JP2012144920A - Construction method for replacing railway viaduct column - Google Patents

Construction method for replacing railway viaduct column Download PDF

Info

Publication number
JP2012144920A
JP2012144920A JP2011004656A JP2011004656A JP2012144920A JP 2012144920 A JP2012144920 A JP 2012144920A JP 2011004656 A JP2011004656 A JP 2011004656A JP 2011004656 A JP2011004656 A JP 2011004656A JP 2012144920 A JP2012144920 A JP 2012144920A
Authority
JP
Japan
Prior art keywords
railway viaduct
plastic hinge
column
railway
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011004656A
Other languages
Japanese (ja)
Other versions
JP5714337B2 (en
Inventor
Tatsuya Nihei
達也 仁平
Mitsuo Kyono
光男 京野
Masaru Okamoto
大 岡本
Yukihiro Tanimura
幸裕 谷村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
Original Assignee
Railway Technical Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute filed Critical Railway Technical Research Institute
Priority to JP2011004656A priority Critical patent/JP5714337B2/en
Publication of JP2012144920A publication Critical patent/JP2012144920A/en
Application granted granted Critical
Publication of JP5714337B2 publication Critical patent/JP5714337B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a construction method for replacing a railway viaduct column, which enables a space under a viaduct to be widened concurrently with the replacement of the railway viaduct column.SOLUTION: In a construction method for replacing a railway viaduct column, plastic hinge sections 2 and 2' of an existing railway viaduct column 1 and the column 1 are removed; drilled holes 5 and 5' are formed at positions to newly serve as plastic hinge sections; a protective cap (on the base side of the railway viaduct column) 6 for the plastic hinge section is installed; axial reinforcements 7 and 7' are inserted into the drilled holes 5 and 5' and fixed by being filled with pieces 8 and 8' of mortar; joints 9 are disposed at the leading ends of the opposed axial reinforcements 7 and 7'; hoop ties 10 are installed on the axial reinforcements 7 and 7'; the protective cap (on the web structure side of the railway viaduct column) 6 for the plastic hinge section is shifted to a position of the joint 9; and concrete 12 and 12' is poured on the axial reinforcements 7 and 7' where the hoop ties 10 are installed.

Description

本発明は、鉄道高架橋柱の取り換え工法に係り、特に、震害などで損傷した柱だけでなく、健全な柱に対しても適用できる既設RC(鉄筋コンクリート:Reinforced Concrete)ラーメン高架橋柱の取り換え工法に関するものである。   The present invention relates to a method for replacing a railway viaduct column, and more particularly, to a method for replacing an existing RC (Reinforced Concrete) ramen viaduct column that can be applied not only to a column damaged due to earthquake damage, but also to a healthy column. Is.

従来、橋脚の補強方法としては、例えば、橋脚の周囲に全体的に鉄筋が入った鉄筋コンクリート構造を形成するようにしたものがある(下記特許文献1参照)。
また、橋脚の建て替え工法では、図2に示すように、建て替え対象となる既存の橋脚101に隣接した位置に、当該既存の橋脚101を挟み込むように、橋軸方向両側に新規橋脚102,103を建て、それらの新規橋脚102,103によって主桁105及び床版106からなる橋梁の上部構造体104が支持される状態とした後に、既存の橋脚101を撤去するようにしていた(下記特許文献2参照)。
Conventionally, as a method for reinforcing a bridge pier, for example, there is a method in which a reinforced concrete structure in which a reinforcing bar is entirely contained around the pier is formed (see Patent Document 1 below).
In the pier rebuilding method, as shown in FIG. 2, new piers 102 and 103 are provided on both sides of the bridge axis direction so as to sandwich the existing pier 101 at a position adjacent to the existing pier 101 to be rebuilt. After the building and the new bridge piers 102 and 103 support the bridge upper structure 104 including the main girder 105 and the floor slab 106, the existing pier 101 is removed (Patent Document 2 below). reference).

特開2007−177492号公報JP 2007-177492 A 特開2008−303698号公報JP 2008-303698 A

鉄道高架橋柱が震害などにより損傷を受けた場合、これまでの高架橋柱の取り換え工法では、軸方向鉄筋を曲げ戻して、鋼板を巻き立てる工法などを用いていた。また、既設高架橋柱は駅部幅が大きいものが多く、これまでの高架橋柱の取り換え工法では、新しい柱の幅を既存の柱の幅より小さくして高架橋柱間の空間拡幅を行うことが難しかった。仮に柱の幅を小さくした場合には、本設構造物として十分な耐力を得ることができる高架橋柱の取り換え工法とならない可能性があった。   When a railway viaduct column is damaged due to earthquake damage or the like, the conventional method for replacing a viaduct column has been to use a method in which the steel bars are rolled up by bending back the axial rebar. In addition, many existing viaduct columns have a large station width, and it has been difficult to expand the space between viaduct columns by replacing the existing viaduct columns with a new column width smaller than that of existing columns. It was. If the width of the column is reduced, there is a possibility that it will not be a method for replacing a viaduct column that can provide sufficient proof stress as a permanent structure.

本発明は、上記状況に鑑みて、震害などで損傷した鉄道高架橋柱の取り換えと同時に高架橋下の空間拡幅を行うことができる、鉄道高架橋柱の取り換え工法を提供することを目的とする。   In view of the above situation, an object of the present invention is to provide a method for replacing a railway viaduct column that can perform space widening under the viaduct simultaneously with replacement of a railway viaduct column damaged by an earthquake or the like.

本発明は、上記目的を達成するために、
〔1〕鉄道高架橋柱の取り換え工法において、既設鉄道高架橋柱の塑性ヒンジ区間及び柱を取り除き、新たに塑性ヒンジ区間となる位置に削孔を形成し、塑性ヒンジ区間保護キャップ(前記鉄道高架橋柱の基台側)を設置し、前記削孔に軸方向鉄筋を挿入し、モルタルを充填して固定し、対向する前記軸方向鉄筋の先端部に継手を配置し、前記軸方向鉄筋に帯鉄筋を設置し、前記継手位置に前記塑性ヒンジ区間保護キャップ(前記鉄道高架橋柱のウエブ構造体側)を移動し、前記帯鉄筋を設置した前記軸方向鉄筋にコンクリートを打設することで新たな鉄道高架橋柱への取り換えを行うことを特徴とする。
In order to achieve the above object, the present invention provides
[1] In the method of replacing a railway viaduct column, the plastic hinge section and column of the existing railway viaduct column are removed, a drill hole is newly formed at a position that becomes a plastic hinge section, and a plastic hinge section protection cap (the railroad viaduct column Base side), insert an axial rebar into the drilling hole, fill with mortar and fix it, place a joint at the tip of the opposing axial rebar, and place a rebar on the axial rebar Installed, moved the plastic hinge section protection cap (on the web structure side of the railway viaduct column) to the joint position, and placed concrete on the axial rebar where the strip reinforcement was installed, thereby creating a new railway viaduct pillar It is characterized in that the replacement is performed.

〔2〕上記〔1〕記載の鉄道高架橋柱の取り換え工法において、前記コンクリートの打設幅を前記塑性ヒンジ区間の幅より狭くし、前記新たな鉄道高架橋柱間の空間拡幅を行うことを特徴とする。
〔3〕上記〔1〕又は〔2〕記載の鉄道高架橋柱の取り換え工法において、前記塑性ヒンジ保護キャップが鋼板または超高強度繊維補強コンクリートからなることを特徴とする。
[2] In the method for replacing a railway viaduct column described in [1] above, the concrete placement width is narrower than the width of the plastic hinge section, and the space between the new railway viaduct columns is widened. To do.
[3] In the method for replacing a railway viaduct column described in [1] or [2] above, the plastic hinge protection cap is made of a steel plate or ultra high strength fiber reinforced concrete.

〔4〕上記〔1〕又は〔2〕記載の鉄道高架橋柱の取り換え工法において、前記継手が重ね継手又は機械式継手であることを特徴とする。   [4] In the method for replacing a railway viaduct column according to the above [1] or [2], the joint is a lap joint or a mechanical joint.

本発明によれば、震害などによる既設鉄道高架橋柱の塑性ヒンジ区間の鉄筋の損傷の有無にかかわらず、適用可能な鉄道高架橋柱の取り換え工法を提供することができる。また、鉄道高架橋下の空間を拡幅することができ、その空間の有効利用に資することができる。加えて、鉄道高架橋柱の性能向上を図ることができる。   ADVANTAGE OF THE INVENTION According to this invention, the replacement construction method of a railway viaduct pillar applicable can be provided irrespective of the presence or absence of the damage of the reinforcing bar of the plastic hinge area of the existing railway viaduct pillar by earthquake damage. Moreover, the space under the railway viaduct can be widened, which can contribute to effective use of the space. In addition, the performance of the railway viaduct pillar can be improved.

本発明の実施例を示す鉄道高架橋柱の取り換え工法を示す図である。It is a figure which shows the replacement construction method of the railway viaduct pillar which shows the Example of this invention. 従来の橋脚の建て替え工法を示す図である。It is a figure which shows the rebuilding method of the conventional pier.

本発明の鉄道高架橋柱の取り換え工法は、既設鉄道高架橋柱の塑性ヒンジ区間及び柱を取り除き、新たに塑性ヒンジ区間となる位置に削孔を形成し、塑性ヒンジ区間保護キャップ(前記鉄道高架橋柱の基台側)を設置し、前記削孔に軸方向鉄筋を挿入し、モルタルを充填して固定し、対向する前記軸方向鉄筋の先端部に継手を配置し、前記軸方向鉄筋に帯鉄筋を設置し、前記継手位置に前記塑性ヒンジ区間保護キャップ(前記鉄道高架橋柱のウエブ構造体側)を移動し、前記帯鉄筋を設置した前記軸方向鉄筋にコンクリートを打設することで新たな鉄道高架橋柱への取り換えを行う。   The method for replacing a railway viaduct column according to the present invention is to remove the plastic hinge section and the column of the existing railway viaduct column, newly form a drilling hole at a position that becomes the plastic hinge section, and to form a plastic hinge section protective cap (of the railway viaduct column). Base side), insert an axial rebar into the drilling hole, fill with mortar and fix it, place a joint at the tip of the opposing axial rebar, and place a rebar on the axial rebar Installed, moved the plastic hinge section protection cap (on the web structure side of the railway viaduct column) to the joint position, and placed concrete on the axial rebar where the strip reinforcement was installed, thereby creating a new railway viaduct pillar Replace with.

以下、本発明の実施の形態について詳細に説明する。
図1は本発明の実施例を示す鉄道高架橋柱の取り換え工法を示す図である。
本発明では、損傷した塑性ヒンジ区間の鉄筋を残さずに取り換えを行うものである。なお、鉄道高架橋柱を切断して取り除いた場合における高架橋柱の倒壊などを防ぐため、仮支柱による補強工事や仮工事が必要になるが、それらについては説明を省略する。
Hereinafter, embodiments of the present invention will be described in detail.
FIG. 1 is a diagram showing a method for replacing a railway viaduct column showing an embodiment of the present invention.
In the present invention, replacement is performed without leaving a damaged reinforcing bar in the plastic hinge section. In addition, in order to prevent the collapse of the viaduct pillar when the railway viaduct pillar is cut and removed, reinforcement work or temporary work with a temporary support is necessary, but description thereof will be omitted.

(1)まず、図1(a)に示すように、既設鉄道高架橋柱である既設RCラーメン高架橋柱1を点検する。ここでは、震害などにより塑性ヒンジ区間2,2′の軸方向鉄筋3に座屈が発生している場合〔図1(b)参照〕を例に説明しているが、本発明は、塑性ヒンジ区間2,2′に損傷がない場合でも適用可能である。なお、Aは既設RCラーメン高架橋柱1の基台、Bは既設RCラーメン高架橋柱1の上部構造体である。   (1) First, as shown in FIG. 1 (a), the existing RC ramen viaduct pillar 1 which is an existing railway viaduct pillar is inspected. Here, a case where buckling occurs in the axial rebar 3 of the plastic hinge sections 2 and 2 'due to earthquake damage or the like is described as an example (see FIG. 1B). This is applicable even when the hinge sections 2 and 2 'are not damaged. In addition, A is a base of the existing RC rigid frame viaduct pillar 1, and B is an upper structure of the existing RC rigid frame viaduct pillar 1.

(2)次に、図1(c)に示すように、元の柱4を切断して取り除くとともに、塑性ヒンジ区間2,2′を軸方向鉄筋3も含めて全て除去する。そして、新たに塑性ヒンジ区間となる位置に削孔5,5′を形成する。
(3)次に、図1(d)に示すように、塑性ヒンジ区間保護キャップ6(基台A側)の設置を行い、削孔5,5′に軸方向鉄筋7,7′を挿入して、モルタル8,8′を充填して固定する。
(2) Next, as shown in FIG. 1 (c), the original pillar 4 is cut and removed, and the plastic hinge sections 2 and 2 ′ including the axial rebar 3 are all removed. And the drilling holes 5 and 5 'are newly formed in the position used as a plastic hinge area.
(3) Next, as shown in FIG. 1 (d), the plastic hinge section protective cap 6 (base A side) is installed, and the axial rebars 7 and 7 'are inserted into the drilled holes 5 and 5'. Then, mortar 8, 8 'is filled and fixed.

(4)次に、図1(e)に示すように、軸方向鉄筋7,7′の先端部7A,7A′に継手9を配置する。ここで、継手9としては、例えば、重ね継手、機械式継手などを用いる。
(5)次に、図1(f)に示すように、軸方向鉄筋7,7′に帯鉄筋10を設置する。また、塑性ヒンジ区間保護キャップ6を継手9の位置に移動させる。
(4) Next, as shown in FIG. 1 (e), the joint 9 is disposed at the tip portions 7A and 7A 'of the axial rebars 7 and 7'. Here, as the joint 9, for example, a lap joint, a mechanical joint, or the like is used.
(5) Next, as shown in FIG.1 (f), the strip reinforcement 10 is installed in the axial direction reinforcement 7,7 '. Further, the plastic hinge section protective cap 6 is moved to the position of the joint 9.

(6)次いで、図1(g)に示すように、帯鉄筋10を設置した軸方向鉄筋7,7′にコンクリート11を打設する。
(7)すると、図1(h)に示すように、既設RCラーメン高架橋柱の取り換えを完了する。ここで、新たな塑性ヒンジ区間12,12′が構築されることになる。
本発明の鉄道高架橋柱の取り換え工法では、既設鉄道高架橋柱1の幅よりも狭い幅の柱とするようにコンクリートを打設することで、柱取り換え後の高架橋柱間の空間を拡幅し、高架橋下の空間を有効に利用することができる。
(6) Next, as shown in FIG. 1 (g), concrete 11 is placed on the axial rebars 7, 7 ′ where the rebar 10 is installed.
(7) Then, as shown in FIG.1 (h), replacement | exchange of the existing RC ramen viaduct pillar is completed. Here, a new plastic hinge section 12, 12 'will be constructed.
In the method of replacing a railway viaduct pillar according to the present invention, the concrete is cast so that the width of the railway viaduct pillar 1 is narrower than that of the existing railway viaduct pillar 1, so that the space between the viaduct pillars after the pillar replacement is widened. The lower space can be used effectively.

本発明の鉄道高架橋柱は、既設のRCラーメン高架橋柱の塑性ヒンジ区間の軸方向鉄筋を取り換えることができるので、震害などによる軸方向鉄筋の損傷があるかないかにかかわらず、あらゆるRCラーメン高架橋柱の取り換えに適用することができる。
なお、本発明は上記実施例に限定されるものではなく、本発明の趣旨に基づき種々の変形が可能であり、これらを本発明の範囲から排除するものではない。
The railway viaduct column of the present invention can replace the axial rebar of the plastic hinge section of the existing RC rigid frame viaduct column, so that any RC ramen viaduct column can be used regardless of whether the axial rebar is damaged due to earthquake damage or the like. It can be applied to the replacement of
In addition, this invention is not limited to the said Example, Based on the meaning of this invention, a various deformation | transformation is possible and these are not excluded from the scope of the present invention.

本発明は、震害などによる損傷の有無にかかわらず実施することのできる鉄道高架橋柱の取り換え工法として利用可能である。   INDUSTRIAL APPLICABILITY The present invention can be used as a method for replacing a railway viaduct column that can be carried out regardless of whether there is damage due to earthquake damage or the like.

1 既設鉄道高架橋柱(既設RCラーメン高架橋柱)
2,2′ 塑性ヒンジ区間
3 軸方向鉄筋
4 元の柱
5,5′ 削孔
6 塑性ヒンジ区間保護キャップ
7,7′ 軸方向鉄筋
7A,7A′ 軸方向鉄筋の先端部
8,8′ モルタル
9 継手
10 帯鉄筋
11 コンクリート
12,12′ 新たな塑性ヒンジ区間
A 既設RCラーメン高架橋柱の基台
B 既設RCラーメン高架橋柱の上部構造体
1 Existing railway viaduct pillar (existing RC ramen viaduct pillar)
2, 2 'Plastic hinge section 3 Axial rebar 4 Original column 5, 5' Drilling hole 6 Plastic hinge section protective cap 7, 7 'Axial rebar 7A, 7A' Tip of axial rebar 8, 8 'Mortar 9 Joint 10 Reinforcing bar 11 Concrete 12, 12 'New plastic hinge section A Base of existing RC rigid frame viaduct column B Superstructure of existing RC rigid frame viaduct column

Claims (4)

(a)既設鉄道高架橋柱の塑性ヒンジ区間及び柱を取り除き、新たに塑性ヒンジ区間となる位置に削孔を形成し、
(b)塑性ヒンジ区間保護キャップ(前記鉄道高架橋柱の基台側)を設置し、前記削孔に軸方向鉄筋を挿入し、モルタルを充填して固定し、
(c)対向する前記軸方向鉄筋の先端部に継手を配置し、
(d)前記軸方向鉄筋に帯鉄筋を設置し、前記継手位置に前記塑性ヒンジ区間保護キャップ(前記鉄道高架橋柱のウエブ構造体側)を移動し、
(e)前記帯鉄筋を設置した前記軸方向鉄筋にコンクリートを打設することで新たな鉄道高架橋柱への取り換えを行うことを特徴とする鉄道高架橋柱の取り換え工法。
(A) Remove the plastic hinge section and pillar of the existing railway viaduct pillar, and form a drilling hole at a position that becomes a new plastic hinge section,
(B) Install a plastic hinge section protective cap (on the base side of the railway viaduct pillar), insert an axial rebar into the drilling hole, fill with mortar and fix,
(C) placing a joint at the tip of the opposing axial rebar;
(D) A band reinforcing bar is installed on the axial reinforcing bar, and the plastic hinge section protection cap (on the web structure side of the railway viaduct pillar) is moved to the joint position,
(E) A method for replacing a railway viaduct column, comprising replacing concrete with a new railroad viaduct column by placing concrete in the axial rebar where the band reinforcing bar is installed.
請求項1記載の鉄道高架橋柱の取り換え工法において、前記コンクリートの打設幅を前記塑性ヒンジ区間の幅より狭くし、前記新たな鉄道高架橋柱間の空間拡幅を行うことを特徴とする鉄道高架橋柱の取り換え工法。   The railway viaduct pillar replacement method according to claim 1, wherein the concrete placement width is narrower than the width of the plastic hinge section, and the space between the new railway viaduct pillars is widened. Replacement method. 請求項1又は2記載の鉄道高架橋柱の取り換え工法において、前記塑性ヒンジ保護キャップが鋼板または超高強度繊維補強コンクリートからなることを特徴とする鉄道高架橋柱の取り換え工法。   The railway viaduct pillar replacement method according to claim 1 or 2, wherein the plastic hinge protection cap is made of a steel plate or ultra-high strength fiber reinforced concrete. 請求項1又は2記載の鉄道高架橋柱の取り換え工法において、前記継手が重ね継手又は機械式継手であることを特徴とする鉄道高架橋柱の取り換え工法。   The railway viaduct pillar replacement method according to claim 1 or 2, wherein the joint is a lap joint or a mechanical joint.
JP2011004656A 2011-01-13 2011-01-13 Railway viaduct pillar replacement method Expired - Fee Related JP5714337B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011004656A JP5714337B2 (en) 2011-01-13 2011-01-13 Railway viaduct pillar replacement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011004656A JP5714337B2 (en) 2011-01-13 2011-01-13 Railway viaduct pillar replacement method

Publications (2)

Publication Number Publication Date
JP2012144920A true JP2012144920A (en) 2012-08-02
JP5714337B2 JP5714337B2 (en) 2015-05-07

Family

ID=46788755

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011004656A Expired - Fee Related JP5714337B2 (en) 2011-01-13 2011-01-13 Railway viaduct pillar replacement method

Country Status (1)

Country Link
JP (1) JP5714337B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221648A (en) * 2018-03-01 2018-06-29 华侨大学 The concrete pier of steel tube for having the function of to restore of novel embedded mild steel
JP2020153104A (en) * 2019-03-19 2020-09-24 株式会社奥村組 Repair method of bridge pier

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007177492A (en) * 2005-12-27 2007-07-12 East Japan Railway Co Pier reinforcing method
JP2008303698A (en) * 2007-05-08 2008-12-18 Metropolitan Expressway Co Ltd Bridge pier rebuilding method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007177492A (en) * 2005-12-27 2007-07-12 East Japan Railway Co Pier reinforcing method
JP2008303698A (en) * 2007-05-08 2008-12-18 Metropolitan Expressway Co Ltd Bridge pier rebuilding method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221648A (en) * 2018-03-01 2018-06-29 华侨大学 The concrete pier of steel tube for having the function of to restore of novel embedded mild steel
JP2020153104A (en) * 2019-03-19 2020-09-24 株式会社奥村組 Repair method of bridge pier
JP7185567B2 (en) 2019-03-19 2022-12-07 株式会社奥村組 Bridge pier repair method

Also Published As

Publication number Publication date
JP5714337B2 (en) 2015-05-07

Similar Documents

Publication Publication Date Title
JP5266291B2 (en) Construction method of bridge deck and joint structure of precast deck
JP5239190B2 (en) Reinforcing method for existing RC member and panel for reinforcing existing RC member
KR101606391B1 (en) Non-Exposed Eengineering Method of Last Concreat for Expansion Joint
CN105155853A (en) Process for positioning and constructing reinforced concrete for high-rise residential buildings
CN207700746U (en) The upper buttress of existing building base isolation reinforcement constructs
CN103696437A (en) Construction method for cutting latticed column
JP2010261270A (en) Composite structure and method for constructing composite structure building
JP2012144920A (en) Construction method for replacing railway viaduct column
JP5485187B2 (en) Railway viaduct pillar replacement method
JP4037187B2 (en) Underground structure construction method and underground structure
JP2012144919A (en) Construction method for replacing damaged railway viaduct column
KR100938876B1 (en) Stay-in-place precast concrete panel
KR100955657B1 (en) Joint construction method of CFT column ? RC member using reinforcement assembly
JP6368584B2 (en) Foundation construction method
JP2002266503A (en) Method for repairing and reinforcing steel structural material for existing building structure and structure
JP5666329B2 (en) Railway viaduct replacement method
JP2008231688A (en) Bridge structure using composite floor slab, its construction method, and form for composite floor slab
JP5259638B2 (en) Construction method of viaduct portal ramen structure
JP2020153104A (en) Repair method of bridge pier
JP7152383B2 (en) Structural column base structure and column base fixing method
JP7008516B2 (en) Bridge bearing replacement method
CN107806252A (en) The upper buttress construction and its construction method of existing building base isolation reinforcement
KR200437570Y1 (en) Mesh Scaffold for Facility Foundation Block Out
CN106639345A (en) Underpinning method of reinforced concrete frame-supported beam steel supporting seat
JP2003336403A (en) Reconstruction method for existing structure, and structure constructed by the reconstruction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130607

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140121

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140826

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140918

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150310

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150311

R150 Certificate of patent or registration of utility model

Ref document number: 5714337

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees