JP2011226091A - Breakwater constructing steel block, and method of constructing breakwater - Google Patents

Breakwater constructing steel block, and method of constructing breakwater Download PDF

Info

Publication number
JP2011226091A
JP2011226091A JP2010094847A JP2010094847A JP2011226091A JP 2011226091 A JP2011226091 A JP 2011226091A JP 2010094847 A JP2010094847 A JP 2010094847A JP 2010094847 A JP2010094847 A JP 2010094847A JP 2011226091 A JP2011226091 A JP 2011226091A
Authority
JP
Japan
Prior art keywords
steel
wall
panel
breakwater
steel block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010094847A
Other languages
Japanese (ja)
Other versions
JP5397701B2 (en
Inventor
Hiroyuki Wakana
弘之 若菜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
JFE Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Engineering Corp filed Critical JFE Engineering Corp
Priority to JP2010094847A priority Critical patent/JP5397701B2/en
Publication of JP2011226091A publication Critical patent/JP2011226091A/en
Application granted granted Critical
Publication of JP5397701B2 publication Critical patent/JP5397701B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a steel block capable of reducing a construction cost, and efficiently integrating steel blocks constituting a breakwater, and a method of constructing a breakwater using the same.SOLUTION: A generally U-shaped inner side steel panel 2A composed of two side walls and a center wall coupling one end portions of the two side walls, and an outer side steel panel 2B are disposed at an interval to form a double wall. At an opening end of a steel panel 8 of the double wall, an end members 4 having a shape engaged with a protrusion 10 of an adjacent steel block is provided. On the center wall of the outer steel panel, the protrusion 10 having a shape engaged with the end member 4 of the adjacent steel block is provided. An inner space of the double wall forms a concrete placing space. A space formed by the inner side steel panel and the outer side panel of the adjacent steel block when the adjacent steel blocks are engaged becomes a space to be filled with infilling material.

Description

本発明は防波堤、特に外洋離島で建設される防波堤の構築に用いる鋼ブロック及びこの鋼ブロックを用いた防波堤の構築方法に関する。   The present invention relates to a breakwater, in particular, a steel block used for construction of a breakwater constructed on an offshore island, and a breakwater construction method using the steel block.

従来、外洋離島で建設される防波堤の構築工事、特に本土から遠い離島での防波堤の構築工事においては一般にケーソンを用いる方法(ケーソン工法)が行われている。
このケーソン工法は、箱船型の構造物を現地まで曳航し、海水で沈設したあと内部に砂を投入し、蓋コンクリートを最後に打設して防波堤を延伸させてゆく方法である。
この工法の一例として特許文献1に記載の方法がある。この方法は静穏海域あるいは陸上で製作されたケーソンを外洋の据え付け位置まで曳航し、静穏海域に構築された仮置マウンド上に順次据え付けていき、ケーソン内への中詰砂の投入、蓋コンクリート施工により防波堤を構築するものである。
Conventionally, a method using a caisson (a caisson method) is generally used in a construction work for a breakwater constructed on a remote island, particularly a breakwater construction work on a remote island far from the mainland.
This caisson method is a method in which an ark type structure is towed to the site, sand is set in the sea, sand is poured into the interior, cover concrete is cast last, and the breakwater is extended.
As an example of this construction method, there is a method described in Patent Document 1. In this method, caisson manufactured in the calm sea area or on land is towed to the installation position in the open ocean, and then installed on the temporary mound constructed in the calm sea area, filling sand inside the caisson, cover concrete construction The breakwater is constructed by

しかしながら、このケーソン工法では次のような問題がある。
(1)海象条件が厳しく、ケーソンの設置機会が得られにくいことなど、他の工種をふくめて稼働率が悪い。
(2)荒天時にケーソンを避難させる港が近くにない。
(3)設置から完成までの現地工期がながく、施工中の被災リスクが大きい。
(4)作業船が大きくなり回航リスクも大きい。
(5)一度に大量の材料調達が必要でこれも本土から運搬する必要がありその運搬リスクも高い。
そして、上記の問題を一つでも解決するために検討がなされている
However, this caisson method has the following problems.
(1) The operating rate is poor including other types of work such as severe sea conditions and difficult to obtain caisson installation opportunities.
(2) There is no nearby port to evacuate caisson during stormy weather.
(3) The local construction period from installation to completion is long, and the risk of damage during construction is high.
(4) The work boat becomes larger and the risk of cruising is greater.
(5) It is necessary to procure a large amount of materials at a time, which also needs to be transported from the mainland, and the transport risk is high.
And studies are being made to solve even one of the above problems.

特開平10−237875号公報Japanese Patent Laid-Open No. 10-237875

本発明は、ケーソン工法における上記の課題を解決することを目的とするものであり、工費の低減及び防波堤を構成するブロックユニット同士の一体化を効率よく行うことを可能とする防波堤構築用鋼ブロック及びこれを用いた防波堤構築方法を提供することにある。   The present invention aims to solve the above-mentioned problems in the caisson method, and is a steel block for constructing a breakwater that enables reduction of construction costs and efficient integration of block units constituting the breakwater. And providing a breakwater construction method using the same.

本発明者らは、防波堤を構築するためのブロックユニットとして特定の構造を有する鋼ブロックを採用することにより上記課題を解決することができることを見出して本発明を完成した。
すなわち、本発明は以下に記載する通りの防波堤構築用の鋼ブロック及びこの鋼ブロックを用いた防波堤構築方法である。
The present inventors have found that the above problem can be solved by adopting a steel block having a specific structure as a block unit for constructing a breakwater, and have completed the present invention.
That is, the present invention is a steel block for building a breakwater as described below, and a breakwater building method using this steel block.

(1)二つの側壁と該二つの側壁の一つの端部を連結する中央壁とからなる略コの字型の鋼パネルからなる内側鋼パネルと外側鋼パネルとが間隔を置いて配置されて二重壁を形成しており、
前記二重壁の鋼パネルの開放端には隣接する鋼ブロックの突起部と係合する形状を有する端部部材が設けられており、前記外側鋼パネルの中央壁には隣接する鋼ブロックの端部部材と係合する形状を有する突起部が設けられ、
前記二重壁の内部空間がコンクリート打設空間を形成しており、
隣接する鋼ブロックが係合したときに内側鋼パネルと隣接する鋼ブロックの外側パネルとによって形成される空間は中詰め材を充填するための空間となる
ことを特徴とする防波堤構築用の鋼ブロック。
(2)前記二重壁内には鉛直部材が配置されており、この鉛直部材は断面が円形又は多角形状の外ガイドと内ガイドとからなり、外ガイド内の上部に内ガイドの一端が挿入され、内ガイドの他端は外ガイドから突出すると共に、鋼パネルの上端からも突出していることを特徴とする(1)に記載の鋼ブロック。
(3)前記突起部が外側パネルの中央壁に二つ設けられており、それぞれの突起部の外側側壁が係合用の傾斜壁を形成しており、夫々の突起部の内側側壁の間の空間が中詰め材の充填空間を形成することを特徴とする(1)又は(2)に記載の鋼ブロック。
(4)前記端部部材は、鋼パネルの中央壁に平行な端部壁とこの端部壁の端部から該端部壁と鋭角をなして内側鋼パネルの端部に向かって伸びる傾斜壁とから係合部Aを形成しており、一方、外側鋼パネルの突起部はその側壁が外側パネルの中央壁の端部壁と鋭角をなす傾斜壁であり、この傾斜壁と中央壁の端部壁とから係合部Bを形成しており、係合部Bの内側に係合部Aが嵌合することによって係合が行われるようにしていることを特徴とする(1)〜(3)のいずれかに記載の鋼ブロック。
(5)端部部材の前記端部壁及び傾斜壁が鉄骨を組みあわせることによって形成されていることを特徴とする(4)に記載の鋼ブロック。
(6)(1)〜(5)のいずれかに記載の鋼ブロックを防波堤構築のためのユニットとして用いて防波堤を構築することを特徴とする防波堤構築方法。
(1) An inner steel panel and an outer steel panel made of a substantially U-shaped steel panel composed of two side walls and a central wall connecting one end of the two side walls are arranged with a space therebetween. Forming a double wall,
The open end of the double-walled steel panel is provided with an end member having a shape that engages with the protrusion of the adjacent steel block, and the end of the adjacent steel block is provided on the central wall of the outer steel panel. A protrusion having a shape that engages with the member,
The internal space of the double wall forms a concrete placement space,
A steel block for building a breakwater, wherein a space formed by an inner steel panel and an outer panel of the adjacent steel block when the adjacent steel blocks are engaged becomes a space for filling the filling material. .
(2) A vertical member is disposed in the double wall, and the vertical member includes an outer guide and an inner guide having a circular or polygonal cross section, and one end of the inner guide is inserted into the upper portion of the outer guide. The steel block according to (1), wherein the other end of the inner guide projects from the outer guide and also projects from the upper end of the steel panel.
(3) Two protrusions are provided on the central wall of the outer panel, and the outer side walls of the respective protrusions form an inclined wall for engagement, and the space between the inner side walls of the respective protrusions. The steel block according to (1) or (2), characterized in that forms a filling space for filling material.
(4) The end member includes an end wall parallel to the central wall of the steel panel and an inclined wall extending from the end of the end wall toward the end of the inner steel panel at an acute angle with the end wall. On the other hand, the protrusion of the outer steel panel is an inclined wall whose side wall forms an acute angle with the end wall of the central wall of the outer panel, and the end of the inclined wall and the central wall The engaging part B is formed from the part wall, and the engaging part A is engaged with the inside of the engaging part B so that the engagement is performed (1) to ( The steel block in any one of 3).
(5) The steel block according to (4), wherein the end wall and the inclined wall of the end member are formed by combining steel frames.
(6) A breakwater construction method, comprising building a breakwater using the steel block according to any one of (1) to (5) as a unit for building a breakwater.

本発明は次のような効果を奏する。
中詰め材として安価な石材を防波堤の堤体の材料の一部として使用でき、また、現地盤を掘削する際のずり石を中詰め材として使用でき、掘削したずり石は直接、隣接する防波堤堤体内に投入することが可能である。
端部部材を隣接ブロックに沿わせて設置できるため、据え付け時の波浪の影響が緩和される。そのため、設置時のクレーン操作も安全で確実な施工が可能である。
鉛直部材を使用することにより平面の据え付け精度を高めることができる。
端部部材及び鉛直部材は鋼ブロックの設置後は波浪による横ずれの防止部材として機能するため、コンクリート打設までのブロックの耐波安定性を確保できる。
堤体構築と隣接ブロックの一体化が一度のコンクリート打設で済み、工程短縮が図れる。
The present invention has the following effects.
Inexpensive stones can be used as part of the material of the breakwater body, and crushed stones used when excavating the local board can be used as filling materials. It can be thrown into the levee body.
Since the end member can be installed along the adjacent block, the influence of waves during installation is mitigated. Therefore, the crane operation at the time of installation is safe and reliable.
By using the vertical member, the plane installation accuracy can be increased.
Since the end member and the vertical member function as a member for preventing a lateral shift due to waves after the installation of the steel block, it is possible to ensure the wave resistance stability of the block until the concrete is placed.
The embankment construction and the integration of adjacent blocks need only be done once, and the process can be shortened.

本発明の鋼ブロックの構成を示す図である。 (a)は本発明の鋼ブロックの全体構造を示す図である。 (b)は(a)のA−A方向から見た図であり、鋼ブロックの端部部材の形状を示す図である。 (c)は(a)のB−B方向から見た図であり、鉛直部材の形状を示す図である。 (d)は(a)のC−C方向から見た図であり、シール材の取り付け状態を示す図である。It is a figure which shows the structure of the steel block of this invention. (A) is a figure which shows the whole structure of the steel block of this invention. (B) is the figure seen from the AA direction of (a), and is a figure which shows the shape of the edge part member of a steel block. (C) is the figure seen from the BB direction of (a), and is a figure which shows the shape of a vertical member. (D) is the figure seen from CC direction of (a), and is a figure which shows the attachment state of a sealing material. 本発明における鉛直部材の構造を示す図である。It is a figure which shows the structure of the vertical member in this invention. 本発明の鋼ブロックにコンクリートを打設した状態を示す図である。It is a figure which shows the state which cast concrete in the steel block of this invention. 本発明の鋼ブロックを鉛直方向に2段重ねる時の工程を示す図である。It is a figure which shows the process at the time of overlapping the steel block of this invention 2 steps | paragraphs in a perpendicular direction. (a)は本発明の鋼ブロックを水平方向に延長した時の鋼ブロックの係合状態を示す図である。(b)は本発明の鋼ブロックを鉛直方向に3段重ねた時の状態を示す図である。(A) is a figure which shows the engagement state of the steel block when the steel block of this invention is extended in the horizontal direction. (B) is a figure which shows a state when the steel block of this invention is piled up on 3 steps | paragraphs in the perpendicular direction. 本発明の鋼ブロックの実施形態を示す図である。It is a figure which shows embodiment of the steel block of this invention. 本発明の防波堤構築方法の工程を説明する図であるIt is a figure explaining the process of the breakwater construction method of the present invention. 本発明の防波堤構築方法の工程を説明する図であるIt is a figure explaining the process of the breakwater construction method of the present invention.

本発明を図に基づいて説明する。
図1(a)は防波堤を構築するためのユニットである本発明の鋼ブロックの実施形態の一例を示したものである
鋼ブロック1は、鋼パネル2、内部部材3、端部部材4、鉛直部材5及びシール材6から構成されている。以下、これらの鋼ブロックを構成する各部材について説明する。
The present invention will be described with reference to the drawings.
FIG. 1A shows an example of an embodiment of a steel block according to the present invention which is a unit for constructing a breakwater. A steel block 1 includes a steel panel 2, an internal member 3, an end member 4, and a vertical member. It is comprised from the member 5 and the sealing material 6. FIG. Hereinafter, each member which comprises these steel blocks is demonstrated.

<鋼パネル>
鋼パネル2は二つの対向する側壁(2a、2a)と該二つの側壁の一つの端部を連結する中央壁(2b)とからなる略コの字状の内側鋼パネル2Aと外側鋼パネル2Bとからなっている。内側鋼パネル2A及び外側鋼パネル2Bは二重壁構造を形成しており、この二重壁の内部空間がコンクリート打設用の空間となる。
外側鋼パネル2Bの中央壁2bは壁面に突起部10を有し、この突起部10は中央壁の端部壁と鋭角をなす傾斜壁11を有している。この突起部10の傾斜壁11と中央壁の端部壁12とは隣接する鋼ブロックの端部部材4と係合するための係合部を形成しており、この係合部には後述する内側壁の端部に設けた端部部材4の傾斜壁13と端部部材の端部壁14とで形成される係合部が嵌合し水平方向に隣接する鋼ブロック同士を固定する機能を有する。
図示した例では突起部が中央壁に二つ設けられる場合を示したが、これは突起部と突起部との間の空間に中詰め材を充填するようにしたものである。突起部を一つとし、突起部の両側壁を傾斜壁として係合部を形成するようにしても良いが、この場合には、コンクリートの使用量が増える。
<Steel panel>
The steel panel 2 includes a substantially U-shaped inner steel panel 2A and an outer steel panel 2B each having two opposing side walls (2a, 2a) and a central wall (2b) connecting one end of the two side walls. It is made up of. The inner steel panel 2A and the outer steel panel 2B form a double wall structure, and the internal space of the double wall is a space for placing concrete.
The central wall 2b of the outer steel panel 2B has a protrusion 10 on the wall surface, and the protrusion 10 has an inclined wall 11 that forms an acute angle with the end wall of the central wall. The inclined wall 11 of the protrusion 10 and the end wall 12 of the central wall form an engaging portion for engaging with the end member 4 of the adjacent steel block, and this engaging portion will be described later. The engaging portion formed by the inclined wall 13 of the end member 4 provided at the end of the inner wall and the end wall 14 of the end member is fitted and functions to fix the steel blocks adjacent in the horizontal direction. Have.
In the illustrated example, the case where two projections are provided on the central wall is shown, but this is to fill the space between the projections with the filling material. Although the engaging portion may be formed by using one protruding portion and both side walls of the protruding portion as inclined walls, in this case, the amount of use of concrete increases.

<内部部材>
内部部材3は鋼パネル間8に配置されて内側及び外側の鋼パネル2を構造体として一体化させるための結合部材である。図示したものではトラス状の部材を用いた例を示しているが、結合の目的が達成されるのであればいかなる形状のものでも良い。
<Internal member>
The inner member 3 is a connecting member that is disposed between the steel panels 8 and integrates the inner and outer steel panels 2 as a structure. In the example shown in the figure, a truss-like member is used. However, any shape may be used as long as the purpose of connection is achieved.

<端部部材>
端部部材4は鋼ブロック8を平面的に隣接する鋼ブロックに対して一体化させるための係合部材である。端部部材4は二重壁の開放端部に配設され、鋼パネル2の中央壁に平行な端部壁14と内側鋼パネルの端部方向で内側方向に傾斜した傾斜壁13とを有する。前述したようにこの端部部材4の傾斜壁13と端部壁14とで形成される係合部が外側鋼パネル8の突起部10に設けた傾斜壁11と中央壁端部壁12とで形成される係合部の内側に嵌合することにより水平方向に隣接する鋼ブロック同士が固定される。
この端部部材4は鋼ブロックの据え付け時には既設のブロックの突起部10を挟み込んで据付用のガイドとしても機能し、水中コンクリートの打設により隣接する鋼ブロックと隙間なく一体化させる。
<End member>
The end member 4 is an engaging member for integrating the steel block 8 with respect to the steel block adjacent in a plane. The end member 4 is disposed at the open end of the double wall, and has an end wall 14 parallel to the central wall of the steel panel 2 and an inclined wall 13 inclined inward in the direction of the end of the inner steel panel. . As described above, the engaging portion formed by the inclined wall 13 and the end wall 14 of the end member 4 is formed by the inclined wall 11 and the central wall end wall 12 provided on the protrusion 10 of the outer steel panel 8. The steel blocks adjacent in the horizontal direction are fixed by fitting inside the formed engaging portion.
The end member 4 also functions as a guide for installation by sandwiching the projection 10 of the existing block when installing the steel block, and is integrated with the adjacent steel block without any gap by placing underwater concrete.

端部部材の一例を図1(b)に示す。図示した例では端部部材は鉄骨を組み合わせた構造となっているが、これは鉄骨を組み合わせた構造とするとコンクリートの充填性が良くコンクリート打設によって隣接する鋼ブロック同士の一体化が強固なものとなるからである。また、隣接ブロックがコンクリートを打設する際の型枠となるため、端部部材は鉄骨構造であっても差し支えない。
この端部部材は鉄骨を組み合わせた構造に限られるものではなく、平板等によって構成しても良いが、平板とすると隣接ブロックとの間のコンクリートの充填性に劣るため、その間隔を少し広げる必要がある。また、鉄骨と平板とを組み合わせた構造であっても良い。
An example of the end member is shown in FIG. In the example shown in the figure, the end member has a structure that combines steel frames, but if this structure is a structure that combines steel frames, the filling of the concrete is good and the integration of adjacent steel blocks by concrete placement is strong Because it becomes. Moreover, since an adjacent block becomes a formwork at the time of placing concrete, the end member may be a steel structure.
This end member is not limited to a structure in which steel frames are combined, and may be constituted by a flat plate or the like, but if it is a flat plate, it is inferior in the filling property of concrete between adjacent blocks, so it is necessary to widen the gap slightly. There is. Moreover, the structure which combined the steel frame and the flat plate may be sufficient.

<鉛直部材>
鉛直部材5は鋼ブロック8の据え付け時に、既設の鋼ブロックと上下に一体化させる部材である。
鉛直部材の詳細を図2に示す。鉛直部材は断面が円形又は多角形状の内ガイド21(内側の鋼管)及び外ガイド22(外側の鋼管)から構成されている。
外ガイド22は鋼ブロック内の内部鋼材によって支持されている。外ガイド22の天端には蓋はなく外ガイドの内側にコンクリートが施工できるようになっている。また、外ガイドの上方部には内ガイド21が挿入され、適宜の支持部材によって外ガイド22に支持されている。
<Vertical member>
The vertical member 5 is a member that is integrated vertically with an existing steel block when the steel block 8 is installed.
Details of the vertical member are shown in FIG. The vertical member includes an inner guide 21 (inner steel pipe) and an outer guide 22 (outer steel pipe) having a circular or polygonal cross section.
The outer guide 22 is supported by an inner steel material in the steel block. The top end of the outer guide 22 does not have a lid, and concrete can be constructed inside the outer guide. Further, an inner guide 21 is inserted above the outer guide and supported by the outer guide 22 by an appropriate support member.

図3は下段ブロックの施工状態を示したものである。
鋼ブロックのコンクリート施工時には、図3(a)に示すように、内ガイドの天端までコンクリートを施工する。このため、内ガイドには底板23が配置されている。なお、据え付け時の波浪外力が小さい場合は、内ガイドには底板23を設けず、図3(b)に示すように鋼ブロックの天端までの施工とし鋼構造だけ(コンクリートを充填せず)のガイドとして使用しても良い。その場合は内ガイドをH鋼から構成しても良い。外ガイドには底板がなく、底部から既設鋼ブロックの内ガイドが挿入できるようになっている。
FIG. 3 shows the construction state of the lower block.
At the time of concrete construction of the steel block, concrete is constructed to the top of the inner guide as shown in FIG. For this reason, the bottom plate 23 is arranged in the inner guide. In addition, when the wave external force at the time of installation is small, the inner guide is not provided with the bottom plate 23, and as shown in FIG. 3 (b), the construction is made up to the top end of the steel block (only the steel structure is not filled). It may be used as a guide. In that case, the inner guide may be made of H steel. The outer guide has no bottom plate, and the inner guide of the existing steel block can be inserted from the bottom.

鉛直部材は上記のような構成とすることにより、水中コンクリートの打設によって下に隣接する鋼ブロックと隙間なく一体化させることができる。また、鉛直部材(外ガイド及び内ガイド)は鋼ブロックの据え付け時には据付用のガイドとしても機能し完成後には水平せん断力を伝える。
図4はコンクリート施工後の下段ブロック上に上段ブロックを施工する工程を示したものである。
By setting the vertical member as described above, the vertical member can be integrated with the steel block adjacent to the bottom without any gap by placing the underwater concrete. The vertical members (outer guide and inner guide) also function as a guide for installation when the steel block is installed, and transmit a horizontal shearing force after completion.
FIG. 4 shows a process of constructing the upper block on the lower block after the concrete construction.

図4(a)はコンクリート施工後の下段ブロック24を示す。図4(b)に示すように、この下段ブロック24の上面に突出している内ガイド21を据え付け用ガイドとして上段ブロック25の外ガイド22を内ガイド21にスライドさせて上段ブロック25を位置決めし載置する。次いで図4(c)に示すように上段ブロック25にコンクリートを施工する。   Fig.4 (a) shows the lower block 24 after concrete construction. As shown in FIG. 4B, the upper guide 25 is positioned and mounted by sliding the outer guide 22 of the upper block 25 onto the inner guide 21 using the inner guide 21 protruding from the upper surface of the lower block 24 as a guide for installation. Put. Next, concrete is applied to the upper block 25 as shown in FIG.

<シール材>
シール材は図1(d)に示すように、隣接する鋼ガイドの突合わせ部に設けられて、水中コンクリートが周囲に漏洩するのを防止する目的で設けられる。シール材の材料としては変形性能が高いゴム系、樹脂系の材料を用いる。
<Seal material>
As shown in FIG.1 (d), a sealing material is provided in the butt | matching part of an adjacent steel guide, and is provided in order to prevent underwater concrete from leaking around. As the material for the sealing material, a rubber-based or resin-based material having high deformation performance is used.

図5は上記の構造を有する鋼ブロックを水平方向及び垂直方向に延長していく様子を示したものである。
図5(a)に示すように、鋼ブロックの端部に設けた係合部を介して水平方向に延長され、また、図5(b)に示すように鉛直部材を介して垂直方向に延長される。外側鋼パネルと内側鋼パネルとは水中コンクリート打設時の型枠として機能し、鋼パネル二重壁の内部空間にコンクリートが打設される。コンクリートは鋼ブロックを隣接ブロックと一体化して、防波堤の外面構造体および隔壁構造体として機能する。
FIG. 5 shows a state in which the steel block having the above structure is extended in the horizontal direction and the vertical direction.
As shown in FIG. 5 (a), it is extended in the horizontal direction through the engaging portion provided at the end of the steel block, and it is extended in the vertical direction through the vertical member as shown in FIG. 5 (b). Is done. The outer steel panel and the inner steel panel function as a formwork for placing underwater concrete, and concrete is placed in the internal space of the steel panel double wall. Concrete integrates a steel block with an adjacent block and functions as an outer surface structure and a bulkhead structure of a breakwater.

また、図5(a)、(b)に示すように、内側鋼パネルとこれに隣接する鋼ブロックの外側鋼パネルとで形成される空間には中詰め材が充填される。
この中詰め材としては石材等のコンクリートより安価な材料を投入する。この中詰め材によって防波堤としての滑動抵抗を増大させる。
また、台風来襲時期等、工事休止状態の期間が長くなる場合は、波浪による中詰め材の吸出しを防ぐ目的で、施工途中段階において、石材の上に水中コンクリートで覆ってもよい。更に中詰め材として石材を投入した後、コンクリートを施工することもできる。(プレパックトコンクリート工法)
Moreover, as shown to Fig.5 (a), (b), the filling material is filled into the space formed with an inner side steel panel and the outer side steel panel of the steel block adjacent to this.
As the filling material, a material cheaper than concrete such as stone is used. This filling material increases sliding resistance as a breakwater.
Moreover, when the period of a construction suspend state becomes long, such as a typhoon invasion time, in order to prevent sucking out the filling material due to the waves, it may be covered with underwater concrete on the stone in the middle of construction. Furthermore, concrete can also be constructed after putting stone as the filling material. (Prepacked concrete method)

図6に本発明の他の実施形態を示す。
防波堤の堤体幅が大きくなり、ブロックの設置重量が大きくなる場合などには、図6(a)に示すように鋼ブロックを防波堤法線直角方向に分割された形状としてブロックを配置するようにしてもよい。図示例では2分割としたが、必要に応じて適宜分割数を多くしても良い。その場合、分割されたブロック同士が一体化するように、鋼パネルの一部を除去し(図6(a)のa部参照)、各分割ブロック同士にまたがるつなぎ材26を配置し、コンクリート打設によりブロック同士を一体化する。つなぎ材としては鋼製のトラス構造、H鋼等の単材を使用することができる。
また、図6(b)に示すように、二つの鋼ブロックを防波堤法線直角方向に並べた形状とし、それぞれのブロック同士が一体化するように、鋼パネルの一部を除去し(図6(b)のb部参照)、各ブロック同士にまたがるつなぎ材26を配置し、コンクリート打設によりブロック同士を一体化してもよい。図示例では二つの鋼ブロックをつなぎ材26で連結した例を示したが、3つ以上の鋼ブロックをつなぎ材で連結した構造としても良い。
FIG. 6 shows another embodiment of the present invention.
When the breakwater width of the breakwater is increased and the installation weight of the block is increased, the block is arranged in a shape in which the steel block is divided in the direction perpendicular to the breakwater normal as shown in FIG. May be. In the illustrated example, the number of divisions is 2. However, the number of divisions may be increased as necessary. In that case, a part of the steel panel is removed so that the divided blocks are integrated (see a part of FIG. 6A), and a connecting material 26 is arranged between the divided blocks, and the concrete is cast. The blocks are integrated with each other. A single material such as a steel truss structure or H steel can be used as the connecting material.
Further, as shown in FIG. 6 (b), two steel blocks are arranged in a direction perpendicular to the breakwater normal line, and a part of the steel panel is removed so that the respective blocks are integrated (FIG. 6). (Refer to b part of (b)), the connecting material 26 straddling each block may be arranged, and the blocks may be integrated by concrete placement. In the illustrated example, two steel blocks are connected by the connecting material 26, but a structure in which three or more steel blocks are connected by the connecting material may be used.

防波堤築造の全工程を図7及び図8に基づいて説明する。
(1)現地盤掘削計画(図7(a))
現地の地盤を調査して掘削計画線を決定する。
(2)海底掘削、取り付け部及び基礎コンクリートの施工(図7(b))
掘削計画線に沿って地盤を掘削し、次いで、防波堤を構築する取り付け部を構築すると共に、基礎コンクリートを施工して鋼ブロック接地面を構築する。
基礎コンクリートには必要に応じて鉛直材を埋め込み、基礎コンクリート上に施工される下段ブロックとの一体化を図る。
(3)鋼ブロックの設置(図7(c))
下段鋼ブロックを設置する。
(4)コンクリート施工(図7(d)
下段鋼ブロックの二重壁の内部空間に水中コンクリートを施工する。
(5)取り付け部及び上部コンクリート施工(図8(e))
上段の鋼ブロックを設置し、コンクリートを施工する。また、取り付け部と鋼ブロックとの間にコンクリートを施工する。
(6)鋼ブロック設置及びコンクリート施工の繰返し(図8(f))
同様にして鋼ブロックの設置、コンクリートの施工、中詰め材の充填を繰り返して行ない、平方向及び垂直方向に鋼ブロックを延長して行く
(7)完成(図8(g))
鋼ブロック群が目的の高さ及び所定の長さになったところで防波堤の構築を完成する。
The whole process of building a breakwater will be described with reference to FIGS.
(1) Field drilling plan (Fig. 7 (a))
Examine the local ground and determine the drilling plan line.
(2) Submarine excavation, installation and foundation concrete construction (Figure 7 (b))
The ground is excavated along the excavation plan line, and then the mounting part for constructing the breakwater is constructed, and the foundation concrete is constructed to construct the steel block ground contact surface.
If necessary, vertical material is embedded in the foundation concrete and integrated with the lower block constructed on the foundation concrete.
(3) Installation of steel block (Fig. 7 (c))
Install the lower steel block.
(4) Concrete construction (Fig. 7 (d)
Underwater concrete is constructed in the internal space of the double wall of the lower steel block.
(5) Installation part and upper concrete construction (Fig. 8 (e))
Install the upper steel block and install concrete. Moreover, concrete is constructed between the attachment part and the steel block.
(6) Repeating steel block installation and concrete construction (Fig. 8 (f))
Similarly, steel block installation, concrete construction, and filling with filling material were repeated, and the steel block was extended in the flat and vertical directions (7) Completed (Fig. 8 (g))
The construction of the breakwater is completed when the steel block group has reached the target height and predetermined length.

本発明の鋼ブロックを用いることにより、工費の低減及び防波堤を構成する鋼ブロック同士の一体化を効率よく行うことができるので、本発明の鋼ブロックは防波堤構築用のブロックユニットとして好適に使用することができる。   By using the steel block of the present invention, the construction cost can be reduced and the steel blocks constituting the breakwater can be efficiently integrated. Therefore, the steel block of the present invention is suitably used as a block unit for building a breakwater. be able to.

1 鋼ブロック
2 鋼パネル
2a 側壁
2b 中央壁
2A 内側鋼パネル
2B 外側鋼パネル
3 内部部材
4 端部部材
5 鉛直部材
6 シール材
7 コンクリート
8 中詰め材
10 突起部
11 傾斜壁
12 中央壁端部壁
13 傾斜壁
14 端部壁
21 内ガイド
22 外ガイド
23 底板
24 下段ブロック
25 上段ブロック
26 つなぎ材
DESCRIPTION OF SYMBOLS 1 Steel block 2 Steel panel 2a Side wall 2b Central wall 2A Inner steel panel 2B Outer steel panel 3 Internal member 4 End member 5 Vertical member 6 Sealing material 7 Concrete 8 Filling material 10 Protruding part 11 Inclined wall 12 Central wall end wall 13 Inclined wall 14 End wall 21 Inner guide 22 Outer guide 23 Bottom plate 24 Lower block 25 Upper block 26 Connecting material

Claims (6)

二つの側壁と該二つの側壁の一つの端部を連結する中央壁とからなる略コの字型の鋼パネルからなる内側鋼パネルと外側鋼パネルとが間隔を置いて配置されて二重壁を形成しており、
前記二重壁の鋼パネルの開放端には隣接する鋼ブロックの突起部と係合する形状を有する端部部材が設けられており、前記外側鋼パネルの中央壁には隣接する鋼ブロックの端部部材と係合する形状を有する突起部が設けられ、
前記二重壁の内部空間がコンクリート打設空間を形成しており、
隣接する鋼ブロックが係合したときに内側鋼パネルと隣接する鋼ブロックの外側パネルとによって形成される空間は中詰め材を充填するための空間となる
ことを特徴とする防波堤構築用の鋼ブロック。
A double wall in which an inner steel panel and an outer steel panel made of a substantially U-shaped steel panel comprising two side walls and a central wall connecting one end of the two side walls are spaced apart from each other. Forming
The open end of the double-walled steel panel is provided with an end member having a shape that engages with the protrusion of the adjacent steel block, and the end of the adjacent steel block is provided on the central wall of the outer steel panel. A protrusion having a shape that engages with the member,
The internal space of the double wall forms a concrete placement space,
A steel block for building a breakwater, wherein a space formed by an inner steel panel and an outer panel of the adjacent steel block when the adjacent steel blocks are engaged becomes a space for filling the filling material. .
前記二重壁内には鉛直部材が配置されており、この鉛直部材は断面が円形又は多角形状の外ガイドと内ガイドとからなり、外ガイド内の上部に内ガイドの一端が挿入され、内ガイドの他端は外ガイドから突出すると共に、鋼パネルの上端からも突出していることを特徴とする請求項1に記載の鋼ブロック。   A vertical member is disposed in the double wall. The vertical member is composed of an outer guide and an inner guide having a circular or polygonal cross section, and one end of the inner guide is inserted into the upper portion of the outer guide. The steel block according to claim 1, wherein the other end of the guide protrudes from the outer guide and also protrudes from the upper end of the steel panel. 前記突起部が外側パネルの中央壁に二つ設けられており、それぞれの突起部の外側側壁が係合用の傾斜壁を形成しており、夫々の突起部の内側側壁の間の空間が中詰め材の充填空間を形成することを特徴とする請求項1又は2に記載の鋼ブロック。   Two protrusions are provided on the central wall of the outer panel, the outer side walls of each protrusion form an inclined wall for engagement, and the space between the inner side walls of each protrusion is filled in. The steel block according to claim 1, wherein a space for filling the material is formed. 前記端部部材は、鋼パネルの中央壁に平行な端部壁とこの端部壁の端部から該端部壁と鋭角をなして内側鋼パネルの端部に向かって伸びる傾斜壁とから係合部Aを形成しており、一方、外側鋼パネルの突起部はその側壁が外側パネルの中央壁の端部壁と鋭角をなす傾斜壁であり、この傾斜壁と中央壁の端部壁とから係合部Bを形成しており、係合部Bの内側に係合部Aが嵌合することによって係合が行われるようにしていることを特徴とする請求項1〜3のいずれかに記載の鋼ブロック。   The end member includes an end wall parallel to the center wall of the steel panel and an inclined wall extending from the end of the end wall toward the end of the inner steel panel at an acute angle with the end wall. On the other hand, the projection of the outer steel panel is an inclined wall whose side wall forms an acute angle with the end wall of the central wall of the outer panel, and the inclined wall and the end wall of the central wall The engagement portion B is formed from the engagement portion B, and the engagement is performed by the engagement of the engagement portion A inside the engagement portion B. Steel block as described in. 端部部材の前記端部壁及び傾斜壁が鉄骨を組みあわせることによって形成されていることを特徴とする請求項4に記載の鋼ブロック。   The steel block according to claim 4, wherein the end wall and the inclined wall of the end member are formed by combining steel frames. 請求項1〜5のいずれかに記載の鋼ブロックを防波堤構築のためのユニットとして用いて防波堤を構築することを特徴とする防波堤構築方法。
A breakwater construction method, comprising building a breakwater using the steel block according to any one of claims 1 to 5 as a unit for building a breakwater.
JP2010094847A 2010-04-16 2010-04-16 Steel block for breakwater construction and breakwater construction method Active JP5397701B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010094847A JP5397701B2 (en) 2010-04-16 2010-04-16 Steel block for breakwater construction and breakwater construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010094847A JP5397701B2 (en) 2010-04-16 2010-04-16 Steel block for breakwater construction and breakwater construction method

Publications (2)

Publication Number Publication Date
JP2011226091A true JP2011226091A (en) 2011-11-10
JP5397701B2 JP5397701B2 (en) 2014-01-22

Family

ID=45041760

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010094847A Active JP5397701B2 (en) 2010-04-16 2010-04-16 Steel block for breakwater construction and breakwater construction method

Country Status (1)

Country Link
JP (1) JP5397701B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020060006A (en) * 2018-10-09 2020-04-16 南和産業株式会社 Header stop block unit and header stop wall structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102266376B1 (en) * 2019-05-31 2021-06-18 최주혁 A Caison and Construction Method of the Caison Structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07305319A (en) * 1994-05-13 1995-11-21 Ohbayashi Corp Installating method for caison for breakwater
JPH10237875A (en) * 1997-02-27 1998-09-08 Tobishima Corp Method for installing caisson
JP2002176877A (en) * 2000-12-14 2002-06-25 Nkk Corp Block to be installed under water
JP2004100322A (en) * 2002-09-11 2004-04-02 Osaka Prefecture Underwater structure considering ecosystem and block for underwater structure
JP2004257150A (en) * 2003-02-27 2004-09-16 Nippon Tetsutou Kogyo Kk Disaster prevention structure having hollow steel cube blocks, and method of constructing the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07305319A (en) * 1994-05-13 1995-11-21 Ohbayashi Corp Installating method for caison for breakwater
JPH10237875A (en) * 1997-02-27 1998-09-08 Tobishima Corp Method for installing caisson
JP2002176877A (en) * 2000-12-14 2002-06-25 Nkk Corp Block to be installed under water
JP2004100322A (en) * 2002-09-11 2004-04-02 Osaka Prefecture Underwater structure considering ecosystem and block for underwater structure
JP2004257150A (en) * 2003-02-27 2004-09-16 Nippon Tetsutou Kogyo Kk Disaster prevention structure having hollow steel cube blocks, and method of constructing the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020060006A (en) * 2018-10-09 2020-04-16 南和産業株式会社 Header stop block unit and header stop wall structure

Also Published As

Publication number Publication date
JP5397701B2 (en) 2014-01-22

Similar Documents

Publication Publication Date Title
KR101613886B1 (en) Open Cell Caisson, Structure and a Construction Method thereof
JP6266821B2 (en) Deadline structure and deadline method
JP2013170354A (en) Raising technique for breakwater
JP5397701B2 (en) Steel block for breakwater construction and breakwater construction method
CA3022014A1 (en) Sea wall structures, sea walls and methods of manufacture and assembly of the same
JP3905776B2 (en) Revetment structure
JP5646978B2 (en) Construction method of transmission type sea area control structure
JP3170990U (en) Breakwater for overturning drag
JP5572540B2 (en) Temporary deadline structure of the final deadline in the impermeable wall and its deadline method
JP4819835B2 (en) Offshore structure and construction method of offshore structure
CN207143965U (en) Steel plate concrete combined type anti-floating water sealing structure
KR20140092217A (en) Construction method of the pier with the working bardge
JP6630610B2 (en) How to improve wavebreak structures
RU2401356C1 (en) Method of block-modular construction of hydraulic structures in underwater pits
CN210529677U (en) Prefabricated underground continuous wall structure
JP2010116715A (en) Retaining wall construction method
JP5669189B2 (en) Construction method of transmission type sea area control structure
JP4523706B2 (en) Floor excavation solidification replacement method
JP2009228268A (en) Leg type offshore breakwater
JP4730691B2 (en) Raising the existing breakwater
CN210946849U (en) Cofferdam device for construction engineering dredging engineering
CN103147488B (en) Box culvert type drainage port structure and construction method thereof
CN218374182U (en) Drainage pipeline system is got to bank
CN107338797B (en) Steel plate concrete combined anti-floating water stop structure and construction method thereof
JP4778460B2 (en) Steel plate cell installation method and structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120806

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130529

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130926

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131009

R150 Certificate of patent or registration of utility model

Ref document number: 5397701

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350