JP2013167069A - Steel supporting - Google Patents

Steel supporting Download PDF

Info

Publication number
JP2013167069A
JP2013167069A JP2012029910A JP2012029910A JP2013167069A JP 2013167069 A JP2013167069 A JP 2013167069A JP 2012029910 A JP2012029910 A JP 2012029910A JP 2012029910 A JP2012029910 A JP 2012029910A JP 2013167069 A JP2013167069 A JP 2013167069A
Authority
JP
Japan
Prior art keywords
steel support
tunnel
cross
section
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2012029910A
Other languages
Japanese (ja)
Other versions
JP5831756B2 (en
Inventor
Hiroo Kumasaka
博夫 熊坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2012029910A priority Critical patent/JP5831756B2/en
Publication of JP2013167069A publication Critical patent/JP2013167069A/en
Application granted granted Critical
Publication of JP5831756B2 publication Critical patent/JP5831756B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide steel supporting to be integrated with spray concrete without leaving cavities between the spray concrete and itself, in a standard construction method for a mountain tunnel.SOLUTION: In steel supporting 41 which is formed arch-shaped so that one of H-shaped flanges formed H-shaped in cross section faces an excavated inner wall face, the outside flange facing the inner wall face of a tunnel is inclined at both sides to the inner space side of the tunnel so that its crosswise center is convexed in cross section. Secondary spray concrete 5 sprayed after erecting the steel supporting therefore comes around the area between the steel supporting 41 and primary spray concrete 3. Thus, the steel supporting 41 and the spray concrete are integrated without leaving cavities between the steel supporting 41 and the primary spray concrete 3. The steel supporting 41 develops higher supporting capability than conventional steel supporting.

Description

本発明は、山岳トンネルの標準工法において用いる鋼製支保工の改良に関する。   The present invention relates to an improvement of a steel support used in a standard method for mountain tunnels.

図1に示すように、山岳トンネルの標準工法である新オーストリアトンネル工法(以下、「NATM」という)において、一次支保工2は、切羽近傍における天端部や側壁部の崩落防止、切羽が通過した後の周辺地山の安定性の確保、を目的とする。一次支保工2には、吹付けコンクリートやロックボルト、鋼製支保工が用いられるが、吹付けコンクリートと鋼製支保工とは、一体となって地山に密着し、トンネル1の断面内に薄肉のアーチ構造を形成する(特許文献1〜3参照)。   As shown in Fig. 1, in the new Austrian tunnel construction method (hereinafter referred to as "NATM"), which is the standard construction method for mountain tunnels, the primary support work 2 prevents collapse of the top edge and the side wall near the face, and the face passes. The purpose is to secure the stability of the surrounding ground after the completion. The primary support 2 is made of shotcrete, rock bolts, or steel support, but the shotcrete and steel support are in close contact with the natural ground and within the cross section of the tunnel 1 A thin arch structure is formed (see Patent Documents 1 to 3).

鋼製支保工は、鋼材を用いることから、その剛性が大きく、周辺地山の崩落や変形抑止効果が他の部材よりも高いと考えられ、建て込み直後から切羽掘削直後のトンネルの安定性を確保することを目的に用いられてきた。   Steel supports are made of steel, so their rigidity is large, and it is considered that the effect of preventing the collapse and deformation of surrounding ground is higher than other members. It has been used for the purpose of securing.

また、近年、吹付けコンクリートは、吹付けから短時間で強度と剛性を発揮するものが開発され、地山の剥落や崩壊、変形抑止等の支保性能が高くなっており、押し出し性の大きな地山のトンネルで使用されている。   In recent years, shotcrete has been developed that exhibits strength and rigidity in a short time after spraying, and has a high supporting performance such as stripping, collapse, and deformation prevention of natural ground, and has a high extrusion property. Used in mountain tunnels.

このように、一次支保工に用いる鋼製支保工と吹付けコンクリートとは、様々な支保効果が期待されているが、これらの効果は、最終的に主に部材に発生する断面力である軸力・軸応力に変換される。この軸応力は、支保工部材の軸剛性により、その発生軸力、軸応力は分担されると考えられる。   As described above, the steel support and shotcrete used for the primary support are expected to have various support effects, but these effects are mainly the shaft that is the sectional force generated mainly in the member. Converted to force / axial stress. It is considered that the generated axial force and axial stress are shared by the axial rigidity of the support member.

