JP2016027239A - Destruction prevention structure for viaduct - Google Patents

Destruction prevention structure for viaduct Download PDF

Info

Publication number
JP2016027239A
JP2016027239A JP2015132426A JP2015132426A JP2016027239A JP 2016027239 A JP2016027239 A JP 2016027239A JP 2015132426 A JP2015132426 A JP 2015132426A JP 2015132426 A JP2015132426 A JP 2015132426A JP 2016027239 A JP2016027239 A JP 2016027239A
Authority
JP
Japan
Prior art keywords
cable
pier
collapse
viaduct
displacement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015132426A
Other languages
Japanese (ja)
Other versions
JP6671612B2 (en
Inventor
芳顯 後藤
Yoshiaki Goto
芳顯 後藤
忠信 山田
Tadanobu Yamada
忠信 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nagoya Institute of Technology NUC
Original Assignee
Nagoya Institute of Technology NUC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nagoya Institute of Technology NUC filed Critical Nagoya Institute of Technology NUC
Priority to JP2015132426A priority Critical patent/JP6671612B2/en
Publication of JP2016027239A publication Critical patent/JP2016027239A/en
Application granted granted Critical
Publication of JP6671612B2 publication Critical patent/JP6671612B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a destruction prevention structure for viaduct with a relatively simple structure and satisfactory workability capable of preventing destruction of bridge pier as well as destruction of the entire viaduct caused therefrom.SOLUTION: A bridge pier transverse beam 3 has brackets 4 provided at both ends thereof and is provided with a cable 5 having a slack. One end of the cable 5 is fastened to the brackets 4 and the other end thereof is fixed at an appropriate position. In an ordinary state or in an earthquake, little force is applied to the cable 5; but at an occurrence of destruction, the cable gets tensioned and weight is distributed to thereby prevent destruction of a bridge pier 2a, 2b, 2c or 2d to prevent destruction of the entire viaduct caused therefrom.SELECTED DRAWING: Figure 2

Description

本発明は、橋脚と横梁を有する高架橋の倒壊防止構造に関するものである。 The present invention relates to a collapse prevention structure for a viaduct having bridge piers and cross beams.

従来、高架橋では上部構造(桁)が横梁上面に設置され支承で支持されている。この支承が東北太平洋沖地震クラスの極大地震動によって破壊した場合、上部構造が水平方向に大きく移動し下部構造である橋脚と横梁から落下する可能性がある。   Conventionally, in the viaduct, the superstructure (girder) is installed on the upper surface of the cross beam and supported by the support. If this support breaks due to the Tohoku Pacific Ocean class maximum ground motion, the superstructure may move greatly in the horizontal direction and fall from the piers and cross beams that are the substructure.

これを防止する目的で設置されるのが落橋防止装置である。落橋防止装置は橋脚が致命的な損傷に至っていない場合に有効に機能する。しかしながら、橋脚が倒壊した場合には無力であり高架橋全体の倒壊につながる。 A fall bridge prevention device is installed for the purpose of preventing this. The falling bridge prevention device functions effectively when the pier has not been fatally damaged. However, if the pier collapses, it is powerless and leads to the collapse of the entire viaduct.

この種の落下防止装置として、上部構造端部と下部構造または隣接する上部構造端部同士をPCケーブルによって連結することにより、支承損壊後の上部構造の移動をPCケーブルによって制限し落橋を防止するもの(特許文献1参照)がある。
また、PCケーブル式と同様に、上部構造端部と下部構造を鋼製のチェーンによって連結し,上部構造の移動を制限することにより落橋を防止するもの(特許文献2参照)がある。
As this type of fall prevention device, the upper structure end and the lower structure or adjacent upper structure ends are connected by PC cable, so that the movement of the upper structure after breakage of the bearing is restricted by PC cable to prevent the falling bridge There is a thing (refer patent document 1).
In addition, as in the case of the PC cable type, there is one that prevents the falling bridge by connecting the upper structure end and the lower structure with a steel chain and restricting the movement of the upper structure (see Patent Document 2).

特許第3746486号公報Japanese Patent No. 3746486 特許第4669572号公報Japanese Patent No. 4669572

従来技術は、上部構造が橋脚頂部から落下することを防止するものであり、したがって,橋脚が致命的な損傷に至っていない段階では機能する。しかし、想定を上まわる大地震によって橋脚が大きく損傷した場合には、本来の機能を発揮できない。 The prior art prevents the superstructure from falling from the top of the pier, and therefore functions when the pier has not been fatally damaged. However, if the bridge pier is greatly damaged by a large earthquake that exceeds the assumption, the original function cannot be achieved.

通常、高架橋では、橋脚を極大地震時における損傷部位と想定し耐震設計がなされるので、極大地震時においては、損傷は必然的に上部構造ではなく、下部構造の橋脚の方に集中する。このため、設計の想定を上まわる大地震が発生すると橋脚が甚大な損傷を受け倒壊する恐れがあり、このような場合、橋梁全体の倒壊を抑止することは困難であった。 Normally, in a viaduct, the bridge pier is assumed to be a damaged part at the time of a quake, so the seismic design is made. For this reason, if a large earthquake exceeding the design assumption occurs, the bridge pier may be damaged and collapsed. In such a case, it is difficult to prevent the entire bridge from collapsing.

本発明は、このような橋脚が倒壊した状況下においても高架橋の全体倒壊を防止する構造を提供することを目的とする。 An object of this invention is to provide the structure which prevents the whole collapse of a viaduct also in the condition where such a pier collapsed.

本発明は、課題を解決するための手段として以下の特徴を有する、
発明1は、橋脚と横梁を有する高架橋において、横梁の両端に、それぞれケーブルの一方を固定し、ケーブルの他方を、横梁の同じ方向の外側に位置するアンカーに、それぞれ弛ませて固定し、橋脚の倒壊時のみに、ケーブルが緊張することにより、橋脚の倒壊および付随して生じる高架橋の全体倒壊を防止することを特徴とする高架橋の倒壊防止構造である。
発明2は、横梁の両端部にそれぞれ2本のケーブルを取付け、橋脚に対して橋軸方向の両側に設置したアンカーに、2本のケーブルの他端を、それぞれ弛ませて固定し、橋脚の橋軸方向の倒壊を抑止することを特徴とする発明1に記載する高架橋の倒壊防止構造である。
発明3は、隣接する橋脚または橋台の、一方の橋脚の横梁の両端と、他方の橋脚の横梁の両端または橋台の一方の橋脚の横張の両端に対応する両端とを、ケーブルで弛みを持って、対角方向に互い交差するように、または、橋軸方向に平行に、結合することを特徴とする高架橋の倒壊防止構造である。
発明4は、ケーブルの長さは、耐震設計での許容限界に発生している変位より算出した値以上、倒壊点に発生している変位より算出した長さを超えない値であることを特徴とする発明1乃至発明3の何れか1項に記載の高架橋の倒壊防止構造である。
発明5は、ケーブルの結合部にダンパーおよび/または弾性体を設置してケーブルに作用する衝撃力を低減することを特徴とする発明1乃至4の何れかに記載の高架橋の倒壊防止構造である。
以上、橋脚の横梁の両側に設置したブラケットに弛みを持たせたケーブル(PCケーブルなど)の一端を締結し,他端を適切なアンカーに定着することにより、橋脚が倒壊した場合、高架橋の全体倒壊を防止するものである。
The present invention has the following features as means for solving the problems,
According to the first aspect of the present invention, in a viaduct having a bridge pier and a cross beam, one end of each cable is fixed to both ends of the cross beam, and the other end of the cable is fixed to each anchor on an outer side in the same direction of the cross beam. A structure for preventing collapse of a viaduct that prevents a collapse of a bridge pier and an accompanying collapse of a viaduct caused by tensioning a cable only when the cable collapses.
In invention 2, two cables are attached to both ends of the cross beam, and the other ends of the two cables are respectively loosened and fixed to anchors installed on both sides in the bridge axis direction with respect to the pier. The collapse prevention structure for a viaduct according to the first aspect of the invention, wherein collapse in the bridge axis direction is suppressed.
The invention 3 has a slack with a cable between the ends of the horizontal beam of one pier of the adjacent pier or the abutment and the ends of the horizontal beam of the other pier or the opposite ends of the horizontal of the one pier of the abutment. A structure for preventing collapse of a viaduct, characterized in that they are connected so as to cross each other diagonally or parallel to the direction of the bridge axis.
Invention 4 is characterized in that the length of the cable is not less than the value calculated from the displacement occurring at the allowable limit in the seismic design and not exceeding the length calculated from the displacement occurring at the collapse point. The structure according to any one of Inventions 1 to 3, wherein the structure is a structure for preventing collapse of the viaduct.
A fifth aspect of the present invention is the structure for preventing collapse of a viaduct according to any one of the first to fourth aspects, wherein a damper and / or an elastic body is installed at a connecting portion of the cable to reduce an impact force acting on the cable. .
As described above, if one end of a cable (PC cable, etc.) with slack is attached to the brackets installed on both sides of the pier's horizontal beam, and the other end is fixed to an appropriate anchor, This is to prevent collapse.

本発明によれば、以下の効果がある。
発明1は、橋脚と横梁を有する高架橋において、横梁の両端に、それぞれケーブルの一方を固定し、ケーブルの他方を、横梁の同じ方向の外側に位置するアンカーに、それぞれ弛ませて固定する。よって、橋脚の倒壊した場合のみケーブルが緊張し、橋脚の倒壊および付随して生じる高架橋の全体倒壊を、ケーブルで支えることにより防止する高架橋の倒壊防止構造である。よって、高架橋の全体倒壊防止をする効果がある。
発明2は、横梁の両端部にそれぞれ2本のケーブルを取付け、橋脚に対して橋軸方向の両側に設置したアンカーに、2本のケーブルの他端を、それぞれ弛ませて固定する発明1に記載する高架橋の倒壊防止構造である。よって、橋脚の橋軸方向に倒壊した場合、ケーブルで支えることにより、橋脚の橋軸方向に倒壊を抑止する効果がある。
発明3は、隣接する橋脚の、一方の橋脚の横梁の両端と、他方の橋脚の横梁の両端または橋台の一方の橋脚の横張の両端に対応する両端とを、ケーブルで弛みを持って、対角方向に互い交差するように、または、橋軸方向に平行に、結合することを特徴とする高架橋の倒壊防止構造である。よって、橋脚の倒壊した場合のみケーブルが緊張し、橋脚の倒壊および付随して生じる高架橋の全体倒壊を、ケーブルで支えることにより防止する。よって、高架橋の全体倒壊防止をする効果がある。
発明4は、ケーブルの長さは、耐震設計での許容限界に発生している変位より算出した値以上、倒壊点に発生している変位より算出した長さを超えない値である高架橋の倒壊防止構造である。よって、発明1乃至発明3の何れかに記載の高架橋の倒壊防止構造に適用した場合、この範囲のケーブル長さで橋脚の倒壊を防止する効果がある。
ここで、耐震設計での許容限界に発生している変位より算出したケーブルが、強度を最も小さく設計できる。よって、ケーブルの質量も最小にできるので、地震時における動特性を変化させない効果がある。即ち、初期のケーブルの弛みは倒壊挙動が生じる直前までケーブルに地震力がなるべく作用しないようにすることができる。これは、倒壊前にケーブルに地震力が作用することで高架橋が複雑な挙動をするのを防ぐ目的と、地震力によりケーブルが損傷することを防ぐことができる。
発明5は、ケーブルの結合部にダンパーおよび/または弾性体を設置する高架橋の倒壊防止構造である。よって、発明1乃至発明4の何れかに記載の高架橋の倒壊防止構造に適用した場合、倒壊時の衝撃力を低減してケーブルに作用する衝撃力を低減する効果がある。
The present invention has the following effects.
According to the first aspect of the present invention, in a viaduct having a bridge pier and a horizontal beam, one end of each cable is fixed to both ends of the horizontal beam, and the other end of the cable is fixed to each anchor on an outer side in the same direction of the horizontal beam. Therefore, the structure of the viaduct collapse prevention structure prevents the collapse of the bridge pier and the accompanying overall collapse of the viaduct by supporting the cable with the cable only when the pier collapses. Therefore, there is an effect of preventing the entire viaduct from collapsing.
Invention 2 is the invention 1 in which two cables are attached to both ends of the cross beam, and the other ends of the two cables are respectively loosened and fixed to anchors installed on both sides of the bridge axis direction with respect to the pier. It is a structure for preventing collapse of the viaduct described. Therefore, when the bridge pier collapses in the direction of the bridge axis, there is an effect of suppressing the collapse in the bridge axis direction of the pier by supporting with the cable.
In the invention 3, the both ends of the lateral beam of one pier of the adjacent pier and the both ends of the lateral beam of the other pier or the both ends corresponding to the lateral ends of one pier of the abutment are connected with a slack with a cable. A structure for preventing collapse of a viaduct, characterized in that they are joined so as to cross each other in the angular direction or parallel to the direction of the bridge axis. Therefore, the cable is strained only when the pier collapses, and the collapse of the pier and the accompanying collapse of the viaduct are prevented by supporting the cable with the cable. Therefore, there is an effect of preventing the entire viaduct from collapsing.
In invention 4, the length of the cable is not less than the value calculated from the displacement occurring at the allowable limit in the seismic design, but not exceeding the length calculated from the displacement occurring at the collapse point. It is a prevention structure. Therefore, when applied to the viaduct collapse prevention structure according to any one of the inventions 1 to 3, the cable length within this range has an effect of preventing the pier from collapsing.
Here, the cable calculated from the displacement generated at the allowable limit in the seismic design can be designed with the smallest strength. Therefore, since the mass of the cable can be minimized, there is an effect that the dynamic characteristics at the time of the earthquake are not changed. That is, the initial slack of the cable can prevent the seismic force from acting on the cable as much as possible until just before the collapse behavior occurs. This is to prevent the viaduct from performing complicated behavior due to the seismic force acting on the cable before collapse, and to prevent the cable from being damaged by the seismic force.
The fifth aspect of the present invention is a viaduct collapse prevention structure in which a damper and / or an elastic body is installed at a connecting portion of a cable. Therefore, when applied to the viaduct collapse prevention structure according to any one of inventions 1 to 4, there is an effect of reducing the impact force acting on the cable by reducing the impact force at the time of collapse.

以上、本発明に係る高架橋の倒壊防止構造によれば、橋脚が想定外の大地震により致命的な損傷を受け倒壊しようとする場合、橋脚の横梁の両側に設置したブラケットに弛みを持たせたケーブル(PCケーブルなど)の一端を締結し,他端を適切なアンカーに定着することにより、高架橋の全体倒壊を防止する効果がある。 As described above, according to the viaduct collapse prevention structure according to the present invention, when the bridge pier is fatally damaged due to an unexpected large earthquake, the brackets installed on both sides of the cross beam of the bridge pier are slackened. By fastening one end of a cable (PC cable, etc.) and fixing the other end to an appropriate anchor, there is an effect of preventing the entire viaduct collapse.

高架橋の側面図を示す。The side view of a viaduct is shown. 第1実施形態の高架橋の倒壊防止構造を、図1のIa方向からの模式図で示す。The structure for preventing collapse of the viaduct of the first embodiment is shown in a schematic view from the Ia direction of FIG. 図2のIb方向から見た側面図を示す。The side view seen from the Ib direction of FIG. 2 is shown. ケーブルの横梁およびアンカーの締結部におけるダンパーおよび/または弾性体を設置した構造の実施例に示す。(a)は、ダンパーを設置した構造の例。(b)は、弾性体を設置した構造の実施例。(c)は、ダンパーおよび弾性体を設置した構造の実施例である。An example of a structure in which a damper and / or an elastic body is installed at a fastening portion of a cable cross beam and an anchor is shown. (A) is an example of the structure which installed the damper. (B) is the Example of the structure which installed the elastic body. (C) is the Example of the structure which installed the damper and the elastic body. 第1実施形態の効果を模式的に示した図である。It is the figure which showed the effect of 1st Embodiment typically. 第2実施形態の構造を模式的に示した図1のIa方向から見た図である。It is the figure seen from the Ia direction of FIG. 1 which showed the structure of 2nd Embodiment typically. 第3実施形態の構造を模式的に示した図1の方向から見た図である。It is the figure seen from the direction of FIG. 1 which showed the structure of 3rd Embodiment typically. 第3実施形態の動作を模式的に示した図である。It is the figure which showed the operation | movement of 3rd Embodiment typically. 第4実施形態の構造を模式的に示した斜視図である。It is the perspective view which showed the structure of 4th Embodiment typically. 同、斜視図である。FIG. 同、斜視図である。FIG. 加振実験の供試体とシミュレーションで用いたモデルを示す。The specimen used in the vibration experiment and the model used in the simulation are shown. 第1実施形態の立体交差部への適用イメージApplication image to the three-dimensional intersection of the first embodiment 第1実施形態の倒壊防止構造の解析モデルAnalytical model of the collapse prevention structure of the first embodiment 第1実施形態の変形時の形状Shape at the time of deformation of the first embodiment ケーブルの長さの計算方法How to calculate cable length 第1実施形態の橋脚の倒壊モードと倒壊防止作用開始点を示す。(a)橋脚の倒壊モード、(b)倒壊モードの変位と荷重の関係における倒壊防止作用開始点を示す。The collapse mode of a bridge pier of 1st Embodiment and the collapse prevention action start point are shown. (A) Collapsed mode of bridge pier, (b) Collapse prevention action start point in relation to displacement and load in collapsed mode. 倒壊防止構造の諸元と倒壊防止時の状況Specifications of the collapse prevention structure and the situation at the time of collapse prevention 橋脚頂部の変位の動的解析結果Dynamic analysis results of displacement at pier top ケーブルの張力の動的解析結果Dynamic analysis results of cable tension

以下、図面を参照しつつ本発明の実施の形態について説明する。本発明は、以下の実施形態に限定されるものではなく、発明の範囲を逸脱しない限りにおいて、変更、修正、改良を加え得るものである。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. The present invention is not limited to the following embodiments, and changes, modifications, and improvements can be added without departing from the scope of the invention.

図1は、高架橋の側面図である。
高架橋は上部構造1と下部構造の橋脚2a,2b,2c,2dによって構成されている。
本発明に係る高架橋の倒壊防止構造を、第1実施形態、第2実施形態、第3実施形態及び第4実施形態により、以下に説明する。
FIG. 1 is a side view of a viaduct.
The viaduct is composed of the upper structure 1 and the lower structure bridge piers 2a, 2b, 2c, 2d.
A structure for preventing collapse of a viaduct according to the present invention will be described below with reference to a first embodiment, a second embodiment, a third embodiment, and a fourth embodiment.

(第1実施形態)
図2に、複数ある橋脚の中で橋脚2bが地震時に最も損傷を受けるとしたとき、橋脚2bに第1実施形態の倒壊防止構造を模式図に示す。図2は、図1のIa方向から見ている。上部構造1については、断面図に該当する。
(First embodiment)
FIG. 2 is a schematic diagram showing the collapse prevention structure of the first embodiment on the pier 2b when the pier 2b is most damaged during an earthquake among a plurality of piers. FIG. 2 is seen from the Ia direction of FIG. The upper structure 1 corresponds to a sectional view.

図3は、図2においてIb方向から見た側面図である。
第1実施形態では、図2に示すように、橋脚2bの横梁3の両側に設置したブラケット4にケーブル5を締結させ、それを左右に広がるように垂らし、ケーブル5のもう一方の端を地面に埋め込んだアンカー6の上端のブラケット7に定着させる。
アンカー6の位置は、ケーブル5を締結したブラケット4のある横梁3の同じ方向の外側に位置する。橋脚2bが、図2の左右のいずれかの方向に倒壊したとき、その反対側のケーブル5が緊張して橋脚2bを支える。これにより、倒壊した橋脚2bによる荷重を分担させ、橋脚2a,2b,2c,2dの倒壊および付随して生じる高架橋の全体倒壊を防止する。
FIG. 3 is a side view seen from the Ib direction in FIG.
In the first embodiment, as shown in FIG. 2, the cable 5 is fastened to the brackets 4 installed on both sides of the cross beam 3 of the pier 2b, and the cable 5 is hung so as to spread left and right, and the other end of the cable 5 is grounded. The anchor 6 is fixed to the bracket 7 at the upper end of the anchor 6 embedded therein.
The position of the anchor 6 is located on the outer side in the same direction of the cross beam 3 with the bracket 4 to which the cable 5 is fastened. When the pier 2b collapses in either the left or right direction in FIG. 2, the cable 5 on the opposite side is tensioned to support the pier 2b. Thereby, the load by the collapsed bridge pier 2b is shared, and the collapse of the bridge piers 2a, 2b, 2c, 2d and the accompanying collapse of the entire viaduct are prevented.

また、橋脚間の上部構造1、橋脚2bは、荷重が1000トン以上ある。
よって、ケーブル5は、PCケーブル(特許文献1参照)または鋼製のチェーン(特許文献2参照)など十分強度があり、弛みを持たせて施工できる物が良い。
The superstructure 1 between the piers and the pier 2b have a load of 1000 tons or more.
Accordingly, the cable 5 is preferably a PC cable (see Patent Document 1) or a steel chain (see Patent Document 2) that has sufficient strength and can be constructed with slack.

なお、必要に応じて衝撃力低減のために図4(a)のようにダンパー14または図4(b)のように弾性体70をケーブル5端とアンカー6側ブラケット7間あるいはケーブル5端と橋脚3側ブラケット4間に設置する。ダンパー14または弾性体70は倒壊時の衝撃力を低減してケーブルに作用する衝撃力を低減する効果がある。また、図4(c)のようにダンパー14と弾性体70は、合わせて設置しても良い。 In order to reduce the impact force as necessary, the elastic body 70 is connected between the end of the cable 5 and the anchor 6 side bracket 7 or the end of the cable 5 as shown in FIG. Installed between the pier 3 side brackets 4. The damper 14 or the elastic body 70 has an effect of reducing the impact force acting on the cable by reducing the impact force at the time of collapse. Further, as shown in FIG. 4C, the damper 14 and the elastic body 70 may be installed together.

ケーブル5が高架橋の下部交通などの妨げにならないように、アンカー6は、ケーブル5を締結したブラケット4のある横梁3の同じ方向の外側に位置する歩道8などの道路幅方向の端部に設置される。ケーブル5には図2に示すように、弛みを持たせている。これは、常時や地震時において、ケーブル5に荷重が作用して、倒壊挙動が生じる以前に、高架橋の応答特性に変化やケーブル5の損傷が、生じないようにするためである。 The anchor 6 is installed at the end of the road width direction such as the sidewalk 8 located outside the cross beam 3 with the bracket 4 to which the cable 5 is fastened in order to prevent the cable 5 from interfering with the underpass of the viaduct. Is done. The cable 5 has a slack as shown in FIG. This is to prevent a change in the response characteristics of the viaduct or damage to the cable 5 before the collapse behavior occurs due to a load acting on the cable 5 at all times or during an earthquake.

第1実施形態のケーブル5による倒壊防止構造は、耐震構造とは異なるものであり、本来の高架橋の耐震性能を変化さたり、倒壊挙動が生じる前に損傷することがあってはならない。
よって、橋脚間の上部構造1、橋脚2bは、荷重が1000トン以上あるが、動特性に影響がでないようにするため、ケーブル5の荷重を橋脚間の上部構造1と橋脚2b荷重に対して5%程度とすることができる。
The collapse preventing structure by the cable 5 of the first embodiment is different from the earthquake resistant structure, and the earthquake resistant performance of the original viaduct must not be changed or damaged before the collapse behavior occurs.
Therefore, the superstructure 1 between the piers and the pier 2b have a load of 1000 tons or more, but in order not to affect the dynamic characteristics, the load of the cable 5 is set against the load of the superstructure 1 between the piers and the pier 2b. It can be about 5%.

高架橋下の道路は車道9と歩道8などによって形成されるが、ケーブル5は高架橋下の車両空間10を侵さないように配慮する必要がある。
図2に示すように、アンカー6の上端のブラケット7に支柱11を立て、支柱11にてケーブル5を支え、ケーブル5の弛みを規制すれば、車道9の常時の車両空間10を確保することができる。
Although the road under the viaduct is formed by the roadway 9 and the sidewalk 8, the cable 5 needs to be considered so as not to invade the vehicle space 10 under the viaduct.
As shown in FIG. 2, if a column 11 is set up on the bracket 7 at the upper end of the anchor 6, the cable 5 is supported by the column 11, and slackness of the cable 5 is restricted, the vehicle space 10 on the roadway 9 is always secured. Can do.

この支柱11は、倒壊防止構造が機能する段階において、ケーブル5が正常に機能するようにしておく。よって、支柱11の強度はケーブル5の荷重を支える程度のもので良い。例えば、木製であっでも良いし、塩化ビニールなど樹脂製のパイプとして中空の内部にケーブル5を通す構造でも良い。よって、ケーブル5の支柱11は、ケーブル5が緊張により容易に壊れるので、ケーブル5を傷つけることが無い。 This support | pillar 11 is set so that the cable 5 may function normally in the step which a collapse prevention structure functions. Therefore, the strength of the support 11 may be sufficient to support the load of the cable 5. For example, it may be made of wood, or may be a structure in which the cable 5 is passed through a hollow interior as a resin pipe such as vinyl chloride. Therefore, the support 11 of the cable 5 does not damage the cable 5 because the cable 5 is easily broken by tension.

前述したように、必要に応じて衝撃力低減のためのダンパー14および/または弾性体70をケーブル5の定着端とブラケット7間に設置する。 As described above, the damper 14 and / or the elastic body 70 for reducing the impact force is installed between the fixing end of the cable 5 and the bracket 7 as necessary.

図4に、ケーブル5の横梁3およびアンカー6の締結部におけるダンパー14および/または弾性体70を設置した構造の実施を示す。
図4(a)は、ダンパーのみを設置した構造の例である。倒壊時にケーブル5に作用する引張力12は、支圧板13を介してダンパー14に伝達される。ダンパー14は支圧板13が反力板15に接触して支持されるまでの変位に対してエネルギを吸収することにより、倒壊時の衝撃力を吸収する。反力板15は中央に孔が設けられており、ケーブルが貫通している。
図4(b)に、ケーブル5の横梁3およびアンカー6の締結部における弾性体70を設置した構造の実施例に示す。倒壊時にケーブル5に作用する引張力12によりケーブル端部と反力板15の間に設置された弾性体70に圧縮力が作用する.この圧縮力により弾性体70が縮むことで倒壊時の衝撃力を吸収する。
図4(c)に, ケーブル5の横梁3およびアンカー6の締結部におけるダンパー14および弾性体70を併用した実施例を示す。倒壊時にケーブル5に作用する引張力12は、ケーブル端部と支圧板13間に設置された弾性体70と支圧板13を介してダンパー14に伝達される。このときダンパー14での倒壊時の衝撃力の吸収とともに、弾性体70に圧縮力が作用し、この圧縮力により弾性体70が縮むことで倒壊時の衝撃力を吸収する。
FIG. 4 shows an implementation of a structure in which the damper 14 and / or the elastic body 70 are installed at the fastening portion of the cross beam 3 of the cable 5 and the anchor 6.
FIG. 4A is an example of a structure in which only a damper is installed. The tensile force 12 acting on the cable 5 at the time of collapse is transmitted to the damper 14 via the bearing plate 13. The damper 14 absorbs energy against displacement until the pressure bearing plate 13 is supported by being in contact with the reaction force plate 15 to absorb the impact force at the time of collapse. The reaction plate 15 is provided with a hole in the center, and the cable passes therethrough.
FIG. 4B shows an embodiment of a structure in which an elastic body 70 is installed at the fastening portion of the cross beam 3 of the cable 5 and the anchor 6. A compressive force is applied to the elastic body 70 installed between the cable end and the reaction force plate 15 by the tensile force 12 acting on the cable 5 at the time of collapse. The elastic body 70 is contracted by this compressive force to absorb the impact force at the time of collapse.
FIG. 4C shows an embodiment in which the damper 14 and the elastic body 70 in the fastening portion of the cross beam 3 of the cable 5 and the anchor 6 are used together. The tensile force 12 acting on the cable 5 at the time of collapse is transmitted to the damper 14 via the elastic body 70 and the support plate 13 installed between the cable end and the support plate 13. At this time, the compression force acts on the elastic body 70 along with the absorption of the impact force at the time of collapse by the damper 14, and the impact force at the time of collapse is absorbed by the compression of the elastic body 70 by this compression force.

図5は、第1実施形態における効果を模式的に示した図である。想定外の大地震によって橋脚2bの基部が損傷し耐力が喪失した場合、橋脚2bはそのまま自重によって倒壊していく。図5に示すように、橋脚2bが右側に倒壊した場合、左側のケーブル5が緊張することによって、荷重を分担し、橋脚の倒壊挙動を抑止する。反対に、橋脚2bが左側に倒壊した場合、右側のケーブル5が緊張することによって、荷重を分担し、橋脚の倒壊挙動を抑止する。
よって、アンカー6の位置は、ケーブル5を取り付けた横梁3の端部に対して、橋脚2bの反対側にある。ケーブル5が緊張のより橋脚2bの倒壊を防止するからである。
FIG. 5 is a diagram schematically showing the effect of the first embodiment. When the base of the pier 2b is damaged due to an unexpected large earthquake and the proof strength is lost, the pier 2b is collapsed by its own weight as it is. As shown in FIG. 5, when the pier 2b collapses to the right side, the cable 5 on the left side is tensioned to share the load and suppress the collapse behavior of the pier. On the contrary, when the pier 2b collapses to the left side, the cable 5 on the right side is tensioned, so that the load is shared and the collapse behavior of the pier is suppressed.
Therefore, the position of the anchor 6 is on the opposite side of the pier 2b with respect to the end of the cross beam 3 to which the cable 5 is attached. This is because the cable 5 prevents the pier 2b from collapsing due to tension.

また、橋脚間の上部構造1、橋脚2bは、荷重が1000トン以上ある。従って、ブラケット4及び7は十分強度のある材料、構造を用いる。加えて、アンカー6は、地中に鉄筋やコンクリート等を用いて施工し、橋脚間の上部構造1、橋脚2bの倒壊により破損したり引き抜かれたりすることが無いようにする。
以上より、橋脚の倒壊を起点とした連鎖的な高架橋全体の倒壊を防止することができる。
The superstructure 1 between the piers and the pier 2b have a load of 1000 tons or more. Therefore, the brackets 4 and 7 are made of a sufficiently strong material and structure. In addition, the anchor 6 is constructed using rebar, concrete, or the like in the ground so that the upper structure 1 between the piers and the pier 2b are not damaged or pulled out.
From the above, it is possible to prevent the collapse of the entire chain viaduct starting from the collapse of the pier.

(第2実施形態)
図6は第2実施形態の構造を模式的に示した図である。図6は、図1のIa方向から見た断面図に該当する。
(Second Embodiment)
FIG. 6 is a diagram schematically showing the structure of the second embodiment. FIG. 6 corresponds to a cross-sectional view seen from the Ia direction of FIG.

橋脚2bの横梁3の両側と橋脚の左右に存在する建築構造物16のアンカー61に鋼製ブラケット17を設置して、その間にケーブル18を設置することにより、橋脚を固定することが第2実施形態の大きな特徴である。第2実施形態の場合,橋脚の倒壊を防止するために必要な力は小さくなるのでケーブル18の断面積やブラケット17とアンカー61の構造は第1実施形態よりも小さくすることが可能である。
即ち、第1実施形態は、図5で示すように橋脚2bの下部が壊れ、右側へ倒壊した場合、ゲーブル5、ブラケット4、アンカー6には、モーメントとして、右側へ倒壊する荷重に高さHを乗じた力が加わる。高さHは、アンカー6から横梁3のブラケット4までの鉛直高さである。一方、第2実施形態は、図6で示すように橋脚2bの下部が壊れ、右側へ倒壊した場合、ゲーブル18、ブラケット7、アンカー61には、右側へ倒壊する荷重のみの力が加わる。アンカー61を地上より高さHの位置に設置したことにより、横梁3のブラケット7の設置位置となって、モーメントが働かないからである。
よって、アンカー61の位置は、ケーブル5を締結したブラケット4のある横梁3の同じ方向の外側に位置する。ケーブル5が緊張により橋脚2bの倒壊を防止するからである。
A second implementation is to fix the pier by installing steel brackets 17 on the anchors 61 of the building structure 16 existing on both sides of the cross beam 3 of the pier 2b and on the left and right of the pier, and installing a cable 18 between them. It is a major feature of the form. In the case of the second embodiment, since the force necessary to prevent the collapse of the pier is reduced, the cross-sectional area of the cable 18 and the structure of the bracket 17 and the anchor 61 can be made smaller than those of the first embodiment.
That is, in the first embodiment, as shown in FIG. 5, when the lower part of the pier 2b is broken and collapses to the right side, the gable 5, the bracket 4 and the anchor 6 have a height H as a moment to collapse to the right side. The power multiplied by is added. The height H is the vertical height from the anchor 6 to the bracket 4 of the cross beam 3. On the other hand, in the second embodiment, as shown in FIG. 6, when the lower part of the pier 2b is broken and collapses to the right side, the gable 18, the bracket 7 and the anchor 61 are applied only with a load that collapses to the right side. This is because the installation of the anchor 61 at a height H from the ground results in the installation position of the bracket 7 of the cross beam 3 and the moment does not work.
Therefore, the position of the anchor 61 is located on the outer side in the same direction of the cross beam 3 with the bracket 4 to which the cable 5 is fastened. This is because the cable 5 prevents the pier 2b from collapsing due to tension.

このとき、第1実施形態と同様に、常時や地震時における高架橋の応答特性に直接的影響を及ぼさないように、ケーブル18には弛みを持たせてある。
また、必要に応じて衝撃力低減のためのダンパーまたは/および弾性体をケーブル18端とブラケット17間に設置することができる。
At this time, as in the first embodiment, the cable 18 is slack so as not to directly affect the response characteristics of the viaduct at all times or during an earthquake.
Further, if necessary, a damper or / and an elastic body for reducing the impact force can be installed between the end of the cable 18 and the bracket 17.

本例では第1実施形態のように、建設に手間がかかるアンカーの設置が、既存の建築構造物16のアンカー61が利用できるので、不要という利点がある。この際、アンカー61は、橋脚間の上部構造1、橋脚2bの倒壊により破損したり引き抜かれたりすることが無いように十分強度を要する。 In this example, as in the first embodiment, there is an advantage that the installation of the anchor, which is troublesome in construction, is unnecessary because the anchor 61 of the existing building structure 16 can be used. At this time, the anchor 61 needs to be sufficiently strong so that it will not be damaged or pulled out due to the collapse of the superstructure 1 between the piers and the pier 2b.

以上、第1実施形態および第2実施形態より、以下の作用および効果がある。
発明1は、橋脚2bと横梁3を有する高架橋において、横梁3の両端に、それぞれケーブル5またはケーブル18の一方を固定し、ケーブル5またはケーブル18の他方を、横梁3の同じ方向の外側に位置するアンカー6またはアンカー61に、それぞれ弛ませて固定する。よって、橋脚2bの倒壊した場合のみケーブル5またはケーブル18が緊張し、橋脚2bの倒壊および付随して生じる高架橋の全体倒壊を、ケーブル5またはケーブル18で支えることにより防止する。高架橋の全体倒壊防止をする効果がある。
発明4は、ケーブル5の長さは、耐震設計での許容限界に発生している変位より算出した値以上、倒壊点に発生している変位より算出した長さを超えない値である高架橋の倒壊防止構造である。よって、発明1乃至発明3の何れかに記載の高架橋の倒壊防止構造に適用した場合、この範囲のケーブル長さで橋脚の倒壊を防止する効果がある。
ここで、耐震設計での許容限界に発生している変位より算出したケーブルが、強度を最も小さく設計できる。よって、ケーブルの質量も最小にできるので、地震時における動特性を変化させない効果がある。即ち、初期のケーブルの弛みは倒壊挙動が生じる直前までケーブルに地震力がなるべく作用しないようにすることができる。これは、倒壊前にケーブルに地震力が作用することで高架橋が複雑な挙動をするのを防ぐ目的と、地震力によりケーブルが損傷することを防ぐことができる。
発明5は、ケーブル5またはケーブル18の結合部にダンパー14および/または弾性体70を設置する高架橋の倒壊防止構造である。発明1の高架橋の倒壊防止構造に適用した場合、倒壊時の衝撃力を低減してケーブル5またはケーブル18に作用する衝撃力を低減する効果がある。
As described above, the following operations and effects are obtained from the first embodiment and the second embodiment.
In the first aspect of the present invention, in the viaduct having the bridge pier 2b and the cross beam 3, one of the cable 5 and the cable 18 is fixed to both ends of the cross beam 3, and the other of the cable 5 and the cable 18 is positioned outside the cross beam 3 in the same direction. The anchor 6 or the anchor 61 is loosened and fixed. Therefore, the cable 5 or the cable 18 is tensioned only when the bridge pier 2b collapses, and the cable 5 or the cable 18 prevents the collapse of the bridge pier 2b and the accompanying collapse of the entire viaduct. It has the effect of preventing the collapse of the entire viaduct.
In the invention 4, the length of the cable 5 is not less than the value calculated from the displacement occurring at the allowable limit in the seismic design and not exceeding the length calculated from the displacement occurring at the collapse point. It is a collapse prevention structure. Therefore, when applied to the viaduct collapse prevention structure according to any one of the inventions 1 to 3, the cable length within this range has an effect of preventing the pier from collapsing.
Here, the cable calculated from the displacement generated at the allowable limit in the seismic design can be designed with the smallest strength. Therefore, since the mass of the cable can be minimized, there is an effect that the dynamic characteristics at the time of the earthquake are not changed. That is, the initial slack of the cable can prevent the seismic force from acting on the cable as much as possible until just before the collapse behavior occurs. This is to prevent the viaduct from performing complicated behavior due to the seismic force acting on the cable before collapse, and to prevent the cable from being damaged by the seismic force.
The fifth aspect of the present invention is a viaduct collapse prevention structure in which the damper 14 and / or the elastic body 70 are installed at the connecting portion of the cable 5 or the cable 18. When applied to the structure for preventing collapse of a viaduct according to the first aspect of the invention, there is an effect of reducing the impact force acting on the cable 5 or the cable 18 by reducing the impact force at the time of collapse.

(第3実施形態)
図7は、第3実施形態の構造を模式的に示した図である。図7は図2のIb方向から見た図に対応する。第3実施形態と第1実施形態の違いは、図3と対比するとよくわかるが、橋軸方向にもケーブル5を2本配置する点である。
(Third embodiment)
FIG. 7 is a diagram schematically showing the structure of the third embodiment. FIG. 7 corresponds to the view seen from the Ib direction of FIG. The difference between the third embodiment and the first embodiment is clearly understood when compared with FIG. 3, but is that two cables 5 are arranged also in the bridge axis direction.

図8は第3実施形態における動作を模式的に示した図であるが、橋脚2bが右側に倒壊した場合、左側のケーブル5が緊張することで橋軸方向の橋脚の倒壊を抑止していることが確認できる。
よって、アンカー6は、前記横梁に対応する橋脚に対して橋軸方向の両側の位置に施工する。
FIG. 8 is a diagram schematically showing the operation in the third embodiment. When the pier 2b collapses to the right side, the cable 5 on the left side is tensioned to prevent the pier from collapsing in the bridge axis direction. I can confirm that.
Therefore, the anchor 6 is constructed at positions on both sides in the bridge axis direction with respect to the pier corresponding to the transverse beam.

必要に応じて、衝撃力低減のためのダンパー14および/または弾性体70をケーブル5の端とブラケット4または7間に設置する。 The damper 14 and / or the elastic body 70 for reducing the impact force is installed between the end of the cable 5 and the bracket 4 or 7 as necessary.

