JP2013019241A - Management method and management device for cast-in-place concrete pile construction method - Google Patents

Management method and management device for cast-in-place concrete pile construction method Download PDF

Info

Publication number
JP2013019241A
JP2013019241A JP2011155562A JP2011155562A JP2013019241A JP 2013019241 A JP2013019241 A JP 2013019241A JP 2011155562 A JP2011155562 A JP 2011155562A JP 2011155562 A JP2011155562 A JP 2011155562A JP 2013019241 A JP2013019241 A JP 2013019241A
Authority
JP
Japan
Prior art keywords
concrete
tube
casing pipe
casing
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011155562A
Other languages
Japanese (ja)
Other versions
JP5758219B2 (en
Inventor
Katsunori Hirano
勝識 平野
Kanako Nakajima
佳奈子 中島
Shingo Yamamoto
新吾 山本
Yusuke Fujikura
裕介 藤倉
Takashi Tokunaga
高志 徳永
Hiroyuki Nakano
浩之 中野
Fumiaki Minamikata
文明 南方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP2011155562A priority Critical patent/JP5758219B2/en
Publication of JP2013019241A publication Critical patent/JP2013019241A/en
Application granted granted Critical
Publication of JP5758219B2 publication Critical patent/JP5758219B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a management method and a management device for a cast-in-place concrete pile construction method, which are advantageous to rationalizing the works of pulling out casing pipes and tremie pipes.SOLUTION: A casing pipe bottom end depth Dc, a tremie pipe bottom end depth Dt, and a concrete top end depth Dk are each detected. Whether it is possible or not to pull out an uppermost casing pipe unit body 12 is determined based on the concrete top end depth Dk, the casing pipe bottom end depth Dc, and the length of the uppermost casing unit body 12. Whether it is possible or not to pull out an uppermost tremie pipe unit body 18 is determined based on the concrete top end depth Dk, the tremie pipe bottom end depth Dt, and the length of the uppermost tremie pipe unit body 18. These determination results are notified. Thus, works of pulling out a casing pipe 14 and a tremie pipe 20 can be performed based on the notified results.

Description

本発明は場所打ちコンクリート杭の構築工法における管理方法および管理装置に関する。   The present invention relates to a management method and a management apparatus in a construction method for cast-in-place concrete piles.

場所打ちコンクリート杭の構築工法として以下の工程を含むものが知られている(特許文献1参照)。
(1)複数のケーシング管単体が長手方向に接続されたケーシング管を地中に押し込む。
(2)ケーシング管の内部の土砂を掘削排出して掘削孔を形成する。
(3)複数のトレミー管単体が長手方向に接続されたトレミー管を掘削孔に挿入し、トレミー管で掘削孔にコンクリートを打設する。
(4)コンクリートの打設後、ケーシング管およびトレミー管を引き抜く。
As a construction method for cast-in-place concrete piles, one including the following steps is known (see Patent Document 1).
(1) A casing pipe having a plurality of single casing pipes connected in the longitudinal direction is pushed into the ground.
(2) Excavating and discharging the earth and sand inside the casing pipe to form an excavation hole.
(3) A tremmy pipe in which a plurality of single tremy pipes are connected in the longitudinal direction is inserted into the excavation hole, and concrete is placed in the excavation hole with the tremey pipe.
(4) After placing the concrete, pull out the casing tube and the tremy tube.

特開2006−16787号公報JP 2006-16787 A

ところで、ケーシング管を引き抜く場合、掘削孔の壁面が崩れることを防止するため、ケーシング管の下端が打設されたコンクリートの天端から上に抜けてないように、ケーシング管の引き抜き作業を管理する必要がある。
また、トレミー管を引き抜く場合、トレミー管から吐出されるコンクリートが安定して掘削孔に打設されるように、トレミー管の下部が打設されたコンクリートに予め定められた深さで埋設されるように、トレミー管の引き抜き作業を管理する必要がある。
従来、これらの管理は、作業者がコンクリート天端の位置を手作業で計測すると共に、ケーシング管やトレミー管の先端の位置を推定して行っている。
しかしながら、これらの管理作業は煩雑で作業者の負担が大きく、ケーシング管、トレミー管の引き抜き作業を的確に実施する上で改善の余地がある。
本発明はこのような事情に鑑みなされたものであり、その目的は、ケーシング管、トレミー管の引き抜き作業の合理化を図れ、ひいては場所打ちコンクリート杭の施工の合理化を図る上で有利な場所打ちコンクリート杭の構築工法における管理方法および管理装置を提供することにある。
By the way, when pulling out the casing pipe, in order to prevent the wall surface of the excavation hole from collapsing, the casing pipe pulling work is managed so that the lower end of the casing pipe does not come out from the top of the placed concrete. There is a need.
In addition, when pulling out the tremmy pipe, the lower part of the tremy pipe is buried at a predetermined depth in the cast concrete so that the concrete discharged from the tremy pipe is stably placed in the excavation hole. Thus, it is necessary to manage the drawing operation of the tremy tube.
Conventionally, these managements are performed by the operator manually measuring the position of the top of the concrete and estimating the positions of the tips of the casing pipe and the tremy pipe.
However, these management operations are cumbersome and burdensome to the operator, and there is room for improvement in accurately performing the pulling out operation of the casing tube and the tremy tube.
The present invention has been made in view of such circumstances. The purpose of the present invention is to make it possible to rationalize the pulling out operation of the casing pipe and the tremy pipe, and in turn, to make the construction of the cast-in-place concrete pile advantageous. It is providing the management method and management apparatus in the construction method of a pile.

上述の目的を達成するため、本発明は、複数のケーシング管単体が長手方向に接続されたケーシング管を地中に押し込み、前記ケーシング管の内部の土砂を掘削排出して掘削孔を形成した後、複数のトレミー管単体が長手方向に接続されたトレミー管を前記掘削孔に挿入し、前記トレミー管で前記掘削孔にコンクリートを打設し、前記コンクリートの打設後、前記ケーシング管および前記トレミー管を引き抜く場所打ちコンクリート杭の構築工法における管理方法であって、前記コンクリートの打設後、前記ケーシング管および前記トレミー管を引き抜くことに先立って、予め定められた基準位置から前記掘削孔に打設された前記コンクリートの天端までの距離であるコンクリート天端深さを検出するコンクリート天端深度検出工程と、前記基準位置から前記ケーシング管の下端までの距離であるケーシング管下端深度を検出するケーシング管下端深度検出工程と、前記基準位置から前記トレミー管の下端までの距離であるトレミー管下端深度を検出するトレミー管下端深度検出工程と、前記コンクリート天端深度と、前記ケーシング管下端深度と、前記ケーシング管のうち最も上部に位置する最上部ケーシング管単体の長さとに基づいて前記最上部ケーシング管単体を引き抜く作業が可能であるか否かを判定する第1の判定工程と、前記コンクリート天端深度と、前記トレミー管下端深度と、前記トレミー管のうち最も上部に位置する最上部トレミー管単体の長さとに基づいて前記最上部トレミー管単体を引き抜く作業が可能であるか否かを判定する第2の判定工程と、前記第1、第2の判定工程の判定結果を報知する報知工程とを含むことを特徴とする。   In order to achieve the above-mentioned object, the present invention is to push a casing pipe having a plurality of casing pipes connected in the longitudinal direction into the ground and excavate and discharge the earth and sand inside the casing pipe to form a drilling hole. A tremely pipe having a plurality of tremely pipes connected in the longitudinal direction is inserted into the excavation hole, concrete is placed in the excavation hole with the tremey pipe, and after the concrete is placed, the casing pipe and the tremee A method for managing a cast-in-place concrete pile that pulls out a pipe, and after the concrete is placed, prior to pulling out the casing pipe and the tremy pipe, the pipe is punched into the excavation hole from a predetermined reference position. A concrete top end depth detecting step for detecting a concrete top end depth which is a distance to the top of the concrete, and A casing tube lower end depth detecting step for detecting a casing tube lower end depth which is a distance from the quasi-position to the lower end of the casing tube, and a tremee for detecting a tremy tube lower end depth which is a distance from the reference position to the lower end of the treme tube. Pulling out the uppermost casing pipe alone based on the pipe lower end depth detection step, the concrete top edge depth, the casing pipe lower end depth, and the length of the uppermost casing pipe located at the top of the casing pipes A first determination step for determining whether or not work is possible; the depth of the top of the concrete; the depth of the lower end of the tremmy pipe; and the length of the uppermost tremy pipe alone located at the top of the tremy pipe And a second determination step for determining whether or not the operation of pulling out the uppermost tremely tube is possible based on Characterized in that it comprises a notification step for notifying the determination result of the second determination process.

また本発明は、複数のケーシング管単体が長手方向に接続されたケーシング管を地中に押し込み、前記ケーシング管の内部の土砂を掘削排出して掘削孔を形成した後、複数のトレミー管単体が長手方向に接続されたトレミー管を前記掘削孔に挿入し、前記トレミー管で前記掘削孔にコンクリートを打設し、前記コンクリートの打設後、前記ケーシング管および前記トレミー管を引き抜く場所打ちコンクリート杭の構築工法における管理装置であって、前記コンクリートの打設後、前記ケーシング管および前記トレミー管を引き抜くことに先立って、予め定められた基準位置から前記掘削孔に打設された前記コンクリートの天端までの距離であるコンクリート天端深さを検出するコンクリート天端深度検出手段と、前記基準位置から前記ケーシング管の下端までの距離であるケーシング管下端深度を検出するケーシング管下端深度検出手段と、前記基準位置から前記トレミー管の下端までの距離であるトレミー管下端深度を検出するトレミー管下端深度検出手段と、前記コンクリート天端深度と、前記ケーシング管下端深度と、前記ケーシング管のうち最も上部に位置する最上部ケーシング管単体の長さとに基づいて前記最上部ケーシング管単体を引き抜く作業が可能であるか否かを判定する第1の判定手段と、前記コンクリート天端深度と、前記トレミー管下端深度と、前記トレミー管のうち最も上部に位置する最上部トレミー管単体の長さとに基づいて前記最上部トレミー管単体を引き抜く作業が可能であるか否かを判定する第2の判定手段と、前記第1、第2の判定手段の判定結果を報知する報知手段と、を含むことを特徴とする。   The present invention also provides a plurality of tremy pipes after a plurality of casing pipes alone are pushed into the ground, and after excavating and discharging soil and sand inside the casing pipes to form excavation holes. A cast-in-place concrete pile in which a tremey pipe connected in the longitudinal direction is inserted into the excavation hole, concrete is placed in the excavation hole with the tremee pipe, and the casing pipe and the tremey pipe are pulled out after the concrete is placed. The construction apparatus of the construction method according to claim 1, wherein after the concrete is placed, prior to pulling out the casing pipe and the tremy pipe, the top of the concrete placed in the excavation hole from a predetermined reference position. A concrete top end depth detecting means for detecting a concrete top end depth, which is a distance to the end, and the casing from the reference position. A casing tube lower end depth detecting means for detecting a casing tube lower end depth which is a distance to the lower end of the pipe, and a tremy tube lower end depth detecting which detects a treme tube lower end depth which is a distance from the reference position to the lower end of the tremy tube. It is possible to pull out the uppermost casing pipe alone based on the means, the concrete top edge depth, the casing pipe lower end depth, and the length of the uppermost casing pipe alone located at the top of the casing pipe. Based on the first determination means for determining whether or not there is, the top depth of the concrete top, the bottom depth of the tremmy pipe, and the length of the uppermost tremy pipe alone located at the uppermost part of the tremy pipe A second determination means for determining whether or not the work for pulling out the uppermost tremely tube is possible; and determinations by the first and second determination means Characterized in that it comprises a notifying means for notifying the result, the.

本発明によれば、コンクリート天端深度と、ケーシング管下端深度と、最上部のケーシング管単体の長さとに基づいて最上部のケーシング管単体を引き抜く作業が可能であるか否かを判定し、コンクリート天端深度と、トレミー管下端深度と、最上部のトレミー管単体の長さとに基づいて最上部のトレミー管単体を引き抜く作業が可能であるか否かを判定し、それら判定結果を報知するようにした。
したがって、報知結果に基づいてケーシング管、トレミー管の引き抜き作業を行えばよく、手作業による計測作業が不要となることから、ケーシング管、トレミー管の引き抜き作業の合理化を図れ、ひいては場所打ちコンクリート杭の施工の合理化、杭コンクリート品質の確保、また、施工履歴情報が残るためにトレーサビリティの確保を図る上で有利となる。
According to the present invention, it is determined whether or not the work of pulling out the uppermost casing pipe is possible based on the concrete top edge depth, the casing pipe lower end depth, and the length of the uppermost casing pipe alone, Based on the depth of the top of the concrete, the depth of the lower end of the tremmy pipe, and the length of the uppermost tremy pipe alone, it is determined whether or not the work of pulling out the uppermost tremy pipe alone is possible, and the determination results are notified. I did it.
Therefore, it is only necessary to pull out the casing pipe and tremey pipe based on the notification result, and manual measurement work is not required, so that the drawing work of the casing pipe and tremey pipe can be streamlined. This is advantageous in streamlining construction, securing pile concrete quality, and ensuring traceability because construction history information remains.

(A)〜(H)は場所打ちコンクリート杭10の構築工法の説明図である。(A)-(H) are explanatory drawings of the construction method of the cast-in-place concrete pile 10. FIG. 本実施の形態に係る場所打ちコンクリート杭の構築工法における管理装置30の構成を示す構成図である。It is a block diagram which shows the structure of the management apparatus 30 in the construction method of the cast-in-place concrete pile concerning this Embodiment. コンピュータ38の構成を示すブロック図である。2 is a block diagram showing a configuration of a computer 38. FIG. ケーシング管14、トレミー管20、コンクリートCの位置関係を示す説明図である。It is explanatory drawing which shows the positional relationship of the casing pipe | tube 14, the tremy pipe | tube 20, and the concrete C. FIG. 管理装置30の動作を示すフローチャートである。4 is a flowchart showing the operation of the management device 30. (A)〜(F)はケーシング管14、トレミー管20の引き抜き手順を示す説明図である。(A)-(F) is explanatory drawing which shows the extraction procedure of the casing pipe | tube 14 and the tremy pipe | tube 20. FIG. 初期入力画面の説明図である。It is explanatory drawing of an initial input screen. 計測画面の説明図である。It is explanatory drawing of a measurement screen. 操作入力画面の説明図である。It is explanatory drawing of an operation input screen. 線図表示画面の説明図である。It is explanatory drawing of a diagram display screen.

次に本発明の実施の形態の場所打ちコンクリート杭の構築工法における管理装置について管理方法と共に説明する。
まず、図1を参照して本発明が適用される場所打ちコンクリート杭の構築工法について説明する。
図1(A)に示すように、場所打ちコンクリート杭10を構築すべき地盤Gに、ケーシング管の押し込み引き抜き装置2と、クローラクレーン4Aとを設置する。
次いで、図1(B)に示すように、押し込み引き抜き装置4Aによってケーシング管単体12を回転させつつ地盤に押し込む。なお、最初に押し込まれるケーシング管単体12の下端(先端)には地盤掘削用の複数のビットが設けられ、これらビットにより地盤Gが削られる。
図1(C)に示すように、1つのケーシング管単体12が地盤Gに押し込まれたならば、クローラクレーン4Aに昇降可能に吊り下げられたグラブハンマー6を用いてケーシング管単体12の内側の土砂を掘削し、この掘削した土砂を掴んで排出する。これによりケーシング管単体12の内側に掘削孔Hを形成する。
1つのケーシング管単体12の長さに相当する掘削孔Hが形成されたならば、ケーシング管単体12の上端に別のケーシング管単体12を接続し、前記と同様に、押し込み引き抜き装置2によって上側のケーシング管単体12を地盤Gに押し込む。これにより接続された2つのケーシング管単体12からなるケーシング管14が地盤Gに押し込まれることになる。
ケーシング管14が地盤Gに押し込まれたならば、前記と同様に、グラブハンマー6を用いてケーシング管単体12の内側に掘削孔Hを形成する。
上述のようにケーシング管単体12を継ぎ足して掘削を行うことにより所望の深度の掘削孔Hを得る。
なお、ケーシング管単体12は、施工の都合上、異なる長さのものを組み合わせて用いることが多い。
Next, the management apparatus in the construction method of the cast-in-place concrete pile of embodiment of this invention is demonstrated with the management method.
First, with reference to FIG. 1, the construction method of the cast-in-place concrete pile to which this invention is applied is demonstrated.
As shown to FIG. 1 (A), the casing pipe pushing-out apparatus 2 and the crawler crane 4A are installed in the ground G where the cast-in-place concrete pile 10 should be constructed.
Next, as shown in FIG. 1B, the casing tube unit 12 is pushed into the ground while being rotated by the push-out device 4A. A plurality of bits for ground excavation are provided at the lower end (tip) of the casing tube 12 that is pushed first, and the ground G is cut by these bits.
As shown in FIG. 1 (C), if one casing pipe single body 12 is pushed into the ground G, a grab hammer 6 suspended on the crawler crane 4A so as to be able to move up and down is used. Excavate earth and sand, grab the excavated earth and sand and discharge. Thereby, the excavation hole H is formed inside the casing pipe single body 12.
If the excavation hole H corresponding to the length of one casing pipe single body 12 is formed, another casing pipe single body 12 is connected to the upper end of the casing pipe single body 12, and the upper side is pushed by the push-pull-out device 2 in the same manner as described above. The single casing pipe 12 is pushed into the ground G. As a result, the casing pipe 14 composed of the two casing pipe single bodies 12 connected to each other is pushed into the ground G.
If the casing pipe 14 is pushed into the ground G, the excavation hole H is formed inside the casing pipe single body 12 using the grab hammer 6 as described above.
As described above, the excavation hole H having a desired depth is obtained by excavating by adding the casing pipe simple substance 12.
The casing tube unit 12 is often used in combination with different lengths for the convenience of construction.

次に、図1(D)に示すように、クローラクレーン4Aに昇降可能に吊り下げられた沈殿バスケット8を用いてスライム処理を実施する。
次に、図1(E)に示すように、別のクローラクレーン4Bによって鉄筋かご16を掘削孔Hに建て込む。
次に、図1(F)に示すように、複数のトレミー管単体18が長手方向に接続されたトレミー管20をクローラクレーン4Bによって掘削孔Hに挿入する。
なお、トレミー管単体18は、施工の都合上、異なる長さのものを組み合わせて用いることが多い。
次に、図1(G)に示すように、コンクリートミキサー車4Cから不図示のホッパを介してコンクリートCをトレミー管20に流し込み、掘削孔HにコンクリートCを打設する。
コンクリートCの打設作業と、押し込み引き抜き装置2によるケーシング管14の引き抜き作業、および、クローラクレーン4Bによるトレミー管20の引き抜き作業とが交互に行われる。本発明は、この図1(G)の作業に適用されるものである。
図1(H)に示すように、コンクリートCの打設が完了し、コンクリートCが硬化することにより場所打ちコンクリート杭10が構築される。なお、図1(H)では、コンクリート天端から上部に残存する掘削孔Hの空間(空堀部)にショベルカー4Dで土砂を埋め戻す場合について図示している。
Next, as shown in FIG. 1 (D), slime treatment is performed using a sedimentation basket 8 that is suspended from the crawler crane 4A so as to be lifted and lowered.
Next, as shown in FIG. 1 (E), the rebar cage 16 is built into the excavation hole H by another crawler crane 4B.
Next, as shown in FIG. 1 (F), the tremmy pipe 20 in which the plurality of tremy pipes 18 are connected in the longitudinal direction is inserted into the excavation hole H by the crawler crane 4B.
The tremy tube unit 18 is often used in combination with different lengths for the convenience of construction.
Next, as shown in FIG. 1 (G), the concrete C is poured into the tremely pipe 20 from the concrete mixer truck 4C through a hopper (not shown), and the concrete C is placed in the excavation hole H.
The concrete C placing work, the pulling work of the casing pipe 14 by the push-pull-out device 2, and the pulling work of the tremy pipe 20 by the crawler crane 4B are alternately performed. The present invention is applied to the operation shown in FIG.
As shown in FIG. 1 (H), the casting of the concrete C is completed, and the cast-in-place concrete pile 10 is constructed when the concrete C is hardened. In addition, in FIG. 1 (H), the case where earth and sand are backfilled with the shovel car 4D in the space (empty moat part) of the excavation hole H remaining in the upper part from the concrete top end is illustrated.

次に本実施の形態に係る場所打ちコンクリート杭の構築工法における管理装置について説明する。
図2に示すように、管理装置30は、RFIDタグ32と、受信装置34(リーダ)と、コンクリート天端深度測定装置36と、コンピュータ38とを含んで構成されている。
RFIDタグ32は、トレミー管20を構成する各トレミー管単体18のそれぞれに取着されており、本実施の形態では、RFIDタグ32は、トレミー管単体18の外周面で長手方向における予め定められた位置に取着されている。
RFIDタグ32は、各トレミー管単体18を識別するためのIDデータを保持している。
Next, the management apparatus in the construction method of the cast-in-place concrete pile concerning this Embodiment is demonstrated.
As shown in FIG. 2, the management device 30 includes an RFID tag 32, a receiving device 34 (reader), a concrete ceiling depth measuring device 36, and a computer 38.
The RFID tag 32 is attached to each tremely tube unit 18 constituting the tremey tube 20. In this embodiment, the RFID tag 32 is predetermined in the longitudinal direction on the outer peripheral surface of the tremey tube unit 18. It is attached to the position.
The RFID tag 32 holds ID data for identifying each tremy tube unit 18.

受信装置34は、アンテナ3402を備え、場所打ちコンクリート杭10を施工する地盤Gの近傍に設置された支持部材35に支持され、アンテナ3402は、予め定められた位置に設置されている。
受信装置34は、トレミー管単体18に取着されたRFIDタグ32がアンテナ3402の通信可能範囲に位置したときにRFIDタグ32との間で無線通信がなされるように配置されており、通信可能範囲に入るRFIDタグ32が常に1つとなるように、アンテナ3402とトレミー管20との位置関係が設定されている。
受信装置34は、アンテナ3402を介してRFタグ32と通信を行い、RFIDタグ32が保持するIDデータを受信して、コンピュータ38に供給するものである。
The receiving device 34 includes an antenna 3402 and is supported by a support member 35 installed in the vicinity of the ground G on which the cast-in-place concrete pile 10 is constructed. The antenna 3402 is installed at a predetermined position.
The receiving device 34 is arranged so that wireless communication can be performed with the RFID tag 32 when the RFID tag 32 attached to the single tremy tube 18 is located within the communicable range of the antenna 3402. The positional relationship between the antenna 3402 and the tremy tube 20 is set so that there is always one RFID tag 32 that falls within the range.
The receiving device 34 communicates with the RF tag 32 via the antenna 3402, receives ID data held by the RFID tag 32, and supplies it to the computer 38.

コンクリート天端深度測定装置36は、錘3602と、ワイヤ3604と、リール3606と、測定部3608とを含んで構成されている。
錘3602は、打設されたコンクリートCの天端に載置される。
ワイヤ3604は、その先端が錘3602に取着されている。
リール3606は、ワイヤ3604を巻回しており、ワイヤ3604を繰り出し、巻き取り可能に収容するものである。
リール3606は、錘3602がコンクリートの天端に載置され、かつ、ワイヤ3604にたるみが生じない程度の張力をワイヤ3604に与えるように構成され、場所打ちコンクリート杭10を施工する地盤Gの近傍に設置された支持部材37に支持されている。
測定部3608は、リール3606の回転量に基づいてワイヤ3604の繰り出し量、すなわち、コンクリートCの天端の高さHc(以下コンクリート天端深度Dkという)を測定し、その測定結果をコンピュータ38に供給するものである。
図4に示すように、コンクリート天端深度Dkは、予め定められた基準位置から天端までの距離をいうものとする。本実施の形態では、基準位置P0を、施工する場所打ちコンクリート杭10よりも上方の予め定められた位置に設定する。
本実施の形態では、コンクリート天端深度測定装置36により「コンクリート天端深度検出手段」が構成されている。
なお、コンクリート天端深度検出手段は、本実施の形態に限定されるものではなく、従来公知の様々な距離測定装置が使用可能である。
The concrete top end depth measuring device 36 includes a weight 3602, a wire 3604, a reel 3606, and a measuring unit 3608.
The weight 3602 is placed on the top edge of the placed concrete C.
The tip of the wire 3604 is attached to the weight 3602.
The reel 3606 winds the wire 3604, and feeds out the wire 3604 so that it can be wound up.
The reel 3606 is configured such that the weight 3602 is placed on the top of the concrete and tension is applied to the wire 3604 so that the wire 3604 does not sag, and the vicinity of the ground G on which the cast-in-place concrete pile 10 is constructed. It is supported by the support member 37 installed in the.
The measuring unit 3608 measures the feed amount of the wire 3604 based on the amount of rotation of the reel 3606, that is, the height Hc of the top end of the concrete C (hereinafter referred to as the concrete top end depth Dk), and the measurement result is sent to the computer 38. To supply.
As shown in FIG. 4, the concrete top end depth Dk is a distance from a predetermined reference position to the top end. In the present embodiment, the reference position P0 is set at a predetermined position above the cast-in-place concrete pile 10 to be constructed.
In the present embodiment, the concrete top end depth measuring device 36 constitutes “concrete top end depth detecting means”.
The concrete top end depth detecting means is not limited to the present embodiment, and various conventionally known distance measuring devices can be used.

図3に示すように、コンピュータ38は、CPU3802と、不図示のインターフェース回路およびバスラインを介して接続されたROM3804、RAM3806、ハードディスク装置3808、ディスク装置3810、キーボード3812、マウス3814、ディスプレイ3816、タッチパネル3818、プリンタ3820、入出力インターフェース3822などを有している。
ROM3804は所定の制御プログラムなどを格納し、RAM3806はワーキングエリアを提供するものである。
ハードディスク装置3808は、管理装置30の機能を実現するための管理プログラムを格納している。
As illustrated in FIG. 3, the computer 38 includes a CPU 3802, a ROM 3804, a RAM 3806, a hard disk device 3808, a disk device 3810, a keyboard 3812, a mouse 3814, a display 3816, and a touch panel connected via an interface circuit and a bus line (not shown). 3818, a printer 3820, an input / output interface 3822, and the like.
A ROM 3804 stores a predetermined control program and the like, and a RAM 3806 provides a working area.
The hard disk device 3808 stores a management program for realizing the functions of the management device 30.

ディスク装置3810はCDやDVDなどの記録媒体に対してデータの記録および/または再生を行うものである。
キーボード3812およびマウス3814は、操作者による操作入力を受け付けるものである。
ディスプレイ3816はデータを表示出力するものであり、プリンタ3820はデータを印刷出力するものであり、ディスプレイ3816およびプリンタ3820によってデータを出力する。
タッチパネル3818は、ディスプレイ3816の表示面に設けられ、ディスプレイ3316と共にタッチパネルディスプレイを構成することで操作者による操作入力を受け付けるものである。
入出力インターフェース3822は、外部装置との間でデータの授受を行うものであり、本実施の形態では、受信装置34および測定部3608からデータを受け付ける。
なお、図3において、符号60は入出力インターフェース3822に接続された無線LAN装置を示し、符号62は、タブレットPCなどのモバイルモニタ装置を示す。
モバイルモニタ装置62は、無線LAN装置60を介してパーソナルコンピュータ38と無線通信を行うことにより、情報の授受を行うものである。
The disk device 3810 records and / or reproduces data with respect to a recording medium such as a CD or a DVD.
The keyboard 3812 and the mouse 3814 receive operation inputs from the operator.
A display 3816 displays and outputs data, and a printer 3820 prints and outputs data. The display 3816 and the printer 3820 output data.
The touch panel 3818 is provided on the display surface of the display 3816 and constitutes a touch panel display together with the display 3316 to receive an operation input by the operator.
The input / output interface 3822 exchanges data with an external device. In this embodiment, the input / output interface 3822 receives data from the receiving device 34 and the measurement unit 3608.
In FIG. 3, reference numeral 60 indicates a wireless LAN device connected to the input / output interface 3822, and reference numeral 62 indicates a mobile monitor device such as a tablet PC.
The mobile monitor device 62 exchanges information by performing wireless communication with the personal computer 38 via the wireless LAN device 60.

管理装置30は、CPU3802が前記の管理プログラムを実行することによって、図2に示すように、ケーシング管下端深度検出手段40と、トレミー管下端深度算出手段42と、天端低下量算出手段44と、第1の判定手段46と、第2の判定手段48と、報知手段50と、線図表示手段52とを実現する。   As shown in FIG. 2, the management device 30 is configured such that the CPU 3802 executes the management program, and as shown in FIG. 2, the casing pipe lower end depth detection means 40, the tremmy pipe lower end depth calculation means 42, and the top end fall amount calculation means 44. The 1st determination means 46, the 2nd determination means 48, the alerting | reporting means 50, and the diagram display means 52 are implement | achieved.

ケーシング管下端深度検出手段40は、コンクリートCの打設後、ケーシング管14およびトレミー管20を引き抜くことに先立って、基準位置P0からケーシング管14の下端までの距離であるケーシング管下端深度Dcを検出するものである。
本実施の形態では、場所打ちコンクリート杭10の構築に先立って、ケーシング管14を構成する複数のケーシング管単体12のそれぞれに設定されたIDデータと、ケーシング管単体12の長さとを対応付けたデータテーブルが作成され、このデータテーブルがハードディスク装置3808に格納される。
そして、ケーシング管下端深度検出手段40は、キーボード3812あるいはタッチパネル3818からの操作入力に応じて最上部に位置するケーシング管単体12のIDデータを特定することにより、データテーブルから最上部のケーシング管単体12の長さを読み出し、最上部のケーシング管単体12の長さをケーシング管14の全長から減算した値に基づいてケーシング管下端深度Dcを算出する。
前記操作入力は、図8に示すように、ケーシング管引き抜き開始を指示する操作ボタン220の操作によりなされる。すなわち、ケーシング管引き抜き開始が指示される毎に、ケーシング管単体12が1本ずつ引き抜かれることになるため、このボタン操作による指示に応じてケーシング管単体12のIDデータを特定することができる。
また、ケーシング管単体12のIDデータの特定は、上述したボタン操作を行う代わりに以下のようにしてもよい。
すなわち、図2に示すように、予めケーシング管単体12に、各ケーシング管単体12を識別するためのIDデータを保持するRFIDタグ33を取着しておく。
そして、受信装置34(アンテナ3402)を用いてケーシング管単体12に取着されたRFIDタグ33によりケーシング管単体12のIDデータを自動認識させるようにしてもよい。
The casing pipe lower end depth detecting means 40 calculates a casing pipe lower end depth Dc which is a distance from the reference position P0 to the lower end of the casing pipe 14 before the casing pipe 14 and the tremy pipe 20 are pulled out after the concrete C is placed. It is to detect.
In the present embodiment, prior to the construction of the cast-in-place concrete pile 10, the ID data set for each of the plurality of casing pipe single bodies 12 constituting the casing pipe 14 is associated with the length of the casing pipe single body 12. A data table is created, and this data table is stored in the hard disk device 3808.
Then, the casing pipe lower end depth detecting means 40 specifies the ID data of the casing pipe single body 12 positioned at the uppermost position in response to an operation input from the keyboard 3812 or the touch panel 3818, and thereby the uppermost casing pipe single body from the data table. 12 is read, and the casing pipe lower end depth Dc is calculated based on a value obtained by subtracting the length of the uppermost casing pipe 12 from the total length of the casing pipe 14.
As shown in FIG. 8, the operation input is performed by operating an operation button 220 for instructing start of casing tube drawing. That is, each time the start of the casing pipe drawing is instructed, the casing pipe single body 12 is pulled out one by one. Therefore, the ID data of the casing pipe single body 12 can be specified according to the instruction by the button operation.
Further, the identification data of the casing tube unit 12 may be specified as follows instead of performing the button operation described above.
That is, as shown in FIG. 2, an RFID tag 33 that holds ID data for identifying each casing tube 12 is attached to the casing tube 12 in advance.
Then, the ID data of the casing tube unit 12 may be automatically recognized by the RFID tag 33 attached to the casing tube unit 12 using the receiving device 34 (antenna 3402).

トレミー管下端深度算出手段42は、基準位置P0からトレミー管20の下端までの距離であるトレミー管下端深度Dtを算出するものである。
本実施の形態では、場所打ちコンクリート杭10の構築に先立って、トレミー管20を構成する複数のトレミー管単体18のそれぞれに設定されたIDデータと、トレミー管単体18の長さとを対応付けたデータテーブルが作成され、このデータテーブルがハードディスク装置3808に格納される。
そして、トレミー管下端深度算出手段42は、受信装置34から供給されるトレミー管単体18のIDデータから最上部のトレミー管単体18のIDデータを特定することにより、データテーブルから最上部のトレミー管単体18の長さを読み出し、最上部トレミー管単体18の長さをケーシング管14の全長から減算した値に基づいてトレミー管下端深度Dtを算出する。
本実施の形態では、RFタグ32と、受信装置34と、トレミー管下端深度算出手段42とによって「トレミー管下端深度検出手段」が構成されている。
The tremmy tube lower end depth calculating means 42 calculates a tremy tube lower end depth Dt which is a distance from the reference position P0 to the lower end of the tremy tube 20.
In the present embodiment, prior to the construction of the cast-in-place concrete pile 10, the ID data set for each of the plurality of tremy pipe single bodies 18 constituting the tremy pipe 20 is associated with the length of the single tremy pipe 18. A data table is created, and this data table is stored in the hard disk device 3808.
Then, the Tremy tube lower end depth calculating means 42 specifies the ID data of the uppermost tremy tube 18 from the ID data of the single tremy tube 18 supplied from the receiving device 34, so that the uppermost tremy tube is obtained from the data table. The length of the single body 18 is read, and the treme tube lower end depth Dt is calculated based on the value obtained by subtracting the length of the uppermost tremy tube 18 from the total length of the casing tube 14.
In the present embodiment, the “tremy tube lower end depth detection unit” is configured by the RF tag 32, the receiving device 34, and the tremy tube lower end depth calculation unit 42.

天端低下量算出手段44は、打設されたコンクリートCからケーシング管14が最上部のケーシング管単体12の長さ分引き抜かれることによって生じるコンクリートCの天端が低下する低下量を算出するものである。
本実施の形態では、ケーシング管14(ケーシング管単体12)が単位長さ分引き抜かれたときにコンクリートCの天端が低下する単位低下量が予め設定されており、天端低下量算出手段44は、引き抜かれたケーシング管14の長さと前記の単位低下量とに基づいてコンクリートCの天端が低下する低下量を算出する。
The top edge reduction amount calculating means 44 calculates the amount of reduction in which the top edge of the concrete C is lowered when the casing pipe 14 is pulled out from the placed concrete C by the length of the uppermost casing pipe alone 12. It is.
In the present embodiment, a unit decrease amount at which the top end of the concrete C decreases when the casing pipe 14 (casing tube single body 12) is pulled out by a unit length is set in advance, and the top end decrease amount calculating means 44 is set. Calculates a reduction amount by which the top end of the concrete C is lowered based on the length of the drawn casing pipe 14 and the unit reduction amount.

第1の判定手段46は、コンクリート天端深度Dkと、ケーシング管下端深度Dcと、ケーシング管14のうち最も上部に位置する最上部のケーシング管単体12の長さとに基づいて最上部のケーシング管単体12を引き抜く作業が可能であるか否かを判定するものである。
本実施の形態では、第1の判定手段46は、ケーシング管14が最上部のケーシング管単体12の長さ分引き抜かれた状態で、コンクリートCの天端とケーシング管14の下端との間に予め定められた第1の距離ΔL1が確保されるという条件が成立するか否かに基づいて前記の判定を行う。
第1の距離ΔL1は、打設されたコンクリートCの圧力によって掘削孔Hの壁面が安定して支持されるために必要な距離である。
また、第1の判定手段46は、天端低下量算出手段44によって算出された低下量を考慮して前記の判定を行う。
The first determination means 46 determines the uppermost casing tube based on the concrete top end depth Dk, the casing tube lower end depth Dc, and the length of the uppermost casing tube unit 12 located at the uppermost position among the casing tubes 14. It is determined whether or not the work of pulling out the single body 12 is possible.
In the present embodiment, the first determination means 46 is provided between the top end of the concrete C and the lower end of the casing tube 14 in a state where the casing tube 14 is pulled out by the length of the uppermost casing tube 12 alone. The determination is made based on whether or not a condition that a predetermined first distance ΔL1 is secured is satisfied.
The first distance ΔL1 is a distance necessary for the wall surface of the excavation hole H to be stably supported by the pressure of the placed concrete C.
Further, the first determination unit 46 performs the above determination in consideration of the amount of decrease calculated by the top end decrease amount calculation unit 44.

第2の判定手段48は、コンクリート天端深度Dkと、トレミー管下端深度Dtと、トレミー管20のうち最も上部に位置する最上部のトレミー管単体18の長さとに基づいて最上部のトレミー管単体18を引き抜く作業が可能であるか否かを判定するものである。
本実施の形態では、第2の判定手段48は、トレミー管20が最上部のトレミー管単体18の長さ分引き抜かれた状態で、コンクリートCの天端とトレミー管20の下端との間に予め定められた第2の距離ΔL2が確保されるという条件が成立するか否かに基づいて前記の判定を行う。
第2の距離ΔL2は、トレミー管20の下部が打設されたコンクリートCに予め定められた深さで埋設された状態で、コンクリートCを打設するために必要な距離である。
The second determination means 48 is based on the concrete top end depth Dk, the treme tube lower end depth Dt, and the length of the uppermost tremy tube unit 18 located at the top of the tremy tube 20. It is determined whether or not the work of pulling out the single unit 18 is possible.
In the present embodiment, the second determining means 48 is provided between the top end of the concrete C and the lower end of the tremmy pipe 20 in a state where the tremy pipe 20 is pulled out by the length of the uppermost tremy pipe 18. The determination is made based on whether or not a condition that a predetermined second distance ΔL2 is secured is satisfied.
The second distance ΔL2 is a distance necessary for placing the concrete C in a state where the lower portion of the tremy tube 20 is buried in the concrete C on which the bottom is placed at a predetermined depth.

報知手段50は、第1、第2の判定手段46、48の判定結果を報知するものである。
本実施の形態では、報知手段50は、第1、第2の判定手段46、48の判定結果をディスプレイ3816に表示させる。ディスプレイ16の表示例を図7、図9に示す。
The notification means 50 notifies the determination results of the first and second determination means 46 and 48.
In the present embodiment, the notification unit 50 causes the display 3816 to display the determination results of the first and second determination units 46 and 48. Display examples on the display 16 are shown in FIGS.

線図表示手段52は、コンクリート天端深度Dkの時系列データと、ケーシング管下端深度Dcの時系列データと、トレミー管下端深度Dtの時系列データとを時間軸に沿ってプロットした線図を表示するものである。
本実施の形態では、線図表示手段52は、線図をディスプレイ3816に表示させ、あるいは、プリンタ3820に印刷出力させる。ディスプレイ16の表示例を図9に示す。
また、本実施の形態では、図3に示すように、モバイルモニタ装置62が無線LAN装置60を介してパーソナルコンピュータ38と無線通信を行うことにより、モバイルモニタ装置62をパーソナルコンピュータ38と同様に機能させている。
したがって、モバイルモニタ装置62が有するディスプレイにより、報知手段50と、線図表示手段52とが実現される。
The diagram display means 52 is a diagram in which the time series data of the concrete top edge depth Dk, the time series data of the casing pipe lower end depth Dc, and the time series data of the tremmy pipe lower end depth Dt are plotted along the time axis. To display.
In the present embodiment, the diagram display means 52 displays the diagram on the display 3816 or causes the printer 3820 to print it out. A display example of the display 16 is shown in FIG.
In the present embodiment, as shown in FIG. 3, the mobile monitor device 62 performs wireless communication with the personal computer 38 via the wireless LAN device 60, so that the mobile monitor device 62 functions similarly to the personal computer 38. I am letting.
Therefore, the notification unit 50 and the diagram display unit 52 are realized by the display of the mobile monitor device 62.

次に、管理装置30の動作について図5のフローチャートを参照して説明する。
まず、初期入力操作がなされ、この入力操作に伴い各種パラメータがディスプレイ16に表示される(ステップS10、S12)。すなわち、図7に示すように、初期入力画面がディスプレイ16に表示される。
初期入力画面には、ケーシング管リスト102、トレミー管リスト104、単位低下量入力欄106が表示される。
ケーシング管リスト102は、ケーシング管単体12の番号と、ケーシング管単体12の長さとが入力されるように構成されている。ここで、ケーシング管単体12の番号は、ケーシング管単体12を接続してケーシング管14を構成した場合、上から下に向かって順番に付された番号であり、言い換えると、ケーシング管単体12のIDデータに相当する。
操作者は、キーボード3812あるいはタッチパネル3818を操作してケーシング管単体12の番号と、ケーシング管単体12の長さとを入力する。
CPU3802は、入力されたケーシング管単体12の番号からなるIDデータと、ケーシング管単体12の長さとを対応付けたデータテーブルを作成し、ハードディスク装置3808に格納する。
Next, the operation of the management apparatus 30 will be described with reference to the flowchart of FIG.
First, an initial input operation is performed, and various parameters are displayed on the display 16 in accordance with the input operation (steps S10 and S12). That is, the initial input screen is displayed on the display 16 as shown in FIG.
On the initial input screen, a casing pipe list 102, a tremy pipe list 104, and a unit decrease amount input field 106 are displayed.
The casing tube list 102 is configured such that the number of the casing tube unit 12 and the length of the casing tube unit 12 are input. Here, the number of the casing tube unit 12 is a number assigned in order from the top to the bottom when the casing tube unit 12 is connected to form the casing tube 14, in other words, the number of the casing tube unit 12. It corresponds to ID data.
The operator operates the keyboard 3812 or the touch panel 3818 to input the number of the casing tube unit 12 and the length of the casing tube unit 12.
The CPU 3802 creates a data table in which the input ID data including the number of the casing tube single body 12 and the length of the casing pipe single body 12 are associated with each other, and stores the data table in the hard disk device 3808.

トレミー管リスト104は、トレミー管単体18の番号と、トレミー管単体18のIDデータと、トレミー管単体18の長さとが入力されるように構成されている。
なお、トレミー管単体18には、前述したRFタグ32が取着されており、それらRFIDタグ32に保持されているIDデータと同じIDデータをトレミー管リスト104から入力設定する。
また、トレミー管単体18の番号は、トレミー管単体18を接続してトレミー管20を構成した場合、上から下に向かって順番に付された番号である。
操作者は、キーボード3812あるいはタッチパネル3818を操作してトレミー管単体18の番号と、トレミー管単体18のIDデータと、トレミー管単体18の長さを入力する。
CPU3802は、入力されたトレミー管単体18のIDデータと、トレミー管単体18の長さとを対応付けたデータテーブルを作成し、ハードディスク装置3808に格納する。
The tremmy tube list 104 is configured such that the number of the single tremmy tube 18, the ID data of the single tremmy tube 18, and the length of the single tremmy tube 18 are input.
Note that the RF tag 32 described above is attached to the treme tube unit 18, and the same ID data as the ID data held in the RFID tag 32 is input and set from the treme tube list 104.
Further, the number of the single tremmy tube 18 is a number assigned in order from top to bottom when the tremy tube 20 is connected to form the tremy tube 20.
The operator operates the keyboard 3812 or the touch panel 3818 to input the number of the single tremmy tube 18, the ID data of the single tremmy tube 18, and the length of the single tremmy tube 18.
The CPU 3802 creates a data table in which the input ID data of the single tremmy tube 18 is associated with the length of the single tremmy tube 18 and stores the data table in the hard disk device 3808.

単位低下量入力欄106は、ケーシング管14(ケーシング管単体12)が単位長さ分引き抜かれたときにコンクリートCの天端が低下する単位低下量を入力するものであり、例えば、現場において、ケーシング管14の単位長さ当たりの容積に基づいて計算してキーボード3812あるいはタッチパネル3818を操作して入力する。   The unit decrease amount input field 106 is used to input a unit decrease amount at which the top end of the concrete C decreases when the casing tube 14 (casing tube 12) is pulled out by a unit length. A calculation is made based on the volume per unit length of the casing tube 14 and the keyboard 3812 or the touch panel 3818 is operated to input.

なお、本実施の形態では、ケーシング管全長算出ボタン108を操作すると、CPU3802がケーシング管リスト102に入力したデータに基づいてケーシング管14の全長を算出して表示欄110に表示する。
同様に、トレミー管全長算出ボタン112を操作すると、CPU3802がトレミー管リスト104に入力したデータに基づいてトレミー管20の全長を算出して表示欄114に表示する。
また、CPU3802は、最上部のケーシング管単体12を引き抜く場合において、コンクリートCの天端とケーシング管14の下端との間に確保されるべき第1の距離ΔL1を「ケーシング管の管理値」として表示欄116に表示させる。
本実施の形態では、1本目のケーシング管単体12に対する管理値(例えば5.0m)を、2本目以降のケーシング管単体12に対する管理値(例えば3.0m)よりも大きな異なる値としている。
このようにすると、まだコンクリート打設高さが土圧に抵抗するのに十分でない段階でのケーシング管撤去に起因する削孔壁崩落を防止することができるため、場所打ち杭の品質確保を図る上で有利となる。
In the present embodiment, when the casing pipe total length calculation button 108 is operated, the CPU 3802 calculates the total length of the casing pipe 14 based on the data input to the casing pipe list 102 and displays it on the display column 110.
Similarly, when the treme tube total length calculation button 112 is operated, the CPU 3802 calculates the total length of the tremy tube 20 based on the data input to the tremy tube list 104 and displays it on the display column 114.
Further, when the uppermost casing pipe 12 is pulled out, the CPU 3802 sets the first distance ΔL1 to be secured between the top end of the concrete C and the lower end of the casing pipe 14 as the “casing pipe management value”. It is displayed in the display column 116.
In the present embodiment, the management value (for example, 5.0 m) for the first casing pipe single unit 12 is set to a value different from the management value (for example, 3.0 m) for the second and subsequent casing pipe single units 12.
In this way, it is possible to prevent the drilling wall from collapsing due to the removal of the casing tube at a stage where the concrete placement height is not sufficient to resist earth pressure, thus ensuring the quality of cast-in-place piles. This is advantageous.

また、最上部のトレミー管単体18を引き抜く場合において、コンクリートCの天端とトレミー管20の下端との間に確保されるべき第2の距離ΔL2を「トレミー管の管理値」として表示欄118に表示させる。   Further, in the case where the uppermost tremy pipe 18 is pulled out, the second distance ΔL2 to be secured between the top end of the concrete C and the lower end of the tremy pipe 20 is displayed as a “tremmy pipe management value” in the display field 118. To display.

また、その他のパラメータとして以下に例示するものが表示される。これらのパラメータは予め作業者によって入力される。
(1)場所打ちコンクリート杭10の杭径
(2)杭天端(コンクリートCの天端)から孔底(掘削孔Hの底部)までの高さHp
(3)基準高(基準位置P0)から孔底までの高さHb
(4)基準高からトレミー管天端までの高さSt
(5)基準高からケーシング管天端までの高さSk
なお、基準高からトレミー管天端までの高さStは、トレミー管単体18の引き抜きを行う時点での高さであり、基準高からケーシング管天端までの高さSkはケーシング管単体12の引き抜きを行う時点での高さである。
(6)生コン車1台当たりのコンクリート量
(7)生コン車1台打設時のコンクリート天端上がり
以上の入力が終了すると、以下に説明するように生コン車1台分のコンクリートCの打設が完了した時点で、管理装置30による動作が開始される。
すなわち、図6(A)に示すように、ケーシング管14の押し込みが完了し、掘削孔Hの形成、スライム処理が終了すると、図6(B)に示すように、トレミー管20が掘削孔Hに挿入され、コンクリートCの打設が可能な状態に準備される。そして、図6(C)に示すように、生コン車1台分のコンクリートCがトレミー管20の上端から流し込まれ、掘削孔Hの底部にコンクリートCが打設される。
コンクリートCの打設が終了した時点で、作業者が計測画面移行用の操作ボタン120(図7)を操作することにより、管理装置30による動作が開始される。
すなわち、コンクリート天端深度測定装置36によってコンクリート天端深度Dkが検出される(ステップS14:コンクリート天端深度検出工程)。
ケーシング管下端深度検出手段40によってケーシング管下端深度Dcが検出される(ステップS16:ケーシング管下端深度検出工程)。
トレミー管下端深度算出手段42によってトレミー管下端深度Dtが算出される(ステップS18:トレミー管下端深度検出工程)。
天端低下量算出手段44によって、最上位のケーシング管単体12が引き抜かれた場合のコンクリートCの天端の低下量が算出される(ステップS20:天端低下量算出工程)。
Moreover, what is illustrated below is displayed as another parameter. These parameters are input in advance by the operator.
(1) Pile diameter of cast-in-place concrete pile 10 (2) Height Hp from top of pile (top of concrete C) to bottom of hole (bottom of excavation hole H)
(3) Height Hb from the reference height (reference position P0) to the hole bottom
(4) Height St from the reference height to the top of the Tremy tube
(5) Height Sk from the reference height to the top of the casing tube
The height St from the reference height to the top end of the tremmy tube is the height at the time when the single tremmy tube 18 is pulled out, and the height Sk from the reference height to the top end of the casing tube is the height of the casing tube single unit 12. This is the height at the time of drawing.
(6) Concrete amount per raw concrete car (7) Top of concrete when placing one raw concrete car When the above input is completed, concrete C for one raw concrete car is placed as described below When the process is completed, the operation by the management apparatus 30 is started.
That is, as shown in FIG. 6A, when the pushing of the casing pipe 14 is completed and the formation of the excavation hole H and the slime process are completed, the tremy pipe 20 is connected to the excavation hole H as shown in FIG. The concrete C is prepared so that it can be placed. Then, as shown in FIG. 6C, the concrete C for one ready-mixed car is poured from the upper end of the tremmy pipe 20, and the concrete C is placed at the bottom of the excavation hole H.
When the placement of the concrete C is completed, the operation by the management device 30 is started when the operator operates the operation button 120 (FIG. 7) for shifting the measurement screen.
That is, the concrete top end depth measuring device 36 detects the concrete top end depth Dk (step S14: concrete top end depth detecting step).
The casing tube lower end depth detection means 40 detects the casing tube lower end depth Dc (step S16: casing tube lower end depth detection step).
The tremmy tube lower end depth calculation means 42 calculates the tremy tube lower end depth Dt (step S18: tremy tube lower end depth detection step).
The top end reduction amount calculation means 44 calculates the top end reduction amount of the concrete C when the uppermost casing pipe single body 12 is pulled out (step S20: top end reduction amount calculation step).

第1の判定手段46は、コンクリート天端深度Dkと、ケーシング管下端深度Dcと、最上部のケーシング管単体12の長さとに基づいて、かつ、天端低下量算出手段44によって算出された低下量を考慮して最上部のケーシング管単体12を引き抜く作業が可能であるか否かを判定する(ステップS22:第1の判定工程)。
すなわち、第1の判定手段46は、最上部のケーシング管単体12が引き抜かれた状態で、コンクリートCの天端とケーシング管14の下端との間に予め定められた第1の距離ΔL1が確保されるという条件が成立するか否かに基づいて判定を行う。
The first determination means 46 is based on the concrete top end depth Dk, the casing pipe lower end depth Dc, and the length of the uppermost casing pipe unit 12 and is calculated by the top end reduction amount calculation means 44. In consideration of the amount, it is determined whether or not the operation of pulling out the uppermost casing pipe 12 is possible (step S22: first determination step).
That is, the first determination means 46 secures a predetermined first distance ΔL1 between the top end of the concrete C and the lower end of the casing tube 14 in a state where the uppermost casing tube 12 is pulled out. The determination is made based on whether or not the condition of being satisfied is satisfied.

第2の判定手段48は、コンクリート天端深度Dkと、トレミー管下端深度Dtと、最上部のトレミー管単体18の長さとに基づいて最上部のトレミー管単体18を引き抜く作業が可能であるか否かを判定する(ステップS24:第2の判定工程)。
すなわち、第2の判定手段48は、最上部のトレミー管単体18が引き抜かれた状態で、コンクリートCの天端とトレミー管20の下端との間に予め定められた第2の距離ΔL2が確保されるという条件が成立するか否かに基づいて判定を行う。
Is the second determination means 48 capable of pulling out the uppermost tremy tube single unit 18 based on the concrete top end depth Dk, the tremy tube lower end depth Dt, and the length of the uppermost tremy tube single unit 18? It is determined whether or not (step S24: second determination step).
That is, the second determination means 48 secures a predetermined second distance ΔL2 between the top end of the concrete C and the lower end of the tremmy pipe 20 in a state where the uppermost tremy pipe 18 is pulled out. The determination is made based on whether or not the condition of being satisfied is satisfied.

報知手段50は、ステップS22、S24の判定結果を報知する(ステップS26:報知工程)。
本実施の形態では、図8の計測画面に示すように、報知手段50は、表示欄202にケーシング管単体12の引き抜きの可否を示すメッセージを表示し、表示欄204にコンクリートCの天端とケーシング管14の下端との間の距離を表示し、表示欄206に第1の距離ΔL1を表示する。
また、報知手段50は、表示欄208にトレミー管単体18の引き抜きの可否を示すメッセージを表示し、表示欄210にコンクリートCの天端とトレミー管20の下端との間の距離を表示し、表示欄212に第2の距離ΔL2を表示する。
The notification means 50 notifies the determination results of steps S22 and S24 (step S26: notification step).
In the present embodiment, as shown in the measurement screen of FIG. 8, the notification means 50 displays a message indicating whether or not the casing tube unit 12 can be pulled out in the display column 202, and the top end of the concrete C in the display column 204. The distance from the lower end of the casing tube 14 is displayed, and the first distance ΔL1 is displayed in the display field 206.
Further, the notifying means 50 displays a message indicating whether or not the tremmy tube 18 can be pulled out in the display column 208, and displays the distance between the top end of the concrete C and the lower end of the tremy tube 20 in the display column 210, The second distance ΔL2 is displayed in the display column 212.

線図表示手段52は、図10に示すように、コンクリート天端深度Dkの時系列データと、ケーシング管下端深度Dcの時系列データと、トレミー管下端深度Dtの時系列データとを時間軸に沿ってプロットした線図を表示する(ステップS28:線図表示工程)。なお、図10で示した時系列グラフの基準は、杭の仕上がり高さを基準としている。
また、線図表示手段52による各時系列データの取り込みは、以下のように(1)主に手動操作(作業者の操作入力)によって指示される方法、(2)RFIDタグを利用して自動的に行われる方法の何れとしてもよい。
(1)手動操作による時系列データの取り込み:
すなわち、図8に示すように、ケーシング管引き抜き作業の開始時点と、ケーシング管引き抜き作業の終了時点との双方で操作ボタン220を操作することにより、線図表示手段52は、ケーシング管下端深度Dcの時系列データを取り込む。
また、トレミー管引き抜き作業の開始時点と、トレミー管引き抜き作業の終了時点との双方で操作ボタン222を操作することにより、線図表示手段52は、トレミー管下端深度Dtの時系列データを取り込む。
また、線図表示手段52は、予め定められた時間間隔でコンクリート天端深度Dkの時系列データを取り込む。
(2)RFIDタグを利用した自動的な時系列データの取り込み:
受信装置34(アンテナ3402)により、トレミー管単体12のRFIDタグ32、ケーシング管単体12のRFIDタグ33が認識された時点で時系列データの取り込みを行う。
コンクリート天端深度Dkの時系列データの取り込みは、(1)の場合と同様に、線図表示手段52が予め定められた時間間隔で実施する。
As shown in FIG. 10, the diagram display means 52 uses the time series data of the concrete top edge depth Dk, the time series data of the casing pipe lower end depth Dc, and the time series data of the tremmy pipe lower end depth Dt as time axes. The plotted diagram is displayed (step S28: diagram display step). In addition, the reference | standard of the time series graph shown in FIG. 10 is based on the finishing height of a pile.
In addition, the time series data is taken in by the diagram display means 52 as follows: (1) a method mainly instructed by manual operation (operator's operation input), and (2) automatic using an RFID tag. Any method can be used.
(1) Importing time-series data by manual operation:
That is, as shown in FIG. 8, by operating the operation button 220 at both the start time of the casing tube pulling operation and the end time of the casing tube pulling operation, the diagram display means 52 causes the casing tube lower end depth Dc. Import time-series data.
Further, by operating the operation button 222 at both the start time of the tremmy tube pulling operation and the end time of the tremmy tube pulling operation, the diagram display means 52 takes in time-series data of the tremmy tube lower end depth Dt.
Moreover, the diagram display means 52 takes in the time series data of the concrete top end depth Dk at a predetermined time interval.
(2) Automatic time-series data capture using RFID tags:
Time series data is taken in when the RFID tag 32 of the single tremmy tube 12 and the RFID tag 33 of the single casing tube 12 are recognized by the receiving device 34 (antenna 3402).
The time series data of the concrete top edge depth Dk is taken in at a predetermined time interval by the diagram display means 52 as in the case of (1).

本実施の形態では、以下のデータについても線図に記載している。
(1)ケーシング管撤去開始可能ライン:1本目のケーシング管単体12を引き抜くことが可能となるケーシング管下端深度Dcを示すライン
(2)ケーシング管撤去後のコンクリート天端許容下がりライン:ケーシング管単体12を引き抜いた場合に許容されるコンクリートCの天端の低下量を示すライン
(3)ケーシング管管理基準ライン:第1の距離ΔL1に相当するライン
(4)トレミー管管理基準ライン:第2の距離ΔL2に相当するライン
なお、本実施の形態では、図10においても、図9に示した表示欄202、204、206、208、210を表示している。
In the present embodiment, the following data is also shown in the diagram.
(1) Casing tube removal start possible line: Line indicating casing tube lower end depth Dc from which the first casing tube single body 12 can be pulled out (2) Concrete top end allowable lowering line after casing pipe removal: Casing tube single body (3) Casing pipe management reference line: line corresponding to the first distance ΔL1 (4) Tremy pipe management reference line: second The line corresponding to the distance ΔL2 In the present embodiment, the display fields 202, 204, 206, 208, and 210 shown in FIG. 9 are also displayed in FIG.

作業者は、ステップS26の報知結果に基づいて、ケーシング管単体12およびトレミー管単体18の引き抜き作業を実施するか否かを判断する(ステップS30)。
引き抜き作業が可能であると判断したならば、図6(D)に示すように、ケーシング管単体12およびトレミー管単体18のうち引き抜き作業が可能なものについて引き抜き作業を実施する(ステップS32)。
具体的には、ケーシング管単体12の引き抜き作業は、押し込み引き抜き装置2(図1)を用いて実施され、トレミー管単体18の引き抜き作業は、クローラクレーン4B(図1)を用いて実施される。
Based on the notification result of step S26, the operator determines whether or not to perform the pulling-out operation of the casing tube unit 12 and the tremy tube unit 18 (step S30).
If it is determined that the drawing work can be performed, as shown in FIG. 6D, the drawing work is performed on the casing pipe 12 and the tremy pipe 18 that can be drawn (step S32).
Specifically, the pull-out operation of the casing tube single body 12 is performed using the push-in / pull-out device 2 (FIG. 1), and the pull-out operation of the tremy tube single body 18 is performed using the crawler crane 4B (FIG. 1). .

次に、作業者は、全てのケーシング管単体12および全てのトレミー管単体18の引き抜き作業が完了したか否かを判定する(ステップS34)。
ステップS34の判定結果が否定ならば、ステップS14に戻る。
一方、ステップS30で引き抜き作業ができないと判断したならば、コンクリートCの打設作業を実施し(ステップS36)、ステップS14に戻り、同様の処理を繰り返して実施する。
この結果、図6(E)、(F)に示すように、コンクリートCの打設と、ケーシング管単体12およびトレミー管単体18の引き抜き作業とが交互に実施され、やがて、全てのケーシング管単体12およびトレミー管単体18の引き抜き作業が完了すると、ステップS34の判定結果が肯定となり、一連の作業が終了する。
Next, the operator determines whether or not all the casing pipes 12 and all the tremmy pipes 18 have been pulled out (step S34).
If the determination result of step S34 is negative, the process returns to step S14.
On the other hand, if it is determined in step S30 that the drawing operation cannot be performed, a concrete C placing operation is performed (step S36), the process returns to step S14, and the same process is repeated.
As a result, as shown in FIGS. 6 (E) and 6 (F), the placement of the concrete C and the drawing operation of the casing pipe single body 12 and the tremy pipe single body 18 are alternately performed, and eventually all the casing pipe single bodies are performed. When the pulling operation of 12 and the single tremmy tube 18 is completed, the determination result in step S34 is affirmative, and the series of operations is completed.

なお、図8に示すように計測動作時における表示画面には、CPU3802の動作により、以下に示すパラメータが表示される。
(1)コンクリート天端実測値:コンクリート天端深度計測装置36によって検出されたコンクリート天端深度Dkが表示される。
(2)残り打設深さ:現時点でのコンクリートCの天端から場所打ちコンクリート杭10の完成時におけるコンクリートCの天端(杭天端)までの距離
(3)残り打設量:現時点から場所打ちコンクリート杭10が完成するまでに必要なコンクリートCの打設量
(4)打設済みコンクリート量:現時点までに打設されたコンクリートCの量
(5)ケーシング管の引き抜き完了本数:現時点までに引き抜きが終了したケーシング管単体12の数
(6)トレミー管の引き抜き完了本数:現時点までに引き抜きが終了したトレミー管単体18の数
また、図8には、置数キー(テンキー)230と、数値入力欄232とが表示されている。
これら置数キー230、数値入力欄232は、コンクリート天端深度計測装置36を用いる代わりに手作業で測定したコンクリート天端深度Dkの値を入力するためのものである。
この場合、先端に錘を付けた巻尺を用意し、錘を地上からコンクリートCの天端に設置したときのコンクリートCの天端から基準位置P0までの距離をコンクリート天端深度Dkとして測定する。
As shown in FIG. 8, the following parameters are displayed on the display screen during the measurement operation by the operation of the CPU 3802.
(1) Concrete top edge measured value: The concrete top edge depth Dk detected by the concrete top edge depth measuring device 36 is displayed.
(2) Remaining placement depth: Distance from the top of concrete C at the current time to the top of concrete C at the time of completion of cast-in-place concrete pile 10 (3) Remaining placement: Cast in from the present Amount of concrete C required to complete the concrete pile 10 (4) Amount of concrete already placed: Amount of concrete C placed so far (5) Number of casing pipes drawn: Number of concrete pipes drawn up to the present (6) Number of tremely tubes drawn out: Number of tremely tubes 18 that have been drawn up to the present time Also, FIG. 8 shows a numeric key (230) and numeric input. A column 232 is displayed.
The numeric keys 230 and the numerical value input field 232 are for inputting the value of the concrete top end depth Dk measured manually instead of using the concrete top end depth measuring device 36.
In this case, a tape measure with a weight attached to the tip is prepared, and the distance from the top of the concrete C to the reference position P0 when the weight is installed from the ground to the top of the concrete C is measured as the concrete top edge depth Dk.

また、図9に示すように、入力・計測ミスを確認することと、施工に関わる異常時のチェックを目的にコンクリートの打設量に応じたコンクリート天端深度Dkの上昇値を示す表示欄302を表示させてもよい。
この場合、図8に示すコンクリートの打設終了を指示する打設終了ボタン240を操作すると、予め定められた量のコンクリート(例えば、予め定められた生コン車1台分のコンクリート)が打設された場合のコンクリート天端深度Dkの上昇値が表示される。
なお、図8の入力やり直しボタン304は、コンクリート天端深度Dkを再度、手作業によってし直す場合に操作することで、表示欄302の表示数値をクリアさせるものである。
また、一時停止ボタン306は、値が正しいときにコンクリートの打設を一時停止するものであり、終了ボタン308は、値が正しいときにコンクリートの打設を終了するときに操作することで、次の作業選択へ進めるものである。
Further, as shown in FIG. 9, a display field 302 showing an increase value of the concrete top end depth Dk corresponding to the amount of concrete placement for the purpose of confirming an input / measurement error and checking for abnormalities related to construction. May be displayed.
In this case, when a placement end button 240 for instructing the finish of concrete placement shown in FIG. 8 is operated, a predetermined amount of concrete (for example, a predetermined concrete for one ready-mixed car) is placed. The rise value of the concrete top edge depth Dk is displayed.
The input redo button 304 in FIG. 8 is used to clear the display numerical value in the display column 302 by operating when the concrete top edge depth Dk is again manually.
The pause button 306 is used to pause the concrete placement when the value is correct, and the end button 308 is operated when the concrete placement is finished when the value is correct. To proceed to work selection.

以上説明したように本実施の形態によれば、ケーシング管下端深度Dc、トレミー管下端深度Dt、コンクリート天端深度Dkをそれぞれ検出し、コンクリート天端深度Dkと、ケーシング管下端深度Dcと、最上部のケーシング管単体12の長さとに基づいて最上部のケーシング管単体12を引き抜く作業が可能であるか否かを判定し、コンクリート天端深度Dkと、トレミー管下端深度Dtと、最上部のトレミー管単体18の長さとに基づいて最上部のトレミー管単体18を引き抜く作業が可能であるか否かを判定し、それら判定結果を報知するようにした。
したがって、報知結果に基づいてケーシング管14、トレミー管20の引き抜き作業を行えばよく、手作業によるコンクリート天端の計測作業やケーシング管14、トレミー管20の位置の推定が不要となることから、ケーシング管14、トレミー管20の引き抜き作業の合理化を図れ、ひいては場所打ちコンクリート杭の施工の合理化、品質確保を図る上で有利となる。
As described above, according to the present embodiment, the casing pipe lower end depth Dc, the tremy pipe lower end depth Dt, and the concrete top end depth Dk are detected, respectively, and the concrete top end depth Dk, the casing pipe lower end depth Dc, Based on the length of the upper casing tube 12, it is determined whether or not the operation of pulling out the uppermost casing tube 12 is possible. The concrete top end depth Dk, the tremy tube lower end depth Dt, Based on the length of the single tremmy tube 18, it is determined whether or not the work of pulling out the uppermost tremy tube 18 is possible, and the determination result is notified.
Therefore, it is only necessary to pull out the casing tube 14 and the tremy tube 20 based on the notification result, and it is unnecessary to manually measure the top of the concrete and estimate the positions of the casing tube 14 and the tremy tube 20. This makes it possible to rationalize the work of pulling out the casing pipe 14 and the tremy pipe 20, and is advantageous in streamlining the construction of cast-in-place concrete piles and ensuring the quality.

また、本実施の形態では、最上部のケーシング管単体12を引き抜く作業が可能であるか否かの判定を、ケーシング管14が最上部のケーシング管単体の長さ分引き抜かれた状態で、コンクリートCの天端とケーシング管14の下端との間に予め定められた第1の距離ΔL1が確保されるという条件が成立するか否かに基づいて行うようにした。
したがって、第1の距離ΔL1を確実に確保できることから掘削孔Hの壁面をコンクリートCで安定して支持し、所定の形状の場所打ちコンクリート杭を精度良く構築する上で有利となる。
Further, in the present embodiment, it is determined whether or not the operation of pulling out the uppermost casing pipe 12 is possible in a state where the casing pipe 14 is pulled out by the length of the uppermost casing pipe alone. The determination is made based on whether or not a condition that a predetermined first distance ΔL1 is ensured between the top end of C and the lower end of the casing tube 14 is satisfied.
Therefore, since the first distance ΔL1 can be surely secured, it is advantageous in stably supporting the wall surface of the excavation hole H with the concrete C and accurately constructing a cast-in-place concrete pile having a predetermined shape.

また、本実施の形態では、ケーシング管14が、打設されたコンクリートCから最上部ケーシング管単体12の長さ分引き抜かれることによって生じるコンクリートCの天端が低下する低下量を算出し、この低下量を考慮して最上部のケーシング管単体12を引き抜く作業が可能であるか否かの判定を行うようにしたので、判定を的確に行う上で有利となる。   Further, in the present embodiment, the amount of decrease in which the top end of the concrete C that is generated when the casing pipe 14 is pulled out of the placed concrete C by the length of the uppermost casing pipe 12 is calculated. Since it is determined whether or not the work of pulling out the uppermost casing pipe single body 12 is possible in consideration of the amount of decrease, it is advantageous in accurately performing the determination.

また、本実施の形態では、最上部のトレミー管単体18を引き抜く作業が可能であるか否かの判定を、トレミー管20が最上部トレミー管単体18の長さ分引き抜かれた状態で、コンクリートCの天端とトレミー管20の下端との間に予め定められた第2の距離ΔL2が確保されるという条件が成立するか否かに基づいて行うようにした。
したがって、第2の距離ΔL2を確実に確保できることから、トレミー管20の下部を打設されたコンクリートCに確実に埋設しつつ打設することができ、コンクリートCの打設を安定し、かつコンクリートに地下水または泥水を巻き込まないよう場所打ちコンクリート杭を構築する上で有利となる。
Further, in the present embodiment, it is determined whether or not the operation of pulling out the uppermost tremy pipe single unit 18 is possible, with the tremy pipe 20 being pulled out by the length of the uppermost tremy pipe single unit 18 in the concrete. The determination is made based on whether or not a condition that a predetermined second distance ΔL2 is ensured between the top of C and the lower end of the tremmy tube 20 is established.
Therefore, since the second distance ΔL2 can be reliably ensured, the lower portion of the tremmy pipe 20 can be placed while being securely embedded in the placed concrete C, and the placement of the concrete C can be stabilized and the concrete can be placed. It is advantageous in constructing cast-in-place concrete piles so as not to involve groundwater or muddy water.

また、本実施の形態では、コンクリート天端深度Dkの時系列データと、ケーシング管下端深度Dcの時系列データと、トレミー管下端深度Dtの時系列データとを時間軸に沿ってプロットした線図を表示するようにしたので、各データを即座に把握でき、施工管理を的確に行う上で有利となる。   In the present embodiment, the time series data of the concrete top end depth Dk, the time series data of the casing pipe lower end depth Dc, and the time series data of the tremey pipe lower end depth Dt are plotted along the time axis. Is displayed, so that each data can be immediately grasped, which is advantageous in accurately performing construction management.

また、本実施の形態では、各トレミー管単体18に取着されたRFIDタグ32と、RFIDタグ32からIDデータを読み出す受信装置34と、IDデータとトレミー管単体18の長さとを対応付けて格納するデータテーブルとを用いてトレミー管下端深度Dtの検出を自動で行うようにした。
したがって、RFIDタグ32を利用することにより自動でトレミー管下端深度Dtの検出を行うことができ、管理装置30の構成の簡素化、低コスト化を図る上で有利となる。
Further, in the present embodiment, the RFID tag 32 attached to each tremely tube single unit 18, the receiving device 34 that reads ID data from the RFID tag 32, and the ID data and the length of the tremey tube single unit 18 are associated with each other. The treme tube lower end depth Dt is automatically detected using the stored data table.
Therefore, by using the RFID tag 32, the treme tube lower end depth Dt can be automatically detected, which is advantageous in simplifying the configuration of the management device 30 and reducing the cost.

C……コンクリート、G……地盤、H……掘削孔、10……場所打ちコンクリート杭、12……ケーシング管単体、14……ケーシング管、16……鉄筋かご、18……トレミー管単体、20……トレミー管、30……管理装置、32、33……RFIDタグ、34……受信装置、36……コンクリート天端深度測定装置(コンクリート天端深度検出手段)、38……コンピュータ、40……ケーシング管下端深度検出手段、42……トレミー管下端深度算出手段、44……天端低下量算出手段、46……第1の判定手段、48……第2の判定手段、50……報知手段、52……線図表示手段。   C: Concrete, G: Ground, H: Drilling hole, 10: Cast-in-place concrete pile, 12: Casing tube, 14: Casing tube, 16: Reinforcing bar, 18 ... Tremy tube, 20 ... Tremy tube, 30 ... Management device, 32, 33 ... RFID tag, 34 ... Receiving device, 36 ... Concrete top end depth measuring device (concrete top end depth detecting means), 38 ... Computer, 40 ... casing pipe lower end depth detecting means, 42 ... tremy pipe lower end depth calculating means, 44 ... top end drop amount calculating means, 46 ... first determining means, 48 ... second determining means, 50 ... Notification means, 52... Diagram display means.

Claims (7)

複数のケーシング管単体が長手方向に接続されたケーシング管を地中に押し込み、前記ケーシング管の内部の土砂を掘削排出して掘削孔を形成した後、複数のトレミー管単体が長手方向に接続されたトレミー管を前記掘削孔に挿入し、前記トレミー管で前記掘削孔にコンクリートを打設し、前記コンクリートの打設後、前記ケーシング管および前記トレミー管を引き抜く場所打ちコンクリート杭の構築工法における管理方法であって、
前記コンクリートの打設後、前記ケーシング管および前記トレミー管を引き抜くことに先立って、予め定められた基準位置から前記掘削孔に打設された前記コンクリートの天端までの距離であるコンクリート天端深さを検出するコンクリート天端深度検出工程と、
前記基準位置から前記ケーシング管の下端までの距離であるケーシング管下端深度を検出するケーシング管下端深度検出工程と、
前記基準位置から前記トレミー管の下端までの距離であるトレミー管下端深度を検出するトレミー管下端深度検出工程と、
前記コンクリート天端深度と、前記ケーシング管下端深度と、前記ケーシング管のうち最も上部に位置する最上部ケーシング管単体の長さとに基づいて前記最上部ケーシング管単体を引き抜く作業が可能であるか否かを判定する第1の判定工程と、
前記コンクリート天端深度と、前記トレミー管下端深度と、前記トレミー管のうち最も上部に位置する最上部トレミー管単体の長さとに基づいて前記最上部トレミー管単体を引き抜く作業が可能であるか否かを判定する第2の判定工程と、
前記第1、第2の判定工程の判定結果を報知する報知工程と、
を含むことを特徴とする場所打ちコンクリート杭の構築工法における管理方法。
After pushing the casing pipe in which a plurality of single casing pipes are connected in the longitudinal direction into the ground and excavating and discharging the earth and sand inside the casing pipe to form excavation holes, the plurality of single tremmy pipes are connected in the longitudinal direction. In the construction method of the cast-in-place concrete pile, the inserted tremely pipe is inserted into the excavation hole, concrete is placed in the excavation hole with the tremey pipe, and the casing pipe and the tremey pipe are pulled out after the concrete is placed. A method,
After the casting of the concrete, prior to pulling out the casing tube and the tremy tube, the concrete top end depth is a distance from a predetermined reference position to the top end of the concrete placed in the excavation hole. A concrete top end depth detecting step for detecting the thickness;
A casing pipe lower end depth detecting step for detecting a casing pipe lower end depth which is a distance from the reference position to a lower end of the casing pipe;
A tremmy tube lower end depth detection step of detecting a tremey tube lower end depth which is a distance from the reference position to a lower end of the tremy tube;
Whether or not the operation of pulling out the uppermost casing pipe alone is possible based on the concrete top end depth, the casing pipe lower end depth, and the length of the uppermost casing pipe alone located in the uppermost part of the casing pipes. A first determination step of determining whether or not
Whether or not it is possible to pull out the uppermost tremy tube alone based on the concrete top end depth, the lower end depth of the tremmy tube, and the length of the uppermost tremy tube located at the top of the tremy tube A second determination step for determining whether or not
A notification step of notifying the determination results of the first and second determination steps;
Management method in construction method of cast-in-place concrete pile characterized by including
複数のケーシング管単体が長手方向に接続されたケーシング管を地中に押し込み、前記ケーシング管の内部の土砂を掘削排出して掘削孔を形成した後、複数のトレミー管単体が長手方向に接続されたトレミー管を前記掘削孔に挿入し、前記トレミー管で前記掘削孔にコンクリートを打設し、前記コンクリートの打設後、前記ケーシング管および前記トレミー管を引き抜く場所打ちコンクリート杭の構築工法における管理装置であって、
前記コンクリートの打設後、前記ケーシング管および前記トレミー管を引き抜くことに先立って、予め定められた基準位置から前記掘削孔に打設された前記コンクリートの天端までの距離であるコンクリート天端深さを検出するコンクリート天端深度検出手段と、
前記基準位置から前記ケーシング管の下端までの距離であるケーシング管下端深度を検出するケーシング管下端深度検出手段と、
前記基準位置から前記トレミー管の下端までの距離であるトレミー管下端深度を検出するトレミー管下端深度検出手段と、
前記コンクリート天端深度と、前記ケーシング管下端深度と、前記ケーシング管のうち最も上部に位置する最上部ケーシング管単体の長さとに基づいて前記最上部ケーシング管単体を引き抜く作業が可能であるか否かを判定する第1の判定手段と、
前記コンクリート天端深度と、前記トレミー管下端深度と、前記トレミー管のうち最も上部に位置する最上部トレミー管単体の長さとに基づいて前記最上部トレミー管単体を引き抜く作業が可能であるか否かを判定する第2の判定手段と、
前記第1、第2の判定手段の判定結果を報知する報知手段と、
を含むことを特徴とする場所打ちコンクリート杭の構築工法における管理装置。
After pushing the casing pipe in which a plurality of single casing pipes are connected in the longitudinal direction into the ground and excavating and discharging the earth and sand inside the casing pipe to form excavation holes, the plurality of single tremmy pipes are connected in the longitudinal direction. In the construction method of the cast-in-place concrete pile, the inserted tremely pipe is inserted into the excavation hole, concrete is placed in the excavation hole with the tremey pipe, and the casing pipe and the tremey pipe are pulled out after the concrete is placed. A device,
After the casting of the concrete, prior to pulling out the casing tube and the tremy tube, the concrete top end depth is a distance from a predetermined reference position to the top end of the concrete placed in the excavation hole. A concrete crest depth detecting means for detecting the thickness,
A casing pipe lower end depth detecting means for detecting a casing pipe lower end depth which is a distance from the reference position to the lower end of the casing pipe;
Treme tube lower end depth detection means for detecting a tremy tube lower end depth which is a distance from the reference position to the lower end of the treme tube;
Whether or not the operation of pulling out the uppermost casing pipe alone is possible based on the concrete top end depth, the casing pipe lower end depth, and the length of the uppermost casing pipe alone located in the uppermost part of the casing pipes. First determination means for determining whether or not
Whether or not it is possible to pull out the uppermost tremy tube alone based on the concrete top end depth, the lower end depth of the tremmy tube, and the length of the uppermost tremy tube located at the top of the tremy tube Second determination means for determining whether or not
An informing means for informing a judgment result of the first and second judging means;
A management device in the construction method of cast-in-place concrete piles characterized by including
前記第1の判定手段による判定は、前記ケーシング管が前記最上部ケーシング管単体の長さ分引き抜かれた状態で、前記コンクリートの天端と前記ケーシング管の下端との間に予め定められた第1の距離が確保されるという条件が成立するか否かに基づいてなされる、
ことを特徴とする請求項2記載の場所打ちコンクリート杭の構築工法における管理装置。
The determination by the first determination means is performed in a state in which the casing pipe is pulled out by the length of the uppermost casing pipe alone and is predetermined between the top end of the concrete and the lower end of the casing pipe. Based on whether the condition that the distance of 1 is secured is satisfied,
The management apparatus in the construction method of the cast-in-place concrete pile of Claim 2 characterized by the above-mentioned.
前記ケーシング管が前記打設されたコンクリートから前記最上部ケーシング管単体の長さ分引き抜かれることによって生じる前記コンクリートの天端が低下する低下量を算出する天端低下量算出手段をさらに含み、
前記第1の判定手段は、前記低下量を考慮して前記判定を行う、
ことを特徴とする請求項3記載の場所打ちコンクリート杭の構築工法における管理装置。
Further comprising a top edge reduction amount calculating means for calculating a reduction amount by which the top edge of the concrete is lowered when the casing pipe is pulled out from the placed concrete by the length of the uppermost casing pipe alone;
The first determination means performs the determination in consideration of the amount of decrease;
The management apparatus in the construction method of the cast-in-place concrete pile of Claim 3 characterized by the above-mentioned.
前記第2の判定手段による判定は、前記トレミー管が前記最上部トレミー管体の長さ分引き抜かれた状態で、前記コンクリートの天端と前記トレミー管の下端との間に予め定められた第2の距離が確保されるという条件が成立するか否かに基づいてなされる、
ことを特徴とする請求項2乃至4に何れか1項記載の場所打ちコンクリート杭の構築工法における管理装置。
The determination by the second determination means is performed in a state in which the tremmy tube is pulled out by the length of the uppermost tremy tube, and is determined in advance between the top end of the concrete and the lower end of the tremy tube. Based on whether the condition that the distance of 2 is secured is satisfied,
The management apparatus in the construction method of the cast-in-place concrete pile of any one of Claims 2 thru | or 4 characterized by the above-mentioned.
前記コンクリート天端深度の時系列データと、前記ケーシング管下端深度の時系列データと、前記トレミー管下端深度の時系列データとを時間軸に沿ってプロットした線図を表示する線図表示手段をさらに含む、
ことを特徴とする請求項2乃至5に何れか1項記載の場所打ちコンクリート杭の構築工法における管理装置。
A diagram display means for displaying a diagram in which the time series data of the concrete top end depth, the time series data of the casing pipe lower end depth, and the time series data of the tremy tube lower end depth are plotted along the time axis; In addition,
The management apparatus in the construction method of the cast-in-place concrete pile of any one of Claim 2 thru | or 5 characterized by the above-mentioned.
前記トレミー管下端深度検出手段は、前記各トレミー管単体に取着されトレミー管単体を識別するためのIDデータを保持するRFタグと、予め定められた位置に設置され前記RFタグと通信を行うアンテナと、前記アンテナを介して前記RFタグからIDデータを読み出す受信装置と、前記IDデータと前記トレミー管単体の長さとを対応付けて格納するデータテーブルとを備え、
前記トレミー管下端深度検出手段による前記トレミー管下端深度の検出は、前記IDデータに基づいて前記データテーブルから読み出した前記トレミー管単体の長さから算出することでなされる、
ことを特徴とする請求項2乃至6に何れか1項記載の場所打ちコンクリート杭の構築工法における管理装置。
The treme tube lower end depth detection means is attached to each treme tube single unit and holds an RF tag holding ID data for identifying the treme tube single unit, and is installed at a predetermined position to communicate with the RF tag. An antenna, a receiving device that reads ID data from the RF tag via the antenna, and a data table that stores the ID data and the length of the single tremmy tube in association with each other,
Detection of the lower end depth of the tremmy tube by the lower end depth detecting unit of the tremmy tube is performed by calculating from the length of the single tremy tube read from the data table based on the ID data.
The management apparatus in the construction method of the cast-in-place concrete pile of any one of Claims 2 thru | or 6 characterized by the above-mentioned.
JP2011155562A 2011-07-14 2011-07-14 Management method and management device in construction method of cast-in-place concrete pile Active JP5758219B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011155562A JP5758219B2 (en) 2011-07-14 2011-07-14 Management method and management device in construction method of cast-in-place concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011155562A JP5758219B2 (en) 2011-07-14 2011-07-14 Management method and management device in construction method of cast-in-place concrete pile

Publications (2)

Publication Number Publication Date
JP2013019241A true JP2013019241A (en) 2013-01-31
JP5758219B2 JP5758219B2 (en) 2015-08-05

Family

ID=47690926

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011155562A Active JP5758219B2 (en) 2011-07-14 2011-07-14 Management method and management device in construction method of cast-in-place concrete pile

Country Status (1)

Country Link
JP (1) JP5758219B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6013674B1 (en) * 2016-04-15 2016-10-25 五洋建設株式会社 Granular material detection device and mound construction method
JP7304465B1 (en) 2022-07-20 2023-07-06 東急建設株式会社 How to measure the crown height of concrete
CN117868779A (en) * 2023-11-20 2024-04-12 中交第二航务工程局有限公司 Digital construction control method for bored pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08177044A (en) * 1994-12-21 1996-07-09 Ando Corp Constructing method of cast-in-place concrete pile and form device for molding pile head used for constructing method
JP2005273411A (en) * 2004-03-26 2005-10-06 Okumura Corp Method for preparing in-place concrete pile
JP2006309410A (en) * 2005-04-27 2006-11-09 Ohbayashi Corp Casting status monitoring method, casting status monitoring device, casting status monitoring program, and mold form
JP2008013999A (en) * 2006-07-05 2008-01-24 Riyouken Kiso Kk Construction method of cast-in-place concrete pile
JP2010084365A (en) * 2008-09-30 2010-04-15 Electric Power Dev Co Ltd Filling material placing method and placing apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08177044A (en) * 1994-12-21 1996-07-09 Ando Corp Constructing method of cast-in-place concrete pile and form device for molding pile head used for constructing method
JP2005273411A (en) * 2004-03-26 2005-10-06 Okumura Corp Method for preparing in-place concrete pile
JP2006309410A (en) * 2005-04-27 2006-11-09 Ohbayashi Corp Casting status monitoring method, casting status monitoring device, casting status monitoring program, and mold form
JP2008013999A (en) * 2006-07-05 2008-01-24 Riyouken Kiso Kk Construction method of cast-in-place concrete pile
JP2010084365A (en) * 2008-09-30 2010-04-15 Electric Power Dev Co Ltd Filling material placing method and placing apparatus

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6013674B1 (en) * 2016-04-15 2016-10-25 五洋建設株式会社 Granular material detection device and mound construction method
JP7304465B1 (en) 2022-07-20 2023-07-06 東急建設株式会社 How to measure the crown height of concrete
JP2024013643A (en) * 2022-07-20 2024-02-01 東急建設株式会社 Measurement method of upper surface height of concrete
CN117868779A (en) * 2023-11-20 2024-04-12 中交第二航务工程局有限公司 Digital construction control method for bored pile

Also Published As

Publication number Publication date
JP5758219B2 (en) 2015-08-05

Similar Documents

Publication Publication Date Title
JP5758219B2 (en) Management method and management device in construction method of cast-in-place concrete pile
JP5860185B1 (en) Caisson construction management device and caisson construction method
JP5819152B2 (en) Support layer arrival estimation method and support layer arrival estimation support device used in pile embedding method
JP2010261298A (en) Management system and method of finished shape
US6574893B2 (en) Method and system for supporting construction of underground continuous wall and excavator therefor
JP2014181526A (en) High pressure injection stirring apparatus and ground pressure measuring method
JP5918435B1 (en) Pile construction management method
JP5015551B2 (en) Quality check method for improved ground and quality check equipment
JP5719672B2 (en) Time management system for concrete placement and its time management method
JP2019073941A (en) Management method of construction of soil improvement body
JP4340209B2 (en) Pile driver depth measuring device
JP2006348592A (en) Pile core control tool, and pile core control method using pile core control tool
JP2008038394A (en) Work control apparatus for pile driver and work execution method
JP5745663B1 (en) Slant pile withdrawal assist device
JP7238484B2 (en) Concrete placement management method
JP2018062738A (en) Dynamic load test apparatus and method of determining bearing capacity of foundation at excavation tip of concrete pile cast in place using thereof
JP4757889B2 (en) Excavation data management system in the all casing method
JPH06128957A (en) Measuring equipment for top end of placed concrete
JP2021181683A (en) Installation management system and installation managing method
JP3811757B2 (en) Construction support method for underground continuous wall construction, excavator used therefor, and construction support system
JP2003138874A (en) Cycle time measuring method in tunnel construction
JP6858385B1 (en) Ground improvement method construction data display system
JP3744887B2 (en) How to excavate the ground
JP2012046961A (en) Pile erection management device and program
JP2007092385A (en) Construction management system for tubing apparatus

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140605

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150210

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150326

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150602

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150603

R150 Certificate of patent or registration of utility model

Ref document number: 5758219

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250