JP2015023594A - Demand adjustment system, power conditioning unit, and demand adjustment method - Google Patents

Demand adjustment system, power conditioning unit, and demand adjustment method Download PDF

Info

Publication number
JP2015023594A
JP2015023594A JP2013147537A JP2013147537A JP2015023594A JP 2015023594 A JP2015023594 A JP 2015023594A JP 2013147537 A JP2013147537 A JP 2013147537A JP 2013147537 A JP2013147537 A JP 2013147537A JP 2015023594 A JP2015023594 A JP 2015023594A
Authority
JP
Japan
Prior art keywords
demand
demand adjustment
load
power
ratio
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013147537A
Other languages
Japanese (ja)
Other versions
JP6248443B2 (en
Inventor
寿人 佐久間
Hisato Sakuma
寿人 佐久間
龍 橋本
Ryu Hashimoto
龍 橋本
仁之 矢野
Hitoshi Yano
仁之 矢野
耕治 工藤
Koji Kudo
耕治 工藤
永典 實吉
Hisanori Saneyoshi
永典 實吉
貴裕 戸泉
Takahiro TOIZUMI
貴裕 戸泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP2013147537A priority Critical patent/JP6248443B2/en
Publication of JP2015023594A publication Critical patent/JP2015023594A/en
Application granted granted Critical
Publication of JP6248443B2 publication Critical patent/JP6248443B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a demand adjustment system that dispenses with transmission of a different command for each electric power load and that can finely control demand balance only by carrying out a limited operation for the electric power load.SOLUTION: A demand adjustment request transmission device 101 determines a change ratio for changing electric power consumption given by an electric power load on the basis of predetermined information. A processing section 203 controls an operating state of a load 103 according to the change ratio determined by the demand adjustment request transmission device 101.

Description

本発明は、需要家が使用する電力負荷を用いて電力系統の需給バランスを維持する需要調整システムに関する。   The present invention relates to a demand adjustment system that maintains a supply and demand balance of an electric power system using an electric load used by a consumer.

太陽光エネルギーのような再生可能エネルギーを用いて発電する再生可能電源では、発電量を制御することが困難であるため、再生可能電源にて発電された電力が使用されると、電力系統の需給バランスが維持できなくなることがある。このため、再生可能電源の普及には、電力系統の需給バランスを図るための需給調整手段が必要となる。このような需給調整手段として、近年、家電のような電力を消費する電力負荷を制御することで、電力需要を調整して、電力系統の需給バランスを維持するものが提案されている。   With a renewable power source that uses renewable energy such as solar energy, it is difficult to control the amount of power generation, so if the power generated by the renewable power source is used, the supply and demand of the power system Balance may not be maintained. For this reason, the spread of renewable power sources requires a supply and demand adjustment means for achieving a balance between supply and demand of the power system. As such a supply and demand adjustment means, in recent years, an apparatus that adjusts the power demand and maintains the supply and demand balance of the power system by controlling a power load that consumes power such as home appliances has been proposed.

例えば、特許文献1に記載の電力供給制御装置は、各需要家に設置された負荷ごとに供給確率と呼ばれる指標を保持し、発電量が不足した場合、供給確率が小さい負荷から順に、その負荷を停止する旨の停止指令を送信して負荷を停止させている。しかしながら、この電力供給制御装置では、負荷のそれぞれについて個別に停止指令を送信しなければならないため、負荷が多くなるほど、処理量が増えてしまう。電力系統には非常に多くの負荷が接続されているため、処理量が膨大となり、需給バランスの維持を実現することが困難になる。   For example, the power supply control device described in Patent Document 1 holds an index called a supply probability for each load installed in each consumer, and when the amount of power generation is insufficient, the load is increased in order from the load with the smallest supply probability. The load is stopped by transmitting a stop command to stop the operation. However, in this power supply control device, since a stop command must be individually transmitted for each load, the amount of processing increases as the load increases. Since a very large number of loads are connected to the power system, the amount of processing becomes enormous and it becomes difficult to achieve a supply-demand balance.

また、特許文献2に記載の充電制御システムは、電気自動車を予め設定された時間内に必要充電量だけ充電するという制約の下で、電力供給側から要求される電力需要の時間変化と実際の電力需要の時間変化とが一致するように、電気自動車の充電電力量を調整している。特許文献2に記載の技術では、全ての充電制御システムに対して同じ電力需要の時間変化が送信されればよいので、処理量が膨大になることを抑制することができる。しかしながら、この技術では、電気自動車の充電電力量を任意の値に設定できることを前提としているが、実際には、充電電力量を任意の値に設定することは難しい。   In addition, the charging control system described in Patent Document 2 is based on the change in power demand over time required by the power supply side and the actual change under the constraint that the electric vehicle is charged by a necessary amount of charge within a preset time. The amount of electric power charged in the electric vehicle is adjusted so that the time change in power demand matches. With the technique described in Patent Document 2, it is only necessary that the same time change in power demand is transmitted to all the charge control systems, so that the processing amount can be prevented from becoming enormous. However, this technique is based on the premise that the charging power amount of an electric vehicle can be set to an arbitrary value. However, in practice, it is difficult to set the charging power amount to an arbitrary value.

これに対して特許文献3には、電気自動車の充電のオンオフを切り替えることで、所望の電力需要の時間変化と実際の電力需要の時間変化とが一致するように、電気自動車の充電電力量を調整することができる充電制御システムが記載されている。しかしながら、特許文献3に記載の技術では、特許文献1に記載の技術と同様に、充電制御システムごとに指令が送信されなければならず、処理量が膨大となってしまう。   On the other hand, in Patent Document 3, by switching on / off charging of an electric vehicle, the charging electric energy of the electric vehicle is set so that the time change of desired power demand matches the time change of actual power demand. A charge control system that can be adjusted is described. However, in the technique described in Patent Document 3, as in the technique described in Patent Document 1, a command must be transmitted for each charging control system, resulting in a huge amount of processing.

したがって、電力負荷を制御する需給調整手段には、電力負荷ごとに異なる指令を送信する必要がなく、さらには、電力負荷に対してオンオフなどの限定的な動作を実行させるだけで、需給バランスを維持する技術が求められている。   Therefore, there is no need to send a different command for each power load to the supply and demand adjustment means for controlling the power load, and furthermore, a balance between supply and demand can be achieved simply by executing a limited operation such as on / off for the power load. The technology to maintain is required.

これに対して非特許文献1には、上記の技術を実現する方法が提案されている。この方法では、電力系統の系統周波数を用いて需給バランスの崩れが推定され、その需給バランスの崩れに基づいて電力需要を変更するか否かが判断される。電力需要を変更する場合、電力負荷を一斉に停止、または電力負荷を一斉に稼働させることで、電力需要を調整する。この方法では、電力負荷ごとに異なる指令を送信する必要がなく、さらには、電力負荷に対して限定的な動作を実行させるだけで、需給バランスを維持することが可能になる。   On the other hand, Non-Patent Document 1 proposes a method for realizing the above technique. In this method, the supply-demand balance collapse is estimated using the grid frequency of the power system, and it is determined whether or not to change the power demand based on the supply-demand balance collapse. When changing the power demand, the power demand is adjusted by stopping the power loads all at once or operating the power loads all at once. In this method, it is not necessary to transmit a different command for each power load, and furthermore, it is possible to maintain a supply-demand balance by only executing a limited operation on the power load.

特許第4489640号公報Japanese Patent No. 4487640 国際公開第2012/120977号International Publication No. 2012/120977 国際公開第2012/120976号International Publication No. 2012/120976

Design Considerations for Frequency Responsive Grid Friendly Appliances, Transmission and Distribution Conference and Exhibition, 2005/2006 IEEE PES, Digital Object Identifier: 10.1109/TDC.2006.1668573, Publication Year: 2006 , Page: 647 - 652Design Considerations for Frequency Responsive Grid Friendly Appliances, Transmission and Distribution Conference and Exhibition, 2005/2006 IEEE PES, Digital Object Identifier: 10.1109 / TDC.2006.1668573, Publication Year: 2006, Page: 647-652

しかしながら、非特許文献1に記載の方法では、全ての電力負荷を一斉に稼働させるか、全ての電力負荷を一斉に停止させるかしかできないため、電力需要を細やかに制御することができず、場合によっては、電力需要が急激にかつ大きく変化してしまい、電力系統の安定性に悪影響を与えることもある。   However, in the method described in Non-Patent Document 1, since it is only possible to operate all the power loads all at once or stop all the power loads all at once, the power demand cannot be finely controlled. Depending on the situation, the power demand may change drastically and may adversely affect the stability of the power system.

本発明の目的は、電力負荷ごとに異なる指令を送信する必要がなく、さらには、電力負荷に対して限定的な動作を実行させるだけで、需要バランスを細やかに制御することが可能な需要調整システム、電力調整装置および需要調整方法を提供することである。   It is an object of the present invention to eliminate the need to send different commands for each power load, and further, to adjust the demand balance precisely by causing a limited operation to be performed on the power load. A system, a power adjustment device, and a demand adjustment method are provided.

本発明による需要調整システムは、予め定められた情報に基づいて、電力負荷にて消費される電力消費量を変更する割合を決定する決定部と、前記決定部にて決定された割合に従って前記電力負荷の動作状態を制御する制御部と、を有する。   The demand adjustment system according to the present invention includes: a determination unit that determines a ratio for changing a power consumption consumed by a power load based on predetermined information; and the power according to the ratio determined by the determination unit. And a control unit that controls the operating state of the load.

本発明による第1の電力調整装置は、電力負荷にて消費される電力消費量を変更する割合を示す調整要請を受信する受信部と、前記調整要請にて示される割合に従って前記電力負荷の動作状態を制御する制御部と、を有する。   A first power adjustment apparatus according to the present invention includes a receiving unit that receives an adjustment request indicating a rate of changing a power consumption consumed by a power load, and an operation of the power load according to the rate indicated by the adjustment request. And a control unit for controlling the state.

本発明による第2の電力調整装置は、予め定められた情報に基づいて、電力負荷にて消費される電力消費量を変更する割合を決定する決定部と、前記決定部にて決定された割合に従って前記電力負荷の動作状態を制御する制御部と、を有する。   The second power adjustment device according to the present invention includes a determination unit that determines a ratio for changing the power consumption consumed by the power load based on predetermined information, and a ratio that is determined by the determination unit. And a control unit for controlling the operating state of the power load according to

本発明による需要調整方法は、予め定められた情報に基づいて、電力負荷にて消費される電力消費量を変更する割合を決定し、前記決定された割合に従って前記電力負荷の動作状態を制御する。   The demand adjustment method according to the present invention determines a rate of changing the power consumption consumed by the power load based on predetermined information, and controls the operating state of the power load according to the determined rate. .

本発明によれば、電力負荷ごとに異なる指令を送信する必要がなく、さらには、電力負荷に対して限定的な動作を実行させるだけで、需要バランスを細やかに制御することが可能になる。   According to the present invention, it is not necessary to transmit a different command for each power load, and it is possible to finely control the demand balance only by executing a limited operation on the power load.

本発明の第1の実施形態の需要調整システムを示す図である。It is a figure which shows the demand adjustment system of the 1st Embodiment of this invention. 本発明の第1の実施形態の需要調整システムにおける需要調整装置の構成の一例を示すブロック図である。It is a block diagram which shows an example of a structure of the demand adjustment apparatus in the demand adjustment system of the 1st Embodiment of this invention. 負荷を制御する負荷制御処理の具体例を説明するための図である。It is a figure for demonstrating the specific example of the load control process which controls load. 電力需要の変化の一例を示す図である。It is a figure which shows an example of the change of an electric power demand. 本発明の第1の実施形態の需要調整システムにおける需要調整装置の動作の一例を説明するためのフローチャートである。It is a flowchart for demonstrating an example of operation | movement of the demand adjustment apparatus in the demand adjustment system of the 1st Embodiment of this invention. 本発明の第1の実施形態の需要調整システムにおける需要調整要請送信装置の動作の一例を説明するためのフローチャートである。It is a flowchart for demonstrating an example of operation | movement of the demand adjustment request | requirement transmission apparatus in the demand adjustment system of the 1st Embodiment of this invention. 本発明の第1の実施形態の需要調整システムにおける需要調整装置の構成の他の例を示すブロック図である。It is a block diagram which shows the other example of a structure of the demand adjustment apparatus in the demand adjustment system of the 1st Embodiment of this invention. 本発明の第2の実施形態の需要調整システムを示す図である。It is a figure which shows the demand adjustment system of the 2nd Embodiment of this invention. 本発明の第2の実施形態の需要調整システムにおける需要調整装置の構成の一例を示すブロック図である。It is a block diagram which shows an example of a structure of the demand adjustment apparatus in the demand adjustment system of the 2nd Embodiment of this invention. 本発明の第2の実施形態の需要調整システムにおける需要調整装置の動作の一例を説明するためのフローチャートである。It is a flowchart for demonstrating an example of operation | movement of the demand adjustment apparatus in the demand adjustment system of the 2nd Embodiment of this invention. 周波数‐需要調整変換関数の一例を示す図である。It is a figure which shows an example of a frequency-demand adjustment conversion function. 周波数‐需要調整変換関数の他の例を示す図である。It is a figure which shows the other example of a frequency-demand adjustment conversion function.

以下、本発明の実施形態について図面を参照して説明する。なお、以下の説明では、同じ機能を有するものには同じ符号を付け、その説明を省略する場合がある。   Embodiments of the present invention will be described below with reference to the drawings. In the following description, components having the same function may be denoted by the same reference numerals and description thereof may be omitted.

図1は、本発明の第1の実施形態の需要調整システムを示す図である。図1に示すように本実施形態の需要調整システムは、需要調整要請送信装置101と、複数の需要調整装置102とを有する。また、需要調整装置102は、電力系統からの電力を消費する電力負荷である負荷103と接続されている。   FIG. 1 is a diagram showing a demand adjustment system according to a first embodiment of the present invention. As shown in FIG. 1, the demand adjustment system of this embodiment includes a demand adjustment request transmission device 101 and a plurality of demand adjustment devices 102. Moreover, the demand adjustment apparatus 102 is connected with the load 103 which is the electric power load which consumes the electric power from an electric power grid | system.

需要調整要請送信装置101は、決定部の一例である。需要調整要請送信装置101は、例えば、電力会社のような電力系統の需給バランスを維持する責任を負う機関によって設置される。   The demand adjustment request transmission apparatus 101 is an example of a determination unit. The demand adjustment request transmitting apparatus 101 is installed by an organization responsible for maintaining a supply and demand balance of an electric power system such as an electric power company.

需要調整要請送信装置101は、予め定められた情報(以下、需給アンバランス情報と称する)に基づいて、負荷103にて消費される電力消費量を変更する割合である変更割合と、その電力消費量の増加または低減を示す変更方向とを決定する。   The demand adjustment request transmitting apparatus 101, based on predetermined information (hereinafter referred to as supply and demand imbalance information), a change rate that is a rate of changing the power consumption consumed by the load 103, and its power consumption A change direction indicating an increase or decrease in quantity is determined.

需給アンバランス情報は、具体的には、電力系統の需給バランスの崩れの程度に応じた情報であり、例えば、電力系統の系統周波数を測定した測定値である。需給アンバランス情報が系統周波数の測定値の場合、需要調整要請送信装置101は、系統周波数の測定値に基づいて、需給バランスの崩れの程度を推定し、その推定結果に基づいて変更割合および変更方向を決定する。   Specifically, the supply and demand imbalance information is information corresponding to the degree of the disruption of the supply and demand balance of the power system, for example, a measurement value obtained by measuring the system frequency of the power system. When the supply and demand imbalance information is a measured value of the system frequency, the demand adjustment request transmitting apparatus 101 estimates the degree of disruption of the supply and demand balance based on the measured value of the system frequency, and based on the estimation result, the change ratio and the change Determine the direction.

なお、需要調整要請送信装置101は、系統周波数を測定する測定部を有してもよいし、中央給電指令所などにて測定された測定値を受信してもよい。また、需給アンバランス情報は、系統周波数に限らず、例えば、中央給電指令所などが推定した需給バランスの崩れの程度を示す情報でもよい。   Note that the demand adjustment request transmission apparatus 101 may have a measurement unit that measures the system frequency, or may receive a measurement value measured at a central power supply command station or the like. Further, the supply and demand imbalance information is not limited to the system frequency, and may be information indicating the degree of disruption of the supply and demand balance estimated by, for example, the central power supply command center.

変更割合および変更方向を決定すると、需要調整要請送信装置101は、その変更割合および変更方向を示す調整要請を需要調整装置102のそれぞれに送信する。   When the change ratio and the change direction are determined, the demand adjustment request transmission apparatus 101 transmits an adjustment request indicating the change ratio and the change direction to each of the demand adjustment apparatuses 102.

本実施形態では、需要調整要請送信装置101は、変更割合を予め定められた特定範囲内の数値である閾値で表し、その閾値を含む調整要請を送信するものとする。以下では、特定範囲は、0から1までの範囲とし、需要調整要請送信装置101は、変更割合に比例する数値を閾値とする。この場合、例えば、変更割合「100%」は、閾値「1」に対応し、変更割合「50%」は閾値「0.5」に対応する。また、後述するように本実施形態では、負荷103を稼働または停止させることで電力消費量を調整するため、需要調整要請送信装置101は、電力消費量を増やす場合、変更方向として負荷稼働を示し、電力消費量を減らす場合、変更方向として負荷停止を示す調整要請を送信する。   In the present embodiment, it is assumed that the demand adjustment request transmitting apparatus 101 represents the change rate with a threshold value that is a numerical value within a predetermined range, and transmits an adjustment request including the threshold value. Hereinafter, the specific range is a range from 0 to 1, and the demand adjustment request transmission apparatus 101 uses a numerical value proportional to the change ratio as a threshold value. In this case, for example, the change rate “100%” corresponds to the threshold value “1”, and the change rate “50%” corresponds to the threshold value “0.5”. Further, as will be described later, in the present embodiment, since the power consumption is adjusted by operating or stopping the load 103, the demand adjustment request transmitting apparatus 101 indicates the load operation as a change direction when increasing the power consumption. When reducing the power consumption, an adjustment request indicating a load stop is transmitted as the change direction.

なお、調整要請を送信するための通信方式は特に限定されないが、FM(Frequency Modulation)放送方式やブロードキャスト通信方式のような一斉配信方式が望ましい。   A communication method for transmitting the adjustment request is not particularly limited, but a simultaneous distribution method such as an FM (Frequency Modulation) broadcast method or a broadcast communication method is desirable.

需要調整装置102は、電力調整装置と呼ばれることもある。需要調整装置102は、電力系統からの電力を使用する需要家などによって負荷103に対応して設けられる。なお、図1の例では、需要調整装置102は、負荷103の外部にあって、負荷103と通信可能に接続されているが、負荷103に内蔵されてもよい。また、図1の例では、1つの負荷103に1つの需要調整装置102が対応しているが、複数の負荷103に1つの需要調整装置102が対応していてもよい。以下では、簡単のため、特に断りのない限り、1つの負荷103に1つの需要調整装置102が対応しているものとして説明する。なお、負荷103は、家電や電気自動車など電力系統から供給される電力を消費するものであれば特に限定されない。   The demand adjustment apparatus 102 may be called a power adjustment apparatus. The demand adjustment apparatus 102 is provided corresponding to the load 103 by a consumer who uses electric power from the electric power system. In the example of FIG. 1, the demand adjustment apparatus 102 is external to the load 103 and is communicably connected to the load 103, but may be built in the load 103. In the example of FIG. 1, one demand adjustment device 102 corresponds to one load 103, but one demand adjustment device 102 may correspond to a plurality of loads 103. In the following, for the sake of simplicity, a description will be given assuming that one demand adjusting device 102 corresponds to one load 103 unless otherwise specified. Note that the load 103 is not particularly limited as long as it consumes power supplied from a power system such as a home appliance or an electric vehicle.

需要調整装置102は、需要調整要請送信装置101から調整要請を受信し、その調整要請に従って負荷103の動作状態を変更する。本実施形態における動作状態には、電力を消費する稼働状態と、電力を消費しない停止状態とがあるものとする。   The demand adjusting apparatus 102 receives the adjustment request from the demand adjustment request transmitting apparatus 101, and changes the operation state of the load 103 according to the adjustment request. The operating state in the present embodiment includes an operating state that consumes power and a stopped state that does not consume power.

図2は、需要調整装置102の構成の一例を示すブロック図である。図2の例では、需要調整装置102は、需要調整要請受信部201と、乱数生成部202と、処理部203とを有する。   FIG. 2 is a block diagram illustrating an example of the configuration of the demand adjustment apparatus 102. In the example of FIG. 2, the demand adjustment apparatus 102 includes a demand adjustment request reception unit 201, a random number generation unit 202, and a processing unit 203.

需要調整要請受信部201は、需要調整要請送信装置101から調整要請を受信する受信部である。   The demand adjustment request receiving unit 201 is a receiving unit that receives an adjustment request from the demand adjustment request transmitting apparatus 101.

乱数生成部202には、特定範囲である0から1までの範囲内の複数の数値に対する確率分布が設定されている。乱数生成部202は、その確率分布に従って上記の複数の数値のいずれかを比較値として生成する。本実施形態では、確率分布における各数値が生成される確率が等しいとする。つまり、乱数生成部202は、上記の複数の数値のいずれかをランダムに生成するものとする。以下では、比較値を乱数値と称する。   In the random number generation unit 202, a probability distribution is set for a plurality of numerical values within a specific range of 0 to 1. The random number generation unit 202 generates one of the plurality of numerical values as a comparison value according to the probability distribution. In the present embodiment, it is assumed that the probability that each numerical value in the probability distribution is generated is equal. In other words, the random number generation unit 202 randomly generates any one of the plurality of numerical values. Hereinafter, the comparison value is referred to as a random value.

処理部203は、制御部の一例である。処理部203は、需要調整要請受信部201が受信した調整要請にて示される変更割合および変更方向に従って負荷103の動作状態を制御する。本実施形態では、負荷103の動作状態は稼働状態および停止状態であるので、処理部203は、変更割合および変更方向に従って負荷103の動作状態を変更または維持する。   The processing unit 203 is an example of a control unit. The processing unit 203 controls the operating state of the load 103 according to the change rate and the change direction indicated by the adjustment request received by the demand adjustment request receiving unit 201. In the present embodiment, since the operating state of the load 103 is an operating state and a stopped state, the processing unit 203 changes or maintains the operating state of the load 103 according to the change ratio and the changing direction.

具体的には、処理部203は、先ず、調整要請が示す変更割合である閾値と乱数生成部202が生成した乱数値とを比較し、乱数値が閾値以下か否かに応じて、負荷103の動作状態を変更するか否かを判断する。本実施形態では、変更割合が高いほど閾値が大きくなるので、処理部203は、乱数が閾値以下の場合、負荷103の動作状態を変更すると判断し、乱数が閾値より大きい場合、負荷103の動作状態を維持すると判断する。   Specifically, the processing unit 203 first compares the threshold value, which is the change rate indicated by the adjustment request, with the random value generated by the random number generation unit 202, and determines whether the load 103 depends on whether the random value is equal to or less than the threshold value. It is determined whether or not to change the operation state. In this embodiment, since the threshold value increases as the change rate increases, the processing unit 203 determines that the operation state of the load 103 is changed when the random number is equal to or smaller than the threshold value. Judge that the state will be maintained.

動作状態を変更する場合、処理部203は、調整要請が示す変更方向に従って、負荷103の動作状態を変更する。本実施形態では、負荷103の動作状態には稼働状態と停止状態とがあるので、処理部203は、調整要請が負荷稼働を示す場合、負荷103を稼働状態にし、調整要請が負荷停止を示す場合、負荷103を停止状態にする。   When changing the operation state, the processing unit 203 changes the operation state of the load 103 in accordance with the change direction indicated by the adjustment request. In the present embodiment, since the operation state of the load 103 includes an operation state and a stop state, the processing unit 203 sets the load 103 to an operation state when the adjustment request indicates load operation, and the adjustment request indicates load stop. In this case, the load 103 is stopped.

図3は、負荷を制御する負荷制御処理の具体例を説明するための図である。図3の例では、負荷103として、EV(電気自動車:Electric Vehicle)、冷蔵庫およびエアコン(エア・コンディショナー)が存在している。各負荷には、需要調整装置102が対応して設けられているが、図3では需要調整装置102は省略されている。   FIG. 3 is a diagram for explaining a specific example of the load control process for controlling the load. In the example of FIG. 3, an EV (electric vehicle), a refrigerator, and an air conditioner (air conditioner) exist as the load 103. Each load is provided with a demand adjustment device 102, but the demand adjustment device 102 is omitted in FIG.

先ず、ステップS2−0に示したように、全ての負荷の動作状態の初期状態が稼働状態であったとする。そして、電力系統の需給バランスが崩れ(具体的には、電力系統の電力供給量が足りなくなり)、稼働状態の全ての負荷のうち40%の負荷を停止状態にする必要が生じたとする。   First, as shown in step S2-0, it is assumed that the initial state of the operating state of all loads is the operating state. Then, it is assumed that the supply and demand balance of the power system is disrupted (specifically, the power supply amount of the power system is insufficient), and it is necessary to stop 40% of all the loads in the operating state.

この場合、ステップS2−1に示すように、需要調整要請送信装置101は、変更割合を40%と決定し、変更割合「40%」に対応する閾値「0.4」と負荷停止とを示す調整要請を各負荷に対応する需要調整装置102のそれぞれに送信する。需要調整装置102のそれぞれは、調整要請を受信すると、乱数生成部202を用いて乱数を生成し、乱数が閾値以下の場合、自身に対応する負荷を停止状態にする。   In this case, as shown in step S2-1, the demand adjustment request transmission apparatus 101 determines the change rate as 40%, and indicates the threshold “0.4” corresponding to the change rate “40%” and the load stop. An adjustment request is transmitted to each of the demand adjustment apparatuses 102 corresponding to each load. Each of the demand adjustment apparatuses 102, when receiving the adjustment request, generates a random number using the random number generation unit 202, and when the random number is equal to or smaller than the threshold value, sets the load corresponding to itself to the stopped state.

図3では、EVに対応する需要調整装置102が乱数として0.3を生成し、冷蔵庫に対応する需要調整装置102が乱数として0.5を生成し、エアコンに対応する需要調整装置102が乱数として0.8を生成している。この場合、閾値以下の乱数を生成した需要調整装置102に対応するEVのみが停止状態となる。   In FIG. 3, the demand adjustment apparatus 102 corresponding to EV generates 0.3 as a random number, the demand adjustment apparatus 102 corresponding to the refrigerator generates 0.5 as a random number, and the demand adjustment apparatus 102 corresponding to an air conditioner As a result, 0.8 is generated. In this case, only the EV corresponding to the demand adjustment device 102 that has generated a random number equal to or smaller than the threshold value is in a stopped state.

その後、電力系統の電力供給量の不足が解消されず、稼働状態の全ての負荷のうち80%の負荷を停止状態にする必要が生じたとする。   Thereafter, it is assumed that the shortage of the power supply amount of the power system is not solved and 80% of all operating loads need to be stopped.

この場合、ステップS2−2に示すように、需要調整要請送信装置101は、変更割合を80%と決定し、変更割合「80%」に対応する閾値「0.8」と負荷停止とを示す調整要請を各負荷に対応する需要調整装置102のそれぞれに送信する。需要調整装置102のそれぞれは、調整要請を受信すると、乱数生成部202を用いて乱数を生成し、乱数が閾値以下の場合に、自分自身に対応する負荷を停止状態にする。   In this case, as shown in step S2-2, the demand adjustment request transmitting apparatus 101 determines the change rate as 80%, and indicates the threshold “0.8” corresponding to the change rate “80%” and the load stop. An adjustment request is transmitted to each of the demand adjustment apparatuses 102 corresponding to each load. Each of the demand adjustment apparatuses 102 receives the adjustment request, generates a random number using the random number generation unit 202, and when the random number is equal to or less than the threshold, sets the load corresponding to itself to a stopped state.

図3では、EVに対応する需要調整装置102が乱数として0.2を生成し、冷蔵庫に対応する需要調整装置102が乱数として0.9を生成し、エアコンに対応する需要調整装置102が乱数として0.7を生成している。この場合、閾値以下の乱数を生成した需要調整装置102に対応するEVおよびエアコンが停止状態となる。   In FIG. 3, the demand adjustment device 102 corresponding to the EV generates 0.2 as a random number, the demand adjustment device 102 corresponding to the refrigerator generates 0.9 as a random number, and the demand adjustment device 102 corresponding to the air conditioner As a result, 0.7 is generated. In this case, the EV and the air conditioner corresponding to the demand adjustment device 102 that has generated a random number equal to or smaller than the threshold value are stopped.

以上説明したように閾値および乱数を用いて停止状態にする負荷が選択されると、全ての負荷の中から、変更割合に応じた数の負荷がランダムで停止状態となり、図4に示すように、電力系統の需給アバランスに応じて電力需要を段階的に変更することが可能になる。   As described above, when the load to be stopped using the threshold value and the random number is selected, the load corresponding to the change ratio is randomly stopped from all the loads, as shown in FIG. The power demand can be changed in stages according to the supply and demand balance of the power system.

なお、図3の例では、負荷が3個のみであったが、通常、負荷の数は非常に多い。例えば、需要調整システムが変電所よりも下流に存在する負荷の動作状態を制御する場合、負荷の数は概ね数万個であり、需要調整システムが電力会社の管轄内に存在する負荷の状態を制御する場合、負荷の数は概ね数百万個以上となる。   In the example of FIG. 3, there are only three loads, but the number of loads is usually very large. For example, when the demand adjustment system controls the operating state of the load existing downstream from the substation, the number of loads is approximately tens of thousands, and the demand adjustment system indicates the state of the load existing within the jurisdiction of the power company. In the case of control, the number of loads is approximately several million or more.

負荷の数が少ない場合、各負荷の消費電力量が異なるため、停止状態となる負荷に応じて電力需要が変化してしまう。このため、閾値にて示される変更割合に比例した分だけ電力需要が変化するとは限らない。しかしながら、負荷の数が十分多くある場合、停止状態となる負荷がランダムに選択されると、選択された負荷の消費電力の総和は、全ての負荷の消費電力の総和に、全ての負荷に対する選択された負荷の割合を掛け合わせた値になる。つまり、変更割合に比例して電力需要が変化するため、正確な需要調整が可能になる。   When the number of loads is small, the power consumption of each load is different, so that the power demand changes depending on the load that is in a stopped state. For this reason, the power demand does not always change by an amount proportional to the change rate indicated by the threshold. However, if the number of loads is sufficiently large and the load to be stopped is selected at random, the total power consumption of the selected loads will be the sum of the power consumption of all loads, and the selection for all loads. It becomes the value which multiplied the ratio of the load which was done. That is, since the power demand changes in proportion to the change rate, accurate demand adjustment is possible.

なお、調整要請が負荷停止を示す場合、稼働状態の負荷のみが動作状態を変更することが可能であり、調整要請が負荷稼働を示す場合、停止状態の負荷のみが動作状態を変更することが可能である。このため、需要調整要請送信装置101は、変更割合を決定する際に、全ての負荷に対する動作状態が変更可能な負荷の割合である対象負荷割合を考慮する必要がある。負荷の数が十分多くある場合、対象負荷割合は、気温などの気象情報や時間帯および曜日などの時間情報などをパラメータとして用いることで統計的に予測することが可能である。   When the adjustment request indicates a load stop, only the operating load can change the operation state. When the adjustment request indicates the load operation, only the stopped load can change the operation state. Is possible. For this reason, when the demand adjustment request transmission apparatus 101 determines the change ratio, it is necessary to consider the target load ratio that is the ratio of the load whose operation state can be changed for all loads. When the number of loads is sufficiently large, the target load ratio can be statistically predicted by using weather information such as temperature, time information such as time zone and day of the week, etc. as parameters.

このため、需要調整要請送信装置101は、変更割合に応じた調整要請を送信したときに、電力系統の需給バランスの崩れがどの程度解消されたかを示す情報を過去の実績としてパラメータと対応付けてデータベースとして保持し、そのデータベースと現在のパラメータの値に基づいて対象負荷割合を予測することができる。   For this reason, when the demand adjustment request transmitting apparatus 101 transmits the adjustment request according to the change ratio, the information indicating how much the disruption of the supply and demand balance of the power system has been resolved is associated with the parameter as the past performance. The target load ratio can be predicted based on the database and the current parameter value.

なお、需要家が動作状態を変更することを希望しない負荷(例えば冷蔵庫など)がある場合には、需要調整システムが管理する負荷を需要家が適宜選択できるようにしてもよい。   In addition, when there exists a load (for example, a refrigerator etc.) which a consumer does not want to change an operation state, you may enable a consumer to select suitably the load which a demand adjustment system manages.

このように需要家が需要調整システムによる負荷の動作状態の変更を許可するか否かを設定することができる場合、動作状態の変更を許可していない負荷も考慮して対象負荷割合を求める必要がある。しかしながら、この場合であっても、適切なデータベースを用いることで対象負荷割合を予測することができる。   In this way, when it is possible to set whether or not to allow the demand adjustment system to change the operating state of the load, it is necessary to determine the target load ratio in consideration of the load that does not allow the operating state to be changed. There is. However, even in this case, the target load ratio can be predicted by using an appropriate database.

次に需要調整システムの動作を説明する。   Next, the operation of the demand adjustment system will be described.

図5は、需要調整装置102の動作の一例を説明するフローチャートである。   FIG. 5 is a flowchart for explaining an example of the operation of the demand adjustment apparatus 102.

先ず、処理部203は、需要調整要請受信部201が調整要請を受信したか否かを確認する(ステップS301)。   First, the processing unit 203 confirms whether or not the demand adjustment request receiving unit 201 has received an adjustment request (step S301).

需要調整要請受信部201が調整要請を受信していない場合、処理部203は、ステップS301の処理に戻る。一方、需要調整要請受信部201が調整要請を受信した場合、処理部203は、以前に受信された調整要請に従って、現在、負荷の動作状態を制御しているか否かを判断する(ステップS302)。   When the demand adjustment request receiving unit 201 has not received the adjustment request, the processing unit 203 returns to the process of step S301. On the other hand, when the demand adjustment request receiving unit 201 receives the adjustment request, the processing unit 203 determines whether the operation state of the load is currently controlled according to the previously received adjustment request (step S302). .

ステップS302において負荷の動作状態を制御している場合、処理部203は、負荷の動作状態の制御を停止して、負荷の動作状態を元の状態に戻す(ステップS303)。   When the operation state of the load is controlled in step S302, the processing unit 203 stops the control of the operation state of the load and returns the operation state of the load to the original state (step S303).

ステップS301において負荷の動作状態を制御していない場合、および、ステップS302において負荷の動作状態を元の状態に戻した場合、処理部203は、調整要請が負荷停止を示すか負荷稼働を示すかを確認する(ステップS304)。   When the operation state of the load is not controlled in step S301 and when the operation state of the load is returned to the original state in step S302, the processing unit 203 indicates whether the adjustment request indicates load stop or load operation. Is confirmed (step S304).

調整要請が負荷稼働を示す場合、処理部203は、負荷103が停止状態か否かを確認する(ステップS305)。一方、調整要請が負荷停止を示す場合、処理部203は、負荷103が稼働状態か否かを確認する(ステップS306)。   When the adjustment request indicates load operation, the processing unit 203 confirms whether or not the load 103 is in a stopped state (step S305). On the other hand, when the adjustment request indicates a load stop, the processing unit 203 checks whether or not the load 103 is in an operating state (step S306).

ステップS305において負荷103が稼働状態の場合、および、ステップS306において負荷が停止状態の場合、処理部203は、ステップS301の処理に戻る。   When the load 103 is in the operating state in step S305 and when the load is in the stopped state in step S306, the processing unit 203 returns to the processing in step S301.

また、ステップS305において負荷103が停止状態の場合、および、ステップS306において負荷が稼働状態の場合、処理部203は、乱数生成部202に乱数値を生成する旨の動作指令を出力する。乱数生成部202は、動作指令を受け付けると、乱数値を生成し、その乱数値を処理部203に通知する。処理部203は、調整要請が示す閾値と、乱数生成部202から通知された乱数値とを比較して、乱数値が閾値以下か否かを判断する(ステップS307)。   Further, when the load 103 is in a stopped state in step S305 and when the load is in an operating state in step S306, the processing unit 203 outputs an operation command for generating a random value to the random number generation unit 202. When receiving the operation command, the random number generation unit 202 generates a random value and notifies the processing unit 203 of the random value. The processing unit 203 compares the threshold value indicated by the adjustment request with the random number value notified from the random number generation unit 202, and determines whether the random number value is equal to or smaller than the threshold value (step S307).

乱数値が閾値以下の場合、処理部203は、調整要請に従って負荷103の動作状態を変更し(ステップS308)、ステップS301の処理に戻る。一方、乱数値が閾値より大きい場合、ステップS308の処理を行わずに、処理部203は、ステップS301の処理に戻る。   When the random number value is equal to or smaller than the threshold value, the processing unit 203 changes the operation state of the load 103 according to the adjustment request (step S308), and returns to the process of step S301. On the other hand, when the random value is larger than the threshold value, the processing unit 203 returns to the process of step S301 without performing the process of step S308.

図6は、需要調整要請送信装置101の動作の一例を説明するためのフローチャートである。   FIG. 6 is a flowchart for explaining an example of the operation of the demand adjustment request transmission apparatus 101.

先ず、需要調整要請送信装置101は、需要アンバランス情報に基づいて、負荷103の動作状態を変更する需要調整が必要か否かを判断する(ステップS401)。例えば、需要調整要請送信装置101は、需要アンバランス情報に基づいて、需給バランスの崩れの程度を推定し、その程度が所定の許容範囲から外れていると、需要調整が必要と判断する。   First, the demand adjustment request transmitting apparatus 101 determines whether or not demand adjustment for changing the operation state of the load 103 is necessary based on the demand imbalance information (step S401). For example, the demand adjustment request transmitting apparatus 101 estimates the degree of supply-demand balance disruption based on the demand imbalance information, and determines that demand adjustment is necessary if the degree is out of a predetermined allowable range.

需要調整が必要ある場合、需要調整要請送信装置101は、需要アンバランス情報に基づいて変更方向を決定し、その変更方向と、現在のパラメータ(気象情報および時間情報)と、保持しているデータベースとに基づいて対象負荷割合を推定する(ステップS402)。   When demand adjustment is necessary, the demand adjustment request transmitting apparatus 101 determines a change direction based on the demand imbalance information, the change direction, current parameters (weather information and time information), and a database that is held. Based on the above, the target load ratio is estimated (step S402).

そして、需要調整要請送信装置101は、予測した対象負荷割合に基づいて変更割合である閾値を決定する(ステップS403)。   And the demand adjustment request | requirement transmission apparatus 101 determines the threshold value which is a change ratio based on the estimated object load ratio (step S403).

その後、需要調整要請送信装置101は、決定した変更方向および閾値を示す調整要請を生成し、その調整要請を需要調整装置102のそれぞれに送信する(ステップS404)。   Thereafter, the demand adjustment request transmission apparatus 101 generates an adjustment request indicating the determined change direction and threshold value, and transmits the adjustment request to each of the demand adjustment apparatuses 102 (step S404).

以下、閾値を決定する処理についてより詳細に説明する。   Hereinafter, the process for determining the threshold will be described in more detail.

例えば、変更方向が電力消費量の低減を示す場合、現在における稼働状態の負荷の総量である稼働総量をPON、動作状態を変更する負荷の量である負荷削減量をPreduceとすると、閾値(変更割合)Wは以下の式1で表される。 For example, when the change direction indicates a reduction in power consumption, the total operation amount that is the total amount of loads in the current operation state is P ON , and the load reduction amount that is the amount of load that changes the operation state is P reduce. (Change ratio) W is expressed by the following formula 1.

Figure 2015023594
Figure 2015023594

また、変更方向が電力消費量の増加を示す場合、現在における停止状態の負荷の総量である停止総量をPOFF、動作状態を変更する負荷の量である負荷増加量をPincreaseとした場合、閾値(変更割合)Wは以下の式2で表される。 Further, when the change direction indicates an increase in power consumption, if the total stop amount that is the total load in the current stop state is P OFF , and the load increase amount that is the amount of load that changes the operation state is P increase , The threshold value (change ratio) W is expressed by the following equation 2.

Figure 2015023594
Figure 2015023594

式1および式2における稼働総量PONおよび停止総量POFFは、以下のように算出することができる。 The total operation amount P ON and the total stop amount P OFF in Equation 1 and Equation 2 can be calculated as follows.

需要家aの負荷b(例:b=1が冷蔵庫、b=2が電気自動車など)の消費電力量をPindividual(a,b)と表し、各需要家の負荷bが時刻tにおいて使用されている確率をRusing(t,b)、と表し、各需要家の負荷bが動作状態の変更を許可されている確率をRallow(t,b)と表すとする。 The power consumption of the load b of the customer a (eg, b = 1 is a refrigerator, b = 2 is an electric vehicle, etc.) is represented as P individual (a, b), and the load b of each customer is used at time t. Is expressed as R using (t, b), and the probability that the load b of each consumer is allowed to change the operating state is expressed as R allow (t, b).

時刻tにおける稼働総量PONは、各需要家aの負荷bの動作状態が稼働状態から停止状態に変更された場合における消費電力量の変化量、つまり負荷bの消費電力量Pindividual(a,b)に、動作状態を変更することが可能な確率Rusing(t,b)×Rallow(t,b)を乗算した値を、全ての需要家aおよび負荷bについて総和をとった値となる。つまり、稼働総量PONは以下の式3で表される。 The total operating amount P ON at time t is the amount of change in power consumption when the operating state of the load b of each customer a is changed from the operating state to the stopped state, that is, the power consumption amount P individual (a, The value obtained by multiplying b) by the probability R using (t, b) × R allow (t, b) that can change the operating state is the sum of all the consumers a and loads b. Become. That is, the total operating amount PON is expressed by the following formula 3.

Figure 2015023594
Figure 2015023594

式3において、   In Equation 3,

Figure 2015023594
Figure 2015023594

は、全ての需要家における負荷bの消費電力の総和であり、需要家の数が十分多い場合、各需要家における負荷bの平均消費電力に、負荷bを有する需要家の数を乗算した値となる。そのため、式3は、以下の式4ように変形することができる。 Is the sum of the power consumption of the load b in all the consumers, and when the number of consumers is sufficiently large, the value obtained by multiplying the average power consumption of the load b in each consumer by the number of consumers having the load b It becomes. Therefore, Equation 3 can be transformed as Equation 4 below.

Figure 2015023594
Figure 2015023594

なお、負荷bを有する需要家の数、負荷bの平均消費電力、確率Rusing(t,b)およびRallow(t,b)は、統計的に求めることができる。 Note that the number of consumers having the load b, the average power consumption of the load b, the probabilities R using (t, b) and R allow (t, b) can be obtained statistically.

また、停止総量POFFは、稼働総量PONと同様に以下の式5で表すことができる。 Further, the total stop amount P OFF can be expressed by the following Expression 5 similarly to the total operation amount P ON .

Figure 2015023594
Figure 2015023594

以上説明した本実施形態では、処理部203は、式1または式2を用いて算出した閾値と、特定範囲である0から1までの範囲内の複数の数値をランダムに生成した値である乱数値と比較することで、負荷103の動作状態を変更するか否かを判断していた。しかしながら、この方法は単なる一例であって、乱数生成部202は確率分布が予め定められた複数の数値のいずれかをその確率分布に従って生成すればよい。この場合、需要調整要請送信装置101は、変更割合をその確率分布に応じた閾値で表せばよい。   In the present embodiment described above, the processing unit 203 is a random value generated by randomly generating a threshold value calculated using Expression 1 or Expression 2 and a plurality of numerical values within a specific range of 0 to 1. By comparing with the numerical value, it is determined whether or not to change the operating state of the load 103. However, this method is merely an example, and the random number generation unit 202 may generate any one of a plurality of numerical values for which the probability distribution is predetermined according to the probability distribution. In this case, the demand adjustment request transmitting apparatus 101 may represent the change rate with a threshold value corresponding to the probability distribution.

例えば、特定範囲を1から1000までの範囲とし、乱数生成部202が1から1000までの範囲内の整数値を乱数値としてランダムに生成してもよい。この場合、需要調整要請送信装置101は、式1または式2で求めた値Wを1から1000までの範囲内にマッピングすることで閾値を決定することができる。   For example, the specific range may be a range from 1 to 1000, and the random number generation unit 202 may randomly generate an integer value within the range from 1 to 1000 as a random value. In this case, the demand adjustment request transmitting apparatus 101 can determine the threshold value by mapping the value W obtained by Expression 1 or Expression 2 within a range from 1 to 1000.

また、乱数生成部202がランダムに乱数値を生成するのではなく、特定の確率分布を有する値を生成する場合、需要調整要請送信装置101は、乱数生成部202が用いる確率分布に従って式1および式2に重み付けを行い、その重み付けを行った式1および式2を用いて閾値を決定することができる。   In addition, when the random number generation unit 202 generates a value having a specific probability distribution instead of randomly generating a random number value, the demand adjustment request transmission apparatus 101 uses the equation 1 and the probability distribution used by the random number generation unit 202. Weighting is applied to Expression 2, and the threshold can be determined using Expression 1 and Expression 2 that are weighted.

また、需要調整装置102がシリアル番号などの固有の数値を保持していれば、需要調整要請送信装置101は、変更割合を固有の数値に対する条件で表してもよい。例えば、変更割合をシリアル番号の下三桁の数値に対する条件で表す場合、需要調整要請送信装置101は、0から999までの1000個の数値から、1000×W(式1および2で求めた変更割合)個の数値をランダムに生成し、その数値を示す需要調整を需要調整装置102のそれぞれに送信する。この場合、需要調整装置102の処理部203は、需要調整が示す数値が自身の需要調整装置102のシリアル番号の下三桁と一致しているならば、負荷103の動作状態を変更する。   Further, if the demand adjustment apparatus 102 holds a unique numerical value such as a serial number, the demand adjustment request transmission apparatus 101 may represent the change rate as a condition for the unique numerical value. For example, when the change ratio is represented by the condition for the last three digits of the serial number, the demand adjustment request transmitting apparatus 101 changes 1000 × W (changes obtained from Formulas 1 and 2 from 1000 numbers from 0 to 999). Proportion) pieces of numerical values are randomly generated, and a demand adjustment indicating the numerical values is transmitted to each of the demand adjustment apparatuses 102. In this case, the processing unit 203 of the demand adjustment device 102 changes the operation state of the load 103 if the numerical value indicated by the demand adjustment matches the last three digits of the serial number of the demand adjustment device 102.

また、需要調整装置102は、図7に示すように複数の負荷103と対応付けられていてもよい。この場合、乱数生成部202が複数の負荷103の全てに共通した乱数値を生成し、処理部203がその乱数値と閾値を比較することで、全ての負荷103の動作状態を一括して変更してもよいし、乱数生成部202が複数の負荷103のそれぞれについて乱数値を生成し、処理部203が乱数値のそれぞれと閾値を比較することで、負荷103の動作状態を個別に変更してもよい。   Moreover, the demand adjustment apparatus 102 may be matched with the some load 103, as shown in FIG. In this case, the random number generation unit 202 generates a random value common to all of the plurality of loads 103, and the processing unit 203 compares the random value with a threshold value, thereby changing the operation state of all the loads 103 at once. Alternatively, the random number generation unit 202 generates a random number value for each of the plurality of loads 103, and the processing unit 203 compares each of the random number values with a threshold value to individually change the operation state of the load 103. May be.

なお、乱数生成部202が乱数値を生成するアルゴリズムが全ての需要調整装置102に共通して用いられると、全ての需要調整装置102が同じ乱数値を生成してしまうことがあるかもしれない。このため、乱数値を生成するアルゴリズムは需要調整装置102ごとに個別に設定されることが望ましい。   Note that if the algorithm that the random number generation unit 202 generates a random number value is used in common for all the demand adjustment apparatuses 102, all the demand adjustment apparatuses 102 may generate the same random value. For this reason, it is desirable that an algorithm for generating a random value is individually set for each demand adjustment apparatus 102.

以上説明したように本実施形態によれば、変更割合に従って負荷103の動作状態が制御されるので、需要アンバランスの程度に応じた割合の負荷だけを稼働させたり、停止させたりすることで需要バランスを維持することが可能になる。このため、負荷103に対して限定的な動作を実行させるだけで、電力需要を細やかに制御することが可能になる。また、変更割合が全ての需要調整装置に通知されればよいので、負荷103ごとに異なる指令を送信する必要がない。したがって、負荷103ごとに異なる指令を送信する必要がなく、さらには、負荷103に対して限定的な動作を実行させるだけで、需要バランスを細やかに制御することが可能になる。   As described above, according to the present embodiment, the operating state of the load 103 is controlled according to the change rate, so that only the load at the rate corresponding to the degree of demand imbalance is operated or stopped. It becomes possible to maintain the balance. For this reason, it is possible to finely control the power demand only by executing a limited operation on the load 103. Further, since it is only necessary to notify the change ratio to all the demand adjusting devices, there is no need to transmit a different command for each load 103. Therefore, it is not necessary to transmit a different command for each load 103, and further, the demand balance can be finely controlled only by executing a limited operation on the load 103.

また、本実施形態では、負荷103の動作状態は停止状態と稼働状態だけなので、負荷103に対してより限定した動作を実行させるだけでよくなる。   Further, in the present embodiment, since the operation state of the load 103 is only the stop state and the operation state, it is only necessary to cause the load 103 to perform a more limited operation.

また、本実施形態では、予め設定された確率分布に従って生成された比較値および閾値に応じて、動作状態が変更または維持されるので、需要バランスを細やかにかつ容易に制御することが可能になる。   In the present embodiment, since the operation state is changed or maintained according to the comparison value and the threshold value generated according to the preset probability distribution, the demand balance can be finely and easily controlled. .

また、本実施形態では、確率分布における各数値が生成される確率が等しいので、非常に容易に需要バランスを制御することが可能になる。   Moreover, in this embodiment, since the probability that each numerical value in the probability distribution is generated is equal, the demand balance can be controlled very easily.

また、本実施形態では、乱数値を生成するアルゴリズムが需要調整装置102ごとに設定されるので、全ての需要調整装置102が同じ乱数値を生成してしまうことが抑制することが可能になる。   Moreover, in this embodiment, since the algorithm which produces | generates a random value is set for every demand adjustment apparatus 102, it becomes possible to suppress that all the demand adjustment apparatuses 102 produce | generate the same random value.

また、本実施形態では、変更割合および変更方向に従って負荷103の動作状態が制御されるので、電力供給量が不足した場合でも、電力供給量が過剰になった場合でも、需給バランスを維持することが可能になる。   In the present embodiment, since the operation state of the load 103 is controlled according to the change ratio and the change direction, the supply and demand balance can be maintained even when the power supply amount is insufficient or the power supply amount is excessive. Is possible.

次に本発明の第2の実施形態について説明する。   Next, a second embodiment of the present invention will be described.

図8は、本発明の需要調整システムの構成を示す図である。図8に示すように本実施形態の需要調整システムは、複数の需要調整装置500を有する。需要調整装置500のそれぞれは、電力系統501と、電力系統501からの電力を消費する負荷502と接続されている。なお、需要調整装置500は、第1の実施形態の需要調整装置102と同様に、複数の負荷502と接続されていても良いが、以下では簡単のために一つの負荷502と接続されているものとする。また、需要調整装置500は負荷502に内蔵されていてもよい。   FIG. 8 is a diagram showing the configuration of the demand adjustment system of the present invention. As shown in FIG. 8, the demand adjustment system of this embodiment includes a plurality of demand adjustment devices 500. Each of the demand adjustment apparatuses 500 is connected to an electric power system 501 and a load 502 that consumes electric power from the electric power system 501. The demand adjustment device 500 may be connected to a plurality of loads 502 as in the case of the demand adjustment device 102 of the first embodiment, but in the following, it is connected to a single load 502 for simplicity. Shall. Further, the demand adjustment device 500 may be built in the load 502.

図9は、需要調整装置500の構成を示す図である。図9に示すように需要調整装置500は、系統周波数測定部511と、格納部512と、処理部513とを有する。   FIG. 9 is a diagram illustrating a configuration of the demand adjustment device 500. As illustrated in FIG. 9, the demand adjustment apparatus 500 includes a system frequency measurement unit 511, a storage unit 512, and a processing unit 513.

系統周波数測定部511は、需要アンバランス情報である系統周波数を測定する。なお、系統周波数は同一の電力系統であればどのポイントで測定してもほぼ同一となるため、複数の需要調整装置500のそれぞれでほぼ同一の系統周波数が測定される。   The system frequency measurement unit 511 measures a system frequency that is demand imbalance information. In addition, since the system frequency is substantially the same regardless of which point is measured as long as the power system is the same, the same system frequency is measured by each of the plurality of demand adjustment devices 500.

格納部512は、負荷502の消費電力を変更する変更割合と系統周波数との対応関係を規定する対応情報を格納する。本実施形態では、格納部512は、系統周波数を引数とし、変更割合を示す解を返す関数である周波数‐需要調整変換関数を対応情報として格納する。   The storage unit 512 stores correspondence information that defines a correspondence relationship between the change rate for changing the power consumption of the load 502 and the system frequency. In the present embodiment, the storage unit 512 stores, as correspondence information, a frequency-demand adjustment conversion function that is a function that uses a system frequency as an argument and returns a solution indicating a change rate.

なお、周波数‐需要調整変換関数は格納部512に予め格納されていてもよいし、インターネットなどを用いて定期的に需要調整装置500に配信された周波数‐需要調整変換関数が格納されてもよい。   The frequency-demand adjustment conversion function may be stored in advance in the storage unit 512, or the frequency-demand adjustment conversion function that is periodically distributed to the demand adjustment device 500 using the Internet or the like may be stored. .

処理部513は、系統周波数測定部511にて測定された測定値と、格納部512に格納された周波数‐需要調整変換関数に基づいて、負荷502の動作状態を制御する。なお、本実施形態では、負荷502の動作状態は、第1の実施形態の負荷103と同様に、稼働状態および停止状態を有するものとする。   The processing unit 513 controls the operation state of the load 502 based on the measurement value measured by the system frequency measurement unit 511 and the frequency-demand adjustment conversion function stored in the storage unit 512. In the present embodiment, it is assumed that the operating state of the load 502 has an operating state and a stopped state, like the load 103 of the first embodiment.

処理部513は、具体的には、決定部521と、制御部522とを有する。   Specifically, the processing unit 513 includes a determination unit 521 and a control unit 522.

決定部521は、系統周波数測定部511にて測定された測定値と、格納部512に格納された周波数‐需要調整変換関数とに基づいて、変更割合を決定する。   The determination unit 521 determines the change rate based on the measurement value measured by the system frequency measurement unit 511 and the frequency-demand adjustment conversion function stored in the storage unit 512.

制御部522は、決定部521が決定した変更割合に基づいて、負荷502の動作状態を制御する。例えば、第1の実施形態と同様に変換確率を閾値で表し、かつ、乱数値を生成し、閾値が乱数値以下か否かに応じて負荷502動作状態を変更または維持する。   The control unit 522 controls the operation state of the load 502 based on the change rate determined by the determination unit 521. For example, as in the first embodiment, the conversion probability is represented by a threshold value, a random value is generated, and the operation state of the load 502 is changed or maintained depending on whether the threshold value is equal to or less than the random value.

図10は、需要調整装置500の動作の一例を説明するためのフローチャートである。   FIG. 10 is a flowchart for explaining an example of the operation of the demand adjustment apparatus 500.

先ず、決定部521は、系統周波数測定部511から系統周波数の測定値を取得する(ステップS601)。なお、系統周波数測定部511は、例えば、常時または定期的に系統周波数を測定し、決定部521は、例えば、定期的にその測定値を取得する。   First, the determination unit 521 acquires a measurement value of the system frequency from the system frequency measurement unit 511 (step S601). The system frequency measurement unit 511 measures the system frequency, for example, constantly or periodically, and the determination unit 521 acquires the measurement value, for example, periodically.

続いて、決定部521は、格納部512から周波数‐需要調整変換関数を取得する(ステップS602)。   Subsequently, the determination unit 521 acquires a frequency-demand adjustment conversion function from the storage unit 512 (step S602).

そして、決定部521は、その周波数周波数‐需要調整変換関数にステップS601で取得した測定値を代入し、周波数周波数‐需要調整変換関数から返された解に応じて変更割合および変更方向を決定する(ステップS603)。   Then, the determination unit 521 substitutes the measurement value acquired in step S601 for the frequency frequency-demand adjustment conversion function, and determines the change ratio and the change direction according to the solution returned from the frequency-frequency-demand adjustment conversion function. (Step S603).

その後、決定部521は、決定した変更割合および変更方向を示す変更情報を制御部522に通知する。制御部522は、変更情報を受け付けると、その変更情報が示す変更割合に従って負荷502の動作状態を変更するか否かを判断する(ステップS604)。   Thereafter, the determination unit 521 notifies the control unit 522 of change information indicating the determined change ratio and change direction. Upon receiving the change information, control unit 522 determines whether or not to change the operating state of load 502 in accordance with the change rate indicated by the change information (step S604).

動作状態を変更する場合、決定部521は、変更方向に従って負荷502の動作状態を変更し(ステップS605)、ステップS601の処理に戻る。一方、動作状態を維持する場合、決定部521は、ステップS605の処理を行わずに、ステップS601の処理に戻る。   When changing the operation state, the determination unit 521 changes the operation state of the load 502 according to the change direction (step S605), and returns to the process of step S601. On the other hand, when maintaining an operation state, the determination part 521 returns to the process of step S601, without performing the process of step S605.

次に周波数‐需要調整変換関数と、周波数‐需要調整変換関数を用いて変更割合および変更方向を決定するステップS603の処理についてより詳細に説明する。   Next, the processing in step S603 for determining the change ratio and the change direction using the frequency-demand adjustment conversion function and the frequency-demand adjustment conversion function will be described in more detail.

図11は、周波数‐需要調整変換関数の一例を示す図である。図11に示す周波数‐需要調整変換関数は、変更方向である電力消費量の増加および削減のそれぞれについて解を返すものである。具体的には、周波数‐需要調整変換関数には、系統周波数に対する、負荷502を停止状態から稼働状態に変更する割合である停止−稼働割合を規定する第1の関数と、系統周波数に対する、負荷502を稼働状態から停止状態に変更する割合である稼働−停止割合を規定する第2の関数とがある。   FIG. 11 is a diagram illustrating an example of a frequency-demand adjustment conversion function. The frequency-demand adjustment conversion function shown in FIG. 11 returns a solution for each of increase and reduction of power consumption, which is the change direction. Specifically, the frequency-demand adjustment conversion function includes a first function that defines a stop-operating ratio that is a ratio of changing the load 502 from a stopped state to an operating state with respect to the system frequency, and a load for the system frequency. There is a second function that defines an operation-stop ratio, which is a ratio of changing 502 from the operation state to the stop state.

周波数‐需要調整変換関数である第1の関数および第2の関数は、任意の系統周波数に対して、停止−稼働割合および稼働−停止割合の少なくとも一方が0になるように設定されている。なお、停止−稼働割合が0より大きい場合、変更方向が負荷稼働であることを示し、稼働−停止割合が0より大きい場合、変更方向が負荷停止であることを示す。   The first function and the second function, which are frequency-demand adjustment conversion functions, are set so that at least one of the stop-operation ratio and the operation-stop ratio becomes 0 for any system frequency. When the stop-operation ratio is greater than 0, the change direction indicates load operation, and when the operation-stop ratio is greater than 0, the change direction indicates load stop.

ここで系統周波数が所定の系統基準周波数よりも高い場合には、電力需要が供給(発電量)を下回っていることを意味し、系統周波数が系統基準周波数よりも低い場合には、電力需要が供給を上回っていることを意味する。このため、系統基準周波数を基準値とし、第1の関数および第2の関数は、系統周波数が基準値よりも高い場合には、停止‐稼働割合が0%より大きくなり、系統周波数が基準値よりも低い場合には、稼働‐停止割合が0%より大きくなるように設定されている。   Here, when the grid frequency is higher than the predetermined grid reference frequency, it means that the power demand is lower than the supply (power generation amount), and when the grid frequency is lower than the grid reference frequency, the power demand is low. It means that it exceeds the supply. For this reason, the system reference frequency is used as a reference value, and when the system frequency is higher than the reference value, the first function and the second function have a stop-operation ratio larger than 0%, and the system frequency is the reference value. If it is lower, the operation-stop ratio is set to be larger than 0%.

なお、日本国内の東側の地域では、系統周波数が系統基準周波数である50Hzの中心として±0.2Hz以内になるように電力系統が運用されているため、図7では、その運用に合わせて、基準値を系統基準周波数と同じ50Hzとし、系統周波数が50Hz±0.2Hzになったときに、変更割合が最大値「100%」となるように、周波数‐需要調整変換関数は設定されている。   In the eastern region of Japan, the power system is operated so that the system frequency is within ± 0.2 Hz as the center of the system reference frequency of 50 Hz. In FIG. 7, in accordance with the operation, The frequency-demand adjustment conversion function is set so that the change rate becomes the maximum value “100%” when the reference value is 50 Hz which is the same as the system reference frequency and the system frequency becomes 50 Hz ± 0.2 Hz. .

この場合、制御部522は、変更割合が0でないことを示す解に基づいて、変更割合および電力消費量の増加または削減を示す変更方向を決定し、変更割合および変更方向に従って、電力負荷の動作状態を制御する、
なお、第1の実施形態と同様に、動作状態を変更できる負荷502は、電力消費量を減らす場合、稼働状態の負荷だけであり、電力消費量を増やす場合、停止状態の負荷だけである。このため、決定部521は、周波数‐需要調整変換関数から返される停止‐稼働割合が0%より大きくても、負荷502が稼働状態の場合には、変更割合を0%とし、周波数‐需要調整変換関数から返される稼働‐停止割合が0%より大きくても、負荷502が停止状態の場合には、変更割合を0%とする。
In this case, the control unit 522 determines a change direction indicating an increase or a reduction in the change rate and the power consumption based on a solution indicating that the change rate is not 0, and operates the power load according to the change rate and the change direction Control the state,
As in the first embodiment, the load 502 whose operation state can be changed is only the load in the operating state when reducing the power consumption, and is only the load in the stopped state when increasing the power consumption. Therefore, the determination unit 521 sets the change rate to 0% when the load 502 is in an operating state even if the stop-operation rate returned from the frequency-demand adjustment conversion function is greater than 0%, and the frequency-demand adjustment Even if the operation-stop ratio returned from the conversion function is greater than 0%, the change ratio is set to 0% when the load 502 is in the stop state.

周波数‐需要調整変換関数は、図11の例に限らない。例えば、周波数‐需要調整変換関数は、系統周波数の測定値の基準値からの偏差が0の場合、変更割合が0%となり、その偏差が正の場合、変更方向が負荷稼働、つまり、停止−稼働割合が0以上になり、その偏差が負の場合、変更方向が負荷停止、つまり、稼働−停止割合が0以上になる関数であればよい。   The frequency-demand adjustment conversion function is not limited to the example of FIG. For example, in the frequency-demand adjustment conversion function, when the deviation from the reference value of the measured value of the system frequency is 0, the change rate is 0%, and when the deviation is positive, the change direction is the load operation, that is, the stop- If the operating ratio becomes 0 or more and the deviation is negative, the change direction may be a function in which the load stops, that is, the operating-stop ratio becomes 0 or more.

図12は、周波数‐需要調整変換関数の他の例を示す図である。図12の例では、周波数‐需要調整変換関数は、偏差が正の場合、解が正になり、偏差が負の場合、変更割合が負になる。この場合、制御部522は、解の符号に応じて変更方向を決定し、解の絶対値に基づいて変更割合を決定する。具体的には、制御部522は、解が正の場合、変更方向を負荷稼働に決定し、かつ、変更割合(停止−稼働割合)を解の絶対値に決定し、解が負の場合、変更方向を負荷停止に決定し、かつ、変更確率(稼働−停止割合)を解の絶対値に決定する。   FIG. 12 is a diagram illustrating another example of the frequency-demand adjustment conversion function. In the example of FIG. 12, the frequency-demand adjustment conversion function has a positive solution when the deviation is positive, and a negative change rate when the deviation is negative. In this case, the control unit 522 determines the change direction according to the sign of the solution, and determines the change ratio based on the absolute value of the solution. Specifically, when the solution is positive, the control unit 522 determines the change direction as load operation, determines the change rate (stop-operation rate) as an absolute value of the solution, and when the solution is negative, The change direction is determined as load stop, and the change probability (operation-stop ratio) is determined as the absolute value of the solution.

なお、系統周波数の基準値は系統基準周波数でなくてもよい。例えば、基準値は、系統基準周波数よりも僅かに小さい値でもよい。この場合、系統周波数は、通常、系統基準周波数を中心として揺らぐため、負荷502の動作状態が停止状態から稼働状態に変更する可能性が、負荷502の動作状態が稼働状態から停止状態に変更する可能性よりも高くなる。このため、需要家は負荷502をより長い時間利用することが可能になる。   The system frequency reference value may not be the system reference frequency. For example, the reference value may be a value slightly smaller than the system reference frequency. In this case, since the system frequency usually fluctuates around the system reference frequency, there is a possibility that the operating state of the load 502 is changed from the stopped state to the operating state, and the operating state of the load 502 is changed from the operating state to the stopped state. Higher than the possibility. For this reason, the consumer can use the load 502 for a longer time.

また、周波数‐需要調整変換関数は、基準値を含む所定範囲に系統周波数が収まる場合、変更割合が0となるものでもよい。この場合、需給バランスの崩れの程度が小さい場合には、負荷502の動作状態が変更されなくなるので、負荷の動作状態が変更する回数を低減することが可能になる。   Further, the frequency-demand adjustment conversion function may have a change rate of 0 when the system frequency falls within a predetermined range including the reference value. In this case, when the degree of disruption of the supply and demand balance is small, the operating state of the load 502 is not changed, so that the number of times that the operating state of the load is changed can be reduced.

また、第1の実施形態と同様に負荷502の数が少ない場合には、各負荷の消費電力量が異なるため、動作状態が変更される負荷に応じて電力需要は変化してしまうが、負荷の数が十分多い場合には、動作状態を変更する変更割合に比例して電力需要が変化するため、正確な需要調整が可能になる。   Further, as in the first embodiment, when the number of loads 502 is small, the power consumption of each load is different, so that the power demand changes depending on the load whose operation state is changed. When there is a sufficient number, the power demand changes in proportion to the change rate for changing the operating state, so that accurate demand adjustment is possible.

なお、本需要調整システムによる需要調整と、既存の電力システムにおける需給調整との整合をとるため、電力会社などの需給調整の責任を負う部門は、本需要調整システムにて需要調整が行われた場合に、その調整された電力量の総量である総需要調整量を把握しておく必要がある。負荷の台数が十分にあると、第1の実施形態と同様に、動作状態の変更を許可していない負荷を考慮しても対象負荷割合は、気象情報や時間情報などのパラメータを用いて統計的に予測可能である。このため、需給調整の責任を負う部門は、パラメータと系統周波数を測定する事で、総需要調整量を把握することが可能になる。   In addition, in order to make the demand adjustment by this demand adjustment system consistent with the supply and demand adjustment in the existing power system, the department responsible for supply and demand adjustment such as the power company has adjusted the demand by this demand adjustment system. In this case, it is necessary to grasp the total demand adjustment amount that is the total amount of the adjusted electric energy. If the number of loads is sufficient, the target load ratio is statistically determined using parameters such as weather information and time information, even if the load that does not permit the change of the operation state is taken into account, as in the first embodiment. Predictable. Therefore, the department responsible for supply and demand adjustment can grasp the total demand adjustment amount by measuring the parameters and the system frequency.

また、本実施形態では、需給アンバランス情報の一種である系統周波数に基づいて変更割合が決定されていたが、変更割合は第1の実施形態と同様に他の需給アンバランス情報に基づいて決定されていてもよい。   In the present embodiment, the change ratio is determined based on the system frequency, which is a kind of supply / demand imbalance information. However, the change ratio is determined based on other supply / demand imbalance information as in the first embodiment. May be.

以上説明したように本実施形態によれば、系統周波数と変更割合との対応関係を規定する対応情報と系統周波数の測定値とに基づいて、変更割合が決定されるため、容易に変更割合を決定することが可能になる。   As described above, according to the present embodiment, since the change ratio is determined based on the correspondence information that defines the correspondence between the system frequency and the change ratio and the measured value of the system frequency, the change ratio can be easily determined. It becomes possible to decide.

また、本実施形態では、対応情報は、系統周波数を引数とし、変更割合を示す解を返す周波数‐需要調整変換関数であるため、より容易に変更割合を決定することが可能になる。   Further, in the present embodiment, the correspondence information is a frequency-demand adjustment conversion function that returns a solution indicating the change ratio with the system frequency as an argument, and thus the change ratio can be determined more easily.

また、需要調整装置500が系統周波数を測定する系統周波数測定部511を備えているため、需要調整装置500は第1の実施形態の需要調整要請送信装置101のような他の装置と通信しなくても、変更割合を決定することが可能になる。   Further, since the demand adjustment device 500 includes the system frequency measurement unit 511 that measures the system frequency, the demand adjustment device 500 does not communicate with other devices such as the demand adjustment request transmission device 101 of the first embodiment. However, it becomes possible to determine the change rate.

以上説明した各実施形態において、図示した構成は単なる一例であって、本発明はその構成に限定されるものではない。   In each embodiment described above, the illustrated configuration is merely an example, and the present invention is not limited to the configuration.

例えば、変更割合と系統周波数との対応関係を規定する対応情報は、変更割合と系統周波数の対応を示すテーブルでもよい。   For example, the correspondence information that defines the correspondence between the change ratio and the system frequency may be a table indicating the correspondence between the change ratio and the system frequency.

また、電力負荷の動作状態は、稼働状態および停止状態の2つであったが、動作状態はこれらの例に限らない。   Moreover, although there are two operating states of the power load, the operating state and the stopped state, the operating state is not limited to these examples.

例えば、負荷には動作状態として電力消費量を低減させて駆動する省電力状態を有するものがある。このため、需要調整システムは、電力負荷の動作状態を、停止状態、稼働状態および省電力状態のいずれかに設定するものでもよい。また、負荷にはEV(電気自動車)のように動作状態として電力を放電する放電状態を有するものがある。このため、需要調整システムは、電力負荷の動作状態を、停止状態、放電状態、稼働状態(電力を充電する充電状態)のいずれかに設定するものでもよい。   For example, some loads have a power saving state in which the power consumption is reduced as an operating state. For this reason, the demand adjustment system may set the operation state of the power load to any one of the stop state, the operation state, and the power saving state. Some loads, such as EVs (electric vehicles), have a discharge state in which electric power is discharged as an operation state. For this reason, the demand adjustment system may set the operating state of the power load to one of a stopped state, a discharged state, and an operating state (a charged state in which power is charged).

なお、これらの需要調整システムでも、例えば、需要調整要請送信装置101が、調整要請に、省電力状態を有する負荷を省電力状態にする旨の情報や、放電状態を有する負荷を放電状態にする旨の情報を追加することで、全ての需要調整装置102に同じ調整要請を送信することで、需要調整を行うことができる。この場合、例えば、省電力状態や放電量帯を有する負荷に対応する需要調整装置102は、調整要請に従って負荷の動作状態を制御し、省電力状態や放電量帯を有していない負荷に対応する需要調整装置102は、負荷の動作状態の制御を行わない。   Even in these demand adjustment systems, for example, the demand adjustment request transmission apparatus 101 sets information indicating that a load having a power saving state is set to a power saving state or a load having a discharge state in a discharge state in the adjustment request. By adding the information to the effect, the demand adjustment can be performed by transmitting the same adjustment request to all the demand adjustment apparatuses 102. In this case, for example, the demand adjustment device 102 corresponding to the load having the power saving state or the discharge amount band controls the operation state of the load according to the adjustment request, and corresponds to the load having no power saving state or the discharge amount band. The demand adjusting device 102 that does not control the operation state of the load.

101 需要調整要請送信装置
102、500 需要調整装置
103、502 負荷
201 需要調整要請受信部
202 乱数生成部
203、513 処理部
501 電力系統
511 系統周波数測定部
512 格納部
521 決定部
522 制御部
DESCRIPTION OF SYMBOLS 101 Demand adjustment request | requirement transmission apparatus 102,500 Demand adjustment apparatus 103,502 Load 201 Demand adjustment request | requirement reception part 202 Random number generation part 203,513 Processing part 501 Power system 511 System frequency measurement part 512 Storage part 521 Determination part 522 Control part

Claims (15)

予め定められた情報に基づいて、電力負荷にて消費される電力消費量を変更する割合を決定する決定部と、
前記決定部にて決定された割合に従って前記電力負荷の動作状態を制御する制御部と、を有する需要調整システム。
A determination unit for determining a ratio of changing the power consumption consumed by the power load based on predetermined information;
And a control unit that controls an operating state of the power load according to the ratio determined by the determination unit.
前記動作状態には、稼働している稼働状態と、停止している停止状態とがあり、
前記制御部は、前記割合に従って前記動作状態を変更または維持する、請求項1に記載の需要調整システム。
The operating state includes an operating state that is operating and a stopped state that is stopped,
The demand control system according to claim 1, wherein the control unit changes or maintains the operation state according to the ratio.
予め定められた特定範囲内の複数の数値に対する確率分布が設定され、当該確率分布に従って前記複数の数値のいずれかを比較値として生成する生成部をさらに有し、
前記決定部は、前記割合を前記確率分布に応じた閾値で表し、
前記制御部は、前記比較値が前記閾値以下か否かに応じて、前記動作状態を変更または維持する、請求項2に記載の需要調整システム。
A probability distribution for a plurality of numerical values within a predetermined specific range is set, and further includes a generation unit that generates any of the plurality of numerical values as a comparison value according to the probability distribution;
The determination unit represents the ratio by a threshold value according to the probability distribution,
The demand control system according to claim 2, wherein the control unit changes or maintains the operation state according to whether the comparison value is equal to or less than the threshold value.
前記確率分布における各数値が生成される確率が等しい、請求項3に記載の需要調整システム。   The demand adjustment system according to claim 3, wherein the probability that each numerical value in the probability distribution is generated is equal. 前記電力負荷は、複数あり、
前記電力負荷ごとに対応して設けられ、前記生成部および前記制御部を備える複数の需要調整装置を有し、
各需要調整装置の制御部は、当該需要調整装置に対応する電力負荷の動作状態を制御し、
各需要調整装置の生成部が前記比較値を生成するアルゴリズムは、前記需要調整装置ごとに設定される、請求項3または4に記載の需要調整システム。
There are a plurality of power loads,
A plurality of demand adjustment devices provided for each of the power loads, including the generation unit and the control unit;
The control unit of each demand adjusting device controls the operating state of the power load corresponding to the demand adjusting device,
The demand adjustment system according to claim 3 or 4, wherein an algorithm for generating the comparison value by a generation unit of each demand adjustment device is set for each of the demand adjustment devices.
前記決定部は、前記情報に基づいて、前記電力消費量の増加または削減を示す変更方向をさらに決定し、
前記制御部は、前記割合および前記変更方向に従って、前記電力負荷の動作状態を制御する、請求項1ないし5のいずれか1項に記載の需要調整システム。
The determination unit further determines a change direction indicating an increase or reduction of the power consumption based on the information,
The demand control system according to any one of claims 1 to 5, wherein the control unit controls an operating state of the power load according to the ratio and the change direction.
前記電力負荷は、電力系統から供給される電力を消費し、
前記情報は、電力系統の系統周波数を測定した測定値であり、
前記系統周波数と前記割合との対応関係を規定する対応情報を格納する格納部をさらに有し、
前記決定部は、前記測定値と前記対応情報とに基づいて、前記割合を決定する、請求項1ないし6のいずれか1項に記載の需要調整システム。
The power load consumes power supplied from a power system,
The information is a measurement value obtained by measuring the system frequency of the power system,
A storage unit that stores correspondence information that defines a correspondence relationship between the system frequency and the ratio;
The demand adjustment system according to any one of claims 1 to 6, wherein the determination unit determines the ratio based on the measurement value and the correspondence information.
前記対応情報は、前記系統周波数を引数とし、前記割合を示す解を返す関数であり、
前記決定部は、前記測定値を前記関数に代入し、当該関数から返された解に応じて前記割合を決定する、請求項7に記載の需要調整システム。
The correspondence information is a function that takes the system frequency as an argument and returns a solution indicating the ratio,
The demand determination system according to claim 7, wherein the determination unit substitutes the measurement value into the function and determines the ratio according to a solution returned from the function.
前記関数は、予め定められた基準値に対する前記代入された測定値の偏差に応じた値を解として返す、請求項8に記載の需要調整システム。   The demand adjustment system according to claim 8, wherein the function returns, as a solution, a value corresponding to a deviation of the substituted measurement value with respect to a predetermined reference value. 前記関数は、前記電力消費量の増加および削減のそれぞれについて解を返し、各解の少なくとも一方は前記割合が0であることを示し、
前記決定部は、各解のうち前記割合が0でないことを示す解に基づいて、前記割合および前記電力消費量の増加または削減を示す変更方向を決定し、前記割合および前記変更方向に従って、前記電力負荷の動作状態を制御する、請求項8または9に記載の需要調整システム。
The function returns a solution for each of the power consumption increases and decreases, at least one of each solution indicating that the percentage is zero;
The determining unit determines a change direction indicating an increase or a reduction in the ratio and the power consumption based on a solution indicating that the ratio is not 0 among the solutions, and according to the ratio and the change direction, The demand adjustment system according to claim 8 or 9, which controls an operating state of a power load.
前記決定部は、前記関数から返された解の絶対値を前記割合として決定し、当該解の符号に応じて、前記電力消費量の増加または削減を示す変更方向をさらに決定し、前記割合および前記変更方向に従って、前記電力負荷の動作状態を制御する、請求項8または9に記載の需要調整システム。   The determining unit determines an absolute value of a solution returned from the function as the ratio, further determines a change direction indicating an increase or reduction of the power consumption according to a sign of the solution, and the ratio and The demand adjustment system according to claim 8 or 9, wherein an operation state of the power load is controlled according to the change direction. 前記電力負荷は、複数あり、
前記電力負荷ごとに対応して設けられ、前記決定部および前記制御部を備える複数の需要調整装置を有し、
各需要調整装置は、前記系統周波数を前記測定値として測定する測定部をさらに備え、
各需要調整装置の決定部は、当該需要調整装置に備わった測定部が測定した測定値に基づいて前記割合を決定し、
各需要調整装置の制御部は、当該需要調整装置に備わった決定部が決定した割合に従って、当該需要調整装置に対応する電力負荷の動作状態を制御する、請求項7ないし11のいずれか1項に記載の需要調整システム。
There are a plurality of power loads,
A plurality of demand adjustment devices provided corresponding to each of the electric power loads, including the determination unit and the control unit;
Each demand adjusting device further includes a measuring unit that measures the system frequency as the measured value,
The determination unit of each demand adjustment device determines the ratio based on the measurement value measured by the measurement unit provided in the demand adjustment device,
The control unit of each demand adjusting device controls the operating state of the power load corresponding to the demand adjusting device according to the ratio determined by the determining unit provided in the demand adjusting device. Demand adjustment system as described in.
電力負荷にて消費される電力消費量を変更する割合を示す調整要請を受信する受信部と、
前記調整要請にて示される割合に従って前記電力負荷の動作状態を制御する制御部と、を有する電力調整装置。
A receiving unit that receives an adjustment request indicating a rate of changing the power consumption consumed by the power load; and
And a control unit that controls an operating state of the power load in accordance with a ratio indicated in the adjustment request.
予め定められた情報に基づいて、電力負荷にて消費される電力消費量を変更する割合を決定する決定部と、
前記決定部にて決定された割合に従って前記電力負荷の動作状態を制御する制御部と、を有する電力調整装置。
A determination unit for determining a ratio of changing the power consumption consumed by the power load based on predetermined information;
And a control unit that controls an operating state of the power load according to the ratio determined by the determination unit.
予め定められた情報に基づいて、電力負荷にて消費される電力消費量を変更する割合を決定し、
前記決定された割合に従って前記電力負荷の動作状態を制御する、需要調整方法。
Based on the predetermined information, determine the rate of changing the power consumption consumed by the power load,
A demand adjustment method for controlling an operating state of the power load according to the determined ratio.
JP2013147537A 2013-07-16 2013-07-16 Demand adjustment system, power adjustment device, and demand adjustment method Expired - Fee Related JP6248443B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013147537A JP6248443B2 (en) 2013-07-16 2013-07-16 Demand adjustment system, power adjustment device, and demand adjustment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013147537A JP6248443B2 (en) 2013-07-16 2013-07-16 Demand adjustment system, power adjustment device, and demand adjustment method

Publications (2)

Publication Number Publication Date
JP2015023594A true JP2015023594A (en) 2015-02-02
JP6248443B2 JP6248443B2 (en) 2017-12-20

Family

ID=52487645

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013147537A Expired - Fee Related JP6248443B2 (en) 2013-07-16 2013-07-16 Demand adjustment system, power adjustment device, and demand adjustment method

Country Status (1)

Country Link
JP (1) JP6248443B2 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11215700A (en) * 1998-01-27 1999-08-06 Mitsubishi Electric Corp Demand control method and device thereof
JPH11332099A (en) * 1997-05-02 1999-11-30 Merikkusu:Kk System and method for controlling service power and computer-readable recording medium with service power recorded therein
JP2006074952A (en) * 2004-09-06 2006-03-16 Matsushita Electric Ind Co Ltd Electric power peak-off control system and its program
JP2008125295A (en) * 2006-11-14 2008-05-29 Central Res Inst Of Electric Power Ind Method and device for selecting/interrupting load in consumer
JP2011024325A (en) * 2009-07-15 2011-02-03 Shikoku Electric Power Co Inc Method and device for averaging electricity-carrying load
WO2011136204A1 (en) * 2010-04-28 2011-11-03 通研電気工業株式会社 Power grid control system, and power grid control method
CA2778345A1 (en) * 2012-06-01 2012-08-07 Bipco-Soft R3 Inc. Power control device
JP2013085410A (en) * 2011-10-12 2013-05-09 Mitsubishi Electric Corp Use electric power distribution system, use electric power distribution method, and program

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11332099A (en) * 1997-05-02 1999-11-30 Merikkusu:Kk System and method for controlling service power and computer-readable recording medium with service power recorded therein
JPH11215700A (en) * 1998-01-27 1999-08-06 Mitsubishi Electric Corp Demand control method and device thereof
JP2006074952A (en) * 2004-09-06 2006-03-16 Matsushita Electric Ind Co Ltd Electric power peak-off control system and its program
JP2008125295A (en) * 2006-11-14 2008-05-29 Central Res Inst Of Electric Power Ind Method and device for selecting/interrupting load in consumer
JP2011024325A (en) * 2009-07-15 2011-02-03 Shikoku Electric Power Co Inc Method and device for averaging electricity-carrying load
WO2011136204A1 (en) * 2010-04-28 2011-11-03 通研電気工業株式会社 Power grid control system, and power grid control method
JP2013085410A (en) * 2011-10-12 2013-05-09 Mitsubishi Electric Corp Use electric power distribution system, use electric power distribution method, and program
CA2778345A1 (en) * 2012-06-01 2012-08-07 Bipco-Soft R3 Inc. Power control device

Also Published As

Publication number Publication date
JP6248443B2 (en) 2017-12-20

Similar Documents

Publication Publication Date Title
US9893526B2 (en) Networked power management and demand response
US20190163152A1 (en) Power sharing in a mesh energy system
JP5560146B2 (en) Power storage device control device
WO2015115385A1 (en) Power control system and method, and information communication ability control system and method
US10496060B2 (en) Power management system and method for power management
WO2015022746A1 (en) Voltage monitoring control device and voltage control device
US20130175863A1 (en) Power Sub-grid Including Power Generated From Alternative Sources
JP2016001986A (en) Power control method, power controller, and power control system
US11277026B2 (en) Power management server, power management method, and power management system
US10680437B2 (en) Method of stabilizing an electrical network by load shedding
WO2013125648A1 (en) Power supply and demand control device and method for controlling power supply and demand
US20160359342A1 (en) Energy management system
JP7102182B2 (en) Power systems, controls, power management methods, programs, and power management servers
JPWO2015098083A1 (en) Electricity supply and demand control device
JP6248443B2 (en) Demand adjustment system, power adjustment device, and demand adjustment method
JP2021097530A (en) Distributed power supply system
JP2014068426A (en) Energy demand-and supply balance maintenance system
AU2019239701A1 (en) System for frequency regulation on a power distribution network
JP6128999B2 (en) Power accommodation system and control procedure determination apparatus for the power accommodation system
JP2013192345A (en) Voltage control system
JP7117546B2 (en) Power control device, power control method
EP2940823B1 (en) Power demand adjustment system and power demand adjustment method
JP2011244511A (en) Local area power supply recovery demand-supply balancing apparatus
JP7511613B2 (en) Communication device, distributed power supply, and communication method
JP2013172589A (en) Power control part and power control system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160610

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170314

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170428

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170704

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170828

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171024

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171106

R150 Certificate of patent or registration of utility model

Ref document number: 6248443

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees