JP2014212622A - Power generating system - Google Patents

Power generating system Download PDF

Info

Publication number
JP2014212622A
JP2014212622A JP2013087571A JP2013087571A JP2014212622A JP 2014212622 A JP2014212622 A JP 2014212622A JP 2013087571 A JP2013087571 A JP 2013087571A JP 2013087571 A JP2013087571 A JP 2013087571A JP 2014212622 A JP2014212622 A JP 2014212622A
Authority
JP
Japan
Prior art keywords
battery
power
power generation
switching unit
batt1
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2013087571A
Other languages
Japanese (ja)
Inventor
原 雅 夫 杉
Masao Sugihara
原 雅 夫 杉
本 博 之 社
Hiroyuki Shamoto
本 博 之 社
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2013087571A priority Critical patent/JP2014212622A/en
Publication of JP2014212622A publication Critical patent/JP2014212622A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/16Mechanical energy storage, e.g. flywheels or pressurised fluids

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a power generating system with a high ratio (Pin/Pout) of electric power (Pin) stored in a storage battery to electric power (Pout) output from the storage battery.SOLUTION: The power generating system includes: first and second chargeable batteries that supply electric power; a first switching section that outputs electric power of either of the first battery or the second battery; a motor that receives electric power of either of the first battery or the second battery output from the first switching section for operation; a power generation section that converts kinetic energy into electrical energy of the motor for generation of electric power; and a second switching section that supplies electric power from the power generation section to either of the first battery or the second battery.

Description

本発明は、発電システムに関する。   The present invention relates to a power generation system.

従来、フライホイールを用いた発電装置では、フライホイールが余剰な(あるいは再生成された)電気エネルギーを回転体の運動エネルギーとして貯蔵し、発電機がこのフライホイールの運動エネルギーを電力エネルギーに変換して、蓄電池を充電する。蓄電池に蓄積された電力エネルギーは、負荷の消費電力として再利用され得る。   Conventionally, in a power generator using a flywheel, the flywheel stores surplus (or regenerated) electrical energy as kinetic energy of the rotating body, and the generator converts the kinetic energy of the flywheel into electric energy. And charge the storage battery. The power energy stored in the storage battery can be reused as the power consumption of the load.

米国特許第6958564号明細書US Pat. No. 6,958,564 米国特許第6837085号明細書US Pat. No. 6,833,085 米国特許第6111329号明細書US Pat. No. 6,111,329

蓄電池へ蓄積される電力(Pin)と蓄電池から出力される電力(Pout)との比率(Pin/Pout)(以下、蓄電効率ともいう)を向上させるためには、発電機が効率よく電気エネルギーを発電すること、あるいは、モータの消費電力を低下させること考えられる。しかし、従来の発電装置では、蓄電効率が依然として低いという問題があった。   In order to improve the ratio (Pin / Pout) of power stored in the storage battery (Pin) and power output from the storage battery (Pout) (hereinafter also referred to as storage efficiency), the generator efficiently supplies electrical energy. It is conceivable to generate power or reduce the power consumption of the motor. However, the conventional power generator has a problem that the power storage efficiency is still low.

上記の課題を解決するために、本実施形態による発電システムは、電力を供給する充電可能な第1のバッテリおよび第2のバッテリと、第1のバッテリまたは第2のバッテリのいずれか一方の電力を出力する第1の切替部と、第1の切替部から出力される第1のバッテリまたは第2のバッテリのいずれか一方の電力を受けて動作するモータと、モータの運動エネルギーを電気エネルギーに変換して電力を生成する発電部と、発電部からの電力を第1のバッテリまたは第2のバッテリのいずれか一方に供給する第2の切替部とを備えている。   In order to solve the above-described problem, the power generation system according to the present embodiment includes a chargeable first battery and a second battery for supplying power, and power of either the first battery or the second battery. A first switching unit that outputs power, a motor that operates by receiving power from either the first battery or the second battery that is output from the first switching unit, and converts the kinetic energy of the motor into electrical energy. A power generation unit that converts and generates power, and a second switching unit that supplies power from the power generation unit to either the first battery or the second battery.

当該発電システムは、第1および第2のバッテリの出力電圧に基づいて第1および第2の切替部を制御するスイッチコントローラをさらに備えてもよい。   The power generation system may further include a switch controller that controls the first and second switching units based on the output voltages of the first and second batteries.

当該発電システムは、第1または第2のバッテリからの直流電力を交流電力に変換するインバータをさらに備えてもよい。   The power generation system may further include an inverter that converts DC power from the first or second battery into AC power.

当該発電システムは、第1の切替部から出力される電力の一部を外部へ出力し、その他の電力をモータへ出力する分電部をさらに備えてもよい。   The power generation system may further include a power distribution unit that outputs part of the power output from the first switching unit to the outside and outputs other power to the motor.

発電部は、モータの回転軸と共通の回転軸を有し、モータが回転軸を回転させることによって発電する第1の発電機および第2の発電機を含んでもよい。   The power generation unit may include a first generator and a second generator that have a rotation shaft that is common to the rotation shaft of the motor and that generates electric power when the motor rotates the rotation shaft.

第1の切替部が第1のバッテリからの電力を出力している場合、第1の切替部は、第1のバッテリの出力電圧が所定値を下回ったときに、第1のバッテリから第2のバッテリへ切替えて、第2のバッテリからの電力を出力し、
第1の切替部が第2のバッテリからの電力を出力している場合、第1の切替部は、第2のバッテリの出力電圧が所定値を下回ったときに、第2のバッテリから第1のバッテリへ切替えて、第1のバッテリからの電力を出力してもよい。
In a case where the first switching unit outputs power from the first battery, the first switching unit outputs the second power from the first battery when the output voltage of the first battery falls below a predetermined value. Switch to the other battery and output the power from the second battery,
When the first switching unit is outputting electric power from the second battery, the first switching unit is configured to output the first battery from the second battery when the output voltage of the second battery falls below a predetermined value. The power from the first battery may be output by switching to the other battery.

第2の切替部が発電部からの電力を第1のバッテリに供給している場合、第2の切替部は、第2のバッテリの出力電圧が所定値を下回ったときに、第1のバッテリから第2のバッテリへ切替えて、発電部からの電力を第2のバッテリに供給し、
第2の切替部が発電部からの電力を第2のバッテリに供給している場合、第2の切替部は、第1のバッテリの出力電圧が所定値を下回ったときに、第2のバッテリから第1のバッテリへ切替えて、発電部からの電力を第1のバッテリに供給してもよい。
When the second switching unit supplies power from the power generation unit to the first battery, the second switching unit is configured such that when the output voltage of the second battery falls below a predetermined value, the first battery To the second battery to supply power from the power generation unit to the second battery,
When the second switching unit supplies power from the power generation unit to the second battery, the second switching unit is configured such that when the output voltage of the first battery falls below a predetermined value, the second battery The first battery may be switched to supply power from the power generation unit to the first battery.

発明の目的Object of the invention

本発明は、蓄電池へ蓄積される電力(Pin)と蓄電池から出力される電力(Pout)との比率(Pin/Pout)が高い発電システムを提供する。   The present invention provides a power generation system having a high ratio (Pin / Pout) between electric power (Pin) stored in a storage battery and electric power (Pout) output from the storage battery.

本発明に係る実施形態に従った発電システム100の構成の一例を示すブロック図。The block diagram which shows an example of a structure of the electric power generation system 100 according to embodiment which concerns on this invention. 発電システム100の動作を示すフロー図。The flowchart which shows operation | movement of the electric power generation system 100. FIG. 本実施形態によるモータMOTおよび発電部GENの構成の一例を示す図。The figure which shows an example of a structure of the motor MOT by this embodiment, and the electric power generation part GEN. 第1および第2の発電機GEN1、GEN2のステータ10およびロータ20の構成の一例を示す図。The figure which shows an example of a structure of the stator 10 and the rotor 20 of 1st and 2nd generator GEN1, GEN2.

以下、図面を参照して本発明に係る実施形態を説明する。本実施形態は、本発明を限定するものではない。   Embodiments according to the present invention will be described below with reference to the drawings. This embodiment does not limit the present invention.

図1は、本発明に係る実施形態に従った発電システム100の構成の一例を示すブロック図である。本実施形態による発電システム100は、第1のバッテリBATT1と、第2のバッテリBATT2と、第1のDC−ACインバータINV1と、第2のDC−ACインバータINV2と、第1のリレースイッチRLY1と、第2のリレースイッチRLY2と、分電盤DSTと、昇圧トランスTRCと、三相変換器CNVと、モータMOTと、発電部GENと、電圧センサ・切替制御装置SWCNTとを備えている。   FIG. 1 is a block diagram showing an example of the configuration of a power generation system 100 according to an embodiment of the present invention. The power generation system 100 according to the present embodiment includes a first battery BATT1, a second battery BATT2, a first DC-AC inverter INV1, a second DC-AC inverter INV2, and a first relay switch RLY1. The second relay switch RLY2, the distribution board DST, the step-up transformer TRC, the three-phase converter CNV, the motor MOT, the power generation unit GEN, and the voltage sensor / switching control device SWCNT are provided.

第1および第2のバッテリBATT1、BATT2は、モータMOTおよび負荷に対して電力を供給することができ、かつ、発電部GENからの電力を充電することができるように構成されている。第1および第2のバッテリBATT1、BATT2は、それぞれ、例えば、直流12ボルトの充電可能なバッテリ、あるいは、このようなバッテリを複数個直列または並列に接続して構成されたバッテリ群であってもよい。第1および第2のバッテリBATT1、BATT2がそれぞれ複数のバッテリから成るバッテリ群である場合、第1および第2のバッテリBATT1、BATT2は、それぞれ、24ボルトや48ボルトの直流電圧を生成することができる。例えば、本実施形態による第1および第2のバッテリBATT1、BATT2は、それぞれ、12ボルトのバッテリを4個直列に接続した48ボルトのバッテリ群でもよい。   The first and second batteries BATT1 and BATT2 are configured to be able to supply power to the motor MOT and the load, and to charge power from the power generation unit GEN. Each of the first and second batteries BATT1 and BATT2 may be, for example, a DC 12 volt rechargeable battery, or a battery group configured by connecting a plurality of such batteries in series or in parallel. Good. When the first and second batteries BATT1 and BATT2 are each a battery group composed of a plurality of batteries, the first and second batteries BATT1 and BATT2 can generate DC voltages of 24 volts and 48 volts, respectively. it can. For example, the first and second batteries BATT1 and BATT2 according to the present embodiment may be a 48-volt battery group in which four 12-volt batteries are connected in series.

第1および第2のバッテリBATT1、BATT2は、互いに同じ出力電圧および容量を有するバッテリであってもよい。また、第1および第2のバッテリBATT1、BATT2は、互いに異なる容量を有するバッテリであってもよい。   The first and second batteries BATT1, BATT2 may be batteries having the same output voltage and capacity. Further, the first and second batteries BATT1, BATT2 may be batteries having different capacities.

第1のDC−ACインバータINV1は、第1のバッテリBATT1と第1のリレースイッチRLY1との間に接続されており、第1のバッテリBATT1からの直流電力を交流電力(例えば、AC100V)に変換する。第2のDC−ACインバータINV2は、第2のバッテリBATT2と第1のリレースイッチRLY1との間に接続されており、第2のバッテリBATT2からの直流電力を交流電力(例えば、AC100V)に変換する。   The first DC-AC inverter INV1 is connected between the first battery BATT1 and the first relay switch RLY1, and converts DC power from the first battery BATT1 into AC power (for example, AC100V). To do. The second DC-AC inverter INV2 is connected between the second battery BATT2 and the first relay switch RLY1, and converts DC power from the second battery BATT2 into AC power (for example, AC100V). To do.

第1のリレースイッチRLY1は、第1および第2のDC−ACインバータINV1、INV2と分電盤DSTとの間に接続されており、第1のバッテリBATT1または第2のバッテリBATT2のいずれか一方の電力を負荷側またはモータMOT側へ出力する。即ち、第1のリレースイッチRLY1は、第1のバッテリBATT1または第2のバッテリBATT2のいずれか一方の電力を選択的に負荷またはモータMOTへ供給することができるように構成されている。   The first relay switch RLY1 is connected between the first and second DC-AC inverters INV1, INV2 and the distribution board DST, and one of the first battery BATT1 and the second battery BATT2 Is output to the load side or the motor MOT side. That is, the first relay switch RLY1 is configured to be able to selectively supply the power of either the first battery BATT1 or the second battery BATT2 to the load or the motor MOT.

分電盤DSTは、第1のリレースイッチRLY1と出力との間、第1のリレースイッチRLY1と昇圧トランスTRCとの間に接続されており、第1のリレースイッチRLY1からの電力を負荷側とモータMOT側とに分配する。即ち、分電盤DSTは、第1の切替部から出力される電力の一部を負荷へ出力し、その他の電力をモータMOTへ供給する。   The distribution board DST is connected between the first relay switch RLY1 and the output, and between the first relay switch RLY1 and the step-up transformer TRC, and the power from the first relay switch RLY1 is supplied to the load side. Distribute to the motor MOT side. That is, the distribution board DST outputs part of the power output from the first switching unit to the load and supplies the other power to the motor MOT.

負荷は、電力を消費する電気機器であればよく、特に限定しない。例えば、負荷は、屋内または屋外で使用される照明器具や空調装置等でよい。また、負荷は、車両用の照明器具や空調装置等であってもよい。本実施形態では、負荷に接続される出力は、商用電力と同じAC100ボルトの電力を出力するが、AC200ボルトの電力を出力してもよい。   The load is not particularly limited as long as it is an electric device that consumes electric power. For example, the load may be a lighting fixture or an air conditioner used indoors or outdoors. Further, the load may be a vehicle lighting device or an air conditioner. In this embodiment, the output connected to the load outputs the same AC 100 volt power as the commercial power, but may output the AC 200 volt power.

昇圧トランスTRCは、分電盤DSTからの交流電力を昇圧する。例えば、昇圧トランスTRCは、AC100Vの電力をAC200Vの電力へ昇圧する。三相変換器CNVは、昇圧トランスTRCで昇圧された交流電力を、モータMOTで使用することができるように三相交流電力へ変換する。   The step-up transformer TRC boosts AC power from the distribution board DST. For example, the step-up transformer TRC boosts AC 100V power to AC 200V power. The three-phase converter CNV converts the AC power boosted by the step-up transformer TRC into three-phase AC power so that it can be used by the motor MOT.

モータMOTは、三相変換器CNVと発電部GENとの間に接続されており、第1のリレースイッチRLY1によって選択された第1または第2のバッテリBATT1、BATT2のいずれか一方から電力供給を受けて回転軸ROTを回転させる。モータMOTは、例えば、三相交流電力によって駆動される三相モータである。モータMOTの内部構成は、特に限定しないが、例えば、上記特許文献1〜3に記載されたブラシレスモータと同様の構成でよい。回転軸ROTの軸受けは、転がり軸受け、すべり軸受け、磁気軸受け等、特に限定しないが、回転抵抗の低い軸受けが好ましい。回転軸ROTの軸受けは、例えば、超伝導技術を用いた浮遊軸受けであってもよい。これにより、回転軸ROTの回転抵抗を可及的に低下させることができる。   The motor MOT is connected between the three-phase converter CNV and the power generation unit GEN, and is supplied with power from either the first or second battery BATT1 or BATT2 selected by the first relay switch RLY1. In response, the rotating shaft ROT is rotated. The motor MOT is, for example, a three-phase motor driven by three-phase AC power. Although the internal configuration of the motor MOT is not particularly limited, for example, the same configuration as the brushless motor described in Patent Documents 1 to 3 may be used. The bearing of the rotating shaft ROT is not particularly limited, such as a rolling bearing, a sliding bearing, or a magnetic bearing, but a bearing having a low rotational resistance is preferable. The bearing of the rotating shaft ROT may be, for example, a floating bearing using superconducting technology. Thereby, the rotational resistance of the rotating shaft ROT can be reduced as much as possible.

発電部GENは、第1の発電機GEN1と第2の発電機GEN2とを含み、モータMOTの運動エネルギーを電気エネルギーに変換する。第1および第2の発電機GEN1、GEN2は互いに共通の回転軸ROTを有し、かつ、第1および第2の発電機GEN1、GEN2の回転軸ROTはモータMOTの回転軸ROTと共通である。即ち、モータMOT、第1および第2の発電機GEN1、GEN2の各回転軸ROTの中心軸はほぼ一致している。このようにモータMOTの回転軸ROTが第1および第2の発電機GEN1、GEN2の回転軸ROTと共通であることにより、回転軸ROTは、モータMOTの運動エネルギーを高効率で第1および第2の発電機GEN1、GEN2へ伝達することができる。   The power generation unit GEN includes a first generator GEN1 and a second generator GEN2, and converts the kinetic energy of the motor MOT into electrical energy. The first and second generators GEN1 and GEN2 have a common rotation axis ROT, and the rotation axes ROT of the first and second generators GEN1 and GEN2 are the same as the rotation axis ROT of the motor MOT. . That is, the central axes of the rotation axes ROT of the motor MOT and the first and second generators GEN1 and GEN2 substantially coincide with each other. Thus, since the rotation axis ROT of the motor MOT is common to the rotation axes ROT of the first and second generators GEN1 and GEN2, the rotation axis ROT uses the first and first kinetic energy of the motor MOT with high efficiency. Can be transmitted to the two generators GEN1 and GEN2.

第1の発電機GEN1および第2の発電機GEN2は、モータMOTによって回転する回転軸ROTの運動エネルギーを電気エネルギーに変換する発電機である。第1の発電機GEN1および第2の発電機GEN2の構成については、後述する。   The first generator GEN1 and the second generator GEN2 are generators that convert the kinetic energy of the rotating shaft ROT rotated by the motor MOT into electric energy. The configurations of the first generator GEN1 and the second generator GEN2 will be described later.

第2のリレースイッチRLY2は、発電部GENと第1および第2のバッテリBATT1、BATT2との間に接続されている。第2のリレースイッチRLY2は、発電部GENにおいて発電された電気エネルギーを第1のバッテリBATT1または第2のバッテリBATT2のいずれか一方に供給するように構成されている。   The second relay switch RLY2 is connected between the power generation unit GEN and the first and second batteries BATT1, BATT2. The second relay switch RLY2 is configured to supply the electric energy generated in the power generation unit GEN to either the first battery BATT1 or the second battery BATT2.

第1および第2のバッテリBATT1、BATT2は、それぞれ蓄電池と充電器とを備えている。充電器が第2のリレースイッチRLY2からの交流電力を直流電力へ変換して蓄電池へ供給し、蓄電池が充電器からの直流電力を蓄電する。また、蓄電池は、直流電力をインバータNV1、INV2へ出力する。   Each of the first and second batteries BATT1 and BATT2 includes a storage battery and a charger. The charger converts AC power from the second relay switch RLY2 into DC power and supplies it to the storage battery, and the storage battery stores the DC power from the charger. The storage battery also outputs DC power to the inverters NV1 and INV2.

電圧センサ・切替制御装置SWCNT(以下、スイッチコントローラSWCNTと呼ぶ)は、第1および第2のバッテリBATT1、BATT2と第1および第2のリレースイッチRLY1、RLY2との間に接続されている。スイッチコントローラSWCNTは、電圧センサ部と、切替制御部とを含む。電圧センサ部は、第1および第2のバッテリBATT1、BATT2の出力電圧をそれぞれ検出する電圧計でよい。切替制御部は、第1および第2のバッテリBATT1、BATT2の出力電圧に応じて第1および第2のリレースイッチRLY1、RLY2の切替えを制御する。スイッチコントローラSWCNTは、PLC(Programmable Logic Controller)またはCPU(Central Processing Unit)等の半導体チップで構成することができる。また、スイッチコントローラSWCNTは、第1および第2のリレースイッチRLY1、RLY2のいずれか一方またはそれらの両方の内部に組み込まれていてもよい。   Voltage sensor / switching control device SWCNT (hereinafter referred to as switch controller SWCNT) is connected between first and second batteries BATT1, BATT2 and first and second relay switches RLY1, RLY2. The switch controller SWCNT includes a voltage sensor unit and a switching control unit. The voltage sensor unit may be a voltmeter that detects output voltages of the first and second batteries BATT1, BATT2. The switching control unit controls switching of the first and second relay switches RLY1, RLY2 according to the output voltages of the first and second batteries BATT1, BATT2. The switch controller SWCNT can be configured by a semiconductor chip such as a PLC (Programmable Logic Controller) or a CPU (Central Processing Unit). The switch controller SWCNT may be incorporated in one or both of the first and second relay switches RLY1, RLY2.

図2は、発電システム100の動作を示すフロー図である。以下、図2を参照して、第1および第2のリレースイッチRLY1、RLY2の切替動作について具体的に説明する。   FIG. 2 is a flowchart showing the operation of the power generation system 100. Hereinafter, the switching operation of the first and second relay switches RLY1, RLY2 will be specifically described with reference to FIG.

(初期状態)
例えば、第1および第2のバッテリBATT1、BATT2がともにフル(満充電)である場合、第1および第2のバッテリBATT1、BATT2は、ともに所定値(例えば、24V)以上の電圧を持続的に出力することができる。従って、この場合、第1および第2のリレースイッチRLY1、RLY2は、第1および第2のバッテリBATT1、BATT2のいずれを選択していてもよい。尚、第1および第2のバッテリBATT1、BATT2の出力電圧の所定値は、予め設定し、スイッチコントローラSWCNT内部のメモリ(図示せず)に格納しておけばよい。出力電圧の所定値は、例えば、第1および第2のバッテリBATT1、BATT2の最大出力電圧の約50%でよい。また、出力電圧の所定値は、第1および第2のバッテリBATT1、BATT2において同一値であってもよい。第1および第2のバッテリBATT1、BATT2の出力電圧または容量が互いに相違する場合、出力電圧の所定値は、第1および第2のバッテリBATT1、BATT2において互いに相違させてもよい。
(initial state)
For example, when the first and second batteries BATT1 and BATT2 are both full (fully charged), both the first and second batteries BATT1 and BATT2 continuously maintain a voltage equal to or higher than a predetermined value (for example, 24V). Can be output. Therefore, in this case, the first and second relay switches RLY1, RLY2 may select either the first or second battery BATT1, BATT2. The predetermined values of the output voltages of the first and second batteries BATT1, BATT2 may be set in advance and stored in a memory (not shown) inside the switch controller SWCNT. The predetermined value of the output voltage may be about 50% of the maximum output voltage of the first and second batteries BATT1, BATT2, for example. Further, the predetermined value of the output voltage may be the same value in the first and second batteries BATT1 and BATT2. When the output voltages or capacities of the first and second batteries BATT1, BATT2 are different from each other, the predetermined values of the output voltages may be different from each other in the first and second batteries BATT1, BATT2.

第1および第2のバッテリBATT1、BATT2がともにフルである場合、例えば、第1および第2のリレースイッチRLY1、RLY2はともに第1のバッテリBATT1を選択する(S10)。第1および第2のリレースイッチRLY1、RLY2がともに第1のバッテリBATT1を選択している場合、第1のバッテリBATT1からの出力電力は、負荷およびモータMOTにおいて消費される。一方、発電部GENからの電力は、第1のバッテリBATT1へ供給される。第1のバッテリBATT1は、負荷およびモータMOTへ電力を供給しながら、発電部GENからの電力を受ける(S15)。   When both the first and second batteries BATT1, BATT2 are full, for example, both the first and second relay switches RLY1, RLY2 select the first battery BATT1 (S10). When both the first and second relay switches RLY1, RLY2 select the first battery BATT1, the output power from the first battery BATT1 is consumed in the load and the motor MOT. On the other hand, the electric power from the power generation unit GEN is supplied to the first battery BATT1. The first battery BATT1 receives power from the power generation unit GEN while supplying power to the load and the motor MOT (S15).

(第1のバッテリBATT1の出力電圧が低下した場合)
第1のバッテリBATT1の選択状態を継続した場合、負荷の消費電力にも依存するが、第1のバッテリBATT1の電荷が次第に消費されていく。そして、第1のバッテリBATT1の出力電圧が所定値(例えば、24V)を下回った場合(S20のYES)、スイッチコントローラSWCNTは、第2のリレースイッチRLY2の状態を維持したまま、第1のリレースイッチRLY1を切り替える。これにより、第1のリレースイッチRLY1は、第1のバッテリBATT1から第2のバッテリBATT2へ切り替える(S30)。第1のリレースイッチRLY1が第2のバッテリBATT2を選択することによって、フル状態の第2のバッテリBATT2が負荷およびモータMOTへ電力を供給することができる。一方、第2のリレースイッチRLY2は第1のバッテリBATT1の選択を維持しているので、発電部GENからの電力が第1のバッテリBATT1へ引き続き充電される。即ち、フル状態の第2のバッテリBATT2は負荷およびモータMOTへ電力を供給し、尚且つ、エンプティ状態の第1のバッテリBATT1は発電部GENから電力を受けて充電される(S35)。
(When the output voltage of the first battery BATT1 decreases)
When the selection state of the first battery BATT1 is continued, the electric charge of the first battery BATT1 is gradually consumed, depending on the power consumption of the load. When the output voltage of the first battery BATT1 falls below a predetermined value (for example, 24V) (YES in S20), the switch controller SWCNT maintains the state of the second relay switch RLY2 while maintaining the state of the second relay switch RLY2. Switch RLY1. Thus, the first relay switch RLY1 switches from the first battery BATT1 to the second battery BATT2 (S30). When the first relay switch RLY1 selects the second battery BATT2, the second battery BATT2 in the full state can supply power to the load and the motor MOT. On the other hand, since the second relay switch RLY2 maintains the selection of the first battery BATT1, the power from the power generation unit GEN is continuously charged to the first battery BATT1. That is, the second battery BATT2 in the full state supplies power to the load and the motor MOT, and the first battery BATT1 in the empty state receives power from the power generation unit GEN and is charged (S35).

(第2のバッテリBATT2の出力電圧が低下した場合(第1のシーケンス))
第1のリレースイッチRLY1が第2のバッテリBATT2を継続的に選択した場合、第2のバッテリBATT2の電荷が次第に消費されていく。そして、第2のバッテリBATT2の出力電圧が所定値を下回った場合(S40のYES)、スイッチコントローラSWCNTは、第1および第2のリレースイッチRLY1、RLY2をともにほぼ同時に切り替える。これにより、第1のリレースイッチRLY1は、第2のバッテリBATT2から第1のバッテリBATT1へ切り替える。第2のリレースイッチRLY2は、第1のバッテリBATT1から第2のバッテリBATT2へ切り替える(S50)。
(When the output voltage of the second battery BATT2 decreases (first sequence))
When the first relay switch RLY1 continuously selects the second battery BATT2, the charge of the second battery BATT2 is gradually consumed. If the output voltage of the second battery BATT2 falls below a predetermined value (YES in S40), the switch controller SWCNT switches both the first and second relay switches RLY1, RLY2 almost simultaneously. Thereby, the first relay switch RLY1 switches from the second battery BATT2 to the first battery BATT1. The second relay switch RLY2 switches from the first battery BATT1 to the second battery BATT2 (S50).

このとき、第1のバッテリBATT1は、フル状態または或る程度まで充電されている。従って、第1のリレースイッチRLY1が第1のバッテリBATT1を選択することによって、それまで充電されてきた第1のバッテリBATT1が負荷およびモータMOTへ電力を供給することができる。一方、第2のリレースイッチRLY2が第2のバッテリBATT2を選択することによって、発電部GENからの電力が第2のバッテリBATT2へ充電され得る。即ち、充電後の第1のバッテリBATT1が負荷およびモータMOTへ電力を供給し、尚且つ、エンプティ状態の第2のバッテリBATT2は発電部GENからの電力を受け充電される(S55)。   At this time, the first battery BATT1 is fully charged or charged to some extent. Therefore, when the first relay switch RLY1 selects the first battery BATT1, the first battery BATT1 that has been charged so far can supply power to the load and the motor MOT. On the other hand, when the second relay switch RLY2 selects the second battery BATT2, the power from the power generation unit GEN can be charged into the second battery BATT2. That is, the charged first battery BATT1 supplies power to the load and the motor MOT, and the empty second battery BATT2 is charged by receiving power from the power generation unit GEN (S55).

(第1のバッテリBATT1の出力電圧が低下した場合(第2のシーケンス))
第1のリレースイッチRLY1が第1のバッテリBATT1を継続的に選択した場合、第1のバッテリBATT1の電荷が次第に消費されていく。そして、第1のバッテリBATT2の出力電圧が所定値を下回った場合(S60のYES)、スイッチコントローラSWCNTは、第1および第2のリレースイッチRLY1、RLY2を同時に切り替える。これにより、第1のリレースイッチRLY1は、第1のバッテリBATT1から第2のバッテリBATT2へ切り替える。第2のリレースイッチRLY2は、第2のバッテリBATT2から第1のバッテリBATT1へ切り替える(S70)。
(When the output voltage of the first battery BATT1 decreases (second sequence))
When the first relay switch RLY1 continuously selects the first battery BATT1, the charge of the first battery BATT1 is gradually consumed. When the output voltage of the first battery BATT2 falls below a predetermined value (YES in S60), the switch controller SWCNT switches the first and second relay switches RLY1, RLY2 at the same time. Thus, the first relay switch RLY1 switches from the first battery BATT1 to the second battery BATT2. The second relay switch RLY2 switches from the second battery BATT2 to the first battery BATT1 (S70).

このとき、第2のバッテリBATT2は、フル状態または或る程度まで充電されている。従って、第1のリレースイッチRLY1が第2のバッテリBATT2を選択することによって、それまで充電されてきた第2のバッテリBATT2が負荷およびモータMOTへ電力を供給することができる。一方、第2のリレースイッチRLY2が第1のバッテリBATT1を選択することによって、発電部GENからの電力が第1のバッテリBATT1へ充電され得る。即ち、充電後の第2のバッテリBATT2が負荷およびモータMOTへ電力を供給し、尚且つ、エンプティ状態の第1のバッテリBATT1は発電部GENからの電力を受け充電される(S75)。   At this time, the second battery BATT2 is fully charged or charged to some extent. Therefore, when the first relay switch RLY1 selects the second battery BATT2, the second battery BATT2 that has been charged so far can supply power to the load and the motor MOT. On the other hand, when the second relay switch RLY2 selects the first battery BATT1, the power from the power generation unit GEN can be charged to the first battery BATT1. That is, the charged second battery BATT2 supplies power to the load and the motor MOT, and the empty first battery BATT1 is charged by receiving power from the power generation unit GEN (S75).

その後、ステップS40へ戻る。即ち、発電システム100は、第1のシーケンス(S40〜S55)および第2のシーケンス(S60〜S75)を繰り返し実行する。このように、第1および第2のシーケンスを繰り返すことによって、発電システム100は、充電された一方のバッテリBATT1(またはBATT2)を用いて負荷およびモータMOTへ電力を供給し、尚且つ、放電されたエンプティ状態の他方のバッテリBATT2(またはBATT1)に対して充電することができる。   Then, it returns to step S40. That is, the power generation system 100 repeatedly executes the first sequence (S40 to S55) and the second sequence (S60 to S75). Thus, by repeating the first and second sequences, the power generation system 100 supplies power to the load and the motor MOT using one charged battery BATT1 (or BATT2), and is discharged. The other battery BATT2 (or BATT1) in the empty state can be charged.

このように、本実施形態による発電システム100は、第1のリレースイッチRLY1と第2のリレースイッチRLY2との間に並列に接続された複数のバッテリ(またはバッテリ群)BATT1、BATT2を備える。そして、第1のリレースイッチRLY1が電力供給側のバッテリ(BATT1、BATT2)を切り替え、第2のリレースイッチRLY2が充電側のバッテリ(BATT2、BATT1)を切り替える。これにより、発電部GENからの電力は、ほとんど無駄なくバッテリBATT1またはBATT2に充電され、それにより、余剰な電力がほとんど発生しない。   As described above, the power generation system 100 according to the present embodiment includes the plurality of batteries (or battery groups) BATT1 and BATT2 connected in parallel between the first relay switch RLY1 and the second relay switch RLY2. The first relay switch RLY1 switches the power supply side batteries (BATT1, BATT2), and the second relay switch RLY2 switches the charge side batteries (BATT2, BATT1). As a result, the electric power from the power generation unit GEN is charged to the battery BATT1 or BATT2 with little waste, so that almost no excessive electric power is generated.

また、発電システム100は、充電されたバッテリBATT1(またはBATT2)の出力電圧が所定値に低下するまで、バッテリBATT1(またはBATT2)からの出力電力を継続して使用する。これにより、第1および第2のリレースイッチRLY1、RLY2は、無駄な切替えを行う必要が無く、切替えを最小限に抑えることができる。これは、スイッチコントローラSWCNT、第1および第2のリレースイッチRLY1、RLY2における消費電力を抑制し、かつ、第1および第2のバッテリBATT1、BATT2の寿命を延ばすという効果を有する。   The power generation system 100 continues to use the output power from the battery BATT1 (or BATT2) until the output voltage of the charged battery BATT1 (or BATT2) drops to a predetermined value. As a result, the first and second relay switches RLY1, RLY2 do not need to perform unnecessary switching, and switching can be minimized. This has the effect of suppressing power consumption in the switch controller SWCNT and the first and second relay switches RLY1, RLY2, and extending the lifetime of the first and second batteries BATT1, BATT2.

ここで、蓄電池へ蓄積される電力をPinとし、蓄電池から出力される電力Poutとし、これらの比率を蓄電効率(Pin/Pout)とする。本実施形態による発電システム100では、発電部GENで発電される電力のほとんどが蓄電池へ蓄積される。このため、本実施形態による発電システム100の電力Pinは非常に高くなる。従って、発電システム100は、従来の発電装置よりも高い蓄電効率Pin/Poutを得ることができる。   Here, the power stored in the storage battery is Pin, the power Pout output from the storage battery is the power storage efficiency (Pin / Pout). In the power generation system 100 according to the present embodiment, most of the power generated by the power generation unit GEN is stored in the storage battery. For this reason, the electric power Pin of the electric power generation system 100 by this embodiment becomes very high. Therefore, the power generation system 100 can obtain a higher storage efficiency Pin / Pout than the conventional power generation apparatus.

図3は、本実施形態によるモータMOTおよび発電部GENの構成の一例を示す図である。第1の発電機GEN1、第2の発電機GEN2およびモータMOTの各回転軸ROTは共通(同軸)である。従って、モータMOTが回転軸ROTを回転させることによって第1の発電機GEN1および第2の発電機GEN2は効率良く発電することができる。さらに、第1の発電機GEN1および第2の発電機GEN2は回転軸ROTによって連結されており、互いに同一の構成を有している。従って、モータMOTが回転軸ROTを回転させることによって、第1の発電機GEN1および第2の発電機GEN2はそれぞれ同一の電力を効率良く出力することができる。   FIG. 3 is a diagram illustrating an example of the configuration of the motor MOT and the power generation unit GEN according to the present embodiment. The rotation axes ROT of the first generator GEN1, the second generator GEN2, and the motor MOT are common (coaxial). Therefore, the first generator GEN1 and the second generator GEN2 can efficiently generate power when the motor MOT rotates the rotary shaft ROT. Furthermore, the first generator GEN1 and the second generator GEN2 are connected by a rotating shaft ROT and have the same configuration. Therefore, when the motor MOT rotates the rotating shaft ROT, the first generator GEN1 and the second generator GEN2 can output the same electric power efficiently.

尚、回転軸ROTは、一体形成された軸であってもよい。しかし、第1の発電機GEN1、第2の発電機GEN2およびモータMOTのそれぞれの回転軸は、カップリングCで結合されることによって共通の回転軸ROTとして機能してもよい。   The rotating shaft ROT may be an integrally formed shaft. However, the rotation shafts of the first generator GEN1, the second generator GEN2, and the motor MOT may function as a common rotation shaft ROT by being coupled by the coupling C.

図4は、第1および第2の発電機GEN1、GEN2のステータ10およびロータ20の構成の一例を示す図である。第1および第2の発電機GEN1、GEN2は、モータMOTと同様に、上記特許文献1〜3に記載されたブラシレスモータの構成と同様でもよい。   FIG. 4 is a diagram illustrating an example of the configuration of the stator 10 and the rotor 20 of the first and second generators GEN1 and GEN2. The first and second generators GEN1 and GEN2 may have the same configuration as the brushless motor described in Patent Documents 1 to 3 like the motor MOT.

代替的に、図4に示す第1および第2の発電機GEN1、GEN2は、ロータ20として24個の永久磁石MAGを配置したフライホイールを用いてもよい。永久磁石MAGは、フライホイールの内側の周囲に均等に配置されている。   Alternatively, the first and second generators GEN 1 and GEN 2 shown in FIG. 4 may use flywheels in which 24 permanent magnets MAG are arranged as the rotor 20. The permanent magnets MAG are evenly arranged around the inside of the flywheel.

ステータ10は、ロータ20の内側にロータ20と対向するように設けられている。ステータ10は、上記特許文献1〜3に記載されるストリップを有する金属プレートを巻き付けた円筒体(コアレスコイル)と同様の構成である。この場合、コアレスコイルから起電力が得られる。このようなステータ10に対して24個の永久磁石MAGを配置したロータ20を対向させることによって、本実施形態による第1および第2の発電機GEN1、GEN2は効率的に発電することができる。   The stator 10 is provided inside the rotor 20 so as to face the rotor 20. The stator 10 has the same configuration as a cylindrical body (coreless coil) around which a metal plate having a strip described in Patent Documents 1 to 3 is wound. In this case, an electromotive force is obtained from the coreless coil. The first and second generators GEN1 and GEN2 according to the present embodiment can efficiently generate power by making the rotor 20 in which the 24 permanent magnets MAG are arranged face the stator 10 as described above.

以上の実施形態による発電システムは、バッテリBATT1、BATT2のみで駆動することができる。従って、本実施形態による発電システムは、商用電源の無い屋外において利用価値が高い。また、石油やガソリンなどの化石燃料を用いないので、環境に良い。さらに、本実施形態は、バッテリBATT1、BATT2のみで駆動しているので、乗用車に適用することもできる。   The power generation system according to the above embodiment can be driven only by the batteries BATT1 and BATT2. Therefore, the power generation system according to the present embodiment has high utility value outdoors without a commercial power source. In addition, since fossil fuels such as oil and gasoline are not used, it is good for the environment. Furthermore, since this embodiment is driven only by the batteries BATT1 and BATT2, it can also be applied to passenger cars.

上記実施形態に係る発電システムは、超伝導フライホイールと組み合わせることもできる。   The power generation system according to the above embodiment can be combined with a superconducting flywheel.

100…発電システム
BATT1…第1のバッテリ
BATT2…第2のバッテリ
INV1…第1のDC−ACインバータ
INV2…第2のDC−ACインバータ
RLY1…第1のリレースイッチ
RLY2…第2のリレースイッチ
DST…分電盤
TRC…昇圧トランス
CNV…三相変換器
MOT…モータ
GEN…発電部
SWCNT…スイッチコントローラ
DESCRIPTION OF SYMBOLS 100 ... Power generation system BATT1 ... 1st battery BATT2 ... 2nd battery INV1 ... 1st DC-AC inverter INV2 ... 2nd DC-AC inverter RLY1 ... 1st relay switch RLY2 ... 2nd relay switch DST ... Distribution board TRC ... Step-up transformer CNV ... Three-phase converter MOT ... Motor GEN ... Power generation unit SWCNT ... Switch controller

Claims (7)

電力を供給する充電可能な第1のバッテリおよび第2のバッテリと、
前記第1のバッテリまたは前記第2のバッテリのいずれか一方の電力を出力する第1の切替部と、
前記第1の切替部から出力される前記第1のバッテリまたは前記第2のバッテリのいずれか一方の電力を受けて動作するモータと、
前記モータの運動エネルギーを電気エネルギーに変換して電力を生成する発電部と、
前記発電部からの電力を前記第1のバッテリまたは前記第2のバッテリのいずれか一方に供給する第2の切替部とを備えた発電システム。
A rechargeable first battery and a second battery for supplying power;
A first switching unit that outputs electric power of either the first battery or the second battery;
A motor that operates by receiving power from either the first battery or the second battery output from the first switching unit;
A power generation unit that generates electric power by converting kinetic energy of the motor into electrical energy; and
A power generation system comprising: a second switching unit that supplies power from the power generation unit to either the first battery or the second battery.
前記第1および前記第2のバッテリの出力電圧に基づいて前記第1および前記第2の切替部を制御するスイッチコントローラをさらに備えたことを特徴とする請求項1に記載の発電システム。   The power generation system according to claim 1, further comprising a switch controller that controls the first and second switching units based on output voltages of the first and second batteries. 前記第1または前記第2のバッテリからの直流電力を交流電力に変換するインバータをさらに備えたことを特徴とする請求項1または請求項2に記載の発電システム。   The power generation system according to claim 1, further comprising an inverter that converts direct current power from the first or second battery into alternating current power. 前記第1の切替部から出力される電力の一部を外部へ出力し、その他の電力を前記モータへ出力する分電部をさらに備えたことを特徴とする請求項1から請求項3のいずれか一項に記載の発電システム。   4. The power distribution device according to claim 1, further comprising a power distribution unit that outputs a part of the power output from the first switching unit to the outside and outputs other power to the motor. The power generation system according to claim 1. 前記発電部は、前記モータの回転軸と共通の回転軸を有し、前記モータが回転軸を回転させることによって発電する第1の発電機および第2の発電機を含むことを特徴とする請求項1から請求項4のいずれか一項に記載の発電システム。   The power generation section includes a first generator and a second generator that have a rotation shaft that is common to the rotation shaft of the motor and that generates electric power when the motor rotates the rotation shaft. The power generation system according to any one of claims 1 to 4. 前記第1の切替部が前記第1のバッテリからの電力を出力している場合、前記第1の切替部は、前記第1のバッテリの出力電圧が所定値を下回ったときに、前記第1のバッテリから前記第2のバッテリへ切替えて、前記第2のバッテリからの電力を出力し、
前記第1の切替部が前記第2のバッテリからの電力を出力している場合、前記第1の切替部は、前記第2のバッテリの出力電圧が所定値を下回ったときに、前記第2のバッテリから前記第1のバッテリへ切替えて、前記第1のバッテリからの電力を出力することを特徴とする請求項1から請求項5のいずれか一項に記載の発電システム。
When the first switching unit is outputting electric power from the first battery, the first switching unit is configured such that when the output voltage of the first battery falls below a predetermined value, the first switching unit Switching from the second battery to the second battery to output power from the second battery,
When the first switching unit is outputting electric power from the second battery, the first switching unit is configured such that when the output voltage of the second battery falls below a predetermined value, the second switching unit 6. The power generation system according to claim 1, wherein the first battery is switched to the first battery to output electric power from the first battery.
前記第2の切替部が前記発電部からの電力を前記第1のバッテリに供給している場合、前記第2の切替部は、前記第2のバッテリの出力電圧が所定値を下回ったときに、前記第1のバッテリから前記第2のバッテリへ切替えて、前記発電部からの電力を前記第2のバッテリに供給し、
前記第2の切替部が前記発電部からの電力を前記第2のバッテリに供給している場合、前記第2の切替部は、前記第1のバッテリの出力電圧が所定値を下回ったときに、前記第2のバッテリから前記第1のバッテリへ切替えて、前記発電部からの電力を前記第1のバッテリに供給することを特徴とする請求項1から請求項6のいずれか一項に記載の発電システム。
When the second switching unit supplies power from the power generation unit to the first battery, the second switching unit is configured such that when the output voltage of the second battery falls below a predetermined value. Switching from the first battery to the second battery to supply power from the power generation unit to the second battery;
When the second switching unit supplies power from the power generation unit to the second battery, the second switching unit is configured such that when the output voltage of the first battery falls below a predetermined value. The switch from the second battery to the first battery is performed to supply power from the power generation unit to the first battery. Power generation system.
JP2013087571A 2013-04-18 2013-04-18 Power generating system Pending JP2014212622A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013087571A JP2014212622A (en) 2013-04-18 2013-04-18 Power generating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013087571A JP2014212622A (en) 2013-04-18 2013-04-18 Power generating system

Publications (1)

Publication Number Publication Date
JP2014212622A true JP2014212622A (en) 2014-11-13

Family

ID=51931986

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013087571A Pending JP2014212622A (en) 2013-04-18 2013-04-18 Power generating system

Country Status (1)

Country Link
JP (1) JP2014212622A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5966210B1 (en) * 2015-12-11 2016-08-10 株式会社Flyconver Flywheel, manufacturing method thereof, and power generation device

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05328617A (en) * 1992-05-25 1993-12-10 Muneaki Takara Reserved power circulating device
JPH0759265A (en) * 1993-08-12 1995-03-03 Casio Comput Co Ltd Battery circuit
JPH1150436A (en) * 1997-08-06 1999-02-23 Kaisei Kogyo Kk Sluice gate opening and closing device
JPH11356032A (en) * 1998-06-10 1999-12-24 Toshio Hanya Generation system
JP2002135906A (en) * 2000-10-19 2002-05-10 Sanyo Electric Co Ltd Hybrid vehicle
JP2006223035A (en) * 2005-02-09 2006-08-24 Hitachi Advanced Digital Inc Battery control system
JP2006296109A (en) * 2005-04-12 2006-10-26 Toyotomi Co Ltd Household compact power supply
JP2008281685A (en) * 2007-05-09 2008-11-20 Canon Inc Power supply device, its control method and image forming apparatus
JP2008297032A (en) * 2007-05-29 2008-12-11 Toyota Industries Corp Industrial vehicle
JP2009197587A (en) * 2008-02-19 2009-09-03 Tokyo Electric Power Co Inc:The Wind turbine generator system
JP3156075U (en) * 2009-10-01 2009-12-10 株式会社ヤマグチリペアラー Battery charger and electric vehicle using the same
JP2010136613A (en) * 2008-12-02 2010-06-17 General Electric Co <Ge> System and method for uninterruptible power supply utilizing vehicle

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05328617A (en) * 1992-05-25 1993-12-10 Muneaki Takara Reserved power circulating device
JPH0759265A (en) * 1993-08-12 1995-03-03 Casio Comput Co Ltd Battery circuit
JPH1150436A (en) * 1997-08-06 1999-02-23 Kaisei Kogyo Kk Sluice gate opening and closing device
JPH11356032A (en) * 1998-06-10 1999-12-24 Toshio Hanya Generation system
JP2002135906A (en) * 2000-10-19 2002-05-10 Sanyo Electric Co Ltd Hybrid vehicle
JP2006223035A (en) * 2005-02-09 2006-08-24 Hitachi Advanced Digital Inc Battery control system
JP2006296109A (en) * 2005-04-12 2006-10-26 Toyotomi Co Ltd Household compact power supply
JP2008281685A (en) * 2007-05-09 2008-11-20 Canon Inc Power supply device, its control method and image forming apparatus
JP2008297032A (en) * 2007-05-29 2008-12-11 Toyota Industries Corp Industrial vehicle
JP2009197587A (en) * 2008-02-19 2009-09-03 Tokyo Electric Power Co Inc:The Wind turbine generator system
JP2010136613A (en) * 2008-12-02 2010-06-17 General Electric Co <Ge> System and method for uninterruptible power supply utilizing vehicle
JP3156075U (en) * 2009-10-01 2009-12-10 株式会社ヤマグチリペアラー Battery charger and electric vehicle using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5966210B1 (en) * 2015-12-11 2016-08-10 株式会社Flyconver Flywheel, manufacturing method thereof, and power generation device
JP2017106602A (en) * 2015-12-11 2017-06-15 株式会社Flyconver Flywheel, manufacturing method for the same and power generation device
US10498209B2 (en) 2015-12-11 2019-12-03 Flyconver Co., Ltd. Flywheel, manufacturing method thereof, and power generating apparatus

Similar Documents

Publication Publication Date Title
US10250054B2 (en) Energy storage system and method for increasing the efficiency of an energy storage system
CN102957143A (en) Hybrid electric generator set
US10312789B2 (en) Electrical power generation and distribution
EP3607627B1 (en) High efficiency electric power generation and charging system
JPWO2017179178A1 (en) Power management system
CN104712485A (en) Diesel engine starter and diesel generating set
JP4926263B2 (en) Flywheel and power generator
JP2008035589A (en) Power feeding method and device
US10547179B2 (en) High efficiency electric power generation and charging system
JP2014212622A (en) Power generating system
JP3197132U (en) Automatic small generator
KR102637683B1 (en) Power generation and distribution
JP3193838U (en) Power generation system
CN102820688A (en) Automobile power system
CN207765966U (en) Distribution type photovoltaic energy storage system
KR102174147B1 (en) Diesel generator improved load receiving capability
JP3243720U (en) Generator
CN110447155B (en) Efficient power generation and charging system
US11760212B1 (en) Electrical power generation and distribution
CN202535133U (en) Wheel shaft rotation system provided with feedback charging function
JP3197131U (en) Automatic small generator
CN101465593A (en) Novel power supply
JP2022073811A (en) Power generating system
RU2354027C1 (en) Independent power supply system
US20090096306A1 (en) Auto-generating electric generator

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140819

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140909

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141118

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20150324