JP2016007611A - Powder molding die apparatus and powder molding method - Google Patents

Powder molding die apparatus and powder molding method Download PDF

Info

Publication number
JP2016007611A
JP2016007611A JP2014128075A JP2014128075A JP2016007611A JP 2016007611 A JP2016007611 A JP 2016007611A JP 2014128075 A JP2014128075 A JP 2014128075A JP 2014128075 A JP2014128075 A JP 2014128075A JP 2016007611 A JP2016007611 A JP 2016007611A
Authority
JP
Japan
Prior art keywords
mold
upper punch
raw material
material powder
powder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014128075A
Other languages
Japanese (ja)
Other versions
JP6325368B2 (en
Inventor
憲一 藤間
Kenichi Fujima
憲一 藤間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OKINAYA KK
Original Assignee
OKINAYA KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OKINAYA KK filed Critical OKINAYA KK
Priority to JP2014128075A priority Critical patent/JP6325368B2/en
Publication of JP2016007611A publication Critical patent/JP2016007611A/en
Application granted granted Critical
Publication of JP6325368B2 publication Critical patent/JP6325368B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To provide a powder molding die apparatus that can mass-produce molded articles continuously.SOLUTION: A powder molding die apparatus comprises a lower punch (40) of a lower lid form where a shaft part is fitted from a bottom opening of a die (20) into a molded part (23) to enable forward and backward movements, an upper punch (50) of an upper lid form which enables engagement and withdrawal from the upper opening of the die (20), heating means (70) that heats raw material powder (1) filling the molded part (23), press means (90) that compresses the raw material powder (1) filling the molded part (23) by pressurizing the upper punch (50) fitted into the die (20) and the lower punch (40) in a direction of approach to mold raw material powder (2), and a plurality of work moving body (63) which enables movement or fixture in a condition that the upper punch (50) is fitted with the die (20) filled with the raw material powder (1) accompanied by at least the lower punch (40).

Description

本発明は、原料粉末を成形して焼結する粉末冶金の手法による粉末成形金型装置および成形方法に関し、特に金属ガラス等の粉末成形体を製造する際に用いる粉末成形金型装置および成形方法に関する。   TECHNICAL FIELD The present invention relates to a powder molding die apparatus and a molding method using a powder metallurgy technique for molding and sintering raw material powder, and in particular, a powder molding mold apparatus and a molding method used when manufacturing a powder molded body such as metal glass. About.

従来の粉末冶金の手法を改善し、金属ガラス等の粉末成形体を製造する方法により、例えば、外径30mm以下のミニチュア・ベアリングを製造することが研究されている。
また、特許文献1に記載の軌道輪、転がり軸受及び軌道輪の製造方法は、鋼等の合金性の軌道輪と比べて耐食性、強度、製造容易性の点で優れた金属ガラス製のミニチュア・ベアリングに適用して好結果を得るものである。そのミニチュア・ベアリングは、金型内に充填された金属ガラス粉末を圧縮するとともに、金属ガラス粉末のガラス遷移温度と結晶化温度との間の温度領域に加熱する工程を経て製造される。
For example, a miniature bearing having an outer diameter of 30 mm or less has been studied by improving a conventional method of powder metallurgy and manufacturing a powder compact such as metal glass.
In addition, the manufacturing method of the bearing ring, rolling bearing, and bearing ring described in Patent Document 1 is a miniature made of metal glass that is superior in corrosion resistance, strength, and ease of manufacturing compared to alloy bearing rings such as steel. Applicable to bearings for good results. The miniature bearing is manufactured through a process of compressing the metal glass powder filled in the mold and heating it to a temperature region between the glass transition temperature and the crystallization temperature of the metal glass powder.

また、特許文献2に記載の粉末成形金型装置は、溶製材からなる軸部の周囲に圧粉体からなる鍔部が一体成形された複合素材を、圧入によらずに、割れやひびといった損傷が生じることなく、一定、かつ高い接合強度で一体成形するようにした粉末成形金型装置が知られている。すなわち、軸部供給手段によって軸部セット位置に供給された軸部を、軸部装填ロッドにより上パンチ内に挿入し、さらに上パンチの粉末圧縮動作に追従して軸部をダイス孔内に挿入し、この状態で、ダイス孔内に充填した粉末を上パンチと下パンチによって軸方向に圧縮する構成とする。鍔部の圧粉体を圧縮成形すると同時に、この圧粉体を軸部に一体成形することができ、圧入によらない成形を可能にするものである。   Moreover, the powder molding die apparatus described in Patent Document 2 is such that a composite material in which a collar portion made of a green compact is integrally formed around a shaft portion made of a melted material is not cracked or cracked regardless of press-fitting. 2. Description of the Related Art There is known a powder molding die apparatus that is integrally molded with constant and high bonding strength without causing damage. That is, the shaft portion supplied to the shaft portion set position by the shaft portion supply means is inserted into the upper punch by the shaft portion loading rod, and the shaft portion is inserted into the die hole following the powder compression operation of the upper punch. In this state, the powder filled in the die hole is compressed in the axial direction by the upper punch and the lower punch. At the same time that the green compact of the collar portion is compression-molded, the green compact can be integrally molded with the shaft portion, and molding without press-in is possible.

特願2013−105533号公報Japanese Patent Application No. 2013-105533 特開2010−144241号公報JP 2010-144241 A

しかしながら、特許文献1に記載の軌道輪、転がり軸受及び軌道輪の製造方法、あるいは特許文献2に記載の粉末成形金型装置、それに類する装置を用いた粉末成形方法において、金属ガラス粉体を使用するものについては自動化されていなかった。しかも、原料粉末充填から製品取出しまでの複数の工程それぞれの工程所要時間、すなわち、タクトタイムが均一でないため、生産設備に対する生産効率の点で改善余地があった。そのため、従来は、研究施設の専用設備で成形品を20分に1個位のペースでしか製造できなかったところを、大量生産可能な粉末成形金型装置が望まれていた。   However, metal glass powder is used in the method of manufacturing the bearing ring, the rolling bearing and the bearing ring described in Patent Document 1, or the powder molding method described in Patent Document 2, and the powder molding method using the similar apparatus. What to do was not automated. In addition, since the time required for each of the plurality of steps from filling the raw material powder to taking out the product, that is, the tact time is not uniform, there is room for improvement in terms of production efficiency for the production facility. Therefore, in the past, there has been a demand for a powder molding die apparatus capable of mass production where a molded product can only be produced at a pace of about one in 20 minutes with dedicated equipment at a research facility.

詳しくは、複数の工程のうち所要時間の長い工程がボトルネックとなり、粉末成形金型装置1台あたりの生産数量、つまり、生産効率を向上させることの阻害要因になっていた。
具体的には、製品1個を製造するために、高温加圧処理工程に要する百数十秒に加え、その後の冷却工程の所要時間も相当に長い。この長い工程に比べて、他の工程はそれぞれ十数秒程度で完了できるので、一連のライン工程において稼動と休止を繰り返すという間欠動作になる。その結果、製造ラインの各工程相互間の稼動バランスが不均衡であるために設備効率も悪かった。
Specifically, a process having a long required time among a plurality of processes has become a bottleneck, which has been an impediment to improving the production quantity per one powder molding die apparatus, that is, the production efficiency.
Specifically, in order to manufacture one product, in addition to the hundreds of seconds required for the high-temperature pressurizing treatment process, the time required for the subsequent cooling process is considerably long. Compared to this long process, each of the other processes can be completed in about ten and a few seconds, so that the operation is intermittent in a series of line processes. As a result, equipment efficiency was also poor due to an imbalance in the operational balance between processes on the production line.

本発明は、このような問題に鑑みてなされたもので、その目的とするところは、完全自動化ラインの完成度を高めるとともに、原料粉末充填から製品取出しまでの複数の工程それぞれの工程所要時間、すなわちタクトタイムを考慮し、製造装置1台について単位時間あたりの生産数量、すなわち生産効率を向上させた粉末成形金型装置および粉末成形方法を提供することにある。   The present invention has been made in view of such problems, and the object thereof is to increase the completeness of a fully automated line and process time required for each of a plurality of processes from raw material powder filling to product removal, That is, in consideration of tact time, it is an object of the present invention to provide a powder molding apparatus and a powder molding method in which the production quantity per unit time, that is, the production efficiency is improved for one manufacturing apparatus.

本発明は、このような目的を達成するためになされたもので、請求項1に記載の発明は、内部に成形部(23)が形成された金型(20)に充填された原料粉末(1)を加熱・圧縮して粉末成形体(2)を成形する粉末成形金型装置(100)であって、前記金型(20)の底部開口(21)から前記成形部(23)に軸部(41)が嵌入されて進退を可能とする下蓋状の下パンチ(40)と、前記金型(20)の上部開口(22)から前記成形部(23)に嵌入と離脱を可能とする上蓋状の上パンチ(50)と、前記成形部(23)に充填された前記原料粉末(1)を加熱する加熱手段(70)と、前記金型(20)に嵌入された前記上パンチ(50)と前記下パンチ(40)とを接近させる方向に加圧することで前記成形部(23)に充填された前記原料粉末(1)を圧縮して粉末成形体(2)を成形するプレス手段(90)と、少なくとも前記下パンチ(40)を伴って前記原料粉末(1)が充填された前記金型(20)に前記上パンチ(50)が嵌着された状態で移動又は固定を可能にする複数のワーク移動体(63)と、を備えたことを特徴とする。   The present invention has been made in order to achieve such an object, and the invention according to claim 1 is directed to a raw material powder (20) filled in a mold (20) having a molded part (23) formed therein. 1) A powder molding apparatus (100) for heating and compressing a powder molded body (2) to form a powder molded body (2) from a bottom opening (21) of the mold (20) to the molding section (23). The lower lid-shaped lower punch (40) that allows the part (41) to be inserted and retracted and the upper part (22) of the mold (20) can be inserted into and removed from the molding part (23). An upper cover-shaped upper punch (50), a heating means (70) for heating the raw material powder (1) filled in the molding part (23), and the upper punch fitted in the mold (20) (50) and the lower punch (40) are pressurized in a direction in which they approach each other to fill the molding part (23). Pressing means (90) for compressing the formed raw material powder (1) to form a powder compact (2), and the gold filled with the raw material powder (1) with at least the lower punch (40) And a plurality of workpiece moving bodies (63) that can be moved or fixed in a state where the upper punch (50) is fitted to the mold (20).

また、請求項2に記載の発明は、請求項1に記載の粉末成形金型装置において、前記金型(20)の中心付近に接近可能なコアロッド(54)に温度センサ(43)を設けたことを特徴とする。   According to a second aspect of the present invention, in the powder molding die apparatus according to the first aspect, a temperature sensor (43) is provided on the core rod (54) accessible near the center of the mold (20). It is characterized by that.

また、請求項3に記載の発明は、請求項1又は2に記載の粉末成形金型装置において、前記ワーク移動体(63)が移動するライン構成は、前記ワーク移動体(63)に仕込まれた原料粉末(1)を窒素雰囲気中で前記加熱手段(70)により所定の温度範囲に維持されて所定の高温加圧処理時間(T1)だけ前記プレス手段(90)により高温加圧処理した前記粉末成形体(2)を温度調整手段(72)により所定の温度勾配で冷却するまでの工程を実行可能なロボット構成の加熱プレス冷却ライン(11)と、該加熱プレス冷却ライン(11)を支援する一連の工程を実行可能なロボット構成の支援ライン(12)と、前記加熱プレス冷却ライン(11)および前記支援ライン(12)を稼動させる制御部(80)と、を備えたことを特徴とする。   The invention according to claim 3 is the powder molding die apparatus according to claim 1 or 2, wherein a line configuration in which the workpiece moving body (63) moves is charged into the workpiece moving body (63). The raw material powder (1) was maintained in a predetermined temperature range by the heating means (70) in a nitrogen atmosphere and subjected to a high-temperature pressure treatment by the pressing means (90) for a predetermined high-temperature pressure treatment time (T1). Supporting the heating press cooling line (11) having a robot configuration capable of executing a process until the powder compact (2) is cooled at a predetermined temperature gradient by the temperature adjusting means (72), and the heating press cooling line (11) A support line (12) having a robot configuration capable of executing a series of processes, and a control unit (80) for operating the heating press cooling line (11) and the support line (12). To.

また、請求項4に記載の発明は、請求項3に記載の粉末成形金型装置において、前記加熱プレス冷却ライン(11)は、前記ワーク移動体(63)を構成する搬送固定冶具(60)を脱着可能に保持する下パンチホルダ(91)と、前記加熱手段(70)として前記搬送固定冶具(60)が前記下パンチホルダ(91)に固定された状態で前記成形部(23)に充填された前記原料粉末(1)を誘導加熱する誘導コイル(71)と、前記加熱手段(70)および前記プレス手段(90)と同時に機能して前記金型(20)を窒素雰囲気に収容可能な窒素室形成手段(93)と、を備え、前記温度調整手段(72)は前記加熱手段(70)により350〜430℃の範囲で150秒以上維持した後に、前記温度勾配を急速冷却から緩慢冷却に切換え可能であることを特徴とする。   According to a fourth aspect of the present invention, in the powder molding die apparatus according to the third aspect, the heating press cooling line (11) is a conveyance fixing jig (60) constituting the workpiece moving body (63). The lower punch holder (91) that holds the detachable member and the conveyance fixing jig (60) as the heating means (70) is filled in the molding part (23) in a state of being fixed to the lower punch holder (91). The induction coil (71) for induction heating the raw material powder (1), and the heating means (70) and the pressing means (90) function together to accommodate the mold (20) in a nitrogen atmosphere. Nitrogen chamber forming means (93), and the temperature adjusting means (72) is maintained in the range of 350 to 430 ° C. for 150 seconds or longer by the heating means (70), and then the temperature gradient is slowly cooled from rapid cooling. Cut into Characterized in that it is a possible example.

また、請求項5に記載の発明は、請求項3又は4に記載の粉末成形金型装置において、前記支援ライン(12)は、前記搬送固定冶具(60)を主要構成する前記下パンチ(40)の上部に前記金型(20)を載置する金型載置手段(86)と、前記原料粉末(1)を計量するとともに前記成形部(23)へ前記原料粉末(1)を充填する原料粉末充填手段(30)と、前記金型載置手段(86)により前記下パンチ(40)の上部に前記金型(20)を載置した状態で前記搬送固定冶具(60)を原料粉末充填位置(8)から上パンチ嵌着位置(3)まで搬送して固定する第1搬送手段(81)と、前記上パンチ嵌着位置(3)で前記上パンチ(50)を前記金型(20)に嵌着する上パンチ嵌着手段(51)と、前記上パンチ嵌着位置(3)から加熱プレス位置(4)へと前記ワーク移動体(63)を搬送する第2搬送手段(82)と、前記ワーク移動体(63)を加熱プレス位置(4)から分解抜出し位置(6)まで搬送する第3搬送手段(83)と、前記分解抜出し位置(6)まで搬送された前記搬送固定冶具(60)から前記上パンチ(50)を取り外す上パンチ取外し手段(52)と、前記上パンチ(50)を取外された前記金型(20)を前記分解抜出し位置(6)から原料粉末充填位置(8)まで搬送する第4搬送手段(84)と、前記上パンチ取外し手段(52)により取り外された前記上パンチ(50)を前記分解抜出し位置(6)から前記上パンチ嵌着位置(3)へと返送する上パンチ返送手段(87)と、前記金型(20)から前記粉末成形体(2)を取り出す製品取出し手段(85)と、を備えたことを特徴とする。   Further, the invention according to claim 5 is the powder molding die apparatus according to claim 3 or 4, wherein the support line (12) includes the lower punch (40) that mainly constitutes the conveyance fixing jig (60). ) And a mold placing means (86) for placing the mold (20) on the top, and the raw material powder (1) is weighed, and the molding part (23) is filled with the raw material powder (1). Raw material powder filling means (30) and the mold placing means (86) are used to feed the conveying and fixing jig (60) as raw material powder in a state where the mold (20) is placed on the lower punch (40). First conveying means (81) for conveying and fixing from the filling position (8) to the upper punch fitting position (3), and the upper punch (50) at the upper punch fitting position (3) is moved to the mold ( 20) an upper punch fitting means (51) to be fitted to the upper punch fitting position ( ) From the heating press position (4) to the disassembling / extracting position (6), second conveying means (82) for conveying the workpiece moving body (63) from the heating press position (4). A third conveying means (83) for conveying the upper punch (50), an upper punch removing means (52) for removing the upper punch (50) from the conveying and fixing jig (60) conveyed to the disassembly / extraction position (6), Fourth conveying means (84) for conveying the mold (20) with the punch (50) removed from the disassembly / extraction position (6) to the raw material powder filling position (8), and the upper punch removing means (52 ) And the upper punch returning means (87) for returning the upper punch (50) removed from the disassembly / extraction position (6) to the upper punch fitting position (3), and the mold (20) from the mold (20). Take the powder compact (2) Characterized by comprising a product taking-out means (85), the issue.

また、請求項6に記載の発明は、請求項1〜5の何れか1項に記載の粉末成形金型装置において、前記原料粉末充填手段(30)は、前記原料粉末(1)を超音波で振動させる超音波発振器(31)を備えたことを特徴とする。   Further, the invention according to claim 6 is the powder molding die apparatus according to any one of claims 1 to 5, wherein the raw material powder filling means (30) ultrasonically converts the raw material powder (1). And an ultrasonic oscillator (31) that is vibrated at a frequency.

また、請求項7に記載の発明は、ピストン状の下パンチ(40)および上パンチ(50)がシリンダ状の金型(20)の上下にそれぞれ嵌着されて形成される成形部(23)に充填された原料粉末(1)を、前記下パンチ(40)および前記上パンチ(50)により圧縮して粉末成形体(2)を成形する粉末冶金法に基づく粉末成形方法であって、前記原料粉末(1)を計量するとともに超音波で振動させながら前記成形部(23)に充填する原料粉末充填工程(S11)と、前記下パンチ(40)に嵌着された前記金型(20)を原料粉末充填位置(8)から上パンチ嵌着位置(3)まで搬送して固定する第1搬送工程(S1)と、上パンチ嵌着位置(3)で前記上パンチ(50)を原料粉末(1)の充填された前記金型(20)に嵌着してワーク移動体(63)を形成する上パンチ嵌着工程(S12)と、前記ワーク移動体(63)の単位で前記上パンチ嵌着位置(3)から加熱プレス位置(4)へと前記ワーク移動体(63)を搬送する第2搬送工程(S2)と、前記加熱プレス位置(4)の前記ワーク移動体(63)に対し窒素雰囲気を形成するとともに前記金型(20)内に充填された原料粉末(1)を加熱する加熱工程(S13)と、前記加熱工程(S13)で加熱された後に所定の温度範囲で所定の高温加圧処理時間(T1)だけ前記原料粉末(1)を高温加圧処理するプレス工程(S14)と、前記プレス工程(S14)の後に前記加熱プレス位置(4)で急速冷却する急速冷却工程(S15)と、前記加熱プレス位置(4)から緩慢冷却位置(5)を経て分解抜出し位置(6)へと前記ワーク移動体(63)を搬送する第3搬送工程(S3)と、前記上パンチ(50)を前記金型(20)から取外して前記分解抜出し位置(6)から上パンチ嵌着位置(3)へと返送する上パンチ返送工程(S17)と、前記分解抜出し位置(6)で前記下パンチ(40)の軸部(41)が前記金型(20)を貫通することにより、前記粉末成形体(2)を前記金型(20)から抜出す製品取出し工程(S18)と、前記分解抜出し位置(6)で前記上パンチ(50)を取外された前記金型(20)を前記原料粉末充填位置(8)まで搬送する第4搬送工程(S4)と、を有することを特徴とする。   The invention according to claim 7 is a molding part (23) in which a piston-like lower punch (40) and an upper punch (50) are respectively formed on the upper and lower sides of a cylindrical mold (20). A powder molding method based on a powder metallurgy method in which the raw material powder (1) filled in is compressed by the lower punch (40) and the upper punch (50) to form a powder compact (2), A raw material powder filling step (S11) for weighing the raw material powder (1) and filling the molding part (23) while vibrating with ultrasonic waves, and the mold (20) fitted to the lower punch (40) Is transferred from the raw material powder filling position (8) to the upper punch fitting position (3) and fixed, and the upper punch (50) is turned into the raw powder at the upper punch fitting position (3). Fit into the mold (20) filled with (1) The upper punch fitting step (S12) for forming the workpiece moving body (63), and the workpiece movement from the upper punch fitting position (3) to the heating press position (4) in units of the workpiece moving body (63). A second conveying step (S2) for conveying the body (63) and a nitrogen atmosphere are formed in the work moving body (63) at the heating press position (4) and the mold (20) is filled. A heating step (S13) for heating the raw material powder (1), and after the heating in the heating step (S13), the raw material powder (1) is heated at a predetermined temperature range for a predetermined high-temperature pressure treatment time (T1). A pressing step (S14) for pressure treatment, a rapid cooling step (S15) for rapid cooling at the heating press position (4) after the pressing step (S14), and a slow cooling position (from the heating press position (4)) 5) After disassembly A third transporting step (S3) for transporting the workpiece moving body (63) to the cutting position (6), and removing the upper punch (50) from the mold (20) from the disassembly / extraction position (6). The upper punch returning step (S17) for returning to the upper punch fitting position (3), and the shaft portion (41) of the lower punch (40) penetrates the mold (20) at the disassembly / extraction position (6). By doing so, the product removing step (S18) for extracting the powder compact (2) from the mold (20), and the metal mold with the upper punch (50) removed at the disassembly and extraction position (6) And a fourth conveying step (S4) for conveying the mold (20) to the raw material powder filling position (8).

本発明によれば、完全自動化ラインの完成度を高めるとともに、原料粉末充填から製品取出しまでの複数の工程それぞれの工程所要時間、すなわちタクトタイムを考慮し、製造装置1台について単位時間あたりの生産数量、すなわち生産効率を向上させた粉末成形金型装置および粉末成形方法を実現できる。   According to the present invention, the complete automation line is improved, and the time required for each of the plurality of processes from filling the raw material powder to taking out the product, i.e., the tact time, is taken into consideration. It is possible to realize a powder molding die apparatus and a powder molding method with improved quantity, that is, production efficiency.

本発明の実施形態に係る粉末成形金型装置(以下、「本装置」ともいう)の概略説明図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a schematic explanatory diagram of a powder molding die apparatus (hereinafter also referred to as “the present apparatus”) according to an embodiment of the present invention. 本装置において、ワーク移動体から上パンチを外した状態を説明するための正面一部断面図である。In this apparatus, it is a front fragmentary sectional view for demonstrating the state which removed the upper punch from the workpiece moving body. 本装置において、上パンチが嵌着された状態のワーク移動体を説明するための正面一部断面図である。In this apparatus, it is a front fragmentary sectional view for demonstrating the workpiece moving body in the state by which the upper punch was fitted. 本装置において、ワーク移動体から上パンチを取外す状況を説明するための正面一部断面図である。In this apparatus, it is a front fragmentary sectional view for demonstrating the condition which removes an upper punch from a workpiece moving body. 本装置において、上パンチが取外された金型およびその周辺部を説明するための斜視図である。In this apparatus, it is a perspective view for demonstrating the metal mold | die from which the upper punch was removed, and its peripheral part. 本装置において、粉末成形体を金型から取出す状況を説明するための正面一部断面図である。In this apparatus, it is a front fragmentary sectional view for demonstrating the condition which takes out a powder compact from a metal mold | die. 本発明の実施形態に係る粉末成形方法(以下、「本方法」ともいう)の工程および金型移動を説明するためのフロー図である。It is a flowchart for demonstrating the process of a powder shaping | molding method (henceforth "this method") and mold movement which concern on embodiment of this invention. 本方法において、金型の温度調整とタクトタイムとを説明するためのグラフである。In this method, it is a graph for demonstrating the temperature adjustment and tact time of a metal mold | die. 本装置の一実施例(以下、「本実施例」ともいう)を示す全体正面図である。1 is an overall front view showing an embodiment of the present apparatus (hereinafter also referred to as “the present embodiment”). 図9に示した本装置を示す全体平面図である。It is a whole top view which shows this apparatus shown in FIG. 細部実施例として、加熱プレス位置へ送られて来たワーク移動体を上昇させる直前の状態を説明するための正面図である。It is a front view for demonstrating the state just before raising the workpiece moving body sent to the heating press position as a detailed Example. 図11に示したワーク移動体を上昇させた直後の状態を説明するための正面図である。It is a front view for demonstrating the state immediately after raising the workpiece moving body shown in FIG. 図12に示したワーク移動体に、横方向からスライドベッド方式のプレス受けおよび窒素室が装備されるとともに、上方から油圧シリンダが下降して当接するまでの状況を説明するための正面一部透視図である。The workpiece moving body shown in FIG. 12 is equipped with a slide bed type press receiver and a nitrogen chamber from the lateral direction, and a partial front perspective view for explaining the situation until the hydraulic cylinder descends and comes into contact from above. FIG.

以下、図面を参照して本発明の実施の形態について説明する。なお、各図において、同一機能を有する部材には同一符号を付して説明を省略する。
図1は、本発明の実施形態に係る粉末成形金型装置の概略説明図である。本装置100は、粉末冶金法に基づいて原料粉末1を粉末成形体2に加工することにより、例えば、ミニチュア・ベアリングや小型歯車等を大量生産するものである。図1に示すように、本装置100は、複数のワーク移動体63と、このワーク移動体63が移動する加熱プレス冷却ライン11および支援ライン12と、これらのライン構成を統括制御する制御部80と、を備えて構成されている。なお、本装置の概略を説明するための図1と他の図とは、細部の形状まで一致させていない。
Embodiments of the present invention will be described below with reference to the drawings. In addition, in each figure, the same code | symbol is attached | subjected to the member which has the same function, and description is abbreviate | omitted.
FIG. 1 is a schematic explanatory view of a powder molding die apparatus according to an embodiment of the present invention. The apparatus 100 is for mass production of, for example, miniature bearings and small gears by processing the raw material powder 1 into a powder compact 2 based on a powder metallurgy method. As shown in FIG. 1, the apparatus 100 includes a plurality of workpiece moving bodies 63, a heating press cooling line 11 and a support line 12 through which the workpiece moving bodies 63 move, and a control unit 80 that performs overall control of these line configurations. And is configured. It should be noted that FIG. 1 for explaining the outline of the present apparatus and other drawings do not coincide with the shape of the details.

加熱プレス冷却ライン11は、下パンチホルダ91と、加熱手段70と、プレス手段90と、窒素室形成手段93と、温度調整手段72と、第3搬送手段83とを備え、加熱プレス位置4および緩慢冷却位置5を有して構成されている。加熱プレス冷却ライン11は、ワーク移動体63を移動単位とし、このワーク移動体63に仕込まれた原料粉末1に対して、加熱手段70による加熱と、プレス手段90による加圧と、温度調整手段72による保温および所定の温度勾配の冷却とを、制御部80の命令により順次実行可能なロボット構成を有する。   The heating press cooling line 11 includes a lower punch holder 91, a heating unit 70, a pressing unit 90, a nitrogen chamber forming unit 93, a temperature adjusting unit 72, and a third transport unit 83. It has a slow cooling position 5. The heating press cooling line 11 uses the workpiece moving body 63 as a moving unit, and heats the raw material powder 1 charged in the workpiece moving body 63 by the heating means 70, pressurization by the pressing means 90, and temperature adjusting means. The robot configuration is such that heat retention by 72 and cooling of a predetermined temperature gradient can be sequentially executed by a command from the control unit 80.

なお、制御部80は、不図示のコンピュータ装置により主要部を構成され、稼動プログラム、データベース、演算部、入力部、出力部を有する。温度調整手段72は制御部80の統括制御を受けながら、加熱手段70により原料粉末1を加熱し、350〜430℃の範囲で150秒以上維持した後に、エアーノズル又は空冷ファン73のエアブローその他により急速冷却から緩慢冷却に温度勾配を切換えながら冷却する。   In addition, the control part 80 is comprised by the computer apparatus not shown, and a principal part is comprised, and has an operation program, a database, a calculating part, an input part, and an output part. The temperature adjusting means 72 is heated by the heating means 70 while maintaining the overall control of the control unit 80 and is maintained in the range of 350 to 430 ° C. for 150 seconds or longer, and then by air blow or the like of an air nozzle or an air cooling fan 73. Cool while switching the temperature gradient from rapid cooling to slow cooling.

加熱プレス冷却ライン11で用いるワーク移動体63は、搬送固定冶具60によりワークおよび関連部材を装着して各工程の進捗に応じて移動するための構成単位である。搬送固定冶具60は金型20をはじめとする関連部材の装着と離脱が可能であり、各工程に応じて各部材の分解、組み立て、固定、および移動を繰り返す。金型20にはワークとして内部に原料粉末1が充填される。なお、搬送固定冶具60の大部分は、下パンチ40が兼用することにより構成されている。   The workpiece moving body 63 used in the heating press / cooling line 11 is a structural unit for mounting the workpiece and related members by the conveyance fixing jig 60 and moving according to the progress of each process. The conveyance fixing jig 60 can attach and detach related members such as the mold 20 and repeats disassembly, assembly, fixing, and movement of each member according to each process. The mold 20 is filled with the raw material powder 1 as a workpiece. Note that most of the conveyance fixing jig 60 is configured by the lower punch 40 also being used.

支援ライン12は、第1搬送手段81、第2搬送手段82および第4搬送手段84と、金型載置手段86と、原料粉末充填手段30と、上パンチ嵌着手段51と、上パンチ取外し手段52と、上パンチ返送手段87と、製品取出し手段85と、を備えて構成されている。この支援ライン12は、上述の加熱プレス冷却ライン11を支援するための一連の工程を、制御部80の命令により実行可能なロボット構成を有する。   The support line 12 includes a first conveying unit 81, a second conveying unit 82, a fourth conveying unit 84, a mold placing unit 86, a raw material powder filling unit 30, an upper punch fitting unit 51, and an upper punch removing unit. A means 52, an upper punch returning means 87, and a product taking-out means 85 are provided. The support line 12 has a robot configuration that can execute a series of steps for supporting the heating press cooling line 11 described above according to a command from the control unit 80.

第1搬送手段81は、搬送固定冶具60の上部に載置された金型20および金型20に充填された原料粉末1を原料粉末充填位置8から上パンチ嵌着位置3まで搬送して固定する。
第2搬送手段82は、ワーク移動体63を上パンチ嵌着位置3から加熱プレス位置4へと搬送する。
第3搬送手段83は、ワーク移動体63を加熱プレス位置4から分解抜出し位置6まで搬送する。
第4搬送手段84は、上パンチ50を取外された金型20を分解抜出し位置6から原料粉末充填位置8(又は金型戻り位置7)まで搬送する。
なお、第3搬送手段83は、高温加圧処理直後で350℃以上のワークを含む搬送移動体63を搬送し固定するので、他の搬送手段が耐熱温度60℃で足りるところ、それよりも高い耐熱性を求められる。
The first conveying means 81 conveys and fixes the mold 20 placed on the upper part of the conveyance fixing jig 60 and the raw material powder 1 filled in the mold 20 from the raw material powder filling position 8 to the upper punch fitting position 3. To do.
The second conveying means 82 conveys the workpiece moving body 63 from the upper punch fitting position 3 to the heating press position 4.
The third transport unit 83 transports the workpiece moving body 63 from the heating press position 4 to the disassembly / extraction position 6.
The 4th conveyance means 84 conveys the metal mold | die 20 which removed the upper punch 50 from the decomposition | disassembly extraction position 6 to the raw material powder filling position 8 (or metal mold | die return position 7).
In addition, since the 3rd conveyance means 83 conveys and fixes the conveyance moving body 63 containing the workpiece | work of 350 degreeC or more immediately after high temperature pressurization process, it is higher than the place where other conveyance means is sufficient with the heat-resistant temperature of 60 degreeC. Heat resistance is required.

以下、図1に他図も加えて、より詳細に説明する。
図2は、本装置において、ワーク移動体から上パンチを外した状態を説明するための正面一部断面図である。ここで、搬送固定冶具60は、下パンチ40の軸穴61からコアロッド42が嵌挿された状態である。この下パンチ40の上部に、金型載置手段86(図1)が金型20を載置する。具体的には、制御部80が不図示のロボットアームを駆動し、下パンチ40の上部の軸部41に円筒形の金型20を同軸状に嵌着する。図2に示すように、搬送固定冶具60は、少なくとも下パンチ40を伴って移動と固定を可能にするために鍔状部62を有する。なお、本装置100において、搬送固定冶具60が移動するときは、コアロッド42が抜け落ちないように、下パンチ40とコアロッド42とを一体的に把持して移動する。
Hereinafter, FIG. 1 will be described in more detail with reference to other drawings.
FIG. 2 is a partial front sectional view for explaining a state in which the upper punch is removed from the workpiece moving body in the present apparatus. Here, the conveyance fixing jig 60 is in a state in which the core rod 42 is inserted from the shaft hole 61 of the lower punch 40. A mold placing means 86 (FIG. 1) places the mold 20 on the lower punch 40. Specifically, the control unit 80 drives a robot arm (not shown), and the cylindrical mold 20 is coaxially fitted to the shaft portion 41 on the upper portion of the lower punch 40. As shown in FIG. 2, the conveying and fixing jig 60 has a hook-like portion 62 to enable movement and fixing with at least the lower punch 40. In the present apparatus 100, when the conveyance fixing jig 60 moves, the lower punch 40 and the core rod 42 are integrally gripped and moved so that the core rod 42 does not fall off.

鍔状部62は不図示のロボットアームによりコアロッド42と一体的に把持されて移動し、固定時には下パンチホルダ91の凹部92に前方から奥へと嵌入され、コアロッド42とともに固定される。下パンチホルダ91は、搬送固定冶具60の鍔状部62を、凹部92で適時に保持と開放することが可能な機構を有する。なお、本実施形態で例示する搬送固定冶具60は、下パンチ40に、別部材のコアロッド42を合体したものであり、主要部は下パンチ40により構成されているが、下パンチ40だけであっても構わない。例えば、ワークがドーナツ状である場合には内径の芯出し(中心確定)のために、コアロッド42を必要とするが、そうでない場合もある。なお、本装置100で各所に用いるロボットアームは、空気圧駆動方式によるエアハンドを用いているが、他の方式でも構わない。   The hook-like portion 62 is moved by being gripped integrally with the core rod 42 by a robot arm (not shown), and when fixed, the hook-like portion 62 is fitted into the concave portion 92 of the lower punch holder 91 from the front to the back, and is fixed together with the core rod 42. The lower punch holder 91 has a mechanism capable of holding and releasing the bowl-shaped portion 62 of the transport fixing jig 60 with the recess 92 in a timely manner. The conveyance fixing jig 60 exemplified in the present embodiment is a combination of the lower punch 40 and a core rod 42 which is a separate member. The main part is composed of the lower punch 40, but only the lower punch 40 is included. It doesn't matter. For example, when the workpiece has a donut shape, the core rod 42 is required for centering the inner diameter (determining the center). In addition, although the robot arm used for each place in this apparatus 100 uses the air hand by a pneumatic drive system, another system may be used.

図3は、本装置において、上パンチが嵌着された状態のワーク移動体を説明するための正面一部断面図である。ここでは、既に、上パンチ嵌着手段51が、上パンチ嵌着位置3(図1)で上パンチ50を金型20に嵌着した姿を示している。上パンチ嵌着手段51を構成する不図示のロボットアームを、制御部80が駆動し、上パンチ50の下部を円筒形の金型20に同軸状に嵌着する。   FIG. 3 is a partial front sectional view for explaining the workpiece moving body with the upper punch fitted in the apparatus. Here, a state is shown in which the upper punch fitting means 51 has already been fitted to the mold 20 at the upper punch fitting position 3 (FIG. 1). The control unit 80 drives a robot arm (not shown) that constitutes the upper punch fitting means 51, and the lower portion of the upper punch 50 is fitted coaxially to the cylindrical mold 20.

図3に示すように、ワーク移動体63は、下パンチ40に嵌着された金型20内の成形部23(図5参照)に原料粉末1(高温加圧処理後は粉末成形体2になる)が充填され、かつ金型20に上パンチ50が嵌着されて構成されている。なお、ピストン状の下パンチ40および上パンチ50がシリンダ状の金型20の上下にそれぞれ嵌着されて組み合わされる一式をまとめて金型という場合も多いが、ここでいう金型20は、シリンダ状の本体部のみを指している。   As shown in FIG. 3, the workpiece moving body 63 is applied to the raw material powder 1 (after the high-temperature pressurization treatment, to the powder molded body 2) in the molding portion 23 (see FIG. 5) in the mold 20 fitted to the lower punch 40. And the upper punch 50 is fitted to the mold 20. In many cases, a set of piston-like lower punch 40 and upper punch 50 fitted together on the upper and lower sides of the cylinder-shaped mold 20 is collectively referred to as a mold. It points only to the main body.

また、上パンチ嵌着手段51と置き換わるように、プレス手段90(図1)を構成する油圧シリンダ99(図13参照)が上パンチ50の上面に当接し、油圧シリンダ99(3〜15KN)により上パンチ50と下パンチ40とを軸方向に近づけるように圧縮する。このように、成形部23に充填され加熱手段70により加熱された原料粉末1をプレス手段90が加圧し、規定の高温加圧処理することで粉末成形体2を成形する。なお、油圧シリンダ99には軸方向の位置計測器(不図示)が配設され、油圧シリンダ99が押し込んだ距離を計測できるように構成されている。計測された距離から成形部23内部のワークの体積を検出し、金属ガラスの成形具合、つまり高温加圧処理の成否を確認することが可能である。この成否確認の際は、金型の加熱温度も判断要素となる。   Further, so as to replace the upper punch fitting means 51, a hydraulic cylinder 99 (see FIG. 13) constituting the pressing means 90 (FIG. 1) abuts on the upper surface of the upper punch 50, and the hydraulic cylinder 99 (3 to 15KN) The upper punch 50 and the lower punch 40 are compressed so as to approach the axial direction. In this way, the powdery compact 2 is molded by pressurizing the raw material powder 1 filled in the molding part 23 and heated by the heating unit 70 with the press unit 90 and subjecting it to a prescribed high-temperature pressurization treatment. The hydraulic cylinder 99 is provided with an axial position measuring device (not shown) so that the distance the hydraulic cylinder 99 is pushed in can be measured. It is possible to detect the volume of the workpiece inside the forming part 23 from the measured distance and confirm the metal glass forming condition, that is, the success or failure of the high-temperature pressurizing process. When confirming success or failure, the heating temperature of the mold is also a determining factor.

図3に示すコアロッド54の先端付近に、ワークの温度を管理するための温度センサ43が配設されている。温度センサ43は、熱電対で構成され、0〜500℃くらいの計測範囲で熱電変換機能を有する。なお、温度センサ43として同等の機能を有するものであれば熱電対でなくても構わない。温度センサ43の配設位置は、上パンチ50に上方から嵌入されるコアロッド54に限らず、下パンチ40に下方から嵌入するコアロッド42の先端近傍であっても構わない。   A temperature sensor 43 for managing the temperature of the workpiece is disposed near the tip of the core rod 54 shown in FIG. The temperature sensor 43 is composed of a thermocouple and has a thermoelectric conversion function in a measurement range of about 0 to 500 ° C. In addition, as long as it has an equivalent function as the temperature sensor 43, it does not need to be a thermocouple. The position of the temperature sensor 43 is not limited to the core rod 54 fitted into the upper punch 50 from above, but may be near the tip of the core rod 42 fitted into the lower punch 40 from below.

温度センサ43は、コアロッド54とともに、金型20の中心付近に接近する。制御部80および温度調整手段72は、温度センサ43から温度情報を得るとともに、金型20の外周に巡らされた誘導コイル71の電流を、規定の制御パタンに沿って制御する。つまり、金型20の内部の成形部23に充填されたワーク、すなわち原料粉末1、又は原料粉末1が圧縮して成形された粉末成形体2の温度は、例えば、温度センサ43から得られる温度情報を参照値と比較しながら参照値との差を縮めるようなフィードバック制御等によって管理される。制御パタンについては、図9の温度管理グラフに沿って後述する。   The temperature sensor 43 approaches the center of the mold 20 together with the core rod 54. The control unit 80 and the temperature adjusting means 72 obtain temperature information from the temperature sensor 43 and control the current of the induction coil 71 circulated around the outer periphery of the mold 20 in accordance with a prescribed control pattern. That is, the temperature of the workpiece filled in the molding part 23 inside the mold 20, that is, the raw material powder 1 or the powder compact 2 formed by compressing the raw material powder 1 is, for example, a temperature obtained from the temperature sensor 43. It is managed by feedback control or the like that reduces the difference from the reference value while comparing the information with the reference value. The control pattern will be described later along the temperature management graph of FIG.

ワーク移動体63は、加熱プレス位置4(図1)に固定されてから加熱工程(S13)に入る(図7)。誘導コイル71は、加熱プレス位置4に固定された金型20との位置関係を適切に保持される。誘導加熱の特性上、ワークが誘導コイル71の中心に位置することが必要である。ただし、誘導コイル71は加熱プレス位置4に配備されて加熱(S13)・プレス(S14)の工程でのみ用いる(図7)。この誘導コイル71に交流電流を流すことにより、鉄その他の磁性材料で構成された金型20自体に誘導電流が発生して温度上昇する。その結果、金型20内部の成形部23に充填された原料粉末1が加熱される。   The workpiece moving body 63 enters the heating step (S13) after being fixed at the heating press position 4 (FIG. 1) (FIG. 7). The induction coil 71 is appropriately held in a positional relationship with the mold 20 fixed at the heating press position 4. Due to the characteristics of induction heating, it is necessary that the workpiece is positioned at the center of the induction coil 71. However, the induction coil 71 is provided at the heating press position 4 and is used only in the steps of heating (S13) and pressing (S14) (FIG. 7). By passing an alternating current through the induction coil 71, an induction current is generated in the mold 20 itself made of iron or other magnetic material, and the temperature rises. As a result, the raw material powder 1 filled in the molding part 23 inside the mold 20 is heated.

下パンチ40は、金型20の底部開口21から成形部23に軸部41が嵌入されて進退を可能とする下蓋状の金属部材である。この下パンチ40は、上述のように搬送固定冶具60の主要部を構成する。上パンチ50は、金型20の上部開口22から成形部23に嵌入と離脱を可能とする上蓋状の金属部材である。本装置100は、図3に示した下パンチホルダ91にワーク移動体63を固定した状態で、ワーク移動体63に仕込まれた原料粉末1を圧縮して粉末成形体2に成形する。なお、図3に示すワーク移動体63は、加熱プレス冷却ライン11において、加熱(S13)・プレス(S14)・急速冷却(S15)の工程から上パンチ返送工程(S17)において上パンチ50を取外す手前までの姿を示している(図7)。なお、途中の温度調整(S16)では、金型外枠94や下パンチホルダ91から外れた状態で搬送される。   The lower punch 40 is a lower lid-shaped metal member that allows the shaft portion 41 to be inserted into the molding portion 23 from the bottom opening 21 of the mold 20 and to advance and retreat. The lower punch 40 constitutes a main part of the conveyance fixing jig 60 as described above. The upper punch 50 is an upper lid-shaped metal member that can be inserted into and removed from the molding portion 23 from the upper opening 22 of the mold 20. The apparatus 100 compresses the raw material powder 1 charged in the workpiece moving body 63 into a powder compact 2 in a state where the workpiece moving body 63 is fixed to the lower punch holder 91 shown in FIG. 3 removes the upper punch 50 in the heating punch cooling line 11 from the heating (S13) / press (S14) / rapid cooling (S15) process to the upper punch returning process (S17). The figure up to this is shown (Fig. 7). In the middle temperature adjustment (S16), the sheet is transported in a state of being detached from the mold outer frame 94 and the lower punch holder 91.

上述したように、誘導コイル71は加熱プレス位置4における加熱(S13)・プレス(S14)の工程以外では用いない。したがって、加熱プレス位置4に固設された誘導コイル71に、前工程から移動してきたワーク移動体63を下方から持ち上げる動作により(図11、図12)、誘導コイル71と金型20とを適切に位置合わせする。その際は、図3に示す上パンチ昇降ホルダ52および金型外枠94は適宜水平移動させる。   As described above, the induction coil 71 is not used except for the heating (S13) and pressing (S14) steps at the heating press position 4. Therefore, the induction coil 71 and the mold 20 are appropriately attached to the induction coil 71 fixed at the heating press position 4 by the operation of lifting the workpiece moving body 63 moved from the previous process from below (FIGS. 11 and 12). Align to. In that case, the upper punch raising / lowering holder 52 and the mold outer frame 94 shown in FIG.

図4は、本装置において、ワーク移動体から上パンチを取外す状況を説明するための正面一部断面図である。ここで、上パンチ取外し手段52は、分解抜出し位置6まで搬送された搬送固定冶具60から上パンチ50を取外す。図4に示すように、上パンチ50の頭部を上パンチ昇降ホルダ(上パンチ取外し手段)52に係合し、持ち上げて外す。なお、上パンチ昇降ホルダ52は、制御部80に制御された不図示の油圧シリンダ又はサーボモータ駆動のシリンダにより駆動される。   FIG. 4 is a partial front sectional view for explaining a situation in which the upper punch is removed from the workpiece moving body in the present apparatus. Here, the upper punch removing means 52 removes the upper punch 50 from the transport fixing jig 60 transported to the disassembly / extraction position 6. As shown in FIG. 4, the head of the upper punch 50 is engaged with the upper punch lifting / lowering holder (upper punch removing means) 52 and lifted off. The upper punch lift holder 52 is driven by a hydraulic cylinder (not shown) controlled by the control unit 80 or a cylinder driven by a servo motor.

図5は、本装置において、上パンチが取外された金型およびその周辺部を説明するための斜視図である。図5に示すように、下パンチ40の軸部41の外周を包囲するようにコイルスプリング96が配設されている。コイルスプリング96は、鍔部62の上面と金型20の底面との間を押し広げるように、つまり、金型20を押し上げるように弾性力を付勢している。一方、金型20の上面は、金型外枠94の下面に当接しながら下向きに位置規制されている。その結果、金型20は、上下動可能な下パンチホルダ91の高さがある程度変動しても、金型外枠94の下面に当接した状態で固定されている。つまり、コイルスプリング96は、加熱時における誘導コイル71の位置(高さ)に金型20を合わせる機能を有する。なお、立体的構造を説明するための図5と、動作を模式的に説明するための図1〜図4、図6および図11〜図13は、細部の形状まで一致しない。   FIG. 5 is a perspective view for explaining the mold from which the upper punch is removed and its peripheral portion in the present apparatus. As shown in FIG. 5, a coil spring 96 is disposed so as to surround the outer periphery of the shaft portion 41 of the lower punch 40. The coil spring 96 urges an elastic force so as to push the space between the upper surface of the flange portion 62 and the bottom surface of the mold 20, that is, to push up the mold 20. On the other hand, the position of the upper surface of the mold 20 is regulated downward while contacting the lower surface of the mold outer frame 94. As a result, the mold 20 is fixed in contact with the lower surface of the mold outer frame 94 even if the height of the lower punch holder 91 that can move up and down varies to some extent. That is, the coil spring 96 has a function of aligning the mold 20 with the position (height) of the induction coil 71 during heating. Note that FIG. 5 for explaining the three-dimensional structure and FIGS. 1 to 4, 6, and 11 to 13 for schematically explaining the operation do not coincide with each other in detail.

図6は、本装置において、粉末成形体を金型から取出す状況を説明するための正面一部断面図である。図6に示すように、金型20の上部が、この工程では不動の金型外枠94の天井部分に当接しているので、金型20は下向きに押さえつけられ位置規制されている。一方、金型20の底部開口21に嵌入されている下パンチ40は、上下動可能な下パンチホルダ91に把持されている。ここで、制御部80が、不図示の油圧シリンダを約1KNの力で駆動し、下パンチホルダ91を上昇させることにより、下パンチ40が押し上げられる。その結果、下パンチ40の軸部41の先端が、金型20の内部から粉末成形体2を押し出すので、上パンチ昇降ホルダ52の上面に露出する。なお、高温加圧処理の過程により、金型一式の各部位がワークと離脱困難に貼着しているので、相当の力で抜出す必要がある。   FIG. 6 is a partial front sectional view for explaining a situation in which the powder compact is taken out from the mold in this apparatus. As shown in FIG. 6, since the upper part of the mold 20 is in contact with the ceiling portion of the stationary mold outer frame 94 in this process, the mold 20 is pressed downward and the position is regulated. On the other hand, the lower punch 40 inserted into the bottom opening 21 of the mold 20 is held by a lower punch holder 91 that can move up and down. Here, the control unit 80 drives a hydraulic cylinder (not shown) with a force of about 1 KN and raises the lower punch holder 91, whereby the lower punch 40 is pushed up. As a result, the tip of the shaft portion 41 of the lower punch 40 pushes out the powder molded body 2 from the inside of the mold 20, so that it is exposed on the upper surface of the upper punch lifting / lowering holder 52. In addition, since each site | part of a metal mold | die is stuck to the workpiece | work with difficulty in the process of a high temperature pressurization process, it is necessary to extract by considerable force.

露出した粉末成形体2を、制御部80に制御されたロボットアーム53で摘まみ上げて不図示の製品置き場まで移動する。なお、下パンチホルダ91、上パンチ昇降ホルダ52およびロボットアーム53は、本発明でいう製品取出し手段85の一部を構成する。このようにして、製品取出し手段85は、金型20から粉末成形体2を取り出す。なお、下パンチホルダ91は、金型20から粉末成形体2を取り出す工程以外では、図6を参照して説明したように上下動する必要は無い。特に、加熱プレス位置4において、ワーク移動体63を固定する下パンチホルダ91は、台座95とともに、プレス時の応力等に対抗できるように構成されている。   The exposed powder compact 2 is picked up by the robot arm 53 controlled by the control unit 80 and moved to a product place (not shown). The lower punch holder 91, the upper punch lifting / lowering holder 52, and the robot arm 53 constitute a part of the product take-out means 85 referred to in the present invention. In this way, the product take-out means 85 takes out the powder molded body 2 from the mold 20. The lower punch holder 91 does not need to move up and down as described with reference to FIG. 6 except for the step of taking out the powder compact 2 from the mold 20. In particular, the lower punch holder 91 for fixing the workpiece moving body 63 at the heating press position 4 is configured so as to be able to resist stress and the like during pressing together with the pedestal 95.

再び図1に戻って説明する。窒素室形成手段93は、加熱手段70およびプレス手段90とほぼ同時に機能して金型20を窒素雰囲気に収容する。すなわち、窒素室形成手段93は、プレス手段90を覆うように窒素雰囲気を形成する。具体的には、窒素パージ用の小部屋(図11〜図13参照)が、ガイドに沿ってエアシリンダで水平に進退する機構を備え、その機構により形成された半密室の窒素室97でワーク移動体63を覆うことによって、適宜に窒素雰囲気を形成する。   Returning again to FIG. The nitrogen chamber forming means 93 functions almost simultaneously with the heating means 70 and the pressing means 90 and accommodates the mold 20 in a nitrogen atmosphere. That is, the nitrogen chamber forming unit 93 forms a nitrogen atmosphere so as to cover the press unit 90. Specifically, a small chamber for purging nitrogen (see FIGS. 11 to 13) is provided with a mechanism that moves horizontally with an air cylinder along a guide, and works in a nitrogen chamber 97 of a semi-closed chamber formed by the mechanism. By covering the moving body 63, a nitrogen atmosphere is appropriately formed.

温度調整手段72は、金型20および粉末成形体2を所定の温度で所定の高温加圧処理時間T1だけ維持した後に冷却する。具体的には、温度調整手段72は、制御部80に統括制御され、温度センサ43(図3)から温度情報の入力を得るとともに、冷却位置5に配設されたエアーノズル又は空冷ファン73の送風出力を、規定の制御パタンに沿って制御する。制御パタンについては、図9の温度管理グラフに沿って後述する。なお、制御パタンには、温度管理以外に、プレス工程(S14)におけるタイマー制御も含まれている。   The temperature adjusting means 72 cools the mold 20 and the powder molded body 2 after maintaining the mold 20 and the powder molded body 2 at a predetermined temperature for a predetermined high-temperature pressure treatment time T1. Specifically, the temperature adjusting means 72 is controlled by the control unit 80 to obtain temperature information input from the temperature sensor 43 (FIG. 3), and the air nozzle or air cooling fan 73 disposed at the cooling position 5 is used. The blower output is controlled according to a prescribed control pattern. The control pattern will be described later along the temperature management graph of FIG. In addition to temperature management, the control pattern includes timer control in the pressing step (S14).

原料粉末充填手段30は、原料粉末1を計量して、金型20の上部開口22から成形部23へ充填する。この原料粉末充填手段30は、不図示のホッパ、電子天秤および超音波発振器31を備えており、ホッパ等に貯留された原料粉末1を電子天秤により計量し、計量された量の原料粉末1を超音波発振器31(図1、図9)が生成する超音波で振動させながら金型20の内部に形成された成形部23へと均一に充填する。   The raw material powder filling means 30 measures the raw material powder 1 and fills the molding part 23 from the upper opening 22 of the mold 20. The raw material powder filling means 30 includes a hopper, an electronic balance, and an ultrasonic oscillator 31 (not shown). The raw material powder 1 stored in the hopper or the like is weighed by an electronic balance, and a measured amount of the raw material powder 1 is obtained. While being vibrated with ultrasonic waves generated by the ultrasonic oscillator 31 (FIGS. 1 and 9), the molding part 23 formed inside the mold 20 is uniformly filled.

分解抜出し位置6まで搬送された複数の搬送固定冶具60から、上パンチ取外し手段52により、上パンチ50が取り外される。取外された上パンチ50は、上パンチ返送手段87により、分解抜出し位置6から上パンチ嵌着位置3へと返送される。上パンチ返送手段87は、不図示のロボットアームを制御部80が駆動する構成である。   The upper punch 50 is removed by the upper punch removing means 52 from the plurality of conveyance fixing jigs 60 conveyed to the disassembly / extraction position 6. The removed upper punch 50 is returned from the disassembly / extraction position 6 to the upper punch fitting position 3 by the upper punch returning means 87. The upper punch returning means 87 is configured such that the controller 80 drives a robot arm (not shown).

図7は、本発明の実施形態に係る粉末成形方法の工程および金型移動を説明するためのフロー図である。本方法は、金型20に形成した成形部23に原料粉末1を充填し、この充填された原料粉末1を加熱・圧縮して粉末成形体2を成形する粉末成形方法である。本方法は、図7に沿って以下に説明する工程を有する。なお、本装置100の起動時には、図2に示すように上パンチ50を取外された金型20が、予め原料粉末充填位置8にセットされているものとする(後述する第4搬送工程(S4)参照)。   FIG. 7 is a flowchart for explaining the steps of the powder molding method and mold movement according to the embodiment of the present invention. This method is a powder molding method in which the raw material powder 1 is filled in the molding part 23 formed in the mold 20 and the powder compact 2 is molded by heating and compressing the filled raw material powder 1. The method includes the steps described below along FIG. When the apparatus 100 is activated, it is assumed that the mold 20 from which the upper punch 50 has been removed is set in advance in the raw material powder filling position 8 as shown in FIG. (See S4)).

まず、原料粉末充填工程(S11)により、金属ガラス粒子の原料粉末1を不図示の電子天秤で計量するとともに、粉末流動性の低い金属ガラス粒子(粉末)を超音波で振動させながら金型20の奥に位置する成形部23まで均一かつスムーズに充填する。つぎに、第1搬送工程(S1)により、金型20を原料粉末充填位置8から上パンチ嵌着位置3まで搬送して固定する。上パンチ嵌着位置3では、上パンチ嵌着工程(S12)により、搬送固定冶具60にセットされた金型20に上パンチ50が嵌着されて、ワーク移動体63が形成される。ここで、金型一式に原料粉末1が仕込まれた状態のワーク移動体63は、第2搬送工程(S2)により、上パンチ嵌着位置3から加熱プレス位置4へと搬送される。   First, in the raw material powder filling step (S11), the metal powder 1 is measured with an electronic balance (not shown), and the metal glass particles (powder) having low powder flowability are vibrated with ultrasonic waves while the mold 20 It fills uniformly and smoothly up to the molding part 23 located in the back. Next, the metal mold | die 20 is conveyed and fixed to the upper punch fitting position 3 from the raw material powder filling position 8 by a 1st conveyance process (S1). At the upper punch fitting position 3, the upper punch 50 is fitted to the mold 20 set on the conveyance fixing jig 60 by the upper punch fitting step (S12), and the workpiece moving body 63 is formed. Here, the workpiece moving body 63 in a state where the raw material powder 1 is charged in the mold set is conveyed from the upper punch fitting position 3 to the heating press position 4 in the second conveying step (S2).

加熱(S13)・プレス(S14)の工程では、上述した窒素室形成手段93により窒素パージ用の小部屋、すなわち窒素室97を用意し、その中で窒素の拡散・浪費を防ぎながら窒素パージを行う(図11〜図13参照)。窒素雰囲気の加熱プレス位置4において、加熱工程(S13)により、金型20内の原料粉末1を誘導加熱により加熱する(図8参照)。   In the step of heating (S13) and pressing (S14), a small chamber for purging nitrogen, that is, a nitrogen chamber 97 is prepared by the nitrogen chamber forming means 93 described above, and nitrogen purging is performed while preventing diffusion and waste of nitrogen therein. Perform (see FIGS. 11 to 13). In the heating press position 4 in a nitrogen atmosphere, the raw material powder 1 in the mold 20 is heated by induction heating (S13) (see FIG. 8).

加熱された原料粉末1を、そのまま窒素雰囲気におけるプレス工程(S14)で、油圧シリンダ99(3〜15KN)により上パンチ50と下パンチ40とを軸方向に近づけるように圧縮する。加熱工程(S13)により、所定の温度範囲に加熱・保温された状態でプレス工程(S14)が実行される。すなわち、プレス工程(S14)において、原料粉末1を350〜430℃の温度範囲で維持するとともに、高温加圧処理時間T1を150秒以上確保するように高温加圧処理する。   The heated raw material powder 1 is compressed as it is in the pressing step (S14) in a nitrogen atmosphere so that the upper punch 50 and the lower punch 40 are brought closer to the axial direction by the hydraulic cylinder 99 (3 to 15 KN). By the heating step (S13), the pressing step (S14) is performed in a state of being heated and kept at a predetermined temperature range. That is, in the pressing step (S14), the raw material powder 1 is maintained in a temperature range of 350 to 430 ° C., and high-temperature pressure treatment is performed so as to ensure a high-temperature pressure treatment time T1 of 150 seconds or more.

プレス工程(S14)の後、急速冷却工程(S15)において、ワーク移動体63を加熱プレス位置4に残した状態で350℃から200℃まで15秒で急速冷却する。この急速冷却工程(S15)は、例えば、エアブローに冷却剤を併用し、不図示の液体窒素をワーク移動体63に吹き付けることで達成できる。   After the pressing step (S14), in the rapid cooling step (S15), the workpiece moving body 63 is left in the heating press position 4 and rapidly cooled from 350 ° C. to 200 ° C. in 15 seconds. This rapid cooling step (S15) can be achieved, for example, by using a coolant in combination with air blow and blowing liquid nitrogen (not shown) onto the workpiece moving body 63.

つぎに、第3搬送工程(S3)により、加熱プレス位置4から緩慢冷却位置5を経て分解抜出し位置6へとワーク移動体63を搬送する(図1参照)。この第3搬送工程(S3)では、ベルトコンベア上に10個のワーク移動体63を順次滞留させながら低速搬送することにより、緩慢冷却工程(S16)も並行して実行される。この緩慢冷却工程(S16)では、金型20の外側からエアーノズル又は空冷ファン73によるブローを吹きかけて、粉末成形体2を200℃から60℃まで150秒で冷却する(図8参照)。   Next, the workpiece moving body 63 is conveyed from the heating press position 4 to the disassembly / extraction position 6 through the slow cooling position 5 in the third conveying step (S3) (see FIG. 1). In this 3rd conveyance process (S3), the slow cooling process (S16) is also performed in parallel by carrying out low speed conveyance, ten work moving bodies 63 stagnating sequentially on a belt conveyor. In the slow cooling step (S16), blow by an air nozzle or an air cooling fan 73 is blown from the outside of the mold 20 to cool the powder molded body 2 from 200 ° C. to 60 ° C. in 150 seconds (see FIG. 8).

つぎに、分解抜出し位置6において、図4、図5に示すように、上パンチ返送工程(S17)により、上パンチ50を金型20から取外す。この上パンチ返送工程(S17)では、取外された上パンチ50を、分解抜出し位置6から上パンチ嵌着位置3へと返送する。また、分解抜出し位置6における製品取出し工程(S18)では、図6に示すように金型20から粉末成形体2を取り出す。   Next, at the disassembly / extraction position 6, as shown in FIGS. 4 and 5, the upper punch 50 is removed from the mold 20 by the upper punch returning step (S17). In the upper punch returning step (S17), the removed upper punch 50 is returned from the disassembly / extraction position 6 to the upper punch fitting position 3. In the product take-out step (S18) at the disassembly / extraction position 6, the powder compact 2 is taken out from the mold 20 as shown in FIG.

一方、分解抜出し位置6で上パンチ50を取外された金型20は、第4搬送工程(S4)により、(金型戻り位置7経由で)原料粉末充填位置8まで搬送される。図7の第1搬送工程(S1)〜第4搬送工程(S4)に示すように、搬送固定冶具60に取付けられた状態の金型20は、原料粉末充填位置8、上パンチ嵌着位置3、加熱プレス位置4、緩慢冷却位置5、分解抜出し位置から(金型戻り位置7経由で)原料粉末充填位置8に戻るまでの5(6)箇所にわたって巡回する。なお、支援ライン12の都合により、金型戻り位置7を大きく設けて、そこに余分な金型20を滞留させるようにしても構わない。その場合は、不図示の上パンチ戻り位置も設けて、そこに余分な上パンチ50を滞留させて数合わせする。   On the other hand, the mold 20 from which the upper punch 50 has been removed at the disassembly / extraction position 6 is conveyed to the raw material powder filling position 8 (via the mold return position 7) in the fourth conveyance step (S4). As shown in the first conveying step (S1) to the fourth conveying step (S4) in FIG. 7, the mold 20 attached to the conveying and fixing jig 60 has the raw material powder filling position 8 and the upper punch fitting position 3. Circulates over 5 (6) locations from the heating press position 4, the slow cooling position 5, and the disassembly / extraction position to the raw material powder filling position 8 (via the mold return position 7). For convenience of the support line 12, a large mold return position 7 may be provided, and an excessive mold 20 may be retained there. In such a case, an upper punch return position (not shown) is also provided, and an excess upper punch 50 is retained there for the number adjustment.

図8は、本方法において、金型の温度調整とタクトタイムとを説明するためのグラフである。
なお、図8は、一例を示したにすぎない。したがって、本装置100の製造品目や原料粉末1が変われば、各工程におけるタクトタイムtその他の最適実行値も適宜に変更される。
図7でも示したように、加熱工程(S13)により、金型20内に充填された原料粉末1を、誘導加熱により常温から430℃まで15秒で加熱する。加熱工程(S13)で加熱され高温に維持された状態でプレス工程(S14)が実行される。すなわち、プレス工程(S14)において、原料粉末1を350〜430℃の温度範囲で維持するとともに、高温加圧処理時間T1を150秒以上確保ように高温加圧処理する。
FIG. 8 is a graph for explaining temperature adjustment and tact time of a mold in this method.
FIG. 8 shows only an example. Therefore, if the manufacturing item of the apparatus 100 and the raw material powder 1 are changed, the tact time t and other optimum execution values in each process are appropriately changed.
As shown also in FIG. 7, the raw material powder 1 filled in the mold 20 is heated from room temperature to 430 ° C. in 15 seconds by induction heating in the heating step (S13). A press process (S14) is performed in the state heated and maintained at the high temperature by the heating process (S13). That is, in the pressing step (S14), the raw material powder 1 is maintained in a temperature range of 350 to 430 ° C., and high-temperature pressure treatment is performed so as to ensure a high-temperature pressure treatment time T1 of 150 seconds or more.

プレス工程(S14)の後、急速冷却工程(S15)において、ワーク移動体63を350℃から200℃まで15秒で急速冷却する。急速冷却工程(S15)の後、緩慢冷却工程(S16)では、200℃から60℃まで150秒で冷却する。60℃以下であれば、支援ライン12のいずれでも耐熱性の問題はないので、その後、上パンチ返送工程(S17)および製品取出し工程(S18)が順次実行されるとともに、室温まで自然冷却される。   After the pressing step (S14), in the rapid cooling step (S15), the workpiece moving body 63 is rapidly cooled from 350 ° C. to 200 ° C. in 15 seconds. In the slow cooling step (S16) after the rapid cooling step (S15), cooling is performed from 200 ° C. to 60 ° C. in 150 seconds. If it is 60 ° C. or lower, there is no problem of heat resistance in any of the support lines 12, and thereafter, the upper punch returning process (S 17) and the product taking-out process (S 18) are sequentially performed and naturally cooled to room temperature. .

全工程を稼動した場合、プレス工程(S14)の高温加圧処理時間(T1=150秒)と、緩慢冷却工程(S16)の緩慢冷却時間(T2=150秒)と、の2工程の長い所要時間に比べて、他の工程は概ねタクトタイム(t=15秒)という短時間で足りるので、ライン構成のバランスが悪い。特に、1箇所しかない加熱プレス位置4に1個のワーク移動体63が固定された状態で実行されるプレス工程(S14)および急速冷却工程(S15)において、T1+t=150+15=165秒の滞留時間となり、その工程がボトルネックになる。そこで、加熱プレス位置4以外の場所で実行される工程に、複数のワーク移動体63を流しながら全工程をできるだけ同時進行させるようにライン稼動する。   When all the processes are in operation, it takes two long steps: high-temperature pressure treatment time (T1 = 150 seconds) in the pressing step (S14) and slow cooling time (T2 = 150 seconds) in the slow cooling step (S16). Compared to the time, the other processes generally require a short time of tact time (t = 15 seconds), so the balance of the line configuration is poor. In particular, in the pressing step (S14) and the rapid cooling step (S15) executed in a state where one workpiece moving body 63 is fixed at only one heating press position 4, the residence time of T1 + t = 150 + 15 = 165 seconds. The process becomes a bottleneck. Therefore, the line operation is performed so that the entire process proceeds as simultaneously as possible while flowing a plurality of workpiece moving bodies 63 to the process executed at a place other than the heating press position 4.

すなわち、プレス工程(S14)および急速冷却工程(S15)で165秒を要する滞留時間は短縮できないので、その165秒の間に、上パンチ嵌着位置3、分解抜出し位置6、金型戻り位置7、および原料粉末充填位置8に、各1個ずつワーク移動体63が流れて稼動する。なお、緩慢冷却位置5は、10個のワーク移動体63を連続的に並べて対応する。緩慢冷却位置5で60℃まで冷却されたワーク移動体63を、順番に次の工程、すなわち上パンチ返送工程(S17)および製品取出し工程(S18)へと進めることができる。   That is, the dwell time requiring 165 seconds in the pressing step (S14) and the rapid cooling step (S15) cannot be shortened, so that the upper punch fitting position 3, the disassembly / extraction position 6, the mold return position 7 during the 165 seconds. , And one workpiece moving body 63 flows and operates at each raw material powder filling position 8. Note that the slow cooling position 5 corresponds to the ten workpiece moving bodies 63 that are continuously arranged. The workpiece moving body 63 cooled to 60 ° C. at the slow cooling position 5 can be sequentially advanced to the next step, that is, the upper punch returning step (S17) and the product taking-out step (S18).

このように、平均的なタクトタイム(t=15秒)では処理できない工程がボトルネックになるので、現状では短縮困難なボトルネックの長い処理時間の間に、短時間で処理可能な他の工程を複数のワーク移動体63で切れ目無く対応することによって、効率良く稼動することが可能となる。
なお、上述したように、プレス工程(S14)および急速冷却工程(S15)に要する165秒の滞留時間と、他の工程の15秒というタクトタイムtと、については、一例を示したにすぎない。つまり、ガラス金属により製造される製品の品目、粉末成形体2の形状、および原料粉末1の材料変更等により、高温加圧処理時間T1をはじめとする各工程の制御パタンが切り替えられる。また、制御パタンの切り替えについては、制御部80のプログラムにより、いかようにも対応することが可能である。
As described above, since a process that cannot be processed with an average tact time (t = 15 seconds) becomes a bottleneck, other processes that can be processed in a short time during a long processing time of a bottleneck that is difficult to shorten at present. It is possible to operate efficiently by dealing with a plurality of workpiece moving bodies 63 without interruption.
As described above, the dwell time of 165 seconds required for the pressing step (S14) and the rapid cooling step (S15) and the tact time t of 15 seconds for the other steps are merely examples. . That is, the control pattern of each process including the high-temperature pressurization treatment time T1 is switched depending on the item of the product manufactured from glass metal, the shape of the powder compact 2, the material change of the raw material powder 1, and the like. Further, the switching of the control pattern can be dealt with in any way by the program of the control unit 80.

本発明によれば、完全自動化ラインの完成度を高めるとともに、原料粉末充填から製品取出しまでの複数の工程それぞれの工程所要時間、すなわちタクトタイムを考慮し、製造装置1台について単位時間あたりの生産数量、すなわち生産効率を向上させた粉末成形金型装置および粉末成形方法を実現することができる。   According to the present invention, the complete automation line is improved, and the time required for each of the plurality of processes from filling the raw material powder to taking out the product, i.e., the tact time, is taken into consideration. It is possible to realize a powder molding die apparatus and a powder molding method with improved quantity, that is, production efficiency.

図9は、本装置の一実施例(本実施例)を示す全体正面図である。図10は、図9に示した本装置を示す全体平面図である。図9、図10に示すように、本装置100は、概ね直方体の外形を形成する金属フレーム10に各部が駆動可能に配設され、外部から電力、油圧、および空気圧による動力と、原料粉末1との供給を受けて、金属ガラス製のミニチュア・ベアリングを、連続的に大量生産するための高速連続式金属ガラス成形装置を構成する。また、本装置100は、工場の内部である程度の移動および据え置きの調整に便利なように、金属フレーム10の底面にキャスター13および高さ調整足14も配設されている。なお、図9、図10は、各部の全てを符号で示す図ではないので他の図を参照することも必要である。また、他の図と細部の形状まで正確に一致させる性質の図ではない。   FIG. 9 is an overall front view showing an embodiment (this embodiment) of the present apparatus. FIG. 10 is an overall plan view showing the present apparatus shown in FIG. As shown in FIG. 9 and FIG. 10, this apparatus 100 is arranged such that each part can be driven on a metal frame 10 that forms a substantially rectangular parallelepiped shape, and is powered by power, hydraulic pressure, and air pressure from the outside, and raw material powder 1. The high-speed continuous metal glass forming apparatus for continuously mass-producing metal glass miniature bearings is constructed. The apparatus 100 is also provided with casters 13 and height adjusting feet 14 on the bottom surface of the metal frame 10 so as to be convenient for a certain degree of movement and stationary adjustment inside the factory. Note that FIGS. 9 and 10 do not show all the parts with reference numerals, so it is necessary to refer to other figures. Moreover, it is not a figure of the property to make it correspond exactly to the shape of a detail with another figure.

本装置100は、図1ほか各図に沿って説明したように、原料粉末充填位置8、上パンチ嵌着位置3、加熱プレス位置4、緩慢冷却位置5、分解抜出し位置6および金型戻り位置7の各所にわたって、金型20が装着された搬送固定冶具60、又は金型一式にワークまで完全に装着されたワーク移動体63、あるいは単独の上パンチ50が、規定どおりに移動を繰り返すように構成されている。移動は、ベルトコンベアおよびロボットアームで構成された第1搬送手段81、第2搬送手段82、第3搬送手段83、第4搬送手段84、および上パンチ返送手段87が、制御部80の命令により実行する。   As described with reference to FIG. 1 and other drawings, the present apparatus 100 includes a raw material powder filling position 8, an upper punch fitting position 3, a heating press position 4, a slow cooling position 5, a disassembly / extraction position 6, and a mold return position. 7, the conveyance fixing jig 60 to which the mold 20 is mounted, the workpiece moving body 63 to which the mold is completely mounted up to the workpiece, or the single upper punch 50 repeats the movement as prescribed. It is configured. The first conveying means 81, the second conveying means 82, the third conveying means 83, the fourth conveying means 84, and the upper punch returning means 87, which are constituted by a belt conveyor and a robot arm, are moved by an instruction from the control unit 80. Run.

本装置100は、図1〜図8に沿って説明したように、金型戻り位置7又は原料粉末充填位置8に金型載置手段86が配設されている。また、原料粉末充填手段30として超音波発振器31が配設されている。また、上パンチ嵌着位置3に上パンチ嵌着手段51が配設されている。また、加熱プレス位置4に金型外枠94、台座95、加熱手段70、プレス手段90、窒素室形成手段93および窒素室97(図12〜図13参照)が配設されている。また、緩慢冷却位置5に第3搬送手段83、温度調整手段72および空冷ファン73が配設されている。同様に、分解抜出し位置6に上パンチ昇降ホルダ(上パンチ取外し手段)52、ロボットアーム53および製品取出し手段85が配設されている。   As described with reference to FIGS. 1 to 8, the apparatus 100 is provided with the mold placing means 86 at the mold return position 7 or the raw material powder filling position 8. Further, an ultrasonic oscillator 31 is disposed as the raw material powder filling means 30. Further, an upper punch fitting means 51 is disposed at the upper punch fitting position 3. Further, a mold outer frame 94, a pedestal 95, a heating means 70, a pressing means 90, a nitrogen chamber forming means 93, and a nitrogen chamber 97 (see FIGS. 12 to 13) are disposed at the heating press position 4. In addition, a third transport unit 83, a temperature adjustment unit 72, and an air cooling fan 73 are disposed at the slow cooling position 5. Similarly, an upper punch raising / lowering holder (upper punch removing means) 52, a robot arm 53, and a product removing means 85 are disposed at the disassembly / extraction position 6.

本装置100は、加熱プレス冷却ライン11および支援ライン12が制御部80で統括制御されて稼動する構成であり、制御部80が有する入力部、すなわち操作盤88に配設された不図示のスイッチ類を操作することにより稼動又は停止の状態となる。また、プログラムの実行により全自動運転が可能であり、例えば、100個生産する旨を入力し、応分の原料粉末1を原料粉末充填位置8に配備し、稼動スイッチをONするだけで、ミニチュア・ベアリングの主要構成部を形成した金属ガラス製の粉末成形体2が製品置き場に100個貯留される。   The apparatus 100 is configured such that the heating press / cooling line 11 and the support line 12 are controlled and operated by the control unit 80, and an input unit included in the control unit 80, that is, a switch (not shown) disposed on the operation panel 88. By operating a class, it is in an active or stopped state. In addition, fully automatic operation is possible by executing the program. For example, input of the fact that 100 pieces are to be produced, the appropriate raw material powder 1 is arranged at the raw material powder filling position 8, and the operation switch is turned on. 100 pieces of metal glass powder compacts 2 forming the main components of the bearing are stored in the product storage area.

なお、本装置100は、加熱プレス位置4における工程の処理能力が、ボトルネックとなっており、1台で全力稼動しても約165秒で1個、すなわち毎時20個強である。そこで、本装置100において、加熱プレス位置4に備わる構成だけを3組に増設したライン構成とすれば、約165秒で3個、すなわち毎時60個強の生産能力に強化することも可能である。この165秒も今後の研究により短縮できる。   In addition, the processing capacity of the process at the heating press position 4 of this apparatus 100 is a bottleneck, and even if one unit is fully operated, it is one in about 165 seconds, that is, more than 20 per hour. Therefore, in the present apparatus 100, if only the configuration provided at the heating press position 4 is a line configuration that is increased to three sets, it is possible to increase the production capacity to 3 pieces in about 165 seconds, that is, over 60 pieces per hour. . This 165 seconds can be shortened by future research.

<細部実施例>
図11は、細部実施例として、加熱プレス位置へ送られて来たワーク移動体を上昇させる直前の状態を説明するための正面図である。図12は、図11に示したワーク移動体を上昇させた直後の状態を説明するための正面図である。図11に示すように、ワーク移動体63は、誘導コイル71が付随していない状態で加熱プレス位置4へ送られて来る。その後、図12に示すように、加熱プレス位置4において、輪形の誘導コイル71に真下から潜り込むような位置関係で、ワーク移動体63を上昇させることにより、ワーク移動体63に誘導コイル71が装備される。また、図12の状態から図11の状態へと逆戻りすることによって、ワーク移動体63から誘導コイル71の装備を解除される。
<Detailed Examples>
FIG. 11 is a front view for explaining a state immediately before the workpiece moving body sent to the heating press position is lifted as a detailed embodiment. FIG. 12 is a front view for explaining a state immediately after the workpiece moving body shown in FIG. 11 is raised. As shown in FIG. 11, the workpiece moving body 63 is sent to the heating press position 4 without the induction coil 71 attached. Then, as shown in FIG. 12, the workpiece moving body 63 is equipped with the induction coil 71 by raising the workpiece moving body 63 in a positional relationship such that it enters the annular induction coil 71 from directly below at the heating press position 4. Is done. Further, by reversing from the state of FIG. 12 to the state of FIG. 11, the equipment of the induction coil 71 is released from the workpiece moving body 63.

図13は、図12に示したワーク移動体に、横方向からスライドベッド方式のプレス受けおよび窒素室が装備されるとともに、上方から油圧シリンダが下降して当接するまでの状況を説明するための正面一部透視図である。図12に示したワーク移動体63には、誘導コイル71のみが装着されているだけであって、プレス受け9および窒素室97は加熱プレス位置4から水平方向に離れた位置で待機しているため、ワーク移動体63には装備されていない。また、油圧シリンダ99は、加熱プレス位置4の上方に高く離れた位置で待機しているため、ワーク移動体63には当接していない。   FIG. 13 is a view for explaining a situation in which the workpiece moving body shown in FIG. 12 is equipped with a slide bed type press receiver and a nitrogen chamber from the lateral direction until the hydraulic cylinder descends and contacts from above. It is a partial front perspective view. Only the induction coil 71 is attached to the workpiece moving body 63 shown in FIG. 12, and the press receiver 9 and the nitrogen chamber 97 stand by at a position away from the heating press position 4 in the horizontal direction. Therefore, the workpiece moving body 63 is not equipped. Further, since the hydraulic cylinder 99 stands by at a position that is highly separated above the heating press position 4, the hydraulic cylinder 99 is not in contact with the workpiece moving body 63.

この状態から、図13に示すように、スライドベッド方式のプレス受け9、およびプレス受け9に載置された窒素室97が、ワーク移動体63に近付くように水平移動して装備される。それと同時に、加熱プレス位置4の上方で待機していた油圧シリンダ99が、下降して上パンチ50に当接する。ただし、この図13は説明のため、油圧シリンダ99が上パンチ50に当接する直前の状態を示しているが、当接してからプレス工程(S14)が実行される。なお、油圧シリンダ99には上述したように軸方向の位置計測器(不図示)が配設されている。   From this state, as shown in FIG. 13, the slide bed type press receiver 9 and the nitrogen chamber 97 placed on the press receiver 9 are mounted so as to move horizontally so as to approach the workpiece moving body 63. At the same time, the hydraulic cylinder 99 waiting above the heating press position 4 descends and comes into contact with the upper punch 50. However, for the sake of explanation, FIG. 13 shows a state immediately before the hydraulic cylinder 99 comes into contact with the upper punch 50, but the pressing step (S14) is executed after the contact. The hydraulic cylinder 99 is provided with an axial position measuring instrument (not shown) as described above.

本発明に係る粉末成形金型装置および粉末成形方法は、例えば、歯科医療用ドリルの軸受けのように、頻繁な薬剤洗浄等にも耐えられる耐食性を要求されるミニチュア・ベアリングを、金属ガラスによって大量生産するための高速連続式金属ガラス成形装置として利用可能性がある。その高速連続式金属ガラス成形装置により大量生産される金属ガラス成形品は、ミニチュア・ベアリングに限らず、小型歯車その他の製品として、歯切り等の切削加工やバリ処理、熱処理の工程が不要なため、従来よりも工程数を減らすことが可能となる。   The powder molding die apparatus and the powder molding method according to the present invention include, for example, a large amount of miniature bearings that require corrosion resistance that can withstand frequent chemical cleaning, such as bearings for dental drills. It can be used as a high-speed continuous metallic glass forming apparatus for production. Metal glass molded products that are mass-produced by the high-speed continuous metal glass molding equipment are not limited to miniature bearings, and as small gears and other products, cutting, burring, and heat treatment processes such as gear cutting are unnecessary. Thus, the number of steps can be reduced as compared with the conventional case.

1 原料粉末、2 粉末成形体、3 上パンチ嵌着位置、4 加熱プレス位置、5 緩慢冷却位置、6 分解抜出し位置、7 金型戻り位置、8 原料粉末充填位置、9 (スライドベッド方式の)プレス受け、10 金属フレーム、11 加熱プレス冷却ライン、12 支援ライン、20 金型、21 底部開口、22 上部開口、23 成形部、30 原料粉末充填手段、31 超音波発振器、40 下パンチ、41 軸部、42 コアロッド、43 温度センサ、50 上パンチ、51 上パンチ嵌着手段、52 上パンチ昇降ホルダ(上パンチ取外し手段)、53 ロボットアーム、54〜59 、60 搬送固定冶具、61 軸穴、62 鍔状部、63 ワーク移動体、70 加熱手段、71 誘導コイル、72 温度調整手段、73 空冷ファン、80 制御部、81 第1搬送手段、82 第2搬送手段、83 第3搬送手段、84 第4搬送手段、85 製品取出し手段、86 金型載置手段、87 上パンチ返送手段、90 プレス手段、91 下パンチホルダ、92 凹部、93 窒素室形成手段、94 金型外枠、95 台座、96 コイルスプリング、97 窒素室、99 油圧シリンダ100 粉末成形金型装置、S1 第1搬送工程、S2 第2搬送工程、S3 第3搬送工程、S4 第4搬送工程、S10 、S11 原料粉末充填工程、S12 上パンチ嵌着工程、S13 加熱工程、S14 プレス工程、S16 緩慢冷却工程、S17 上パンチ返送工程、S18 製品取出し工程、S20 、T1 高温加圧処理時間、T2 緩慢冷却時間、t タクトタイム、 1 Raw material powder 2 Powder compact 3 Upper punch fitting position 4 Heating press position 5 Slow cooling position 6 Disassembly / extraction position 7 Mold return position 8 Raw material powder filling position 9 (Slide bed type) Press receiver, 10 Metal frame, 11 Heating press cooling line, 12 Support line, 20 Mold, 21 Bottom opening, 22 Upper opening, 23 Molding part, 30 Raw material powder filling means, 31 Ultrasonic oscillator, 40 Lower punch, 41 axis Part, 42 core rod, 43 temperature sensor, 50 upper punch, 51 upper punch fitting means, 52 upper punch lifting holder (upper punch removing means), 53 robot arm, 54-59, 60 transport fixing jig, 61 shaft hole, 62 Casket, 63 Workpiece moving body, 70 Heating means, 71 Induction coil, 72 Temperature adjusting means, 73 Air cooling fan, 80 81, first conveying means, 82 second conveying means, 83 third conveying means, 84 fourth conveying means, 85 product take-out means, 86 mold placing means, 87 upper punch returning means, 90 pressing means, 91 Lower punch holder, 92 recess, 93 nitrogen chamber forming means, 94 outer mold frame, 95 pedestal, 96 coil spring, 97 nitrogen chamber, 99 hydraulic cylinder 100 powder molding die device, S1 first transfer step, S2 second transfer Step, S3 Third conveying step, S4 Fourth conveying step, S10, S11 Raw material powder filling step, S12 Upper punch fitting step, S13 Heating step, S14 Pressing step, S16 Slow cooling step, S17 Upper punch returning step, S18 product Extraction process, S20, T1 high-temperature pressure treatment time, T2 slow cooling time, t tact time,

Claims (7)

内部に成形部が形成された金型に充填された原料粉末を加熱・圧縮して粉末成形体を成形する粉末成形金型装置であって、
前記金型の底部開口から前記成形部に軸部が嵌入されて進退を可能とする下蓋状の下パンチと、
前記金型の上部開口から前記成形部に嵌入と離脱を可能とする上蓋状の上パンチと、
前記成形部に充填された前記原料粉末を加熱する加熱手段と、
前記金型に嵌入された前記上パンチと前記下パンチとを接近させる方向に加圧することで前記成形部に充填された前記原料粉末を圧縮して粉末成形体を成形するプレス手段と、
少なくとも前記下パンチを伴って前記原料粉末が充填された前記金型に前記上パンチが嵌着された状態で移動又は固定を可能にする複数のワーク移動体と、
を備えたことを特徴とする粉末成形金型装置。
A powder molding die device for molding a powder compact by heating and compressing raw material powder filled in a mold having a molding part formed therein,
A lower punch-shaped lower punch that allows the shaft portion to be inserted into the molding portion from the bottom opening of the mold and allows advancement and retraction;
An upper punch-like upper punch that enables insertion and removal from the upper opening of the mold to the molding part;
Heating means for heating the raw material powder filled in the molded part;
A pressing means for compressing the raw material powder filled in the molding part by pressurizing the upper punch and the lower punch inserted in the mold so as to approach each other, and molding a powder compact;
A plurality of workpiece moving bodies capable of moving or fixing in a state in which the upper punch is fitted in the mold filled with the raw material powder with at least the lower punch;
A powder molding die apparatus comprising:
前記金型の中心付近に接近可能なコアロッドに温度センサを設けたことを特徴とする請求項1に記載の粉末成形金型装置。   2. The powder molding die apparatus according to claim 1, wherein a temperature sensor is provided on a core rod accessible near the center of the die. 前記ワーク移動体が移動するライン構成は、
前記ワーク移動体に仕込まれた原料粉末を窒素雰囲気中で前記加熱手段により所定の温度範囲に維持されて所定の高温加圧処理時間だけ前記プレス手段により高温加圧処理した前記粉末成形体を温度調整手段により所定の温度勾配で冷却するまでの工程を実行可能なロボット構成の加熱プレス冷却ラインと、
該加熱プレス冷却ラインを支援する一連の工程を実行可能なロボット構成の支援ラインと、
前記加熱プレス冷却ラインおよび前記支援ラインを稼動させる制御部と、
を備えたことを特徴とする請求項1又2に記載の粉末成形金型装置。
The line configuration on which the workpiece moving body moves is as follows:
The powder compact that has been subjected to high-temperature pressure treatment by the press means for a predetermined high-temperature pressure treatment time while the raw material powder charged in the workpiece moving body is maintained in a predetermined temperature range by the heating means in a nitrogen atmosphere A heating press cooling line with a robot configuration capable of executing a process until cooling with a predetermined temperature gradient by the adjusting means;
A robot-structured support line capable of performing a series of steps to support the heating press cooling line;
A control unit for operating the heating press cooling line and the support line;
The powder molding die apparatus according to claim 1 or 2, further comprising:
前記加熱プレス冷却ラインは、
前記ワーク移動体を構成する搬送固定冶具を脱着可能に保持する下パンチホルダと、
前記加熱手段として前記搬送固定冶具が前記下パンチホルダに固定された状態で前記成形部に充填された前記原料粉末を誘導加熱する誘導コイルと、
前記加熱手段および前記プレス手段と同時に機能して前記金型を窒素雰囲気に収容可能な窒素室形成手段と、を備え、
前記温度調整手段は前記加熱手段により350〜430℃の範囲で150秒以上維持した後に、前記温度勾配を急速冷却から緩慢冷却に切換え可能であることを特徴とする請求項3に記載の粉末成形金型装置。
The heating press cooling line is
A lower punch holder that detachably holds a conveyance fixing jig constituting the workpiece moving body;
An induction coil that induction-heats the raw material powder filled in the molding part in a state where the conveyance fixing jig is fixed to the lower punch holder as the heating means;
A nitrogen chamber forming means that functions simultaneously with the heating means and the pressing means and can accommodate the mold in a nitrogen atmosphere;
4. The powder molding according to claim 3, wherein the temperature adjusting means is capable of switching the temperature gradient from rapid cooling to slow cooling after maintaining for 150 seconds or more in the range of 350 to 430 ° C. by the heating means. Mold equipment.
前記支援ラインは、
前記搬送固定冶具を主要構成する前記下パンチの上部に前記金型を載置する金型載置手段と、
前記原料粉末を計量するとともに前記成形部へ前記原料粉末を充填する原料粉末充填手段と、
前記金型載置手段により前記下パンチの上部に前記金型を載置した状態で前記搬送固定冶具を原料粉末充填位置から上パンチ嵌着位置まで搬送して固定する第1搬送手段と、
前記上パンチ嵌着位置で前記上パンチを前記金型に嵌着する上パンチ嵌着手段と、
前記上パンチ嵌着位置から加熱プレス位置へと前記ワーク移動体を搬送する第2搬送手段と、
前記ワーク移動体を前記加熱プレス位置から分解抜出し位置まで搬送する第3搬送手段と、
前記分解抜出し位置まで搬送された前記搬送固定冶具から前記上パンチを取り外す上パンチ取外し手段と、
前記上パンチを取外された前記金型を前記分解抜出し位置から原料粉末充填位置まで搬送する第4搬送手段と、
前記上パンチ取外し手段により取り外された前記上パンチを前記分解抜出し位置から前記上パンチ嵌着位置へと返送する上パンチ返送手段と、
前記金型から前記粉末成形体を取り出す製品取出し手段と、
を備えたことを特徴とする請求項3又は4に記載の粉末成形金型装置。
The support line is
A mold placing means for placing the mold on the upper part of the lower punch that mainly constitutes the conveyance fixing jig;
Raw material powder filling means for weighing the raw material powder and filling the raw material powder into the molding part,
First conveying means for conveying and fixing the conveying and fixing jig from the raw material powder filling position to the upper punch fitting position with the mold placed on the lower punch by the mold placing means;
Upper punch fitting means for fitting the upper punch to the mold at the upper punch fitting position;
Second conveying means for conveying the workpiece moving body from the upper punch fitting position to the heating press position;
Third transport means for transporting the workpiece moving body from the heating press position to the disassembly / extraction position;
An upper punch removing means for removing the upper punch from the transport fixing jig transported to the disassembly and extraction position;
A fourth conveying means for conveying the mold from which the upper punch has been removed from the disassembly / extraction position to a raw material powder filling position;
An upper punch returning means for returning the upper punch removed by the upper punch removing means from the disassembly / extraction position to the upper punch fitting position;
Product take-out means for taking out the powder compact from the mold;
The powder molding die apparatus according to claim 3 or 4, characterized by comprising:
前記原料粉末充填手段は、前記原料粉末を超音波で振動させる超音波発振器を備えたことを特徴とする請求項5に記載の粉末成形金型装置。   6. The powder molding die apparatus according to claim 5, wherein the raw material powder filling means includes an ultrasonic oscillator that vibrates the raw material powder with ultrasonic waves. ピストン状の下パンチおよび上パンチがシリンダ状の金型の上下にそれぞれ嵌着されて形成される成形部に充填された原料粉末を、前記下パンチおよび前記上パンチにより圧縮して粉末成形体を成形する粉末冶金法に基づく粉末成形方法であって、
前記原料粉末を計量するとともに超音波で振動させながら前記成形部に充填する原料粉末充填工程と、
前記下パンチに嵌着された前記金型を原料粉末充填位置から上パンチ嵌着位置まで搬送して固定する第1搬送工程と、
上パンチ嵌着位置で前記上パンチを原料粉末の充填された前記金型に嵌着してワーク移動体を形成する上パンチ嵌着工程と、
前記ワーク移動体の単位で前記上パンチ嵌着位置から加熱プレス位置へと前記ワーク移動体を搬送する第2搬送工程と、
前記加熱プレス位置の前記ワーク移動体に対し窒素雰囲気を形成するとともに前記金型内に充填された原料粉末を加熱する加熱工程と、
前記加熱工程で加熱された後に所定の温度範囲で所定の高温加圧処理時間だけ前記原料粉末を高温加圧処理するプレス工程と、
前記プレス工程の後に前記加熱プレス位置で急速冷却する急速冷却工程と、
前記加熱プレス位置から緩慢冷却位置を経て分解抜出し位置へと前記ワーク移動体を搬送する第3搬送工程と、
前記上パンチを前記金型から取外して前記分解抜出し位置から上パンチ嵌着位置へと返送する上パンチ返送工程と、
前記分解抜出し位置で前記下パンチの軸部が前記金型を貫通することにより、前記粉末成形体を前記金型から抜出す製品取出し工程と、
前記分解抜出し位置で前記上パンチを取外された前記金型を前記原料粉末充填位置まで搬送する第4搬送工程と、
を有することを特徴とする粉末成形方法。
A powder compact is obtained by compressing the raw material powder filled in the molding portion formed by fitting the piston-like lower punch and the upper punch respectively on the upper and lower sides of the cylinder-shaped mold by the lower punch and the upper punch. A powder molding method based on a powder metallurgy method for molding,
Raw material powder filling step of weighing the raw material powder and filling the molded part while vibrating with ultrasonic waves,
A first conveying step of conveying and fixing the mold fitted to the lower punch from the raw material powder filling position to the upper punch fitting position;
An upper punch fitting step of fitting the upper punch into the mold filled with raw material powder to form a workpiece moving body at an upper punch fitting position;
A second conveying step of conveying the workpiece moving body from the upper punch fitting position to the heating press position in units of the workpiece moving body;
A heating step of forming a nitrogen atmosphere for the workpiece moving body at the heating press position and heating the raw material powder filled in the mold,
A pressing step in which the raw material powder is subjected to high-temperature pressure treatment for a predetermined high-temperature pressure treatment time within a predetermined temperature range after being heated in the heating step;
A rapid cooling step of rapidly cooling at the heating press position after the pressing step;
A third transport step for transporting the workpiece moving body from the heating press position to the disassembly / extraction position via the slow cooling position;
An upper punch returning step of removing the upper punch from the mold and returning it from the disassembly / extraction position to the upper punch fitting position;
A product removing step of extracting the powder compact from the mold by allowing the shaft portion of the lower punch to penetrate the mold at the disassembly and extraction position;
A fourth transporting step of transporting the mold, from which the upper punch has been removed at the disassembly and extraction position, to the raw material powder filling position;
A powder molding method characterized by comprising:
JP2014128075A 2014-06-23 2014-06-23 Powder molding die apparatus and powder molding method Active JP6325368B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014128075A JP6325368B2 (en) 2014-06-23 2014-06-23 Powder molding die apparatus and powder molding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014128075A JP6325368B2 (en) 2014-06-23 2014-06-23 Powder molding die apparatus and powder molding method

Publications (2)

Publication Number Publication Date
JP2016007611A true JP2016007611A (en) 2016-01-18
JP6325368B2 JP6325368B2 (en) 2018-05-16

Family

ID=55225580

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014128075A Active JP6325368B2 (en) 2014-06-23 2014-06-23 Powder molding die apparatus and powder molding method

Country Status (1)

Country Link
JP (1) JP6325368B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107866570A (en) * 2017-12-15 2018-04-03 东北大学 A kind of equipment for powder metallurgy warm pressing formation
CN113727527A (en) * 2021-08-31 2021-11-30 苏州景昱医疗器械有限公司 Rolling equipment and rolling method for flexible conductive flexible board

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61273300A (en) * 1985-05-27 1986-12-03 Tatsuro Kuratomi Heat pressurization press device for electrical heating and mechanical pressurizing
JPS63138999U (en) * 1987-03-03 1988-09-13
JP2010144241A (en) * 2008-12-22 2010-07-01 Hitachi Powdered Metals Co Ltd Molding die apparatus
JP2013111598A (en) * 2011-11-28 2013-06-10 Kobe Steel Ltd Forming die transfer device of dry type cold isostatic pressing device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61273300A (en) * 1985-05-27 1986-12-03 Tatsuro Kuratomi Heat pressurization press device for electrical heating and mechanical pressurizing
JPS63138999U (en) * 1987-03-03 1988-09-13
JP2010144241A (en) * 2008-12-22 2010-07-01 Hitachi Powdered Metals Co Ltd Molding die apparatus
JP2013111598A (en) * 2011-11-28 2013-06-10 Kobe Steel Ltd Forming die transfer device of dry type cold isostatic pressing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107866570A (en) * 2017-12-15 2018-04-03 东北大学 A kind of equipment for powder metallurgy warm pressing formation
CN113727527A (en) * 2021-08-31 2021-11-30 苏州景昱医疗器械有限公司 Rolling equipment and rolling method for flexible conductive flexible board

Also Published As

Publication number Publication date
JP6325368B2 (en) 2018-05-16

Similar Documents

Publication Publication Date Title
EP3462963B1 (en) Method and apparatus for automatically manufacturing shoe soles
JP3780842B2 (en) Powder molding apparatus and powder molding method
KR102424649B1 (en) Sintered compact manufacturing apparatus and sintered compact manufacturing method
JP6325368B2 (en) Powder molding die apparatus and powder molding method
JP2014231185A (en) Resin molding apparatus and resin molding method
CN116600980A (en) Mold device for direct injection molding of footwear, system comprising such mold device and direct injection molding system
JPH0596589A (en) Producing system for molded component and controlling method therefor
JP6523785B2 (en) Powder molding machine
CN105522467B (en) A kind of commutator is from dynamic pressure fillet polishing machine
CN218555272U (en) Multi-station high-precision ultra-thin special material in-mold riveting cold stamping die
CN113800921B (en) Ceramic dielectric window processing method for plasma etcher
CN107627230B (en) Automatic production equipment and method for elastic grinding block
CN110961934A (en) Die casting processing and detecting integrated machine
CN114434145A (en) Relay iron core riveting equipment
JPH05138683A (en) Rotary injection molding machine
JP2007211269A (en) Method for sizing parts provided with protrusion, and facility therefor
JP4114931B2 (en) Raw material powder molding apparatus and method of conveying molded body
JP4181003B2 (en) Permanent magnet forming device
US11780005B2 (en) Method for manufacturing sintered body
US11338349B2 (en) Loading dies in a press
JP4377711B2 (en) Optical element transport device
TWI786794B (en) Resin sealing device
CN211640752U (en) Contact lens mould conveyer
CN220412035U (en) Injection molding beer tray arranging machine
CN216891100U (en) Annular gear sleeve pressure quenching machine tool

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170330

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180123

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180306

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180403

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180412

R150 Certificate of patent or registration of utility model

Ref document number: 6325368

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150