JP2014211032A - Installation structure of floor frame - Google Patents

Installation structure of floor frame Download PDF

Info

Publication number
JP2014211032A
JP2014211032A JP2013087337A JP2013087337A JP2014211032A JP 2014211032 A JP2014211032 A JP 2014211032A JP 2013087337 A JP2013087337 A JP 2013087337A JP 2013087337 A JP2013087337 A JP 2013087337A JP 2014211032 A JP2014211032 A JP 2014211032A
Authority
JP
Japan
Prior art keywords
frame
wall
floor
floor frame
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013087337A
Other languages
Japanese (ja)
Other versions
JP6159562B2 (en
Inventor
哲夫 舛田
Tetsuo Masuda
哲夫 舛田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Kasei Homes Corp
Original Assignee
Asahi Kasei Homes Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Kasei Homes Corp filed Critical Asahi Kasei Homes Corp
Priority to JP2013087337A priority Critical patent/JP6159562B2/en
Publication of JP2014211032A publication Critical patent/JP2014211032A/en
Application granted granted Critical
Publication of JP6159562B2 publication Critical patent/JP6159562B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units

Landscapes

  • Residential Or Office Buildings (AREA)
  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an installation structure of a floor frame, in which the floor frame can be removed even after a wall body is installed and the construction of the floor frame can be efficiently performed.SOLUTION: An installation structure 1 of a floor frame 10 includes: a pair of steel frame beams 3a, 3b provided to face each other; the floor frame 10 laid between the pair of steel frame beams 3a, 3b; and a wall body 4 provided on one steel frame beam 3a. In the floor frame 10, an end 10c close to the wall body 4 is detachably supported at a position further separated from the steel frame beam 3a than a surface 4x of the wall body 4. In the installation structure 1 of the floor frame 10, the attachment/detachment of the floor frame 10 is not limited by the wall body 4 even after the wall body 4 is laid on the steel frame beam 3a. That is, the floor frame 10 can be removed even after the wall body 4 is installed, and thus an efficient construction can be achieved.

Description

本発明は、一対の躯体梁間に設けられる床フレームの設置構造に関する。   The present invention relates to a floor frame installation structure provided between a pair of frame beams.

従来、戸建て住宅等の施工は、最初に基礎の施工が行われ、その後に、梁柱等を設置する躯体工事、屋根や外壁パネル間の目地を埋める防水工事、界壁やユニットバス等を設置する躯体内部工事が行われ、最後に木工事や仕上げ工事が行われる。このような工程で進行する建物の施工では、効率化の観点から、各工事が別々の業者により行われることが多い。そのため、前工程の工事結果を変更する場合には、他の業者の協力が必要となり施工が非効率となるおそれがある。   Conventionally, the construction of detached houses, etc., has been carried out first, followed by frame construction for installing beam pillars, waterproof construction for filling joints between roofs and outer wall panels, border walls and unit baths, etc. The interior of the building will be done, and finally wood work and finishing work will be done. In the construction of a building that proceeds in such a process, each construction is often performed by a separate contractor from the viewpoint of efficiency. Therefore, when changing the construction result of the previous process, the cooperation of other contractors is required, and the construction may become inefficient.

例えば、浴室部(ユニットバス)の設置施工では、ユニットバスの設置位置によっては、躯体工事の結果を一部変更しなければユニットバスの設置が行えない場合がある。躯体工事の結果を一部変更する場合、再度の躯体工事とユニットバスの設置という2つの施工が必要となり、この場合、躯体工事を行う設置業者とユニットバスを設置する設置業者とが混在して作業を行うこととなる。すなわち、施工のみならず設置業者が混在することとなる。このことで、設置業者による施工が非効率になるという問題がある。かかる問題を解決すべく、例えば特許文献1には、ユニットフロアに固定された複数の小梁を大梁に着脱自在とした構成が開示されている。   For example, in the installation construction of a bathroom part (unit bath), depending on the installation position of the unit bath, the unit bath may not be installed unless the result of the frame construction is partially changed. To partially change the result of the frame construction, it is necessary to carry out two types of construction, the second frame construction and the installation of the unit bath. In this case, the installation contractor who installs the frame construction and the installation contractor who installs the unit bus are mixed. Work will be done. That is, not only construction but also installation contractors are mixed. As a result, there is a problem that the installation by the installer becomes inefficient. In order to solve such a problem, for example, Patent Document 1 discloses a configuration in which a plurality of small beams fixed to a unit floor are detachable from a large beam.

特開2004−278210号公報JP 2004-278210 A

ユニットバスの施工は、躯体梁と該躯体梁に架設される床フレームが設置される躯体工事、及び、躯体工事後に行われる該躯体梁上への壁体の設置施工、の後に行われることが一般的である。ここで、躯体梁上に壁体が設置された後には、特許文献1に記載された構成をもってしても床フレームを取り外すことはできない。この場合、床フレームを残したままユニットバス設置作業を行うか、施工手順を見直す必要があり、施工性が悪化するという問題があった。   The construction of the unit bath may be carried out after the frame construction in which the frame beam and the floor frame constructed on the frame beam are installed, and the wall installation on the frame beam performed after the frame construction. It is common. Here, after the wall body is installed on the frame beam, the floor frame cannot be removed even with the configuration described in Patent Document 1. In this case, it is necessary to perform the unit bath installation work while leaving the floor frame or to review the construction procedure, and there is a problem that the workability deteriorates.

そこで、本願発明は、施工手順を改変することなく、躯体施工後にユニットバス等の後設置物を設置することができる床フレームの設置構造を提供することを目的とする。   Then, this invention aims at providing the installation structure of the floor frame which can install post-installation things, such as a unit bath, after a frame construction, without changing a construction procedure.

本発明に係る床フレームの設置構造は、対向して設けられた一対の躯体梁と、一対の躯体梁間に架設された床フレームと、一対の躯体梁のうち少なくとも一方の躯体梁上に設けられた壁体と、を備え、床フレームは、その壁体に近接する端部が、壁体の表面よりも一方の躯体梁から離間した位置で着脱自在に支持されていることを特徴とする。   The floor frame installation structure according to the present invention is provided on at least one of the pair of frame beams, a pair of frame beams provided opposite to each other, a floor frame provided between the pair of frame beams, and the pair of frame beams. The floor frame is characterized in that an end portion close to the wall body is detachably supported at a position farther from one frame beam than the surface of the wall body.

本発明によれば、壁体下の躯体梁から見て、その躯体梁に対して壁体の表面よりも該躯体梁から離間した位置に床フレームの端部が設けられることとなる。その結果、躯体梁上に壁体を設置した後であっても、該壁体によって床フレームの着脱が制限されることがない。すなわち、壁体の設置後にも床フレームを取り外すことができ、効率的に施工を行うことが可能となる。   According to the present invention, when viewed from the frame beam under the wall, the end of the floor frame is provided at a position farther from the frame beam than the surface of the wall with respect to the frame beam. As a result, even after the wall body has been installed on the frame beam, the wall body does not restrict the attachment / detachment of the floor frame. That is, the floor frame can be removed even after the wall body is installed, and the construction can be performed efficiently.

また、一方の躯体梁には、床フレームの端部を支持する受け具が設けられており、受け具は、壁体の表面よりも上記の一方の躯体梁から離間した内側の位置で床フレームの端部を着脱自在に支持していると好適である。これによれば、床フレームの端部を、受け具を介して、壁体の表面よりも躯体梁間の内側に位置づけた状態で確実に架設できる。   In addition, one of the frame beams is provided with a support for supporting the end of the floor frame, and the support frame is located at an inner position farther from the one frame beam than the surface of the wall. It is preferable that the end portion of this is detachably supported. According to this, the end portion of the floor frame can be reliably installed in a state where the end portion of the floor frame is positioned on the inner side between the frame beams rather than the surface of the wall body.

また、受け具は、壁体の下端部を支持する壁受け部と、該壁受け部から突設され、且つ床フレームの端部を支持するフレーム受け部と、を有し、壁受け部は、一方の躯体梁の側縁部よりも内側に突き出た部分を有していると好適である。受け具が壁受け部とフレーム受け部とを有していることで、床フレームのみならず壁体をも支持することができる。また、壁受け部が躯体梁の側縁部よりも該躯体梁と対向する躯体梁側に突き出た部分を含んでいることで、躯体梁の幅よりも大きい壁厚を有する壁体を支持することが可能となる。   The receiver includes a wall receiving portion that supports the lower end portion of the wall body, and a frame receiving portion that protrudes from the wall receiving portion and supports the end portion of the floor frame, and the wall receiving portion is It is preferable to have a portion protruding inward from the side edge of one of the frame beams. Since the receiving device has the wall receiving portion and the frame receiving portion, it is possible to support not only the floor frame but also the wall body. Further, the wall receiving portion includes a portion protruding to the side of the frame beam facing the frame beam from the side edge of the frame beam, thereby supporting a wall body having a wall thickness larger than the width of the frame beam. It becomes possible.

また、壁体の下方であって躯体梁の内側には、その内表面が壁体の表面に揃う補助壁部材が設けられ、受け具には、一方の躯体梁の上端部よりも上方で補助壁部材の上端部を収容する補助壁収容部が凹設されていることが好適である。躯体梁と隣り合う位置に設けられた補助壁部材の上端部が、該躯体梁の上端部よりも上方に位置することで、補助壁部材の上端部と躯体梁の上端部との間で段差が生じることとなる。このことで、躯体梁の側方から見ると躯体梁の上端部が補助壁部材により覆われることとなり、補助壁部材により躯体梁側への断熱性、防音性が高められ、躯体梁及び壁体を介して隣り合う室同士が互いの影響を受け難いものとできる。   In addition, an auxiliary wall member is provided below the wall body and inside the frame beam so that the inner surface thereof is aligned with the surface of the wall body, and the support is provided above the upper end of one frame beam. It is preferable that the auxiliary wall housing portion for housing the upper end portion of the wall member is recessed. The upper end of the auxiliary wall member provided at a position adjacent to the frame beam is located above the upper end of the frame beam, so that a step is formed between the upper end of the auxiliary wall member and the upper end of the frame beam. Will occur. Thus, when viewed from the side of the frame beam, the upper end of the frame beam is covered with the auxiliary wall member, and the auxiliary wall member improves the heat insulation and soundproofing to the frame beam side, and the frame beam and the wall body The rooms adjacent to each other can be hardly affected by each other.

本発明によれば、壁体の設置後にも床フレームを取り外すことができ、効率的に施工が行える床フレームの設置構造を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, a floor frame can be removed even after installation of a wall body, and the installation structure of the floor frame which can be constructed efficiently can be provided.

本発明の第1実施形態に係る床フレームの設置構造の平面図である。It is a top view of the installation structure of the floor frame which concerns on 1st Embodiment of this invention. 図1のII-II線に沿った断面図である。It is sectional drawing along the II-II line of FIG. 図1のIII-III線に沿った断面図である。It is sectional drawing along the III-III line of FIG. 本発明の第2実施形態に係る床フレームの設置構造の断面図である。It is sectional drawing of the installation structure of the floor frame which concerns on 2nd Embodiment of this invention.

以下、添付図面を参照して、本発明の好適な実施形態について詳細に説明する。なお、以下の説明においては同一又は相当要素には同一符号を付し、重複する説明を省略する。   Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description, the same or corresponding elements are denoted by the same reference numerals, and redundant description is omitted.

[第1実施形態]
本実施形態では、建物の2階以上の階(以下、「上階」という)に設けられている浴室部に設置される床フレーム10の設置構造1について説明する。
[First embodiment]
In the present embodiment, an installation structure 1 of a floor frame 10 installed in a bathroom section provided on two or more floors (hereinafter referred to as “upper floor”) of a building will be described.

最初に、図1、及び図2を参照して浴室部のレイアウト、及び浴室部に設置する床フレーム10の周囲構造の概略を説明する。浴室部は、ユニットバスが設置される空間(以下、「ユニットバス空間」という)Aと脱衣所となる空間(以下、「洗面所空間」という)Bを備えている。洗面所空間Bはユニットバス空間Aに隣接しており、ユニットバス空間Aには、浴槽が設置される浴槽領域A1と、洗い場領域A2とが設けられている。また、ユニットバス空間Aと洗面所空間Bとには、同じ深さだけ落とし込まれた落とし込み部2が一体的に形成されている。なお、洗面所空間Bには、ユニットバス空間Aの反対側において床部分となる空間(以下、「上階床空間」という)Cが隣接している。   First, the layout of the bathroom part and the outline of the surrounding structure of the floor frame 10 installed in the bathroom part will be described with reference to FIGS. The bathroom section includes a space (hereinafter referred to as “unit bath space”) A in which a unit bath is installed and a space (hereinafter referred to as “toilet space”) B serving as a dressing room. The washroom space B is adjacent to the unit bath space A, and the unit bath space A is provided with a bathtub area A1 where a bathtub is installed and a wash area A2. The unit bath space A and the washroom space B are integrally formed with a drop portion 2 that is dropped by the same depth. The bathroom space B is adjacent to a space C (hereinafter referred to as an “upper floor space”) C serving as a floor portion on the opposite side of the unit bath space A.

ユニットバス空間A、洗面所空間B、及び上階床空間Cの境界に沿って、柱Pに接続された大梁3b,3c及び小梁3a,3dが設置されている。具体的には、ユニットバス空間A、洗面所空間B、及び上階床空間Cを左右から挟むようにして大梁3b、及び小梁3aが設けられており、この大梁3bと小梁3aとによって対向して設けられた一対の躯体梁が形成される。   Large beams 3b and 3c and small beams 3a and 3d connected to the pillar P are installed along the boundaries of the unit bath space A, the washroom space B, and the upper floor space C. Specifically, a large beam 3b and a small beam 3a are provided so as to sandwich the unit bath space A, the washroom space B, and the upper floor space C from the left and right sides, and the large beam 3b and the small beam 3a face each other. A pair of frame beams provided are formed.

大梁3b、及び小梁3aの上階床空間C側の端部には大梁3cが架設されている。また、洗面所空間Bと上階床空間Cとの境界には、小梁3dが設けられている。大梁3b,3c及び小梁3a,3dはH型鋼からなり、以下の説明では総称して「鉄骨梁」という。なお、鉄骨梁3a,3b,3c上には、壁体4が設けられている。   A large beam 3c is installed at the end of the upper beam space C side of the large beam 3b and the small beam 3a. In addition, a small beam 3d is provided at the boundary between the washroom space B and the upper floor space C. The large beams 3b and 3c and the small beams 3a and 3d are made of H-shaped steel, and are collectively referred to as “steel beams” in the following description. A wall body 4 is provided on the steel beams 3a, 3b, 3c.

落とし込み部2(図2参照)の下部には床材11が設けられている。床材11は、ALC(軽量気泡コンクリート)パネルであり、施工、加工が容易で断熱性、耐火性が高い。床材11は、鉄骨梁3a,3b間に架設されている。床材11は、落とし込み部2全域(ユニットバス空間A及び洗面所空間Bの床部全域)に亘って設けられており、床フレーム10と床材11との間のスペースには、給水管、給湯管、排水管等の配管(図示せず)が設けられている。   A flooring 11 is provided at the lower part of the drop-in part 2 (see FIG. 2). The flooring 11 is an ALC (lightweight aerated concrete) panel, is easy to construct and process, and has high heat insulation and fire resistance. The floor material 11 is constructed between the steel beam 3a, 3b. The flooring 11 is provided over the entire drop-in part 2 (the entire floor of the unit bath space A and the washroom space B), and the space between the floor frame 10 and the flooring 11 includes a water pipe, Pipings (not shown) such as hot water supply pipes and drain pipes are provided.

鉄骨梁3aの上にはALCパネルからなる床材41の端部が当接し、この端部に隣接して受け具20aが固定されている。また、鉄骨梁3bの上には、ALCパネルからなる別の床材41の端部が当接し、この端部に隣接して受け具20bが固定されている。受け具20a,20bは、鉄骨梁3a,3b上で床材41の端部と協同して壁体4を支持する部材である。なお、鉄骨梁3aの上方に設置された壁体4は各住戸の間を区切る界壁である。   An end portion of a flooring 41 made of an ALC panel abuts on the steel beam 3a, and a receiving tool 20a is fixed adjacent to the end portion. Further, an end portion of another floor material 41 made of an ALC panel is brought into contact with the steel beam 3b, and the receiving member 20b is fixed adjacent to the end portion. The receivers 20a and 20b are members that support the wall body 4 in cooperation with the end of the flooring 41 on the steel beams 3a and 3b. In addition, the wall body 4 installed above the steel beam 3a is a boundary wall which divides between each dwelling unit.

次に、図1〜図3を参照し、床フレーム10の設置構造1を詳しく説明する。床フレーム10は、洗面所空間B(図1参照)において一対の鉄骨梁3a,3b間に架設されている。床フレーム10は梯子状であり、鉄骨梁3a,3bの対向方向に延在する一対の横架部10aと、一対の横架部10a間に架設された複数の縦骨部10bと、を備えている。   Next, the installation structure 1 of the floor frame 10 will be described in detail with reference to FIGS. The floor frame 10 is installed between the pair of steel beams 3a and 3b in the toilet space B (see FIG. 1). The floor frame 10 has a ladder shape, and includes a pair of horizontal portions 10a extending in the opposing direction of the steel beams 3a and 3b, and a plurality of vertical bone portions 10b provided between the pair of horizontal portions 10a. ing.

横架部10aの一方の端部10cは、鉄骨梁3aに近接する側に配置され、受け具20aに支持され、他方の端部10dは、鉄骨梁3bに近接する側に配置され、受け具20bに支持される。なお、鉄骨梁3a側で床フレーム10を支持する構造と鉄骨梁3b側で支持する構造とは実質的に同一であるため、以下の説明では、図3を参照して鉄骨梁3a側で支持する構造を中心に説明する。また、鉄骨梁3b側は相違点を中心に説明し、鉄骨梁3a側と同一の構造や要素は図面上で同一の符号を付して説明を省略する。   One end portion 10c of the horizontal portion 10a is disposed on the side close to the steel beam 3a and supported by the receiving tool 20a, and the other end portion 10d is disposed on the side close to the steel beam 3b. 20b. Since the structure for supporting the floor frame 10 on the steel beam 3a side and the structure for supporting the steel frame 3b side are substantially the same, in the following description, the structure is supported on the steel beam 3a side with reference to FIG. The structure will be described mainly. Further, the steel beam 3b side will be described mainly with respect to the differences, and the same structures and elements as those of the steel beam 3a side will be denoted by the same reference numerals in the drawing and description thereof will be omitted.

鉄骨梁3aは上フランジ31、下フランジ32、及び上フランジ31と下フランジ32とを連結するウェブ33を有している。   The steel beam 3 a has an upper flange 31, a lower flange 32, and a web 33 that connects the upper flange 31 and the lower flange 32.

ウェブ33の内側、言い換えれば対向する鉄骨梁3b側には、パネル受け金物6が固定されている。パネル受け金物6は、ウェブ33にボルト留めされたフランジ片61と、フランジ片61に溶接された略L字板状の支持片62と、支持片62に固定され、床材11の縁に沿って延在するパネル受け片63と、を備えている。パネル受け片63は、L字が上下二段となるようなクランク状に折り曲げられ、下段のL字形状によって下段水平片64と下段起立片65とが形成され、上段のL字形状によって上段水平片66と上段起立片67とが形成される。   A panel bracket 6 is fixed to the inside of the web 33, in other words, on the opposite steel beam 3b side. The panel receiver 6 is fixed to the flange piece 61 bolted to the web 33, a substantially L-shaped support piece 62 welded to the flange piece 61, and the edge of the flooring 11. And a panel receiving piece 63 extending. The panel receiving piece 63 is bent in a crank shape so that the L-shape is two steps up and down, and a lower horizontal piece 64 and a lower standing piece 65 are formed by the lower L-shape, and the upper horizontal by the upper L-shape. A piece 66 and an upper standing piece 67 are formed.

下段水平片64は落とし込み2に配置された床材11を受け、下段起立片65と床材11との隙間にはモルタル12が充填されて床材11とパネル受け金物6とが一体的に固定されている。なお、下段起立片65には、補助壁部材5を支える平板8が固定されている。   The lower horizontal piece 64 receives the floor material 11 arranged in the drop 2, and the gap between the lower standing piece 65 and the floor material 11 is filled with mortar 12 so that the floor material 11 and the panel bracket 6 are integrally fixed. Has been. A flat plate 8 that supports the auxiliary wall member 5 is fixed to the lower standing piece 65.

鉄骨梁3aの上フランジ31には、床材41の端部に隣接して受け具20aがボルト留めされている。受け具20aは、壁受け部22aと、壁受け部22aに溶接されたフレーム受け部21aとを有する。壁受け部22aは、鉄骨梁3aに沿った長尺で、且つ断面W字状のモルタル受け部22bと、モルタル受け部22bに溶接された複数の補強リブ22cとを有する。   A receiver 20a is bolted to the upper flange 31 of the steel beam 3a adjacent to the end of the flooring 41. The receiving device 20a includes a wall receiving portion 22a and a frame receiving portion 21a welded to the wall receiving portion 22a. The wall receiving part 22a has a long mortar receiving part 22b along the steel beam 3a and a W-shaped cross section, and a plurality of reinforcing ribs 22c welded to the mortar receiving part 22b.

モルタル受け部22bは、上フランジ31に接してボルト締結される下段水平片22qと、下段水平片22qから屈曲して立ち上がる下段起立片22rと、下段起立片22rから屈曲して水平方向に延在する上段水平片22sと、上段水平片22sから屈曲して立ち上がる上段起立片22tとを有する。   The mortar receiving portion 22b is in contact with the upper flange 31 and is bolted to a lower horizontal piece 22q, a lower standing piece 22r which is bent and rises from the lower horizontal piece 22q, and is bent from the lower standing piece 22r and extends in the horizontal direction. The upper horizontal piece 22s and the upper standing piece 22t that bends and rises from the upper horizontal piece 22s.

下段水平片22qから下段起立片22rにつながる連結(屈曲)部位は、鉄骨梁3aの上フランジ31の側縁、つまり、鉄骨梁3aの側縁部34aに揃っている。また、上段起立片22tの内面、言い換えれば、鉄骨梁3aに対向する鉄骨梁3b側の面は、壁体4の表面4xに揃っている。また、上段起立片22t、及び補強リブ22cの上端、つまり壁受け部22aの上端は、床材41の高さに揃っている。その結果、壁受け部22a及び床材41上に設けられる壁体4の左右(壁受け部22a側、及び、床材41側)の大きさが揃うものとなり、部材が削減される。なお、上フランジ31、壁受け部22a、及び床材41の端部の間に形成された間隔にはモルタル13が充填され、鉄骨梁3a、壁受け部22a、クリップ材53、及び床材41が一体的に固定されている。   The connection (bending) part connected from the lower horizontal piece 22q to the lower standing piece 22r is aligned with the side edge of the upper flange 31 of the steel beam 3a, that is, the side edge 34a of the steel beam 3a. Further, the inner surface of the upper standing piece 22t, in other words, the surface on the steel beam 3b side facing the steel beam 3a is aligned with the surface 4x of the wall 4. Further, the upper standing pieces 22t and the upper ends of the reinforcing ribs 22c, that is, the upper ends of the wall receiving portions 22a are aligned with the floor 41. As a result, the left and right sides (the wall receiving portion 22a side and the floor material 41 side) of the wall body 4 provided on the wall receiving portion 22a and the floor material 41 are aligned, and members are reduced. In addition, the mortar 13 is filled in the space | interval formed between the upper flange 31, the wall receiving part 22a, and the edge part of the flooring 41, and the steel beam 3a, the wall receiving part 22a, the clip material 53, and the flooring 41 Are integrally fixed.

モルタル受け部22bの上段水平片22sは、鉄骨梁3aの側縁部34aよりも内側、言い換えれば、鉄骨梁3aに対向する鉄骨梁3b側に突き出している。また、下段起立片22rと上段水平片22sとが屈曲して連絡することでモルタル受け部22bの内側には凹部が形成され、つまり凹設された構造となっている。つまり、下段起立片22rと上段水平片22sとによって補助壁部材5を収容する補助壁収容部22zが形成される。   The upper horizontal piece 22s of the mortar receiving portion 22b protrudes on the inner side of the side edge portion 34a of the steel beam 3a, in other words, on the side of the steel beam 3b facing the steel beam 3a. Further, the lower standing piece 22r and the upper horizontal piece 22s are bent and connected to each other, so that a concave portion is formed inside the mortar receiving portion 22b, that is, a structure in which the concave portion is provided. That is, the auxiliary wall accommodating portion 22z that accommodates the auxiliary wall member 5 is formed by the lower standing piece 22r and the upper horizontal piece 22s.

補助壁部材5は、矩形のALCパネルからなり、落とし込み部2の側面に沿って短手が縦、長手が横になるように配置される。補助壁部材5は、下端がパネル受け片63の上段水平片66上に載置され、上段起立片67及び平板8に挟まれるようにして支えられる。補助壁部材5の内側の表面(内表面)5xと壁体4の表面4xとは、完全に同一の平面上(面一)ではないものの、略揃った状態となるように配置されている。   The auxiliary wall member 5 is composed of a rectangular ALC panel, and is arranged along the side surface of the drop-in portion 2 such that the short side is vertical and the long side is horizontal. The auxiliary wall member 5 is supported such that its lower end is placed on the upper horizontal piece 66 of the panel receiving piece 63 and is sandwiched between the upper standing piece 67 and the flat plate 8. Although the inner surface (inner surface) 5x of the auxiliary wall member 5 and the surface 4x of the wall body 4 are not completely on the same plane (the same surface), they are arranged so as to be substantially aligned.

補助壁部材5の上端部51は、補助壁収容部22z内に収まるように設置され、壁受け部22aの下段起立片22rに当接している。下段起立片22rには、断面U字状に形成されたピース状のクリップ材53が嵌め込まれる切欠きが長手方向に所定間隔で形成されており、補助壁部材5の上端部51は、クリップ材53と下段起立片22rの間に挟持されている。   The upper end portion 51 of the auxiliary wall member 5 is installed so as to be accommodated in the auxiliary wall housing portion 22z, and is in contact with the lower standing piece 22r of the wall receiving portion 22a. The lower standing piece 22r is formed with notches into which piece-like clip materials 53 formed in a U-shaped cross section are fitted at predetermined intervals in the longitudinal direction, and the upper end portion 51 of the auxiliary wall member 5 is formed of a clip material. 53 and the lower erected piece 22r.

壁受け部22aには、床フレーム10の端部10cを支持する断面略L字状のフレーム受け部21aが固定されている。フレーム受け部21aは、壁受け部22aの上段起立片22tに溶接される固定部21yと、固定部21yから内側、言い換えれば対向する鉄骨梁3b側に突き出して床フレーム10の端部10cを支えるフレーム載置部21xとを備えている。   A frame receiving portion 21a having a substantially L-shaped cross section for supporting the end portion 10c of the floor frame 10 is fixed to the wall receiving portion 22a. The frame receiving portion 21a supports the end portion 10c of the floor frame 10 by protruding from the fixing portion 21y to the inner side, in other words, the opposite steel beam 3b side, and the fixing portion 21y welded to the upper standing piece 22t of the wall receiving portion 22a. And a frame placing portion 21x.

壁受け部22aの上段起立片22tは壁体4の表面4xに揃っており、従って、上段起立片22tから内側に突き出したフレーム受け部21aは、鉄骨梁3aに対して壁体4の表面4xよりも離間した内側の位置に設けられている。その結果、フレーム受け部21aに支持された床フレーム10についても、鉄骨梁3aに対して壁体4の表面4xよりも内側に離間した位置に設けられている。   The upper standing piece 22t of the wall receiving portion 22a is aligned with the surface 4x of the wall body 4. Therefore, the frame receiving portion 21a protruding inward from the upper standing piece 22t has the surface 4x of the wall body 4 with respect to the steel beam 3a. It is provided in the inner position farther away. As a result, the floor frame 10 supported by the frame receiving portion 21a is also provided at a position spaced inward from the surface 4x of the wall 4 with respect to the steel beam 3a.

床フレーム10は、端部10cがフレーム受け部21aのフレーム載置部21xに載置された状態でボルト25とナット26とにより締結されており、締結を解くことでフレーム受け部21aから取り外すことができる。すなわち、床フレーム10はフレーム受け部21aに着脱自在に支持されている。なお、ボルト25とナット26とによる締結は、ユニットバス空間Aの設置施工完了後に行われことが好ましい。   The floor frame 10 is fastened by bolts 25 and nuts 26 with the end 10c placed on the frame placing part 21x of the frame receiving part 21a, and is removed from the frame receiving part 21a by releasing the fastening. Can do. That is, the floor frame 10 is detachably supported by the frame receiving portion 21a. The fastening by the bolt 25 and the nut 26 is preferably performed after the installation work of the unit bath space A is completed.

界壁である鉄骨梁3a上の壁体4は、遮音性及び断熱性の向上を図るための種々の部材により構成されている。すなわち、壁体4は中央部近辺にロックウール等を用いた断熱材81が設けられている。また、断熱材81の周囲を覆うようにして、遮音シートや石膏ボードが設けられ、遮音性の向上が図られている。   The wall body 4 on the steel beam 3a which is a boundary wall is composed of various members for improving sound insulation and heat insulation. That is, the wall body 4 is provided with a heat insulating material 81 using rock wool or the like in the vicinity of the center. In addition, a sound insulation sheet and a gypsum board are provided so as to cover the periphery of the heat insulating material 81, so that the sound insulation is improved.

図1、及び図2に示されるように、鉄骨梁3b側の受け具20bの実質的な機能は、鉄骨梁3a側の受け具20aと同様であるが、構造や形状が一部異なる。具体的には、受け具20bは壁受け部23aとフレーム受け部24aとを備えており、壁受け部23aは、断面略L字状で鉄骨梁3bの上フランジ31に取り付けられるモルタル受け部23bと、補強リブ23cとを備えている。モルタル受け部23bは、下段水平片23qが上フランジ31にボルト締結されている。なお、壁受け部23aは、鉄骨梁3a側の壁受け部22aと異なり、対向する鉄骨梁3a側に突出した部分を有していない。   As shown in FIGS. 1 and 2, the substantial function of the steel beam 3b-side support 20b is the same as that of the steel beam 3a-side support 20a, but the structure and shape are partially different. Specifically, the receiving device 20b includes a wall receiving portion 23a and a frame receiving portion 24a. The wall receiving portion 23a has a substantially L-shaped cross section and is attached to the upper flange 31 of the steel beam 3b. And a reinforcing rib 23c. As for the mortar receiving part 23b, the lower horizontal piece 23q is bolted to the upper flange 31. In addition, the wall receiving part 23a is different from the wall receiving part 22a on the steel beam 3a side, and does not have a portion protruding to the opposite steel beam 3a side.

フレーム受け部24aは、壁受け部23aに溶接される固定部24yと、固定部24yから内側、言い換えれば対向する鉄骨梁3a側に突き出して床フレーム10の端部10dを支えるフレーム載置部24xとを備えている。フレーム載置部24xは、鉄骨梁3a側のフレーム載置部21xに比べて対向する鉄骨梁3a側への突き出し長さが長くなっている。その結果、受け具20bが床フレーム10の端部10dを支持する箇所は、鉄骨梁3aに対して壁体4の表面4xよりも内側に離間した位置に設けられている。なお、壁受け部23aに対してフレーム受け部24aが突き出すことで受け具20bには凹設された部位が存在することになり、この凹設された部位が補助壁部材5を収容する補助壁収容部となる。   The frame receiving portion 24a includes a fixing portion 24y welded to the wall receiving portion 23a, and a frame placement portion 24x that protrudes inward from the fixing portion 24y, in other words, the opposite steel beam 3a side and supports the end portion 10d of the floor frame 10. And. The frame mounting portion 24x has a longer protruding length toward the opposing steel beam 3a than the frame mounting portion 21x on the steel beam 3a side. As a result, the place where the receiving member 20b supports the end portion 10d of the floor frame 10 is provided at a position spaced inward from the surface 4x of the wall body 4 with respect to the steel beam 3a. The frame receiving portion 24a protrudes from the wall receiving portion 23a, so that there is a recessed portion in the receiving device 20b. The recessed portion accommodates the auxiliary wall member 5. It becomes a housing part.

次に、図1〜図3を用いて、ユニットバス施工までの一連の工程について説明する。建物の躯体を施工する工程では、柱と梁が組まれ、床パネルが敷設されると共に、外壁パネルが設置される。本実施形態に係る浴室部は、落とし込み部2に床材11が敷設され、洗面所空間Bとなる床材11の上方に床フレーム10が設置される。以下、詳細に説明する。   Next, a series of steps up to the construction of the unit bath will be described with reference to FIGS. In the process of constructing the building frame, pillars and beams are assembled, floor panels are laid, and outer wall panels are installed. In the bathroom part according to the present embodiment, a flooring 11 is laid on the dropping part 2, and a floor frame 10 is installed above the flooring 11 serving as a washroom space B. Details will be described below.

浴室部を施工する際には、鉄骨梁3a,3bにパネル受け金物6を取り付け、落とし込み部2に床材11を設置する。次に、落とし込み部2の周囲に沿って補助壁部材5を設置し、床フレーム10を取り付けるための受け具20a,20bを鉄骨梁3a,3bに取り付ける。その後、受け具20a,20bに床フレーム10を載置し、必要に応じてボルト締結などで仮止めする。その後、クリップ材53を差し込み、補助壁部材5を固定する。   When constructing the bathroom part, the panel support 6 is attached to the steel beams 3 a and 3 b, and the flooring 11 is installed in the dropping part 2. Next, the auxiliary wall member 5 is installed along the periphery of the dropping part 2, and the receiving tools 20a and 20b for attaching the floor frame 10 are attached to the steel beams 3a and 3b. Thereafter, the floor frame 10 is placed on the receivers 20a and 20b, and temporarily fixed by bolt fastening or the like as necessary. Thereafter, the clip material 53 is inserted, and the auxiliary wall member 5 is fixed.

床フレーム10を設置した後、受け具20a,20bの壁受け部22a,23a及び床材41上の隙間をモルタル13で埋め、壁体4を立設する界壁施工を行う。界壁施工に際しては、最初に、断面コ字状のランナが上下に対向するように設置され、該ランナ間にスタッドが設置される。そして、スタッドを固定しつつ下地材が組み上げられ、当該下地材に石膏ボードが敷設され界壁となる壁体4を形成する。   After the floor frame 10 has been installed, the gaps on the wall receiving portions 22a and 23a and the floor material 41 of the receiving devices 20a and 20b are filled with the mortar 13, and the boundary wall construction for standing the wall body 4 is performed. When constructing the boundary wall, first, runners having a U-shaped cross section are installed so as to face each other vertically, and studs are installed between the runners. Then, the base material is assembled while fixing the studs, and a gypsum board is laid on the base material to form a wall body 4 serving as a boundary wall.

壁体施工の完了後、ユニットバス施工を行う。ユニットバス空間Aに隣接する洗面所空間Bに床フレーム10が設置されたままだとユニットバスや配管等の設置の際に邪魔になるので、まずは、床フレーム10を取り外す。この際、床フレーム10はフレーム受け部21a,24aに設置されているだけなので簡単に取り外しできる。   After completing the wall construction, the unit bath will be constructed. If the floor frame 10 is left installed in the washroom space B adjacent to the unit bath space A, the floor frame 10 is first removed because it interferes with the installation of the unit bath and piping. At this time, the floor frame 10 is simply installed on the frame receiving portions 21a and 24a, so that it can be easily removed.

その後、ユニットバス空間Aにユニットバスを設置し、合わせて配管施工を行う。最後に、床フレーム10を再度架設し、床フレーム10をボルト締結によってフレーム受け部21a,24aに固定する。   Thereafter, a unit bus is installed in the unit bath space A, and piping work is performed together. Finally, the floor frame 10 is installed again, and the floor frame 10 is fixed to the frame receiving portions 21a and 24a by bolt fastening.

上述した床フレーム10の設置構造1では、壁体4下の鉄骨梁3aから見て、壁体4の表面4xよりも鉄骨梁3aから離間した位置に床フレーム10の端部10cが設けられることとなる。また、壁体4下の鉄骨梁3bから見て、壁体4の表面4xよりも鉄骨梁3bから離間した位置に床フレーム10の端部10dが設けられることとなる。その結果、鉄骨梁3a,3b上に界壁となる壁体4を設置した後に、隣接するユニットバス空間Aにユニットバスや配管を設置する必要などが生じた場合にも、施工の邪魔になる床フレーム10の着脱が制限されることはない。すなわち、壁体4の設置後にも床フレーム10を取り外すことができ、効率的な施工が実現可能となる。   In the installation structure 1 of the floor frame 10 described above, the end portion 10c of the floor frame 10 is provided at a position farther from the steel beam 3a than the surface 4x of the wall body 4 when viewed from the steel beam 3a below the wall body 4. It becomes. Further, when viewed from the steel beam 3b below the wall body 4, the end portion 10d of the floor frame 10 is provided at a position farther from the steel beam 3b than the surface 4x of the wall body 4. As a result, even if it becomes necessary to install a unit bath or piping in the adjacent unit bath space A after installing the wall body 4 as the boundary wall on the steel beams 3a and 3b, it also obstructs the construction. The attachment / detachment of the floor frame 10 is not limited. That is, the floor frame 10 can be removed even after the wall body 4 is installed, and efficient construction can be realized.

また、鉄骨梁3aには、床フレーム10の端部10cを、壁体4の表面4xよりも、鉄骨梁3aから離間した内側の位置で着脱自在に支持する受け具20aが設けられており、同様に、鉄骨梁3bには、受け具20bが設けられている。したがって、床フレーム10を、その端部10c,10dを壁体4の表面4xよりも鉄骨梁3a,3b間の内側に位置づけた状態で、受け具20aを介して鉄骨梁3aに確実に架設できる。   In addition, the steel beam 3a is provided with a support 20a that detachably supports the end portion 10c of the floor frame 10 at an inner position farther from the steel beam 3a than the surface 4x of the wall body 4, Similarly, the steel beam 3b is provided with a receiving tool 20b. Therefore, the floor frame 10 can be reliably installed on the steel beam 3a via the support 20a in a state where the end portions 10c and 10d are positioned inside the steel beam 3a and 3b with respect to the surface 4x of the wall 4. .

また、受け具20aは、壁体4の下端部を支持する壁受け部22aと、壁受け部22aから突設され、且つ床フレーム10の端部10cを支持するフレーム受け部21aとを有し、同様に、受け具20bは、壁受け部23aと、フレーム受け部23aとを有している。その結果、受け具20a,20bにより、床フレーム10だけでなく壁体4も支持できる。   The receiving device 20a includes a wall receiving portion 22a that supports the lower end portion of the wall body 4, and a frame receiving portion 21a that protrudes from the wall receiving portion 22a and supports the end portion 10c of the floor frame 10. Similarly, the receiving tool 20b includes a wall receiving portion 23a and a frame receiving portion 23a. As a result, not only the floor frame 10 but also the wall body 4 can be supported by the receivers 20a and 20b.

更に、壁受け部22aが、壁体4下の鉄骨梁3aの側縁部34aよりも鉄骨梁3aの対向側に突き出た部分を含んでいることで、鉄骨梁3の梁芯と壁体4の壁芯とを一致させ、鉄骨梁3aの幅よりも大きい壁厚を有する壁体4を支持することが可能となる。   Furthermore, the wall receiving portion 22a includes a portion protruding to the opposite side of the steel beam 3a with respect to the side edge 34a of the steel beam 3a below the wall body 4, so that the beam core of the steel beam 3 and the wall body 4 are included. It is possible to support the wall body 4 having a wall thickness larger than the width of the steel beam 3a.

また、壁体4の下方であって鉄骨梁3a,3bの内側には、その内表面5xが壁体4の表面4xに略面一つまり揃った状態となる補助壁部材5が設けられ、受け具20aには鉄骨梁3aの上フランジ31よりも上方で補助壁部材5の上端部51を収容する補助壁収容部22zが凹設されており、受け具20bには鉄骨梁3bの上フランジ31よりも上方で補助壁部材5の上端部51を収容する補助壁収容部22zが凹設されている。その結果、補助壁部材5の上端部51と鉄骨梁3a,3bの上フランジ31との間で段差が生じることとなる。つまり、鉄骨梁3a,3bの側方から見た場合に、鉄骨梁3a,3bの上フランジ31と受け具20a,20bの下段水平片22q,23qとの継ぎ目(界面)が補助壁部材5により覆われることとなる。補助壁部材5により鉄骨梁3a,3b側への断熱性、防音性が高められ、鉄骨梁3a,3b及び壁体4を介して隣り合う室同士が互いの影響を受け難いものとできる。   An auxiliary wall member 5 is provided below the wall body 4 and inside the steel beams 3a and 3b so that the inner surface 5x thereof is substantially flush with the surface 4x of the wall body 4, that is, aligned. Auxiliary wall accommodating portion 22z for accommodating the upper end portion 51 of the auxiliary wall member 5 is recessed in the tool 20a above the upper flange 31 of the steel beam 3a, and the upper flange 31 of the steel beam 3b is provided in the receiver 20b. An auxiliary wall accommodating portion 22z that accommodates the upper end portion 51 of the auxiliary wall member 5 is recessed above the upper portion. As a result, a step is generated between the upper end portion 51 of the auxiliary wall member 5 and the upper flange 31 of the steel beams 3a and 3b. That is, when viewed from the side of the steel beams 3a and 3b, the joint (interface) between the upper flange 31 of the steel beams 3a and 3b and the lower horizontal pieces 22q and 23q of the receivers 20a and 20b is formed by the auxiliary wall member 5. It will be covered. The auxiliary wall member 5 enhances the heat insulation and soundproofing properties toward the steel beams 3a and 3b, so that the adjacent chambers are less likely to be affected by each other via the steel beams 3a and 3b and the wall body 4.

[第2実施形態]
次に、図4を参照して、第2実施形態に係る床フレーム10の設置構造1Aについて説明する。なお、第2実施形態では、第1実施形態に係る床フレーム10の設置構造1と実質的に同一の部材や要素を備えているので、以下の説明では、第1実施形態との相違点を中心に説明し、同一の部材や要素には同一の符号を付して重複する説明は省略する。
[Second Embodiment]
Next, with reference to FIG. 4, the installation structure 1A of the floor frame 10 which concerns on 2nd Embodiment is demonstrated. In addition, in 2nd Embodiment, since the substantially same member and element as the installation structure 1 of the floor frame 10 which concern on 1st Embodiment are provided, in the following description, a difference with 1st Embodiment is provided. It demonstrates centering, the same code | symbol is attached | subjected to the same member and element, and the overlapping description is abbreviate | omitted.

図4に示されるように、床フレーム10の設置構造1Aは、建物の1階に設けられるユニットバス(図示せず)の施工において、ユニットバス空間に隣接する洗面所空間に設けられる床フレーム10の設置構造1Aである。   As shown in FIG. 4, the floor frame 10 installation structure 1 </ b> A is a floor frame 10 provided in a washroom space adjacent to a unit bath space in the construction of a unit bath (not shown) provided on the first floor of a building. This is an installation structure 1A.

第1実施形態とは異なり、第2実施形態では、躯体梁として鉄骨梁ではなく、鉄筋コンクリート構造の基礎梁3xを利用する。   Unlike the first embodiment, the second embodiment uses a foundation beam 3x having a reinforced concrete structure instead of a steel beam as a frame beam.

基礎梁3x上には、床材41と受け具85が固定されている。受け具85は、基礎梁3xの上端に設置されたプレート状のフレーム受け部85aと、フレーム受け部85aの途中に立設された壁受け部85bとを備えている。フレーム受け部85aは、壁受け部85bよりも先端側で僅かに下方にオフセットしており、更にオフセットした先が壁体4の表面4xよりも基礎梁3xから対向する他の基礎梁(図示せず)側、つまり内側に突き出している。この先端側に、床フレーム10の端部10xが載置され、着脱自在にボルト締結される。壁受け部85b、床材41、及び基礎梁3xの上端で形成される隙間には、モルタル14が充填され一体的に固定されている。   On the foundation beam 3x, a flooring 41 and a receiving tool 85 are fixed. The support 85 includes a plate-shaped frame receiving portion 85a installed at the upper end of the foundation beam 3x, and a wall receiving portion 85b erected in the middle of the frame receiving portion 85a. The frame receiving portion 85 a is slightly offset downward on the tip side from the wall receiving portion 85 b, and further the other end of the foundation beam (not shown) whose offset tip is opposed to the foundation beam 3 x rather than the surface 4 x of the wall body 4. Z) and protrudes inward. An end portion 10x of the floor frame 10 is placed on the front end side and is detachably bolted. The gap formed by the upper ends of the wall receiving portion 85b, the floor material 41, and the foundation beam 3x is filled with mortar 14 and fixed integrally.

本実施形態における床フレーム10の設置構造1Aでは、壁体4の表面4xよりも床材41から内側に離間した位置で、床フレーム10がフレーム受け部121に支持されている。その結果、壁体4を設置した後であっても、壁体4によって床フレーム10の着脱が制限されることがない。すなわち、本実施形態のように1階に設けられるユニットバスの施工においても、効率的な施工が実現できる。   In the installation structure 1A of the floor frame 10 in the present embodiment, the floor frame 10 is supported by the frame receiving portion 121 at a position spaced inward from the floor material 41 with respect to the surface 4x of the wall body 4. As a result, even after the wall body 4 is installed, the wall body 4 does not restrict the attachment / detachment of the floor frame 10. That is, efficient construction can be realized also in the construction of the unit bus provided on the first floor as in the present embodiment.

以上、本発明について各実施形態に基づいて説明したが、本発明は、以上の各実施形態のみに限定されない。例えば、第1実施形態では、対向して設けられた梁3a,3bの双方の上方に壁体4が設けられているとして説明したが、本発明に係る床フレームの設置構造では、対向して設けられた躯体梁の一方の躯体梁上方にのみ壁体が設けられるものであってもよい。また、一方の躯体梁上にのみ壁体、他方の躯体梁上には壁体を有しない間取り構造の場合、一方の躯体梁側にのみ本願発明の構成を採用し、他方の躯体梁には公知の方法で床フレームを着脱自在に支持する構成を採用することができる。   As mentioned above, although this invention was demonstrated based on each embodiment, this invention is not limited only to the above each embodiment. For example, in the first embodiment, it has been described that the wall body 4 is provided above both the beams 3a and 3b provided to face each other. However, in the floor frame installation structure according to the present invention, the walls 3a and 3b face each other. The wall body may be provided only above one of the frame beams provided. In addition, in the case of a floor plan structure that does not have a wall on one frame beam and a wall on the other frame beam, the configuration of the present invention is adopted only on one frame beam side, and the other frame beam has A configuration in which the floor frame is detachably supported by a known method can be employed.

1,1A…床フレームの設置構造、3a,3b…鉄骨梁(躯体梁)、3x…基礎梁(躯体梁)、4…壁体、4x…表面、5…補助壁部材、5x…補助壁部材の内側の表面(内表面)、10…床フレーム、10c,10d,10x…床フレームの端部、20a,20b,85…受け具、21a,24a,85a…フレーム受け部、22a,23a,85b…壁受け部、22z…補助壁収容部、31…上フランジ(躯体梁の上端部)、34a…鉄骨梁の側縁部(躯体梁の側縁部)。   DESCRIPTION OF SYMBOLS 1,1A ... Installation structure of floor frame, 3a, 3b ... Steel beam (frame beam), 3x ... Foundation beam (frame beam), 4 ... Wall body, 4x ... Surface, 5 ... Auxiliary wall member, 5x ... Auxiliary wall member Inside surface (inner surface), 10 ... floor frame, 10c, 10d, 10x ... end of floor frame, 20a, 20b, 85 ... receiving device, 21a, 24a, 85a ... frame receiving portion, 22a, 23a, 85b ... Wall receiving part, 22z ... Auxiliary wall accommodating part, 31 ... Upper flange (upper end part of the frame beam), 34a ... Side edge part of the steel beam (side edge part of the frame beam).

Claims (4)

対向して設けられた一対の躯体梁と、
前記一対の躯体梁間に架設された床フレームと、
前記一対の躯体梁のうち少なくとも一方の前記躯体梁上に設けられた壁体と、を備え、
前記床フレームは、前記壁体に近接する端部が、前記壁体の表面よりも前記一方の躯体梁から離間した位置で着脱自在に支持されていることを特徴とする床フレームの設置構造。
A pair of frame beams provided opposite to each other;
A floor frame constructed between the pair of frame beams;
A wall body provided on at least one of the pair of frame beams;
An installation structure of a floor frame, wherein an end of the floor frame that is close to the wall body is detachably supported at a position farther from the one frame beam than the surface of the wall body.
前記一方の躯体梁には、前記床フレームの前記端部を支持する受け具が設けられており、前記受け具は、前記壁体の表面よりも前記一方の躯体梁から離間した内側の位置で前記床フレームの前記端部を着脱自在に支持していることを特徴とする請求項1記載の床フレームの設置構造。   The one frame beam is provided with a support for supporting the end portion of the floor frame, and the support is located at an inner position away from the one frame beam than the surface of the wall body. The floor frame installation structure according to claim 1, wherein the end of the floor frame is detachably supported. 前記受け具は、前記壁体の下端部を支持する壁受け部と、該壁受け部から突設され、且つ前記床フレームの前記端部を支持するフレーム受け部と、を有し、
前記壁受け部は、前記一方の躯体梁の側縁部よりも前記内側に突き出た部分を有することを特徴とする請求項2記載の床フレームの設置構造。
The receiver includes a wall receiving portion that supports a lower end portion of the wall body, and a frame receiving portion that protrudes from the wall receiving portion and supports the end portion of the floor frame,
The floor frame installation structure according to claim 2, wherein the wall receiving portion has a portion protruding inward from a side edge portion of the one frame beam.
前記壁体の下方であって前記躯体梁の前記内側には、その内表面が前記壁体の表面に揃う補助壁部材が設けられ、
前記受け具には、前記一方の躯体梁の上端部よりも上方で前記補助壁部材の上端部を収容する補助壁収容部が凹設されていることを特徴とする請求項2または3記載の床フレームの設置構造。
An auxiliary wall member whose inner surface is aligned with the surface of the wall body is provided below the wall body and on the inside of the frame beam,
The auxiliary wall housing portion for housing the upper end portion of the auxiliary wall member above the upper end portion of the one frame beam is recessed in the receiver. Floor frame installation structure.
JP2013087337A 2013-04-18 2013-04-18 Floor frame installation structure Active JP6159562B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013087337A JP6159562B2 (en) 2013-04-18 2013-04-18 Floor frame installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013087337A JP6159562B2 (en) 2013-04-18 2013-04-18 Floor frame installation structure

Publications (2)

Publication Number Publication Date
JP2014211032A true JP2014211032A (en) 2014-11-13
JP6159562B2 JP6159562B2 (en) 2017-07-05

Family

ID=51930972

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013087337A Active JP6159562B2 (en) 2013-04-18 2013-04-18 Floor frame installation structure

Country Status (1)

Country Link
JP (1) JP6159562B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019173319A (en) * 2018-03-27 2019-10-10 旭化成ホームズ株式会社 Elevator pit, construction method and building for elevator pit

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5698920U (en) * 1979-12-27 1981-08-05
JPS57172802U (en) * 1981-04-28 1982-10-30
JP2009275465A (en) * 2008-05-16 2009-11-26 Kumagai Gumi Co Ltd Floor backing constitutive body
US20110282633A1 (en) * 2010-05-11 2011-11-17 Thuan Bui Component building system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5698920U (en) * 1979-12-27 1981-08-05
JPS57172802U (en) * 1981-04-28 1982-10-30
JP2009275465A (en) * 2008-05-16 2009-11-26 Kumagai Gumi Co Ltd Floor backing constitutive body
US20110282633A1 (en) * 2010-05-11 2011-11-17 Thuan Bui Component building system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019173319A (en) * 2018-03-27 2019-10-10 旭化成ホームズ株式会社 Elevator pit, construction method and building for elevator pit

Also Published As

Publication number Publication date
JP6159562B2 (en) 2017-07-05

Similar Documents

Publication Publication Date Title
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
KR20120062407A (en) Reinforced insulation panel, constructing system of light-weight wall and slab by using the panel and constructing method thereof
KR101029839B1 (en) Waterproofing structure of prefabricated bathroom use in combination with wet and dry by tpr waterproofing plate
JP5715439B2 (en) Thermal insulation structure of building
JP6159562B2 (en) Floor frame installation structure
KR101490756B1 (en) Prefabricated wall frame unit and prefabricated wall frame using the same
KR20120107365A (en) Method for installing alc panel to concrete slab
JP2011202396A (en) Heat insulating structure of reinforced concrete wall type structure construction using steel frame concurrently
KR20230171515A (en) Seismic isolation device for drywall
KR102264712B1 (en) module type bathroom and building method using the same
KR102264711B1 (en) module type bathroom and building method using the same
JPH08312169A (en) Method of compounding unit construction of multiple dwelling house
JP2020197084A (en) Outer wall installation structure of building
KR200421529Y1 (en) Prefabricated of Unit Cabin the Whole Construction
JP5791416B2 (en) Building floor structure
JP4702717B2 (en) Partition wall panel
JP7331631B2 (en) Basic insulation structure
JP2007309051A (en) Frame arranging structure for installing sanitary facility
JP2007191926A (en) Partition panel installation method and partition panel
KR102683785B1 (en) Seismic isolation device for dry wall reinforcement
JP6653495B2 (en) Double floor structure and double floor installation method
JP6376641B2 (en) Seismic reinforcement structure
JP2010265716A (en) Bathroom component body and installation method for bathroom unit
KR102350985B1 (en) System for double insulation form and construction method thereof
KR200347936Y1 (en) Prefabricated bath

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160107

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161013

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161101

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161228

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170606

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170612

R150 Certificate of patent or registration of utility model

Ref document number: 6159562

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350