JP2015031631A - Watt-hour meter - Google Patents

Watt-hour meter Download PDF

Info

Publication number
JP2015031631A
JP2015031631A JP2013162529A JP2013162529A JP2015031631A JP 2015031631 A JP2015031631 A JP 2015031631A JP 2013162529 A JP2013162529 A JP 2013162529A JP 2013162529 A JP2013162529 A JP 2013162529A JP 2015031631 A JP2015031631 A JP 2015031631A
Authority
JP
Japan
Prior art keywords
terminal
power
meter
terminal block
side terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2013162529A
Other languages
Japanese (ja)
Inventor
法正 藤田
Norimasa Fujita
法正 藤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2013162529A priority Critical patent/JP2015031631A/en
Publication of JP2015031631A publication Critical patent/JP2015031631A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a watt-hour meter capable of meeting with any of whole power purchasing system and excess power purchasing system by one set only.SOLUTION: The watt-hour meter includes: a first terminal 110; a second terminal 120; a third terminal 130; a first power selling meter 140 for measuring power supplied to the second terminal 120 from the first terminal 110; a second power selling meter 160 for measuring the power supplied to the third terminal 130 from the first terminal 110; a first power buying meter 150 for measuring the power supplied to the first terminal 110 from the second terminal 120; a housing 180 for storing the first power selling meter 140, the second power selling meter 160, and the first power buying meter 150; and a terminal block 190 fitted with the first terminal 110, the second terminal 120, and the third terminal 130. The first terminal 110 and the second terminal 120 are connected in series with each other via the first power selling meter 140 and the first power buying meter 150. The first terminal 110 and the third terminal 130 are connected with each other via the second power selling meter 160.

Description

本発明は、異なる電力を計測する複数の電力メータを備える電力量計に関する。   The present invention relates to a watt hour meter including a plurality of power meters that measure different powers.

従来より、発電設備(太陽光発電設備等)を所有する一般家庭は、この発電設備で発電された電力を生活に必要な電力として自ら使用し、使用せずに余った電力を電力会社に買い取ってもらうことがあった。ただし、発電設備で発電される電力は、日照量等の環境要因によって変動するため、発電設備を所有する一般家庭は、自ら使用する電力を常に発電設備で発電された電力で賄うことができない。そのため、発電設備を所有する一般家庭は、電力会社から必要に応じて電力を売ってもらう必要もある。
よって、電力会社は、発電設備を所有する一般家庭が使用せずに余った電力の買い取りを行うとともに、発電設備を所有する一般家庭に電力を売ることも行っている。
Conventionally, ordinary households that own power generation equipment (solar power generation equipment, etc.) use the power generated by this power generation equipment as necessary for their daily lives, and purchase the remaining power from the power company. There was sometimes. However, since the electric power generated by the power generation facility fluctuates due to environmental factors such as the amount of sunlight, ordinary households who own the power generation facility cannot always cover the power they use with the power generated by the power generation facility. For this reason, ordinary households that own power generation facilities also need to have their electric power sold as needed.
Therefore, the electric power company purchases surplus power without being used by a general household that owns the power generation equipment, and also sells power to a general household that owns the power generation equipment.

このように、発電設備を所有する一般家庭が、発電設備で発電した電力を生活に必要な電力として自ら使用し、使用せずに余った電力を電力会社に買い取ってもらうとともに、必要に応じて電力会社から電力を売ってもらう方式は、余剰買い取り方式と呼ばれている。   In this way, ordinary households that own power generation equipment use the power generated by the power generation equipment as necessary for their daily lives, and have the power company buy the remaining power without using it, as needed. A method of selling power from an electric power company is called a surplus purchase method.

電力会社が一般家庭から電力を買い取るためには、買い取る電力の電力量を計測するための買電メータが必要である。また、発電設備を所有する一般家庭に電力を売るためには、売る電力の電力量を計測するための売電メータが必要である。そして、これら2つのメータは、共に一般家庭の敷地内に設置される。   In order for an electric power company to purchase electric power from a general household, a power purchase meter for measuring the amount of electric power to be purchased is necessary. In addition, in order to sell electric power to a general household that owns power generation equipment, a power sale meter for measuring the amount of electric power sold is necessary. These two meters are both installed in a general household site.

一般家庭の敷地内に2つの電力メータを設置する場合、広い設置場所が必要になり、かつ、配線も複雑になるという問題がある。従来、この問題を解決するために、2つの電力メータを一体化した電力量計が提案されている(特許文献1、特許文献2参照。)。   When two power meters are installed in a general household site, there is a problem that a large installation place is required and wiring is complicated. Conventionally, in order to solve this problem, a watt hour meter in which two power meters are integrated has been proposed (see Patent Document 1 and Patent Document 2).

特開2011−80810号公報JP 2011-80810 A 特開平9−218224号公報JP-A-9-218224

ところで、電力会社が一般家庭から買い取る電力の単価は、電力会社が一般家庭に売る電力の単価よりも高いことがある。そのため、一般家庭は、発電設備で発電した電力を自らは使用せず、すべて電力会社に買い取ってもらった上で、必要な電力をすべて電力会社から売ってもらった方が、発電設備で発電した電力を自ら使用する余剰買い取り方式よりも、金銭的に有利なことがある。一般家庭が、発電設備で発電した電力を自らは使用せず、すべて電力会社に買い取ってもらった上で、必要な電力をすべて電力会社から売ってもらう方式は、全量買い取り方式と呼ばれている。   By the way, the unit price of electric power purchased by an electric power company from an ordinary household may be higher than the unit price of electric power sold by an electric power company to an ordinary household. For this reason, ordinary households do not use the power generated by the power generation facilities themselves, but have all the necessary power sold from the power companies after they are purchased by the power companies, and the power generation facilities generate power. It may be more financially advantageous than the surplus purchase method that uses electricity by itself. A method in which a general household does not use the power generated by the power generation facility, but buys all the necessary power from the power company after it is purchased by the power company, is called a full purchase method. .

しかし、全量買い取り方式を採用する場合、電力メータが3つ必要となり、配線も余剰買い取り方式に比べると複雑になる。また、発電設備で発電する電力が少ない場合や、電力会社が一般家庭から買い取る電力の単価が高くない場合には、全量買い取り方式にするメリットがなく、余剰買い取り方式を採用した方がよい場合もある。   However, when the total purchase method is adopted, three power meters are required, and the wiring becomes more complicated than the surplus purchase method. In addition, when the power generated by the power generation facility is low or the unit price of power purchased by a power company from a general household is not high, there is no merit in using the full purchase method, and it may be better to adopt the surplus purchase method. is there.

本発明は、全量買い取り方式及び余剰買い取り方式のいずれの方式にも1台で対応できる電力量計を提供することを目的とする。   An object of this invention is to provide the watt-hour meter which can respond | correspond to any system of all quantity purchase systems and a surplus purchase system.

(1)第1端子と、第2端子と、第3端子と、前記第1端子から前記第2端子に供給される電力を計測する第1売電メータと、前記第1端子から前記第3端子に供給される電力を計測する第2売電メータと、前記第2端子から前記第1端子に供給される電力を計測する第1買電メータと、前記第1売電メータ、前記第2売電メータ及び前記第1買電メータを収納する筐体と、前記第1端子、前記第2端子及び前記第3端子が取り付けられている端子台と、を備え、前記第1端子と前記2端子とは、直列に接続された前記第1売電メータ及び前記第1買電メータを介して接続されており、前記第1端子と前記第3端子とは、前記第2売電メータを介して接続されている。   (1) a first terminal, a second terminal, a third terminal, a first power sale meter for measuring power supplied from the first terminal to the second terminal, and a third terminal from the first terminal. A second power sale meter for measuring power supplied to the terminal; a first power purchase meter for measuring power supplied from the second terminal to the first terminal; the first power sale meter; A housing for storing a power sale meter and the first power purchase meter; and a terminal block to which the first terminal, the second terminal, and the third terminal are attached, the first terminal and the 2 The terminal is connected via the first power meter and the first power meter connected in series, and the first terminal and the third terminal are connected via the second power meter. Connected.

(1)の電力量計によれば、全量買い取り方式及び余剰買い取り方式のいずれの方式にも1台で対応することが可能となる。   According to the watt-hour meter of (1), it is possible to deal with both the total purchase method and the surplus purchase method with one unit.

(2)(1)において、前記筐体は、表示部を有しており、前記表示部は、前記第1売電メータが計測する電力の値、前記第2売電メータが計測する電力の値及び前記第1買電メータが計測する電力の値のうちのいずれか1つ以上を表示する電力量計。   (2) In (1), the housing includes a display unit, and the display unit is configured to display a value of power measured by the first power sale meter and power measured by the second power sale meter. A watt-hour meter that displays one or more of a value and a value of power measured by the first power meter.

(2)の電力量計によれば、第1買電メータ、第2売電メータ及び第1買電メータで計測した値を必要に応じて表示部に自由に表示させることができる。   According to the watt-hour meter of (2), the values measured by the first power meter, the second power meter, and the first power meter can be freely displayed on the display unit as necessary.

(3)(2)において、前記端子台は、第1の厚みを有する第1端子台部と、前記第1の厚みよりも厚い第2の厚みを有する第2端子台部と、を有しており、引込線側端子、発電設備側端子及び負荷設備側端子のうちの1つは、前記第1端子台部と前記第2端子台部のいずれか一方に取り付けられており、引込線側端子、発電設備側端子及び負荷設備側端子のうちの残りの2つは、前記第1端子台部と前記第2端子台部の他方に取り付けられている電力量計。   (3) In (2), the terminal block includes a first terminal block portion having a first thickness, and a second terminal block portion having a second thickness larger than the first thickness. One of the lead-in wire side terminal, the power generation equipment side terminal, and the load equipment side terminal is attached to one of the first terminal block and the second terminal block, The remaining two of the power generation facility side terminal and the load facility side terminal are watt hour meters attached to the other of the first terminal block and the second terminal block.

(3)の電力量計によれば、第1端子と第2端子と第3端子に配線をそれぞれ接続する場合に、配線同士が短絡することを抑制することができる。   According to the watt-hour meter of (3), when wiring is connected to the first terminal, the second terminal, and the third terminal, it is possible to suppress short-circuiting of the wirings.

(4)(1)において、前記端子台は、第1端子台部と、第2端子台部と、を有し、前記筐体と、前記第1端子台部と、前記第2端子台部とは、並んで配置されており、前記筐体は、前記第1端子台部に隣接しており、前記第2端子台部は、前記第1端子台部における前記筐体に隣接する部分と反対側の部分に隣接しており、前記第1端子、前記第2端子及び前記第3端子のうちの1つは、前記第1端子台部と前記第2端子台部のいずれか一方に取り付けられており、前記第1端子、前記第2端子及び前記第3端子のうちの残りの2つは、前記第1端子台部と前記第2端子台部の他方に取り付けられている電力量計。   (4) In (1), the terminal block includes a first terminal block portion and a second terminal block portion, and the housing, the first terminal block portion, and the second terminal block portion. Are arranged side by side, the case is adjacent to the first terminal block, and the second terminal block is a portion of the first terminal block adjacent to the case. Adjacent to the opposite portion, one of the first terminal, the second terminal, and the third terminal is attached to one of the first terminal block and the second terminal block The remaining two of the first terminal, the second terminal, and the third terminal are attached to the other of the first terminal base part and the second terminal base part. .

(4)の電力量計によれば、第1端子と第2端子と第3端子に配線をそれぞれ接続する場合に、配線同士が短絡することを抑制することができる。   According to the watt-hour meter of (4), when the wiring is connected to the first terminal, the second terminal, and the third terminal, respectively, it is possible to suppress the wiring from being short-circuited.

(5)(1)において、前記第3端子から前記第1端子に供給される電力を計測する第2買電メータをさらに備え、前記第2買電メータは前記筐体に収納されており、前記第1端子と前記3端子とは、直列に接続された前記第2売電メータ及び前記第2買電メータを介して接続されている電力量計。   (5) In (1), it further comprises a second power purchase meter for measuring the power supplied from the third terminal to the first terminal, and the second power purchase meter is housed in the housing, The first terminal and the three terminals are watt-hour meters connected via the second power sale meter and the second power purchase meter connected in series.

本発明によれば、全量買い取り方式と余剰買い取り方式の両方に一台で対応することができる。   According to the present invention, it is possible to cope with both the full quantity purchase method and the surplus purchase method.

全量買い取り方式を採用した第1実施形態の電力計測システム1の概略図である。It is the schematic of the electric power measurement system 1 of 1st Embodiment which employ | adopted the whole quantity purchase method. 本発明に係る電力量計100の正面図である。It is a front view of the watt-hour meter 100 which concerns on this invention. 本発明に係る電力量計100の端子台190の拡大図である。It is an enlarged view of the terminal block 190 of the watt-hour meter 100 which concerns on this invention. 本発明に係る電力量計100の右側面図である。It is a right view of the watt-hour meter 100 which concerns on this invention. 余剰買い取り方式を採用した第1実施形態の電力計測システム2の概略図である。It is the schematic of the electric power measurement system 2 of 1st Embodiment which employ | adopted the surplus purchase system. 余剰買い取り方式を採用した第2実施形態の電力計測システム3の概略図である。It is the schematic of the electric power measurement system 3 of 2nd Embodiment which employ | adopted the surplus purchase method.

以下、本発明の実施形態について、図面を参照しながら詳細に説明する。
[第1実施形態]
図1は、全量買い取り方式を採用した第1実施形態の電力計測システム1の概略図である。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[First Embodiment]
FIG. 1 is a schematic diagram of a power measurement system 1 according to the first embodiment that employs a total purchase method.

図1に示すように、全量買い取り方式を採用した第1実施形態の電力計測システム1は、本発明の第1実施形態の電力量計100と、引込線Wと、発電設備Gと、パワーコンディショナPCSと、分電盤DBと、を備えている。また、この電力測定システム1には、負荷設備Lが接続されている。   As shown in FIG. 1, the power measurement system 1 according to the first embodiment adopting the total purchase method is a watt-hour meter 100 according to the first embodiment of the present invention, a lead-in wire W, a power generation facility G, and a power conditioner. PCS and distribution board DB are provided. In addition, a load facility L is connected to the power measurement system 1.

図1に示すように、電力量計100は、第1端子としての引込線側端子110と、第2端子としての発電設備側端子120と、第3端子としての負荷設備側端子130と、第1売電メータ140と、第1買電メータ150と、第2売電メータ160と、筐体180と、端子台190と、を有する。   As shown in FIG. 1, the watt hour meter 100 includes a lead-in wire side terminal 110 as a first terminal, a power generation equipment side terminal 120 as a second terminal, a load equipment side terminal 130 as a third terminal, It has a power sale meter 140, a first power purchase meter 150, a second power sale meter 160, a housing 180, and a terminal block 190.

引込線側端子110は、引込線Wの一端に電気的に接続されている。また、引込線Wの他端は、図示しない配電線に電気的に接続されている。発電設備側端子120は、パワーコンディショナPCSを介して、発電設備Gに電気的に接続されている。負荷設備側端子130は、分電盤DBを介して、負荷設備Lに電気的に接続されている。   The lead-in terminal 110 is electrically connected to one end of the lead-in wire W. The other end of the lead-in wire W is electrically connected to a distribution line (not shown). The power generation facility side terminal 120 is electrically connected to the power generation facility G via the power conditioner PCS. The load facility side terminal 130 is electrically connected to the load facility L via the distribution board DB.

電力量計100において、引込線側端子110、発電設備側端子120及び負荷設備側端子130は、端子台190に取り付けられている。第1売電メータ140、第2売電メータ160及び第1買電メータ150は、筐体180の中に収納されている。
なお、筐体180及び端子台190の具体的な構成については、図2〜図4を用いて後述する。
In the watt-hour meter 100, the lead-in wire side terminal 110, the power generation facility side terminal 120, and the load facility side terminal 130 are attached to the terminal block 190. The first power sale meter 140, the second power sale meter 160, and the first power purchase meter 150 are housed in a housing 180.
Note that specific configurations of the housing 180 and the terminal block 190 will be described later with reference to FIGS.

電力量計100内において、引込線側端子110は、配線L1の一端に電気的に接続されている。配線L1の他端は、分岐点Jに電気的に接続されている。配線L1は、分岐点Jを介して、配線L2及び配線L3に電気的に接続されている。配線L2は、発電設備側端子120に電気的に接続されており、配線L2の途中には、分岐点J側から順に第1売電メータ140及び第1買電メータ150が電気的に接続されている。配線L3は、負荷設備側端子130に電気的に接続されており、配線L3の途中には、第2売電メータ160が接続されている。   In the watt-hour meter 100, the lead-in terminal 110 is electrically connected to one end of the wiring L1. The other end of the wiring L1 is electrically connected to the branch point J. The wiring L1 is electrically connected to the wiring L2 and the wiring L3 via the branch point J. The wiring L2 is electrically connected to the power generation facility side terminal 120, and the first power sale meter 140 and the first power purchase meter 150 are electrically connected in order from the branch point J side in the middle of the wiring L2. ing. The wiring L3 is electrically connected to the load facility side terminal 130, and the second power sale meter 160 is connected to the middle of the wiring L3.

つまり、電力量計100において、引込線側端子110と発電設備側端子120とは、直列に接続された第1売電メータ140及び第1買電メータ150を介して接続される。引込線側端子110と負荷設備側端子130とは、第2売電メータ160を介して接続される。   That is, in the watt-hour meter 100, the lead-in wire side terminal 110 and the power generation equipment side terminal 120 are connected via the first power sale meter 140 and the first power purchase meter 150 connected in series. The lead-in wire side terminal 110 and the load facility side terminal 130 are connected via a second power sale meter 160.

なお、図1において、分岐点Jは、筐体180の中に存在するように示しているが、これに限定されない。分岐点Jは、電力量計100に存在していればよく、例えば、端子台190に存在していてもよい。このように、分岐点Jが電力量計100に存在しているため、全量買い取り方式において、第1売電メータ140及び第2売電メータ160を引込線Wに別々に接続する必要はない。そのため、配線を行う作業者の作業負担は、2つの売電メータを個別に引込線Wに接続する場合に比べて軽減される。   In FIG. 1, the branch point J is shown to exist in the housing 180, but is not limited to this. The branch point J only needs to exist in the watt-hour meter 100, and may exist in the terminal block 190, for example. As described above, since the branch point J exists in the watt-hour meter 100, it is not necessary to separately connect the first power sale meter 140 and the second power sale meter 160 to the lead-in line W in the total amount purchase method. Therefore, the work burden of the worker who performs wiring is reduced as compared with the case where the two power sale meters are individually connected to the lead-in wire W.

発電設備Gは、太陽光電池パネル等で構成されており、電力会社に供給するための電力を発電する。
パワーコンディショナPCSは、発電設備Gで発電された電力を電力会社に供給するために適した電力に変換する。
分電盤DBは、電力会社から供給された電力を家庭内の複数の部屋へ分配する。また、分電盤DBには、漏電や過電流の防止のために、ブレーカー等が設けられている。
負荷設備Lは、家庭で使用される使用機器を概念的にまとめたものであり、例えば、家電製品、照明、電子機器等である。負荷設備Lは、分電盤DBで分配された電力を消費する。
The power generation facility G is composed of a solar battery panel or the like, and generates power to be supplied to an electric power company.
The power conditioner PCS converts the power generated by the power generation facility G into power suitable for supplying the power company.
The distribution board DB distributes the electric power supplied from the electric power company to a plurality of rooms in the home. Further, the distribution board DB is provided with a breaker or the like to prevent leakage or overcurrent.
The load facility L is a conceptual collection of devices used in the home, such as home appliances, lighting, electronic devices, and the like. The load facility L consumes the power distributed by the distribution board DB.

第1売電メータ140は、引込線側端子110から発電設備側端子120に供給される電力を計測する。
第1買電メータ150は、発電設備側端子120から引込線側端子110に供給される電力を計測する。
第2売電メータ160は、引込線側端子110から負荷設備側端子130に供給される電力を計測する。
The first power sale meter 140 measures the power supplied from the service line side terminal 110 to the power generation equipment side terminal 120.
The first electricity purchase meter 150 measures the electric power supplied from the power generation equipment side terminal 120 to the lead-in wire side terminal 110.
The second power sale meter 160 measures the power supplied from the lead-in wire side terminal 110 to the load facility side terminal 130.

全量買い取り方式を採用した電力計測システム1における電力の流れは、次の通りである。
電力会社で発電された電力は、図示しない配電線及び引込線Wを介して引込線側端子110に供給される。引込線側端子110に供給された電力は、配線L1を介して分岐点Jに供給される。分岐点Jに供給された電力は、配線L2と配線L3に分岐する。配線L2に分岐した電力は、発電設備側端子120を介して、パワーコンディショナPCSや発電設備Gに供給される。配線L3に分岐した電力は、負荷設備側端子130及び分電盤DBを介して負荷設備Lに供給される。
The flow of electric power in the electric power measurement system 1 adopting the total purchase method is as follows.
The electric power generated by the electric power company is supplied to the service line side terminal 110 through a distribution line and a service line W (not shown). The electric power supplied to the lead-in terminal 110 is supplied to the branch point J through the wiring L1. The electric power supplied to the branch point J branches to the wiring L2 and the wiring L3. The electric power branched to the wiring L2 is supplied to the power conditioner PCS and the power generation equipment G through the power generation equipment side terminal 120. The power branched to the wiring L3 is supplied to the load facility L via the load facility side terminal 130 and the distribution board DB.

パワーコンディショナPCSや発電設備Gに供給された電力は、パワーコンディショナPCSや発電設備Gを駆動するために消費される。また、負荷設備Lに供給された電力は、負荷設備Lを駆動するために消費される。
このとき、第1売電メータ140は、引込線側端子110から発電設備側端子120に供給される電力、すなわち、電力会社からパワーコンディショナPCSや発電設備Gに供給される電力を計測する。第2売電メータ160は、引込線側端子110から負荷設備側端子130に供給される電力、すなわち、電力会社から負荷設備Lに供給される電力を計測する。
The electric power supplied to the power conditioner PCS and the power generation facility G is consumed to drive the power conditioner PCS and the power generation facility G. Further, the electric power supplied to the load facility L is consumed to drive the load facility L.
At this time, the 1st power sale meter 140 measures the electric power supplied to the power conditioner PCS and the power generation equipment G from the power company, ie, the electric power supplied to the power generation equipment side terminal 120 from the service line side terminal 110. The second power sale meter 160 measures the power supplied from the service line side terminal 110 to the load facility side terminal 130, that is, the power supplied from the power company to the load facility L.

発電設備Gで発電された電力は、パワーコンディショナPCSを介して発電設備側端子120に供給され、引込線側端子110、引込線200及び図示しない配電線を介して電力会社に供給される。
このとき、第1買電メータ150は、発電設備側端子120から引込線側端子110に供給される電力、すなわち、発電設備Gで発電され、電力会社に供給される電力を計測する。
The electric power generated by the power generation facility G is supplied to the power generation facility side terminal 120 through the power conditioner PCS, and is supplied to the power company through the service line side terminal 110, the service line 200, and a distribution line (not shown).
At this time, the first electricity purchase meter 150 measures the power supplied from the power generation facility side terminal 120 to the lead-in wire side terminal 110, that is, the power generated by the power generation facility G and supplied to the power company.

電力会社は、第1売電メータ140、第1買電メータ150及び第2売電メータ160の計測結果に基づいて、一般家庭から供給された電力の料金(買電料金)及び一般家庭に供給した電力の料金(売電料金)を決める。
例えば、第1買電メータ150が計測した電力から第1売電メータ140が計測した電力を引いた電力を買い取り電力とし、この買い取り電力に買い取り電力用単価を掛けることによって、買電料金を決めることができる。そして、第2売電メータ160が計測した電力を一般家庭に売る電力とし、この売る電力に単位電力あたりの売る電力用単価を掛けることによって、売電料金を決めることができる。
Based on the measurement results of the first power sale meter 140, the first power purchase meter 150, and the second power sale meter 160, the electric power company supplies the electric power supplied from an ordinary household (electricity purchase fee) and the ordinary household. Decide the price of the electricity (power sales fee).
For example, a power purchase fee is determined by taking power obtained by subtracting power measured by the first power sale meter 140 from power measured by the first power purchase meter 150 and multiplying the purchased power by the unit price for the purchased power. be able to. Then, the power measured by the second power sale meter 160 is set as the power sold to a general household, and the power selling fee can be determined by multiplying the sold power by the unit price for power sold per unit power.

次に、電力量計100の具体的な構造について、図2〜図4を参照しながら説明する。   Next, a specific structure of the watt-hour meter 100 will be described with reference to FIGS.

図2は、電力量計100の正面図である。図3は、本発明に係る電力量計の端子台の拡大図である。図4は、本発明に係る電力量計の右側面図である。   FIG. 2 is a front view of the watt-hour meter 100. FIG. 3 is an enlarged view of the terminal block of the watt-hour meter according to the present invention. FIG. 4 is a right side view of the watt-hour meter according to the present invention.

電力量計100は、筐体180と、端子台190とを有している。筐体180は、箱状となっており、筐体180の中には、上述した第1売電メータ140、第1買電メータ150及び第2売電メータ160が収納されている。これらのメータは、電子式のメータである。なお、メータは、電子式である必要はないが、電子式のメータの方が、誘導形のメータ等の他のメータに比べて小型化が容易である。また、筐体180の中には、これらのメータの他に、各メータ同士を電気的に接続するための配線も収容されている。さらに、筐体180の中には、必要に応じて、記憶装置、通信装置、保護回路等が収納される。   The watt-hour meter 100 includes a housing 180 and a terminal block 190. The case 180 has a box shape, and the case 180 houses the first power sale meter 140, the first power purchase meter 150, and the second power sale meter 160 described above. These meters are electronic meters. The meter does not need to be electronic, but the electronic meter is easier to miniaturize than other meters such as an induction meter. In addition to these meters, housing 180 also contains wiring for electrically connecting the meters. Further, a storage device, a communication device, a protection circuit, and the like are accommodated in the housing 180 as necessary.

図2に示すように、筐体180の形状は、正面視において、4つの角が丸みを帯びた長方形である。筐体180の中央には、長方形の表示部181が配置されている。表示部181は、例えば液晶ディスプレイや有機ELディスプレイ等で構成されている。この表示部181には、第1売電メータ140、第1買電メータ150及び第2売電メータ160で計測された電力の値のすべてを一度に表示させることが可能である。このように、第1売電メータ140、第1買電メータ150及び第2売電メータ160で計測したすべての電力を表示部181に表示することが可能であるため、電力量計100の検針が容易になる。また、第1売電メータ140、第1買電メータ150及び第2売電メータ160で計測した電力のうちの1つ又は2つを選択的に表示し、残りの電力を選択的に非表示にすることもできる。よって、必要な電力の値のみを表示し、不必要な電力の値を非表示とできるため、電力量計100の検針における誤検針が抑制される。   As shown in FIG. 2, the shape of the housing 180 is a rectangle having four rounded corners when viewed from the front. A rectangular display unit 181 is disposed at the center of the housing 180. The display unit 181 is configured by, for example, a liquid crystal display or an organic EL display. The display unit 181 can display all the power values measured by the first power sale meter 140, the first power purchase meter 150, and the second power sale meter 160 at a time. Thus, since all the power measured with the 1st power sale meter 140, the 1st power purchase meter 150, and the 2nd power sale meter 160 can be displayed on the display part 181, the meter-reading of the watt-hour meter 100 is possible. Becomes easier. In addition, one or two of the power measured by the first power sale meter 140, the first power purchase meter 150, and the second power sale meter 160 are selectively displayed, and the remaining power is selectively hidden. It can also be. Therefore, only the necessary power value can be displayed and the unnecessary power value can be hidden, so that erroneous meter reading in the meter reading of the watt-hour meter 100 is suppressed.

また、表示部181には、各メータが計測した電力の他に、日付、時刻、電力量計100の動作状態や位置情報等の様々な情報を表示させることもできる。また、筐体180の中に記憶装置を設けておき、各メータが計測した電力、電力量計100の動作状態等を日付や時刻とともに記憶させておけば、過去に計測した電力や過去の動作状態等を表示部181に表示させることもできる。なお、表示部181の操作については、図3を用いて後述する。   In addition to the power measured by each meter, the display unit 181 can also display various information such as date, time, operating state of the watt-hour meter 100, and position information. In addition, if a storage device is provided in the housing 180 and the power measured by each meter, the operation state of the watt hour meter 100 and the like are stored together with the date and time, the power measured in the past and the past operation The state or the like can also be displayed on the display unit 181. The operation of the display unit 181 will be described later with reference to FIG.

図2に示すように、端子台190の形状は、正面視において、長方形である。端子台190は、第1端子台部191と、第2端子台部192の2つの部分を有している。筐体180と、第1端子台部191と、第2端子台部192とは、上下方向に並んで配置されている。第1端子台部191は、長方形の上辺で筐体180と隣接し、長方形の下辺で第2端子台部192と隣接している。なお、端子台190には、引込線側端子110、発電設備側端子120及び負荷設備側端子130が取り付けられているが、これらの端子の図示は、図2では省略されている。端子台190にこれらの端子が取り付けられている状態は、図3を用いて後述する。   As shown in FIG. 2, the terminal block 190 has a rectangular shape when viewed from the front. The terminal block 190 has two parts, a first terminal block 191 and a second terminal block 192. The casing 180, the first terminal block 191 and the second terminal block 192 are arranged side by side in the vertical direction. The first terminal block 191 is adjacent to the housing 180 at the upper side of the rectangle, and is adjacent to the second terminal block 192 at the lower side of the rectangle. In addition, although the lead-in terminal 110, the power generation equipment side terminal 120, and the load equipment side terminal 130 are attached to the terminal block 190, illustration of these terminals is omitted in FIG. A state in which these terminals are attached to the terminal block 190 will be described later with reference to FIG.

図3に示すように、端子台190は、第1端子台部191と、第2端子台部192の2つの部分を有している。図3に示すように、第1端子台部191の右側に、発電設備側端子120が取り付けられ、第2端子台部192の左側に、引込線側端子110が取り付けられ、第2端子台部192の右側に、負荷設備側端子130が取り付けられている。引込線側端子110、発電設備側端子120及び負荷設備側端子130は、それぞれ3つの端子で構成されている。   As shown in FIG. 3, the terminal block 190 has two parts, a first terminal block 191 and a second terminal block 192. As shown in FIG. 3, the power generation equipment side terminal 120 is attached to the right side of the first terminal base part 191, the lead-in wire side terminal 110 is attached to the left side of the second terminal base part 192, and the second terminal base part 192. The load facility side terminal 130 is attached to the right side of the. The lead-in wire side terminal 110, the power generation facility side terminal 120, and the load facility side terminal 130 are each composed of three terminals.

引込線側端子110、発電設備側端子120及び負荷設備側端子130には、図示しない配線が、例えばネジ止め等によって接続される。   Wiring (not shown) is connected to the lead-in wire side terminal 110, the power generation equipment side terminal 120, and the load equipment side terminal 130 by, for example, screwing or the like.

第1端子台部191と第2端子台部192が上下方向に並んで配置され、第1端子台部191に発電設備側端子120が配置され、第2端子台部192に引込線側端子110及び負荷設備側端子130が取り付けられることによって、引込線側端子110、発電設備側端子120及び負荷設備側端子130が、端子台190に横一列に並べられる場合と比較して、配線時における各端子間の短絡は抑制される。   The first terminal block 191 and the second terminal block 192 are arranged side by side in the vertical direction, the power generation equipment side terminal 120 is disposed on the first terminal block 191, and the lead-in wire side terminal 110 and the second terminal block 192. By attaching the load facility side terminal 130, the lead-in wire side terminal 110, the power generation facility side terminal 120, and the load facility side terminal 130 are arranged between the terminals at the time of wiring as compared with the case where the load facility side terminal 130 is arranged in a horizontal row on the terminal block 190. The short circuit is suppressed.

なお、図3では、第1端子台部191に発電設備側端子120が配置され、端子台190における第2端子台部192に引込線側端子110及び負荷設備側端子130が取り付けられている場合を示したが、これに限定されない。引込線側端子110、発電設備側端子120及び負荷設備側端子130の3つの端子のうちの1つが、第1端子台部191と第2端子台部192のいずれか一方に取り付けられ、引込線側端子110、発電設備側端子120及び負荷設備側端子130の3つの端子のうちの残りの2つが、第1端子台部191と第2端子台部192の他方に取り付けられていてもよい。   In addition, in FIG. 3, the case where the power generation equipment side terminal 120 is arrange | positioned at the 1st terminal stand part 191 and the lead-in wire side terminal 110 and the load equipment side terminal 130 are attached to the 2nd terminal stand part 192 in the terminal block 190 is shown. Although shown, it is not limited to this. One of the three terminals of the lead-in wire side terminal 110, the power generation equipment side terminal 120, and the load equipment side terminal 130 is attached to one of the first terminal block 191 and the second terminal block 192, and the lead-in wire side terminal 110, the power generation equipment side terminal 120, and the load equipment side terminal 130, the remaining two terminals may be attached to the other of the first terminal block 191 and the second terminal block 192.

図3に示すように、第1端子台部191には、発電設備側端子120の他に、通信端子193と、操作スイッチ194と、が取り付けられている。通信端子193には、図示しない通信用配線が接続される。通信端子193からは、第1売電メータ140、第1買電メータ150及び第2売電メータ160で計測された各電力、電力量計100の動作状態等に対応した信号が出力される。遠隔地にいる作業者は、通信用配線を介して出力された信号をモニタすることにより、第1売電メータ140、第1買電メータ150及び第2売電メータ160で計測された各電力、電力量計100の状態等を知ることができる。また、遠隔地にいる作業者は、通信用配線を介して電力量計100を操作するための信号を通信端子193に入力することによって、電力量計100を操作することもできる。   As shown in FIG. 3, in addition to the power generation equipment side terminal 120, a communication terminal 193 and an operation switch 194 are attached to the first terminal block 191. A communication wire (not shown) is connected to the communication terminal 193. From the communication terminal 193, signals corresponding to each power measured by the first power sale meter 140, the first power purchase meter 150, and the second power sale meter 160, the operating state of the watt-hour meter 100, and the like are output. An operator at a remote location monitors each signal output via the communication wiring, thereby measuring each power measured by the first power meter 140, the first power meter 150, and the second power meter 160. The state of the watt-hour meter 100 can be known. An operator at a remote location can also operate the watt-hour meter 100 by inputting a signal for operating the watt-hour meter 100 to the communication terminal 193 via the communication wiring.

操作スイッチ194は、表示部181の表示内容等を変更する際に使用される。例えば、作業者が検針を行う場合、作業者はこの操作スイッチ194を操作することによって、表示部181に検針に必要な情報を表示させ、あるいは、不必要な情報を表示させないようにすることが可能である。   The operation switch 194 is used when changing the display contents of the display unit 181. For example, when an operator performs meter reading, the operator operates the operation switch 194 to display information necessary for meter reading on the display unit 181 or prevent unnecessary information from being displayed. Is possible.

なお、図3においては、引込線側端子110、発電設備側端子120及び負荷設備側端子130の端子数は、それぞれ3であるが、端子数は3に限定されない。図3においては、3本の配線を使用して電力を供給する場合に使用する電力量計100の端子を示したため、端子数は3となっているが、端子数は、電力を供給するために使用する配線の数に依存する。例えば、2本の配線を使用して電力を供給する場合には、端子数は2であってもよい。
また、通信端子193の数や操作スイッチ194の数も図3に示すものに限定されない。通信端子193の数は、入出力信号の種類や数によって適宜変更可能である。操作スイッチ194の数も、必要とされる操作の種類等によって適宜変更可能である。
In addition, in FIG. 3, although the number of terminals of the service wire side terminal 110, the power generation equipment side terminal 120, and the load equipment side terminal 130 is 3, respectively, the number of terminals is not limited to 3. In FIG. 3, since the terminal of the watt-hour meter 100 used when supplying power using three wires is shown, the number of terminals is 3, but the number of terminals is for supplying power. Depends on the number of wires used. For example, when power is supplied using two wires, the number of terminals may be two.
Further, the number of communication terminals 193 and the number of operation switches 194 are not limited to those shown in FIG. The number of communication terminals 193 can be appropriately changed according to the type and number of input / output signals. The number of operation switches 194 can also be changed as appropriate depending on the type of operation required.

図4に示すように、筐体180は、上述したように箱状となっており、筐体箱部182と筐体蓋部183とで構成されている。筐体箱部182と筐体蓋部183とは、例えばネジ止め等によって固定され、筐体180が構成される。   As shown in FIG. 4, the housing 180 has a box shape as described above, and includes a housing box portion 182 and a housing lid portion 183. The housing box 182 and the housing lid 183 are fixed by, for example, screwing or the like, and the housing 180 is configured.

筐体180の外形は、端子台190に比べて、前後方向に厚くなっている。また、端子台190は、上述したように第1端子台部191と、第2端子台部192とに分割されている。そして、第1端子台部191は、第2端子台部192の厚みよりも厚くされている。このように第1端子台部191の厚みを第2端子台部192の厚みより厚くすることによって、配線時における第1端子台部191に取り付けられた発電設備側端子120と、第2端子台部192に取り付けられた引込線側端子110及び負荷設備側端子130との短絡を抑制することができる。
なお、図4では、第1端子台部191の厚みが、第2端子台部192の厚みよりも厚くなっているが、これに限定されない。第2端子台部192の厚みが、第1端子台部191の厚みよりも厚くなっていてもよい。すなわち、第1端子台部191と第2端子台部192のいずれか一方の厚みが、他方の厚みよりも厚くなっていればよい。
The outer shape of the housing 180 is thicker in the front-rear direction than the terminal block 190. Further, the terminal block 190 is divided into the first terminal block portion 191 and the second terminal block portion 192 as described above. The first terminal block 191 is thicker than the second terminal block 192. Thus, by making the thickness of the first terminal block 191 thicker than the thickness of the second terminal block 192, the power generation equipment side terminal 120 attached to the first terminal block 191 during wiring and the second terminal block Short-circuiting between the lead-in wire side terminal 110 and the load facility side terminal 130 attached to the portion 192 can be suppressed.
In FIG. 4, the thickness of the first terminal block 191 is thicker than the thickness of the second terminal block 192, but is not limited to this. The thickness of the second terminal block 192 may be greater than the thickness of the first terminal block 191. That is, it is only necessary that the thickness of one of the first terminal block 191 and the second terminal block 192 is thicker than the other.

次に、余剰買い取り方式を採用した第1実施形態の電力計測システム2の概略図を図5に示す。図5における図1と共通する構成や接続に関しては、説明を省略する。また、電力量計100は、図1において説明した全量買い取り方式を採用した電力計測システム1で使用したものと同じものである。   Next, FIG. 5 shows a schematic diagram of the power measurement system 2 of the first embodiment adopting the surplus purchase method. Descriptions of configurations and connections common to FIG. 1 in FIG. 5 are omitted. The watt-hour meter 100 is the same as that used in the power measurement system 1 that employs the total purchase method described in FIG.

図5に示すように、余剰買い取り方式を採用した第1実施形態の電力計測システム2においては、発電設備側端子120に分電盤DBが電気的に接続されている。分電盤DBは、パワーコンディショナPCSを介して発電設備Gに接続される。また、分電盤DBは、負荷設備Lに電気的に接続されている。余剰買い取り方式を採用した電力計測システム2において、負荷設備側端子3は使用されないため、適切な状態、例えば解放状態又は終端状態にしておく。
その他の構成は、図1で示した全量買い取り方式を採用した電力計測システム1と同様なので、説明を省略する。
As shown in FIG. 5, in the power measurement system 2 of the first embodiment adopting the surplus purchase method, the distribution board DB is electrically connected to the power generation equipment side terminal 120. The distribution board DB is connected to the power generation equipment G via the power conditioner PCS. Further, the distribution board DB is electrically connected to the load facility L. In the electric power measurement system 2 adopting the surplus purchase method, the load facility side terminal 3 is not used, so that it is in an appropriate state, for example, in a released state or a terminal state.
The other configuration is the same as that of the power measurement system 1 adopting the total amount purchase method shown in FIG.

余剰買い取り方式を採用した電力計測システム2における電力の流れは、次の通りである。
電力会社で発電された電力は、図示しない配電線及び引込線Wを介して引込線側端子110に供給される。引込線側端子110に供給された電力は、配線L1、分岐点J、配線L2、及び発電設備側端子120を介して分電盤DBに供給され、分電盤DBで分岐されて負荷設備L、パワーコンディショナPCS及び発電設備Gに供給される。負荷設備L、パワーコンディショナPCS及び発電設備Gに供給された電力は、負荷設備L、パワーコンディショナPCS及び発電設備Gを駆動するために消費される。
このとき、第1売電メータ140は、引込線側端子110から発電設備側端子120に供給される電力、すなわち、電力会社から負荷設備L、パワーコンディショナPCS及び発電設備Gに供給される電力を計測する。
なお、負荷設備側端子130は、使用されず、適切な状態にされているため、引込線側端子110に供給された電力が、分岐点J及び配線L3を介して、負荷設備側端子130に向かうことはない。
The flow of power in the power measurement system 2 adopting the surplus purchase method is as follows.
The electric power generated by the electric power company is supplied to the service line side terminal 110 through a distribution line and a service line W (not shown). The power supplied to the service line side terminal 110 is supplied to the distribution board DB via the wiring L1, the branch point J, the wiring L2, and the power generation equipment side terminal 120, and is branched by the distribution board DB to be loaded into the load equipment L, It is supplied to the power conditioner PCS and the power generation equipment G. The electric power supplied to the load facility L, the power conditioner PCS, and the power generation facility G is consumed to drive the load facility L, the power conditioner PCS, and the power generation facility G.
At this time, the first power sale meter 140 supplies the power supplied from the service line side terminal 110 to the power generation equipment side terminal 120, that is, the power supplied from the power company to the load equipment L, the power conditioner PCS, and the power generation equipment G. measure.
In addition, since the load facility side terminal 130 is not used and is in an appropriate state, the power supplied to the lead-in wire side terminal 110 goes to the load facility side terminal 130 via the branch point J and the wiring L3. There is nothing.

発電設備Gで発電された電力は、図1の全量買い取り方式を採用した電力計測システム1と異なり、パワーコンディショナPCS及び分電盤を介して負荷設備Lに供給され、負荷設備Lを駆動するために消費される。すなわち、一般家庭は、発電設備Gで発電された電力を自ら使用する。そして、発電設備Gで発電された電力が、負荷設備Lを駆動するために消費される電力を上回る場合、上回った電力は、余剰電力として分電盤を介して発電設備側端子120に供給され、引込線側端子110、引込線W及び図示しない配電線を介して電力会社に供給される。
このとき、第1買電メータ150は、発電設備側端子120から引込線側端子110に供給される電力、すなわち、発電設備Gで発電され、余剰電力として電力会社に供給される電力を計測する。
The power generated by the power generation facility G is supplied to the load facility L via the power conditioner PCS and the distribution board to drive the load facility L, unlike the power measurement system 1 adopting the total purchase method of FIG. To be consumed. That is, the general household uses the power generated by the power generation facility G by itself. When the power generated by the power generation facility G exceeds the power consumed to drive the load facility L, the surplus power is supplied as surplus power to the power generation facility side terminal 120 via the distribution board. , The lead-in terminal 110, the lead-in line W, and a distribution line (not shown) are supplied to the electric power company.
At this time, the first power meter 150 measures the power supplied from the power generation facility side terminal 120 to the service line side terminal 110, that is, the power generated by the power generation facility G and supplied to the power company as surplus power.

電力会社は、第1売電メータ140及び第1買電メータ150の計測結果に基づいて、一般家庭から供給された電力の料金(買電料金)及び一般家庭に供給した電力の料金(売電料金)を決める。
例えば、第1買電メータ150が計測した電力を買い取り電力とし、この買い取り電力に買い取り電力用単価を掛けることによって、買電料金を決めることができる。そして、第2売電メータ160が計測した電力を一般家庭に売る電力とし、この売る電力に単位電力あたりの売る電力用単価を掛けることによって、売電料金を決めることができる。
Based on the measurement results of the first power sale meter 140 and the first power purchase meter 150, the electric power company charges the electric power supplied from the general household (electric power purchase fee) and the electric power supplied to the general household (electric power sales). Determine the price.
For example, the power purchase price can be determined by using the power measured by the first power purchase meter 150 as the purchased power and multiplying the purchased power by the unit price for the purchased power. Then, the power measured by the second power sale meter 160 is set as the power sold to a general household, and the power selling fee can be determined by multiplying the sold power by the unit price for power sold per unit power.

ここまでで説明したように、本発明の第1実施形態の電力量計100は、図1で示したような全量買い取り方式を採用した電力計測システム1にも、図5で示した余剰買い取り方式を採用した電力計測システム2にも1台で対応可能である。そのため、電力会社は、全量買い取り方式と余剰買い取り方式とで異なる種類の電力量計を用意する必要がなく、1種類の電力量計を用意すればよいので、電力量計の製造コストを抑制できる。   As described above, the watt-hour meter 100 according to the first embodiment of the present invention includes the surplus purchase method illustrated in FIG. 5 in the power measurement system 1 that employs the total amount purchase method as illustrated in FIG. 1. It is possible to deal with the power measurement system 2 that employs the same. Therefore, it is not necessary for the electric power company to prepare different types of watt hour meters for the total amount purchase method and the surplus purchase method, and it is only necessary to prepare one type of watt hour meter, which can suppress the manufacturing cost of the watt hour meter. .

[第2実施形態]
図6は、余剰買い取り方式を採用した第2実施形態の電力計測システム3の概略図である。この電力計測システム3には、第2実施形態の電力量計300が使用されている。この第2実施形態の電力量計300は、第2売電メータ160に直列に第2買電メータ170が接続されている点で、第1実施形態の電力量計100とは異なる。その他の構成については、第1実施形態の電力量計100と同様なので、説明を省略する。
[Second Embodiment]
FIG. 6 is a schematic diagram of the power measurement system 3 of the second embodiment adopting the surplus purchase method. The power meter system 3 uses the watt-hour meter 300 of the second embodiment. The watt-hour meter 300 of the second embodiment is different from the watt-hour meter 100 of the first embodiment in that a second power purchase meter 170 is connected in series to a second power sale meter 160. Since other configurations are the same as those of the watt-hour meter 100 of the first embodiment, description thereof is omitted.

図6に示すように、第2実施形態の電力量計300は、引込線側端子110と発電設備側端子120との間と、引込線側端子110と負荷設備側端子130との間のいずれにも、直列に接続された売電メータ及び売電メータが存在することになる。よって、この電力量計300において、発電設備側端子120と負荷設備側端子130は、同一の機能を有する端子であるが、便宜上一方を発電設備側端子120と称し、他方を負荷設備側端子130と称する。   As shown in FIG. 6, the watt-hour meter 300 according to the second embodiment is provided between the lead-in terminal 110 and the power generation equipment-side terminal 120 and between the lead-in terminal 110 and the load equipment-side terminal 130. There will be a power sale meter and a power sale meter connected in series. Therefore, in this watt-hour meter 300, the power generation facility side terminal 120 and the load facility side terminal 130 are terminals having the same function, but for convenience, one is referred to as the power generation facility side terminal 120 and the other is the load facility side terminal 130. Called.

第1実施形態の電力量計100を余剰買い取り方式に使用した電力計測システム2においては、分電盤DBは、発電設備側端子120に接続されていた。しかし、この電力計測システム3においては、分電盤DBは、発電設備側端子120と負荷設備側端子130のいずれの端子に接続されてもよい。図6では、分電盤DBを負荷設備側端子130に接続した場合を示しているが、図4に示した場合と同様に、分電盤DBを発電設備側端子120に接続することもできる。   In the power measurement system 2 that uses the watt-hour meter 100 of the first embodiment for the surplus purchase method, the distribution board DB is connected to the power generation equipment side terminal 120. However, in the power measurement system 3, the distribution board DB may be connected to any one of the power generation equipment side terminal 120 and the load equipment side terminal 130. Although FIG. 6 shows a case where the distribution board DB is connected to the load facility side terminal 130, the distribution board DB can be connected to the power generation facility side terminal 120 as in the case shown in FIG. 4. .

また、図示しないが、全量買い取り方式にこの第2実施形態の電力量計300を使用する場合、第1実施形態の電力量計100を使用する場合と同様に、パワーコンディショナPCSを発電設備側端子120に接続し、分電盤DBを負荷設備側端子130に接続することができる。また、パワーコンディショナPCSを負荷設備側端子130に接続し、分電盤DBを発電設備側端子120に接続することもできる。   Although not shown, when the watt-hour meter 300 of the second embodiment is used for the total amount purchase method, the power conditioner PCS is connected to the power generation equipment side in the same manner as when the watt-hour meter 100 of the first embodiment is used. The distribution board DB can be connected to the load facility side terminal 130 by connecting to the terminal 120. Further, the power conditioner PCS can be connected to the load facility side terminal 130, and the distribution board DB can be connected to the power generation facility side terminal 120.

本実施形態によれば、例えば、次のような効果が奏される。
本実施形態において、第1売電メータ140、第1買電メータ150及び第2売電メータ160は、すべて1つの筐体180に収納されており、引込線側端子110と発電設備側端子120とは、直列に接続された第1売電メータ140及び第1買電メータ150を介して接続されており、引込線側端子110と負荷設備側端子130とは、第2売電メータ160を介して接続されている。
そして、電力量計100,300を全量買い取り方式に使用する場合は、発電設備側端子120にパワーコンディショナPCSを接続するとともに、負荷設備側端子130に分電盤DBを接続し、余剰買い取り方式に使用する場合には、発電設備側端子120に分電盤DBを接続すればよいため、全量買い取り方式と余剰買い取り方式のいずれの方式にも1台で対応可能な電力量計を実現することができる。
According to this embodiment, the following effects are produced, for example.
In the present embodiment, the first power sale meter 140, the first power purchase meter 150, and the second power sale meter 160 are all housed in one housing 180, and the lead-in wire side terminal 110, the power generation equipment side terminal 120, Are connected via a first power meter 140 and a first power meter 150 connected in series, and the lead-in wire side terminal 110 and the load facility side terminal 130 are connected via a second power meter 160. It is connected.
And when using the watt-hour meter 100,300 for the whole quantity purchase method, while connecting the power conditioner PCS to the power generation equipment side terminal 120 and connecting the distribution board DB to the load equipment side terminal 130, the surplus purchase method When using it for power generation, it is only necessary to connect the distribution board DB to the power generation equipment side terminal 120. Therefore, it is necessary to realize a watt-hour meter that can be used for both the full purchase method and the surplus purchase method. Can do.

また、本実施形態においては、筐体180に表示部181が設けられており、表示部181には、第1売電メータ140が計測する電力の値、第2売電メータ160が計測する電力の値及び第1買電メータ150が計測する電力の値のうちのいずれか1つ以上が表示されるので、第1売電メータ140、第2売電メータ160及び第1買電メータ150で計測した値を必要に応じて表示部181に自由に表示させることができる。   In the present embodiment, the housing 180 is provided with a display unit 181, and the display unit 181 has a power value measured by the first power sale meter 140 and a power value measured by the second power sale meter 160. 1 or more than the value of the power measured by the first power meter 150 is displayed, so that the first power meter 140, the second power meter 160, and the first power meter 150 The measured value can be freely displayed on the display unit 181 as necessary.

また、本実施形態においては、端子台190は、厚みの異なる2つの端子台部、すなわち第1端子台部191と第2端子台部192と、を有しており、引込線側端子110、発電設備側端子120及び負荷設備側端子130のうちの1つは、第1端子台部191と第2端子台部192のいずれか一方に取り付けられており、残りの2つは、第1端子台部191と第2端子台部192の他方に取り付けられているので、引込線側端子110、発電設備側端子120及び負荷設備側端子130に配線をそれぞれ接続する場合に、配線同士が短絡することを抑制することができる。   Further, in the present embodiment, the terminal block 190 has two terminal block portions having different thicknesses, that is, a first terminal block portion 191 and a second terminal block portion 192. One of the facility side terminal 120 and the load facility side terminal 130 is attached to one of the first terminal block 191 and the second terminal block 192, and the remaining two are the first terminal block. Since it is attached to the other of the part 191 and the second terminal base part 192, when connecting the wiring to the lead-in wire side terminal 110, the power generation equipment side terminal 120, and the load equipment side terminal 130, the wirings are short-circuited. Can be suppressed.

また、本実施形態においては、端子台190は、第1端子台部191と第2端子台部192と、を有し、筐体180と第1端子台部191と第2端子台部192は、上下に並んで配置されている。そして、引込線側端子110、発電設備側端子120及び負荷設備側端子130のうちの1つは、第1端子台部191と第2端子台部192のいずれか一方に取り付けられており、残りの2つは、第1端子台部191と第2端子台部192の他方に取り付けられているので、引込線側端子110、発電設備側端子120及び負荷設備側端子130に配線をそれぞれ接続する場合に、配線同士が短絡することを抑制することができる。   In the present embodiment, the terminal block 190 includes a first terminal block 191 and a second terminal block 192, and the housing 180, the first terminal block 191 and the second terminal block 192 include They are arranged side by side. One of the lead-in wire side terminal 110, the power generation equipment side terminal 120, and the load equipment side terminal 130 is attached to one of the first terminal base 191 and the second terminal base 192, and the remaining Since the two are attached to the other of the first terminal block 191 and the second terminal block 192, when wiring is connected to the lead-in wire side terminal 110, the power generation facility side terminal 120, and the load facility side terminal 130, respectively. It is possible to suppress the short circuit between the wirings.

また、本実施形態においては、負荷設備側端子130から引込線側端子110に供給される電力を計測する第2買電メータ170をさらに備え、第2買電メータ170は筐体に収納されており、引込線側端子110と負荷設備側端子130とは、直列に接続された第2売電メータ160及び第2買電メータ170を介して接続されているので、全量買い取り方式と余剰買い取り方式のいずれの方式にも1台で対応可能な電力量計を実現することができる。   Moreover, in this embodiment, it further has the 2nd power purchase meter 170 which measures the electric power supplied to the lead-in side terminal 110 from the load equipment side terminal 130, and the 2nd power purchase meter 170 is accommodated in the housing | casing. Since the lead-in wire side terminal 110 and the load facility side terminal 130 are connected via the second power sale meter 160 and the second power purchase meter 170 connected in series, either the full quantity purchase method or the surplus purchase method is used. It is possible to realize a watt-hour meter that can be used with one of these methods.

以上、本発明の実施形態について説明したが、本発明の実施形態はこれらに限定されない。例えば、図2〜図4において、端子台190は、上下方向に並ぶ第1端子台部191と第2端子台部192に分割されていたが、左右方向に並ぶ第1端子台部191と第2端子台部192に分割されていてもよい。そして、左右方向に並ぶ第1端子台部191と第2端子台部192のいずれか一方の前後方向の厚みが、他方の前後方向の厚みより厚くなるようにしてもよい。さらに、端子台190を3つの部分に分けて、3つの部分の前後方向の厚みが互いに異なるようにし、引込線側端子110、発電設備側端子120及び負荷設備側端子130をそれぞれの部分に1端子ずつ取り付けてもよい。   As mentioned above, although embodiment of this invention was described, embodiment of this invention is not limited to these. For example, in FIGS. 2 to 4, the terminal block 190 is divided into the first terminal block 191 and the second terminal block 192 arranged in the vertical direction, but the first terminal block 191 and the first terminal block 191 aligned in the horizontal direction are divided. It may be divided into two terminal block portions 192. Then, the thickness in the front-rear direction of either the first terminal block 191 or the second terminal block 192 arranged in the left-right direction may be larger than the thickness in the other front-rear direction. Further, the terminal block 190 is divided into three parts so that the thicknesses of the three parts in the front-rear direction are different from each other, and the lead-in wire side terminal 110, the power generation equipment side terminal 120, and the load equipment side terminal 130 are one terminal in each part. It may be attached one by one.

上述の実施形態では、筐体180には、表示部181が1つ設けられていたが、表示部は1つに限定されない。例えば、表示部を2つ以上設けておくことも可能である。   In the above-described embodiment, one display unit 181 is provided in the housing 180, but the number of display units is not limited to one. For example, two or more display units can be provided.

発電設備Gや負荷設備Lを有している場所は、上述の実施形態では一般家庭であったがこれに限定されず、商業施設や工場等であってもよい。
Although the place which has the power generation equipment G and the load equipment L was a general household in the above-mentioned embodiment, it is not limited to this, Commercial facilities, a factory, etc. may be sufficient.

100、300……電力量計、110……引込線側端子(第1端子)、120……発電設備側端子(第2端子)、130……負荷設備側端子(第3端子)、140……第1売電メータ、150……第1買電メータ、160……第2売電メータ、170……第2買電メータ、180……筐体、181……表示部、190……端子台、191……第1端子台部、192……第2端子台部   100, 300 ... watt hour meter, 110 ... service line side terminal (first terminal), 120 ... power generation equipment side terminal (second terminal), 130 ... load equipment side terminal (third terminal), 140 ... 1st electricity sales meter, 150 ... 1st electricity purchase meter, 160 ... 2nd electricity sale meter, 170 ... 2nd electricity purchase meter, 180 ... housing, 181 ... display part, 190 ... terminal block , 191... First terminal block, 192. Second terminal block

Claims (5)

第1端子と、
第2端子と、
第3端子と、
前記第1端子から前記第2端子に供給される電力を計測する第1売電メータと、
前記第1端子から前記第3端子に供給される電力を計測する第2売電メータと、
前記第2端子から前記第1端子に供給される電力を計測する第1買電メータと、
前記第1売電メータ、前記第2売電メータ及び前記第1買電メータを収納する筐体と、
前記第1端子、前記第2端子及び前記第3端子が取り付けられている端子台と、
を備え、
前記第1端子と前記2端子とは、直列に接続された前記第1売電メータ及び前記第1買電メータを介して接続されており、
前記第1端子と前記第3端子とは、前記第2売電メータを介して接続されている
電力量計。
A first terminal;
A second terminal;
A third terminal;
A first power meter for measuring the power supplied from the first terminal to the second terminal;
A second power selling meter for measuring the power supplied from the first terminal to the third terminal;
A first power meter for measuring the power supplied from the second terminal to the first terminal;
A housing for housing the first power sale meter, the second power sale meter, and the first power purchase meter;
A terminal block to which the first terminal, the second terminal, and the third terminal are attached;
With
The first terminal and the two terminals are connected via the first power meter and the first power meter connected in series,
The first terminal and the third terminal are watt hour meters connected via the second power sale meter.
前記筐体は、表示部を有しており、
前記表示部は、前記第1売電メータが計測する電力の値、前記第2売電メータが計測する電力の値及び前記第1買電メータが計測する電力の値のうちのいずれか1つ以上を表示する請求項1に記載の電力量計。
The housing has a display unit,
The display unit is any one of a power value measured by the first power sale meter, a power value measured by the second power sale meter, and a power value measured by the first power purchase meter. The watt-hour meter of Claim 1 which displays the above.
前記端子台は、第1の厚みを有する第1端子台部と、
前記第1の厚みよりも厚い第2の厚みを有する第2端子台部と、を有しており、
引込線側端子、発電設備側端子及び負荷設備側端子のうちの1つは、前記第1端子台部と前記第2端子台部のいずれか一方に取り付けられており、
引込線側端子、発電設備側端子及び負荷設備側端子のうちの残りの2つは、前記第1端子台部と前記第2端子台部の他方に取り付けられている請求項1から2のいずれか1項に記載の電力量計。
The terminal block includes a first terminal block portion having a first thickness;
A second terminal block having a second thickness greater than the first thickness,
One of the lead-in wire side terminal, the power generation equipment side terminal, and the load equipment side terminal is attached to one of the first terminal block and the second terminal block,
The remaining two of the lead-in wire side terminal, the power generation facility side terminal, and the load facility side terminal are attached to the other of the first terminal block portion and the second terminal block portion. The watt-hour meter according to item 1.
前記端子台は、第1端子台部と、第2端子台部と、を有し、
前記筐体と、前記第1端子台部と、前記第2端子台部とは、並んで配置されており、前記筐体は、前記第1端子台部に隣接しており、前記第2端子台部は、前記第1端子台部における前記筐体に隣接する部分と反対側の部分に隣接しており、
前記第1端子、前記第2端子及び前記第3端子のうちの1つは、前記第1端子台部と前記第2端子台部のいずれか一方に取り付けられており、
前記第1端子、前記第2端子及び前記第3端子のうちの残りの2つは、前記第1端子台部と前記第2端子台部の他方に取り付けられている請求項1から3のいずれか1項に記載の電力量計。
The terminal block has a first terminal block part and a second terminal block part,
The casing, the first terminal block, and the second terminal block are arranged side by side, the casing is adjacent to the first terminal block, and the second terminal The base part is adjacent to a part opposite to the part adjacent to the housing in the first terminal base part,
One of the first terminal, the second terminal, and the third terminal is attached to one of the first terminal block and the second terminal block,
The remaining two of the first terminal, the second terminal, and the third terminal are attached to the other of the first terminal block and the second terminal block. The watt-hour meter according to item 1.
前記第3端子から前記第1端子に供給される電力を計測する第2買電メータをさらに備え、
前記第2買電メータは前記筐体に収納されており、
前記第1端子と前記3端子とは、直列に接続された前記第2売電メータ及び前記第2買電メータを介して接続されている請求項1から4のいずれか1項に記載の電力量計。
A second power meter for measuring the power supplied from the third terminal to the first terminal;
The second power meter is housed in the housing;
The power according to any one of claims 1 to 4, wherein the first terminal and the three terminals are connected via the second power sale meter and the second power purchase meter connected in series. Quantity meter.
JP2013162529A 2013-08-05 2013-08-05 Watt-hour meter Pending JP2015031631A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013162529A JP2015031631A (en) 2013-08-05 2013-08-05 Watt-hour meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013162529A JP2015031631A (en) 2013-08-05 2013-08-05 Watt-hour meter

Publications (1)

Publication Number Publication Date
JP2015031631A true JP2015031631A (en) 2015-02-16

Family

ID=52517056

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013162529A Pending JP2015031631A (en) 2013-08-05 2013-08-05 Watt-hour meter

Country Status (1)

Country Link
JP (1) JP2015031631A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018530735A (en) * 2015-07-27 2018-10-18 サンパワー コーポレイション Solar energy metering, communication and control systems
JP2020167865A (en) * 2019-03-29 2020-10-08 旭化成ホームズ株式会社 Power receiving system repair method and power supply system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018530735A (en) * 2015-07-27 2018-10-18 サンパワー コーポレイション Solar energy metering, communication and control systems
US10466282B2 (en) 2015-07-27 2019-11-05 Sunpower Corporation Solar energy metering, communications, and control system
US11231446B2 (en) 2015-07-27 2022-01-25 Sunpower Corporation Solar energy metering, communications, and control system
JP2020167865A (en) * 2019-03-29 2020-10-08 旭化成ホームズ株式会社 Power receiving system repair method and power supply system
JP7246230B2 (en) 2019-03-29 2023-03-27 旭化成ホームズ株式会社 Power receiving system modification method and power supply system

Similar Documents

Publication Publication Date Title
JP5814999B2 (en) Display device
JP2001103622A (en) Measuring system of subscriber's private electrical energy
US20120197563A1 (en) Electric power meter
GB2379993A (en) Electrical energy consumption and generation metering arrangement
JP2001103621A (en) Distribution board with measuring function
JP6179590B2 (en) Link adapter, distribution board, distribution board system
JP2014183664A (en) Power distribution system and current-limiting device
JP5433105B1 (en) Energy management system
JP2015186277A (en) Power management system, power management method, and program
JP2017103866A (en) Cubicle
JP7038314B2 (en) Display control method, display control program, and display control system
WO2014167780A1 (en) Distribution board, distribution board system, and independent distribution board
JP2015031631A (en) Watt-hour meter
JP2017191522A (en) Electricity charge estimate system, electricity charge estimate method, and program
WO2019067638A1 (en) Resource meter system and method
JP6548105B2 (en) Power measurement apparatus and power measurement system using the same
JP2019022288A (en) Power distribution system, installation method, branching device
WO2018006144A1 (en) Digital electronic meter for electrical magnitudes with six or more measurement elements
KR200360131Y1 (en) An electronic wattmeter consists of plurality module
JP3299499B2 (en) Solar power system
JP2002071734A (en) Electric energy-integrating apparatus and distribution board
JP2005102432A (en) System interconnection system
JP6369778B2 (en) Measurement system, distribution board cabinet, distribution board
JP2016034218A (en) Photovoltaic power generation display apparatus
JP5416576B2 (en) Electricity rate selection system