JP2012057342A - Concrete pile with shell steel pipe - Google Patents

Concrete pile with shell steel pipe Download PDF

Info

Publication number
JP2012057342A
JP2012057342A JP2010200786A JP2010200786A JP2012057342A JP 2012057342 A JP2012057342 A JP 2012057342A JP 2010200786 A JP2010200786 A JP 2010200786A JP 2010200786 A JP2010200786 A JP 2010200786A JP 2012057342 A JP2012057342 A JP 2012057342A
Authority
JP
Japan
Prior art keywords
steel pipe
earthquake
pile
stress
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010200786A
Other languages
Japanese (ja)
Other versions
JP5527120B2 (en
Inventor
Naoto Mori
直人 森
Hiromasa Tanaka
宏征 田中
Hirotaka Kusaka
裕貴 日下
Yukito Yoshizawa
幸仁 吉澤
Yukio Abe
幸夫 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries Ltd filed Critical Sumitomo Metal Industries Ltd
Priority to JP2010200786A priority Critical patent/JP5527120B2/en
Publication of JP2012057342A publication Critical patent/JP2012057342A/en
Application granted granted Critical
Publication of JP5527120B2 publication Critical patent/JP5527120B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a concrete pile with shell steel pipe which is excellent in economical efficiency, capable of suppressing the plate thickness of a steel pipe most by selecting an optimum combination for the material strengths of the steel pipe and concrete against external force acting on a pile body.SOLUTION: The relation of the strength of the material of a steel pipe 3, the strength of concrete 2, the Young's modulus of the steel pipe 3 and the Young's modulus of the concrete 2 satisfies the relation of an expression (1). In this case, fs is stress (N/mm) of the steel pipe to be allowed in an earthquake, fc is stress (N/mm) of pile body concrete to be allowed in an earthquake, Ec is the Young's modulus (N/mm) of the concrete, and Es is the Young's modulus (N/mm) of the steel pipe.

Description

本発明は、土木・建築用基礎部材として用いられる外殻鋼管付コンクリート杭(以下、「SC杭」)に関するものである。   The present invention relates to a concrete pile with a shell steel pipe (hereinafter referred to as “SC pile”) used as a foundation member for civil engineering and construction.

SC杭は、主に地表面付近の上杭として使用され、構造物を支えるための軸力に加えて地震発生時の水平力および曲げモーメントに耐えうるべく、高強度コンクリート杭の外に鋼管を設置することにより高い曲げ性能を有する杭である。   SC piles are mainly used as upper piles near the ground surface, and steel pipes are installed outside of high-strength concrete piles to withstand horizontal forces and bending moments in the event of an earthquake in addition to axial forces to support structures. It is a pile that has high bending performance when installed.

従来のSC杭は、その外殻鋼管としてはJIS A 5525 に記載されているSKK400(短期許容応力は235(N/mm2)程度)やSKK490(短期許容応力は325(N/mm2)程度)と同等の強度の鋼管を用い、コンクリートとしてはその設計基準強度が80(N/mm2)(短期許容応力は40(N/mm2))や105(N/mm2)(短期許容応力は60(N/mm2))程度のコンクリートを用いた杭が知られている(例えば、非特許文献1等)。 For conventional SC piles, SKK400 (short-term allowable stress is about 235 (N / mm 2 )) and SKK490 (short-term allowable stress is about 325 (N / mm 2 )) described in JIS A 5525 as the outer shell steel pipe ), And the design standard strength of concrete is 80 (N / mm 2 ) (short-term allowable stress is 40 (N / mm 2 )) or 105 (N / mm 2 ) (short-term allowable stress) Is a pile using concrete of about 60 (N / mm 2 )) (for example, Non-Patent Document 1).

しかしながら、近年は、構造物の高層・大型化が進み、それに伴って従来よりも大きな支持力を備える杭及びその工法が提案されており(例えば、特許文献1)、その影響でSC杭にも更なる曲げ性能の向上が望まれている。   However, in recent years, piles and structures with higher bearing capacity than conventional ones and methods of construction have been proposed (for example, Patent Document 1) due to the progress of higher-rise and larger structures. Further improvement in bending performance is desired.

ところで、SC杭に高い曲げ性能を付与する手段としては、最も単純には鋼管の板厚を厚くすることやコンクリートの壁厚を厚くすることが考えられる。
特開2005-139900号公報 JP-SC105パイル及びJP-HSC105パイル:(財)日本建築センター評定番号FD0180-05
By the way, as means for imparting high bending performance to the SC pile, the simplest method is to increase the thickness of the steel pipe or the thickness of the concrete wall.
JP 2005-139900 A JP-SC105 pile and JP-HSC105 pile: Japan Building Center rating number FD0180-05

しかし、鋼管の板厚を厚くする方法は、SC杭のコスト内訳のなかで鋼管の材料コストは大きな部分を占めているため、単純に板厚を厚くするのでは、大きなコスト増となってしまう。   However, in the method of increasing the thickness of the steel pipe, the material cost of the steel pipe occupies a large part of the cost breakdown of the SC pile. Therefore, simply increasing the thickness of the steel pipe will greatly increase the cost. .

また、スパイラル鋼管としての製造可能な板厚を超えると、プレスベンド鋼管等のさらに高価な鋼管を使用することになるのでさらにコストが著しく増大する。一方、コンクリートの壁厚を厚くする方法は、コンクリートの壁厚を増加させることによる曲げ性能の向上効果は限定的である。   In addition, if the thickness of the spiral steel pipe that can be manufactured is exceeded, a more expensive steel pipe such as a press-bend steel pipe is used, which further increases the cost. On the other hand, the method of increasing the concrete wall thickness has a limited effect of improving the bending performance by increasing the concrete wall thickness.

そこで、曲げ性能を向上させる手段として、鋼管とコンクリートの材料強度を変更することが考えられる。   Therefore, as a means for improving the bending performance, it is conceivable to change the material strength of the steel pipe and concrete.

しかし、所要の外力に耐えうる鋼管の材料強度、コンクリートの材料強度、および鋼管の板厚には無限の組合せがあるため、外力に見合った最適なSC杭の提供はきわめて困難であった。   However, since there are infinite combinations of steel pipe material strength that can withstand the required external force, concrete material strength, and steel pipe plate thickness, it has been extremely difficult to provide the optimum SC pile that matches the external force.

本発明は、上記問題点に鑑み、杭体に作用する外力に対して、鋼管ならびにコンクリートの材料強度について最適な組合せを選定することにより鋼管の板厚を最も抑えることのできる、経済性に優れたSC杭を提供することを目的とするものである。   In view of the above problems, the present invention can suppress the plate thickness of the steel pipe most by selecting the optimum combination of the steel pipe and the material strength of the concrete against the external force acting on the pile body, and is excellent in economic efficiency. The purpose is to provide the SC pile.

請求項1記載のSC杭は、鋼管材料の強度と、コンクリートの強度と、鋼管のヤング率と、コンクリートのヤング率との関係が、式(1)の関係を満たすように構成されていることを特徴とするものである。   The SC pile according to claim 1 is configured such that the relationship between the strength of the steel pipe material, the strength of the concrete, the Young's modulus of the steel tube, and the Young's modulus of the concrete satisfies the relationship of the formula (1). It is characterized by.

Figure 2012057342
Figure 2012057342

ここに、fs:鋼管の地震時に許容される応力(N/mm2)
fc:杭体コンクリートの地震時に許容される応力(N/mm2)
Ec:コンクリートのヤング率(N/mm2)
Es:鋼管のヤング率(N/mm2)
Where fs is the stress that can be tolerated during a steel pipe earthquake (N / mm 2 )
fc: Stress that is allowed during pile earthquake (N / mm 2 )
Ec: Young's modulus of concrete (N / mm 2 )
Es: Young's modulus of steel pipe (N / mm 2 )

軸力および曲げを受けるSC杭において、鋼管およびコンクリートに発生するひずみと応力状態は、図1(c)に図示するようになる。   In the SC pile subjected to the axial force and bending, the strain and stress state generated in the steel pipe and concrete are as shown in FIG.

図1(c)において、圧縮側縁端における軸方向ひずみをεとすると、鋼管の圧縮側縁端に発生する応力σs、およびコンクリートの圧縮側縁端に発生する応力σcは以下のようになる。   In FIG. 1C, when the axial strain at the compression side edge is ε, the stress σs generated at the compression side edge of the steel pipe and the stress σc generated at the compression side edge of the concrete are as follows. .

Figure 2012057342
Figure 2012057342

Figure 2012057342
Figure 2012057342

なお、鋼管の板厚は杭径に対して十分小さいものとしている。
このとき、σsが鋼管の地震時に許容される応力fsに達するか、σcがコンクリートの地震時に許容される応力fcに達した時点で、SC杭としての地震時に許容される曲げモーメントに達したことになる。コンクリートの発生応力σcがfcに達する条件は、式(1)の左側で表される。
The plate thickness of the steel pipe is sufficiently small relative to the pile diameter.
At this time, when σs reaches the stress fs allowed during the earthquake of steel pipe or σc reaches the stress fc allowed during the earthquake of concrete, the bending moment allowed during the earthquake as an SC pile has been reached become. The condition for the generated stress σc of the concrete to reach fc is expressed on the left side of Equation (1).

なお、鋼管の地震に許容される応力fs、コンクリートの地震時に許容される応力fcは、建築分野においては、それぞれ、鋼管の短期許容応力、コンクリートの短期許容応力を意味する。   Note that the stress fs allowed for an earthquake of a steel pipe and the stress fc allowed for an earthquake of a concrete mean a short-term allowable stress for a steel pipe and a short-term allowable stress for a concrete, respectively, in the building field.

図2は 、非地震時の許容支持力として12000(kN/m2)である高支持力杭工法の上杭にSC杭が用いられた場合において、短期軸力(非地震時の軸力 NL(非地震時の許容支持力12000(kN/m2)に等しいものとする。)に、地震時の変動軸力NEとしてNLの0.5倍を加算又は減算した値)のもとで、地震力の水平力HとしてNLの0.15倍が作用した場合に(図7参照)、この外力に耐えうるのに必要な外殻鋼管の板厚tを、SC杭における式(1)のパラメータの値との関係で整理したものである。 Fig. 2 shows the short-term axial force (non-earthquake axial force NL) when SC pile is used for the upper pile of the high bearing force pile method that is 12000 (kN / m 2 ) as the allowable bearing force during non-earthquake. (Assuming that it is equal to the allowable bearing capacity 12000 (kN / m 2 ) at the time of non-earthquake) and the value of 0.5 times NL as the variable axial force NE at the time of earthquake) When the horizontal force H of 0.15 times NL acts as the horizontal force H (see Fig. 7), the thickness t of the outer steel pipe necessary to withstand this external force is expressed as the value of the parameter in equation (1) for the SC pile. It is arranged in relation to.

ここで、SC杭に係る数値として、表1の値を用いた。   Here, the value of Table 1 was used as a numerical value related to the SC pile.

Figure 2012057342
Figure 2012057342

また、図2の縦軸は、同一径、同一コンクリート強度の条件において、鋼管の地震時に許容される応力を変化させた場合に最も薄くなる板厚をt_opt として、各条件における必要板厚tとt_optとの比t/ t_opt を示している。   The vertical axis in Fig. 2 shows the required thickness t in each condition, where t_opt is the thickness that is the thinnest when the allowable stress at the time of the earthquake of the steel pipe is changed under the conditions of the same diameter and the same concrete strength. The ratio t / t_opt with t_opt is shown.

図2に示す通り、横軸すなわち式(1)のパラメータの値が1である場合を臨界点として、1より小さい場合は、横軸の値を大きくするほど(単純には鋼管の強度を大きくするほど) 鋼管の必要板厚は減少するが、1を超えると必要板厚は変わらない。   As shown in FIG. 2, the horizontal axis, that is, the case where the value of the parameter of the formula (1) is 1, and the critical value is less than 1, the larger the value of the horizontal axis (simply increase the strength of the steel pipe). The required plate thickness of the steel pipe decreases, but if it exceeds 1, the required plate thickness does not change.

以上より、式(1)の左側の関係を満たせば、板厚の最も薄いSC杭となることがわかる。かえって横軸の値を必要以上に大きくしても板厚は減少せず鋼材コストが高くなるので、式(1)のパラメータが1のときが最も効率がよい。   From the above, it can be seen that the SC pile with the smallest thickness is obtained if the relationship on the left side of Equation (1) is satisfied. On the other hand, even if the value on the horizontal axis is increased more than necessary, the plate thickness does not decrease and the steel material cost increases.

しかし、製造バラツキ等の安全シロを考慮して、式(1)のパラメータの上限は1.0〜1.2程度とする。   However, the upper limit of the parameter of the formula (1) is set to about 1.0 to 1.2 in consideration of safety margin such as manufacturing variation.

請求項2記載のSC杭は、請求項1記載のSC杭において、鋼管の地震時に許容される応力と、非地震時においてSC杭に作用する軸力と、杭の断面積(中空部分を含む)に関して、下式を満たすように構成されていることを特徴とするものである。   The SC pile according to claim 2 is the SC pile according to claim 1, wherein the stress allowed when the steel pipe is earthquake, the axial force acting on the SC pile during non-earthquake, and the cross-sectional area of the pile (including the hollow portion) ) Is configured to satisfy the following expression.

Figure 2012057342
Figure 2012057342

ここに、N:非地震時においてSC杭に作用する軸力(kN)
Ap:杭の断面積(中空部分含む)(m2)
N: Axial force acting on SC pile during non-earthquake (kN)
Ap: Cross-sectional area of pile (including hollow part) (m 2 )

請求項3に記載のSC杭は、請求項1または請求項2に記載のSC杭において、鋼管の地震時に許容される応力が、400〜440(N/mm2)であるように構成されていることを特徴とするものである。 The SC pile according to claim 3 is configured such that in the SC pile according to claim 1 or claim 2, the allowable stress at the time of the earthquake of the steel pipe is 400 to 440 (N / mm 2 ). It is characterized by being.

本発明は、鋼管材料の強度と、コンクリートの強度と、鋼管のヤング率と、コンクリートのヤング率との関係が、式(1)の関係を満たすように構成されていることにより、杭体に作用する外力に対して、鋼管ならびにコンクリートの材料強度について最適な組合せを選定することにより鋼管の板厚を最も抑えることのできる、経済性に優れたSC杭を提供することができる。   The present invention provides a pile body in which the relationship between the strength of the steel pipe material, the strength of the concrete, the Young's modulus of the steel pipe, and the Young's modulus of the concrete satisfies the relationship of formula (1). By selecting the optimum combination of the steel pipe and the material strength of the concrete with respect to the acting external force, it is possible to provide an economical SC pile that can minimize the plate thickness of the steel pipe.

高強度コンクリート杭の外側に外殻鋼管を設置して形成されたSC杭を示し、(a)はその縦断面図、(b)は横断面図、(c)は軸力(圧縮)と曲げを受けるSC杭において、鋼管およびコンクリートに発生するひずみと応力状態を示す図である。An SC pile formed by installing an outer shell steel pipe on the outside of a high-strength concrete pile, (a) is a longitudinal sectional view, (b) is a transverse sectional view, (c) is an axial force (compression) and bending It is a figure which shows the distortion and stress state which generate | occur | produce in a steel pipe and concrete in SC pile which receives. 非地震時の許容支持力として12000(kN/m2)である高支持力杭工法の上杭にSC杭が用いられた場合において、短期軸力のもとで、地震力の水平力として非地震時に作用する軸力 の0.15倍が作用した場合に、この外力に耐えうるのに必要な外殻鋼管の板厚を、SC杭における式(1)のパラメータの値との関係で整理した図である。When SC pile is used for the upper pile of the high bearing capacity pile construction method which is 12000 (kN / m 2 ) as the allowable bearing capacity at the time of non-earthquake, the horizontal force of the seismic force is not Figure showing the thickness of the outer steel pipe necessary to withstand this external force when the axial force acting at the time of the earthquake is 0.15 times, in relation to the value of the parameter in equation (1) for SC piles It is. 式(1)の関係を保ちながら鋼管の地震時に許容される応力を変化させた場合の必要板厚について、地震時に許容される応力が235(N/mm2)の場合と比較した場合の減少率を示す図である。Decrease in the required plate thickness when the allowable stress at the time of earthquake of steel pipe is changed while maintaining the relationship of equation (1) compared with the case where the allowable stress at the time of earthquake is 235 (N / mm 2 ) It is a figure which shows a rate. 鋼管の地震時に許容される応力が235(N/mm2)、350(N/mm2)、500(N/mm2)の場合における地震時に許容されるモーメントに関する軸力−曲げモーメントを示す図である。A figure showing the axial force-bending moment related to the moment allowed for an earthquake when the allowable stress for a steel pipe is 235 (N / mm 2 ), 350 (N / mm 2 ), or 500 (N / mm 2 ) It is. SC杭に非地震時に作用する軸力の大きさ、地震時の変動軸力の割合、水平力の条件を変更した場合において、臨界点となる鋼管の地震時に許容される応力と、SC杭に作用する軸力を横軸として表示した図である。When the magnitude of the axial force acting on the SC pile during non-earthquake, the ratio of variable axial force at the time of the earthquake, and the condition of the horizontal force are changed, the stress allowed during the earthquake of the steel pipe, which is the critical point, It is the figure which displayed the acting axial force as a horizontal axis. 非地震時の作用軸力を杭の断面積で除した値が12000(kN/m2)の場合と16000(kN/m2)の場合における、地震時に許容される応力と、板厚の減少/地震時に許容される応力の増分の関係を表した図である。Decrease in plate thickness and allowable stress during earthquakes when the axial force of non-earthquake divided by the cross-sectional area of the pile is 12000 (kN / m 2 ) and 16000 (kN / m 2 ) FIG. 6 is a diagram showing a relationship between increments of stress allowed at the time of an earthquake. 軸力(圧縮)と水平力を受けるSC杭を示す図である。It is a figure which shows the SC pile which receives an axial force (compression) and a horizontal force.

図1(a),(b)は、請求項1に係る発明の一実施形態を示し、SC杭1は、コンクリート2の外周に鋼管3を設置することにより形成され、鋼管3には地震時に許容される応力fsが350(N/mm2)以上の鋼管が用いられている。 1 (a) and 1 (b) show an embodiment of the invention according to claim 1, and SC pile 1 is formed by installing steel pipe 3 on the outer periphery of concrete 2, and steel pipe 3 has an A steel pipe having an allowable stress fs of 350 (N / mm 2 ) or more is used.

現在のSC杭に用いられている鋼管3の地震時に許容される応力fsは、JIS A 5525 に記載されているSKK400(235N/mm2程度)やSKK490(325N/mm2程度)と同等であり、これを、鋼管3の地震時に許容される応力fsを350(N/mm2)以上とすることにより、従来のSC杭よりも鋼管3の板厚を減じることができ、経済的なSC杭を提供することができる。これについて、以下に説明する。 Stress fs allowed during an earthquake of a steel pipe 3 used in the current SC piles, JIS A 5525 SKK400 (235N / mm 2 approximately), which is described in and is equivalent to SKK490 (325N / mm 2 approximately) By making the stress fs allowed at the time of earthquake of the steel pipe 3 350 (N / mm 2 ) or more, the plate thickness of the steel pipe 3 can be reduced compared with the conventional SC pile, and the economical SC pile Can be provided. This will be described below.

図3は、式(1)の関係を保ちながら鋼管3の地震時に許容される応力fsを変化させた場合の必要板厚について、地震時に許容される応力fsが235(N/mm2)の場合と比較した場合の減少率を示したものである。 Fig. 3 shows the necessary thickness of the steel pipe 3 when the stress fs allowed during an earthquake is changed while maintaining the relationship of equation (1). The stress fs allowed during an earthquake is 235 (N / mm 2 ). The rate of decrease when compared to the case is shown.

なお、ここでは、図2の結果を誘導した条件と同様に、非地震時の許容支持力として12000(kN/m2)である高支持力杭工法の上杭にSC杭1が用いられた場合を想定している。 In addition, SC pile 1 was used for the upper pile of the high bearing capacity pile method of 12000 (kN / m 2 ) as the allowable bearing capacity at the time of non-earthquake as well as the conditions which derived the result of FIG. Assume the case.

また、図3には、点線にて、板厚の減少が鋼管3の強度上昇に逆比例すると仮定した場合を併記している。これは、鋼材強度の上昇した分、板厚の減少が期待できるという、一般的な予想値を記述したものである。   FIG. 3 also shows a case where it is assumed that the decrease in the plate thickness is inversely proportional to the increase in the strength of the steel pipe 3 by dotted lines. This describes a general expected value that a reduction in sheet thickness can be expected by the increase in steel strength.

図3 に示すように、式(1)の関係を保った場合、必要板厚は、鋼管3の地震時に許容される応力fsが350(N/mm2)程度以下の領域では、地震時に許容される応力fsを上昇させるにつれて必要板厚が大きく減少する。 As shown in Fig. 3, if the relationship of equation (1) is maintained, the required plate thickness is acceptable in the event of an earthquake when the stress fs of the steel pipe 3 is less than about 350 (N / mm 2 ). As the stress fs is increased, the required plate thickness is greatly reduced.

これは、鋼管3自身の強度上昇分に加えて、鋼管3が地震時に許容される応力fsに達するまでにコンクリート杭2により多くの荷重を分担できる効果があるためである。   This is because in addition to the increase in strength of the steel pipe 3 itself, there is an effect that a large amount of load can be shared by the concrete pile 2 until the steel pipe 3 reaches the stress fs allowed during an earthquake.

板厚減少の度合いは、種々の設計条件にもよるが、図3の条件では、鋼管3の降伏強度が235(N/mm2)の場合に比して75%程度、鋼管の降伏強度が325(N/mm2)の場合に比しても40%程度にも上る。 The degree of sheet thickness reduction depends on various design conditions, but under the conditions shown in Fig. 3, the yield strength of steel pipe 3 is about 75% that of steel pipe 3 when the yield strength is 235 (N / mm 2 ). Compared to the case of 325 (N / mm 2 ), it is as high as 40%.

一方、鋼管3の地震時に許容される応力fsが概ね350(N/mm2)以上の領域では、それ以下の場合と比較して強度上昇による必要板厚の減少度合いが小さくなる。 On the other hand, in the region where the stress fs allowed at the time of the earthquake of the steel pipe 3 is approximately 350 (N / mm 2 ) or more, the degree of reduction in the required plate thickness due to the increase in strength is smaller than that in the case where the stress is less than that.

これは、以下の理由による。   This is due to the following reason.

図4は、鋼管3の地震時に許容される応力fsが235(N/mm2)、350(N/mm2)、500(N/mm2)の場合における地震時に許容されるモーメントに関する軸力−曲げモーメント図を示したものである。図中、黒丸のプロットは、損傷限界時の外力の例を示す。なお、外力の条件は図2を導出した条件と同一である。 Fig. 4 shows the axial force related to the moment allowed during an earthquake when the stress fs allowed during an earthquake of the steel pipe 3 is 235 (N / mm 2 ), 350 (N / mm 2 ), and 500 (N / mm 2 ). -A bending moment diagram is shown. In the figure, the black circle plot shows an example of the external force at the damage limit. The external force conditions are the same as those derived from FIG.

鋼管3の地震時に許容される応力fsが小さい場合(235(N/mm2))は、地震時の変動軸力NEが正にかかった場合の照査で設計が決まっている。一方、鋼管3の地震時に許容される応力fsが十分大きい場合(500(N/mm2))は、地震時の変動軸力NEが負にかかった場合の照査で板厚が決まる。 When the stress fs allowed at the time of earthquake of the steel pipe 3 is small (235 (N / mm 2 )), the design is determined by checking when the variable axial force NE at the time of the earthquake is positive. On the other hand, when the stress fs allowed at the time of the earthquake of the steel pipe 3 is sufficiently large (500 (N / mm 2 )), the plate thickness is determined by checking when the variable axial force NE at the time of the earthquake is negative.

地震時の変動軸力NEが正にかかった場合の照査で決まる場合(鋼管3の地震時に許容される応力fsが低い場合)は、鋼管3の強度を上昇させることで、コンクリート杭2に荷重をより多く伝達できるために、板厚を大きく減らすことができるが、地震時の変動軸力NEが負にかかった場合の照査で決まる場合(鋼管3の地震時に許容される応力fsが十分大きい場合)は、軸力が小さく、曲げ耐力にコンクリート杭2の強度がほとんど寄与しないので、鋼管3の地震時に許容される応力fsを上昇させても板厚の減少はあまり期待できない。   When it is determined by checking when the variable axial force NE during earthquake is applied positively (when the stress fs allowed during the earthquake of the steel pipe 3 is low), the strength of the steel pipe 3 is increased to load the concrete pile 2 The plate thickness can be greatly reduced because it can be transmitted more, but when the variable axial force NE at the time of the earthquake is negatively determined by the verification (the stress fs allowed during the earthquake of the steel pipe 3 is sufficiently large) In the case), since the axial force is small and the strength of the concrete pile 2 hardly contributes to the bending strength, even if the stress fs allowed during the earthquake of the steel pipe 3 is increased, the reduction of the plate thickness cannot be expected so much.

鋼管3の地震時に許容される応力fsを上昇させることは、化学成分、コイルの製造条件、製管条件、溶接条件等の技術的障害が増加し、また製造コストについてもそれらに従って上昇する。その臨界点は概ね350(N/mm2)である。 Increasing the stress fs allowed during an earthquake of the steel pipe 3 increases technical obstacles such as chemical components, coil manufacturing conditions, pipe manufacturing conditions, welding conditions, and the manufacturing cost also increases accordingly. Its critical point is approximately 350 (N / mm 2 ).

請求項2に係る発明の一実施形態として、SC杭1は、鋼管3の地震時に許容される応力fsと、SC杭1に非地震時に作用する軸力N と、SC杭1の断面積Apが、式(4)を満たすように構成されている。   As an embodiment of the invention according to claim 2, the SC pile 1 includes a stress fs allowed during an earthquake of the steel pipe 3, an axial force N acting on the SC pile 1 during a non-earthquake, and a cross-sectional area Ap of the SC pile 1. However, it is comprised so that Formula (4) may be satisfy | filled.

図5は、SC杭1に非地震時に作用する軸力NL(kN)の大きさ(SC杭1に非地震時に作用する軸力NLをSC杭1の断面積Apで除したものが6000〜16000(kN/m2))、地震時の変動軸力NEの割合(地震時の変動軸力NEが非地震時に作用する軸力NLの0.5倍〜1倍)、水平力Hの条件(水平力Hが非地震時に作用する軸力NLの0.15〜0.2倍)を変更した場合において、図3と同様に臨界点となる鋼管3の地震時に許容される応力fsを求め、SC杭1に作用する軸力を横軸として表示したものである。 Figure 5 shows the magnitude of axial force NL (kN) acting on SC pile 1 during non-earthquake (the axial force NL acting on SC pile 1 during non-earthquake divided by the cross-sectional area Ap of SC pile 1 16000 (kN / m 2 )), ratio of variable axial force NE during earthquake (0.5 to 1 times axial force NL acting when non-earthquake variable axial force NE during earthquake), horizontal force H condition (horizontal When the force H is changed from 0.15 to 0.2 times the axial force NL that acts during non-earthquake), the stress fs allowed during the earthquake of the steel pipe 3, which is the critical point, is obtained in the same way as in FIG. The axial force to be displayed is displayed as a horizontal axis.

横軸の値が同一のものについては、軸力変動の割合、水平力Hの各条件を変更しても、臨界点となる鋼管3の地震時に許容される応力fsへの影響はそれほど大きくない。   When the horizontal axis value is the same, changing the axial force fluctuation rate and horizontal force H conditions does not have a significant effect on the stress fs allowed during an earthquake of the steel pipe 3 that is the critical point. .

一方、非地震時に作用する軸力NLを変更した場合には、臨界点となる鋼管3の地震時に許容される応力fsに変化が表れ、非地震時に作用する軸力NLが大きい程、臨界点となる鋼管3の地震時に許容される応力fsは高くなり、その値はSC杭1に作用する軸力に対して一次の相関関係となる。   On the other hand, when the axial force NL acting at the time of non-earthquake is changed, the stress fs allowed during the earthquake of the steel pipe 3 that becomes the critical point changes, and the critical point increases as the axial force NL acting at the time of non-earthquake increases. The stress fs allowed at the time of the earthquake of the steel pipe 3 becomes high, and the value has a first-order correlation with the axial force acting on the SC pile 1.

非地震時にSC杭1に作用する軸力NLと、臨界点となる鋼管3の地震時に許容される応力fsとの関係は、概ね式(4)の関係に内包される。   The relationship between the axial force NL acting on the SC pile 1 at the time of a non-earthquake and the stress fs allowed at the time of the earthquake of the steel pipe 3 as a critical point is generally included in the relationship of the equation (4).

式(4)よりも軸力が上方にある領域では、鋼管3の地震時に許容される応力fsが不足する影響で、鋼管3の板厚が厚くなってしまい、経済的ではない。   In the region where the axial force is higher than the formula (4), the plate thickness of the steel pipe 3 is increased due to the insufficient stress fs allowed at the time of the earthquake of the steel pipe 3, which is not economical.

また、式(4)よりも軸力が下方にある領域では、鋼管3の地震時に許容される応力fsが必要以上に高く、鋼管3の地震時に許容される応力を下げても、必要板厚に大きな変化はないため、鋼管3の地震時に許容される応力を下げることが望ましい。   Further, in the region where the axial force is lower than the equation (4), the stress fs allowed during the earthquake of the steel pipe 3 is higher than necessary, and even if the stress allowed during the earthquake of the steel pipe 3 is lowered, the necessary plate thickness Therefore, it is desirable to reduce the allowable stress during the earthquake of the steel pipe 3.

従って、式(4)に合致する領域で使用するSC杭1が、与えられた外力条件に対して、板厚を最も効果的に抑えるための鋼管3を有する SC杭を提供することが可能となる。   Therefore, it is possible to provide the SC pile 1 having the steel pipe 3 for suppressing the plate thickness most effectively for the given external force condition. Become.

請求項3に係る発明の一実施形態として、SC杭1は、鋼管3の地震時に許容される応力fsが400〜440(N/mm2)程度であるように構成されている。 As an embodiment of the invention according to claim 3, the SC pile 1 is configured such that the stress fs allowed during the earthquake of the steel pipe 3 is about 400 to 440 (N / mm 2 ).