ところで、既往のトンネル建設時の計測結果では、鋼製支保工が有する軸剛性に比べて計測された軸力、軸方向応力が小さいことが知られている。この理由の1つは、鋼製支保工が本来受ける地圧を十分に受けることができないことにあると考えられる。   By the way, it is known that the axial force and the axial stress measured are smaller than the axial rigidity of the steel support in the measurement result at the time of construction of the existing tunnel. One reason for this is thought to be that the ground pressure that the steel support works originally cannot receive sufficiently.

また、これは、図2に示すように、鋼製支保工4が吹付けたコンクリート(一次吹付けコンクリート3)に均等に接触しないことによるものと考えられる。すなわち、NATMでは、掘削直後に周辺地山Bから浮いた岩石・地山を取り除き、その後、掘削面の平滑化と取り除けなかった地山の浮き剥落を防止することを目的に、一次吹付けコンクリート3を5cm程度吹き付けるが、一次吹付けコンクリート3の仕上面を十分に平滑にすることは難しく、一次吹付けコンクリート3と鋼製支保工4との間にすき間Sが残ることによるものと考えられる。   Moreover, as shown in FIG. 2, this is considered to be due to the fact that the concrete (primary sprayed concrete 3) sprayed by the steel supporter 4 is not evenly contacted. That is, in NATM, the primary shotcrete is used to remove rocks and grounds that have floated from the surrounding natural ground B immediately after excavation, and then smooth the excavated surface and prevent the natural ground from being lifted off. 3 is sprayed about 5 cm, but it is difficult to make the finished surface of the primary sprayed concrete 3 sufficiently smooth, and it is considered that a gap S remains between the primary sprayed concrete 3 and the steel support 4. .

したがって、鋼製支保工4の建て込み後に吹き付けるコンクリート(二次吹付けコンクリート)が鋼製支保工4と一次吹付けコンクリート3との間にまわり込み、鋼製支保工4と一次吹付けコンクリート3との間に残るすき間を埋めることが求められる。   Therefore, the concrete (secondary shot concrete) sprayed after the steel support 4 is installed wraps around between the steel support 4 and the primary shotcrete 3, and the steel support 4 and the primary shotcrete 3 It is required to fill the remaining gap.

特開平5−86800号公報JP-A-5-86800 特開平7−97899号公報Japanese Unexamined Patent Publication No. 7-97899 特開平8−232589号公報JP-A-8-232589

しかしながら、図3に示すように、鋼製支保工4には、断面がHの字状であるH型鋼が用いられ、図3−2に示すように、断面がHの字状である鋼製支保工40と一次吹付けコンクリート3との間にすき間がある場合には、二次吹付けコンクリート5が断面がHの字状である鋼製支保工40と一次吹付けコンクリート3との間にまわり込むことはなく、断面がHの字状である鋼製支保工40と一次吹付けコンクリート3との間に空隙(鬆)Sが残ることになる。   However, as shown in FIG. 3, an H-shaped steel having a H-shaped cross section is used for the steel support 4 and a steel having a H-shaped cross section as shown in FIG. 3-2. When there is a gap between the support 40 and the primary shotcrete 3, the secondary shotcrete 5 is between the steel support 40 and the primary shotcrete 3 whose section is H-shaped. It does not wrap around, and a void S remains between the steel support 40 having a H-shaped cross section and the primary shotcrete 3.

本発明は、上記に鑑みてなされたものであって、吹付けコンクリートとの間に空隙(鬆)が残ることなく、吹付けコンクリートと一体化することができる鋼製支保工を提供することを目的とする。   The present invention has been made in view of the above, and provides a steel support that can be integrated with shotcrete without leaving a void between the shotcrete and the shotcrete. Objective.

上述した課題を解決し、目的を達成するために、本発明は、断面H型に形成されたH型鋼のフランジの一方が掘削したトンネルの内壁面に向かい合うように、アーチ状に形成された鋼製支保工において、トンネルの内壁面に向かい合う外側のフランジを、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に傾けたことを特徴とする。   In order to solve the above-described problems and achieve the object, the present invention provides a steel formed in an arch shape so that one of the flanges of the H-shaped steel formed in the H-shaped section faces the inner wall surface of the excavated tunnel. In the support work, the outer flange facing the inner wall surface of the tunnel is inclined on both sides of the tunnel so that the center in the width direction is convex in the cross section.

また、本発明は、上記発明において、前記外側のフランジが、横断面において幅方向中央が凸となり、その両側が一定の角度でトンネルの内空側に傾く山型であることを特徴とする。   Further, the present invention is characterized in that, in the above-mentioned invention, the outer flange has a mountain shape in which the center in the width direction is convex in the cross section and both sides thereof are inclined toward the inner space side of the tunnel at a constant angle.

また、本発明は、上記発明において、前記角度が、30°〜45°の間であることを特徴とする。   Moreover, the present invention is characterized in that, in the above invention, the angle is between 30 ° and 45 °.

また、本発明は、上記発明において、前記外側のフランジが、横断面において幅方向中央が凸となり、その両側がトンネルの内空側に漸次傾く円弧状であることを特徴とする。   Further, the present invention is characterized in that, in the above-mentioned invention, the outer flange has a circular arc shape in which the center in the width direction is convex in the cross section and both sides thereof are gradually inclined toward the inner side of the tunnel.

本発明にかかる鋼製支保工は、トンネルの内壁面に向かい合う外側のフランジを、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に傾けたので、鋼製支保工の建て込み後に吹き付けた二次吹付けコンクリートが鋼製支保工と一次吹付けコンクリートとの間にまわり込む。これにより、鋼製支保工と一次吹付けコンクリートとの間に空隙(鬆)が残ることがなく、鋼製支保工と吹付けコンクリートとが一体化する。そして、鋼製支保工は従来の鋼製支保工よりも高い支保能力を発揮する。   In the steel support according to the present invention, the outer flange facing the inner wall surface of the tunnel is tilted on the inner side of the tunnel so that both sides thereof are inclined so that the center in the width direction is convex in the cross section. The secondary shotcrete sprayed after the construction of the work goes around between the steel support and the primary shotcrete. Thereby, a space | gap (pore) does not remain between steel support and primary shotcrete, but steel support and shotcrete are integrated. And steel support works show higher support ability than the conventional steel support works.

図1は、NATMで構築した山岳トンネルの構造を示す横断面図である。FIG. 1 is a cross-sectional view showing the structure of a mountain tunnel constructed with NATM. 図2は、NATMにおける一次吹付けコンクリートと鋼製支保工との接触状況を示す横断面図である。FIG. 2 is a cross-sectional view showing a contact state between the primary shotcrete and the steel support in NATM. 図3−1は、NATMで構築した山岳トンネルの構造を示す断面図であって、鋼製支保工が吹付けコンクリートと一体化した状態を示す図である。FIG. 3-1 is a cross-sectional view showing the structure of a mountain tunnel constructed by NATM, and shows a state where a steel support is integrated with shotcrete. 図3−2は、NATMで構築した山岳トンネルの構造を示す断面図であって、鋼製支保工の背面に鬆が残った状態を示す図である。FIG. 3-2 is a cross-sectional view showing the structure of a mountain tunnel constructed by NATM, and shows a state in which voids remain on the back of a steel support. 図4−1は、本発明の実施の形態1である鋼製支保工を用いた山岳トンネルの構造を示す断面図であって、鋼製支保工が吹付けコンクリートと一体化した状態を示す図である。4-1 is sectional drawing which shows the structure of the mountain tunnel using the steel support construction which is Embodiment 1 of this invention, Comprising: The figure which shows the state with which the steel support construction was integrated with shotcrete It is. 図4−2は、本発明の実施の形態1である鋼製支保工を用いた山岳トンネルの構造を示す断面図であって、鋼製支保工の背面に二次吹き付けコンクリートがまわりこみ一体化した状態を示す図である。4-2 is sectional drawing which shows the structure of the mountain tunnel using the steel support construction which is Embodiment 1 of this invention, Comprising: Secondary spray concrete wraps around and integrated with the back surface of the steel support construction. It is a figure which shows a state. 図5は、鋼製支保工の折れ角度と断面二次モーメントの低減率との関係を示す図である。FIG. 5 is a diagram showing the relationship between the bending angle of the steel support and the reduction rate of the secondary moment of section. 図6−1は、NATMで構築した山岳トンネルの構造を示す断面図であって、実施の形態2である鋼製支保工が吹付けコンクリートと一体化した状態を示す図である。FIG. 6-1 is a cross-sectional view showing the structure of a mountain tunnel constructed by NATM, and shows a state in which the steel support according to the second embodiment is integrated with shotcrete. 図6−2は、NATMで構築した山岳トンネルの構造を示す断面図であって、実施の形態2である鋼製支保工の背面に二次吹付けコンクリートがまわり込み一体化した状態を示す図である。FIG. 6-2 is a cross-sectional view showing the structure of a mountain tunnel constructed by NATM, and shows a state in which secondary shotcrete wraps around and integrated with the back surface of the steel support that is Embodiment 2. It is. 図7は、実施の形態1である鋼製支保工の断面と実施の形態2である鋼製支保工の断面とを比較する断面模式図である。FIG. 7 is a schematic cross-sectional view comparing the cross section of the steel support structure according to the first embodiment and the cross section of the steel support structure according to the second embodiment.

以下に、本発明にかかる鋼製支保工の実施の形態を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。   Hereinafter, embodiments of a steel support according to the present invention will be described in detail with reference to the drawings. Note that the present invention is not limited to the embodiments.

本発明の実施の形態である鋼製支保工は、NATMにおいて、掘削直後のトンネルの内壁面にコンクリート(一次吹付けコンクリート)を吹き付けた後に、一次吹付けコンクリートに接するように、トンネルの内空側に建て込むものである。そして、本発明の実施の形態である鋼製支保工は、トンネルの内空側に建て込んだ後に、コンクリート(二次吹付けコンクリート)を吹き付けた場合に、吹き付けた二次吹付けコンクリートが一次吹付けコンクリートとの間にまわり込むように形成したことに特徴がある。以下、具体的に説明する。   The steel supporter according to the embodiment of the present invention has a structure in which the inner space of the tunnel is in contact with the primary sprayed concrete after spraying concrete (primary sprayed concrete) on the inner wall surface of the tunnel immediately after excavation in NATM. It is built on the side. And the steel supporter which is the embodiment of the present invention, when the concrete (secondary sprayed concrete) is sprayed after being built in the inner space of the tunnel, the sprayed secondary sprayed concrete is the primary It is characterized by being formed so as to wrap around between shotcrete. This will be specifically described below.

[実施の形態1]
図4は、本発明の実施の形態1である鋼製支保工を用いた山岳トンネルの構造を示す断面図であって、図4−1は、鋼製支保工が吹付けコンクリートと一体化した状態を示す図であり、図4−2は、鋼製支保工の背面に二次吹付けコンクリートがまわり込み一体化した状態を示す図である。
[Embodiment 1]
FIG. 4 is a cross-sectional view showing the structure of a mountain tunnel using a steel support that is Embodiment 1 of the present invention, and FIG. 4-1 shows that the steel support is integrated with shotcrete. It is a figure which shows a state, and FIG. 4-2 is a figure which shows the state which secondary spray concrete wraps around and integrated with the back surface of the steel support.

図4に示すように、本発明の実施の形態1である鋼製支保工41は、掘削したトンネルの内壁面に吹き付けたコンクリート(一次吹付けコンクリート3)に接するように建て込まれ、その後、吹き付けられたコンクリート(二次吹付けコンクリート5)により、吹き付けられたコンクリート(一次吹付けコンクリート3および二次吹付けコンクリート5)と一体化する。   As shown in FIG. 4, the steel support 41 according to the first embodiment of the present invention is built in contact with the concrete sprayed on the inner wall surface of the excavated tunnel (primary sprayed concrete 3), and then The sprayed concrete (secondary spray concrete 5) is integrated with the sprayed concrete (primary spray concrete 3 and secondary spray concrete 5).

本発明の実施の形態1である鋼製支保工41は、上述した鋼製支保工40と同様に、断面がHの字状に形成されたH型鋼を用いたものである。H型鋼は、対となるフランジ(断面「H」において「I」となる部分)とフランジを相互に繋ぐウェブ(断面「H」において「−」となる部分)とを有しており、フランジの一方が掘削したトンネルの内壁面に向かい合うように、アーチ状(円弧状)に形成してある。   The steel support 41 according to the first embodiment of the present invention uses H-shaped steel having a H-shaped cross section, as with the steel support 40 described above. The H-shaped steel has a pair of flanges (portion that becomes “I” in the cross section “H”) and a web that connects the flanges to each other (portion that becomes “−” in the cross section “H”). One side is formed in an arch shape (arc shape) so as to face the inner wall surface of the excavated tunnel.

また、本発明の実施の形態1である鋼製支保工41は、一次吹付けコンクリート3との間に吹き付けたコンクリート(二次吹付けコンクリート5)がまわり込むように、トンネルの内壁面に向かい合うフランジ(外側となるフランジ)を形成してある。具体的には、トンネルの内壁面に向かい合うフランジを、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に傾けてある。これにより、鋼製支保工41は、その横断面において外側となるフランジがΛ(山)型となる。   Moreover, the steel support 41 which is Embodiment 1 of this invention faces the inner wall surface of a tunnel so that the concrete (secondary shot concrete 5) sprayed between the primary shot concrete 3 may wrap around. A flange (an outer flange) is formed. Specifically, both sides of the flange facing the inner wall surface of the tunnel are inclined toward the inner space of the tunnel so that the center in the width direction is convex in the cross section. Thereby, as for the steel support 41, the flange which becomes an outer side in the cross section becomes a Λ (mountain) type.

このように、トンネルの内壁面に向かい合うフランジを、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に傾けた鋼製支保工41は、トンネルの内空側に建て込んだ場合に、図4に示すように、フランジの幅方向中央、凸となる稜線において一次吹付けコンクリート3に最も接近する。そして、その後、吹き付けられたコンクリート(二次吹付けコンクリート5)は、一次吹付けコンクリート3と鋼製支保工41との間にまわり込み、鋼製支保工41と吹付けコンクリート(一次吹付けコンクリート3と二次吹付けコンクリート5)とを一体化する。   As described above, the steel support 41 having the flange facing the inner wall surface of the tunnel inclined toward the inner space side of the tunnel so that the center in the width direction is convex in the cross section is formed on the inner space side of the tunnel. When it is built, as shown in FIG. 4, it comes closest to the primary shotcrete 3 at the center in the width direction of the flange and at the convex ridgeline. After that, the sprayed concrete (secondary shot concrete 5) wraps around between the first shot concrete 3 and the steel support 41, and the steel support 41 and the shot concrete (primary shot concrete). 3 and secondary shotcrete 5) are integrated.

ところで、本発明の実施の形態1である鋼製支保工41のように、トンネルの内壁面に向かい合うフランジを、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に傾けると、軸力部材としての性能は低下しないが、鋼製支保工4の断面二次モーメントは低下することになる。   By the way, like the steel support 41 which is Embodiment 1 of the present invention, the flange facing the inner wall surface of the tunnel is arranged on both sides of the tunnel so that the center in the width direction is convex in the cross section. When tilted to the right, the performance as an axial force member does not decrease, but the cross-sectional secondary moment of the steel support 4 decreases.

図5は、鋼製支保工の折れ角度と断面二次モーメントの低減率との関係を示す図である。図5に示すように、鋼製支保工4の断面二次モーメントの低下する度合い(低下比)は、鋼製支保工4の折れ角度、すなわち、フランジの傾き角度と相関関係を有している。これにより、フランジの傾き角度が小さいほど断面二次モーメントの低下量は小さくて済むことになるが、フランジの傾き角度が小さいと吹き付けられたコンクリートがまわり込みにくくなる。このことを踏まえると、鋼製支保工の折れ角度は、30°〜45°の間に設定することが好ましいと考えられる。   FIG. 5 is a diagram showing the relationship between the bending angle of the steel support and the reduction rate of the secondary moment of section. As shown in FIG. 5, the degree (decrease ratio) in which the cross-sectional secondary moment of the steel support 4 decreases is correlated with the bending angle of the steel support 4, that is, the inclination angle of the flange. . As a result, the smaller the inclination angle of the flange, the smaller the amount of decrease in the secondary moment of section. However, when the inclination angle of the flange is small, the sprayed concrete is less likely to wrap around. Considering this, it is considered that the bending angle of the steel support is preferably set between 30 ° and 45 °.

上述した本発明の実施の形態1である鋼製支保工41は、トンネルの内壁面に向かい合うフランジ(外側フランジ)を、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に傾けてあるので、図4−1に示すように、外側フランジの幅方向中央、凸となる稜線が一次吹付けコンクリート3に接する場合、図4−2に示すように、外側フランジの幅方向中央、凸となる稜線が一次吹付けコンクリート3から離れている場合、のいずれでも、吹き付けたコンクリート(二次吹付けコンクリート5)が一次吹付けコンクリート3との間にまわり込む。これにより、鋼製支保工41と一次吹付けコンクリート3との間に空隙(鬆)が残ることがなく、鋼製支保工41と吹付けコンクリート(一次吹付けコンクリート3と二次吹付けコンクリート5)とが一体化する。そして、鋼製支保工41は、従来の鋼製支保工40よりも高い支保能力を発揮する。   The steel support 41 according to the first embodiment of the present invention described above has a flange (outer flange) facing the inner wall surface of the tunnel on both sides of the tunnel so that the center in the width direction is convex in the cross section. Since it is inclined to the sky side, as shown in FIG. 4-1, when the ridge line that is convex in the center in the width direction of the outer flange is in contact with the primary sprayed concrete 3, as shown in FIG. In any case where the center in the width direction and the protruding ridgeline are separated from the primary shotcrete 3, the sprayed concrete (secondary shotcrete 5) wraps around the primary shotcrete 3. Thereby, a space | gap (void) does not remain between the steel support 41 and the primary shotcrete 3, but the steel support 41 and the shotcrete (the primary shotcrete 3 and the secondary shotcrete 5 ) Are integrated. The steel support 41 exhibits a higher support capacity than the conventional steel support 40.

[実施の形態2]
図6は、本発明の実施の形態2である鋼製支保工を用いた山岳トンネルの構造を示す断面図であって、図6−1は、鋼製支保工がコンクリートと一体化した状態を示す図であり、図6−2は、鋼製支保工の背面に二次吹付けコンクリートがまわりこみ一体化した状態を示す図である。
[Embodiment 2]
FIG. 6 is a cross-sectional view showing a structure of a mountain tunnel using a steel support that is Embodiment 2 of the present invention, and FIG. 6-1 shows a state where the steel support is integrated with concrete. FIG. 6B is a diagram illustrating a state where the secondary shotcrete is wrapped around and integrated with the back surface of the steel support.

図6に示すように、本発明の実施の形態2である鋼製支保工42は、上述した本発明の実施の形態1である鋼製支保工41と同様に、掘削したトンネルの内壁面に吹き付けたコンクリート(一次吹付けコンクリート3)に接するように建て込まれ、その後、吹き付けられたコンクリート(二次吹付けコンクリート5)により、吹き付けられたコンクリート(一次吹付けコンクリート3および二次吹付けコンクリート5)と一体化する。   As shown in FIG. 6, the steel support 42 according to the second embodiment of the present invention is formed on the inner wall surface of the excavated tunnel in the same manner as the steel support 41 according to the first embodiment of the present invention described above. Concrete (primary sprayed concrete 3 and secondary shotcrete) that was built in contact with the sprayed concrete (primary sprayed concrete 3) and then sprayed with the sprayed concrete (secondary sprayed concrete 5) Integrated with 5).

本発明の実施の形態2である鋼製支保工42は、上述した本発明の実施の形態1である鋼製支保工41と同様に、断面がHの字状に形成されたH型鋼を用いたものである。H型鋼は、対となるフランジ(断面「H」において「I」となる部分)とフランジを相互に繋ぐウェブ(断面「H」において「−」となる部分)とを有しており、フランジの一方が掘削したトンネルの内壁面に向かい合うように、アーチ状(円弧状)に形成してある。   The steel support 42 according to the second embodiment of the present invention uses an H-shaped steel having a H-shaped cross section similar to the steel support 41 according to the first embodiment of the present invention described above. It was. The H-shaped steel has a pair of flanges (portion that becomes “I” in the cross section “H”) and a web that connects the flanges to each other (portion that becomes “−” in the cross section “H”). One side is formed in an arch shape (arc shape) so as to face the inner wall surface of the excavated tunnel.

また、本発明の実施の形態2である鋼製支保工42は、一次吹付けコンクリート3との間に吹き付けたコンクリート(二次吹付けコンクリート5)がまわり込むように、トンネルの内壁面に向かい合うフランジ(外側となるフランジ)を形成してある。具体的には、トンネルの内壁面に向かい合うフランジは、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に漸次傾けてある。これにより、鋼製支保工41は、その横断面において外側となるフランジが∩(円弧)状になる。   Moreover, the steel support 42 which is Embodiment 2 of this invention faces the inner wall surface of a tunnel so that the concrete (secondary shot concrete 5) sprayed between primary shot concrete 3 may wrap around. A flange (an outer flange) is formed. Specifically, both sides of the flange facing the inner wall surface of the tunnel are gradually inclined toward the inner side of the tunnel so that the center in the width direction is convex in the cross section. Thereby, as for the steel support 41, the flange which becomes an outer side in the cross section becomes a hook (arc) shape.

このように、トンネルの内壁面に向かい合うフランジを、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に漸次傾けた鋼製支保工42は、トンネルの内空側に建て込んだ場合に、図6に示すように、フランジの幅方向中央、凸となる部分において一次吹付けコンクリート3に最も接近する。そして、その後、吹き付けられたコンクリート(二次吹付けコンクリート5)は、一次吹付けコンクリート3と鋼製支保工42との間にまわり込み、鋼製支保工42と吹付けコンクリート(一次吹付けコンクリート3と二次吹付けコンクリート5)とを一体化する。   In this way, the steel support 42, in which the flange facing the inner wall surface of the tunnel is gradually inclined toward the inner air side of the tunnel so that the center in the width direction is convex in the cross section, is the inner air side of the tunnel. 6, as shown in FIG. 6, the flange is closest to the primary shotcrete 3 at the center of the flange in the width direction and at the convex portion. After that, the sprayed concrete (secondary shot concrete 5) wraps around between the primary shot concrete 3 and the steel support 42, and the steel support 42 and the shot concrete (primary shot concrete). 3 and secondary shotcrete 5) are integrated.

図7は、実施の形態1である鋼製支保工の断面と実施の形態2である鋼製支保工の断面とを比較する断面模式図である。図7に示すように、本発明の実施の形態2である鋼製支保工42のように、トンネルの内壁面に向かい合うフランジを、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に漸次傾けても、本発明の実施の形態1である鋼製支保工41の折れ高さが同じ程度であれば、同等以上の断面二次モーメントを確保できる。   FIG. 7 is a schematic cross-sectional view comparing the cross section of the steel support structure according to the first embodiment and the cross section of the steel support structure according to the second embodiment. As shown in FIG. 7, like the steel support 42 which is the second embodiment of the present invention, the flange facing the inner wall surface of the tunnel is arranged on both sides so that the center in the width direction is convex in the cross section. Even if it is gradually inclined toward the inner space side of the tunnel, if the bending height of the steel support 41 according to the first embodiment of the present invention is approximately the same, a cross-sectional secondary moment equal to or higher than that can be secured.

上述した本発明の実施の形態2である鋼製支保工42は、トンネルの内壁面に向かい合うフランジ(外側フランジ)を、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に漸次傾けたので、図6−1に示すように、外側フランジの幅方向中央、凸となる稜線が一次吹付けコンクリート3に接する場合、図6−2に示すように、外側フランジの幅方向中央、凸となる稜線が一次吹付けコンクリート3から離れている場合、のいずれでも、吹き付けたコンクリート(二次吹付けコンクリート5)が一次吹付けコンクリート3との間にまわり込む。これにより、鋼製支保工42と一次吹付けコンクリートとの間に空隙(鬆)が残ることがなく、鋼製支保工42と吹付けコンクリート(一次吹付けコンクリート3と二次吹付けコンクリート5)とが一体化する。そして、鋼製支保工42は、従来の鋼製支保工40よりも高い支保能力を発揮する。   The steel support 42 according to the second embodiment of the present invention described above has a flange (outer flange) facing the inner wall surface of the tunnel on both sides of the tunnel so that the center in the width direction is convex in the cross section. Since it is gradually inclined toward the sky side, as shown in FIG. 6A, when the convex ridge line is in contact with the primary shotcrete 3, the center of the outer flange in the width direction, as shown in FIG. In any case where the center in the width direction and the protruding ridgeline are separated from the primary shotcrete 3, the sprayed concrete (secondary shotcrete 5) wraps around the primary shotcrete 3. As a result, no voids remain between the steel support 42 and the primary shotcrete, and the steel support 42 and the shotcrete (primary shotcrete 3 and secondary shotcrete 5). And unite. The steel support 42 exhibits a higher support capacity than the conventional steel support 40.

1 トンネル
2 一次支保工
3 一次吹付けコンクリート
4 鋼製支保工
41 鋼製支保工
42 鋼製支保工
5 二次吹付けコンクリート
B 地山
DESCRIPTION OF SYMBOLS 1 Tunnel 2 Primary support 3 Primary spray concrete 4 Steel support 41 Steel support 42 Steel support 5 Secondary spray concrete B Ground

Claims (4)

断面H型に形成されたH型鋼のフランジの一方が掘削したトンネルの内壁面に向かい合うように、アーチ状に形成された鋼製支保工において、
トンネルの内壁面に向かい合う外側のフランジを、横断面において幅方向中央が凸となるように、その両側をトンネルの内空側に傾けたことを特徴とする鋼製支保工。
In the steel support work formed in the arch shape so that one of the flanges of the H-shaped steel formed in the H-shaped section faces the inner wall surface of the excavated tunnel,
A steel supporter characterized in that both sides of the outer flange facing the inner wall of the tunnel are inclined toward the inner side of the tunnel so that the center in the width direction is convex in the cross section.
前記外側のフランジは、横断面において幅方向中央が凸となり、その両側が一定の角度でトンネルの内空側に傾く山型であることを特徴とする請求項1に記載の鋼製支保工。   2. The steel support according to claim 1, wherein the outer flange has a mountain shape in which the center in the width direction is convex in a cross section, and both sides thereof are inclined toward the inner side of the tunnel at a constant angle. 前記角度は、30°〜45°の間であることを特徴とする請求項2に記載の鋼製支保工。   The steel support according to claim 2, wherein the angle is between 30 ° and 45 °. 前記外側のフランジは、横断面において幅方向中央が凸となり、その両側がトンネルの内空側に漸次傾く円弧状であることを特徴とする請求項1に記載の鋼製支保工。   2. The steel support according to claim 1, wherein the outer flange has an arc shape in which the center in the width direction is convex in the cross section and both sides thereof are gradually inclined toward the inner space side of the tunnel.
JP2012029910A 2012-02-14 2012-02-14 Steel support Expired - Fee Related JP5831756B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012029910A JP5831756B2 (en) 2012-02-14 2012-02-14 Steel support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012029910A JP5831756B2 (en) 2012-02-14 2012-02-14 Steel support

Publications (2)

Publication Number Publication Date
JP2013167069A true JP2013167069A (en) 2013-08-29
JP5831756B2 JP5831756B2 (en) 2015-12-09

Family

ID=49177663

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012029910A Expired - Fee Related JP5831756B2 (en) 2012-02-14 2012-02-14 Steel support

Country Status (1)

Country Link
JP (1) JP5831756B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015086584A (en) * 2013-10-30 2015-05-07 清水建設株式会社 Steel support
CN112832825A (en) * 2021-01-19 2021-05-25 华北理工大学 Assembled hollow sandwich concrete filled steel tube arch center and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS554920B2 (en) * 1976-09-18 1980-02-01
JPH0586800A (en) * 1991-09-25 1993-04-06 Minoru Yamamoto Method of constructing assembly of steel timbering for tunnel and spacer fixture
JP3048604U (en) * 1997-11-04 1998-05-22 文夫 大沢 Concrete support for tunnel
JPH11223097A (en) * 1998-02-05 1999-08-17 Fumio Osawa Trapezoidal trench timbering for tunnel
JP2012188870A (en) * 2011-03-11 2012-10-04 Jfe Steel Corp Steel concrete composite column

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS554920B2 (en) * 1976-09-18 1980-02-01
JPH0586800A (en) * 1991-09-25 1993-04-06 Minoru Yamamoto Method of constructing assembly of steel timbering for tunnel and spacer fixture
JP3048604U (en) * 1997-11-04 1998-05-22 文夫 大沢 Concrete support for tunnel
JPH11223097A (en) * 1998-02-05 1999-08-17 Fumio Osawa Trapezoidal trench timbering for tunnel
JP2012188870A (en) * 2011-03-11 2012-10-04 Jfe Steel Corp Steel concrete composite column

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015086584A (en) * 2013-10-30 2015-05-07 清水建設株式会社 Steel support
CN112832825A (en) * 2021-01-19 2021-05-25 华北理工大学 Assembled hollow sandwich concrete filled steel tube arch center and construction method thereof
CN112832825B (en) * 2021-01-19 2022-04-12 华北理工大学 Assembled hollow sandwich concrete filled steel tube arch center and construction method thereof

Also Published As

Publication number Publication date
JP5831756B2 (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN104329095B (en) A kind of existing tunnel Widening Construction method
JP6480815B2 (en) Tunnel junction structure and tunnel construction method
JP2007321490A (en) Tunnel excavation method
KR20130012106A (en) Transition piece and momopile connection structure of offshore wind turbine
JP5831756B2 (en) Steel support
JP6448089B2 (en) How to build an arch bridge
JP2009185556A (en) Self-supporting earth retaining wall construction method
JP6386829B2 (en) Pneumatic caisson tilt correction method
JP5187325B2 (en) Steel sheet pile retaining wall and design method thereof
KR20140069845A (en) Retaining wall using diagonal reinforcement member
JP6791586B2 (en) Structure of support work in tunnel and installation method of support work
CN203463109U (en) Asymmetric multi-arch tunnel structure
JP2006233666A (en) Foundation structure of building receiving partial earth pressure
CN205638476U (en) A section of jurisdiction steel shotcrete for tunnel construction
JP2015081425A (en) Steel support and structure of lining concrete
JP5747516B2 (en) Shield tunnel
JP6229400B2 (en) Tunnel connection structure and tunnel connection method
JP5839279B2 (en) Tunnel structure and construction method thereof
JP6696822B2 (en) Foundation structure
KR101598048B1 (en) High strength lattice girder
JP2009203717A (en) Concrete structure
RU2602533C1 (en) Tunnel for motor roads, railways and subways
JP4947969B2 (en) Building construction method and construction structure using underground outer peripheral wall of existing building
CN110670602A (en) Compressive deformation control design method for radial support and the like
CN204646268U (en) A kind of underground construction steel arch-shelf composite supporting construction

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140730

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150409

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150428

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150623

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150929

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151014

R150 Certificate of patent or registration of utility model

Ref document number: 5831756

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees