JP2016125523A - Fixture for suspension bolt - Google Patents

Fixture for suspension bolt Download PDF

Info

Publication number
JP2016125523A
JP2016125523A JP2014264494A JP2014264494A JP2016125523A JP 2016125523 A JP2016125523 A JP 2016125523A JP 2014264494 A JP2014264494 A JP 2014264494A JP 2014264494 A JP2014264494 A JP 2014264494A JP 2016125523 A JP2016125523 A JP 2016125523A
Authority
JP
Japan
Prior art keywords
bolt
nut
split
suspension bolt
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014264494A
Other languages
Japanese (ja)
Other versions
JP5729849B1 (en
Inventor
和広 野島
Kazuhiro Nojima
和広 野島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOOYOOTEKKU KK
Original Assignee
TOOYOOTEKKU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOOYOOTEKKU KK filed Critical TOOYOOTEKKU KK
Priority to JP2014264494A priority Critical patent/JP5729849B1/en
Application granted granted Critical
Publication of JP5729849B1 publication Critical patent/JP5729849B1/en
Publication of JP2016125523A publication Critical patent/JP2016125523A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)
  • Clamps And Clips (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a fixture for a suspension bolt capable of installing a novel pipeline without installing a new suspension bolt to ceiling concrete.SOLUTION: A fixture for a suspension bolt installed to a suspension bolt includes: a first division length nut 5a and a second division length nut 5b prepared by vertically dividing a predetermined length nut screwed into a suspension bolt 50 into two at its center; a U bolt 6 fixed to a surface reverse to a screw part of the first division length nut 5a; and a patch 7 fixed to a surface reverse to a screw part of the second division length nut 5b, and having two holes into which the U bolt 6 is inserted.SELECTED DRAWING: Figure 1

Description

本発明は、屋根裏に新規配管を設置するための吊りボルト用固定具に関する。   The present invention relates to a hanging bolt fixture for installing a new pipe in an attic.

屋根裏に設置される空調ダクト、空調機等は上部コンクリート床に固定する必要があるが、その際吊りボルトがしばしば使用される。図4は、新規配管30及び空調機60の設置状態を示した図である。空調機60は、アンカーボルトに挿入し固定された吊りボルト50を取付座60aに挿入し、ナットNによって固定される。天井板65には空調機60の吹出し穴が開けられている。   Air conditioning ducts, air conditioners, etc. installed in the attic need to be fixed to the upper concrete floor, but suspension bolts are often used. FIG. 4 is a diagram illustrating an installation state of the new pipe 30 and the air conditioner 60. The air conditioner 60 is fixed by a nut N by inserting the suspension bolt 50 inserted and fixed into the anchor bolt into the mounting seat 60a. The ceiling plate 65 has a blowout hole for the air conditioner 60.

このように屋根裏に空調機60が吊りボルト50に設置されている状態で、新たに新規配管30を設置する場合には図4に示したように、新たに吊りボルト50を設置して吊り配管金具40を使って新規配管30を設置するのが通常である。この場合の設置手順は、吊り配管金具40の固定金具40aをナットNを使って吊りボルト50に固定し、次に新規配管30が挿入された吊りバンド40bをボルトBとナットNを使って固定金具40aに固定する。   In the state where the air conditioner 60 is installed on the hanging bolt 50 in the attic in this way, when a new pipe 30 is newly installed, the hanging bolt 50 is newly installed as shown in FIG. Usually, the new pipe 30 is installed using the metal fitting 40. The installation procedure in this case is to fix the fixing bracket 40a of the suspension pipe fitting 40 to the suspension bolt 50 using the nut N, and then fix the suspension band 40b into which the new pipe 30 is inserted using the bolt B and the nut N. It fixes to the metal fitting 40a.

なお、例えば特許文献1には、線材や管材を吊りボルトに迅速、確実かつ容易に傷つけずに固定できる吊りボルト用固定具に関する技術が開示されている。   For example, Patent Document 1 discloses a technique related to a suspension bolt fixing tool that can fix a wire or a tube material to a suspension bolt quickly, reliably, and easily without being damaged.

特開平10−32751号公報JP-A-10-32751

しかし、上記したような新規配管30の固定方法では、新たにアンカーボルトを天井コンクリート70に挿入した後吊りボルト50を設置しなければならず、コストと時間がかかるという課題があった。   However, in the fixing method of the new pipe 30 as described above, there is a problem that it is necessary to install the hanging bolt 50 after newly inserting the anchor bolt into the ceiling concrete 70, which requires cost and time.

本発明は、以上の課題に着目して成されたもので、新たに天井コンクリートに吊りボルトを設置することなく新規配管を設置することができる吊りボルト用固定具を提供することを目的とする。   The present invention has been made paying attention to the above problems, and an object of the present invention is to provide a suspension bolt fixing tool capable of installing a new pipe without newly installing a suspension bolt on ceiling concrete. .

本発明は上記課題を解決するため、以下の構成を備えるものである。   In order to solve the above problems, the present invention has the following configuration.

(1)吊りボルトに設置される固定具であって、
前記吊りボルトと螺合する所定長さの長ナットを縦に中央で分割して作製される第1の分割長ナットと第2の分割長ナットと、
前記第1の分割長ナットのネジ部とは逆の面に固定されるUボルトと、
前記第2の分割長ナットのネジ部とは逆の面に固定され、前記Uボルトが挿入される2個の穴を有する当て板と、
を有することを特徴とする吊りボルト用固定具。
(1) A fixing device installed on a suspension bolt,
A first split-length nut and a second split-length nut that are manufactured by vertically dividing a long nut having a predetermined length to be screwed into the suspension bolt;
A U-bolt fixed to a surface opposite to the threaded portion of the first split-length nut;
A backing plate that is fixed to a surface opposite to the threaded portion of the second split-length nut and has two holes into which the U-bolts are inserted;
A suspension bolt fixing tool characterized by comprising:

(2)吊りボルトに設置される固定具であって、
前記吊りボルトと螺合する所定長さの長ナットを縦に中央で分割して作製される第1の分割長ナットと第2の分割長ナットと、
前記第1の分割長ナットのネジ部とは逆の面に固定されるUボルトと、
を有することを特徴とする吊りボルト用固定具。
(2) A fixing device installed on a suspension bolt,
A first split-length nut and a second split-length nut that are manufactured by vertically dividing a long nut having a predetermined length to be screwed into the suspension bolt;
A U-bolt fixed to the surface opposite to the threaded portion of the first split-length nut;
A suspension bolt fixing tool characterized by comprising:

(3)前記第1の分割長ナットと前記Uボルトとの固定が、溶接、ロー付け、または接着によってなされることを特徴とする前記(1)または(2)に記載の吊りボルト用固定具。   (3) The suspension bolt fixture according to (1) or (2), wherein the first split-length nut and the U-bolt are fixed by welding, brazing, or adhesion. .

(4)前記第2の分割長ナットと前記当て板との固定が、溶接、ロー付け、または接着によってなされることを特徴とする前記(1)または(3)に記載の吊りボルト用固定具。   (4) The suspension bolt fixing device according to (1) or (3), wherein the second split-length nut and the contact plate are fixed by welding, brazing, or adhesion. .

本発明によれば、新たに天井コンクリートに吊りボルトを設置することなく新規配管を設置することができる吊りボルト用固定具を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the fixing tool for suspension bolts which can install new piping, without newly installing a suspension bolt in ceiling concrete can be provided.

実施例の吊りボルト用固定具の構成を示す図The figure which shows the structure of the fixing tool for suspension bolts of an Example. 実施例の吊りボルト用固定具の使用状態を示す第1の図1st figure which shows the use condition of the fixing tool for suspension bolts of an Example. 実施例の吊りボルト用固定具の使用状態を示す第2の図2nd figure which shows the use condition of the fixing tool for suspension bolts of an Example. 従来の屋根裏における新規配管の設置状態を示す図The figure which shows the installation state of the new piping in the conventional attic

以下、本発明を実施するための形態を、実施例により詳しく説明する。   Hereinafter, the form for implementing this invention is demonstrated in detail by an Example.

図1は、本発明の吊りボルト用固定具10の構成を示す図である。吊りボルト用固定具10は、部品A 10aと部品B 10bによって構成される。部品A 10aは、分割長ナット5aとUボルト6によって作成され、図1(b)に示したように分割長ナット5aとUボルト6の接触部が溶接部8によって固定されている。また、部品B 10bは、分割長ナット5bと当て板7によって作成され、図1(c)に示したように分割長ナット5bと当て板7の接触部が溶接部9によって固定されている。当て板7の2個の穴には、部品A 10aのUボルト6のネジ棒が挿入される。なお、部品B 10bは分割長ナット5bのみで構成し、当て板7を省略してもよい。部品A 10aの分割長ナット5aと部品B 10bの分割長ナット5bは、1個の長ナットを中央で2分割して作成される。上記した吊りボルト用固定具10では、部品の連結に溶接を用いたが、他の例えばロー付け、接着等によって連結してもよい。   FIG. 1 is a diagram showing a configuration of a suspension bolt fixture 10 according to the present invention. The suspension bolt fixture 10 includes a part A 10a and a part B 10b. The part A 10a is made up of a split-length nut 5a and a U-bolt 6, and the contact portion of the split-length nut 5a and the U-bolt 6 is fixed by a weld 8 as shown in FIG. Further, the component B 10b is created by the split length nut 5b and the contact plate 7, and the contact portion between the split length nut 5b and the contact plate 7 is fixed by the welded portion 9 as shown in FIG. The threaded rod of the U bolt 6 of the part A 10a is inserted into the two holes of the backing plate 7. Note that the component B 10b may be constituted only by the split-length nut 5b, and the contact plate 7 may be omitted. The split length nut 5a of the part A 10a and the split length nut 5b of the part B 10b are formed by dividing one long nut into two at the center. In the hanging bolt fixture 10 described above, welding is used to connect the components, but the components may be connected by other methods such as brazing or bonding.

図2に、本実施例の吊りボルト用固定具10の使用状態を示す。既に2本の吊りボルト50が設置されているものとする。まず、2本の吊りボルト50を挟んで吊りボルト用固定具10の部品A 10aと部品B 10bを抱き合わせる。部品A 10aの分割長ナット5aと部品B 10bの分割長ナット5bは吊りボルト50とネジ部ではまり合うためずれることはない。この場合、部品A 10aのUボルト6のネジ部を部品B 10bの当て板7の2つの穴に挿入する。次に、小判形状の穴20aが複数形成されたアングル材20を2個の部品B 10bのUボルト6に挿入する。更に、部品B 10bの当て板7と同様の当て板7をUボルト6のネジ部に挿入し、ナットNで締め付ける。このように2個の吊りボルト用固定具10を使えば、アングル材20を2本の吊りボルト50の間に簡単に設置することができる。   In FIG. 2, the use condition of the fixing tool 10 for suspension bolts of a present Example is shown. It is assumed that two suspension bolts 50 are already installed. First, the component A 10a and the component B 10b of the suspension bolt fixing device 10 are held together with the two suspension bolts 50 interposed therebetween. The split-length nut 5a of the part A 10a and the split-length nut 5b of the part B 10b are not displaced because they fit in the suspension bolt 50 and the threaded portion. In this case, the thread portion of the U bolt 6 of the part A 10a is inserted into the two holes of the contact plate 7 of the part B 10b. Next, the angle member 20 in which a plurality of oval holes 20a are formed is inserted into the U bolts 6 of the two parts B 10b. Further, a backing plate 7 similar to the backing plate 7 of the component B 10 b is inserted into the threaded portion of the U bolt 6 and tightened with a nut N. Thus, if the two suspension bolt fixtures 10 are used, the angle member 20 can be easily installed between the two suspension bolts 50.

次に、上記した方法によって設置されたアングル材20を使って新規配管30を設置する方法を図3を参照しつつ説明する。図3の吊りボルト50は、空調機60を設置するための天井コンクリート70に他端が固定された吊りボルトである。なお、図示しなかったが、天井コンクリート70にはアンカーボルトが打ち込まれているものとする。   Next, a method of installing the new pipe 30 using the angle member 20 installed by the above-described method will be described with reference to FIG. The suspension bolt 50 in FIG. 3 is a suspension bolt having the other end fixed to the ceiling concrete 70 for installing the air conditioner 60. Although not shown, it is assumed that anchor bolts are driven into the ceiling concrete 70.

図中のアングル材20は、既に述べたように吊りボルト用固定具10によって2本の吊りボルト50の間に設置されている。そして、このアングル材20に吊り配管金具40の固定金具40aをボルトBとナットNを使って固定する。次に、新規配管30を挿入した吊りバンド40bを固定金具40aにボルトBとナットNを使って連結する。   The angle member 20 in the figure is installed between the two suspension bolts 50 by the suspension bolt fixture 10 as described above. Then, the fixing fitting 40 a of the hanging pipe fitting 40 is fixed to the angle member 20 using the bolt B and the nut N. Next, the suspension band 40b into which the new pipe 30 is inserted is connected to the fixing bracket 40a using bolts B and nuts N.

通常、空調機60は4本の吊りボルト50によって屋根裏に設置されるため、この既に設置された吊りボルト50を使って2本のアングル材20を設置することができ、新規配管30を2箇所で固定することができる。   Usually, since the air conditioner 60 is installed in the attic by the four suspension bolts 50, the two angle members 20 can be installed using the already installed suspension bolts 50, and two new pipes 30 are installed at two locations. It can be fixed with.

本実施例の吊りボルト用固定具によれば、新たに天井コンクリートに吊りボルトを設置することなく、安価にかつ短時間に新規配管を設置することができる。   According to the hanging bolt fixture of the present embodiment, new piping can be installed at low cost and in a short time without newly installing a hanging bolt on the ceiling concrete.

5a 分割長ナット
5b 分割長ナット
6 Uボルト
7 当て板
8,9 溶接部
10 吊りボルト用固定具
10a 部品A
10b 部品B
20 アングル材
20a 取付穴
30 新規配管
40 吊り配管金具
40a 固定金具
40b 吊りバンド
50 吊りボルト
60 空調機
60a 取付座
65 天井板
70 天井コンクリート
B ボルト
N ナット
5a Divided length nut 5b Divided length nut 6 U-bolt 7 Contact plate 8, 9 Welding part 10 Suspension bolt fixture 10a Part A
10b Part B
20 Angle material 20a Mounting hole 30 New piping 40 Hanging piping fitting 40a Fixing fitting 40b Hanging band 50 Hanging bolt 60 Air conditioner 60a Mounting seat 65 Ceiling plate 70 Ceiling concrete B Bolt N Nut

(1)吊りボルトに設置される固定具であって、
前記吊りボルトと螺合する所定長さの長ナットを縦に中央で分割して作製される第1の分割長ナット及び第2の分割長ナットと、
前記第1の分割長ナットのネジ部とは逆の面に溶接、ロー付け、または接着によって固定されるUボルトと
有することを特徴とする吊りボルト用固定具。
(2)前記第2の分割長ナットのネジ部とは逆の面に固定され、前記Uボルトが挿入される2個の穴を有する当て板を有することを特徴とする前記(1)記載の吊りボルト用固定具。
(3)前記第2の分割長ナットと前記当て板との固定が、溶接、ロー付け、または接着によってなされることを特徴とする前記(2)に記載の吊りボルト用固定具。
(1) A fixing device installed on a suspension bolt,
A first split-length nut and a second split-length nut produced by vertically dividing a long nut having a predetermined length to be screwed into the suspension bolt;
A U-bolt fixed to the surface opposite to the threaded portion of the first split-length nut by welding, brazing, or bonding ;
Bolt fixture hanging and having a.
(2) The above-mentioned (1), characterized by having a backing plate that is fixed to a surface opposite to the threaded portion of the second split-length nut and has two holes into which the U-bolts are inserted. Suspension bolt fixture.
(3) The hanging bolt fixture according to (2), wherein the second split-length nut and the contact plate are fixed by welding, brazing, or adhesion.

Claims (4)

吊りボルトに設置される固定具であって、
前記吊りボルトと螺合する所定長さの長ナットを縦に中央で分割して作製される第1の分割長ナットと第2の分割長ナットと、
前記第1の分割長ナットのネジ部とは逆の面に固定されるUボルトと、
前記第2の分割長ナットのネジ部とは逆の面に固定され、前記Uボルトが挿入される2個の穴を有する当て板と、
を有することを特徴とする吊りボルト用固定具。
A fixing device installed on a suspension bolt,
A first split-length nut and a second split-length nut that are manufactured by vertically dividing a long nut having a predetermined length to be screwed into the suspension bolt;
A U-bolt fixed to the surface opposite to the threaded portion of the first split-length nut;
A backing plate that is fixed to a surface opposite to the threaded portion of the second split-length nut and has two holes into which the U-bolts are inserted;
A suspension bolt fixing tool characterized by comprising:
吊りボルトに設置される固定具であって、
前記吊りボルトと螺合する所定長さの長ナットを縦に中央で分割して作製される第1の分割長ナットと第2の分割長ナットと、
前記第1の分割長ナットのネジ部とは逆の面に固定されるUボルトと、
を有することを特徴とする吊りボルト用固定具。
A fixing device installed on a suspension bolt,
A first split-length nut and a second split-length nut that are manufactured by vertically dividing a long nut having a predetermined length to be screwed into the suspension bolt;
A U-bolt fixed to the surface opposite to the threaded portion of the first split-length nut;
A suspension bolt fixing tool characterized by comprising:
前記第1の分割長ナットと前記Uボルトとの固定が、溶接、ロー付け、または接着によってなされることを特徴とする請求項1または2に記載の吊りボルト用固定具。   The suspension bolt fixing tool according to claim 1 or 2, wherein the first split-length nut and the U-bolt are fixed by welding, brazing, or adhesion. 前記第2の分割長ナットと前記当て板との固定が、溶接、ロー付け、または接着によってなされることを特徴とする請求項1または3に記載の吊りボルト用固定具。   The suspension bolt fixing device according to claim 1 or 3, wherein the second split-length nut and the contact plate are fixed by welding, brazing, or adhesion.
JP2014264494A 2014-12-26 2014-12-26 Suspension bolt fixing Active JP5729849B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014264494A JP5729849B1 (en) 2014-12-26 2014-12-26 Suspension bolt fixing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014264494A JP5729849B1 (en) 2014-12-26 2014-12-26 Suspension bolt fixing

Publications (2)

Publication Number Publication Date
JP5729849B1 JP5729849B1 (en) 2015-06-03
JP2016125523A true JP2016125523A (en) 2016-07-11

Family

ID=53437966

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014264494A Active JP5729849B1 (en) 2014-12-26 2014-12-26 Suspension bolt fixing

Country Status (1)

Country Link
JP (1) JP5729849B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044566A (en) * 2016-02-05 2017-08-15 第防蚀管业有限公司 Tubing suspends bracket in midair
JP7131747B2 (en) * 2018-12-14 2022-09-06 丸井産業株式会社 Steel mounting bracket for hanger bolt

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4733458U (en) * 1971-05-07 1972-12-14
JPS55158375U (en) * 1979-05-02 1980-11-14
JPS5876812U (en) * 1981-11-20 1983-05-24 三菱自動車工業株式会社 U bolt for fixing circular cross section material
JPH078895Y2 (en) * 1989-03-15 1995-03-06 因幡電機産業株式会社 Support for long members
JPH053769U (en) * 1991-06-27 1993-01-22 三菱重工業株式会社 Double tube support structure
JP4216119B2 (en) * 2003-05-15 2009-01-28 有限会社ウェイヴテック Mounting bracket for anchor screw rod
JP3152477U (en) * 2009-05-22 2009-07-30 有限会社ハヤシメンテサービス Hanging bolt bracket
FR2946071B1 (en) * 2009-05-28 2013-05-17 Chabanne Sas ADJUSTING HEAD FOR A DOUBLING FRAME

Also Published As

Publication number Publication date
JP5729849B1 (en) 2015-06-03

Similar Documents

Publication Publication Date Title
US8763645B2 (en) Support system for process piping and method of installation
US9383039B2 (en) Pipe brace
US7850213B2 (en) Coupling with crossable means for couplings to connect endportions of pipes and valves
JP2015034608A (en) Pipeline support
JP5729849B1 (en) Suspension bolt fixing
JP2012087859A (en) Swing preventive metal fitting
JP4216119B2 (en) Mounting bracket for anchor screw rod
JP5992083B1 (en) Fall-out prevention fitting for lighting equipment and fall-off prevention method
CN204004810U (en) A kind of pipeline fixing device
KR20140003489U (en) Support clamp for pipe flange of ship
WO2013015693A1 (en) Method for installation of a pipe based system, and a pipe based system particularly suitable for the method
JP3183555U (en) Piping support device
CN211118002U (en) Supporting and fixing part for electromechanical pipeline on steel beam
JP3194764U (en) Piping fixing bracket
JP2014134011A (en) Brace fixture
CN203797162U (en) Small-gap adjustable pipeline support device
CN216480615U (en) Hanging bracket
CA2910487C (en) Method for forming a pipe joint, pipe joint and flange part arrangement
CN204540135U (en) Booth multiple tube fixture
US20220390040A1 (en) Flanged pipe support bracket
CN210034094U (en) Detachable expansion screw
CN101581388A (en) Heavy pipe clamp with smooth guide rail type base plate
JP2023040448A (en) Metal fitting for fitting wire rope for steel pipe
JP2021092277A (en) Fixing metal fitting for suspension bolt, and structure using metal fitting
JP2831341B2 (en) Suspension devices such as ceiling-mounted air conditioners

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150305

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150324

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150403

R150 Certificate of patent or registration of utility model

Ref document number: 5729849

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250