JP2012097554A JP2011243017A JP2011243017A JP2012097554A JP 2012097554 A JP2012097554 A JP 2012097554A JP 2011243017 A JP2011243017 A JP 2011243017A JP 2011243017 A JP2011243017 A JP 2011243017A JP 2012097554 A JP2012097554 A JP 2012097554A
Authority
JP
Japan
Prior art keywords
floor slab
platform
flange
slab
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011243017A
Other languages
Japanese (ja)
Other versions
JP5857379B2 (en
Inventor
Daigo Uchida
大悟 内田
Shinichi Ide
進一 井出
Yoshimasa Maeda
欣昌 前田
Yasukazu Ozawa
靖一 小澤
Shota Miyoshi
祥太 三好
Hidetoshi Sugimoto
英俊 杉本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hokukon Co Ltd
Tokyu Construction Co Ltd
Original Assignee
Hokukon Co Ltd
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hokukon Co Ltd, Tokyu Construction Co Ltd filed Critical Hokukon Co Ltd
Priority to JP2011243017A priority Critical patent/JP5857379B2/en
Publication of JP2012097554A publication Critical patent/JP2012097554A/en
Application granted granted Critical
Publication of JP5857379B2 publication Critical patent/JP5857379B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a platform constructed with use of a floor slab, allowing a door device to be easily installed by floor slab replacement alone.SOLUTION: A platform 1 is constructed with use of a floor slab 3 formed of high strength concrete material without placement of steel bars or PC steel wires for installation of a movable platform fence 2. The platform 1 comprises the slab 3, a support part 4 which supports the spanned slab 3, a connection bolt 5 which connects the slab 3 and the support part 4, and the movable platform fence 2 which is fixed on the floor slab.

Description

本発明は、可動式ホーム柵やプラットホームスクリーンドアなどのドア装置をプラットホームに設置するための床版、それを使用して構築されるプラットホーム及びプラットホームの構築方法に関するものである。   The present invention relates to a floor slab for installing door devices such as movable platform fences and platform screen doors on a platform, a platform constructed using the floor slab, and a platform construction method.

特許文献1,2には、線路側の縁部に沿って可動式ホーム柵が設置されたプラットホームが開示されている。また、特許文献1には、線路側に張り出された床版の上に腰壁程度の高さの可動式ホーム柵が取り付けられた構造が開示されている。さらに、特許文献2には、可動式ホーム柵を床版に打ち込まれたアンカーボルトによって固定する構造が開示されている。   Patent Documents 1 and 2 disclose a platform in which a movable platform fence is installed along an edge on a track side. Further, Patent Document 1 discloses a structure in which a movable home fence having a height of about a waist wall is attached on a floor slab that projects to the track side. Furthermore, Patent Document 2 discloses a structure in which a movable home fence is fixed by anchor bolts driven into a floor slab.

また、特許文献3には、床から天井までの高さのプラットホームスクリーンドアの柱を、線路側に張り出された床版にアンカーボルトを介して固定する構造が開示されている。   Patent Document 3 discloses a structure in which a pillar of a platform screen door having a height from the floor to the ceiling is fixed to a floor slab protruding to the track side via an anchor bolt.

特許文献1−3に開示された可動式ホーム柵やプラットホームスクリーンドアなどのドア装置は、金属製のドアや壁及びドアを開閉させるための駆動モータなどを備えているため重量が大きい。   The door devices such as movable platform fences and platform screen doors disclosed in Patent Documents 1-3 are heavy because they include a metal door, a wall, and a drive motor for opening and closing the door.

このため、最初からドア装置をプラットホームに設置する場合は、この重量に耐えられる強度の床版が鉄筋コンクリートによって構築される。また、ドア装置を固定するためのアンカーボルトが、床版に埋設された鉄筋やPC鋼線に当たることがないように設計がなされる。   For this reason, when installing a door apparatus in a platform from the beginning, the floor slab of the strength which can endure this weight is constructed with reinforced concrete. In addition, the anchor bolt for fixing the door device is designed so as not to hit a reinforcing bar or a PC steel wire embedded in the floor slab.

特開2011−184021号公報JP 2011-184021 A 特開2009−143567号公報JP 2009-143567 A 特開平10−16766号公報Japanese Patent Laid-Open No. 10-16766

しかしながら、既存のプラットホームにドア装置を設置する場合は、床版がドア装置の荷重を考慮して設計されていないため、耐力の大きい床版に取り替える必要がある。   However, when the door device is installed on an existing platform, the floor slab is not designed in consideration of the load of the door device, so it is necessary to replace it with a floor slab having a high yield strength.

この際、鉄筋コンクリート製の床版によって耐力を上げるようとすると、床版の厚さが既存のものより厚くなる。そして、床版のみを厚くすると、プラットホームの床面の位置が上がって列車との関係で支障が生じるようになる。   At this time, if the strength is increased by the slab concrete slab, the thickness of the slab becomes thicker than the existing one. And if only the floor slab is thickened, the position of the floor of the platform will rise and trouble will occur in relation to the train.

そこで、この問題を解消するために、線路の高さを上げる又は床版を支える支持部の高さを低くするなどの調整用の工事が必要になるが、これらの工事を供用中の鉄道において実施するには多くの制約があるうえに、工費及び工期が増大するという問題もある。   Therefore, in order to solve this problem, adjustment work such as increasing the height of the track or reducing the height of the support section supporting the floor slab is necessary. In addition to many restrictions on implementation, there are also problems that the construction cost and construction period increase.

また、鉄筋コンクリートにおける鉄筋は、主構造部材になるため、鉄筋を損傷させたり、切断させたりすると、床版の耐力低下の原因になる。しかしながら、ドア装置を設置するためには、床版に支柱用の穿孔を行わなければならず、鉄筋やPC鋼線の位置を避けて穿孔を行うことが要求される。このため、所望する位置にドア装置を設置することができなくなったり、誤って鉄筋が切断されたりするおそれがある。   Moreover, since the reinforcing bar in reinforced concrete becomes a main structural member, if the reinforcing bar is damaged or cut, it causes a decrease in the proof strength of the floor slab. However, in order to install the door device, the floor slab must be perforated for columns, and it is required to perforate while avoiding the positions of reinforcing bars and PC steel wires. For this reason, there is a possibility that the door device cannot be installed at a desired position, or the reinforcing bars are cut by mistake.

そこで、本発明は、床版のみを取り替えるだけで容易にドア装置を設置することが可能になる床版、それを使用して構築されるプラットホーム及びプラットホームの構築方法を提供することを目的としている。   Therefore, an object of the present invention is to provide a floor slab in which a door device can be easily installed only by replacing the floor slab, a platform constructed using the floor slab, and a platform construction method. .

前記目的を達成するために、本発明の床版は、プラットホームにドア装置を設置するための床版であって、高強度のコンクリート材料によって鉄筋又はPC鋼線を配置することなく形成されることを特徴とする。   In order to achieve the above object, the floor slab of the present invention is a floor slab for installing a door device on a platform, and is formed of a high-strength concrete material without arranging reinforcing bars or PC steel wires. It is characterized by.

また、本発明のプラットホームは、上記床版と、架け渡される前記床版を支持する支持部と、前記床版と前記支持部とを連結させる連結材と、前記床版上に固定されるドア装置とを備えたことを特徴とする。   The platform of the present invention includes the floor slab, a support part that supports the floor slab to be bridged, a connecting member that connects the floor slab and the support part, and a door that is fixed on the floor slab. And an apparatus.

ここで、前記連結材を通す貫通部を、前記床版の縁部に設けることができる。また、前記支持部の上面はH形鋼材又は溝形鋼材のフランジによって形成され、前記床版の縁部が前記フランジ上に載置され、前記床版及び前記フランジに連続して通された前記連結材によって前記床版と前記支持部とが連結される構成であってもよい。   Here, the penetration part which lets the said connection material pass can be provided in the edge part of the said floor slab. Further, the upper surface of the support portion is formed by a flange of an H-shaped steel material or a groove-shaped steel material, and an edge portion of the floor slab is placed on the flange, and is continuously passed through the floor slab and the flange. The structure by which the said floor slab and the said support part are connected by the connection material may be sufficient.

さらに、本発明のプラットホームの構築方法は、上記プラットホームを構築するプラットホームの構築方法であって、前記支持部に前記床版を架け渡す工程と、前記床版の上から前記支持部に向けて連結材を配置して前記床版と前記支持部とを連結する工程と、前記床版に穴を開けて前記ドア装置をその穴を介して固定する工程とを備えたことを特徴とする。   Furthermore, the platform construction method of the present invention is a platform construction method for constructing the platform, and includes a step of bridging the floor slab on the support part, and a connection from above the floor slab toward the support part. A step of arranging a material to connect the floor slab and the support; and a step of making a hole in the floor slab and fixing the door device through the hole.

このように構成された本発明の床版は、高強度のコンクリート材料によって形成される。このため、床版を既存の床版の厚さ以下にしてもドア装置の荷重に耐えることができるので、床面高さを変えることなくドア装置が設置されたプラットホームを容易に構築することができる。   The floor slab of this invention comprised in this way is formed with a high-strength concrete material. For this reason, even if the floor slab is less than the thickness of the existing floor slab, it can withstand the load of the door device, so it is possible to easily construct a platform on which the door device is installed without changing the floor surface height. it can.

また、この床版には、鉄筋又はPC鋼線が配置されない。このため、床版の任意の箇所に穿孔することができ、プラットホームの所望する位置にドア装置を取り付けることができる。   Moreover, a reinforcing bar or PC steel wire is not arranged on this floor slab. For this reason, it can pierce | drill in the arbitrary locations of a floor slab, and a door apparatus can be attached to the desired position of a platform.

さらに、鉄筋コンクリートであれば、基準などによって定められた鉄筋のかぶり厚さを確保しなければならないために、床版の縁部に貫通部を設けることができないが、高強度のコンクリート材料によって鉄筋又はPC鋼線を配置することなく形成された床版であれば、縁部であっても貫通部を設けることができる。   Furthermore, in the case of reinforced concrete, since it is necessary to secure the cover thickness of the reinforcing bar determined by standards, it is not possible to provide a penetration part at the edge of the floor slab. If it is a floor slab formed without arranging PC steel wire, a penetrating part can be provided even at the edge.

また、ボルト等の連結材を床版と支持部の上面を形成するフランジとに連続して通して連結させる構成であれば、連結材のせん断力によって床版とフランジとの間のせん断抵抗力を増加させることができる。   In addition, if the connecting material such as a bolt is continuously passed through the floor slab and the flange forming the upper surface of the support portion, the shear resistance force between the floor slab and the flange is caused by the shearing force of the connecting material. Can be increased.

さらに、鉄筋又はPC鋼線を配置することなく形成された床版であれば、床版を設置した後に鉄筋やPC鋼線の位置を気にすることなくドア装置を設置するための穴を穿孔することができるので、正確な位置に迅速にドア装置を配置することができる。   Furthermore, if the floor slab is formed without placing reinforcing bars or PC steel wires, after installing the floor slab, drill holes for installing the door device without worrying about the position of the reinforcing bars or PC steel wires Therefore, the door device can be quickly arranged at an accurate position.

本発明の実施の形態のプラットホームの構成を説明する断面図である。It is sectional drawing explaining the structure of the platform of embodiment of this invention. 本発明の実施の形態の床版の構成を説明する平面図である。It is a top view explaining the structure of the floor slab of embodiment of this invention. 図1のA−A矢視方向で見た断面図である。It is sectional drawing seen in the AA arrow direction of FIG. 実施例1の床版と支持部のフランジとの連結構造を説明する図であって、(a)は断面図、(b)は(a)のB−B矢視方向で見た平面図である。It is a figure explaining the connection structure of the floor slab of Example 1, and the flange of a support part, (a) is sectional drawing, (b) is the top view seen in the BB arrow direction of (a). is there. 実施例2の床版と支持部のフランジとの連結構造を説明する断面図である。It is sectional drawing explaining the connection structure of the floor slab of Example 2, and the flange of a support part.

以下、本発明の実施の形態について図面を参照して説明する。図1は、本実施の形態のプラットホーム1の構成を説明する図である。プラットホーム1は、列車が走行する線路11に沿って構築される。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a diagram for explaining the configuration of the platform 1 of the present embodiment. The platform 1 is constructed along a track 11 on which a train travels.

このプラットホーム1は、下部構造体となる支持部4と、その上に敷設される複数の床版3,・・・とによって主に構成される。また、床版3,・・・の上にはアスファルトコンクリート等が敷き均された舗装部13が形成されるとともに、線路11側の上層にはノンスリップタイル12や点字ブロックが配置される。   The platform 1 is mainly configured by a support portion 4 serving as a lower structure and a plurality of floor slabs 3. Further, a pavement portion 13 is formed on the floor slabs 3... And leveled with asphalt concrete, and non-slip tiles 12 and braille blocks are disposed on the upper layer of the track 11 side.

支持部4は、支持部4の基礎として設置されるブロック状の土台43,・・・と、その土台43に下部が固定される脚部42,・・・と、脚部42,42間に架け渡される桁部41とによって主に構成される。   The support unit 4 includes a block-shaped base 43, which is installed as a base of the support unit 4, and leg portions 42,. It is mainly comprised by the girder part 41 spanned.

桁部41は、プラットホーム1の延伸方向に直交する方向に向けて架け渡される。また、桁部41は、図3に示すように、上側のフランジ41aと、それに平行な下側のフランジ41bと、フランジ41a,41b間を繋ぐウエブ41cとを有する断面視略H字形のH形鋼材によって形成される。   The girder 41 is bridged in a direction orthogonal to the extending direction of the platform 1. Further, as shown in FIG. 3, the girder portion 41 has an H-shape that is substantially H-shaped in cross-section and includes an upper flange 41a, a lower flange 41b parallel to the upper flange 41a, and a web 41c that connects the flanges 41a and 41b. It is made of steel.

本実施の形態では、H形鋼材によって形成された桁部41を使って説明するが、これに限定されるものではなく、断面視略C字形の溝形鋼材など別の鋼材によって桁部41を形成することもできる。   In the present embodiment, description will be given using the girder portion 41 formed of the H-shaped steel material. However, the present invention is not limited to this, and the girder portion 41 is made of another steel material such as a groove-shaped steel material having a substantially C-shaped cross section. It can also be formed.

そして、床版3は、図3に示すように、プラットホーム1の延伸方向に間隔を置いて設置された桁部41,41間に架け渡される。床版3は、平面視略長方形のパネル状に形成されたスラブである。   And the floor slab 3 is spanned between the girder parts 41 and 41 installed at intervals in the extending | stretching direction of the platform 1, as shown in FIG. The floor slab 3 is a slab formed in a substantially rectangular panel shape in plan view.

ここで、床版3の外縁近傍を縁部3a,3bと呼ぶ。床版3の短辺側を縁部3a,3aと呼び、長辺側を縁部3b,3bと呼ぶ。そして、床版3の短辺側の縁部3a,3aが、それぞれ桁部41,41のフランジ41a,41a上に載せられる。   Here, the vicinity of the outer edge of the floor slab 3 is referred to as edge portions 3a and 3b. The short side of the floor slab 3 is called edges 3a and 3a, and the long side is called edges 3b and 3b. The edge portions 3a and 3a on the short side of the floor slab 3 are placed on the flanges 41a and 41a of the beam portions 41 and 41, respectively.

この床版3は、繊維補強コンクリートやレジンコンクリートなどの高強度のコンクリート材料によって成形される。例えば、高強度の繊維補強コンクリートとしては、特許第3855511号に記載されている金属繊維強化コンクリートが使用できる。   The floor slab 3 is formed of a high-strength concrete material such as fiber reinforced concrete or resin concrete. For example, as the high-strength fiber reinforced concrete, metal fiber reinforced concrete described in Japanese Patent No. 3855511 can be used.

この金属繊維強化コンクリートは、セメントと、最大粒度が2mm以下の骨材粒子と、一次粒子粒度が1μm以下のポゾラン反応粒子と、長さが2mm以上で長さと径の比が20以上の金属繊維とを主に含有する。   This metal fiber reinforced concrete consists of cement, aggregate particles with a maximum particle size of 2 mm or less, pozzolanic reaction particles with a primary particle size of 1 μm or less, and metal fibers with a length of 2 mm or more and a length-to-diameter ratio of 20 or more. And mainly contains.

そして、このような金属繊維強化コンクリートの力学特性は、引張強度が12 MPa以上、曲げ強度が25 MPa以上、圧縮強度が150 MPa以上となり、非常に高い強度を示す。また、緻密な成形物になるため、耐久性の高い床版3を形成することができる。   The mechanical properties of such metal fiber reinforced concrete are very high, with a tensile strength of 12 MPa or more, a bending strength of 25 MPa or more, and a compressive strength of 150 MPa or more. Moreover, since it becomes a precise | minute molding, the highly durable floor slab 3 can be formed.

一方、レジンコンクリートは、セメントに代えて液状の樹脂を結合材として骨材を結合させたコンクリートである。レジンコンクリートは、樹脂と触媒による重合反応によって高い結合力で短時間に硬化することから、高強度で耐久性に優れた緻密な成形物にすることができる。レジンコンクリートの力学特性は、引張強度が10 MPa以上、曲げ強度が20 MPa以上、圧縮強度が100 MPa以上となる。   On the other hand, resin concrete is concrete in which an aggregate is bonded using a liquid resin as a binder instead of cement. Resin concrete is hardened in a short time with a high bonding force by a polymerization reaction between a resin and a catalyst, so that it can be formed into a dense molded product having high strength and excellent durability. The mechanical properties of resin concrete are that tensile strength is 10 MPa or more, bending strength is 20 MPa or more, and compressive strength is 100 MPa or more.

このような金属繊維強化コンクリートやレジンコンクリートによって床版3を製作するに際しては、通常のコンクリートを使用する場合のように鉄筋を配置する必要がない。また、PC鋼線を配置してプレストレスを導入する必要もない。例えば、床版3は、長辺側の長さを3.0m程度、短辺側の長さを1.0m程度、厚さを100mm程度にしたパネルに成形できる。   When the floor slab 3 is manufactured using such metal fiber reinforced concrete or resin concrete, it is not necessary to arrange reinforcing bars as in the case of using ordinary concrete. Moreover, it is not necessary to arrange a PC steel wire and introduce prestress. For example, the floor slab 3 can be formed into a panel having a long side length of about 3.0 m, a short side length of about 1.0 m, and a thickness of about 100 mm.

そして、床版3の短辺側の縁部3a,3aには、図2,3に示すように、桁部41と連結させるための貫通部31が設けられる。本実施の形態では、縁部3aの2箇所に間隔を置いて貫通部31,31が設けられる。   And the edge part 3a, 3a by the side of the short side of the floor slab 3 is provided with the penetration part 31 for making it connect with the girder part 41, as shown in FIG. In the present embodiment, penetrating portions 31 and 31 are provided at two positions on the edge 3a with a space therebetween.

この貫通部31は、連結材としての連結ボルト5を装着するための穴である。連結ボルト5は、ボルト51と、ゆるみ止めナット52と、バネ座金52aと、アンカープレート53とによって主に構成される。   This penetration part 31 is a hole for mounting | wearing with the connecting bolt 5 as a connection material. The connecting bolt 5 is mainly composed of a bolt 51, a locking nut 52, a spring washer 52 a, and an anchor plate 53.

アンカープレート53及びボルト51の頭部は、貫通部31の上方に形成される平面視が半長円状の切欠部32に収容される。ここで、切欠部32の側方は、図3に示すように開放されている。   The heads of the anchor plate 53 and the bolt 51 are accommodated in a notch 32 having a semi-oval shape in plan view formed above the penetrating part 31. Here, the side of the notch 32 is opened as shown in FIG.

一方、貫通部31は、切欠部32の下方にボルト51の軸より僅かに大きい内径の円柱状に穿孔される。床版3には、鉄筋又はPC鋼線が配置されていないので、切欠部32や貫通部31を設ける位置は、任意に選定することができる。   On the other hand, the penetrating portion 31 is drilled in a cylindrical shape having an inner diameter slightly larger than the axis of the bolt 51 below the notch portion 32. Since no reinforcing bars or PC steel wires are arranged on the floor slab 3, the positions at which the notches 32 and the through portions 31 are provided can be arbitrarily selected.

また、床版3は、強度が高いコンクリート材料によって成形されるため、縁部3aに貫通部31を設けることができる。この貫通部31を設けることができる縁部3aとは、例えば床版3の側面から30mm以上内側の縁と呼べる範囲をいう。例えば、床版3の側面から30mmから70mmくらいの範囲に貫通部31を設けることができる。   Moreover, since the floor slab 3 is formed of a concrete material having high strength, the through portion 31 can be provided in the edge portion 3a. The edge portion 3a where the penetrating portion 31 can be provided refers to a range that can be called an edge that is 30 mm or more from the side surface of the floor slab 3, for example. For example, the penetration part 31 can be provided in the range of about 30 mm to 70 mm from the side surface of the floor slab 3.

この貫通部31と連結ボルト5によって、床版3と桁部41とが連結される。図3に示すように床版3の縁部3aが桁部41のフランジ41a上に設置される。   The floor slab 3 and the girder 41 are connected by the through portion 31 and the connecting bolt 5. As shown in FIG. 3, the edge 3 a of the floor slab 3 is installed on the flange 41 a of the girder 41.

このフランジ41aには、ボルト51を通す穴(図示省略)が設けられる。このフランジ41aの穴は、貫通部31の中からそれに連続するように穿孔すればよい。なお、予め穿孔しておいたり、床版3を載せた後に貫通部31と同時に穿孔したりすることもできる。   The flange 41a is provided with a hole (not shown) through which the bolt 51 is passed. What is necessary is just to drill the hole of this flange 41a so that it may continue from it in the penetration part 31. FIG. In addition, it can drill | pierce previously, and after mounting the floor slab 3, it can also pierce with the penetration part 31 simultaneously.

そして、切欠部32に設置されたアンカープレート53と、貫通部31及びフランジ41aの穴に通されたボルト51と、ボルト51に装着されたバネ座金52a及びゆるみ止めナット52とによって、床版3と桁部41とが連結される。   The floor slab 3 is formed by the anchor plate 53 installed in the notch 32, the bolt 51 passed through the hole of the penetration part 31 and the flange 41a, and the spring washer 52a and the locking nut 52 attached to the bolt 51. And the girder 41 are connected.

次に、本実施の形態の床版3を使ったプラットホーム1の構築方法について説明する。以下では、既設の床版を取り外し、ドア装置としての可動式ホーム柵2の荷重に耐え得る床版3に取り替える場合について説明する。   Next, the construction method of the platform 1 using the floor slab 3 of the present embodiment will be described. Below, the case where an existing floor slab is removed and it replaces with the floor slab 3 which can endure the load of the movable platform fence 2 as a door apparatus is demonstrated.

予め工場や作業ヤードなどで上述した金属繊維強化コンクリートを使って床版3を製作する。床版3は、交換される既存の床版と略同じ厚さ又はそれよりも薄く成形される。   The floor slab 3 is manufactured in advance using the above-described metal fiber reinforced concrete in a factory or work yard. The floor slab 3 is formed to have substantially the same thickness or thinner than the existing floor slab to be replaced.

一方、現場となる駅では、支持部4上に設置されていた既設の床版を撤去する。この撤去作業は、一日又は一晩の作業で交換できる範囲でおこなう。そして、新たな床版3を支持部4の桁部41,41上に吊り降ろす。この際、床版3が交換する既設の床版よりも薄い場合は、スペーサを桁部41,41上に設置しておく。   On the other hand, the existing floor slab installed on the support part 4 is removed at the station serving as the site. This removal work is performed within a range that can be replaced by one day or one night work. Then, the new floor slab 3 is suspended on the girders 41 and 41 of the support 4. At this time, if the floor slab 3 is thinner than the existing floor slab to be replaced, a spacer is installed on the girders 41 and 41.

床版3の短辺側の縁部3aは、桁部41のフランジ41aの幅方向中央を越えない領域、図3の右側の桁部41でいえばフランジ41aの左半分の領域に設置される。   The edge 3a on the short side of the floor slab 3 is installed in a region not exceeding the center in the width direction of the flange 41a of the girder 41, that is, in the left half region of the flange 41a in the case of the right girder 41 in FIG. .

続いて、床版3の貫通部31とフランジ41aの穴(図示省略)に連結ボルト5を装着する。ここで、貫通部31の穴は、予め設けておく。そして、床版3を設置した後で、その貫通部31からフランジ41aに穴を穿孔する。この方法であれば、床版3や桁部41に設置誤差などがあった場合でも穴が真っ直ぐに連続して形成されるので、ボルト51の挿入を容易におこなうことができる。   Subsequently, the connecting bolt 5 is attached to the through-hole 31 of the floor slab 3 and the hole (not shown) of the flange 41a. Here, the hole of the penetration part 31 is provided beforehand. And after installing the floor slab 3, a hole is drilled from the penetration part 31 to the flange 41a. With this method, even if there is an installation error or the like in the floor slab 3 or the girder 41, the holes are formed straight and continuously, so that the bolts 51 can be easily inserted.

そして、床版3の上から、縁部3aの切欠部32にアンカープレート53を設置し、貫通部31とフランジ41aの穴にボルト51を通す。一方、フランジ41aの下から、バネ座金52aとゆるみ止めナット52をボルト51の先端に装着し、所定のトルクに達するまで連結ボルト5を締め付ける。   And the anchor plate 53 is installed in the notch part 32 of the edge part 3a from the top of the floor slab 3, and the volt | bolt 51 is passed through the hole of the penetration part 31 and the flange 41a. On the other hand, a spring washer 52a and a locking nut 52 are attached to the tip of the bolt 51 from below the flange 41a, and the connecting bolt 5 is tightened until a predetermined torque is reached.

このような床版3と桁部41との連結は、図3の左側の桁部41上に示したように、フランジ41aの両側でおこなわれる。このフランジ41a上で側面が対向する二枚の床版3,3間には隙間が開いているので、そこにモルタルを充填して目地部15を形成する。また、モルタルは切欠部32にも充填され、連結ボルト5の頭部周辺に充填部14が形成される。   Such connection between the floor slab 3 and the girder 41 is performed on both sides of the flange 41a as shown on the left girder 41 in FIG. Since a gap is opened between the two floor slabs 3 and 3 whose side surfaces oppose each other on the flange 41a, the joint portion 15 is formed by filling mortar there. The mortar is also filled in the notch 32, and the filling portion 14 is formed around the head of the connecting bolt 5.

さらに、線路11側の床版3上には、層状にモルタル部13が形成され、その上にノンスリップタイル12が貼り付けられる。そして、可動式ホーム柵2を設置する場所に合わせて支柱を固定するための穴が穿孔され、その穴を使用して可動式ホーム柵2が固定される。   Further, a mortar portion 13 is formed in a layered manner on the floor slab 3 on the track 11 side, and a non-slip tile 12 is pasted thereon. And the hole for fixing a support | pillar is drilled according to the place where the movable home fence 2 is installed, and the movable home fence 2 is fixed using the hole.

このように構成された本実施の形態の床版3は、上述した高強度の金属繊維強化コンクリート等によって形成される。このため、床版3を交換前の既存の床版の厚さ以下にしても可動式ホーム柵2の荷重に耐えることができる。よって、交換前と同じ床面高さのプラットホーム1に容易に可動式ホーム柵2を設置する改修をおこなうことができる。   The floor slab 3 of the present embodiment configured as described above is formed of the above-described high-strength metal fiber reinforced concrete or the like. For this reason, even if it makes the floor slab 3 below the thickness of the existing floor slab before replacement | exchange, it can endure the load of the movable platform fence 2. FIG. Therefore, it is possible to easily renovate the movable platform fence 2 on the platform 1 having the same floor height as before the replacement.

また、この床版3には、鉄筋又はPC鋼線が配置されない。このため、床版3の任意の箇所に穿孔をおこなうことができ、プラットホーム1の所望する位置に可動式ホーム柵2を設置することができる。   Further, no reinforcing bars or PC steel wires are arranged on the floor slab 3. For this reason, perforation can be performed at an arbitrary location on the floor slab 3, and the movable home fence 2 can be installed at a desired position of the platform 1.

さらに、鉄筋コンクリートであれば、コンクリート標準示方書(土木学会)などの基準によって定められた鉄筋のかぶり厚さを確保しなければならないために、床版の縁部に貫通部を設けることができないが、金属繊維強化コンクリートによって鉄筋又はPC鋼線を配置することなく形成された床版3であれば、縁部3aであっても貫通部31を設けることができる。   Furthermore, in the case of reinforced concrete, since it is necessary to secure the cover thickness of the reinforcing bar defined by standards such as the Standard Specification for Concrete (Japan Society of Civil Engineers), it is not possible to provide a penetrating part at the edge of the floor slab. As long as the floor slab 3 is formed of metal fiber reinforced concrete without arranging a reinforcing bar or PC steel wire, the penetrating part 31 can be provided even at the edge 3a.

また、ボルト51を床版3と桁部41の上面を形成するフランジ41aとに連続して通して締め付ける連結方法であれば、連結ボルト5の締結力によって床版3を強固に桁部41に固定することができる。さらに、ボルト51のせん断力によって床版3とフランジ41aとの間のせん断抵抗力を増加させることができる。   Further, if the connecting method is such that the bolt 51 is continuously passed through the floor slab 3 and the flange 41 a forming the upper surface of the girder 41 and tightened, the floor slab 3 is firmly attached to the girder 41 by the fastening force of the connecting bolt 5. Can be fixed. Furthermore, the shear resistance between the floor slab 3 and the flange 41a can be increased by the shear force of the bolt 51.

また、鉄筋又はPC鋼線を配置することなく形成された床版3であれば、床版3を設置した後に可動式ホーム柵2を設置するための穴を鉄筋やPC鋼線の位置を気にすることなく開けることができるので、正確な位置に迅速に可動式ホーム柵2を配置することができる。すなわち、鉄筋コンクリート製の床版では、鉄筋やPC鋼線を切断しないように穿孔位置の制約を受けることになるが、本実施の形態の床版3を使用する場合には、そのような制約を受けることがない。   In addition, if the floor slab 3 is formed without placing reinforcing bars or PC steel wires, the holes for installing the movable home fence 2 after the floor slab 3 is installed are used to check the positions of the reinforcing bars and PC steel wires. Therefore, the movable home fence 2 can be quickly arranged at an accurate position. That is, in the floor slab made of reinforced concrete, the drilling position is restricted so as not to cut the reinforcing bar or the PC steel wire, but when using the floor slab 3 of the present embodiment, such a restriction is imposed. I do not receive it.

以下、前記実施の形態で説明した床版3とは別の形態の床版6について、図4を参照しながら説明する。なお、前記実施の形態で説明した内容と同一乃至均等な部分の説明については、同一用語又は同一符号を付して説明する。   Hereinafter, a floor slab 6 in a form different from the floor slab 3 described in the above embodiment will be described with reference to FIG. The description of the same or equivalent parts as the contents described in the above embodiment will be described with the same terms or the same reference numerals.

この実施例1で説明する床版6は、前記実施の形態で説明した床版3よりも内側の位置に連結ボルト5を装着するための貫通部61が設けられる。なお、床版6の全体形状及び材質については、前記実施の形態の床版3と略同様であり、短辺側の縁部6aと長辺側の縁部6bを有する平面視略長方形のパネル状に形成される。   The floor slab 6 described in Example 1 is provided with a through portion 61 for mounting the connecting bolt 5 at a position inside the floor slab 3 described in the above embodiment. The overall shape and material of the floor slab 6 is substantially the same as that of the floor slab 3 of the above-described embodiment, and is a generally rectangular panel in plan view having a short side edge 6a and a long side edge 6b. It is formed in a shape.

実施例1の床版6にも、縁部6aに複数の貫通部61が設けられる。この貫通部61は、連結材としての連結ボルト5を装着するための穴である。また、貫通部61は、前記実施の形態で説明した貫通部31よりも床版6の側面から内側に離れた位置に設けられる。   The floor slab 6 of Example 1 is also provided with a plurality of through portions 61 at the edge 6a. This penetration part 61 is a hole for mounting | wearing with the connection bolt 5 as a connection material. Further, the penetrating portion 61 is provided at a position farther inward from the side surface of the floor slab 6 than the penetrating portion 31 described in the above embodiment.

このため、前記実施の形態では側方が開放された切欠部32が貫通部31の上方に形成されたが、実施例1の貫通部61の上方には截頭円錐を逆さまにした凹部62が形成される。この凹部62には、アンカープレート53及びボルト51の頭部が収容される。   For this reason, in the above-described embodiment, the cutout portion 32 whose side is opened is formed above the penetrating portion 31, but the concave portion 62 in which the truncated cone is inverted is formed above the penetrating portion 61 of the first embodiment. It is formed. The recess 62 accommodates the anchor plate 53 and the head of the bolt 51.

このように構成された床版6は、貫通部61を任意の箇所に設けることができる。すなわち、鉄筋又はPC鋼線が配置されていない高強度の金属繊維強化コンクリートによって形成される床版6であれば、床版6の側面近くやそれよりも内部側などの任意の箇所に貫通部61を設けることができる。   The floor slab 6 configured in this way can be provided with the penetrating portion 61 at an arbitrary location. That is, if the floor slab 6 is formed of high-strength metal fiber reinforced concrete in which no reinforcing bars or PC steel wires are arranged, the penetration portion is located at an arbitrary location such as near the side surface of the floor slab 6 or inside the floor slab. 61 can be provided.

なお、他の構成及び作用効果については、前記実施の形態又は他の実施例と略同様であるので説明を省略する。   Other configurations and functions and effects are substantially the same as those of the above-described embodiment or other examples, and thus description thereof is omitted.

以下、前記実施の形態又は実施例1で説明した床版3,6とは別の形態の床版7について、図5を参照しながら説明する。なお、前記実施の形態又は実施例1で説明した内容と同一乃至均等な部分の説明については、同一用語又は同一符号を付して説明する。   Hereinafter, a floor slab 7 of a form different from the floor slabs 3 and 6 described in the embodiment or Example 1 will be described with reference to FIG. In addition, about the description of the part same or equivalent to the content demonstrated in the said embodiment or Example 1, it attaches | subjects and demonstrates the same term or the same code | symbol.

前記実施の形態又は実施例1で説明した床版3,6は、内部がすべて金属繊維強化コンクリートで満たされた中実構造であったが、実施例2で説明する床版7には複数のボイド73,・・・が設けられる。ボイド73は、床版7の内部に形成される柱状の空隙である。   The floor slabs 3 and 6 described in the above embodiment or example 1 have a solid structure filled with metal fiber reinforced concrete, but the floor slab 7 described in example 2 includes a plurality of floor slabs. Voids 73 are provided. The void 73 is a columnar space formed inside the floor slab 7.

このようにボイド73,・・・を設けることによって、床版7の厚さを大きくしてもそれに比例して重量が増加するのを抑えることができる。よって、交換前と略同じ厚さで軽量の床版7に形成することができる。   Thus, by providing the voids 73,..., Even if the thickness of the floor slab 7 is increased, it is possible to suppress an increase in weight in proportion thereto. Therefore, it can be formed on the lightweight floor slab 7 with substantially the same thickness as before the replacement.

このように交換前の厚さと略同じ厚さの床版7に成形すれば、桁部41との間にスペーサを介在させるなどの高さ調整をおこなう必要がない。なお、このような重量の増加を抑えた厚さの調整は、床版の上面や下面にスリットを設けることによってもおこなうことができる。   If the floor slab 7 having a thickness substantially the same as that before the replacement is formed in this way, it is not necessary to adjust the height such as interposing a spacer between the girder 41 and the like. In addition, adjustment of the thickness which suppressed the increase in such a weight can also be performed by providing a slit in the upper surface and lower surface of a floor slab.

また、この床版7は、縁部7aに設けられる貫通部71の位置が、実施例1で説明した貫通部61よりも床版7の側面からさらに内側に離れた位置に設けられる。   Further, the floor slab 7 is provided at a position where the penetrating portion 71 provided in the edge portion 7a is further inward from the side surface of the floor slab 7 than the penetrating portion 61 described in the first embodiment.

さらに、連結材としての連結治具8は、L字形のL型ボルト81と、その頭部に装着されるナット82及び座金83とから主に構成される。L型ボルト81は、垂直に立った部分を下から貫通部71に通すと、水平に向いた部分がフランジ41aの下面に接触可能な形状に形成されている。   Further, the connecting jig 8 as a connecting member is mainly composed of an L-shaped L-shaped bolt 81, a nut 82 and a washer 83 attached to the head thereof. The L-shaped bolt 81 is formed in such a shape that when a vertically standing portion is passed through the through portion 71 from below, the horizontally oriented portion can contact the lower surface of the flange 41a.

L型ボルト81は、フランジ41aとの接触箇所において溶接部84によって接合させる。すなわち、床版7を真っ直ぐつき抜けたL型ボルト81は、曲折された水平部分においてフランジ41aに固着される。   The L-shaped bolt 81 is joined by a welded portion 84 at a contact point with the flange 41a. That is, the L-shaped bolt 81 that has passed straight through the floor slab 7 is fixed to the flange 41a at the bent horizontal portion.

一方、凹部72内に突出したL型ボルト81の先端にはネジ溝が刻まれており、凹部72内で座金83及びナット82が装着され、ナット82を締め付けることによって床版7と桁部41とが連結される。   On the other hand, a thread groove is carved at the tip of the L-shaped bolt 81 projecting into the recess 72, and a washer 83 and a nut 82 are mounted in the recess 72. And are connected.

このように構成された連結治具8を使用する場合は、桁部41に穴を開けなくても床版7と桁部41とを連結することができる。また、L型ボルト81とフランジ41aの接触箇所を溶接によって接合する構成であるため、床版7とフランジ41aとの相対的な位置関係に誤差があったとしても吸収させることが容易にできる。   When the connecting jig 8 configured in this way is used, the floor slab 7 and the girder part 41 can be coupled without making a hole in the girder part 41. Moreover, since it is the structure which joins the contact location of the L-type volt | bolt 81 and the flange 41a by welding, even if there exists an error in the relative positional relationship of the floor slab 7 and the flange 41a, it can absorb easily.

なお、他の構成及び作用効果については、前記実施の形態又は他の実施例と略同様であるので説明を省略する。   Other configurations and functions and effects are substantially the same as those of the above-described embodiment or other examples, and thus description thereof is omitted.

以上、図面を参照して、本発明の実施の形態を詳述してきたが、具体的な構成は、この実施の形態及び実施例に限らず、本発明の要旨を逸脱しない程度の設計的変更は、本発明に含まれる。   The embodiment of the present invention has been described in detail above with reference to the drawings. However, the specific configuration is not limited to the embodiment and the example, and the design change is within a range not departing from the gist of the present invention. Are included in the present invention.

例えば、前記実施の形態では、ドア装置として可動式ホーム柵2を設置する場合について説明したが、これに限定されるものではなく、プラットホームスクリーンドアをドア装置として設置する場合にも本発明は適用できる。   For example, in the above-described embodiment, the case where the movable platform fence 2 is installed as a door device has been described. However, the present invention is not limited to this, and the present invention is also applied to a case where a platform screen door is installed as a door device. it can.

1 プラットホーム
2 可動式ホーム柵(ドア装置)
3 床版
3a 縁部
31 貫通部
4 支持部
41 桁部
41a フランジ
5 連結ボルト(連結材)
6 床版
6a 縁部
61 貫通部
7 床版
7a 縁部
71 貫通部
8 連結治具(連結材)
1 platform 2 movable platform fence (door device)
3 Floor slab 3a Edge portion 31 Through portion 4 Support portion 41 Girder portion 41a Flange 5 Connection bolt (connection material)
6 Floor slab 6a Edge 61 Through part 7 Floor slab 7a Edge 71 Through part 8 Connecting jig (connecting material)

Claims (5)

プラットホームにドア装置を設置するための床版であって、
高強度のコンクリート材料によって鉄筋又はPC鋼線を配置することなく形成されることを特徴とする床版。
A floor slab for installing a door device on a platform,
A floor slab characterized by being formed of a high-strength concrete material without arranging reinforcing bars or PC steel wires.
請求項1に記載の床版と、架け渡される前記床版を支持する支持部と、前記床版と前記支持部とを連結させる連結材と、前記床版上に固定されるドア装置とを備えたことを特徴とするプラットホーム。   The floor slab according to claim 1, a support part that supports the floor slab to be bridged, a connecting member that connects the floor slab and the support part, and a door device fixed on the floor slab. A platform characterized by comprising. 前記連結材を通す貫通部が、前記床版の縁部に設けられることを特徴とする請求項2に記載のプラットホーム。   The platform according to claim 2, wherein a penetrating portion through which the connecting material passes is provided at an edge portion of the floor slab. 前記支持部の上面はH形鋼材又は溝形鋼材のフランジによって形成され、前記床版の縁部が前記フランジ上に載置され、前記床版及び前記フランジに連続して通された前記連結材によって前記床版と前記支持部とが連結されることを特徴とする請求項2又は3に記載のプラットホーム。   The upper surface of the support portion is formed by a flange of an H-shaped steel material or a groove-shaped steel material, and an edge portion of the floor slab is placed on the flange, and the connecting material is continuously passed through the floor slab and the flange. The platform according to claim 2 or 3, wherein the floor slab and the support portion are connected by each other. 請求項2乃至4のいずれか一項に記載のプラットホームを構築するプラットホームの構築方法であって、
前記支持部に前記床版を架け渡す工程と、
前記床版の上から前記支持部に向けて連結材を配置して前記床版と前記支持部とを連結する工程と、
前記床版に穴を開けて前記ドア装置をその穴を介して固定する工程とを備えたことを特徴とするプラットホームの構築方法。
A platform construction method for constructing the platform according to any one of claims 2 to 4,
Spanning the floor slab on the support;
Disposing a connecting material from above the floor slab toward the support to connect the floor slab and the support;
A method of constructing a platform, comprising the steps of: making a hole in the floor slab and fixing the door device through the hole.
JP2011243017A 2011-11-07 2011-11-07 Platform and platform construction method Active JP5857379B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011243017A JP5857379B2 (en) 2011-11-07 2011-11-07 Platform and platform construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011243017A JP5857379B2 (en) 2011-11-07 2011-11-07 Platform and platform construction method

Publications (2)

Publication Number Publication Date
JP2012097554A true JP2012097554A (en) 2012-05-24
JP5857379B2 JP5857379B2 (en) 2016-02-10

Family

ID=46389768

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011243017A Active JP5857379B2 (en) 2011-11-07 2011-11-07 Platform and platform construction method

Country Status (1)

Country Link
JP (1) JP5857379B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343658A (en) * 2013-07-31 2013-10-09 上海嘉成轨道交通安全保障***有限公司 Energy-saving shielding door system for rail transit station
CN104018521A (en) * 2014-06-25 2014-09-03 中铁第一勘察设计院集团有限公司 Metro double-column elevated station steel reinforced concrete transformation structure reinforcing bar and construction method thereof
JP2014173315A (en) * 2013-03-08 2014-09-22 East Japan Railway Co Platform
JP2014213713A (en) * 2013-04-25 2014-11-17 ジェイアール東日本コンサルタンツ株式会社 Movable-type platform fence support structure and construction method for movable-type platform fence
JP2019011580A (en) * 2017-06-29 2019-01-24 株式会社日本コンポジット工業 Floor structure
JP2020186613A (en) * 2019-05-17 2020-11-19 中日本高速道路株式会社 Connection structure between girder and precast floor slab

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01102105A (en) * 1987-10-15 1989-04-19 Oriental Concrete Kk Method for fixing precast concrete floor panel and steel beam
JPH01198908A (en) * 1987-10-20 1989-08-10 P S Concrete Co Ltd Construction method for composite girder using precast concrete floorplate and fixture thereof
JPH03137303A (en) * 1989-10-24 1991-06-11 Nippon Tetsudo Kensetsu Kodan Building method for frame shaped slab track
JPH0527722B2 (en) * 1986-06-06 1993-04-22 Tetsudo Sogo Gijutsu Kenkyusho
JP2001164502A (en) * 1999-12-09 2001-06-19 Seltec Corp Precast-concrete pavement slab
JP2003041517A (en) * 2001-07-30 2003-02-13 Kinki Nippon Railway Co Ltd Support structure for newly provided floor part of existing platform
JP2005306229A (en) * 2004-04-22 2005-11-04 Mitsubishi Electric Corp Platform fence fixing means
JP2010261246A (en) * 2009-05-08 2010-11-18 Taisei Corp Floor slab unit, structure for joining floor slab, and method for constructing the floor slab
JP2010275829A (en) * 2009-06-01 2010-12-09 Taisei Corp Main girder, bridge, and bridge construction method
JP2011184021A (en) * 2010-03-11 2011-09-22 Kyosan Electric Mfg Co Ltd Fall preventing device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0527722B2 (en) * 1986-06-06 1993-04-22 Tetsudo Sogo Gijutsu Kenkyusho
JPH01102105A (en) * 1987-10-15 1989-04-19 Oriental Concrete Kk Method for fixing precast concrete floor panel and steel beam
JPH01198908A (en) * 1987-10-20 1989-08-10 P S Concrete Co Ltd Construction method for composite girder using precast concrete floorplate and fixture thereof
JPH03137303A (en) * 1989-10-24 1991-06-11 Nippon Tetsudo Kensetsu Kodan Building method for frame shaped slab track
JP2001164502A (en) * 1999-12-09 2001-06-19 Seltec Corp Precast-concrete pavement slab
JP2003041517A (en) * 2001-07-30 2003-02-13 Kinki Nippon Railway Co Ltd Support structure for newly provided floor part of existing platform
JP2005306229A (en) * 2004-04-22 2005-11-04 Mitsubishi Electric Corp Platform fence fixing means
JP2010261246A (en) * 2009-05-08 2010-11-18 Taisei Corp Floor slab unit, structure for joining floor slab, and method for constructing the floor slab
JP2010275829A (en) * 2009-06-01 2010-12-09 Taisei Corp Main girder, bridge, and bridge construction method
JP2011184021A (en) * 2010-03-11 2011-09-22 Kyosan Electric Mfg Co Ltd Fall preventing device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014173315A (en) * 2013-03-08 2014-09-22 East Japan Railway Co Platform
JP2014213713A (en) * 2013-04-25 2014-11-17 ジェイアール東日本コンサルタンツ株式会社 Movable-type platform fence support structure and construction method for movable-type platform fence
CN103343658A (en) * 2013-07-31 2013-10-09 上海嘉成轨道交通安全保障***有限公司 Energy-saving shielding door system for rail transit station
CN103343658B (en) * 2013-07-31 2016-08-10 上海嘉成轨道交通安全保障***股份公司 Energy saving shielding door of rail transit station platform system
CN104018521A (en) * 2014-06-25 2014-09-03 中铁第一勘察设计院集团有限公司 Metro double-column elevated station steel reinforced concrete transformation structure reinforcing bar and construction method thereof
CN104018521B (en) * 2014-06-25 2015-10-07 中铁第一勘察设计院集团有限公司 Subway twin columns overhead station steel reinforced concrete transformational structure reinforcing bar and construction method thereof
JP2019011580A (en) * 2017-06-29 2019-01-24 株式会社日本コンポジット工業 Floor structure
JP7037798B2 (en) 2017-06-29 2022-03-17 株式会社日本コンポジット工業 Floor structure
JP2020186613A (en) * 2019-05-17 2020-11-19 中日本高速道路株式会社 Connection structure between girder and precast floor slab

Also Published As

Publication number Publication date
JP5857379B2 (en) 2016-02-10

Similar Documents

Publication Publication Date Title
JP5857379B2 (en) Platform and platform construction method
KR101030419B1 (en) Joint structure of vertical member and horizontal member
JP6652754B2 (en) Joint structure of precast concrete slab for rapid construction and its construction method
KR20130000105A (en) Reinforcement structure for slab bending and beam for enduring earthquake
JP2018188851A (en) Steel concrete composite structure and construction method of steel concrete composite structure
KR101845717B1 (en) Aseismatic Reinforcement Steel Frame with Hinge Type Friction Slip Brace and Aseismatic Reinforcement Method using thereof
KR100653283B1 (en) Method for connecting reinforced concrete structures
JP2017040052A (en) Expansion device of road bridge and construction method of expansion device
KR101472027B1 (en) Method of building concrete structure using attachment plates adjoining ends of concrete beam with walls of abutments
JP2000054319A (en) Formation of concrete floor slab and construction of suspended deck bridge
JP2014148815A (en) Reinforcement method
KR100554342B1 (en) Lining board and method for manufacturing thereof
JP2014001550A (en) Slab for connection and construction method thereof
JP2019143449A (en) Foundation structure of platform door, construction method therefor and screw-in jig
JP5139718B2 (en) Construction method of pre-packed concrete girder
JP2009052197A (en) Composite steel plate deck bridge
KR101752285B1 (en) Hybrid beam with wide PSC lower flange and enlarged section upper flange and structure frame using the same
KR200408399Y1 (en) Slav building structure used transparent deck plate
JP5041481B2 (en) Updating method and structure of existing bearing device
KR102142185B1 (en) Seismic reinforcement device of brick walls using masonry joint locking member and fixer and construction method using of the same
JP2017137627A (en) Composite structure of steel girder and precast floor slab, precast floor slab, floor slab replacement method
JP5982143B2 (en) Reinforcing structure and reinforcing method for existing structure
JPH1181737A (en) Vibration control construction for reinforced concrete building and constructing method therefor
JP2010248746A (en) Embedded form
JP4365709B2 (en) Structural member

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120207

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120309

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20141031

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150827

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150901

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151020

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151117

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151126

R150 Certificate of patent or registration of utility model

Ref document number: 5857379

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees