JP2014094809A - Conveying system - Google Patents

Conveying system Download PDF

Info

Publication number
JP2014094809A
JP2014094809A JP2012247424A JP2012247424A JP2014094809A JP 2014094809 A JP2014094809 A JP 2014094809A JP 2012247424 A JP2012247424 A JP 2012247424A JP 2012247424 A JP2012247424 A JP 2012247424A JP 2014094809 A JP2014094809 A JP 2014094809A
Authority
JP
Japan
Prior art keywords
command
conveyance
transport
time
required time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2012247424A
Other languages
Japanese (ja)
Other versions
JP6016102B2 (en
Inventor
Yoshiyuki Miyamoto
義幸 宮本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Priority to JP2012247424A priority Critical patent/JP6016102B2/en
Publication of JP2014094809A publication Critical patent/JP2014094809A/en
Application granted granted Critical
Publication of JP6016102B2 publication Critical patent/JP6016102B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

PROBLEM TO BE SOLVED: To enable a worker to understand when an article arrives.SOLUTION: A conveying system includes a controller performing: assigning a conveyance command to a conveying device and managing an execution status of the conveyance command; storing a required period from a past actual conveyance; estimating a progress ratio of a required period of an execution completed part of the conveyance command to a required period of an overall conveyance commands, or a remaining period until the article arriving a load port, on the basis of the execution state of the conveyance command and a required period in the past actual conveyance; and displaying the progress ratio, or the remaining period, for the article to be conveyed to the load port on a terminal attached to the load port or a terminal freely carried by a worker.

Description

この発明は搬送システムに関し、特に作業者へのGUI(グラフィカル・ユーザ・インターフェース)の改善に関する。   The present invention relates to a transport system, and more particularly to improvement of a GUI (graphical user interface) for an operator.

搬送システムでは、天井走行車、無人搬送車、スタッカークレーン等により物品を搬送する。そして搬送システムを管理するオペレータのために、システムの状況を表示することが行われている。例えば特許文献1(JP2010-152605A)は、搬送指令の数と、搬送装置の数、及び搬送装置の出入りを、エリア毎に棒グラフで表示することを開示している。このようにすると、どのエリアで搬送装置が不足するかが分かるので、搬送装置が過剰のエリアから不足のエリアへ搬送装置を移動させることができる。   In the conveyance system, articles are conveyed by an overhead traveling vehicle, an automatic guided vehicle, a stacker crane, or the like. For the operator who manages the transport system, the status of the system is displayed. For example, Patent Document 1 (JP2010-152605A) discloses displaying the number of conveyance commands, the number of conveyance devices, and the entry / exit of the conveyance devices in a bar graph for each area. If it does in this way, since it will be understood in which area a conveyance apparatus runs short, a conveyance apparatus can move a conveyance apparatus from an excess area to an insufficient area.

搬送システムでは、作業者がロードポートで物品が到着するのを待つことがある。このとき、いつ物品が到着するのかが分からないと、作業者は心理的負担を感じる。しかしながら特許文献1等のシステムはシステムの管理者のためのもので、個々の作業者に物品が到着する時間を表示することを検討していない。   In the transport system, an operator may wait for an article to arrive at the load port. At this time, the worker feels a psychological burden if he does not know when the article will arrive. However, the system disclosed in Patent Document 1 is for a system administrator, and does not consider displaying the arrival time of an article for each worker.

JP2010-152605AJP2010-152605A

この発明の課題は、物品がいつ到着するかを作業者が理解できるようにすることにある。   An object of the present invention is to enable an operator to understand when an article arrives.

この発明は、コントローラが、搬送装置に搬送指令を割り付け物品を搬送させる搬送システムであって、
前記コントローラは、
搬送指令を搬送装置に割り付けると共に、搬送指令の実行状況を管理する搬送指令管理部と、
過去の搬送実績での所要時間を記憶する記憶部と、
搬送指令の実行状況と過去の搬送実績での所要時間とから、搬送指令中の実行済みの部分の所要時間と搬送指令全体の所要時間との割合から成る進捗率、または物品がロードポートに到着するまでの残り時間を推定する所要時間推定部と、
ロードポートへ搬送予定の物品に対する前記進捗率もしくは前記残り時間を表示する表示画面の生成部、とを備え、
前記表示画面を、前記ロードポートに付属の端末もしくは作業者が携帯自在な端末に表示するように構成されていることを特徴とする。
This invention is a transport system in which a controller assigns a transport command to a transport device and transports an article,
The controller is
A conveyance command management unit that assigns a conveyance command to the conveyance device and manages the execution status of the conveyance command;
A storage unit for storing the required time in the past conveyance results;
Progress rate consisting of the ratio of the time required for the completed part of the transport command and the time required for the entire transport command based on the execution status of the transport command and the required time in the past transport results, or the article arrives at the load port A time estimation unit for estimating the remaining time until
A display screen generating unit that displays the progress rate or the remaining time for an article to be transported to a load port,
The display screen is configured to be displayed on a terminal attached to the load port or a terminal portable by an operator.

この発明では、ロードポートで物品の到着を待機している作業者のために、搬送指令の進捗率あるいは残り時間を表示する。このため作業者はいつ頃物品がロードポートに到着するかを理解できる。従って搬送指令の実行状況が不明なまま、物品の到着を待つ必要がない。   In this invention, the progress rate or remaining time of the conveyance command is displayed for the worker who is waiting for the arrival of the article at the load port. This allows the worker to understand when the article arrives at the load port. Therefore, there is no need to wait for the arrival of an article while the execution status of the conveyance command is unknown.

好ましくは、前記搬送指令管理部は実行中に異常が生じた搬送指令を検出するように構成され、かつ前記表示画面の生成部は、実行中に異常が生じた搬送指令を他の搬送指令と異なる表示色で、前記表示画面に表示するように構成されている。搬送指令の異常とは、ハードウェア的なあるいはソフトウェア的なトラブル等により、搬送指令を実行することが困難になったことを意味する。異常が発生したことを表示色を変えて表示すると、到着する目処が立たない物品を作業者が待ち続けることがない。   Preferably, the conveyance command management unit is configured to detect a conveyance command in which an abnormality has occurred during execution, and the generation unit of the display screen determines a conveyance command in which an abnormality has occurred during execution as another conveyance command. It is configured to display on the display screen with different display colors. The abnormality of the conveyance command means that it is difficult to execute the conveyance command due to a hardware or software problem. By displaying the occurrence of abnormality by changing the display color, the worker does not continue to wait for an article that cannot be reached.

また好ましくは、前記所要時間推定部は、現在までの搬送指令の所要時間を、過去の搬送実績での所要時間の分布と比較することにより、搬送指令が正常に実行されているか遅延しているかを判別するように構成されている。また前記表示画面の生成部は、正常に実行されている搬送指令と、遅延している搬送指令とを、異なる表示色で前記表示画面に表示するように構成されている。現在までの搬送指令の所要時間を、過去の搬送実績での所要時間の分布と比較すると、作業者の感覚的判断とフィットするように、搬送指令の遅延/正常を判別できる。そして遅延している搬送指令を、正常に実行中の搬送指令とは異なる表示色で表示すると、作業者は搬送指令が遅延していることを一目で理解できる。   Preferably, the required time estimation unit compares the required time of the conveyance command up to the present with the distribution of the required time in the past conveyance results to determine whether the conveyance command is normally executed or delayed. Is configured to determine. In addition, the display screen generation unit is configured to display a normally executed conveyance command and a delayed conveyance command on the display screen in different display colors. Comparing the required time of the conveyance command up to the present with the distribution of the required time in the past conveyance results, it is possible to determine the delay / normality of the conveyance command so as to fit the sensory judgment of the operator. When the delayed transfer command is displayed in a display color different from that of the normally executed transfer command, the operator can understand at a glance that the transfer command is delayed.

また好ましくは、前記所要時間推定部は、過去の搬送実績中で所要時間が上位の所定の割合を除いた搬送実績の所要時間から、前記進捗率または前記残り時間を推定するように構成されている。このようにすると、過去の搬送実績から異常が生じたもの及び著しい遅延が生じたものを除いて、所要時間を推定できる。このため遅延等の影響を過度に受けない適切な所要時間を推定できる。   Further preferably, the required time estimation unit is configured to estimate the progress rate or the remaining time from the required time of the transfer results excluding a predetermined ratio of the upper required time in the past transfer results. Yes. In this way, it is possible to estimate the required time, excluding those in which an abnormality has occurred from past transport results and those in which a significant delay has occurred. For this reason, it is possible to estimate an appropriate required time that is not excessively affected by delay or the like.

特に好ましくは、前記所要時間推定部は、前記搬送指令を複数のイベントに分解すると共に、過去の搬送実績からイベント毎の所要時間を推定する。そして実行済みのイベントの所要時間の和と、搬送指令に含まれる全イベントの所要時間との割合から進捗率を求め、かつ未完了のイベントの所要時間から残り時間を求める。また表示画面の生成部は、進捗率と残り時間とを共に表示画面に表示する。イベント毎に所要時間を求めて積算し、実行済みのイベントの所要時間(実際に要した時間ではなく、過去の実績から推定した所要時間)と、総所要時間との割合から進捗率を求める。すると信頼のある進捗率が得られる。例えば総所要時間が2分と推定され、所要時間が各30秒の4イベントから成る搬送指令に対し、最初のイベントを1分掛けて完了した場合、進捗率を25%と的確に求めることができる。なお実行中のイベントに対しては、未実行と見なして進捗率に反映させなくても、あるいは実行中イベントの何%までを完了したかを推定して進捗率に反映させても良い。   Particularly preferably, the required time estimation unit decomposes the transport command into a plurality of events, and estimates the required time for each event from past transport results. Then, the progress rate is obtained from the ratio of the sum of the time required for the executed events and the time required for all the events included in the transport command, and the remaining time is obtained from the time required for the uncompleted event. The display screen generation unit displays both the progress rate and the remaining time on the display screen. The required time is obtained for each event and accumulated, and the progress rate is obtained from the ratio of the required time of the executed event (the required time estimated from the past results instead of the actual time required) and the total required time. This will give you a reliable progress rate. For example, if the total required time is estimated to be 2 minutes, and the transfer command consisting of 4 events of 30 seconds each is completed by taking the first event for 1 minute, the progress rate can be accurately obtained as 25%. it can. Note that events that are being executed may not be considered as being executed and reflected in the progress rate, or may be reflected in the progress rate by estimating up to what percentage of the event being executed has been completed.

実施例の搬送システムのレイアウトを示す平面図The top view which shows the layout of the conveyance system of an Example 実施例の搬送システムの制御系を示すブロック図The block diagram which shows the control system of the conveyance system of an Example 実施例でのユーザ端末での表示画面を示す図The figure which shows the display screen in the user terminal in an Example 実施例でのイベントの定め方と所要時間の求め方とを示す図Figure showing how to determine the event and how to calculate the required time in the example ログファイルでの所要時間の分布を示す図Diagram showing time distribution in log file 実施例でのユーザ端末への表示アルゴリズムを示す図The figure which shows the display algorithm to the user terminal in an Example

以下に本発明を実施するための最適実施例を示す。この発明の範囲は、特許請求の範囲の記載に基づき、明細書の記載とこの分野での周知技術とを参酌し、当業者の理解に従って定められるべきである。   In the following, an optimum embodiment for carrying out the present invention will be shown. The scope of the present invention should be determined according to the understanding of those skilled in the art based on the description of the scope of the claims, taking into account the description of the specification and well-known techniques in this field.

図1〜図6に実施例の搬送システム2を示す。図1は搬送システム2のレイアウトを示し、4〜12はイントラベイルートで、これ以外にイントラベイルート4〜12を互いに接続するインターベイルートを備えても良い。そして図示しない天井走行車がこれらのルートを走行する。14,15はストッカで、FOUP,SMIFポッド等の物品を一時保管すると共に、イントラベイルート4〜6とイントラベイルート7〜12を中継する。ストッカ14,15は、天井走行車用のロードポート16と作業者用のロードポート17とを備えている。そして作業者用のロードポート17には、物品が到着するまでの残り時間等を表示し、かつ作業者が種々の入力をするための、端末18が備えられている。   The conveyance system 2 of an Example is shown in FIGS. FIG. 1 shows a layout of the transport system 2, and reference numerals 4 to 12 denote intrabay routes. In addition to this, an interbay route that connects the intrabay routes 4 to 12 may be provided. An overhead traveling vehicle (not shown) travels along these routes. 14 and 15 are stockers that temporarily store articles such as FOUPs and SMIF pods, and relay intrabay routes 4 to 6 and intrabay routes 7 to 12. The stockers 14 and 15 include a load port 16 for overhead traveling vehicles and a load port 17 for workers. The worker load port 17 is provided with a terminal 18 for displaying the remaining time until the article arrives and for the operator to make various inputs.

20は半導体等の処理装置、21は半導体等の検査装置で、処理装置20はロードポート24を備えて天井走行車との間で物品をやり取りし、検査装置21は、ストッカ14,15と同様に、作業者用のロードポート17と端末18とを備えている。25はイントラベイルート4〜12の直下あるいは側部に設けられたバッファで、物品を一時保管する。なお搬送装置の種類と搬送システムのレイアウトは任意で、例えば無人搬送車、自動倉庫のスタッカークレーン等により搬送しても良い。また搬送する物品の種類は任意で、例えばフラットパネルディスプレイの基板、医薬品等を搬送しても良い。   20 is a processing apparatus such as a semiconductor, 21 is an inspection apparatus such as a semiconductor, and the processing apparatus 20 includes a load port 24 to exchange articles with an overhead traveling vehicle. The inspection apparatus 21 is similar to the stockers 14 and 15. In addition, an operator load port 17 and a terminal 18 are provided. A buffer 25 is provided directly below or on the side of the intra-bay routes 4 to 12, and temporarily stores articles. The type of the transfer device and the layout of the transfer system are arbitrary, and may be transferred by, for example, an automatic guided vehicle, a stacker crane of an automatic warehouse, or the like. Further, the type of article to be conveyed is arbitrary, and for example, a substrate of a flat panel display, a medicine, etc. may be conveyed.

図2に搬送システム2の制御系を示す。ストッカ内搬送装置30はストッカコントローラ31からの指令により、ストッカの内部で物品を搬送する。また天井走行車コントローラ33の指令により、イントラベイルート及びインターベイルート等に沿って、天井走行車32が物品を搬送する。なお天井走行車コントローラ33と天井走行車32との間に、中継用のローカルコントローラを介在させても良い。システムコントローラ34は、図示しない生産管理コントローラ等から搬送要求を受信し、ストッカコントローラ31,天井走行車コントローラ33等を介して、搬送システム2による物品の搬送を制御する。さらに搬送システム2の各部にIDリーダが設けられ、搬送中の物品のIDを確認する。   FIG. 2 shows a control system of the transport system 2. The stocker transport device 30 transports articles within the stocker according to a command from the stocker controller 31. Moreover, the overhead traveling vehicle 32 conveys the article along the intrabay route, the interbay route, and the like according to a command from the overhead traveling vehicle controller 33. A relay local controller may be interposed between the overhead traveling vehicle controller 33 and the overhead traveling vehicle 32. The system controller 34 receives a conveyance request from a production management controller (not shown) or the like, and controls the conveyance of articles by the conveyance system 2 via the stocker controller 31, the overhead traveling vehicle controller 33, and the like. Further, an ID reader is provided in each part of the transport system 2 to confirm the ID of the article being transported.

システムコントローラ34の搬送指令管理部35は、搬送要求に応じて搬送指令を作成し、ストッカ内搬送装置30,天井走行車32等に実行させる。搬送指令では例えば、搬送する物品を荷積みする位置(From位置)と荷下ろしする位置(To位置)とを指定し、その間の走行ルートを指定する。さらに物品のID等も搬送指令に記述する。搬送指令管理部35は、所定の時間毎に搬送装置の位置と状況等を確認し、搬送装置等に異常が生じ搬送指令を実行不能になると、異常として検出する。   The transport command management unit 35 of the system controller 34 creates a transport command in response to the transport request, and causes the intra-stocker transport device 30, the overhead traveling vehicle 32, and the like to execute the transport command. In the transport command, for example, a position (From position) for loading an article to be transported and a position (To position) for unloading are specified, and a travel route between them is specified. In addition, the ID of the article is described in the transport command. The conveyance command management unit 35 checks the position and status of the conveyance device every predetermined time, and detects an abnormality when an abnormality occurs in the conveyance device and the conveyance command cannot be executed.

所要時間推定部36は搬送指令の実行開始から実行完了までの所要時間を推定し、この推定に、例えばログファイル記憶部37に記憶している過去の搬送実績のデータを使用する。ログファイル記憶部37は、過去の搬送指令を複数のイベントに分解し、イベント毎の所要時間を記憶している。所要時間推定部36は、搬送指令管理部35が生成した搬送指令の内で、実行中の指令の個数と実行待ちの指令の個数、あるいは実行中の指令でのTo位置の分布等から、搬送指令の実行までの待ち時間を推定しても良い。所要時間推定部36は、搬送指令の実行状況から、搬送指令の進捗率、即ち、搬送指令中の実行済みの部分の所要時間と搬送指令全体の所要時間との割合、を推定する。所要時間推定部36はさらに物品がロードポートに到着するまでの残り時間を推定する。また所要時間推定部36は、現在までの搬送指令の所要時間と過去の搬送実績での所要時間の分布とから、搬送指令が正常に実行されているか遅延しているかを判別する。例えば所要時間の分布の平均値あるいはメディアンから、分布の標準偏差に所定の倍率を乗じた時間以上遅れているものを、遅延とする。   The required time estimation unit 36 estimates the required time from the start of execution of the conveyance command to the completion of the execution, and for this estimation, for example, the past conveyance result data stored in the log file storage unit 37 is used. The log file storage unit 37 disassembles the past conveyance command into a plurality of events, and stores the required time for each event. The required time estimation unit 36 determines the conveyance from the number of commands being executed and the number of commands waiting to be executed among the conveyance commands generated by the conveyance command management unit 35, or the distribution of the To position in the command being executed. The waiting time until execution of the command may be estimated. The required time estimation unit 36 estimates the progress rate of the conveyance command, that is, the ratio between the required time of the executed part in the conveyance command and the required time of the entire conveyance command from the execution status of the conveyance command. The required time estimation unit 36 further estimates the remaining time until the article arrives at the load port. The required time estimation unit 36 determines whether the transfer command is being executed normally or delayed from the required time of the transfer command up to now and the distribution of the required time in the past transfer results. For example, a delay that is more than the time obtained by multiplying the standard deviation of the distribution by a predetermined magnification from the average value or median of the required time is defined as the delay.

なおこの明細書では、搬送指令を天井走行車等の搬送装置に割り付け、搬送装置から確認信号をコントローラが受信した時点で、搬送指令の実行を開始したものとする。また仮に、搬送指令を実行するまでに待ち時間が必要な搬送装置に搬送指令を割り付けることを認める場合、搬送指令の実行を開始したことを搬送装置からコントローラが受信した時点で、搬送指令の実行を開始したものとする。   In this specification, it is assumed that the conveyance command is assigned to a conveyance device such as an overhead traveling vehicle, and the execution of the conveyance command is started when the controller receives a confirmation signal from the conveyance device. Also, if it is allowed to assign a transport command to a transport device that requires a waiting time before the transport command is executed, the transport command is executed when the controller receives from the transport device that the transport command has been started. Is assumed to have started.

表示画面生成部38は、作業者の端末18に表示する画面等を生成し、図示しない通信部を介して作業者の端末18へ表示画面のデータを送信する。作業者の端末18からは各種の問い合わせ、検索の依頼、データの入力等ができ、例えば端末18が置かれているロードポート17に到着する予定の物品のリストを要求できる。表示画面生成部38は、これに応じて図3の表示画面を生成し、端末18に表示する。また作業者が個々の搬送指令に関して問い合わせを行うと、表示画面生成部38は図3のHostID、搬送物等の詳細データを生成し、端末18に表示する。   The display screen generation unit 38 generates a screen or the like to be displayed on the worker's terminal 18 and transmits display screen data to the worker's terminal 18 via a communication unit (not shown). Various inquiries, search requests, data input, and the like can be made from the operator's terminal 18. For example, a list of articles scheduled to arrive at the load port 17 where the terminal 18 is placed can be requested. In response to this, the display screen generation unit 38 generates the display screen of FIG. 3 and displays it on the terminal 18. Further, when the operator makes an inquiry about each conveyance command, the display screen generation unit 38 generates detailed data such as HostID and conveyance items in FIG. 3 and displays them on the terminal 18.

実施例ではシステムコントローラ34が搬送指令を管理する例を示すが、搬送指令をストッカコントローラ31,天井走行車コントローラ33等が作成して管理しても良い。その場合、搬送指令管理部35〜表示画面生成部38を各コントローラ31,33に設けて、端末18へ表示画面を送信する。端末18は図1のロードポート17に固定の端末に限らず、作業者が携帯する端末等でも良く、さらに図1での通常のロードポート24にも設けても良い。またシステムコントローラ34は、搬送システム2の状況を監視しているオペレータに、搬送システムの状況に関するデータを提供する。   In the embodiment, an example in which the system controller 34 manages the conveyance command is shown, but the conveyance command may be created and managed by the stocker controller 31, the overhead traveling vehicle controller 33, or the like. In that case, the conveyance command management unit 35 to the display screen generation unit 38 are provided in each of the controllers 31 and 33, and the display screen is transmitted to the terminal 18. The terminal 18 is not limited to a terminal fixed to the load port 17 in FIG. 1, but may be a terminal carried by an operator, or may be provided in the normal load port 24 in FIG. Further, the system controller 34 provides data relating to the status of the transport system to an operator who monitors the status of the transport system 2.

図3に、作業者用の端末18での表示画面の例を示す。図1の作業者用のロードポート17は、検査が必要、物品のIDが不明等のため、作業者が直接取り扱うことが必要な物品のロードポートである。このため作業者はロードポート17で物品の到着を待つことになり、物品が到着するまでの残り時間が不明であると、作業者はストレスを感じる。そこで端末18に、ロードポートへ搬送する予定の物品のリストを、搬送物(物品)のID、物品毎の進捗率のグラフ、及び到着までの残り時間の推定値の形で表示する。進捗率のグラフは例えば棒グラフもしくは円グラフである。さらに端末18は、搬送指令の状況に応じて、進捗率のグラフを、
・ 正常(正常に実行中)、
・ 異常発生(ハードウェア的あるいはソフト的なエラーが発生し、メンテナンス等が必要なため、到着時間を推定できない)、
・ 遅延(実行中であるが、予定値に対して無視できない遅れが生じている)、
・ 実行待ち(搬送指令の実行を開始していない)、
等に表示色を変えて表示する。実行待ちでの残り時間は、例えば搬送指令の実行を開始するまでの所要時間と実行開始から到着までの所要時間の和であるが、実行開始から到着までの所要時間を表示しても良い。実施例では進捗率と残り時間とを表示するが、一方のみを表示しても良い。また残り時間のみを表示する場合、正常/遅延/異常の種別を、残り時間の表示色を変えることにより表示する。さらに異常の場合、残り時間は不明として扱う。
FIG. 3 shows an example of a display screen on the operator terminal 18. The load port 17 for the worker shown in FIG. 1 is a load port for an article that needs to be handled directly by the worker because inspection is necessary and the ID of the article is unknown. For this reason, the worker waits for the arrival of the article at the load port 17, and the worker feels stress if the remaining time until the article arrives is unknown. Therefore, a list of articles to be transported to the load port is displayed on the terminal 18 in the form of an ID of the transported object (article), a graph of the progress rate for each article, and an estimated value of the remaining time until arrival. The progress rate graph is, for example, a bar graph or a pie graph. Furthermore, the terminal 18 displays a progress rate graph in accordance with the status of the conveyance command.
・ Normal (running normally),
・ Abnormal occurrence (Hardware or software error occurs and maintenance is required, so arrival time cannot be estimated),
Delay (running, but there is a delay that cannot be ignored)
-Waiting for execution (execution of transfer command has not started),
For example, change the display color. The remaining time waiting for execution is, for example, the sum of the required time until the execution of the conveyance command is started and the required time from the start of execution to the arrival, but the required time from the start of execution to the arrival may be displayed. In the embodiment, the progress rate and the remaining time are displayed, but only one of them may be displayed. When only the remaining time is displayed, the normal / delay / abnormal type is displayed by changing the display color of the remaining time. In case of an abnormality, the remaining time is treated as unknown.

図3の表示画面に対して、作業者が個々の搬送指令を指定すると、搬送指令の詳細と搬送指令の実行状況の詳細とをポップアップ表示する。これによって例えば図3の場合、異常が発生したため残り時間が不明な搬送物111111が、どのような状態にあるのかが分かる。   When the operator designates each conveyance command on the display screen of FIG. 3, the details of the conveyance command and the details of the execution status of the conveyance command are displayed in a pop-up. Thus, for example, in the case of FIG. 3, it is possible to know in what state the conveyed product 111111 whose remaining time is unknown because an abnormality has occurred.

図4に、正常な場合への残り時間の推定機構を示す。1個の搬送指令は複数のイベントの列に分解できる。図4の例では、搬送指令は、天井走行車が現在地からFrom位置へ走行する(イベントe1、所要時間t1)、From位置で物品を荷積みする(イベントe2、所要時間t2)、分岐合流部40の入口まで走行する(イベントe3、所要時間t3)、分岐と合流とを行う(イベントe4、所要時間t4)、To位置まで走行する(イベントe5、所要時間t5)、To位置で荷下ろしする(イベントe6、所要時間t6)等に分解できる。なおより詳細に各イベントを分解することもでき、イベントへの分解の仕方は任意である。例えばイベントe2をFrom位置に停止し移載確認信号を交換、From位置で移載を開始、From位置で移載を完了し移載完了信号を交換、の3つのイベントに分解することもできる。またイベントe3,e4,e5を1個のイベントにまとめることもできる。   FIG. 4 shows a mechanism for estimating the remaining time in the normal case. One transport command can be broken down into a plurality of event rows. In the example of FIG. 4, the conveyance command is that the overhead traveling vehicle travels from the current location to the From position (event e1, required time t1), loads an article at the From position (event e2, required time t2), and a branch / merging unit Travel to 40 entrance (event e3, required time t3), branch and merge (event e4, required time t4), travel to To position (event e5, required time t5), unload at To position (Event e6, required time t6). Each event can also be decomposed in more detail, and the method of decomposing into events is arbitrary. For example, the event e2 is stopped at the From position, the transfer confirmation signal is exchanged, the transfer is started at the From position, the transfer is completed at the From position, and the transfer completion signal is exchanged. Also, events e3, e4, e5 can be combined into one event.

これらのイベントの所要時間の総和が搬送指令の総所要時間Tであり、完了済みのイベントの所要時間の和と総所要時間Tとの割合等が進捗率である。また正常な場合、例えば完了していないイベントの所要時間の和、あるいは未実行のイベントの所要時間の和と実行中のイベントの残り時間との和が、図3の表示画面での残り時間である。なお各搬送装置は、現在位置、状態等を、所定の時間間隔で、天井走行車コントローラ、ストッカコントローラ等へ送信する。従ってコントローラ34の搬送指令管理部35と所要時間推定部36は、各搬送装置が実行中のイベントのどの部分までを完了したかを把握している。   The total required time of these events is the total required time T of the transport command, and the ratio of the total required time of completed events and the total required time T is the progress rate. In the normal case, for example, the sum of the time required for an uncompleted event, or the sum of the time required for an unexecuted event and the remaining time for an event being executed is the remaining time on the display screen of FIG. is there. Each transport device transmits the current position, state, etc. to the overhead traveling vehicle controller, stocker controller, etc. at predetermined time intervals. Accordingly, the transport command management unit 35 and the required time estimation unit 36 of the controller 34 know up to which part of the event being executed by each transport device.

図5はログファイルでの所要時間の実績の分布を示す。例えば図4の搬送指令に対し、現在地からFrom位置への走行と、From位置からTo位置への物品の搬送に搬送指令を2分し、2個の部分毎に実績を求めても良い。しかしFrom位置とTo位置とを指定すると、実績の個数が少なくなる場合、図4のイベントを単位として実績を求めても良い。過去の実績での所要時間の分布から、所要時間が長い側の例えば10%と短い側の例えば10%等を除いたものを有効範囲とし、有効範囲での所要時間の平均値、あるいは中央値(メディアン値)等を所要時間とする。また有効範囲での所要時間の分散もしくは標準偏差等の分布の広さを表す量を求め、正常/遅延の判別に用いる。   FIG. 5 shows the distribution of the required time in the log file. For example, with respect to the conveyance command of FIG. 4, the conveyance command may be divided into two parts for traveling from the current position to the From position and conveying the article from the From position to the To position, and the results may be obtained for every two parts. However, when the From position and the To position are designated, when the number of achievements decreases, the achievement may be obtained in units of events in FIG. From the distribution of required time in the past results, excluding 10% on the long side, for example 10% on the short side, etc. is the effective range, and the average value or median of the required time in the effective range (Median value) etc. is the required time. Also, an amount representing the distribution of required time in the effective range or the distribution width such as standard deviation is obtained and used for normal / delay discrimination.

搬送指令を複数のイベントに分解し、イベント毎に所要時間とその分布とを求める場合、イベント毎の所要時間の総和を総所要時間とし、イベント毎の分散の和等を搬送指令全体での所要時間の分散とする。所要時間が極端に長いデータを無視するのは、異常に対応するデータを無視すると共に、著しく遅延した例によって所要時間が長くなることを防止するためである。なお所要時間が長い側及び短い側の何%を無視するかは任意である。実施例では、所要時間が極端に短いデータを無視したが、このデータを有効範囲に加えても良い。   When disassembling a transport command into multiple events and obtaining the required time and distribution for each event, the total required time for each event is taken as the total required time, and the sum of variance for each event is required for the entire transport command. Let time dispersion. The reason why data having an extremely long required time is ignored is to prevent the data corresponding to the abnormality from being ignored and to prevent the required time from becoming longer due to a significantly delayed example. It should be noted that what percentage of the long side and the short side is ignored is arbitrary. In the embodiment, data having an extremely short required time is ignored, but this data may be added to the effective range.

例えば最初のイベントから実行中のイベントまでの範囲で、各イベントの所要時間の平均値もしくはメディアンに、所要時間の分散の和の1/2乗、即ち実行中のイベントまでの所要時間の標準偏差、に1等の所定の倍率を加えたを加えたものを求める。この値は正常/遅延の境界と見なすことができる。そして現在までの所要時間がこの値よりも長いものを遅延とする。例えば前記の倍率を1とすると、搬送指令の10%程度を遅延として扱うことになる。なお正常/遅延の境界の定め方は任意で、例えば実行中のイベントまでの所要時間の分布を求め、現在までの所要時間がこの分布での長い側の10%以内に含まれるものを遅延としても良い。   For example, in the range from the first event to the event being executed, the average value or median of the time required for each event is the 1/2 power of the sum of the variance of the time required, that is, the standard deviation of the time required for the event being executed , Plus a predetermined magnification of 1 etc. is obtained. This value can be regarded as a normal / delay boundary. Then, the delay time is longer than this value. For example, assuming that the magnification is 1, about 10% of the conveyance command is handled as a delay. The normal / delay boundary can be defined in any way. For example, the distribution of the required time to the event being executed is obtained, and the time required to the present is within 10% of the long side of the distribution as a delay. Also good.

図6に進捗状況の表示アルゴリズムを示す。端末が置かれた作業者用のロードポートへ搬送予定の物品に対し、搬送指令の状況を正常/遅延/異常/実行待ち等に分類し、それぞれ表示色を異ならせる(ステップ1)。正常/遅延の判別では、例えば最初のイベントから実行中のイベントまでの実際の所要時間が、実行中のイベントまでの平均値あるいはメディアンの和に、実行中のイベントまでの分散の和の1/2乗以上を加えたものを越えると、遅延とする。ただしこの判別条件は任意である。   FIG. 6 shows a progress display algorithm. For the articles to be transported to the load port for the worker where the terminal is placed, the status of the transport command is classified into normal / delayed / abnormal / waiting for execution, and the display colors are changed (step 1). In the normal / delay determination, for example, the actual required time from the first event to the running event is calculated by adding the average value or median to the running event to 1 / of the sum of the variance to the running event. If the sum of squares or more is exceeded, a delay is assumed. However, this determination condition is arbitrary.

正常に実行中の搬送指令に対し、例えば実行済みのイベントの所要時間と、総所要時間との割合を進捗率とする。なお実行済みのイベントの所要時間に実行中のイベント中の実行済みの部分の所要時間を加えて、進捗率を求めても良い(ステップ2)。そして未実行のイベントの所要時間の和、あるいは未実行のイベントの所要時間の和に実行中のイベントの未実行部分の所要時間を加えたものを、残り時間として表示する(ステップ3)。   For a conveyance command that is being executed normally, for example, the ratio of the required time of an executed event and the total required time is set as the progress rate. Note that the progress rate may be obtained by adding the time required for the executed part of the event being executed to the time required for the executed event (step 2). Then, the sum of the required times of unexecuted events or the sum of the required times of unexecuted events plus the required time of the unexecuted portion of the event being executed is displayed as the remaining time (step 3).

遅延中の搬送指令に対し、ステップ2と同様にして進捗率を表示する(ステップ4)。次ぎに遅延中のイベントの残り時間を推定し、これに未実行のイベントの所要時間の和を加えて、残り時間として表示する(ステップ5)。例えば遅延している天井走行車が、図4のイベントe5を実行中で、イベントe5の所要時間は20秒で、現在イベントe5の実行開始から15秒経過して、イベントe5の走行距離の1/2を走行したとすると、イベントe5の残り時間は15秒と推定できる。   In response to the delayed conveyance command, the progress rate is displayed in the same manner as in step 2 (step 4). Next, the remaining time of the delayed event is estimated, and the sum of the required time of the unexecuted event is added to this and displayed as the remaining time (step 5). For example, a delayed overhead vehicle is executing event e5 in FIG. 4, and the time required for event e5 is 20 seconds, and 15 seconds have elapsed from the start of execution of event e5. If you run / 2, you can estimate that the remaining time of event e5 is 15 seconds.

この状況でより正確に残り時間を推定するには、To位置までに位置する先行の天井走行車の数、あるいはTo位置までの範囲で停止する予定の先行の天井走行車の数、To位置までの範囲で合流もしくは分岐する予定の先行の天井走行車の数、等をカウントすると良い。これらの数は渋滞の起こり易さを表し、これらの数により定まる遅延時間を所要時間の平均値等に加えることによっても、イベントe5の残り時間を推定できる。   To estimate the remaining time more accurately in this situation, the number of preceding overhead vehicles that are located up to the To position, or the number of preceding overhead vehicles that are scheduled to stop in the range up to the To position, up to the To position It is better to count the number of preceding overhead traveling vehicles that are scheduled to merge or branch in the range of. These numbers represent the likelihood of traffic jams, and the remaining time of the event e5 can also be estimated by adding the delay time determined by these numbers to the average value of the required time.

未実行の場合、実行開始までの待ち時間の推定値+実行開始から完了までの所要時間、あるいは待ち時間を無視して実行開始から完了までの所要時間を残り時間として表示する(ステップ6)。異常の場合(ステップ7)、天井走行車、IDリーダ、ロードポート等にトラブルが生じているので、残り時間は表示しない。いずれの場合も、作業者の問い合わせに対し、図3の詳細表示を行い、状況を作業者が理解できるようにする(ステップ8)。   If not executed, the estimated value of the waiting time until the start of execution + the required time from the start of execution to the completion, or the required time from the start of execution to the completion is displayed as the remaining time ignoring the waiting time (step 6). If there is an abnormality (step 7), troubles have occurred in the overhead traveling vehicle, ID reader, load port, etc., so the remaining time is not displayed. In either case, the detailed display shown in FIG. 3 is displayed in response to the inquiry of the worker so that the worker can understand the situation (step 8).

これらの処理により、ロードポートへ物品が到着するまでの残り時間等を作業者は視覚的に理解でき、物品の到着を待つことによるストレスを最小にできる。   By these processes, the worker can visually understand the remaining time until the article arrives at the load port, and the stress caused by waiting for the arrival of the article can be minimized.

2 搬送システム
4〜12 イントラベイルート
14,15 ストッカ
16,24 ロードポート
17 作業者用のロードポート
18 端末
20 処理装置
21 検査装置
25 バッファ
30 ストッカ内搬送装置
31 ストッカコントローラ
32 天井走行車
33 天井走行車コントローラ
34 システムコントローラ
35 搬送指令管理部
36 所要時間推定部
37 ログファイル記憶部
38 表示画面生成部
40 分岐合流部
From 荷積み位置
To 荷下ろし位置
e1〜e6 イベント
t1〜t6 所要時間
2 Transport System 4 to 12 Intrabay Routes 14 and 15 Stockers 16 and 24 Load Port 17 Load Port 18 for Worker 18 Terminal 20 Processing Device 21 Inspection Device 25 Buffer 30 Stocker Transport Device 31 Stocker Controller 32 Overhead Vehicle 33 Overhead Vehicle Controller 34 System controller 35 Transport command management unit 36 Time required estimation unit 37 Log file storage unit 38 Display screen generation unit 40 Branch / merging unit
From loading position
To unloading position
e1-e6 event
t1-t6 required time

Claims (5)

コントローラが、搬送装置に搬送指令を割り付け物品を搬送させる搬送システムであって、
前記コントローラは、
搬送指令を搬送装置に割り付けると共に、搬送指令の実行状況を管理する搬送指令管理部と、
過去の搬送実績での所要時間を記憶する記憶部と、
搬送指令の実行状況と過去の搬送実績での所要時間とから、搬送指令中の実行済みの部分の所要時間と搬送指令全体の所要時間との割合から成る進捗率、または物品がロードポートに到着するまでの残り時間を推定する所要時間推定部と、
ロードポートへ搬送予定の物品に対する前記進捗率もしくは前記残り時間を表示する表示画面の生成部、とを備え、
前記表示画面を、前記ロードポートに付属の端末もしくは作業者が携帯自在な端末に表示するように構成されていることを特徴とする、搬送システム。
The controller is a transport system that assigns a transport command to the transport device and transports the article,
The controller is
A conveyance command management unit that assigns a conveyance command to the conveyance device and manages the execution status of the conveyance command;
A storage unit for storing the required time in the past conveyance results;
Progress rate consisting of the ratio of the time required for the completed part of the transport command and the time required for the entire transport command based on the execution status of the transport command and the required time in the past transport results, or the article arrives at the load port A time estimation unit for estimating the remaining time until
A display screen generating unit that displays the progress rate or the remaining time for an article to be transported to a load port,
A transport system configured to display the display screen on a terminal attached to the load port or a terminal portable by an operator.
前記搬送指令管理部は実行中に異常が生じた搬送指令を検出するように構成され、
かつ前記表示画面の生成部は、実行中に異常が生じた搬送指令を他の搬送指令と異なる表示色で、前記表示画面に表示するように構成されていることを特徴とする、請求項1の搬送システム。
The conveyance command management unit is configured to detect a conveyance command in which an abnormality has occurred during execution,
The display screen generating unit is configured to display a transport command in which an abnormality has occurred during execution on the display screen in a display color different from that of other transport commands. Transport system.
前記所要時間推定部は、現在までの搬送指令の所要時間を、過去の搬送実績での所要時間の分布と比較することにより、搬送指令が正常に実行されているか遅延しているかを判別するように構成され、
かつ前記表示画面の生成部は、正常に実行されている搬送指令と、遅延している搬送指令とを、異なる表示色で前記表示画面に表示するように構成されていることを特徴とする、請求項2の搬送システム。
The required time estimation unit determines whether the conveyance command is normally executed or delayed by comparing the required time of the conveyance command up to the present with the distribution of the required time in the past conveyance results. Composed of
In addition, the display screen generation unit is configured to display the transport command that is normally executed and the transport command that is delayed on the display screen in different display colors. The transport system according to claim 2.
前記所要時間推定部は、過去の搬送実績中で所要時間が上位の所定の割合に含まれるものを除いた搬送実績の所要時間から、前記進捗率または前記残り時間を推定するように構成されていることを特徴とする、請求項1〜3のいずれかの搬送システム。   The required time estimation unit is configured to estimate the progress rate or the remaining time from the required time of the transfer results excluding the required transfer time included in the upper predetermined ratio in the past transfer results. The conveyance system according to claim 1, wherein 前記所要時間推定部は、前記搬送指令を複数のイベントに分解すると共に、過去の搬送実績からイベント毎の所要時間を推定し、実行済みのイベントの所要時間の和と、搬送指令に含まれる全イベントの所要時間との割合から前記進捗率を求め、かつ未完了のイベントの所要時間から前記残り時間を求めるように構成され、
かつ前記表示画面の生成部は、前記進捗率と前記残り時間とを共に前記表示画面に表示するように構成されていることを特徴とする、請求項1〜4のいずれかの搬送システム。
The required time estimation unit decomposes the transport command into a plurality of events, estimates the required time for each event from the past transport results, and calculates the sum of the required time of executed events and all the transport commands included in the transport command. The progress rate is determined from a ratio to the duration of an event, and the remaining time is determined from the duration of an incomplete event.
The transfer system according to claim 1, wherein the display screen generating unit is configured to display both the progress rate and the remaining time on the display screen.
JP2012247424A 2012-11-09 2012-11-09 Transport system Active JP6016102B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012247424A JP6016102B2 (en) 2012-11-09 2012-11-09 Transport system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012247424A JP6016102B2 (en) 2012-11-09 2012-11-09 Transport system

Publications (2)

Publication Number Publication Date
JP2014094809A true JP2014094809A (en) 2014-05-22
JP6016102B2 JP6016102B2 (en) 2016-10-26

Family

ID=50938229

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012247424A Active JP6016102B2 (en) 2012-11-09 2012-11-09 Transport system

Country Status (1)

Country Link
JP (1) JP6016102B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020154380A (en) * 2019-03-18 2020-09-24 トヨタ自動車株式会社 Article transportation system
KR20210065878A (en) 2019-11-27 2021-06-04 가부시키가이샤 다이후쿠 Article transport apparatus

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003160208A (en) * 2001-11-22 2003-06-03 Daifuku Co Ltd Physical distribution facility
JP2008168989A (en) * 2007-01-11 2008-07-24 Toyota Industries Corp Work completion time predicting device in automated warehouse
JP2012035999A (en) * 2010-08-11 2012-02-23 Okamura Corp Book storage management system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003160208A (en) * 2001-11-22 2003-06-03 Daifuku Co Ltd Physical distribution facility
JP2008168989A (en) * 2007-01-11 2008-07-24 Toyota Industries Corp Work completion time predicting device in automated warehouse
JP2012035999A (en) * 2010-08-11 2012-02-23 Okamura Corp Book storage management system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020154380A (en) * 2019-03-18 2020-09-24 トヨタ自動車株式会社 Article transportation system
CN111709676A (en) * 2019-03-18 2020-09-25 丰田自动车株式会社 Article carrying system
JP7135952B2 (en) 2019-03-18 2022-09-13 トヨタ自動車株式会社 Goods transport system
US11440734B2 (en) 2019-03-18 2022-09-13 Toyota Jidosha Kabushiki Kaisha Article transport system
CN111709676B (en) * 2019-03-18 2023-10-03 丰田自动车株式会社 Article handling system
KR20210065878A (en) 2019-11-27 2021-06-04 가부시키가이샤 다이후쿠 Article transport apparatus

Also Published As

Publication number Publication date
JP6016102B2 (en) 2016-10-26

Similar Documents

Publication Publication Date Title
JP4746674B2 (en) Transport system and transport method
US9811090B2 (en) Guided vehicle system and guided vehicle travel schedule generation method
EP3389084B1 (en) Conveyance system and conveyance method
US9836050B2 (en) Guided vehicle system and guided vehicle control method
CN107703943A (en) A kind of method and its system that control multiple mobile robots concurrently to run
JP2013049500A (en) Simulation system and simulation method for guided vehicle system
TWI817010B (en) Transport control device
WO2007132650A1 (en) Transfer system, and transfer method
US7809466B2 (en) Transportation system and transportation method
JP2013050776A (en) Simulation system and simulation method for carriage system
JP2009215032A (en) Automated transportation system, and carrier waiting position setting method in automated transportation system
JP6016102B2 (en) Transport system
JP4143828B2 (en) Conveyor cart system
TWI679510B (en) Transportation control device and transportation control system
JP5758166B2 (en) Processing support apparatus and method, semiconductor manufacturing support apparatus and method, and program
TWI448861B (en) Shorten the handling time of handling time
JP4492525B2 (en) Transport control device, transport control program, and transport control method
Chung Estimating arrival times of transportation jobs for automated material handling in LCD fabrication facilities
JP5874301B2 (en) Transport vehicle system
Gupta et al. Improving scheduling and control of the OHTC controller in wafer fab AMHS systems
JP2004086734A (en) Centralized control system for service parts
JP2004192411A (en) Carrier conveyance control method
JP2003347388A (en) Conveyance system
CN118295386A (en) Transport vehicle dispatching method and device
JP6769033B2 (en) Production volume management system on the production line

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150819

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160414

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160506

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160615

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160902

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160915

R150 Certificate of patent or registration of utility model

Ref document number: 6016102

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250