の推進ジャッキの伸長を一時停止して、所定の順番でグループごとに、推進ジャッキの短縮を行って、当該推進ジャッキに作用する荷重を緩和することができるので、推進ジャッキの変形に起因するシールド掘進機の全体での振動の発生を抑制することができる。   According to the second aspect of the present invention, when the measured value of the vibration of the excavator body becomes a predetermined value or more while all the plurality of propulsion jacks are extended (in other words, the vibration of the excavator body) First, the extension of all the plurality of propulsion jacks is stopped, and then the propulsion jacks constituting the group are shortened and shortened for each group in a predetermined order. The operation of the plurality of propulsion jacks is controlled so as to extend the propulsion jacks. Accordingly, it is possible to temporarily stop the extension of all the plurality of propulsion jacks, shorten the propulsion jacks for each group in a predetermined order, and reduce the load acting on the propulsion jacks. Occurrence of vibration in the entire shield machine due to the deformation of can be suppressed.

本発明の第1実施形態におけるシールド掘進機の概略構成図The schematic block diagram of the shield machine in 1st Embodiment of this invention 図1のI−I断面図II sectional view of FIG. 同上実施形態における推進ジャッキの作動制御方法を示すフローチャートThe flowchart which shows the operation control method of the propulsion jack in embodiment same as the above. 本発明の第2実施形態における推進ジャッキの作動制御方法を示すフローチャートThe flowchart which shows the operation control method of the propulsion jack in 2nd Embodiment of this invention.

以下に本発明の実施の形態を図面に基づいて説明する。
図1は、本発明の第1実施形態におけるシールド掘進機の概略構成を示す。図2は、図1のI−I断面図である。尚、図2においては、図示の簡略化のため、後述するエレクター及びセグメントリングの図示を省略している。
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 shows a schematic configuration of a shield machine according to a first embodiment of the present invention. 2 is a cross-sectional view taken along the line II of FIG. In FIG. 2, for simplification of illustration, illustration of an erector and a segment ring, which will be described later, is omitted.

尚、本実施形態では、便宜上、トンネル掘進方向を前進方向として前後左右を規定している。
また、本実施形態では、いわゆる泥土圧式のシールド掘進機を例にとってシールド掘進機の構成を説明するが、シールド掘進機の種類はこれに限らない。
In this embodiment, for the sake of convenience, the front, rear, left and right are defined with the tunneling direction as the forward direction.
In the present embodiment, the configuration of the shield machine is described by taking a so-called mud pressure shield machine as an example, but the type of shield machine is not limited to this.

トンネルの構築に用いられるシールド掘進機1は、その本体(掘進機本体)2が、円筒形状の前胴3及び後胴4を含んで構成される。ここで、前胴3の側部に配置されるスキンプレート5と、後胴4の側部に配置されるスキンプレート6とは、それぞれ、掘進機本体2の外殻をなすものである。   A shield machine 1 used for construction of a tunnel is configured such that a main body (digging machine body) 2 includes a cylindrical front cylinder 3 and a rear cylinder 4. Here, the skin plate 5 disposed on the side portion of the front barrel 3 and the skin plate 6 disposed on the side portion of the rear barrel 4 each constitute an outer shell of the excavator main body 2.

前胴3は、掘削用のカッタヘッド7とシールド隔壁(バルクヘッド)8とを有する。
カッタヘッド7は前胴3の前端部に配置されている。シールド隔壁8は、カッタヘッド7の後方に離間して前胴3に配置されている。
カッタヘッド7は、シールド隔壁8に回転自在に支持されており、シールド隔壁8の後面に設置された駆動用モータ9を駆動源として、回転しながら地山を掘削する。
The front barrel 3 has a cutter head 7 for excavation and a shield partition wall (bulk head) 8.
The cutter head 7 is disposed at the front end of the front barrel 3. The shield partition 8 is disposed on the front cylinder 3 so as to be separated from the rear of the cutter head 7.
The cutter head 7 is rotatably supported by the shield partition wall 8, and excavates a natural ground while rotating using a drive motor 9 installed on the rear surface of the shield partition wall 8 as a drive source.

カッタヘッド7とシールド隔壁8との間には、これらとスキンプレート5とによりカッタチャンバ10が区画形成されている。
カッタチャンバ10内では、カッタヘッド7による掘削で生じた掘削土砂が滞留する。
A cutter chamber 10 is defined between the cutter head 7 and the shield partition wall 8 and the skin plate 5.
In the cutter chamber 10, excavated earth and sand generated by excavation by the cutter head 7 stay.

シールド掘進機1には、その前胴3の後部と後胴4の前部とを連結するように、複数の中折れジャッキ11が、胴の周方向に互いに間隔を空けて配置されている。
中折れジャッキ11は、シリンダ11aとロッド11bとにより構成される油圧ジャッキである。シリンダ11aは、その一端が後胴4の前部に固定されており、他端側にて、ロッド11bが進出・退入可能となっている。中折れジャッキ11のロッド11bは、その先端部が、前胴3の後部に固定されている。シールド掘進機1の掘進方向の変更・調整時には、各中折れジャッキ11の伸長量が変更・調整される。
In the shield machine 1, a plurality of middle-folding jacks 11 are arranged at intervals in the circumferential direction of the cylinder so as to connect the rear part of the front cylinder 3 and the front part of the rear cylinder 4.
The bent jack 11 is a hydraulic jack constituted by a cylinder 11a and a rod 11b. One end of the cylinder 11a is fixed to the front portion of the rear barrel 4, and the rod 11b can be advanced and retracted on the other end side. The tip of the rod 11b of the middle folding jack 11 is fixed to the rear part of the front barrel 3. At the time of changing / adjusting the excavation direction of the shield machine 1, the extension amount of each bent jack 11 is changed / adjusted.

シールド掘進機1は、後胴4のスキンプレート6内にエレクター12を備える。
エレクター12は把持部12aを備える。エレクター12は、スキンプレート6の後部(テール部)60の内方にて、円弧状断面を有するセグメント13を把持部12aで把持しつつ、セグメント13をトンネル軸方向、径方向、周方向に適宜移動させることができる。エレクター12は、スキンプレート6の後部60の内方にて、その周方向にセグメント13を組み立てて、円筒状のセグメントリング14を構築する。
The shield machine 1 includes an erector 12 in the skin plate 6 of the rear trunk 4.
The erector 12 includes a grip portion 12a. The erector 12 appropriately holds the segment 13 in the tunnel axial direction, the radial direction, and the circumferential direction while gripping the segment 13 having an arc-shaped cross section with the grip portion 12a inside the rear portion (tail portion) 60 of the skin plate 6. Can be moved. The erector 12 assembles the segments 13 in the circumferential direction inside the rear portion 60 of the skin plate 6 to construct a cylindrical segment ring 14.

シールド掘進機1の後胴4の周縁部には、複数(図2では92本)の推進ジャッキ15が、複数の中折れジャッキ11と干渉しないように、胴の周方向に互いに間隔を空けて配置されている。ここで、図2に示す円周Cが、本発明の「掘進機本体の周縁線」に対応する。ゆえに、本実施形態では、掘進機本体2(後胴4)の周縁線上(円周C上)に、複数の推進ジャッキ15が配置されている。尚、本実施形態では推進ジャッキ15の本数が92本であるとして以下説明するが、推進ジャッキ15の本数はこれに限らない。   A plurality of (92 in FIG. 2) propulsion jacks 15 are spaced apart from each other in the circumferential direction of the barrel so that they do not interfere with the plurality of middle-folded jacks 11 at the peripheral portion of the rear barrel 4 of the shield machine 1. Has been placed. Here, the circumference C shown in FIG. 2 corresponds to the “periphery line of the excavator main body” of the present invention. Therefore, in this embodiment, the some propulsion jack 15 is arrange | positioned on the peripheral line (circumference C) of the excavation machine main body 2 (rear trunk | drum 4). In the present embodiment, the number of propulsion jacks 15 will be described below as 92, but the number of propulsion jacks 15 is not limited to this.

推進ジャッキ15は、シリンダ15aとロッド15bとにより構成される油圧ジャッキである。シリンダ15aは、その一端側が後胴4に固定されており、他端側にて、ロッド15bが進出・退入可能となっている。本実施形態では、通常時において、全ての推進ジャッキ15のロッド15bの先端部をスプレッダ15cを介して既設のセグメントリング14に当接させた状態で全ての推進ジャッキ15を伸長作動させることにより、シールド掘進機1(掘進機本体2)は推進力を得る。それゆえ、推進ジャッキ15は、既設のセグメントリング14をスキンプレート6の後部60の後方を押し出して、その反力により、シールド掘進機1(掘進機本体2)を前方に推進させることができる。   The propulsion jack 15 is a hydraulic jack composed of a cylinder 15a and a rod 15b. One end side of the cylinder 15a is fixed to the rear cylinder 4, and the rod 15b can be advanced and retracted at the other end side. In the present embodiment, in a normal state, by operating all the propulsion jacks 15 in a state where the tip portions of the rods 15b of all the propulsion jacks 15 are in contact with the existing segment rings 14 via the spreaders 15c, The shield machine 1 (digging machine main body 2) obtains a driving force. Therefore, the propulsion jack 15 can push the existing segment ring 14 behind the rear portion 60 of the skin plate 6 and propel the shield machine 1 (digging machine body 2) forward by the reaction force.

尚、本実施形態では、推進ジャッキ15の伸長時に、推進ジャッキ15からの押圧力が既設のセグメントリング14に伝達される際に、推進ジャッキ15の偏芯量を低減させるために、及び、セグメントリング14に作用する偏荷重を抑制するために、1つのスプレッダ15cに対して2つの推進ジャッキ15が取り付けられた、いわゆるツインジャッキが採用されている。それゆえ、本実施形態では、スプレッダ15cの個数が46個である(図2参照)。しかしながら、推進ジャッキ15の形式はこれに限らない。すなわち、1つのスプレッダ15cに対して1つの推進ジャッキ15が取り付けられた形式であってもよい。   In this embodiment, when the propulsion jack 15 is extended, when the pressing force from the propulsion jack 15 is transmitted to the existing segment ring 14, the eccentric amount of the propulsion jack 15 is reduced, and the segment In order to suppress the uneven load acting on the ring 14, a so-called twin jack in which two propulsion jacks 15 are attached to one spreader 15c is employed. Therefore, in the present embodiment, the number of spreaders 15c is 46 (see FIG. 2). However, the type of the propulsion jack 15 is not limited to this. That is, it may be a type in which one propulsion jack 15 is attached to one spreader 15c.

本実施形態では、92本の推進ジャッキ15が、12個のグループ(グループG1〜G12)に分けられている。すなわち、複数の推進ジャッキ15が複数のグループ(グループG1〜G12)に分けられている。これらグループG1〜G12は、掘進機本体2の周方向に並んでいる。
尚、複数の推進ジャッキ15のグループ分けについては、グループの総数が4の倍数になることが好ましく、グループの総数が8、12、16のうちのいずれかになることが更に好ましい。これにより、各グループを、上下左右にバランスよく分散配置することができる。
In the present embodiment, 92 propulsion jacks 15 are divided into 12 groups (groups G1 to G12). That is, the plurality of propulsion jacks 15 are divided into a plurality of groups (groups G1 to G12). These groups G1 to G12 are arranged in the circumferential direction of the excavator main body 2.
As for the grouping of the plurality of propulsion jacks 15, the total number of groups is preferably a multiple of 4, and the total number of groups is more preferably any of 8, 12, and 16. Thereby, each group can be distributed in a well-balanced manner vertically and horizontally.

図2に示すように、グループG1〜G3、G5〜G9、G11及びG12は、それぞれ、8本の推進ジャッキ15により構成されている。グループG4及びG10は、それぞれ、6本の推進ジャッキ15により構成されている。尚、各グループにおける推進ジャッキ15の本数はこれに限らず、2本以上であれば何本でもよい。
グループG1とグループG7とは機軸MCを挟んで互いに対向している。グループG2とグループG8とは機軸MCを挟んで互いに対向している。グループG3とグループG9とは機軸MCを挟んで互いに対向している。グループG4とグループG10とは機軸MCを挟んで互いに対向している。グループG5とグループG11とは機軸MCを挟んで互いに対向している。グループG6とグループG12とは機軸MCを挟んで互いに対向している。
As shown in FIG. 2, each of the groups G1 to G3, G5 to G9, G11, and G12 includes eight propulsion jacks 15. The groups G4 and G10 are each composed of six propulsion jacks 15. The number of propulsion jacks 15 in each group is not limited to this, and any number may be used as long as it is two or more.
The group G1 and the group G7 face each other across the axis MC. The group G2 and the group G8 are opposed to each other across the axis MC. The group G3 and the group G9 are opposed to each other across the axis MC. The group G4 and the group G10 are opposed to each other across the axis MC. The group G5 and the group G11 are opposed to each other across the axis MC. The group G6 and the group G12 are opposed to each other across the axis MC.

図1に戻り、シールド掘進機1は、カッタチャンバ10内の掘削土砂をシールド隔壁8の後方に搬出するスクリューコンベヤ16を備えている。
スクリューコンベヤ16は、シールド隔壁8に固定された円筒状のケース17とその内部に組み込まれたオーガ18とからなり、オーガ18を回転させることにより、カッタチャンバ10内の掘削土砂をシールド隔壁8の後方に搬出する。
Returning to FIG. 1, the shield machine 1 includes a screw conveyor 16 that carries the excavated earth and sand in the cutter chamber 10 to the rear of the shield partition wall 8.
The screw conveyor 16 includes a cylindrical case 17 fixed to the shield partition 8 and an auger 18 incorporated therein. By rotating the auger 18, excavated earth and sand in the cutter chamber 10 is transferred to the shield partition 8. Carry out backwards.

後胴4は、その中央部に足場20を備える。足場20は、機軸MCに沿うように延在している。足場20の本体をなすフレーム部21は、図2に示すような矩形断面を有して機軸MCに沿うように延在している。   The back trunk 4 includes a scaffold 20 at the center thereof. The scaffold 20 extends along the axis MC. The frame portion 21 constituting the main body of the scaffold 20 has a rectangular cross section as shown in FIG. 2 and extends along the axis MC.

足場20(フレーム部21)の下方であって、かつ、エレクター12の後方には、エレクター12にセグメント13を供給するセグメント供給装置22が配置されている。また、足場20のうち、スキンプレート6の後部60の内方に位置する部分には、機軸方向に沿って往復移動可能な移動足場(図示せず)が設けられている。この移動足場は、セグメント13同士を連結する作業等に用いられ得る。   A segment supply device 22 that supplies the segment 13 to the erector 12 is disposed below the scaffold 20 (frame portion 21) and behind the erector 12. In addition, a moving scaffold (not shown) capable of reciprocating along the axis direction is provided in a portion of the scaffold 20 that is located inside the rear portion 60 of the skin plate 6. This moving scaffold can be used for work etc. which connect segments 13 mutually.

フレーム部21には、振動センサの一例である加速度センサ31が設けられている。本実施形態において、加速度センサ31は、互いに直交する3つの軸方向(x軸方向,y軸方向,z軸方向)の加速度を測定する3軸加速度センサである。従って、加速度センサ31は、掘進機本体2の加速度として、前記3つの軸方向の加速度を測定することができ、ひいては、掘進機本体2の振動として、前記3つの軸方向の振動を測定することができる。また、加速度センサ31によって、前記3つの軸方向における掘進機本体2の加速度の度合い(換言すれば、掘進機本体2の振動の度合い)を把握することができる。それゆえ、加速度センサ31が、本発明の「振動測定部」として機能し得る。   The frame unit 21 is provided with an acceleration sensor 31 that is an example of a vibration sensor. In the present embodiment, the acceleration sensor 31 is a three-axis acceleration sensor that measures acceleration in three axial directions (x-axis direction, y-axis direction, and z-axis direction) orthogonal to each other. Therefore, the acceleration sensor 31 can measure the accelerations in the three axial directions as the acceleration of the excavator body 2, and consequently measures the vibrations in the three axial directions as the vibrations of the excavator body 2. Can do. Further, the acceleration sensor 31 can grasp the degree of acceleration of the excavator main body 2 in the three axial directions (in other words, the degree of vibration of the excavator main body 2). Therefore, the acceleration sensor 31 can function as the “vibration measurement unit” of the present invention.

加速度センサ31にて測定された、前記3つの軸方向の加速度(振動)に対応する信号は、図示しない信号線を介して、制御装置42に伝達される。ここで、制御装置42は、例えば、足場20に設けられた運転管理室45内に配置され得る。
制御装置42は、合成加速度算出部48、及び、振動判定部49を備える。また、制御装置42は、本発明の「制御部」として機能して、全ての推進ジャッキ15の作動(具体的には伸縮作動)を前述のグループG1〜G12ごとに制御する。
Signals corresponding to the accelerations (vibrations) in the three axial directions measured by the acceleration sensor 31 are transmitted to the control device 42 via signal lines (not shown). Here, the control apparatus 42 may be arrange | positioned in the driving | operation management room 45 provided in the scaffold 20, for example.
The control device 42 includes a combined acceleration calculation unit 48 and a vibration determination unit 49. Further, the control device 42 functions as a “control unit” of the present invention, and controls the operation (specifically, the expansion / contraction operation) of all the propulsion jacks 15 for each of the aforementioned groups G1 to G12.

合成加速度算出部48は、加速度センサ31にて測定された、前記3つの軸方向の加速度x,y,zを以下の式(1)により合成して、合成加速度aを算出する。ここで、加速度x,y,zは、それぞれ、x軸方向,y軸方向,z軸方向の加速度である。   The combined acceleration calculating unit 48 combines the three axial accelerations x, y, and z measured by the acceleration sensor 31 according to the following equation (1) to calculate a combined acceleration a. Here, the accelerations x, y, and z are accelerations in the x-axis direction, the y-axis direction, and the z-axis direction, respectively.