以上、第3実施形態より、以下の作用および効果がある。
発明2は、横梁3の両端部にそれぞれ2本のケーブル5を取付け、橋脚2bに対して橋軸方向の両側に設置したアンカー62に、2本のケーブル5の他端を、それぞれ弛ませて固定する発明1に記載する高架橋の倒壊防止構造である。よって、橋脚2bが橋軸方向に倒壊した場合、一方のケーブル5で支えることにより、橋脚の橋軸方向に倒壊を抑止する効果がある。
発明4は、ケーブル5の長さは、耐震設計での許容限界に発生している変位より算出した値以上、倒壊点に発生している変位より算出した長さを超えない値である高架橋の倒壊防止構造である。よって、発明1乃至発明3の何れかに記載の高架橋の倒壊防止構造に適用した場合、この範囲のケーブル長さで橋脚の倒壊を防止する効果がある。
ここで、耐震設計での許容限界に発生している変位より算出したケーブルが、強度を最も小さく設計できる。よって、ケーブルの質量も最小にできるので、地震時における動特性を変化させない効果がある。即ち、初期のケーブルの弛みは倒壊挙動が生じる直前までケーブルに地震力がなるべく作用しないようにすることができる。これは、倒壊前にケーブルに地震力が作用することで高架橋が複雑な挙動をするのを防ぐ目的と、地震力によりケーブルが損傷することを防ぐことができる。
発明5は、ケーブル5の結合部にダンパー14および/または弾性体70を設置する高架橋の倒壊防止構造である。発明2の高架橋の倒壊防止構造に適用した場合、倒壊時の衝撃力を低減してケーブル5に作用する衝撃力を低減する効果がある。
As described above, the third embodiment has the following operations and effects.
In the second aspect of the invention, two cables 5 are attached to both ends of the cross beam 3 and the other ends of the two cables 5 are slackened to the anchors 62 installed on both sides of the bridge pier 2b in the bridge axis direction. It is a structure for preventing collapse of the viaduct described in Invention 1 to be fixed. Therefore, when the pier 2b collapses in the direction of the bridge axis, by supporting with one cable 5, there is an effect of suppressing the collapse in the bridge axis direction of the pier.
In the invention 4, the length of the cable 5 is not less than the value calculated from the displacement occurring at the allowable limit in the seismic design and not exceeding the length calculated from the displacement occurring at the collapse point. It is a collapse prevention structure. Therefore, when applied to the viaduct collapse prevention structure according to any one of the inventions 1 to 3, the cable length within this range has an effect of preventing the pier from collapsing.
Here, the cable calculated from the displacement generated at the allowable limit in the seismic design can be designed with the smallest strength. Therefore, since the mass of the cable can be minimized, there is an effect that the dynamic characteristics at the time of the earthquake are not changed. That is, the initial slack of the cable can prevent the seismic force from acting on the cable as much as possible until just before the collapse behavior occurs. This is to prevent the viaduct from performing complicated behavior due to the seismic force acting on the cable before collapse, and to prevent the cable from being damaged by the seismic force.
The fifth aspect of the present invention is a viaduct collapse prevention structure in which the damper 14 and / or the elastic body 70 is installed at the joint portion of the cable 5. When applied to the viaduct collapse prevention structure of the invention 2, the impact force at the time of collapse is reduced, and the impact force acting on the cable 5 is reduced.

(第4実施形態)
図9は、倒壊を防止する橋脚(当該橋脚19a)に隣接する十分強度の高い橋脚19bを利用した倒壊防止構造である。
(Fourth embodiment)
FIG. 9 shows a collapse prevention structure using a sufficiently high strength pier 19b adjacent to a pier (the pier 19a) that prevents collapse.

この倒壊防止構造では、当該橋脚19aの横梁20a両端と、隣接する橋脚19bの横梁20b両端に設置するブラケット21を介して、ケーブル22で対角方向に互いに交差するように、斜めに弛みを持って締結する。 In this collapse prevention structure, the cable 22 has diagonal slack so as to cross each other diagonally via the brackets 21 installed at both ends of the horizontal beam 20a of the pier 19a and both ends of the horizontal beam 20b of the adjacent pier 19b. And conclude.

なお、必要に応じて衝撃力低減のためのダンパー14および/または弾性体70をケーブル22端とブラケット21間に設置する。 If necessary, the damper 14 and / or the elastic body 70 for reducing the impact force is installed between the end of the cable 22 and the bracket 21.

本例では、図10のように、隣接する橋台23を利用することも可能である。この場合、倒壊を防止する橋脚19aの横梁20aに設置したブラケット21と橋台前面に設置したブラケット27の間にケーブル22を設置する。ここで橋台23は、具体的には河川にかけた橋の場合、両側の岸部に相当する。橋台23へのケーブル22を取り付けるブラケット27の位置は、隣接する橋脚19aの横梁20a両端に取り付けたケーブル22を取り付けるブラケット21の位置と対応する高さ、幅とするのが良い。
この倒壊防止構造は橋軸方向の倒壊を主に防止するものであるが、ケーブル22を斜めに張ることにより、橋軸直角方向の倒壊にも有効に機能する。
In this example, it is also possible to use adjacent abutments 23 as shown in FIG. In this case, the cable 22 is installed between the bracket 21 installed on the cross beam 20a of the bridge pier 19a for preventing the collapse and the bracket 27 installed on the front surface of the abutment. Here, in the case of a bridge over a river, the abutment 23 corresponds to the shores on both sides. The position of the bracket 27 for attaching the cable 22 to the abutment 23 is preferably set to a height and width corresponding to the position of the bracket 21 for attaching the cable 22 attached to both ends of the cross beam 20a of the adjacent bridge pier 19a.
Although this collapse prevention structure mainly prevents the collapse in the bridge axis direction, it effectively functions for the collapse in the direction perpendicular to the bridge axis by stretching the cable 22 at an angle.

橋軸方向のみの倒壊の防止であれば、図11のように、ケーブル28を橋軸方向に平行に配置する。 In order to prevent collapse only in the bridge axis direction, the cable 28 is arranged in parallel to the bridge axis direction as shown in FIG.

発明3は、隣接する橋脚19aおよび橋脚19bの、一方の橋脚19aの横梁20aの両端と、他方の橋脚19bの横梁20bの両端または橋台23の一方の橋脚19aの横張20aの両端に対応する両端とを、ケーブル22で弛みを持って、対角方向に互い交差するように、または、ケーブル28で弛みを持って橋軸方向に平行に結合する高架橋の倒壊防止構造である。よって、橋脚19aの倒壊した場合のみケーブル22またはケーブル28が緊張し、橋脚19aの倒壊および付随して生じる高架橋の全体倒壊を、ケーブル22またはケーブル28で支えることにより防止する。よって、高架橋の全体倒壊防止をする効果がある。
発明4は、ケーブル5の長さは、耐震設計での許容限界に発生している変位より算出した値以上、倒壊点に発生している変位より算出した長さを超えない値である高架橋の倒壊防止構造である。よって、発明1乃至発明3の何れかに記載の高架橋の倒壊防止構造に適用した場合、この範囲のケーブル長さで橋脚2bの倒壊を防止する効果がある。
ここで、耐震設計での許容限界に発生している変位より算出したケーブルが、強度を最も小さく設計できる。よって、ケーブルの質量も最小にできるので、地震時における動特性を変化させない効果がある。即ち、初期のケーブルの弛みは倒壊挙動が生じる直前までケーブルに地震力がなるべく作用しないようにすることができる。これは、倒壊前にケーブルに地震力が作用することで高架橋が複雑な挙動をするのを防ぐ目的と、地震力によりケーブルが損傷することを防ぐことができる。
発明5は、ケーブル22またはケーブル28の結合部にダンパー14および/または弾性体70を設置する高架橋の倒壊防止構造である。発明3の高架橋の倒壊防止構造に適用した場合、倒壊時の衝撃力を低減してケーブル22またはケーブル28に作用する衝撃力を低減する効果がある。
The invention 3 has both ends of the adjacent bridge piers 19a and 19b corresponding to both ends of the cross beam 20a of one pier 19a and both ends of the cross beam 20b of the other pier 19b or both ends of the horizontal strut 20a of one pier 19a of the abutment 23. Is a viaduct collapse-preventing structure in which the cable 22 has a slack and crosses each other diagonally, or the cable 28 has a slack and is connected in parallel to the bridge axis direction. Therefore, the cable 22 or the cable 28 is tensioned only when the bridge pier 19a collapses, and the cable 22 or the cable 28 prevents the collapse of the bridge pier 19a and the accompanying collapse of the viaduct. Therefore, there is an effect of preventing the entire viaduct from collapsing.
In the invention 4, the length of the cable 5 is not less than the value calculated from the displacement occurring at the allowable limit in the seismic design and not exceeding the length calculated from the displacement occurring at the collapse point. It is a collapse prevention structure. Therefore, when applied to the viaduct collapse prevention structure according to any one of the inventions 1 to 3, there is an effect of preventing the bridge pier 2b from collapsing with the cable length in this range.
Here, the cable calculated from the displacement generated at the allowable limit in the seismic design can be designed with the smallest strength. Therefore, since the mass of the cable can be minimized, there is an effect that the dynamic characteristics at the time of the earthquake are not changed. That is, the initial slack of the cable can prevent the seismic force from acting on the cable as much as possible until just before the collapse behavior occurs. This is to prevent the viaduct from performing complicated behavior due to the seismic force acting on the cable before collapse, and to prevent the cable from being damaged by the seismic force.
The fifth aspect of the present invention is a viaduct collapse prevention structure in which the damper 14 and / or the elastic body 70 is installed at the connection portion of the cable 22 or the cable 28. When applied to the viaduct collapse prevention structure of the invention 3, the impact force at the time of collapse is reduced and the impact force acting on the cable 22 or the cable 28 is reduced.

(FEM解析によるシミュレーション)
第1実施形態について、倒壊防止の効果についてシミュレーションを行った。発明者等は別途論文発表する予定である。論文において、地震振動の入力波として、兵庫県南部地震にてJJR鷹取駅で観測されたRT観測波(直下型)並びにH25年に内閣府から提示された南海トラフ巨大地震の工学基盤波(海溝型)に基づく愛知県東部の地上波を用いて、橋脚2bについてFEM解析によるシミュレーションを行なった。シミュレーションでは、橋脚2bを、三曲面モデルを導入したシェル要素でモデル化し、上部構造1を集中質量と回転慣性要素で表し橋脚2bに剛性をもたせて結合した。
また、ケーブル5無しでのシミュレーションの結果を、ケーブル無しの橋脚について1/8スケールの模型による振動台を用いた加振実験を行って検証した。図12は、加振実験の供試体とシミュレーションで用いたモデルを示す。
検証の結果、倒壊時における橋脚基部の座屈変形の進展など、シミュレーションと実験とは良く一致した(詳細割愛)。
図13は、立体交差部への第1実施形態の倒壊防止構造の適用イメージを示す。本発明の倒壊防止構造は、このような立体交差などの重要な箇所で橋脚の補強が困難な場所への設置が可能である。なお、ケーブル5は橋脚2bの両側に設置されている(片側のみ図示)。
(Simulation by FEM analysis)
About 1st Embodiment, it simulated about the effect of collapsing prevention. The inventors will publish a separate paper. In the paper, as an input wave of earthquake vibration, RT observation wave (direct type) observed at JJR Takatori Station in the Hyogoken-Nanbu Earthquake and engineering base wave of Nankai Trough giant earthquake presented by the Cabinet Office in 2013 The pier 2b was simulated by FEM analysis using terrestrial waves in eastern Aichi Prefecture based on the type). In the simulation, the bridge pier 2b is modeled by a shell element into which a three-curved surface model is introduced, and the superstructure 1 is represented by a concentrated mass and a rotary inertia element, and is coupled to the bridge pier 2b with rigidity.
The simulation results without the cable 5 were verified by conducting an excitation experiment using a 1/8 scale model shaking table for a pier without a cable. FIG. 12 shows a specimen used in the vibration experiment and a model used in the simulation.
As a result of the verification, the simulation and the experiment agreed well, such as the progress of buckling deformation of the pier base at the time of collapse (details omitted).
FIG. 13: shows the application image of the collapse prevention structure of 1st Embodiment to a three-dimensional intersection. The collapse prevention structure of the present invention can be installed in a place where it is difficult to reinforce the pier at such an important place as a three-dimensional intersection. The cable 5 is installed on both sides of the pier 2b (only one side is shown).

図14は、図2をベースにした倒壊防止構造の解析モデルを示す。橋脚2bは、鋼製橋脚であり、板厚36mmの鋼板で、直径2500mmの円形断面、高さ(h)16334mmである。上部構造1の荷重は、高さ17584mmに、質量Mが1093000kgとした。ケーブル5は、上端を横梁3の端部にブラケット4を介して固定し、下端をアンカー6に、ブラケット7を介して固定した。また、ケーブル5とブラケットの間には、弾性体70を追加、または弾性体70を追加した場合もシミュレーションした。尚、ダンパー14は考慮しなかった。
弾性体70は、ケーブル5をアンカー6に直接固定すると倒壊時の衝撃によりケーブル5に過大な張力が作用するので、衝撃吸収の手段として用いた。ケーブルは常時は弛んだ状態にある。
FIG. 14 shows an analysis model of the collapse prevention structure based on FIG. The pier 2b is a steel pier, is a steel plate having a thickness of 36 mm, has a circular cross section with a diameter of 2500 mm, and a height (h) of 16334 mm. The load of the superstructure 1 was 17584 mm in height and 1093,000 kg in mass M. The cable 5 has its upper end fixed to the end of the cross beam 3 via the bracket 4 and its lower end fixed to the anchor 6 via the bracket 7. In addition, the simulation was performed when the elastic body 70 was added between the cable 5 and the bracket, or when the elastic body 70 was added. The damper 14 was not considered.
The elastic body 70 is used as a means for absorbing the shock because when the cable 5 is directly fixed to the anchor 6, an excessive tension acts on the cable 5 due to an impact at the time of collapse. The cable is always loose.

図15は、倒壊防止構造の変形時の形状を示す。図5に相当する状態である。橋脚2bが損傷するレベルの大きな地震が発生すると、橋脚2bの橋脚基部には、上部構造1の揺れによる応力が集中して損傷する。損傷が起こると橋脚2bは一方へ倒壊するが、倒壊の反対方向のケーブル5が引っ張られ緊張することで倒壊が防止される。即ち、ケーブルは常時は弛んだ状態にあり、耐震設計の許容限界を超える地震が発生した場合、一定の変位(作用開始点,図-17(b)参照)に達するとケーブルが緊張し倒壊を防止する。この際、倒壊側の橋脚基部には、座屈変形が発生している。ここで、地震振動の入力波は、想定外の地震を考慮してJRT NS波の1.5倍増幅波とする。 FIG. 15 shows the shape of the collapse preventing structure when it is deformed. This is a state corresponding to FIG. When a large earthquake that damages the pier 2b occurs, stress due to shaking of the superstructure 1 concentrates on the pier base of the pier 2b. When the damage occurs, the pier 2b collapses to one side, but the collapse is prevented by pulling and tensioning the cable 5 in the opposite direction of the collapse. In other words, the cable is always slackened, and when an earthquake exceeding the allowable limit of seismic design occurs, when the cable reaches a certain displacement (operation start point, see Fig. 17 (b)), the cable is tensioned and collapsed. To prevent. At this time, buckling deformation has occurred at the pier base on the collapse side. Here, the input wave of the earthquake vibration is assumed to be a 1.5 times amplified wave of the JRT NS wave in consideration of an unexpected earthquake.

図16に、ケーブル5の長さの計算方法を示す。図16(a)は、橋脚2bに地震による変位uが発生していない場合を示す。ケーブル5の長さL1は、横梁の端部のケーブル5を取り付けるブラケットの位置4からアンカー6(弾性体70、ダンパー14は省略)までの長さで、式(1)である。
L1=(b+h0.5 (1)
図16(b)に、橋脚2bに地震による変位uが発生している場合を示す。この場合のケーブル5の長さL2は、式(2)である。
L2=((b+u)+h0.5 (2)
よって、ケーブルの弛み長さは、L2−L1となる。
FIG. 16 shows a method for calculating the length of the cable 5. FIG. 16A shows a case where the displacement u due to the earthquake has not occurred on the pier 2b. The length L1 of the cable 5 is the length from the position 4 of the bracket to which the cable 5 at the end of the cross beam is attached to the anchor 6 (the elastic body 70 and the damper 14 are omitted), and is represented by Expression (1).
L1 = (b 2 + h 2 ) 0.5 (1)
FIG. 16B shows a case where the displacement u due to the earthquake occurs on the pier 2b. In this case, the length L2 of the cable 5 is expressed by Equation (2).
L2 = ((b + u) 2 + h 2 ) 0.5 (2)
Therefore, the slack length of the cable is L2-L1.

図17は、第1実施形態の橋脚の倒壊モードと倒壊防止作用開始点を示す。図15(a)は橋脚の倒壊モード、図15(b)は倒壊モードにおける変位と荷重の関係における倒壊防止作用開始点を示す。
図17(a)の橋脚2bの倒壊モードは、倒壊防止構造の設計の考え方を示す。倒壊モードは、鉛直に立てられた柱の上部に、鉛直上方から一定荷重Pかかかった状態にて、上部に水平方向の力HとそのHによる変位uの関係を示す。水平変位の限界値までは力Hは増加する。この領域では、変位uと力Hは比例関係にあり、力学的に安定している。力Huは、力Hの最大値であり水平復元力の限界値である。ここで、水平変位が限界値を超えると、いわゆる座屈現象が発生し、変位uが増加すると共に力Hが減少する。力Hがゼロになるとその変位uで橋脚2bは倒壊している。座屈現象が発生している領域は不安定である。この不安定な領域が、本発明の倒壊防止構造の対象とする範囲である。これは、倒壊防止構造の設計と橋脚の耐震設計とは明確に分離できることを意味している。
図17(b)に、FEM解析によるシミュレーションにより求めた、倒壊モードにおける変位uと荷重Hの関係における倒壊防止作用開始点を示す。縦軸は荷重H、横軸は変位uである。uは、初期水平降伏変位、即ち弾性限G(荷重Hをゼロにすると変位δもゼロになる弾性領域)での変位である。Hmaxは、耐震設計での許容限界の荷重であり、その時の変位は、3.94uである。橋脚2bの上部の横梁3の揺れ変移が、3.94u以下(弾制限Gの変位u以上)の場合、橋脚2bの橋脚基部に座屈は発生しない。但し、橋脚2bに生じた変位は地震が終了しても、小さくはなるが残留変位として残る。
ここで、荷重Hmax、3/4Hmax、1/2Hmaxを基準とすると、変位は、3.94u0、7.65u0、11.40u0となる。これを、ケーブル5が緊張する作用開始点として検討した。図15に示す不安定領域の荷重Hが、耐震設計での許容限界(Hmax)から倒壊点(H=0)に向けて減少しているが、これは橋脚2bが有している強度が減少していることを示している。即ち、倒壊時とは、耐震設計での許容限界での変位以上の変位が発生した場合を指す。ここでは、耐震設計での許容限界での変位は、3.94uである。弾制限Gでの変位uの約4倍である。
また、弾性体70はね剛性は、作用応力が許容値を満足しケーブル断面積が最小となるように決定した。
FIG. 17 shows the collapse mode and the collapse prevention action start point of the pier of the first embodiment. FIG. 15A shows the collapse mode of the pier, and FIG. 15B shows the collapse prevention action start point in the relationship between the displacement and the load in the collapse mode.
The collapse mode of the pier 2b in FIG. 17 (a) indicates the concept of designing the collapse prevention structure. The collapse mode indicates the relationship between the horizontal force H and the displacement u due to the H in a state where a constant load P is applied from above the vertically standing column. The force H increases up to the limit value of the horizontal displacement. In this region, the displacement u and the force H are in a proportional relationship and are mechanically stable. The force Hu is the maximum value of the force H and the limit value of the horizontal restoring force. Here, when the horizontal displacement exceeds the limit value, a so-called buckling phenomenon occurs, and the displacement H increases and the force H decreases. When the force H becomes zero, the pier 2b collapses due to the displacement u. The region where the buckling phenomenon occurs is unstable. This unstable region is a target range of the collapse prevention structure of the present invention. This means that the design of the collapse prevention structure and the seismic design of the pier can be clearly separated.
FIG. 17B shows a collapse prevention action start point in the relationship between the displacement u and the load H in the collapse mode, which is obtained by simulation by FEM analysis. The vertical axis represents the load H, and the horizontal axis represents the displacement u. u 0 is the initial horizontal yield displacement, that is, the displacement in the elastic limit G (the elastic region in which the displacement δ is also zero when the load H is zero). Hmax is the load of the allowable limit in seismic design, the displacement at that time is 3.94u 0. Shaking transition crossbeam 3 at the top of the pier 2b is, in the case of 3.94U 0 or less (bullet limit displacement u 0 or more G), buckling a pier base piers 2b does not occur. However, the displacement generated in the bridge pier 2b remains as a residual displacement although it becomes small even after the earthquake ends.
Here, when the loads Hmax, 3 / 4Hmax, and 1 / 2Hmax are used as a reference, the displacements are 3.94u0, 7.65u0, and 11.40u0. This was examined as an action starting point at which the cable 5 was tensed. The load H in the unstable region shown in FIG. 15 decreases from the allowable limit (Hmax) in the seismic design toward the collapse point (H = 0). This is because the strength of the pier 2b decreases. It shows that you are doing. That is, the time of collapse refers to a case where a displacement greater than the displacement at the allowable limit in the seismic design has occurred. Here, the displacement of the allowable limit in seismic design is 3.94u 0. It is about 4 times the displacement u 0 at the bullet limit G.
Further, the elastic body 70 has a spring stiffness determined so that the applied stress satisfies the allowable value and the cable cross-sectional area is minimized.

以上の条件にて、円形断面鋼製橋脚の崩壊特性とFEシェルモデルの倒壊解析を行った結果を図18、図19、図20に示す。
図18に、倒壊防止構造の諸元と倒壊防止時の状況を示す。ケーブル5に張力が作用する作用開始点の変位が小さいほど、ケーブル5の断面積は小さくなるとともに,倒壊が防止された状態での橋脚2bの傾斜も小さい。逆に、ケーブル5に張力が作用する作用開始点の変位が大きいほど、ケーブル5の断面積は大きくなるとともに,倒壊が防止された状態での橋脚2bの傾斜も大きい。よって、橋脚2bの傾斜が大きい程、ケーブル5の断面積が大きく、許容荷重も大きくなる。これは,倒壊防止装置の作用開始点変位が小さいと橋脚の水平変位が小さく、死荷重による倒壊モーメントも小さくなるためである。これは、図16よりケーブル5の許容荷重は565.0〜1493.6kNであるので、橋脚に作用する上部構造1の質量Mの1093000kgによる死荷重10711kNの5.3〜13.9%に過ぎない小さい力で橋脚の倒壊の防止が可能になることを示している。この時の橋脚の傾きは0.063〜0.132である。
ケーブル5が、死荷重の5.3〜13.9%の張力Tで、橋脚2bの倒壊の防止ができる理由を図15の橋脚基部O周りに発生するモーメントで説明する。反時計周りには、死荷重に距離R1を乗じたモーメントが発生する。一方、時計周りには、ケーブル5の張力Tに距離R2を乗じたモーメントが発生する。この2つのモーメントは釣り合っているが、ケーブル5の張力Tによる距離R2が死荷重Mによる距離R1よりも大きくすることができるからである。距離R2が距離R1より大きく取れるのは、発明1が、橋脚2bと横梁3を有する高架橋において、横梁3の両端に、それぞれケーブル5の一方を固定し、ケーブル5の他方を、横梁3の同じ方向の外側に位置するアンカー6にそれぞれ弛ませて固定し、橋脚2bの倒壊時のみに、ケーブル5が緊張することにより、橋脚2bの倒壊および付随して生じる高架橋の全体倒壊を防止することを特徴とする高架橋の倒壊防止構造だからである。発明2においても同様である。
また、ケーブル5の長さは、23.36〜24.14mである。弛みの無い基準長は図13より23.1mであるので、ケーブル5の弛み長さは、0.26〜1.04mとなる。 この弛み長さが、ケーブル5を弛ませている。
ここで、橋脚2bの倒壊防止をするための、横梁3の変位uは、図17bの耐震設計でも許容限界の3.94以上、倒壊点の変位を超えない値であれば良い。したがって、ケーブル5の長さは、耐震設計での許容限界に発生している変位より算出した値以上、倒壊点に発生している変位より算出した長さを超えない値である。この範囲で橋脚2bの倒壊を防止する効果がある。
また、ケーブル5の強度は、耐震設計での許容限界で最小値、倒壊点の変位を超えない値で最大値をとる単調減少の関係になる。よって、ケーブル5は、耐震設計での許容限界を基準として、径年変化等を考慮して余裕をもたせて設計するのが良い。
加えて、ケーブルの質量を小さくすることで、地震時における動特性を変化させない効果がある。即ち、初期のケーブルの弛みは倒壊挙動が生じる直前までケーブルに地震力がなるべく作用しないようにすることができる。これは、倒壊前にケーブルに地震力が作用することで高架橋が複雑な挙動をするのを防ぐ目的と、地震力によりケーブルが損傷することを防ぐことができる。
18, 19, and 20 show the collapse characteristics of the circular cross section steel pier and the collapse analysis of the FE shell model under the above conditions.
FIG. 18 shows the specifications of the collapse prevention structure and the situation at the time of collapse prevention. The smaller the displacement of the action start point at which the tension acts on the cable 5, the smaller the cross-sectional area of the cable 5 and the smaller the inclination of the pier 2b in a state in which collapse is prevented. Conversely, the greater the displacement of the action starting point at which the tension acts on the cable 5, the greater the cross-sectional area of the cable 5, and the greater the inclination of the pier 2b in a state where collapse is prevented. Therefore, the greater the inclination of the pier 2b, the larger the cross-sectional area of the cable 5 and the allowable load. This is because the horizontal displacement of the pier is small and the collapse moment due to dead load is small when the action start point displacement of the collapse prevention device is small. Since the allowable load of the cable 5 is 565.0 to 1493.6 kN from FIG. 16, it is only 5.3 to 13.9% of the dead load 10711 kN due to 1093,000 kg of the mass M of the superstructure 1 acting on the pier. It shows that it is possible to prevent the collapse of the bridge pier with little force. The slope of the pier at this time is 0.063 to 0.132.
The reason why the cable 5 can prevent the pier 2b from collapsing with a tension T of 5.3 to 13.9% of the dead load will be described with reference to the moment generated around the pier base O in FIG. A counterclockwise moment is generated by multiplying the dead load by the distance R1. On the other hand, a clockwise moment is generated by multiplying the tension T of the cable 5 by the distance R2. This is because although the two moments are balanced, the distance R2 due to the tension T of the cable 5 can be made larger than the distance R1 due to the dead load M. The reason why the distance R2 can be larger than the distance R1 is that, in the first embodiment, in the viaduct having the bridge pier 2b and the cross beam 3, one end of the cable 5 is fixed to each end of the cross beam 3, and the other end of the cable 5 is connected to the same cross beam 3 The cable 5 is tensioned only when the pier 2b collapses to prevent the collapse of the pier 2b and the accompanying collapse of the viaduct. This is because of the characteristic structure of preventing the collapse of the elevated bridge. The same applies to Invention 2.
The length of the cable 5 is 23.36 to 24.14 m. Since the reference length with no slack is 23.1 m from FIG. 13, the slack length of the cable 5 is 0.26 to 1.04 m. This slack length causes the cable 5 to slack.
Here, the displacement u of the horizontal beam 3 for preventing the pier 2b from collapsing may be a value that does not exceed the displacement of the collapsing point, which is an allowable limit of 3.94 or more even in the seismic design of FIG. Therefore, the length of the cable 5 is not less than the value calculated from the displacement occurring at the allowable limit in the earthquake-resistant design and not exceeding the length calculated from the displacement occurring at the collapse point. Within this range, there is an effect of preventing the collapse of the pier 2b.
In addition, the strength of the cable 5 has a monotonically decreasing relationship that takes a minimum value at the allowable limit in the earthquake-resistant design and a maximum value that does not exceed the displacement of the collapse point. Therefore, the cable 5 is preferably designed with a margin in consideration of a change in diameter and the like on the basis of an allowable limit in the seismic design.
In addition, reducing the cable mass has the effect of not changing the dynamic characteristics during an earthquake. That is, the initial slack of the cable can prevent the seismic force from acting on the cable as much as possible until just before the collapse behavior occurs. This is to prevent the viaduct from performing complicated behavior due to the seismic force acting on the cable before collapse, and to prevent the cable from being damaged by the seismic force.

図19は、橋脚頂部の変位の動的解析結果を示す。作用開始点の変位は、7.65の場合である。横軸は時間(秒)、縦軸は変位である。パラメータは、(1)倒壊防止構造無し(ケーブル5および弾性体70無し)、(2)ケーブル5+弾性体70(バネ)、(3)ケーブル5のみの3つである。(1)倒壊防止構造無しにおいては、約10秒後に変位が大きくなり、耐震設計での許容限界を超えて、橋脚2bが倒壊する。一方、(2) ケーブル5+弾性体70、および(3)ケーブル5のみでは、変位が大きくなるが、約10秒後には耐震設計での許容限界以下で安定する。これはケーブル5により橋脚2bを支えていることを示している。また、(2)ケーブル5+弾性体70の変位は、弾性体70の変位により、(3)ケーブル5のみの変位より大きくなる。 FIG. 19 shows the result of dynamic analysis of the displacement of the pier top. The displacement of the action start point is in the case of 7.65. The horizontal axis is time (seconds), and the vertical axis is displacement. There are three parameters: (1) no collapse prevention structure (without cable 5 and elastic body 70), (2) cable 5 + elastic body 70 (spring), and (3) cable 5 only. (1) Without the collapse prevention structure, the displacement increases after about 10 seconds, and the pier 2b collapses exceeding the allowable limit in the seismic design. On the other hand, although (2) the cable 5 + elastic body 70 and (3) the cable 5 alone, the displacement increases, but after about 10 seconds, it stabilizes below the allowable limit in the seismic design. This indicates that the pier 2b is supported by the cable 5. Further, (2) the displacement of the cable 5 + elastic body 70 is larger than the displacement of only the cable 5 due to the displacement of the elastic body 70.

図20は、ケーブルの張力の動的解析結果を示す。作用開始点の変位は、7.65の場合である。横軸は時間(秒)、縦軸は張力である。パラメータは、(2)ケーブル5+弾性体70(バネ)、(3)ケーブル5のみの2つである。これによると、橋脚頂部変位が作用開始点に到達する5秒付近からケーブル5に張力が作用し始め,10秒すぎで張力がケーブル5の許容荷重にほぼ到達する。この時図17に示す変位の増大が止まっている。即ち、変位が耐震設計での許容限界以下、張力が許容荷重以下で安定するので、倒壊防止構造が適切に機能していることが確認できる。なお、弾性体70がない場合には、弾性体70の伸びがないために最大および残留変位は小さくなるものの、ケーブル5には許容荷重の約1.6倍の張力が一時的に作用しており、弾性体70が用いた方がより安全であると考えられる。 FIG. 20 shows the result of dynamic analysis of cable tension. The displacement of the action start point is in the case of 7.65. The horizontal axis is time (seconds), and the vertical axis is tension. There are two parameters: (2) cable 5 + elastic body 70 (spring), (3) cable 5 only. According to this, the tension starts to act on the cable 5 from around 5 seconds when the pier top displacement reaches the action start point, and the tension almost reaches the allowable load of the cable 5 after 10 seconds. At this time, the increase in displacement shown in FIG. 17 stops. That is, since the displacement is stabilized below the allowable limit in the seismic design and the tension is stabilized below the allowable load, it can be confirmed that the collapse prevention structure functions properly. If there is no elastic body 70, the elastic body 70 is not stretched and the maximum and residual displacement are small, but a tension of about 1.6 times the allowable load is temporarily applied to the cable 5. Therefore, it is considered safer to use the elastic body 70.

本発明に係る高架橋の倒壊防止構造によれば、高架橋ばかりでなく、建築物にも転用することができる。   The structure for preventing collapse of a viaduct according to the present invention can be used not only for a viaduct but also for a building.

1 上部構造
2a,2b,2c,2d,19a,19b, 橋脚
3,20a,20b 横梁
4,7,17,21,27 ブラケット
5,18,22,28 ケーブル
6,61,62 アンカー
8 歩道
9 車道
10 車両空間
11 支柱
12 引張力
13 支圧板
14 ダンパー
15 反力板
16 建築構造物
23 橋台
70 弾性体
DESCRIPTION OF SYMBOLS 1 Superstructure 2a, 2b, 2c, 2d, 19a, 19b, Pier 3, 20a, 20b Cross beam 4, 7, 17, 21, 27 Bracket 5, 18, 22, 28 Cable 6, 61, 62 Anchor 8 Sidewalk 9 Roadway DESCRIPTION OF SYMBOLS 10 Vehicle space 11 Support | pillar 12 Tensile force 13 Supporting plate 14 Damper 15 Reaction force plate 16 Building structure 23 Abutment 70 Elastic body

Claims (5)

橋脚と横梁を有する高架橋において、
前記横梁の両端に、それぞれケーブルの一方を固定し、
前記ケーブルの他方を、前記横梁の同じ方向の外側に位置するアンカーに、
それぞれ弛ませて固定し、
前記橋脚の倒壊時のみに、
前記ケーブルが緊張することにより、
前記橋脚の倒壊および付随して生じる高架橋の全体倒壊を防止することを特徴とする高架橋の倒壊防止構造。
In the viaduct with piers and cross beams,
Secure one end of the cable to each end of the transverse beam,
The other end of the cable is an anchor located outside the transverse beam in the same direction,
Each loosened and fixed,
Only when the pier collapses,
By tensioning the cable,
A structure for preventing collapse of a viaduct, which prevents the collapse of the bridge pier and the accompanying collapse of the entire viaduct.
前記横梁の両端部にそれぞれ2本のケーブルを取付け、
橋脚に対して橋軸方向の両側に設置したアンカーに、
2本のケーブルの他端を、
それぞれ弛ませて固定し、
橋脚の橋軸方向の倒壊を抑止することを特徴とする請求項1に記載する高架橋の倒壊防止構造。
Attach two cables to both ends of the cross beam,
To anchors installed on both sides of the bridge axis direction with respect to the pier,
Connect the other end of the two cables
Each loosened and fixed,
The collapse prevention structure for a viaduct according to claim 1, wherein collapse of the bridge pier in the direction of the bridge axis is suppressed.
隣接する橋脚または橋台の、一方の橋脚の横梁の両端と、
他方の橋脚の横梁の両端または橋台の前記一方の橋脚の横張の両端に対応する両端とを、
ケーブルで弛みを持って、
対角方向に互い交差するように、
または、橋軸方向に平行に、結合することを特徴とする高架橋の倒壊防止構造。
Both ends of the cross beam on one pier of the adjacent pier or abutment,
Both ends of the transverse beam of the other pier or both ends corresponding to the both ends of the horizontal of the one pier of the abutment,
Hold slack with cable,
To cross each other diagonally,
Alternatively, a structure for preventing collapse of a viaduct, which is bonded in parallel to the bridge axis direction.
前記ケーブルの長さは、耐震設計での許容限界に発生している変位より算出した値以上、倒壊点に発生している変位より算出した長さを超えない値であることを特徴とする請求項1乃至請求項3の何れか1項に記載の高架橋の倒壊防止構造。 The length of the cable is not less than a value calculated from a displacement occurring at an allowable limit in an earthquake-resistant design, and a value not exceeding a length calculated from a displacement occurring at a collapse point. The structure for preventing collapse of the viaduct according to any one of claims 1 to 3. ケーブルの結合部にダンパーおよび/または弾性体を設置してケーブルに作用する衝撃力を低減することを特徴とする請求項1乃至請求項4の何れか1項に記載の高架橋の倒壊防止構造。

The structure for preventing collapse of a viaduct according to any one of claims 1 to 4, wherein an impact force acting on the cable is reduced by installing a damper and / or an elastic body at a connecting portion of the cable.

JP2015132426A 2014-07-04 2015-07-01 Viaduct collapse prevention structure Active JP6671612B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015132426A JP6671612B2 (en) 2014-07-04 2015-07-01 Viaduct collapse prevention structure

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2014138360 2014-07-04
JP2014138360 2014-07-04
JP2015132426A JP6671612B2 (en) 2014-07-04 2015-07-01 Viaduct collapse prevention structure

Publications (2)

Publication Number Publication Date
JP2016027239A true JP2016027239A (en) 2016-02-18
JP6671612B2 JP6671612B2 (en) 2020-03-25

Family

ID=55352711

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015132426A Active JP6671612B2 (en) 2014-07-04 2015-07-01 Viaduct collapse prevention structure

Country Status (1)

Country Link
JP (1) JP6671612B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235237A (en) * 2018-09-27 2019-01-18 中铁二院工程集团有限责任公司 A kind of high pier bridge earthquake resistance system in high intensity Zone
CN111424535A (en) * 2020-03-18 2020-07-17 石家庄铁道大学 Single-column type bridge antidumping reinforcing apparatus
CN113265942A (en) * 2021-06-22 2021-08-17 宗杰 T-shaped bridge damping method
CN113811655A (en) * 2020-10-10 2021-12-17 嘉兴金喜莱科技有限公司 Pier protection structure and position angle calculation method thereof
CN113846549A (en) * 2021-10-12 2021-12-28 李林峰 Viaduct buffering safety structure and working method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002227127A (en) * 2001-01-31 2002-08-14 Mitsubishi Heavy Ind Ltd Bridge and aseismatic strength reinforcing method for bridge pier
JP2006307444A (en) * 2005-04-26 2006-11-09 Chiyoda Engineering Consultants Co Ltd Seismically retrofitting structure for existing bridge
JP2008196135A (en) * 2007-02-08 2008-08-28 Akio Kitayama Reinforcing structure of bridge
JP2010180574A (en) * 2009-02-04 2010-08-19 Bridgestone Corp Implement for preventing fall of bridge

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002227127A (en) * 2001-01-31 2002-08-14 Mitsubishi Heavy Ind Ltd Bridge and aseismatic strength reinforcing method for bridge pier
JP2006307444A (en) * 2005-04-26 2006-11-09 Chiyoda Engineering Consultants Co Ltd Seismically retrofitting structure for existing bridge
JP2008196135A (en) * 2007-02-08 2008-08-28 Akio Kitayama Reinforcing structure of bridge
JP2010180574A (en) * 2009-02-04 2010-08-19 Bridgestone Corp Implement for preventing fall of bridge

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235237A (en) * 2018-09-27 2019-01-18 中铁二院工程集团有限责任公司 A kind of high pier bridge earthquake resistance system in high intensity Zone
CN111424535A (en) * 2020-03-18 2020-07-17 石家庄铁道大学 Single-column type bridge antidumping reinforcing apparatus
CN113811655A (en) * 2020-10-10 2021-12-17 嘉兴金喜莱科技有限公司 Pier protection structure and position angle calculation method thereof
CN113265942A (en) * 2021-06-22 2021-08-17 宗杰 T-shaped bridge damping method
CN113846549A (en) * 2021-10-12 2021-12-28 李林峰 Viaduct buffering safety structure and working method thereof
CN113846549B (en) * 2021-10-12 2023-09-08 中新创达咨询有限公司 Viaduct buffer safety structure and working method thereof

Also Published As

Publication number Publication date
JP6671612B2 (en) 2020-03-25

Similar Documents

Publication Publication Date Title
JP6671612B2 (en) Viaduct collapse prevention structure
TWI617724B (en) Seismic-free chemical method for existing steel-braced support structures
JP5007380B2 (en) Seismic isolation / damping mechanism
JP6173553B1 (en) Seismic control device for bridge
JP4624048B2 (en) Slit leaf springs, earthquake-proof struts using the same, and earthquake-proof reinforcement structures for buildings
JP5908688B2 (en) Exposed-type column base structure of steel column
KR101319698B1 (en) Steel damper using cantilever behavior
JP6058332B2 (en) Seismic reinforcement structure for concrete column and seismic reinforcement method for concrete column
JP2010047933A (en) Damping reinforcement frame
JP2006233591A (en) Support structure of fixed support part in bridge, and aseismatic reinforcing method for existing bridge
JP6275314B1 (en) Seismic reinforcement structure for bridges
JP7312422B2 (en) bridge displacement limiter
JP7081745B2 (en) Seismic isolation structure
JP5654060B2 (en) Damper brace and damping structure
JP5868603B2 (en) Seismic reinforcement method for existing buildings
JP6004617B2 (en) Damping beam and portal beam having the damping beam
JP2006077492A (en) Earthquake resisting pier
JP6534628B2 (en) Fallout prevention structure
JP2009068295A (en) Elevated structure
JP5214371B2 (en) Structure
JP7429550B2 (en) building
KR102094814B1 (en) Bridge seismic reinforcement structure
JP2020090812A (en) Vibration control structure
JP5778062B2 (en) Seismic and damping material installation structure
JP7417213B2 (en) Bridge collapse prevention device

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20160107

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20160107

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20160107

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180605

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20180605

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190212

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190412

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190806

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20191004

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200206

R150 Certificate of patent or registration of utility model

Ref document number: 6671612

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250