JP2013161155A - Load device information automatic extraction and management system - Google Patents

Load device information automatic extraction and management system Download PDF

Info

Publication number
JP2013161155A
JP2013161155A JP2012020707A JP2012020707A JP2013161155A JP 2013161155 A JP2013161155 A JP 2013161155A JP 2012020707 A JP2012020707 A JP 2012020707A JP 2012020707 A JP2012020707 A JP 2012020707A JP 2013161155 A JP2013161155 A JP 2013161155A
Authority
JP
Japan
Prior art keywords
load device
information
power
distribution system
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2012020707A
Other languages
Japanese (ja)
Inventor
Hiroyuki Enomoto
裕幸 榎本
Isao Somemura
染村  庸
Shinsuke Iihashi
真輔 飯橋
Akiyoshi Tominaga
哲欣 富永
Yasuyuki Sugiyama
泰之 杉山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Telegraph and Telephone Corp
Original Assignee
Nippon Telegraph and Telephone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp filed Critical Nippon Telegraph and Telephone Corp
Priority to JP2012020707A priority Critical patent/JP2013161155A/en
Publication of JP2013161155A publication Critical patent/JP2013161155A/en
Pending legal-status Critical Current

Links

Landscapes

  • Power Sources (AREA)

Abstract

PROBLEM TO BE SOLVED: To enable grasping an actual electric power of any of the load devices connected to an electric outlet individually from a remote place without using a communication network function of a remote electric power monitoring outlet.SOLUTION: Electronic sensors, which are provided in distribution circuits of electric power, detect power consumption data on a plurality of load devices disposed for each distribution circuit of electric power, and a collection server collects the detected power consumption data on the load devices. Then, a management server, when receiving information on the load devices, including the power consumption data thereof collected by the collection server, stores it in a memory as data, and also manages the information on the load devices in such a manner as to be associated with information on the distribution circuit to which the load devices belong, and terminals can display the information managed by the management server. In the memory of the management server, at least IDs of the load devices belonging to the distribution circuit and power consumption data on the load devices are associated with an ID of the distribution circuit and registered as hierarchical data, and the hierarchical data can be acquired and displayed on the terminals at a remote place.

Description

本発明は通信機器等の負荷機器の情報を自動的に抽出して管理するシステムに関する。   The present invention relates to a system for automatically extracting and managing information on a load device such as a communication device.

従来の電流計測装置(最大容量警報機能付きコンセントプラグ)には、本体が規定するコンセント本体の最大許容電流(Maximum Total Current)におけるアラーム機能(機器の過剰搭載により起こる過電流を未然に防止するための機能のみ)であり、どのコンセントに接続されている負荷機器(通信機器類)がどういった名称で、且つ個々の機器がどれだけの消費電力なのかを、自動で把握・管理する機能はなく、各負荷機器(通信機器類)の設置場所を特定できるようなシステムであるとは言い難い(非特許文献1,2)。   The conventional current measuring device (outlet plug with maximum capacity alarm function) has an alarm function for the maximum allowable current (Maximum Total Current) of the outlet body specified by the body (to prevent overcurrent caused by overloading of the device in advance) The function to automatically grasp and manage what kind of name the load device (communication equipment) connected to which outlet and how much power each individual device consumes. In other words, it is difficult to say that the system can identify the installation location of each load device (communication device) (Non-Patent Documents 1 and 2).

一方、例えば東京都環境確保条例に基づく、データセンタ等通信ビルの省エネルギー活動の推進おいては、まずどのようにエネルギーが使われているかを把握するため、計量・計測により電力の見える化をすることが重要となっている。この電力の見える化を行うことにより、新しい省エネルギーの種を発見するとともに、取り組んだ省エネルギーの効果を継続的に確認することが可能となる。これは先の東日本大震災により、より拘束力を持った削減義務として課せられたことで、データセンタ等通信ビルの省エネルギー活動の推進がより強く求められている。   On the other hand, in the promotion of energy-saving activities for communication buildings such as data centers based on the Tokyo Metropolitan Environmental Security Ordinance, power is first visualized by measuring and measuring to understand how energy is used. It is important. By visualizing this power, it is possible to discover new energy-saving seeds and continuously confirm the effects of the energy-saving efforts. This was imposed as a more restrictive reduction obligation due to the Great East Japan Earthquake, and there is a strong demand for the promotion of energy-saving activities in communication buildings such as data centers.

この趨勢により、様々な通信ビル向けのエネルギー管理ソリューションの開発が各社から提案されており、一定の効果が事例として示されている。しかしながら、節電を検討する上で最も重要となる負荷機器(例えば通信機器類)毎の実績電力を把握するための機能、つまりは、それぞれの分電盤(分岐回路)単位に計量されたエネルギー量(電力量)の値と、その分電盤(分岐回路)の系統毎に接続されている負荷機器の情報(コンセントに接続されている様々な負荷機器(通信機器類)の情報)を紐付き管理するための機能の充実化が必須となる。   With this trend, companies have proposed the development of energy management solutions for various telecommunications buildings, and some effects are shown as examples. However, the function for grasping the actual power of each load device (for example, communication devices), which is the most important in considering power saving, that is, the amount of energy measured for each distribution board (branch circuit) (Power consumption) value and information on load devices connected to each distribution board (branch circuit) system (information on various load devices (communication devices) connected to outlets) It is essential to enhance the functions to do this.

これに関して、コンセントに接続された複数の負荷機器(通信機器類)に対しネットワークを介して消費電力状況を監視し、その監視結果に基づき通信ラックの最適化運用を行うといった機能を備えた遠隔電力監視機能付きコンセントシステムが提案されているが、このようなシステムは、監視規模が広範囲に拡大した場合の帯域確保、遠隔電力監視コンセント専用のネットワーク構築における通信線敷設工事(イニシャルコスト)および、敷設線増により生じるフリーアクセス(二重床)面の空調送風ルートの閉塞等悪影響につながる可能性、そして何よりも通信機能を確保するために必要な電力消費(コンセント内に実装されている通信機能を司る構成品(ハード面)の消費電力)などの問題がある。また更に、この電力監視ネットワークシステムを維持管理する上での保守費(通信障害探索時間+コンセント本体ならびに構成機器の交換)が増大する。   In this regard, remote power with the function of monitoring the power consumption status of multiple load devices (communication devices) connected to an outlet via the network and optimizing the operation of the communication rack based on the monitoring results. Outlet systems with monitoring functions have been proposed, but such systems are designed to secure bandwidth when the monitoring scale is expanded over a wide range, to construct communication lines (initial cost) for the construction of a dedicated network for remote power monitoring outlets, and to install them. The possibility of adverse effects such as blockage of the air-conditioning ventilation route on the free access (double floor) surface caused by the line increase, and above all, the power consumption necessary to secure the communication function (communication function installed in the outlet) There is a problem such as the power consumption of the component (hardware) to be controlled. Furthermore, the maintenance cost (communication failure search time + replacement of the outlet main body and component devices) for maintaining the power monitoring network system increases.

このことから、費用対効果の観点においても、ネットワーク通信可能なコンセントを通信ラックに実装し、負荷機器の消費電力を遠隔監視するといったソリューションの展開ではなく、通信ネットワーク機能を利用せずともコンセントに接続された「全て」の負荷機器の実績電力を「個々」に遠隔地より把握できる機能を実装することで、前記課題を解決した形で、負荷機器(通信機器類)の消費電力の抽出が可能となり、通信ラックの最適化運用、延いては削減義務にあたるピーク電力の抑制や、効率的なコンセントの使用、更には各負荷機器の設置場所も遠隔電力監視コンセントに実装された通信ネットワーク機能を使用することなく把握できることから、煩雑になりがちな資産管理もローコストで実現可能なシステムが検討されている。   Therefore, from the viewpoint of cost-effectiveness, it is not a solution to mount an outlet capable of network communication in a communication rack and remotely monitor the power consumption of the load device, but it can also be used as an outlet without using the communication network function. By implementing a function that can grasp the actual power of all connected load devices “individually” from a remote location, the power consumption of the load devices (communication devices) can be extracted in a form that solves the above problems. It is possible to optimize the operation of communication racks, suppress peak power, which is a duty to reduce, use efficient outlets, and also install a communication network function where each load device is installed at a remote power monitoring outlet. Since it is possible to grasp without using it, a system that can realize complicated asset management at low cost is being studied.

しかし、このようなシステムは当該の遠隔電力監視コンセントと監視システム間の通信が、何らかの影響で不可能になった際、その当該の遠隔電力監視コンセント配下の負荷機器(通信機器類)の消費電力をシステム上で収集することが出来なくなる。また、遠隔電力監視コンセントの通信ネットワーク機能を利用して情報を収集するために、内部に実装された通信機能部に対して電力が必要となる(待機時消費電力を含む)など、省エネとはある種矛盾した運用を余儀なくされることが懸念される。また、通信機能部そのものが何らかの影響で故障した場合、コンセント本体一式の交換が必要となり、仮に配下に負荷設備(通信機器類)が接続されている際には、それら負荷機器を止めて(サービス中の機器は簡単に止めることができない)その上での本体交換が要求される。   However, in such a system, when communication between the remote power monitoring outlet and the monitoring system becomes impossible due to some influence, the power consumption of the load devices (communication devices) under the remote power monitoring outlet Cannot be collected on the system. Also, in order to collect information using the communication network function of the remote power monitoring outlet, power is required for the communication function unit installed inside (including standby power consumption). There is a concern that some kind of contradictory operation will be forced. In addition, if the communication function unit itself fails due to some kind of influence, it is necessary to replace the complete outlet body. If load equipment (communication equipment) is connected under the control, stop the load equipment (service The equipment inside cannot be easily stopped).

以上により、先ず遠隔電力監視コンセント本体自体が高価であることと、監視規模拡大に伴う帯域確保、通信線敷設等によるイニシャルコスト、フリーアクセス(二重床)問題、通信機能部の消費電力、故障時の対応など、様々な運用面での課題を払拭するには至らない。このため、遠隔電力監視コンセントの通信ネットワーク機能を利用せずに、それぞれの負荷機器の電力情報の抽出が可能なシステムが要望されており、削減義務にあたるピーク電力の抑制や、効率的なコンセントの使用、更には各負荷機器の設置場所も把握できるといった要件をクリアした機能が要望されている。   From the above, first of all, the remote power monitoring outlet itself is expensive, securing the bandwidth accompanying expansion of the monitoring scale, initial cost due to communication line laying, free access (double floor) problem, power consumption of communication function section, failure It is not possible to wipe out various operational issues such as handling time. Therefore, there is a demand for a system that can extract the power information of each load device without using the communication network function of the remote power monitoring outlet. There is a demand for a function that clears the requirements of use and the ability to grasp the installation location of each load device.

http://www.rittal.co.jp/article.php/it-solutions_Power、PDUソリューション(リタール株式会社)http://www.rittal.co.jp/article.php/it-solutions_Power, PDU Solutions (Rittal Corporation) http://www.apc.com/products/category.cfm?id=6&segmentID=2、Switched Rack PDU(American Power Conversion Corp)http://www.apc.com/products/category.cfm?id=6&segmentID=2, Switched Rack PDU (American Power Conversion Corp)

本発明は上記事項に着目してなされたもので、その目的とするところは、遠隔電力監視コンセントの通信ネットワーク機能を利用せずともコンセントに接続された「全て」の負荷機器の実績電力を「個々」に遠隔地より把握できる機能を実装することにより、前述の課題を解決した形で負荷機器(通信機器類)の消費電力の抽出が可能で、通信ラックの最適化運用、延いては削減義務にあたるピーク電力の抑制や、効率的なコンセントの使用、更には各負荷機器の設置場所も遠隔電力監視コンセントに実装された通信ネットワーク機能を使用することなく把握可能であって、煩雑になりがちな資産管理もローコストで実現可能となるシステムを実現することにある。   The present invention has been made paying attention to the above items, and the purpose of the present invention is to obtain the actual power of all load devices connected to the outlet without using the communication network function of the remote power monitoring outlet. By implementing functions that can be grasped from a remote location individually, it is possible to extract the power consumption of the load equipment (communication equipment) in a form that solves the above-mentioned problems, optimizing the operation of the communication rack, and consequently reducing it. Suppressing peak power, which is an obligation, efficient use of outlets, and the location of each load device can be grasped without using the communication network function implemented in the remote power monitoring outlet, which can be complicated. Another asset management is to realize a system that can be realized at low cost.

このような課題を解決するために本発明は、電力の分電系統毎にそれぞれ複数配設され電力を消費する負荷機器と、分電系統毎に配設され、この分電系統に属する負荷機器の消費電力量を検出する電力センサと、電力センサにより検出された負荷機器の消費電力量を収集する収集サーバと、収集サーバにより収集された負荷機器の消費電力量を取得すると、データとしてメモリに保存するとともにこの消費電力量を含む負荷機器の情報をこの負荷機器が属する分電系統の情報と関連づけて管理する管理サーバと、管理サーバにより管理される情報の少なくとも表示が可能な端末とを備え、少なくとも分電系統のIDに関連づけてこの分電系統に属する負荷機器のIDとこの負荷機器の消費電力量とが付加された階層化データとしてメモリに登録され、管理サーバは階層化データの管理が可能であり、端末は階層化データの表示が可能であることを特徴とする。   In order to solve such a problem, the present invention provides a plurality of load devices that are disposed for each power distribution system and consume power, and load devices that are disposed for each distribution system and belong to this distribution system. The power sensor that detects the power consumption of the load device, the collection server that collects the power consumption of the load device detected by the power sensor, and the power consumption of the load device that is collected by the collection server A management server that stores and manages information on a load device including the power consumption amount in association with information on a power distribution system to which the load device belongs, and a terminal that can display at least information managed by the management server. The data is stored in the memory as hierarchical data to which at least the ID of the load device belonging to this distribution system and the power consumption of this load device are added in association with the ID of the distribution system. Is, the management server is capable of managing hierarchical data, and wherein the terminal is capable of displaying hierarchical data.

ここで、階層化データは、負荷機器が増設される毎に、分電系統のIDに関連づけて増設負荷機器のIDが付加されるとともに、この増設負荷機器のIDに対応づけてこの増設負荷機器の消費電力量が付加されることにより生成される。
また、収集サーバは、電力センサから消費電力量を電力量情報として収集した場合、この電力センサに対応する分電系統のIDを、収集した電力量情報に付加し、この分電系統のIDは管理サーバと共有される。
Here, each time the load device is added, the hierarchical data is added with the ID of the additional load device in association with the distribution system ID, and the additional load device is associated with the ID of the additional load device. It is generated by adding the amount of power consumption.
In addition, when collecting the power consumption amount from the power sensor as the power amount information, the collection server adds the ID of the distribution system corresponding to the power sensor to the collected power amount information, and the ID of the distribution system is Shared with the management server.

この場合、管理サーバは、収集サーバから取得した分電系統の消費電力量を表すデータを前回のデータと比較して相対変化量を演算し、相対変化量が正の場合はこの相対変化量と分電系統のIDとを端末に配信し表示させる一方、相対変化量が負の場合は、階層化データをもとに相対変化量に等しい消費電力量を有する負荷機器のIDと、この負荷機器が属する分電系統のIDと、相対変化量とを端末に配信し表示させる。   In this case, the management server calculates the relative change amount by comparing the data representing the power consumption amount of the distribution system acquired from the collection server with the previous data, and if the relative change amount is positive, While the distribution system ID is distributed and displayed on the terminal and the relative change amount is negative, the load device ID having the power consumption equal to the relative change amount based on the hierarchical data and the load device The distribution system ID to which the ID belongs and the relative change amount are distributed and displayed on the terminal.

ここで、端末に、分電系統のIDと相対変化量が表示されている場合、端末から相対変化量に等しい負荷機器の名称が増設された負荷機器のIDとして入力されると、管理サーバは、分電系統のIDに関連づけて増設負荷機器のIDを追加し、かつ増設負荷機器のIDに関連づけて相対変化量を付加することにより階層化データを更新し、かつメモリに保存され端末により指定された期間内のデータのオフセット処理と平均化処理を行って負荷機器単位の階層化を実行し、実行結果をメモリに前記前回のデータとして保存する。   Here, when the ID of the distribution system and the relative change amount are displayed on the terminal, when the name of the load device equal to the relative change amount is input from the terminal as the ID of the added load device, the management server Add the ID of the additional load device in association with the ID of the distribution system, and update the hierarchical data by adding the relative change amount in association with the ID of the additional load device, and save it in the memory and specify it by the terminal The offset processing and averaging processing of the data within the specified period are performed to execute hierarchization in units of load devices, and the execution result is stored in the memory as the previous data.

また、端末に、負荷機器のIDとこの負荷機器が属する分電系統のIDと相対変化量とが表示されている場合、端末がこれらIDを含む情報の確定操作を行うと、管理サーバは、分電系統のIDに関連づけて付加されている負荷機器のIDとその相対変化量を削除し、階層化データを更新し、かつ前記分電系統に属している全ての負荷機器の消費電力量を表すデータからこの負荷機器の相対変化量を削除し、前記前回のデータとして保存する。
そして、IDが削除された負荷機器は移設、除却廃棄および電源オフの何れかとして扱われる。
Further, when the ID of the load device, the ID of the distribution system to which the load device belongs, and the relative change amount are displayed on the terminal, when the terminal performs a determination operation of information including these IDs, the management server Delete the load device ID and its relative change added in association with the ID of the distribution system, update the hierarchical data, and calculate the power consumption of all load devices belonging to the distribution system. The relative change amount of the load device is deleted from the data to be represented and stored as the previous data.
Then, the load device from which the ID has been deleted is handled as any one of relocation, disposal disposal, and power off.

本発明では、分電系統のIDとこの分電系統の定格電流値とが階層化データとしてメモリに登録され、管理サーバは、分電系統に属する負荷機器の合計電流値が演算可能であり、端末は、分電系統のIDとこの分電系統の定格電流値とが表示可能であるとともに、この分電系統に属する負荷機器の合計電流値が表示可能である。   In the present invention, the ID of the distribution system and the rated current value of this distribution system are registered in the memory as hierarchical data, and the management server can calculate the total current value of the load devices belonging to the distribution system, The terminal can display the distribution system ID and the rated current value of the distribution system, and can display the total current value of the load devices belonging to the distribution system.

本発明によれば、従来の遠隔電力監視コンセントの通信ネットワーク機能を利用せずとも、負荷機器をコンセントに接続した時点で、接続された負荷機器の電力量を遠隔地より把握できる機能、および、コンセントに接続された全ての負荷機器の電力量を個々に遠隔地より把握できる機能を実装したことにより、負荷機器の消費電力の抽出が可能になり、また通信ラックの最適化運用、延いては削減義務にあたるピーク電力の抑制や、効率的なコンセントの使用が可能になり、更には各負荷機器の設置場所も遠隔電力監視コンセントに実装された通信ネットワーク機能を使用することなく負荷機器の電力量を把握できるので、煩雑になりがちな資産(負荷機器)管理もローコストで実現可能となる。また、既存の遠隔電力監視コンセントでは、本体一式ならびに通信線敷設等によるイニシャルコスト、フリーアクセス(二重床)問題、通信機能部の消費電力、故障時の対応などの課題が顕在化していたが、本発明では運用面での費用の増大を抑え、各負荷機器の電力情報収集をローコストで実現できるので、本発明はこれら課題をも解決することができる。   According to the present invention, when the load device is connected to the outlet without using the communication network function of the conventional remote power monitoring outlet, the function that can grasp the amount of power of the connected load device from a remote place, and By implementing a function that can individually grasp the amount of power of all the load devices connected to the outlet from a remote location, it is possible to extract the power consumption of the load devices, optimize the operation of the communication rack, It is possible to control peak power, which is a duty to reduce, and to use efficient outlets. In addition, the location of each load device can be installed without using the communication network function implemented in the remote power monitoring outlet. Therefore, asset (load equipment) management, which tends to be complicated, can be realized at low cost. In addition, with existing remote power monitoring outlets, problems such as initial cost due to laying of the main unit and laying of communication lines, free access (double floor) problem, power consumption of communication function section, response in case of failure, etc. have become obvious In the present invention, an increase in operation cost can be suppressed, and power information collection of each load device can be realized at low cost. Therefore, the present invention can also solve these problems.

本発明のシステムの概要を示す図である。It is a figure which shows the outline | summary of the system of this invention. 資産管理機能画面を示す図である。It is a figure which shows an asset management function screen. 資産管理機能画面の補助機能画面を示す図である。It is a figure which shows the auxiliary function screen of an asset management function screen. 資産管理機能画面の補助機能画面を示す図である。It is a figure which shows the auxiliary function screen of an asset management function screen. 情報登録の自動通知画面を示す図である。It is a figure which shows the automatic notification screen of information registration. 自動通知・負荷機器情報登録機能を示すシーケンス図である。It is a sequence diagram which shows an automatic notification and load apparatus information registration function. 負荷機器情報取得を示すシーケンス図である。It is a sequence diagram which shows load apparatus information acquisition. 負荷機器(資産機器)名称投入画面を示す図であるIt is a figure which shows a load apparatus (asset apparatus) name input screen 自動通知・負荷機器情報登録処理の事例(基本アルゴリズム)を示す流れ図である。It is a flowchart which shows the example (basic algorithm) of an automatic notification and load apparatus information registration process. 資産現況管理情報の入力画面を示す図である。It is a figure which shows the input screen of asset present condition management information. 資産現況管理情報の入力機能を表すシーケンス図である。It is a sequence diagram showing the input function of asset present condition management information. 現況登録の自動通知画面を示す図である。It is a figure which shows the automatic notification screen of present condition registration. 資産現況管理情報処理の事例(基本アルゴリズム)を示す流れ図である。It is a flowchart which shows the example (basic algorithm) of asset status management information processing. 資産現況管理情報処理(階層処理)の状態遷移を表す図である。It is a figure showing the state transition of asset status management information processing (hierarchical processing). オフセット処理の原理を示す図である。It is a figure which shows the principle of an offset process. 平均化処理と階層化(レイヤー)処理の原理を示す図である。It is a figure which shows the principle of an averaging process and a hierarchization (layer) process. データ取得期間設定画面を示す図である。It is a figure which shows a data acquisition period setting screen. オフセット設定画面を示す図である。It is a figure which shows an offset setting screen. 分岐回路の定格電流値の設定画面を表す図である。It is a figure showing the setting screen of the rated current value of a branch circuit.

以下に図面と表を参照して本発明の実施の形態について説明する。
(第一の実施の形態)
本発明の第一の実施の形態では、電力管理者(建物管理者)が、それぞれの分電盤(分岐回路)単位に計量されたエネルギー量(電力量)の値と、その分電盤(分岐回路)の系統毎に接続されている負荷機器の情報(コンセントに接続されている様々な負荷機器の情報)を紐付ける階層化(layer)管理がクライアントPC上で可能となるアセットマネジメントの提供を実現した負荷機器情報自動抽出・管理システムを提案する。
図1は、本発明のシステム構成の概要を示す図であり、表1は、本発明の構成品の機能概要を示す表である。
Embodiments of the present invention will be described below with reference to the drawings and tables.
(First embodiment)
In the first embodiment of the present invention, the power manager (building manager) determines the value of the energy amount (power amount) measured for each distribution board (branch circuit) unit and the distribution board ( Providing asset management that enables management on the client PC (layer) that links information on load devices connected to each branch circuit) (information on various load devices connected to outlets) We propose a load equipment information automatic extraction and management system that realizes the above.
FIG. 1 is a diagram showing an outline of a system configuration of the present invention, and Table 1 is a table showing an outline of functions of components of the present invention.

これらに示すように、情報を要求する任意の位置にある各クライアントPC10のブラウザからデータ管理システムサーバ20に対し、階層化された全データ、または指定した範囲の階層化データ(この階層化データは、負荷機器が1台ずつ増設される毎に後述の図5のシーケンス図に示すような処理を行うことにより生成される)の取得を要求することにより、要求された階層化データを正確にアンサーバックするためのシステム構成の全容である。尚、データ管理システムサーバ20は、内部のデータ収集取込みツール21により、配下のデータ収集システムサーバ30に対して、定期的(1分〜1時間の任意タイミング(システムのパラメータ変更により設定))にバッチ処理の要求をかけデータを取得する。   As shown in these figures, the data management system server 20 from the browser of each client PC 10 at an arbitrary position where information is requested is sent to the data management system server 20 or the specified range of hierarchical data (this hierarchical data is Each time a load device is added one by one, it is obtained by performing processing as shown in the sequence diagram of FIG. The whole system configuration for backing up. The data management system server 20 is periodically (arbitrary timing of 1 minute to 1 hour (set by changing system parameters)) with respect to the subordinate data collection system server 30 by the internal data collection / acquisition tool 21. Request data for batch processing.

また、内部のデータ管理DB22にて、Header情報に基づき保存した電力データを、クライアントで指定した期間(1日〜1ヶ月の任意期間(クライアントPC10側で指定可能:デフォルト1週間))に基づきそれぞれオフセット処理と平均化処理を実行し、負荷機器単位の階層化を実行する。尚、オフセット処理と平均化処理のタイミングは、クライアントの負荷機器登録情報のリクエストにより、固有IDが付与された時点をキーに実行する。また、相対変化量の演算処理は、収集データ取り込みツール21からのバッチ処理により得たデータをキーにメモリに保持された前回データ(平均値)との比較処理実行後に行われ、その結果をデータ収集判定ツール23からのデータ取得要求により返送する。   Also, in the internal data management DB 22, the power data stored based on the header information is based on a period designated by the client (an arbitrary period from one day to one month (can be designated on the client PC 10 side: default one week)). Execute offset processing and averaging processing, and execute hierarchization for each load device. Note that the timing of the offset process and the averaging process is executed using the point in time when the unique ID is given by the client's request for the load device registration information as a key. Further, the relative change amount calculation processing is performed after execution of the comparison processing with the previous data (average value) held in the memory using the data obtained by the batch processing from the collected data import tool 21 as a key, and the result is obtained as data. It is returned in response to a data acquisition request from the collection judgment tool 23.

データ収集判定ツール23は、収集データ取り込みツール21からのバッチ処理により得たデータをキーにデータ管理DB22にて比較・相対変化量の演算処理される間の遅延時間(システムのパラメータ変更により設定可能)を想定したタイマーが起動する。そして、取得時間となった時点で、データ管理DB22に対して、演算処理結果のデータ取得要求をかける。そして更に、取得したデータが[変化量>0]であった場合、負荷機器(増)の判定を下し、その内容に合致した情報を、データ表示AP24を介して、クライアントPC10および携帯端末11にメール配信すると同時に、HTTPにて登録を促すリクエストの要求をデータ表示AP24に対してかける。   The data collection judgment tool 23 uses the data obtained from the batch processing from the collected data import tool 21 as a key to set a delay time during comparison / relative change calculation processing in the data management DB 22 (can be set by changing system parameters) ) Is started. Then, when the acquisition time is reached, a data acquisition request for the calculation processing result is made to the data management DB 22. Further, when the acquired data is [change amount> 0], the load device (increase) is determined, and the information that matches the content is sent via the data display AP 24 to the client PC 10 and the portable terminal 11. At the same time as mail delivery, a request for a registration request is made to the data display AP 24 via HTTP.

そして、その情報をもとにクライアント側で表示された変化量に対するユニークな名称をGUI(Graphical User Interface)上で入力し、決定とすることで、その変化量(電力)と固有名称とを紐付けるレイヤーID情報がデータ管理DB22内で生成されるとともに、後述のデータ収集DB31から得たID情報に加えられる。また、クライアントPC10の同GUI上で、追加情報として、組織名、通信ラック番号などの任意な追加情報を登録できる機能も具備しており、追加した場合には、自動で同ID情報に紐付く形でHeader内に登録される。ここで、データ収集DB31から得たID情報と特定の部屋を示すフロアIDは、データ管理DB22において事前にHeader内に登録、関連付けされ同DB22内に格納されている。なお、負荷機器(減)の動作については、第八の実施の形態を参照。   Based on this information, a unique name for the amount of change displayed on the client side is entered on the GUI (Graphical User Interface) and determined to link the amount of change (electric power) with the unique name. The layer ID information to be added is generated in the data management DB 22 and added to the ID information obtained from the data collection DB 31 described later. In addition, on the same GUI of the client PC 10, there is also a function that can register arbitrary additional information such as an organization name and a communication rack number as additional information. When added, the information is automatically associated with the same ID information. Registered in the Header in the form. Here, the ID information obtained from the data collection DB 31 and the floor ID indicating the specific room are registered and associated in advance in the header in the data management DB 22 and stored in the DB 22. For the operation of the load device (reduction), refer to the eighth embodiment.

データ収集システムサーバ30は、内部のデータ収集AP32により、各電力センサシステム41からの電力量情報を収集し、内部のデータ収集DB31内に各電力情報として格納する。更には、同DB31内で保存した各データに、どの分電盤かに加えて、どのセンサ(分岐回路毎に実装されたセンサ)からの情報かを表すID情報をそれぞれに付加する加工を行う。これら一連の処理により、各電力センサシステム41の状態(診断結果)をクライアントが自身のブラウザ上で確認することができる。ここで、各IDは、共通フォーマット(共通Header)に基づき各DB22,31内で共有・管理される。なお、共通フォーマットにはタイムスタンプ情報も含まれている。   The data collection system server 30 collects power amount information from each power sensor system 41 by the internal data collection AP 32 and stores it as each power information in the internal data collection DB 31. Furthermore, each data stored in the DB 31 is processed to add ID information indicating which sensor (sensor mounted for each branch circuit) to each distribution board in addition to which distribution board. . Through these series of processes, the client can check the state (diagnosis result) of each power sensor system 41 on its own browser. Here, each ID is shared and managed in each DB 22, 31 based on a common format (common header). The common format includes time stamp information.

(第二の実施の形態)
図2は、様々な負荷機器の資産管理(設置場所)とその消費電力量が個々に確認できる画面を示した図である。このように、特定したい負荷機器をクライアント側で任意に選択し、実行ボタンをクリックすることで、選択した負荷機器の設置場所ならびに消費電力量、負荷機器実装時に投入した関連情報(最大3つ)が表示される。具体的には、資産管理の固有名称が予め分かるようであれば、固有名称を直接入力して実行ボタンをクリックすることで、当該資産機器の設置場所(フロアID−分電盤ID−センサ(分岐回路)ID)、消費電力量、負荷機器実装時に投入した関連情報(最大3つ)が自動で表示される。
(Second embodiment)
FIG. 2 is a diagram showing a screen on which asset management (installation location) and power consumption of various load devices can be individually confirmed. In this way, by arbitrarily selecting the load device to be specified on the client side and clicking the execution button, the installation location and power consumption of the selected load device, and related information input when the load device is installed (up to 3) Is displayed. Specifically, if the unique name of asset management can be known in advance, by directly entering the unique name and clicking the execute button, the installation location of the asset device (floor ID-distribution panel ID-sensor ( Branch circuit) ID), power consumption, and related information (up to 3) input when the load device is mounted are automatically displayed.

また、資産管理の固有名称が分からない場合の補助機能として、建物名とフロア名の任意選択にて資産機器を検索可能な機能を具備している。具体的には、建物名、次いでフロア名をプルダウンメニューから任意に選択することで、当該のフロア図面が表示される。そして、図中の分電盤部分をマウスオーバーすることにより、その分電盤に紐付く資産機器が一覧として表示されるものである。   In addition, as an auxiliary function when the unique name of asset management is not known, it has a function capable of searching for asset devices by arbitrarily selecting a building name and a floor name. Specifically, the floor name is displayed by arbitrarily selecting a building name and then a floor name from a pull-down menu. Then, by moving the mouse over the distribution board portion in the figure, the asset devices associated with the distribution board are displayed as a list.

更に、図3Aに示す通り、任意のキーワード入力による資産機器の検索機能(補助機能)も具備しており、また更に、図3Bに示す通り、図2の画面内にある「当該回路の総電流値」をクリックすることにより、その当該回路の現在の合計電流値(データ管理システムサーバ20により演算されてデータ管理サーバ20内に記憶されている)が表示され、且つ、事前に設定されている当該回路の定格電流値(第十四の実施の形態にて記載)が表示される。なお、当該回路に紐づく負荷機器の情報を表示する機能も具備している。   Further, as shown in FIG. 3A, it also has a search function (auxiliary function) for asset devices by inputting an arbitrary keyword. Furthermore, as shown in FIG. 3B, “total current of the circuit” in the screen of FIG. By clicking “value”, the current total current value (calculated by the data management system server 20 and stored in the data management server 20) of the circuit is displayed and set in advance. The rated current value of the circuit (described in the fourteenth embodiment) is displayed. It also has a function of displaying information on load devices associated with the circuit.

(第三の実施の形態)
図4は、第一の実施の形態で示した、クライアントPC10および携帯端末11にメール配信すると同時に、HTTPにて情報登録を促すリクエスト画面を示した実施の形態である。この図に示す通り、クライアントはシステムから自動でメール配信されてきた内容を確認した後、クライアントPC10のブラウザ上で展開されている画面を確認するといった流れを示したものである。
(Third embodiment)
FIG. 4 is an embodiment showing a request screen for urging information registration by HTTP at the same time as delivering mail to the client PC 10 and the mobile terminal 11 shown in the first embodiment. As shown in this figure, the client confirms the contents automatically delivered from the system, and then confirms the screen developed on the browser of the client PC 10.

このように、負荷機器情報の登録を促すメール配信を行うことで、未登録(登録忘れ)を未然に防ぐことが可能となる。また、ブラウザ上に展開されている情報設定実施の問い合わせに対して、「はい」を選択することにより、実際の登録画面となる、負荷機器(資産機器)名称投入画面に遷移する。   In this way, by performing mail delivery that prompts registration of load device information, it becomes possible to prevent unregistered (forgotten registration). Further, by selecting “Yes” in response to the information setting execution inquiry developed on the browser, the screen shifts to a load device (asset device) name input screen which is an actual registration screen.

(第四の実施の形態)
図5は、第一の実施の形態で示した、自動通知・負荷機器情報登録機能のシーケンスを示した図である。このように、データ管理DB22では、収集データ取り込みツール21からのバッチ処理により得たデータ(図6を参照)をキーにメモリに保持された前回データ(平均値)との比較処理を実行(S13)後、相対変化量の演算処理を実行する(S14)。また同時に、データ収集判定ツール23では、収集データ取り込みツール21からのバッチ処理により得たデータ(図6を参照)をキーにデータ管理DB22にて比較・相対変化量の演算処理される間の遅延時間(システムのパラメータ変更により設定可能)を想定したタイマーが起動し(S15)、そして、取得時間となった時点で、データ管理DB22に対して、演算処理結果のデータ取得要求(ID情報を含む)をかける(S16)。
(Fourth embodiment)
FIG. 5 is a diagram showing a sequence of the automatic notification / load device information registration function shown in the first embodiment. In this way, the data management DB 22 executes a comparison process with the previous data (average value) held in the memory using the data (see FIG. 6) obtained by the batch process from the collected data import tool 21 as a key (S13). ) After that, a relative change amount calculation process is executed (S14). At the same time, the data collection determination tool 23 uses the data (see FIG. 6) obtained by the batch processing from the collected data import tool 21 as a key to delay during the comparison / relative change calculation processing in the data management DB 22. A timer that assumes time (can be set by changing system parameters) is started (S15), and when the acquisition time is reached, a data acquisition request (including ID information) as a result of calculation processing is sent to the data management DB 22. ) Is applied (S16).

そして、その要求により、データ管理DB22にて相対変化量の演算結果(ID情報を含む)を返送する(S18)。そして更に、データ管理DB22から取得した演算結果データが[変化量>0]であった場合、負荷機器(増)の判定を下し、その内容に合致した情報(ID情報・変化量)を、データ表示AP24を介して、クライアントPC10および携帯端末11にメール配信する(S21,S22)と同時に、HTTPにて登録を促すリクエストの要求をデータ表示AP24に対してかける。ここで、[変化量=0]の場合、状態変化なしと判定しメール配信および登録リクエスト要求はかけない。   In response to the request, the data management DB 22 returns a calculation result (including ID information) of the relative change amount (S18). Further, when the calculation result data acquired from the data management DB 22 is [change amount> 0], the load device (increase) is determined, and information (ID information / change amount) matching the content is determined. At the same time as mail delivery to the client PC 10 and the portable terminal 11 via the data display AP 24 (S21, S22), a request for a request for registration by HTTP is made to the data display AP 24. Here, in the case of [change amount = 0], it is determined that there is no state change, and mail delivery and registration request requests are not made.

そして、その情報をもとにクライアント側で負荷機器(資産機器)名称投入画面(図7を参照)上で表示された変化量に対するユニークな名称を同GUI上で入力し、決定とすることで、そのリクエスト情報が、データ表示AP24を介して、データ管理DB22へ送られる(S23,S24)。そして、送達されたタイミングで、タイムスタンプがHeader情報に記録され(S25)、また、変化量(電力)と固有名称とを紐付けるレイヤーID情報が同データ管理DB22内で生成されるとともに、データ収集DB32から得たID情報に加えられ同Header情報に記録される(S26)。   Based on this information, a unique name for the amount of change displayed on the load device (asset device) name input screen (see FIG. 7) on the client side is entered on the GUI and determined. The request information is sent to the data management DB 22 via the data display AP 24 (S23, S24). At the time of delivery, a time stamp is recorded in the header information (S25), and layer ID information for associating the change amount (power) with the unique name is generated in the data management DB 22, and the data It is added to the ID information obtained from the collection DB 32 and recorded in the header information (S26).

また、クライアントPC10の同GUI上で、追加情報として、組織名、通信ラック番号などの任意な追加情報を登録できる機能も具備しており、追加した場合には、自動で同Header内に記録される。また、オフセット処理と平均化処理のタイミングは、クライアントの負荷機器登録情報のリクエストにより、固有IDが付与された時点をキーに実行し(S27)、その後、固有ID単位の階層化処理を実行し(S28)、最新情報(任意期間内の実績値(次のオフセットに使用)と、当該レイヤーのオフセット値、および当該レイヤーの平均値(相対値)など)としてメモリ内に保持される(S29)。図8はこのような自動通知・負荷機器情報登録処理の事例(基本アルゴリズム)を示す流れ図である。   In addition, on the same GUI of the client PC 10, there is also a function that can register arbitrary additional information such as an organization name and a communication rack number as additional information. When added, it is automatically recorded in the header. The In addition, the offset process and the averaging process are performed using the time when the unique ID is given by the request of the load device registration information of the client as a key (S27), and thereafter, the hierarchization process for each unique ID is executed. (S28) The latest information (actual value within an arbitrary period (used for the next offset), the offset value of the layer, the average value (relative value) of the layer, etc.) is held in the memory (S29). . FIG. 8 is a flowchart showing an example (basic algorithm) of such automatic notification / load device information registration processing.

(第五の実施の形態)
図6は、第一、第四の実施の形態でも示した、負荷機器情報取得のシーケンスを示した図である。これに示すように、データ収集AP32によって得た個々の電力センサシステム41のデータ(S61,S62)に、どの分電盤40かに加えて、どのセンサ(分岐回路毎に実装されたセンサ)からの情報かを示すためのID情報をデータ収集DB31において付与し(S63)、最新データとして格納する(S64)。そして、収集データ取り込みツール21により、システム上で設定したバッチ処理タイミングで最新データを取得する(S67)。ついで、第四の実施の形態、すなわち図5のシーケンスで示した一連の処理を実行する。これにより、クライアント側のリクエスト(S70)に対して、すぐさまレスポンスを返せる状態が維持できることとなる。
(Fifth embodiment)
FIG. 6 is a diagram showing a load device information acquisition sequence shown in the first and fourth embodiments. As shown in this figure, from each power sensor system 41 data (S61, S62) obtained by the data collection AP 32, in addition to which distribution board 40, from which sensor (sensor mounted for each branch circuit). ID information for indicating whether or not the information is stored in the data collection DB 31 (S63) and storing it as the latest data (S64). Then, the latest data is acquired at the batch processing timing set on the system by the collected data capture tool 21 (S67). Next, a series of processing shown in the fourth embodiment, that is, the sequence of FIG. 5 is executed. As a result, it is possible to maintain a state in which a response can be immediately returned in response to the client-side request (S70).

(第六の実施の形態)
図7は、第一、第四の実施の形態でも示した負荷機器(資産機器)名称投入画面を示した図である。ここに示す通り、システム側での判定処理の結果に基づく未登録情報が表示され、その情報をもとにクライアント側で負荷機器情報を任意なテキスト文として登録することが出来ることを示した図である。具体的には、データ収集判定ツール23にて判定された結果に基づき、クライアントPC10のGUI上で展開された、ID情報+変化量(複数の未登録情報が発生した場合、一覧として全て表示)に対して、登録したい内容(ID情報+変化量)をクリックすることで登録対象が仮確定され、次いで確定ボタンをクリックすることにより登録したい内容が確定される。また確定されると同時に、確定された内容(ID情報)が「登録する内容」欄に表示される。
(Sixth embodiment)
FIG. 7 is a diagram showing the load device (asset device) name input screen shown in the first and fourth embodiments. As shown here, unregistered information based on the result of determination processing on the system side is displayed, and the load device information can be registered as an arbitrary text sentence on the client side based on that information It is. Specifically, based on the result determined by the data collection determination tool 23, ID information + change amount developed on the GUI of the client PC 10 (when a plurality of unregistered information occurs, all are displayed as a list) On the other hand, the registration target is provisionally confirmed by clicking the content to be registered (ID information + change amount), and then the content to be registered is confirmed by clicking the confirm button. At the same time, the confirmed content (ID information) is displayed in the “Registered content” column.

次に、負荷機器の管理名称をクライアント側での任意なテキスト情報(全角・半角共に入力可)を入力し、次に、自由登録を任意に入力(全角・半角共に入力可/入力はクライアント側の任意であるので、入力は必須ではない)する。そして、決定ボタンをクリックすることにより、設定された内容が仮確定されると同時に、ポップアップ画面が表示され、「はい」で本確定となる。そして、そのリクエスト情報が、データ表示AP24を介して、データ管理DB22へ送られる。   Next, enter any text information (can be entered in both full-width and half-width) on the client side for the management name of the load device, and then enter any free registration (both full-width and half-width are acceptable) Input is not required). Then, by clicking the decision button, the set contents are provisionally confirmed, and at the same time, a pop-up screen is displayed, and “Yes” is finally confirmed. Then, the request information is sent to the data management DB 22 via the data display AP 24.

(第七の実施の形態)
図9は、資産現況管理情報の入力画面を示した図である。ここに示す通り、システム側での判定処理の結果に基づき、電力量が同一となる対象登録IDが表示(電力量が同一となる登録IDがなければ、一つのみ表示)され、その情報をもとにクライアント側で、負荷機器の現況情報を選択(移設・除却廃棄・電源OFF)、登録することが出来ることを示した図である。具体的には、データ管理DB22にて相対変化量をもとに検索された結果に基づいて、クライアントPC10のGUI上で展開された、登録ID情報+変化量をクリックすることで現況登録対象が仮確定され、次いで確定ボタンをクリックすることにより現況登録したい内容が確定される。
(Seventh embodiment)
FIG. 9 is a diagram showing an input screen for asset status management information. As shown here, based on the result of the determination process on the system side, the target registration ID with the same power amount is displayed (if there is no registration ID with the same power amount, only one is displayed), and the information is displayed. It is the figure which showed that the present condition information of a load apparatus can be selected (relocation / removal disposal / power-off) and registered on the client side. Specifically, based on the result searched based on the relative change amount in the data management DB 22, by clicking on the registered ID information + change amount developed on the GUI of the client PC 10, the current status registration target is displayed. The provisional confirmation is made, and then the contents to be registered are confirmed by clicking the confirmation button.

また確定されると同時に、確定された内容(登録ID情報)が「更新する内容」欄に表示される。次に、「移設」「除却廃棄」「電源OFF」ボタンの何れかを任意でクリックすることにより、選択した内容が仮確定される。と同時にポップアップ画面が表示され、「はい」で本確定となる。そして、そのリクエスト情報が、データ表示AP24を介して、データ管理DBへ送られる。   At the same time, the confirmed content (registration ID information) is displayed in the “content to be updated” column. Next, the selected content is temporarily confirmed by arbitrarily clicking any of the “relocation”, “retirement disposal”, and “power OFF” buttons. At the same time, a pop-up screen is displayed and “Yes” confirms this. Then, the request information is sent to the data management DB via the data display AP 24.

(第八の実施の形態)
図10は、資産現況管理情報入力機能のシーケンスを示した図である。このシーケンス図に示すように、データ管理DB22では、収集データ取り込みツール21からのバッチ処理により得たデータ(図6を参照)をキーにメモリに保持された前回データとの比較計算処理を実行(S83)後、相対変化量の演算処理を実行する(S84)。その際、演算処理の結果が[変化量<0]となった場合には、その相対値をもとに対象となる登録IDを検索する処理を開始する(S87,S88)。
(Eighth embodiment)
FIG. 10 is a diagram showing a sequence of the asset status management information input function. As shown in this sequence diagram, the data management DB 22 executes a comparison calculation process with the previous data held in the memory using the data (see FIG. 6) obtained from the batch processing from the collected data import tool 21 as a key (see FIG. 6). After S83), a relative change amount calculation process is executed (S84). At this time, if the result of the calculation process is [change amount <0], a process of searching for a target registration ID based on the relative value is started (S87, S88).

また同時に、データ収集判定ツール23では、収集データ取り込みツール21からのバッチ処理により得たデータ(図6を参照)をキーにデータ管理DB22にて比較・相対変化量の演算処理される間の遅延時間(システムのパラメータ変更により設定可能)を想定したタイマーが起動し(S85)、そして、取得時間となった時点で、データ管理DB22に対して、検索結果のデータ取得要求(ID情報を含む)をかける(S86)。そして、その要求により、データ管理DB22にて検索結果(ID情報を含む)を返送する(S89)。そして、その内容に合致した情報(ID情報・変化量)を、データ表示AP24を介して、クライアントPC10および携帯端末11にメール配信する(S90,S91,S92)と同時に、HTTPにて登録を促すリクエストの要求をデータ表示AP24に対してかける。   At the same time, the data collection determination tool 23 uses the data (see FIG. 6) obtained by the batch processing from the collected data import tool 21 as a key to delay during the comparison / relative change calculation processing in the data management DB 22. A timer assuming time (can be set by changing system parameters) is started (S85), and when the acquisition time is reached, a data acquisition request (including ID information) as a search result is sent to the data management DB 22. (S86). Then, in response to the request, the search result (including ID information) is returned in the data management DB 22 (S89). Then, information matching the contents (ID information / change amount) is mail-delivered to the client PC 10 and the portable terminal 11 via the data display AP 24 (S90, S91, S92), and at the same time, registration is prompted by HTTP. A request for the request is made to the data display AP 24.

そして、その情報をもとにクライアント側で、資産現況管理情報入力画面(図9を参照)上で現況内容を選択し、決定とすることで、そのリクエスト情報が、データ表示AP24を介して、データ管理DB22へ送られる(S93,S94)。そして、送達されたタイミングで、タイムスタンプがHeader情報に更新され(S95)、更に現況内容も更新される(S96)。次に、階層(レイヤー)構造化された当該の登録IDの相対量をレイヤーから削除する処理を実行し(S97)、最新情報としてメモリ内に保持され次回の比較計算処理時に前回データとして使用される(S98)。なお図12はこのような資産現況管理情報処理の事例(基本アルゴリズム)を示す流れ図であり、図13はその状態遷移図である。   Based on the information, the client selects the current status content on the asset status management information input screen (see FIG. 9) and decides it, so that the request information is sent via the data display AP 24. The data is sent to the data management DB 22 (S93, S94). At the time of delivery, the time stamp is updated to Header information (S95), and the current contents are also updated (S96). Next, a process of deleting the relative amount of the registration ID of the hierarchy (layer) from the layer is executed (S97), and is stored in the memory as the latest information and used as the previous data in the next comparison calculation process. (S98). FIG. 12 is a flowchart showing an example (basic algorithm) of such asset status management information processing, and FIG. 13 is a state transition diagram thereof.

(第九の実施の形態)
図11は、第七、第八の実施の形態で示した、クライアントPC10および携帯端末11にメール配信すると同時に、HTTPにて現況登録を促すリクエスト画面を示した実施の形態である。この図に示す通り、クライアントはシステムから自動でメール配信されてきた内容を確認した後、クライアントPC10のブラウザ上で展開されている画面を確認するといった流れを示したものである。このように、現況情報の登録を促すメール配信を行うことで、未登録(登録忘れ)を未然に防ぐことが可能となる。また、ブラウザ上に展開されている現況設定実施の問い合わせに対して、「はい」を選択することにより、実際の登録画面となる、資産現況管理情報の入力画面に遷移する。
(Ninth embodiment)
FIG. 11 is an embodiment showing a request screen for urging the current status registration by HTTP at the same time as delivering mail to the client PC 10 and the portable terminal 11 shown in the seventh and eighth embodiments. As shown in this figure, the client confirms the contents automatically delivered from the system, and then confirms the screen developed on the browser of the client PC 10. As described above, by performing mail delivery for encouraging registration of the current status information, it becomes possible to prevent unregistration (registration forgotten). Further, by selecting “Yes” in response to the current setting execution inquiry developed on the browser, the screen shifts to an asset current management information input screen which is an actual registration screen.

(第十の実施の形態)
図14は、第一の実施の形態等その他の実施の形態で示した、オフセット処理の原理を示す図である。この図に示す通り、クライアントで指定した任意期間(1日〜1ヶ月の任意期間(クライアントPC側で指定可能:デフォルト1週間))の新規追加電力量の揺らぎに対して、予め保持された前回の実績電力量の相対でのピークレベルとボトムレベルをモニタし、新規追加分のオフセット値を自動で決定する。これにより、当該の負荷機器の電源がOFF(減)となったタイミング時での電力量の揺らぎ(電力変化)にも対応した高精度な電源OFF(減)の検出を可能としている。
(Tenth embodiment)
FIG. 14 is a diagram showing the principle of offset processing shown in other embodiments such as the first embodiment. As shown in this figure, the previous time held in advance for fluctuations in the amount of newly added power during an arbitrary period specified by the client (an arbitrary period from 1 day to 1 month (can be specified on the client PC side: default 1 week)) The relative peak level and bottom level of the actual power consumption are monitored, and the offset value for the newly added is automatically determined. Thereby, it is possible to detect the power OFF (reduction) with high accuracy corresponding to the fluctuation (power change) of the electric energy at the timing when the power of the load device is turned OFF (reduction).

ただし、常に新規追加分に対してこの一連のオフセット処理を実施するので、レイヤー管理されている負荷機器毎にオフセット値が保持されているが、そもそも既設と同仕様の負荷機器を実装するなど、消費電力が一致するケースはままある。その際は、図9、図10などにも示した通り、判定処理の結果に基づき、電力量が同一となる対象登録IDが表示(電力量が同一となる登録IDがなければ、一つのみ表示)される。また、クライアントPC10側において、オフセット値を変更することも可能になっている。   However, since this series of offset processing is always performed for newly added parts, an offset value is held for each load device managed by layer, but in the first place load devices with the same specifications as the existing ones are installed. There are still cases where the power consumption matches. In that case, as shown in FIGS. 9 and 10, based on the result of the determination process, the target registration ID with the same power amount is displayed (if there is no registration ID with the same power amount, only one is displayed. Is displayed. Also, the offset value can be changed on the client PC 10 side.

(第十一の実施の形態)
図15は、第一の実施の形態等その他の実施の形態で示した、平均化処理・階層化(レイヤー)処理の原理を示す図である。これらの図に示す通り、対象センサID下において新規で負荷機器がコンセントに接続された際、その負荷機器に対する電力量の平均化処理を自動で行い、次いで階層化処理するものである。
(Eleventh embodiment)
FIG. 15 is a diagram illustrating the principle of the averaging process / hierarchization (layer) process shown in other embodiments such as the first embodiment. As shown in these drawings, when a new load device is connected to an outlet under the target sensor ID, the power amount averaging process for the load device is automatically performed, and then the hierarchization process is performed.

クライアントで指定した任意期間(1日〜1ヶ月の任意期間(クライアントPC側で指定可能:デフォルト1週間))に基づきそれぞれオフセット処理(第十の実施の形態に記載)と平均化処理を実行し、負荷機器単位の階層化を実行する。尚、オフセット処理と平均化処理のタイミングは、クライアントの負荷機器登録情報のリクエストにより、固有IDが付与された時点をキーに実行する。   Executes offset processing (described in the tenth embodiment) and averaging processing based on an arbitrary period specified by the client (an arbitrary period of one day to one month (can be specified on the client PC side: default one week)). Execute hierarchy for each load device. Note that the timing of the offset process and the averaging process is executed using the point in time when the unique ID is given by the client's request for the load device registration information as a key.

(第十二の実施の形態)
図16は、第一の実施の形態等その他の実施の形態で示した、平均化処理・階層化(レイヤー)処理を対象とするデータ取得期間を設定する画面構成を示した図である。ここに示す通り、データ取得期間を設定したいセンサを、建物名、フロア名、分電盤名、センサ名のプルダウンメニューにより選択することができる。尚、建物名を先ず選択することで、フロア名のプルダウンメニュー項目が決定し、その中からフロア名を選択することで、分電盤名のプルダウンメニュー項目が決定するなど、体系付けが事前に行われている。
(Twelfth embodiment)
FIG. 16 is a diagram showing a screen configuration for setting a data acquisition period for the averaging process / layering process shown in other embodiments such as the first embodiment. As shown here, the sensor for which the data acquisition period is to be set can be selected from the pull-down menu of the building name, floor name, distribution board name, and sensor name. In addition, by selecting the building name first, the floor name pull-down menu item is determined, and by selecting the floor name from among them, the distribution panel name pull-down menu item is determined. Has been done.

そして、確定ボタンをクリックすることにより、データ取得期間を設定したいセンサが確定される。また確定されると同時に、確定された内容(登録ID情報)が「設定対象センサ」欄に表示される。次に、プルダウンメニューで1日〜1ヶ月の間の任意での取得期間を選択し、次いで、決定ボタンをクリックすることにより、設定された内容が仮確定されると同時に、ポップアップ画面が表示され、「はい」で本確定となる。そして、そのリクエスト情報が、データ表示AP24を介して、データ管理DB22へ送られる。   Then, by clicking the confirm button, the sensor for which the data acquisition period is to be set is confirmed. At the same time, the confirmed content (registration ID information) is displayed in the “setting target sensor” column. Next, select an arbitrary acquisition period between 1 day and 1 month from the pull-down menu, and then click the OK button to confirm the set contents and display a pop-up screen at the same time. “Yes” confirms this. Then, the request information is sent to the data management DB 22 via the data display AP 24.

(第十三の実施の形態)
図17は、第十の実施の形態でも触れた、オフセット値をクライアント側で任意に設定できる画面構成を示した図である。ここに示す通り、オフセット値を変更設定したい登録IDを、建物名、フロア名、分電盤名、センサ名、管理名称のプルダウンメニューにより選択することができる。尚、建物名を先ず選択することで、フロア名のプルダウンメニュー項目が決定し、その中からフロア名を選択することで、分電盤名のプルダウンメニュー項目が決定するなど、体系付けが事前に行われている。
(Thirteenth embodiment)
FIG. 17 is a diagram showing a screen configuration that can be set arbitrarily on the client side as described in the tenth embodiment. As shown here, the registration ID for which the offset value is to be changed can be selected from the pull-down menu of the building name, floor name, distribution board name, sensor name, and management name. In addition, by selecting the building name first, the floor name pull-down menu item is determined, and by selecting the floor name from among them, the distribution panel name pull-down menu item is determined. Has been done.

そして、確定ボタンをクリックすることにより、オフセット値を変更設定したい登録IDが確定される。また確定されると同時に、確定された内容(登録IDとオフセット値情報)が「設定対象ID」欄に表示される。次に、変更したいオフセット値を半角数字の任意な値として入力することができる。(ただし、入力条件として、小数点第一位、偶数値のみ)次いで、決定ボタンをクリックすることにより、設定された内容が仮確定されると同時に、ポップアップ画面が表示され、「はい」で本確定となる。そして、そのリクエスト情報が、データ表示AP24を介して、データ管理DB22へ送られる。   Then, by clicking the confirm button, the registration ID for which the offset value is to be changed and set is confirmed. At the same time, the confirmed contents (registration ID and offset value information) are displayed in the “setting object ID” column. Next, the offset value to be changed can be input as an arbitrary value of a single-byte number. (However, only the first decimal place and even values are input conditions.) Next, by clicking the OK button, the set contents are temporarily confirmed, and at the same time, a pop-up screen is displayed. It becomes. Then, the request information is sent to the data management DB 22 via the data display AP 24.

(第十四の実施の形態)
図18は、第二、第三の二つの実施の形態で示した、当該回路の定格電流値をクライアント側で任意に設定できる画面構成を示した図である。ここに示す通り、当該回路の定格電流値を設定したい回路(センサ)を、建物名、フロア名、分電盤名、センサ名のプルダウンメニューにより選択することができる。尚、建物名を先ず選択することで、フロア名のプルダウンメニュー項目が決定し、その中からフロア名を選択することで、分電盤名のプルダウンメニュー項目が決定するなど、体系付けが事前に行われている。
(14th embodiment)
FIG. 18 is a diagram showing a screen configuration in which the rated current value of the circuit can be arbitrarily set on the client side shown in the second and third embodiments. As shown here, the circuit (sensor) for which the rated current value of the circuit is to be set can be selected from the pull-down menu of the building name, floor name, distribution board name, and sensor name. In addition, by selecting the building name first, the floor name pull-down menu item is determined, and by selecting the floor name from among them, the distribution panel name pull-down menu item is determined. Has been done.

そして、確定ボタンをクリックすることにより、定格電流値を設定したい回路(センサ)が確定される。そして次に、当該回路の電圧と相条件をプルダウンメニューより選択し、確定ボタンをクリックすることによって、当該回路の回路条件が決定される。また確定されると同時に、確定された内容(登録ID情報と回路条件)が「選定された対象回路(センサ)」欄に表示される。次に、設定したい定格電流値を半角数字の任意な値として入力することができる。(ただし、入力条件として、小数点以下の入力は不可)次いで、決定ボタンをクリックすることにより、設定された内容が仮確定されると同時に、ポップアップ画面が表示され、「はい」で本確定となる。そして、そのリクエスト情報が、データ表示AP24を介して、データ管理DB22へ送られる。   Then, by clicking the confirm button, the circuit (sensor) for which the rated current value is to be set is confirmed. Next, the voltage and phase conditions of the circuit are selected from the pull-down menu, and the confirmation button is clicked to determine the circuit conditions of the circuit. At the same time, the confirmed contents (registration ID information and circuit conditions) are displayed in the “selected target circuit (sensor)” column. Next, the rated current value to be set can be input as an arbitrary value of half-width numbers. (However, the input condition cannot be entered after the decimal point.) Then, by clicking the OK button, the set contents are temporarily confirmed, and at the same time, a pop-up screen is displayed. . Then, the request information is sent to the data management DB 22 via the data display AP 24.

また、データ管理DB22では、第二、第三の二つの実施の形態の「現在の当該回路の合計電流値(A)」を表示するための計算処理として、当該回路(センサ)に紐づく各階層(各レイヤー)の総電力量をもとに、先ほど設定した回路条件に従い、I=W/V(単相の場合)を実施し、その結果を合計電流値(A)として表示する機能となっている。ここで、三相の場合は、I=W/√3 Vの計算を実施し、その結果を合計電流値(A)として表示する。   In the data management DB 22, each calculation associated with the circuit (sensor) is performed as a calculation process for displaying the “current total current value (A) of the circuit” in the second and third embodiments. A function that performs I = W / V (in the case of a single phase) based on the total power consumption of each layer (each layer) according to the circuit conditions set earlier and displays the result as a total current value (A); It has become. Here, in the case of three phases, I = W / √3 V is calculated, and the result is displayed as a total current value (A).

このように、従来の遠隔電力監視コンセントの通信ネットワーク機能を利用せずとも、負荷機器をコンセントに接続した時点で、接続された負荷機器の電力量を遠隔地より把握できる機能、および、コンセントに接続された「全て」の負荷機器の電力量を「個々」に遠隔地より把握できる機能を実装することで、前述の課題を解決した形で負荷機器(通信機器類)の消費電力の抽出が可能となり、通信ラックの最適化運用、延いては削減義務にあたるピーク電力の抑制や、効率的なコンセントの使用、更には各負荷機器の設置場所も遠隔電力監視コンセントに実装された通信ネットワーク機能を使用することなく把握できるので、煩雑になりがちな資産管理もローコストで実現可能となる。   In this way, without using the communication network function of the conventional remote power monitoring outlet, when the load device is connected to the outlet, the power amount of the connected load device can be grasped from a remote location, and the outlet By implementing a function that allows you to “individually” grasp the amount of power of all connected load devices from a remote location, the power consumption of load devices (communication devices) can be extracted in a form that solves the above-mentioned problems. It is possible to optimize the operation of communication racks, suppress peak power, which is a duty to reduce, use efficient outlets, and also install a communication network function where each load device is installed at a remote power monitoring outlet. Since it can be grasped without using it, asset management that tends to be complicated can be realized at low cost.

また、既存の遠隔電力監視コンセントでは、本体一式ならびに通信線敷設等によるイニシャルコスト、フリーアクセス(二重床)問題、通信機能部の消費電力、故障時の対応など課題が顕在化しており、運用面での費用の増大を抑え、各負荷機器の電力情報収集をローコストで実現させるという、これら課題をも本発明により解決できる。更には、ユーザの要望により任意にデータ表示APのカスタマイズが可能であり、また、様々なエネルギー管理システムとの連携が行えるシステム間I/Fを具備した構造等、柔軟性を持って導入プランの検討が行えるなど、優れたアセットマネジメント・ソリューションの実現を本発明により可能としている点にある。   In addition, the existing remote power monitoring outlets have problems such as initial cost due to the main unit and communication line laying, free access (double floor) problem, power consumption of communication function section, response in case of failure, etc. The present invention can also solve these problems of suppressing the increase in cost and realizing the power information collection of each load device at a low cost. Furthermore, it is possible to customize the data display AP arbitrarily according to the user's request, and the structure of the installation plan with flexibility such as a structure with inter-system I / F that can be linked with various energy management systems. The present invention enables the realization of an excellent asset management solution, such as a study.

10…クライアントPC(クライアント端末)、11…携帯端末、20…データ管理システムサーバ、21…収集データ取り込みツール、22…データ管理DB、23…データ収集判定ツール、24…データ表示AP、30…データ収集システムサーバ、31…データ収集DB、40…分電盤、41…電力センサシステム、50…通信ラック、51…コンセント、52…負荷機器。   DESCRIPTION OF SYMBOLS 10 ... Client PC (client terminal), 11 ... Portable terminal, 20 ... Data management system server, 21 ... Collected data acquisition tool, 22 ... Data management DB, 23 ... Data collection determination tool, 24 ... Data display AP, 30 ... Data Collection system server, 31 ... Data collection DB, 40 ... Distribution board, 41 ... Power sensor system, 50 ... Communication rack, 51 ... Outlet, 52 ... Load equipment.

Claims (8)

電力の分電系統毎にそれぞれ複数配設され電力を消費する負荷機器と、
前記分電系統毎に配設され、この分電系統に属する前記負荷機器の消費電力量を検出する電力センサと、
前記電力センサにより検出された前記負荷機器の消費電力量を収集する収集サーバと、
前記収集サーバにより収集された前記負荷機器の消費電力量を取得すると、データとしてメモリに保存するとともにこの消費電力量を含む前記負荷機器の情報をこの負荷機器が属する分電系統の情報と関連づけて管理する管理サーバと、
前記管理サーバにより管理される情報の少なくとも表示が可能な端末と
を備え、
少なくとも分電系統のIDに関連づけてこの分電系統に属する負荷機器のIDとこの負荷機器の消費電力量とが付加された階層化データが前記メモリに登録され、
前記管理サーバは前記階層化データの管理が可能であり、前記端末は前記階層化データの表示が可能であることを特徴とする負荷機器情報自動抽出・管理システム。
A plurality of load devices that are arranged for each power distribution system and consume power; and
A power sensor that is arranged for each power distribution system and detects a power consumption amount of the load device belonging to the power distribution system;
A collection server that collects the power consumption of the load device detected by the power sensor;
When the power consumption of the load device collected by the collection server is acquired, the load device information including the power consumption is stored in the memory as data and associated with the information of the power distribution system to which the load device belongs. A management server to manage,
A terminal capable of displaying at least information managed by the management server,
Hierarchical data to which at least the ID of the load device belonging to this distribution system and the power consumption of this load device are added in association with at least the ID of the distribution system is registered in the memory,
The load server information automatic extraction / management system, wherein the management server is capable of managing the hierarchical data, and the terminal is capable of displaying the hierarchical data.
請求項1において、
前記階層化データは、負荷機器が増設される毎に、前記分電系統のIDに関連づけて前記増設負荷機器のIDが付加されるとともに、この増設負荷機器のIDに対応づけてこの増設負荷機器の消費電力量が付加されることにより生成されることを特徴とする負荷機器情報自動抽出・管理システム。
In claim 1,
Each time the load device is added, the hierarchical data is added with the ID of the additional load device in association with the ID of the distribution system, and the additional load device is associated with the ID of the additional load device. A load device information automatic extraction / management system characterized by being generated by adding the amount of power consumption.
請求項1において、
前記収集サーバは、電力センサから前記消費電力量を電力量情報として収集した場合、この電力センサに対応する前記分電系統のIDを、収集した前記電力量情報に付加し、この分電系統のIDは前記管理サーバと共有されることを特徴とする負荷機器情報自動抽出・管理システム。
In claim 1,
When the collection server collects the power consumption amount from the power sensor as the power amount information, the collection server adds the ID of the distribution system corresponding to the power sensor to the collected power amount information. ID is shared with the said management server, The load apparatus information automatic extraction and management system characterized by the above-mentioned.
請求項3において、
前記管理サーバは、前記収集サーバから取得した前記分電系統の消費電力量を表すデータを前回のデータと比較して相対変化量を演算し、前記相対変化量が正の場合はこの相対変化量と前記分電系統のIDとを前記端末に配信し表示させる一方、前記相対変化量が負の場合は、前記階層化データをもとに前記相対変化量に等しい消費電力量を有する負荷機器のIDと、この負荷機器が属する分電系統のIDと、前記相対変化量とを前記端末に配信し表示させることを特徴とする負荷機器情報自動抽出・管理システム。
In claim 3,
The management server calculates a relative change amount by comparing data representing the power consumption amount of the distribution system acquired from the collection server with the previous data, and if the relative change amount is positive, the relative change amount When the relative change amount is negative, the load device having the power consumption equal to the relative change amount based on the hierarchical data is displayed. An automatic load device information extraction / management system that distributes and displays an ID, an ID of a distribution system to which the load device belongs, and the relative change amount on the terminal.
請求項4において、
前記端末に、前記分電系統のIDと相対変化量が表示されている場合、前記端末から前記相対変化量に等しい負荷機器の名称が増設された負荷機器のIDとして入力されると、前記管理サーバは、前記分電系統のIDに関連づけて増設負荷機器のIDを追加し、かつ前記増設負荷機器のIDに関連づけて前記相対変化量を付加することにより前記階層化データを更新し、かつ前記メモリに保存され前記端末により指定された期間内のデータのオフセット処理と平均化処理を行って負荷機器単位の階層化を実行し、前記実行結果を前記メモリに前記前回のデータとして保存することを特徴とする負荷機器情報自動抽出・管理システム。
In claim 4,
When the ID of the power distribution system and the relative change amount are displayed on the terminal, if the name of the load device equal to the relative change amount is input from the terminal as the ID of the added load device, the management The server updates the layered data by adding the ID of the additional load device in association with the ID of the power distribution system, and adding the relative change amount in association with the ID of the additional load device, and Performing offset processing and averaging processing of data within a period specified by the terminal that is stored in the memory and executing hierarchization in units of load devices, and storing the execution result as the previous data in the memory A featured automatic device information extraction and management system.
請求項4において、
前記端末に、負荷機器のIDとこの負荷機器が属する分電系統のIDとこの負荷機器の相対変化量とが表示されている場合、前記端末がこれらIDを含む情報の確定操作を行うと、前記管理サーバは、前記分電系統のIDに関連づけて付加されている負荷機器のIDとその相対変化量を削除することにより前記階層化データを更新し、かつ前記分電系統に属している全ての負荷機器の消費電力量を表すデータから前記負荷機器の相対変化量を削除し、前記前回のデータとして保存することを特徴とする負荷機器情報自動抽出・管理システム。
In claim 4,
When the ID of the load device, the ID of the distribution system to which the load device belongs, and the relative change amount of the load device are displayed on the terminal, the terminal performs an operation for confirming information including these IDs. The management server updates the hierarchical data by deleting the ID of the load device added in association with the ID of the distribution system and the relative change amount thereof, and belongs to the distribution system. A load device information automatic extraction / management system, wherein a relative change amount of the load device is deleted from data representing the power consumption amount of the load device and stored as the previous data.
請求項6において、
前記IDが削除された負荷機器は移設、除却廃棄および電源オフの何れかとして扱われることを特徴とする負荷機器情報自動抽出・管理システム。
In claim 6,
The load device from which the ID is deleted is handled as any one of relocation, retirement disposal, and power-off.
請求項1において、
前記分電系統のIDとこの分電系統の定格電流値とが前記階層化データとして前記メモリに登録され、
前記管理サーバは、前記分電系統に属する負荷機器の合計電流値が演算可能であり、
前記端末は、前記分電系統のIDとこの分電系統の定格電流値とが表示可能であるとともに、この分電系統に属する負荷機器の合計電流値が表示可能であることを特徴とする負荷機器情報自動抽出・管理システム。
In claim 1,
The ID of the distribution system and the rated current value of the distribution system are registered in the memory as the hierarchical data,
The management server can calculate a total current value of load devices belonging to the distribution system,
The terminal is capable of displaying an ID of the power distribution system and a rated current value of the power distribution system, and is capable of displaying a total current value of load devices belonging to the power distribution system. Equipment information automatic extraction and management system.
JP2012020707A 2012-02-02 2012-02-02 Load device information automatic extraction and management system Pending JP2013161155A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012020707A JP2013161155A (en) 2012-02-02 2012-02-02 Load device information automatic extraction and management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012020707A JP2013161155A (en) 2012-02-02 2012-02-02 Load device information automatic extraction and management system

Publications (1)

Publication Number Publication Date
JP2013161155A true JP2013161155A (en) 2013-08-19

Family

ID=49173373

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012020707A Pending JP2013161155A (en) 2012-02-02 2012-02-02 Load device information automatic extraction and management system

Country Status (1)

Country Link
JP (1) JP2013161155A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016151804A (en) * 2015-02-16 2016-08-22 日本電信電話株式会社 Power consumption analyzing apparatus, power consumption analysis method, and power consumption analysis program
KR101750135B1 (en) * 2013-10-07 2017-06-23 엘에스산전 주식회사 Apparatus and method for correcting of acquired data

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101750135B1 (en) * 2013-10-07 2017-06-23 엘에스산전 주식회사 Apparatus and method for correcting of acquired data
JP2016151804A (en) * 2015-02-16 2016-08-22 日本電信電話株式会社 Power consumption analyzing apparatus, power consumption analysis method, and power consumption analysis program

Similar Documents

Publication Publication Date Title
EP2625614B1 (en) System and method for monitoring and managing data center resources in real time incorporating manageability subsystem
EP2625612B1 (en) System and method for monitoring and managing data center resources in real time
EP2673712B1 (en) Infrastructure control fabric system and method
US10061371B2 (en) System and method for monitoring and managing data center resources in real time incorporating manageability subsystem
US11422910B2 (en) Method and system for implementing a data center operating system
JP6400733B2 (en) Electric energy dispatch method and apparatus, and power management method and apparatus
US10324430B2 (en) Infrastructure control fabric system and method
WO2012047756A1 (en) System and method for monitoring and managing data center resources incorporating a common data model repository
US20140052304A1 (en) Dynamic enforcement of power management policy and methods thereof
JP2013161155A (en) Load device information automatic extraction and management system
CA2878655A1 (en) Power distribution, management, and monitoring systems and methods
CN110603526B (en) Infrastructure control architecture system and method
CN208424393U (en) Internet of Things builds operation management system
CN117235326B (en) Visual display system of district equipment based on district portrait
JP2011065424A (en) Electric power data management system
JP5562268B2 (en) Connection management system
WO2014157663A1 (en) Power management device, power management method and program