JP2015048602A - Cross section measuring device of crossing pipe in bend pipe and cross section measuring method of crossing pipe performed by using the cross section measuring device - Google Patents

Cross section measuring device of crossing pipe in bend pipe and cross section measuring method of crossing pipe performed by using the cross section measuring device Download PDF

Info

Publication number
JP2015048602A
JP2015048602A JP2013179439A JP2013179439A JP2015048602A JP 2015048602 A JP2015048602 A JP 2015048602A JP 2013179439 A JP2013179439 A JP 2013179439A JP 2013179439 A JP2013179439 A JP 2013179439A JP 2015048602 A JP2015048602 A JP 2015048602A
Authority
JP
Japan
Prior art keywords
pipe
line
cross
measuring device
transverse pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013179439A
Other languages
Japanese (ja)
Other versions
JP5992882B2 (en
Inventor
節雄 山田
Setsuo Yamada
節雄 山田
山本 博之
Hiroyuki Yamamoto
博之 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Metropolitan Sewerage Service Corp
Adachi Construction and Industry Co Ltd
Original Assignee
Tokyo Metropolitan Sewerage Service Corp
Adachi Construction and Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Metropolitan Sewerage Service Corp, Adachi Construction and Industry Co Ltd filed Critical Tokyo Metropolitan Sewerage Service Corp
Priority to JP2013179439A priority Critical patent/JP5992882B2/en
Publication of JP2015048602A publication Critical patent/JP2015048602A/en
Application granted granted Critical
Publication of JP5992882B2 publication Critical patent/JP5992882B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

PROBLEM TO BE SOLVED: To accurately measure a cross section situation by deposits in the crossing pipe through a communication line by disposing the communication line in the crossing pipe of an inverted siphon part of a sewer pipe without damaging a pipe port .SOLUTION: A cross section measuring device is connected to a communication line moving with a desired tension in a crossing pipe, and having a flow rate measuring device section. A cross section situation of the crossing pipe is displayed by applying correction to a flow rate value and obtaining a level flow rate by taking in the speed of the communication line and tilt angle information.

Description

この発明は、曲がり管路における横断管の断面計測装置及び該断面計測装置を使用してなされる横断管の断面計測方法に関し、更に詳しくは、流体管路中の対向する立孔間を直線状の横断管を介して流通状態に接続される曲がり管路において、立孔間の横断管内に高さ及び張力の調整された通線が配され、該通線に連結されて使用される横断管の断面計測装置並びに該断面計測装置を使用してなされる横断管の断面計測方法に関する。
本発明は特には、下水道管路における伏越し部の横断管に適用されて好適な当該計測装置及び計測方法に関する。
The present invention relates to a cross-section measuring apparatus for a cross pipe in a bent pipe and a cross-section measuring method for a cross pipe made using the cross-section measuring apparatus. More specifically, the present invention relates to a straight line between opposing vertical holes in a fluid pipe. In a bent pipe line connected in a flowing state via a transverse pipe of the same, a crossing pipe whose height and tension are adjusted is arranged in the transverse pipe between the vertical holes, and is used by being connected to the through line This invention relates to a cross-section measuring apparatus and a cross-section measuring method for a transverse pipe made using the cross-section measuring apparatus.
In particular, the present invention relates to the measurement apparatus and the measurement method that are suitable for being applied to a cross pipe of an overhanging part in a sewer pipe.

下水道管路における伏越し部の人孔、更にはその横断管に溜まる土砂は下水道の流通に障害となり、その除去のため種々の工法が提案されている。
しかし、堆積土砂の除去に先立って、当該横断管内の堆積の状況を把握するための計測が重要であることは論を俟たないが、従来より伏越し部の横断管内の計測に係る技術はその過酷な状況から全く手が付けられておらず、計測、更にはその後の除去・清掃作業の一貫して行われる技術は未だ確立していない。
なお、上記の除去工法の一公知例として特開平10−131278のものは、通線ワイヤーに重量性の大型の球状体を取り付け、該球状体を横断管内を逆流移動させて横断管内の堆積物を除去するものであるが、これによれば、通線に大きな荷重負担が掛かり、管口に設置される滑車に負荷を与え、管口の損傷は避けられない。さらには、当該滑車を管口にどのように設置するのか何ら具体的な対策も採られていない。
なお、このような問題・状況は、下水道管路に留まらずその他の管路(上水管、パイプライン)においても起こり得ることである。
The manholes in the overlying part of the sewer pipes and the earth and sand collected in the cross pipes obstruct the circulation of the sewer, and various methods have been proposed for the removal.
However, it is obvious that the measurement for grasping the state of sedimentation in the crossing pipe is important prior to the removal of sediment, but the technology related to the measurement in the crossing pipe in the overpass has been Because of the harsh conditions, nothing has been done, and the technology for consistent measurement, measurement, and subsequent removal and cleaning work has not yet been established.
In addition, as a known example of the above-described removal method, Japanese Patent Application Laid-Open No. 10-131278 discloses a deposit in a transverse pipe by attaching a heavy heavy spherical body to a wire and moving the spherical body in a reverse flow in the transverse pipe. However, according to this, a heavy load load is applied to the line, and a load is applied to the pulley installed in the pipe opening, and damage to the pipe opening cannot be avoided. Furthermore, no specific measures are taken as to how to install the pulley at the pipe opening.
Such a problem / situation can occur not only in the sewer pipe but also in other pipes (water pipes, pipelines).

特開平10−131278号公報JP-A-10-131278

本発明は上記実情に鑑みてなされたものであり、流体管路中の対向する立孔間の横断管内における付着物(堆積物)、特には下水道管路の伏越し部の横断管路内における土砂の付着物の固着状況を正確かつ迅速(実時間で)に計測できる
計測装置及び計測方法を実現することを目的とする。
本発明はこのため、立孔から横断管にわたって所期の張力をもって移動可能に架設される通線を介し、該通線の所期位置及び所期のたわみ、傾斜角に基づき該通線に配された測定装置の位置決めをなすことにより、この課題を達成できるとの知見に基づいてなされたものである。
The present invention has been made in view of the above circumstances, and deposits (sediments) in the cross pipe between the adjacent vertical holes in the fluid pipe, particularly in the cross pipe in the overhanging part of the sewer pipe. It is an object of the present invention to provide a measuring device and a measuring method capable of accurately and promptly (in real time) measuring the state of adhesion of earth and sand deposits.
For this reason, according to the present invention, a line that is movably installed with a predetermined tension from the vertical hole to the cross pipe is arranged on the line based on the intended position, the desired deflection, and the inclination angle of the line. This is based on the knowledge that this problem can be achieved by positioning the measuring device.

本発明の曲がり管路における横断管の断面計測装置及び該断面計測装置を使用してなされる横断管の断面計測方法は具体的には以下の構成を採る。
(第1発明)
本発明の第1は、曲がり管路に配される通線とともに使用される横断管の断面計測装置に係り、請求項1に記載のとおり、
上流から下流への流体の流れをなす流体管路の、対向する立孔間を直線状の横断管を介して流通状態に接続される曲がり管路において、
前記立孔及び横断管にわたって配されるとともに該立孔及び横断管の軸方向に所期の張力をもって移動する通線に連結されて使用される該断管の断面計測装置であって、
前記通線には取付け台車が介装され、
前記通線の取付け台車との取付け部を介して流速計測装置部が取り付けられてなる、
ことを特徴とする。
本第1発明は、以下の実施形態でより具体的に示され、かつはその実施形態より抽出される発明概念である。
上記において、
1)「流体管路」は上下水道、パイプラインを含む。
2)本通線の作動において、流体管路の流体は流通(通水)状態にあるが、非流通(非通水)状態を除外しない。
3)横断管の「直線状」は、水平に限定されず、傾斜状態を除外するものではない
また、上記構成において、
1)流速計測装置部のセンサーは電磁流速計であること、
2)流速計測装置部のセンサーは電気流速計であること(該電気流速計はプロペラ駆動を含む)、
3)センサーには計測値の傾斜角度補正機能を有すること、
4)センサーによる計測値は外部の傾斜角度補正機能部により補正を受けること、
5)本断面計測装置の連結される通線は、次のようにして配すること、
すなわち、下端に所定の曲率の曲がり部よりなる管口保護部を有し、その長手方向に通線の誘導路が形成されたレール材を、該管口保護部を横断管の管口に臨ませるとともに、相対する立孔のそれぞれの壁面に沿って立設し、該両立孔の上位に配された各ウインチにより当該通線を該レール材の誘導路に沿って所定の張力をもって誘導し、立孔間の横断管内に高さ及び張力を調整して配すること、
は適宜採択される選択的事項である。
なお、1)〜5)は矛盾しない限りにおいて互いに組合せ可能である。
Specifically, the cross-section measurement apparatus for a cross pipe in a bent pipe and the cross-section measurement method for a cross pipe made using the cross-section measurement apparatus of the present invention have the following configurations.
(First invention)
1st of this invention is related with the cross-section measuring apparatus of the crossing pipe used with the communication line distribute | arranged to a curved pipe line, As described in Claim 1,
In the bent pipe line connected to the flow state through the straight transverse pipe between the opposing vertical holes of the fluid pipe line that forms the flow of fluid from the upstream to the downstream,
A cross-section measuring device for the broken pipe used by being connected to a line that is arranged over the vertical hole and the transverse pipe and moves with an intended tension in the axial direction of the vertical hole and the transverse pipe,
A mounting carriage is interposed in the line,
A flow velocity measuring device part is attached via an attachment part with the attachment carriage of the line,
It is characterized by that.
The first invention is an inventive concept that is more specifically shown in the following embodiment and extracted from the embodiment.
In the above,
1) “Fluid pipeline” includes water and sewage systems and pipelines.
2) In the operation of the main line, the fluid in the fluid pipe line is in a circulation (water flow) state, but a non-flow (non-water flow) state is not excluded.
3) The “straight line” of the transverse pipe is not limited to the horizontal, and does not exclude the inclined state.
1) The sensor of the flow velocity measuring device is an electromagnetic current meter,
2) The sensor of the flow velocity measuring device is an electric velocity meter (this electric velocity meter includes a propeller drive),
3) The sensor has a function of correcting the tilt angle of the measured value,
4) The measured value by the sensor is corrected by an external tilt angle correction function unit,
5) The connecting line of this cross-section measuring device should be arranged as follows:
That is, a rail member having a pipe opening protection portion formed of a bent portion having a predetermined curvature at the lower end and having a through-duct guide path formed in the longitudinal direction thereof is exposed to the pipe opening of the transverse pipe. And standing up along the respective wall surfaces of the opposing vertical holes, and guiding each through line with a predetermined tension along the guide path of the rail material by each winch disposed above the compatible holes, Adjusting the height and tension in the transverse pipe between the vertical holes,
Is an optional matter that is adopted as appropriate.
Note that 1) to 5) can be combined with each other as long as there is no contradiction.

(作用)
本断面計測装置の使用において、流速計測装置部は上流側に向けられ、横断管内の通線は、本断面計測装置の移動する位置において当該計測装置の集中荷重を受けて所期のたわみ及び傾斜角をなす。
すなわち、本断面計測装置はその自重を取付け板を介して通線に作用するが、当該装置の自重及び通線の自重により(浮力も付加される)、所期の張力が導入された通線は当該位置で所期のたわみ量及び傾斜角を現す。
通線の移動に伴い、本流速計測装置部内の速度センサーにより横断管内の各位置の実流速を検知し、
通線の傾斜角情報により補正を加えて横断管内の各位置の水平流速を得、
これにより
横断管内の各位置の堆積状況を表示する。
(Function)
In the use of this cross-section measuring device, the flow velocity measuring device section is directed upstream, and the line in the transverse pipe receives the concentrated load of the measuring device at the position where the cross-section measuring device moves, and the expected deflection and inclination Make a corner.
In other words, this cross-section measuring device applies its own weight to the line through the mounting plate, but due to its own weight and the line's own weight (buoyancy is also added), the line having the desired tension introduced. Indicates the desired amount of deflection and angle of inclination at that position.
As the line moves, the actual flow velocity at each position in the cross pipe is detected by the velocity sensor in the flow velocity measuring device.
The horizontal flow velocity at each position in the crossing pipe is obtained by correcting with the inclination angle information of the line,
As a result, the deposition status at each position in the transverse pipe is displayed.

(第2発明)
本発明の第2は、曲がり管路に配される通線とともに使用される横断管の断面計測装置に係り、請求項3に記載のとおり、
上流から下流への流体の流れをなす流体管路の、対向する立孔間を直線状の横断管を介して流通状態に接続される曲がり管路において、
前記立孔及び横断管にわたって配されるとともに該立孔及び横断管の軸方向に所期の張力をもって移動する通線に連結されて使用される該断管の断面計測装置であって、
前記通線の配設は、下端に所定の曲率の曲がり部よりなる管口保護部を有し、その長手方向に通線の誘導路が形成されたレール材を、該管口保護部を横断管の管口に臨ませるとともに、相対する立孔のそれぞれの壁面に沿って立設し、該両立孔の上位に配された各ウインチにより当該通線を該レール材の誘導路に沿って所定の張力をもって誘導し、立孔間の横断管内に高さ及び張力を調整してなし、 前記通線には取付け台車が介装され、
前記通線の取付け台車との取付け部を介して流速計測装置部が取り付けられてなる、
ことを特徴とする。
本第2発明は、以下の実施形態でより具体的に示され、かつはその実施形態より抽出される発明概念である。
上記において、
1)「流体管路」は上下水道、パイプラインを含む。
2)本通線の作動において、流体管路の流体は流通(通水)状態にあるが、非流通(非通水)状態を除外しない。
3)横断管の「直線状」は、水平に限定されず、傾斜状態を除外するものではない
また、上記構成において、
1)流速計測装置部のセンサーは電磁流速計であること、
2)流速計測装置部のセンサーは電気流速計であること(該電気流速計はプロペラ駆動を含む)、
3)センサーには計測値の傾斜角度補正機能を有すること、
4)センサーによる計測値は外部の傾斜角度補正機能部により補正を受けること、
は適宜採択される選択的事項である。
なお、1)〜4)は矛盾しない限りにおいて互いに組合せ可能である。
(Second invention)
A second aspect of the present invention relates to a cross-section measuring device for a transverse pipe used together with a line arranged in a curved pipe line, as described in claim 3,
In the bent pipe line connected to the flow state through the straight transverse pipe between the opposing vertical holes of the fluid pipe line that forms the flow of fluid from the upstream to the downstream,
A cross-section measuring device for the broken pipe used by being connected to a line that is arranged over the vertical hole and the transverse pipe and moves with an intended tension in the axial direction of the vertical hole and the transverse pipe,
In the arrangement of the through wire, a rail member having a pipe port protecting portion formed of a bent portion having a predetermined curvature at a lower end and having a guide line for the through wire formed in the longitudinal direction thereof is crossed over the pipe port protecting portion. It faces the pipe mouth of the pipe, and stands along each wall surface of the opposite vertical hole, and the wiring is predetermined along the guide path of the rail material by each winch arranged above the compatible hole. The height and tension are adjusted in the transverse pipe between the vertical holes, and a mounting carriage is interposed in the line,
A flow velocity measuring device part is attached via an attachment part with the attachment carriage of the line,
It is characterized by that.
The second invention is an inventive concept that is more specifically shown in the following embodiment and extracted from the embodiment.
In the above,
1) “Fluid pipeline” includes water and sewage systems and pipelines.
2) In the operation of the main line, the fluid in the fluid pipe line is in a circulation (water flow) state, but a non-flow (non-water flow) state is not excluded.
3) The “straight line” of the transverse pipe is not limited to the horizontal, and does not exclude the inclined state.
1) The sensor of the flow velocity measuring device is an electromagnetic current meter,
2) The sensor of the flow velocity measuring device is an electric velocity meter (this electric velocity meter includes a propeller drive),
3) The sensor has a function of correcting the tilt angle of the measured value,
4) The measured value by the sensor is corrected by an external tilt angle correction function unit,
Is an optional matter that is adopted as appropriate.
Note that 1) to 4) can be combined with each other as long as no contradiction arises.

(作用)
ウインチによる通線への張力の導入において、管口はレール材の管口保護部により保護され、管口の損傷はない。更に、通線は曲がり部に沿って配されるので当該曲がり部において応力集中がなく、張力の均等な伝達がなされる。
レール材の管口保護部を管口に臨んで配されることにより、通線は横断管内において高さの調整された配置を採ることになる。
本断面計測装置の使用において、流速計測装置部は上流側に向けられ、横断管内の通線は、本断面計測装置の移動する位置において当該計測装置の集中荷重を受けて所期のたわみ及び傾斜角をなす。
すなわち、本断面計測装置はその自重を取付け板を介して通線に作用するが、当該装置の自重及び通線の自重により(浮力も付加される)、所期の張力が導入された通線は当該位置で所期のたわみ量及び傾斜角を現す。
通線の移動に伴い、本速度計測装置部内の速度センサーにより横断管内の各位置の実流速を検知し、通線の傾斜角情報により補正を加えて横断管内の各位置の水平流速を得、
これにより
横断管内の各位置の堆積状況を表示する。
(Function)
In the introduction of the tension to the communication line by the winch, the tube port is protected by the tube port protecting part of the rail material, and the tube port is not damaged. Furthermore, since the through line is arranged along the bent portion, there is no stress concentration in the bent portion, and the tension is evenly transmitted.
By arranging the pipe port protecting portion of the rail material so as to face the pipe port, the through line takes an arrangement in which the height is adjusted in the transverse pipe.
In the use of this cross-section measuring device, the flow velocity measuring device section is directed upstream, and the line in the transverse pipe receives the concentrated load of the measuring device at the position where the cross-section measuring device moves, and the expected deflection and inclination Make a corner.
In other words, this cross-section measuring device applies its own weight to the line through the mounting plate, but due to its own weight and the line's own weight (buoyancy is also added), the line having the desired tension introduced. Indicates the desired amount of deflection and angle of inclination at that position.
Along with the movement of the line, the actual flow velocity at each position in the transverse pipe is detected by the speed sensor in the speed measuring device, and the horizontal flow velocity at each position in the transverse pipe is obtained by correcting the inclination angle information of the line.
As a result, the deposition status at each position in the transverse pipe is displayed.

(第3発明)
本発明の第3は、曲がり管路における横断管の断面計測方法に係り、請求項4に記載のとおり、
上流から下流への流体の流れをなす流体管路の、対向する立孔間を直線状の横断管を介して流通状態に接続される曲がり管路において、
前記立孔及び横断管にわたって配されるとともに該立孔及び横断管の軸方向に所期の張力をもって移動する通線に連結されて使用され、
前記通線には取付け台車が介装され、
前記通線の取付け台車との取付け部を介して流速計測装置部が取り付けられてなる断面計測装置を使用してなされる横断管の断面計測方法であって、
前記通線の移動とともに、前記流速計測装置部より流速を計測し、上記通線の移動量と上記計測値を情報処理し、当該横断管の断面状況を計測する、
ことを特徴とする。
本第3発明は、以下の実施形態でより一層具体的に示され、かつはその実施形態より抽出される発明概念である。
上記において、
1)「流体管路」は上下水道、パイプラインを含む。
2)本通線の作業において、流体管路の流体は流通(通水)状態にあるが、非流通(非通水)状態を除外しない。
3)横断管の「直線状」は、水平に限定されず、傾斜状態を除外するものではない。
4)通線の「移動位置」は、通線の横断管での軸方向移動量、本断面計測装置の存する位置での通線のたわみ及び傾斜角を含む。
また、上記構成において、
1)流速計測装置部のセンサーは電磁流速計であること、
2)流速計測装置部のセンサーは電気流速計であること(該電気流速計はプロペラ駆動を含む)、
3)センサーには計測値の傾斜角度補正機能を有すること、
4)センサーによる計測値は外部の傾斜角度補正機能部により補正を受けること、
5)本断面計測装置の連結される通線は、次のようにして配すること、
すなわち、下端に所定の曲率の曲がり部よりなる管口保護部を有し、その長手方向に通線の誘導路が形成されたレール材を、該管口保護部を横断管の管口に臨ませるとともに、相対する立孔のそれぞれの壁面に沿って立設し、該両立孔の上位に配された各ウインチにより当該通線を該レール材の誘導路に沿って所定の張力をもって誘導し、立孔間の横断管内に高さ及び張力を調整して配すること、
は適宜採択される選択的事項である。
なお、1)〜5)は矛盾しない限りにおいて互いに組合せ可能である。
(Third invention)
3rd of this invention is related with the cross-section measuring method of the crossing pipe in a curved pipe line, As described in Claim 4,
In the bent pipe line connected to the flow state through the straight transverse pipe between the opposing vertical holes of the fluid pipe line that forms the flow of fluid from the upstream to the downstream,
Used across the vertical hole and the transverse pipe and connected to a line that moves with the desired tension in the axial direction of the vertical hole and the transverse pipe,
A mounting carriage is interposed in the line,
A cross-section measurement method for a transverse pipe, which is performed using a cross-section measurement device to which a flow velocity measurement device portion is attached via an attachment portion with an attachment carriage of the line,
Along with the movement of the line, the flow velocity is measured from the flow velocity measuring device, the movement amount of the line and the measured value are processed, and the cross-sectional state of the transverse pipe is measured.
It is characterized by that.
The third invention is an invention concept that is more specifically shown in the following embodiment and extracted from the embodiment.
In the above,
1) “Fluid pipeline” includes water and sewage systems and pipelines.
2) In the operation of the main line, the fluid in the fluid pipe line is in a circulation (water flow) state, but a non-flow (non-water flow) state is not excluded.
3) The “straight line” of the transverse tube is not limited to horizontal, and does not exclude the inclined state.
4) The “movement position” of the line includes the amount of axial movement of the line in the crossing tube, the deflection of the line at the position where the cross-section measuring device exists, and the inclination angle.
In the above configuration,
1) The sensor of the flow velocity measuring device is an electromagnetic current meter,
2) The sensor of the flow velocity measuring device is an electric velocity meter (this electric velocity meter includes a propeller drive),
3) The sensor has a function of correcting the tilt angle of the measured value,
4) The measured value by the sensor is corrected by an external tilt angle correction function unit,
5) The connecting line of this cross-section measuring device should be arranged as follows:
That is, a rail member having a pipe opening protection portion formed of a bent portion having a predetermined curvature at the lower end and having a through-duct guide path formed in the longitudinal direction thereof is exposed to the pipe opening of the transverse pipe. And standing up along the respective wall surfaces of the opposing vertical holes, and guiding each through line with a predetermined tension along the guide path of the rail material by each winch disposed above the compatible holes, Adjusting the height and tension in the transverse pipe between the vertical holes,
Is an optional matter that is adopted as appropriate.
Note that 1) to 5) can be combined with each other as long as there is no contradiction.

(作用)
本断面計測方法において、流速計測装置部は上流側に向けられる。
横断管内の通線は、本断面計測装置の移動する位置において当該計測装置の集中荷重を受けて所期のたわみ及び傾斜角をなす。
すなわち、本断面計測装置はその自重を取付け板を介して通線に作用するが、当該装置の自重及び通線の自重により(浮力も付加される)、所期の張力が導入された通線は当該位置で所期のたわみ量及び傾斜角を現す。
通線の上流から下流への移動に伴い、本流速計測装置部内の速度センサーにより横断管内の各位置の実流速を検知し、通線の傾斜角情報により補正を加えて横断管内の各位置の水平流速を得る。
この水平流速情報に基づいて、通線の移動とともに横断管の各断面の断面状況を表示する。
(Function)
In this cross-section measuring method, the flow velocity measuring device is directed upstream.
The line in the transverse pipe is subjected to the concentrated load of the measuring device at the position where the cross-section measuring device moves, and forms the desired deflection and inclination angle.
In other words, this cross-section measuring device applies its own weight to the line through the mounting plate, but due to its own weight and the line's own weight (buoyancy is also added), the line having the desired tension introduced. Indicates the desired amount of deflection and angle of inclination at that position.
As the line moves from upstream to downstream, the actual flow velocity at each position in the crossing pipe is detected by the speed sensor in the flow velocity measuring device, and the position of each position in the crossing pipe is corrected by correcting the inclination angle information of the line. Obtain the horizontal flow rate.
Based on the horizontal flow velocity information, the cross-sectional state of each cross section of the crossing tube is displayed along with the movement of the line.

(第4発明)
本発明の第4は、曲がり管路における横断管の断面計測方法に係り、請求項6に記載のとおり、
上流から下流への流体の流れをなす流体管路の、対向する立孔間を直線状の横断管を介して流通状態に接続される曲がり管路において、
前記立孔及び横断管にわたって配されるとともに該立孔及び横断管の軸方向に所期の張力をもって移動する通線に連結されて使用され、
前記通線には取付け台車が介装され、
前記通線の取付け台車との取付け部を介して流速計測装置部が取り付けられてなる断面計測装置を使用してなされる横断管の断面計測方法であって、
通線の配設は、下端に所定の曲率の曲がり部よりなる管口保護部を有し、その長手方向に通線の誘導路が形成されたレール材を、該管口保護部を横断管の管口に臨ませるとともに、相対する立孔のそれぞれの壁面に沿って立設し、該両立孔の上位に配された各ウインチにより当該通線を該レール材の誘導路に沿って所定の張力をもって誘導し、立孔間の横断管内に高さ及び張力を調整して配設され、
前記通線の移動とともに、前記流速計測装置部より流速を計測し、上記通線の移動量と上記計測値を情報処理し、当該横断管の断面状況を計測する、
ことを特徴とする。
本第4発明は、以下の実施形態でより一層具体的に示され、かつはその実施形態より抽出される発明概念である。
上記において、
1)「流体管路」は上下水道、パイプラインを含む。
2)本通線の作業において、流体管路の流体は流通(通水)状態にあるが、非流通(非通水)状態を除外しない。
3)横断管の「直線状」は、水平に限定されず、傾斜状態を除外するものではない。
4)通線の「移動位置」は、通線の横断管での軸方向移動量、本断面計測装置の存する位置での通線のたわみ及び傾斜角を含む。
また、上記構成において、
1)流速計測装置部のセンサーは電磁流速計であること、
2)流速計測装置部のセンサーは電気流速計であること(該電気流速計はプロペラ駆動を含む)、
3)センサーには計測値の傾斜角度補正機能を有すること、
4)センサーによる計測値は外部の傾斜角度補正機能部により補正を受けること、
は適宜採択される選択的事項である。
なお、1)〜4)は矛盾しない限りにおいて互いに組合せ可能である。
(Fourth invention)
4th of this invention is related with the cross-sectional measurement method of the crossing pipe in a curved pipe line, As described in Claim 6,
In the bent pipe line connected to the flow state through the straight transverse pipe between the opposing vertical holes of the fluid pipe line that forms the flow of fluid from the upstream to the downstream,
Used across the vertical hole and the transverse pipe and connected to a line that moves with the desired tension in the axial direction of the vertical hole and the transverse pipe,
A mounting carriage is interposed in the line,
A cross-section measurement method for a transverse pipe, which is performed using a cross-section measurement device to which a flow velocity measurement device portion is attached via an attachment portion with an attachment carriage of the line,
In the arrangement of the through wire, a rail member having a pipe port protecting portion consisting of a bent portion with a predetermined curvature at the lower end and having a through wire guiding path formed in the longitudinal direction of the rail material is passed through the pipe port protecting portion. And the standing line along each wall surface of the opposite vertical hole, and the winch arranged above the compatible hole is used to pass the wire along the guide path of the rail material. Inducted with tension, arranged in the transverse tube between the vertical holes with height and tension adjusted,
Along with the movement of the line, the flow velocity is measured from the flow velocity measuring device, the movement amount of the line and the measured value are processed, and the cross-sectional state of the transverse pipe is measured.
It is characterized by that.
The fourth invention is an inventive concept that is more specifically shown in the following embodiment and extracted from the embodiment.
In the above,
1) “Fluid pipeline” includes water and sewage systems and pipelines.
2) In the operation of the main line, the fluid in the fluid pipe line is in a circulation (water flow) state, but a non-flow (non-water flow) state is not excluded.
3) The “straight line” of the transverse tube is not limited to horizontal, and does not exclude the inclined state.
4) The “movement position” of the line includes the amount of axial movement of the line in the crossing tube, the deflection of the line at the position where the cross-section measuring device exists, and the inclination angle.
In the above configuration,
1) The sensor of the flow velocity measuring device is an electromagnetic current meter,
2) The sensor of the flow velocity measuring device is an electric velocity meter (this electric velocity meter includes a propeller drive),
3) The sensor has a function of correcting the tilt angle of the measured value,
4) The measured value by the sensor is corrected by an external tilt angle correction function unit,
Is an optional matter that is adopted as appropriate.
Note that 1) to 4) can be combined with each other as long as no contradiction arises.

(作用)
ウインチによる通線への張力の導入において、管口はレール材の管口保護部により保護され、管口の損傷はない。更に、通線は曲がり部に沿って配されるので当該曲がり部において応力集中がなく、張力の均等な伝達がなされる。
レール材の管口保護部を管口に臨んで配されることにより、通線は横断管内において高さの調整された配置を採ることになる。
本断面計測方法において、流速計測装置部は上流側に向けられる。
横断管内の通線は、本断面計測装置の移動する位置において当該計測装置の集中荷重を受けて所期のたわみ及び傾斜角をなす。すなわち、本断面計測装置はその自重を取付け板を介して通線に作用するが、当該装置の自重及び通線の自重により(浮力も付加される)、所期の張力が導入された通線は当該位置で所期のたわみ量及び傾斜角を現す。
通線の上流から下流への移動に伴い、本流速計測装置部内の速度センサーにより横断管内の各位置の実流速を検知し、通線の傾斜角情報により補正を加えて横断管内の各位置の水平流速を得る。
この水平流速情報に基づいて、通線の移動とともに横断管の各断面の断面状況を表示する。
(Function)
In the introduction of the tension to the communication line by the winch, the tube port is protected by the tube port protecting part of the rail material, and the tube port is not damaged. Furthermore, since the through line is arranged along the bent portion, there is no stress concentration in the bent portion, and the tension is evenly transmitted.
By arranging the pipe port protecting portion of the rail material so as to face the pipe port, the through line takes an arrangement in which the height is adjusted in the transverse pipe.
In this cross-section measuring method, the flow velocity measuring device is directed upstream.
The line in the transverse pipe is subjected to the concentrated load of the measuring device at the position where the cross-section measuring device moves, and forms the desired deflection and inclination angle. In other words, this cross-section measuring device applies its own weight to the line through the mounting plate, but due to its own weight and the line's own weight (buoyancy is also added), the line having the desired tension introduced. Indicates the desired amount of deflection and angle of inclination at that position.
As the line moves from upstream to downstream, the actual flow velocity at each position in the crossing pipe is detected by the speed sensor in the flow velocity measuring device, and the position of each position in the crossing pipe is corrected by correcting the inclination angle information of the line. Obtain the horizontal flow rate.
Based on the horizontal flow velocity information, the cross-sectional state of each cross section of the crossing tube is displayed along with the movement of the line.

本発明の曲がり管路における横断管の断面計測装置及び該断面計測装置を使用してなされる横断管の断面計測方法によれば、横断管内に配される通線が移動とともに所期のたわみ及び傾斜角を採り、これに連動して計測装置の位置決めがなされ、かつ、検出された流速値の移動速度補正及び傾斜補正がなされて正確な流速値を得ることができ、これにより横断管内の各位置の正確な断面状況を得ることができる。   According to the cross-section measurement apparatus for a cross pipe in a bent pipe and the cross-section measurement method for a cross pipe made using the cross-section measurement apparatus according to the present invention, the passage line arranged in the cross pipe moves with the desired deflection and Taking the inclination angle, the measuring device is positioned in conjunction with it, and the movement velocity correction and inclination correction of the detected flow velocity value are performed to obtain an accurate flow velocity value. An accurate cross-sectional situation of the position can be obtained.

本発明の適用される下水道管路の伏越し部の概略構成図。The schematic block diagram of the overhanging part of the sewer pipe to which this invention is applied. 公知技術の説明図面。FIG. レール材の全体側面図。The whole rail material side view. レール材の部分図であって、(a)は図3の4−4線断面図、(b)は(a)の4方向矢視図。It is a fragmentary figure of a rail material, Comprising: (a) is 4-4 sectional view taken on the line of FIG. 3, (b) is a 4-direction arrow directional view of (a). レール材の分割態様を示す図。The figure which shows the division | segmentation aspect of a rail material. レール材の下端部を示し、(a)はその側面図、(b)は(a)の6方向矢視図。The lower end part of a rail material is shown, (a) is the side view, (b) is a six-direction arrow view of (a). 作業装置の一部断面側面図。The partial cross section side view of a working device. 作業装置の平面図。The top view of a working device. 先導管装置Tにおける取付け台車のレール材への組付け図。The assembly figure to the rail material of the attachment trolley | bogie in the tip conduit apparatus T. FIG. 取付け台車の詳細構造を示す一部断面側面図(図11の10方向矢視図)。The partial cross section side view which shows the detailed structure of an attachment trolley | bogie (10 direction arrow line view of FIG. 11). 取付け台車の正面図(図10の11方向矢視図)。The front view of an attachment trolley | bogie (11 direction arrow line view of FIG. 10). 先導管装置Tの動作図。The operation | movement figure of the tip conduit apparatus T. FIG. 計測装置Vの構成を示す側面図(図14、図15の13方向矢視図)。The side view which shows the structure of the measuring device V (13 direction arrow line view of FIG. 14, FIG. 15). 計測装置Vの平面図(図13、図14の14方向矢視図)。The top view of the measuring device V (14 direction arrow line view of FIG. 13, FIG. 14). 計測装置Vの正面図(図12の15方向矢視図)。The front view of the measuring device V (15 direction arrow view of FIG. 12). 計測装置Vに係る信号処理構成を示すブロック図。The block diagram which shows the signal processing structure concerning the measuring device V. FIG. パイプラインにおける実施の態様を示す一部断面全体側面図。The partial cross section whole side view which shows the embodiment in a pipeline.

本発明の曲がり管路における横断管の断面計測装置及び該断面計測装置を使用してなされる横断管の断面計測方法の実施の形態を図面に基づいて説明する。
図1〜図16は本発明の一実施形態である下水道管路の伏越し部への適用を示す。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of a cross-section measuring apparatus for a cross pipe in a bent pipe and a cross-section measuring method for a cross pipe made using the cross-section measuring apparatus according to the present invention will be described with reference to the drawings.
FIGS. 1-16 shows the application to the overhanging part of the sewer pipe line which is one Embodiment of this invention.

図1は一般的な下水道管路の伏越し部を示す。図において、1は人孔(1Aは上流側人孔、1Bは下流側人孔)、2は人孔1A,1B間の横断管路(伏越し管路)、3Aは上流側管路、3Bは下流側管路、を示す。これらより曲がり管路を形成する。また、Hは地表の路盤、Iは伏越し人孔部内の土砂等の付着物である。
しかして、この伏越し部において、人孔1内にレール材5が立て込まれ、該レール材5に案内されて通線6が誘導される。地上には人孔1の開口部1aに臨んで作業装置Sが配され、該作業装置Sに搭載されたウインチ7(7Aは上流側ウインチ、7Bは下流側ウインチ)により、通線6の両端を巻き取り・巻き戻して、通線6を移動させ、かつ該通線6に所要の張力を導入する。
FIG. 1 shows an overhanging part of a general sewer line. In the figure, 1 is a human hole (1A is an upstream human hole, 1B is a downstream human hole), 2 is a transverse pipe line between the human holes 1A and 1B (an overpass pipe line), 3A is an upstream pipe line, 3B Indicates a downstream pipe line. A curved pipe line is formed from these. In addition, H is a roadbed on the ground surface, and I is deposits such as earth and sand in the overpass manhole.
Thus, in this overhanging portion, the rail material 5 is set up in the human hole 1 and is guided by the rail material 5 to guide the through wire 6. A work device S is disposed on the ground facing the opening 1a of the human hole 1, and winches 7 (7A is an upstream winch and 7B is a downstream winch) mounted on the work device S are connected to both ends of the line 6. Is wound and unwound to move the wire 6 and a necessary tension is introduced into the wire 6.

以下、通線6の設置を手順に従って説明する。
(1) 通線6の導通
通線6を上流側地上より上流側人孔1A、伏越し横断管路2、下流側人孔1B、そして下流側地上に導通する。
通線6の伏越し横断管路2内への導通については、本実施形態では従来より使用されている噴射ノズルを用いるが、他の態様を除外しない。当該噴射ノズルは出願人らの特許第2791502号(特許公報では下水道管用洗浄装置)により公知である。
図2は当該特許公報の一図面を示し、ここに、Sは下水道管用洗浄装置(噴射ノズル)、Hはこの装置Sに接続される高圧ホース、Iは圧縮空気ホース、Jはリール、高圧ポンプ、圧縮部を含む駆動部である。
(1a) 地上において、噴射ノズル、高圧水ポンプ、ホースが準備される。
通線(ワイヤー)6の端部を噴射ノズルに結合し、該噴射ノズルとともに上流側人孔1Aに落し込み、該噴射ノズルを上流側人孔1Aの管口に臨ませる。そして、噴射ノズルをそのジェット(噴射流)推進により伏越し横断管2内を下流側に向けて進行させる。
噴射ノズルが下流側人孔1Bに到達したとき、下流側人孔1Bで噴射ノズルの通線を引き上げる。
(1b)上流側及び下流側地上部で通線6を作業装置Sの電動ウインチ7に取り付ける。この状態では通線6は弛んだ状態であるが、ウインチ7の駆動により通線6に必要に応じて速やかに張力が導入される。
Hereinafter, the installation of the line 6 will be described according to the procedure.
(1) Conduction of the communication line 6 The communication line 6 is connected to the upstream human hole 1A, the overpass passage 2, the downstream human hole 1B, and the downstream ground from the upstream ground.
As for the conduction of the line 6 into the overpass passage 2, an injection nozzle that has been conventionally used is used in this embodiment, but other aspects are not excluded. Such an injection nozzle is known from the applicant's patent No. 2791502 (in the patent publication, a sewage pipe cleaning device).
FIG. 2 shows one drawing of the patent publication, wherein S is a cleaning device for a sewer pipe (injection nozzle), H is a high-pressure hose connected to the device S, I is a compressed air hose, J is a reel, and a high-pressure pump. A drive unit including a compression unit.
(1a) An injection nozzle, a high-pressure water pump, and a hose are prepared on the ground.
The end of the wire (wire) 6 is connected to the injection nozzle, dropped together with the injection nozzle into the upstream human hole 1A, and the injection nozzle faces the pipe port of the upstream human hole 1A. Then, the jet nozzle is advanced by the jet (jet flow) propulsion so that the inside of the transverse pipe 2 is advanced toward the downstream side.
When the injection nozzle reaches the downstream side human hole 1B, the line of the injection nozzle is pulled up by the downstream side human hole 1B.
(1b) Attach the line 6 to the electric winch 7 of the work device S on the upstream and downstream ground portions. In this state, the line 6 is in a slack state, but a tension is quickly introduced into the line 6 as needed by driving the winch 7.

(2) レール材5の設置
上流側人孔1A、下流側人孔1Bに管口保護器付きレール材5を設置する。該レール材5には管口部位においてレベル調整材10が適宜付加される。
図3〜図6に該管口保護器付きレール材5の詳細構造を示す。
レール材5は、長尺の鋼(特にはステンレス鋼)製の型材いわゆるC型チャンネルよりなり、上位より鉛直部5A、曲がり部5B、水平部5Cの各部位よりなる。
該型材(C型チャンネル材)の断面構成につき、背面部12(寸法A)、両側面部13(寸法B)、前面部14(寸法C)よりなり、前面部14間に溝15、更に該チャンネル材の内部に溝空間16が形成される。本実施形態として、A12cm、B6cm、C2cm、厚さt3.2mmを採る。
(2) Installation of the rail material 5 The rail material 5 with a pipe opening protector is installed in the upstream side human hole 1A and the downstream side human hole 1B. A level adjusting material 10 is appropriately added to the rail material 5 at the pipe opening portion.
3 to 6 show the detailed structure of the rail member 5 with a tube opening protector.
The rail material 5 is made of a long steel (particularly stainless steel) mold material, a so-called C-type channel, and is composed of vertical parts 5A, bent parts 5B, and horizontal parts 5C from the top.
The cross section of the mold material (C-type channel material) is composed of a back surface portion 12 (dimension A), both side surface portions 13 (dimension B), and a front surface portion 14 (dimension C). A groove space 16 is formed inside the material. As this embodiment, A12cm, B6cm, C2cm, and thickness t3.2mm are taken.

(鉛直部5A)(図3〜図5参照)
鉛直部5Aは、長尺をもって本レール材5の上位部位を占め、その長さは人孔深さを目途として決められる。
更に、鉛直部5Aは、分割体100をもって構成され、各分割体100を継ぎ足して長尺とされる。このため、各分割体100は本体101の上下端にフランジ102(上フランジ102a、下フランジ102b)が形成され、各フランジに開設された穴に締具103のボルト104を挿通し、ナット105を締め込んで接合される。分割体100の長さは1mを標準とし、人力による扱いが容易とされる。
なお、該鉛直部5Aの下端は後記する曲がり部5B及び水平部5Cと一体とされる。
本レール材5の定位置で、レール材5の上端すなわち鉛直部5Aの上端は、地上部に突出し、該地上部で固定把持される。
(曲がり部5B)(図3、図6参照)
曲がり部5Bは、所定の曲率(曲率半径)Rをもって鉛直部5Aに連設される。該Rは本レール材5の人孔1の壁面との距離(間隔)を決め、本実施形態では例えばRは30cmを採る。
本曲がり部5Bにおいて、レール材5の背面部12の背面の中心線上に四分円形状の平板すなわちR(アール)材18が固設される。18aはその水平辺部、18bはその垂直辺部である。該R材18は所定の厚みを有し、間隔保持とともに補剛の機能を果す。
なお、曲がり部5Bにおいて、その背面部12に溝空間16に臨んで複数の円筒状転がり軸受(コロ軸受)を相並べて配する態様を採ることができる。この態様によれば、レール材5内に配される通線6の移動が円滑になされる。
(水平部5C)(図3、図6参照)
水平部5Cは、曲がり部5Bに連設され、定位置において管口の頂部に当接する。該水平部5Cの長さは本レール材5の人孔開口部1aからの挿入に支障のない長さで決められ、本実施形態では開口部が60cmを採るとき15cm程度を相当とする。
しかして、レール材5が通線6を介して所要の引上げ力を受けるとき、該水平部5Cの管口部位では最大の曲げモーメントを受けるものとなる。このため、当該部位ではR材18が補強を担い、更には図3、図6に示すレベル調整材10とともに使用されて補剛を高める。
水平部5Cの先端は、通線6の移動(特には該通線6に移動体が取り付けられる態様において)の便宜に備えて広口部20が形成される。該広口部20はいわゆるラッパ状をなし、20aはその側方へ広がる部位(側方拡開部)であり、20bはその上方へ広がる部位(上方拡開部)である。上方拡開部20bはレベル調整材10を使用するもとで形成されるものであり、レベル調整材10が使用されない場合には不要である。
上記構成において、「管口保護器」は曲がり部5B、水平部5Cによって構成されるが、これに限定されるものではない。
(Vertical part 5A) (refer FIGS. 3-5)
The vertical portion 5A is long and occupies the upper part of the rail member 5, and its length is determined with the human hole depth as a target.
Furthermore, the vertical portion 5A is configured with the divided bodies 100, and is elongated by adding the divided bodies 100 together. For this reason, each divided body 100 is formed with flanges 102 (upper flange 102a and lower flange 102b) at the upper and lower ends of the main body 101, the bolts 104 of the fasteners 103 are inserted into holes formed in the flanges, and nuts 105 are inserted. Tightened and joined. The length of the divided body 100 is 1 m as a standard, and handling by human power is easy.
The lower end of the vertical portion 5A is integrated with a bent portion 5B and a horizontal portion 5C which will be described later.
At the fixed position of the rail member 5, the upper end of the rail member 5, that is, the upper end of the vertical portion 5A protrudes to the ground portion and is fixedly held by the ground portion.
(Bent portion 5B) (see FIGS. 3 and 6)
The bent portion 5B is connected to the vertical portion 5A with a predetermined curvature (curvature radius) R. The R determines the distance (interval) between the rail member 5 and the wall surface of the human hole 1. In the present embodiment, for example, R takes 30 cm.
In the bent portion 5B, a quadrant-shaped flat plate, that is, an R (R) material 18 is fixed on the center line of the back surface of the back surface portion 12 of the rail material 5. 18a is the horizontal side, and 18b is the vertical side. The R material 18 has a predetermined thickness, and performs a stiffening function while maintaining a gap.
In the bent portion 5B, a mode in which a plurality of cylindrical rolling bearings (roller bearings) are arranged side by side facing the groove space 16 on the back surface portion 12 can be adopted. According to this aspect, the through wire 6 arranged in the rail member 5 is smoothly moved.
(Horizontal part 5C) (see FIGS. 3 and 6)
The horizontal portion 5C is connected to the bent portion 5B and abuts on the top of the pipe opening at a fixed position. The length of the horizontal portion 5C is determined by a length that does not hinder the insertion of the rail member 5 from the manhole opening 1a. In the present embodiment, when the opening takes 60 cm, the length is approximately 15 cm.
Therefore, when the rail member 5 receives a required pulling force via the through-wire 6, the maximum bending moment is received at the pipe opening portion of the horizontal portion 5C. For this reason, R material 18 bears reinforcement in the said part, Furthermore, it uses with the level adjustment material 10 shown in FIG. 3, FIG. 6, and raises stiffening.
At the tip of the horizontal portion 5C, a wide-mouthed portion 20 is formed for the convenience of movement of the line 6 (particularly in a mode in which a moving body is attached to the line 6). The wide-mouthed portion 20 has a so-called trumpet shape, 20a is a portion that spreads to the side (side widened portion), and 20b is a portion that spreads upward (upward spread portion). The upper expanding portion 20b is formed when the level adjusting material 10 is used, and is unnecessary when the level adjusting material 10 is not used.
In the above configuration, the “tube opening protector” includes the bent portion 5B and the horizontal portion 5C, but is not limited thereto.

レベル調整材10(図3、図6参照)
レベル調整材10は、上記した曲がり部5B、水平部5Cの上面に当接して配される。10aはその上面、10bはその側面、10cはその下面である。該レベル調整材10のR部には溝が成形され、R材18を受け入れる。
該レベル調整材10は、後記するように、多段にして使用され得る。第1段はレール材5における曲がり部5B、水平部5Cの曲げ補強としても機能する。
Level adjustment material 10 (see FIGS. 3 and 6)
The level adjusting material 10 is disposed in contact with the upper surfaces of the bent portion 5B and the horizontal portion 5C. 10a is the upper surface, 10b is the side surface, and 10c is the lower surface. A groove is formed in the R portion of the level adjusting material 10 to receive the R material 18.
The level adjusting material 10 can be used in multiple stages as will be described later. The first stage also functions as a bending reinforcement for the bent portion 5B and the horizontal portion 5C in the rail member 5.

レール材5の人孔1への設置は次のようにしてなされる。
(2a)
レール材5の下端部すなわち鉛直部5Aの最下端部、曲がり部5B、水平部5Cの一体ものを人孔1の開口部1aより人孔1内へ挿入し、一旦その上端を地上部で把持し、次いで、その上に鉛直部5Aの分割体100をそのフランジ102を介して継ぎ足し、再び人孔1内へ挿入する。レール材5の下端には適宜レベル調整材10が取り付けられている。
以後、レール材5の鉛直部5Aをその分割体100により順次継ぎ足し、長尺のレール材5を得る。
レール材5の下端が管口に臨む位置になるとき、水平部5Cの上面を管口の頂部より一定の間隔を保持しつつ押し込み、しかる後、レール材5を引き上げ、水平部5Cの上面、もしくはレベル調整材10の上面を管口の頂部に当接させる。(2b)
レール材5の鉛直部5Aはその下端のR材18により人孔1の内壁と所定の間隔をもって配される。すなわち、本実施形態では人孔1の内壁より30cmの間隔を保って配されることになる。
地上部においては、レール材5の上端が固定される。
The rail material 5 is installed in the manhole 1 as follows.
(2a)
The lower end of the rail member 5, that is, the lowermost end of the vertical portion 5A, the bent portion 5B, and the horizontal portion 5C are inserted into the human hole 1 through the opening 1a of the human hole 1, and the upper end is once held by the ground portion. Then, the divided body 100 of the vertical portion 5A is added on the flange 102 through the flange 102 and inserted into the human hole 1 again. A level adjusting material 10 is appropriately attached to the lower end of the rail material 5.
Thereafter, the vertical portion 5A of the rail material 5 is sequentially added by the divided body 100, and the long rail material 5 is obtained.
When the lower end of the rail member 5 is at a position facing the pipe opening, the upper surface of the horizontal part 5C is pushed in from the top part of the pipe opening while keeping a certain distance, and then the rail member 5 is pulled up, the upper surface of the horizontal part 5C, Alternatively, the upper surface of the level adjusting material 10 is brought into contact with the top of the pipe opening. (2b)
The vertical portion 5A of the rail member 5 is arranged with a predetermined distance from the inner wall of the human hole 1 by the R member 18 at the lower end thereof. That is, in this embodiment, it is arranged with an interval of 30 cm from the inner wall of the human hole 1.
In the above-ground part, the upper end of the rail material 5 is fixed.

(3) 通線の定置
作業装置Sの上流側ウインチ7A、下流側ウインチ7Bを駆動し、緩み状態にある通線6を管口保護器付きレール材5の鉛直部5A及び曲がり部5Bの溝15より溝空間16内に導き、該溝空間16内に沿わせて下流側ウインチ7Bに巻き取る。これにより、通線6は曲がり管路において、上流より下流にかけて一貫して所定状態に張設がなされる。
ここに、通線6は鋼線(ワイヤー)が使用され、径φ12mmを規格とし、単位長さ質量w0.53kg/mを採る。また、ウインチ7は上下流側とも1.3トンを規格として使用される。
(3) Placement of the wire The upstream winch 7A and the downstream winch 7B of the work device S are driven, and the loose wire 6 is inserted into the groove of the vertical portion 5A and the bent portion 5B of the rail member 5 with the tube protector. 15 is guided into the groove space 16 and is wound around the downstream winch 7B along the groove space 16. As a result, the connecting line 6 is consistently stretched in a predetermined state from the upstream side to the downstream side in the curved pipeline.
Here, a steel wire (wire) is used as the through wire 6, the diameter φ12 mm is standard, and the unit length mass w 0.53 kg / m is adopted. The winch 7 is used with 1.3 tons as the standard on both the upstream and downstream sides.

以下の作業において、作業装置Sの諸機能が利用される。
図7、図8は、当該作業装置Sの詳細を示す。
本作業装置Sはフレーム22を基体とし、前後の車輪23(前輪23A、後輪23B)によって移動可能とされるが、前部のアウトリガー24を前方へ引き出して地表に定置することにより固定状態となる(すなわち反力を受け止める)。フレーム22は四角箱状をなし、上部フレーム22A、下部フレーム22B、及びこれらの上部フレーム22Aと下部フレーム22Bとを繋ぐ4周の柱材22C、更にはこれらのフレーム材(22A、22B、22C)に取り付けられる他の剛性材よりなる。車輪23の前輪23A及び後輪23Bはキャスター型式となっており、横移動も可能である。アウトリガー24は、その水平部(水平材)24aが上部フレーム22A内に収納、引き出し可能となっており、水平部24aの端部には鉛直部(鉛直材)24bが配される。
フレーム22の上部の後方にはウインチ7が設置され、駆動部(電動モータ)7aをもって回転駆動される。駆動部7aには変位量センサー25が配され、ウインチ7の回転量を計り、通線6の巻取り量・巻戻し量、すなわち通線6の変位量を計測する。
フレーム22の上部フレーム22Aの中央部に剛接状に横架された梁材(フレーム材)22A’に、ピン結合をもって棒状の滑車支持体27が上下回転自在に取り付けられ、該滑車支持体27の先端には滑車28が回転自在に取り付けられる。滑車支持体27の下面とフレーム22の前部の上部フレーム22A(他の上部フレーム22Aよりも低くされている)の上面との間には荷重センサー29が介装設置され、該荷重センサー29に負荷される荷重、ひいては通線6に懸かる張力を計測する。
アウトリガー24につき、鉛直部(鉛直材)24bの下端には高さ調整機能付き定置板24cが配される。該高さ調整機能付き定置板24cの操作をもって地表面へ均等な押圧がなされ、本作業装置Sのぐらつきのない確実な固定がなされる。
Various functions of the working device S are used in the following work.
7 and 8 show details of the working device S. FIG.
The working device S has a frame 22 as a base and can be moved by front and rear wheels 23 (front wheels 23A and rear wheels 23B). The front outrigger 24 is pulled forward to be fixed on the ground surface. (Ie take the reaction force). The frame 22 has a rectangular box shape, and includes an upper frame 22A, a lower frame 22B, four-round pillars 22C connecting the upper frames 22A and the lower frames 22B, and these frame members (22A, 22B, 22C). It consists of other rigid materials attached to the. The front wheel 23A and the rear wheel 23B of the wheel 23 are caster type, and can be moved laterally. The outrigger 24 has a horizontal portion (horizontal member) 24a that can be stored and pulled out in the upper frame 22A, and a vertical portion (vertical member) 24b is disposed at the end of the horizontal portion 24a.
A winch 7 is installed behind the upper portion of the frame 22 and is rotationally driven by a drive unit (electric motor) 7a. A displacement sensor 25 is disposed in the drive unit 7a, measures the amount of rotation of the winch 7, and measures the amount of winding / rewinding of the line 6, that is, the amount of displacement of the line 6.
A rod-like pulley support 27 is attached to a beam member (frame material) 22A ′, which is horizontally mounted in a rigid contact with the central portion of the upper frame 22A of the frame 22, with a pin connection so as to be rotatable up and down. A pulley 28 is rotatably attached to the tip of the shaft. A load sensor 29 is interposed between the lower surface of the pulley support 27 and the upper surface of the upper frame 22A at the front portion of the frame 22 (lower than the other upper frame 22A). The load to be applied, and hence the tension applied to the line 6 is measured.
With respect to the outrigger 24, a stationary plate 24c with a height adjusting function is disposed at the lower end of the vertical portion (vertical material) 24b. By operating the stationary plate 24c with the height adjusting function, the ground surface is evenly pressed, and the work device S is securely fixed without wobbling.

(吊下げ装置120)
作業装置Sは上記構成に加え、レール材5を吊り下げる吊下げ装置120を備え、該吊下げ装置120を介してレール材5の保持(不動状態)がなされる。
吊下げ装置120は作業装置Sのフレーム22(上部フレーム22A)上に滑車支持体27を跨いで立設された2つの柱材121、該柱材121の上端部に載置固定される梁材122、該梁材122より水平状に前方に突設されるブラケット材123、を基台とし、該梁材122の上に配されたウインチ124、該ブラケット123の前端に配された滑車125、が配され、ウインチ124より繰り出されたワイヤー126は、滑車125を介してレール材5の上端に固定されてなる。
ウインチ124の巻き込みによりレール材5を吊り上げ、該レール材5の下端の水平部5Cを横断管2の管口頂部に係合させて固定し、ワイヤー126に所定の張力を付与してレール材5を固定(不動状態)する。
なお、レール材5の吊り下げ保持はこの態様に限らず、レール材5の上端を地上部で固定把持することによってもなされる。
(Hanging device 120)
In addition to the above configuration, the working device S includes a suspension device 120 that suspends the rail material 5, and the rail material 5 is held (immobilized) via the suspension device 120.
The suspension device 120 includes two pillar members 121 erected on the frame 22 (upper frame 22 </ b> A) of the working device S so as to straddle the pulley support 27, and a beam member placed and fixed on the upper end portion of the pillar member 121. 122, a bracket material 123 protruding forward in a horizontal direction from the beam member 122, a winch 124 disposed on the beam member 122, a pulley 125 disposed on the front end of the bracket 123, The wire 126 fed out from the winch 124 is fixed to the upper end of the rail member 5 via the pulley 125.
The rail material 5 is lifted by the winding of the winch 124, the horizontal portion 5C at the lower end of the rail material 5 is engaged with the top of the tube mouth of the transverse tube 2 and fixed, and a predetermined tension is applied to the wire 126 to provide the rail material 5. Is fixed (immobilized).
In addition, the suspension holding | maintenance of the rail material 5 is made not only by this aspect but by making the upper end of the rail material 5 fixedly hold | grip by a ground part.

通線6の定置は以下のようにしてなされる。
(3a)
上流側人孔1Aにある通線6、下流側人孔1Bにある通線6の各下端を適当な治具(例えば、下端に懸け金具を装着した長棒)を使用して人孔1の中心部もしくはレール材5の前面付近に保持し、下流側ウインチ7Bを駆動して、通線6を弛ませることなく張設する。
上流側人孔1Aにある通線6、下流側人孔1Bにある通線6の鉛直部をレール材5の溝15に誘導し、溝空間16内に嵌入させる。
(3b)
下流側ウインチ7Bを更に駆動して、横断管2内部の水平通線6をレール材5の下端部(曲がり部5B、水平部5C)の溝15、溝空間16内に誘導する。
以上により、通線6はレール材5の対応位置で該レール材5の溝空間16内に挿入され、通線6の定置作業は完了する。
The stationary line 6 is fixed as follows.
(3a)
The lower end of the communication line 6 in the upstream human hole 1A and the communication line 6 in the downstream human hole 1B is connected to the lower end of the human hole 1 by using an appropriate jig (for example, a long bar with a hanging metal fitting attached to the lower end). The central portion or the vicinity of the front surface of the rail member 5 is held, the downstream winch 7B is driven, and the through wire 6 is stretched without slackening.
The vertical portions of the communication line 6 in the upstream human hole 1 </ b> A and the communication line 6 in the downstream human hole 1 </ b> B are guided to the groove 15 of the rail member 5 and are inserted into the groove space 16.
(3b)
The downstream winch 7B is further driven to guide the horizontal passage 6 inside the transverse pipe 2 into the groove 15 and the groove space 16 at the lower end portion (bent portion 5B, horizontal portion 5C) of the rail member 5.
As described above, the through wire 6 is inserted into the groove space 16 of the rail material 5 at the position corresponding to the rail material 5, and the installation work of the through wire 6 is completed.

(4) 通線への張力の導入
なおここで、通線6に上流側ウインチ7A、下流側ウインチ7Bにより所定の張力を導入することにより、本実施形態における通線システムが構築される。
すなわち、本規格の通線6(径φ12mm、単位長さ質量w0.53kg/m)に、同じく規格のウインチ7(1.3トン)により所要の張力を導入し、横断管路2(20mとする。)内の通線6を所定の勾配(たるみ、傾斜)とする。すなわち、所期の懸垂曲線状態の通線に対し、所期の集中荷重が作用して重ね合わせによる所定の曲線状態(たるみ、傾斜)を採るものである。
そして、本通線6は横断管2内への配設後、該横断管2内での機器の移動に供されるものであり、機器すなわち移動体が水流抵抗を受ける際、破断あるいは大きな撓みを受けることのない力学的状況(強度)を保持することが要請され、本規格は当該力学的要請に基づくものである。
本通線6が所期の張力を受けるとき、通線6の横断管2(20m)の中央での撓みは2.7cmであり、また通線6に固定される移動体の荷重が18.0kgを採るとき通線6の中央での撓みは11.7cmであり、本通線6に取り付けられてなされる横断管2内での作業に支障にはならない。また、管口での所期の張力による曲げモーメントは本レール材5の断面の抵抗モーメントで対抗されるものである。
(4) Introduction of tension to the communication line Here, by introducing a predetermined tension to the communication line 6 by the upstream winch 7A and the downstream winch 7B, the communication system in this embodiment is constructed.
That is, the required tension is introduced to the standard line 7 (diameter 12 mm, unit length mass w 0.53 kg / m) by the same standard winch 7 (1.3 tons), and the transverse pipe 2 (20 m ) Is set to a predetermined slope (sag, slope). That is, the predetermined concentrated load acts on the intended line of the suspension curve state and takes a predetermined curve state (sag, inclination) due to superposition.
The main line 6 is provided for movement of the equipment in the transverse pipe 2 after being disposed in the transverse pipe 2, and when the equipment, that is, the moving body is subjected to water resistance, it is broken or greatly bent. It is required to maintain a mechanical situation (strength) that is not subject to this standard, and this standard is based on the mechanical request.
When the main line 6 is subjected to the desired tension, the deflection at the center of the transverse pipe 2 (20 m) of the line 6 is 2.7 cm, and the load of the moving body fixed to the line 6 is 18. When taking 0 kg, the deflection at the center of the line 6 is 11.7 cm, and it does not hinder the work in the transverse pipe 2 attached to the line 6. Further, the bending moment due to the desired tension at the pipe opening is countered by the resistance moment of the cross section of the rail material 5.

(5) 流れの現況の把握
以上の通線6の配設の後、所定の計測装置により横断管2内の付着物の付着状況の計測がなされるが、それに先立って当該横断管2を含む伏越し部の流れの現況(いわゆる流況)が把握される。
(5a)流量の計測
伏越し部の流れの現況すなわち流量の計測は、下流側の下水道管路3Bの水面の水位を計測することによってなされる。すなわち、下水道管路3Bの管底を0(ゼロ)位置として、その水深(水位)を計り、流量qを得る。
あるいは、下水道管路3A,3Bに一時的に設置された開水路用の流量測定装置によって流量を得る。
そのような流量測定装置Qの1例として、下流側人孔1Bに臨む下水道管路3Bの管口部において、切欠き(三角形、四角形)を有するせき板を設置し、該切欠きからの流れを保持しつつせき板上流側の水位を計って流量qを得るせき式計測方法が採られる。
また、他の流量測定装置Qとして、下流側人孔1Bに臨む下水道管路3Bの管口部において、フリュームを設置し、フリュームスロート部の水位を計測し、流量を得るフリューム式計測方法が採られる。
あるいは、下流側人孔1Bに臨む下水道管路3Bの管口部の一定区間を清掃した後、その既知の流路断面を流れる流速及び水位を計り流量を得る方法を採ることもできる。
(5b)調査結果の判定
しかして、現況調査の結果、横断管2内に流通断面が確保されていると判定される場合には先導管による障害物予備調査が実施される。
(5) Grasping the present state of flow After the above arrangement of the line 6, the state of adhesion of the deposits in the transverse pipe 2 is measured by a predetermined measuring device. Prior to that, the relevant transverse pipe 2 is included. The current state of the flow of the overpass (the so-called flow state) is grasped.
(5a) Measurement of the flow rate The current state of the flow over the overpass, that is, the measurement of the flow rate, is made by measuring the water level of the water surface of the downstream sewer line 3B. That is, the pipe bottom of the sewer pipe 3B is set to the 0 (zero) position, the water depth (water level) is measured, and the flow rate q is obtained.
Alternatively, the flow rate is obtained by an open channel flow rate measuring device temporarily installed in the sewer pipes 3A and 3B.
As an example of such a flow rate measuring device Q, a swash plate having a notch (triangle, quadrangle) is installed at the mouth of the sewer line 3B facing the downstream side human hole 1B, and the flow from the notch A crest-type measuring method is adopted in which the water level is measured upstream of the dam plate while maintaining the flow rate q.
As another flow rate measuring device Q, a flume type measuring method is adopted in which a flume is installed at the pipe port portion of the sewer line 3B facing the downstream side human hole 1B, the water level in the flume throat portion is measured, and the flow rate is obtained. It is done.
Or after cleaning the fixed area | region of the pipe part of the sewer pipe line 3B which faces the downstream side human hole 1B, the method of measuring the flow velocity and water level which flow through the known flow-path cross section, and obtaining a flow volume can also be taken.
(5b) Judgment of survey results However, if it is determined that the distribution cross section is secured in the cross pipe 2 as a result of the current status survey, a preliminary obstacle survey using the previous conduit is carried out.

(6) 先導管装置による障害物予備調査(図9〜図12参照)
障害物予備調査は先導管装置Tを用いてなされるが、該先導管装置Tは通線6に介装された取付け台車32を介して取り付けられる。
図9〜図11に取付け台車32の詳細構成を示す。
本取付け台車32は(左右前後、上下は図面におけるもの)、細長の箱状をなすフレーム体33と、該フレーム体33の前後において該フレーム体33に回転自在に軸支される回転軸34a、該回転軸34aの両端に装着されるローラ34と、フレーム体33の下面に突出して固設される取付け板35と、フレーム体33の前後部に固設される取付け環36と、からなる。取付け板35には作業体Aとの取付けに供される取付け穴35aが開設される。取付け板35の高さhは3〜4cmとされる。
該取付け台車32はレール材5の溝空間16内に嵌装され、そのローラ34をレール材5の背面部12、前面部14の内面に沿わせて移動自在とされる。フレーム体33の幅はレール材5の溝15の幅よりもわずかに小さいものとされ、該取付け台車32をぶれなく移動を案内する。
一方、先導管装置Tは図12に示されるように、通線6に配された取付け台車32に取り付けられる取付け板38と、該取付け板40に固設される中空円筒状の先導管40と、からなる。
詳しくは、取付け板38は平板体をなし、前後に取付け穴38aが開設され、その取付け穴38aと前記した台車32の取付け穴35aとを対応させ、それらの穴に装着した固定具39を締め込んで装置Tの固定がなされる。
先導管40は、金属製よりなり、前後に開放された中空円筒体をなし、所定の重量、直径φ及び長さmを有する。すなわち、重量は可及的軽量が好ましいが、浮き上がらないこと、水流に妄動しないことの要件を満たすものとする。直径φについては後述する作業体の装置本体の差し渡し最大長と同等とされ、長さmについては作業体の装置本体の最大長と同等とされ、これらの通過を保証する寸法を採る。
(6) Preliminary obstacle survey using the leading conduit system (see Figures 9 to 12)
The preliminary obstacle survey is performed by using the leading conduit device T, and the leading conduit device T is attached via an attachment carriage 32 interposed in the communication line 6.
9 to 11 show the detailed configuration of the mounting carriage 32. FIG.
The main mounting carriage 32 (left and right front and rear, top and bottom are shown in the drawing) includes a frame body 33 having an elongated box shape, and a rotating shaft 34 a rotatably supported by the frame body 33 before and after the frame body 33. The roller 34 is mounted on both ends of the rotating shaft 34 a, the mounting plate 35 is fixed to protrude from the lower surface of the frame body 33, and the mounting ring 36 is fixed to the front and rear portions of the frame body 33. An attachment hole 35a is provided in the attachment plate 35 for attachment to the work body A. The height h of the mounting plate 35 is 3 to 4 cm.
The mounting carriage 32 is fitted in the groove space 16 of the rail member 5, and the roller 34 can be moved along the inner surface of the rear surface portion 12 and the front surface portion 14 of the rail material 5. The width of the frame body 33 is slightly smaller than the width of the groove 15 of the rail member 5, and guides the movement of the mounting carriage 32 without shaking.
On the other hand, as shown in FIG. 12, the front conduit device T includes a mounting plate 38 attached to the mounting carriage 32 disposed on the line 6, and a hollow cylindrical front conduit 40 fixed to the mounting plate 40. It consists of.
Specifically, the mounting plate 38 is a flat plate, and mounting holes 38a are formed in the front and rear. The mounting holes 38a correspond to the mounting holes 35a of the carriage 32 described above, and the fixture 39 attached to these holes is tightened. Then, the device T is fixed.
The front conduit 40 is made of metal, has a hollow cylindrical body opened front and rear, and has a predetermined weight, a diameter φ, and a length m. That is, the weight should preferably be as light as possible, but it should satisfy the requirements of not floating and not reluctant to flow. The diameter φ is the same as the maximum passing length of the apparatus body of the working body, which will be described later, and the length m is the same as the maximum length of the apparatus body of the working body.

(6a)先導管装置Tの取付け
上流側地上部において、通線6に取付け台車32を介装設置する。すなわち、該取付け台車32の両端の取付け環36を介して通線6に取り付ける。
この状態で、取付け台車32の取付け板35と先導管装置Tの取付け板38とを重合し、それらの取付け穴35a,38aに固定具(ボルト・ナット)39を挿通し、該固定具39を締め込んで先導管装置Tの取付けがなされる。
先導管装置Tをレール材5の上位に配し、取付け台車32をレール材5の溝空間16内に嵌め込む。
(6b)先導管装置Tの下降/沈設
上流側ウインチ7Aの巻き出しと下流側ウインチ7Bの巻き取りとを同調させて、先導管装置Tの重量に抗して該先導管装置Tを上流側人孔1A内に下降・沈設する。
(6c)先導管装置Tの管口への配置
先導管装置Tがレール材5の曲がり部5Bに至ると、先導管装置Tは円弧軌跡を描いて横断管2の管口に近づく。このとき、先導管装置Tは所定の大きさに規定されているので、管口壁面に衝突することなく、先導管装置Tは所定の姿勢で横断管2の管口に臨む。
(6d)先導管装置Tの移動
上流側ウインチ7A、下流側ウインチ7Bにより所定の張力をもって先導管装置Tを上流側管口から当該横断管内を進行させ、下流側管口まで移動させる。
当該先導管装置Tはその重量による通線6の撓みをもって横断管路2内を移動する。
(6e)下流側管口部の先導管装置T
先導管装置Tが横断管2の下流側管口に至ると、通線6の取付け台車32がレール材5の端部の広口部20に臨み、円滑にレール材5の溝空間16内に入り込む。
(6f)先導管装置Tの引き上げ
ウインチ7A,7Bの駆動により、先導管装置Tはレール材5の曲がり部5Bを経由して、鉛直部5Aを上昇し、人孔1の開口部1aから地上部に引き上げられる。
その後、先導管装置Tは取付け台車32から外され、該取付け台車32は通線6とともにウインチ7A,7Bの逆操作により逆行され、再び上流側地上へ引き戻され、次の作業に備える。
(6g)以後の作業
以上の障害物予備調査の実施により、先導管装置Tが支障なく、立孔1、横断管2内を通過することが確認されれば、以後の作業体による計測作業ないし清掃作業を実施する。なお、先導管装置Tの重量は軽いものであるので、通線6の張力を低減し、そのたるみを利用して先導管40を横断管2の中心部に位置させる手法を採ることができる。
(6a) Attaching the first conduit device T At the upstream ground part, an installation carriage 32 is installed on the line 6. That is, it is attached to the line 6 through the attachment rings 36 at both ends of the attachment carriage 32.
In this state, the mounting plate 35 of the mounting carriage 32 and the mounting plate 38 of the tip conduit device T are overlapped, and fixing tools (bolts and nuts) 39 are inserted into the mounting holes 35a, 38a. The leading conduit device T is attached by tightening.
The leading conduit device T is disposed above the rail member 5, and the mounting carriage 32 is fitted into the groove space 16 of the rail member 5.
(6b) Lowering / sinking of the front conduit unit T The upstream side winch 7A is synchronized with the winding of the downstream side winch 7B so that the upstream side of the front conduit unit T is against the weight of the front conduit unit T. Lower and sink in the human hole 1A.
(6c) Arrangement of the leading conduit device T at the tube port When the leading conduit device T reaches the bent portion 5B of the rail member 5, the leading conduit device T draws an arc locus and approaches the tube port of the transverse tube 2. At this time, since the leading conduit device T is defined to have a predetermined size, the leading conduit device T faces the tube port of the transverse tube 2 in a predetermined posture without colliding with the wall surface of the tube port.
(6d) Movement of the leading conduit device T The leading conduit device T is advanced from the upstream port to the downstream tube with a predetermined tension by the upstream winch 7A and the downstream winch 7B and is moved to the downstream port.
The tip conduit device T moves in the transverse conduit 2 with the deflection of the wire 6 due to its weight.
(6e) Downstream pipe port T
When the leading conduit device T reaches the downstream side port of the crossing tube 2, the mounting carriage 32 of the line 6 faces the wide opening 20 at the end of the rail member 5 and smoothly enters the groove space 16 of the rail member 5. .
(6f) Pulling up the leading conduit device T By driving the winches 7A and 7B, the leading conduit device T rises through the bent portion 5B of the rail material 5 and moves up the vertical portion 5A and from the opening 1a of the human hole 1 to the ground. Pulled up to the department.
Thereafter, the leading conduit device T is removed from the mounting carriage 32, and the mounting carriage 32 is reversed by the reverse operation of the winches 7A and 7B together with the line 6, and is pulled back to the ground on the upstream side again for the next work.
(6g) Subsequent work If it is confirmed that the preceding conduit device T passes through the vertical hole 1 and the crossing pipe 2 without any trouble by the above obstacle preliminary survey, Perform cleaning work. Since the tip conduit device T is light in weight, it is possible to reduce the tension of the through wire 6 and use the slack to position the tip conduit 40 at the center of the transverse tube 2.

(7) 断面計測装置の設置及び計測作業(図13〜図16参照)
(6) の工程に続き、通線6を介して本実施形態の断面計測装置(以下単に「計測装置」という)Vが設置され、該計測装置Vを使用して横断管2の断面が計測される。
(計測装置V)(図13〜図15参照)
計測装置Vは、フレーム体42をもって流速計測装置部としてのセンサー43、該センサー43に接続される通信線44を固定材(ボルト・ナット)45を介して挟着保持してなる。該フレーム体42は、相隔てて配される2枚の平板体よりなり、上部に2つの取付け穴42aが開設され、取付け台車32との連結に供される。フレーム体42の両側には水平翼47が取り付けられ、また、その下部には重錘部48(重錘48a、固定バンド48b)が配される。重錘48aは通常には鉛材が使用される。
センサー43は本計測装置Vの要部をなし、本実施形態では電磁流速計が用いられる。該電磁流速計は小型であり、かつ精度が高いものであり、使用には好適である。該センサー43はフレーム体42の後部かつ下部に突出して取り付けられる。該センサー43によって検出された流速信号(電流値)は、通信線44を介して地上部の処理部(後述)に送られる。なお、本実施形態のセンサー43は1軸機能であるとともに、傾斜角度の補正機能はない。
通信線44は防水層をもって被覆され、フレーム体42の挟着作用に対抗する。
水平翼47、重錘部48は本計測装置Vの水中における安定のために付加されるものであり、安定が得られる場合には省略され、非本質的事項である。
(計測装置Vの信号処理)
計測装置V内のセンサー43は所定の計測をなし、横断管2の内面の状況をモニターに表示する。
図16は計測装置Vと該計測装置Vに繋がる地上部でのモニター表示の概要を示す。
図示されるように、計測装置Vには前記したとおり電磁流速センサー43が内蔵されている。
計測装置Vは通信線44を介して地上部の処理装置(通常にはパソコン)50と信号のやり取りを行う。該処理装置50には通線6の変位量を検知する変位量センサー25(ウインチ7に内蔵)及び通線6の荷重センサー29(作業装置Sに設置)からの信号を受け入れ、ウインチ7へ駆動信号を送る。処理装置50には、入力手段(キーボード)50a、出力手段(プリンター)50b、画像処理部50c、補正計算部50dが付置もしくは内蔵され、これらの信号をモニター51に表示する。
処理装置50は変位量センサー25、荷重センサー29からの情報信号も受け入れて、計測装置Vの進行につれ、通線6のたわみ及び傾斜角を計算処理する。入力手段50aからは当該横断管2の内径、長さ等の情報が入力される。補正計算部50dでは電磁流速センサー43からの実流速データに傾斜角度の補正を行う。更には、検知速度(実流速)に本計測装置Vの進行速度の補正を行う。モニター51では、画像処理された情報が表示される。
このようにして、計測装置Vの横断管2内での進行につれ、横断管2の内面状況をモニター51で表示される。
(7) Installation and measurement work of the cross-section measuring device (see Figs. 13 to 16)
Following the step (6), the cross-section measuring device (hereinafter simply referred to as “measuring device”) V of the present embodiment is installed via the line 6, and the cross-section of the transverse tube 2 is measured using the measuring device V. Is done.
(Measurement device V) (see FIGS. 13 to 15)
The measuring device V includes a frame 43 and a sensor 43 serving as a flow velocity measuring device and a communication wire 44 connected to the sensor 43 via a fixing member (bolt / nut) 45. The frame body 42 is composed of two flat plates that are spaced apart from each other, and two mounting holes 42 a are formed in the upper portion thereof, and are used for connection to the mounting carriage 32. Horizontal wings 47 are attached to both sides of the frame body 42, and weight portions 48 (weights 48a and fixed bands 48b) are disposed below the horizontal wings 47. The weight 48a is usually made of lead.
The sensor 43 is a main part of the measuring device V, and an electromagnetic current meter is used in this embodiment. The electromagnetic current meter is small and has high accuracy, and is suitable for use. The sensor 43 protrudes from the rear and lower part of the frame body 42 and is attached. A flow velocity signal (current value) detected by the sensor 43 is sent to a processing unit (described later) on the ground via the communication line 44. The sensor 43 according to the present embodiment has a uniaxial function and does not have a tilt angle correction function.
The communication line 44 is covered with a waterproof layer and opposes the sandwiching action of the frame body 42.
The horizontal blade 47 and the weight 48 are added for the stability of the measuring device V in water, and are omitted when stability is obtained, and are non-essential matters.
(Signal processing of measuring device V)
The sensor 43 in the measuring device V performs a predetermined measurement, and displays the state of the inner surface of the transverse tube 2 on a monitor.
FIG. 16 shows an outline of the monitor display on the ground unit connected to the measurement device V and the measurement device V.
As shown in the drawing, the electromagnetic flow velocity sensor 43 is built in the measuring device V as described above.
The measuring device V exchanges signals with a processing device (usually a personal computer) 50 on the ground via the communication line 44. The processing device 50 receives signals from a displacement sensor 25 (built in the winch 7) that detects the displacement of the wire 6 and a load sensor 29 (installed in the work device S) of the wire 6, and drives the winch 7. Send a signal. The processing device 50 includes or includes an input unit (keyboard) 50 a, an output unit (printer) 50 b, an image processing unit 50 c, and a correction calculation unit 50 d, and displays these signals on the monitor 51.
The processing device 50 also accepts information signals from the displacement sensor 25 and the load sensor 29, and calculates the deflection and the inclination angle of the wire 6 as the measuring device V advances. Information such as the inner diameter and length of the transverse tube 2 is input from the input means 50a. The correction calculation unit 50d corrects the inclination angle of the actual flow velocity data from the electromagnetic flow velocity sensor 43. Further, the traveling speed of the measuring device V is corrected to the detection speed (actual flow speed). On the monitor 51, the image-processed information is displayed.
In this way, the internal state of the transverse tube 2 is displayed on the monitor 51 as the measuring device V advances in the transverse tube 2.

(7a)計測装置Vの取付け
前記した(6a)先導管装置Tの取付けに準じ、取付け台車32の取付け板35と本計測装置Vのフレーム体42の上部とを重合し、それらの取付け穴35a,42aに固定具(ボルト・ナット)39を挿通し、該固定具39を締め込んで計測装置Vの取付けがなされる。なお、通信線44は長尺をもって地上の処理装置50に接続される。
(7b)計測装置Vの下降/沈設
前記した(6b)先導管装置Tの下降/沈設に準じる。
(7c)計測装置Vの管口への配置
前記した(6c)先導管装置Tの管口への配置に準じる。
(7d)計測装置Vによる動作
上流側ウインチ7A、下流側ウインチ7Bにより通線6への所定の張力をもって計測装置Vを上流側管口から当該横断管2内を所定速度(w)で進行させ、下流側管口まで移動させる。計測装置V内の速度センサー43は所定の計測をなし、当該計測信号を地上部の処理装置50へ送る。
速度センサー43は上流側に向けられたものであり、かつ計測装置V本体(すなわちフレーム体42)の端部に設置されたものであるので、横断管2内の通常の水流を乱すことなく実際の流れを捉える。
速度センサー43は通線6の傾きをもって移動するものであるので、その計測速度(実流速)は通線6の移動速度及び傾斜角を反映したものとなっている。この実流速は前記したとおり、処理装置50内の補正計算部50dで相対速度及び傾斜角度の補正が行われ、実際の水平速度に変換表示される。
なお、通線6の移動は、一定速度で行われる外、停止を含む断続移動(その停止時に流速の検出がなされる)を採ることを除外しない。
(断面阻害率)
本計測装置Vの移動は前記した工程(5a)の流量計測の結果(流量q)に関連付けられる。
すなわち、流量qを本水平速度vで除すことにより当該位置での横断管2の断面積Aが算定され、
この断面積Aは新設当時の横断管2の断面積A’より縮小されたものとなり、
その比率(A’/A)により断面阻害率を表示する。
(7e)下流側管口部の計測装置V
前記した(6e)下流側管口部の先導管装置Tに準じる。
(7f)計測装置Vの引き上げ
前記した(6f)先導管装置Tの引き上げに準じる。
あるいは、計測装置Vの通信線44を考慮して、本計測装置Vを逆に進行させ、上流側人孔1Aから引き上げることもできる。
(7g)作業の完了
以上をもって計測装置Vによる計測作業は完了するが、本計測作業の後、更に精確な計測作業及び/又は清掃作業を実施することが通常であり、それらの作業の後、計測装置Vが再度使用される。
(7a) Mounting of measuring device V According to the mounting of (6a) leading conduit device T described above, the mounting plate 35 of the mounting carriage 32 and the upper portion of the frame body 42 of the measuring device V are overlapped, and their mounting holes 35a , 42a, a fixture (bolt / nut) 39 is inserted, and the fixture 39 is tightened to attach the measuring device V. The communication line 44 is long and connected to the ground processing device 50.
(7b) Lowering / sinking of measuring device V Same as (6b) Descent / sinking of leading conduit device T described above.
(7c) Arrangement of the measuring device V in the tube port According to the above-described (6c) arrangement of the leading conduit device T in the tube port.
(7d) Operation by measuring device V The measuring device V is advanced from the upstream port through the transverse pipe 2 at a predetermined speed (w) with a predetermined tension to the communication line 6 by the upstream winch 7A and the downstream winch 7B. And move to the downstream side pipe opening. The speed sensor 43 in the measuring device V performs a predetermined measurement and sends the measurement signal to the processing device 50 on the ground.
Since the speed sensor 43 is directed to the upstream side and is installed at the end of the measuring device V main body (that is, the frame body 42), the speed sensor 43 actually does not disturb the normal water flow in the transverse pipe 2. Capture the flow of
Since the speed sensor 43 moves with the inclination of the line 6, the measurement speed (actual flow velocity) reflects the movement speed and the inclination angle of the line 6. As described above, this actual flow velocity is corrected and displayed as an actual horizontal velocity by correcting the relative velocity and the inclination angle by the correction calculation unit 50d in the processing device 50.
Note that the movement of the line 6 is not limited to being performed at a constant speed but adopting intermittent movement including stop (detection of the flow velocity at the time of stop).
(Cross-section inhibition rate)
The movement of the measuring device V is associated with the flow rate measurement result (flow rate q) in the step (5a).
That is, by dividing the flow rate q by the horizontal velocity v, the cross-sectional area A of the transverse pipe 2 at the position is calculated.
This cross-sectional area A is smaller than the cross-sectional area A ′ of the transverse pipe 2 at the time of new construction,
The cross-section inhibition rate is displayed by the ratio (A ′ / A).
(7e) Downstream pipe port measuring device V
It conforms to the above-mentioned (6e) the tip conduit device T at the downstream side pipe opening.
(7f) Lifting of measuring device V Same as (6f) Lifting of leading conduit device T described above.
Alternatively, in consideration of the communication line 44 of the measuring device V, the measuring device V can be advanced in the reverse direction and pulled up from the upstream side human hole 1A.
(7g) Completion of work Although the measurement work by the measuring device V is completed as described above, it is normal to carry out more accurate measurement work and / or cleaning work after the main measurement work. The measuring device V is used again.

(実施形態の効果)
本実施形態の断面計測装置V及び該断面計測装置Vを使用してなされる横断管の断面計測方法によれば、横断管2内に配される通線6が移動とともに所期のたわみ及び傾斜角を採り、これに連動して本計測装置Vの位置決めがなされ、かつ、検出された流速値の移動速度補正及び傾斜補正がなされて正確な流速値を得ることができ、これにより横断管内の各位置の正確な断面状況を得ることができる。
(Effect of embodiment)
According to the cross-section measuring device V of the present embodiment and the cross-section measuring method of the cross pipe made using the cross-section measuring device V, the line 6 arranged in the cross pipe 2 moves with the expected deflection and inclination. The measuring device V is positioned in conjunction with the angle, and the movement velocity correction and the inclination correction of the detected flow velocity value are performed to obtain an accurate flow velocity value. An accurate cross-sectional situation at each position can be obtained.

(8) 作業の続行
上記の作業の後、更に精確な計測作業及び清掃作業が以下のように実施され、それらの作業の後、計測装置Vが再度使用される。
(8a)精確な計測作業
前記(7) の計測作業は横断管2の現況の断面阻害率を、該伏越し部の水位測定とともに机上(水理計算の適用)の流量計算に基づいて求めるものであったが、更に精確な計測作業を実施する。そのような精確な計測作業手段として、本出願人らが先に提案した特願2013−162216による計測作業を実施することが好適である。この計測作業によれば、横断管2内の上部に付着するラード類、下部に堆積する固結土砂による断面状況が更に精確に計測され、モニターに画像表示され、かつそのデータは保存される。
(8b)正確な清掃作業
上記(8a)の計測結果によるデータ(画像表示)に基づき、横断管2内の正確な清掃作業が実施される。そのような清掃手段として、本出願人らが先に提案した特願2013−165138、特願2013−176585による清掃手段が適用される。
(8c)再計測作業
(8b)の後、更に(8a)に準じて精確な計測作業を実施する。これにより、横断管2内の清掃完了後の断面状況を得る。
(8d)流速計測の実施
以上に続けて、先の(7) に準じ、計測装置Vによる流速の計測作業を実施する。
これにより、この(8d)の実施時点(あるいは清掃作業完了時点)での当該伏越し部の流入水量がその流速とともに計測される。
(8) Continuation of work After the above work, more accurate measurement work and cleaning work are performed as follows, and after those work, the measuring device V is used again.
(8a) Precise measurement work The measurement work in (7) above is to determine the cross-section inhibition rate of the current condition of the cross pipe 2 based on the flow rate calculation on the desktop (application of hydraulic calculation) along with the measurement of the water level in the overpass. However, more accurate measurement work will be implemented. As such an accurate measurement work means, it is preferable to carry out the measurement work according to Japanese Patent Application No. 2013-162216 previously proposed by the present applicants. According to this measurement work, the cross-sectional state due to lards adhering to the upper part of the cross pipe 2 and consolidated soil sand deposited in the lower part is more accurately measured, displayed on the monitor, and the data is stored.
(8b) Accurate cleaning work Based on the data (image display) based on the measurement result of (8a) above, an accurate cleaning work in the transverse tube 2 is performed. As such cleaning means, the cleaning means according to Japanese Patent Application Nos. 2013-165138 and 2013-176585 previously proposed by the present applicants is applied.
(8c) Re-measurement work
After (8b), further accurate measurement work is performed according to (8a). Thereby, the cross-sectional state after completion of cleaning in the transverse tube 2 is obtained.
(8d) Implementation of flow velocity measurement Following the above, the flow velocity measurement work by the measuring device V is carried out according to the previous (7).
As a result, the amount of inflowing water in the overhanging portion at the time of execution of (8d) (or when the cleaning operation is completed) is measured together with the flow velocity.

(9) 当該伏越し部の適正判定
以上の計測データのもとに、上記(8d)の実施時点(あるいは清掃作業完了時点)での当該伏越し部の流入水量と清掃作業以前でした水位計測に基づく先の流入水量との比較解析を行い、当該伏越し部の維持管理(改修も含む)計画の策定に資するものである。
(9) Appropriate judgment of the overhanging part Based on the above measurement data, the amount of inflow water in the overhanging part at the time of implementation of (8d) above (or when the cleaning work is completed) and the water level measurement before the cleaning work Based on the above, it will be compared with the previous inflow water volume, and will contribute to the development of the maintenance plan (including refurbishment) of the overhang section.

本発明は伏越し管渠に限定されず、更に下水道における他の横断管(地中埋設管)、更には水道管、パイプラインへの適用も可能である。
パイプライン(石油、天然ガス)において、管壁への異物の強固な付着が問題となっており、この付着物の調査・除去のため本発明の適用が期待されるものである。
図17において、Pは地上に配されたパイプラインを示す。パイプラインPの適宜の2箇所で穿孔Q用の立孔管200を立設し、かつ、架台部201を設置する。架台部201にはウインチ202、滑車203が設置される。
本発明の実施において、架台部201上で穿孔Qをなし、この穿孔Qを介して通線205を配し、またレール材206を挿入し、ウインチ202により通線205を所期の状態に設置し、本断面計測装置Kを配し、該断面計測装置Kをもって計測を実施するものである。
The present invention is not limited to the underground pipe dredging, and can also be applied to other transverse pipes (underground pipes) in the sewerage system, water pipes, and pipelines.
In pipelines (petroleum, natural gas), the strong adhesion of foreign matter to the pipe wall has become a problem, and the application of the present invention is expected for the investigation and removal of this deposit.
In FIG. 17, P indicates a pipeline arranged on the ground. Upright pipes 200 for the perforations Q are erected at appropriate two locations of the pipeline P, and the gantry 201 is installed. A winch 202 and a pulley 203 are installed on the gantry 201.
In the implementation of the present invention, a perforation Q is formed on the gantry 201, a through wire 205 is arranged through the perforation Q, a rail material 206 is inserted, and the through wire 205 is installed in a desired state by the winch 202. The cross-section measuring device K is arranged, and the cross-section measuring device K is used for measurement.

本発明は叙上の実施の形態にのみ限定されるものではなく、本発明の基本的技術思想の範囲内で種々設計変更が可能である。
1)叙上の実施形態では、断面計測装置Vの流速装置部に電磁流速計を用いたが、電磁流速計に替えて通常に使用されるプロペラ式の電気流速計を採用することは自由である。
この場合、当該プロペラ式電気流速計の胴体部(発電部の内蔵部)の上部に取付け板が取り付けられる。
The present invention is not limited to the above-described embodiments, and various design changes can be made within the scope of the basic technical idea of the present invention.
1) In the above embodiment, an electromagnetic current meter is used for the flow velocity device of the cross-section measuring device V. However, it is free to adopt a propeller type electric current meter that is normally used instead of the electromagnetic current meter. is there.
In this case, a mounting plate is attached to the upper part of the body part (built-in part of the power generation part) of the propeller type electric current meter.

V…断面計測装置、T…先導管装置、1…立孔(人孔)、1A…上流側立孔(人孔)、1B…下流側立孔(人孔)、2…横断管(伏越し管)、3A…上流側管路、3B…下流側管路、5…レール材、5A…鉛直部、5B…曲がり部、5C…水平部、6…通線、7…ウインチ、7A…上流側ウインチ、7B…下流側ウインチ、32…取付け台車、35、38…取付け板、40…先導管、43…流速センサー   V ... Cross-section measuring device, T ... Lead conduit device, 1 ... Standing hole (human hole), 1A ... Upstream side vertical hole (human hole), 1B ... Downstream side vertical hole (human hole), 2 ... Transverse pipe (passing down) Pipe), 3A ... upstream pipe, 3B ... downstream pipe, 5 ... rail material, 5A ... vertical part, 5B ... bent part, 5C ... horizontal part, 6 ... wire, 7 ... winch, 7A ... upstream side Winch, 7B ... downstream winch, 32 ... mounting carriage, 35, 38 ... mounting plate, 40 ... tip conduit, 43 ... flow rate sensor

Claims (6)

上流から下流への流体の流れをなす流体管路の、対向する立孔間を直線状の横断管を介して流通状態に接続される曲がり管路において、
前記立孔及び横断管にわたって配されるとともに該立孔及び横断管の軸方向に所期の張力をもって移動する通線に連結されて使用される該断管の断面計測装置であって、
前記通線には取付け台車が介装され、
前記通線の取付け台車との取付け部を介して流速計測装置部が取り付けられてなる、
ことを特徴とする曲がり管路に配される通線とともに使用される横断管の断面計測装置。
In the bent pipe line connected to the flow state through the straight transverse pipe between the opposing vertical holes of the fluid pipe line that forms the flow of fluid from the upstream to the downstream,
A cross-section measuring device for the broken pipe used by being connected to a line that is arranged over the vertical hole and the transverse pipe and moves with an intended tension in the axial direction of the vertical hole and the transverse pipe,
A mounting carriage is interposed in the line,
A flow velocity measuring device part is attached via an attachment part with the attachment carriage of the line,
A cross-section measuring device for a transverse pipe used together with a line arranged in a bent pipe line.
通線の配設は、下端に所定の曲率の曲がり部よりなる管口保護部を有し、その長手方向に通線の誘導路が形成されたレール材を、該管口保護部を横断管の管口に臨ませるとともに、相対する立孔のそれぞれの壁面に沿って立設し、
該両立孔の上位に配された各ウインチにより当該通線を該レール材の誘導路に沿って所定の張力をもって誘導し、
立孔間の横断管内に高さ及び張力を調整してなす、
ことを特徴とする請求項1に記載の曲がり管路に配される通線とともに使用される横断管の断面計測装置。
In the arrangement of the through wire, a rail member having a pipe port protecting portion consisting of a bent portion with a predetermined curvature at the lower end and having a through wire guiding path formed in the longitudinal direction of the rail material is passed through the pipe port protecting portion. And erected along each wall of the opposite vertical hole,
The winch is guided with a predetermined tension along the guide path of the rail material by each winch arranged above the compatible hole,
Adjust the height and tension in the transverse pipe between the vertical holes,
The cross-section measuring device for a transverse pipe used together with the through-wire arranged in the bent pipeline according to claim 1.
上流から下流への流体の流れをなす流体管路の、対向する立孔間を直線状の横断管を介して流通状態に接続される曲がり管路において、
前記立孔及び横断管にわたって配されるとともに該立孔及び横断管の軸方向に所期の張力をもって移動する通線に連結されて使用される該断管の断面計測装置であって、
前記通線の配設は、下端に所定の曲率の曲がり部よりなる管口保護部を有し、その長手方向に通線の誘導路が形成されたレール材を、該管口保護部を横断管の管口に臨ませるとともに、相対する立孔のそれぞれの壁面に沿って立設し、該両立孔の上位に配された各ウインチにより当該通線を該レール材の誘導路に沿って所定の張力をもって誘導し、立孔間の横断管内に高さ及び張力を調整してなし、 前記通線には取付け台車が介装され、
前記通線の取付け台車との取付け部(連結部)を介して流速計測装置部が取り付けられてなる、
ことを特徴とする曲がり管路に配される通線とともに使用される横断管の断面計測装置。
In the bent pipe line connected to the flow state through the straight transverse pipe between the opposing vertical holes of the fluid pipe line that forms the flow of fluid from the upstream to the downstream,
A cross-section measuring device for the broken pipe used by being connected to a line that is arranged over the vertical hole and the transverse pipe and moves with an intended tension in the axial direction of the vertical hole and the transverse pipe,
In the arrangement of the through wire, a rail member having a pipe port protecting portion formed of a bent portion having a predetermined curvature at a lower end and having a guide line for the through wire formed in the longitudinal direction thereof is crossed over the pipe port protecting portion. It faces the pipe mouth of the pipe, and stands along each wall surface of the opposite vertical hole, and the wiring is predetermined along the guide path of the rail material by each winch arranged above the compatible hole. The height and tension are adjusted in the transverse pipe between the vertical holes, and a mounting carriage is interposed in the line,
A flow velocity measuring device part is attached via an attachment part (connecting part) with the attachment carriage of the line,
A cross-section measuring device for a transverse pipe used together with a line arranged in a bent pipe line.
上流から下流への流体の流れをなす流体管路の、対向する立孔間を直線状の横断管を介して流通状態に接続される曲がり管路において、
前記立孔及び横断管にわたって配されるとともに該立孔及び横断管の軸方向に所期の張力をもって移動する通線に連結されて使用され、
前記通線には取付け台車が介装され、
前記通線の取付け台車との取付け部を介して流速計測装置部が取り付けられてなる断面計測装置を使用してなされる横断管の断面計測方法であって、
前記通線の移動とともに、前記流速計測装置部より流速を計測し、上記通線の移動量と上記計測値を情報処理し、当該横断管の断面状況を計測する、
ことを特徴とする曲がり管路における横断管の断面計測方法。
In the bent pipe line connected to the flow state through the straight transverse pipe between the opposing vertical holes of the fluid pipe line that forms the flow of fluid from the upstream to the downstream,
Used across the vertical hole and the transverse pipe and connected to a line that moves with the desired tension in the axial direction of the vertical hole and the transverse pipe,
A mounting carriage is interposed in the line,
A cross-section measurement method for a transverse pipe, which is performed using a cross-section measurement device to which a flow velocity measurement device portion is attached via an attachment portion with an attachment carriage of the line,
Along with the movement of the line, the flow velocity is measured from the flow velocity measuring device, the movement amount of the line and the measured value are processed, and the cross-sectional state of the transverse pipe is measured.
A method for measuring a cross section of a transverse pipe in a bent pipe.
通線の配設は、下端に所定の曲率の曲がり部よりなる管口保護部を有し、その長手方向に通線の誘導路が形成されたレール材を、該管口保護部を横断管の管口に臨ませるとともに、相対する立孔のそれぞれの壁面に沿って立設し、
該両立孔の上位に配された各ウインチにより当該通線を該レール材の誘導路に沿って所定の張力をもって誘導し、
立孔間の横断管内に高さ及び張力を調整してなす、
ことを特徴とする請求項4に記載の曲がり管路における横断管の断面計測方法。
In the arrangement of the through wire, a rail member having a pipe port protecting portion consisting of a bent portion with a predetermined curvature at the lower end and having a through wire guiding path formed in the longitudinal direction of the rail material is passed through the pipe port protecting portion. And erected along each wall of the opposite vertical hole,
The winch is guided with a predetermined tension along the guide path of the rail material by each winch arranged above the compatible hole,
Adjust the height and tension in the transverse pipe between the vertical holes,
The method of measuring a cross section of a transverse pipe in a bent pipe according to claim 4.
上流から下流への流体の流れをなす流体管路の、対向する立孔間を直線状の横断管を介して流通状態に接続される曲がり管路において、
前記立孔及び横断管にわたって配されるとともに該立孔及び横断管の軸方向に所期の張力をもって移動する通線に連結されて使用され、
前記通線には取付け台車が介装され、
前記通線の取付け台車との取付け部を介して流速計測装置部が取り付けられてなる断面計測装置を使用してなされる横断管の断面計測方法であって、
通線の配設は、下端に所定の曲率の曲がり部よりなる管口保護部を有し、その長手方向に通線の誘導路が形成されたレール材を、該管口保護部を横断管の管口に臨ませるとともに、相対する立孔のそれぞれの壁面に沿って立設し、該両立孔の上位に配された各ウインチにより当該通線を該レール材の誘導路に沿って所定の張力をもって誘導し、立孔間の横断管内に高さ及び張力を調整して配設され、
前記通線の移動とともに、前記流速計測装置部より流速を計測し、上記通線の移動量と上記計測値を情報処理し、当該横断管の断面状況を計測する、
ことを特徴とする曲がり管路における横断管の断面計測方法。
In the bent pipe line connected to the flow state through the straight transverse pipe between the opposing vertical holes of the fluid pipe line that forms the flow of fluid from the upstream to the downstream,
Used across the vertical hole and the transverse pipe and connected to a line that moves with the desired tension in the axial direction of the vertical hole and the transverse pipe,
A mounting carriage is interposed in the line,
A cross-section measurement method for a transverse pipe, which is performed using a cross-section measurement device to which a flow velocity measurement device portion is attached via an attachment portion with an attachment carriage of the line,
In the arrangement of the through wire, a rail member having a pipe port protecting portion consisting of a bent portion with a predetermined curvature at the lower end and having a through wire guiding path formed in the longitudinal direction of the rail material is passed through the pipe port protecting portion. And the standing line along each wall surface of the opposite vertical hole, and the winch arranged above the compatible hole is used to pass the wire along the guide path of the rail material. Inducted with tension, arranged in the transverse tube between the vertical holes with height and tension adjusted,
Along with the movement of the line, the flow velocity is measured from the flow velocity measuring device, the movement amount of the line and the measured value are processed, and the cross-sectional state of the transverse pipe is measured.
A method for measuring a cross section of a transverse pipe in a bent pipe.
JP2013179439A 2013-08-30 2013-08-30 Cross section measuring device for cross pipe in bent pipe and cross section measuring method for cross pipe made using the cross section measuring device Active JP5992882B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013179439A JP5992882B2 (en) 2013-08-30 2013-08-30 Cross section measuring device for cross pipe in bent pipe and cross section measuring method for cross pipe made using the cross section measuring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013179439A JP5992882B2 (en) 2013-08-30 2013-08-30 Cross section measuring device for cross pipe in bent pipe and cross section measuring method for cross pipe made using the cross section measuring device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2015197543A Division JP6181131B2 (en) 2015-10-05 2015-10-05 Cross-tube flow velocity measuring device and method for measuring cross-flow velocity in curved pipe

Publications (2)

Publication Number Publication Date
JP2015048602A true JP2015048602A (en) 2015-03-16
JP5992882B2 JP5992882B2 (en) 2016-09-14

Family

ID=52698849

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013179439A Active JP5992882B2 (en) 2013-08-30 2013-08-30 Cross section measuring device for cross pipe in bent pipe and cross section measuring method for cross pipe made using the cross section measuring device

Country Status (1)

Country Link
JP (1) JP5992882B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07279141A (en) * 1994-04-08 1995-10-24 Mitsubishi Heavy Ind Ltd Method and device for carrying machine into horizontal hole
JP2003121379A (en) * 2001-10-19 2003-04-23 Hitachi Ltd Pipe checking device
JP2003294502A (en) * 2002-04-03 2003-10-15 Ueda Japan Radio Co Ltd Measurement device of sewage flow rate in sewage pipe
JP2008179992A (en) * 2007-01-25 2008-08-07 Hitachi Ltd Sewerage unknown water detecting method and device
JP2008286654A (en) * 2007-05-18 2008-11-27 Mitsubishi Electric Corp In-pipe measuring device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07279141A (en) * 1994-04-08 1995-10-24 Mitsubishi Heavy Ind Ltd Method and device for carrying machine into horizontal hole
JP2003121379A (en) * 2001-10-19 2003-04-23 Hitachi Ltd Pipe checking device
JP2003294502A (en) * 2002-04-03 2003-10-15 Ueda Japan Radio Co Ltd Measurement device of sewage flow rate in sewage pipe
JP2008179992A (en) * 2007-01-25 2008-08-07 Hitachi Ltd Sewerage unknown water detecting method and device
JP2008286654A (en) * 2007-05-18 2008-11-27 Mitsubishi Electric Corp In-pipe measuring device

Also Published As

Publication number Publication date
JP5992882B2 (en) 2016-09-14

Similar Documents

Publication Publication Date Title
JP5923071B2 (en) Method of passing working line to transverse pipe in fluid conduit and apparatus used in the method
CN103924597B (en) Platform-type jackstone leveling ship and construction method thereof
CN207048069U (en) A kind of pipe gallery segmental timbering
US8122913B2 (en) High pressure hose protector
CN202298628U (en) Automatic steel pipe column perpendicularity adjusting device using reverse construction method
CN104532843A (en) Method for positioning and straightening steel stand column of stand column pile
JP6181131B2 (en) Cross-tube flow velocity measuring device and method for measuring cross-flow velocity in curved pipe
RU2316630C2 (en) Method for pipeline protection against emergency state caused by doline
JP2016000959A5 (en)
CN102767643B (en) Sectional laying and mounting method for long-distance pipeline in culvert
JP5992882B2 (en) Cross section measuring device for cross pipe in bent pipe and cross section measuring method for cross pipe made using the cross section measuring device
CN104280403A (en) Defect detection device and detection method for under dam culvert
JP5795784B2 (en) Cross section measuring device for cross pipe in bent pipe and cross section measuring method for cross pipe made using the cross section measuring device
CN104196062B (en) A kind of cast-in-place concrete pile free of discontinuities sound detecting pipe installation method and device of detecting
CN210985463U (en) Auxiliary device is laid to cable
JP5877180B2 (en) CLEANING TUBE CLEANING DEVICE IN BENDED PIPELINE AND METHOD OF CLEANING CROSS TUBE USING THE CLEANING DEVICE
JP5877179B2 (en) CLEANING TUBE CLEANING DEVICE IN BENDED PIPELINE AND METHOD OF CLEANING CROSS TUBE USING THE CLEANING DEVICE
US9683679B2 (en) Method for laying a pipeline
JP5602042B2 (en) Separation distance measuring device
JP2009008567A (en) Flow measurement system of river
EP1486616A1 (en) Wire type excavating accuracy control device of soil improving machine
CN105464060A (en) Supporting leg and iron shoe transportation construction method of inner-hole pressure steel pipe
CN110306420A (en) Pipe bridge interior conduit transport device and its construction method
JP5171753B2 (en) Pipe thinning measuring device and pipe thinning measuring method using the same
JP2008082804A (en) Measurement method and measurement device of link type displacement gauge

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150722

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150804

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151001

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151002

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151005

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160301

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160420

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160816

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160818

R150 Certificate of patent or registration of utility model

Ref document number: 5992882

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250