それゆえ、加速度センサ31と合成加速度算出部48とが協働して、本発明の「振動測定部」として機能して、掘進機本体2の加速度(合成加速度)を測定することができ、ひいては、掘進機本体2の振動を測定することができる。また、掘進機本体2の加速度(合成加速度)の度合い(換言すれば、掘進機本体2の振動の度合い)を把握することができる。   Therefore, the acceleration sensor 31 and the combined acceleration calculating unit 48 cooperate to function as the “vibration measuring unit” of the present invention to measure the acceleration (synthetic acceleration) of the excavator main body 2. The vibration of the excavator main body 2 can be measured. Further, the degree of acceleration (synthetic acceleration) of the excavator main body 2 (in other words, the degree of vibration of the excavator main body 2) can be grasped.

振動判定部49は、掘進機本体2の振動が所定値以上であるか否かを判定する。本実施形態では、具体的には、掘進機本体2の振動に対応する合成加速度aが所定値P以上であるか否かを判定する。ここで、所定値Pとは、後述する振動抑制制御ルーチンを実行するか否かを判定するための閾値であり、予め設定されている。また、所定値Pが本発明の「所定値」及び「所定の閾値」に対応し得る。また、合成加速度aが、本発明の「掘進機本体の振動の測定値」及び「掘進機本体の振動の度合い」に対応し得る。   The vibration determination unit 49 determines whether the vibration of the excavator main body 2 is equal to or greater than a predetermined value. In the present embodiment, specifically, it is determined whether or not the combined acceleration a corresponding to the vibration of the excavator body 2 is equal to or greater than a predetermined value P. Here, the predetermined value P is a threshold value for determining whether or not to execute a vibration suppression control routine described later, and is set in advance. Further, the predetermined value P can correspond to the “predetermined value” and the “predetermined threshold value” of the present invention. The combined acceleration a may correspond to the “measured value of the vibration of the excavator body” and the “degree of vibration of the excavator body” of the present invention.

次に、制御装置42により実現される推進ジャッキ15の作動制御方法について、上述の図1及び図2に加えて、図3を用いて説明する。
図3は、本実施形態における推進ジャッキ15の作動制御方法を示すフローチャートである。
Next, the operation control method of the propulsion jack 15 realized by the control device 42 will be described with reference to FIG. 3 in addition to the above-described FIG. 1 and FIG.
FIG. 3 is a flowchart showing an operation control method of the propulsion jack 15 in the present embodiment.

図3に示すフローは、全ての推進ジャッキ15のロッド15bの先端部がスプレッダ15cを介して既設のセグメントリング14に当接している状態で、全ての推進ジャッキ15が伸長作動しているときに(すなわち、全ての推進ジャッキ15が伸長している途中において)、所定の周期で繰り返し実行される。   The flow shown in FIG. 3 is when all the propulsion jacks 15 are operating in an extended state in a state where the tip ends of the rods 15b of all the propulsion jacks 15 are in contact with the existing segment rings 14 via the spreaders 15c. (In other words, while all the propulsion jacks 15 are extended), it is repeatedly executed at a predetermined cycle.

まず、ステップS1にて、合成加速度aが所定値P以上であるか否かを判定する。
合成加速度aが所定値P以上ではない(すなわち、合成加速度aが所定値P未満である)場合には、ステップS2に進み、全ての推進ジャッキ15の伸長作動を継続して、このフローを終了する。
First, in step S1, it is determined whether the combined acceleration a is equal to or greater than a predetermined value P.
If the combined acceleration a is not greater than or equal to the predetermined value P (that is, the combined acceleration a is less than the predetermined value P), the process proceeds to step S2, and the extension operation of all the propulsion jacks 15 is continued to end this flow. To do.

一方、合成加速度aが所定値P以上である場合には、ステップS3に進み、シールド掘進機1の振動抑制制御を行う。具体的には、後述するシールド掘進機1の振動抑制制御ルーチンの第1例〜第3例のいずれかを実行する。
ステップS3におけるシールド掘進機1の振動抑制制御が完了すると、ステップS4に進み、全ての推進ジャッキ15の伸長作動を再開して、このフローを終了する。
On the other hand, if the combined acceleration a is equal to or greater than the predetermined value P, the process proceeds to step S3, and vibration suppression control of the shield machine 1 is performed. Specifically, any one of the first to third examples of the vibration suppression control routine of the shield machine 1 described later is executed.
When the vibration suppression control of the shield machine 1 in step S3 is completed, the process proceeds to step S4, the extension operation of all the propulsion jacks 15 is resumed, and this flow is finished.

ここで、シールド掘進機1の振動抑制制御ルーチンの第1例について説明する。
本例では、まず、グループG1を構成する推進ジャッキ15の伸長作動を停止するか又は短縮作動させて短縮状態を維持する。この伸長作動の停止又は短縮状態の維持の期間は、予め設定されている。また、この期間では、グループG2〜G12(すなわちグループG1以外のグループ)を構成する推進ジャッキ15の伸長作動が継続される。それゆえ、グループG2〜G12を構成する推進ジャッキ15のロッド15bの先端部をスプレッダ15cを介して既設のセグメントリング14に当接させた状態で、グループG2〜G12を構成する推進ジャッキ15を伸長作動させることにより、シールド掘進機1(掘進機本体2)は推進力を得ることができる。従って、グループG2〜G12を構成する推進ジャッキ15は、既設のセグメントリング14をスキンプレート6の後部60の後方を押し出して、その反力により、シールド掘進機1(掘進機本体2)を前方に推進させることができる。
Here, a first example of the vibration suppression control routine of the shield machine 1 will be described.
In this example, first, the extension operation of the propulsion jack 15 constituting the group G1 is stopped or shortened to maintain the shortened state. The period for stopping the extension operation or maintaining the shortened state is set in advance. Further, during this period, the extension operation of the propulsion jack 15 configuring the groups G2 to G12 (that is, the group other than the group G1) is continued. Therefore, the propulsion jack 15 constituting the groups G2 to G12 is extended in a state where the tip of the rod 15b of the propulsion jack 15 constituting the groups G2 to G12 is brought into contact with the existing segment ring 14 via the spreader 15c. By operating, the shield machine 1 (digging machine main body 2) can obtain a propulsive force. Therefore, the propulsion jack 15 constituting the groups G2 to G12 pushes the existing segment ring 14 to the rear of the rear portion 60 of the skin plate 6, and the reaction force causes the shield machine 1 (the machine body 2) to move forward. Can be promoted.

また、前述の期間においては、グループG1を構成する推進ジャッキ15が、既設のセグメントリング14から離れる。それゆえ、当該推進ジャッキ15の拘束が解放されるので、当該推進ジャッキ15に作用する荷重を緩和することができ、ひいては、当該推進ジャッキ15の変形量を減少させることができる。   Further, in the above-described period, the propulsion jack 15 configuring the group G1 is separated from the existing segment ring 14. Therefore, since the restraint of the propulsion jack 15 is released, the load acting on the propulsion jack 15 can be relaxed, and as a result, the deformation amount of the propulsion jack 15 can be reduced.

前述の期間が経過すると、次に、グループG2〜G12を構成する推進ジャッキ15の伸長作動に追いつくまで、グループG1を構成する推進ジャッキ15を伸長作動させる。
この後、グループG2〜G12について、グループG2からグループG12へと順に、各グループごとに、前述のグループG1と同様に、推進ジャッキ15の伸長の停止又は短縮と、この停止又は短縮された推進ジャッキ15の伸長とを行う。
When the above-described period has elapsed, next, the propulsion jack 15 that constitutes the group G1 is operated to extend until it catches up with the extension operation of the propulsion jack 15 that constitutes the groups G2 to G12.
Thereafter, with respect to the groups G2 to G12, in the order from the group G2 to the group G12, for each group, as in the group G1 described above, the extension or stop of the extension of the propulsion jack 15, and the propulsion jack that has been stopped or shortened. 15 stretches.

このようにして、掘進を継続しつつ、グループG1〜G12の各々を構成する推進ジャッキ15が、順次、既設のセグメントリング14から離れる。それゆえ、当該推進ジャッキ15の拘束が順次解放されるので、当該推進ジャッキ15に作用する荷重を緩和することができ、ひいては、当該推進ジャッキ15の変形量を減少させることができる。
ここで、本例では、掘進機本体2の周方向に沿って進む順番で(具体的には、図2に示すグループG1からグループG12への昇順で)、グループごとに、推進ジャッキ15の伸長の停止又は短縮と、この停止又は短縮された推進ジャッキ15の伸長とを行う。また、あるグループにて推進ジャッキ15の伸長の停止又は短縮が行われる前記期間中に、当該グループ以外のグループについては、推進ジャッキ15の伸長が継続される(すなわち、シールド掘進機1による掘進が中断されることなく継続される)。
尚、本例では、掘進機本体2の周方向に沿って進む順番(具体的には、図2に示すグループG1からグループG12への昇順)が、本発明の「所定の順番」に対応する。
In this way, the propulsion jack 15 constituting each of the groups G1 to G12 is sequentially separated from the existing segment ring 14 while continuing the excavation. Therefore, since the restraint of the propulsion jack 15 is sequentially released, the load acting on the propulsion jack 15 can be relaxed, and consequently, the deformation amount of the propulsion jack 15 can be reduced.
Here, in this example, the extension of the propulsion jack 15 for each group in the order of proceeding along the circumferential direction of the excavator main body 2 (specifically, in ascending order from the group G1 to the group G12 shown in FIG. 2). Is stopped or shortened and the propulsion jack 15 is stopped or shortened. Further, during the period in which the extension of the propulsion jack 15 is stopped or shortened in a certain group, the extension of the propulsion jack 15 is continued for groups other than the group (that is, the excavation by the shield machine 1 is performed). Will continue without interruption).
In this example, the order of traveling along the circumferential direction of the excavator body 2 (specifically, the ascending order from the group G1 to the group G12 shown in FIG. 2) corresponds to the “predetermined order” of the present invention. .

次に、シールド掘進機1の振動抑制制御ルーチンの第2例について説明する。
前述の第1例と異なる点について説明する。
本例では、グループG1、G7、G2、G8、G3、G9、G4、G10、G5、G11、G6、G12という順番で、グループごとに、推進ジャッキ15の伸長の停止又は短縮と、この停止又は短縮された推進ジャッキ15の伸長とを行う。また、あるグループにて推進ジャッキ15の伸長の停止又は短縮が行われる前記期間中に、当該グループ以外のグループについては、推進ジャッキ15の伸長が継続される(すなわち、シールド掘進機1による掘進が中断されることなく継続される)。
Next, a second example of the vibration suppression control routine of the shield machine 1 will be described.
Differences from the first example will be described.
In this example, in the order of the groups G1, G7, G2, G8, G3, G9, G4, G10, G5, G11, G6, G12, the extension or stop of the extension of the propulsion jack 15 is stopped for each group. The shortened propulsion jack 15 is extended. Further, during the period in which the extension of the propulsion jack 15 is stopped or shortened in a certain group, the extension of the propulsion jack 15 is continued for groups other than the group (that is, the excavation by the shield machine 1 is performed). Will continue without interruption).

尚、本例では、グループG1が本発明の「第1のグループ」に対応する。また、グループG7が本発明の「第2のグループ」に対応する。また、グループG2が本発明の「第3のグループ」に対応する。また、グループG8が本発明の「第4のグループ」に対応する。グループG1とグループG2とは、掘進機本体2の周方向で互いに隣接している。また、グループG1、G7、G2、G8、G3、G9、G4、G10、G5、G11、G6、G12という順番が、本発明の「所定の順番」に対応する。   In this example, the group G1 corresponds to the “first group” of the present invention. The group G7 corresponds to the “second group” of the present invention. The group G2 corresponds to the “third group” of the present invention. The group G8 corresponds to the “fourth group” of the present invention. The group G1 and the group G2 are adjacent to each other in the circumferential direction of the excavator main body 2. The order of the groups G1, G7, G2, G8, G3, G9, G4, G10, G5, G11, G6, and G12 corresponds to the “predetermined order” of the present invention.

次に、シールド掘進機1の振動抑制制御ルーチンの第3例について説明する。
前述の第2例と異なる点について説明する。
本例では、第2例におけるグループG1、G7、G2、G8、G3、G9、G4、G10、G5、G11、G6、G12という順番において、グループG1とグループG7とが同時であり、グループG2とグループG8とが同時であり、グループG3とグループG9とが同時であり、グループG4とグループG10とが同時であり、グループG5とグループG11が同時であり、グループG6とグループG12とが同時である。
Next, a third example of the vibration suppression control routine of the shield machine 1 will be described.
Differences from the second example will be described.
In this example, in the order of the groups G1, G7, G2, G8, G3, G9, G4, G10, G5, G11, G6, G12 in the second example, the group G1 and the group G7 are simultaneous, and the group G2 Group G8 is simultaneous, Group G3 and Group G9 are simultaneous, Group G4 and Group G10 are simultaneous, Group G5 and Group G11 are simultaneous, Group G6 and Group G12 are simultaneous .

本実施形態によれば、シールド掘進機1は、掘進機本体2と、掘進機本体2の周縁線(円周C)上に配置されて伸縮可能であり、かつ、伸長時に掘進機本体2を前進させることが可能な複数の推進ジャッキ15と、掘進機本体2の振動を測定する振動測定部(加速度センサ31)と、複数の推進ジャッキ15の作動を制御する制御部(制御装置42)と、を有する。複数の推進ジャッキ15は複数のグループG1〜G12に分けられている。制御部(制御装置42)は、全ての複数の推進ジャッキ15が伸長している途中で、掘進機本体2の振動の測定値(例えば合成加速度a)が所定値以上(例えば所定値P以上)になると、所定の順番(前述の第1例〜第3例参照)でグループごとに、該グループを構成する推進ジャッキ15の伸長の停止又は短縮と、この停止又は短縮された推進ジャッキ15の伸長とを行うように、複数の推進ジャッキ15の作動を制御する。これにより、全ての複数の推進ジャッキ15が伸長している途中において、所定の順番でグループごとに、推進ジャッキ15の停止又は短縮を行って、当該推進ジャッキ15に作用する荷重を緩和することができるので、推進ジャッキ15の変形に起因するシールド掘進機1の全体での振動の発生を抑制することができる。   According to this embodiment, the shield machine 1 is arranged on the digging machine body 2 and the peripheral line (circumference C) of the digging machine body 2 and can be expanded and contracted. A plurality of propulsion jacks 15 that can be moved forward, a vibration measuring unit (acceleration sensor 31) that measures the vibration of the excavator main body 2, and a control unit (control device 42) that controls the operation of the plural propulsion jacks 15 Have. The plurality of propulsion jacks 15 are divided into a plurality of groups G1 to G12. The control unit (control device 42) has a measured value (for example, synthetic acceleration a) of the excavator main body 2 that is greater than or equal to a predetermined value (for example, a predetermined value P or more) while all of the plurality of propulsion jacks 15 are extended. Then, for each group in a predetermined order (see the first to third examples described above), stop or shortening of the extension of the propulsion jack 15 constituting the group and extension of the propulsion jack 15 that has been stopped or shortened. The operation of the plurality of propulsion jacks 15 is controlled so that As a result, while all the plurality of propulsion jacks 15 are extended, the propulsion jacks 15 are stopped or shortened for each group in a predetermined order, and the load acting on the propulsion jacks 15 can be reduced. Therefore, the generation of vibrations in the entire shield machine 1 due to the deformation of the propulsion jack 15 can be suppressed.

また本実施形態によれば、掘進機本体2と、掘進機本体2の周縁線(円周C)上に配置されて伸縮可能であり、かつ、伸長時に掘進機本体2を前進させることが可能な複数の推進ジャッキ15と、を有するシールド掘進機1における推進ジャッキ15の作動制御方法では、複数の推進ジャッキ15を複数のグループG1〜G12に分け、全ての複数の推進ジャッキ15が伸長している途中で、掘進機本体2の振動の度合い(例えば合成加速度a)が所定の閾値以上(例えば所定値P以上)になると、所定の順番(前述の第1例〜第3例参照)でグループごとに、該グループを構成する推進ジャッキ15の伸長の停止又は短縮と、この停止又は短縮された推進ジャッキ15の伸長とを行うように、複数の推進ジャッキ15の作動を制御する。これにより、全ての複数の推進ジャッキ15が伸長している途中において、所定の順番でグループごとに、推進ジャッキ15の停止又は短縮を行って、当該推進ジャッキ15に作用する荷重を緩和することができるので、推進ジャッキ15の変形に起因するシールド掘進機1の全体での振動の発生を抑制することができる。   Moreover, according to this embodiment, it is arrange | positioned on the digging machine main body 2 and the peripheral line (circumference C) of the digging machine main body 2, can be expanded-contracted, and can advance the digging machine main body 2 at the time of expansion | extension In the method of controlling the operation of the propulsion jack 15 in the shield machine 1 having a plurality of propulsion jacks 15, the plurality of propulsion jacks 15 are divided into a plurality of groups G1 to G12, and all the plurality of propulsion jacks 15 are extended. If the degree of vibration of the excavator main body 2 (for example, the combined acceleration a) becomes equal to or greater than a predetermined threshold (for example, equal to or greater than the predetermined value P) in the middle, Each time, the operation of the plurality of propulsion jacks 15 is controlled so as to stop or shorten the extension of the propulsion jacks 15 constituting the group and to extend the propulsion jacks 15 that are stopped or shortened. As a result, while all the plurality of propulsion jacks 15 are extended, the propulsion jacks 15 are stopped or shortened for each group in a predetermined order, and the load acting on the propulsion jacks 15 can be reduced. Therefore, the generation of vibrations in the entire shield machine 1 due to the deformation of the propulsion jack 15 can be suppressed.

また本実施形態によれば、複数のグループG1〜G12は、掘進機本体2の周方向に並んでいる。これにより、複数の推進ジャッキ15のグループ分けを容易に行うことができる。   According to the present embodiment, the plurality of groups G <b> 1 to G <b> 12 are arranged in the circumferential direction of the excavator main body 2. Thereby, grouping of the some propulsion jack 15 can be performed easily.

また本実施形態によれば、前述の第1例において「所定の順番」とは掘進機本体2の周方向に沿って進む順番である。これにより、グループごとの推進ジャッキ15の拘束の解放を、掘進機本体2の周方向に順序よく行うことができる。   Further, according to the present embodiment, the “predetermined order” in the first example described above is the order of proceeding along the circumferential direction of the excavator main body 2. Thereby, the restraint of the propulsion jack 15 for each group can be released in order in the circumferential direction of the excavator main body 2.

また本実施形態によれば、前述の第2例において、複数のグループG1〜G12は、第1のグループ(グループG1)、第2のグループ(グループG7)、第3のグループ(グループG2)、及び、第4のグループ(グループG8)を含み、第1のグループ(グループG1)と第2のグループ(グループG7)とは掘進機本体2の機軸MCを挟んで互いに対向し、第3のグループ(グループG2)と第4のグループ(グループG8)とは掘進機本体2の機軸MCを挟んで互いに対向し、第1のグループ(グループG1)と第3のグループ(グループG2)とは掘進機本体2の周方向で互いに隣接し、「所定の順番」とは、第1のグループ(グループG1)、第2のグループ(グループG7)、第3のグループ(グループG2)、第4のグループ(グループG8)という順番である。これにより、グループごとの推進ジャッキ15の拘束の解放を、機軸MCを基準とした対称性を確保しつつ行うことができる。   Further, according to the present embodiment, in the above-described second example, the plurality of groups G1 to G12 include a first group (group G1), a second group (group G7), a third group (group G2), In addition, the fourth group (group G8) is included, and the first group (group G1) and the second group (group G7) face each other across the axis MC of the excavator body 2, and the third group (Group G2) and the fourth group (Group G8) are opposed to each other across the axis MC of the excavator body 2, and the first group (Group G1) and the third group (Group G2) are the excavator The main body 2 is adjacent to each other in the circumferential direction, and the “predetermined order” means the first group (group G1), the second group (group G7), the third group (group G2), and the fourth group. It is the order of (group G8). Thereby, the restraint of the propulsion jack 15 for each group can be released while ensuring symmetry with respect to the axle MC.

また本実施形態によれば、前述の第3例では、前述の第2例の「所定の順番」における、第1のグループ(グループG1)と第2のグループ(グループG7)とを同時とし、かつ、第3のグループ(グループG2)と第4のグループ(グループG8)とを同時とする。これにより、機軸MCを挟んで対向するグループ同士で同時に推進ジャッキ15の拘束の解放を行うことができるので、当該拘束の開放に伴うシールド掘進機1の推進力のアンバランス化を抑制することができる。   Further, according to the present embodiment, in the above-described third example, the first group (group G1) and the second group (group G7) in the “predetermined order” of the above-described second example are set simultaneously, In addition, the third group (group G2) and the fourth group (group G8) are set at the same time. As a result, it is possible to simultaneously release the restraint of the propulsion jack 15 between the groups facing each other with the axis MC interposed therebetween, so that it is possible to suppress the unbalance of the propulsion force of the shield machine 1 associated with the release of the restraint. it can.

図4は、本発明の第2実施形態における推進ジャッキ15の作動制御方法を示すフローチャートである。
前述の第1実施形態と異なる点について説明する。
FIG. 4 is a flowchart showing an operation control method of the propulsion jack 15 in the second embodiment of the present invention.
Differences from the first embodiment will be described.

本実施形態では、ステップS1にて合成加速度aが所定値P以上である場合に、ステップS6に進み、全ての推進ジャッキ15が伸長作動を停止する。この後に、ステップS7に進み、シールド掘進機1の振動抑制制御を行う。具体的には、後述するシールド掘進機1の振動抑制制御ルーチンの第4例〜第6例のいずれかを実行する。
ステップS7におけるシールド掘進機1の振動抑制制御が完了すると、ステップS8に進み、全ての推進ジャッキ15の伸長作動を再開して、このフローを終了する。
In the present embodiment, when the resultant acceleration a is equal to or greater than the predetermined value P in step S1, the process proceeds to step S6, and all the propulsion jacks 15 stop the extension operation. Then, it progresses to step S7 and performs vibration suppression control of the shield machine 1. Specifically, any of the fourth to sixth examples of the vibration suppression control routine of the shield machine 1 described later is executed.
When the vibration suppression control of the shield machine 1 in step S7 is completed, the process proceeds to step S8, the extension operation of all the propulsion jacks 15 is resumed, and this flow is finished.

ここで、シールド掘進機1の振動抑制制御ルーチンの第4例について説明する。
本例では、まず、グループG1を構成する推進ジャッキ15を短縮作動させて短縮状態を維持する。この短縮状態の維持の期間は、予め設定されている。また、この期間において、グループG2〜G12(すなわちグループG1以外のグループ)を構成する推進ジャッキ15の伸長作動は停止している。それゆえ、この期間において、グループG2〜G12を構成する推進ジャッキ15のロッド15bは、その先端部がスプレッダ15cを介して既設のセグメントリング14に当接している。
Here, a fourth example of the vibration suppression control routine of the shield machine 1 will be described.
In this example, first, the propulsion jack 15 constituting the group G1 is shortened to maintain the shortened state. The period for maintaining the shortened state is set in advance. Further, during this period, the extension operation of the propulsion jack 15 constituting the groups G2 to G12 (that is, a group other than the group G1) is stopped. Therefore, during this period, the rods 15b of the propulsion jacks 15 constituting the groups G2 to G12 are in contact with the existing segment rings 14 via the spreaders 15c.

また、この期間においては、グループG1を構成する推進ジャッキ15が、既設のセグメントリング14から離れる。それゆえ、当該推進ジャッキ15の拘束が解放されるので、当該推進ジャッキ15に作用する荷重を緩和することができ、ひいては、当該推進ジャッキ15の変形量を減少させることができる。   Further, during this period, the propulsion jack 15 configuring the group G1 is separated from the existing segment ring 14. Therefore, since the restraint of the propulsion jack 15 is released, the load acting on the propulsion jack 15 can be relaxed, and as a result, the deformation amount of the propulsion jack 15 can be reduced.

この期間が経過すると、次に、グループG1を構成する推進ジャッキ15を伸長作動させて、そのロッド15bの先端部をスプレッダ15cを介して既設のセグメントリング14に当接させる。
この後、グループG2〜G12について、グループG2からグループG12へと順に、各グループごとに、前述のグループG1と同様に、推進ジャッキ15の短縮と、この短縮された推進ジャッキ15の伸長作動とを行う。
When this period elapses, the propulsion jack 15 constituting the group G1 is then extended to bring the tip of the rod 15b into contact with the existing segment ring 14 via the spreader 15c.
Thereafter, with respect to the groups G2 to G12, in order from the group G2 to the group G12, the shortening of the propulsion jack 15 and the extension operation of the shortened propulsion jack 15 are performed for each group in the same manner as the group G1 described above. Do.

このようにして、グループG1〜G12の各々を構成する推進ジャッキ15が、順次、既設のセグメントリング14から離れる。それゆえ、当該推進ジャッキ15の拘束が順次解放されるので、当該推進ジャッキ15に作用する荷重を緩和することができ、ひいては、当該推進ジャッキ15の変形量を減少させることができる。
ここで、本例では、掘進機本体2の周方向に沿って進む順番で(具体的には、図2に示すグループG1からグループG12への昇順で)、グループごとに、推進ジャッキ15の短縮と、この短縮された推進ジャッキ15の伸長とを行う。
尚、本例では、掘進機本体2の周方向に沿って進む順番(具体的には、図2に示すグループG1からグループG12への昇順)が、本発明の「所定の順番」に対応する。
In this way, the propulsion jacks 15 constituting each of the groups G1 to G12 are sequentially separated from the existing segment ring 14. Therefore, since the restraint of the propulsion jack 15 is sequentially released, the load acting on the propulsion jack 15 can be relaxed, and consequently, the deformation amount of the propulsion jack 15 can be reduced.
Here, in this example, the propulsion jack 15 is shortened for each group in the order along the circumferential direction of the excavator main body 2 (specifically, in the ascending order from the group G1 to the group G12 shown in FIG. 2). Then, the shortened propulsion jack 15 is extended.
In this example, the order of traveling along the circumferential direction of the excavator body 2 (specifically, the ascending order from the group G1 to the group G12 shown in FIG. 2) corresponds to the “predetermined order” of the present invention. .

次に、シールド掘進機1の振動抑制制御ルーチンの第5例について説明する。
前述の第4例と異なる点について説明する。
本例では、グループG1、G7、G2、G8、G3、G9、G4、G10、G5、G11、G6、G12という順番で、グループごとに、推進ジャッキ15の短縮と、この短縮された推進ジャッキ15の伸長とを行う。
Next, a fifth example of the vibration suppression control routine of the shield machine 1 will be described.
Differences from the fourth example will be described.
In this example, the propulsion jack 15 is shortened and the propulsion jack 15 is shortened for each group in the order of groups G1, G7, G2, G8, G3, G9, G4, G10, G5, G11, G6, and G12. And stretching.

尚、本例では、グループG1が本発明の「第1のグループ」に対応する。また、グループG7が本発明の「第2のグループ」に対応する。また、グループG2が本発明の「第3のグループ」に対応する。また、グループG8が本発明の「第4のグループ」に対応する。グループG1とグループG2とは、掘進機本体2の周方向で互いに隣接している。また、グループG1、G7、G2、G8、G3、G9、G4、G10、G5、G11、G6、G12という順番が、本発明の「所定の順番」に対応する。   In this example, the group G1 corresponds to the “first group” of the present invention. The group G7 corresponds to the “second group” of the present invention. The group G2 corresponds to the “third group” of the present invention. The group G8 corresponds to the “fourth group” of the present invention. The group G1 and the group G2 are adjacent to each other in the circumferential direction of the excavator main body 2. The order of the groups G1, G7, G2, G8, G3, G9, G4, G10, G5, G11, G6, and G12 corresponds to the “predetermined order” of the present invention.

次に、シールド掘進機1の振動抑制制御ルーチンの第6例について説明する。
前述の第5例と異なる点について説明する。
本例では、第5例におけるグループG1、G7、G2、G8、G3、G9、G4、G10、G5、G11、G6、G12という順番において、グループG1とグループG7とが同時であり、グループG2とグループG8とが同時であり、グループG3とグループG9とが同時であり、グループG4とグループG10とが同時であり、グループG5とグループG11が同時であり、グループG6とグループG12とが同時である。
Next, a sixth example of the vibration suppression control routine of the shield machine 1 will be described.
Differences from the fifth example will be described.
In this example, in the order of the groups G1, G7, G2, G8, G3, G9, G4, G10, G5, G11, G6, G12 in the fifth example, the group G1 and the group G7 are simultaneous, and the group G2 Group G8 is simultaneous, Group G3 and Group G9 are simultaneous, Group G4 and Group G10 are simultaneous, Group G5 and Group G11 are simultaneous, Group G6 and Group G12 are simultaneous .

特に本実施形態によれば、制御部(制御装置42)は、全ての複数の推進ジャッキ15が伸長している途中で、掘進機本体2の振動の測定値(例えば合成加速度a)が所定値以上(例えば所定値P以上)になると、まず、全ての複数の推進ジャッキ15の伸長の停止を行い、次に、所定の順番(前述の第4例〜第6例参照)でグループごとに、該グループを構成する推進ジャッキ15の短縮と、この短縮された推進ジャッキ15の伸長とを行うように、複数の推進ジャッキ15の作動を制御する。これにより、全ての複数の推進ジャッキ15の伸長を一時停止して、所定の順番でグループごとに、推進ジャッキ15の短縮を行って、当該推進ジャッキ15に作用する荷重を緩和することができるので、推進ジャッキ15の変形に起因するシールド掘進機1の全体での振動の発生を抑制することができる。   In particular, according to the present embodiment, the control unit (the control device 42) determines that the measured value (for example, the combined acceleration a) of the vibration of the excavator main body 2 is a predetermined value while all the plurality of propulsion jacks 15 are extended. When the above is reached (for example, a predetermined value P or more), first, the extension of all the plurality of propulsion jacks 15 is stopped, and then, for each group in a predetermined order (see the fourth to sixth examples above), The operations of the plurality of propulsion jacks 15 are controlled so as to shorten the propulsion jacks 15 constituting the group and extend the shortened propulsion jacks 15. Thereby, the extension of all the plurality of propulsion jacks 15 can be temporarily stopped, the propulsion jacks 15 can be shortened for each group in a predetermined order, and the load acting on the propulsion jacks 15 can be reduced. The occurrence of vibration in the entire shield machine 1 due to the deformation of the propulsion jack 15 can be suppressed.

また本実施形態によれば、シールド掘進機1における推進ジャッキ15の作動制御方法では、複数の推進ジャッキ15を複数のグループG1〜G12に分け、全ての複数の推進ジャッキ15が伸長している途中で、掘進機本体2の振動の度合い(例えば合成加速度a)が所定の閾値以上(例えば所定値P以上)になると、まず、全ての複数の推進ジャッキ15の伸長の停止を行い、次に、所定の順番(前述の第4例〜第6例参照)でグループごとに、該グループを構成する推進ジャッキ15の短縮と、この短縮された推進ジャッキ15の伸長とを行うように、複数の推進ジャッキ15の作動を制御する。これにより、全ての複数の推進ジャッキ15の伸長を一時停止して、所定の順番でグループごとに、推進ジャッキ15の短縮を行って、当該推進ジャッキ15に作用する荷重を緩和することができるので、推進ジャッキ15の変形に起因するシールド掘進機1の全体での振動の発生を抑制することができる。   Moreover, according to this embodiment, in the operation control method of the propulsion jack 15 in the shield machine 1, the plurality of propulsion jacks 15 are divided into the plurality of groups G1 to G12, and all the plural propulsion jacks 15 are being extended. When the degree of vibration of the excavator main body 2 (for example, the combined acceleration a) is equal to or greater than a predetermined threshold (for example, equal to or greater than the predetermined value P), first, the extension of all the plurality of propulsion jacks 15 is stopped. For each group in a predetermined order (see the above-described fourth to sixth examples), a plurality of propulsions are performed so as to shorten the propulsion jack 15 constituting the group and to extend the shortened propulsion jack 15. The operation of the jack 15 is controlled. Thereby, the extension of all the plurality of propulsion jacks 15 can be temporarily stopped, the propulsion jacks 15 can be shortened for each group in a predetermined order, and the load acting on the propulsion jacks 15 can be reduced. The occurrence of vibration in the entire shield machine 1 due to the deformation of the propulsion jack 15 can be suppressed.

また本実施形態によれば、前述の第4例において「所定の順番」とは掘進機本体2の周方向に沿って進む順番である。これにより、グループごとの推進ジャッキ15の拘束の解放を、掘進機本体2の周方向に順序よく行うことができる。   Further, according to the present embodiment, the “predetermined order” in the above-described fourth example is the order of proceeding along the circumferential direction of the excavator main body 2. Thereby, the restraint of the propulsion jack 15 for each group can be released in order in the circumferential direction of the excavator main body 2.

また本実施形態によれば、前述の第5例において、複数のグループG1〜G12は、第1のグループ(グループG1)、第2のグループ(グループG7)、第3のグループ(グループG2)、及び、第4のグループ(グループG8)を含み、第1のグループ(グループG1)と第2のグループ(グループG7)とは掘進機本体2の機軸MCを挟んで互いに対向し、第3のグループ(グループG2)と第4のグループ(グループG8)とは掘進機本体2の機軸MCを挟んで互いに対向し、第1のグループ(グループG1)と第3のグループ(グループG2)とは掘進機本体2の周方向で互いに隣接し、「所定の順番」とは、第1のグループ(グループG1)、第2のグループ(グループG7)、第3のグループ(グループG2)、第4のグループ(グループG8)という順番である。これにより、グループごとの推進ジャッキ15の拘束の解放を、機軸MCを基準とした対称性を確保しつつ行うことができる。   According to the present embodiment, in the fifth example described above, the plurality of groups G1 to G12 include a first group (group G1), a second group (group G7), a third group (group G2), In addition, the fourth group (group G8) is included, and the first group (group G1) and the second group (group G7) face each other across the axis MC of the excavator body 2, and the third group (Group G2) and the fourth group (Group G8) are opposed to each other across the axis MC of the excavator body 2, and the first group (Group G1) and the third group (Group G2) are the excavator The main body 2 is adjacent to each other in the circumferential direction, and the “predetermined order” means the first group (group G1), the second group (group G7), the third group (group G2), and the fourth group. It is the order of (group G8). Thereby, the restraint of the propulsion jack 15 for each group can be released while ensuring symmetry with respect to the axle MC.

また本実施形態によれば、前述の第6例では、前述の第5例の「所定の順番」における、第1のグループ(グループG1)と第2のグループ(グループG7)とを同時とし、かつ、第3のグループ(グループG2)と第4のグループ(グループG8)とを同時とする。これにより、機軸MCを挟んで対向するグループ同士で同時に推進ジャッキ15の拘束の解放を行うことができるので、当該拘束の開放に伴うシールド掘進機1のセグメントリング14への押圧力のアンバランス化を抑制することができる。   Further, according to the present embodiment, in the above-described sixth example, the first group (group G1) and the second group (group G7) in the “predetermined order” in the above-described fifth example are set simultaneously, In addition, the third group (group G2) and the fourth group (group G8) are set at the same time. As a result, it is possible to simultaneously release the restraint of the propulsion jack 15 between the groups facing each other across the axis MC, so that the pressing force to the segment ring 14 of the shield machine 1 due to the release of the restraint is unbalanced. Can be suppressed.

尚、前述の第1及び第2実施形態では、加速度センサ31として3軸加速度センサを用いて説明しているが、加速度センサ31はこれに限らず、例えば、1軸加速度センサ、又は、2軸加速度センサを用いてもよい。   In the first and second embodiments described above, a three-axis acceleration sensor is used as the acceleration sensor 31. However, the acceleration sensor 31 is not limited to this, for example, a one-axis acceleration sensor or a two-axis acceleration sensor. An acceleration sensor may be used.

また、前述の第1及び第2実施形態では、振動センサの一例として加速度センサ31を用いて説明しているが、振動センサはこれに限らず、例えば、速度センサ又は変位センサであってもよい。   In the first and second embodiments described above, the acceleration sensor 31 is used as an example of the vibration sensor. However, the vibration sensor is not limited to this and may be, for example, a speed sensor or a displacement sensor. .

また、前述の第1及び第2実施形態では、振動センサがフレーム部21に設けられているが、掘進機本体2の振動が測定できる限りにおいて、振動センサの設置場所は任意である。例えば、振動センサが、シールド隔壁8の後面に設けられてもよい。また、振動センサの設置個数は1個に限らず複数個であってもよい。   Further, in the first and second embodiments described above, the vibration sensor is provided in the frame portion 21, but the installation location of the vibration sensor is arbitrary as long as the vibration of the excavator main body 2 can be measured. For example, a vibration sensor may be provided on the rear surface of the shield partition wall 8. Further, the number of installed vibration sensors is not limited to one, and may be plural.

また、前述の第1及び第2実施形態では、泥土圧式のシールド掘進機1を用いて説明したが、シールド掘進機1の種類はこれに限らず、例えば、泥水式のシールド掘進機であってもよい。   In the first and second embodiments described above, the mud pressure shield shield machine 1 has been described. However, the type of the shield machine 1 is not limited to this, for example, a muddy water shield machine. Also good.

1 シールド掘進機
2 掘進機本体
3 前胴
4 後胴
5、6 スキンプレート
7 カッタヘッド
8 シールド隔壁
9 駆動用モータ
10 カッタチャンバ
11 中折れジャッキ
11a シリンダ
11b ロッド
12 エレクター
12a 把持部
13 セグメント
14 セグメントリング
15 推進ジャッキ
15a シリンダ
15b ロッド
15c スプレッダ
16 スクリューコンベヤ
17 ケース
18 オーガ
20 足場
21 フレーム部
22 セグメント供給装置
31 加速度センサ(振動センサ)
42 制御装置
45 運転管理室
48 合成加速度算出部
49 振動判定部
60 後部
DESCRIPTION OF SYMBOLS 1 Shield machine 2 Engraver body 3 Front trunk 4 Rear trunk 5, 6 Skin plate 7 Cutter head 8 Shield partition 9 Drive motor 10 Cutter chamber 11 Folding jack 11a Cylinder 11b Rod 12 Elector 12a Gripping part 13 Segment 14 Segment ring 15 Propulsion jack 15a Cylinder 15b Rod 15c Spreader 16 Screw conveyor 17 Case 18 Auger 20 Scaffolding 21 Frame portion 22 Segment supply device 31 Acceleration sensor (vibration sensor)
42 Control Device 45 Operation Management Room 48 Synthetic Acceleration Calculation Unit 49 Vibration Determination Unit 60 Rear

Claims (12)

掘進機本体と、
前記掘進機本体の周縁線上に配置されて伸縮可能であり、かつ、伸長時に前記掘進機本体を前進させることが可能な複数の推進ジャッキと、
前記掘進機本体の振動を測定する振動測定部と、
前記複数の推進ジャッキの作動を制御する制御部と、
を有するシールド掘進機であって、
前記複数の推進ジャッキは複数のグループに分けられており、
前記制御部は、全ての前記複数の推進ジャッキが伸長している途中で、前記掘進機本体の振動の測定値が所定値以上になると、所定の順番で前記グループごとに、該グループを構成する推進ジャッキの伸長の停止又は短縮と、前記停止又は短縮された推進ジャッキの伸長とを行うように、前記複数の推進ジャッキの作動を制御する、
シールド掘進機。
The machine body,
A plurality of propulsion jacks that are arranged on a peripheral line of the excavator main body, are extendable, and can advance the excavator main body when extended;
A vibration measuring unit for measuring the vibration of the main body,
A control unit for controlling the operation of the plurality of propulsion jacks;
A shield machine having
The plurality of propulsion jacks are divided into a plurality of groups,
The control unit configures the group for each group in a predetermined order when a measured value of the vibration of the excavator main body becomes a predetermined value or more while all the plurality of propulsion jacks are extending. Controlling the operation of the plurality of propulsion jacks to stop or shorten extension of the propulsion jacks and to extend the stop or shortened propulsion jacks;
Shield machine.
掘進機本体と、
前記掘進機本体の周縁線上に配置されて伸縮可能であり、かつ、伸長時に前記掘進機本体を前進させることが可能な複数の推進ジャッキと、
前記掘進機本体の振動を測定する振動測定部と、
前記複数の推進ジャッキの作動を制御する制御部と、
を有するシールド掘進機であって、
前記複数の推進ジャッキは複数のグループに分けられており、
前記制御部は、全ての前記複数の推進ジャッキが伸長している途中で、前記掘進機本体の振動の測定値が所定値以上になると、まず、全ての前記複数の推進ジャッキの伸長の停止を行い、次に、所定の順番で前記グループごとに、該グループを構成する推進ジャッキの短縮と、前記短縮された推進ジャッキの伸長とを行うように、前記複数の推進ジャッキの作動を制御する、
シールド掘進機。
The machine body,
A plurality of propulsion jacks that are arranged on a peripheral line of the excavator main body, are extendable, and can advance the excavator main body when extended;
A vibration measuring unit for measuring the vibration of the main body,
A control unit for controlling the operation of the plurality of propulsion jacks;
A shield machine having
The plurality of propulsion jacks are divided into a plurality of groups,
When the measured value of the vibration of the excavator main body exceeds a predetermined value while all the plurality of propulsion jacks are being extended, the control unit first stops the extension of all the plurality of propulsion jacks. And then controlling the operation of the plurality of propulsion jacks so as to shorten the propulsion jacks constituting the group and extend the shortened propulsion jacks for each group in a predetermined order.
Shield machine.
前記複数のグループは、前記掘進機本体の周方向に並んでいる、請求項1又は請求項2に記載のシールド掘進機。   The shield machine according to claim 1 or 2, wherein the plurality of groups are arranged in a circumferential direction of the machine body. 前記所定の順番とは、前記掘進機本体の周方向に沿って進む順番である、請求項3に記載のシールド掘進機。   The shield machine according to claim 3, wherein the predetermined order is an order of proceeding along a circumferential direction of the machine body. 前記複数のグループは、第1のグループ、第2のグループ、第3のグループ、及び、第4のグループを含み、
前記第1のグループと前記第2のグループとは前記掘進機本体の機軸を挟んで互いに対向し、
前記第3のグループと前記第4のグループとは前記掘進機本体の機軸を挟んで互いに対向し、
前記第1のグループと前記第3のグループとは前記掘進機本体の周方向で互いに隣接し、
前記所定の順番とは、前記第1のグループ、前記第2のグループ、前記第3のグループ、前記第4のグループという順番である、請求項3に記載のシールド掘進機。
The plurality of groups includes a first group, a second group, a third group, and a fourth group,
The first group and the second group are opposed to each other across the axis of the excavator body,
The third group and the fourth group are opposed to each other across the axis of the excavator body,
The first group and the third group are adjacent to each other in the circumferential direction of the excavator body,
The shield machine according to claim 3, wherein the predetermined order is an order of the first group, the second group, the third group, and the fourth group.
前記所定の順番において、前記第1のグループと前記第2のグループとは同時であり、かつ、前記第3のグループと前記第4のグループとは同時である、請求項5に記載のシールド掘進機。   6. The shield drilling according to claim 5, wherein in the predetermined order, the first group and the second group are simultaneous, and the third group and the fourth group are simultaneous. Machine. 掘進機本体と、前記掘進機本体の周縁線上に配置されて伸縮可能であり、かつ、伸長時に前記掘進機本体を前進させることが可能な複数の推進ジャッキと、を有するシールド掘進機における推進ジャッキの作動制御方法であって、
前記複数の推進ジャッキを複数のグループに分け、
全ての前記複数の推進ジャッキが伸長している途中で、前記掘進機本体の振動の度合いが所定の閾値以上になると、所定の順番で前記グループごとに、該グループを構成する推進ジャッキの伸長の停止又は短縮と、前記停止又は短縮された推進ジャッキの伸長とを行うように、前記複数の推進ジャッキの作動を制御する、
シールド掘進機における推進ジャッキの作動制御方法。
A propulsion jack in a shield excavator having an excavator main body and a plurality of propulsion jacks that are disposed on a peripheral line of the excavator main body and are extendable and extendable and capable of moving the excavator main body forward when extended. The operation control method of
Dividing the plurality of propulsion jacks into a plurality of groups;
When all of the plurality of propulsion jacks are extended, if the degree of vibration of the excavator main body exceeds a predetermined threshold, the propulsion jacks constituting the group are Controlling the operation of the plurality of propulsion jacks to stop or shorten and to extend the stopped or shortened propulsion jacks;
A method for controlling the operation of a propulsion jack in a shield machine.
掘進機本体と、前記掘進機本体の周縁線上に配置されて伸縮可能であり、かつ、伸長時に前記掘進機本体を前進させることが可能な複数の推進ジャッキと、を有するシールド掘進機における推進ジャッキの作動制御方法であって、
前記複数の推進ジャッキを複数のグループに分け、
全ての前記複数の推進ジャッキが伸長している途中で、前記掘進機本体の振動の度合いが所定の閾値以上になると、まず、全ての前記複数の推進ジャッキの伸長の停止を行い、次に、所定の順番で前記グループごとに、該グループを構成する推進ジャッキの短縮と、前記短縮された推進ジャッキの伸長とを行うように、前記複数の推進ジャッキの作動を制御する、
シールド掘進機における推進ジャッキの作動制御方法。
A propulsion jack in a shield excavator having an excavator main body and a plurality of propulsion jacks that are disposed on a peripheral line of the excavator main body and are extendable and extendable and capable of moving the excavator main body forward when extended. The operation control method of
Dividing the plurality of propulsion jacks into a plurality of groups;
When all of the plurality of propulsion jacks are extending, when the degree of vibration of the excavator main body is equal to or greater than a predetermined threshold, first, the extension of all the plurality of propulsion jacks is stopped, and then For each of the groups in a predetermined order, the operation of the plurality of propulsion jacks is controlled so that the propulsion jacks constituting the group are shortened and the shortened propulsion jacks are elongated.
A method for controlling the operation of a propulsion jack in a shield machine.
前記複数のグループは、前記掘進機本体の周方向に並んでいる、請求項7又は請求項8に記載のシールド掘進機における推進ジャッキの作動制御方法。   The operation control method of the propulsion jack in the shield machine according to claim 7 or 8, wherein the plurality of groups are arranged in a circumferential direction of the machine body. 前記所定の順番とは、前記掘進機本体の周方向に沿って進む順番である、請求項9に記載のシールド掘進機における推進ジャッキの作動制御方法。   The method for controlling the operation of a propulsion jack in a shield machine according to claim 9, wherein the predetermined order is an order of proceeding along a circumferential direction of the machine body. 前記複数のグループは、第1のグループ、第2のグループ、第3のグループ、及び、第4のグループを含み、
前記第1のグループと前記第2のグループとは前記掘進機本体の機軸を挟んで互いに対向し、
前記第3のグループと前記第4のグループとは前記掘進機本体の機軸を挟んで互いに対向し、
前記第1のグループと前記第3のグループとは前記掘進機本体の周方向で互いに隣接し、
前記所定の順番とは、前記第1のグループ、前記第2のグループ、前記第3のグループ、前記第4のグループという順番である、請求項9に記載のシールド掘進機における推進ジャッキの作動制御方法。
The plurality of groups includes a first group, a second group, a third group, and a fourth group,
The first group and the second group are opposed to each other across the axis of the excavator body,
The third group and the fourth group are opposed to each other across the axis of the excavator body,
The first group and the third group are adjacent to each other in the circumferential direction of the excavator body,
The operation control of the propulsion jack in the shield machine according to claim 9, wherein the predetermined order is an order of the first group, the second group, the third group, and the fourth group. Method.
前記所定の順番において、前記第1のグループと前記第2のグループとは同時であり、かつ、前記第3のグループと前記第4のグループとは同時である、請求項11に記載のシールド掘進機における推進ジャッキの作動制御方法。   The shield excavation according to claim 11, wherein in the predetermined order, the first group and the second group are simultaneous, and the third group and the fourth group are simultaneous. Control method of propulsion jack in machine.
JP2015182104A 2015-09-15 2015-09-15 Shield machine and method of controlling operation of propulsion jack in shield machine Active JP6426571B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015182104A JP6426571B2 (en) 2015-09-15 2015-09-15 Shield machine and method of controlling operation of propulsion jack in shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015182104A JP6426571B2 (en) 2015-09-15 2015-09-15 Shield machine and method of controlling operation of propulsion jack in shield machine

Publications (2)

Publication Number Publication Date
JP2017057602A true JP2017057602A (en) 2017-03-23
JP6426571B2 JP6426571B2 (en) 2018-11-21

Family

ID=58390077

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015182104A Active JP6426571B2 (en) 2015-09-15 2015-09-15 Shield machine and method of controlling operation of propulsion jack in shield machine

Country Status (1)

Country Link
JP (1) JP6426571B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109357939A (en) * 2018-12-12 2019-02-19 中铁十八局集团有限公司 Shield sky pushes away field testing procedure
JP2020193450A (en) * 2019-05-27 2020-12-03 Jimテクノロジー株式会社 Tunnel excavator and tunnel excavation method
JP2021127630A (en) * 2020-02-14 2021-09-02 日立造船株式会社 Tunnel excavator

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04140397A (en) * 1990-10-01 1992-05-14 Hitachi Constr Mach Co Ltd Speed controller of shield jack
JPH06294289A (en) * 1993-04-09 1994-10-21 Mitsubishi Heavy Ind Ltd Method for controlling shield jack of shield excavator
JP2000110479A (en) * 1998-10-08 2000-04-18 Hitachi Zosen Corp Tunnel excavating machine and excavating method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04140397A (en) * 1990-10-01 1992-05-14 Hitachi Constr Mach Co Ltd Speed controller of shield jack
JPH06294289A (en) * 1993-04-09 1994-10-21 Mitsubishi Heavy Ind Ltd Method for controlling shield jack of shield excavator
JP2000110479A (en) * 1998-10-08 2000-04-18 Hitachi Zosen Corp Tunnel excavating machine and excavating method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109357939A (en) * 2018-12-12 2019-02-19 中铁十八局集团有限公司 Shield sky pushes away field testing procedure
CN109357939B (en) * 2018-12-12 2023-11-21 中铁十八局集团有限公司 Shield air-pushing field test method
JP2020193450A (en) * 2019-05-27 2020-12-03 Jimテクノロジー株式会社 Tunnel excavator and tunnel excavation method
JP7245714B2 (en) 2019-05-27 2023-03-24 Jimテクノロジー株式会社 Tunnel excavator and tunnel excavation method
JP2021127630A (en) * 2020-02-14 2021-09-02 日立造船株式会社 Tunnel excavator
JP7348856B2 (en) 2020-02-14 2023-09-21 地中空間開発株式会社 tunnel boring machine

Also Published As

Publication number Publication date
JP6426571B2 (en) 2018-11-21

Similar Documents

Publication Publication Date Title
JP6607815B2 (en) Tunnel excavator and tunnel excavation method
JP6618685B2 (en) Tunnel machine
JP2017057602A (en) Shield excavation machine and operation control method for shield jack thereof
CN112101621A (en) Discrete variable-based soft soil stratum shield construction surface deformation prediction method
JP4371603B2 (en) Semi shield excavator
JP7291448B2 (en) Erector device, lining construction system, and lining construction method
JP5969964B2 (en) Method for measuring tail clearance of shield machine and method for determining roundness of segment ring
JP7152936B2 (en) Tunnel excavator and tunnel excavation method
JP6325820B2 (en) Shield tunneling segment assembly simultaneous construction method
JP2007070827A (en) Shield machine, and method of measuring tail clearance and/or dimension of internal space of segment tunnel
JP7245714B2 (en) Tunnel excavator and tunnel excavation method
JP7293150B2 (en) tunnel excavator
JP4936450B2 (en) Shield machine
JP2015117481A (en) Method for starting excavator
JP2005307674A (en) Cutter head of shield machine
JP6193451B2 (en) Measurement method for tail clearance of shield machine
JP2014125770A (en) Shield machine
JP4968925B2 (en) Rectangular machine
JP7333138B2 (en) Rolling correction method for shield excavator, rolling correction device for shield excavator, and shield excavation method using the same
JP3940007B2 (en) Digging equipment
JPH0656075B2 (en) Tunnel excavator
JP2023028773A (en) Measurement system and measurement method
JP2008014738A (en) Angle measuring device used for position measurement of excavator, and jacking method of excavator
JP2016223110A (en) Method to prepare for starting, and start shield machine
JP2670207B2 (en) Tunnel excavator gripper equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180129

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180926

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181009

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181025

R150 Certificate of patent or registration of utility model

Ref document number: 6426571

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250