JP2011236755A - Remote monitoring management system of wind power generation facility - Google Patents

Remote monitoring management system of wind power generation facility Download PDF

Info

Publication number
JP2011236755A
JP2011236755A JP2010106885A JP2010106885A JP2011236755A JP 2011236755 A JP2011236755 A JP 2011236755A JP 2010106885 A JP2010106885 A JP 2010106885A JP 2010106885 A JP2010106885 A JP 2010106885A JP 2011236755 A JP2011236755 A JP 2011236755A
Authority
JP
Japan
Prior art keywords
power generation
wind power
disposal
generation facility
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2010106885A
Other languages
Japanese (ja)
Inventor
Yasunori Shinohara
康則 篠原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2010106885A priority Critical patent/JP2011236755A/en
Publication of JP2011236755A publication Critical patent/JP2011236755A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

PROBLEM TO BE SOLVED: To make a plan for disposal of facilities, and to optimize disposal cost, in managing a plurality of wind power generation facilities.SOLUTION: The remote monitoring management system is connected via a network to a monitoring control device of the plurality of wind power generation facilities, a maintenance company and a recycle dealer, stores information on a failure of the wind power generation facility provided from the monitoring control device via the network, information on disposal cost required for disassembling the wind power generation facility determined from disassembling cost and transport cost provided from the maintenance company via the network, and information on a selling price in recycling the wind power generation facility determined from a selling unit price provided from the recycle dealer via the network, determines profit and loss per one unit from a difference between the selling price and the disposal cost, and calculates the disposal timing from its time-series change.

Description

本発明は、広域に分散して設置された風力発電設備の設備管理を集約して行う遠隔監視管理システムに関する。   The present invention relates to a remote monitoring and management system that collectively performs facility management of wind power generation facilities distributed in a wide area.

近年、環境意識の高まりと石油他エネルギー資源の価格高騰などから、風力発電設備の開発と普及が進んでいる。特に、風車利用の歴史が長い欧州と、環境投資を強力に推進している中国と米国の普及が著しい。   In recent years, wind power generation facilities have been developed and spread due to increasing environmental awareness and rising prices of petroleum and other energy resources. In particular, Europe, which has a long history of using windmills, and China and the United States, which are strongly promoting environmental investment, are becoming increasingly popular.

風力発電は風をエネルギーとすること、回転体(プロペラ)が露出した構造であること、大型化が進んでいる事などから山間部や沿岸など人家から離れた場所に設置されることが多い。また、風力発電の発電量は一定でない事、一台当たりの発電量が少なく、分散して設置されているため保守員の駐在がコスト的に見合わないことなどから、発電設備の各々に監視装置を備えてインターネット等の広域ネットワーク経由でその運転状態を集約的に監視管理する手法が提案されている。   Wind power generation is often installed in places away from homes, such as mountainous areas and coasts, due to the use of wind as energy, the structure with exposed rotating bodies (propellers), and increasing size. In addition, the amount of power generated by wind power generation is not constant, the amount of power generated per unit is small, and the installation of dispersed maintenance personnel does not meet the cost of maintenance. There has been proposed a method of intensively monitoring and managing the operation state via a wide area network such as the Internet provided with a device.

特許文献1には、複数の風力発電設備の運転情報などを、通信ネットワークを介して取得し、取得した情報に基づいて風力発電設備の維持管理を行うシステムが開示されている。   Patent Document 1 discloses a system that acquires operation information and the like of a plurality of wind power generation facilities via a communication network and performs maintenance management of the wind power generation facilities based on the acquired information.

また、風力発電設備は自然力である風を利用しているために、思わぬ突風により破損する可能性がある。この場合に、山間部や沿岸など人家から離れた場所に設置された風力発電設備に保守員を派遣して修理などの対策を行なうが、場合によっては廃棄、リサイクルの方針を決定することもある。この点に関し、特許文献2には、風力発電設備について、設計当初から解体しやすい構造を念頭に設計を行い、リサイクルを行い易い構造としておくことについての開示がある。   In addition, since wind power generation facilities use wind that is a natural force, they may be damaged by unexpected gusts. In this case, maintenance personnel are dispatched to wind power generators installed in remote areas such as mountains and coasts, and repairs are performed. However, in some cases, disposal and recycling policies may be determined. . In this regard, Patent Document 2 discloses that a wind power generation facility is designed with a structure that can be easily dismantled from the beginning of the design in mind, and has a structure that can be easily recycled.

なお、資源の有効利用の観点から、家電製品の場合には、リサイクル活動の普及も進んでいる。日本では、家電リサイクル法(特定家庭用機器再商品化法)が施行され、家電メーカ、家電小売店、消費者間で家電製品をリサイクルするための仕掛けが運用されている。この点に関し、非特許文献1には、家庭用電化製品のリサイクルを行い、資源の有効利用を推進するための仕組みの記載がある。   From the viewpoint of effective use of resources, in the case of home appliances, recycling activities are also spreading. In Japan, the Home Appliance Recycling Law (Specific Household Equipment Re-Production Law) has been enforced, and a device for recycling home appliances is operated between home appliance manufacturers, home appliance retailers, and consumers. In this regard, Non-Patent Document 1 describes a mechanism for recycling household appliances and promoting effective use of resources.

特開2009−287453号公報JP 2009-287453 A 特開2005−220715号公報JP 2005-220715 A

家電リサイクル法(特定家庭用機器再商品化法)(日本国)Home Appliance Recycling Law (Recycling Law for Specified Household Equipment) (Japan)

このように、風力発電設備については、設計当初からリサイクルを念頭に置いた構造や運用方法が提案され、家電製品を中心に物品のリサイクルに関する仕組みが多数公表されている。   As described above, with regard to wind power generation facilities, a structure and operation method with recycling in mind have been proposed from the beginning of design, and a number of mechanisms related to the recycling of goods, mainly home appliances, have been published.

しかし、広範囲に多数設置された風力発電設備をリサイクルすることについて、実際に実行しようとすると、以下に示す課題がある。   However, when actually trying to recycle a large number of wind power generation facilities installed in a wide area, there are the following problems.

近年、発電効率を上げることを目的として、風力発電設備の大型化が進んでいる。例えば、現在において中型機に位置付けられている風車の仕様は、回転部(ローター)の直径が80m、支柱(タワー)の高さが60〜100mという、巨大建造物であり、今後ますます大型化する傾向にある。   In recent years, wind power generation facilities have been increasing in size for the purpose of increasing power generation efficiency. For example, the specifications of wind turbines currently positioned as medium-sized aircraft are huge buildings with a rotating part (rotor) diameter of 80 m and a column (tower) height of 60 to 100 m. Tend to.

その結果、設置や解体には大型クレーンなどの重機の調達・準備が必要となり、簡単に解体作業が行える環境では無くなった。また、設置後に故障が起きた際に解体や修理を行う場合、エンジニアの移動費や滞在費を考慮すると、一台故障する度に解体や修理をすることは設備メーカと購入事業者のどちらが負担するにしても費用的に効率的とはいえない。   As a result, installation and dismantling required the procurement and preparation of heavy machinery such as large cranes, and it was no longer an environment where dismantling work could be performed easily. Also, when dismantling and repairing when a failure occurs after installation, considering the moving costs and staying costs of engineers, either the equipment manufacturer or the purchaser will be responsible for dismantling or repairing each unit when it fails. Even so, it is not cost effective.

このように、風力発電設備を数十台備えた発電サイト(ウィンドファーム)が一般には交通不便の遠隔の地にあり、1台あたりの発電出力が比較的に小さいことを考慮すると、故障の都度修理、リサイクルをすることが必ずしも得策とはいえず、纏めて行なったほうが良いと言う判断もあり得る。   Thus, considering that a power generation site (wind farm) equipped with several tens of wind power generation facilities is generally located in a remote place with inconvenient traffic, the power generation output per unit is relatively small. Repairing and recycling is not always a good idea, and it can be judged that it is better to carry out repairs and recycling.

また、風力発電設備には大型の発電機(電動機)、増速機(ギヤボックス)、変圧器などが含まれている。これらの主成分は鉄と銅であり、リサイクルを選択した場合には売却する事になる。   The wind power generation equipment includes a large generator (motor), a gearbox (gearbox), a transformer, and the like. These main components are iron and copper and will be sold if you choose to recycle.

しかるに、H2品種の鉄スクラップ相場によれば、2008年の中ごろには鉄スクラップの価格が一トン辺り6万円台後半まで高騰したが、その後の世界同時不況の影響により、2008年の終わりには1万円台まで暴落するなど、昨今の資源相場の変動は非常に激しい。   However, according to the steel scrap market of the H2 variety, the price of iron scrap soared to around the 60,000 yen level per ton in the middle of 2008, but at the end of 2008 due to the subsequent global recession The recent fluctuations in the stock market have been extremely severe.

その結果、風力発電設備の解体と処分を行う時期の見極めを非常に難しくしている。   As a result, it is very difficult to determine when to dismantle and dispose of wind power generation facilities.

さらに、風力発電設備の大量導入が始まったのは、西暦2000年以降のため、風力発電設備のリサイクルの運用はまだ途上の状態にある。   Furthermore, since the introduction of a large amount of wind power generation facilities began in 2000 AD, the operation of recycling wind power generation facilities is still in progress.

本発明は、複数の風力発電設備を管理する場合における設備の処分計画の策定と処分費用の最適化を目的とする。   An object of the present invention is to formulate a facility disposal plan and optimize disposal costs when managing a plurality of wind power generation facilities.

上記目的を達成するために本発明の風力発電設備の遠隔監視管理システムは、複数の風力発電設備の監視制御装置とネットワークを介して接続され、複数の風力発電設備の運転状態と、故障した風車発電設備の解体にかかる処分費用の情報と、故障した風車発電設備をリサイクルしたときの販売価格についての情報を、ネットワークを介して入手し、販売価格と処分費用の差額から1台当りの損益を求めて記憶し、損益の時系列推移から処分時期を算出する。   In order to achieve the above object, a remote monitoring management system for wind power generation equipment according to the present invention is connected to a plurality of wind power generation equipment monitoring control devices via a network, and the operating state of the plurality of wind power generation equipment and a faulty windmill. Obtain information on the disposal cost for dismantling the power generation facility and the sales price when recycling the failed wind turbine power generation facility via the network, and calculate the profit / loss per unit from the difference between the sales price and the disposal cost. Find and store it, and calculate the disposal time from the time series of profit and loss.

また、ネットワークを介して保守会社から解体費用と輸送費用を入手し、風車発電設備の解体にかかる処分費用の情報として記憶するのがよい。   Further, it is preferable to obtain a dismantling cost and a transportation cost from a maintenance company via a network and store them as information on a disposal cost for dismantling the wind turbine power generation facility.

また、ネットワークを介してリサイクル業者から販売単価を入手し、風車発電設備をリサイクルしたときの販売価格の情報として記憶することを特徴とするのがよい。   Further, it is preferable that the sales unit price is obtained from a recycler via a network and stored as information on the sales price when the wind turbine generator is recycled.

また、風力発電設備の処分費用における損益の時系列変化について、短期的な移動平均値と長期的な移動平均値の相対変化により処分時期を算出するのがよい。   In addition, regarding the time-series change in profit and loss in the disposal costs of wind power generation facilities, it is preferable to calculate the disposal time based on the relative change between the short-term moving average value and the long-term moving average value.

上記目的を達成するために本発明の風力発電設備の遠隔監視管理システムは、 複数の風力発電設備の監視制御装置、保守会社、リサイクル業者とネットワークを介して接続され、ネットワークを介して監視制御装置から得た風力発電設備の故障の情報と、ネットワークを介して保守会社から得た解体費用と輸送費用から求めた風車発電設備の解体にかかる処分費用の情報と、ネットワークを介してリサイクル業者から得た販売単価から求めた風車発電設備をリサイクルしたときの販売価格の情報とを記憶し、販売価格と処分費用の差から1台当りの損益を求め、その時系列推移から処分時期を算出する。   In order to achieve the above object, a remote monitoring and management system for wind power generation equipment according to the present invention is connected to a monitoring control device, a maintenance company, and a recycler for a plurality of wind power generation equipment via a network. Information on the failure of the wind power generation equipment obtained from the company, information on the dismantling cost of the wind turbine power generation equipment obtained from the dismantling cost and transportation cost obtained from the maintenance company via the network, and information obtained from the recycler via the network The information on the sales price when the wind turbine power generation equipment is recycled from the sales unit price is stored, the profit / loss per unit is obtained from the difference between the sales price and the disposal cost, and the disposal time is calculated from the time series transition.

本発明によれば、複数の風力発電設備について、故障などにより解体処分の対象になった複数の設備の処分を、市場の相場に照らして適切と考えられる時期に設定することができる。   ADVANTAGE OF THE INVENTION According to this invention, about the some wind power generation equipment, disposal of the some equipment used as the object of dismantling disposal by failure etc. can be set to the time considered appropriate in light of the market price.

本発明のシステム構成例を示す説明図。Explanatory drawing which shows the system configuration example of this invention. 風力発電設備の外観を示した図。The figure which showed the external appearance of the wind power generation equipment. 風力発電設備の主要な構成機器と電気的接続を示した図。The figure which showed the main component apparatus and electrical connection of a wind power generation installation. 各施設の配置の一例を示した図。The figure which showed an example of arrangement | positioning of each facility. 風力発電設備の解体処理の判定フローを示した図。The figure which showed the determination flow of the dismantling process of a wind power generation facility. 損益最大を判定する考え方の一例を示す図。The figure which shows an example of the way of thinking which determines profit and loss maximum. データベース格納内容を示す図。The figure which shows the database storage content. 損益が右肩上がり時の判定を示す図。The figure which shows the judgment when profit / loss rises to the right. 損益が変化しない場合の判定を示す図。The figure which shows the determination when profit / loss does not change.

以下、本発明の一実施の形態を、図1〜図7を参照して説明する。   Hereinafter, an embodiment of the present invention will be described with reference to FIGS.

図1は、本発明のシステム構成例を示している。本システムによれば、複数個所のウィンドファーム102が、広域ネットワーク1により接続されており、さらに広域ネットワーク1にはリサイクル業者103、保守会社104、電力会社105などが接続されている。また、広域ネットワーク1には遠隔監視センター101が接続され、種々の観点からウィンドファーム102の状況を監視している。   FIG. 1 shows a system configuration example of the present invention. According to this system, a plurality of wind farms 102 are connected by a wide area network 1, and a recycler 103, a maintenance company 104, an electric power company 105, and the like are further connected to the wide area network 1. A remote monitoring center 101 is connected to the wide area network 1 to monitor the status of the wind farm 102 from various viewpoints.

このうち、ウィンドファーム102には、複数の風力発電設備2と、風力発電設備2ごとに設置され、その稼働状態を監視する監視制御装置3と、複数の監視制御装置3と通信装置5を中継するハブなどのネットワーク中継装置4とを備える。ルータ等の通信装置5は、監視制御装置3から得られた情報を、広域ネットワーク1経由で遠隔監視センター101に中継する。   Among these, in the wind farm 102, a plurality of wind power generation facilities 2, a monitor control device 3 installed for each wind power generation facility 2 and monitoring its operating state, a plurality of monitor control devices 3 and a communication device 5 are relayed. And a network relay device 4 such as a hub. The communication device 5 such as a router relays information obtained from the monitoring control device 3 to the remote monitoring center 101 via the wide area network 1.

リサイクル業者103は、風力発電設備2を処分(購入)する場合の販売単価情報の入力を行うパソコンなどの入出力端末19と、広域ネットワーク1に接続するためのルータ等の通信装置18を備える。   The recycler 103 includes an input / output terminal 19 such as a personal computer for inputting sales unit price information when the wind power generation facility 2 is disposed (purchased), and a communication device 18 such as a router for connecting to the wide area network 1.

保守会社104には、風力発電設備2の解体費用と輸送費用の情報を入力するパソコンなどの入出力端末21と、広域ネットワーク1に接続するためのルータ等の通信装置20を備える。   The maintenance company 104 includes an input / output terminal 21 such as a personal computer for inputting information on the dismantling cost and transportation cost of the wind power generation facility 2 and a communication device 20 such as a router for connecting to the wide area network 1.

電力会社105には、処分指示情報の入力と解体処分の実施の判定結果を閲覧するパソコンなどの入出力端末23と、広域ネットワーク1に接続するためのルータ等の通信装置22を備える。   The electric power company 105 is provided with an input / output terminal 23 such as a personal computer for viewing the input of disposal instruction information and the determination result of the dismantling disposal, and a communication device 22 such as a router for connecting to the wide area network 1.

遠隔監視センター101には、広域ネットワーク1と接続するルータ等の通信装置6と、サーバなどの処理装置7と、各種のデータベースと、データベースの情報を閲覧または編集する入出力端末8を備える。   The remote monitoring center 101 includes a communication device 6 such as a router connected to the wide area network 1, a processing device 7 such as a server, various databases, and an input / output terminal 8 for browsing or editing database information.

ここで、各種のデータベースとは、風力発電設備2の故障情報を格納する故障台数データベース9、時間経過の情報を格納する時間データベース10、保守会社104から情報が入力される解体費用データベース11及び輸送費用データベース12、リサイクル業者103から情報が入力される販売単価データベース14、電力会社105から情報が入力される処分指示データベース17、処理装置7が演算した結果を格納する処分経費データベース13及び販売価格データベース15及び損益データベース16などである。   Here, the various databases include a failure number database 9 for storing failure information of the wind power generation facility 2, a time database 10 for storing information on the passage of time, a dismantling cost database 11 to which information is input from the maintenance company 104, and transportation. Cost database 12, sales unit price database 14 to which information is input from the recycler 103, disposal instruction database 17 to which information is input from the electric power company 105, disposal cost database 13 and sales price database to store the results calculated by the processing device 7 15 and profit / loss database 16.

図2は、風力発電設備2の外観を示した図である。図2左が正面図、図2右が側面図である。風を受けるブレード(翼)201と、ブレード201を支えるロータヘッド202と、風力を電力に変換する発電機などが収納されているナセル203と、ナセル203を支えるタワー(支柱)204と、電力を商用の電力系統に接続するための変圧器盤205を備える。なお、風力発電設備には様々な形状が存在するが、近年は本図のような3枚羽の構造が主流となってきている。   FIG. 2 is a diagram illustrating an appearance of the wind power generation facility 2. The left side of FIG. 2 is a front view, and the right side of FIG. 2 is a side view. A blade (blade) 201 that receives wind, a rotor head 202 that supports the blade 201, a nacelle 203 that stores a generator that converts wind power into electric power, a tower (support) 204 that supports the nacelle 203, and power A transformer panel 205 is provided for connection to a commercial power system. There are various types of wind power generation facilities, but in recent years, a three-blade structure as shown in this figure has become the mainstream.

図3は、風力発電設備2の電気的接続を示した図である。ブレード(翼)201が風を受けて回転し、ナセル203に伝達する。ナセル203内では、まず増速機301により回転数を上昇し、回転する動力を発電機302が電力に変換し、電力変換装置303が電力の出力を一定に変換し、外部の変圧器盤205を経て電力系統304に電力を供給する。   FIG. 3 is a diagram showing the electrical connection of the wind power generation facility 2. The blade (wing) 201 receives the wind and rotates, and transmits it to the nacelle 203. In the nacelle 203, first, the speed increaser 301 increases the rotational speed, the generator 302 converts the rotating power into electric power, the power converter 303 converts the electric power output to a constant value, and the external transformer panel 205. Then, power is supplied to the power system 304.

また、ナセル203内には図1に図示した監視制御装置3が設置されている。監視制御装置3は、増速機301と発電機302と電力変換装置303の運転状態の情報を、ネットワーク中継装置4と通信装置5と広域ネットワーク1を介して遠隔監視センター101に送信する。   In the nacelle 203, the monitoring control device 3 shown in FIG. The monitoring control device 3 transmits information on the operation states of the speed increaser 301, the generator 302, and the power conversion device 303 to the remote monitoring center 101 via the network relay device 4, the communication device 5, and the wide area network 1.

図4は、本実施形態における各施設の配置の一例を示した図である。遠隔監視センター101の所在は例えば日本にあり、リサイクル業者103と、保守会社104と、電力会社105と、複数の風力発電設備2を有するウィンドファーム102は米国に設置されている。この場合、風力発電設備2の解体処分に関して、解体と輸送は保守会社104が行い、解体した設備の買取りはリサイクル業者103が行う。また、電力会社105は風力発電設備2を所有し、必要に応じて電力会社105は処分の判断を行う。   FIG. 4 is a diagram showing an example of the arrangement of each facility in the present embodiment. The remote monitoring center 101 is located, for example, in Japan, and a recycler 103, a maintenance company 104, a power company 105, and a wind farm 102 having a plurality of wind power generation facilities 2 are installed in the United States. In this case, regarding the dismantling of the wind power generation facility 2, the maintenance company 104 performs dismantling and transportation, and the recycler 103 performs purchase of the dismantling facility. In addition, the electric power company 105 owns the wind power generation facility 2, and the electric power company 105 determines disposal as necessary.

図5は、遠隔監視センター101における風力発電設備の解体処理の判定フローを示した図である。また、図7は図5のフロチャートの判断結果として各データベースに格納された情報を一覧にして示した図である。
まず、図5のステップS11において、遠隔監視センター101の処理装置7は、風力発電設備2を監視する監視制御装置3から、風力発電設備2の故障情報を、ネットワーク中継装置4と、通信装置5と、広域ネットワーク1と、通信装置6を介して取得し、故障台数を積算し、故障台数データベース9に格納する。
FIG. 5 is a diagram illustrating a determination flow of the dismantling process of the wind power generation facility in the remote monitoring center 101. FIG. 7 is a diagram showing a list of information stored in each database as the determination result of the flowchart of FIG.
First, in step S11 of FIG. 5, the processing device 7 of the remote monitoring center 101 sends the failure information of the wind power generation facility 2 from the monitoring control device 3 that monitors the wind power generation facility 2 to the network relay device 4 and the communication device 5. And acquired via the wide area network 1 and the communication device 6, the number of failures is integrated, and stored in the failure number database 9.

つぎに、図5のステップS12において、サーバなどの処理装置7は、自身が持つ時間情報を時間データベース10に格納する。   Next, in step S <b> 12 of FIG. 5, the processing device 7 such as a server stores the time information held by itself in the time database 10.

図7は、左側から順次、図5のデータベース番号DB、その項目、単位、処理内容を記述しており、データベース番号10には、時間データベース10の時間経過情報が記憶される。なおここでは、風力発電設備2を設置したときからの経過時間で記憶しているが、これは西暦年などの絶対時間で記憶してもよい。   FIG. 7 describes the database number DB of FIG. 5, its items, units, and processing contents sequentially from the left side, and the database number 10 stores time lapse information of the time database 10. In addition, although it memorize | stores by the elapsed time from the time of installing the wind power generation equipment 2 here, you may memorize | store this by absolute time, such as a Christian year.

図7の表示例を、時間データベース10と、故障台数データベース9の関係を一例として説明すると、風力発電設備2を設置したときからの経過時間が1年目での故障台数が1台、3年目で2台、5年目で3台、9年目で4台というように増加したことを表している。なお、他のデータベースの内容も、上記と同じように時間経過と共に記憶されている。   The display example of FIG. 7 will be described by taking the relationship between the time database 10 and the failure number database 9 as an example. The number of failures in the first year after the installation of the wind power generation facility 2 is one, three years. This represents an increase of 2 units in the eyes, 3 units in the 5th year, and 4 units in the 9th year. Note that the contents of other databases are also stored over time in the same manner as described above.

図5のステップS13とステップS14において、処理装置7は、保守会社104からの情報について処理を行なう。まず、入出力端末21と通信装置20を使用して処理装置7に連絡する故障台数に対する一括解体費用と一括輸送費用の情報を元に、故障台数データベース9に格納されている故障台数情報から、故障台数に対応する一括解体費用と一括輸送費用を導出し、解体費用データベース11と輸送費用データベース12に格納する。   In step S13 and step S14 in FIG. 5, the processing device 7 processes information from the maintenance company 104. First, based on the information of the number of failures stored in the number-of-failures database 9 based on the information on the collective dismantling cost and the collective transportation cost for the number of failures communicated to the processing device 7 using the input / output terminal 21 and the communication device 20, The collective dismantling cost and the collective transportation cost corresponding to the number of failures are derived and stored in the dismantling cost database 11 and the transport cost database 12.

図7のデータベース11には合計の解体費用が記憶されるが、この金額はデータベース9の故障台数に依存し、故障台数が増えると単価が減少する関係にある。また、輸送費用データベース12には、輸送費用が記憶されるが、ここでは輸送費用は故障台数に比例するものとして計算される。   The total dismantling cost is stored in the database 11 of FIG. 7, but this amount depends on the number of failures in the database 9, and the unit price decreases as the number of failures increases. The transportation cost database 12 stores transportation costs, but here the transportation costs are calculated as being proportional to the number of failures.

図5のステップS15において、処理装置7は、解体費用データベース11と輸送費用データベース12から故障台数全数に対する一括解体費用と一括輸送費用を取得、加算し、処分経費として処分経費データベース13に格納する。   In step S15 of FIG. 5, the processing device 7 acquires and adds the collective dismantling cost and the collective transportation cost for the total number of faults from the dismantling cost database 11 and the transportation cost database 12, and stores them in the disposal cost database 13 as disposal costs.

図7のデータベース13に記憶された処分経費は、その算出根拠である一括解体費用と一括輸送費用が共に故障台数の増加に伴い増加する指標であるために、故障台数、従って経過時間と共に増加する傾向にある。以上のステップを通して算出した処分経費は、負担者が外部に支払うべき費用(損失)に関わるものである。   The disposal costs stored in the database 13 in FIG. 7 increase with the number of failures and thus with the elapsed time because the lump-sum dismantling costs and the lump-sum transportation costs, which are the basis for calculation, are both indicators that increase as the number of failures increases. There is a tendency. The disposal costs calculated through the above steps are related to costs (losses) that the bearer should pay to the outside.

これに対し、本実施例の図5の風力発電設備の解体処理の判定フローでは、次にリサイクルに伴う利益面を計算する。特に、利益最大となる時点を判断する。   On the other hand, in the determination flow of the dismantling process of the wind power generation facility of FIG. In particular, determine the point at which profits are maximized.

図5のステップS16において、処理装置7は、リサイクル業者103が入出力端末19と通信装置18を使用して処理装置7に連絡する風力発電設備に関するスクラップ相場(買い取り価格相場)情報を、販売単価データベース14に格納する。   In step S16 of FIG. 5, the processing device 7 uses the input / output terminal 19 and the communication device 18 to contact the processing device 7 by the recycler 103. Store in database 14.

図7の事例では、当初のスクラップ相場が1台あたり200万円程度であったものが、時間の経過と共に増大する事例を示しており、9年目に400万円まで増大したところで、11年目に370万円に減少したとする。   In the example of FIG. 7, the initial scrap market price of about 2 million yen per vehicle shows an example of increasing over time, and when it increased to 4 million yen in the 9th year, 11 years Suppose that the eye drops to 3.7 million yen.

次に図5のステップS17において、処理装置7は、販売単価データベース14から風力発電設備に関する一台当りのスクラップ相場情報を取得、故障台数データベース9に格納されている故障台数情報から、故障した風力発電設備全数のスクラップ販売価格を算出し、販売価格データベース15に格納する。   Next, in step S <b> 17 of FIG. 5, the processing device 7 acquires scrap market price information about the wind power generation facility from the sales unit price database 14, and uses the failed wind power information from the failed number information stored in the failed number database 9. The scrap sales price of all power generation facilities is calculated and stored in the sales price database 15.

図7の事例では、スクラップ販売価格は、その算出根拠である故障台数(データベース9)も、またスクラップ相場(データベース14)もあるところまでは増大しているので、右肩上がりに増大する傾向を示す。このスクラップ販売価格が、外部から得る費用(利益)に関わる。   In the example of FIG. 7, the scrap sales price has increased to the point where the number of failures (database 9), which is the basis for calculation, and the scrap market (database 14) are also increased. Show. The scrap sales price is related to the cost (profit) obtained from the outside.

次に図5のステップS18において、処理装置7は、販売価格データベース15に格納されている故障した風力発電設備全数のスクラップ販売価格から、処分経費データベース13に格納されている処分経費を差し引き、故障した風力発電設備全数の解体と輸送と販売による損益を導出し、故障台数データベース9に格納されている故障台数で割り、一台当り損益を導出し、損益データベース16に格納する。   Next, in step S18 of FIG. 5, the processing device 7 subtracts the disposal cost stored in the disposal cost database 13 from the scrap sales price of all the failed wind power generation facilities stored in the sales price database 15, The profit / loss due to the dismantling, transportation, and sales of all the wind power generation facilities obtained is derived, divided by the number of failures stored in the failure number database 9, and the profit / loss per unit is derived and stored in the profit / loss database 16.

図7の事例では、損益データベース16には、全体損益と1台あたり損益が記憶されることになる。このうち、全体利益について検討すると、この事例では、利益(スクラップ販売価格15)が損益(処分経費)13を常に上回っているため9年目までは、右肩上がりに増大し続けている。また、一台当り損益も、同様である。   In the case of FIG. 7, the profit / loss database 16 stores the overall profit / loss and profit / loss per vehicle. Of these, when considering the overall profit, in this case, the profit (scrap selling price 15) always exceeds the profit / loss (disposal expenses) 13 and continues to increase upward until the ninth year. The same applies to the profit / loss per vehicle.

以上述べたところの一連の処理により、一台当り損益がその時間経過と共にトレンドとして記憶されるが、本実施例ではこれらの推移をもとにして、次に売却タイミングを決定する。   According to the series of processes described above, the profit / loss per vehicle is stored as a trend with the lapse of time. In this embodiment, the sale timing is determined next based on these changes.

まず図5のステップS19において、処理装置7は、損益データベース16に格納されている損益情報と、時間データベース10に格納されている時間情報と、電力会社105が入出力端末23と通信装置22を使用し処理装置7を経由して処分指示データベース17に格納する指示情報を用いて、図6の判定条件に基づき判定を行う。   First, in step S19 of FIG. 5, the processing device 7 sets the profit / loss information stored in the profit / loss database 16, the time information stored in the time database 10, and the power company 105 connects the input / output terminal 23 and the communication device 22. A determination is made based on the determination conditions of FIG. 6 using the instruction information stored in the disposal instruction database 17 via the processing apparatus 7 that is used.

ステップS19を実行するに当り、損益データベース16に格納されている損益情報と、時間データベース10に格納されている時間情報と、その傾向については図7を用いて既に説明したとおりである。   In executing step S19, the profit / loss information stored in the profit / loss database 16, the time information stored in the time database 10, and the tendency thereof are as already described with reference to FIG.

そして次に、処分指示データベース17に格納する指示情報について検討すると、図7にこれを表示していないが、ここでは、電力会社からの処分指示(データベース17に格納する指示情報)は、何時でもよい(処分についての権限委譲)という前提であるものとする。   Then, when the instruction information stored in the disposal instruction database 17 is examined, this is not displayed in FIG. 7, but here, the disposal instruction from the electric power company (instruction information stored in the database 17) is anytime. It is assumed that it is good (delegation of authority for disposal).

また、図6の判定条件は後で纏めて説明する。   The determination conditions in FIG. 6 will be described later.

係る前提において、ステップS20では、ステップS19の判定結果が是(YES)の場合、電力会社105に対し、通信装置22と入出力端末23を用いて、故障した風力発電設備の解体と輸送と売却(スクラップ処理)を行う判定結果を伝達する。   Under such a premise, in step S20, when the determination result in step S19 is YES (YES), the communication device 22 and the input / output terminal 23 are used to dismantle, transport, and sell the failed wind power generation facility to the power company 105. The determination result for performing (scrap processing) is transmitted.

次に、保守会社104に対し、通信装置20と入出力端末21を用いて、故障した風力発電設備全数の解体と輸送の依頼を実施する。   Next, the maintenance company 104 is requested to use the communication device 20 and the input / output terminal 21 to dismantle and transport all the failed wind power generation facilities.

次に、リサイクル業者103に対し、通信装置18と入出力端末19を用いて、故障した風力発電設備全数の買取り(スクラップ処理)の依頼を実施する。   Next, the recycler 103 is requested to purchase (scrap processing) all the failed wind power generation facilities using the communication device 18 and the input / output terminal 19.

ステップS21において、処理装置7は、ステップS19の判定結果が否(NO)の場合、一定期間の待機処理(スタンバイディレイ)を行い、待機後、本フローを再度実施する。   In step S21, if the determination result in step S19 is NO (NO), the processing device 7 performs a standby process (standby delay) for a certain period, and then performs this flow again after waiting.

図6には、故障した複数の風力発電設備について、解体と輸送と売却(スクラップ処理)の実施の是非を判定する条件の例を示している。この図6の判断が、損益最大となるタイミングを決定するものである。   FIG. 6 shows an example of conditions for determining whether or not to perform dismantling, transportation, and sale (scrap processing) for a plurality of failed wind power generation facilities. The determination in FIG. 6 determines the timing when the profit / loss is maximized.

ケース1には、風力発電設備の売却に関する一台当り損益の推移が上昇したのち、下落に転じた場合に是(売却)とする条件を示している。具体的には、一台当り損益の経過時間に対する推移について、過去3ヶ月間の移動平均値が、過去12ヶ月間の移動平均値を下回り、かつ過去36ヶ月間の移動平均値を上回る場合に、是とする。   Case 1 shows a condition that a right (sale) is made when the profit / loss per unit regarding the sale of the wind power generation equipment rises and then falls. Specifically, regarding the change in profit / loss per vehicle over time, when the moving average value for the past 3 months is below the moving average value for the past 12 months and exceeds the moving average value for the past 36 months , I will.

図8(a)は、損益が右肩上がりに上昇し続ける場合の3ヶ月、12ヶ月、36ヶ月の移動平均A3,A12,A36を示す。この場合には、右肩上がりなので移動平均の間にはA3≧A12≧A36の関係が成立する。従って損益が悪化して右肩上がりから右肩下がりに変化する最初の時点では、まず3ヶ月の移動平均A3が減少に転じ、次いで、12ヶ月、36ヶ月の移動平均A12,A36が順次減少に転ずる。   FIG. 8A shows moving averages A3, A12, and A36 for three months, twelve months, and thirty-six months when profits and losses continue to rise. In this case, since it rises to the right, the relationship of A3 ≧ A12 ≧ A36 is established between the moving averages. Therefore, at the first point in time when the profit / loss deteriorates and changes from rising to falling, the 3-month moving average A3 starts to decrease, and then the 12-month and 36-month moving averages A12 and A36 gradually decrease. Roll over.

このことから、図6ケース1の状態A12≧A3≧A36というのは、図8(a)の時刻t1からt2の期間であり、このときに売却すれば利益が最大のときに売り抜けられることを意味する。なお、以上の例で月数が任意に変更できることは言うまでもなく、設定期間については、実際の相場の推移を参考に設定される。   From this, the state A12 ≧ A3 ≧ A36 in FIG. 6 case 1 is the period from time t1 to time t2 in FIG. 8 (a), and if sold at this time, it is sold out when the profit is maximum. means. In addition, it cannot be overemphasized that the number of months can be changed arbitrarily in the above example, and the setting period is set with reference to the transition of the actual market price.

図7の事例では、11年目に判定結果がNOからYESに変化しているが、これは1台あたりの損益が、その前まで右肩上がりに増大して最終的に353万円まで増大し続けてきたものが、11年目では323万円に減少したことを、ケース1で説明した条件で確認して、損益が減少し始めた今の時点なら損益が最大の状態で売り抜けられることを判断したものである。   In the case of FIG. 7, the judgment result has changed from NO to YES in the 11th year, but this is because the profit / loss per vehicle increased to the previous level and finally increased to 35.3 million yen. What has been continued is that it has decreased to 3.23 million yen in the 11th year under the conditions explained in Case 1, and if profits have started to decrease now, profits can be sold out in the maximum state Is a judgment.

ケース2に、風力発電設備の売却に関する一台当り損益の推移Aが長期的に変化しない場合に、是とする条件を示している。具体的には、図10(b)に示すように、一台当り損益Aの経過時間に対する推移について、過去24ヶ月間の移動平均値A24に対する偏差が、プラスマイナス10%の場合に、是とする。この判断は、長期にわたり、損益に価格変動がないのであれば、いつ(今)売っても同じという判断である。   Case 2 shows the conditions to be considered when the change in profit / loss A per unit related to the sale of wind power generation equipment does not change over the long term. Specifically, as shown in FIG. 10B, when the deviation of the profit / loss A per unit with respect to the elapsed time is ± 10% when the deviation from the moving average value A24 over the past 24 months is plus or minus 10%. To do. This judgment is the same as any time (now) if there is no price fluctuation in profit and loss over the long term.

ケース3に、風力発電設備の所有者の都合により処分する場合の条件を示している。具体的には、風力発電設備の所有者である電力会社105が、入出力端末23と通信装置22を用いて、遠隔監視センター1の処理装置7に処分指示情報を伝達し、処理装置7が処分指示情報を処分指示データベース17に格納している場合に、是とする。この場合の処分指示情報は、先に述べた「何時でもよい(処分についての権限委譲)」といった緩やかな条件ではなく、「いつまでに売却」といった、より明確な指示であることはいうまでもない。   Case 3 shows conditions for disposal for the convenience of the owner of the wind power generation facility. Specifically, the power company 105 that is the owner of the wind power generation facility transmits the disposal instruction information to the processing device 7 of the remote monitoring center 1 using the input / output terminal 23 and the communication device 22, and the processing device 7 It is determined that the disposal instruction information is stored in the disposal instruction database 17. In this case, the disposal instruction information is not a gradual condition such as “anytime (delegation of authority for disposal)”, but a clearer instruction such as “selling by time”. .

なお、図6の例では損益を監視しながら売却のタイミングを決定する事例を紹介したが、これ以外にも種々の判断手法を採用し得ることは言うまでもない。   In the example of FIG. 6, an example in which the timing of sale is determined while monitoring the profit and loss is introduced, but it goes without saying that various determination methods can be adopted.

以上説明したように、本例では、複数の風力発電設備について、故障などにより解体処分の対象になった複数の設備の処分を、市場の相場に照らして適切と考えられる時期に設定することができる。   As explained above, in this example, with regard to multiple wind power generation facilities, the disposal of multiple facilities that were subject to dismantling due to failure etc. can be set at a time that is considered appropriate in light of market prices. it can.

本実施例では、風車発電設備が故障し、リサイクルを行なうに当り、1台ごとにリサイクルするのではなく、複数同時にリサイクルする前提で待機し、その間解体に要する費用と、リサイクルによる収益との差額の変動を監視しながら最適な処理タイミングを決定することでコストミニマムを達成しいている。   In this embodiment, when the wind turbine power generation equipment breaks down and is recycled, it waits on the premise that a plurality of units are recycled at the same time, and the difference between the cost required for dismantling and the revenue from recycling during that time The minimum cost is achieved by deciding the optimal processing timing while monitoring the fluctuations.

本発明によれば、風車発電機のリサイクルが適切な時期に、コストミニマムで実行できるので、広く適用することができる。   According to the present invention, the wind turbine generator can be widely applied because it can be executed at a minimum cost at an appropriate time.

1…広域ネットワーク
2…風力発電設備
3…監視制御装置
4…ネットワーク中継装置
5…通信装置
6…通信装置
7…処理装置
8…入出力端末
9…故障台数データベース
10…時間データベース
11…解体費用データベース
12…輸送費用データベース
13…処分経費データベース
14…販売単価データベース
15…販売価格データベース
16…損益データベース
17…処分指示データベース
18…通信装置
19…入出力端末
20…通信装置
21…入出力端末
22…通信装置
23…入出力端末
101…遠隔監視センター
102…ウィンドファーム
103…リサイクル業者
104…保守会社
105…電力会社
201…ブレード(翼)
202…ロータヘッド
203…ナセル
204…タワー(支柱)
205…変圧器盤
301…増速機
302…発電機
303…電力変換装置
304…電力系統
DESCRIPTION OF SYMBOLS 1 ... Wide area network 2 ... Wind power generation equipment 3 ... Monitoring control apparatus 4 ... Network relay apparatus 5 ... Communication apparatus 6 ... Communication apparatus 7 ... Processing apparatus 8 ... Input / output terminal 9 ... Number of failure database 10 ... Time database 11 ... Dismantling expense database 12 ... Transportation cost database 13 ... Disposal cost database 14 ... Sales unit price database 15 ... Sales price database 16 ... Profit / loss database 17 ... Disposal instruction database 18 ... Communication device 19 ... Input / output terminal 20 ... Communication device 21 ... Input / output terminal 22 ... Communication Device 23 ... Input / output terminal 101 ... Remote monitoring center 102 ... Wind farm 103 ... Recycler 104 ... Maintenance company 105 ... Electric power company 201 ... Blade (wing)
202 ... Rotor head 203 ... Nacelle 204 ... Tower (post)
205 ... Transformer panel 301 ... Speed increaser 302 ... Generator 303 ... Power converter 304 ... Power system

Claims (5)

複数の風力発電設備の監視制御装置とネットワークを介して接続された風力発電設備の遠隔監視管理システムにおいて、
前記複数の風力発電設備の運転状態と、故障した風車発電設備の解体にかかる処分費用の情報と、故障した風車発電設備をリサイクルしたときの販売価格についての情報を、前記ネットワークを介して入手し、前記販売価格と前記処分費用の差額から1台当りの損益を求めて記憶し、損益の時系列推移から処分時期を算出することを特徴とする風力発電設備の遠隔監視管理システム。
In a remote monitoring and management system for wind power generation equipment connected to a plurality of wind power generation equipment monitoring and control devices via a network,
Obtain information on the operating status of the plurality of wind turbine generators, information on the disposal costs for dismantling the faulty wind turbine generator, and information on the sales price when the faulty wind turbine generator is recycled through the network. A remote monitoring and management system for a wind power generation facility, characterized in that a profit / loss per vehicle is obtained and stored from a difference between the selling price and the disposal cost, and a disposal time is calculated from a time series transition of the profit / loss.
請求項1記載の風力発電設備の遠隔監視管理システムにおいて、
前記ネットワークを介して保守会社から解体費用と輸送費用を入手し、風車発電設備の解体にかかる前記処分費用の情報として記憶することを特徴とする風力発電設備の遠隔監視管理システム。
In the remote monitoring management system of the wind power generation facility of Claim 1,
A remote monitoring and management system for wind power generation facilities, wherein dismantling costs and transportation costs are obtained from a maintenance company via the network, and stored as information on the disposal costs for dismantling the wind turbine power generation facilities.
請求項1記載の風力発電設備の遠隔監視管理システムにおいて、
前記ネットワークを介してリサイクル業者から販売単価を入手し、風車発電設備をリサイクルしたときの前記販売価格の情報として記憶することを特徴とする風力発電設備の遠隔監視管理システム。
In the remote monitoring management system of the wind power generation facility of Claim 1,
A remote monitoring and management system for a wind power generation facility, wherein a sales unit price is obtained from a recycler through the network and stored as information on the sales price when the wind turbine power generation facility is recycled.
請求項1記載の風力発電設備の遠隔監視管理システムにおいて、
前記風力発電設備の処分費用における損益の時系列変化について、短期的な移動平均値と長期的な移動平均値の相対変化により処分時期を算出する前記処理装置を備えることを特長とする風力発電設備の遠隔監視管理システム。
In the remote monitoring management system of the wind power generation facility of Claim 1,
A wind power generation facility comprising the processing device for calculating a disposal time based on a relative change between a short-term moving average value and a long-term moving average value with respect to a time-series change in profit and loss in the disposal cost of the wind power generation facility. Remote monitoring management system.
複数の風力発電設備の監視制御装置、保守会社、リサイクル業者とネットワークを介して接続され、ここから得られた情報を利用する風力発電設備の遠隔監視管理システムにおいて、
前記ネットワークを介して前記監視制御装置から得た風力発電設備の故障の情報と、ネットワークを介して前記保守会社から得た解体費用と輸送費用から求めた風車発電設備の解体にかかる処分費用の情報と、前記ネットワークを介して前記リサイクル業者から得た販売単価から求めた風車発電設備をリサイクルしたときの販売価格の情報とを記憶し、販売価格と処分費用の差から1台当りの損益を求め、その時系列推移から処分時期を算出することを特徴とする風力発電設備の遠隔監視管理システム。
In a remote monitoring and management system for wind power generation equipment that is connected to a plurality of wind power generation equipment monitoring and control devices, maintenance companies, and recyclers via a network and uses information obtained from the network,
Information on the failure of the wind power generation facility obtained from the monitoring and control device via the network, and information on the disposal cost for dismantling the wind turbine power generation facility obtained from the dismantling cost and the transportation cost obtained from the maintenance company via the network And information on the selling price when the wind turbine power generation facility obtained from the selling unit price obtained from the recycler through the network is stored, and the profit / loss per unit is obtained from the difference between the selling price and the disposal cost. A remote monitoring and management system for wind power generation equipment, characterized in that the disposal time is calculated from the time series transition.
JP2010106885A 2010-05-07 2010-05-07 Remote monitoring management system of wind power generation facility Pending JP2011236755A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010106885A JP2011236755A (en) 2010-05-07 2010-05-07 Remote monitoring management system of wind power generation facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010106885A JP2011236755A (en) 2010-05-07 2010-05-07 Remote monitoring management system of wind power generation facility

Publications (1)

Publication Number Publication Date
JP2011236755A true JP2011236755A (en) 2011-11-24

Family

ID=45325015

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010106885A Pending JP2011236755A (en) 2010-05-07 2010-05-07 Remote monitoring management system of wind power generation facility

Country Status (1)

Country Link
JP (1) JP2011236755A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101395430B1 (en) * 2012-05-18 2014-05-15 (주)유로코리아 System for monitoring for condition of wind power generator using wireless sensor node
JP2015162958A (en) * 2014-02-27 2015-09-07 株式会社東芝 Wind power generator and wind power generator system
CN107701367A (en) * 2016-08-08 2018-02-16 锐电科技有限公司 A kind of device and method for improving distributed Wind turbines generated energy
CN109357647A (en) * 2018-09-29 2019-02-19 观为监测技术无锡股份有限公司 A kind of wind power equipment positioning monitoring system and method
KR102569043B1 (en) * 2023-03-06 2023-08-24 주식회사 에이투엠 Dismantling and recycling management system for wind power generation facilities

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101395430B1 (en) * 2012-05-18 2014-05-15 (주)유로코리아 System for monitoring for condition of wind power generator using wireless sensor node
JP2015162958A (en) * 2014-02-27 2015-09-07 株式会社東芝 Wind power generator and wind power generator system
CN107701367A (en) * 2016-08-08 2018-02-16 锐电科技有限公司 A kind of device and method for improving distributed Wind turbines generated energy
CN109357647A (en) * 2018-09-29 2019-02-19 观为监测技术无锡股份有限公司 A kind of wind power equipment positioning monitoring system and method
CN109357647B (en) * 2018-09-29 2024-05-24 观为监测技术无锡股份有限公司 Wind power equipment positioning monitoring system and method
KR102569043B1 (en) * 2023-03-06 2023-08-24 주식회사 에이투엠 Dismantling and recycling management system for wind power generation facilities
JP7402581B1 (en) * 2023-03-06 2023-12-21 エイ2エム カンパニー,リミテッド Wind power facility dismantling and recycling management system

Similar Documents

Publication Publication Date Title
Seneviratne et al. Frequency response due to a large generator loss with the increasing penetration of wind/PV generation–A literature review
CN103328818B (en) The specified control of mistake in wind turbine and wind power station
Kahrobaee et al. Risk-based failure mode and effect analysis for wind turbines (RB-FMEA)
Wu et al. Towards an assessment of power system frequency support from wind plant—Modeling aggregate inertial response
Herbert et al. A review of technical issues on the development of wind farms
Shafiullah et al. Potential challenges of integrating large-scale wind energy into the power grid–A review
Colmenar-Santos et al. Repowering: An actual possibility for wind energy in Spain in a new scenario without feed-in-tariffs
US20070006586A1 (en) Serving end use customers with onsite compressed air energy storage systems
McMillan et al. Techno-economic comparison of operational aspects for direct drive and gearbox-driven wind turbines
Arabian-Hoseynabadi et al. Wind turbine productivity considering electrical subassembly reliability
JP2011236755A (en) Remote monitoring management system of wind power generation facility
Yuan et al. Wind turbine manufacturing in China: A review
Saheb-Koussa et al. Modeling and simulation of the fixed-speed WECS (wind energy conversion system): application to the Algerian Sahara area
CN103946540A (en) Control of wind turbines
Puglia et al. Cost efficient maintenance strategies for wind power systems using LCC
Mikheev et al. Determination of energy costs of wind farms at all life cycle stages
Puglia Life cycle cost analysis on wind turbines
Hadingham et al. Distributed energy resources roadmap: how the state of Western Australia is leading in integration
Van Kooten et al. Economics of wind power when national grids are unreliable
Nelson et al. Wind hybrid systems technology characterization
JP2009287453A (en) Wind power generation facility remote monitor, wind power generation remote management method and wind power generation remote management program
Gevorgian et al. Wind generation participation in power system frequency response
Rivkin et al. Wind Turbine Technology and Design
Willey Design and development of megawatt wind turbines
Outhred Wind energy and the national electricity market with particular reference to South Australia