JP2011142756A - Apparatus and method for inspecting current transformation ratio - Google Patents

Apparatus and method for inspecting current transformation ratio Download PDF

Info

Publication number
JP2011142756A
JP2011142756A JP2010002376A JP2010002376A JP2011142756A JP 2011142756 A JP2011142756 A JP 2011142756A JP 2010002376 A JP2010002376 A JP 2010002376A JP 2010002376 A JP2010002376 A JP 2010002376A JP 2011142756 A JP2011142756 A JP 2011142756A
Authority
JP
Japan
Prior art keywords
current
current transformer
transformer
transformation ratio
remote monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010002376A
Other languages
Japanese (ja)
Other versions
JP5420431B2 (en
Inventor
Tetsuo Miura
哲郎 三浦
Seiji Hino
誠二 日野
Tenei Otsuka
天英 大塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2010002376A priority Critical patent/JP5420431B2/en
Publication of JP2011142756A publication Critical patent/JP2011142756A/en
Application granted granted Critical
Publication of JP5420431B2 publication Critical patent/JP5420431B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To inspect transformers of a remote monitoring controller regarding whether improper current transformation ratio has been set or not, to prevent setting error. <P>SOLUTION: In a current transformation ratio checker 1, a central processing unit determines that a current value (i.e., the sum of currents flowing through secondary coils of transformers constituting adjusting input units 11, 12a, 12b, ..., 12n) measured by a current measuring unit is proper when the current value is almost zero. In other cases, the central processing unit determines that the current value is improper. The central processing unit causes a display unit 14 to display the current value (and an error) and a determination result. When determining that the current value is improper, the central processing unit causes an alarm unit 13 to output an alarm sound. <P>COPYRIGHT: (C)2011,JPO&amp;INPIT

Description

この発明は、例えば、変電所等の電気所に設置される変流器の変流比の遠隔監視制御装置における設定を検査するための変流比検査装置及び変流比検査方法に関する。   The present invention relates to a current transformation ratio inspection device and a current transformation ratio inspection method for inspecting a setting in a remote monitoring and control device of a current transformation ratio of a current transformer installed in an electric station such as a substation.

従来より、変電所等の電気所の電力系統において、例えば、変圧器が、一次側で送電線に、二次側で下位の母線に接続され、母線には、複数の配電線が接続されているような場合に、変圧器の二次側(の母線の手前)や、配電線には、それぞれ、変流器が、所定の変流比に設定されて配置されている。変流器は、遠隔監視制御装置に接続され、計測された電流値は、伝送路を介して制御所に配置された中央制御装置へ送られ、中央制御装置の表示部に表示される(例えば、特許文献1参照。)。   Conventionally, in an electric power system of an electric station such as a substation, for example, a transformer is connected to a transmission line on the primary side and a lower bus on the secondary side, and a plurality of distribution lines are connected to the bus. In such a case, a current transformer is set to a predetermined current ratio on the secondary side of the transformer (before the bus) and the distribution line. The current transformer is connected to the remote monitoring control device, and the measured current value is sent to the central control device arranged at the control station via the transmission line and displayed on the display unit of the central control device (for example, , See Patent Document 1).

ところで、例えば、遠隔監視制御装置の取替工事では、単線結線図等の図面を見て、遠隔監視制御装置において多数の変流器の変流比を設定している。このため、図面の記載に誤りがあったとしても、これにより計測ポジション表が作成され、この通りに設定されてしまうことがある。また、誤った電流値が中央制御装置において表示されても見逃され、変電所での電流計の指示と照合を行う際にも、思込みで指示値を見てしまうと、誤りを見逃してしまい、ヒューマンエラーを引き起こしている。   By the way, for example, in the replacement work of the remote monitoring control device, the current monitoring ratios of a large number of current transformers are set in the remote monitoring control device by looking at a drawing such as a single line connection diagram. For this reason, even if there is an error in the description of the drawing, the measurement position table may be created and set in this way. In addition, even if an incorrect current value is displayed on the central control unit, it is overlooked, and when checking the instruction value with an assumption when checking the ammeter instruction at the substation, the error is overlooked. , Causing human error.

現状では、切替後の実負荷試験時には発見できずに、運用開始後の運転中や点検作業中に、誤設定が判明することもある。遠隔監視制御装置において誤った変流比が設定されると、誤った二次電流値が、中央制御装置において表示されるとともに、設備の過負荷運用や、過負荷遮断を引き起こしてしまう。   Currently, it cannot be detected during an actual load test after switching, and an incorrect setting may be found during operation or inspection after the start of operation. If an incorrect current ratio is set in the remote monitoring control device, an incorrect secondary current value is displayed in the central control device, and the facility overload operation or overload interruption is caused.

特開2000―249723号公報JP 2000-249723 A

しかしながら、上記従来技術では、ヒューマンエラーを完全になくすことは困難である。   However, it is difficult to completely eliminate human errors with the above-described conventional technology.

この発明は、前記の課題を解決し、遠隔監視制御装置における変流器の変流比の誤設定の有無を検査して、誤設定の防止に寄与することができる変流比検査装置及び変流比検査方法を提供することを目的としている。   The present invention solves the above-mentioned problems, inspects whether there is an erroneous setting of the current transformation ratio of the current transformer in the remote monitoring control device, and contributes to prevention of the erroneous setting. The purpose is to provide a flow ratio inspection method.

前記の課題を解決するために、請求項1の発明は、第1の回線と、前記第1の回線から分岐された複数の第2の回線と、前記第1の回線を流れる第1の電流を計測するための第1の変流器と、前記第2の回線を流れる第2の電流を計測するための複数の第2の変流器と、前記第1の変流器及び前記第2の変流器から、それぞれ計測用の第3の電流及び第4の電流が入力されるともに前記第1の変流器及び前記第2の変流器の変流比が設定される遠隔監視制御装置とが配置された電気所において用いられ、前記遠隔監視制御装置において設定された前記変流比の適否を検査するための変流比検査装置であって、前記遠隔監視制御装置において設定された前記変流比に基づいた、前記第3の電流と、前記第4の電流の合成との関係が、前記第1の電流と、前記第2の電流の合成とが略一致する関係に対応する場合に、前記遠隔監視制御装置において設定された前記変流比が適正であると判定されることを特徴としている。   In order to solve the above problems, the invention of claim 1 is directed to a first line, a plurality of second lines branched from the first line, and a first current flowing through the first line. A first current transformer for measuring current, a plurality of second current transformers for measuring a second current flowing through the second circuit, the first current transformer, and the second current transformer. Remote monitoring control in which a third current and a fourth current for measurement are respectively input from the current transformers and current transformation ratios of the first current transformer and the second current transformer are set. A current transformation ratio inspection device for inspecting the suitability of the current transformation ratio set in the remote monitoring control device, which is used in an electric station where the device is arranged, and is set in the remote monitoring control device Based on the current transformation ratio, the relationship between the third current and the composition of the fourth current is the first current. The flow, if the synthesis and of the second current corresponds to the relationship that substantially matches the current transformer ratio set in the remote monitoring and control device is characterized in that it is determined to be appropriate.

請求項1の発明では、第3の電流と第4の電流の合成との関係が、第1の電流と、第2の電流の合成とが略一致する関係に対応する場合に、遠隔監視制御装置において設定された変流比が適正であると判定される。   According to the first aspect of the present invention, when the relationship between the third current and the fourth current combination corresponds to a relationship in which the first current and the second current combination substantially coincide with each other, the remote monitoring control is performed. It is determined that the current transformation ratio set in the apparatus is appropriate.

請求項2の発明は、請求項1に記載の変流比検査装置であって、前記第3の電流を一次電流とする第3の変流器と、前記第4の電流を一次電流とする複数の第4の変流器とを備え、前記第1の変流器及び前記第3の変流器の変流比の積と、前記第2の変流器及び前記第4の変流器の変流比の積とが略一致するように、前記第3の変流器及び前記第4の変流器の変流比が設定された場合に、前記第3の変流器の二次電流としての第5の電流と、前記第4の変流器の二次電流としての第6の電流の合成とが略一致するときに、前記遠隔監視制御装置において設定された前記変流比が適正であると判定されることを特徴としている。   The invention according to claim 2 is the current transformation ratio inspection device according to claim 1, wherein the third current transformer uses the third current as a primary current, and the fourth current serves as a primary current. A plurality of fourth current transformers, a product of current transformation ratios of the first current transformer and the third current transformer, and the second current transformer and the fourth current transformer. When the current transformation ratios of the third current transformer and the fourth current transformer are set so that the products of the current transformation ratios of the third current transformer and the fourth current transformer are substantially the same, the secondary current of the third current transformer When the fifth current as the current substantially matches the synthesis of the sixth current as the secondary current of the fourth current transformer, the current transformation ratio set in the remote monitoring control device is It is characterized by being determined to be appropriate.

請求項3の発明は、請求項2に記載の変流比検査装置であって、前記第3の変流器及び前記第4の変流器の変流比を設定するためのタップ切替器を備え、前記タップ切替器は、各タップに対応し固定された複数の接触端子と、前記接触端子に対応したスライド可能な可動金具とを有し、タップ切替途中は、切替操作前に接触していた前記可動金具及び前記接触端子を接触させるように構成されていることを特徴としている。   A third aspect of the present invention is the current transformation ratio inspection device according to the second aspect, wherein a tap switch for setting a current transformation ratio of the third current transformer and the fourth current transformer is provided. The tap changer has a plurality of contact terminals fixed corresponding to each tap and a slidable movable fitting corresponding to the contact terminal, and is in contact before the switching operation during the tap switching. Further, the movable metal fitting and the contact terminal are configured to contact each other.

請求項4の発明は、請求項2又は3に記載の変流比検査装置であって、前記第3の変流器は、前記第3の電流を逆極性で取り込むように接続されることを特徴としている。   A fourth aspect of the present invention is the current transformation ratio inspection device according to the second or third aspect, wherein the third current transformer is connected so as to capture the third current with a reverse polarity. It is a feature.

請求項5の発明は、第1の回線と、前記第1の回線から分岐された複数の第2の回線と、前記第1の回線を流れる第1の電流を計測するための第1の変流器と、前記第2の回線を流れる第2の電流を計測するための複数の第2の変流器と、前記第1の変流器及び前記第2の変流器から、それぞれ計測用の第3の電流及び第4の電流が入力されるともに前記第1の変流器及び前記第2の変流器の変流比が設定される遠隔監視制御装置とが配置された電気所において用いられ、前記遠隔監視制御装置において設定された前記変流比の適否を検査するための変流比検査方法であって、前記遠隔監視制御装置において設定された前記変流比に基づいた、前記第3の電流と、前記第4の電流の合成との関係が、前記第1の電流と、前記第2の電流の合成とが略一致する関係に対応する場合に、前記遠隔監視制御装置において設定された前記変流比が適正であると判定されることを特徴としている。   According to a fifth aspect of the present invention, there is provided a first variable for measuring a first line, a plurality of second lines branched from the first line, and a first current flowing through the first line. A current transformer, a plurality of second current transformers for measuring a second current flowing through the second circuit, a first current transformer, and a second current transformer for measurement. A remote monitoring and control device in which the third current and the fourth current are input and the current transformer ratio of the first current transformer and the second current transformer is set. A current transformation ratio inspection method for inspecting the suitability of the current transformation ratio set in the remote monitoring and control device, based on the current transformation ratio set in the remote monitoring and control device, The relationship between the third current and the composition of the fourth current is the composition of the first current and the second current. There when corresponding relationship substantially matching, the current transformer ratio set in the remote monitoring and control device is characterized in that it is determined to be appropriate.

請求項1の発明によれば、第3の電流と第4の電流の合成との関係が、第1の電流と、第2の電流の合成とが略一致する関係に対応する場合に、遠隔監視制御装置において設定された変流比が適正であると判定されるので、遠隔監視制御装置における変流器の変流比の誤設定の有無を検査して、誤設定の防止に寄与することができる。   According to the first aspect of the present invention, when the relationship between the third current and the fourth current combination corresponds to a relationship in which the first current and the second current combination substantially match, Since it is determined that the current transformation ratio set in the monitoring and control device is appropriate, the presence or absence of incorrect setting of the current transformation ratio of the current transformer in the remote monitoring and control device is examined to contribute to prevention of erroneous setting. Can do.

請求項2の発明によれば、第1の変流器及び第3の変流器の変流比の積と、第2の変流器及び第4の変流器の変流比の積とが略一致するように、第3の変流器及び第4の変流器の変流比が設定された場合に、第5の電流と、第6の電流の合成とが略一致するときに、遠隔監視制御装置において設定された変流比が適正であると判定されるので、遠隔監視制御装置における変流器の変流比の誤設定の有無を確実に検査することができる。   According to invention of Claim 2, the product of the current transformation ratio of a 1st current transformer and a 3rd current transformer, and the product of the current transformation ratio of a 2nd current transformer and a 4th current transformer, When the current ratio of the third current transformer and the fourth current transformer is set so that the currents substantially match, the fifth current and the composition of the sixth current substantially match Since it is determined that the current transformation ratio set in the remote monitoring and control apparatus is appropriate, it is possible to reliably check whether or not there is an erroneous setting of the current transformation ratio of the current transformer in the remote monitoring and control apparatus.

請求項3の発明によれば、タップ切替途中は、切替操作前に接触していた可動金具及び接触端子を接触させるように構成されているので、切替時に、回路が開放されることがなく、円滑に検査を行うことできる。   According to the invention of claim 3, during the tap switching, it is configured to contact the movable metal fitting and the contact terminal that were in contact before the switching operation, so that the circuit is not opened at the time of switching, Inspection can be performed smoothly.

請求項4の発明によれば、第3の変流器は、第3の電流を逆極性で取り込むように接続されるので、第4の変流器と接続して、電流の合成結果が略0か否かで適否の判定を行うことができ、簡単かつ円滑に検査を行うことができる。   According to the invention of claim 4, since the third current transformer is connected so as to capture the third current with the reverse polarity, the third current transformer is connected to the fourth current transformer, and the result of current synthesis is substantially reduced. Whether it is 0 or not can be judged as appropriate, and the inspection can be performed easily and smoothly.

請求項5の発明によれば、第3の電流と第4の電流の合成との関係が、第1の電流と、第2の電流の合成とが略一致する関係に対応する場合に、遠隔監視制御装置において設定された変流比が適正であると判定されるので、遠隔監視制御装置における変流器の変流比の誤設定の有無を検査して、誤設定の防止に寄与することができる。   According to the invention of claim 5, when the relationship between the combination of the third current and the fourth current corresponds to the relationship in which the combination of the first current and the second current substantially matches, Since it is determined that the current transformation ratio set in the monitoring and control device is appropriate, the presence or absence of incorrect setting of the current transformation ratio of the current transformer in the remote monitoring and control device is examined to contribute to prevention of erroneous setting. Can do.

この発明の一実施の形態に係る制御所及び電気所の構成を説明するための説明図である。It is explanatory drawing for demonstrating the structure of the control center and electric station which concern on one embodiment of this invention. この発明の一実施の形態による変流比チェッカの構成を模式的に示す斜視図である。It is a perspective view which shows typically the structure of the current transformation ratio checker by one Embodiment of this invention. 同変流比チェッカによる変流比の検査のために用いられる4極のCTTプラグの構成を説明するための説明図であって、同図(a)は、同CTTプラグの構成を示す斜視図、同図(b)は、同CTTプラグの端子を示す図である。It is explanatory drawing for demonstrating the structure of the 4-pole CTT plug used for the inspection of the current transformation ratio by the current transformation ratio checker, The figure (a) is a perspective view which shows the structure of the CTT plug. FIG. 4B is a diagram showing terminals of the CTT plug. 同変流比チェッカによる変流比の検査のために用いられる2極のCTTプラグの構成を説明するための説明図であって、同図(a)は、同CTTプラグの構成を示す斜視図、同図(b)は、同CTTプラグの端子を示す図である。It is explanatory drawing for demonstrating the structure of the 2 pole CTT plug used for the inspection of the current ratio by the current ratio checker, The figure (a) is a perspective view which shows the structure of the same CTT plug. FIG. 4B is a diagram showing terminals of the CTT plug. 同変流比チェッカの構成を示す回路図である。It is a circuit diagram which shows the structure of the same current ratio checker. 同電気所の構成を説明するための説明図である。It is explanatory drawing for demonstrating the structure of the same electric station. 同電気所に配置された遠隔監視制御装置のTC盤の構成を説明するための説明図である。It is explanatory drawing for demonstrating the structure of TC board of the remote monitoring control apparatus arrange | positioned in the same electric station. 同変流比チェッカ、及び同CTTプラグを用いた変流比の検査方法を説明するための説明図である。It is explanatory drawing for demonstrating the inspection method of the current transformation ratio using the same current transformation ratio checker and the same CTT plug. 同変流比チェッカ、及び同CTTプラグを用いた変流比の検査方法を説明するための説明図であって、同TC盤のCTTターミナルに同CTTプラグが挿入された状態を示す図である。It is explanatory drawing for demonstrating the inspection method of the current transformation ratio using the same current ratio checker and the same CTT plug, Comprising: It is a figure which shows the state by which the same CTT plug was inserted in the CTT terminal of the same TC board. . 同変流比チェッカと4極の同CTTプラグとの接続方法を説明するための説明図である。It is explanatory drawing for demonstrating the connection method of the same current ratio checker and the same CTT plug of 4 poles. 同変流比チェッカと2極の同CTTプラグとの接続方法を説明するための説明図である。It is explanatory drawing for demonstrating the connection method of the same current ratio checker and the same CTT plug of 2 poles. 同変流比チェッカのタップ切替器の構成及びタップ設定方法を説明するための説明図である。It is explanatory drawing for demonstrating the structure of the tap switch of the same current ratio checker, and a tap setting method. 同変流比チェッカにおけるタップ設定方法を説明するための説明図である。It is explanatory drawing for demonstrating the tap setting method in the same current ratio checker.

次に、この発明の実施の形態について、図面を用いて詳しく説明する。   Next, embodiments of the present invention will be described in detail with reference to the drawings.

図1は、この発明の一実施の形態に係る制御所及び電気所の構成を説明するための説明図、図2は、この発明の一実施の形態による変流比チェッカの構成を模式的に示す斜視図、図3は、同変流比チェッカによる変流比の検査のために用いられる4極のCTTプラグの構成を説明するための説明図であって、同図(a)は、同CTTプラグの構成を示す斜視図、同図(b)は、同CTTプラグの端子を示す図、図4は、同変流比チェッカによる変流比の検査のために用いられる2極のCTTプラグの構成を説明するための説明図であって、同図(a)は、同CTTプラグの構成を示す斜視図、同図(b)は、同CTTプラグの端子を示す図、図5は、同変流比チェッカの構成を示す回路図、図6は、同電気所の構成を説明するための説明図、図7は、同電気所に配置された遠隔監視制御装置のTC盤の構成を説明するための説明図、図8は、同変流比チェッカ、及び同CTTプラグを用いた変流比の検査方法を説明するための説明図、図9は、同変流比チェッカ、及び同CTTプラグを用いた変流比の検査方法を説明するための説明図であって、同TC盤のCTTターミナルに同CTTプラグが挿入された状態を示す図、図10は、同変流比チェッカと4極の同CTTプラグとの接続方法を説明するための説明図、図11は、同変流比チェッカと2極の同CTTプラグとの接続方法を説明するための説明図、図12は、同変流比チェッカのタップ切替器の構成及びタップ設定方法を説明するための説明図、図13は、同変流比チェッカにおけるタップ設定方法を説明するための説明図である。   FIG. 1 is an explanatory diagram for explaining the configuration of a control station and an electric station according to one embodiment of the present invention, and FIG. 2 schematically shows the configuration of a current transformation ratio checker according to one embodiment of the present invention. FIG. 3 is an explanatory diagram for explaining a configuration of a four-pole CTT plug used for inspecting a current transformation ratio by the current transformation ratio checker, and FIG. The perspective view which shows the structure of a CTT plug, the figure (b) is a figure which shows the terminal of the CTT plug, and FIG. 4 is a 2 pole CTT plug used for the inspection of the current transformation ratio by the current transformation ratio checker. FIG. 5A is a perspective view showing the configuration of the CTT plug, FIG. 5B is a diagram showing terminals of the CTT plug, and FIG. The circuit diagram which shows the structure of the same current ratio checker, FIG. 6 is explanatory drawing for demonstrating the structure of the same electric station, 7 is an explanatory diagram for explaining the configuration of a TC board of a remote monitoring and control device disposed in the same electric station, and FIG. 8 is a current ratio comparison checker and a current ratio inspection method using the same CTT plug. FIG. 9 is an explanatory diagram for explaining a current ratio inspection method using the same current ratio checker and the same CTT plug, and is similar to the CTT terminal of the same TC board. FIG. 10 is a diagram showing a state in which the CTT plug is inserted, FIG. 10 is an explanatory diagram for explaining a connection method between the current transformation ratio checker and the 4-pole CTT plug, and FIG. 12 is an explanatory diagram for explaining a method of connecting the poles with the same CTT plug, FIG. 12 is an explanatory diagram for explaining the configuration of the tap changer and the tap setting method of the same current ratio checker, and FIG. Explanation for explaining tap setting method in flow ratio checker It is.

図2及び図5に示すような、この実施の形態の変流比チェッカ1は、図1に示すように、電気所Bに配置された遠隔監視制御装置2において設定されている変流器Ta,Tb1,Tb2,…の変流比を検査するために用いられる。遠隔監視制御装置2は、伝送路3を介して制御所Aに配置された中央制御装置4に接続され、電流値は、中央制御装置4の表示部5に表示されるとともに、電気所Bに配置された電流計6によって指示される。なお、電気所Bにおける電力系統において、例えば、図1及び図6に示すように、変圧器Trが、一次側で送電線L0に、二次側で下位の母線B1に接続され、母線B1には、配電線L1,L2,…が接続されている。変圧器Trの二次側には変流器Taが、配電線L1,L2,…には、それぞれ、変流器Tb1,Tb2,…が配置されている。   As shown in FIG. 1, a current transformer ratio checker 1 of this embodiment as shown in FIG. 2 and FIG. 5 is a current transformer Ta set in a remote monitoring control device 2 arranged at an electric station B. , Tb1, Tb2,... The remote monitoring control device 2 is connected to the central control device 4 disposed in the control station A via the transmission path 3, and the current value is displayed on the display unit 5 of the central control device 4 and also to the electric station B. Indicated by the arranged ammeter 6. In the power system at the electric station B, for example, as shown in FIGS. 1 and 6, the transformer Tr is connected to the power transmission line L0 on the primary side and to the lower bus B1 on the secondary side, and connected to the bus B1. Are connected to the distribution lines L1, L2,. A current transformer Ta is arranged on the secondary side of the transformer Tr, and current transformers Tb1, Tb2,... Are arranged on the distribution lines L1, L2,.

また、遠隔監視制御装置2は、図7に示すように、変流器回路にCTTターミナル8a,8b,…、9a,9b,…が組み込まれたTC盤7を含み、変圧器Trの二次側の線路(第1の回線)を流れる二次電流I0や、各配電線(第2の回線)L1,L2,…のフィーダ電流I1,I2,…等の計測値は、中央制御装置4へ伝送される。   Further, as shown in FIG. 7, the remote monitoring and control device 2 includes a TC board 7 in which CTT terminals 8a, 8b,..., 9a, 9b,. The measured values of the secondary current I0 flowing through the side line (first line) and the feeder currents I1, I2,... Of each distribution line (second line) L1, L2,. Is transmitted.

変流比チェッカ1は、図2及び図5に示すように、電流計測部10と、調整入力部11,12a,12b,…,12nと、警報部13と、表示部14と、中央処理部(不図示)とを有し、それぞれ、筐体17に収納又は取り付けられている。   As shown in FIGS. 2 and 5, the current ratio checker 1 includes a current measurement unit 10, adjustment input units 11, 12a, 12b,..., 12n, an alarm unit 13, a display unit 14, and a central processing unit. (Not shown), and each is housed or attached to the housing 17.

変流比チェッカ1は、図3に示すような4極のCTTプラグ23を介して、TC盤7のCTTターミナル8a(8b,8c,…)に接続されるとともに、図4に示すような2極のCTTプラグ24を介して、TC盤7のCTTターミナル9a(9b,9c,…)に接続される。なお、端子t2には、入力変換器25が、端子ta4(tb4,tc4,…)には、入力変換器26a(26b,26c,…)が、それぞれ接続されている。   The current ratio checker 1 is connected to a CTT terminal 8a (8b, 8c,...) Of the TC board 7 via a 4-pole CTT plug 23 as shown in FIG. It is connected to the CTT terminal 9a (9b, 9c,...) Of the TC board 7 through the pole CTT plug 24. The input converter 25 is connected to the terminal t2, and the input converter 26a (26b, 26c,...) Is connected to the terminal ta4 (tb4, tc4,...).

調整入力部11(12a,12b,…,12n)は、変流器15(16a,16b,…,16n)と、スライド式のタップ切替器と、端子18a,19a、21a,22a(21b,22b、…、21n,22n)とを有している。   The adjustment input unit 11 (12a, 12b,..., 12n) includes a current transformer 15 (16a, 16b,..., 16n), a sliding tap switch, and terminals 18a, 19a, 21a, 22a (21b, 22b). ,..., 21n, 22n).

タップ切替器は、図12及び図13に示すように、変成器の二次巻線54のN1タップ、N1/2タップ、N/4タップに対応する接触端子55a,55b,55cがスライドボックス58に配置され、接触端子55a,55b,55cに対応したスライド金具56a,56b,56cが絶縁連結部59によってスライド可能に連結されて概略構成されている。   12 and 13, the tap changer includes contact terminals 55a, 55b, and 55c corresponding to N1, N1 / 2, and N / 4 taps of the secondary winding 54 of the transformer. The slide fittings 56a, 56b, and 56c corresponding to the contact terminals 55a, 55b, and 55c are slidably connected by the insulating connection portion 59, and are schematically configured.

なお、図12及び図13においては、調整入力部11(12a,12b,…,12n)のタップ切替器を共通の符号を用いて示している。すなわち、接触端子55a,55b,55cは、端子t3,t4,t5(ta5,ta6,ta7、…、tn5,tn6,tn7)に対応し、端子61a,61b,61cは、端子t6,t7,t8(ta8,ta9,ta10、…、tn8,tn9,tn10)に対応し、端子57a,57bは、端子t9,t10(ta11,ta12、…、tn11,tn12)に対応している。   In FIG. 12 and FIG. 13, the tap switch of the adjustment input unit 11 (12a, 12b,..., 12n) is shown using a common code. That is, the contact terminals 55a, 55b, and 55c correspond to the terminals t3, t4, and t5 (ta5, ta6, ta7,..., Tn5, tn6, and tn7), and the terminals 61a, 61b, and 61c correspond to the terminals t6, t7, and t8. (Ta8, ta9, ta10,..., Tn8, tn9, tn10), and the terminals 57a, 57b correspond to the terminals t9, t10 (ta11, ta12,..., Tn11, tn12).

変流器15の一次巻線の両端は、端子18a,19aに接続され、CTTプラグ23を介して、CTTターミナル8a(8b,8c,…)の端子t1,t2に接続される。また、変流器15の二次巻線の両端は、端子t3,t10に接続され、中間点はt4に、中間点と一端との中間点は端子t5に、それぞれ接続され、端子t3,t4,t5は、対応する端子t6,t7,t8と接続又は非接続とされることで、タップ切替がなされる。   Both ends of the primary winding of the current transformer 15 are connected to terminals 18a and 19a, and are connected to terminals t1 and t2 of a CTT terminal 8a (8b, 8c,...) Via a CTT plug 23. Further, both ends of the secondary winding of the current transformer 15 are connected to terminals t3 and t10, an intermediate point is connected to t4, an intermediate point between the intermediate point and one end is connected to a terminal t5, and terminals t3 and t4. , T5 are connected to or disconnected from the corresponding terminals t6, t7, t8, so that tap switching is performed.

また、変成器15においてのみ、電流Iaを逆極性で取り込むように接続する。これにより、適正な場合は、電流Icは、電流Id1+Id2+…と大きさが略等しくなり、電流計測部10で計測される電流は略0となる。   Further, only the transformer 15 is connected so as to capture the current Ia with the reverse polarity. Thus, when appropriate, the current Ic is substantially equal in magnitude to the currents Id1 + Id2 +... And the current measured by the current measuring unit 10 is substantially zero.

ここで、端子t3が選択され、端子t3,t6が接続されると、二次電流が流れる部分の二次巻線の巻数N2は、一次巻線の巻数N1に対して、N2=N1となり、端子t4が選択され、端子t4,t7が接続されると、二次巻線の上記巻数N2は、一次巻線の巻数N1に対して、N2=N1/2となり、端子t5が選択され、端子t5,t8が接続されると、二次巻線の巻数N2は、一次巻線の巻数N1に対して、N2=N1/4となる。   Here, when the terminal t3 is selected and the terminals t3 and t6 are connected, the number of turns N2 of the secondary winding in the portion through which the secondary current flows becomes N2 = N1 with respect to the number of turns N1 of the primary winding. When the terminal t4 is selected and the terminals t4 and t7 are connected, the number of turns N2 of the secondary winding is N2 = N1 / 2 with respect to the number of turns N1 of the primary winding, the terminal t5 is selected, and the terminal When t5 and t8 are connected, the number of turns N2 of the secondary winding is N2 = N1 / 4 with respect to the number of turns N1 of the primary winding.

すなわち、変流器Taにおける変流比をNaとすると、N1タップ(端子t3選択)の場合は、(N1(I0/Na)=N1(I0/Na))となり、N1/2タップ(端子t4選択)の場合は、(N1(I0/Na)=(N1/2)(2I0/Na))となり、N1/4タップ(端子t5選択)の場合は、(N1(I0/Na)=(N1/4)(4I0/Na))となる。   That is, assuming that the current transformation ratio in the current transformer Ta is Na, in the case of N1 tap (terminal t3 selection), (N1 (I0 / Na) = N1 (I0 / Na)) and N1 / 2 tap (terminal t4) (N1 (I0 / Na) = (N1 / 2) (2I0 / Na)) in the case of selection), and (N1 (I0 / Na) = (N1) in the case of N1 / 4 tap (terminal t5 selection). / 4) (4I0 / Na)).

同様にして、変流器16a(16b,…,16n)の一次巻線の両端は、端子21a,22a(21b,22b、…、21n,22n)に接続され、CTTプラグ24を介して、CTTターミナル9a(9b,9c,…)の端子ta3,ta4(tb3,tb4,…,tn3,tn4)に接続される。   Similarly, both ends of the primary winding of the current transformer 16a (16b,..., 16n) are connected to terminals 21a, 22a (21b, 22b,..., 21n, 22n), and the CTT is connected via the CTT plug 24. .. Are connected to terminals ta3, ta4 (tb3, tb4,..., Tn3, tn4) of the terminal 9a (9b, 9c,...).

また、変流器16a(16b,…,16n)の二次巻線の両端は、端子ta5,ta12(tb5,tb12,…,tn5,tn12)に接続され、中間点はta6(tb6,…,tn6)に、中間点と一端との中間点は端子ta7(tb7,…,tn7)に、それぞれ接続され、端子ta5(tb5,…,tn5),ta6(tb6,…,tn6),ta7(tb7,…,tn7)は、対応する端子ta8(tb8,…,tn8),ta9(tb9,…,tn9),ta10(tb10,…,tn10)と接続又は非接続とされることで、タップ切替がなされる。   Further, both ends of the secondary winding of the current transformer 16a (16b,..., 16n) are connected to terminals ta5, ta12 (tb5, tb12,..., Tn5, tn12), and the intermediate points are ta6 (tb6,. tn6), the intermediate point between the intermediate point and one end is connected to the terminal ta7 (tb7,..., tn7), respectively, and the terminals ta5 (tb5,..., tn5), ta6 (tb6,..., tn6), ta7 (tb7) ,..., Tn7) are connected to or disconnected from the corresponding terminals ta8 (tb8,..., Tn8), ta9 (tb9,..., Tn9), ta10 (tb10,..., Tn10). Made.

ここで、端子ta5(tb5,…,tn5)が選択され、端子ta5(tb5,…,tn5),ta8(tb8,…,tn8)が接続されると、二次電流が流れる部分の二次側巻線の巻数N2は、一次側巻線の巻数N1に対して、N2=N1となり、端子ta6(tb6,…,tn6)が選択され、端子ta6(tb6,…,tn6),ta9(tb9,…,tn9)が接続されると、二次側巻線の上記巻数N2は、一次側巻線の巻数N1に対して、N2=N1/2となり、端子ta7(tb7,…,tn7)が選択され、端子ta7(tb7,…,tn7),ta10(tb10,…,tn10)が接続されると、二次巻線の上記巻数N2は、一次巻線の巻数N1に対して、N2=N1/4となる。   Here, when the terminal ta5 (tb5, ..., tn5) is selected and the terminals ta5 (tb5, ..., tn5) and ta8 (tb8, ..., tn8) are connected, the secondary side of the portion where the secondary current flows The number of turns N2 of the winding is N2 = N1 with respect to the number of turns N1 of the primary winding, and the terminals ta6 (tb6,..., Tn6) are selected, and the terminals ta6 (tb6,..., Tn6), ta9 (tb9, tb9, .., Tn9) are connected, the number of turns N2 of the secondary winding is N2 = N1 / 2 with respect to the number of turns N1 of the primary winding, and the terminal ta7 (tb7,..., Tn7) is selected. When the terminals ta7 (tb7,..., Tn10) and ta10 (tb10,..., Tn10) are connected, the number of turns N2 of the secondary winding is N2 = N1 / with respect to the number of turns N1 of the primary winding. 4

また、例えば、端子ta12と、端子tb8に接続された端子tb11とが接続され、各変流器15(16a,16b,…,16n)の二次側巻線は、直列に接続される。また、端子ta8に接続された端子ta11と、端子t10とは、電流計測部10に接続される。   For example, the terminal ta12 and the terminal tb11 connected to the terminal tb8 are connected, and the secondary windings of the current transformers 15 (16a, 16b,..., 16n) are connected in series. The terminal ta11 connected to the terminal ta8 and the terminal t10 are connected to the current measuring unit 10.

タップ設定は、遠隔監視制御装置2において変流比に基づいて、変流比が最も小さい配電線用の変流器に対応する調整入力部12a(12b,…,12n)における設定をベースとして、例えば、この調整入力部12a(12b,…,12n)において、N1タップとして、二次電流を小さくし、他の調整入力部11(12a,12b,…,12n)において、N1/2タップ、N1/4タップ等とする。   The tap setting is based on the setting in the adjustment input unit 12a (12b, ..., 12n) corresponding to the current transformer for the distribution line having the smallest current transformation ratio based on the current transformation ratio in the remote monitoring and control device 2. For example, in the adjustment input unit 12a (12b,..., 12n), the secondary current is reduced as the N1 tap, and in the other adjustment input units 11 (12a, 12b,..., 12n), the N1 / 2 tap, N1 / 4 tap.

例えば、調整入力部11,12a,12b,…で、変流器Ta,Tb1,Tb2,…の変流比が、1200/5、600/5、300/5,…等と設定されていれば、N1/4タップ、N1/2タップ、N1タップ、…等と設定する。   For example, if the current input ratios of the current transformers Ta, Tb1, Tb2,... Are set to 1200/5, 600/5, 300/5,. , N1 / 4 tap, N1 / 2 tap, N1 tap,...

一般には、遠隔監視制御装置2において設定されている変流器Ta,Tb1,Tb2,…の変流比をα0,α1,α2,…とし、タップ設定する変流器15,16a,16b,…の変流比をβ0,β1,β2,…として、(α0β0=α1β1=α2β2=…)となるように、各変流器15(16a,16b,…)についてタップ設定を行えば良い。これにより、変流器16a,16b,…の二次電流の合成結果と、変流器15の二次電流とを比較して、両者が一致するか否かによって、検査(変流比の適否の判定)を行うことができる。   In general, the current transformer ratios of the current transformers Ta, Tb1, Tb2,... Set in the remote monitoring control device 2 are α0, α1, α2,..., And the current transformers 15, 16a, 16b,. Is set to each of the current transformers 15 (16a, 16b,...) Such that (α0β0 = α1β1 = α2β2 =...). As a result, the combined result of the secondary currents of the current transformers 16a, 16b,... And the secondary current of the current transformer 15 are compared. Determination).

上記中央処理部は、電流計測部10で計測された電流値(すなわち、各変流器15(16a,16b,…,16n)の二次巻線に流れる電流の合成結果)が、略0の場合は、適正、これ以外の場合は、不適正と判定し、電流値(及び誤差)と判定結果とを、表示部14に表させるとともに、不適正と判定した場合には、警報部13に警報音を出力させる。   In the central processing unit, the current value measured by the current measuring unit 10 (that is, the combined result of the currents flowing through the secondary windings of the current transformers 15 (16a, 16b,..., 16n)) is substantially zero. If it is determined to be inappropriate, otherwise it is determined to be inappropriate, and the current value (and error) and the determination result are displayed on the display unit 14. An alarm sound is output.

例えば、図5に示すように、n=2で、Ia=5A、Ib1=5A、Ib2=5Aの場合に、変流器Tb2の変流比が、遠隔監視制御装置2において、600/5のところ、誤って300/5に設定されていると、調整入力部12bでN1タップとし、変流比が600/5の変流器Tb1に対応する調整入力部12aでN1/2タップとし、変流比が1200/5の変流器Taに対応する調整入力部11でN1タップ/4とすることとなる。この場合は、Ic=20A、Id1=−10A、Id2=−5Aで、ΣI=20−10−5=5Aとなり、300Aの差分が生じていることがわかり、不適正と判定される。   For example, as shown in FIG. 5, when n = 2, Ia = 5A, Ib1 = 5A, Ib2 = 5A, the current transformation ratio of the current transformer Tb2 is 600/5 in the remote monitoring control device 2. However, if it is set to 300/5 by mistake, the adjustment input unit 12b uses N1 taps, and the adjustment input unit 12a corresponding to the current transformer Tb1 with a current conversion ratio of 600/5 uses N1 / 2 taps. The adjustment input unit 11 corresponding to the current transformer Ta having a flow ratio of 1200/5 is set to N1 tap / 4. In this case, Ic = 20A, Id1 = −10A, Id2 = −5A, and ΣI = 20−10−5 = 5A, which indicates that a difference of 300A occurs, and is determined to be inappropriate.

これに対して、変流器Tb2の変流比が、遠隔監視制御装置2において、正しく600/5に設定されていると、調整入力部12bでN1/2タップとし、調整入力部12aでN1/2タップとし、調整入力部11でN1タップ/4とすることとなる。この場合は、Ic=20A、Id1=−10A、Id2=−10Aで、ΣI=0Aとなり、適正と判定される。   On the other hand, if the current transformation ratio of the current transformer Tb2 is correctly set to 600/5 in the remote monitoring control device 2, the adjustment input unit 12b sets N1 / 2 taps, and the adjustment input unit 12a sets N1. / 2 taps, and the adjustment input unit 11 sets N1 taps / 4. In this case, Ic = 20A, Id1 = −10A, Id2 = −10A, and ΣI = 0A.

CTTプラグ23は、図3に示すように、上下に互いに絶縁された各一対の接触子27,28が絶縁板29に設けられ、一対の接触子27,28の反対側には、同軸上に配設された一対の端子31a,31b(32a,32b、33a,33b、34a,34b)が接触子27,28に接続されて概略構成されている。   As shown in FIG. 3, the CTT plug 23 includes a pair of contacts 27 and 28 that are insulated from each other on the insulating plate 29. The CTT plug 23 is coaxially disposed on the opposite side of the pair of contacts 27 and 28. A pair of arranged terminals 31a and 31b (32a, 32b, 33a, 33b, 34a, 34b) are connected to the contacts 27, 28 and are schematically configured.

CTTプラグ24は、図4に示すように、上下に互いに絶縁された各一対の接触子36,37が絶縁板38に設けられ、一対の接触子36,37の反対側には、同軸上に配設された一対の端子39a,39b(41a,41b)が接触子36,37に接続されて概略構成されている。   As shown in FIG. 4, the CTT plug 24 is provided with a pair of contacts 36 and 37 insulated from each other on the insulating plate 38, and on the opposite side of the pair of contacts 36 and 37, coaxially. A pair of arranged terminals 39a and 39b (41a and 41b) is connected to the contacts 36 and 37 and is schematically configured.

次に、図8乃至図13を参照して、変流比チェッカ1の動作について説明する。まず、変流比チェッカ1の調整入力部11(12a,12b,…,12n)において、タップ設定を行う。タップ設定は、遠隔監視制御装置2において設定されている変流比に基づいて、変流比が最も小さい配電線用の変流器に対応する調整入力部12a(12b,…,12n)における設定をベースとして、例えば、この調整入力部12a(12b,…,12n)において、N1タップとして、二次電流を小さくし、他の調整入力部11(12a,12b,…,12n)において、N1/2タップ、N1/4タップ等とする。   Next, the operation of the current transformation ratio checker 1 will be described with reference to FIGS. First, tap setting is performed in the adjustment input unit 11 (12a, 12b,..., 12n) of the current transformation ratio checker 1. The tap setting is set in the adjustment input unit 12a (12b,..., 12n) corresponding to the current transformer for the distribution line having the smallest current transformation ratio based on the current transformation ratio set in the remote monitoring control device 2. For example, in this adjustment input unit 12a (12b,..., 12n), the secondary current is reduced as an N1 tap, and in other adjustment input units 11 (12a, 12b,..., 12n), N1 / 2 taps, N1 / 4 taps, etc.

例えば、調整入力部11,12a,12b,…で、変流器Ta,Tb1,Tb2,…の変流比が、1200/5、600/5、300/5,…等と設定されていれば、N1/4タップ、N1/2タップ、N1タップ、…等と設定する。   For example, if the current input ratios of the current transformers Ta, Tb1, Tb2,... Are set to 1200/5, 600/5, 300/5,. , N1 / 4 tap, N1 / 2 tap, N1 tap,...

次に、図8及び図9に示すように、変流比チェッカ1を、CTTプラグ23,24を介して、遠隔監視制御装置2のTC盤7に接続する。すなわち、図8及び図10に示すように、変流比チェッカ1の端子18a,19aと、CTTプラグ23の端子32a,32bとを配線r1,r2によって、接続する。ここで、導通金具51a,51b,51cによって、計測対象外の端子31a,31b、端子33a,33b、端子34a,34bは、短絡させておく。   Next, as shown in FIGS. 8 and 9, the current transformation ratio checker 1 is connected to the TC board 7 of the remote monitoring control device 2 via the CTT plugs 23 and 24. That is, as shown in FIGS. 8 and 10, the terminals 18a and 19a of the current transformation ratio checker 1 and the terminals 32a and 32b of the CTT plug 23 are connected by wirings r1 and r2. Here, the terminals 31a and 31b, the terminals 33a and 33b, and the terminals 34a and 34b that are not to be measured are short-circuited by the conductive fittings 51a, 51b, and 51c.

次に、図8及び図11に示すように、変流比チェッカ1の端子21a,22a(21b,22b、…、21n,22n)と、CTTプラグ24の端子39a,39bとを配線r3,r4によって接続する。ここで、導通金具52aによって、計測対象外の端子41a,41bは短絡させておく。次に、図9に示すように、CTTプラグ23を、TC盤7の対応するCTTターミナル8a(8b,8c,…)のプラグ挿入口に挿入するとともに、CTTプラグ24を、TC盤7の対応するCTTターミナル9a(9b,9c,…)のプラグ挿入口に挿入する。   Next, as shown in FIGS. 8 and 11, the terminals 21a, 22a (21b, 22b,..., 21n, 22n) of the current transformation ratio checker 1 and the terminals 39a, 39b of the CTT plug 24 are connected to wirings r3, r4. Connect by. Here, the terminals 41a and 41b not to be measured are short-circuited by the conductive fitting 52a. Next, as shown in FIG. 9, the CTT plug 23 is inserted into the plug insertion port of the corresponding CTT terminal 8 a (8 b, 8 c,...) Of the TC board 7, and the CTT plug 24 is attached to the TC board 7. Is inserted into the plug insertion port of the CTT terminal 9a (9b, 9c,...).

中央処理部は、電流測定部10で計測された電流値(すなわち、各変成器15(16a,16b,…,16n)の二次巻線に流れる電流の合成結果)が、略0の場合は、適正、これ以外の場合は、不適正と判定し、電流値(及び誤差)と判定結果とを、表示部14に表させるとともに、不適正と判定した場合には、警報部13に警報音を出力させる。   When the current value measured by the current measuring unit 10 (that is, the combined result of the currents flowing through the secondary windings of the transformers 15 (16a, 16b,..., 16n)) is approximately 0, the central processing unit In other cases, it is determined to be inappropriate, and the current value (and error) and the determination result are displayed on the display unit 14. Is output.

例えば、図5に示すように、n=2で、Ia=5A、Ib1=5A、Ib2=5Aの場合に、変流器Tb2の変流比が、遠隔監視制御装置2において、600/5のところ、300/5に設定されていると、調整入力部12bでN1タップとし、変流比が600/5の変流器Tb1に対応する調整入力部12aでN1/2タップとし、変流比が1200/5の変流器Taに対応する調整入力部11でN1タップ/4とすることとなる。この場合は、Ic=20A、Id1=−10A、Id2=−5Aで、ΣI=5Aとなり、不適正と判定される。   For example, as shown in FIG. 5, when n = 2, Ia = 5A, Ib1 = 5A, Ib2 = 5A, the current transformation ratio of the current transformer Tb2 is 600/5 in the remote monitoring control device 2. However, if it is set to 300/5, the adjustment input unit 12b has N1 taps, and the adjustment input unit 12a corresponding to the current transformer Tb1 having a current transformation ratio of 600/5 has N1 / 2 taps. Is set to N1 tap / 4 at the adjustment input unit 11 corresponding to the current transformer Ta of 1200/5. In this case, Ic = 20A, Id1 = −10A, Id2 = −5A, and ΣI = 5A, which is determined as inappropriate.

これに対して、変流器Tb2の変流比が、遠隔監視制御装置2において、600/5に設定されていると、調整入力部12bでN1/2タップとし、調整入力部12aでN1/2タップとし、調整入力部11でN1タップ/4とすることとなる。この場合は、Ic=20A、Id1=−10A、Id2=−10Aで、ΣI=0Aとなり、適正と判定される。   On the other hand, when the current transformation ratio of the current transformer Tb2 is set to 600/5 in the remote monitoring control device 2, the adjustment input unit 12b has N1 / 2 taps, and the adjustment input unit 12a has N1 / tap. Two taps are set, and the adjustment input unit 11 sets N1 taps / 4. In this case, Ic = 20A, Id1 = −10A, Id2 = −10A, and ΣI = 0A.

次に、図12及び図13を用いて、タップ切替方法について詳述する。まず、N1/2タップが選択されている場合は、図12(a)に示すように、スライド金具56bが、接触端子55bに接触し、かつ、スライド金具56a,56cは、接触端子55a,55cから外れるように配置される。この結果、図13(a)に示すように、端子55bと端子61bとが接続されて、電流Idaが流れる。   Next, the tap switching method will be described in detail with reference to FIGS. First, when the N1 / 2 tap is selected, as shown in FIG. 12A, the slide fitting 56b comes into contact with the contact terminal 55b, and the slide fittings 56a, 56c are contact terminals 55a, 55c. It is arranged so that it will come off. As a result, as shown in FIG. 13A, the terminal 55b and the terminal 61b are connected, and a current Ida flows.

次に、この状態からN1タップに切り替えたい場合は、図12(b)に示すように、スライド金具56a,56b,56cをスライドさせて、スライド金具56bが、接触端子55bに接触し、スライド金具56aも、接触端子55aに接触し、かつ、スライド金具56cは、接触端子55cから外れるように配置される状態を経過させる。ここで、図13(b)に示すように、端子55bと端子61bとが接続されて、電流Idcが流れ、かつ、端子55aと端子61aとが接続されて、電流Idbが流れる。   Next, when switching from this state to the N1 tap, as shown in FIG. 12B, the slide fittings 56a, 56b, 56c are slid so that the slide fitting 56b contacts the contact terminal 55b, and the slide fitting 56a also contacts the contact terminal 55a, and the slide fitting 56c passes through the state where it is arranged so as to be detached from the contact terminal 55c. Here, as shown in FIG. 13B, the terminal 55b and the terminal 61b are connected and the current Idc flows, and the terminal 55a and the terminal 61a are connected and the current Idb flows.

次に、図12(c)に示すように、スライド金具56a,56b,56cをさらにスライドさせて、スライド金具56aが、接触端子55aに接触し、かつ、スライド金具56b,56cは、接触端子55b,55cから外れるように配置させる。この結果、図13(c)に示すように、端子55aと端子61aとが接続されて、電流Iddが流れる。   Next, as shown in FIG. 12C, the slide fittings 56a, 56b, and 56c are further slid so that the slide fitting 56a contacts the contact terminal 55a, and the slide fittings 56b and 56c are connected to the contact terminal 55b. , 55c. As a result, as shown in FIG. 13C, the terminal 55a and the terminal 61a are connected, and a current Idd flows.

次に、N1/4タップに切り替えたい場合は、図12(d)に示すように、スライド金具56a,56b,56cをスライドさせて、スライド金具56cが、接触端子55cに接触し、スライド金具56a(56b)も、接触端子55a(56b)に接触する状態を経過させてから、さらに、スライド金具56a,56b,56cをスライドさせて、スライド金具56cが、接触端子55cに接触し、かつ、スライド金具56a,56bは、接触端子55a,55bから外れるように配置させる。この結果、図13(d)に示すように、端子55cと端子61cとが接続されて、電流Ideが流れる。   Next, when it is desired to switch to the N1 / 4 tap, as shown in FIG. 12D, the slide fittings 56a, 56b, 56c are slid so that the slide fitting 56c contacts the contact terminal 55c, and the slide fitting 56a. (56b), after the state of contact with the contact terminal 55a (56b) has elapsed, the slide fittings 56a, 56b, and 56c are further slid so that the slide fitting 56c contacts the contact terminal 55c and slides. The metal fittings 56a and 56b are arranged so as to be detached from the contact terminals 55a and 55b. As a result, as shown in FIG. 13D, the terminal 55c and the terminal 61c are connected, and a current Ide flows.

こうして、この実施の形態の構成によれば、電流計測部10によって、電流値を計測し、フィーダ電流I1,I2,…に対応する変流器16a,16b,…の二次電流の合成と、二次電流I0に対応する変流器15の二次電流とが、略一致するか否かによって、変流器Ta、変流器Tb1,Tb2,…の変流比が適正値か否か判定するので、遠隔監視制御装置2における変流器の変流比の誤設定の有無を検査して、誤設定の防止に寄与することができる。したがって、設備の過負荷運用や過負荷遮断を防止し、電力の安定供給に寄与することができる。   Thus, according to the configuration of this embodiment, the current measurement unit 10 measures the current value, and combines the secondary currents of the current transformers 16a, 16b,... Corresponding to the feeder currents I1, I2,. It is determined whether or not the current transformation ratio of current transformer Ta, current transformers Tb1, Tb2,... Is an appropriate value depending on whether or not the secondary current of current transformer 15 corresponding to secondary current I0 substantially matches. Therefore, the presence or absence of an incorrect setting of the current transformer ratio of the current transformer in the remote monitoring and control device 2 can be inspected to contribute to prevention of the erroneous setting. Therefore, it is possible to prevent overload operation and overload interruption of the facility, and contribute to stable power supply.

また、タップ切替時に、隣接するスライド金具と接触端子とも接触する状態を経過させるので、回路が開放されることがなく、円滑に検査を行うことできる。また、変成器15においてのみ、電流Iaを逆極性で取り込むように接続するので、変流器16a等と接続して、電流の合成結果が略0か否かで適否の判定を行うことができ、簡単かつ円滑に検査を行うことができる。   In addition, since the state in which the adjacent slide metal fitting and the contact terminal are in contact with each other at the time of tap switching is passed, the circuit is not opened and the inspection can be performed smoothly. Further, since only the transformer 15 is connected so as to capture the current Ia with the reverse polarity, it can be connected to the current transformer 16a and the like, and the suitability can be determined based on whether or not the combined current result is substantially zero. The inspection can be performed easily and smoothly.

以上、この発明の実施の形態を図面を参照して詳述してきたが、具体的な構成はこれらの実施の形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があってもこの発明に含まれる。例えば、上述した実施の形態では、各変流比の積が、(α0β0=α1β1=α2β2=…)となるように、各変流器15(16a,16b,…)についてタップ設定を行い、変流器16a,16b,…の二次電流の合成と、変流器15の二次電流とを比較して、両者が一致するか否かによって、遠隔監視制御装置2において設定されている変流比について、検査を行う場合について述べたが、各変流比の積について、(α0β0)と、(α1β1),(α2β2),…とが一定の比の値となるように、各変流器15(16a,16b,…)についてタップ設定を行い、変流器16a,16b,…の二次電流の合成と、変流器15の二次電流とを比較して、一定の比になるか否かによって検査を行うようにしても良い。   The embodiments of the present invention have been described in detail with reference to the drawings. However, the specific configuration is not limited to these embodiments, and the design can be changed without departing from the gist of the present invention. Is included in the present invention. For example, in the above-described embodiment, tap setting is performed for each current transformer 15 (16a, 16b,...) So that the product of each current ratio becomes (α0β0 = α1β1 = α2β2 =...). The comparison of the secondary currents of the current transformers 16a, 16b,... And the secondary current of the current transformer 15 is compared, and the current transformer set in the remote monitoring control device 2 depends on whether or not they match. As for the ratio, the case where the inspection is performed has been described. With respect to the products of the respective current transformation ratios, each current transformer is set so that (α0β0) and (α1β1), (α2β2),... 15 is set for tap (16a, 16b,...), And the comparison of the secondary current of the current transformers 16a, 16b,. You may make it test | inspect according to it.

また、変成器15において、必ずしも、電流Iaを逆極性で取り込むように接続しなくても良い。また、所定の調整入力部において、タップを固定して、タップ切替器を廃しても良い。また、変流比チェッカにおいて、表示部を廃して、単に電流計の指示によって検査結果を示すようにしても良い。また、表示に加えて又は代えて、音声で計測値や判定結果を報知するようにしても良い。   Further, the transformer 15 does not necessarily have to be connected so as to capture the current Ia with the reverse polarity. Moreover, in a predetermined adjustment input part, a tap may be fixed and a tap changer may be abolished. Further, in the current transformation ratio checker, the display unit may be omitted, and the inspection result may be simply indicated by an ammeter instruction. In addition to or instead of the display, the measurement value and the determination result may be notified by voice.

変電所における電力系統としては、1バンク系統のほか、2重母線系統や、2バンク系統の場合等に適用できる。また、電気所として、変電所のほか、発電所等について適用できる。   The power system in the substation can be applied to a single bus system, a double bus system, a two bank system, and the like. In addition to substations, power stations can also be applied as electric stations.

1 変流比チェッカ(変流比検査装置)
2 遠隔監視制御装置
15 変流器(第3の変流器)
16a,16b,… 変流器(第4の変流器)
55a,55b,55c 接触端子
56a,56b,56c スライド金具(可動金具)
B 電気所
I0 二次電流(第1の電流)
I1,I2,… フィーダ電流(第2の電流)
Ia 電流(第3の電流)
Ib1,Ib2,… 電流(第4の電流)
Ic 電流(第5の電流)
Id1,Id2,… 電流(第6の電流)
L1,L2,… 配電線(第2の回線)
Ta 変流器(第1の変流器)
Tb1,Tb2,… 変流器(第2の変流器)
1 Current ratio checker (Current ratio inspection device)
2 Remote monitoring and control device 15 Current transformer (third current transformer)
16a, 16b, ... Current transformer (fourth current transformer)
55a, 55b, 55c Contact terminals 56a, 56b, 56c Slide bracket (movable bracket)
B Electricity station I0 Secondary current (first current)
I1, I2, ... Feeder current (second current)
Ia current (third current)
Ib1, Ib2, ... Current (fourth current)
Ic current (fifth current)
Id1, Id2, ... current (sixth current)
L1, L2, ... Distribution line (second line)
Ta current transformer (first current transformer)
Tb1, Tb2, ... Current transformer (second current transformer)

Claims (5)

第1の回線と、前記第1の回線から分岐された複数の第2の回線と、前記第1の回線を流れる第1の電流を計測するための第1の変流器と、前記第2の回線を流れる第2の電流を計測するための複数の第2の変流器と、前記第1の変流器及び前記第2の変流器から、それぞれ計測用の第3の電流及び第4の電流が入力されるともに前記第1の変流器及び前記第2の変流器の変流比が設定される遠隔監視制御装置とが配置された電気所において用いられ、前記遠隔監視制御装置において設定された前記変流比の適否を検査するための変流比検査装置であって、
前記遠隔監視制御装置において設定された前記変流比に基づいた、前記第3の電流と、前記第4の電流の合成との関係が、前記第1の電流と、前記第2の電流の合成とが略一致する関係に対応する場合に、前記遠隔監視制御装置において設定された前記変流比が適正であると判定される
ことを特徴とする変流比検査装置。
A first line, a plurality of second lines branched from the first line, a first current transformer for measuring a first current flowing through the first line, and the second A plurality of second current transformers for measuring a second current flowing through the circuit, and a third current for measurement and a second current transformer from the first current transformer and the second current transformer, respectively. 4 is used in an electrical station where a current of 4 is input and a remote monitoring control device in which a current ratio of the first current transformer and the second current transformer is set is arranged, and the remote monitoring control A current transformation ratio inspection device for inspecting the suitability of the current transformation ratio set in the device,
Based on the current transformation ratio set in the remote monitoring control device, the relationship between the third current and the combination of the fourth current is the combination of the first current and the second current. The current transformation ratio set in the remote monitoring and control device is determined to be appropriate when it corresponds to a relationship that substantially agrees with the current transformation ratio inspection device.
前記第3の電流を一次電流とする第3の変流器と、前記第4の電流を一次電流とする複数の第4の変流器とを備え、前記第1の変流器及び前記第3の変流器の変流比の積と、前記第2の変流器及び前記第4の変流器の変流比の積とが略一致するように、前記第3の変流器及び前記第4の変流器の変流比が設定された場合に、前記第3の変流器の二次電流としての第5の電流と、前記第4の変流器の二次電流としての第6の電流の合成とが略一致するときに、前記遠隔監視制御装置において設定された前記変流比が適正であると判定されることを特徴とする請求項1に記載の変流比検査装置。   A third current transformer that uses the third current as a primary current; and a plurality of fourth current transformers that use the fourth current as a primary current. The first current transformer and the first current transformer The current transformer ratio of the third current transformer and the products of the current transformer ratios of the second current transformer and the fourth current transformer substantially coincide with each other. When the current transformer ratio of the fourth current transformer is set, the fifth current as the secondary current of the third current transformer and the secondary current of the fourth current transformer are 2. The current transformation ratio test according to claim 1, wherein the current transformation ratio set in the remote monitoring control device is determined to be appropriate when the composition of the sixth current substantially matches. apparatus. 前記第3の変流器及び前記第4の変流器の変流比を設定するためのタップ切替器を備え、前記タップ切替器は、各タップに対応し固定された複数の接触端子と、前記接触端子に対応したスライド可能な可動金具とを有し、タップ切替途中は、切替操作前に接触していた前記可動金具及び前記接触端子を接触させるように構成されていることを特徴とする請求項2に記載の変流比検査装置。   A tap changer for setting a current change ratio of the third current transformer and the fourth current transformer, and the tap changer includes a plurality of contact terminals fixed to each tap; and It has a slidable movable fitting corresponding to the contact terminal, and is configured to contact the movable fitting and the contact terminal that were in contact before the switching operation during tap switching. The current transformation ratio inspection device according to claim 2. 前記第3の変流器は、前記第3の電流を逆極性で取り込むように接続されることを特徴とする請求項2又は3に記載の変流比検査装置。   The current transformer ratio inspection device according to claim 2 or 3, wherein the third current transformer is connected so as to take in the third current with a reverse polarity. 第1の回線と、前記第1の回線から分岐された複数の第2の回線と、前記第1の回線を流れる第1の電流を計測するための第1の変流器と、前記第2の回線を流れる第2の電流を計測するための複数の第2の変流器と、前記第1の変流器及び前記第2の変流器から、それぞれ計測用の第3の電流及び第4の電流が入力されるともに前記第1の変流器及び前記第2の変流器の変流比が設定される遠隔監視制御装置とが配置された電気所において用いられ、前記遠隔監視制御装置において設定された前記変流比の適否を検査するための変流比検査方法であって、
前記遠隔監視制御装置において設定された前記変流比に基づいた、前記第3の電流と、前記第4の電流の合成との関係が、前記第1の電流と、前記第2の電流の合成とが略一致する関係に対応する場合に、前記遠隔監視制御装置において設定された前記変流比が適正であると判定される
ことを特徴とする変流比検査方法。
A first line, a plurality of second lines branched from the first line, a first current transformer for measuring a first current flowing through the first line, and the second A plurality of second current transformers for measuring a second current flowing through the circuit, and a third current for measurement and a second current transformer from the first current transformer and the second current transformer, respectively. 4 is used in an electrical station where a current of 4 is input and a remote monitoring control device in which a current ratio of the first current transformer and the second current transformer is set is arranged, and the remote monitoring control A current transformation ratio inspection method for inspecting the suitability of the current transformation ratio set in the apparatus,
Based on the current transformation ratio set in the remote monitoring control device, the relationship between the third current and the combination of the fourth current is the combination of the first current and the second current. The current transformation ratio set in the remote monitoring and control device is determined to be appropriate when the relationship corresponds to a relationship that substantially coincides with the current transformation ratio inspection method.
JP2010002376A 2010-01-07 2010-01-07 Current ratio inspection apparatus and current ratio inspection method Expired - Fee Related JP5420431B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010002376A JP5420431B2 (en) 2010-01-07 2010-01-07 Current ratio inspection apparatus and current ratio inspection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010002376A JP5420431B2 (en) 2010-01-07 2010-01-07 Current ratio inspection apparatus and current ratio inspection method

Publications (2)

Publication Number Publication Date
JP2011142756A true JP2011142756A (en) 2011-07-21
JP5420431B2 JP5420431B2 (en) 2014-02-19

Family

ID=44458194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010002376A Expired - Fee Related JP5420431B2 (en) 2010-01-07 2010-01-07 Current ratio inspection apparatus and current ratio inspection method

Country Status (1)

Country Link
JP (1) JP5420431B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101548065B1 (en) 2011-02-15 2015-08-27 지멘스 악티엔게젤샤프트 Test connection for a current converter
CN105527519A (en) * 2015-12-31 2016-04-27 贵州栢通科技有限责任公司 Transformer testing device
JP2021071412A (en) * 2019-10-31 2021-05-06 日新電機株式会社 Tester

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106527229A (en) * 2016-11-30 2017-03-22 国网江苏省电力公司淮安供电公司 Method for misoperation-preventing locking of transformer station secondary overhaul remote control operation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01136527A (en) * 1987-11-20 1989-05-29 Toshiba Corp Digital type bus bar protective relay
JPH11332085A (en) * 1998-05-12 1999-11-30 Nissin Electric Co Ltd Digital type ratio differential relay
JP2000249723A (en) * 1999-02-26 2000-09-14 Hitachi Ltd Measuring terminal device
JP2001116772A (en) * 1999-10-20 2001-04-27 Meidensha Corp Current transformer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01136527A (en) * 1987-11-20 1989-05-29 Toshiba Corp Digital type bus bar protective relay
JPH11332085A (en) * 1998-05-12 1999-11-30 Nissin Electric Co Ltd Digital type ratio differential relay
JP2000249723A (en) * 1999-02-26 2000-09-14 Hitachi Ltd Measuring terminal device
JP2001116772A (en) * 1999-10-20 2001-04-27 Meidensha Corp Current transformer

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101548065B1 (en) 2011-02-15 2015-08-27 지멘스 악티엔게젤샤프트 Test connection for a current converter
CN105527519A (en) * 2015-12-31 2016-04-27 贵州栢通科技有限责任公司 Transformer testing device
JP2021071412A (en) * 2019-10-31 2021-05-06 日新電機株式会社 Tester

Also Published As

Publication number Publication date
JP5420431B2 (en) 2014-02-19

Similar Documents

Publication Publication Date Title
US9322866B2 (en) Method and apparatus for transformer diagnosis
JP5420431B2 (en) Current ratio inspection apparatus and current ratio inspection method
KR101731705B1 (en) Apparatus and method for testing current transformer circuit
JP6373019B2 (en) Simulated power supply device and normal weighing confirmation device
JP2007248104A (en) Method for determining ratio and polarity of current transformer, and its device
CN109856586B (en) Current rising device and preparation method and inspection method thereof
KR101157362B1 (en) Measure method and device of Three phase instrument transformer ratio error test
JP2010048676A (en) Method for conducting protective cooperation test of protective relay, and tester used for the same
KR20060063829A (en) Test method and device of ratio error test
JP2009081929A (en) Cable connection checker
EP1532461B1 (en) Circuit for simultaneous testing of electricity meters with interconnected current and voltage circuits
JP2584464B2 (en) Indoor wiring inspection method
JP2007212308A (en) Test plug performance determiner
JP2015184003A (en) Testing coil of penetration type current transformer
KR101582227B1 (en) A error measurement system and method for Metering Out Fit
KR101654644B1 (en) Test device for wiring electric generator
JP2010044947A (en) Circuit breaker and distribution board
GB2444850A (en) An apparatus for assisting measurement of the resistances of LV ring main circuits
JP7270521B2 (en) Distribution board connection inspection device
JP2007278751A (en) Improper connection decision method for ground-electrode-equipped socket and improper connection decision tester for ground-electrode-equipped socket
KR102550523B1 (en) Apparatus for checking of motor control center
CN108152725B (en) Electrical switch tripping performance test device
JP2008108853A (en) Terminal block for current transformer
CN103885022A (en) Rated current ratio measuring method based on transformer calibrator
JP7300372B2 (en) Distribution board connection inspection device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121113

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131112

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131119

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131120

R150 Certificate of patent or registration of utility model

Ref document number: 5420431

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees