JP2015503322A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2015503322A5 JP2015503322A5 JP2014548109A JP2014548109A JP2015503322A5 JP 2015503322 A5 JP2015503322 A5 JP 2015503322A5 JP 2014548109 A JP2014548109 A JP 2014548109A JP 2014548109 A JP2014548109 A JP 2014548109A JP 2015503322 A5 JP2015503322 A5 JP 2015503322A5
- Authority
- JP
- Japan
- Prior art keywords
- smart grid
- energy
- amount
- cluster
- electrical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000000875 corresponding Effects 0.000 claims 9
- 238000004422 calculation algorithm Methods 0.000 claims 2
- 238000009825 accumulation Methods 0.000 claims 1
- 238000004088 simulation Methods 0.000 claims 1
Claims (15)
- 電気装置のクラスタにわたって電気エネルギを分配するためのシステムであって、前記クラスタは、少なくとも1つのスマートグリッド対応電気装置と少なくとも1つのスマートグリッド非対応電気装置とを含み、前記スマートグリッド対応電気装置は、課せられたタスクの実行に対して柔軟性を有し、スマートグリッドエージェントによってスマートグリッドを介して電気グリッドに接続され、前記スマートグリッドエージェントは、前記クラスタの前記スマートグリッド対応電気装置のために前記電気グリッドに対して授受される時間の関数としての電気エネルギの量を前記スマートグリッド対応電気装置および前記スマートグリッドの情報に基づいて判定するように構成され、前記システムは、前記クラスタのために前記電気グリッドに対して実際に授受される電気エネルギの量を測定するためのメーターと、所定期間にわたって前記クラスタに対して授受されると前記スマートグリッドエージェントによって判定されるエネルギの量と前記所定期間にわたって前記クラスタに対して実際に授受されてメーターによって測定されるエネルギの量との差を判定するためのソフトウェアコンポーネントを含む制御部とを備え、前記制御部は、前記判定された差に基づいて仮想スマートグリッド対応電気装置をシミュレーションし、前記判定された差に基づいて前記スマートグリッドエージェントに情報を提供するためのソフトウエアコンポーネントを含み、前記スマートグリッドエージェントは、前記クラスタの前記仮想スマートグリッド対応電気装置としてモデル化された前記スマートグリッド対応電気装置および前記スマートグリッド非対応電気装置の両方のために前記電気グリッドに対して授受される時間の関数としての電気エネルギの量を前記クラスタの前記スマートグリッド対応電気装置および前記スマートグリッド非対応電気装置の両方ならびに前記スマートグリッドの情報に基づいて判定するように構成され、前記システムは、前記エネルギの分配を、前記所定期間にわたって前記クラスタに対して授受されると前記スマートグリッドエージェントによって判定されるエネルギの量と前記所定期間にわたって前記クラスタに対して実際に伝達されて前記メーターによって測定されるエネルギの量との差が減少されるように制御するよう適合される、システム。
- 前記制御部はPID調整計またはPI制御部である、請求項1に記載のシステム
- 前記システムは複数のスマートグリッド対応電気装置とスマートグリッド非対応電気装置とを備える、請求項1または2に記載のシステム。
- 請求項1に係るシステムの電気装置のクラスタにわたって電気エネルギを分配するための方法であって、前記クラスタは、課せられたタスクの実行に対して柔軟性を有する少なくとも1つのスマートグリッド対応電気装置と少なくとも1つのスマートグリッド非対応電気装置とを含み、前記スマートグリッド対応電気装置は、スマートグリッドエージェントによってスマートグリッドを介して電気グリッドに接続され、前記スマートグリッドエージェントは、クラスタのスマートグリッド対応電気装置のために電気グリッドに対して授受される時間の関数としての電気エネルギの量を前記スマートグリッド対応電気装置および前記スマートグリッドの上方に基づいて判定し、前記システムは、前記クラスタのために前記電気グリッドに対して実際に授受される電気エネルギの量を測定するメーターをさらに備え、前記システムは、前記所定期間にわたって前記クラスタに対して授受されると前記スマートグリッドエージェントによって判定されるエネルギの量と前記所定期間にわたって前記クラスタに対して実際に授受されて前記メーターによって測定されるエネルギの量との差を判定する制御部を備え、前記制御部は、前記判定された差に基づいて前記仮想スマートグリッド対応電気装置をシミュレーションし、前記判定された差に基づいて前記スマートグリッドエージェントに情報を提供し、前記スマートグリッドエージェントは、前記クラスタの前記仮想スマートグリッド対応電気装置としてモデル化された前記スマートグリッド対応電気装置および前記非対応電気装置の両方のために前記電気グリッドに対して授受される時間の関数としての電気エネルギの量を前記クラスタの前記スマートグリッド対応電気装置および前記スマートグリッド非対応電気装置の両方ならびに前記スマートグリッドの情報に基づいて判定し、前記エネルギの分配を、所定期間にわたって前記クラスタに対して授受されると前記スマートグリッドエージェントによって判定されるエネルギの量と所定期間にわたって前記クラスタに対して実際に伝達されて前記メーターによって測定されるエネルギの量との差が減少されるように制御するよう適合される、方法。
- 前記判定された差に基づく前記制御部による前記仮想スマートグリッド対応電気装置の前記シミュレーションは、過去の判定された差に基づいて、次の所定期間にわたって前記スマートグリッド非対応電気装置によって使用されると予想されるエネルギの量を判定することによって行われる、請求項4に記載の方法。
- 前記予想されるエネルギの量についての前記判定は、周期的に行われ、好ましくは各所定期間に行われる、請求項5に記載の方法。
- 前記次の期間にわたって前記スマートグリッド非対応電気装置によって使用されると予想されるエネルギの量を判定するために使用される前記過去の判定された差は、過去の統計的に比較可能な時間において判定されれた差を含む、請求項5または6に記載の方法。
- 前記統計的に比較可能な時間は、前の日、前の週、前の月、前の年のうちのいずれか1つである、請求項7に記載の方法。
- 前記過去の判定された差は、前の所定期間からの判定された差を含む、請求項7または8に記載の方法。
- 前記制御部は、PID調整計を使用して前記仮想スマートグリッドエージェントをシミュレーションする、請求項1から9のいずれか1項に記載の方法。
- 前記PID調整計は、それぞれP、I、およびDで示される、比例、積分、および微分パラメータの3つの別個のパラメータを有する計算アルゴリズムを実施し、Pは現在のエ
ラーに依存し、Iは過去のエラーの蓄積に依存し、Dは現在の変化率に基づく未来のエラーの予測であり、PID計算アルゴリズムは、以下によって与えられ、
- 前記PID調整計はPI制御部である、請求項10または11に記載の方法。
- 次の期間にわたってスマートグリッド対応電気装置に対して授受されると予想されるエネルギの量を過去の判定された差に基づいて判定することは、PID調整計を使用して行われる、請求項10または12のいずれか1項に記載の方法。
- 所定期間にわたって前記スマートグリッド対応電気装置に対して授受されると前記スマートグリッドエージェントによって判定されるエネルギの量と所定期間にわたって前記クラスタに対して実際に伝達されて前記メーターによって測定されるエネルギの量との差を判定する、請求項4から13のいずれか1項に記載の方法。
- 所定期間にわたってクラスタに対して授受されるとスマートグリッドエージェントによって判定されるエネルギの量と所定期間にわたってクラスタに対して実際に伝達されてメーターによって測定されるエネルギの量との間の差を判定するために請求項1、2、または3に記載のシステムにおいて使用される制御部であって、前記制御部は、判定された差に基づいて仮想スマートグリッド対応電気装置をシミュレーションし、判定された差に基づいて前記スマートグリッドエージェントに情報を提供するために提供され、前記クラスタの前記仮想スマートグリッド対応電気装置としてモデル化された前記スマートグリッド対応電気装置および前記スマートグリッド非対応電気装置の両方ために前記電気グリッドに対して授受される時間の関数としての電気エネルギの量を前記クラスタの前記スマートグリッド対応電気装置および前記スマートグリッド非対応電気装置の両方ならびに前記スマートグリッドの情報に基づいて判定するように構成され、前記エネルギの分配を、所定期間にわたって前記クラスタに対して授受されると前記スマートグリッドエージェントによって判定されるエネルギの量と所定期間にわたってクラスタに対して実際に伝達されてメーターによって測定されるエネルギの量との間の差が減少されるように制御する、制御部。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP11195718.9A EP2608123B1 (en) | 2011-12-23 | 2011-12-23 | System for distributing electrical energy over a cluster of electrical devices, method for distributing electrical energy over a cluster of electrical devices of such a system and controller for use in such a system |
EP11195718.9 | 2011-12-23 | ||
PCT/EP2012/076882 WO2013093119A1 (en) | 2011-12-23 | 2012-12-24 | System for distributing electrical energy over a cluster of electrical devices, method for distributing electrical energy over a cluster of electrical devices of such a system and controller for use in such a system |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2015503322A JP2015503322A (ja) | 2015-01-29 |
JP2015503322A5 true JP2015503322A5 (ja) | 2016-01-28 |
JP6203748B2 JP6203748B2 (ja) | 2017-09-27 |
Family
ID=47598768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014548109A Expired - Fee Related JP6203748B2 (ja) | 2011-12-23 | 2012-12-24 | 電気装置のクラスタにわたって電気エネルギを分配するためのシステム、このようなシステムの電気装置のクラスタにわたって電気エネルギを分配するための方法、およびこのようなシステムにおいて使用される制御部 |
Country Status (9)
Country | Link |
---|---|
US (1) | US9964933B2 (ja) |
EP (2) | EP2608123B1 (ja) |
JP (1) | JP6203748B2 (ja) |
DK (1) | DK2608123T3 (ja) |
ES (1) | ES2616207T3 (ja) |
HK (2) | HK1186826A1 (ja) |
PL (1) | PL2608123T3 (ja) |
PT (1) | PT2608123T (ja) |
WO (1) | WO2013093119A1 (ja) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9703308B2 (en) * | 2011-04-15 | 2017-07-11 | Vlaamse Instelling Voor Technologisch Onderzoek (Vito) | Method for distributing an energy flow over a predetermined period of time to a cluster of a plurality of devices taking into account constraints relating to the energy to be delivered to the devices, a computer program for performing such a method and a system therefor |
ES2818048T3 (es) | 2015-08-31 | 2021-04-09 | Otis Elevator Co | Puesta en servicio automática de controlador para convertidores electrónicos de potencia activos trifásicos |
CN108604310B (zh) | 2015-12-31 | 2022-07-26 | 威拓股份有限公司 | 用于使用神经网络架构来控制分配***的方法、控制器和*** |
US10348630B2 (en) * | 2017-04-24 | 2019-07-09 | Facebook, Inc. | Load balancing based on load projections for events |
CN109003002A (zh) * | 2018-08-14 | 2018-12-14 | 中国南方电网有限责任公司超高压输电公司 | 一种节能型输电网的技术评价标准体系的构建方法 |
EP3660612B1 (en) * | 2018-11-30 | 2022-12-28 | Siemens Aktiengesellschaft | Method and system for elimination of fault conditions in a technical installation |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3671680B2 (ja) * | 1998-07-13 | 2005-07-13 | 株式会社日立製作所 | 電力設備の状況に適応する負荷制御装置を備えた電力系統 |
US7142949B2 (en) * | 2002-12-09 | 2006-11-28 | Enernoc, Inc. | Aggregation of distributed generation resources |
JP2005045866A (ja) * | 2003-07-22 | 2005-02-17 | Fuji Xerox Co Ltd | 電力制御システム |
FR2876475A1 (fr) * | 2004-10-07 | 2006-04-14 | Yves Claude Luc Beck | Dispositif d'optimatisation multisites en temps reel des energies electriques permettant le profilage et la modelisation de ces energies |
EP1955276A4 (en) | 2005-11-14 | 2011-02-16 | Sempa Power Systems Ltd | SYSTEM ENERGY MANAGEMENT SYSTEM |
US20080040223A1 (en) * | 2006-08-10 | 2008-02-14 | V2 Green Inc. | Electric Resource Module in a Power Aggregation System for Distributed Electric Resources |
US8363069B2 (en) * | 2006-10-25 | 2013-01-29 | Abl Ip Holding Llc | Calibration method and apparatus for lighting fixtures using multiple spectrum light sources and light mixing |
US20090228324A1 (en) * | 2008-03-04 | 2009-09-10 | Ronald Ambrosio | Method and System for Efficient Energy Distribution in Electrical Grids Using Sensor and Actuator Networks |
US8674544B2 (en) * | 2009-01-26 | 2014-03-18 | Geneva Cleantech, Inc. | Methods and apparatus for power factor correction and reduction of distortion in and noise in a power supply delivery network |
EP2389617A4 (en) * | 2009-01-26 | 2015-02-25 | Geneva Cleantech Inc | ENERGY CONSUMPTION MONITORING WITH A REMOTE DISPLAY AND AUTOMATIC DETECTION OF A DEVICE WITH A GRAPHIC USER INTERFACE |
GB2479908B (en) * | 2010-04-28 | 2013-07-10 | Toshiba Res Europ Ltd | Apparatus and method for privacy-driven moderation of metering data |
US8716887B2 (en) * | 2010-06-03 | 2014-05-06 | General Electric Company | Systems and apparatus for monitoring and selectively controlling a load in a power system |
-
2011
- 2011-12-23 PL PL11195718T patent/PL2608123T3/pl unknown
- 2011-12-23 PT PT111957189T patent/PT2608123T/pt unknown
- 2011-12-23 ES ES11195718.9T patent/ES2616207T3/es active Active
- 2011-12-23 DK DK11195718.9T patent/DK2608123T3/en active
- 2011-12-23 EP EP11195718.9A patent/EP2608123B1/en active Active
-
2012
- 2012-12-24 WO PCT/EP2012/076882 patent/WO2013093119A1/en active Application Filing
- 2012-12-24 EP EP12816668.3A patent/EP2795545A1/en not_active Withdrawn
- 2012-12-24 JP JP2014548109A patent/JP6203748B2/ja not_active Expired - Fee Related
-
2013
- 2013-12-27 HK HK13114341.2A patent/HK1186826A1/zh not_active IP Right Cessation
-
2014
- 2014-06-19 US US14/309,419 patent/US9964933B2/en active Active
-
2015
- 2015-03-25 HK HK15103047.0A patent/HK1202687A1/xx unknown
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2015503322A5 (ja) | ||
WO2014151129A3 (en) | Smart scale -culinary ratio system | |
EP2642358A3 (en) | Process control system that controls an industrial process implemented in a plant | |
CN106462129B (zh) | 用于供应网络中的压力控制的方法、装置及供应网络 | |
GB0526069D0 (en) | Method for verifying smart battery failures by measuring input charging voltageand associated systems | |
WO2014076447A3 (en) | Monitoring and control of computer apparatus and virtual machine via a network | |
JP2010262625A5 (ja) | ||
WO2010005667A3 (en) | Method and system of coordination of measurement subsystems of a flow meter | |
MX350537B (es) | Infraestructura de iluminación y modelo de ingresos. | |
MX347293B (es) | Sistemas y métodos de tratamiento de semillas de punto minorista. | |
KR20150001102A (ko) | 가상 머신을 이용한 서버 전력 예측 장치 및 그 방법 | |
TW200511771A (en) | Method and system for remote metering the consumption of electricity, water or gas | |
EP2523142A3 (en) | Feature license management system | |
MX2015000304A (es) | Sistemas y metodos para la evaluacion cuantitativa de una propiedad para renovacion. | |
EP2530859A3 (en) | Power management for audience measurement meters | |
PH12019501654A1 (en) | Power distribution network monitoring system and power distribution network monitoring device | |
WO2015086957A3 (fr) | Prévision d'opérations de maintenance a appliquer sur un moteur | |
JP6203748B2 (ja) | 電気装置のクラスタにわたって電気エネルギを分配するためのシステム、このようなシステムの電気装置のクラスタにわたって電気エネルギを分配するための方法、およびこのようなシステムにおいて使用される制御部 | |
WO2014165208A3 (en) | Meter reading data validation | |
GB2509647A (en) | Testing transaction applications | |
IN2014DN09872A (ja) | ||
FR3014188B1 (fr) | Capteur de mesure, installation de mesure comprenant un tel capteur et un serveur, procede d'echange de donnees et produit programme d'ordinateur associes | |
WO2014039290A3 (en) | Method for energy demand management in a production flow line | |
WO2014036306A3 (en) | System and method for determining a value of information metric from a posterior distribution generated through stochastic inversion | |
JP2013092929A5 (ja) |