JP2011208949A - Satellite radio-controlled wrist watch - Google Patents

Satellite radio-controlled wrist watch Download PDF

Info

Publication number
JP2011208949A
JP2011208949A JP2010073853A JP2010073853A JP2011208949A JP 2011208949 A JP2011208949 A JP 2011208949A JP 2010073853 A JP2010073853 A JP 2010073853A JP 2010073853 A JP2010073853 A JP 2010073853A JP 2011208949 A JP2011208949 A JP 2011208949A
Authority
JP
Japan
Prior art keywords
reference information
satellite radio
reception
satellite
controlled wristwatch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010073853A
Other languages
Japanese (ja)
Other versions
JP5595770B2 (en
Inventor
Akira Kato
加藤  明
Takushi Hagita
拓史 萩田
顕斉 ▲高▼田
Akinari Takada
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Citizen Holdings Co Ltd
Citizen Watch Co Ltd
Original Assignee
Citizen Holdings Co Ltd
Citizen Watch Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Citizen Holdings Co Ltd, Citizen Watch Co Ltd filed Critical Citizen Holdings Co Ltd
Priority to JP2010073853A priority Critical patent/JP5595770B2/en
Priority to PCT/JP2011/056818 priority patent/WO2011118573A1/en
Priority to CN201180015750.0A priority patent/CN102884483B/en
Priority to EP11759378.0A priority patent/EP2555062B1/en
Priority to US13/634,306 priority patent/US9606515B2/en
Publication of JP2011208949A publication Critical patent/JP2011208949A/en
Priority to HK13105877.2A priority patent/HK1178270A1/en
Application granted granted Critical
Publication of JP5595770B2 publication Critical patent/JP5595770B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Clocks (AREA)
  • Electromechanical Clocks (AREA)

Abstract

PROBLEM TO BE SOLVED: To perform a receiving operation on a condition varying according to the kind of reference information going to be acquired.SOLUTION: In this satellite radio-controlled wrist watch, time and date are adjusted based on satellite signals including a plurality of reference signals transmitted from a satellite. This wrist watch includes: a reception circuit 31 for receiving the satellite signals; and a controller 47 for therein storing start-up conditions on a reception means for acquiring the reference information in relation to each piece of the reference information, for determining whether or not the start-up conditions stored in relation to the reference information are satisfied in the event that each piece of the reference information is acquired, and for starting the receiving operation of the satellite signals by the reception circuit 31 according to a determination result.

Description

本発明は衛星電波腕時計に関し、特に衛星から送信される衛星信号に基づいて時刻及び日付を修正する衛星電波腕時計に関する。   The present invention relates to a satellite radio wave wristwatch, and more particularly to a satellite radio wave wristwatch that corrects the time and date based on a satellite signal transmitted from a satellite.

下記特許文献1には、GPS(Global Positioning System)衛星からの衛星信号に基づいて時刻修正するGPS付き腕時計が開示されている。具体的には、この腕時計は、衛星信号に含まれる週内時刻TOW(Time Of Week)に基づいて時刻修正する。週内時刻TOWは、直近の日曜日の0時からの経過秒を示すものである。   Patent Document 1 listed below discloses a GPS wristwatch that corrects the time based on a satellite signal from a GPS (Global Positioning System) satellite. Specifically, this wristwatch corrects the time based on the weekly time TOW (Time Of Week) included in the satellite signal. The weekly time TOW indicates the elapsed seconds from 0:00 on the most recent Sunday.

特開2008−039565号公報JP 2008-039565 A

しかしながら、衛星信号に基づいて時刻及び日付を正しく修正するには、実際には週内時刻TOWの他に、週番号WN(Week Number)及び閏秒オフセットΔtLS(Leap Second)を衛星信号から取得する必要がある。週番号WNは、1999年8月22日午前9時に0に再設定された後、毎週1ずつ増加している。閏秒オフセットΔtLSは、GPS衛星の原子時計の出力する時刻とUTC(Universal Time, Coordinated)とのずれを示すものであり、不定期に更新されるものである。ここで、週内時刻TOWは、衛星信号の全てのサブフレーム1〜5に含まれており、各サブフレームにおいて、同期ワードであるTLM(TeLemeTry)の直後に位置するHOW(Hand Over Word)に含まれている。このため、1秒弱で受信完了し、比較的容易に受信できる。しかし、週番号WNは、衛星信号のサブフレーム1のみに含まれており、HOWの後に位置している。このため、その受信には最短でも1秒強掛かる。さらに、閏秒オフセットΔtLSは、衛星信号のサブフレーム4が25回送信されるうち1回のみに含まれており、しかもTLMから4〜5秒経過後に送信されることから、その受信には5〜6秒掛かる。このように、時刻及び日付修正に必要な情報には、受信の難易度に差がある。一方で、週番号WNや閏秒オフセットΔtLSは、当然ながら週内時刻TOWよりも更新間隔が長い。このため、これら週内時刻TOW、週番号WN、閏秒オフセットΔtLSといった基準情報を同一条件で受信するのでは、電力消費に無駄が生じる。   However, in order to correct the time and date correctly based on the satellite signal, the week number WN (Week Number) and leap second offset ΔtLS (Leap Second) are actually acquired from the satellite signal in addition to the weekly time TOW. There is a need. The week number WN is increased by 1 every week after resetting to 0 at 9 am on August 22, 1999. The leap second offset ΔtLS indicates a difference between the time output from the atomic clock of the GPS satellite and UTC (Universal Time, Coordinated), and is updated irregularly. Here, the weekly time TOW is included in all the subframes 1 to 5 of the satellite signal, and in each subframe, the HOW (Hand Over Word) located immediately after the synchronization word TLM (TeLemeTry). include. For this reason, reception is completed in less than one second, and reception is relatively easy. However, the week number WN is included only in the subframe 1 of the satellite signal, and is located after the HOW. For this reason, the reception takes a little more than 1 second. Further, the leap second offset ΔtLS is included only in one out of 25 transmissions of the subframe 4 of the satellite signal, and is transmitted 4 to 5 seconds after the TLM. It takes ~ 6 seconds. Thus, there is a difference in the level of difficulty in receiving information necessary for time and date correction. On the other hand, the update interval of the week number WN and the leap second offset ΔtLS is naturally longer than the weekly time TOW. For this reason, if the reference information such as the weekly time TOW, the week number WN, and the leap second offset ΔtLS is received under the same conditions, power consumption is wasted.

本発明は上記課題に鑑みてなされたものであって、その目的は、取得しようとする基準情報の種類に応じて異なる条件で受信動作を行うことができる衛星電波腕時計を提供することにある。   The present invention has been made in view of the above problems, and an object of the present invention is to provide a satellite radio-controlled wristwatch that can perform a receiving operation under different conditions depending on the type of reference information to be acquired.

上記課題を解決するために、本発明に係る衛星電波腕時計は、衛星から送信される、複数の基準信号を含む衛星信号に基づいて、時刻及び日付を修正する衛星電波腕時計において、前記衛星信号を受信する受信手段と、前記各基準情報に関連づけて、該基準情報を取得するための前記受信手段の起動条件を記憶する起動条件記憶手段と、前記各基準情報を取得する場合に、該基準情報に関連づけて記憶される前記起動条件が満足されているか否かを判定する判定手段と、前記判定手段による判定結果に応じて、前記受信手段による前記衛星信号の受信動作を開始させる受信制御手段と、を含むことを特徴とする。   In order to solve the above problems, a satellite radio-controlled wristwatch according to the present invention is a satellite radio-controlled wristwatch that corrects the time and date based on a satellite signal including a plurality of reference signals transmitted from a satellite. A receiving means for receiving, an activation condition storage means for storing an activation condition of the receiving means for obtaining the reference information in association with the reference information, and the reference information when acquiring the reference information. Determination means for determining whether or not the activation condition stored in association with is satisfied, and reception control means for starting the reception operation of the satellite signal by the reception means according to a determination result by the determination means; , Including.

本発明によれば、取得しようとする基準情報の種類に応じて異なる条件で受信動作を行うことができ、省電力化を図ることができる。   According to the present invention, it is possible to perform a receiving operation under different conditions depending on the type of reference information to be acquired, and to save power.

本発明の実施形態に係る衛星電波腕時計の平面図である。1 is a plan view of a satellite radio-controlled wristwatch according to an embodiment of the present invention. 図1のA−A線における断面図である。It is sectional drawing in the AA of FIG. 本発明の実施形態に係る衛星電波腕時計の回路構成図である。1 is a circuit configuration diagram of a satellite radio-controlled wristwatch according to an embodiment of the present invention. コントローラに記憶される基準情報を模式的に示す図である。It is a figure which shows the reference | standard information memorize | stored in a controller typically. 発電量検出部の回路構成例を示す図である。It is a figure which shows the circuit structural example of an electric power generation amount detection part. 受信回路の起動条件を示す図である。It is a figure which shows the starting conditions of a receiving circuit. 太陽電池の発電量の変化及び基準情報の受信タイミングを示す図である。It is a figure which shows the change of the electric power generation amount of a solar cell, and the reception timing of reference | standard information. 受信動作の制御フロー図である。It is a control flowchart of a receiving operation. 起動条件判定処理の詳細フロー図である。It is a detailed flowchart of a starting condition determination process. 各基準情報の各発電量範囲における受信回路の起動回数を示す図である。It is a figure which shows the frequency | count of starting of the receiving circuit in each electric power generation amount range of each reference | standard information. 変更後の受信回路起動条件を示す図である。It is a figure which shows the receiving circuit starting conditions after a change. 基準情報の受信タイミングの変形例1を説明する図である。It is a figure explaining the modification 1 of the reception timing of reference | standard information. 変形例1に係る受信動作の制御フロー図である。FIG. 10 is a control flow diagram of a reception operation according to Modification 1. 基準情報の受信タイミングの変形例2を説明する図である。It is a figure explaining the modification 2 of the reception timing of reference | standard information. 変形例2に係る受信動作の制御フロー図である。FIG. 10 is a control flow diagram of a reception operation according to Modification 2. 基準情報の受信タイミングの変形例3を説明する図である。It is a figure explaining the modification 3 of the reception timing of reference | standard information. 変形例3に係る受信動作の制御フロー図である。FIG. 10 is a control flowchart of a reception operation according to Modification 3.

以下、本発明の実施形態について図面に基づき詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

図1は、本発明の実施形態に係る衛星電波腕時計100を示す平面図である。同図には、衛星電波腕時計の外装(時計ケース)である胴1、胴1内に配置された文字板2と時刻を示す指針である時針3、分針4、秒針5が示されている。また、胴1の3時側の側面にはユーザが種々の操作を行うための竜頭6、ボタン7が配置されている。胴1の12時側及び6時側の側面からは、バンドを固定するためのバンド固定部8が伸びている。   FIG. 1 is a plan view showing a satellite radio-controlled wristwatch 100 according to an embodiment of the present invention. The figure shows a case 1 that is the exterior (watch case) of a satellite radio-controlled wristwatch, a dial 2 that is arranged in the case 1, and an hour hand 3, a minute hand 4, and a second hand 5 that are hands indicating time. Further, a crown 6 and buttons 7 are arranged on the side surface of the trunk 1 on the 3 o'clock side for the user to perform various operations. A band fixing portion 8 for fixing the band extends from the side surface of the trunk 1 on the 12 o'clock side and the 6 o'clock side.

なお、同図に示した衛星電波腕時計100のデザインは一例である。ここで示したもの以外にも、例えば、胴1を丸型でなく角型にしてもよいし、竜頭6やボタン7の有無、数、配置は任意である。また、本実施形態では、指針を時針3、分針4、秒針5の3本としているが、これに限定されず、秒針5を省略しても、あるいは、曜日、タイムゾーンやサマータイムの有無、電波の受信状態や電池の残量、各種の表示を行う指針や、日付表示等を追加したりしてもよい。   In addition, the design of the satellite radio-controlled wristwatch 100 shown in the figure is an example. In addition to those shown here, for example, the barrel 1 may be square instead of round, and the presence / absence, number, and arrangement of the crown 6 and the button 7 are arbitrary. Further, in the present embodiment, the hands are three hands of the hour hand 3, the minute hand 4, and the second hand 5, but the present invention is not limited to this, and even if the second hand 5 is omitted, the day of the week, the time zone or the presence / absence of summer time, the radio wave The reception status, remaining battery level, pointers for various displays, date display, and the like may be added.

なお、本明細書では、衛星電波腕時計という用語を、腕時計であって、かつ、GPS衛星などの日付や時刻に関する情報を含む衛星信号を送信する衛星から当該衛星信号を受信し、それに含まれる日付や時刻に関する情報、すなわち基準情報に基づき、腕時計内部に保持している時刻の情報である内部時刻を修正する機能を有している腕時計を指すものとして用いる。   In this specification, the term satellite radio wave wristwatch refers to a wristwatch that receives a satellite signal from a satellite that transmits information about the date and time, such as a GPS satellite, and the date included in the satellite signal. It is used to indicate a wristwatch having a function of correcting the internal time, which is information on the time held in the wristwatch, based on information related to the time, that is, reference information.

図2は、図1のA−A線による断面図である。衛星電波腕時計100の文字板2を覆うように風防9が胴1に取り付けられ、また、風防9の反対側では、裏蓋10が胴1に取り付けられる。風防9の材質は、ガラス等の透明な材料であり、非磁性かつ非導電性である。また、胴1及び裏蓋10の材質は、特に限定はされないが、本実施形態では金属である。   2 is a cross-sectional view taken along line AA in FIG. A windshield 9 is attached to the trunk 1 so as to cover the dial 2 of the satellite radio-controlled wristwatch 100, and a back cover 10 is attached to the trunk 1 on the opposite side of the windshield 9. The material of the windshield 9 is a transparent material such as glass, and is nonmagnetic and nonconductive. Moreover, although the material of the trunk | drum 1 and the back cover 10 is not specifically limited, In this embodiment, it is a metal.

本明細書では、以降、衛星電波腕時計100の風防9が配置される方向(図2における上方向)を風防側、裏蓋10が配置される方向(図2における下方向)を裏蓋側と呼ぶ。   In the present specification, hereinafter, the direction in which the windshield 9 of the satellite radio-controlled wristwatch 100 is arranged (upward direction in FIG. 2) is the windshield side, and the direction in which the back cover 10 is arranged (downward direction in FIG. 2) is the back cover side. Call.

文字板2の裏蓋側には、太陽電池(光起電パネル)11が配置され、風防側から入光した光により発電がなされる。そのため、文字板2はある程度光線を透過する材質で形成される。本実施形態では、文字板2は、太陽電池11を挟むようにして、ベース部材12に固定される。   A solar cell (photovoltaic panel) 11 is disposed on the back cover side of the dial plate 2, and power is generated by light incident from the windshield side. Therefore, the dial 2 is made of a material that transmits light to some extent. In the present embodiment, the dial 2 is fixed to the base member 12 so as to sandwich the solar cell 11.

ベース部材12は、合成樹脂等の非磁性かつ非導電性の材質からなり、パッチアンテナ14や指針を駆動するための歯車機構25をはじめとする各種部材を支持する。パッチアンテナ14には、その厚み方向を貫くように給電ピン14bが設けられ、風防側の面が衛星からの電波を受信する受信面14aとなっている。   The base member 12 is made of a non-magnetic and non-conductive material such as synthetic resin, and supports various members including a gear mechanism 25 for driving the patch antenna 14 and the pointer. The patch antenna 14 is provided with a feed pin 14b so as to penetrate the thickness direction thereof, and the windshield side surface serves as a reception surface 14a for receiving radio waves from the satellite.

ところで、一般に長波帯を用いて地上局から送信される標準電波を用いて時刻修正を行う電波時計では、フェライトあるいはアモルファス合金等の磁芯にコイルを巻いた形式のいわゆるバーアンテナが用いられることが多い。これに対し、本実施形態に係る衛星電波腕時計100では、はるかに周波数の高いUHF帯を用いて衛星から送信される信号を受信する。そのため、UHF帯の信号の受信に適した小型のアンテナとして、パッチアンテナ14を用いている。   By the way, in general, in a radio timepiece that performs time adjustment using a standard radio wave transmitted from a ground station using a long wave band, a so-called bar antenna in which a coil is wound around a magnetic core such as a ferrite or an amorphous alloy is used. Many. In contrast, the satellite radio-controlled wristwatch 100 according to the present embodiment receives a signal transmitted from a satellite using a UHF band having a much higher frequency. For this reason, the patch antenna 14 is used as a small antenna suitable for receiving a UHF band signal.

ベース部材12の裏蓋側には、回路基板24が配置され、さらにその裏蓋側には電池26が配置される。本実施形態では、電池26は充電可能な二次電池であり、ボタン型のリチウムイオン二次電池を用いている。そして、太陽電池11により発電された電力が蓄積されるようになっている。また、回路基板24には歯車機構25の駆動源であるモータ23も取り付けられている。   A circuit board 24 is disposed on the back cover side of the base member 12, and a battery 26 is disposed on the back cover side. In the present embodiment, the battery 26 is a rechargeable secondary battery, and uses a button-type lithium ion secondary battery. And the electric power generated by the solar cell 11 is accumulated. A motor 23 that is a drive source of the gear mechanism 25 is also attached to the circuit board 24.

なお、電池26の形状はボタン型に限定されず、任意である。さらに、二次電池としてリチウムイオン二次電池以外のもの、例えば、リチウムイオンキャパシタやニッケル水素畜電池を用いてもよい。   The shape of the battery 26 is not limited to the button type, and is arbitrary. Further, a secondary battery other than the lithium ion secondary battery, for example, a lithium ion capacitor or a nickel metal hydride battery may be used.

ここで、図2に示されるようにパッチアンテナ14の受信面14aは太陽電池11の受光面と平行に設けられており、いずれも風防側を向いている。また、図1に示されるように太陽電池11は概略円形をなし、その外周の一部が矩形状に切りかかれている。そして、この部分にパッチアンテナ14が配置されている。このため、パッチアンテナ14の受信面14aと太陽電池11の受光面は、いずれも文字板2の裏面に直接対向している。本実施形態では、太陽電池11の発電量を衛星電波腕時計100の受光量としている。この受光量は、パッチアンテナ14の受信面14aが天上方向を向いているか否かの判断基準として用いられる。強い光が文字板2にあたっている状況は、日中の屋外や窓際など、パッチアンテナ14が衛星に向いており、受信に適した環境にある可能性が高い。そこで、本実施形態では、太陽電池11の発電量により、衛星信号の受信タイミングを決定するようにしている。   Here, as shown in FIG. 2, the receiving surface 14 a of the patch antenna 14 is provided in parallel with the light receiving surface of the solar cell 11, and all face the windshield side. Further, as shown in FIG. 1, the solar cell 11 has a substantially circular shape, and a part of the outer periphery thereof is cut into a rectangular shape. And the patch antenna 14 is arrange | positioned at this part. For this reason, the receiving surface 14 a of the patch antenna 14 and the light receiving surface of the solar cell 11 are both directly opposed to the back surface of the dial 2. In the present embodiment, the amount of power generated by the solar cell 11 is the amount of light received by the satellite radio-controlled wristwatch 100. This received light amount is used as a criterion for determining whether or not the receiving surface 14a of the patch antenna 14 is facing upward. The situation where strong light strikes the dial 2 is likely to be in an environment suitable for reception because the patch antenna 14 faces the satellite, such as outdoors during the day or near the window. Therefore, in this embodiment, the reception timing of the satellite signal is determined based on the power generation amount of the solar cell 11.

図3は、本実施形態に係る電波腕時計100の回路構成図である。これら回路要素は、主に回路基板24上に配置される。パッチアンテナ14により受信された衛星信号は、高周波回路46によりベースバンド信号に変換され、デコーダ回路53により時刻に関する情報、具体的には時刻や日付を示す情報が抽出され、コントローラ47へと受け渡される。高周波回路46及びデコーダ回路53により受信回路31が構成される。コントローラ47は、モータ23のドライバ、揮発性及び不揮発性メモリ、時計回路、各種AD変換器を内蔵したマイクロコンピュータであり、各種の制御は不揮発性メモリに記憶されたプログラムに従って実行される。   FIG. 3 is a circuit configuration diagram of the radio-controlled wristwatch 100 according to the present embodiment. These circuit elements are mainly arranged on the circuit board 24. The satellite signal received by the patch antenna 14 is converted into a baseband signal by the high-frequency circuit 46, and information related to time, specifically, information indicating time and date is extracted by the decoder circuit 53 and delivered to the controller 47. It is. The high frequency circuit 46 and the decoder circuit 53 constitute a receiving circuit 31. The controller 47 is a microcomputer incorporating a driver for the motor 23, volatile and nonvolatile memory, a clock circuit, and various AD converters, and various controls are executed in accordance with programs stored in the nonvolatile memory.

ここで、コントローラ47に内蔵される揮発性メモリには、図4に示される日時修正のための基準情報が格納される。これらの基準情報は、衛星信号から抽出されるものである。まず、週内時刻TOWは、直近の日曜日の0時からの経過秒を示すものであり、衛星信号の全てのサブフレーム1〜5に含まれており、各サブフレームにおいて、同期ワードであるTLMの直後に位置するHOWに含まれている。週番号WNは、1999年8月22日午前9時に0に再設定された後、毎週1ずつ増加している。週番号WNは、衛星信号のサブフレーム1のみに含まれており、HOWの後に位置している。閏秒オフセットΔtLSは、GPS衛星の原子時計の出力する時刻とUTCとのずれを示すものであり、不定期に更新されるものである。閏秒オフセットΔtLSは、衛星信号のサブフレーム4が25回(ページ1〜25)送信されるうち1回のみ(サブフレーム4ページ18)に含まれており、TLMから4〜5秒経過後に送信される。サブフレーム1〜5はそれぞれ6秒かけて送信されるので、閏秒オフセットΔtLSは12.5分に一度送信されることになる。閏秒更新週WNLSFは、閏秒オフセットΔtLSの更新が予定される週の週番号であり、閏秒オフセットΔtLSの直後に送信される。閏秒更新日DNは、閏秒オフセットΔtLSの更新が予定される日の、直近の日曜日からの経過日数であり、閏秒更新週WNLSFの直後に送信される。更新後閏秒オフセットΔtLSFは、更新後の閏秒オフセットの値であり、閏秒更新日DNの直後に送信される。コントローラ47では、衛星信号からこれらの基準情報を抽出すると、揮発性メモリに保存するとともに、その保存した基準情報に関連づけて該基準情報の受信日時も記憶する(図4参照)。受信日時は、例えば内蔵時計回路の出力に従って設定される。   Here, the volatile memory built in the controller 47 stores reference information for date correction shown in FIG. The reference information is extracted from the satellite signal. First, the weekly time TOW indicates the elapsed seconds from 0 o'clock on the last Sunday, and is included in all the subframes 1 to 5 of the satellite signal. In each subframe, a TLM that is a synchronization word Is included in the HOW located immediately after. The week number WN is increased by 1 every week after resetting to 0 at 9 am on August 22, 1999. Week number WN is included only in subframe 1 of the satellite signal, and is located after HOW. The leap second offset ΔtLS indicates a difference between the time output by the atomic clock of the GPS satellite and UTC, and is updated irregularly. The leap second offset ΔtLS is included only once (subframe 4 page 18) out of 25 transmissions (pages 1 to 25) of satellite signal subframe 4, and is transmitted after 4 to 5 seconds have elapsed since TLM. Is done. Since each of subframes 1 to 5 is transmitted over 6 seconds, the leap second offset ΔtLS is transmitted once every 12.5 minutes. The leap second update week WNLSF is the week number of the week in which the leap second offset ΔtLS is scheduled to be updated, and is transmitted immediately after the leap second offset ΔtLS. The leap second update date DN is the number of days elapsed since the last Sunday on the day when the leap second offset ΔtLS is scheduled to be updated, and is transmitted immediately after the leap second update week WNLSF. The updated leap second offset ΔtLSF is a value of the updated leap second offset and is transmitted immediately after the leap second update date DN. When these reference information is extracted from the satellite signal, the controller 47 stores the reference information in a volatile memory and also stores the reception date and time of the reference information in association with the stored reference information (see FIG. 4). The reception date and time is set according to the output of the built-in clock circuit, for example.

コントローラ47は、こうして保存される基準情報に基づいて、内部の時計回路が保持する時刻情報である内部時刻(現在の時刻及び日付を含む)を修正し、内部時刻に基づいてモータ23を駆動する。モータ23により発生した回転動力は、輪列を経て指針(時針3、分針4及び秒針5)へと伝達され、時刻表示がなされる。   Based on the reference information thus stored, the controller 47 corrects the internal time (including the current time and date), which is time information held by the internal clock circuit, and drives the motor 23 based on the internal time. . The rotational power generated by the motor 23 is transmitted to the hands (hour hand 3, minute hand 4 and second hand 5) through the train wheel, and the time is displayed.

また、太陽電池11はスイッチ29を介して電池26に接続されており、コントローラ47からの指示によりスイッチ29が太陽電池11と電池26とを導通させている状態では、太陽電池11により発電された電力は、電池26に蓄積される。そして、電池26からは、高周波回路46、デコーダ回路53及びコントローラ47に電力が供給される。また、太陽電池11はスイッチ29を介して発電量検出部30にも接続されており、コントローラ47からの指示によりスイッチ29が太陽電池11と発電量検出部30を導通させている状態では、太陽電池11により生じる電流は発電量検出部30に流れる。発電量検出部30はこの電流を電圧に変換するとともに、この電圧をさらにデジタル値に変換し、コントローラ47に供給する。スイッチ56は、受信回路31、すなわち高周波回路46及びデコーダ回路53への電力供給のオン/オフを切り替えるスイッチであり、コントローラ47により制御される。高周波数で動作する高周波回路46とデコーダ回路53はその消費電力が大きいため、コントローラ47は、衛星信号を受信する時のみスイッチ56をオンとして受信回路31、すなわち高周波回路46及びデコーダ回路53を動作させ、それ以外の時はスイッチ56をオフとして、電力消費を低減する。   Further, the solar cell 11 is connected to the battery 26 via the switch 29, and the solar cell 11 generates electric power in a state where the switch 29 makes the solar cell 11 and the battery 26 conductive by an instruction from the controller 47. Electric power is stored in the battery 26. Then, power is supplied from the battery 26 to the high frequency circuit 46, the decoder circuit 53, and the controller 47. Further, the solar cell 11 is also connected to the power generation amount detection unit 30 via the switch 29, and in a state where the switch 29 causes the solar cell 11 and the power generation amount detection unit 30 to conduct in accordance with an instruction from the controller 47, The current generated by the battery 11 flows to the power generation amount detection unit 30. The power generation amount detection unit 30 converts this current into a voltage, further converts this voltage into a digital value, and supplies it to the controller 47. The switch 56 is a switch for switching on / off the power supply to the receiving circuit 31, that is, the high frequency circuit 46 and the decoder circuit 53, and is controlled by the controller 47. Since the high-frequency circuit 46 and the decoder circuit 53 that operate at a high frequency consume a large amount of power, the controller 47 turns on the switch 56 only when receiving a satellite signal, and operates the reception circuit 31, that is, the high-frequency circuit 46 and the decoder circuit 53. In other cases, the switch 56 is turned off to reduce power consumption.

衛星信号の受信は、竜頭6やボタン7等の入力手段によるユーザからの要求がなされた時や、あらかじめ定められた時刻となったときに行ってよく、そのほかにも、前回の時刻修正があった時刻からの経過時間、あるいは太陽電池11の発電量やその他の電波腕時計100の周囲の環境を示す情報等に基づいて行うようにしてよい。なお、コントローラ47は、任意のタイミングでスイッチ29を切り替えて太陽電池11の端子を発電量検出部30に接続し、発電量検出部30に発電量を示すデジタル値を生成させ、このデジタル値をコントローラ47が取得することができるようになっている。図5は、発電量検出部30の回路構成例である。太陽電池11は、該太陽電池11が受ける光の量により電流値が大きく異なる。そこで、同図に示す発電量検出部30は、太陽電池11と並列接続され、太陽電池11の発電電流が流れる抵抗器30aと、該抵抗器30aの両端電圧をデジタル値に変換するAD変換器30bと、を備えるようにしている。AD変換器30bにより生成されるデジタル値は発電量、すなわち太陽電池11が受ける光の量を示しており、このデジタル値はコントローラ47に入力される。   The satellite signal may be received when a request is made by the user through the input means such as the crown 6 or the button 7 or when a predetermined time is reached. It may be performed on the basis of the elapsed time from the specified time, the amount of power generated by the solar cell 11 or other information indicating the environment around the radio-controlled wristwatch 100. The controller 47 switches the switch 29 at an arbitrary timing to connect the terminal of the solar cell 11 to the power generation amount detection unit 30 and causes the power generation amount detection unit 30 to generate a digital value indicating the power generation amount. The controller 47 can acquire it. FIG. 5 is a circuit configuration example of the power generation amount detection unit 30. The current value of the solar cell 11 varies greatly depending on the amount of light received by the solar cell 11. Therefore, the power generation amount detection unit 30 shown in the figure is connected in parallel with the solar cell 11, a resistor 30a through which the power generation current of the solar cell 11 flows, and an AD converter that converts the voltage across the resistor 30a into a digital value. 30b. The digital value generated by the AD converter 30 b indicates the power generation amount, that is, the amount of light received by the solar cell 11, and this digital value is input to the controller 47.

以下では、受信回路31を起動させて衛星信号を受信する制御について具体的に説明する。本衛星電波腕時計100では、図4に示されるようにして保存されている、衛星信号から抽出される各種基準情報の有効期限を調べ、有効期限が切れている基準情報は再取得するようにしている。例えば、週内時刻TOWは、前回受信日時から48時間が経過した場合に有効期限切れであると判断する。内部時計の精度を15秒/月とすると、48時間(2日)では1秒程度のずれが生じる可能性がある。48時間で週内時刻TOWを有効期限切れと判断し、再取得することで、内部時計のずれを継続的に1秒程度内に抑えることができる。週番号WNは、前回受信日時から例えば1週間が経過した場合に有効期限切れであると判断する。閏秒オフセットΔtLS、閏秒更新週WNLSF、閏秒更新日DN、更新後閏秒オフセットΔtLSFは、前回受信日時から半年が経過した場合や、既に記憶されている閏秒更新週WNLSF及び閏秒更新日DNにより特定される日付の翌月に入った場合に、有効期限切れであると判断する。いずれかの情報が有効期限切れであれば、受信環境に応じて受信回路31を起動し、当該情報を取得する。   Below, the control which starts the receiving circuit 31 and receives a satellite signal is demonstrated concretely. In the satellite radio-controlled wristwatch 100, the expiration date of various reference information extracted from the satellite signal stored as shown in FIG. 4 is checked, and the reference information that has expired is reacquired. Yes. For example, the weekly time TOW is determined to have expired when 48 hours have passed since the previous reception date and time. If the accuracy of the internal clock is 15 seconds / month, a shift of about 1 second may occur in 48 hours (2 days). By determining that the weekly time TOW has expired in 48 hours and reacquiring it, the deviation of the internal clock can be continuously suppressed within about 1 second. The week number WN is determined to have expired when, for example, one week has passed since the last reception date. The leap second offset ΔtLS, the leap second update week WNLSF, the leap second update date DN, and the updated leap second offset ΔtLSF are displayed when a half-year has elapsed from the previous reception date or when the leap second update week WNLSF and leap second update are already stored. When the month following the date specified by the date DN is entered, it is determined that the expiration date has expired. If any information is expired, the reception circuit 31 is activated according to the reception environment, and the information is acquired.

また、上述のように内部時刻を修正するには週内時刻TOW、週番号WN及び閏秒オフセットΔtLSが必要である。本実施形態では、内蔵時計回路の出力する内部時刻に従って、上述のように12.5分に1回到来するサブフレーム4ページ18の送信タイミングで受信回路31を起動する。そして、サブフレーム4ページ18に含まれるHOWから週内時刻TOWを取得する。また、必要に応じて、同サブフレーム4ページ18に含まれる閏秒オフセットΔtLS、閏秒更新週WNLSF、閏秒更新日DN、更新後閏秒オフセットΔtLSFを取得する。さらに、必要に応じて後続のサブフレーム1ページ19に含まれる週番号WNを取得する。上述のように週内時刻TOWは比較的受信が容易である。また、週番号WNは、週内時刻TOW及び閏秒オフセットΔtLSが更新される限り、正確性を維持できる。一方、閏秒オフセットΔtLSは、上述のように受信が難しい。そこで、本実施形態では、サブフレーム4ページ18の送信タイミングで受信回路31を起動するようにして、閏秒オフセットΔtLSを正常受信できる可能性を優先的に高めるようにしている。   Further, in order to correct the internal time as described above, the weekly time TOW, the week number WN, and the leap second offset ΔtLS are required. In the present embodiment, the receiving circuit 31 is activated at the transmission timing of the subframe 4 page 18 that arrives once every 12.5 minutes as described above according to the internal time output from the built-in clock circuit. The weekly time TOW is acquired from the HOW included in the subframe 4 page 18. Further, the leap second offset ΔtLS, the leap second update week WNLSF, the leap second update date DN, and the updated leap second offset ΔtLSF included in the same subframe 4 page 18 are acquired as necessary. Further, the week number WN included in the subsequent subframe 1 page 19 is acquired as necessary. As described above, the weekly time TOW is relatively easy to receive. The week number WN can maintain accuracy as long as the weekly time TOW and the leap second offset ΔtLS are updated. On the other hand, the leap second offset ΔtLS is difficult to receive as described above. Therefore, in the present embodiment, the reception circuit 31 is activated at the transmission timing of the subframe 4 page 18, so that the possibility that the leap second offset ΔtLS can be normally received is preferentially increased.

また、図6に示すように、週内時刻TOWを取得する場合と、閏秒オフセットΔtLS、閏秒更新週WNLSF、閏秒更新日DN、更新後閏秒オフセットΔtLSF(以下、閏秒情報という。)を取得する場合と、週番号WNを取得する場合とで、受信回路31を起動する発電量条件、すなわち太陽電池11の発電量の下限と、回数条件、すなわち所定時間(例えば24時間)内に受信回路31を起動する回数と、が別々に定められている。なお、同図に示す起動条件はコントローラ47に記憶されるものであり、取得すべき基準情報の種類(週内時刻TOWか閏秒情報か週番号WNか)に関連づけて発電量条件(発電量の下限)と回数条件(一日あたりの起動回数の上限)を記したものである。同図に示す起動条件は、週内時刻TOWを取得する場合は、太陽電池11の発電量が「小」でも受信回路31を起動するが、閏秒情報や週番号WNを取得する場合は、太陽電池11の発電量が「大」でなければ受信回路31を起動しないことが示されている。これは、週内時刻TOW、閏秒情報、週番号WNの受信の困難性の違いを考慮したものである。すなわち週内時刻TOWは、HOWの最初の17ビットに含まれ、TLMと併せてもわずか47ビットしかない。このため、わずか1秒弱で受信できる(50bpsの場合)。HOWの全体を受信するとしてもTLMと併せて60ビットしかなく、わずか1.2秒で受信できる。一方、一連の閏秒情報はサブフレーム4ページ18の後半部分に含まれており、閏秒オフセットΔtLSだけを受信するに場合でも5秒程度、閏秒情報全体を取得する場合には6秒程度が必要である。また、週番号WNはサブフレーム1の先頭部分に含まれており、サブフレーム4の全体、サブフレーム5の全体、及びサブフレーム1の先頭70ビットを受信することで週番号WNを取得することができる。このため、週番号WNの取得には合計で670ビットのデータの受信が必要であり(1サブフレームは300ビット)、13秒強が掛かる。このように、週内時刻TOW、閏秒情報、週番号WNの受信の困難性は大きく異なり、正常受信に必要な受信環境は大きく異なる。そこで、本実施形態では基準情報の種類毎に発電量条件を記憶しておき、取得しようとする基準情報に対応する発電量条件が充足されているか否かにより受信回路31を実際に起動するかどうかを判断している。なお、本実施形態では、発電量を、その大きさにより、順に「大」、「中」、「小」及び「不可」に分類して制御に用いている。   Also, as shown in FIG. 6, when the weekly time TOW is acquired, the leap second offset ΔtLS, the leap second update week WNLSF, the leap second update date DN, the updated leap second offset ΔtLSF (hereinafter referred to as leap second information). ) And when acquiring the week number WN, the power generation amount condition that activates the receiving circuit 31, that is, the lower limit of the power generation amount of the solar cell 11, and the frequency condition, that is, within a predetermined time (for example, 24 hours) The number of times of starting the receiving circuit 31 is determined separately. The activation conditions shown in the figure are stored in the controller 47, and are associated with the type of reference information to be acquired (weekly time TOW, leap second information or week number WN). ) And frequency conditions (upper limit on the number of activations per day). The activation condition shown in the figure is that when the weekly time TOW is acquired, the reception circuit 31 is activated even if the power generation amount of the solar cell 11 is “small”, but when the leap second information and the week number WN are acquired, It is shown that the receiving circuit 31 is not started unless the power generation amount of the solar cell 11 is “large”. This takes into account the difference in difficulty in receiving weekly time TOW, leap second information, and week number WN. That is, the weekly time TOW is included in the first 17 bits of the HOW, and only 47 bits when combined with the TLM. Therefore, it can be received in just under 1 second (in the case of 50 bps). Even if the entire HOW is received, it has only 60 bits in combination with the TLM, and can be received in only 1.2 seconds. On the other hand, a series of leap second information is included in the second half portion of the subframe 4 page 18, which is about 5 seconds even when only the leap second offset ΔtLS is received, and about 6 seconds when the whole leap second information is acquired. is required. The week number WN is included in the head portion of the subframe 1, and the week number WN is obtained by receiving the entire subframe 4, the entire subframe 5, and the first 70 bits of the subframe 1. Can do. For this reason, in order to acquire the week number WN, it is necessary to receive a total of 670 bits of data (one subframe is 300 bits), which takes a little over 13 seconds. Thus, the difficulty in receiving weekly time TOW, leap second information, and week number WN is greatly different, and the reception environment required for normal reception is greatly different. Therefore, in the present embodiment, the power generation amount condition is stored for each type of reference information, and whether the reception circuit 31 is actually started depending on whether or not the power generation amount condition corresponding to the reference information to be acquired is satisfied. Judgment is made. In the present embodiment, the power generation amount is classified into “large”, “medium”, “small”, and “impossible” in order according to the magnitude, and is used for control.

また、発電量が十分であったとしても、12.5分ごとに受信回路31を常に起動し、その度に各種基準情報の取得に失敗したのでは、電池26の残量が急速に減ってしまう。そこで、図6に示すように回数条件も設定して、1日あたりの受信回路31の起動回数も制限している。このとき、閏秒情報や週番号WNの受信には週内時刻TOWの受信に比して、受信回路31を長い時間動作させておく必要があり、消費電力が大きい。そこで、週内時刻TOW、閏秒情報、週番号WNとで、回数条件を別々に設定している。また、同じ電力消費するならば、発電量が「小」よりも「大」のときに受信回路31を起動させる方が、基準情報を正しく取得できる可能性が高い。つまり、受信環境によって受信回路31を起動させる回数を異ならせることが望ましい。そこで、回数条件を、発電量の範囲毎に設定している。具体的には、図6に示す回数条件によれば、週内時刻TOWを取得すべく発電量「大」のときに受信回路31を起動する1日あたりの上限回数、「中」のときに起動する上限回数、「小」のときに起動する上限回数が、それぞれ定められている。同様に、閏秒情報や週番号WNを取得すべく発電量「大」のときに受信回路31を起動する1日あたりの上限回数が定められている。   Even if the power generation amount is sufficient, if the receiving circuit 31 is always started every 12.5 minutes and acquisition of various reference information fails each time, the remaining amount of the battery 26 decreases rapidly. End up. Therefore, as shown in FIG. 6, the number of times condition is also set to limit the number of activations of the receiving circuit 31 per day. At this time, reception of leap second information and week number WN requires that reception circuit 31 be operated for a longer time than reception of weekly time TOW, resulting in high power consumption. Therefore, the number of times conditions are set separately for the weekly time TOW, leap second information, and week number WN. Further, if the same power is consumed, it is more likely that the reference information can be correctly acquired by starting the receiving circuit 31 when the power generation amount is “large” than “small”. In other words, it is desirable to vary the number of times to activate the reception circuit 31 depending on the reception environment. Therefore, the frequency condition is set for each power generation range. Specifically, according to the number of times condition shown in FIG. 6, the upper limit number of times per day that the receiving circuit 31 is activated when the power generation amount is “large” to acquire the weekly time TOW, The upper limit number of times of starting and the upper limit number of times of starting when “small” are set respectively. Similarly, an upper limit number of times per day for starting up the receiving circuit 31 when the power generation amount is “large” to acquire leap second information and week number WN is determined.

また、受信環境が変化しないのに何度も連続して受信回路31を起動しても、基準情報の取得に失敗し続ける可能性が高い。そこで、本実施形態では、受信環境が変化した場合、すなわち太陽電池11の発電量が増加した場合に受信回路31を起動するようにして、省電力化を図るようにしている。図7は、太陽電池11の発電量の推移、発電量の取得タイミング、受信回路31の起動タイミングを概念的に示している。発電量の取得タイミングは丸で示され、受信回路31の起動タイミングは二重丸で示されている。本実施形態では、同図に示すように、12.5分ごとに太陽電池11の発電量がサンプリングされているが、発電量が起動条件を満足していたとしても、必ずしも受信回路31は起動されない。本実施形態では、発電量が増加し、且つ発電量が、取得しようとする基準情報に応じた下限以上である場合にのみ、受信回路31が起動されるようにしている。こうして、無駄に何度も受信回路31を起動して電池26の残量が急速に減ることを防止している。   In addition, even if the reception circuit 31 is continuously activated many times even when the reception environment does not change, there is a high possibility that the acquisition of the reference information will continue to fail. Therefore, in the present embodiment, when the reception environment changes, that is, when the power generation amount of the solar battery 11 increases, the reception circuit 31 is activated to save power. FIG. 7 conceptually shows the transition of the power generation amount of the solar cell 11, the acquisition timing of the power generation amount, and the start timing of the reception circuit 31. The power generation amount acquisition timing is indicated by a circle, and the activation timing of the reception circuit 31 is indicated by a double circle. In this embodiment, as shown in the figure, the power generation amount of the solar cell 11 is sampled every 12.5 minutes. However, even if the power generation amount satisfies the start condition, the reception circuit 31 is not necessarily started. Not. In the present embodiment, the reception circuit 31 is activated only when the power generation amount increases and the power generation amount is equal to or greater than the lower limit corresponding to the reference information to be acquired. In this way, the receiving circuit 31 is activated many times in vain to prevent the remaining amount of the battery 26 from rapidly decreasing.

図8は、コントローラ47で実行される受信回路31の起動処理を示すフロー図である。また、図9は起動条件判定処理の詳細フロー図である。図8に示すように、コントローラ47は、まず内部時刻に従って、サブフレーム4ページ18の受信タイミングを待機する(S101)。そして、サブフレーム4ページ18の受信タイミング(サブフレーム4ページ18の先頭タイミングから所定時間(例えば2〜3秒)前)が到来すると、週内時刻TOWが有効であるかどうかを判断し(S102)、週内時刻TOWが有効期限切れであれば、TOW受信モードを設定する(S105)。一方、週内時刻TOWが有効期限切れでなければ、閏秒情報及び週番号WNの両方ともが有効であるかどうかを判断する(S103)。そして、閏秒情報及び週番号WNのいずれか少なくとも1つでも有効期限切れであれば、全受信モードを設定する(S104)。一方、閏秒情報及び週番号WNの両方が有効であれば、S101の処理に戻る。   FIG. 8 is a flowchart showing the starting process of the receiving circuit 31 executed by the controller 47. FIG. 9 is a detailed flowchart of the activation condition determination process. As shown in FIG. 8, the controller 47 first waits for the reception timing of the subframe 4 page 18 according to the internal time (S101). Then, when the reception timing of the subframe 4 page 18 (a predetermined time (for example, 2 to 3 seconds) before the start timing of the subframe 4 page 18) arrives, it is determined whether or not the weekly time TOW is valid (S102). ) If the weekly time TOW expires, the TOW reception mode is set (S105). On the other hand, if the weekly time TOW is not expired, it is determined whether both leap second information and week number WN are valid (S103). If at least one of the leap second information and the week number WN has expired, the all reception mode is set (S104). On the other hand, if both leap second information and week number WN are valid, the process returns to S101.

次に、コントローラ47は起動条件が充足されているか否かを判断する(S106)。具体的には、図9に示すように、コントローラ47は、スイッチ29を切り替えて太陽電池11の発電量(大、中、小、不可のいずれか)を取得するとともに、有効期限切れの基準情報に応じた発電量条件を取得する(S1061)。有効期限切れの基準情報が複数の場合、各基準情報に対応する発電量条件を取得する。次に、S1061で取得した発電量が、取得した各発電量条件を充足しているか否かを判断する(S1062)。S1061で取得した発電量が、取得した、いずれの発電量条件も充足しなければ、起動条件が充足されていないと判定する(S1066)。この場合、S101の処理に戻る(S107)。   Next, the controller 47 determines whether the activation condition is satisfied (S106). Specifically, as shown in FIG. 9, the controller 47 switches the switch 29 to acquire the power generation amount (large, medium, small, or impossible) of the solar cell 11, and uses the expired reference information as reference information. A corresponding power generation amount condition is acquired (S1061). When there are a plurality of expired reference information, a power generation amount condition corresponding to each reference information is acquired. Next, it is determined whether or not the power generation amount acquired in S1061 satisfies each acquired power generation amount condition (S1062). If the power generation amount acquired in S1061 does not satisfy any of the acquired power generation amount conditions, it is determined that the activation condition is not satisfied (S1066). In this case, the process returns to S101 (S107).

一方、S1061で取得した発電量が、いずれかの発電量条件を充足していれば、充足された発電量条件に対応する基準情報を仮受信対象基準情報とする。そして、仮受信対象基準情報に対応する起動実績回数及び回数条件を読み出す(S1063)。図10に示すように、コントローラ47は、1日の間(所定時刻から翌日の同時刻まで)に、週内時刻TOWと閏秒情報と週番号WNのそれぞれを取得するために、発電量が「大」、「中」、「小」のそれぞれの状態で受信回路31を起動した回数、つまり起動実績回数を記憶している。起動実績回数は、基準情報の種類数及び発電量「大」、「中」、「小」に応じて、全部で9つの数を含む。これら9つの数は、毎日所定時刻に零にリセットされる。S1063の処理では、仮受信対象基準情報及びS1061で取得した発電量に関連づけて記憶された起動実績回数が読み出される。仮受信対象基準情報が複数の場合、それらすべての仮受信対象基準情報に関連づけられた起動実績回数が読み出される。さらに、仮受信対象基準情報及びS1061で取得した発電量に関連づけられた回数条件も読み出される。そして、読み出された起動実績回数が、読み出された対応する回数条件を充足しているか否か、すなわち起動実績回数が上限回数以下であるか否かを判断する(S1064)。ここで、読み出された起動実績回数が複数である場合、いずれかの起動実績回数が、それに対応する回数条件を充足する場合に、S1064において“Y”(イエス)と判断してよい。この場合、起動実績回数が回数条件を充足する仮受信対象基準情報を、確定受信対象基準情報とする。一方、いずれの起動実績回数も、それに対応する回数条件を充足しない場合に、S1064において“N”(ノー)と判断してよい。この場合、起動条件が充足されていないと判定し(S1066)、S101の処理に戻る(S107)。なお、各回数条件が充足されているか否かを、該回数条件に対応する発電量以上の発電量に関連づけられた起動実績回数の合計値が、該回数条件(上限回数)以下であるか否かにより判断してもよい。こうすれば、より良い環境で該当基準情報を受信した実績の全てを考慮して、十分な回数だけ受信したかを判断できる。一方、S1064において“Y”と判断されると、起動条件が充足されていると判定し(S1065)、S108の処理に進む(S107)。   On the other hand, if the power generation amount acquired in S1061 satisfies any power generation amount condition, the reference information corresponding to the satisfied power generation amount condition is set as provisional reception target reference information. Then, the number of times of activation and the number of times corresponding to the provisional reception target reference information are read (S1063). As shown in FIG. 10, the controller 47 acquires the power generation amount to acquire each of the weekly time TOW, leap second information, and week number WN during one day (from a predetermined time to the same time on the next day). The number of times of activation of the reception circuit 31 in each of the “large”, “medium”, and “small” states, that is, the actual number of activations is stored. The number of activation results includes a total of nine numbers according to the number of types of reference information and the power generation amounts “large”, “medium”, and “small”. These nine numbers are reset to zero every day at a predetermined time. In the process of S1063, the provisional reception target reference information and the actual number of times of activation stored in association with the power generation amount acquired in S1061 are read. When there are a plurality of provisional reception target reference information, the number of activation results associated with all the provisional reception target reference information is read. Further, the provisional reception target reference information and the number-of-times condition associated with the power generation amount acquired in S1061 are also read out. Then, it is determined whether or not the read activation performance count satisfies the read corresponding frequency condition, that is, whether or not the activation performance count is equal to or less than the upper limit count (S1064). Here, when there are a plurality of read activation results, if any of the activation results satisfies the corresponding number of times, it may be determined as “Y” (Yes) in S1064. In this case, the provisional reception target reference information that satisfies the number-of-times condition for the number of times of activation is set as the fixed reception target reference information. On the other hand, if the number of actual activations does not satisfy the corresponding number of times, the determination may be “N” (No) in S1064. In this case, it is determined that the activation condition is not satisfied (S1066), and the process returns to S101 (S107). Whether or not each number of times condition is satisfied, whether the total value of the actual number of startups associated with the amount of power generation equal to or greater than the amount of power generation corresponding to the number of times condition is less than or equal to the number of times condition (upper limit number of times). You may judge by. In this way, it is possible to determine whether or not it has been received a sufficient number of times in consideration of all the results of receiving the relevant reference information in a better environment. On the other hand, if “Y” is determined in S1064, it is determined that the activation condition is satisfied (S1065), and the process proceeds to S108 (S107).

図8に戻り、S108の処理では、予め記憶されている前回発電量(大、中、小、不可のいずれか)を読み出す。なお、前回発電量は、受信回路31を起動する度にS111でコントローラ47に記憶されるものである。そして、S1061で取得した発電量が前回発電量よりも大きいかどうかを判断する(S109)。そして、S1061で取得された発電量が前回発電量以下であれば、S101に戻る。一方、S1061で取得された発電量が前回発電量よりも大きければ、次に、スイッチ56を接続して、受信回路31を起動する(S110)。   Returning to FIG. 8, in the process of S108, the previous power generation amount (large, medium, small, or impossible) stored in advance is read. The previous power generation amount is stored in the controller 47 in S111 every time the receiving circuit 31 is activated. Then, it is determined whether or not the power generation amount acquired in S1061 is larger than the previous power generation amount (S109). And if the electric power generation amount acquired by S1061 is below the previous electric power generation amount, it will return to S101. On the other hand, if the power generation amount acquired in S1061 is larger than the previous power generation amount, then the switch 56 is connected and the receiving circuit 31 is activated (S110).

受信回路31を起動すると、受信モード及び確定受信対象基準情報の数及び種類に応じた期間だけスイッチ56をオンにしておき、その後にスイッチ56をオフにし、その期間の衛星データを受信する。具体的には、TOW受信モードで確定受信対象基準情報が週内時刻TOWの場合、サブフレーム4ページ18の頭から週内時刻TOWの部分までを受信する。全受信モードで、確定受信対象基準情報に週番号WNが含まれていれば、サブフレーム4ページ18の頭からサブフレーム1ページ19における週番号WNの部分までを受信する。全受信モードで、確定受信対象基準情報に週番号WNが含まれておらず、閏秒情報が含まれていれば、サブフレーム4ページ18の頭から閏秒情報の部分までを受信する。その後、各種の受信後処理を実施する(S111)。すなわち、S1061で取得した発電量を上述した前回発電量としてコントローラ47に記憶する。また、図10に示される起動実績回数を更新する。具体的には、S1061で取得した発電量及び確定受信対象基準情報に関連づけられた起動実績回数を1だけ増加させる。また、いずれかの基準情報の取得に成功していれば、図4に示すテーブルにおける前回受信値及び前回受信日時を更新する。また、更新後の基準情報に従って内部時刻を修正する。このとき、確定受信対象基準情報以外にも基準情報が正常取得されていれば、その基準情報についても更新してよい。その後、S101以降の処理を再度実行する。   When the reception circuit 31 is activated, the switch 56 is turned on only for a period according to the reception mode and the number and type of definite reception target reference information, and then the switch 56 is turned off to receive satellite data during that period. Specifically, when the definite reception target reference information is the weekly time TOW in the TOW reception mode, the sub-frame 4 page 18 from the head of the weekly time TOW is received. In the all reception mode, if the week number WN is included in the fixed reception target reference information, the portion from the head of the subframe 4 page 18 to the portion of the week number WN in the subframe 1 page 19 is received. In the all reception mode, if the week number WN is not included in the fixed reception target reference information and leap second information is included, the subframe 4 page 18 to the leap second information part is received. Thereafter, various post-reception processes are performed (S111). That is, the power generation amount acquired in S1061 is stored in the controller 47 as the previous power generation amount described above. Also, the number of times of activation shown in FIG. 10 is updated. Specifically, the number of times of activation associated with the power generation amount and the fixed reception target reference information acquired in S1061 is increased by one. If any of the reference information has been successfully acquired, the previous reception value and the previous reception date and time in the table shown in FIG. 4 are updated. Further, the internal time is corrected according to the updated reference information. At this time, if the reference information other than the fixed reception target reference information is normally acquired, the reference information may be updated. Thereafter, the processing after S101 is executed again.

以上説明した実施形態によると、週内時刻TOWを取得する場合と、閏秒情報や週番号WNを取得する場合とで、太陽電池11の発電量の条件が異なる。すなわち、基準情報の種類による受信難易度の差を踏まえて、受信回路31の起動条件に差を設けている。こうすることで、電力が無駄に消費されることを防止している。また、受信回路31の起動回数の1日あたりの上限を設けており、また、太陽電池11の発電量が増加した場合にのみ、受信回路31を起動させている。このため、何度も連続して基準情報の取得に失敗するという無駄を抑制できる。   According to the embodiment described above, the condition of the power generation amount of the solar cell 11 is different between the case where the weekly time TOW is acquired and the case where the leap second information and the week number WN are acquired. That is, based on the difference in reception difficulty depending on the type of reference information, a difference is provided in the activation conditions of the reception circuit 31. By doing so, power is prevented from being wasted. Further, the upper limit of the number of activations of the reception circuit 31 per day is provided, and the reception circuit 31 is activated only when the amount of power generated by the solar cell 11 is increased. For this reason, it is possible to suppress the waste of failing to acquire the reference information continuously over and over.

なお、基準情報の有効期限が切れた場合において、所定時間にわたり同基準情報の再取得ができない場合、図11に示すように、同基準情報の発電量条件及び回数条件を緩和してもよい。この場合、コントローラ47に記憶される発電量条件及び回数条件が更新される。例えば、閏秒情報が所定日数にわたり再取得できない場合、発電量の下限を「中」に変更してよい。また、受信回路31の起動回数の上限を増やしてよい。   In addition, when the expiration date of the reference information expires and the reference information cannot be reacquired for a predetermined time, the power generation amount condition and the frequency condition of the reference information may be relaxed as shown in FIG. In this case, the power generation amount condition and the number of times condition stored in the controller 47 are updated. For example, when leap second information cannot be reacquired for a predetermined number of days, the lower limit of the power generation amount may be changed to “medium”. Further, the upper limit of the number of activations of the receiving circuit 31 may be increased.

[変形例1]
以上の説明では発電量の取得間隔を12.5分で固定したが、取得間隔を12.5×n分とし、nを発電量に応じて変化させてよい。図12は、発電量の推移と発電量の取得間隔を示している。同図に示すように、発電量が大きくなるほど取得間隔が短くなるようにnを小さくし、逆に発電量が小さくなるほど取得間隔が長くなるようにnを大きくしてもよい。
[Modification 1]
In the above description, the power generation amount acquisition interval is fixed at 12.5 minutes, but the acquisition interval may be 12.5 × n minutes, and n may be changed according to the power generation amount. FIG. 12 shows the transition of the power generation amount and the acquisition interval of the power generation amount. As shown in the figure, n may be decreased so that the acquisition interval becomes shorter as the power generation amount increases, and conversely, n may be increased so that the acquisition interval becomes longer as the power generation amount decreases.

図13は、コントローラ47で実行される受信回路31の起動処理の変形例1を示すフロー図である。同図に示すように、コントローラ47は、まず、発電量の取得間隔を定める変数nを1に初期化する(S201)。次に、内部時刻に従って、前回の受信タイミングを起点にしてn回目のサブフレーム4ページ18の受信タイミングが到来したか否かを判断する(S202)。そして、n回目のサブフレーム4ページ18の受信タイミング(サブフレーム4ページ18の先頭タイミングから所定時間(例えば2〜3秒)前)が到来すると、次に、週内時刻TOWが有効であるかどうかを判断する(S203)。そして、週内時刻TOWが有効期限切れであれば、TOW受信モードを設定する(S206)。一方、週内時刻TOWが有効であれば、閏秒情報及び週番号WNの両方ともが有効であるかどうかを判断し(S204)、有効であればS202の処理に戻る。一方、閏秒情報及び週番号WNのいずれか少なくとも1つが有効期限切れであれば、全受信モードを設定する(S205)。   FIG. 13 is a flowchart showing a first modification of the starting process of the receiving circuit 31 executed by the controller 47. As shown in the figure, the controller 47 first initializes a variable n for determining the power generation amount acquisition interval to 1 (S201). Next, according to the internal time, it is determined whether or not the reception timing of the nth subframe 4 page 18 has arrived, starting from the previous reception timing (S202). Then, when the reception timing of the nth subframe 4 page 18 (predetermined time (for example, 2 to 3 seconds) before the start timing of the subframe 4 page 18) arrives, is the next weekly time TOW valid? It is determined whether or not (S203). If the weekly time TOW expires, the TOW reception mode is set (S206). On the other hand, if the weekly time TOW is valid, it is determined whether both leap second information and week number WN are valid (S204). If valid, the process returns to S202. On the other hand, if at least one of the leap second information and the week number WN has expired, the all reception mode is set (S205).

その後、スイッチ29を切り替えて太陽電池11の発電量を取得し、取得した発電量に応じて変数nを設定する(S207)。例えば、発電量が「大」であれば変数nを1とし、「中」であれば3とし、「小」であれば5とする。これらの値は例示であり、他の適切な値を設定してよいのはもちろんである。さらに、上述のS106の処理と同様にして、受信回路31の起動条件(発電量条件及び回数条件)が満足されているか否かを判断する(S208)。そして、起動条件が満足されていれば(S209)、スイッチ56を接続して、受信回路31を起動する(S210)。一方、満足されていなければ(S209)、S202に戻る。   Thereafter, the switch 29 is switched to acquire the power generation amount of the solar cell 11, and the variable n is set according to the acquired power generation amount (S207). For example, the variable n is set to 1 if the power generation amount is “large”, 3 if it is “medium”, and 5 if it is “small”. These values are examples, and other appropriate values may be set as a matter of course. Further, similarly to the process of S106 described above, it is determined whether or not the start condition (power generation amount condition and frequency condition) of the receiving circuit 31 is satisfied (S208). If the activation condition is satisfied (S209), the switch 56 is connected and the reception circuit 31 is activated (S210). On the other hand, if not satisfied (S209), the process returns to S202.

受信回路31を起動すると、受信モード及び確定受信対象基準情報の数及び種類に応じた期間だけスイッチ56をオンにしておき、その後にスイッチ56をオフにし、その期間の衛星データを受信する。その後、S109の処理と同様にして各種の受信後処理を行ってから(S211)、S202以降の処理を再度実行する。   When the reception circuit 31 is activated, the switch 56 is turned on only for a period according to the reception mode and the number and type of definite reception target reference information, and then the switch 56 is turned off to receive satellite data during that period. Thereafter, various post-reception processes are performed in the same manner as the process of S109 (S211), and the processes after S202 are executed again.

以上のようにすれば、発電量の大きさによって発電量の取得間隔を変えることができる。発電量が小さなときには受信に適した環境がすぐに実現する可能性は高くない。発電量を取得する際にはスイッチ29により、太陽電池11と電池26とが切り離され、充電が中断する。そこで、発電量が小さなときには発電量の取得間隔を長くすることで、電池26への充電機会が増え、充電効率を上げることができる。   If it carries out as mentioned above, the acquisition interval of electric power generation amount can be changed with the magnitude | size of electric power generation amount. When the amount of power generation is small, it is not likely that an environment suitable for reception will be realized immediately. When the power generation amount is acquired, the solar battery 11 and the battery 26 are disconnected by the switch 29, and charging is interrupted. Therefore, when the power generation amount is small, by increasing the power generation amount acquisition interval, the battery 26 is charged more frequently and the charging efficiency can be increased.

[変形例2]
基準情報の取得に失敗した場合には、一定時間だけ発電量の取得を禁止してもよい。図14は、発電量の推移と発電量の取得タイミングを示している。同図に示すように、本変形例2では、基準情報の取得に失敗した場合に発電量の取得を一定時間だけ禁止される。
[Modification 2]
If acquisition of the reference information fails, acquisition of the power generation amount may be prohibited for a certain period of time. FIG. 14 shows the transition of the power generation amount and the acquisition timing of the power generation amount. As shown in the figure, in the second modification, when the acquisition of the reference information fails, the acquisition of the power generation amount is prohibited for a certain period of time.

図15は、コントローラ47で実行される受信回路31の起動処理の変形例2を示すフロー図である。同図に示すように、コントローラ47は、まず、内部時刻に従って、サブフレーム4ページ18の受信タイミングを待機する(S301)。そして、同タイミングが到来すると、次に、週内時刻TOWが有効であるかどうかを判断する(S302)。そして、週内時刻TOWが有効期限切れであれば、TOW受信モードを設定する(S305)。一方、週内時刻TOWが有効であれば、閏秒情報及び週番号WNの両方ともが有効であるかどうかを判断し(S303)、有効であればS301の処理に戻る。一方、閏秒情報及び週番号WNのいずれか少なくとも1つが有効期限切れであれば、全受信モードを設定する(S304)。   FIG. 15 is a flowchart showing a second modification of the starting process of the receiving circuit 31 executed by the controller 47. As shown in the figure, the controller 47 first waits for the reception timing of the subframe 4 page 18 according to the internal time (S301). When the same timing arrives, it is next determined whether the weekly time TOW is valid (S302). If the weekly time TOW expires, the TOW reception mode is set (S305). On the other hand, if the weekly time TOW is valid, it is determined whether both leap second information and week number WN are valid (S303). If valid, the process returns to S301. On the other hand, if at least one of the leap second information and the week number WN has expired, the all reception mode is set (S304).

次に、上述のS106の処理と同様にして、受信回路31の起動条件(発電量条件及び回数条件)が満足されているか否かを判断する(S306)。そして、起動条件が満足されていれば(S307)、スイッチ56を接続して、受信回路31を起動する(S308)。一方、満足されていなければ(S307)、S301に戻る。受信回路31を起動すると、受信モード及び確定受信対象基準情報の数及び種類に応じた期間だけスイッチ56をオンにしておき、その後にスイッチ56をオフにし、その期間の衛星データを受信する。   Next, similarly to the process of S106 described above, it is determined whether or not the activation condition (power generation amount condition and frequency condition) of the reception circuit 31 is satisfied (S306). If the activation condition is satisfied (S307), the switch 56 is connected and the reception circuit 31 is activated (S308). On the other hand, if not satisfied (S307), the process returns to S301. When the reception circuit 31 is activated, the switch 56 is turned on only for a period according to the reception mode and the number and type of definite reception target reference information, and then the switch 56 is turned off to receive satellite data during that period.

その後、S109の処理と同様にして、各種の受信後処理を行う(S309)。さらに、なんらかの基準情報の取得に成功したか否かを判断する(S310)。S308においてなんらかの基準情報の取得に成功していれば、S301に戻る。一方、失敗していれば所定時間だけ待機してからS301に戻る(S311)。   Thereafter, various post-reception processes are performed in the same manner as in S109 (S309). Further, it is determined whether or not any reference information has been successfully acquired (S310). If any reference information has been successfully acquired in S308, the process returns to S301. On the other hand, if it has failed, the process waits for a predetermined time and then returns to S301 (S311).

以上のようにすれば、基準情報の取得に失敗すれば所定時間だけ発電量の取得がされず、また受信回路31も起動されない。このため、電池26への充電機会が増え、また基準情報の取得可能性が低いのに無駄に受信回路31の起動が連続起動されずに済む。   As described above, if the acquisition of the reference information fails, the power generation amount is not acquired for a predetermined time, and the receiving circuit 31 is not activated. For this reason, the chances of charging the battery 26 are increased, and although the possibility of acquiring the reference information is low, the reception circuit 31 does not need to be continuously activated.

[変形例3]
図16に示すように、基準情報の取得に失敗した場合、所定時間だけ発電量の取得をせずに待機するとともに、所定時間経過後、サブフレーム4ページ18の受信タイミングを待って、発電量が増加しているか、或いは発電量が「大」である場合にのみ、受信回路31を起動して受信動作を開始させてもよい。
[Modification 3]
As shown in FIG. 16, when the acquisition of the reference information fails, the system waits for a predetermined time without acquiring the power generation amount, and waits for the reception timing of the subframe 4 page 18 after the predetermined time elapses. The reception circuit 31 may be activated to start the reception operation only when the power generation amount increases or the power generation amount is “large”.

図17は、コントローラ47で実行される受信回路31の起動処理の変形例3を示すフロー図である。同図に示すように、コントローラ47は、まず、内部時刻に従って、サブフレーム4ページ18の受信タイミングを待機する(S401)。そして、同タイミングが到来すると、週内時刻TOWが有効であるかどうかを判断する(S402)。そして、閏秒情報及び週番号WNのいずれか少なくとも1つ週内時刻TOWが有効期限切れであれば、TOW受信モードを設定する(S405)。一方、週内時刻TOWが有効であれば、閏秒情報及び週番号WNの両方ともが有効であるかどうかを判断し(S403)、有効であればS401の処理に戻る。一方、閏秒情報及び週番号WNのいずれか少なくとも1つが有効期限切れであれば、全受信モードを設定する(S404)。   FIG. 17 is a flowchart showing a third modification of the starting process of the receiving circuit 31 executed by the controller 47. As shown in the figure, the controller 47 first waits for the reception timing of the subframe 4 page 18 according to the internal time (S401). When the same timing arrives, it is determined whether the weekly time TOW is valid (S402). If at least one of the leap second information and the week number WN has expired, the TOW reception mode is set (S405). On the other hand, if the weekly time TOW is valid, it is determined whether both leap second information and week number WN are valid (S403). If valid, the process returns to S401. On the other hand, if at least one of the leap second information and the week number WN has expired, the all reception mode is set (S404).

次に、スイッチ29を切り替えて太陽電池11の発電量を取得し、発電量が前回取得したものから増えているか否かを判断する(S406)。増えていなければS401に戻る。一方、発電量が増えていれば、次に、上述のS106の処理と同様にして、受信回路31の起動条件(発電量条件及び回数条件)が満足されているか否かを判断する(S407)。そして、起動条件が満足されていれば(S408)、スイッチ56を接続して、受信回路31を起動する(S409)。一方、満足されていなければ(S408)、S401に戻る。   Next, the power generation amount of the solar cell 11 is acquired by switching the switch 29, and it is determined whether or not the power generation amount has increased from the previous acquisition (S406). If not increased, the process returns to S401. On the other hand, if the power generation amount has increased, it is next determined whether or not the activation conditions (power generation amount condition and frequency condition) of the receiving circuit 31 are satisfied in the same manner as in the above-described processing of S106 (S407). . If the activation condition is satisfied (S408), the switch 56 is connected and the reception circuit 31 is activated (S409). On the other hand, if not satisfied (S408), the process returns to S401.

受信回路31を起動すると、受信モード及び確定受信対象基準情報の数及び種類に応じた期間だけスイッチ56をオンにしておき、その後にスイッチ56をオフにし、その期間の衛星データを受信する。その後、S109の処理と同様にして、各種の受信後処理を行う(S410)。さらに、なんらかの基準情報の取得に成功したか否かを判断する(S411)。S409においてなんらかの基準情報の取得に成功していれば、S401に戻る。   When the reception circuit 31 is activated, the switch 56 is turned on only for a period according to the reception mode and the number and type of definite reception target reference information, and then the switch 56 is turned off to receive satellite data during that period. Thereafter, various post-reception processes are performed in the same manner as in S109 (S410). Further, it is determined whether or not acquisition of some reference information has succeeded (S411). If any reference information has been successfully acquired in S409, the process returns to S401.

一方、失敗していれば所定時間だけ待機してから(S412)、サブフレーム4ページ18の受信タイミングを待機する(S413)。そして、同タイミングが到来すると、太陽電池11の発電量を取得し、前回取得した発電量よりも増えているか、或いは発電量が「大」であるかを判断する(S414)。そして、いずれかがイエスであれば、S409の処理に戻る。一方、いずれもノーであれば、S401の処理に戻る。   On the other hand, if it fails, after waiting for a predetermined time (S412), it waits for the reception timing of the subframe 4 page 18 (S413). When the same timing arrives, the power generation amount of the solar battery 11 is acquired, and it is determined whether the power generation amount is greater than the previously acquired power generation amount or is “large” (S414). If any of them is YES, the process returns to S409. On the other hand, if both are NO, the process returns to S401.

以上のようにすれば、基準情報の取得に失敗すれば所定時間だけ発電量の取得がされず、また受信回路31も起動されない。このため、電池26への充電機会が増え、また基準情報の取得可能性が低いのに無駄に受信回路31の起動が連続起動されずに済む。さらに、太陽電池11の発電量が増加し、又は発電量が「大」である場合にのみ、受信回路31を起動させるので、何度も連続して基準情報の取得に失敗するという無駄を抑制できる。   As described above, if the acquisition of the reference information fails, the power generation amount is not acquired for a predetermined time, and the receiving circuit 31 is not activated. For this reason, the chances of charging the battery 26 are increased, and although the possibility of acquiring the reference information is low, the reception circuit 31 does not need to be continuously activated. Furthermore, since the receiving circuit 31 is activated only when the power generation amount of the solar cell 11 increases or the power generation amount is “large”, it is possible to suppress the waste of failing to acquire the reference information over and over again. it can.

1 胴、2 文字板、3 時針、4 分針、5 秒針、6 竜頭、7 ボタン、8 バンド固定部、9 風防、10 裏蓋、11 太陽電池、12 ベース部材、14 パッチアンテナ、14a 受信面、14b 給電ピン、23 モータ、24 回路基板、26 電池、100 衛星電波腕時計。   1 body, 2 dial, 3 hour hand, 4 minute hand, 5 second hand, 6 crown, 7 button, 8 band fixing part, 9 windshield, 10 back cover, 11 solar cell, 12 base member, 14 patch antenna, 14a receiving surface, 14b Power supply pin, 23 Motor, 24 Circuit board, 26 Battery, 100 Satellite radio wave watch.

Claims (9)

衛星から送信される、複数の基準信号を含む衛星信号に基づいて、時刻及び日付を修正する衛星電波腕時計において、
前記衛星信号を受信する受信手段と、
前記各基準情報に関連づけて、該基準情報を取得するための前記受信手段の起動条件を記憶する起動条件記憶手段と、
前記各基準情報を取得する場合に、該基準情報に関連づけて記憶される前記起動条件が満足されているか否かを判定する判定手段と、
前記判定手段による判定結果に応じて、前記受信手段による前記衛星信号の受信動作を開始させる受信制御手段と、
を含むことを特徴とする衛星電波腕時計。
In a satellite radio wave wristwatch that corrects the time and date based on a satellite signal including a plurality of reference signals transmitted from a satellite,
Receiving means for receiving the satellite signal;
An activation condition storage means for storing an activation condition of the receiving means for acquiring the reference information in association with the reference information;
A determination means for determining whether or not the activation condition stored in association with the reference information is satisfied when each of the reference information is acquired;
A reception control means for starting the reception operation of the satellite signal by the reception means in accordance with a determination result by the determination means;
A satellite radio wave watch characterized by including:
請求項1に記載の衛星電波腕時計において、
前記各基準情報の取得の成否に応じて前記各起動条件を変更する条件変更手段をさらに含む、
ことを特徴とする衛星電波腕時計。
The satellite radio-controlled wristwatch according to claim 1,
Further comprising condition changing means for changing each of the activation conditions according to success or failure of acquisition of each of the reference information.
A satellite radio-controlled wristwatch.
請求項1又は2に記載の衛星電波腕時計において、
前記衛星信号の受信環境を取得する受信環境取得手段をさらに含み、
前記起動条件は、前記受信環境の下限を示す、
ことを特徴とする衛星電波腕時計。
In the satellite radio-controlled wristwatch according to claim 1 or 2,
A reception environment acquisition means for acquiring a reception environment of the satellite signal;
The activation condition indicates a lower limit of the reception environment.
A satellite radio-controlled wristwatch.
請求項3に記載の衛星電波腕時計において、
前記受信環境は、前記衛星電波腕時計の受光量である、
ことを特徴とする衛星電波腕時計。
In the satellite radio-controlled wristwatch according to claim 3,
The reception environment is the amount of light received by the satellite radio-controlled wristwatch,
A satellite radio-controlled wristwatch.
請求項3又は4に記載の衛星電波腕時計において、
前記衛星信号の受信環境の変化に応じて前記判定手段による判定タイミングを決定する、
ことを特徴とする衛星電波腕時計。
In the satellite radio-controlled wristwatch according to claim 3 or 4,
Determining the determination timing by the determination means according to a change in the reception environment of the satellite signal;
A satellite radio-controlled wristwatch.
請求項3又は4に記載の衛星電波腕時計において、
前記衛星信号の受信環境に応じて前記判定手段による判定間隔を変更する、
ことを特徴とする衛星電波腕時計。
In the satellite radio-controlled wristwatch according to claim 3 or 4,
Changing the determination interval by the determination means according to the reception environment of the satellite signal;
A satellite radio-controlled wristwatch.
請求項1乃至5のいずれかに記載の衛星電波腕時計において、
前記各基準情報の取得の成否に応じて前記受信手段による前記衛星信号の受信動作を制限する、
ことを特徴とする衛星電波腕時計。
In the satellite radio-controlled wristwatch according to any one of claims 1 to 5,
Limiting the receiving operation of the satellite signal by the receiving means according to success or failure of acquisition of each reference information;
A satellite radio-controlled wristwatch.
請求項1乃至7のいずれかに記載の衛星電波腕時計において、
前記各基準情報に関連づけて、該基準情報を取得するために前記受信手段を起動した回数を記憶する起動回数記憶手段をさらに含み、
前記起動条件は、前記回数の上限を含む、
ことを特徴とする衛星電波腕時計。
In the satellite radio-controlled wristwatch according to any one of claims 1 to 7,
In association with each of the reference information, further includes an activation number storage means for storing the number of activations of the receiving means to obtain the reference information,
The activation condition includes an upper limit of the number of times.
A satellite radio-controlled wristwatch.
請求項1乃至8のいずれかに記載の衛星電波腕時計において、
前記各基準情報が有効であるか否かを判断する有効性判断手段と、
前記有効性判断手段による判断結果に応じて前記起動条件を選択する条件選択手段と、
をさらに含むことを特徴とする衛星電波腕時計。
In the satellite radio-controlled wristwatch according to any one of claims 1 to 8,
Validity determination means for determining whether or not each of the reference information is valid;
Condition selection means for selecting the activation condition in accordance with a determination result by the validity determination means;
A satellite radio-controlled wristwatch further comprising:
JP2010073853A 2010-03-26 2010-03-26 Satellite radio watch Active JP5595770B2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP2010073853A JP5595770B2 (en) 2010-03-26 2010-03-26 Satellite radio watch
PCT/JP2011/056818 WO2011118573A1 (en) 2010-03-26 2011-03-22 Satellite radio-wave watch
CN201180015750.0A CN102884483B (en) 2010-03-26 2011-03-22 Satellite radio-wave watch
EP11759378.0A EP2555062B1 (en) 2010-03-26 2011-03-22 Satellite radio-wave watch
US13/634,306 US9606515B2 (en) 2010-03-26 2011-03-22 Satellite radio-controlled watch
HK13105877.2A HK1178270A1 (en) 2010-03-26 2013-05-20 Satellite radio-wave watch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010073853A JP5595770B2 (en) 2010-03-26 2010-03-26 Satellite radio watch

Publications (2)

Publication Number Publication Date
JP2011208949A true JP2011208949A (en) 2011-10-20
JP5595770B2 JP5595770B2 (en) 2014-09-24

Family

ID=44940187

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010073853A Active JP5595770B2 (en) 2010-03-26 2010-03-26 Satellite radio watch

Country Status (1)

Country Link
JP (1) JP5595770B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016129665A1 (en) * 2015-02-13 2016-08-18 日本電信電話株式会社 Time synchronization device, and method and program therefor
JP2019027914A (en) * 2017-07-31 2019-02-21 シチズン時計株式会社 Radio-controlled timepiece

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07198876A (en) * 1993-12-28 1995-08-01 Casio Comput Co Ltd Time data receiver
JPH1082875A (en) * 1996-09-09 1998-03-31 Furuno Electric Co Ltd Electronic watch and clocking content correcting method
JP2004003929A (en) * 2002-03-26 2004-01-08 Seiko Epson Corp Radio wave corrected clock
JP2006322812A (en) * 2005-05-19 2006-11-30 Seiko Epson Corp Radio-controlled clock
JP2009014668A (en) * 2007-07-09 2009-01-22 Seiko Epson Corp Time correction device, timepiece having the same, and time correction method of time correction device
JP2009250801A (en) * 2008-04-07 2009-10-29 Seiko Epson Corp Electronic timepiece and time-correcting method of electronic timepiece

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07198876A (en) * 1993-12-28 1995-08-01 Casio Comput Co Ltd Time data receiver
JPH1082875A (en) * 1996-09-09 1998-03-31 Furuno Electric Co Ltd Electronic watch and clocking content correcting method
JP2004003929A (en) * 2002-03-26 2004-01-08 Seiko Epson Corp Radio wave corrected clock
JP2006322812A (en) * 2005-05-19 2006-11-30 Seiko Epson Corp Radio-controlled clock
JP2009014668A (en) * 2007-07-09 2009-01-22 Seiko Epson Corp Time correction device, timepiece having the same, and time correction method of time correction device
JP2009250801A (en) * 2008-04-07 2009-10-29 Seiko Epson Corp Electronic timepiece and time-correcting method of electronic timepiece

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016129665A1 (en) * 2015-02-13 2016-08-18 日本電信電話株式会社 Time synchronization device, and method and program therefor
JPWO2016129665A1 (en) * 2015-02-13 2017-08-17 日本電信電話株式会社 Time synchronization apparatus, method and program thereof
US11150353B2 (en) 2015-02-13 2021-10-19 Nippon Telegraph And Telephone Corporation Time synchronization device, and method and program therefor
JP2019027914A (en) * 2017-07-31 2019-02-21 シチズン時計株式会社 Radio-controlled timepiece

Also Published As

Publication number Publication date
JP5595770B2 (en) 2014-09-24

Similar Documents

Publication Publication Date Title
JP6593228B2 (en) Electronic clock
WO2011118573A1 (en) Satellite radio-wave watch
JP5087071B2 (en) Radio correction clock
JP6354289B2 (en) Radio wave receiving apparatus, electronic device, and radio wave receiving method
JP2017173129A (en) Radio wave clock, leap second correction information acquisition method and program
JP5386422B2 (en) Radio wave watch
JP2014173968A (en) Electronic watch
JP5215651B2 (en) Radio correction clock
JP5595770B2 (en) Satellite radio watch
JP2015055478A (en) Electronic watch and method of controlling display of electronic watch
JP5710139B2 (en) Satellite radio watch
JP5468955B2 (en) Radio wave watch
JP2011220843A (en) Gps receiving clock
JP2015055477A (en) Electronic watch and method of controlling display of electronic watch
JP5870221B2 (en) Radio wave watch
JP6849033B2 (en) Electronic clock
JP5946554B2 (en) Satellite radio watch
JP7324081B2 (en) electronic clock
JP7002327B2 (en) Radio clock
JP6340836B2 (en) Satellite signal receiving apparatus, electronic timepiece, and satellite signal receiving method
JP7075828B2 (en) Electronic clock
JP6959061B2 (en) Radio clock
JP7034784B2 (en) Radio clock
JP6884057B2 (en) Radio clock
JP6910895B2 (en) Radio clock

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140325

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140522

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140715

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140806

R150 Certificate of patent or registration of utility model

Ref document number: 5595770

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250