JP2011172410A - Digital control power supply device - Google Patents

Digital control power supply device Download PDF

Info

Publication number
JP2011172410A
JP2011172410A JP2010034721A JP2010034721A JP2011172410A JP 2011172410 A JP2011172410 A JP 2011172410A JP 2010034721 A JP2010034721 A JP 2010034721A JP 2010034721 A JP2010034721 A JP 2010034721A JP 2011172410 A JP2011172410 A JP 2011172410A
Authority
JP
Japan
Prior art keywords
power supply
notification signal
control unit
control
output voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010034721A
Other languages
Japanese (ja)
Other versions
JP5458942B2 (en
Inventor
Yuichi Sakashita
友一 坂下
Takayoshi Nagai
孝佳 永井
Takayuki Hidaka
貴幸 日高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2010034721A priority Critical patent/JP5458942B2/en
Publication of JP2011172410A publication Critical patent/JP2011172410A/en
Application granted granted Critical
Publication of JP5458942B2 publication Critical patent/JP5458942B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Dc-Dc Converters (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To obtain a digital control power supply device for reducing a drop level of an output voltage in generation of a pulse load. <P>SOLUTION: The digital control power supply device includes a DC/DC converter 3, and a power supply control unit 4 that feeds back the output voltage of the DC/DC converter 3 to decide a duty of a pulse width modulation pulse signal, and controls the output voltage of the DC/DC converter 3 by pulse width modulation. The power supply control unit 4 receives a notification signal rising at timing earlier than the rising of the pulse load by a prescribed time at the generation of the pulse load, and performs pulse width modulation control based on the notification signal. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

この発明は、パルス負荷に対応することが可能であるデジタル制御電源装置に関する。   The present invention relates to a digital control power supply apparatus that can cope with a pulse load.

従来のパルス負荷対応のデジタル制御電源装置においては、通常のデジタル信号処理による所望のデューティのパルス幅変調(PWM)パルス信号の出力とは別に、出力インダクタの両端に設けたCRフィルタとウインドコンパレータとからなる過渡変動検出手段を並列に設け、負荷急変を検出した場合、負荷急減時には0%デューティのPWMパルス信号を、負荷急増時には100%デューティのPWMパルス信号を強制的に出力している(例えば、特許文献1参照)。   In the conventional digital control power supply apparatus for pulse load, a CR filter and a window comparator provided at both ends of the output inductor are provided separately from the output of a pulse width modulation (PWM) pulse signal having a desired duty by normal digital signal processing. When a sudden load change is detected by providing a transient fluctuation detection means consisting of the following, a 0% duty PWM pulse signal is forcibly output when the load suddenly decreases, and a 100% duty PWM pulse signal is forcibly output when the load suddenly increases (for example, , See Patent Document 1).

特開2008−113542号公報(第9−10頁、第1−2図)JP 2008-113542 A (page 9-10, FIG. 1-2)

従来のデジタル制御電源装置では、数100A/数μsレベルの急激な電流変化(di/dt)を有するパルス負荷に対して、出力電圧の変動を確認してからPWMパルス信号を変化させても出力インダクタに流れる電流は急には変化しないので、出力電圧の落ち込みを抑えることができないという問題があった。また、出力インダクタに流れる電流の立ち上がりを早くするためには出力インダクタのインダクタンス値を小さくする必要があるが、出力インダクタのインダクタンス値を小さくすると出力電圧のリップルが大きくなってしまい、電源装置が許容できるリップルの上限値の仕様を満たせなくなる可能性があるという問題があった。   In the conventional digital control power supply device, even if the PWM pulse signal is changed after confirming the fluctuation of the output voltage with respect to a pulse load having a sudden current change (di / dt) of several hundreds A / several μs level, the output is possible. Since the current flowing through the inductor does not change abruptly, there has been a problem that the drop in the output voltage cannot be suppressed. In addition, in order to speed up the rise of the current flowing to the output inductor, it is necessary to reduce the inductance value of the output inductor. However, if the inductance value of the output inductor is reduced, the ripple of the output voltage will increase and the power supply device will be allowed. There was a problem that there was a possibility that the specification of the upper limit value of the ripple that could be made could not be satisfied.

この発明は、上述のような課題を解決するためになされたもので、数100A/数μsレベルの急激な電流変化(di/dt)を有するパルス負荷に対して、出力電圧の落ち込むレベルを小さくすることができるデジタル制御電源装置を得るものである。   The present invention has been made in order to solve the above-described problems, and reduces the level at which the output voltage drops with respect to a pulse load having a rapid current change (di / dt) of several hundred A / several μs level. A digitally controlled power supply device that can be obtained is obtained.

この発明に係るデジタル制御電源装置は、DC/DCコンバータと、DC/DCコンバータの出力電圧をフィードバックしてパルス幅変調パルス信号のデューティを決定し、パルス幅変調によりDC/DCコンバータの出力電圧を制御する電源制御部とを備え、電源制御部は、パルス負荷発生時に、パルス負荷の立ち上がりより所定時間早いタイミングで立ち上がる報知信号を受信し、報知信号に基づいて予め定めたデューティでパルス幅変調制御を行うものである。   The digital control power supply device according to the present invention feeds back the output voltage of the DC / DC converter and the DC / DC converter to determine the duty of the pulse width modulation pulse signal, and the output voltage of the DC / DC converter is determined by pulse width modulation. A power control unit for controlling, and when the pulse load occurs, the power control unit receives a notification signal that rises at a timing earlier than the rise of the pulse load by a predetermined time, and performs pulse width modulation control at a predetermined duty based on the notification signal Is to do.

この発明は、急激な電流変化(di/dt)を有するパルス負荷の発生時に、パルス負荷の立ち上がりより所定時間早いタイミングで立ち上がる報知信号を受信し、報知信号に基づいて予め定めたデューティでパルス幅変調制御を行うので、パルス負荷が発生した際に出力電圧が落ち込むレベルを小さくすることができる。   In the present invention, when a pulse load having a rapid current change (di / dt) is generated, a notification signal that rises at a timing earlier than the rising of the pulse load by a predetermined time is received, and a pulse width is set with a predetermined duty based on the notification signal. Since modulation control is performed, the level at which the output voltage drops when a pulse load occurs can be reduced.

本発明の実施の形態1におけるデジタル制御電源装置の構成図である。It is a block diagram of the digital control power supply device in Embodiment 1 of this invention. 本発明の実施の形態1における報知信号のタイミングおよびデジタル制御電源装置の出力電圧波形を示した図である。It is the figure which showed the timing of the alerting | reporting signal in Embodiment 1 of this invention, and the output voltage waveform of a digital control power supply device. 本発明の実施の形態1における制御フローチャートを示す図である。It is a figure which shows the control flowchart in Embodiment 1 of this invention. 本発明の実施の形態1における別の報知信号のタイミングおよびデジタル制御電源装置の出力電圧波形を示した図である。It is the figure which showed the timing of another alerting signal in Embodiment 1 of this invention, and the output voltage waveform of a digital control power supply device. 本発明の実施の形態1における別の制御フローチャートを示す図である。It is a figure which shows another control flowchart in Embodiment 1 of this invention. 本発明の実施の形態2における報知信号のタイミングおよびデジタル制御電源装置の出力電圧波形を示した図である。It is the figure which showed the timing of the alerting | reporting signal in Embodiment 2 of this invention, and the output voltage waveform of a digital control power supply device. 本発明の実施の形態2における制御フローチャートを示す図である。It is a figure which shows the control flowchart in Embodiment 2 of this invention. 本発明の実施の形態3におけるデジタル制御電源装置の構成図である。It is a block diagram of the digital control power supply device in Embodiment 3 of this invention. 本発明の実施の形態3における制御フローチャートを示す図である。It is a figure which shows the control flowchart in Embodiment 3 of this invention. 本発明の実施の形態3における入力電圧と最大Dutyとの関係を示した図である。It is the figure which showed the relationship between the input voltage and the maximum duty in Embodiment 3 of this invention.

実施の形態1.
図1は、この発明の実施の形態1におけるデジタル制御電源装置の構成図である。図1において、デジタル制御電源装置1は、ある任意のシステム内に配置され、上位システム制御部2からの指令を受けて直流電圧を負荷9に出力する電源装置であり、DC/DCコンバータ3と電源制御部4とにより構成されている。DC/DCコンバータ3は、DC/DC変換を行う電力変換部5、出力インダクタ6、および出力コンデンサ7により構成されている。また、電力変換部5と電源制御部4との間のインタフェース信号として、出力電圧フィードバック信号とパルス幅変調パルス信号(PWM信号)とを備えている。
Embodiment 1 FIG.
FIG. 1 is a configuration diagram of a digital control power supply apparatus according to Embodiment 1 of the present invention. In FIG. 1, a digital control power supply device 1 is a power supply device that is arranged in an arbitrary system, receives a command from the host system control unit 2, and outputs a DC voltage to a load 9. And a power supply control unit 4. The DC / DC converter 3 includes a power converter 5 that performs DC / DC conversion, an output inductor 6, and an output capacitor 7. Further, an output voltage feedback signal and a pulse width modulation pulse signal (PWM signal) are provided as interface signals between the power conversion unit 5 and the power supply control unit 4.

電源制御部4は、DC/DCコンバータ3の出力電圧をフィードバックしてパルス幅変調パルス信号のデューティを決定し、パルス幅変調によりDC/DCコンバータ3の出力電圧を制御する。さらに、電源制御部4は、パルス負荷の立ち上がりのタイミングを知らせるための報知信号を上位システム制御部2から受信するインタフェースも備えている。報知信号は、パルス負荷の立ち上がりより所定時間早いタイミングで立ち上がる信号である。そして、電源制御部4は、パルス負荷発生時に、この報知信号を受信し、報知信号に基づいて予め定めたデューティでパルス幅変調制御を行う。   The power supply controller 4 feeds back the output voltage of the DC / DC converter 3 to determine the duty of the pulse width modulation pulse signal, and controls the output voltage of the DC / DC converter 3 by pulse width modulation. Furthermore, the power supply control unit 4 also includes an interface for receiving a notification signal for notifying the rising timing of the pulse load from the host system control unit 2. The notification signal is a signal that rises at a timing earlier than the rise of the pulse load by a predetermined time. And the power supply control part 4 receives this alerting | reporting signal at the time of pulse load generation, and performs pulse width modulation control by the duty defined beforehand based on the alerting | reporting signal.

直流電源8から入力された直流電圧は、電源制御部4の制御により電力変換部5で所定の電圧に変換され,出力インダクタ6と出力コンデンサ7とにより平滑される。電力変換部5から出力されるエネルギは、出力コンデンサ7に蓄えられたり、負荷9に出力されたりする。そして、負荷9が急峻なパルス負荷の場合、電圧変換部5からのエネルギおよび出力コンデンサ7からのエネルギが重畳されて、必要なエネルギを負荷9へ供給することができる。   The DC voltage input from the DC power supply 8 is converted into a predetermined voltage by the power conversion unit 5 under the control of the power supply control unit 4 and smoothed by the output inductor 6 and the output capacitor 7. The energy output from the power converter 5 is stored in the output capacitor 7 or output to the load 9. When the load 9 is a steep pulse load, the energy from the voltage conversion unit 5 and the energy from the output capacitor 7 are superimposed, and necessary energy can be supplied to the load 9.

図2は、実施の形態1における電源制御部4に入力される報知信号のタイミングおよびデジタル制御電源装置1の出力電圧波形を示した図である。図2(a)に、実際のパルス負荷の発生タイミングである負荷波形を示す。図2(b)に、電源制御部4に入力される報知信号を示す。図2(c)に、パルス負荷に対応して行う制御方法を示す。図2(d)に、DC/DCコンバータ3の電流波形を示す。図2(e)に、DC/DCコンバータ3の出力電圧波形を示す。また、図3は、電源制御部4で行う制御フローチャートである。図1〜図3を用いて、デジタル制御電源装置1の動作について説明する。   FIG. 2 is a diagram showing the timing of the notification signal input to the power supply control unit 4 and the output voltage waveform of the digital control power supply device 1 in the first embodiment. FIG. 2A shows a load waveform that is an actual pulse load generation timing. FIG. 2B shows a notification signal input to the power supply control unit 4. FIG. 2C shows a control method performed corresponding to the pulse load. FIG. 2D shows a current waveform of the DC / DC converter 3. FIG. 2E shows an output voltage waveform of the DC / DC converter 3. FIG. 3 is a control flowchart performed by the power supply control unit 4. The operation of the digitally controlled power supply device 1 will be described with reference to FIGS.

通常、システム制御を行う上で、上位のシステム制御部は、パルス負荷発生タイミングもあわせて制御していることが多い。上位システム制御部2は、パルス負荷発生タイミングを管理している制御部であって、パルス負荷を発生させる前にパルス負荷が発生するタイミングを上位システム制御部2からデジタル制御電源装置1へ知らせるためのものである。本実施の形態では、図2(b)に示すように、上位システム制御部2は、実際のパルス負荷の立ち上がりより所定時間前倒ししたタイミングで立ち上がるパルス信号を報知信号として電源制御部4へ送信する。この所定時間は、出力インダクタ6の電流の立ち上がり特性に応じた前倒し時間Tとなる。   Usually, when performing system control, the host system control unit often controls the pulse load generation timing as well. The host system control unit 2 manages the pulse load generation timing, and notifies the digital control power supply device 1 from the host system control unit 2 of the timing at which the pulse load is generated before generating the pulse load. belongs to. In the present embodiment, as shown in FIG. 2 (b), the host system control unit 2 transmits a pulse signal that rises at a timing advanced by a predetermined time from the rise of the actual pulse load to the power supply control unit 4 as a notification signal. . This predetermined time is a forward time T corresponding to the current rise characteristic of the output inductor 6.

ここで、電源制御部4における制御について、図3に示した制御フローチャートにしたがって説明する。なお、図2(c)に、電源制御部4がどのタイミングで「通常制御」、「最大デューティ(最大Duty)制御」、および「最小デューティ(最小Duty)制御」のうちのどのパルス幅変調制御を行うかを示す。まず、ステップS11で、電力変換部5から出力電圧フィードバック信号を入力し、出力電圧AD(アナログ/デジタル)変換値Vo1として読み込む。次に、ステップS12で、電源制御部4内の図示しないメモリから前回の出力電圧AD変換値Vo2を読み出す。次に、ステップS13で、報知信号がHighであるかLowであるかを判断する。   Here, the control in the power supply control part 4 is demonstrated according to the control flowchart shown in FIG. 2C, at which timing the power supply control unit 4 performs “normal control”, “maximum duty (maximum duty) control”, and “minimum duty (minimum duty) control” which pulse width modulation control. Indicates what to do. First, in step S11, an output voltage feedback signal is input from the power converter 5 and read as an output voltage AD (analog / digital) conversion value Vo1. Next, in step S12, the previous output voltage AD conversion value Vo2 is read from a memory (not shown) in the power supply control unit 4. Next, in step S13, it is determined whether the notification signal is high or low.

ステップS13の処理において、報知信号がHighである場合、ステップS14に進み、出力電圧AD変換値Vo1から前回の出力電圧AD変換値Vo2を減算した結果が予め定めた閾値1より大きいか否かを判断する。減算した結果(Vo1−Vo2)が予め定めた閾値1よりも小さい場合、ステップS15に進み、出力インダクタ6の電流を強制的に立ち上げるために電源制御部4は最大デューティ制御によりDC/DCコンバータ3の出力電圧を制御する。なお、最大デューティ制御を行うために、パルス幅変調パルス信号の最大デューティを予め設定しておく。   When the notification signal is High in the process of Step S13, the process proceeds to Step S14, and whether or not the result of subtracting the previous output voltage AD conversion value Vo2 from the output voltage AD conversion value Vo1 is greater than a predetermined threshold value 1 or not. to decide. When the subtraction result (Vo1-Vo2) is smaller than the predetermined threshold 1, the process proceeds to step S15, and the power supply control unit 4 performs DC / DC converter by maximum duty control in order to forcibly raise the current of the output inductor 6. 3 output voltage is controlled. In order to perform the maximum duty control, the maximum duty of the pulse width modulation pulse signal is set in advance.

減算した結果(Vo1−Vo2)が予め定めた閾値1よりも大きい場合、ステップS16に進み、出力インダクタ6に流れる電流が十分に立ち上がり、出力電流波形の波高値に到達していると判断し、電源制御部4は通常制御によりDC/DCコンバータ3の出力電圧を制御する。通常制御とは、例えば出力電圧フィードバック信号と予め定めた目標電圧値との偏差をとりPID演算を実行してパルス幅変調制御量を決定するパルス幅変調制御のことである。ステップS15またはステップS16での処理が終了すると、ステップS17に進み、前回報知信号フラグを「1」に設定する。そして、ステップS22で、電源制御部4内のメモリに、前回の出力電圧AD変換値Vo2として出力電圧AD変換値Vo1の値を代入し、一連の処理が完了する。   If the result of subtraction (Vo1-Vo2) is greater than the predetermined threshold 1, the process proceeds to step S16, where it is determined that the current flowing through the output inductor 6 has sufficiently risen and has reached the peak value of the output current waveform, The power supply control unit 4 controls the output voltage of the DC / DC converter 3 by normal control. The normal control is, for example, pulse width modulation control in which a deviation between an output voltage feedback signal and a predetermined target voltage value is taken and PID calculation is performed to determine a pulse width modulation control amount. When the process in step S15 or step S16 ends, the process proceeds to step S17, and the previous notification signal flag is set to “1”. In step S22, the value of the output voltage AD conversion value Vo1 is substituted as the previous output voltage AD conversion value Vo2 into the memory in the power supply control unit 4, and the series of processes is completed.

一方、ステップS13の処理において、報知信号がHighでない場合、つまりLowの場合、ステップS18に進み、報知信号の立ち下がり検出を行うための前回報知信号フラグを読み出し、前回報知信号フラグが「1」であるか、または、減算した結果(Vo1−Vo2)が予め定めた閾値2より大きいか否かを判断する。前回報知信号フラグが「1」ではなく、かつ、減算した結果(Vo1−Vo2)が予め定めた閾値2より小さい場合(ステップS18での判断結果が「No」である場合)、ステップS19に進み、パルス負荷のオン区間の終了間際であると判断し、電力変換部5からの電流供給を止めるために電源制御部4は最小デューティ制御によりDC/DCコンバータ3の出力電圧を制御する。なお、最小デューティ制御を行うために、パルス幅変調パルス信号の最小デューティを予め設定しておく。   On the other hand, if the notification signal is not high in the processing of step S13, that is, if it is low, the process proceeds to step S18, where the previous notification signal flag for detecting the falling edge of the notification signal is read, and the previous notification signal flag is “1”. Or whether the result of subtraction (Vo1-Vo2) is greater than a predetermined threshold value 2. When the previous notification signal flag is not “1” and the subtraction result (Vo1−Vo2) is smaller than the predetermined threshold 2 (when the determination result in step S18 is “No”), the process proceeds to step S19. Therefore, it is determined that the pulse load on period is about to end, and the power supply control unit 4 controls the output voltage of the DC / DC converter 3 by the minimum duty control in order to stop the current supply from the power conversion unit 5. In order to perform the minimum duty control, the minimum duty of the pulse width modulation pulse signal is set in advance.

前回報知信号フラグが「1」である、または、減算した結果(Vo1−Vo2)が予め定めた閾値2より大きい場合(ステップS18での判断結果が「Yes」である場合)、ステップS20に進み、電源制御部4はステップS16と同様の通常制御によりDC/DCコンバータ3の出力電圧を制御する。ステップS19またはステップS20での処理が終了すると、ステップS21に進み、前回報知信号フラグを「0」に設定する。そして、ステップS22で、電源制御部4内のメモリに、前回の出力電圧AD変換値Vo2として出力電圧AD変換値Vo1の値を代入し、一連の処理が完了する。   If the previous notification signal flag is “1” or if the result of subtraction (Vo1−Vo2) is greater than a predetermined threshold 2 (when the determination result in step S18 is “Yes”), the process proceeds to step S20. The power supply control unit 4 controls the output voltage of the DC / DC converter 3 by the normal control similar to step S16. When the process in step S19 or step S20 ends, the process proceeds to step S21, and the previous notification signal flag is set to “0”. In step S22, the value of the output voltage AD conversion value Vo1 is substituted as the previous output voltage AD conversion value Vo2 into the memory in the power supply control unit 4, and the series of processes is completed.

このような制御を行った場合の出力インダクタ6の電流波形およびDC/DCコンバータ3の出力電流波形を図2(d)に、DC/DCコンバータ3の出力電圧波形を図2(e)に示す。電源制御部4が、前倒しで報知信号の立ち上がり時点(報知信号がHighであると判断した時点)から出力電流波形の波高値に到達するまで、予め定めた最大デューティ制御を行うことにより、パルス負荷が開始される前から出力インダクタ6の電流は徐々に立ち上がり始め、同様にDC/DCコンバータ3の出力電圧も徐々に大きくなる。DC/DCコンバータ3の出力電圧は、PID制御で設定していた目標電圧値よりも大きくなるが、この電圧レベルが出力電圧仕様の範囲内(上限値と下限値との間)であれば問題ない。また、電源制御部4が、上位システム制御部2から報知信号を受信した際に、DC/DCコンバータ3の出力電圧の目標電圧値をDC/DCコンバータ3の出力電圧の仕様上限値に変更しておいてもよい。   FIG. 2 (d) shows the current waveform of the output inductor 6 and the output current waveform of the DC / DC converter 3 when such control is performed, and FIG. 2 (e) shows the output voltage waveform of the DC / DC converter 3. . The power supply control unit 4 performs a predetermined maximum duty control until the peak value of the output current waveform is reached from the time when the notification signal rises ahead of time (when the notification signal is determined to be high). The current of the output inductor 6 starts to rise gradually before the start of the signal, and similarly, the output voltage of the DC / DC converter 3 gradually increases. The output voltage of the DC / DC converter 3 becomes larger than the target voltage value set in the PID control. However, if this voltage level is within the range of the output voltage specification (between the upper limit value and the lower limit value), there is a problem. Absent. Further, when the power supply control unit 4 receives the notification signal from the host system control unit 2, the target voltage value of the output voltage of the DC / DC converter 3 is changed to the specification upper limit value of the output voltage of the DC / DC converter 3. You may keep it.

パルス負荷が開始されたときには、まだ出力インダクタ6に流れる電流は完全に立ち上がってはおらず、出力電流波形を得るために出力コンデンサ7からその差分のエネルギが供給される。一方、パルス負荷が開始されたときの出力電圧波形は、出力コンデンサ7のESR(等価直列抵抗)で決定される電圧ドロップ量だけ電圧降下する。出力インダクタ6の電流波形が出力電流波形の波高値に到達すると、出力電圧は数mV上昇し、目標電圧値に近づく。電源制御部4では、この出力電圧の上昇を検知した場合に、出力インダクタ6に流れる電流が十分に立ち上がったと判断し、最大デューティ制御から通常制御へ切り替えを行う。通常制御に切り替えた後は、出力電圧は目標電圧値に収束し、出力電流は少しオーバーシュートした後に、出力電流波形の波高値に収束する。   When the pulse load is started, the current flowing through the output inductor 6 has not yet risen completely, and the difference energy is supplied from the output capacitor 7 to obtain the output current waveform. On the other hand, the output voltage waveform when the pulse load is started drops by a voltage drop amount determined by ESR (equivalent series resistance) of the output capacitor 7. When the current waveform of the output inductor 6 reaches the peak value of the output current waveform, the output voltage increases by several mV and approaches the target voltage value. When detecting the increase in the output voltage, the power supply control unit 4 determines that the current flowing through the output inductor 6 has sufficiently risen, and switches from the maximum duty control to the normal control. After switching to normal control, the output voltage converges to the target voltage value, the output current slightly overshoots, and then converges to the peak value of the output current waveform.

この状態で、パルス負荷オン時間が終了すると、パルス負荷の波高値が大きい場合、その切り替わりの瞬間に出力電圧が大きく跳ね上がってしまい、出力電圧仕様の上限値を超えてしまう可能性がある。このため、パルス負荷が終了するよりも先に、出力インダクタ6の電流を抑えるために、報知信号の立ち下がり時点(報知信号がHighからLowへ変化したと判断した時点)から電源制御部4が予め定めた最小デューティ制御を行う。パルス負荷が発生している間に最小デューティ制御を行うため、出力インダクタ6の電流は徐々に立ち下がっていき、出力電圧も同様に降下していく。このとき、出力電流波形を維持するために必要なエネルギは出力コンデンサ7から出力される。そして、パルス負荷オン時間が終了すると、出力インダクタ6に残留しているエネルギにより出力電圧が跳ね上がるため、電源制御部4では、この出力電圧の上昇を検知した場合に、パルス負荷が終了したと判断し、最小デューティ制御から通常制御へ切り替えを行う。なお、図2(a)、図2(b)に示すように、報知信号がHighとなっている期間を報知信号のオン時間幅とすると、報知信号のオン時間幅は、パルス負荷のオン時間幅と同程度の長さになっている。   When the pulse load on time ends in this state, if the peak value of the pulse load is large, the output voltage jumps greatly at the moment of switching, which may exceed the upper limit value of the output voltage specification. For this reason, in order to suppress the current of the output inductor 6 before the end of the pulse load, the power supply control unit 4 starts from the time when the notification signal falls (when it is determined that the notification signal has changed from High to Low). Predetermined minimum duty control is performed. Since the minimum duty control is performed while the pulse load is generated, the current of the output inductor 6 gradually falls, and the output voltage also drops similarly. At this time, energy necessary for maintaining the output current waveform is output from the output capacitor 7. When the pulse load on-time ends, the output voltage jumps up due to the energy remaining in the output inductor 6. Therefore, the power supply control unit 4 determines that the pulse load has ended when the increase in the output voltage is detected. Then, the minimum duty control is switched to the normal control. As shown in FIGS. 2A and 2B, when the period in which the notification signal is High is the ON time width of the notification signal, the ON time width of the notification signal is the ON time of the pulse load. The length is about the same as the width.

以上のように、本実施の形態におけるデジタル制御電源装置1では、実際のパルス負荷の立ち上がりより所定時間前倒ししたタイミングで立ち上がり、実際のパルス負荷のオン時間幅と同程度の時間幅でHighとなる報知信号を上位システム制御部2から電源制御部4へ入力し、電源制御部4では、報知信号の立ち上がり時点(報知信号がHighであると判断した時点)から出力インダクタ6の電流が十分に立ち上がったと判断するまで強制的に最大デューティ制御を行い、報知信号の立ち下がり時点(報知信号がHighからLowへ変化したと判断した時点)からパルス負荷が終了したと判断するまで強制的に最小デューティ制御を行う。   As described above, in the digitally controlled power supply device 1 according to the present embodiment, the digital control power supply device 1 rises at a timing that is advanced a predetermined time from the rise of the actual pulse load, and becomes High in a time width that is about the same as the on-time width of the actual pulse load. The notification signal is input from the host system control unit 2 to the power supply control unit 4, and the power supply control unit 4 sufficiently increases the current of the output inductor 6 from the rising point of the notification signal (when the notification signal is determined to be High). The maximum duty control is forcibly performed until it is determined that the pulse load has been reached, and the minimum duty control is forcibly performed until it is determined that the pulse load has ended from the time when the notification signal falls (when it is determined that the notification signal has changed from High to Low). I do.

このような制御を行うことにより、急激な電流変化(di/dt)を有するパルス負荷の発生時に、DC/DCコンバータ3の出力電圧をパルス負荷発生前に予め出力仕様範囲内でPID制御時の目標電圧値よりも高くすることになるため、その上昇分だけオフセットをかけたことになり、実際にパルス負荷が発生した際に出力電圧が落ち込むレベルを小さくすることができる。また、パルス負荷発生前に出力インダクタ6の電流を立ち上げておくことができ、実際のパルス負荷が発生した際の出力インダクタ6に流れる電流の立ち上がりの遅れを解消することができる。負荷9への電流供給がスムーズに行われので、出力コンデンサ7の容量を大きくする必要がなく、出力コンデンサ7の容量を小さくすることができる。さらに、パルス負荷終了前に出力インダクタ6の電流を立ち下げ始めておくことにより、実際のパルス負荷が終了した際の出力電圧の跳ね上がりを少なくすることができる。   By performing such control, when a pulse load having a sudden current change (di / dt) is generated, the output voltage of the DC / DC converter 3 is set in advance within the output specification range before the pulse load is generated. Since the voltage is set higher than the target voltage value, an offset is applied by the increase, and the level at which the output voltage drops when a pulse load is actually generated can be reduced. Moreover, the current of the output inductor 6 can be raised before the pulse load is generated, and the delay of the rise of the current flowing through the output inductor 6 when the actual pulse load is generated can be eliminated. Since the current is smoothly supplied to the load 9, it is not necessary to increase the capacity of the output capacitor 7, and the capacity of the output capacitor 7 can be decreased. Furthermore, by starting to decrease the current of the output inductor 6 before the end of the pulse load, it is possible to reduce the jump of the output voltage when the actual pulse load ends.

なお、本実施の形態では、報知信号のオン時間幅をパルス負荷のオン時間幅と同程度の長さになるように報知信号の波形を設定した。しかしながら、出力インダクタ6の仕様により、パルス負荷終了後の出力電圧の跳ね上がりが小さくなるような場合には、報知信号をHighからLowへ変化させるタイミングをパルス負荷のオン時間終了と同じとなるように報知信号の波形を設定して、パルス負荷終了まで通常制御を行ってもよい。   In the present embodiment, the waveform of the notification signal is set so that the ON time width of the notification signal is approximately the same as the ON time width of the pulse load. However, when the output voltage jump after the end of the pulse load is small due to the specifications of the output inductor 6, the timing for changing the notification signal from High to Low is the same as the end time of the pulse load. The waveform of the notification signal may be set and normal control may be performed until the end of the pulse load.

また、本実施の形態では、報知信号がHighであると判断したと同時に最大デューティ制御を行う場合について説明したが、図4に示すように、報知信号の立ち上がり後(報知信号がHighであると判断した後)所定の待機時間を経過してから最大デューティ制御を開始してもよい。待機期間の設定方法の一例として、電源制御部4における制御フローチャートを図5に示す。図3に示した制御フローチャートに対してステップS23とステップS24が追加されている。ステップS13で、報知信号がHighであると判断した後、ステップS23で、カウンタ(CNT)をインクリメントする。そして、ステップS24で、カウンタが所定の待機期間に相当する設定値に達すると、ステップS14に進み、減算した結果(Vo1−Vo2)が予め定めた閾値1よりも小さい場合、ステップS15で、電源制御部4が最大デューティ制御を行う。また、報知信号の立ち下がり後(報知信号がHighからLowへ変化したと判断した後)所定の待機時間を経過してから最小デューティ制御を開始してもよい。   In the present embodiment, the case where the maximum duty control is performed simultaneously with the determination that the notification signal is High has been described. However, as illustrated in FIG. 4, after the notification signal rises (the notification signal is High). The maximum duty control may be started after a predetermined waiting time has elapsed after the determination. As an example of the setting method of the standby period, a control flowchart in the power supply control unit 4 is shown in FIG. Steps S23 and S24 are added to the control flowchart shown in FIG. After determining that the notification signal is High in step S13, the counter (CNT) is incremented in step S23. When the counter reaches a set value corresponding to a predetermined standby period in step S24, the process proceeds to step S14. If the result of subtraction (Vo1-Vo2) is smaller than a predetermined threshold value 1, the power supply is The control unit 4 performs maximum duty control. Alternatively, the minimum duty control may be started after a predetermined standby time has elapsed after the notification signal falls (after it is determined that the notification signal has changed from High to Low).

実施の形態2.
電源装置の仕様には、出力電圧のリップルの規定があるのが一般的である。リップルは出力インダクタ6のインダクタンス値に大きく依存しており、インダクタンス値が大きい場合はリップルが小さくなり、インダクタンス値が小さい場合はリップルが大きくなる。一方、インダクタンス値が大きい場合は出力電流の立ち上がりが遅くなり、インダクタンス値が小さい場合は出力電流の立ち上がりが早くなるという特徴がある。このため、出力電圧のリップルを小さくするために出力インダクタのインダクタンス値を大きくすると、出力電流の立ち上がりが遅くなるので、負荷急変の場合に電圧変換部から必要なエネルギ供給をスムーズに行うことができず、この対策として出力コンデンサの容量を大きくする必要がある。本実施の形態は、電源装置が許容できるリップルの上限値の仕様が厳しくて出力インダクタのインダクタンス値を実施の形態1で使用したものより大きくせざるを得ない場合、あるいはパルス負荷のオン時間が短い場合でも対応できるデジタル制御電源装置に関するものである。
Embodiment 2. FIG.
In general, the specifications of the power supply apparatus include a regulation of output voltage ripple. The ripple greatly depends on the inductance value of the output inductor 6. When the inductance value is large, the ripple is small, and when the inductance value is small, the ripple is large. On the other hand, when the inductance value is large, the output current rises slowly, and when the inductance value is small, the output current rises quickly. For this reason, if the inductance value of the output inductor is increased in order to reduce the ripple of the output voltage, the rise of the output current is delayed, so that the required energy can be supplied smoothly from the voltage converter in the case of sudden load change. As a countermeasure, it is necessary to increase the capacity of the output capacitor. In the present embodiment, the specification of the upper limit value of the ripple that the power supply apparatus can tolerate is strict and the inductance value of the output inductor must be made larger than that used in the first embodiment, or the on time of the pulse load The present invention relates to a digital control power supply apparatus that can cope with even a short case.

図6は、実施の形態2におけるデジタル制御電源装置1の電源制御部4に入力される報知信号のタイミングおよびデジタル制御電源装置1の出力電圧波形を示した図である。図6(a)に、実際のパルス負荷の発生タイミングである負荷波形を示す。図6(b)に、電源制御部4に入力される報知信号を示す。図6(c)に、パルス負荷に対応して行う制御方法を示す。図6(d)に、DC/DCコンバータ3の電流波形を示す。図6(e)に、DC/DCコンバータ3の出力電圧波形を示す。また、図7は、電源制御部4で行う制御フローチャートである。デジタル制御電源装置1の構成は、実施の形態1の図1と同様である。   FIG. 6 is a diagram illustrating the timing of the notification signal input to the power control unit 4 of the digital control power supply device 1 and the output voltage waveform of the digital control power supply device 1 according to the second embodiment. FIG. 6A shows a load waveform which is an actual pulse load generation timing. FIG. 6B shows a notification signal input to the power supply control unit 4. FIG. 6C shows a control method performed corresponding to the pulse load. FIG. 6D shows a current waveform of the DC / DC converter 3. FIG. 6E shows an output voltage waveform of the DC / DC converter 3. FIG. 7 is a control flowchart performed by the power supply control unit 4. The configuration of the digital control power supply device 1 is the same as that of FIG.

図6において、実施の形態1との違いは、出力インダクタ6のインダクタンス値が大きく、DC/DCコンバータ3の出力電流の立ち上がりが遅い場合、あるいはパルス負荷のオン時間が短い場合でも対応できるように、実施の形態2の報知信号は、実施の形態1の報知信号と比べて、前倒し時間Tを長くしている点である。   In FIG. 6, the difference from the first embodiment can be dealt with even when the inductance value of the output inductor 6 is large and the rise of the output current of the DC / DC converter 3 is slow or the on time of the pulse load is short. The notification signal of the second embodiment is that the advance time T is made longer than that of the notification signal of the first embodiment.

通常、システム制御を行う上で、上位のシステム制御部は、パルス負荷発生タイミングもあわせて制御していることが多い。上位システム制御部2は、パルス負荷発生タイミングを管理している制御部であって、パルス負荷を発生させる前にパルス負荷が発生するタイミングを上位システム制御部2からデジタル制御電源装置1に知らせるためのものである。図6(b)に示すように、実際のパルス負荷の立ち上がりより所定時間前倒ししたタイミングで立ち上がるパルス信号を報知信号として電源制御部4へ送信する。この所定時間は、出力インダクタ6の電流の立ち上がり特性に応じた前倒し時間Tとなる。なお、本実施の形態では、パルス負荷のオン区間と報知信号のオン区間の重なりはない。   Usually, when performing system control, the host system control unit often controls the pulse load generation timing as well. The host system control unit 2 is a control unit that manages the pulse load generation timing, and informs the digital control power supply device 1 from the host system control unit 2 of the timing at which the pulse load is generated before the pulse load is generated. belongs to. As shown in FIG. 6B, a pulse signal that rises at a timing advanced by a predetermined time from the rise of the actual pulse load is transmitted to the power supply control unit 4 as a notification signal. This predetermined time is a forward time T corresponding to the current rise characteristic of the output inductor 6. In the present embodiment, there is no overlap between the on period of the pulse load and the on period of the notification signal.

ここで、電源制御部4における制御について、図7に示した制御フローチャートにしたがって説明する。なお、図6(c)に、電源制御部4がどのタイミングで「通常制御」および「最大デューティ(最大Duty)制御」のうちのどのパルス幅変調制御を行うかを示す。まず、ステップS31で、報知信号がHighであるかLowであるかを判断する。報知信号がLow、つまりパルス負荷がオフあるいはパルス負荷発生予告の連絡を受けていない場合は、ステップS33に進み、電源制御部4は通常制御によりDC/DCコンバータ3の出力電圧を制御する。通常制御とは、例えば出力電圧フィードバック信号と予め定めた目標電圧値との偏差をとりPID演算を実行してパルス幅変調制御量を決定するパルス幅変調制御のことである。一方、報知信号がHigh、つまりパルス負荷発生予告の連絡を受けた場合は、ステップS32に進み、出力電圧フィードバック信号のレベルに関わらず、出力インダクタ6の電流を強制的に立ち上げるために、電源制御部4は報知信号の立ち上がり時点(報知信号がHighであると判断した時点)からパルス負荷の立ち下がり時点まで予め定めた最大デューティ制御によりDC/DCコンバータ3の出力電圧を制御する。   Here, the control in the power supply control part 4 is demonstrated according to the control flowchart shown in FIG. FIG. 6C shows which pulse width modulation control of “normal control” and “maximum duty (maximum duty) control” is performed by the power supply control unit 4 at which timing. First, in step S31, it is determined whether the notification signal is high or low. When the notification signal is Low, that is, when the pulse load is off or the notification of the pulse load occurrence notice is not received, the process proceeds to Step S33, and the power supply control unit 4 controls the output voltage of the DC / DC converter 3 by normal control. The normal control is, for example, pulse width modulation control in which a deviation between an output voltage feedback signal and a predetermined target voltage value is taken and PID calculation is performed to determine a pulse width modulation control amount. On the other hand, when the notification signal is High, that is, when the notification of the pulse load occurrence notice is received, the process proceeds to Step S32, and the power supply is turned on in order to forcibly raise the current of the output inductor 6 regardless of the level of the output voltage feedback signal. The control unit 4 controls the output voltage of the DC / DC converter 3 by a predetermined maximum duty control from the rising point of the notification signal (when the notification signal is determined to be High) to the falling point of the pulse load.

このような制御を行った場合の出力インダクタ6の電流波形およびDC/DCコンバータ3の出力電流波形を図6(d)に、DC/DCコンバータ3の出力電圧波形を図6(e)に示す。電源制御部4が、報知信号の立ち上がり時点(報知信号がHighであると判断した時点)から最大デューティ制御を行うことにより、出力インダクタ6の電流は徐々に立ち上がり始め、同様にDC/DCコンバータ3の出力電圧も徐々に大きくなる。したがって、DC/DCコンバータ3の出力電圧は、PID制御で設定していた目標電圧値よりも大きくなるが、この電圧レベルが出力電圧仕様の範囲内(上限値と下限値との間)であれば問題ない。また、電源制御部4が、上位システム制御部2から報知信号を受信した際に、DC/DCコンバータ3の出力電圧の目標電圧値をDC/DCコンバータ3の出力電圧の仕様上限値に変更しておいてもよい。図6(d)、図6(e)示すように、報知信号の立ち上がり時点から前倒し時間Tを経過すると実際にパルス負荷が発生し、電圧変換部5および出力コンデンサ7から必要なエネルギを負荷9へ供給する。   FIG. 6 (d) shows the current waveform of the output inductor 6 and the output current waveform of the DC / DC converter 3 when such control is performed, and FIG. 6 (e) shows the output voltage waveform of the DC / DC converter 3. . When the power supply control unit 4 performs maximum duty control from the time when the notification signal rises (when the notification signal is determined to be High), the current of the output inductor 6 starts to gradually rise, and similarly, the DC / DC converter 3 The output voltage increases gradually. Therefore, the output voltage of the DC / DC converter 3 becomes larger than the target voltage value set in the PID control, but this voltage level is within the range of the output voltage specification (between the upper limit value and the lower limit value). No problem. Further, when the power supply control unit 4 receives the notification signal from the host system control unit 2, the target voltage value of the output voltage of the DC / DC converter 3 is changed to the specification upper limit value of the output voltage of the DC / DC converter 3. You may keep it. As shown in FIGS. 6D and 6E, a pulse load is actually generated when the forward time T elapses from the rising point of the notification signal, and the necessary energy is supplied from the voltage converter 5 and the output capacitor 7 to the load 9. To supply.

本実施の形態では、出力電圧仕様の上限値がある程度厳しい、例えば通常制御する際の目標電圧値と上限値との差分が小さい場合、あるいは、パルス負荷のオン時間が短い場合を想定した。しかしながら、出力電圧仕様の上限値の制限が緩くて余裕がある場合には、実施の形態1と同様に、出力電流波形の波高値まで立ち上がるような前倒し時間Tとしてもよい。また、本実施の形態では、報知信号がHighであると判断したと同時に最大デューティ制御を行う場合について説明したが、報知信号の立ち上がり後(報知信号がHighであると判断した後)所定の待機時間を経過してからパルス負荷の立ち下がり時点まで最大デューティ制御を行ってもよい。   In the present embodiment, it is assumed that the upper limit value of the output voltage specification is somewhat severe, for example, when the difference between the target voltage value and the upper limit value during normal control is small, or when the pulse load ON time is short. However, when the upper limit value of the output voltage specification is loose and there is room, the advance time T that rises to the peak value of the output current waveform may be used as in the first embodiment. In the present embodiment, the case where the maximum duty control is performed at the same time that the notification signal is determined to be High has been described. However, after the notification signal rises (after the notification signal is determined to be High), a predetermined standby is performed. The maximum duty control may be performed from the elapse of time until the pulse load falls.

以上のように、本実施の形態におけるデジタル制御電源装置1では、パルス負荷発生タイミングを知らせる報知信号を上位システム制御部2から電源制御部4へ入力し、電源制御部4では、報知信号がLow、つまりパルス負荷がオフあるいはパルス負荷発生予告の連絡を受けていない場合は、電源制御部4は通常制御を行い、報知信号がHigh、つまりパルス負荷発生予告の連絡を受けた場合は、強制的に電源制御部4は最大デューティ制御によりDC/DCコンバータ3の出力電圧を制御する。このような制御を行うことにより、急激な電流変化(di/dt)を有するパルス負荷の発生時に、パルス負荷発生前に出力インダクタ6の出力電流を立ち上げておくことができ、実際のパルス負荷が発生した際の電圧変換部5および出力コンデンサ7から負荷9への必要なエネルギ供給がスムーズに行われ、出力コンデンサ7の容量を小さくすることができる。また、DC/DCコンバータ3の出力電圧をパルス負荷発生前に予め出力仕様範囲内でPID制御時の目標電圧値よりも高くすることになるため、その上昇分だけオフセットをかけたことになり、実際にパルス負荷が発生した際に出力電圧が落ち込むレベルを小さくすることができる。さらに、インダクタンス値が大きい出力インダクタ6を選定することができ、リップルの小さい電源装置とすることができる。   As described above, in the digitally controlled power supply device 1 according to the present embodiment, a notification signal that notifies the pulse load generation timing is input from the host system control unit 2 to the power supply control unit 4, and the power supply control unit 4 receives the notification signal Low. That is, when the pulse load is off or when the notification of the pulse load occurrence notice is not received, the power supply control unit 4 performs the normal control, and when the notification signal is High, that is, when the notification of the pulse load occurrence notice is received, it is compulsory. The power supply control unit 4 controls the output voltage of the DC / DC converter 3 by maximum duty control. By performing such control, when a pulse load having a rapid current change (di / dt) is generated, the output current of the output inductor 6 can be raised before the pulse load is generated. When this occurs, the necessary energy supply from the voltage converter 5 and the output capacitor 7 to the load 9 is performed smoothly, and the capacity of the output capacitor 7 can be reduced. In addition, since the output voltage of the DC / DC converter 3 is made higher than the target voltage value at the time of PID control within the output specification range in advance before the pulse load is generated, the offset is applied by the increase. The level at which the output voltage drops when a pulse load is actually generated can be reduced. Furthermore, the output inductor 6 having a large inductance value can be selected, and a power supply device with a small ripple can be obtained.

実施の形態3.
一般的な電源装置の仕様には、出力電圧変動の仕様のほかに、入力電圧範囲の仕様がある。つまり、ある入力電圧範囲の中で動作させた場合に、パルス負荷に対応した出力電圧変動が仕様範囲内に収まるような電源装置が要求される。実施の形態1および実施の形態2では、パルス負荷に対応する電源装置において、出力電圧の変動を少なくするために報知信号に基づいて最大デューティ制御を行う場合について説明した。しかしながら、このような制御を行うと、入力電圧が小さい場合での最大デューティを、入力電圧が大きい場合での最大デューティとして利用することになる。このため、入力電圧が大きい場合、入力電圧が小さい場合と同じ所定時間前倒ししたタイミングで最大デューティ制御を開始すると、出力電圧の上限値を超えてしまうことがある。実施の形態3は、このような入力電圧範囲の仕様を考慮したデジタル制御電源装置に関するものである。
Embodiment 3 FIG.
General power supply specifications include input voltage range specifications in addition to output voltage fluctuation specifications. That is, there is a demand for a power supply device that, when operated within a certain input voltage range, allows output voltage fluctuations corresponding to pulse loads to fall within the specification range. In the first embodiment and the second embodiment, the case where the maximum duty control is performed based on the notification signal in the power supply device corresponding to the pulse load to reduce the fluctuation of the output voltage has been described. However, when such control is performed, the maximum duty when the input voltage is small is used as the maximum duty when the input voltage is large. For this reason, when the input voltage is large, if the maximum duty control is started at the same timing as that when the input voltage is low, the upper limit value of the output voltage may be exceeded. The third embodiment relates to a digital control power supply apparatus that takes into consideration the specifications of such an input voltage range.

図8は、この発明の実施の形態3におけるデジタル制御電源装置の構成図である。電力変換部5と電源制御部4との間にインタフェース信号として電力変換部5の入力電圧をモニタするための信号である入力電圧フィードバック信号を追加した点、およびDC/DCコンバータ3の入力電圧値毎に対応する最大デューティの値を予め定め電源制御部4内の図示しないルックアップテーブル等に保存している点が実施の形態1と異なる。なお、報知信号を受信するタイミングおよび本実施の形態で得られる出力波形は図2で示したものと同じである。電源制御部4における制御について、図9に示した制御フローチャートにしたがって説明する。   FIG. 8 is a configuration diagram of a digital control power supply apparatus according to Embodiment 3 of the present invention. An input voltage feedback signal that is a signal for monitoring the input voltage of the power conversion unit 5 is added as an interface signal between the power conversion unit 5 and the power supply control unit 4, and the input voltage value of the DC / DC converter 3 The difference from the first embodiment is that the maximum duty value corresponding to each is predetermined and stored in a lookup table (not shown) in the power supply control unit 4. The timing of receiving the notification signal and the output waveform obtained in this embodiment are the same as those shown in FIG. The control in the power supply control unit 4 will be described according to the control flowchart shown in FIG.

まず、ステップS41で、実施の形態1と同様に、報知信号がHighであるか否かを判断する。報知信号がHighではなくLowであると判断した場合には、ステップS45に進み、実施の形態1と同様に電源制御部4は通常制御によりDC/DCコンバータ3の出力電圧を制御する。一方、報知信号がHighであると判断した場合には、ステップS42に進み、入力電圧フィードバック信号によりDC/DCコンバータ3の入力電圧を確認する。ステップS43では、ステップS42にて確認した入力電圧値に対応した最大デューティを電源制御部4内のルックアップテーブル等を用いて選択する。入力電圧値と最大デューティとの関係については、例えば図10に示したようなグラフから求めることができる。図10は、入力電圧と最大デューティ(最大Duty)との関係を示した図である。ステップS44では、ステップS43にて選択した最大デューティにてDC/DCコンバータ3の出力電圧をパルス幅変調制御する。   First, in step S41, similarly to the first embodiment, it is determined whether or not the notification signal is High. If it is determined that the notification signal is Low instead of High, the process proceeds to step S45, and the power supply control unit 4 controls the output voltage of the DC / DC converter 3 by normal control as in the first embodiment. On the other hand, if it is determined that the notification signal is High, the process proceeds to step S42, and the input voltage of the DC / DC converter 3 is confirmed by the input voltage feedback signal. In step S43, the maximum duty corresponding to the input voltage value confirmed in step S42 is selected using a lookup table in the power supply control unit 4 or the like. The relationship between the input voltage value and the maximum duty can be obtained from a graph as shown in FIG. 10, for example. FIG. 10 is a diagram showing the relationship between the input voltage and the maximum duty (maximum duty). In step S44, the output voltage of the DC / DC converter 3 is subjected to pulse width modulation control at the maximum duty selected in step S43.

以上のように、本実施の形態におけるデジタル制御電源装置1では、入力電圧範囲が広い電源装置に対応するためのものであり、電源制御部4では、報知信号がLow、つまりパルス負荷がオフあるいはパルス負荷発生予告の連絡を受けていない場合は、電源制御部4は通常制御を行い、報知信号がHigh、つまりパルス負荷発生予告の連絡を受けた場合は、DC/DCコンバータ3の入力電圧を確認し、その入力電圧に応じた最大デューティにてDC/DCコンバータ3の出力電圧をパルス幅変調制御する。このような制御を行うことにより、広範囲の入力電圧に対応した最大デューティで出力電圧をパルス幅変調制御することができるので、パルス負荷発生前の出力電圧レベルを仕様範囲内の出力電圧に抑えた状態で出力インダクタ6の電流を立ち上げておくことができ、実際のパルス負荷が発生した際に、電圧変換部5および出力コンデンサ7から負荷9への必要なエネルギ供給がスムーズに行われ、出力コンデンサ7の容量を小さくすることができる。また、出力電圧をパルス負荷発生前に予め出力仕様範囲内でPID制御時の目標電圧値よりも高くすることになるため、その上昇分だけオフセットをかけたことになり、実際にパルス負荷が発生した際に出力電圧が落ち込むレベルを小さくすることができる。   As described above, the digitally controlled power supply device 1 according to the present embodiment is for dealing with a power supply device having a wide input voltage range. In the power supply control unit 4, the notification signal is Low, that is, the pulse load is turned off or When the notification of the pulse load occurrence notice is not received, the power supply control unit 4 performs the normal control, and when the notification signal is High, that is, when the pulse load occurrence notice is received, the input voltage of the DC / DC converter 3 is set. The output voltage of the DC / DC converter 3 is subjected to pulse width modulation control with the maximum duty corresponding to the input voltage. By performing such control, the pulse width modulation control of the output voltage can be performed with the maximum duty corresponding to a wide range of input voltages, so that the output voltage level before the generation of the pulse load is suppressed to the output voltage within the specification range. In this state, the current of the output inductor 6 can be raised, and when an actual pulse load is generated, the necessary energy supply from the voltage converter 5 and the output capacitor 7 to the load 9 is smoothly performed, and the output The capacity of the capacitor 7 can be reduced. Also, since the output voltage is set higher than the target voltage value during PID control within the output specification range in advance before the pulse load is generated, an offset is applied for the increase, and a pulse load is actually generated. In this case, the level at which the output voltage drops can be reduced.

なお、すべての実施の形態において、報知信号をパルス状の波形として説明したが、報知信号はパルス状の波形に限定されるものではない。電源制御部4は、パルス負荷発生に対応する報知信号を受信し、報知信号によりパルス幅変調制御を開始する時間およびパルス幅変調を終了する時間を事前に得るようにすればよい。このため、報知信号は、パルス負荷の立ち上がりおよびパルス負荷の立ち下がりを事前に電源制御部4に通知する信号であればよく、報知信号をパルス状以外の生成しやすい波形としてもよい。   In all the embodiments, the notification signal has been described as a pulse waveform, but the notification signal is not limited to the pulse waveform. The power supply control unit 4 may receive the notification signal corresponding to the generation of the pulse load and obtain in advance the time for starting the pulse width modulation control and the time for ending the pulse width modulation based on the notification signal. Therefore, the notification signal may be a signal that notifies the power supply control unit 4 in advance of the rise of the pulse load and the fall of the pulse load, and the notification signal may have a waveform that is easy to generate other than the pulse shape.

1 デジタル制御電源装置、2 上位システム制御部、3 DC/DCコンバータ、4 電源制御部、5 電力変換部、6 出力インダクタ、7 出力コンデンサ、8 直流電源、9 負荷。   DESCRIPTION OF SYMBOLS 1 Digital control power supply device, 2 Host system control part, 3 DC / DC converter, 4 Power supply control part, 5 Power conversion part, 6 Output inductor, 7 Output capacitor, 8 DC power supply, 9 Load

Claims (11)

DC/DCコンバータと、
前記DC/DCコンバータの出力電圧をフィードバックしてパルス幅変調パルス信号のデューティを決定し、パルス幅変調により前記DC/DCコンバータの出力電圧を制御する電源制御部とを備え、
前記電源制御部は、パルス負荷発生時に、前記パルス負荷の立ち上がりより所定時間早いタイミングで立ち上がる報知信号を受信し、前記報知信号に基づいて予め定めたデューティでパルス幅変調制御を行うことを特徴とするデジタル制御電源装置。
A DC / DC converter;
A power control unit that feeds back an output voltage of the DC / DC converter to determine a duty of a pulse width modulation pulse signal, and controls an output voltage of the DC / DC converter by pulse width modulation;
The power supply control unit receives a notification signal that rises at a timing earlier than a rise of the pulse load when a pulse load occurs, and performs pulse width modulation control at a predetermined duty based on the notification signal. A digitally controlled power supply.
前記報知信号のオン時間幅は、前記パルス負荷のオン時間幅と同程度の長さであることを特徴とする請求項1に記載のデジタル制御電源装置。 The digital control power supply apparatus according to claim 1, wherein an ON time width of the notification signal is approximately the same as an ON time width of the pulse load. 前記電源制御部は、前記報知信号の立ち上がり時点から予め定めた最大デューティでパルス幅変調制御を行うことを特徴とする請求項1または2に記載のデジタル制御電源装置。 The digital control power supply apparatus according to claim 1, wherein the power supply control unit performs pulse width modulation control with a predetermined maximum duty from a rising point of the notification signal. 前記電源制御部は、前記報知信号の立ち下がり時点から予め定めた最小デューティでパルス幅変調制御を行うことを特徴とする請求項1〜3のいずれか1項に記載のデジタル制御電源装置。 The digital control power supply apparatus according to any one of claims 1 to 3, wherein the power supply control unit performs pulse width modulation control with a predetermined minimum duty from a time point when the notification signal falls. 前記電源制御部は、前記報知信号の立ち上がり後の所定時間経過してから予め定めた最大デューティでパルス幅変調制御を行うことを特徴とする請求項1または2に記載のデジタル制御電源装置。 The digital control power supply apparatus according to claim 1, wherein the power supply control unit performs pulse width modulation control with a predetermined maximum duty after a predetermined time has elapsed after the rising of the notification signal. 前記電源制御部は、前記報知信号の立ち下がり後の所定時間経過してから予め定めた最小デューティでパルス幅変調制御を行うことを特徴とする請求項1、2、5のいずれか1項に記載のデジタル制御電源装置。 The said power supply control part performs pulse width modulation control by the predetermined minimum duty after predetermined time passes after the fall of the said alerting | reporting signal, The one of Claim 1, 2, 5 characterized by the above-mentioned. The digitally controlled power supply device described. 前記電源制御部は、前記報知信号の立ち上がり時点から前記パルス負荷の立ち下がり時点まで予め定めた最大デューティでパルス幅変調制御を行うことを特徴とする請求項1または2に記載のデジタル制御電源装置。 3. The digital control power supply apparatus according to claim 1, wherein the power supply control unit performs pulse width modulation control with a predetermined maximum duty from a rising point of the notification signal to a falling point of the pulse load. 4. . 前記電源制御部は、前記報知信号の立ち上がり後の所定時間経過してから前記パルス負荷の立ち下がり時点まで予め定めた最大デューティでパルス幅変調制御を行うことを特徴とする請求項1または2に記載のデジタル制御電源装置。 The power supply control unit performs pulse width modulation control at a predetermined maximum duty from a lapse of a predetermined time after the rising of the notification signal to a falling point of the pulse load. The digitally controlled power supply device described. 前記電源制御部は、前記DC/DCコンバータの入力電圧値毎に前記最大デューティの値を予め定め、前記入力電圧に応じた最大デューティでパルス幅変調制御を行うことを特徴とする請求項3、5、7、8のいずれか1項に記載のデジタル制御電源装置。 The power supply control unit predetermines a value of the maximum duty for each input voltage value of the DC / DC converter, and performs pulse width modulation control with a maximum duty according to the input voltage. The digitally controlled power supply device according to any one of 5, 7, and 8. 前記電源制御部は、前記報知信号を受信した際に、前記出力電圧の目標値を前記DC/DCコンバータの出力電圧の仕様上限値に変更することを特徴とする請求項1〜9のいずれか1項に記載のデジタル制御電源装置。 The said power supply control part changes the target value of the said output voltage to the specification upper limit of the output voltage of the said DC / DC converter, when the said alerting | reporting signal is received. The digitally controlled power supply device according to item 1. 前記報知信号は、前記パルス負荷の立ち上がりおよび前記パルス負荷の立ち下がりを事前に前記電源制御部に通知する信号であることを特徴とする請求項1に記載のデジタル制御電源装置。 The digital control power supply apparatus according to claim 1, wherein the notification signal is a signal that notifies the power supply control unit in advance of the rise of the pulse load and the fall of the pulse load.
JP2010034721A 2010-02-19 2010-02-19 Digital control power supply Active JP5458942B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010034721A JP5458942B2 (en) 2010-02-19 2010-02-19 Digital control power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010034721A JP5458942B2 (en) 2010-02-19 2010-02-19 Digital control power supply

Publications (2)

Publication Number Publication Date
JP2011172410A true JP2011172410A (en) 2011-09-01
JP5458942B2 JP5458942B2 (en) 2014-04-02

Family

ID=44685941

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010034721A Active JP5458942B2 (en) 2010-02-19 2010-02-19 Digital control power supply

Country Status (1)

Country Link
JP (1) JP5458942B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130096678A (en) * 2012-02-22 2013-08-30 램 리써치 코포레이션 State-based adjustment of power and frequency
JP2016519356A (en) * 2013-03-15 2016-06-30 クアルコム,インコーポレイテッド Voltage regulator
JP2017534236A (en) * 2014-11-12 2017-11-16 クゥアルコム・インコーポレイテッドQualcomm Incorporated Circuit and method for providing supply voltage control based on transient load prediction
US9842725B2 (en) 2013-01-31 2017-12-12 Lam Research Corporation Using modeling to determine ion energy associated with a plasma system
US10032605B2 (en) 2012-02-22 2018-07-24 Lam Research Corporation Methods and apparatus for controlling plasma in a plasma processing system
US10629413B2 (en) 2012-02-22 2020-04-21 Lam Research Corporation Adjustment of power and frequency based on three or more states
CN117578883A (en) * 2024-01-17 2024-02-20 上海思格新能源技术有限公司 Flyback circuit limiting loop, flyback circuit control method and optical storage system

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001103733A (en) * 1999-09-30 2001-04-13 Toshiba Corp Dc power source
JP2002159177A (en) * 2000-11-17 2002-05-31 Mitsubishi Electric Corp Power source for pulse load
JP2003199342A (en) * 2001-12-25 2003-07-11 Canon Inc Switching power supply, switching power system, image forming device, control method of switching power system, program, and memory medium
JP2005020927A (en) * 2003-06-27 2005-01-20 Shindengen Electric Mfg Co Ltd Dc-dc converter
JP2005020886A (en) * 2003-06-26 2005-01-20 Fuji Photo Film Co Ltd Switching power supply device and electronic apparatus
JP2006500897A (en) * 2002-09-26 2006-01-05 アイティーティー マニュファクチュアリング エンタープライズィズ インコーポレイテッド Power management system for variable load
JP2008113542A (en) * 2006-10-02 2008-05-15 Hitachi Ltd Digital control switching power supply and information processing apparatus
JP2008165583A (en) * 2006-12-28 2008-07-17 Fujitsu Ltd Circuit system, circuit unit, power feeding unit, and power feeding method
JP2008187771A (en) * 2007-01-26 2008-08-14 Fujitsu Ltd Power supply device and communication apparatus
WO2009042704A1 (en) * 2007-09-26 2009-04-02 Qualcomm Incorporated Switch mode power supply (smps) and methods thereof
JP2009257883A (en) * 2008-04-15 2009-11-05 Mitsubishi Electric Corp Radar dc power supply unit

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001103733A (en) * 1999-09-30 2001-04-13 Toshiba Corp Dc power source
JP2002159177A (en) * 2000-11-17 2002-05-31 Mitsubishi Electric Corp Power source for pulse load
JP2003199342A (en) * 2001-12-25 2003-07-11 Canon Inc Switching power supply, switching power system, image forming device, control method of switching power system, program, and memory medium
JP2006500897A (en) * 2002-09-26 2006-01-05 アイティーティー マニュファクチュアリング エンタープライズィズ インコーポレイテッド Power management system for variable load
JP2005020886A (en) * 2003-06-26 2005-01-20 Fuji Photo Film Co Ltd Switching power supply device and electronic apparatus
JP2005020927A (en) * 2003-06-27 2005-01-20 Shindengen Electric Mfg Co Ltd Dc-dc converter
JP2008113542A (en) * 2006-10-02 2008-05-15 Hitachi Ltd Digital control switching power supply and information processing apparatus
JP2008165583A (en) * 2006-12-28 2008-07-17 Fujitsu Ltd Circuit system, circuit unit, power feeding unit, and power feeding method
JP2008187771A (en) * 2007-01-26 2008-08-14 Fujitsu Ltd Power supply device and communication apparatus
WO2009042704A1 (en) * 2007-09-26 2009-04-02 Qualcomm Incorporated Switch mode power supply (smps) and methods thereof
JP2009257883A (en) * 2008-04-15 2009-11-05 Mitsubishi Electric Corp Radar dc power supply unit

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130096678A (en) * 2012-02-22 2013-08-30 램 리써치 코포레이션 State-based adjustment of power and frequency
JP2013191554A (en) * 2012-02-22 2013-09-26 Lam Research Corporation State-based adjustment of power and frequency
US10032605B2 (en) 2012-02-22 2018-07-24 Lam Research Corporation Methods and apparatus for controlling plasma in a plasma processing system
US10231321B2 (en) 2012-02-22 2019-03-12 Lam Research Corporation State-based adjustment of power and frequency
KR102025950B1 (en) 2012-02-22 2019-09-26 램 리써치 코포레이션 State-based adjustment of power and frequency
US10629413B2 (en) 2012-02-22 2020-04-21 Lam Research Corporation Adjustment of power and frequency based on three or more states
US9842725B2 (en) 2013-01-31 2017-12-12 Lam Research Corporation Using modeling to determine ion energy associated with a plasma system
JP2016519356A (en) * 2013-03-15 2016-06-30 クアルコム,インコーポレイテッド Voltage regulator
JP2017534236A (en) * 2014-11-12 2017-11-16 クゥアルコム・インコーポレイテッドQualcomm Incorporated Circuit and method for providing supply voltage control based on transient load prediction
CN117578883A (en) * 2024-01-17 2024-02-20 上海思格新能源技术有限公司 Flyback circuit limiting loop, flyback circuit control method and optical storage system
CN117578883B (en) * 2024-01-17 2024-03-29 上海思格新能源技术有限公司 Flyback circuit limiting loop, flyback circuit control method and optical storage system

Also Published As

Publication number Publication date
JP5458942B2 (en) 2014-04-02

Similar Documents

Publication Publication Date Title
JP5458942B2 (en) Digital control power supply
US8525502B2 (en) Digital pulse-frequency modulation controller for switch-mode power supplies with frequency targeting and ultrasonic modes
KR101877552B1 (en) DC-DC Converter
KR101677728B1 (en) Power factor correction circuit and driving method thereof
US9531266B2 (en) Power supply circuitry and adaptive transient control
JP2008228362A (en) Power supply unit
JP2012175868A (en) Device of controlling dc-dc converter
JP7101590B2 (en) Switching regulator
JP2009296840A (en) Switching power supply
US20120049824A1 (en) Power supply control circuits including enhanced ramp pulse modulation
CN106569432B (en) Control circuit and method for switching between control modes of power converter
US9203305B2 (en) Pulse width modulation power converter and control method employing different sets of PID coefficients
JP2016140168A (en) Device and method for voltage conversion
JP5721403B2 (en) Buck-boost circuit and buck-boost circuit control method
JP4701968B2 (en) Overvoltage protection circuit
JP2011130631A (en) Power supply unit
JP2010063231A (en) Switching regulator
EP3335307B1 (en) Device and method for processing an inductor current
JP2006166613A (en) Switching power supply
EP2638624B1 (en) Method for generating pwm signals and a pulse width modulation power converter
JP5188939B2 (en) Power conversion apparatus and control method thereof
JP4676211B2 (en) Switching regulator control circuit and switching regulator
JP2017055535A (en) Power conversion device for photovoltaic power generation and photovoltaic power generation system
JP2005261060A (en) Switching regulator
WO2020066111A1 (en) Switching power supply device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111020

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130326

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130402

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130516

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131217

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131230

R151 Written notification of patent or utility model registration

Ref document number: 5458942

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250