昨今、高支持力の工法が増えてきていることは前述の通りである。当該工法の場合、先端支持層が十分固い場合は(N値にして、50〜60程度)、非地震時の作用軸力を杭断面積で除した値が12000〜16000(kN/m2)程度となる場合もあり、現状の強度の鋼管(SKK400、SKK490程度)であれば、上記のケース(鋼管3の地震時に許容される応力fsが不足して板厚が厚くなり、不経済なケース)に該当することになる。 As mentioned above, the construction methods with high bearing capacity are increasing recently. In the case of this method, when the tip support layer is sufficiently hard (N value is about 50-60), the value obtained by dividing the non-earthquake acting axial force by the pile cross-sectional area is 12000-16000 (kN / m 2 ) If it is a steel pipe of the current strength (about SKK400, SKK490), the above case (stress fs allowed at the time of earthquake of steel pipe 3 is insufficient and the plate thickness becomes thick, which is uneconomical ).

従って、非地震時の軸力NLが前記のように大きくなる場合については、式(1)の関係を満たした上で、現状の鋼管よりも、地震時に許容される応力fsが高い鋼管を使用することにより、板厚を著しく減少でき、経済的なSC杭を提供することが可能である。   Therefore, when the axial force NL at the time of non-earthquake becomes large as described above, a steel pipe having a higher stress fs allowed at the time of earthquake than the current steel pipe is used after satisfying the relationship of equation (1). By doing so, it is possible to significantly reduce the plate thickness and provide an economical SC pile.

図3において、非地震時の作用軸力NLを杭断面積Apで除した値が12000〜16000(kN/m2)の範囲を網羅する鋼管3の地震時に許容される応力fsとして、400(N/mm2)程度のものを用いることが好ましいと考えられる。 In FIG. 3, the stress fs allowed during an earthquake of the steel pipe 3 covering the range of 12000 to 16000 (kN / m 2 ) obtained by dividing the non-earthquake acting axial force NL by the pile cross-sectional area Ap is 400 ( It is considered preferable to use a material of about N / mm 2 ).

図6は、非地震時の作用軸力NLを杭の断面積Apで除した値が12000(kN/m2)の場合と16000(kN/m2)の場合における、地震時に許容される応力fsと、板厚の減少/地震時に許容される応力の増分の関係を示したものである。 Fig. 6 shows the stresses allowed during an earthquake when the axial force NL during non-earthquake divided by the cross-sectional area Ap of the pile is 12000 (kN / m 2 ) and 16000 (kN / m 2 ). It shows the relationship between fs and the decrease in plate thickness / increase in allowable stress during an earthquake.

なお、非地震時の作用軸力NL以外の条件としては、図3を導出した時のものと同様である。   The conditions other than the acting axial force NL at the time of non-earthquake are the same as those when FIG. 3 was derived.

図中の縦軸は、鋼管3の強度上昇に対して、どの程度板厚を軽減できるかを示したものであり、この数値が高い程、鋼管3の強度上昇による板厚低減の余地が残されていることを示し、この数値が低い程、鋼管3の強度上昇を行っても板厚低減が図り辛いことを表している。   The vertical axis in the figure indicates how much the plate thickness can be reduced with respect to the increase in strength of the steel pipe 3, and the higher this value, the more room for reducing the plate thickness due to the increase in strength of the steel pipe 3. The lower the numerical value, the more difficult it is to reduce the plate thickness even if the strength of the steel pipe 3 is increased.

図中、鋼管3の地震時に許容される応力fsが350〜400(N/mm2)程度で急激に縦軸の値が小さくなっていることが分かる。従って、鋼管3の地震時に許容される応力fsが400(N/mm2)程度の鋼管を用いることにより、効率的に鋼管3の板厚を抑えたSC杭を提供することが可能となる。 In the figure, it can be seen that the value of the vertical axis abruptly decreases when the stress fs allowed during an earthquake of the steel pipe 3 is about 350 to 400 (N / mm 2 ). Therefore, by using a steel pipe having a stress fs allowable at the time of earthquake of the steel pipe 3 of about 400 (N / mm 2 ), it is possible to provide an SC pile in which the thickness of the steel pipe 3 is efficiently suppressed.

なお、実用上は、種々の設計条件のばらつきに対する安全シロを考慮し、鋼管3の地震時に許容される応力fsが400〜440(N/mm2)程度の鋼管3を用いることが望ましい。 In practice, it is desirable to use a steel pipe 3 having a stress fs of about 400 to 440 (N / mm 2 ) allowed in the event of an earthquake of the steel pipe 3 in consideration of a safety margin against variations in various design conditions.

本発明は、杭体に作用する外力に対して、鋼管ならびにコンクリート杭の材料強度について最適な組合せを選定することにより鋼管の板厚を最も抑えることのできる、経済性に優れたSC杭を提供することができる。   The present invention provides an economical SC pile that can suppress the plate thickness of the steel pipe most by selecting the optimal combination of material strength of the steel pipe and concrete pile against the external force acting on the pile body. can do.

1 SC杭
2 コンクリート杭
3 鋼管
1 SC pile 2 Concrete pile 3 Steel pipe

Claims (3)

SC杭を構成する鋼管およびコンクリートについて、当該鋼管における地震時に許容される応力fs 及びヤング率Esと、当該コンクリートにおける地震時に許容される応力fc及びヤング率Ecとの関係が、以下の式を満たすように構成されてなることを特徴とするSC杭。
Figure 2012057342
ここに、fs:鋼管の地震時に許容される応力(N/mm2)
fc:杭体コンクリートの地震時に許容される応力(N/mm2)
Ec:コンクリートのヤング率(N/mm2)
Es:鋼管のヤング率(N/mm2)
The relationship between the stress fs and Young's modulus Es allowed during an earthquake in the steel pipe and the concrete constituting the SC pile and the stress fc and Young's modulus Ec allowed during an earthquake in the concrete satisfies the following formula: SC pile characterized by being configured as follows.
Figure 2012057342
Where fs is the stress that can be tolerated during a steel pipe earthquake (N / mm 2 )
fc: Stress that is allowed during pile earthquake (N / mm 2 )
Ec: Young's modulus of concrete (N / mm 2 )
Es: Young's modulus of steel pipe (N / mm 2 )
請求項1記載のSC杭において、鋼管の地震時に許容される応力fsと、非地震時においてSC杭に作用する軸力Nと、杭の断面積(中空部分を含む)Apに関して、以下の式を満たすように構成されてなることを特徴とするSC杭。
Figure 2012057342
ここに、 N:非地震時においてSC杭に作用する軸力(kN)
Ap:杭の断面積(中空部分含む)(m2)
In the SC pile according to claim 1, regarding the stress fs allowed during an earthquake of a steel pipe, the axial force N acting on the SC pile during a non-earthquake, and the cross-sectional area (including the hollow portion) Ap of the pile, the following equations SC pile characterized by being configured to satisfy.
Figure 2012057342
N: Axial force acting on SC pile during non-earthquake (kN)
Ap: Cross-sectional area of pile (including hollow part) (m 2 )
請求項1または2記載のSC杭において、鋼管の地震時に許容される応力が400〜440(N/mm2)であるように構成されてなることを特徴とするSC杭。 The SC pile according to claim 1 or 2, characterized in that the stress allowed at the time of an earthquake of a steel pipe is 400 to 440 (N / mm 2 ).
JP2010200786A 2010-09-08 2010-09-08 Concrete pile with shell steel pipe Active JP5527120B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010200786A JP5527120B2 (en) 2010-09-08 2010-09-08 Concrete pile with shell steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010200786A JP5527120B2 (en) 2010-09-08 2010-09-08 Concrete pile with shell steel pipe

Publications (2)

Publication Number Publication Date
JP2012057342A true JP2012057342A (en) 2012-03-22
JP5527120B2 JP5527120B2 (en) 2014-06-18

Family

ID=46054770

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010200786A Active JP5527120B2 (en) 2010-09-08 2010-09-08 Concrete pile with shell steel pipe

Country Status (1)

Country Link
JP (1) JP5527120B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960597A (en) * 2022-04-14 2022-08-30 湖南文理学院 Method for testing strain-internal force of pile body of PHC pipe pile

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61202536U (en) * 1985-06-10 1986-12-19

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61202536U (en) * 1985-06-10 1986-12-19

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JPN7013001930; 国内カタログ: 'ASAHI KASEI PILE TECHNICAL HAND BOOK' ASAHI KASEI PILE TECHNICAL HAND BOOK , 200304, 旭化成建材 *
JPN7013001931; 国内カタログ: '拡頭リング工法(SC杭用)' 拡頭リング工法(SC杭用) , 201003, ジャパンパイル株式会社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960597A (en) * 2022-04-14 2022-08-30 湖南文理学院 Method for testing strain-internal force of pile body of PHC pipe pile

Also Published As

Publication number Publication date
JP5527120B2 (en) 2014-06-18

Similar Documents

Publication Publication Date Title
JP5154338B2 (en) Prestressed reinforced concrete pile
EP2615226B1 (en) Steel pipe column structure and method for producing same
US9062432B2 (en) Depression-provided steel pipe and composite pile
JP5896004B2 (en) Steel pipe concrete composite pile
JP2017534031A (en) Circular shear panel damper
CN111706003A (en) Round steel tube concrete with negative Poisson's ratio effect and design method thereof
JP5527120B2 (en) Concrete pile with shell steel pipe
JP2010190409A (en) Seismic isolation device and building
JP2014227661A (en) Aseismic reinforcement structure of joint part of submerged tunnel
CN113293878A (en) Double-yield-point steel bar buckling restrained brace with limiting function
JP6003526B2 (en) Rolled H-section steel
JP6423628B2 (en) Building basic structure
TW201303137A (en) Method for designing corrugated steel sheet, and corrugated steel sheet pipe
CN216973812U (en) Take limit function's two yield point rod iron bucking restraint to support
JP5423185B2 (en) Concrete-filled pier structure
JP2010216115A (en) Steel frame structure
JP4708296B2 (en) Pile-column connection structure
JP4708295B2 (en) Pile-column connection structure
EP3540151A1 (en) Enhanced seismic isolation lead rubber bearings
Mishra et al. Lead Rubber Bearings as Base Isolating Devices for the Construction of Earthquake Resistant Structures-A Review
JP2006214201A (en) Composite foundation of piles and continuous underground wall
JP2009002359A (en) Energy absorbing device
CN212026365U (en) Earthquake-resistant building foundation
JP6296199B1 (en) Hat-shaped steel sheet pile and wall
CN219653991U (en) Novel metal shearing damper

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120625

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121011

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20121011

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130424

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130528

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130723

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140318

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140331

R151 Written notification of patent or utility model registration

Ref document number: 5527120

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350