JP2014167713A - Information processing device, information processing system, information processing device management program and information processing device management method - Google Patents

Information processing device, information processing system, information processing device management program and information processing device management method Download PDF

Info

Publication number
JP2014167713A
JP2014167713A JP2013039324A JP2013039324A JP2014167713A JP 2014167713 A JP2014167713 A JP 2014167713A JP 2013039324 A JP2013039324 A JP 2013039324A JP 2013039324 A JP2013039324 A JP 2013039324A JP 2014167713 A JP2014167713 A JP 2014167713A
Authority
JP
Japan
Prior art keywords
virtual machine
virtual
information processing
load
physical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2013039324A
Other languages
Japanese (ja)
Inventor
Shunji Matsuo
峻治 松尾
Minoru Takimoto
稔 瀧本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2013039324A priority Critical patent/JP2014167713A/en
Publication of JP2014167713A publication Critical patent/JP2014167713A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Debugging And Monitoring (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an information processing device, information processing system, information processing device management program and information processing device management method which equalize a load of virtual machines while suppressing increase of a system load.SOLUTION: A virtual machine group management unit 102 generates a plurality of virtual machine groups by combining virtual machines 4 with prescribed correlation among a plurality of virtual machines 4. A migration control unit 105 determines combinations of the virtual machine groups so that a combined load per unit time of the whole of the virtual machine groups is equalized on the basis of the load of each virtual machine group. A migration execution unit 106 allocates the virtual machines 4 to each physical machine 3 for each combination of the virtual machine groups determined by the migration control unit 105.

Description

本発明は、情報処理装置、情報処理システム、情報処理装置管理プログラム及び情報処理装置管理方法に関する。   The present invention relates to an information processing apparatus, an information processing system, an information processing apparatus management program, and an information processing apparatus management method.

近年、クラウドコンピューティングの発展により、大量のサーバがデータセンターに配置され、サーバを複数台利用してサービスを提供する形態がとられている。このような形態において、ハードウェアリソースの柔軟な活用やサーバ集約などの観点から、1台の物理マシン上に複数台の仮想サーバを動作させる仮想化技術が採用されることがある。   In recent years, with the development of cloud computing, a large number of servers are arranged in a data center, and a service is provided by using a plurality of servers. In such a form, a virtualization technology for operating a plurality of virtual servers on one physical machine may be employed from the viewpoint of flexible utilization of hardware resources and server aggregation.

仮想化技術を採用したシステムでは、1つのデータセンター内に数千、数万台規模の仮想サーバが配備され、仮想サーバ同士が通信を行うことにより膨大な量の処理を実現している。仮想マシンは、必要に応じ短時間で生成や削除を行うことが可能であり、また、別の物理マシン上に移動することも可能である。   In a system employing virtualization technology, thousands or tens of thousands of virtual servers are arranged in one data center, and a huge amount of processing is realized by communication between virtual servers. A virtual machine can be created and deleted in a short time if necessary, and can be moved to another physical machine.

このように、仮想化環境において、1台の物理マシンのリソースは複数の仮想マシンによって共有されている。このような状況で、仮想マシンのリソースの使用率が物理マシンのリソースの限度を超過することが考えられる。その場合に、Central Processing Unit(CPU)やメモリ、トラフィックを基に各物理マシンに割当て可能な処理量の計算を行い、仮想マシンを物理マシンに再配置することで、物理的なリソースの最適化を行う従来技術がある。   Thus, in a virtual environment, the resources of one physical machine are shared by a plurality of virtual machines. In such a situation, it is conceivable that the resource usage rate of the virtual machine exceeds the resource limit of the physical machine. In that case, calculate the amount of processing that can be allocated to each physical machine based on the Central Processing Unit (CPU), memory, and traffic, and reallocate the virtual machine to the physical machine to optimize physical resources. There is a conventional technique for performing.

また、仮想マシンの再配置の技術として、仮想マシンの負荷情報から所定の相関関係を有する仮想マシンを抽出し、抽出した所定の相関関係を有する仮想マシン同士を同じ物理マシンに配置する従来技術がある。その他にも、仮想マシン毎の最大負荷を求めて、最大負荷の総計が物理マシンの性能の上限に収まるように再配置する従来技術がある。   Further, as a technique for rearranging virtual machines, there is a conventional technique for extracting virtual machines having a predetermined correlation from the load information of the virtual machines and arranging the extracted virtual machines having the predetermined correlation on the same physical machine. is there. In addition, there is a conventional technique in which the maximum load for each virtual machine is obtained and rearranged so that the total maximum load falls within the upper limit of the physical machine performance.

特開2009−116852号公報JP 2009-116852 A 特開平04−167046号公報Japanese Patent Laid-Open No. 04-167046 国際公開第2004/027676号International Publication No. 2004/027676

最近の仮想化環境では、1台の仮想マシンに1機能が割当てられていることが多い。これに対して、サービスの提供と言う観点では、複数の機能が連携することで1つのサービスが提供されることが一般的である。そのため、多くのシステムでは、複数の仮想マシンサーバが連携して1つのサービスを提供することが行われている。   In recent virtual environments, one function is often assigned to one virtual machine. On the other hand, from the viewpoint of service provision, it is common that a plurality of functions cooperate to provide one service. Therefore, in many systems, a plurality of virtual machine servers cooperate to provide one service.

このような状況で、単に物理マシンの処理量のみを考慮して仮想マシンを分散させた場合、同じサービスを提供する複数の仮想マシンが異なる物理マシンに配置されるおそれがある。この場合、同じ物理マシン内の仮想サーバが1つのサービスを提供する場合に比べて、物理マシン間の通信量が増えてしまうなど、ネットワークや物理マシンなどの負荷が増加し、システム全体の負荷が高くなってしまう。   In such a situation, when the virtual machines are distributed considering only the processing amount of the physical machines, a plurality of virtual machines providing the same service may be arranged in different physical machines. In this case, compared to the case where a virtual server in the same physical machine provides one service, the load on the network or physical machine increases, such as the amount of communication between physical machines increases. It will be high.

また、所定の相関関係を考慮して再配置する従来技術を用いても、負荷の平滑化を目的とした相関関係を有する仮想マシン同士が同じ物理マシンに配置されてしまい、通信量を減らすなどシステムの負荷を軽減することは困難である。また、仮想マシン毎の最大負荷を基に再配置を行う従来技術を用いても、仮想マシン間の通信量は考慮されておらず、システムの負荷を軽減することは困難である。   In addition, even if the conventional technique of rearranging in consideration of a predetermined correlation is used, virtual machines having a correlation for the purpose of load smoothing are placed in the same physical machine, reducing the amount of communication, etc. It is difficult to reduce the load on the system. Further, even if the conventional technology that performs rearrangement based on the maximum load for each virtual machine is used, the amount of communication between virtual machines is not considered, and it is difficult to reduce the load on the system.

開示の技術は、上記に鑑みてなされたものであって、システムの負荷の上昇を抑えた仮想マシンの負荷の平準化を行う情報処理装置、情報処理システム、情報処理装置管理プログラム及び情報処理装置管理方法を提供することを目的とする。   The disclosed technology has been made in view of the above, and an information processing device, an information processing system, an information processing device management program, and an information processing device that perform load leveling of a virtual machine while suppressing an increase in system load The purpose is to provide a management method.

本願の開示する情報処理装置、情報処理システム、情報処理装置管理プログラム及び情報処理装置管理方法は、一つの態様において、群作成部は、複数の仮想マシンのうち所定の関連性を有する前記仮想マシンをまとめて複数の仮想マシン群を作成する。平準化部は、各前記仮想マシン群の負荷を基に、組合せた仮想マシン群全体の時間毎の負荷が均一になるように前記仮想マシン群の組合せを決定する。割当部は、前記平準化部により決定された前記仮想マシン群の組合せ毎に前記仮想マシンを各物理マシンに割当てる。   In one aspect, an information processing apparatus, an information processing system, an information processing apparatus management program, and an information processing apparatus management method disclosed in the present application are such that a group creation unit has a predetermined relevance among a plurality of virtual machines. To create multiple virtual machine groups. The leveling unit determines the combination of the virtual machine groups based on the loads of the virtual machine groups so that the load of the combined virtual machine groups as a whole is uniform. The assigning unit assigns the virtual machine to each physical machine for each combination of the virtual machine groups determined by the leveling unit.

本願の開示する情報処理装置、情報処理システム、情報処理装置管理プログラム及び情報処理装置管理方法の一つの態様によれば、システムの負荷の上昇を抑えた仮想マシンの負荷の平準化を行うことができるという効果を奏する。   According to one aspect of the information processing apparatus, the information processing system, the information processing apparatus management program, and the information processing apparatus management method disclosed in the present application, it is possible to level the load on the virtual machine while suppressing an increase in the system load. There is an effect that can be done.

図1は、実施例に係る情報処理システムの概略構成図である。FIG. 1 is a schematic configuration diagram of an information processing system according to an embodiment. 図2は、実施例に係る情報処理システムのソフトウェア構成を表す概略図である。FIG. 2 is a schematic diagram illustrating a software configuration of the information processing system according to the embodiment. 図3は、実施例に係る情報処理システムのブロック図である。FIG. 3 is a block diagram of the information processing system according to the embodiment. 図4は、物理リソース表の一例を示す図である。FIG. 4 is a diagram illustrating an example of a physical resource table. 図5は、仮想リソース表の一例を示す図である。FIG. 5 is a diagram illustrating an example of a virtual resource table. 図6は、物理マシンに配置された仮想マシンの一例を示す図である。FIG. 6 is a diagram illustrating an example of a virtual machine arranged in a physical machine. 図7は、仮想マシン通信表の一例の図である。FIG. 7 is a diagram illustrating an example of the virtual machine communication table. 図8は、仮想マシン群表の一例の図である。FIG. 8 is an example of a virtual machine group table. 図9は、A群の負荷総計の算出を説明するための図である。FIG. 9 is a diagram for explaining the calculation of the total load of group A. 図10は、各仮想マシン群の負荷総計を表す図である。FIG. 10 is a diagram illustrating the total load of each virtual machine group. 図11は、仮想マシン群間の相関係数の一例を示す図である。FIG. 11 is a diagram illustrating an example of a correlation coefficient between virtual machine groups. 図12は、実施例に係る情報処理システムにおける仮想マシンの再配置の処理のフローチャートである。FIG. 12 is a flowchart of virtual machine relocation processing in the information processing system according to the embodiment. 図13は、実施例に係る管理サーバによる負荷の平準化の効果を説明するための図である。FIG. 13 is a diagram for explaining the effect of load leveling by the management server according to the embodiment. 図14は、管理サーバのハードウェア構成図である。FIG. 14 is a hardware configuration diagram of the management server.

以下に、本願の開示する情報処理装置、情報処理システム、情報処理装置管理プログラム及び情報処理装置管理方法の実施例を図面に基づいて詳細に説明する。なお、以下の実施例により本願の開示する情報処理装置、情報処理システム、情報処理装置管理プログラム及び情報処理装置管理方法が限定されるものではない。   Embodiments of an information processing apparatus, an information processing system, an information processing apparatus management program, and an information processing apparatus management method disclosed in the present application will be described below in detail with reference to the drawings. The information processing apparatus, the information processing system, the information processing apparatus management program, and the information processing apparatus management method disclosed in the present application are not limited by the following embodiments.

図1は、実施例に係る情報処理システムの概略構成図である。また、図2は、実施例に係る情報処理システムのソフトウェア構成を表す概略図である。   FIG. 1 is a schematic configuration diagram of an information processing system according to an embodiment. FIG. 2 is a schematic diagram illustrating a software configuration of the information processing system according to the embodiment.

図1に示すように、本実施例に係る情報処理システムは、複数の物理マシン3を有している。物理マシン3とは、機械としての実態を有する情報処理装置であり、物理的なサーバなどである。   As illustrated in FIG. 1, the information processing system according to the present embodiment includes a plurality of physical machines 3. The physical machine 3 is an information processing apparatus having a reality as a machine, such as a physical server.

各物理マシン3は、仮想マシン4を有している。仮想マシン4は、仮想的な情報処理装置であり、仮想サーバなどである。図1では、仮想マシン4が、各物理マシン3に2つずつ搭載されているが、1台の物理マシン3に搭載される仮想マシン4の数に特に制限は無い。   Each physical machine 3 has a virtual machine 4. The virtual machine 4 is a virtual information processing apparatus, such as a virtual server. In FIG. 1, two virtual machines 4 are mounted on each physical machine 3, but the number of virtual machines 4 mounted on one physical machine 3 is not particularly limited.

さらに、各物理マシン3は、スイッチ2に接続されている。スイッチ2は、情報システム内に複数台配置されネットワークを構成している。そして、各物理マシン3は、スイッチ2が構成するネットワークを介して物理マシン3同士で通信を行うことができる。   Further, each physical machine 3 is connected to the switch 2. A plurality of switches 2 are arranged in the information system to form a network. The physical machines 3 can communicate with each other via the network formed by the switch 2.

また、管理サーバ1は、ネットワークを構成するスイッチ2のいずれかに接続されている。管理サーバ1は、スイッチ2が構成するネットワークを介して全ての物理マシン3と通信を行うことができる。図1における破線は、管理サーバ1が、ネットワークを介してスイッチ2を監視し、物理マシン3同士の間での通信状態を監視していることを表している。また、一点鎖線は、管理サーバ1が、ネットワークを介して各物理マシンのシステムの状態を監視していることを表している。また、二点差線は、管理サーバ1が、ネットワークを介して仮想マシン4のリソースを監視していることを表している。   The management server 1 is connected to any one of the switches 2 constituting the network. The management server 1 can communicate with all the physical machines 3 via the network configured by the switch 2. The broken line in FIG. 1 indicates that the management server 1 monitors the switch 2 via the network and monitors the communication state between the physical machines 3. A one-dot chain line indicates that the management server 1 monitors the system status of each physical machine via the network. A two-dot chain line indicates that the management server 1 is monitoring the resources of the virtual machine 4 via the network.

さらに、図2を参照して、管理サーバ1及び物理マシン3の具体的なソフトウェア構成について説明する。   Further, specific software configurations of the management server 1 and the physical machine 3 will be described with reference to FIG.

物理マシン3は、ハイパーバイザー31を有する。ハイパーバイザー31は、仮想マシンを実現するための制御プログラムである。ハイパーバイザー31は、ホストOperation System(OS)上でミドルウェアとして動作しても良いし、ハードウェア上で直接動作しても良い。   The physical machine 3 has a hypervisor 31. The hypervisor 31 is a control program for realizing a virtual machine. The hypervisor 31 may operate as middleware on the host operation system (OS), or may directly operate on hardware.

ハイパーバイザー31は、負荷計測部301及び情報格納部302を有する。負荷計測部301及び情報格納部302については後で詳細に説明する。   The hypervisor 31 includes a load measurement unit 301 and an information storage unit 302. The load measurement unit 301 and the information storage unit 302 will be described in detail later.

さらに、仮想マシン4は、ハイパーバイザー31上で動作する。仮想マシン4は、仮想OS41及びアプリ42を有している。   Furthermore, the virtual machine 4 operates on the hypervisor 31. The virtual machine 4 has a virtual OS 41 and an application 42.

仮想OS41は、仮想マシン4上で動作する仮想のOSであり、仮想マシン4の動作を統括制御する。   The virtual OS 41 is a virtual OS that operates on the virtual machine 4, and performs overall control of the operation of the virtual machine 4.

アプリ42は、仮想OS上で動作する。アプリ42は、例えばウェブサーバ機能やデータベースサーバ機能といった情報システムが利用者にサービスとして提供する各種機能を実現するための処理を行う。   The application 42 operates on the virtual OS. The application 42 performs processing for realizing various functions provided as a service by the information system, such as a web server function and a database server function.

また、物理マシン3は、ネットワークインタフェース32及び33を有している。ネットワークインタフェース32は、管理用のネットワークに接続されている。ネットワークインタフェース33は、他の物理マシン3とのデータの送受信を行うネットワークに接続されている。ここで、図1では、データの送受信用と管理用とでネットワークを分けずに示しているが、実際には、セキュリティやネットワーク負荷などの観点から、図2のようにデータの送受信用と管理用とでネットワークを分けることが好ましい。また、図2の管理用のネットワークでは、スイッチを省いて記載しているが、管理用のネットワークにもスイッチやルータなどの通信機器が用いられてもよい。   The physical machine 3 has network interfaces 32 and 33. The network interface 32 is connected to a management network. The network interface 33 is connected to a network that transmits and receives data to and from other physical machines 3. Here, in FIG. 1, the data transmission / reception and management are shown without dividing the network, but actually, from the viewpoint of security and network load, the data transmission / reception and management are performed as shown in FIG. 2. It is preferable to divide the network for use. In the management network of FIG. 2, the switches are omitted, but communication devices such as switches and routers may be used for the management network.

スイッチ2は、物理マシン3のネットワークインタフェース33と接続されている。また、スイッチ2は、管理サーバ1のネットワークインタフェース13と接続されている。   The switch 2 is connected to the network interface 33 of the physical machine 3. The switch 2 is connected to the network interface 13 of the management server 1.

管理サーバ1は、ネットワークインタフェース12及びネットワークインタフェース13を有している。   The management server 1 has a network interface 12 and a network interface 13.

ネットワークインタフェース12は、管理用のネットワークに接続されている。管理サーバ1は、ネットワークインタフェース12を用いて各物理マシン3及び仮想マシン4の監視や制御を行う。   The network interface 12 is connected to a management network. The management server 1 monitors and controls each physical machine 3 and virtual machine 4 using the network interface 12.

ネットワークインタフェース13は、データの送受信用のネットワークにスイッチ2を介して接続されている。管理サーバ1は、ネットワークインタフェース13を用いて、物理マシン3同士の通信状態などを取得する。   The network interface 13 is connected to a data transmission / reception network via the switch 2. The management server 1 acquires the communication state between the physical machines 3 using the network interface 13.

さらに、管理サーバ1では、OS11が動作している。そして、OS11上で、本実施例の各機能を実現するための各部が動作している。例えば、OS11上では、ネットワーク監視部101、仮想マシン群管理部102、物理リソース監視部103、仮想リソース監視部104、移行制御部105及び移行実施部106が動作している。これらの各部については次に詳細に説明する。   Furthermore, in the management server 1, the OS 11 is operating. On the OS 11, each unit for realizing each function of this embodiment is operating. For example, on the OS 11, a network monitoring unit 101, a virtual machine group management unit 102, a physical resource monitoring unit 103, a virtual resource monitoring unit 104, a migration control unit 105, and a migration execution unit 106 are operating. Each of these parts will be described in detail next.

図3は、実施例に係る情報処理システムのブロック図である。図3では、説明の都合上、物理マシン3及びスイッチ2を1つずつのみ記載している。   FIG. 3 is a block diagram of the information processing system according to the embodiment. In FIG. 3, only one physical machine 3 and one switch 2 are shown for convenience of explanation.

物理マシン3及び物理マシン3上で動作する仮想マシン4について説明する。   The physical machine 3 and the virtual machine 4 operating on the physical machine 3 will be described.

負荷計測部301は、物理マシン3に搭載されているCPU、メモリ及びネットワーク帯域の使用率を所定時間毎に計測する。本実施例では、負荷計測部301は、1時間ごとに各使用率の計測を実行する。そして、負荷計測部301は、計測結果を情報格納部302に格納する。   The load measurement unit 301 measures the usage rates of the CPU, memory, and network bandwidth mounted on the physical machine 3 at predetermined time intervals. In the present embodiment, the load measurement unit 301 measures each usage rate every hour. Then, the load measurement unit 301 stores the measurement result in the information storage unit 302.

また、負荷計測部301は、計測したCPU、メモリ及びネットワークの使用率の中で、各仮想マシン4が使用しているCPU、メモリ及びネットワークの使用率を、それぞれの仮想マシン4の情報格納部43に送信する。   The load measuring unit 301 also displays the CPU, memory, and network usage rates used by each virtual machine 4 among the measured CPU, memory, and network usage rates. 43.

情報格納部302は、物理マシン3のCPU、メモリ及びネットワークの情報を格納する。例えば、情報格納部302は、CPUの情報として、CPUコアの数及びクロック数などを格納する。また、例えば、情報格納部302は、メモリの情報として、メモリの容量などを格納する。また、例えば、情報格納部302は、ネットワークの情報として、回線速度などを格納する。   The information storage unit 302 stores information on the CPU, memory, and network of the physical machine 3. For example, the information storage unit 302 stores the number of CPU cores and the number of clocks as CPU information. Further, for example, the information storage unit 302 stores the memory capacity and the like as memory information. Further, for example, the information storage unit 302 stores a line speed as network information.

さらに、情報格納部302は、負荷計測部301から送られてくるCPU、メモリ及びネットワーク帯域の使用率の計測結果を計測順に格納する。   Furthermore, the information storage unit 302 stores the CPU, memory, and network bandwidth usage rate measurement results sent from the load measurement unit 301 in the order of measurement.

仮想マシン4は、情報格納部43を有している。仮想マシン4は、予め使用する物理的なリソースとして、CPU、メモリ及びネットワーク帯域などが割当てられている。仮想マシン4は、割り当てられた物理的なリソースを用いて処理を実行する。   The virtual machine 4 has an information storage unit 43. The virtual machine 4 is assigned a CPU, memory, network bandwidth, etc. as physical resources to be used in advance. The virtual machine 4 executes processing using the allocated physical resource.

情報格納部43は、当該情報格納部43を有する仮想マシン4に割当てられているCPU、メモリ及びネットワークの情報を格納する。   The information storage unit 43 stores CPU, memory, and network information assigned to the virtual machine 4 having the information storage unit 43.

さらに、情報格納部43は、負荷計測部301から送られてくる当該情報格納部43を有する仮想マシン4に割り当てられているCPU、メモリ及びネットワーク帯域の使用率の計測結果を計測順に格納する。   Furthermore, the information storage unit 43 stores the CPU, memory, and network band usage rate measurement results assigned to the virtual machine 4 having the information storage unit 43 sent from the load measurement unit 301 in the order of measurement.

次に、管理サーバ1について説明する。   Next, the management server 1 will be described.

物理リソース監視部103は、各物理マシン3のCPU、メモリ及びネットワークの情報を各物理マシン3の情報格納部302から取得する。さらに、物理リソース監視部103は、物理マシン3のCPU、メモリ及びネットワーク帯域の構成が変更された場合、CPU、メモリ及びネットワークの情報を当該物理マシン3の情報格納部302から再取得する。   The physical resource monitoring unit 103 acquires the CPU, memory, and network information of each physical machine 3 from the information storage unit 302 of each physical machine 3. Furthermore, when the configuration of the CPU, memory, and network bandwidth of the physical machine 3 is changed, the physical resource monitoring unit 103 re-acquires the CPU, memory, and network information from the information storage unit 302 of the physical machine 3.

物理リソース監視部103は、取得した情報から各物理マシン3のCPUのコア数及びクロック数、メモリ容量、並びに、回線速度を抽出する。そして、物理リソース監視部103は、抽出した情報と各物理マシン3とを対応させて物理リソース表113を作成し、作成した物理リソース表113を記憶部110に格納する。   The physical resource monitoring unit 103 extracts the number of CPU cores and clocks, the memory capacity, and the line speed of each physical machine 3 from the acquired information. Then, the physical resource monitoring unit 103 creates a physical resource table 113 by associating the extracted information with each physical machine 3, and stores the created physical resource table 113 in the storage unit 110.

図4は、物理リソース表の一例を示す図である。図4に示すように、物理リソース表113は、物理マシン3毎に、物理マシン名に対応させて、その物理マシン3に搭載されているCPUのコア数及びクロック数、メモリ容量、並びに、回線速度が登録されている。以下では、第i物理マシンのCPUコア数を「cc」、クロック数を「cl」、メモリ容量を「mc」、及び回線速度を「ns」として表す場合がある。 FIG. 4 is a diagram illustrating an example of a physical resource table. As shown in FIG. 4, the physical resource table 113 includes, for each physical machine 3, the number of CPU cores and clocks mounted on the physical machine 3, the memory capacity, and the line corresponding to the physical machine name. The speed is registered. Hereinafter, the number of CPU cores of the i-th physical machine may be represented as “cc i ”, the number of clocks as “cl i ”, the memory capacity as “mc i ”, and the line speed as “ns i ”.

また、物理リソース監視部103は、定期的に各物理マシン3の情報格納部302にアクセスし、CPU、メモリ及びネットワーク帯域の使用率の計測結果を取得する。この場合、物理リソース監視部103が情報格納部302にアクセスする間隔は、各物理マシン3の負荷の変化に適切に対応するためは、物理マシン3の負荷計測部301により使用率が計測されるタイミングと同期することが好ましい。ただし、物理マシン3の負荷の変化への対応に有る程度の許容時間が認められるなら、その許容時間に合わせて、物理リソース監視部103が情報格納部302にアクセスする間隔を延ばしてもよい。   In addition, the physical resource monitoring unit 103 periodically accesses the information storage unit 302 of each physical machine 3 and acquires the measurement results of the usage rates of the CPU, the memory, and the network bandwidth. In this case, the interval at which the physical resource monitoring unit 103 accesses the information storage unit 302 measures the usage rate by the load measuring unit 301 of the physical machine 3 in order to appropriately respond to the change in the load of each physical machine 3. It is preferable to synchronize with the timing. However, if a permissible time that corresponds to the change in the load of the physical machine 3 is recognized, the interval at which the physical resource monitoring unit 103 accesses the information storage unit 302 may be extended according to the permissible time.

そして、物理リソース監視部103は、物理マシンのリソースが不足すると、仮想マシン4の再配置を移行制御部105に指示する。本実施例では、物理リソース監視部103は、CPU、メモリ又はネットワーク帯域の使用率が予め決められた値を超えた場合、仮想マシン4の再配置を移行制御部105に指示する。   The physical resource monitoring unit 103 then instructs the migration control unit 105 to relocate the virtual machine 4 when the physical machine resources are insufficient. In the present embodiment, the physical resource monitoring unit 103 instructs the migration control unit 105 to relocate the virtual machine 4 when the usage rate of the CPU, memory, or network bandwidth exceeds a predetermined value.

仮想リソース監視部104は、各仮想マシン4に割り当てられているCPU、メモリ及びネットワークの情報を各仮想マシン4の情報格納部43から取得する。また、仮想マシン4のCPU、メモリ及びネットワーク帯域の構成が変更された場合、仮想リソース監視部104は、CPU、メモリ及びネットワークの情報を当該仮想マシン4の情報格納部43から再取得する。   The virtual resource monitoring unit 104 acquires CPU, memory, and network information assigned to each virtual machine 4 from the information storage unit 43 of each virtual machine 4. When the configuration of the CPU, memory, and network bandwidth of the virtual machine 4 is changed, the virtual resource monitoring unit 104 re-acquires the CPU, memory, and network information from the information storage unit 43 of the virtual machine 4.

さらに、仮想リソース監視部104は、定期的に各仮想マシン4の情報格納部43にアクセスし、CPU、メモリ及びネットワーク帯域の使用率の計測結果を取得する。ここで、仮想リソース監視部104が情報格納部43にアクセスする間隔は、各仮想マシン4の負荷の変化に適切に対応するためには、負荷計測部301により使用率が計測されるタイミングと同期することが好ましい。ただし、仮想マシン4の負荷の変化への対応に有る程度の許容時間が認められるのであれば、その許容時間に合わせて、仮想リソース監視部104が情報格納部43にアクセスする間隔を延ばしてもよい。   Furthermore, the virtual resource monitoring unit 104 periodically accesses the information storage unit 43 of each virtual machine 4 and acquires the measurement results of the usage rates of the CPU, memory, and network bandwidth. Here, the interval at which the virtual resource monitoring unit 104 accesses the information storage unit 43 is synchronized with the timing at which the usage rate is measured by the load measurement unit 301 in order to appropriately cope with the load change of each virtual machine 4. It is preferable to do. However, if a permissible time that corresponds to the change in the load of the virtual machine 4 is recognized, the interval at which the virtual resource monitoring unit 104 accesses the information storage unit 43 may be extended in accordance with the permissible time. Good.

そして、仮想リソース監視部104は、各仮想マシン4と当該仮想マシン4に割当てられているCPUのコア数及びクロック数、メモリ容量、並びに、回線速度を対応させて仮想リソース表114を作成する。さらに、仮想リソース監視部104は、作成した仮想リソース表114における各仮想マシン4に対応させて、各時刻におけるCPU、メモリ及びネットワーク帯域の使用率を登録する。その後、仮想リソース監視部104は、作成した仮想リソース表114を記憶部110に格納する。   Then, the virtual resource monitoring unit 104 creates the virtual resource table 114 in association with each virtual machine 4 and the number of CPU cores and the number of clocks assigned to the virtual machine 4, the memory capacity, and the line speed. Furthermore, the virtual resource monitoring unit 104 registers the usage rates of the CPU, memory, and network bandwidth at each time in association with each virtual machine 4 in the created virtual resource table 114. Thereafter, the virtual resource monitoring unit 104 stores the created virtual resource table 114 in the storage unit 110.

図5は、仮想リソース表の一例を示す図である。図5に示すように、仮想リソース表114は、仮想マシン4毎に、仮想マシン名に対応させて、その仮想マシン4に搭載されているCPUのコア数及びクロック数、メモリ容量、回線速度、CPU使用率、メモリ使用率、並びに、ネットワーク帯域使用率が登録されている。以下では、第s仮想マシンのCPUコア数を「cc」、クロック数を「cl」、メモリ容量を「mc」、及び回線速度を「ns」として表す場合がある。また、第s仮想マシンにおけるCPU使用率を「cusj」、メモリ使用率を「musj」、ネットワーク使用率を「nusj」として表す場合がある。ここで、「j」は時刻を表している。図5では、使用率として現在の使用率のみを記載しているが、実際には、過去の使用率も時刻毎に格納されている。ただし、本実施例では24時間前までの使用率を利用するので、仮想リソース監視部104は、仮想リソース表114に現在から24時間前までの各時刻の使用率を登録している。 FIG. 5 is a diagram illustrating an example of a virtual resource table. As illustrated in FIG. 5, the virtual resource table 114 includes, for each virtual machine 4, the number of CPU cores and the number of clocks mounted on the virtual machine 4, the memory capacity, the line speed, A CPU usage rate, a memory usage rate, and a network bandwidth usage rate are registered. Hereinafter, the number of CPU cores of the s-th virtual machine may be expressed as “cc s ”, the number of clocks as “cl s ”, the memory capacity as “mc s ”, and the line speed as “ns s ”. In some cases, the CPU usage rate in the s-th virtual machine is represented as “cu sj ”, the memory usage rate as “mu sj ”, and the network usage rate as “nu sj ”. Here, “j” represents time. In FIG. 5, only the current usage rate is shown as the usage rate, but actually the past usage rate is also stored for each time. However, in this embodiment, the usage rate up to 24 hours ago is used, so the virtual resource monitoring unit 104 registers the usage rate at each time up to 24 hours ago from the current time in the virtual resource table 114.

ネットワーク監視部101は、スイッチ2において転送されるデータを監視する。そして、ネットワーク監視部101は、転送される各データの通信元及び通信先の仮想マシン4の情報を取得する。ここで、ネットワーク監視部101は、同一の物理マシン3内に配置された仮想マシン4同士の通信が発生した場合のデータの通信元及び通信先の仮想マシン4の情報も、スイッチ2経由で取得する。   The network monitoring unit 101 monitors data transferred in the switch 2. Then, the network monitoring unit 101 acquires information of the communication source and the communication destination virtual machine 4 of each transferred data. Here, the network monitoring unit 101 also acquires information on the data communication source and the communication destination virtual machine 4 via the switch 2 when communication between the virtual machines 4 arranged in the same physical machine 3 occurs. To do.

ネットワーク監視部101は、取得した仮想マシン4の間の通信における通信元の仮想マシン4の情報と通信先の仮想マシン4の情報とを対応付けて仮想マシン通信表111を作成する。そして、ネットワーク監視部101は、作成した仮想マシン通信表111を記憶部110に格納する。   The network monitoring unit 101 creates the virtual machine communication table 111 by associating the information of the communication source virtual machine 4 and the information of the communication destination virtual machine 4 in the communication between the acquired virtual machines 4. Then, the network monitoring unit 101 stores the created virtual machine communication table 111 in the storage unit 110.

ここで、例えば、図6に示すような構成の場合で説明する。図6は、物理マシンに配置された仮想マシンの一例を示す図である。   Here, for example, the case of a configuration as shown in FIG. 6 will be described. FIG. 6 is a diagram illustrating an example of a virtual machine arranged in a physical machine.

図6では、物理マシン3A〜3Fの6台の物理マシンが配置されている。そして、物理マシン3Aに、仮想マシン#1及び#2が搭載されている。また、物理マシン3Bに、仮想マシン#3が配置されている。また、物理マシン3Dに、仮想マシン#4が配置されている。また、物理マシン3Eに、仮想マシン#5及び#6が配置されている。   In FIG. 6, six physical machines 3A to 3F are arranged. Then, virtual machines # 1 and # 2 are mounted on the physical machine 3A. Further, the virtual machine # 3 is arranged in the physical machine 3B. In addition, virtual machine # 4 is arranged in physical machine 3D. In addition, virtual machines # 5 and # 6 are arranged in the physical machine 3E.

図6の状態で、ネットワーク監視部101は、仮想マシン#1〜#6のそれぞれの間の通信を監視し、仮想マシン#1〜#6の間の通信における通信元と通信先の情報を取得する。そして、ネットワーク監視部101は、取得した通信元と通信先の情報を用いて、図7に示す、仮想マシン通信表111を作成し記憶部110へ格納する。図7は、仮想マシン通信表の一例の図である。   In the state of FIG. 6, the network monitoring unit 101 monitors communication between the virtual machines # 1 to # 6 and acquires information on the communication source and the communication destination in the communication between the virtual machines # 1 to # 6. To do. Then, the network monitoring unit 101 creates the virtual machine communication table 111 shown in FIG. 7 using the acquired information on the communication source and the communication destination, and stores them in the storage unit 110. FIG. 7 is a diagram illustrating an example of the virtual machine communication table.

図7に示すように、仮想マシン通信表111は、仮想マシン#1〜#6のそれぞれを通信元とする通信においてどの仮想マシン4が通信先となったかを表示している。例えば、仮想マシン#1を通信元とする通信では、仮想マシン#4及び#5が通信先とされている。   As illustrated in FIG. 7, the virtual machine communication table 111 displays which virtual machine 4 is a communication destination in communication using each of the virtual machines # 1 to # 6 as a communication source. For example, in communication using the virtual machine # 1 as a communication source, the virtual machines # 4 and # 5 are set as communication destinations.

また、ネットワーク監視部101は、ネットワークトラフィックの負荷を監視している。そして、ネットワークワークトラフィックの負荷が予め決められた閾値を超えた場合、ネットワーク監視部101は、仮想マシン4の再配置を移行制御部105へ指示する。   Further, the network monitoring unit 101 monitors the load of network traffic. When the load of network work traffic exceeds a predetermined threshold, the network monitoring unit 101 instructs the migration control unit 105 to relocate the virtual machine 4.

図3に戻って説明を続ける。仮想マシン群管理部102は、記憶部110に格納されている仮想マシン通信表111を用いて、通信の送信先と送信元となった仮想マシン4を組み合わせて仮想マシン群を作成する。そして、仮想マシン群管理部102は、作成した仮想マシン群を表す仮想マシン群表112を作成して、記憶部110へ格納する。この仮想マシン群管理部102が、「群作成部」の一例にあたる。   Returning to FIG. 3, the description will be continued. The virtual machine group management unit 102 uses the virtual machine communication table 111 stored in the storage unit 110 to create a virtual machine group by combining the communication destination and the virtual machine 4 serving as the transmission source. Then, the virtual machine group management unit 102 creates a virtual machine group table 112 representing the created virtual machine group and stores it in the storage unit 110. The virtual machine group management unit 102 is an example of a “group creation unit”.

例えば、図6の構成で、図7の仮想マシン通信表111がネットワーク監視部101により作成された場合、仮想マシン群管理部102は、通信元である仮想マシン#1と通信先である仮想マシン#4及び#5を組み合わせる。さらに、仮想マシン群管理部102は、仮想マシン#1,#4及び#5と通信する他のマシンが無いかを検出する。通信を行う他のマシンがない場合には、仮想マシン群管理部102は、仮想マシン#1,#4及び#5を1つの仮想マシン群とする。これに対して、通信を行う他のマシンが有る場合、仮想マシン群管理部102は、そのマシンを仮想マシン#1,#4及び#5と組み合わせる。このようにして、仮想マシン群管理部102は、通信が発生する仮想マシン4の全ての組を組み合わせて一つの群を作成する。本実施例では、仮想マシン群管理部102は、仮想マシン#1,#4及び#5により1つの仮想マシン群であるA群を作成する。   For example, in the configuration of FIG. 6, when the virtual machine communication table 111 of FIG. 7 is created by the network monitoring unit 101, the virtual machine group management unit 102 uses the virtual machine # 1 that is the communication source and the virtual machine that is the communication destination. Combine # 4 and # 5. Furthermore, the virtual machine group management unit 102 detects whether there are other machines communicating with the virtual machines # 1, # 4, and # 5. When there is no other machine that performs communication, the virtual machine group management unit 102 sets the virtual machines # 1, # 4, and # 5 as one virtual machine group. On the other hand, when there is another machine that performs communication, the virtual machine group management unit 102 combines the machine with the virtual machines # 1, # 4, and # 5. In this way, the virtual machine group management unit 102 creates one group by combining all the combinations of the virtual machines 4 in which communication occurs. In this embodiment, the virtual machine group management unit 102 creates a group A, which is one virtual machine group, using the virtual machines # 1, # 4, and # 5.

同様に、仮想マシン群管理部102は、全ての仮想マシン#1〜#6がいずれかの群に属するようになるまで、群を作成する。そして、仮想マシン群管理部102は、図8に示す仮想マシン群表112を作成し記憶部110へ格納する。図8は、仮想マシン群表の一例の図である。ここでは、仮想マシン群管理部102は、仮想マシン群としてA群、B群及びC群を生成する。A群には、仮想マシン#1,#4及び#5が含まれる。また、B群には、仮想マシン#2が含まれる。また、C群には、仮想マシン#3及び#6が含まれる。   Similarly, the virtual machine group management unit 102 creates groups until all virtual machines # 1 to # 6 belong to any group. Then, the virtual machine group management unit 102 creates the virtual machine group table 112 shown in FIG. 8 and stores it in the storage unit 110. FIG. 8 is an example of a virtual machine group table. Here, the virtual machine group management unit 102 generates a group A, a group B, and a group C as virtual machine groups. Group A includes virtual machines # 1, # 4, and # 5. In addition, group B includes virtual machine # 2. The group C includes virtual machines # 3 and # 6.

ここで、本実施例では、仮想マシン群管理部102が通信状態を確認して、通信を行っている仮想マシン4同士を組み合わせて仮想マシン群を作成しているが、仮想マシン群の作成方法はこれに限らない。例えば、情報処理システムの管理者が、1つのサービスを提供する仮想マシン4をまとめて仮想マシン群として予め登録しておいてもよい。また、情報処理システムの管理者が、同じVLAN(Virtual Local Area Network)の識別情報を有する仮想マシン4をまとめて仮想マシン群として予め登録しておいてもよい。   Here, in this embodiment, the virtual machine group management unit 102 confirms the communication state and creates a virtual machine group by combining the virtual machines 4 that are communicating with each other. Is not limited to this. For example, the administrator of the information processing system may collectively register the virtual machines 4 that provide one service as a virtual machine group. Further, the administrator of the information processing system may collectively register the virtual machines 4 having the same VLAN (Virtual Local Area Network) identification information as a virtual machine group.

図3に戻って説明を続ける。移行制御部105は、ネットワークトラフィックの負荷が閾値を超えた場合、仮想マシン4の再配置実行の指示をネットワーク監視部101から受ける。また、移行制御部105は、物理マシンのリソースが不足した場合、例えば、CPU、メモリ又はネットワーク帯域などの使用率が閾値を超えた場合、仮想マシン4の再配置実行の指示を物理リソース監視部103から受ける。移行制御部105は、仮想マシン4の再配置実行の指示を受けると、以下の処理を行う。   Returning to FIG. 3, the description will be continued. The migration control unit 105 receives an instruction to execute the rearrangement of the virtual machine 4 from the network monitoring unit 101 when the load of network traffic exceeds the threshold value. In addition, when the physical machine resource is insufficient, for example, when the usage rate of the CPU, memory, network bandwidth, or the like exceeds a threshold value, the migration control unit 105 issues a relocation execution instruction for the virtual machine 4 to the physical resource monitoring unit. Receive from 103. When the migration control unit 105 receives an instruction to execute the rearrangement of the virtual machine 4, the migration control unit 105 performs the following processing.

移行制御部105は、各物理マシン3のCPUコア数、クロック数、メモリ容量、回線速度を物理リソース表113から取得する。   The migration control unit 105 acquires the number of CPU cores, the number of clocks, the memory capacity, and the line speed of each physical machine 3 from the physical resource table 113.

次に、移行制御部105は、次の数式(1)を用いて各物理マシン3の許容量を算出する。ここで、許容量とは、搭載された仮想マシン4による負荷に対して、どのくらいの負荷まで耐えられるかを表す値である。数式(1)は、第i物理マシンの負荷度yi(i=1,2,・・・,n)を算出するための式である。   Next, the migration control unit 105 calculates the allowable amount of each physical machine 3 using the following formula (1). Here, the allowable amount is a value indicating how much load can be endured with respect to the load of the mounted virtual machine 4. Expression (1) is an expression for calculating the load degree yi (i = 1, 2,..., N) of the i-th physical machine.

Figure 2014167713
Figure 2014167713

ここで、kαはCPUの重み付けであり、kβはメモリの重み付けであり、kγはネットワークの重み付けである。本実施例では、各リソースの負荷全体に対する評価を一致させるため、以下の数式(2)〜(4)のように重み付けを行う。 Here, k α is a CPU weight, k β is a memory weight, and k γ is a network weight. In the present embodiment, weighting is performed as in the following mathematical formulas (2) to (4) in order to match evaluations for the entire load of each resource.

Figure 2014167713
Figure 2014167713

Figure 2014167713
Figure 2014167713

Figure 2014167713
Figure 2014167713

数式(2)〜(4)は、各リソースの能力を数値として足し合わせ全体のリソースの能力を求め、全体のリソースの能力と各リソースの比を求めることで、全体のリソースに対して各リソースがどの程度の影響を有するかを表す式となっている。   The formulas (2) to (4) are obtained by adding the capabilities of each resource as a numerical value to obtain the overall resource capability, and by determining the overall resource capability and the ratio of each resource, This is a formula that expresses how much influence has.

例えば、図4の物理リソース表113及び図5の仮想リソース表114を用いた場合、kα=6.67・・・≒6、kβ=1.18・・・≒1、kγ=194.47・・・≒194となる。 For example, when the physical resource table 113 in FIG. 4 and the virtual resource table 114 in FIG. 5 are used, k α = 6.67... ≈6, k β = 1.18... ≈1, k γ = 194 .47... ≈194.

さらに、移行制御部105は、各仮想マシン4のCPUコア数、クロック数、メモリ容量、回線速度、CPU使用率、メモリ使用率及びネットワーク帯域使用率を仮想リソース表114から取得する。ここで、本実施例では、移行制御部105は、CPU使用率、メモリ使用率及びネットワーク帯域使用率は、最も新しい使用率から24時間前の使用率までの各時刻の使用率を取得する。   Further, the migration control unit 105 acquires the number of CPU cores, the number of clocks, the memory capacity, the line speed, the CPU usage rate, the memory usage rate, and the network bandwidth usage rate of each virtual machine 4 from the virtual resource table 114. Here, in the present embodiment, the migration control unit 105 acquires the usage rate at each time from the latest usage rate to the usage rate 24 hours ago as the CPU usage rate, the memory usage rate, and the network bandwidth usage rate.

次に、移行制御部105は、次の数式(5)を用いて各仮想マシン4の各時刻における負荷度を算出する。数式1は、第S仮想マシンの負荷度xsj(s=1,2,・・・N)を算出するための式である。本実施例では1時間に1回使用率を計算しているので、jは、1〜24のいずれかである。 Next, the migration control unit 105 calculates the degree of load at each time of each virtual machine 4 using the following formula (5). Formula 1 is a formula for calculating the load degree x sj (s = 1, 2,... N) of the S-th virtual machine. In this embodiment, since the usage rate is calculated once per hour, j is one of 1 to 24.

Figure 2014167713
Figure 2014167713

例えば、図4の物理リソース表113を用いて図4における第1物理マシンの許容量y1を算出する場合を説明する。この場合、y=6*6*3+1*96+194*0.1となる。したがって、移行制御部105は、図4における第1物理マシンの許容量yを、y≒223と算出する。 For example, the case where the allowable amount y1 of the first physical machine in FIG. 4 is calculated using the physical resource table 113 in FIG. 4 will be described. In this case, y 1 = 6 * 6 * 3 + 1 * 96 + 194 * 0.1. Therefore, the migration control unit 105 calculates the allowable amount y 1 of the first physical machine in FIG. 4 as y 1 ≈223.

また、例えば、図5の仮想リソース表114を用いて図5における第1仮想マシンの負荷度x1を算出する場合を説明する。この場合、図4のタイミングでの負荷度は、x=6*1*1*0.8+1*2*0.6+194*0.1*0.8となる。したがって、移行制御部105は、図5における第1仮想マシンの許容量xを、x≒21と算出する。 Further, for example, a case where the load degree x1 of the first virtual machine in FIG. 5 is calculated using the virtual resource table 114 in FIG. 5 will be described. In this case, the load degree at the timing of FIG. 4 is x 1 = 6 * 1 * 1 * 0.8 + 1 * 2 * 0.6 + 194 * 0.1 * 0.8. Therefore, the migration control unit 105 calculates the allowable amount x 1 of the first virtual machine in FIG. 5 as x 1 ≈21.

以上のようにして、移行制御部105は、各物理マシン3の許容量を求める。また、移行制御部105は、各仮想マシン4の時間毎の負荷度を求める。   As described above, the migration control unit 105 obtains the allowable amount of each physical machine 3. Further, the migration control unit 105 obtains the load degree of each virtual machine 4 for each time.

次に、移行制御部105は、記憶部110に格納されている仮想マシン群表112から各仮想マシン群に含まれる仮想マシン4の情報を取得する。そして、移行制御部105は、仮想マシン群毎に、算出した各仮想マシン4の時間毎の負荷度の中からその群に含まれる各仮想マシン4の時間毎の負荷度を取得する。そして、移行制御部105は、各仮想マシン群に含まれる仮想マシン4の時間毎の負荷度を合算し、各仮想マシン群の負荷総計を算出する。   Next, the migration control unit 105 acquires information about the virtual machines 4 included in each virtual machine group from the virtual machine group table 112 stored in the storage unit 110. Then, the migration control unit 105 acquires, for each virtual machine group, the load degree of each virtual machine 4 included in the group from the calculated load degree of each virtual machine 4 for each hour. Then, the migration control unit 105 adds the load degree of each virtual machine 4 included in each virtual machine group for each time, and calculates the total load of each virtual machine group.

例えば、図6のような構成で、図8のような仮想マシン群表112が仮想マシン群管理部102によって作成された場合で説明する。ここでは、図9を参照して、A群の負荷総計の算出を例に説明する。図9は、A群の負荷総計の算出を説明するための図である。図9のグラフ501〜503及び511は、横軸で時間を表し、縦軸で負荷を表している。この場合、移行制御部105は、仮想リソース表114の値及び数式(5)を用いて、A群に含まれる仮想マシン#1,#4及び#5の時間毎の負荷度を求める。   For example, the case where the virtual machine group table 112 as shown in FIG. 8 is created by the virtual machine group management unit 102 in the configuration as shown in FIG. 6 will be described. Here, with reference to FIG. 9, the calculation of the total load of group A will be described as an example. FIG. 9 is a diagram for explaining the calculation of the total load of group A. The graphs 501 to 503 and 511 in FIG. 9 represent time on the horizontal axis and load on the vertical axis. In this case, the migration control unit 105 uses the values in the virtual resource table 114 and Equation (5) to obtain the load degree for each time of the virtual machines # 1, # 4, and # 5 included in the group A.

例えば、移行制御部105は、仮想マシン#1の時間毎の負荷度として、図9のグラフ501で表される負荷度を取得する。また、移行制御部105は、仮想マシン#4の時間毎の負荷度として、図9のグラフ502で表される負荷度を取得する。また、移行制御部105は、仮想マシン#5の時間毎の負荷度として、図9のグラフ503で表される負荷度を取得する。   For example, the migration control unit 105 acquires the load degree represented by the graph 501 in FIG. 9 as the load degree for each time of the virtual machine # 1. Further, the migration control unit 105 acquires the load degree represented by the graph 502 in FIG. 9 as the load degree for each time of the virtual machine # 4. Further, the migration control unit 105 acquires the load degree represented by the graph 503 in FIG. 9 as the load degree for each time of the virtual machine # 5.

そして、移行制御部105は、A群に属する仮想マシン#1,#4及び#5の時間毎の負荷度を時間毎に足し合わせて、グラフ511で表されるA群の負荷総計Zを求める。 The transition control unit 105, a virtual machine # 1 belonging to group A, # 4 and # are summed for each time each of the load of the 5 time, the load sum Z A of A group represented by the graph 511 Ask.

続いて、移行制御部105は、図10のグラフ512で表されるB群の負荷総計Z及びグラフ513で表されるC群の負荷総計Zを算出する。図10は、各仮想マシン群の負荷総計を表す図である。図10のグラフ511〜521は、横軸で時刻を表し、縦軸で負荷を表している。 Subsequently, the transition control unit 105 calculates the total load Z B of the B group represented by the graph 512 in FIG. 10 and the total load Z C of the C group represented by the graph 513. FIG. 10 is a diagram illustrating the total load of each virtual machine group. In graphs 511 to 521 in FIG. 10, the horizontal axis represents time and the vertical axis represents load.

その後、移行制御部105は、各仮想マシン群の間の相関係数を次の数式(6)を用いて求める。数式6は、A群とB群との相関係数を表す式である。   Thereafter, the migration control unit 105 obtains a correlation coefficient between the virtual machine groups using the following formula (6). Expression 6 is an expression representing a correlation coefficient between the A group and the B group.

Figure 2014167713
Figure 2014167713

ここで、小文字の「z」は、相加平均を表している。   Here, the lowercase letter “z” represents an arithmetic mean.

仮想マシン群であるA群〜C群が図10のような負荷総計を有している場合、図11に示すように、各仮想マシン群間の相関係数が求められる。図11は、仮想マシン群間の相関係数の一例を示す図である。   When group A to group C, which are virtual machine groups, have load totals as shown in FIG. 10, correlation coefficients between the virtual machine groups are obtained as shown in FIG. FIG. 11 is a diagram illustrating an example of a correlation coefficient between virtual machine groups.

移行制御部105は、求めた相関係数から、負の相関が高い仮想マシン群の組合せを抽出する。相関係数は、正の値の絶対値が大きくなるほど負の相関は低くなり、負の値の絶対値が大きくなるほど負の相関が高くなる。そこで、移行制御部105は、求めた相関係数の中で最も絶対値の大きい負の値を特定し、その特定した値の相関関係を有する仮想マシン群の組合せを抽出する。例えば、図11のように各仮想マシン群間の相関係数が求まった場合、欄601及び602の「−0.4」が最も絶対値が大きい負の値である。そこで、移行制御部105は、欄601及び602の相関係数を有する仮想マシン群の組合せとして、A群とB群の組合せを抽出する。   The migration control unit 105 extracts a combination of virtual machine groups having a high negative correlation from the obtained correlation coefficient. As the correlation coefficient increases, the negative correlation decreases as the absolute value of the positive value increases, and the negative correlation increases as the absolute value of the negative value increases. Therefore, the migration control unit 105 identifies a negative value having the largest absolute value among the obtained correlation coefficients, and extracts a combination of virtual machine groups having a correlation between the identified values. For example, when the correlation coefficient between the virtual machine groups is obtained as shown in FIG. 11, “−0.4” in the columns 601 and 602 is a negative value having the largest absolute value. Therefore, the migration control unit 105 extracts a combination of the A group and the B group as a combination of virtual machine groups having the correlation coefficients in the columns 601 and 602.

そして、移行制御部105は、負の相関が高い仮想マシン4の組合せを新たな仮想マシン群として再形成する。例えば、移行制御部105は、A群とB群を組み合わせて新たなA+B群を作成し、C群はそのままとする。   Then, the migration control unit 105 re-forms a combination of virtual machines 4 having a high negative correlation as a new virtual machine group. For example, the transition control unit 105 creates a new A + B group by combining the A group and the B group, and leaves the C group as it is.

ここで、仮想マシン群の数が物理マシンの数よりも多い場合、移行制御部105は、新たな仮想マシン群の負荷総計を用いて、再度仮想マシン群間の相関係数を求め、負の相関が高い仮想マシン群同士を組み合わせて新たな仮想マシン群を作成する。   Here, when the number of virtual machine groups is larger than the number of physical machines, the migration control unit 105 obtains a correlation coefficient between the virtual machine groups again using the total load of the new virtual machine group, and the negative A new virtual machine group is created by combining virtual machine groups having high correlation.

移行制御部105は、仮想マシン群の数が物理マシンの数以下になった時点で、各仮想マシン群の負荷総計を求める。そして、移行制御部105は、算出した各物理マシン3の許容量に収まるように、仮想マシン群の物理マシン3への配置を決定する。ここで、移行制御部105は、同じ仮想マシン群に属する仮想マシン4はなるべく同じ物理マシン3に配置されるように配置を決定する。そして、同じ仮想マシン群に属する仮想マシン4が1台の物理マシン3に搭載できない場合、移行制御部105は、許容量に余裕のある物理マシン3に余った仮想マシン4を配置する。   The migration control unit 105 obtains a total load of each virtual machine group when the number of virtual machine groups becomes equal to or less than the number of physical machines. Then, the migration control unit 105 determines the placement of the virtual machine group on the physical machine 3 so as to be within the calculated allowable amount of each physical machine 3. Here, the migration control unit 105 determines the arrangement so that the virtual machines 4 belonging to the same virtual machine group are arranged in the same physical machine 3 as much as possible. If the virtual machines 4 belonging to the same virtual machine group cannot be mounted on one physical machine 3, the migration control unit 105 arranges the virtual machines 4 that are left in the physical machines 3 having a surplus capacity.

移行制御部105は、物理マシン3への各仮想マシン4の配置を決定すると、決定した物理マシン3への各仮想マシン4の配置を移行実施部106に通知する。この移行制御部105が、「平準化部」の一例にあたる。   When the migration control unit 105 determines the placement of each virtual machine 4 on the physical machine 3, the migration control unit 105 notifies the migration execution unit 106 of the placement of each virtual machine 4 on the physical machine 3. The transition control unit 105 is an example of a “leveling unit”.

ここで、本実施例では、移行制御部105は、ネットワークトラフィックの負荷の超過及び物理マシン3のリソースの不足をトリガとして、仮想マシン4の再配置を行っているが、再配置のタイミングはこれに限らない。例えば、移行制御部105は、1月や1年など予め決められた期間で定期的に再配置を行ってもよい。また、移行制御部105は、情報システムの構成の変更が発生した場合に再配置を行ってもよい。   Here, in this embodiment, the migration control unit 105 performs the rearrangement of the virtual machine 4 triggered by an excess of network traffic load and a shortage of resources of the physical machine 3, but the timing of the rearrangement is this. Not limited to. For example, the migration control unit 105 may periodically perform rearrangement in a predetermined period such as January or one year. Further, the migration control unit 105 may perform rearrangement when a change in the configuration of the information system occurs.

また、本実施例では、移行制御部105は、仮想マシン4の負荷情報として24時間のうちの1時間毎の負荷情報を用いて仮想マシン4の配置を決定したが、利用する負荷情報の期間や間隔はこれに限らない。例えば、移行制御部105は、1年間又は1時間の間の負荷情報を用いて仮想マシン4の配置を決定してもよい。また、移行制御部105は、30分毎の負荷情報を用いて仮想マシン4の配置を決定してもよい。ただし、移行制御部105が利用する負荷情報の間隔に合わせて、物理マシン3の負荷計測部301は使用率の計測を行い、仮想リソース監視部104は計測結果を取得することが好ましい。   In this embodiment, the migration control unit 105 determines the placement of the virtual machine 4 using the load information for each hour out of 24 hours as the load information of the virtual machine 4, but the period of the load information to be used The interval is not limited to this. For example, the migration control unit 105 may determine the placement of the virtual machine 4 using load information for one year or one hour. Further, the migration control unit 105 may determine the placement of the virtual machine 4 using the load information every 30 minutes. However, it is preferable that the load measurement unit 301 of the physical machine 3 measures the usage rate and the virtual resource monitoring unit 104 acquires the measurement result in accordance with the load information interval used by the migration control unit 105.

移行実施部106は、物理マシン3への各仮想マシン4の配置の通知を移行制御部105から受信する。そして、移行実施部106は、仮想マシン4に対してマイグレーションを行い、移行制御部105により指定された物理マシン3に各仮想マシン4を再配置する。この移行実施部106が、「割当部」の一例にあたる。   The migration execution unit 106 receives a notification of the placement of each virtual machine 4 on the physical machine 3 from the migration control unit 105. Then, the migration execution unit 106 performs migration on the virtual machine 4 and rearranges each virtual machine 4 on the physical machine 3 designated by the migration control unit 105. The migration execution unit 106 is an example of an “allocation unit”.

次に、図12を参照して、本実施例に係る情報処理システムにおける仮想マシン4の再配置の処理を説明する。図12は、実施例に係る情報処理システムにおける仮想マシンの再配置の処理のフローチャートである。   Next, with reference to FIG. 12, the rearrangement process of the virtual machine 4 in the information processing system according to the present embodiment will be described. FIG. 12 is a flowchart of virtual machine relocation processing in the information processing system according to the embodiment.

ネットワーク監視部101は、仮想マシン4の間の通信状態をスイッチ2から取得する(ステップS1)。   The network monitoring unit 101 acquires the communication state between the virtual machines 4 from the switch 2 (step S1).

そして、ネットワーク監視部101は、取得した通信状態から仮想マシン4の間の通信における通信元及び通信先の情報を取得する。次に、ネットワーク監視部101は、仮想マシン4の間の通信の通信元と通信先との関係を表す仮想マシン通信表111を作成する(ステップS2)。ネットワーク監視部101は、作成した仮想マシン通信表111を記憶部110へ格納する。   Then, the network monitoring unit 101 acquires information on a communication source and a communication destination in communication between the virtual machines 4 from the acquired communication state. Next, the network monitoring unit 101 creates a virtual machine communication table 111 representing a relationship between a communication source and a communication destination of communication between the virtual machines 4 (step S2). The network monitoring unit 101 stores the created virtual machine communication table 111 in the storage unit 110.

仮想マシン群管理部102は、仮想マシン通信表111に記載されている通信元及び通信先の情報から、通信を行う仮想マシン4を組み合わせて仮想マシン群を作成する。そして、仮想マシン群管理部102は、各仮想マシン群に属する仮想マシン4を表す仮想マシン群表112を作成する(ステップS3)。仮想マシン群管理部102は、作成した仮想マシン群表112を記憶部110へ格納する。   The virtual machine group management unit 102 creates a virtual machine group by combining the virtual machines 4 that perform communication from the communication source and communication destination information described in the virtual machine communication table 111. Then, the virtual machine group management unit 102 creates a virtual machine group table 112 representing the virtual machines 4 belonging to each virtual machine group (step S3). The virtual machine group management unit 102 stores the created virtual machine group table 112 in the storage unit 110.

物理リソース監視部103は、物理マシン3の性能を表すCPU、メモリ及びネットワークの情報を物理マシン3の情報格納部302から取得する。また、仮想リソース監視部104は、仮想マシン4の性能を表す仮想マシン4に割り当てられたCPU、メモリ及びネットワークの情報を仮想マシン4の情報格納部43から取得する(ステップS4)。   The physical resource monitoring unit 103 acquires CPU, memory, and network information representing the performance of the physical machine 3 from the information storage unit 302 of the physical machine 3. Further, the virtual resource monitoring unit 104 acquires the CPU, memory, and network information assigned to the virtual machine 4 representing the performance of the virtual machine 4 from the information storage unit 43 of the virtual machine 4 (step S4).

物理リソース監視部103は、取得した情報からCPUコア数及びクロック数、メモリ容量、並びに、回線速度の情報を抽出し、物理リソース表113を作成する。そして、物理リソース監視部103は、物理リソース表113を記憶部110に格納する。また、仮想リソース監視部104は、取得した情報から仮想マシン4に割り当てられているCPUコア数及びクロック数、メモリ容量並びに回線速度を抽出し、仮想リソース表114を作成する。そして、仮想リソース監視部104は、仮想リソース表114を記憶部110に格納する(ステップS5)。   The physical resource monitoring unit 103 extracts information on the number of CPU cores, the number of clocks, the memory capacity, and the line speed from the acquired information, and creates the physical resource table 113. Then, the physical resource monitoring unit 103 stores the physical resource table 113 in the storage unit 110. In addition, the virtual resource monitoring unit 104 extracts the number of CPU cores and the number of clocks, the memory capacity, and the line speed allocated to the virtual machine 4 from the acquired information, and creates the virtual resource table 114. Then, the virtual resource monitoring unit 104 stores the virtual resource table 114 in the storage unit 110 (step S5).

次に、仮想リソース監視部104は、所定時間毎に仮想マシン4に割当てられたCPU、メモリ及びネットワーク帯域の使用率を仮想マシン4の情報格納部43から取得する(ステップS6)。   Next, the virtual resource monitoring unit 104 acquires from the information storage unit 43 of the virtual machine 4 the usage rate of the CPU, memory, and network bandwidth allocated to the virtual machine 4 every predetermined time (step S6).

そして、仮想リソース監視部104は、時間毎のCPUの使用率、メモリの使用率及びネットワーク帯域使用率を用いて仮想リソース表114を更新する(ステップS7)。   Then, the virtual resource monitoring unit 104 updates the virtual resource table 114 using the CPU usage rate, the memory usage rate, and the network bandwidth usage rate for each hour (step S7).

移行制御部105は、ネットワーク監視部101又は物理リソース監視部103から仮想マシン4の再配置の指示を受けたか否かを判定する(ステップS8)。ネットワーク監視部101は、ネットワークトラフィックの負荷が閾値を超えた場合に、仮想マシン4の再配置の指示を移行制御部105へ通知する。また、物理リソース監視部103は、物理リソースが不足した場合に、仮想マシン4の再配置の指示を移行制御部105へ通知する。再配置の指示がない場合(ステップS8:否定)、移行制御部105は、ステップS6へ戻る。   The migration control unit 105 determines whether a relocation instruction for the virtual machine 4 has been received from the network monitoring unit 101 or the physical resource monitoring unit 103 (step S8). The network monitoring unit 101 notifies the migration control unit 105 of an instruction to relocate the virtual machine 4 when the load of network traffic exceeds a threshold value. Further, the physical resource monitoring unit 103 notifies the migration control unit 105 of an instruction to relocate the virtual machine 4 when the physical resources are insufficient. When there is no rearrangement instruction (No at Step S8), the migration control unit 105 returns to Step S6.

これに対して、再配置の指示があった場合(ステップS8:肯定)、移行制御部105は、物理リソース表113の情報及び数式(1)を用いて各物理マシン3の許容量を算出する(ステップS9)。   On the other hand, when there is an instruction for rearrangement (step S8: affirmative), the migration control unit 105 calculates the allowable amount of each physical machine 3 using the information in the physical resource table 113 and Equation (1). (Step S9).

次に、移行制御部105は、仮想リソース表114の情報及び数式(5)を用いて各仮想マシン4の負荷総計を算出する(ステップS10)。   Next, the migration control unit 105 calculates the total load of each virtual machine 4 using the information in the virtual resource table 114 and Equation (5) (Step S10).

次に、移行制御部105は、算出した負荷総計及び数式(6)を用いて、仮想マシン群間の相関係数を算出する(ステップS11)。   Next, the migration control unit 105 calculates a correlation coefficient between the virtual machine groups using the calculated load total and Expression (6) (step S11).

そして、移行制御部105は、負の相関が高い仮想マシン群を組合せて新たな仮想マシン群を作成する(ステップS12)。   Then, the migration control unit 105 creates a new virtual machine group by combining virtual machine groups having a high negative correlation (step S12).

移行制御部105は、仮想マシン群の数が物理マシン3の数以下であるか否かを判定する(ステップS13)。仮想マシン群の数が物理マシン3の数より多い場合(ステップS13:否定)、移行制御部105は、ステップS10へ戻る。   The migration control unit 105 determines whether the number of virtual machine groups is equal to or less than the number of physical machines 3 (step S13). If the number of virtual machine groups is greater than the number of physical machines 3 (No at Step S13), the migration control unit 105 returns to Step S10.

これに対して、仮想マシン群の数が物理マシン3の数以上の場合(ステップS13:肯定)、移行制御部105は、作成した各仮想マシン群の負荷総計が物理マシンの許容量内に納まるように仮想マシン4の物理マシン3への配置を決定する。そして、移行制御部105は、決定した仮想マシン4の物理マシン3への配置を移行実施部106へ通知する。移行実施部106は、移行制御部105から通知された仮想マシン4の配置となるように、仮想マシン4のマイグレーションを行い、仮想マシン4を再配置する(ステップS14)。   On the other hand, when the number of virtual machine groups is equal to or greater than the number of physical machines 3 (step S13: Yes), the migration control unit 105 fits the created total load of each virtual machine group within the allowable amount of the physical machine. Thus, the arrangement of the virtual machine 4 to the physical machine 3 is determined. Then, the migration control unit 105 notifies the migration execution unit 106 of the determined placement of the virtual machine 4 on the physical machine 3. The migration execution unit 106 migrates the virtual machine 4 so as to arrange the virtual machine 4 notified from the migration control unit 105, and rearranges the virtual machine 4 (step S14).

図13は、実施例に係る管理サーバによる負荷の平準化の効果を説明するための図である。   FIG. 13 is a diagram for explaining the effect of load leveling by the management server according to the embodiment.

ここでは、例えば、情報処理システム内に物理マシン311〜313が配置されている場合で説明する。そして、図13の各物理マシン311〜313の中に記載されている枠は仮想マシン4を表し、枠内の数字は、その仮想マシン4が属する仮想マシン群を表している。例えば、物理マシン311には、第1群に属する仮想マシン4が1台、第2群に属する仮想マシン4が1台、第3群に属する仮想マシン4が1台、第5群に属する仮想マシン4が1台搭載されている。そして、グラフ701〜703は、物理マシン311〜313ぞれぞれの負荷の遷移を表している。グラフ701〜703は、横軸が時間を表し、縦軸が負荷を表している。   Here, for example, a case where physical machines 311 to 313 are arranged in the information processing system will be described. A frame described in each of the physical machines 311 to 313 in FIG. 13 represents the virtual machine 4, and a number in the frame represents a virtual machine group to which the virtual machine 4 belongs. For example, the physical machine 311 includes one virtual machine 4 belonging to the first group, one virtual machine 4 belonging to the second group, one virtual machine 4 belonging to the third group, and a virtual machine belonging to the fifth group. One machine 4 is mounted. Graphs 701 to 703 represent the load transitions of the physical machines 311 to 313, respectively. In the graphs 701 to 703, the horizontal axis represents time, and the vertical axis represents load.

そして、本実施例に係る管理サーバ1により、仮想マシン4の再配置が行われた後の状態が、物理マシン321〜323である。物理マシン321〜323は、それぞれ物理マシン311〜313に対応している。そして、再配置後の物理マシン311〜313の負荷の遷移を表すグラフが、グラフ711〜713である。管理サーバ1により負荷総計の負の相関が高い管理マシン群同士が組み合わせられるので、グラフ711〜713に示すように、物理マシン321〜323のいずれにおいても、各時間帯における負荷が平準化され突出したピークを有さなくなる。これにより、物理マシン321〜323は安定して稼動することができる。   Then, the state after the virtual machine 4 is rearranged by the management server 1 according to the present embodiment is the physical machines 321 to 323. The physical machines 321 to 323 correspond to the physical machines 311 to 313, respectively. And the graph showing the transition of the load of the physical machines 311 to 313 after rearrangement is the graphs 711 to 713. Because the management server 1 combines management machine groups having a high negative correlation of the load total, as shown in the graphs 711 to 713, the load in each time zone is leveled and protrudes in any of the physical machines 321 to 323. No longer have a peak. Thereby, the physical machines 321 to 323 can operate stably.

物理マシン321〜323では、同じ仮想マシン群に属する仮想マシン4が同じ物理マシンに配置されている。これにより、物理マシン321〜323のそれぞれの間での通信を抑えることができ、ネットワークの負荷を低減することができる。   In the physical machines 321 to 323, the virtual machines 4 belonging to the same virtual machine group are arranged in the same physical machine. As a result, communication between each of the physical machines 321 to 323 can be suppressed, and the load on the network can be reduced.

以上に説明したように、本実施例に係る管理サーバは、相互に通信を行う仮想マシン4を組み合わせて仮想マシン群を作成し、作成した仮想マシン群間の相関関係を求め、負の相関が高い群を組み合わせて1つの物理マシンに配置する。これにより、物理マシン間の通信を押えることができ、ネットワークの負荷や物理マシンの処理負荷を軽減することができる。また、各物理マシンの負荷を平準化することができ、物理マシンが有するリソースを有効利用することができる。このように、本実施例に係る管理サーバは、システム全体の負荷の上昇を抑えつつ、各物理マシンの負荷の平準化に寄与することができる。   As described above, the management server according to the present embodiment creates a virtual machine group by combining virtual machines 4 that communicate with each other, obtains a correlation between the created virtual machine groups, and has a negative correlation. Combine high groups and place them on one physical machine. As a result, communication between physical machines can be suppressed, and the network load and the physical machine processing load can be reduced. Further, the load on each physical machine can be leveled, and the resources of the physical machine can be used effectively. As described above, the management server according to the present embodiment can contribute to leveling the load on each physical machine while suppressing an increase in the load on the entire system.

図14は、管理サーバのハードウェア構成図である。図14に示すように、管理サーバ1は、CPU901、メモリ902、ハードディスク903及びネットワークコントローラ904を有している。   FIG. 14 is a hardware configuration diagram of the management server. As illustrated in FIG. 14, the management server 1 includes a CPU 901, a memory 902, a hard disk 903, and a network controller 904.

メモリ902、ハードディスク903及びネットワークコントローラ904は、CPU901にバスで接続されている。   The memory 902, the hard disk 903, and the network controller 904 are connected to the CPU 901 by a bus.

ネットワークコントローラ904は、図2に例示したネットワークインタフェース12及び13の機能を実現する。   The network controller 904 implements the functions of the network interfaces 12 and 13 illustrated in FIG.

ハードディスク903は、図3に例示した記憶部110の機能などを実現する。すなわち、ハードディスク903は、仮想マシン通信表111、仮想マシン群表112、物理リソース表113及び仮想リソース表114を記憶している。   The hard disk 903 implements the functions of the storage unit 110 illustrated in FIG. That is, the hard disk 903 stores a virtual machine communication table 111, a virtual machine group table 112, a physical resource table 113, and a virtual resource table 114.

また、ハードディスク903は、図3に例示した、ネットワーク監視部101、仮想マシン群管理部102、物理リソース監視部103、仮想リソース監視部104、移行制御部105及び移行実施部106の機能を実現するプログラムなど各種プログラムを記憶している。   The hard disk 903 realizes the functions of the network monitoring unit 101, the virtual machine group management unit 102, the physical resource monitoring unit 103, the virtual resource monitoring unit 104, the migration control unit 105, and the migration execution unit 106 illustrated in FIG. Various programs such as programs are stored.

CPU901及びメモリ902は、図3に例示した、ネットワーク監視部101、仮想マシン群管理部102、物理リソース監視部103、仮想リソース監視部104、移行制御部105及び移行実施部106の機能を実現する。具体的には、CPU901は、ハードディスク903に格納された各種プログラムを読みだす。そして、CPU901は、図3に例示した、ネットワーク監視部101、仮想マシン群管理部102、物理リソース監視部103、仮想リソース監視部104、移行制御部105及び移行実施部106の機能を実現するプロセスをメモリ902上に展開し、実行する。   The CPU 901 and the memory 902 realize the functions of the network monitoring unit 101, the virtual machine group management unit 102, the physical resource monitoring unit 103, the virtual resource monitoring unit 104, the migration control unit 105, and the migration execution unit 106 illustrated in FIG. . Specifically, the CPU 901 reads various programs stored in the hard disk 903. The CPU 901 implements the functions of the network monitoring unit 101, the virtual machine group management unit 102, the physical resource monitoring unit 103, the virtual resource monitoring unit 104, the migration control unit 105, and the migration execution unit 106 illustrated in FIG. Is expanded on the memory 902 and executed.

また、物理マシン3も、一例として、図14に示す管理サーバ1と同様のハードウェア構成であってもよい。   Further, as an example, the physical machine 3 may have a hardware configuration similar to that of the management server 1 illustrated in FIG.

その場合、CPU901及びメモリ902は、図3に例示した仮想マシン4及び負荷計測部301の機能などを実現する。また、ハードディスク903は、情報格納部43及び情報格納部302の機能などを実現する。   In that case, the CPU 901 and the memory 902 realize the functions of the virtual machine 4 and the load measurement unit 301 illustrated in FIG. Further, the hard disk 903 realizes the functions of the information storage unit 43 and the information storage unit 302 and the like.

1 管理サーバ
2 スイッチ
3 物理マシン
4 仮想マシン
43 情報格納部
101 ネットワーク監視部
102 仮想マシン群管理部
103 物理リソース監視部
104 仮想リソース監視部
105 移行制御部
106 移行実施部
110 記憶部
111 仮想マシン通信表
112 仮想マシン群表
113 物理リソース表
114 仮想リソース表
301 負荷計測部
302 情報格納部
DESCRIPTION OF SYMBOLS 1 Management server 2 Switch 3 Physical machine 4 Virtual machine 43 Information storage part 101 Network monitoring part 102 Virtual machine group management part 103 Physical resource monitoring part 104 Virtual resource monitoring part 105 Migration control part 106 Migration execution part 110 Storage part 111 Virtual machine communication Table 112 Virtual machine group table 113 Physical resource table 114 Virtual resource table 301 Load measurement unit 302 Information storage unit

Claims (7)

複数の仮想マシンのうち所定の関連性を有する前記仮想マシンをまとめて複数の仮想マシン群を作成する群作成部と、
各前記仮想マシン群の負荷を基に、組合せた仮想マシン群全体の時間毎の負荷が均一になるように前記仮想マシン群の組合せを決定する平準化部と、
前記平準化部により決定された前記仮想マシン群の組合せ毎に前記仮想マシンを各物理マシンに割当てる割当部と
を備えたことを特徴とする情報処理装置。
A group creation unit that creates a plurality of virtual machine groups by collecting the virtual machines having a predetermined relationship among a plurality of virtual machines;
A leveling unit that determines a combination of the virtual machine groups based on a load of each of the virtual machine groups, so that a load per hour of the entire combined virtual machine group is uniform;
An information processing apparatus comprising: an allocation unit that allocates the virtual machine to each physical machine for each combination of the virtual machine groups determined by the leveling unit.
前記平準化部は、各前記仮想マシン群の負荷の相関関係を求め、負の相関が高い前記仮想マシン群を組み合わせることを特徴とする請求項1に記載の情報処理装置。   The information processing apparatus according to claim 1, wherein the leveling unit obtains a correlation between loads of the virtual machine groups and combines the virtual machine groups having a high negative correlation. 前記平準化部は、各前記仮想マシン群間の負荷の相関係数を算出し、絶対値が最大となる負の相関係数を有する前記仮想マシン群を組み合わせることを特徴とする請求項2に記載の情報処理装置。   The leveling unit calculates a correlation coefficient of a load between the virtual machine groups, and combines the virtual machine groups having a negative correlation coefficient having a maximum absolute value. The information processing apparatus described. 前記群作成部は、前記仮想マシン間で通信が行われる場合に、該通信を行う前記仮想マシン同士が前記所定の関連性を有すると判定することを特徴とする請求項1〜3のいずれか一つに記載の情報処理装置。   The group creation unit, when communication is performed between the virtual machines, determines that the virtual machines that perform the communication have the predetermined relationship with each other. The information processing apparatus according to one. 複数の物理マシンと、仮想マシンが動作する複数の前記物理マシンを管理する管理装置とを有する情報処理システムであって、
前記管理装置は、
前記仮想マシンのうち所定の関連性を有する前記仮想マシンをまとめて複数の仮想マシン群を作成する群作成部と、
各前記仮想マシン群の負荷を基に、組合せた仮想マシン群全体の時間毎の負荷が均一になるように前記仮想マシン群の組合せを決定する平準化部と、
前記平準化部により決定された前記仮想マシン群の組合せ毎に前記仮想マシンを各前記物理マシンに割当てる割当部とを備え、
前記物理マシンは、
前記割当部により割当てられた前記仮想マシンを動作させる仮想マシン実行部を備えた
ことを特徴とする情報処理システム。
An information processing system having a plurality of physical machines and a management device that manages the plurality of physical machines on which virtual machines operate,
The management device
A group creation unit that creates a plurality of virtual machine groups by grouping the virtual machines having a predetermined relationship among the virtual machines;
A leveling unit that determines a combination of the virtual machine groups based on a load of each of the virtual machine groups, so that a load per hour of the entire combined virtual machine group is uniform;
An allocating unit that allocates the virtual machine to each physical machine for each combination of the virtual machine group determined by the leveling unit;
The physical machine is
An information processing system comprising: a virtual machine execution unit that operates the virtual machine allocated by the allocation unit.
複数の仮想マシンのうち所定の関連性を有する前記仮想マシンをまとめて複数の仮想マシン群を作成し、
各前記仮想マシン群の負荷を基に、組合せた仮想マシン群全体の時間毎の負荷が均一になるように前記仮想マシン群の組合せを決定し、
前記仮想マシン群の組合せ毎に前記仮想マシンを各物理マシンに割当てる
処理をコンピュータに実行させることを特徴とする情報処理装置管理プログラム。
Create a plurality of virtual machine groups by collecting the virtual machines having a predetermined relationship among a plurality of virtual machines,
Based on the load of each virtual machine group, determine the combination of the virtual machine group so that the load of the entire combined virtual machine group is uniform every time,
An information processing apparatus management program for causing a computer to execute a process of assigning the virtual machine to each physical machine for each combination of the virtual machine groups.
複数の仮想マシンのうち所定の関連性を有する前記仮想マシンをまとめて複数の仮想マシン群を作成し、
各前記仮想マシン群の負荷を基に、組合せた仮想マシン群全体の時間毎の負荷が均一になるように前記仮想マシン群の組合せを決定し、
前記仮想マシン群の組合せ毎に前記仮想マシンを各物理マシンに割当てる
ことを特徴とする情報処理装置管理方法。
Create a plurality of virtual machine groups by collecting the virtual machines having a predetermined relationship among a plurality of virtual machines,
Based on the load of each virtual machine group, determine the combination of the virtual machine group so that the load of the entire combined virtual machine group is uniform every time,
An information processing apparatus management method, comprising: allocating the virtual machine to each physical machine for each combination of the virtual machine groups.
JP2013039324A 2013-02-28 2013-02-28 Information processing device, information processing system, information processing device management program and information processing device management method Pending JP2014167713A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013039324A JP2014167713A (en) 2013-02-28 2013-02-28 Information processing device, information processing system, information processing device management program and information processing device management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013039324A JP2014167713A (en) 2013-02-28 2013-02-28 Information processing device, information processing system, information processing device management program and information processing device management method

Publications (1)

Publication Number Publication Date
JP2014167713A true JP2014167713A (en) 2014-09-11

Family

ID=51617373

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013039324A Pending JP2014167713A (en) 2013-02-28 2013-02-28 Information processing device, information processing system, information processing device management program and information processing device management method

Country Status (1)

Country Link
JP (1) JP2014167713A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017002812A1 (en) * 2015-06-30 2017-01-05 日本電気株式会社 Virtualization infrastructure management device, virtual network function management device, virtual machine management method, and program
JP2018055160A (en) * 2016-09-26 2018-04-05 日本電気株式会社 Virtual machine management device, method and program
WO2023218664A1 (en) * 2022-05-13 2023-11-16 楽天モバイル株式会社 Replacement system and replacement method
WO2023218663A1 (en) * 2022-05-13 2023-11-16 楽天モバイル株式会社 Execution platform determination system and execution platform determination method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017002812A1 (en) * 2015-06-30 2017-01-05 日本電気株式会社 Virtualization infrastructure management device, virtual network function management device, virtual machine management method, and program
JP2018055160A (en) * 2016-09-26 2018-04-05 日本電気株式会社 Virtual machine management device, method and program
WO2023218664A1 (en) * 2022-05-13 2023-11-16 楽天モバイル株式会社 Replacement system and replacement method
WO2023218663A1 (en) * 2022-05-13 2023-11-16 楽天モバイル株式会社 Execution platform determination system and execution platform determination method

Similar Documents

Publication Publication Date Title
TWI591542B (en) Cloud compute node,method and system,and computer readable medium
EP3467652A1 (en) Data balancing method and device
CN107273185B (en) Load balancing control method based on virtual machine
JP6729399B2 (en) System, virtualization control device, control method of virtualization control device, and program
JP5370946B2 (en) Resource management method and computer system
EP3253027B1 (en) Resource allocation method and apparatus for virtual machines
Shen et al. A resource usage intensity aware load balancing method for virtual machine migration in cloud datacenters
US20120159476A1 (en) Computer workload capacity estimation
CN104601664B (en) A kind of control system of cloud computing platform resource management and scheduling virtual machine
US20150172204A1 (en) Dynamically Change Cloud Environment Configurations Based on Moving Workloads
KR101941282B1 (en) Method of allocating a virtual machine for virtual desktop service
WO2016134542A1 (en) Virtual machine migration method, apparatus and device
JP2011237844A (en) Load balancer and system
US9690608B2 (en) Method and system for managing hosts that run virtual machines within a cluster
JP6424632B2 (en) Load calculation method, load calculation program and load calculation device
Dong et al. Energy-aware scheduling schemes for cloud data centers on *** trace data
JP2016024612A (en) Data processing control method, data processing control program, and data processing control apparatus
JP2014167713A (en) Information processing device, information processing system, information processing device management program and information processing device management method
KR101656706B1 (en) Job distribution system in high-performance computing environment
US20200272526A1 (en) Methods and systems for automated scaling of computing clusters
Babu et al. Interference aware prediction mechanism for auto scaling in cloud
Dörterler et al. Multi-objective virtual machine placement optimization for cloud computing
Li et al. PageRankVM: A pagerank based algorithm with anti-collocation constraints for virtual machine placement in cloud datacenters
JP6116102B2 (en) Cluster system and load balancing method