JP2013112483A - Control method of belt conveyor device and belt conveyor facility - Google Patents

Control method of belt conveyor device and belt conveyor facility Download PDF

Info

Publication number
JP2013112483A
JP2013112483A JP2011261389A JP2011261389A JP2013112483A JP 2013112483 A JP2013112483 A JP 2013112483A JP 2011261389 A JP2011261389 A JP 2011261389A JP 2011261389 A JP2011261389 A JP 2011261389A JP 2013112483 A JP2013112483 A JP 2013112483A
Authority
JP
Japan
Prior art keywords
belt
amount
belt conveyor
conveyed product
speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2011261389A
Other languages
Japanese (ja)
Inventor
Tomoyuki Fukunaga
智幸 福永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ube Machinery Corp Ltd
Original Assignee
Ube Machinery Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ube Machinery Corp Ltd filed Critical Ube Machinery Corp Ltd
Priority to JP2011261389A priority Critical patent/JP2013112483A/en
Publication of JP2013112483A publication Critical patent/JP2013112483A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Control Of Conveyors (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce a maintenance cost by extending the service life of a replacement part such as a roller and to attain energy saving in a belt conveyor device.SOLUTION: In the belt conveyor device conveying a bulk load as a conveyance object, the quantity of the conveyance object per unit length on a running belt is set as a predetermined amount of load. Even if the quantity of the conveyance object loaded on the belt during an operation of the belt conveyor device changes, the speed of the belt is adjusted in response to a changed amount of the conveyance object and the conveyance object loaded on the belt is controlled so as to meet the predetermined amount of load. Because a required operation is performed at a necessary minimum belt speed according to the quantity of the conveyance object, the energy of belt driving power and the like can be decreased. In addition, because the number of rotations per conveyance amount can be suppressed with respect to the total number of rotations of the bearing currently used for the belt conveyor, the service life of each replacement part such as a roller can be extended.

Description

本発明は、複数台のベルトコンベヤ装置を上流側から下流側に連続的に並べることにより、搬送物を上流側から下流側のベルトコンベヤ装置に、順次、送給して搬送するベルトコンベヤ設備に係わり、特に、ベルトコンベヤ装置に対して搬送物の供給量が一定しないバラ物の搬送物を搬送するに好適なベルトコンベヤ装置の制御方法、並びにベルトコンベヤ設備に関するものである。   The present invention provides a belt conveyor facility that sequentially feeds and conveys a conveyed product from an upstream side to a downstream belt conveyor device by sequentially arranging a plurality of belt conveyor devices from the upstream side to the downstream side. In particular, the present invention relates to a method for controlling a belt conveyor device suitable for transporting a loosely-conveyed material whose supply amount is not constant with respect to the belt conveyor device, and a belt conveyor facility.

2個のプーリ間に架け渡されて回転する輪状のベルトの上に、バラ物等の搬送物を載せて搬送するベルトコンベヤ装置は、古くから当業者に周知であって、様々な搬送物が、ベルトコンベヤ装置で搬送されている。   BACKGROUND ART A belt conveyor apparatus that conveys a conveyed object such as a rose on a ring-shaped belt that is stretched between two pulleys and rotates is well known to those skilled in the art. It is conveyed by a belt conveyor device.

なお、搬送物の搬送距離が長い場合、或いは、搬送ラインが直線的でない場合等において、複数台のベルトコンベヤ装置を、上流(搬送物が送られてくる方向)側から下流(搬送物が流れて行く先側の方向)側に、連続的に並べて一つのベルトコンベヤ設備を構成する方法が一般的に採用されている。 When the transport distance of the transported object is long or when the transport line is not linear, the plurality of belt conveyor devices are moved downstream (in the direction in which the transported object is sent) from the downstream side (the transported object flows). Generally, a method is used in which one belt conveyor facility is configured in a continuous manner on the direction of the destination side.

各種の製造工場や発電所などにおいても、複数台のベルトコンベヤ装置が連続的に並べて配置されており、上流側から下流側に複数台並べられたベルトコンベヤ装置が、それぞれ連続的に搬送物を搬送する構成となっている。ただ、複数台並べられたベルトコンベヤ装置は、通常、運転中において、常に一定のベルト速度で搬送するように制御される。 In various manufacturing factories and power plants, a plurality of belt conveyor devices are arranged side by side, and a plurality of belt conveyor devices arranged from the upstream side to the downstream side continuously convey the conveyed items. It is configured to carry. However, a plurality of belt conveyor devices arranged in a row are usually controlled so as to always convey at a constant belt speed during operation.

なお、近年になって、複数台のコンベヤ装置を、まとめて一つの設備として考え、一つの制御装置で制御するケースも見受けられる。例えば、そのようなベルトコンベヤ設備の制御装置として、特許文献1に開示されたような技術が公知である。 In recent years, there are cases where a plurality of conveyor devices are considered as a single facility and controlled by a single control device. For example, a technique as disclosed in Patent Document 1 is known as a control device for such a belt conveyor facility.

特開平07−206133号公報Japanese Patent Application Laid-Open No. 07-206133

特許文献1に開示されたベルトコンベヤ制御装置の特徴は、最も上流側に配した1台のベルトコンベヤ装置を基準として、その基準となるベルトコンベヤ装置が下流側のベルトコンベヤ装置に送り出す、搬送物の量、並びに、それに要する時間等のファクターを算出して記憶するとともに、下流側のベルトコンベヤ装置が、送り出された搬送物を効率よく運搬できる条件(ベルト速度、時間等)を算出して、当該条件にて下流側のベルトコンベヤを制御するという点にある。
特許文献1に開示されたベルトコンベヤの制御装置は、前述の構成により、下流側に配したベルトコンベヤ装置のベルト速度を制御することによって、ベルトコンベヤ設備の省エネルギーを図るものである。
The feature of the belt conveyor control device disclosed in Patent Document 1 is that a single belt conveyor device arranged at the most upstream side is used as a reference, and the belt conveyor device serving as the reference sends the belt conveyor device to the downstream belt conveyor device. , As well as calculating and storing factors such as the time required for it, and calculating conditions (belt speed, time, etc.) where the belt conveyor device on the downstream side can efficiently transport the delivered material, The point is that the downstream belt conveyor is controlled under this condition.
The belt conveyor control device disclosed in Patent Document 1 is intended to save energy in the belt conveyor equipment by controlling the belt speed of the belt conveyor device arranged on the downstream side with the above-described configuration.

ところで、セメント工場や発電所等においては、工場から遠く離れた遠隔地で採取されて荷揚げ等された石炭や石灰石等、所謂、バラ物を原料や燃料として使用する。
発電所で使用する石炭を例として説明すれば、海外にある石炭の産出地から、発電所近辺の港に設置した受け入れ設備まで、専用船(石炭運搬用船舶)を使用して石炭を輸送することが一般的である。
なお、遠隔地から工場近辺の受け入れ設備までバラ物を輸送するのに、前述した船舶以外にも、トラック、或いは貨車等の輸送手段が一般的に利用されている。
By the way, in cement factories, power plants, and the like, so-called roses such as coal and limestone collected and unloaded from a remote place far from the factory are used as raw materials and fuels.
Taking coal used at a power plant as an example, transport coal using a dedicated ship (coal carrier ship) from overseas coal production sites to a receiving facility installed at a port near the power plant. It is common.
In addition to the above-described ships, transportation means such as trucks or freight cars are generally used for transporting loose items from remote places to receiving facilities near the factory.

ここで、石炭運搬用の専用船で発電所に隣接する港まで石炭を輸送してきたケースを想定すると、専用船の船倉に蓄えられた石炭を、グラブバケット等のアンローダー(所謂、荷揚設備)によって船外に荷卸し、その後、港の受け入れ設備から工場内の石炭保管場所まで、ベルトコンベヤ設備で搬送するケースが多い。   Here, assuming a case where coal is transported to a port adjacent to the power plant by a special ship for coal transportation, coal stored in the hold of the special ship is unloaded (so-called unloading equipment) such as grab buckets. In many cases, it is unloaded from the ship and then transported from the port receiving facility to the coal storage in the factory using a belt conveyor facility.

しかし、グラブバケット等のアンローダを例にすれば、船倉から石炭を取り出す場合に、一回の取り出し動作で取り出すことのできる石炭の量は、必ずしも一定ではない。
例えば、船倉に石炭が満載されている場合、グラブバケットは、一回の取り出し動作で、グラブバケット一杯の石炭を容易に掴んで取り出すことが出来る。それに対して、船倉に石炭が残り少なくなった場合、グラブバケットで、単位時間あたりに掴める石炭の量が極端に少なくなる。特に、船倉の石炭が残り少なくなって、船倉の底に残る石炭の荷揚(所謂、底ざらえ)をするような状況下において、荷揚能力の低下は顕著である。
従って、グラブバケット等のアンローダで取り出したバラ物を、ベルトコンベヤ装置で搬送する際においては、ベルト上に供給される搬送物の量がばらついて一定にならず、コンベヤ上には、ほとんど搬送物が無いのにベルトだけが高速で走行しているという状態が生じる可能性がある。
However, if an unloader such as a grab bucket is taken as an example, when coal is taken out from the hold, the amount of coal that can be taken out by one take-out operation is not necessarily constant.
For example, when the cargo hold is loaded with coal, the grab bucket can be easily grabbed and taken out by a single take-out operation. On the other hand, when there is less coal left in the hold, the amount of coal that can be grabbed per unit time with the grab bucket becomes extremely small. In particular, in a situation where the coal in the hold is low and the coal remaining at the bottom of the hold is unloaded (so-called bottom-up), the unloading capacity is significantly reduced.
Therefore, when a loose article taken out by an unloader such as a grab bucket is transported by a belt conveyor device, the amount of the transported substance supplied on the belt varies and is not constant. There is a possibility that only the belt is running at high speed even though there is no belt.

前述したケース以外にも、ベルト上に供給される搬送物の量が一定とならないケース、或いは、極端に減少するケース等が、多々想定される。
例えば、ホッパに貯えられた原料を、その下部から取り出してベルトコンベヤ装置に供給する場合には、ホッパが十分に満たされている時と、満たされていない時で、その供給量に大きな差が生じてしまう。
また、例え、ベルトフィーダ等の計量装置を利用することによって、ホッパに貯えられた原料を定量的に取り出す構成にしたとしても、ホッパが空になる直前等については、ベルトフィーダで定量的に取り出せる搬送物の量に限界がある、又、取出しが断続的になる可能性がある、等の理由から、かならずしも一定量の搬送物をベルト上に供給することができるとは限らない。
例えば、前述したように、アンローダで取り出せる搬送物の量は、状況によって大きく左右される。ベルトフィーダによって搬送物をホッパからベルト上へ供給する能力が、アンローダによって搬送物をホッパに投入する能力よりも勝った場合に、ホッパはいずれ空になる。従って、ホッパを空にしないために、アンローダからホッパに投入される搬送物の量をみながら、ベルトフィーダの能力を調整するケースも想定される。
以上、いくつかの例を説明したが、それ以外の理由によっても、ベルトコンベヤ設備のベルト上に供給される搬送物の量が、一定にならず、又断続的になるようなケースは、存在する。
In addition to the cases described above, there are many cases where the amount of the conveyed product supplied on the belt is not constant, or when the amount is extremely reduced.
For example, when the raw material stored in the hopper is taken out from the lower part and supplied to the belt conveyor device, there is a large difference in the supply amount between when the hopper is fully filled and when it is not filled. It will occur.
In addition, even if it is configured to take out the raw material stored in the hopper quantitatively by using a weighing device such as a belt feeder, it can be taken out quantitatively with the belt feeder immediately before the hopper is empty. A fixed amount of the conveyed product cannot always be supplied onto the belt because the amount of the conveyed product is limited or the takeout may be intermittent.
For example, as described above, the amount of the conveyed product that can be taken out by the unloader greatly depends on the situation. If the ability to feed the conveyed product from the hopper onto the belt by the belt feeder exceeds the ability to feed the conveyed product to the hopper by the unloader, the hopper will eventually become empty. Therefore, in order not to empty the hopper, there may be a case where the capacity of the belt feeder is adjusted while checking the amount of the conveyed product loaded from the unloader to the hopper.
Although some examples have been described above, there are cases in which the amount of the conveyed product supplied on the belt of the belt conveyor equipment is not constant or intermittent even for other reasons. To do.

ベルトコンベヤ装置に供給される搬送物の量が一定にならないケースにおいて、前述した従来技術のように、ベルト速度一定でベルトコンベヤ装置を運転するとすれば、必然的に搬送量の多い場合を想定して、ベルト速度を設定せざるを得ない。
従って、前述したアンローダ等の荷揚設備につながるコンベヤ装置の能力については、通常、アンローダ等の最大荷揚能力を基準として設計されている。
また、シップローダ等の荷積設備につながるコンベヤ装置の能力については、通常、リクレーマなどの最大払出能力を基準として設計される。
In cases where the amount of transported material supplied to the belt conveyor device is not constant, if the belt conveyor device is operated at a constant belt speed as in the prior art described above, it is assumed that the amount of transport is inevitably large. The belt speed must be set.
Therefore, the capacity of the conveyor device connected to the unloading equipment such as the unloader described above is usually designed based on the maximum unloading capacity of the unloader or the like.
Further, the capacity of a conveyor device connected to a loading facility such as a ship loader is usually designed based on the maximum payout capacity of a reclaimer or the like.

ところで、ベルトコンベヤ装置の搬送能力を向上させる手段として、ベルト速度の高速化が効果的であるので、ベルトコンベヤ装置のベルト速度は、通常、高めの速度に設定されている。しかし、ベルトコンベヤ装置においては、ベルト上に載せられた搬送物の量の大小に係わらず、ベルトを下から支えるローラを回転させるための抵抗力と、ベルト速度を維持するための動力等が必要である。従って、ベルト速度を高めにした場合には、搬送物を搬送するために使用する以外の動力、即ち前述したローラを回転させるために必要な抵抗力等、非常に大きな動力を必要とするから、エネルギー効率を悪化させる。また、特に、前述のローラを支持する軸受け等の寿命は、実搬送量に係わらず、荷重とローラの総回転数で決まってしまうから、不必要にベルト速度を高めることは好ましくない。特に、ベルト速度が高速で一定となっている一般的なベルトコンベヤ装置は、この問題が顕著である。 By the way, since it is effective to increase the belt speed as means for improving the conveying capability of the belt conveyor apparatus, the belt speed of the belt conveyor apparatus is usually set to a higher speed. However, the belt conveyor device requires resistance to rotate the roller that supports the belt from the bottom, power to maintain the belt speed, etc., regardless of the amount of conveyed material placed on the belt. It is. Therefore, when the belt speed is increased, power other than that used for transporting the transported material, that is, very large power such as the resistance necessary for rotating the roller described above is required. Deteriorate energy efficiency. In particular, the life of the above-described bearings for supporting the roller is determined by the load and the total number of rotations of the roller regardless of the actual conveyance amount, and therefore it is not preferable to unnecessarily increase the belt speed. In particular, this problem is remarkable in a general belt conveyor apparatus in which the belt speed is high and constant.

なお、前述した特許文献1に記載された従来技術のベルトコンベヤ装置は、複数台並んだベルトコンベヤ装置について、最も上流側に配した1台のベルトコンベヤ装置を基準として、下流側のベルトコンベヤ装置を制御する。
この方法は、ベルト速度を一定とする前述の従来技術より、効率的な技術であると推察するが、基準とする上流側のベルトコンベヤ装置から、わずかでも搬送物が供給されると、下流側のベルトコンベヤ装置は、その流量に合わせて動き続けなければならないという問題点があって、やはり効率的な面で改善の必要性がある。
The prior art belt conveyor device described in the above-mentioned Patent Document 1 is a belt conveyor device on the downstream side of a plurality of belt conveyor devices on the basis of one belt conveyor device arranged on the most upstream side. To control.
This method is presumed to be more efficient than the above-mentioned conventional technique in which the belt speed is constant. However, if even a small amount of transported material is supplied from the reference upstream belt conveyor device, the downstream side However, there is a problem in that the belt conveyor apparatus must continue to move according to the flow rate, and there is a need for improvement in terms of efficiency.

本発明は、以上、説明した問題点に鑑みてなされたものであり、ベルトコンベヤ設備の省エネルギー化を図ると同時に、ベルトコンベヤ装置に使用されているローラ等の交換部品の長寿命化による保守コストの低減並びに省資源化を図るものである。   The present invention has been made in view of the problems described above, and is intended to save energy in the belt conveyor equipment, and at the same time, to maintain maintenance costs by extending the service life of replacement parts such as rollers used in the belt conveyor apparatus. Reduction and resource saving.

(1) 上記の目的を達成するため、本発明によるベルトコンベヤ装置の制御方法は、
バラ物を搬送物として搬送するベルトコンベヤ装置の制御方法であって、走行しているベルト上の単位長さあたりに載せる搬送物の量を設定載置量として設定し、ベルトコンベヤ装置の運転中に、搬送物の供給機構からベルト上に供給される搬送物の単位時間あたりの量を検知して、該ベルト上に供給される搬送物の単位時間あたりの量が変化する場合に、搬送物の供給量の変化に対応させてベルトの速度を調整することにより、ベルト上に載せられた搬送物が設定載置量になるように制御する。
(1) In order to achieve the above object, a method for controlling a belt conveyor apparatus according to the present invention includes:
This is a method for controlling a belt conveyor apparatus that conveys a loose article as a conveyed article, and sets the amount of the article to be loaded per unit length on the traveling belt as a set loading amount, and the belt conveyor apparatus is operating. In addition, when the amount per unit time of the transported object supplied on the belt from the transported material supply mechanism is detected, and the amount per unit time of the transported object supplied on the belt changes, the transported object By adjusting the speed of the belt in accordance with the change in the supply amount, the conveyed product placed on the belt is controlled so as to become the set placement amount.

(2) (1)に記載のベルトコンベヤ装置の制御方法において、ベルトコンベヤ装置のベルトが最大定格速度で走行している状態において、走行しているベルト上の単位長さあたりに載せることができる搬送物の最大の量を定格載置量として、該定格載置量を前記設定載置量とする。 (2) In the control method of the belt conveyor apparatus according to (1), the belt of the belt conveyor apparatus can be placed per unit length on the traveling belt in a state where the belt is traveling at the maximum rated speed. The maximum amount of the transported object is set as the rated placement amount, and the rated placement amount is set as the set placement amount.

(3) (1)又は(2)に記載のベルトコンベヤ装置の制御方法において、ベルトが設定載置量の搬送物を載せた際に、ベルトコンベヤ装置が搬送できる単位時間あたりの最大搬送量を、ベルトを駆動するプーリの最大定格回転速度で、除した値を算出し、基準値として設定し、ベルトコンベヤ装置の運転中に、ベルト上に供給される搬送物の量が変化する場合において、変化した搬送物の量をプーリ回転速度で除した値が、該基準値から変化しないように、プーリ回転速度を制御することによりベルトの速度を調整して、ベルト上に載せられた搬送物が設定載置量になるように制御する。 (3) In the control method of the belt conveyor device according to (1) or (2), when the belt places a set amount of transported material, the maximum transport amount per unit time that the belt conveyor device can transport is set. , Calculate the value divided by the maximum rated rotational speed of the pulley that drives the belt, set it as a reference value, and when the amount of conveyed material supplied on the belt changes during operation of the belt conveyor device, The speed of the belt is adjusted by controlling the pulley rotation speed so that the value obtained by dividing the changed amount of the conveyance object by the pulley rotation speed does not change from the reference value. Control so that the set loading amount is achieved.

(4) (1)から(3)までのいずれか1項に記載のベルトコンベヤ装置の制御方法において、予めベルトの最低速度を設定することにより、運転中に、ベルト上に供給される搬送物の量が変化して、一時的に、微少或いは零、という状態になった場合において、
前記設定載置量になるベルト速度が、該設定した最低速度を下まわる際に、ベルトが最低速度で走行するように制御する。
(4) In the method for controlling a belt conveyor device according to any one of (1) to (3), a conveyed product supplied on the belt during operation by setting a minimum belt speed in advance. In the case where the amount of is changed and temporarily becomes small or zero,
Control is performed so that the belt travels at the minimum speed when the belt speed at which the set loading amount falls below the set minimum speed.

(5) (2)に記載のベルトコンベヤ装置の制御方法において、ベルトコンベヤ装置の運転中に搬送物の比重が変化する際において、ベルトコンベヤ装置の定格載置量を再度演算する。 (5) In the method for controlling the belt conveyor apparatus according to (2), when the specific gravity of the conveyed product changes during operation of the belt conveyor apparatus, the rated loading amount of the belt conveyor apparatus is calculated again.

(6) (5)に記載のベルトコンベヤ装置の制御方法において、ベルト上に載っている搬送物の積載断面を計測するとともに、ベルトの単位長さあたりに載置されている搬送物の重量を検知することによって、搬送物の比重を算出する。 (6) In the control method of the belt conveyor device according to (5), the loading cross section of the conveyed object placed on the belt is measured, and the weight of the conveyed object placed per unit length of the belt is measured. By detecting, the specific gravity of the conveyed product is calculated.

(7) 上記の目的を達成するため、本発明によるベルトコンベヤ設備は、上流側から下流側に並んで配された複数台のベルトコンベヤ装置を有するベルトコンベヤ設備であって、該上流側から下流側に並んで配された複数台のベルトコンベヤ装置の全部、或いは少なくともその中の一台について、ベルト上に供給される単位時間あたりの搬送物量を測定して検知する検知器、又は、上流側に配したベルトフィーダ或いはベルトコンベヤ装置からの信号が入力されて単位時間あたりに供給される搬送物量を検知する検知器、を備えるとともに、ベルトを駆動するプーリの回転速度を制御してベルト速度を変化させる速度調整器を備えて、走行しているベルト上の単位長さあたりに載せることができる搬送物の量を設定載置量として設定することによって、ベルト上に供給される搬送物の量が変化する場合に、搬送物の量の変化に対応させて、プーリ回転速度を制御することによりベルトの速度を調整して、ベルト上に載せられた搬送物が設定載置量になるように制御する制御装置を備えた構成とする。 (7) In order to achieve the above object, a belt conveyor facility according to the present invention is a belt conveyor facility having a plurality of belt conveyor devices arranged side by side from the upstream side to the downstream side, from the upstream side to the downstream side. A detector for measuring and detecting the amount of conveyed articles per unit time supplied on the belt for all or at least one of the plurality of belt conveyor devices arranged side by side, or on the upstream side And a detector for detecting the amount of a conveyed product supplied per unit time when a signal from a belt feeder or a belt conveyor device is input to the belt feeder, and controlling the rotational speed of a pulley that drives the belt to control the belt speed. With a speed adjuster to change, the amount of the transported object that can be placed per unit length on the running belt is set as the set loading amount. Therefore, when the amount of the conveyed product supplied on the belt changes, the belt speed is adjusted by controlling the pulley rotation speed in response to the change in the amount of the conveyed product, and the belt is placed on the belt. In addition, a configuration is provided in which a control device that performs control so that the conveyed product reaches the set placement amount is provided.

(8) (7)に記載のベルトコンベヤ設備において、ベルトコンベヤ装置のベルトが最大定格速度で走行している状態において、走行しているベルト上の単位長さあたりに載せることができる搬送物の最大の量を定格載置量として、該定格載置量を前記設定載置量とする。 (8) In the belt conveyor facility according to (7), in the state where the belt of the belt conveyor device is traveling at the maximum rated speed, the conveyance object that can be placed per unit length on the traveling belt. The maximum amount is set as the rated placement amount, and the rated placement amount is set as the set placement amount.

本発明によるベルトコンベヤ装置の制御方法によれば、搬送物を搬送するにあたり、搬送物の量に合わせてベルト速度を調整することによって、必要最低限のベルト速度で運転する。その結果、ベルト速度に相関して上昇する「ベルト駆動力」又「ローラを回転させるための抵抗力」等のエネルギーについて、一定速度で運転する従来技術に比較して、減少させることができるので、搬送エネルギー効率が向上して、省エネルギー化が図れる。   According to the method for controlling a belt conveyor apparatus according to the present invention, when a conveyed product is conveyed, the belt speed is adjusted in accordance with the amount of the conveyed product, thereby operating at a minimum belt speed. As a result, energy such as “belt driving force” or “resistance force for rotating the roller” that increases in correlation with the belt speed can be reduced as compared with the conventional technology that operates at a constant speed. As a result, the conveyance energy efficiency is improved and energy saving can be achieved.

さらに、ベルト速度を抑えた結果、ベルトコンベヤに使用されている軸受けの総回転数について、搬送量あたりの回転数を抑えることができるので、ベルトコンベヤ設備に使用しているローラ等の交換部品について長寿命化が可能になり、交換部材の省資源化と、保守のための負荷が減少するという効果を奏することができる。   Furthermore, as a result of suppressing the belt speed, the total number of rotations of the bearings used in the belt conveyor can be reduced per conveyance amount, so replacement parts such as rollers used in belt conveyor equipment The service life can be extended, and the effects of resource saving of the replacement member and reduction of the load for maintenance can be achieved.

本発明に係わるベルトコンベヤ設備の1例を説明する図である。It is a figure explaining an example of the belt conveyor installation concerning this invention. 本発明に係わるベルトコンベヤ設備の運転時挙動の1例を説明する図である。It is a figure explaining an example of the behavior at the time of operation of the belt conveyor equipment concerning the present invention. 本発明に係わりベルト上に供給される搬送物の量とベルト速度の関係を説明する図である。It is a figure explaining the relationship between the quantity of the conveyed product and belt speed which concern on this invention and are supplied on a belt. 本発明に係わりベルト上における搬送物の載置状態を説明する概念図である。It is a conceptual diagram explaining the mounting state of the conveyed product on a belt in connection with this invention. 本発明による他の実施形態に係わりベルト上に供給される搬送物の量とベルト速度の関係を説明する図である。It is a figure explaining the relationship between the quantity of the conveyed product and belt speed which are related with other embodiment by this invention and are supplied on a belt. 従来技術に係わりベルト上における搬送物の載置状態を説明する概念図である。It is a conceptual diagram explaining the mounting state of the conveyed product on a belt in connection with a prior art. 従来技術に係わり新規搬送物の量とベルト速度の関係を説明する図である。It is a figure explaining the relationship between the amount of a new conveyance thing, and a belt speed in connection with a prior art.

以下、図面等に基づいて本発明に係わる実施形態の好ましい1例を詳細に説明する。
図1〜図5は本発明の実施形態に係わり、図1はベルトコンベヤ設備全体の概要を説明する図であり、図2はベルトコンベヤ設備の運転時の挙動について1例を説明する図である。図3はベルト上に供給される搬送物の量とベルト速度の関係を説明する図であり、図4はベルト上における搬送物の載置状態を説明するための概念図である。図5は本発明による他の実施形態に係わりベルト上に供給される搬送物の量とベルト速度の関係を説明する図である。図6及び図7は従来技術を説明するための図である。
Hereinafter, a preferred example of an embodiment according to the present invention will be described in detail with reference to the drawings.
1 to 5 relate to an embodiment of the present invention, FIG. 1 is a diagram for explaining an outline of the entire belt conveyor facility, and FIG. 2 is a diagram for explaining an example of behavior during operation of the belt conveyor facility. . FIG. 3 is a diagram for explaining the relationship between the amount of the conveyed product supplied on the belt and the belt speed, and FIG. 4 is a conceptual diagram for explaining the loaded state of the conveyed product on the belt. FIG. 5 is a diagram for explaining the relationship between the amount of the conveyed product supplied on the belt and the belt speed according to another embodiment of the present invention. 6 and 7 are diagrams for explaining the prior art.

以下、図1を用いて本実施形態によるベルトコンベヤ設備1の構成について、その好ましい1例を説明する。
図1に示したベルトコンベヤ設備1は、ホッパ130の直下に配されたベルトフィーダ5、並びに、第1のベルトコンベヤ装置(第1ベルトコンベヤ装置と称することもある)から、第2のベルトコンベヤ装置、及び、第3のベルトコンベヤ装置まで、合計3台のベルトコンベヤ装置を備えており、ベルトフィーダ5を上流側として、下流側の第3のベルトコンベヤまで、搬送物が搬送される構成となっている。
なお、図1に示した実施形態においては、ベルトフィーダ5並びに3台のベルトコンベヤ装置に指令を送信してベルト速度を制御する制御装置50を備えている。
Hereinafter, a preferred example of the configuration of the belt conveyor facility 1 according to the present embodiment will be described with reference to FIG.
A belt conveyor facility 1 shown in FIG. 1 includes a belt feeder 5 disposed immediately below a hopper 130, and a first belt conveyor device (also referred to as a first belt conveyor device). A total of three belt conveyor devices, up to the device and the third belt conveyor device, with the belt feeder 5 as the upstream side, and the conveyed product to the downstream third belt conveyor, It has become.
In addition, in embodiment shown in FIG. 1, the control apparatus 50 which transmits a command to the belt feeder 5 and three belt conveyor apparatuses and controls a belt speed is provided.

ここで、ベルトフィーダ5は、一定長さのベルト上に載っている搬送物の重量を、リアルタイムで測定できるベルトスケール52を備えており、ベルトスケール52で測定した搬送物の流量測定信号が、制御装置50まで送信され入力されることで、流量を検知できるシステムとなっている。制御装置50は、ベルトスケール52で測定し検知した搬送物の流量について、測定時刻と合わせて記憶し、第1ベルトコンベヤ装置10の第1ベルト15上に新たに供給された搬送物の量を算出することができる。
なお、図1に示すベルトコンベヤ設備1において、ベルトフィーダ5は、第1ベルトコンベヤ装置10に対する搬送物の定量供給装置として配されており、ホッパ130内に搬送物が十分に貯えられている通常時において、単位時間当たりに設定した搬送量の搬送物を、ホッパ130から定量的に取り出して、第1ベルトコンベヤ装置10に供給する。
Here, the belt feeder 5 includes a belt scale 52 that can measure in real time the weight of a conveyed product placed on a belt having a certain length, and the flow measurement signal of the conveyed product measured by the belt scale 52 is: The system can detect the flow rate by being transmitted to the control device 50 and input. The control device 50 stores the flow rate of the transported object measured and detected by the belt scale 52 together with the measurement time, and determines the amount of the transported object newly supplied onto the first belt 15 of the first belt conveyor device 10. Can be calculated.
In the belt conveyor facility 1 shown in FIG. 1, the belt feeder 5 is arranged as a quantitative supply device for the conveyed product to the first belt conveyor device 10, and the conveyed product is sufficiently stored in the hopper 130. At the time, the transported amount set per unit time is quantitatively taken out from the hopper 130 and supplied to the first belt conveyor device 10.

次に、ベルトコンベヤ装置10の構成について簡単に説明する。
第1ベルトコンベヤ装置10は、第1ヘッドプーリ11と第1テールプーリ13を備えて、その間に円環上に接続されてエンドレスとなった第1ベルト15が掛け渡されている。そして、第1ヘッドプーリ11を図示しない駆動源で駆動して回転させることによって、第1ベルト15が回転(図1において時計回りの回転)して、第1ベルト15上に載せた搬送物を、第1テールプーリ13側から第1ヘッドプーリ11側へと搬送する構造となっている。図1においては、上側に配されたベルトが搬送物を搬送するためのキャリア側ベルトになり、下側に配されたベルトがリターンベルトである。
なお、本実施形態においては、後述する第2ベルトコンベヤ装置20と、第3ベルトコンベヤ装置も同様の構成となっている。
Next, the configuration of the belt conveyor device 10 will be briefly described.
The first belt conveyor device 10 includes a first head pulley 11 and a first tail pulley 13, and an endless first belt 15 that is connected on a ring is placed between the first belt pulley 11 and the first tail pulley 13. Then, by driving and rotating the first head pulley 11 with a drive source (not shown), the first belt 15 rotates (clockwise rotation in FIG. 1), and the conveyed product placed on the first belt 15 is moved. In this structure, the first tail pulley 13 is transported to the first head pulley 11 side. In FIG. 1, the belt disposed on the upper side serves as a carrier side belt for transporting a conveyed product, and the belt disposed on the lower side is a return belt.
In the present embodiment, a second belt conveyor device 20 and a third belt conveyor device described later have the same configuration.

ここで、図1に示したベルトコンベヤ設備1は、第1ベルトコンベヤを上流側の1台として、第2、及び第3と、順次、下流側に複数台のベルトコンベヤ装置を配した構成となっており、第1から第3のベルトコンベヤ装置まで、順次、搬送物を送る構成となっている。従って、ホッパ130の直下に配されたベルトフィーダ5から供給された搬送物は、前述の構成によって、上流側にある第1ベルトコンベヤ装置10から下流側の第3ベルトコンベヤ装置30まで、順次、搬送されて移動する。   Here, the belt conveyor facility 1 shown in FIG. 1 has a configuration in which a plurality of belt conveyor devices are arranged on the downstream side in the order of the second and third, with the first belt conveyor as one upstream side. It is the structure which sends a conveyed product sequentially from the 1st to 3rd belt conveyor apparatus. Therefore, the conveyed product supplied from the belt feeder 5 arranged immediately below the hopper 130 is sequentially transferred from the first belt conveyor device 10 on the upstream side to the third belt conveyor device 30 on the downstream side by the above-described configuration. Move and move.

なお、本実施形態において、図1に示す3台のベルトコンベヤ装置は、それぞれ駆動源として、電動モータをインバータ制御する方式の装置を使用した。
従って、駆動モータは、制御装置50からの信号によって、自在に停止及び運転することは勿論のこと、駆動モータにつながるプーリの回転速度を自在に変化させて、プーリ間に掛け渡されたベルトの速度を変化させることが可能である。
In the present embodiment, each of the three belt conveyor devices shown in FIG. 1 uses a device of an inverter control of an electric motor as a drive source.
Therefore, the drive motor can be freely stopped and operated by a signal from the control device 50, and the rotation speed of the pulley connected to the drive motor can be freely changed, so that the belt spanned between the pulleys It is possible to change the speed.

次に、図1に記載したホッパ130は、グラブバケット150から投入された搬送物を、その上部から受け入れて下部から排出する方式となっている。そして、本実施形態においては、ホッパ130の下部にベルトフィーダ5を配することにより、搬送物は、ホッパ130からベルトフィーダ5を介して第1ベルトコンベヤ装置10に供給される構成となっている。   Next, the hopper 130 described in FIG. 1 has a system in which a conveyed product input from the grab bucket 150 is received from the upper part and discharged from the lower part. In the present embodiment, the belt feeder 5 is arranged at the lower part of the hopper 130 so that the conveyed product is supplied from the hopper 130 to the first belt conveyor device 10 via the belt feeder 5. .

ここで、制御装置50は、搬送物の流量と測定時刻をセットで記憶することによって、第1ベルトコンベヤ装置10の第1ベルト15上に供給される搬送物の量を算出することができる。
なお、前述したように、ベルトフィーダ5は、基本的に定量供給装置(所謂、定量払い出し装置)であるから、ホッパ130から、単位時間当たりに設定した搬送量の搬送物を取り出して、第1ベルトコンベヤ装置10に供給する。
しかしながら、従来技術の問題点で前述したように、例えば、船倉の底に残る石炭の荷揚げをするような状況下において、アンローダ等の荷揚設備の荷揚能力の低下は顕著であり、このような状況下では、ホッパ130内に搬送物が充分貯えられないような状況になることが想定され、ベルトフィーダ5を使用したとしても、下流側にある第1ベルトコンベヤ装置10に搬送物を安定した状態で供給できない可能性がある。
Here, the control device 50 can calculate the amount of the conveyed product supplied onto the first belt 15 of the first belt conveyor device 10 by storing the flow rate and the measurement time of the conveyed product as a set.
Note that, as described above, the belt feeder 5 is basically a fixed amount supply device (so-called fixed amount dispensing device). Supplied to the belt conveyor device 10.
However, as described above in connection with the problems of the prior art, for example, in the situation where the coal remaining at the bottom of the hold is unloaded, the unloading capacity of the unloader and other unloading facilities is significantly reduced. Below, it is assumed that the conveyed product is not sufficiently stored in the hopper 130, and even if the belt feeder 5 is used, the conveyed product is in a stable state in the first belt conveyor device 10 on the downstream side. May not be available.

以下、本実施形態における定格載置量の定義について説明する。
ホッパ130内に十分に搬送物が充填されている場合、ベルトフィーダ5は、安定した状態で、搬送物を取り出して、第1ベルトコンベヤ10に供給する。
ベルトフィーダ5から第1ベルトコンベヤ10への搬送物の供給量は、通常、ベルトフィーダ5より下流側に配されたベルトコンベヤ装置のサイズ、或いは駆動モータ等の能力を勘案して決められた値であり、ベルトフィーダ5より下流側に配されたベルトコンベヤ装置が支障なく運転できる搬送量の上限値が最大搬送量として決められる。
Hereinafter, the definition of the rated placement amount in the present embodiment will be described.
When the conveyed product is sufficiently filled in the hopper 130, the belt feeder 5 takes out the conveyed product in a stable state and supplies it to the first belt conveyor 10.
The supply amount of the conveyed product from the belt feeder 5 to the first belt conveyor 10 is usually a value determined in consideration of the size of the belt conveyor device arranged on the downstream side of the belt feeder 5 or the capacity of the drive motor or the like. Thus, the upper limit value of the transport amount that the belt conveyor device disposed downstream of the belt feeder 5 can operate without any problem is determined as the maximum transport amount.

ここで、ベルトコンベヤ装置における最大搬送量は、ベルトコンベヤ装置のベルトを最大定格速度のSmax(m/min)で運転した際に、ベルト上に載せて搬送できる搬送物の最大重量としてMmax(kg/min)、或いは、ベルト上に載せて搬送できる搬送物の最大容量であるVmax(m/min)で定められ、単位時間あたりに搬送できる搬送物の最大重量、又は、単位時間あたりに搬送できる搬送物の最大容量を基準として定義される。 Here, the maximum transport amount in the belt conveyor device is Mmax (kg) as the maximum weight of the transported material that can be transported on the belt when the belt of the belt conveyor device is operated at the maximum rated speed Smax (m / min). / Min) or Vmax (m 3 / min), which is the maximum capacity of the transported object that can be transported on the belt, and is transported per unit time or the maximum weight of the transportable object that can be transported per unit time It is defined on the basis of the maximum capacity of the transportable goods.

なお、前述した最大搬送量は、通常、搬送物の最大重量に基づいて表記されることが多いが、比重が小さく容量あたりの重量が小さな搬送物を搬送する場合は、ベルト上に載せられる搬送物の容量がネック(容量が大きすぎてベルト上からこぼれ落ちる等)となって、最大搬送量が決まる場合がある。しかしながら、本明細書においては、説明を簡略化するため、最大容量を基準にして最大搬送量を算出したケースにおいても、表記としては、容量に比重をかけて重量で表すものとして、Mmax(kg/min)で表現することにする。 The above-mentioned maximum transport amount is usually expressed based on the maximum weight of the transported object. However, when transporting a transported object having a small specific gravity and a small weight per volume, the transport is placed on the belt. There is a case where the capacity of the object becomes a neck (the capacity is too large and spills from the belt, etc.) and the maximum transport amount is determined. However, in the present specification, in order to simplify the description, even in the case where the maximum transport amount is calculated based on the maximum capacity, the notation is expressed as Mmax (kg / Min).

本実施形態においては、前述した最大搬送量に着目して、最大搬送量の際において、ベルトの単位長さあたりに載っている搬送物の重量を定格載置量として定義し、以下の数式(1)により、Bmax(kg/m)として表記した。   In the present embodiment, paying attention to the above-mentioned maximum transport amount, the weight of the transported object placed per unit length of the belt is defined as the rated placement amount at the time of the maximum transport amount, and the following formula ( According to 1), it was expressed as Bmax (kg / m).

Figure 2013112483
Figure 2013112483

本実施形態における定格載置量は、ベルトコンベヤ装置が、当該装置の最大搬送量で運転された際において、搬送物がベルト上に均一に載せられた状態であると仮定した場合に、ベルトの単位長さ(本実施形態においては長手方向に長さ1m)あたりに載せられた搬送物の重量となる。
なお、ベルトコンベヤ装置において使用されるベルトは、通常、その全長に渡ってベルトの幅寸法が一定である。即ち、ベルトの単位長さあたりに載せられた搬送物の重量とは、単位長さにベルトの幅寸法を掛け合わせた面積に載せられた搬送物の重量を指し示めしている。従って、前記数式(1)について、例えば、ベルトの単位長さあたりに載せられた搬送物の重量を、ベルトの単位面積あたりに載せられた搬送物の重量と差し替えて制御することが、本発明の適応の範囲内であることは言うまでもない。
When the belt conveyor apparatus is operated at the maximum conveyance amount of the apparatus, it is assumed that the rated loading amount in this embodiment is a state in which the conveyed object is uniformly placed on the belt. This is the weight of the transported object placed per unit length (in this embodiment, 1 m in the longitudinal direction).
Incidentally, the belt used in the belt conveyor apparatus usually has a constant width dimension over its entire length. That is, the weight of the conveyed product placed per unit length of the belt indicates the weight of the conveyed product placed on the area obtained by multiplying the unit length by the width of the belt. Therefore, in the above formula (1), for example, the weight of the conveyed product placed per unit length of the belt is controlled by replacing the weight of the conveyed product placed per unit area of the belt with the present invention. Needless to say, it is within the scope of adaptation.

前述したように図1に示すベルトコンベヤ設備1においては、ホッパ130に原料が十分な量、或いは、少なくともベルトフィーダ5で搬送物を定量的に取り出すために必要最小限な量、に充填されているときに、ベルトフィーダ5は、搬送物を安定して取り出し、定量的に第1ベルトコンベヤ装置10に搬送物を供給することができる。
しかしながら、ホッパ130内の搬送物の量が減少して残りわずかになると、ベルトフィーダ5で安定的に搬送物を取り出せなくなり、極端なケースではホッパ130の中が空、或いは、空の直前になって、ベルトフィーダ5からベルトコンベヤ装置10への搬送物の供給が停止する可能性もある。
As described above, in the belt conveyor facility 1 shown in FIG. 1, the hopper 130 is filled with a sufficient amount of raw material, or at least a minimum amount necessary for quantitatively removing the conveyed product by the belt feeder 5. The belt feeder 5 can stably take out the conveyed product and supply the conveyed product to the first belt conveyor device 10 quantitatively.
However, when the amount of the conveyed product in the hopper 130 decreases and the remaining amount becomes small, the belt feeder 5 cannot stably take out the conveyed product. In an extreme case, the hopper 130 is empty or immediately before empty. Thus, there is a possibility that the supply of the conveyed product from the belt feeder 5 to the belt conveyor device 10 is stopped.

言い換えれば、ホッパ130内の搬送物の量が減少し、ベルトフィーダ5で安定的に搬送物を取り出せなくなった状況下において、ベルトフィーダ5から第1ベルトコンベヤ装置10に供給される搬送物の供給量としてM(kg/min)は変化する。
本実施形態では、このようなケースにおいて、ベルトフィーダ5より下流のベルト上に載せる搬送物の量について、ベルトの単位長さあたりに載せられた搬送物の重量が、定格載置量としてBmax(kg/m)を確保するように、第1ベルト15のベルト速度を調整する。
In other words, the supply of the conveyed product supplied from the belt feeder 5 to the first belt conveyor device 10 in a situation where the amount of the conveyed product in the hopper 130 decreases and the belt feeder 5 cannot stably take out the conveyed product. M (kg / min) varies as an amount.
In this embodiment, in such a case, with respect to the amount of the object to be placed on the belt downstream from the belt feeder 5, the weight of the object to be carried per unit length of the belt is expressed as Bmax ( The belt speed of the first belt 15 is adjusted so as to ensure (kg / m).

そのような理由から、本実施形態においては、ベルトフィーダ5からの流量測定信号を制御装置50で検知して、第1ベルトコンベヤ10の第1ベルト15上に投入される搬送物の量を算出する。より具体的に説明すれば、制御装置50は、ベルトフィーダ5に備え付けたベルトスケール52で測定した搬送物の流量を、測定時刻と共に記憶しており、搬送物の流量と時間経過から、第1ベルトコンベヤ装置10に供給された搬送物の量をM(kg/min)として算出する。 For this reason, in the present embodiment, the flow rate measurement signal from the belt feeder 5 is detected by the control device 50, and the amount of the conveyed product to be put on the first belt 15 of the first belt conveyor 10 is calculated. To do. More specifically, the control device 50 stores the flow rate of the transported object measured by the belt scale 52 provided in the belt feeder 5 together with the measurement time. The amount of the conveyed product supplied to the belt conveyor apparatus 10 is calculated as M (kg / min).

そして、第1ベルトコンベヤ装置10に供給された搬送物の量をM(kg/min)として、第1ベルト15上の単位長さあたりに載せられた搬送物の重量が、定格載置量であるBmax(kg/m)とした場合に、ベルト速度がS(m/min)となるように制御する。前述した数値の関係は以下の数式(2)で表される。 Then, assuming that the amount of the conveyed product supplied to the first belt conveyor device 10 is M (kg / min), the weight of the conveyed product placed per unit length on the first belt 15 is the rated loading amount. When a certain Bmax (kg / m) is set, the belt speed is controlled to be S (m / min). The numerical relationship described above is expressed by the following mathematical formula (2).

Figure 2013112483
Figure 2013112483

なお、定格載置量であるBmax(kg/m)の値は、ベルトコンベヤ装置の大きさ等により決定して設定した数値であるから、搬送物の重量に基づく流量M(kg/min)を勘案して、載置量Bmax(kg/m)が維持できるベルト速度S(m/min)を算出して、その速度になるようにベルト速度を制御すれば良い。
以上説明した方法によって、制御装置50は、ベルト上に載せる搬送物の載置量が、運転中に、Bmax(kg/m)となるように、ベルト速度S(m/s)を制御する。
In addition, since the value of Bmax (kg / m) which is the rated loading amount is a numerical value determined and set by the size of the belt conveyor device or the like, the flow rate M (kg / min) based on the weight of the conveyed product is set. In consideration, the belt speed S (m / min) that can maintain the loading amount Bmax (kg / m) is calculated, and the belt speed may be controlled to be the speed.
By the method described above, the control device 50 controls the belt speed S (m / s) so that the placement amount of the conveyed product placed on the belt becomes Bmax (kg / m) during operation.

以下、補足説明のため、参考となる1例について、要点のみを簡略に説明する。
例えば、グラブバケット等のアンローダからホッパ130に供給される搬送物の量が減少し、ホッパ130内の搬送物の量が減少して、ベルトフィーダ5から供給される搬送物の供給量であるM(kg/min)が最大搬送量の半分(50%)になったと仮定した場合には、ベルト速度S(m/min)を、半分(50%)の速度に減速することによって、ベルト上に載せる搬送物の載置量が、定格載置量Bmax(kg/m)となるように制御する。
In the following, for the sake of supplementary explanation, only the main points of a reference example will be briefly described.
For example, the amount of the conveyed product supplied from the unloader such as a grab bucket to the hopper 130 decreases, the amount of the conveyed product in the hopper 130 decreases, and M is the supply amount of the conveyed product supplied from the belt feeder 5. Assuming that (kg / min) has become half (50%) of the maximum transport amount, the belt speed S (m / min) is reduced to half (50%) speed, so that Control is performed so that the placement amount of the transported object to be placed becomes the rated placement amount Bmax (kg / m).

以上、本発明を説明するための好ましい1例として、1つの実施形態を説明したが、本発明はこれに限るものではなく、本発明の技術思想を逸脱しない範囲であれば変更は可能である。 As described above, one embodiment has been described as a preferred example for explaining the present invention. However, the present invention is not limited to this, and can be changed within a range not departing from the technical idea of the present invention. .

また、前述の実施形態においては、ベルトコンベヤ装置のサイズ、或いは駆動モータ等の能力を勘案して、最大搬送量を算出し、その数値を利用して、定格載置量を決定し、制御装置50に設定した。
しかしながら、本発明は、ベルトの単位長さあたりに載せる搬送物の量について、条件の許す限り大きくしたいとの考えに基づくものである。
言い換えれば、前述した実施形態は、制御装置50に設定する設定載置量として、ベルトコンベヤ装置が、トラブルなく運転できる最大の載置量を、定格載置量として算出し、使用したものである。
従って、例えば、実際の運転時、定格載置量Bmax(kg/m)で連続運転することにより荷こぼれ等のトラブルが心配な場合等、何らかの理由により、定格載置量Bmax(kg/m)より小さな載置量でベルトコンベヤ装置を運転したい場合には、定格載置量Bmax(kg/m)より小さな載置量を、設定載置量Bs(kg/m)として制御装置50に設定しても良い。そして、その場合は、BmaxをBsと置き換えて、数式(2)を利用することにより、設定載置量Bs(kg/m)からベルト速度S(m/min)を算出し、その速度になるようにベルト速度を制御すれば良い。
Further, in the above-described embodiment, the maximum conveying amount is calculated in consideration of the size of the belt conveyor device or the capacity of the drive motor, etc., the rated loading amount is determined using the numerical value, and the control device 50.
However, the present invention is based on the idea that the amount of the conveyed product placed per unit length of the belt should be as large as the conditions allow.
In other words, in the above-described embodiment, the maximum placement amount that the belt conveyor device can operate without trouble is calculated as the rated placement amount and used as the set placement amount set in the control device 50. .
Therefore, for example, when there is a concern about troubles such as spillage due to continuous operation at the rated load Bmax (kg / m) during actual operation, the rated load Bmax (kg / m) for some reason. When it is desired to operate the belt conveyor device with a smaller placement amount, a placement amount smaller than the rated placement amount Bmax (kg / m) is set in the control device 50 as the set placement amount Bs (kg / m). May be. In this case, the belt speed S (m / min) is calculated from the set loading amount Bs (kg / m) by replacing the Bmax with Bs and using Equation (2), and the speed is obtained. Thus, the belt speed may be controlled.

なお、ベルト速度であるS(m/min)を制御する方法としては、例えば、ベルト近傍にセンサーを取り付けることによって、実際のベルト速度S(m/min)を検出しながら、プーリの駆動モータの回転速度を調整することによって、所望するベルト速度に制御することも可能である。   As a method of controlling the belt speed S (m / min), for example, by attaching a sensor in the vicinity of the belt, the actual belt speed S (m / min) is detected and the pulley drive motor is controlled. It is also possible to control to a desired belt speed by adjusting the rotational speed.

また、定格載置量で制御する方法として、プーリの最大定格回転速度であるRmax(rpm)、プーリ周長のL(m)等を使用して、後述の数式(3)を利用することもできる。 Further, as a method of controlling with the rated loading amount, it is also possible to use Equation (3) described later by using Rmax (rpm) which is the maximum rated rotation speed of the pulley, L (m) of the pulley peripheral length, and the like. it can.

Figure 2013112483
Figure 2013112483

数式(3)を利用する場合には、L(m)を一定値として、M(kg/min)の変化に合わせて、R(rpm)を変更し、Bmaxで一定となるようにして、プーリ回転速度を制御すれば、定格載置量が確保される。この方法は、構成がシンプルで、かつ、制御が簡単であるという優れた作用効果を奏するものである。   When formula (3) is used, L (m) is set to a constant value, R (rpm) is changed in accordance with the change in M (kg / min), and the pulley is set to be constant at Bmax. If the rotational speed is controlled, the rated placement amount is secured. This method has an excellent effect that the configuration is simple and the control is easy.

以下、図1に示す第1ベルトコンベヤ装置10の1つ下流側に配した第2ベルトコンベヤ装置20について制御方法を説明する。
第2ベルトコンベヤ装置20については、第1ベルトコンベヤ装置10に供給された搬送物の重量、ベルト速度変化、並びに経過時間から、第2ベルトコンベヤ装置20に供給される搬送物のM(kg/min)を算出する。
そして、前述の方法により算出された第2ベルトコンベヤ装置20に供給される搬送物のM(kg/min)に基づいて、第1ベルトコンベヤ装置10の制御と同様に、第2ベルト25上に載せる搬送物の載置量が定格載置量Bmax(kg/m)となるように、ベルト速度を制御する。
Hereinafter, a control method is demonstrated about the 2nd belt conveyor apparatus 20 distribute | arranged one downstream of the 1st belt conveyor apparatus 10 shown in FIG.
About the 2nd belt conveyor apparatus 20, M (kg / kg) of the conveyed product supplied to the 2nd belt conveyor apparatus 20 from the weight of the conveyed product supplied to the 1st belt conveyor apparatus 10, a belt speed change, and elapsed time. min).
And based on M (kg / min) of the conveyed product supplied to the 2nd belt conveyor apparatus 20 calculated by the above-mentioned method, on the 2nd belt 25 similarly to control of the 1st belt conveyor apparatus 10 The belt speed is controlled so that the placement amount of the transported object to be placed becomes the rated placement amount Bmax (kg / m).

なお、図1に示したベルトコンベヤ設備1の実施形態においては、制御を簡単にするために、第1ベルトコンベヤ装置10から第3ベルトコンベヤ装置40まで、全て同一サイズで同一能力のベルトコンベヤ装置を使用した。
しかし、仮に、第1ベルトコンベヤ装置10と、第2ベルトコンベヤ装置20で、装置サイズが異なり最大定格搬送量、及び、定格載置量Bmax(kg/m)の値が異なったとしても、原則、それぞれの装置における定格載置量Bmax(kg/m)で運転するように、ベルト速度S(m/min)を制御すれば良い。
In the embodiment of the belt conveyor facility 1 shown in FIG. 1, in order to simplify the control, the belt conveyor apparatus having the same size and the same capacity from the first belt conveyor apparatus 10 to the third belt conveyor apparatus 40 are all used. It was used.
However, even if the first belt conveyor device 10 and the second belt conveyor device 20 have different device sizes, and the maximum rated transport amount and the rated loading amount Bmax (kg / m) are different, in principle, The belt speed S (m / min) may be controlled so as to operate at the rated loading amount Bmax (kg / m) in each device.

但し、上流側にある第1ベルトコンベヤ装置10の方が、下流側にある第2ベルトコンベヤ装置20より、最大定格搬送量が大きい場合に、第1ベルトコンベヤ装置10から供給された搬送物を、第2ベルトコンベヤ装置20で搬送しきれないという状態が発生する可能性がある。基本的に、そのようなケースはベルトコンベヤ装置のサイズ選定ミスとも言えることであろうが、そのような場合には、最も小さい最大定格搬送量の装置を基準にして、各々の装置について、定格載置量Bmax(kg/m)を決定することが好ましい。そして、ホッパ130から供給される搬送物の量についても調整して、定格載置量を超えないように制御する。 However, when the maximum rated transport amount is larger in the first belt conveyor device 10 on the upstream side than in the second belt conveyor device 20 on the downstream side, the conveyed product supplied from the first belt conveyor device 10 The second belt conveyor device 20 may not be able to be transported. Basically, such a case can be said to be a mistake in the size selection of the belt conveyor device. In such a case, the rating of each device is rated based on the device with the smallest maximum rated transfer amount. It is preferable to determine the loading amount Bmax (kg / m). And it adjusts also about the quantity of the conveyed product supplied from the hopper 130, and controls so that a rated mounting amount may not be exceeded.

なお、第3のベルトコンベヤ装置についても、第2のベルトコンベヤ装置20と同様に、それぞれ隣接する一つ前の上流側に配したベルトコンベヤ装置10から排出される新規搬送物の量M(kg/min)を算出して、第2ベルトコンベヤ装置20と同様に、定格載置量Bmax(kg/m)で、一定となるように、ベルト速度制御を行う。   Note that, similarly to the second belt conveyor device 20, the third belt conveyor device also has an amount M (kg) of a new transported material discharged from the belt conveyor device 10 disposed on the upstream side adjacent to each other. / Min) is calculated, and the belt speed control is performed so as to be constant at the rated loading amount Bmax (kg / m) as in the second belt conveyor device 20.

なお、図1に示した本実施形態においては、ベルトフィーダ5にのみ、ベルトスケール52を配し、時間経過と合わせて搬送物の流量を測定し、その時間経過と流量データ等から、第1ベルトコンベヤに供給する搬送物の流量M(kg/min)と、第2ベルトコンベヤ装置に供給する搬送物の流量M(kg/min)を算出した。   In the present embodiment shown in FIG. 1, the belt scale 52 is disposed only on the belt feeder 5, the flow rate of the conveyed product is measured along with the passage of time, and from the passage of time and the flow rate data, the first The flow rate M (kg / min) of the conveyed product supplied to a belt conveyor and the flow rate M (kg / min) of the conveyed product supplied to a 2nd belt conveyor apparatus were computed.

以下、ベルトコンベヤ設備1の制御方法について、その好ましい1例を、専用船で輸入した石炭を搬送する例を参考にして、図2から図5を用いて説明する。
海外から国内工場近くの港まで石炭運搬用の専用船で輸送されてきた石炭は、専用船の庫内に貯えられており、それを、グラブバケット150によりホッパ130に移送する。そして、ホッパ130の下部からベルトフィーダ5を介して、石炭を、第1ベルトコンベヤ装置10の第1ベルト15上に供給する。
Hereinafter, a preferable example of the control method of the belt conveyor facility 1 will be described with reference to FIGS. 2 to 5 with reference to an example of transporting coal imported by a dedicated ship.
Coal that has been transported from overseas to a port near the domestic factory by a special ship for transporting coal is stored in the warehouse of the special ship, and is transferred to the hopper 130 by the grab bucket 150. And coal is supplied on the 1st belt 15 of the 1st belt conveyor apparatus 10 via the belt feeder 5 from the lower part of the hopper 130. FIG.

ここで、ホッパ130内に石炭が十分貯えられている場合に、ベルトフィーダ5は、搬送物を安定して取り出し、定量的に第1ベルトコンベヤ装置10に搬送物を供給することができる。この場合には、ベルト速度を最大のSmax(m/min)して、ベルト上に載せられた搬送物の量が、定格載置量Bmaxで一定となるように制御する。 Here, when the coal is sufficiently stored in the hopper 130, the belt feeder 5 can stably take out the conveyed product and quantitatively supply the conveyed product to the first belt conveyor device 10. In this case, the belt speed is set to the maximum Smax (m / min), and the amount of the conveyed product placed on the belt is controlled to be constant at the rated loading amount Bmax.

そして、ホッパ130内の搬送物の量が減少し、ベルトフィーダ5で安定的に搬送物を取り出せなくなった状況下等において、第1ベルトコンベヤ装置10に供給される搬送物の搬送量であるM(kg/min)は変化する場合がある。本実施形態においては、このような場合に、ベルト上に載せる搬送物の量について、ベルトの単位長さあたりに載せられた搬送物の重量が、定格載置量としてBmax(kg/m)を確保するように、ベルト速度を調整する。   Then, in a situation where the amount of the conveyed product in the hopper 130 is reduced and the conveyed product cannot be stably taken out by the belt feeder 5, M is the conveyed amount of the conveyed product supplied to the first belt conveyor device 10. (Kg / min) may vary. In the present embodiment, in such a case, the weight of the transported object placed on the belt per unit length of the amount of the transported object placed on the belt is Bmax (kg / m) as the rated placement amount. Adjust the belt speed to ensure.

ホッパ130から取り出される搬送物の量については、特に荷揚開始時と荷揚終了時において、ホッパ130内に搬送物がほとんど入っていない状況下になりやすくなり、そのような場合に、ベルト速度S(m/min)を減速することによって、ベルト上に載せる搬送物の載置量が、定格載置量Bmax(kg/m)となるように制御する。   Regarding the amount of the conveyed product to be taken out from the hopper 130, it becomes easy to be in a state where there is almost no conveyed product in the hopper 130 especially at the start and end of unloading. In such a case, the belt speed S ( m / min) is controlled so that the placement amount of the transported object placed on the belt becomes the rated placement amount Bmax (kg / m).

図3及び図4に制御方法のイメージを概念的に説明する。
例えば、船舶から荷降ろしする都合で、グラブバケット150によって船舶から取り出せる搬送物の量が減少し、ホッパ130に投入される搬送物の量が減少した場合に、ホッパ130が空になるのを防止するために、ベルトコンベヤ設備1のオペレータが操作、或いは自動的制御によって、ベルトフィーダ5に対して指令を発信し、ベルトコンベヤ装置10に供給する搬送物の量を減少させる場合がある。そのようなケースにおいて、搬送物の供給量とベルト速度の関係について、そのイメージを図3に示す。
まず、ホッパ130内の搬送物の量が極端に少なくなった場合に、ベルトフィーダ5をコントロールして、ベルト上に供給される搬送物の量を減少させると、制御装置50は搬送物の供給量が減少したのを検知して、ベルト速度をそれにあわせて低下させて、ベルト上に載せる搬送物の載置量が、定格載置量Bmax(kg/m)となるように制御する
3 and 4 conceptually explain the image of the control method.
For example, it is possible to prevent the hopper 130 from becoming empty when the amount of transported goods that can be taken out from the ship by the grab bucket 150 is reduced due to the convenience of unloading from the ship, and the amount of transported material that is put into the hopper 130 is reduced. In order to do this, the operator of the belt conveyor equipment 1 may send a command to the belt feeder 5 by operation or automatic control to reduce the amount of the conveyed product supplied to the belt conveyor device 10. In such a case, FIG. 3 shows an image of the relationship between the supply amount of the conveyed product and the belt speed.
First, when the amount of the conveyed product in the hopper 130 becomes extremely small, the controller 50 controls the belt feeder 5 to reduce the amount of the conveyed product supplied on the belt, so that the control device 50 supplies the conveyed product. Detecting the decrease in the amount, the belt speed is decreased accordingly, and the loaded amount of the object to be loaded on the belt is controlled to be the rated loaded amount Bmax (kg / m).

その後、ホッパ130内に搬送物が投入されて、ホッパ130内に貯えられた搬送物の量が大きくなり、ホッパ130が空になる危険性が小さくなると、オペレータ等は、ベルトフィーダ5をコントロールして、ベルト上に供給する搬送物の量を増加させる。
そのような場合に、制御装置50は、搬送物の供給量の増加を検知して、ベルト速度を上げて、ベルト上に載せる搬送物の載置量が、定格載置量Bmax(kg/m)となるように制御する。
なお、図3に示した制御方法では、その後も同様に、ベルトフィーダ5コントロールしてベルト上に供給する搬送物の量を減少させた場合に、ベルト速度をそれにあわせて低下させて、ベルト上に載せる搬送物の載置量が、常に定格載置量Bmax(kg/m)となるように制御している。
After that, when the conveyed product is thrown into the hopper 130 and the amount of the conveyed product stored in the hopper 130 increases and the risk of emptying the hopper 130 decreases, the operator or the like controls the belt feeder 5. Thus, the amount of the conveyed product supplied on the belt is increased.
In such a case, the control device 50 detects an increase in the supply amount of the conveyed product, increases the belt speed, and the loaded amount of the conveyed item placed on the belt is equal to the rated loaded amount Bmax (kg / m ).
In the control method shown in FIG. 3, similarly, when the amount of the conveyed product to be supplied onto the belt is reduced by controlling the belt feeder 5, the belt speed is reduced accordingly, It is controlled so that the loading amount of the conveyed product placed on the vehicle is always the rated loading amount Bmax (kg / m).

図4にベルト上における搬送物の載置状態を説明する。
ベルトフィーダ5により供給される搬送物の重量が、例え、運転中に変更されたとしても、ベルト上に載せる搬送物の載置量を、定格載置量Bmax(kg/m)となるように制御していれば、図4に示したように、ベルト上に載置された搬送物の積載物の断面(積載断面と称することもある)は、ベルトの単位長さあたりに載せられる搬送物の最大量が積載された状態になる(積載断面H1からH3を比較すると類似する寸法形状となっている)。
FIG. 4 illustrates the loaded state of the conveyed product on the belt.
Even if the weight of the conveyed product supplied by the belt feeder 5 is changed during operation, the loaded amount of the conveyed item placed on the belt is set to the rated loaded amount Bmax (kg / m). If controlled, as shown in FIG. 4, the cross section (sometimes referred to as the loading cross section) of the load of the transported object placed on the belt is transported per unit length of the belt. The maximum amount is loaded (the dimensional shape is similar when comparing the loading sections H1 to H3).

以下、本発明に係わる制御方法として、先に説明したものと異なる他の実施形態について、図5を用いて説明する。
例えば、前述の実施形態と同様に船舶から荷降ろしする都合により、グラブバケット150によって船舶から取り出せる搬送物の量が減少し、ホッパ130が、ほとんど空になった場合において、ベルトフィーダ5からベルトコンベヤ装置10に対して供給される搬送物の量とベルト速度の関係について、そのイメージを図5に示す。
ホッパ130内の搬送物の量が極端に少なくなった場合に、ベルトフィーダ5により、ベルト上に供給される搬送物の量が急激に減少するので、ベルト速度をそれにあわせて低下させて、ベルト上に載せる搬送物の載置量が、常に定格載置量Bmax(kg/m)となるように制御する
Hereinafter, another embodiment different from the above-described control method according to the present invention will be described with reference to FIG.
For example, in the same way as in the above-described embodiment, due to the convenience of unloading from the ship, when the amount of transported material that can be taken out from the ship by the grab bucket 150 is reduced and the hopper 130 is almost empty, the belt feeder 5 to the belt conveyor. FIG. 5 shows an image of the relationship between the amount of conveyed product supplied to the apparatus 10 and the belt speed.
When the amount of the conveyed product in the hopper 130 becomes extremely small, the amount of the conveyed product supplied onto the belt is drastically reduced by the belt feeder 5, so that the belt speed is lowered accordingly, and the belt Control is performed so that the placement amount of the transported object to be placed always becomes the rated placement amount Bmax (kg / m).

その後、ホッパ内に搬送物が投入されて、ホッパ内の搬送物の量が大きくなると、ベルトフィーダ5によってベルト上に供給される搬送物の量が急激に増加した際には、ベルト速度を上げて、ベルト上に載せる搬送物の載置量が、定格載置量Bmax(kg/m)となるように制御する。   Thereafter, when the conveyed product is put into the hopper and the amount of the conveyed product in the hopper increases, the belt speed is increased when the amount of the conveyed product supplied onto the belt by the belt feeder 5 increases rapidly. Then, control is performed so that the placement amount of the conveyed product placed on the belt becomes the rated placement amount Bmax (kg / m).

なお、ベルトフィーダ5からベルト装置10への搬送物の供給が停止した場合、或いは、供給量がわずかになって実質停止させた場合に、前述した定格載置量Bmax(kg/m)を守ろうとすれば、ベルトを停止させる必要があるが、図5に示した実施形態では、ベルトを停止させず、予め決めたベルト最低速度でベルトが走行するようにプーリを駆動する。これは、ベルトコンベヤ装置10においては、再起動時において、第1ベルト15などに対して機械的又電気的に大きな負荷がかかり、更に、起動完了までに要する時間が必要という理由からによる。
また、ベルトコンベヤ装置が複数台並んだベルトコンベヤ設備1においては、起動時に複数台並んだベルトコンベヤ装置について、起動開始する順番を注意しなければならない等、制約条件が多い。
図5に例を示した実施形態では、制御装置50に、予めベルトの最低速度を設定しておき、定格載置量Bmax(kg/m)を守ろうとしてベルト速度を制御した場合に、最低速度を下回る場合には、制御ロジックを切り替えて、ベルトが最低速度で走行するようプログラムした。図5に示す実施形態では、搬送物の供給が停止した場合においても、ベルトを停止させないので、前述の問題点を防止できるという利点を有している。
In addition, when the supply of the conveyed product from the belt feeder 5 to the belt device 10 is stopped, or when the supply amount becomes small and is substantially stopped, the above-mentioned rated loading amount Bmax (kg / m) is observed. If it is going to be, it is necessary to stop the belt, but in the embodiment shown in FIG. 5, the pulley is driven so that the belt runs at a predetermined minimum belt speed without stopping the belt. This is because, in the belt conveyor device 10, a large mechanical or electrical load is applied to the first belt 15 or the like at the time of restart, and further, the time required for completing the start is required.
Further, in the belt conveyor equipment 1 in which a plurality of belt conveyor devices are arranged, there are many restrictions such as the order of starting the belt conveyor devices in which a plurality of belt conveyor devices are arranged at the time of activation.
In the embodiment shown as an example in FIG. 5, the minimum belt speed is set in advance in the control device 50, and the belt speed is controlled when the belt speed is controlled to protect the rated load Bmax (kg / m). When below speed, the control logic was switched and the belt was programmed to run at the lowest speed. The embodiment shown in FIG. 5 has an advantage that the above-mentioned problems can be prevented because the belt is not stopped even when the supply of the conveyed product is stopped.

なお、運転中に搬送物の種類が変化して、比重が変わる場合がある。このような場合には、ベルト上に載置できる搬送物の最大量が変化する。従って、ベルトコンベヤ装置の運転中に搬送物の比重が変化した場合には、ベルトコンベヤ装置の定格載置量を、再度演算しなおすことが有効である。
なお、搬送物の比重が変化したことについて検知する手段として、公知の測定方法がいくつか知られているが、例えば、ベルト上の搬送物の積載断面を、レーザ変位計等で測定することにより、ベルトの単位長さあたりの重量測定値と合わせて演算することによって、搬送物の比重を検知する方法が、運転中でも、常にリアルタイムで搬送物の比重を測定できるという点で非常に有効である。
In addition, the specific gravity may change due to a change in the type of the conveyed product during operation. In such a case, the maximum amount of the conveyed product that can be placed on the belt changes. Therefore, when the specific gravity of the conveyed product changes during operation of the belt conveyor device, it is effective to recalculate the rated loading amount of the belt conveyor device.
Note that several known measurement methods are known as means for detecting that the specific gravity of the conveyed product has changed. For example, by measuring the loading cross section of the conveyed product on the belt with a laser displacement meter or the like. The method of detecting the specific gravity of the transported object by calculating it together with the measured weight per unit length of the belt is very effective in that the specific gravity of the transported object can always be measured in real time even during operation. .

なお、参考として、図6及び図7に従来技術による制御方法のイメージを概念的に説明する。従来技術におけるベルトコンベヤ設備の運転方法は、第1ベルトコンベヤ装置を、通常、定格速度で回転させている。
従って、例えば、前述した図3の実施例のように、ベルトフィーダ5から供給される搬送物の量に変動があった場合に、図6に示したように、ベルト上に載った搬送物の積載断面h1からh3を比較すると、それぞれ全く異なった断面形状となっており、載置量が一定となっていない。
For reference, FIGS. 6 and 7 conceptually illustrate an image of a control method according to the prior art. In the operation method of the belt conveyor equipment in the prior art, the first belt conveyor device is usually rotated at a rated speed.
Therefore, for example, when there is a change in the amount of the conveyed product supplied from the belt feeder 5 as in the above-described embodiment of FIG. 3, as illustrated in FIG. When the loading sections h1 to h3 are compared, the sectional shapes are completely different from each other, and the loading amount is not constant.

以下、本実施形態においては、下流側に配した第2ベルトコンベヤ装置20についても同様に、第1ベルトコンベヤ装置10で時間経過と共に記憶した搬送物の重量から、第2ベルトコンベヤ装置20に供給される新規搬送物の流量M(kg/min)を算出して、第1ベルトコンベヤ装置10の制御と同様に、ベルト上に載せる搬送物の載置量が、常に定格載置量Bmax(kg/m)となるようにベルト速度S(m/min)を制御する。   Hereinafter, in the present embodiment, the second belt conveyor device 20 disposed on the downstream side is similarly supplied to the second belt conveyor device 20 from the weight of the conveyed product stored with time in the first belt conveyor device 10. The flow rate M (kg / min) of the new conveyed product is calculated, and the loaded amount of the conveyed item placed on the belt is always the rated loaded amount Bmax (kg), similarly to the control of the first belt conveyor device 10. / M), the belt speed S (m / min) is controlled.

なお、第1ベルトコンベヤ装置10と第2ベルトコンベヤ装置20が同一サイズで同一能力のものであった場合には、第1ベルトコンベヤ装置10において、新規搬送物がベルト上に載置されてから第2ベルトコンベヤ装置20に送給されるまでの時間を算出し、その算出した時間分だけを、時間遅れとして、第2ベルトコンベヤ装置20を、第1ベルトコンベヤ装置10と、同様のベルト速度S(m/min)で制御すれば良く、この制御方法は、演算も簡単で、好ましい制御方法の1つである。   In addition, when the 1st belt conveyor apparatus 10 and the 2nd belt conveyor apparatus 20 are the thing of the same size and the same capability, after a new conveyance thing is mounted on a belt in the 1st belt conveyor apparatus 10. The time until it is fed to the second belt conveyor device 20 is calculated, and the second belt conveyor device 20 is set to the same belt speed as that of the first belt conveyor device 10 by setting only the calculated time as a time delay. The control method may be controlled by S (m / min), and this control method is one of preferable control methods because the calculation is simple.

そして、第2ベルトコンベヤ装置20の下流側に配した第3ベルトコンベヤ装置30についても、第2ベルトコンベヤ装置20と同様に、第1ベルトコンベヤ装置10で時間経過と共に記憶した搬送物の重量変化から、ベルト上の載せられる新規搬送物の流量M(kg/min)を算出して、ベルト上に載せる搬送物の載置量が、常に定格載置量Bmax(kg/m)となるように制御する。   And also about the 3rd belt conveyor apparatus 30 distribute | arranged to the downstream of the 2nd belt conveyor apparatus 20, like the 2nd belt conveyor apparatus 20, the weight change of the conveyed product memorize | stored with time passage in the 1st belt conveyor apparatus 10 From the above, the flow rate M (kg / min) of a new transported object placed on the belt is calculated so that the placement amount of the transported object placed on the belt always becomes the rated placement amount Bmax (kg / m). Control.

なお、本実施形態においては、ベルトスケール52により、搬送物の重量変化を測定し、ベルトコンベヤ設備1に配した複数台のベルトコンベヤ装置について、新規搬送物の流量、並びに下流側のベルトコンベヤ装置に供給する搬送物の流量等を算出した。
しかし、搬送物の流量変化を測定する方法が、これに限らないことは勿論であって、他の公知の方法を採用して良く、さらに言えば、搬送物の流量を測定する箇所も、本実施形態で説明したものに限る必要はなく、本発明の技術思想を逸脱しない範囲で変更して良く、例えば、ホッパ130の重量変化、或いは、排出物の重量を測定して、ベルト上に載置された新規搬送物の流量M(kg/min)を算出しても良い。
また、第1ベルトコンベヤ装置のみならず、第2ベルトコンベヤから第3ベルトコンベヤ装置まで全てベルトスケールを配して、その重量変化から、ベルト上に載置された新規搬送物の流量M(kg/min)を算出しても良い。
In the present embodiment, the change in the weight of the conveyed product is measured by the belt scale 52, and the flow rate of the new conveyed product and the downstream belt conveyor device are measured for a plurality of belt conveyor devices arranged in the belt conveyor facility 1. The flow rate and the like of the conveyed product supplied to was calculated.
However, the method for measuring the flow rate change of the conveyed product is not limited to this, and other known methods may be adopted. The present invention is not limited to the one described in the embodiment, and may be changed without departing from the technical idea of the present invention. For example, the weight change of the hopper 130 or the weight of the discharged material is measured and mounted on the belt. You may calculate the flow rate M (kg / min) of the new conveyance thing set | placed.
Further, not only the first belt conveyor device but also all the belt scales from the second belt conveyor to the third belt conveyor device are arranged, and the flow rate M (kg) of the new transported material placed on the belt due to the change in its weight. / Min) may be calculated.

前述した実施形態は、ベルト上に載置できる単位長さあたりの搬送物の重量について、定格載置量を設定して、その値で一定になるようベルト速度を制御した。従って、ベルトコンベヤ設備の有する各ベルトコンベヤ装置について、問題が発生しない範囲で、ベルト速度を小さくして運転することができる。
その結果、ベルト速度に相関して必要となる抵抗力をまかなう為の動力が小さくなり、搬送エネルギー効率が向上するので、省エネルギー化が図れる。
In the embodiment described above, the rated loading amount is set for the weight of the conveyed product per unit length that can be placed on the belt, and the belt speed is controlled to be constant at that value. Therefore, each belt conveyor apparatus included in the belt conveyor facility can be operated at a reduced belt speed as long as no problem occurs.
As a result, the power required to cover the required resistance in relation to the belt speed is reduced, and the conveyance energy efficiency is improved, so that energy saving can be achieved.

また、搬送物を搬送するにあたり、必要最低限のベルト速度で運転するので、ベルトコンベヤ装置に使用されている軸受けの総回転数が抑えられる。その結果、ベルトコンベヤ設備の運転寿命が延び、交換材料の低減、保守のための負荷が減少、並びにローラ等の交換部材の省資源化が図れるという効果を有する。   In addition, since the belt is operated at the minimum necessary belt speed for conveying the conveyed product, the total number of rotations of the bearings used in the belt conveyor device can be suppressed. As a result, the operation life of the belt conveyor equipment is extended, and there is an effect that the replacement material is reduced, the load for maintenance is reduced, and the resource saving of the replacement member such as a roller can be achieved.

以上のように本願発明に係わるベルトコンベヤの制御方法並びにベルトコンベヤ設備によれば、省エネルギー化、省資源化、又省メンテナンス化に効果があり、特に、搬送物の供給量が変化する可能性のある搬送物を搬送するのに好適である。 As described above, according to the belt conveyor control method and the belt conveyor facility according to the present invention, there is an effect in energy saving, resource saving, and maintenance saving. It is suitable for conveying a certain conveyed product.

1 ベルトコンベヤ設備
10 第1ベルトコンベヤ装置
11 第1ヘッドプーリ(HP)
13 第1テールプーリ(TP)
15 第1ベルト
20 第2ベルトコンベヤ装置
21 第2ヘッドプーリ(HP)
23 第2テールプーリ(TP)
25 第2ベルト
30 第3ベルトコンベヤ装置
31 第3ヘッドプーリ(HP)
33 第3テールプーリ(TP)
35 第3ベルト
40 第4ベルトコンベヤ装置
41 第3ヘッドプーリ(HP)
43 第3テールプーリ(TP)
45 第4ベルト
52 ベルトスケール
130 ホッパ
150 グラブバケット
DESCRIPTION OF SYMBOLS 1 Belt conveyor equipment 10 1st belt conveyor apparatus 11 1st head pulley (HP)
13 First tail pulley (TP)
15 1st belt 20 2nd belt conveyor device 21 2nd head pulley (HP)
23 Second tail pulley (TP)
25 Second belt 30 Third belt conveyor 31 Third head pulley (HP)
33 Third tail pulley (TP)
35 Third belt 40 Fourth belt conveyor 41 Third head pulley (HP)
43 Third tail pulley (TP)
45 4th belt 52 Belt scale 130 Hopper 150 Grab bucket

Claims (8)

バラ物を搬送物として搬送するベルトコンベヤ装置の制御方法であって、
走行しているベルト上の単位長さあたりに載せる搬送物の量を設定載置量として設定し、ベルトコンベヤ装置の運転中に、搬送物の供給機構からベルト上に供給される搬送物の単位時間あたりの量を検知して、該ベルト上に供給される搬送物の単位時間あたりの量が変化する場合に、搬送物の供給量の変化に対応させてベルトの速度を調整することにより、ベルト上に載せられた搬送物が設定載置量になるように制御するベルトコンベヤ装置の制御方法。
A method for controlling a belt conveyor device that conveys a loose article as a conveyed article,
Set the amount of the object to be loaded per unit length on the running belt as the set loading amount, and the unit of the object to be supplied on the belt from the object supply mechanism during the operation of the belt conveyor device By detecting the amount per hour and changing the amount per unit time of the conveyed product supplied on the belt, by adjusting the belt speed in accordance with the change in the amount of conveyed product, A control method of a belt conveyor device for controlling a conveyed product placed on a belt so as to have a set loading amount.
ベルトコンベヤ装置のベルトが最大定格速度で走行している状態において、走行しているベルト上の単位長さあたりに載せることができる搬送物の最大の量を定格載置量として、該定格載置量を前記設定載置量とする請求項1に記載のベルトコンベヤ装置の制御方法。   In the state where the belt of the belt conveyor device is traveling at the maximum rated speed, the maximum amount of the transported object that can be loaded per unit length on the traveling belt is defined as the rated loading amount. The method of controlling a belt conveyor device according to claim 1, wherein an amount is set as the set placement amount. ベルトが設定載置量の搬送物を載せた際に、ベルトコンベヤ装置が搬送できる単位時間あたりの最大搬送量を、ベルトを駆動するプーリの最大定格回転速度で、除した値を算出し、基準値として設定し、
ベルトコンベヤ装置の運転中に、ベルト上に供給される搬送物の量が変化する場合において、変化した搬送物の量をプーリ回転速度で除した値が、該基準値から変化しないように、プーリ回転速度を制御することによりベルトの速度を調整して、ベルト上に載せられた搬送物が設定載置量になるように制御する請求項1又は請求項2記載のベルトコンベヤ装置の制御方法。
Calculate the standard value by dividing the maximum transport amount per unit time that can be transported by the belt conveyor device by the maximum rated rotational speed of the pulley that drives the belt when the belt is loaded with a set load. Set as value,
When the amount of the conveyed product supplied on the belt changes during operation of the belt conveyor apparatus, the value obtained by dividing the changed amount of the conveyed product by the pulley rotation speed does not change from the reference value. The method of controlling a belt conveyor apparatus according to claim 1 or 2, wherein the belt speed is adjusted by controlling the rotational speed, and the conveyed product placed on the belt is controlled to have a set loading amount.
予めベルトの最低速度を設定することにより、運転中に、ベルト上に供給される搬送物の量が変化して、一時的に、微少或いは零、という状態になった場合において、
前記設定載置量になるベルト速度が、該設定した最低速度を下まわる際に、ベルトが最低速度で走行するように制御する請求項1から請求項3までのいずれか1項に記載のベルトコンベヤ装置の制御方法。
By setting the minimum speed of the belt in advance, the amount of transported material supplied on the belt changes during operation, and when the state temporarily becomes slight or zero,
The belt according to any one of claims 1 to 3, wherein the belt is controlled to travel at the minimum speed when the belt speed at which the set loading amount falls below the set minimum speed. Conveyor device control method.
ベルトコンベヤ装置の運転中に搬送物の比重が変化する際において、ベルトコンベヤ装置の定格載置量を再度演算する請求項2に記載のベルトコンベヤ装置の制御方法。   3. The method of controlling a belt conveyor device according to claim 2, wherein when the specific gravity of the conveyed product changes during operation of the belt conveyor device, the rated loading amount of the belt conveyor device is calculated again. ベルト上に載っている搬送物の積載断面を計測するとともに、ベルトの単位長さあたりに載置されている搬送物の重量を検知することによって、搬送物の比重を算出する請求項5に記載のベルトコンベヤ装置の制御方法。   6. The specific gravity of the conveyed product is calculated by measuring a loading section of the conveyed product placed on the belt and detecting the weight of the conveyed product placed per unit length of the belt. Method for controlling the belt conveyor apparatus of the machine. 上流側から下流側に並んで配された複数台のベルトコンベヤ装置を有するベルトコンベヤ設備であって、
該上流側から下流側に並んで配された複数台のベルトコンベヤ装置の全部、或いは少なくともその中の一台について、
ベルト上に供給される単位時間あたりの搬送物量を測定して検知する検知器、又は、上流側に配したベルトフィーダ或いはベルトコンベヤ装置からの信号が入力されて単位時間あたりに供給される搬送物量を検知する検知器、を備えるとともに、ベルトを駆動するプーリの回転速度を制御してベルト速度を変化させる速度調整器を備えて、
走行しているベルト上の単位長さあたりに載せることができる搬送物の量を設定載置量として設定することによって、ベルト上に供給される搬送物の量が変化する場合に、搬送物の量の変化に対応させて、プーリ回転速度を制御することによりベルトの速度を調整して、ベルト上に載せられた搬送物が設定載置量になるように制御する制御装置を備えた、ベルトコンベヤ設備。
A belt conveyor facility having a plurality of belt conveyor devices arranged side by side from the upstream side,
For all or at least one of the plurality of belt conveyor devices arranged side by side from the upstream side,
A detector that measures and detects the amount of transported goods per unit time supplied on the belt, or the amount of transported goods that is supplied per unit time when a signal from a belt feeder or belt conveyor device placed upstream is input. And a speed adjuster that changes the belt speed by controlling the rotational speed of the pulley that drives the belt,
When the amount of transported material supplied on the belt changes by setting the amount of transported material that can be placed per unit length on the traveling belt as the set loading amount, A belt provided with a control device that adjusts the speed of the belt by controlling the pulley rotation speed in response to the change in the amount, and controls the conveyed product placed on the belt to a set loading amount. Conveyor equipment.
ベルトコンベヤ装置のベルトが最大定格速度で走行している状態において、走行しているベルト上の単位長さあたりに載せることができる搬送物の最大の量を定格載置量として、該定格載置量を前記設定載置量とする請求項7に記載のベルトコンベヤ設備。   In the state where the belt of the belt conveyor device is traveling at the maximum rated speed, the maximum amount of the transported object that can be loaded per unit length on the traveling belt is defined as the rated loading amount. The belt conveyor equipment according to claim 7, wherein an amount is set as the set placement amount.
JP2011261389A 2011-11-30 2011-11-30 Control method of belt conveyor device and belt conveyor facility Pending JP2013112483A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011261389A JP2013112483A (en) 2011-11-30 2011-11-30 Control method of belt conveyor device and belt conveyor facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011261389A JP2013112483A (en) 2011-11-30 2011-11-30 Control method of belt conveyor device and belt conveyor facility

Publications (1)

Publication Number Publication Date
JP2013112483A true JP2013112483A (en) 2013-06-10

Family

ID=48708386

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011261389A Pending JP2013112483A (en) 2011-11-30 2011-11-30 Control method of belt conveyor device and belt conveyor facility

Country Status (1)

Country Link
JP (1) JP2013112483A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103662722A (en) * 2013-12-12 2014-03-26 南京西坝码头有限公司 Coal blending system and process
JP2016011203A (en) * 2014-06-30 2016-01-21 株式会社日立プラントメカニクス Unloader energy saving control method
WO2016011891A1 (en) * 2014-07-24 2016-01-28 湖南三德科技股份有限公司 Method for controlling conveying speed in sampling and preparation
CN110950002A (en) * 2019-10-16 2020-04-03 焦作煤业(集团)新乡能源有限公司 Operation control method of high-voltage variable-frequency main coal flow intelligent conveying system
KR102097934B1 (en) * 2020-03-17 2020-04-06 권두영 Recycling system for waste pet using cleaning unit motor load
CN111620072A (en) * 2020-06-03 2020-09-04 诸暨利心输送机械科技有限公司 Material transportation device for quantitative conveying
CN112896990A (en) * 2021-03-17 2021-06-04 中信重工开诚智能装备有限公司 Mining explosion-proof coal quantity detection system and method
CN113895910A (en) * 2021-10-27 2022-01-07 西安科技大学 Optimized control method for multi-stage tandem type rubber belt conveyor transportation system
CN114275487A (en) * 2022-01-21 2022-04-05 煤炭科学技术研究院有限公司 Belt speed control method, device and equipment for belt conveyor and storage medium
CN114803382A (en) * 2022-04-28 2022-07-29 天津美腾科技股份有限公司 Conveying control method, system, device, conveyor equipment and readable storage medium

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103662722A (en) * 2013-12-12 2014-03-26 南京西坝码头有限公司 Coal blending system and process
JP2016011203A (en) * 2014-06-30 2016-01-21 株式会社日立プラントメカニクス Unloader energy saving control method
WO2016011891A1 (en) * 2014-07-24 2016-01-28 湖南三德科技股份有限公司 Method for controlling conveying speed in sampling and preparation
CN110950002A (en) * 2019-10-16 2020-04-03 焦作煤业(集团)新乡能源有限公司 Operation control method of high-voltage variable-frequency main coal flow intelligent conveying system
KR102097934B1 (en) * 2020-03-17 2020-04-06 권두영 Recycling system for waste pet using cleaning unit motor load
CN111620072A (en) * 2020-06-03 2020-09-04 诸暨利心输送机械科技有限公司 Material transportation device for quantitative conveying
CN112896990A (en) * 2021-03-17 2021-06-04 中信重工开诚智能装备有限公司 Mining explosion-proof coal quantity detection system and method
CN113895910A (en) * 2021-10-27 2022-01-07 西安科技大学 Optimized control method for multi-stage tandem type rubber belt conveyor transportation system
CN114275487A (en) * 2022-01-21 2022-04-05 煤炭科学技术研究院有限公司 Belt speed control method, device and equipment for belt conveyor and storage medium
CN114803382A (en) * 2022-04-28 2022-07-29 天津美腾科技股份有限公司 Conveying control method, system, device, conveyor equipment and readable storage medium
CN114803382B (en) * 2022-04-28 2024-03-19 天津美腾科技股份有限公司 Conveying control method, system, device, conveyor equipment and readable storage medium

Similar Documents

Publication Publication Date Title
JP2013112483A (en) Control method of belt conveyor device and belt conveyor facility
CN209667955U (en) A kind of circulating transmission device
EP3428089A1 (en) Accumulation conveyor system and transport system
KR101225784B1 (en) Goods supplying device for belt conveyor
EP2798295A1 (en) Device and method to control the charge in electric arc furnaces
CN108341206A (en) A kind of coil of strip transport system
CN202499553U (en) Destacking and entrucking conveying device for bagged material
CN104495414A (en) Mass flow multi-coal rapid storehouse feeding system and method for multiple buffer storehouses
Kumar Fundamentals of conveyors
US20230021955A1 (en) Energy-efficient control of a device for continuously conveying material
CN111908160B (en) Multi-bin continuous feeding method
JP3336712B2 (en) Belt conveyor speed controller
JP5371516B2 (en) Loading / dispensing device
CN111908154A (en) Many feed bins continuous feed conveying equipment
KR100960963B1 (en) Powder & bulk pneumatic dense & dilute phase conveying system
EP1961539B1 (en) A method of weighing of loose fractions of a mixture and equipment for carrying out this method
CN104444443B (en) Automatic quantitative delivery control device for train and automatic quantitative delivery control method
CN203512570U (en) Bucket elevator with dust raising function
CN110386470A (en) A kind of movable type stacker belt feeder Predictive Control System
CN210762650U (en) Automatic powder lifting device
CN107098131A (en) Piece supplying device
JP2018144896A (en) Horizontal screw silo and operation method thereof
JP2015027919A (en) Method and device for detecting amount of accumulation of conveyor
KR20130013631A (en) Loading device for ship
JP6656814B2 (en) Stacker control method