JP2011099299A - Structure - Google Patents

Structure Download PDF

Info

Publication number
JP2011099299A
JP2011099299A JP2009256389A JP2009256389A JP2011099299A JP 2011099299 A JP2011099299 A JP 2011099299A JP 2009256389 A JP2009256389 A JP 2009256389A JP 2009256389 A JP2009256389 A JP 2009256389A JP 2011099299 A JP2011099299 A JP 2011099299A
Authority
JP
Japan
Prior art keywords
tower
steel
precast concrete
groove
vertical direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009256389A
Other languages
Japanese (ja)
Other versions
JP5503253B2 (en
Inventor
Ai Urabe
藍 卜部
Fumio Watanabe
史夫 渡邉
Hideki Kimura
秀樹 木村
Yoshihiro Ota
義弘 太田
Kazuo Otake
和夫 大竹
Hideyuki Tanaka
英之 田中
Masahiro Sugata
昌宏 菅田
Mitsuru Takeuchi
満 竹内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2009256389A priority Critical patent/JP5503253B2/en
Publication of JP2011099299A publication Critical patent/JP2011099299A/en
Application granted granted Critical
Publication of JP5503253B2 publication Critical patent/JP5503253B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Wind Motors (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To improve strength against bending fracture of a structural body to which vertical prestress is introduced. <P>SOLUTION: Both of the strength against bending tension fracture and the strength against bending compression fracture are improved by introducing prestress in vertical and peripheral directions of a tower-like structural body 100 by PC steel strands 132, 134 which are wound around an outer peripheral surface 100A of the tower-like structural body 100 comprising a tower for wind-power generation and to which a tensile force is applied. In other words, the strength against the bending fracture is improved compared to the constitution in which prestress is introduced only in a vertical direction of the tower-like structural body 100. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、構造物に関する。   The present invention relates to a structure.

特許文献1の塔状の構造物は、周方向と鉛直方向とにコンクリートパネルを配置し、これらのコンクリートパネルを連結することによって構築されている。特許文献1のような鉄筋コンクリート製の塔状の構造物では、地震や風等によって大きな曲げモーメントが作用した場合に、この曲げモーメントに起因して引張応力が発生する部分(以下、「引張応力発生部」とする)にコンクリートのひび割れが生じることが危惧される。   The tower-like structure of Patent Document 1 is constructed by arranging concrete panels in a circumferential direction and a vertical direction and connecting these concrete panels. In a tower-like structure made of reinforced concrete such as Patent Document 1, when a large bending moment is applied due to an earthquake or wind, a portion where tensile stress is generated due to this bending moment (hereinafter referred to as “tensile stress generation”). It is feared that cracks in the concrete will occur.

このようなコンクリートのひび割れを抑制する対策としては、塔状の構造物を構成するコンクリートに上下方向のプレストレス(圧縮力)を導入する方法が一般に効果的とされている。   As a measure for suppressing such cracking of concrete, a method of introducing prestress (compression force) in the vertical direction to concrete constituting a tower-like structure is generally considered effective.

例えば、特許文献2のコンクリート製風車支持タワーは、複数個のコンクリート製筒型セグメントを上下に積み重ねて構築されている。そして、各コンクリート製筒型セグメントには、ポストテンション方式によるプレストレスが上下方向に導入されている。   For example, the concrete windmill support tower of Patent Document 2 is constructed by stacking a plurality of concrete cylindrical segments vertically. And prestress by a post tension system is introduced into each concrete cylindrical segment in the up-down direction.

これにより、地震や風等により作用する大きな曲げモーメントによって引張応力発生部に生じるコンクリートのひび割れを防ぐことが可能とされ、コンクリート製風車支持タワーの剛性及び耐久性を向上させている。
特開2008−101363号公報 特開2000−283019号公報
As a result, it is possible to prevent cracking of the concrete generated in the tensile stress generating portion due to a large bending moment acting due to an earthquake or wind, and the rigidity and durability of the concrete windmill support tower are improved.
JP 2008-101363 A JP 2000-283019 A

構造物に上下方向にプレストレスを導入すると、構造物における曲げモーメントに起因して圧縮応力が発生する部位(以下、「圧縮応力発生部」とする)には、曲げモーメントに起因して発生する圧縮応力と、上下方向に導入されたプレストレスと、が合わさった大きな圧縮力が作用する。更に、圧縮応力発生部には、圧縮応力発生部よりも上部の重量も圧縮力として作用する。そして、圧縮応力発生部に発生する圧縮応力が、許容圧縮応力を超過すると曲げ圧縮破壊に至る。   When prestress is introduced into the structure in the vertical direction, it occurs at the site where the compressive stress is generated due to the bending moment in the structure (hereinafter referred to as “compressive stress generating part”) due to the bending moment. A large compressive force that combines the compressive stress and the prestress introduced in the vertical direction acts. Furthermore, the weight above the compressive stress generating portion also acts as a compressive force on the compressive stress generating portion. When the compressive stress generated in the compressive stress generating portion exceeds the allowable compressive stress, bending compressive failure occurs.

このため、上下方向にプレストレスが導入された構造体の圧縮応力発生部には、上下方向にプレストレスを導入していない構造体よりも、大きな圧縮強度を確保する必要がある。   For this reason, it is necessary to ensure a higher compressive strength in the compressive stress generating portion of the structure in which prestress is introduced in the vertical direction than in a structure in which prestress is not introduced in the vertical direction.

本発明は、上記事実を鑑み、上下方向にプレストレスが導入された構造体の曲げ破壊に対する耐力を向上させることが目的である。   In view of the above facts, an object of the present invention is to improve the resistance to bending fracture of a structure in which prestress is introduced in the vertical direction.

請求項1の発明は、直立する構造体と、前記構造体の外周面に設けられ、緊張力が付与され、前記構造体の上下方向及び周方向にプレストレスを導入する一本又は複数本の緊張材と、を備える。   The invention according to claim 1 is an upright structure and one or a plurality of structures that are provided on the outer peripheral surface of the structure, are given tension, and introduce prestress in the vertical and circumferential directions of the structure. A tension material.

請求項1の発明では、構造体の外周面に設けられた緊張材によって構造体の上下方向と周方向とにプレストレス(圧縮力)が導入される。   According to the first aspect of the present invention, prestress (compressive force) is introduced in the vertical direction and the circumferential direction of the structure by the tension material provided on the outer peripheral surface of the structure.

構造体に導入された上下方向のプレストレスによって、地震や風等によって構造体に作用する曲げモーメントに起因して発生する曲げ引張応力が低減される。よって、上下方向のプレストレスを導入していない構成と比較し、構造体の引張応力発生部に発生する曲げ引張破壊に対する耐力が向上する。   The bending tensile stress generated due to the bending moment acting on the structure due to an earthquake, wind, or the like is reduced by the vertical prestress introduced into the structure. Therefore, as compared with a configuration in which prestress in the vertical direction is not introduced, the yield strength against bending tensile failure generated in the tensile stress generation portion of the structure is improved.

更に、構造体に導入された周方向のプレストレスによって、構造体が周方向に拘束されコンファインド効果が発揮される。つまり、構造体の耐力や靱性が向上する。よって、周方向にプレストレスを導入しない構成と比較し、構造体の圧縮応力発生部に発生する曲げ圧縮破壊に対する耐力が向上する。   Furthermore, the structure is restrained in the circumferential direction by the circumferential prestress introduced into the structure, and the confining effect is exhibited. That is, the yield strength and toughness of the structure are improved. Therefore, compared with the structure which does not introduce prestress in the circumferential direction, the proof stress against the bending compression failure generated in the compressive stress generating portion of the structure is improved.

このように構造体の外周面に設けられた緊張材によって、構造体の上下方向と周方向とにプレストレスが導入されることにより、曲げ引張破壊耐力と曲げ圧縮破壊耐力の両方が向上する。言い換えると、構造体の上下方向にのみプレストレスが導入された構成と比較し、曲げ破壊に対する耐力が向上する。   Thus, the prestress is introduced in the vertical direction and the circumferential direction of the structure by the tension material provided on the outer peripheral surface of the structure, thereby improving both the bending tensile fracture resistance and the bending compression fracture resistance. In other words, the resistance to bending fracture is improved as compared with a configuration in which prestress is introduced only in the vertical direction of the structure.

請求項2の発明は、前記構造体の外周面に設けられ、前記緊張材の上下方向及び周方向の少なくとも一方の位置を規制する規制手段を備える。   According to a second aspect of the present invention, there is provided a restricting means that is provided on the outer peripheral surface of the structure and restricts at least one position of the tension material in the vertical direction and the circumferential direction.

請求項2の発明では、構造体の外周面に設けられた規制手段によって、緊張材の上下方向及び周方向の少なくとも一方の位置が規制される。よって、規制手段が無い構成と比較し、緊張材が所望の位置により正確に配置される。   In the invention of claim 2, at least one position in the vertical direction and the circumferential direction of the tendon is regulated by the regulating means provided on the outer peripheral surface of the structure. Therefore, compared with the structure without a regulation means, a tendon is correctly arrange | positioned by a desired position.

なお、緊張材が規制手段に当接されていなくてもよい。緊張材が所定量以上移動しないように規制する構成も含まれる。   Note that the tendon need not be in contact with the restricting means. A configuration is also included in which the tendon is regulated so as not to move more than a predetermined amount.

請求項3の発明は、前記規制手段は、前記外周面に設けられた一つ又は複数の溝とされ、前記緊張材は前記溝に配置されている。   According to a third aspect of the present invention, the restricting means is one or a plurality of grooves provided on the outer peripheral surface, and the tension material is disposed in the grooves.

請求項3の発明では、外周面に設けられた一つ又は複数の溝に緊張材が配置されることによって、緊張材の上下方向の位置と及び周方向の位置が規制される。よって、溝が無い構成と比較し、緊張材が所望の位置により正確に配置される。   In the invention of claim 3, the tension material is arranged in one or a plurality of grooves provided on the outer peripheral surface, whereby the vertical position and the circumferential position of the tension material are regulated. Therefore, compared with the structure without a groove | channel, a tendon is correctly arrange | positioned by a desired position.

また、例えば、構造体の外周面に段差や凹凸がある場合であっても、段差や凹凸を解消するように溝を形成することで、緊張材が段差や凹凸に影響されることなく、緊張材が構造体の外周面に容易に配置される。   In addition, for example, even when there are steps or unevenness on the outer peripheral surface of the structure, by forming a groove so as to eliminate the step or unevenness, the tension material can be tensioned without being affected by the step or unevenness. The material is easily placed on the outer peripheral surface of the structure.

請求項4の発明は、深さの異なる複数の前記溝が交差するように形成されている。   According to a fourth aspect of the present invention, the plurality of grooves having different depths are formed so as to intersect with each other.

請求項4の発明では、深さの異なる複数の溝が交差するように形成されているので、緊張材の交差部分に段差ができない(干渉しない)。或いは、緊張材の交差部分の段差が低く抑えられる。   In the invention of claim 4, since the plurality of grooves having different depths are formed so as to intersect with each other, a step cannot be formed at the intersecting portion of the tendon (no interference). Or the level | step difference of the intersection part of a tendon is suppressed low.

請求項5の発明は、前記緊張材の少なくとも一部が前記溝から突出するように、前記溝の深さが設定されている。   In the invention of claim 5, the depth of the groove is set so that at least a part of the tendon protrudes from the groove.

請求項5の発明では、緊張材の溝から突出した部位によって、構造体の外周面に沿って流れる風に乱れが生じる。よって、構造体の風下側に発生するカルマン渦等が抑制される。したがって、緊張材が溝から突出してない構成と比較し、構造体に発生する渦励振が抑制又は防止される。   In the invention of claim 5, the wind flowing along the outer peripheral surface of the structure is disturbed by the portion protruding from the groove of the tendon. Therefore, Karman vortices and the like generated on the leeward side of the structure are suppressed. Therefore, compared with a configuration in which the tendon does not protrude from the groove, vortex excitation generated in the structure is suppressed or prevented.

請求項6の発明は、前記規制手段は、前記外周面に設けられた一つ又は複数の凸部とされ、前記緊張材は前記外周面に配置されている。   According to a sixth aspect of the present invention, the regulating means is one or a plurality of convex portions provided on the outer peripheral surface, and the tension material is disposed on the outer peripheral surface.

請求項6の発明では、外周面に設けられた一つ又は複数の凸部によって、緊張材の上下方向の位置及び周方向の位置の少なくとも一方が規制される。よって、凸部が無い構成と比較し、緊張材が所望の位置により正確に配置される。   In the invention of claim 6, at least one of the vertical position and the circumferential position of the tendon is regulated by one or a plurality of convex portions provided on the outer peripheral surface. Therefore, compared with the structure without a convex part, a tendon is correctly arrange | positioned by a desired position.

請求項7の発明は、前記緊張材は、上下方向に延設され且つ周方向に傾斜して配置されている構造物。   The invention according to claim 7 is the structure in which the tendon is extended in the vertical direction and inclined in the circumferential direction.

請求項7の発明では、上下方向に延設され且つ周方向に傾斜して配置されている緊張材に対して上下方向に緊張力を付与することにで、構造体の上下方向と周方向との両方にプレストレスが導入される。よって、例えば、プレストレスを導入する回数が減少するので、プレストレス導入作業の煩雑さが低減される。   In the invention of claim 7, by applying a tension force in the vertical direction to the tension material extending in the vertical direction and inclined in the circumferential direction, the vertical direction and the circumferential direction of the structure Prestress is introduced into both. Therefore, for example, since the number of times prestress is introduced is reduced, the complexity of the prestress introduction work is reduced.

なお、規制手段を有する構成において、構造体の軸線に対する緊張材の傾斜角度を調整することが可能である。そして、構造体の軸線に対する緊張材の傾斜角度を調整することで、構造体の上下方向と周方向とに導入するプレストレスの大きさが調整される。   In addition, in the structure which has a control means, it is possible to adjust the inclination | tilt angle of the tension material with respect to the axis line of a structure. And the magnitude | size of the prestress introduced into the up-down direction and circumferential direction of a structure is adjusted by adjusting the inclination-angle of the tension material with respect to the axis line of a structure.

請求項8の発明は、対をなす前記緊張材が、前記構造体の上下方向を基準に逆向きに傾斜して配置されている。   According to an eighth aspect of the present invention, the tension members forming a pair are disposed so as to be inclined in the opposite direction with respect to the vertical direction of the structure.

請求項8の発明では、対をなす緊張材が、構造体の上下方向を基準に逆向きに傾斜し交差して配置されているので、緊張材による構造体の捩れが相殺される。よって、対をなす緊張材が、構造体の上下方向を基準に同じ向きに傾斜して配置されている構成と比較し、緊張材による構造体の捩れが防止又は抑制される。   In the invention of claim 8, since the tension members forming a pair are inclined and crossed in opposite directions with respect to the vertical direction of the structure, the twist of the structure due to the tension material is offset. Therefore, as compared with a configuration in which the pair of tension members are arranged to be inclined in the same direction with respect to the vertical direction of the structure body, twisting of the structure body due to the tension material is prevented or suppressed.

請求項9の発明は、上下方向と周方向とに沿って、それぞれ前記緊張材が配置されている。   In the invention of claim 9, the tendon is arranged along the up-down direction and the circumferential direction, respectively.

請求項9の発明では、上下方向に沿って配置された緊張材の緊張力と、周方向に沿って配置された緊張材の緊張力とを、それぞれ個別に調整することで、構造体の上下方向と周方向とにそれぞれ最適な大きさのプレストレスが容易に導入される。   In the invention of claim 9, the tension force of the tension material arranged along the vertical direction and the tension force of the tension material arranged along the circumferential direction are individually adjusted, so that Prestresses of optimum sizes are easily introduced in each of the direction and the circumferential direction.

請求項10の発明は、前記緊張材が網状とされている。   According to a tenth aspect of the present invention, the tendon is net-like.

請求項10の発明では、網状の緊張材に対して、上下方向に緊張力を付与することで、構造体の上下方向と周方向との両方にプレストレスが導入される。   In the tenth aspect of the invention, prestress is introduced in both the vertical direction and the circumferential direction of the structure body by applying a tension force in the vertical direction to the net-like tension material.

請求項11の発明は、前記構造体は、コンクリートで構成されている。   According to an eleventh aspect of the present invention, the structure is made of concrete.

請求項11の発明では、構造体がコンクリートで構成されているので、鋼製の構造体と比べて、錆び発生やボルトの疲労等による耐力の低下が少ないので、耐久性が優れている。   In invention of Claim 11, since the structure is comprised with concrete, since the fall of yield strength by fatigue | exhaustion of a rust, bolt fatigue, etc. is less compared with a steel structure, durability is excellent.

請求項12の発明は、前記構造体は、内部に鉄筋が配されていない無筋コンクリートで構成されている。   According to a twelfth aspect of the invention, the structure is made of unreinforced concrete in which no reinforcing bars are arranged.

請求項12の発明では、構造体が内部に鉄筋が配されていない無筋コンクリートで構成されているので、鉄筋コンクリートで構成された構造体と比較し、鉄筋のさび発生に伴う耐久性低下の可能性が小さい。   In the invention of claim 12, since the structure is made of unreinforced concrete in which no reinforcing bars are arranged, the durability can be reduced due to the rusting of the reinforcing bars compared to the structure made of reinforced concrete. The nature is small.

また、鉄筋コンクリートで構成された構造体と比較し、施工性や生産性が向上する。   In addition, workability and productivity are improved compared to a structure made of reinforced concrete.

なお、緊張材によって上下方向に圧縮力が付与されているので、無筋コンクリートであってっても、引張力によるひび割れが抑制される。   In addition, since compressive force is given to the up-down direction by the tension material, even if it is unreinforced concrete, the crack by tensile force is suppressed.

請求項13に記載の発明は、前記構造体は、内部に鉄筋が配されている鉄筋コンクリートで構成されている。   In the invention described in claim 13, the structure is made of reinforced concrete in which reinforcing bars are arranged.

請求項13の発明では、構造体が内部に鉄筋が配されている鉄筋コンクリートで構成されているので、無筋コンクリートと比較し、耐力が大きい。   In invention of Claim 13, since the structure is comprised with the reinforced concrete by which the reinforcing bar is distribute | arranged inside, compared with unreinforced concrete, yield strength is large.

請求項14に記載の発明は、前記構造体は、繊維補強コンクリートで構成されている。   In the invention described in claim 14, the structure is made of fiber reinforced concrete.

請求項14に記載の発明では、構造体が繊維補強コンクリートで構成されている。繊維補強コンクリートは、合成繊維や鋼繊維などの補強繊維をコンクリートに複合したコンクリート材とされている。そして、補強繊維によってコンクリートにひび割れが発生した後、ひび割れ面間をつなぎとめることによって引張力を制御する。よって、引張力によるひび割れが更に抑制される。   In the invention described in claim 14, the structure is made of fiber reinforced concrete. Fiber reinforced concrete is a concrete material in which reinforcing fibers such as synthetic fibers and steel fibers are combined with concrete. And after a crack generate | occur | produces in concrete with a reinforcement fiber, a tensile force is controlled by connecting between crack surfaces. Therefore, the crack by a tensile force is further suppressed.

請求項15の発明は、前記構造体は、複数のユニットを上下方向に積み上げて構成されている。   In the invention of claim 15, the structure is configured by stacking a plurality of units in the vertical direction.

請求項15の発明では、ユニットを上下方向に積み上げることによって構造体が構成されているので、施工性が向上する。   In the invention of claim 15, since the structure is configured by stacking the units in the vertical direction, workability is improved.

また、ユニットを施工現場で製作するのでなく、工場等で大量に製作することによって、ユニットの品質を向上し、且つコストを低減することが可能とされる。   In addition, it is possible to improve the quality of the unit and reduce the cost by manufacturing the unit in large quantities at a factory or the like instead of manufacturing the unit at the construction site.

なお、構造体に導入される上下方向のプレストレスによって、ユニット同士を上下に圧着接合することも可能とされる。   It is also possible to press-bond the units up and down by pre-stress in the vertical direction introduced into the structure.

請求項16の発明は、前記ユニットが、周方向に分割された複数の分割部材によって構成されている。   According to a sixteenth aspect of the present invention, the unit includes a plurality of divided members divided in the circumferential direction.

請求項16の発明では、周方向に分割された複数の分割部材によってユニットが構成されているので、施工性が向上する。   In the invention of claim 16, since the unit is constituted by a plurality of divided members divided in the circumferential direction, workability is improved.

また、構造体に導入される周方向のプレストレスによって、分割部材同士を周方向に圧着接合することも可能とされる。   Moreover, it is also possible to crimp and join the divided members in the circumferential direction by circumferential prestress introduced into the structure.

請求項17の発明は、前記分割部材は同一形状に形成されると共に、周方向に配置された前記分割部材の間隔を調整する調整部材が前記分割部材の間に配置されている。   According to a seventeenth aspect of the present invention, the dividing members are formed in the same shape, and an adjusting member for adjusting the interval between the dividing members arranged in the circumferential direction is arranged between the dividing members.

請求項17の発明では、分割部材を同一形状とすることにより、分割部材が低コスト化で製造される。   According to the seventeenth aspect of the present invention, the divided member is manufactured at a low cost by making the divided member have the same shape.

また、分割部材の間隔を調整する調整部材によって、製作寸法や配置位置の誤差が吸収される。よって、分割部材の製作や配置に高い精度が必要とされない。   In addition, errors in manufacturing dimensions and arrangement positions are absorbed by the adjusting member that adjusts the distance between the divided members. Therefore, high accuracy is not required for the production and arrangement of the divided members.

請求項18の発明は、前記構造体の頂部に風車が設けられている。   In the invention of claim 18, a windmill is provided at the top of the structure.

請求項18の発明では、構造体の頂部に風車が設けられた所謂風力発電用タワーとされている。   The invention according to claim 18 is a so-called wind power generation tower in which a windmill is provided at the top of the structure.

ここで、構造物に作用する曲げモーメントの大きさは、構造物の高さが高いほど大きく、また頂部が重いほど大きくなる。   Here, the magnitude of the bending moment acting on the structure increases as the height of the structure increases, and increases as the top is heavier.

一般に、地上に近い低い位置よりも地上から離れた高い位置の方が強い風を安定して受けることができるので、風力発電用タワーの風車は高い位置に設置されている。つまり、風力発電用タワーの高さが高く、その頂部には風車が配置されている。更に、風車には、風荷重がかかる。よって、一般的に風力発電用タワーには大きな曲げモーメントが発生する。   Generally, a wind turbine of a wind power generation tower is installed at a high position because a strong wind can be stably received at a high position far from the ground rather than a low position near the ground. That is, the height of the tower for wind power generation is high, and the windmill is arranged on the top. Furthermore, a wind load is applied to the windmill. Therefore, a large bending moment is generally generated in the tower for wind power generation.

更に、風力発電用タワーは、強い風が安定して吹く、沿岸部、洋上、山岳部等の風の強い地域に設置されることが多い。   Furthermore, wind power generation towers are often installed in windy areas such as coastal areas, offshore areas, and mountainous areas where strong winds blow stably.

また、風力発電用タワーの設置基数の増加に伴って、風力発電における風況に適した場所や、風力発電用タワーの建設に適した場所が減少してきており、少ない基数の風力発電用タワーによって多くの発電量を確保することが望まれている。よって、風力発電用タワーの風車の翼(羽根車)の径は大きくなる傾向にある。また、多くの風を受けせるために風車はより高い位置に設けられる傾向にある。つまり風力発電用タワーの高さは高くなる傾向にある。   In addition, as the number of installed wind power towers increases, the number of places suitable for wind conditions in wind power generation and places suitable for construction of wind power towers are decreasing. It is desired to secure a large amount of power generation. Therefore, the diameter of the blade (impeller) of the wind turbine of the wind power generation tower tends to increase. Moreover, in order to receive many winds, a windmill tends to be provided in a higher position. In other words, the height of the tower for wind power generation tends to increase.

したがって、曲げモーメントに起因する曲げ破壊に対する耐力が向上した構造物を風力発電用タワーとして利用することは好適される。つまり、より大きな風車をより高い位置に、更により強い風が吹く場所に設置することが可能とされ、その結果、大きな電力を得られる。   Therefore, it is preferable to use a structure with improved resistance to bending fracture caused by a bending moment as a tower for wind power generation. That is, it is possible to install a larger windmill at a higher position and at a place where stronger wind blows, and as a result, a large electric power can be obtained.

更に、緊張材が構造体の外周面から容易に視認可能な構成とすることで、緊張材の検査やメンテナンスが容易に行なうことができる。よって、風の強い場所である沿岸部、洋上、山岳部等に設置することが多い風力発電用タワーとして利用することは好適とされる。   Furthermore, the tension material can be easily visually recognized from the outer peripheral surface of the structure, whereby the tension material can be easily inspected and maintained. Therefore, it is suitable to use as a tower for wind power generation that is often installed in coastal areas, offshore, mountainous areas and the like where wind is strong.

請求項1に記載の発明によれば、構造体の上下方向にのみプレストレスが導入された構成と比較し、構造物の曲げ破壊に対する耐力が向上する。   According to the first aspect of the present invention, as compared with the configuration in which prestress is introduced only in the vertical direction of the structure, the strength against bending fracture of the structure is improved.

請求項2の発明に記載の発明によれば、規制手段が無い構成と比較し、緊張材を所望の位置に正確に配置することができる。   According to invention of Claim 2, compared with the structure without a control means, a tension material can be correctly arrange | positioned in a desired position.

請求項3に記載の発明によれば、溝が無い構成と比較し、緊張材を所望の位置により正確に配置することができる。   According to invention of Claim 3, compared with the structure without a groove | channel, a tension material can be correctly arrange | positioned by a desired position.

請求項4に記載の発明によれば、緊張材の交差部分の段差が低く抑える、或いは段差を無くすことができる。   According to invention of Claim 4, the level | step difference of the crossing part of a tendon can be suppressed low, or a level | step difference can be eliminated.

請求項5に記載の発明によれば、緊張材が溝から突出してない構成と比較し、構造体の風下側のカルマン渦の発生を抑制することができる。   According to the fifth aspect of the present invention, the generation of Karman vortices on the leeward side of the structure can be suppressed as compared with the configuration in which the tendon does not protrude from the groove.

請求項6に記載の発明によれば、凸部が無い構成と比較し、緊張材を所望の位置により正確に配置することができる。   According to invention of Claim 6, compared with the structure without a convex part, a tension material can be correctly arrange | positioned by a desired position.

請求項7に記載の発明によれば、緊張材に対して上下方向に緊張力を付与することで、構造体の上下方向と周方向との両方にプレストレスを導入することができる。   According to the seventh aspect of the present invention, prestress can be introduced in both the vertical direction and the circumferential direction of the structure body by applying a tension force in the vertical direction to the tension material.

請求項8に記載の発明によれば、緊張材による構造体の捩れを防止又は抑制することができる。   According to invention of Claim 8, the twist of the structure by a tension material can be prevented or suppressed.

請求項9に記載の発明によれば、構造体の上下方向と周方向とにそれぞれ最適な大きさのプレストレスを容易に導入することができる。   According to the ninth aspect of the present invention, it is possible to easily introduce prestresses having optimum sizes in the vertical direction and the circumferential direction of the structure.

請求項10に記載の発明によれば、格子状に組まれた網状の緊張材に上下方向に緊張力を付与することで、構造体の上下方向と周方向との両方にプレストレスを導入することができる。   According to the invention described in claim 10, prestress is introduced in both the vertical direction and the circumferential direction of the structure body by applying a tensile force in the vertical direction to the net-like tension member assembled in a lattice shape. be able to.

請求項11に記載の発明によれば、構造体がコンクリートで構成されているので、鋼製の構造体と比べて、耐久性に優れた構造物を構築することができる。   According to the eleventh aspect of the invention, since the structure is made of concrete, it is possible to construct a structure having excellent durability as compared with a steel structure.

請求項12に記載の発明によれば、鉄筋コンクリートで構成された構造体と比較し、耐久性低下の可能性を小さくすることができる。   According to invention of Claim 12, possibility of a durable fall can be made small compared with the structure comprised with the reinforced concrete.

請求項13に記載の発明によれば、無筋コンクリートで構成された構造体と比較し、耐久を大きくすることができる。   According to invention of Claim 13, compared with the structure comprised with unreinforced concrete, durability can be enlarged.

請求項14に記載の発明によれば、引張力によるひび割れが更に抑制される。   According to the fourteenth aspect of the present invention, cracking due to tensile force is further suppressed.

請求項15に記載の発明によれば、施工性が向上する。   According to the invention of claim 15, the workability is improved.

請求項16に記載の発明によれば、施工性が向上する。   According to invention of Claim 16, workability improves.

請求項17に記載の発明によれば、低コストで製造することができる。   According to invention of Claim 17, it can manufacture at low cost.

請求項18に記載の発明によれば、曲げモーメントによる曲げ破壊に強い風力発電用タワーを構築することができる。   According to the eighteenth aspect of the present invention, it is possible to construct a tower for wind power generation that is resistant to bending failure due to a bending moment.

本発明の第一実施形態に係る風力発電用タワーを示す立面図である。It is an elevation view which shows the tower for wind power generation which concerns on 1st embodiment of this invention. 図1の風力発電用タワーを構成する塔状構造体の要部を示す斜視図である。It is a perspective view which shows the principal part of the tower-like structure which comprises the tower for wind power generation of FIG. (A)は図1の風力発電用タワーを構成する塔状構造体にPC鋼より線を巻く前の状態を示す斜視図であり、(B)は(A)の塔状構造体にPC鋼より線を巻いた状態を示す斜視図である。(A) is a perspective view which shows the state before winding a wire from PC steel to the tower-like structure which comprises the tower for wind power generation of FIG. 1, (B) is PC steel to the tower-like structure of (A). It is a perspective view which shows the state which wound the strand. 図3に示す塔状構造体の構築工程の(a)〜(c)を示す説明図である。It is explanatory drawing which shows (a)-(c) of the construction process of the tower-like structure shown in FIG. 図2の塔状構造体を構成するプレキャストコンクリートユニットの接合方法の変形例を説明する(a)は斜視図であり、(b)は(a)のE−E矢視図であり、(c)は、(a)のF−F矢視図である。(A) is a perspective view, (b) is an EE arrow view of (a), explaining the modification of the joining method of the precast concrete unit which comprises the tower-like structure of FIG. ) Is an FF arrow view of (a). 図2の塔状構造体を構成するプレキャストコンクリートユニットの接合方法の変形例を説明する、(a)は、プレキャストコンクリートユニット同士が接合される前の状態の要部の正面図であり、(b)は、プレキャストコンクリートユニット同士が接合された状態の要部の正面図である。The modification of the joining method of the precast concrete unit which comprises the tower-like structure of FIG. 2 is demonstrated, (a) is a front view of the principal part of the state before the precast concrete units are joined, (b ) Is a front view of the main part in a state where the precast concrete units are joined together. 本発明の第一実施形態に係る風力発電用タワーの変形例を示す立面図である。It is an elevation view which shows the modification of the tower for wind power generation which concerns on 1st embodiment of this invention. 本発明の第一実施形態に係る風力発電用タワーの塔状構造体を構成するプレキャストユニットの変形例を示す斜視図である。It is a perspective view which shows the modification of the precast unit which comprises the tower-like structure of the tower for wind power generation concerning 1st embodiment of this invention. (a)は深さの異なる三つの溝にPC鋼より線が配置された例を模式的に示す縦断面図であり、(b)は深さの異なる三つの溝にPC鋼より線間にスペーサを挟んで配置した例を示す縦断面図である。(A) is a longitudinal cross-sectional view which shows typically the example by which the PC steel strand was arrange | positioned in three groove | channels from which depth differs, (b) is between three strands in which depth differs from PC steel strand. It is a longitudinal cross-sectional view which shows the example arrange | positioned on both sides of a spacer. (a)は段差がある塔状構造体の外周面に形成した溝にPC鋼より線が配置された例を模式的に示す正面図であり、(b)は溝と外周面との関係を説明するための説明図である。(A) is a front view which shows typically the example by which the wire from PC steel was arrange | positioned in the groove | channel formed in the outer peripheral surface of the tower-like structure with a level | step difference, (b) is the relationship between a groove | channel and an outer peripheral surface. It is explanatory drawing for demonstrating. 塔状構造体の溝に沿ってPC鋼より線を配置する方法を説明する説明図である。It is explanatory drawing explaining the method of arrange | positioning a strand from PC steel along the groove | channel of a tower-like structure. 塔状構造体の溝に沿ってPC鋼より線を配置する配線機構を示す斜視図である。It is a perspective view which shows the wiring mechanism which arrange | positions a strand from PC steel along the groove | channel of a tower-like structure. (a)は塔状構造体の水平断面を模式的に示す水平断面図であり、(b)は(a)とは別の高さにおける水平断面を模式的に示す水平断面図である。(A) is a horizontal sectional view schematically showing a horizontal section of the tower-like structure, and (b) is a horizontal sectional view schematically showing a horizontal section at a height different from (a). 本発明の第二実施形態に係る風力発電用タワーを示す立面図である。It is an elevation view which shows the tower for wind power generation which concerns on 2nd embodiment of this invention. 図14のA−A矢視図である。It is an AA arrow line view of FIG. 図15の塔状構造体を構成するプレキャストコンクリートユニットを示す斜視図である。It is a perspective view which shows the precast concrete unit which comprises the tower-like structure of FIG. 図16のプレキャストコンクリートユニットの要部を示す斜視図である。It is a perspective view which shows the principal part of the precast concrete unit of FIG. 塔状構造体を構成するプレキャストコンクリートユニットの接合構造を説明するための示す(a)は縦断面図であり、(b)は(a)とは別の縦断面を示す縦段面図である。(A) shown for demonstrating the joining structure of the precast concrete unit which comprises a tower-like structure is a longitudinal cross-sectional view, (b) is a vertical step figure which shows the vertical cross-section different from (a). . 図14に示す塔状構造体の構築工程の(a)〜(c)を示す説明図である。It is explanatory drawing which shows (a)-(c) of the construction | assembly process of the tower-like structure shown in FIG. 図14に示す塔状構造体の構築工程の(d)〜(e)を示す説明図である。It is explanatory drawing which shows (d)-(e) of the construction process of the tower-like structure shown in FIG. 図15の塔状構造体を構成するプレキャストコンクリートユニットの接合構造の変形例を示す説明図である。It is explanatory drawing which shows the modification of the joining structure of the precast concrete unit which comprises the tower-like structure of FIG. 本発明の第三実施形態に係る風力発電用タワーの塔状構造体を構成するプレキャストコンクリートユニットを示す斜視図である。It is a perspective view which shows the precast concrete unit which comprises the tower-like structure of the tower for wind power generation concerning 3rd embodiment of this invention. (A)は図22のプレキャストコンクリートの外周面に周方向に巻かれたPC鋼より線の端部の固定部を示す説明図であり、(B)はPC鋼より線の端部同士をターンバックルで接続した構造を示す説明図である。(A) is explanatory drawing which shows the fixing | fixed part of the edge part of the PC steel strand wound around the outer peripheral surface of the precast concrete of FIG. 22, (B) turns the ends of a strand of PC steel from each other It is explanatory drawing which shows the structure connected with the buckle. 本発明の第四実施形態に係る風力発電用タワーを構成する塔状構造体の要部を示す正面図である。It is a front view which shows the principal part of the tower-like structure which comprises the tower for wind power generation which concerns on 4th embodiment of this invention. 突起部の変形例を説明する正面図である。It is a front view explaining the modification of a projection part. 突起部の変形例を説明する正面図である。It is a front view explaining the modification of a projection part. (a)〜(c)は突起部の変形例を説明する正面図であり、(d)は変形例の突起部の分解斜視図である。(A)-(c) is a front view explaining the modification of a projection part, (d) is an exploded perspective view of the projection part of a modification. 突起部の変形例を説明する側面図である。It is a side view explaining the modification of a projection part. (a)は突起部の変形例を説明する斜視図であり、(b)は(a)のB−B矢視図であり、(c)は突起部の側面図である。(A) is a perspective view explaining the modification of a projection part, (b) is a BB arrow directional view of (a), (c) is a side view of a projection part. 本発明の第五実施形態に係る風力発電用タワーを構成する塔状構造体の要部を示す斜視図である。It is a perspective view which shows the principal part of the tower-like structure which comprises the tower for wind power generation concerning 5th embodiment of this invention. (a)は図30塔状構造体の外周面にPC鋼より線を固定具で固体した状態の斜視図であり、(b)は(a)のb−b矢視図である。(A) is a perspective view of the state which solidified the strand from PC steel with the fixture to the outer peripheral surface of FIG. 30 tower-like structure, (b) is a bb arrow line view of (a). (A)は本発明の第六実施形態に係る風力発電用タワーを構成する塔状構造体の要部を示す斜視図であり、(B)は、塔状構造体の上端部の構造の一例を示す側面図である。(A) is a perspective view which shows the principal part of the tower-like structure which comprises the tower for wind power generation concerning 6th embodiment of this invention, (B) is an example of the structure of the upper end part of a tower-like structure. FIG. 網の変形例を説明する図である。It is a figure explaining the modification of a net | network. (a)は網の変形例を説明する図であり、(b)は網を構成するPCより線の交差角度が変更された例を示す図であり、(c)は接続部材の中でPC鋼より線が交差するように通された状態を示す模式図であり、(d)は接続部材中でPC鋼より線が交差しないように通された状態を示す模式図である。(A) is a figure explaining the modification of a net | network, (b) is a figure which shows the example by which the crossing angle of the line was changed from PC which comprises a net | network, (c) is PC in a connection member. It is a schematic diagram which shows the state passed so that the strands of steel may cross, (d) is a schematic diagram which shows the state passed so that the strands of PC steel may not cross in a connection member. 本発明の実施形態に係る塔状構造体の構造の変形例を示す立面図である。It is an elevation which shows the modification of the structure of the tower-like structure which concerns on embodiment of this invention. 本発明の実施形態に係る塔状構造体の構造の変形例を示す立面図である。It is an elevation which shows the modification of the structure of the tower-like structure which concerns on embodiment of this invention. 海底に打ち込んだ基礎杭が支持する風力発電用タワーを示す正面図である。It is a front view which shows the tower for wind power generation which the foundation pile driven into the seabed supports. 海面に浮かせた浮部材が支持する風力発電用タワーを示す正面図である。It is a front view which shows the tower for wind power generation which the floating member floated on the sea surface supports. (A)は塔状構造体の外周面に螺旋状に配置したPC鋼より線を模式的に示す説明図であり、(B)は上下方向のプレストレスを説明するための説明図であり、(C)は周方向のプレストレスを説明するための説明図である。(A) is an explanatory view schematically showing a strand of PC steel spirally disposed on the outer peripheral surface of the tower-like structure, (B) is an explanatory view for explaining the prestress in the vertical direction, (C) is explanatory drawing for demonstrating the circumferential prestress. (A)は溝と溝との交差部分の構造を説明するための断面斜視図であり、(B)は(A)のB−B線に沿った断面図であり、(C)は溝にPC鋼より線を配置した状態の(B)に対応する断面図である。(A) is a cross-sectional perspective view for explaining the structure of the intersection between the grooves, (B) is a cross-sectional view taken along line BB in (A), (C) is a groove It is sectional drawing corresponding to (B) of the state which has arrange | positioned the strand from PC steel. (A)は溝の側壁にPC鋼より線が当接していない構成を模式的に示す断面図であり、(B)は凸部の側壁にPC鋼より線が当接していない構成を模式的に示す断面図である。(A) is sectional drawing which shows typically the structure which the wire from PC steel does not contact | abut to the side wall of a groove | channel, (B) is a structure which does not contact the wire from PC steel to the side wall of a convex part typically. FIG.

<第一実施形態>
本発明の第一実施形態について、説明する。
図1の立面図に示すように、風力発電用タワー98は、塔状構造体100の頂部100Uに、ブレード16及びナセル18を備える風車17が設けられた構成とされている。
また、塔状構造体100は、上方に向かって直径が小さくなる円錐状とされ、地盤14に基礎杭24を介して支持された基礎部130上に立てられている。
<First embodiment>
A first embodiment of the present invention will be described.
As shown in the elevation view of FIG. 1, the wind power generation tower 98 is configured such that a windmill 17 including a blade 16 and a nacelle 18 is provided on the top portion 100 </ b> U of the tower-like structure 100.
Further, the tower-like structure 100 has a conical shape whose diameter decreases upward, and stands on the foundation 130 supported by the ground 14 via the foundation pile 24.

塔状構造体100には、塔状構造体100の外周面100Aに形成された螺旋状の溝110、120(図2、図3(a)を参照)に配置されたPC鋼より線132、134によって、塔状構造体100の上下方向と周方向とにプレストレス(圧縮力)が導入されている(図39を参照、詳細は後述する)。
塔状構造体100は、複数のプレキャストコンクリートユニット104を上下方向に積み上げることにより構成されている(詳細は後述する)。
The tower structure 100 includes a PC steel strand 132 disposed in spiral grooves 110 and 120 (see FIGS. 2 and 3A) formed on the outer peripheral surface 100A of the tower structure 100, 134 introduces prestress (compressive force) in the vertical direction and the circumferential direction of the tower-like structure 100 (see FIG. 39, details will be described later).
The tower-like structure 100 is configured by stacking a plurality of precast concrete units 104 in the vertical direction (details will be described later).

図2の斜視図に示すように、プレキャストコンクリートユニット104は、一定の壁厚を有する円筒状の構造体であり、無筋の繊維補強コンクリートによって形成されている。 繊維補強コンクリートは、合成繊維や鋼繊維などをコンクリートに複合したコンクリート材とされている。   As shown in the perspective view of FIG. 2, the precast concrete unit 104 is a cylindrical structure having a constant wall thickness, and is formed of unreinforced fiber reinforced concrete. Fiber reinforced concrete is a concrete material in which synthetic fiber, steel fiber, or the like is combined with concrete.

なお、塔状構造体100は、前述したように円錐形状とされているので(図1、図3を参照)、プレキャストコンクリートユニット104は、上部側程、縮径されている。つまり、各プレキャストコンクリートユニット104は大きさが異なる。しかし、ここでは特に区別せずにプレキャストコンクリートユニット104とする。   Since the tower-like structure 100 has a conical shape as described above (see FIGS. 1 and 3), the diameter of the precast concrete unit 104 is reduced toward the upper side. That is, each precast concrete unit 104 has a different size. However, the precast concrete unit 104 is not particularly distinguished here.

各プレキャストコンクリートユニット104の外周面104Aには、対をなす溝112と溝122とが、上下方向に延設され且つ周方向に傾斜して形成されている。更に、対をなす溝112と溝122とは、上下方向を基準に逆向きに傾斜し交差するように形成されている。また、溝112よりも溝122の方が深い(図40(A)、(B)も参照)。   On the outer peripheral surface 104A of each precast concrete unit 104, a pair of grooves 112 and 122 are formed extending in the vertical direction and inclined in the circumferential direction. Further, the paired grooves 112 and 122 are formed so as to incline and intersect in the opposite direction with respect to the vertical direction. Further, the groove 122 is deeper than the groove 112 (see also FIGS. 40A and 40B).

そして、図1と図3とに示すように、各プレキャストコンクリートユニット104を所定の平面配置で上下方向に積み上げると、溝112は一つにつながり螺旋状の溝120となり、溝112は一つにつながり螺旋状の溝120となる。   As shown in FIGS. 1 and 3, when the precast concrete units 104 are stacked in a vertical direction in a predetermined plane arrangement, the grooves 112 are connected together to form a spiral groove 120, and the grooves 112 are combined into one. A connecting spiral groove 120 is formed.

このようにして、塔状構造体100の外周面100Aに、塔状構造体100の軸心である軸106(図2を参照)を中心にして、螺旋状に溝110と溝120とが形成される。また、溝110と溝120とは、互いに反対方向に旋回する。つまり、上から見て、且つ、上方に向かって、溝110が左巻き(反時計回り)であり、溝120は右巻き(時計回り)とされ、螺旋の巻き方向が異なる。
別の言い方をすると、対をなす溝110と溝120とが、塔状構造体100の上下方向(軸106)を基準に逆向きに傾斜し且つ交差するように形成されている。
Thus, the groove 110 and the groove 120 are spirally formed on the outer peripheral surface 100A of the tower structure 100 around the shaft 106 (see FIG. 2) which is the axis of the tower structure 100. Is done. Further, the groove 110 and the groove 120 pivot in opposite directions. That is, when viewed from above and upward, the groove 110 is counterclockwise (counterclockwise), the groove 120 is clockwise (clockwise), and the spiral winding direction is different.
In other words, the groove 110 and the groove 120 that form a pair are formed so as to incline and intersect in the opposite direction with respect to the vertical direction (axis 106) of the tower-like structure 100.

なお、図40に示すように、溝112(溝110)よりも溝122(溝120)の方が深いので、溝112と溝122との交差部115に段差113(溝112の底112Aと溝122の底122Aとの段差)が形成されている。図40(C)に示すように、この段差113は、溝122(溝120)に配置されるPC鋼より線134の直径よりも大きくなるように、溝112(溝110)と溝122(溝120)との深さが設定されている。また、浅い溝112(溝110)の深さは、この溝112(溝110)に配置されるPC鋼より線132の直径よりも浅く設定されている。   As shown in FIG. 40, since the groove 122 (groove 120) is deeper than the groove 112 (groove 110), a step 113 (the bottom 112A of the groove 112 and the groove 112) is formed at the intersection 115 between the groove 112 and the groove 122. 122 is formed). As shown in FIG. 40 (C), the step 113 has a groove 112 (groove 110) and a groove 122 (groove) so as to be larger than the diameter of the wire 134 from the PC steel disposed in the groove 122 (groove 120). 120) is set. Moreover, the depth of the shallow groove | channel 112 (groove 110) is set shallower than the diameter of the wire 132 from PC steel arrange | positioned in this groove | channel 112 (groove 110).

また、溝112(溝110)及び溝122(溝120)の断面は、深くなるにつれ幅狭となるように形成されている(断面台形状)。よって、PC鋼より線132、134が溝112、122の側壁に当りPC鋼より線132、134が固定される。   Further, the cross section of the groove 112 (groove 110) and the groove 122 (groove 120) is formed so as to become narrower as it becomes deeper (trapezoidal cross section). Therefore, the PC steel strands 132 and 134 hit the side walls of the grooves 112 and 122, and the PC steel strands 132 and 134 are fixed.

図2に示すように、上下方向に積み上げられる各プレキャストコンクリートユニット104の上端部には凸部126が複数形成され、下端部にはこれらの凸部126が挿入される凹部128が複数形成されている。これにより、積み上げられ複数のプレキャストコンクリートユニット104が一体化される前の、複数のプレキャストコンクリートユニット104を積み上げただけの状態においても、プレキャストコンクリートユニット104が脱落することを防ぐことができるように構成されている。   As shown in FIG. 2, a plurality of convex portions 126 are formed at the upper end portion of each precast concrete unit 104 stacked in the vertical direction, and a plurality of concave portions 128 into which these convex portions 126 are inserted are formed at the lower end portion. Yes. Accordingly, the precast concrete unit 104 can be prevented from falling off even when the plurality of precast concrete units 104 are simply stacked before being stacked and integrated. Has been.

なお、凸部126をプレキャストコンクリートユニット104の下端部に形成し、凹部128をプレキャストコンクリートユニット104の上端部に形成してもよい。また、凸部126及び凹部128は連続して形成する必要はなく、コッター形状のものをプレキャストコンクリートユニット104の上端部又は下端部に配置してもよい。また、プレキャストコンクリートユニット104の上端部及び下端部に凹部を形成し、これらの凹部にグラウト材等を充填してコッターを形成してもよい。また、プレキャストコンクリートユニット104同士の接合面のせん断力伝達が可能であれば、このような凸部や凹部を形成しなくてもよい。   The convex portion 126 may be formed at the lower end portion of the precast concrete unit 104 and the concave portion 128 may be formed at the upper end portion of the precast concrete unit 104. Moreover, it is not necessary to form the convex part 126 and the recessed part 128 continuously, and you may arrange | position a cotter-shaped thing in the upper end part or lower end part of the precast concrete unit 104. FIG. Moreover, you may form a cotter by forming a recessed part in the upper end part and lower end part of the precast concrete unit 104, and filling grout material etc. in these recessed parts. Moreover, if the shear force transmission of the joint surface between the precast concrete units 104 is possible, such a convex part and a recessed part do not need to be formed.

次に、塔状構造体100の構築方法の一例について説明する。
まず、図4(a)の斜視図に示すように、基礎杭24上に鉄筋コンクリート製の基礎部130を形成する。基礎部130は、塔状構造体100を確実に支持できる構造であれば他の構造であってもよい。例えば、基礎部130が、無筋のコンクリートで構成されていてもよいし、プレストレストコンクリートによって構成されてもよい。或いは、鋼製にしてもよい。
Next, an example of a method for constructing the tower structure 100 will be described.
First, as shown in the perspective view of FIG. 4A, a foundation portion 130 made of reinforced concrete is formed on the foundation pile 24. The base portion 130 may have another structure as long as it can reliably support the tower structure 100. For example, the base part 130 may be comprised with unreinforced concrete, and may be comprised with prestressed concrete. Alternatively, it may be made of steel.

次に、図4(b)の斜視図に示すように、基礎部130上にプレキャストコンクリートユニット104(図2参照)を載置する。このとき、プレキャストコンクリートユニット104の平面配置を調整して、プレキャストコンクリートユニット104の下端部に形成された凹部128に、基礎部130の上端部に形成された凸部126が挿入されるように載置する。   Next, as shown in the perspective view of FIG. 4B, the precast concrete unit 104 (see FIG. 2) is placed on the foundation portion 130. At this time, the planar arrangement of the precast concrete unit 104 is adjusted so that the convex portion 126 formed at the upper end portion of the foundation portion 130 is inserted into the concave portion 128 formed at the lower end portion of the precast concrete unit 104. Put.

そして、基礎部130にプレキャストコンクリートユニット104を接合する。この接合方法は、塔状構造体100に大きな曲げモーメントが発生した場合においても十分に耐えることができる方法であれば、どのような接合方法であってもよい。   Then, the precast concrete unit 104 is joined to the foundation portion 130. This joining method may be any joining method as long as it can sufficiently withstand even when a large bending moment is generated in the tower structure 100.

次に、図4(c)の斜視図に示すように、基礎部130上に載置したプレキャストコンクリートユニット104の上に、プレキャストコンクリートユニット104を積み上げていく。   Next, as shown in the perspective view of FIG. 4C, the precast concrete unit 104 is stacked on the precast concrete unit 104 placed on the foundation portion 130.

そして、必要な高さになるまでプレキャストコンクリートユニット104の積み上げを行って、塔状構造体100が完成する(図3(a)参照)。   And the precast concrete unit 104 is piled up until it becomes required height, and the tower-like structure 100 is completed (refer Fig.3 (a)).

そして、全てのプレキャストコンクリートユニット104の積み上げが完了したときに、各プレキャストコンクリートユニット104の外周面に形成された溝112同士と溝122同士がそれぞれつながり、図3(a)で示すように、螺旋状の溝110、120が形成される。   When the stacking of all the precast concrete units 104 is completed, the grooves 112 and the grooves 122 formed on the outer peripheral surface of each precast concrete unit 104 are connected to each other, as shown in FIG. Shaped grooves 110 and 120 are formed.

次に、図3(b)に示すように、PC鋼より線132、134を溝110、120に配置する。これにより、PC鋼より線132、134は、互いに反対方向に旋回するように配置される。すなわち、塔状構造体100の上下方向及び周方向にプレストレスを導入する緊張材としてのPC鋼より線132、134が、塔状構造体100の軸106(図2参照)を中心にして螺旋状に配置される。別の言い方をすると、対をなすPC鋼より線132、134が、塔状構造体100の上下方向(軸106)を基準に逆向きに傾斜し、且つ交差するように配置される。
なお、PC鋼より線132、134を溝110、120に配置する方法については後述する。また、PC鋼より線132、134は、塔状構造体100の外周面100Aから視認可能に設けられている。
Next, as shown in FIG. 3 (b), PC steel strands 132 and 134 are arranged in the grooves 110 and 120. Thus, the PC steel stranded wires 132 and 134 are arranged so as to pivot in opposite directions. That is, PC steel strands 132 and 134 as tension materials for introducing prestress in the vertical direction and circumferential direction of the tower-like structure 100 spiral around the axis 106 (see FIG. 2) of the tower-like structure 100. Arranged. In other words, the paired PC steel strands 132 and 134 are disposed so as to incline and intersect in the opposite direction with respect to the vertical direction (axis 106) of the tower-like structure 100.
In addition, the method of arranging the stranded wires 132 and 134 in the grooves 110 and 120 will be described later. Further, the PC steel stranded wires 132 and 134 are provided so as to be visible from the outer peripheral surface 100 </ b> A of the tower-like structure 100.

次に、PC鋼より線132、134の下端を塔状構造体100の下端部に定着具(図示略)によって固定した状態で、上端を緊張ジャッキ(図示略)により引っ張ってPC鋼より線132、134に緊張力を加える。そして、PC鋼より線132、134に緊張力が加えられた状態を保持するように、定着具(図示略)によってPC鋼より線132、134の上端を塔状構造体100の頂部100Uに定着する。   Next, with the lower ends of the PC steel strands 132 and 134 fixed to the lower end of the tower-like structure 100 by a fixing tool (not shown), the upper ends are pulled with a tension jack (not shown) and the PC steel strand 132 is pulled. , 134 is tensioned. Then, the upper ends of the PC steel strands 132 and 134 are fixed to the top portion 100U of the tower-like structure 100 by a fixing tool (not shown) so as to keep the tension applied to the PC steel strands 132 and 134. To do.

このようにして、緊張材としてのPC鋼より線132、134によって、塔状構造体100の螺旋方向(上下方向及び周方向)にプレストレスを導入し、さらに、このプレストレスによってプレキャストコンクリートユニット104同士を圧着接合し、積み上げられた全てのプレキャストコンクリートユニット104を一体化して塔状構造体100を構築する。   In this way, prestress is introduced in the spiral direction (vertical direction and circumferential direction) of the tower-like structure 100 by the PC steel strands 132 and 134 as the tendon material, and further, the precast concrete unit 104 is introduced by this prestress. The tower-like structure 100 is constructed by pressing and joining together and integrating all the precast concrete units 104 stacked.

そして、塔状構造体100の頂部100Uに風車17を設けることで、風力発電用タワー98が構築される。   And the wind power generation tower 98 is constructed | assembled by providing the windmill 17 in the top part 100U of the tower-like structure 100. As shown in FIG.

このように塔状構造体100の構築方法では、プレキャストコンクリートユニット104の組み立て(積み上げ)作業によって合理的に塔状構造体100を構築することができるので、施工コストを低く抑えることができ、工期を短くすることができる。   Thus, in the construction method of the tower-like structure 100, the tower-like structure 100 can be rationally constructed by assembling (stacking) the precast concrete unit 104. Therefore, the construction cost can be kept low, and the construction period Can be shortened.

なお、プレキャストコンクリートユニット104を成形する型枠の内壁に設ける突起部材(目地棒)によって溝112、122を形成することができるので、突起部材の位置を変更することによって打設直前に溝112、122の配置(PC鋼より線132、134の配置位置や傾斜角度(図39(a)の傾斜角度θを参照)を変更することができる。   In addition, since the grooves 112 and 122 can be formed by the protruding members (joint rods) provided on the inner wall of the mold for forming the precast concrete unit 104, the grooves 112 and 122 are formed immediately before placing by changing the position of the protruding members. The arrangement position of 122 (the arrangement position and inclination angle of the PC strands 132 and 134 (see the inclination angle θ in FIG. 39A)) can be changed.

また、このように、塔状構造体100の螺旋方向(上下方向及び周方向)へのプレストレスの導入方法には、コンクリートが固まった後にプレストレスを導入するポストテンション方式が用いられている。   As described above, as a method for introducing prestress in the spiral direction (vertical direction and circumferential direction) of the tower-like structure 100, a post-tension method is used in which prestress is introduced after the concrete is solidified.

ここで、PC鋼より線132、134を溝110、120に配置する方法ついて、図11と図12を用いて説明する。なお、ここで説明する方法は一例であって、どのような方法であってもよい。また、ここでは、PCより線132と溝110とを用いて説明するが、PCより線134と溝120とに関しても同様である。   Here, a method of arranging the PC steel stranded wires 132 and 134 in the grooves 110 and 120 will be described with reference to FIGS. 11 and 12. The method described here is an example, and any method may be used. Here, the PC strand 132 and the groove 110 will be described, but the same applies to the PC strand 134 and the groove 120.

図11に示すように、溝110に沿って送出ローラ906を下降又は上昇させることで、PC鋼線収容リール910に巻かれているPC鋼より線132を送り出し、溝110に配置する。   As shown in FIG. 11, by lowering or raising the delivery roller 906 along the groove 110, the wire 132 is sent out from the PC steel wound around the PC steel wire housing reel 910 and is arranged in the groove 110.

送出ローラ906の下降又は上昇させる機構はどのような機構であってもあってもよい。一例として、図12に示す配線機構900を説明する。   The mechanism for lowering or raising the delivery roller 906 may be any mechanism. As an example, a wiring mechanism 900 shown in FIG. 12 will be described.

図12に示すように、配線機構900は、塔状構造体100よりも大きな直径のリング902を備えている。リング902には錘904が設けられている。リング902の内壁面には、送出ローラ906(図11参照)が設けられている。なお、送出ローラ906は、リング902の内壁面を周方向に移動自在とされている。また、リング902は、図示が省略されているウインチなどの昇降機構によって昇降する。   As shown in FIG. 12, the wiring mechanism 900 includes a ring 902 having a diameter larger than that of the tower structure 100. A weight 904 is provided on the ring 902. A delivery roller 906 (see FIG. 11) is provided on the inner wall surface of the ring 902. The delivery roller 906 is movable on the inner wall surface of the ring 902 in the circumferential direction. The ring 902 is raised and lowered by a lifting mechanism such as a winch (not shown).

そして、このリング902を下降又は上昇させることで、送出ローラ906が溝110に沿って移動しつつ、PC鋼より線132が送り出され、溝110に配置される。   Then, by lowering or raising the ring 902, the wire 132 is sent out from the PC steel and disposed in the groove 110 while the feed roller 906 moves along the groove 110.

次に、本実施形態の作用及び効果について説明する。
塔状構造体100の外周面100Aに螺旋状に巻きつけられ緊張力が付与されたPC鋼より線132、134によって、塔状構造体100の上下方向と周方向とにプレストレス(圧縮力)が導入される。
Next, the operation and effect of this embodiment will be described.
Prestress (compressive force) in the vertical direction and circumferential direction of the tower-like structure 100 by the PC steel strands 132 and 134 that are spirally wound around the outer peripheral surface 100A of the tower-like structure 100 and applied with tension. Is introduced.

すなわち、図39(a)に示す螺旋状に巻かれたPC鋼より線132、134に加えられた斜め方向の緊張力の鉛直成分F1が、図39(b)に示す塔状構造体100の上下方向に導入されるプレストレスとなる。また、図39(a)に示すPC鋼より線132、134に加えられた斜め方向の緊張力の水平成分F2が、図39(c)に示す塔状構造体100の周方向に導入されるプレストレスとなる。   That is, the vertical component F1 of the tensile force in the oblique direction applied to the spirally wound PC steel wires 132 and 134 shown in FIG. 39 (a) is the same as that of the tower-like structure 100 shown in FIG. 39 (b). Prestress is introduced in the vertical direction. Moreover, the horizontal component F2 of the tension force in the diagonal direction applied to the PC steel strands 132 and 134 shown in FIG. 39 (a) is introduced in the circumferential direction of the tower-like structure 100 shown in FIG. 39 (c). It becomes prestress.

塔状構造体100に導入された上下方向のプレストレス(図39(b))によって、地震や風等によって塔状構造体100に作用する曲げモーメントに起因して発生する曲げ引張応力が低減される。よって、上下方向のプレストレスを導入していない構成と比較し、塔状構造体100の引張応力発生部に発生する曲げ引張破壊に対する耐力が向上する。   The prestress in the vertical direction introduced into the tower-like structure 100 (FIG. 39B) reduces the bending tensile stress generated due to the bending moment acting on the tower-like structure 100 due to an earthquake or wind. The Therefore, compared with the structure which does not introduce the prestress of an up-down direction, the yield strength with respect to the bending tensile fracture which generate | occur | produces in the tensile-stress generation part of the tower-like structure 100 improves.

更に、塔状構造体100に導入された周方向のプレストレス(図39(c))によって、塔状構造体100が周方向に拘束されコンファインド効果が発揮される。つまり、塔状構造体100の耐力や靱性が向上する。よって、周方向にプレストレスを導入しない構成と比較し、塔状構造体100の圧縮応力発生部に発生する曲げ圧縮破壊に対する耐力が向上する。   Furthermore, the circumferential prestress introduced into the tower-like structure 100 (FIG. 39C) restrains the tower-like structure 100 in the circumferential direction and exhibits a confining effect. That is, the yield strength and toughness of the tower-like structure 100 are improved. Therefore, as compared with a configuration in which no prestress is introduced in the circumferential direction, the resistance to bending compressive fracture occurring in the compressive stress generating portion of the tower-like structure 100 is improved.

このように塔状構造体100の外周面100Aに巻きつけられ緊張力が付与されたPC鋼より線132、134によって、塔状構造体100の上下方向と周方向とにプレストレスが導入されることにより、曲げ引張破壊耐力と曲げ圧縮破壊耐力の両方が向上する。言い換えると、塔状構造体100の上下方向にのみプレストレスが導入された構成と比較し、曲げ破壊に対する耐力が向上する。   Prestress is introduced into the vertical direction and the circumferential direction of the tower-like structure 100 by the PC steel strands 132 and 134 wound around the outer peripheral surface 100A of the tower-like structure 100 and imparted with tension. As a result, both the bending tensile fracture strength and the bending compression fracture strength are improved. In other words, compared to a configuration in which prestress is introduced only in the vertical direction of the tower-like structure 100, the yield strength against bending fracture is improved.

なお、螺旋状に配置されたPC鋼より線132、134に対して上下方向に緊張力を付与することで、塔状構造体100の上下方向と周方向との両方にプレストレスが導入される。よって、例えば、プレストレスを導入する回数が減少するので、プレストレス導入作業の煩雑さが低減される。   In addition, prestress is introduce | transduced into both the up-down direction and the circumferential direction of the tower-like structure 100 by providing tension | tensile_strength to the up-down direction with respect to the wires 132 and 134 from the PC steel arrange | positioned helically. . Therefore, for example, since the number of times prestress is introduced is reduced, the complexity of the prestress introduction work is reduced.

また、PC鋼より線132の旋回方向とPC鋼より線134の旋回方向とは逆方向である(上下方向を基準に逆向きに傾斜して配置されている)。したがって、PC鋼より線132、134による塔状構造体100の捩れが相殺される。よって、PC鋼より線132の旋回方向とPC鋼より線134の旋回方向とが同方向である構成(上下方向を基準に御同じ向きに傾斜して配置されている構成)と比較し、螺旋状に巻かれたPC鋼より線132、134による塔状構造体100の捩れが防止又は抑制される。   Further, the turning direction of the PC steel twisted wire 132 is opposite to the turning direction of the PC steel twisted wire 134 (arranged in a reverse direction with respect to the vertical direction). Therefore, the twist of the tower-like structure 100 by the PC steel strands 132 and 134 is offset. Therefore, in comparison with a configuration in which the turning direction of the PC steel twisted wire 132 and the turning direction of the PC steel twisted wire 134 are the same direction (configuration arranged to be inclined in the same direction with respect to the vertical direction), the spiral Twisting of the tower-like structure 100 due to the strands 132 and 134 of PC steel wound in a shape is prevented or suppressed.

また、塔状構造体100の外周面100Aに形成された溝110、120にPC鋼より線132、134が配置されることによって、PC鋼より線132、134の上下方向の位置と及び周方向の位置が規制される。よって、溝が無い構成と比較し、PC鋼より線132、134が所望の位置により正確に配置される。   Further, the PC steel stranded wires 132 and 134 are arranged in the grooves 110 and 120 formed on the outer peripheral surface 100A of the tower-like structure 100, whereby the PC steel stranded wires 132 and 134 are positioned in the vertical direction and the circumferential direction. The position of is regulated. Therefore, compared with the structure without a groove, the strands 132 and 134 of PC steel are correctly arrange | positioned by a desired position.

ここで、PC鋼より線132、134は、溝110、120に沿って配置される。よって、溝110、120の塔状構造体100の軸106(図2参照)に対する傾斜角度θ(図39(a)参照)を調整することで、PC鋼より線132、134の傾斜角度θを調整することが可能である。そして、塔状構造体100の軸106に対するPC鋼より線132、134の傾斜角度θを調整することで、塔状構造体100の上下方向と周方向とに導入するプレストレスの大きさを調整することができる。   Here, the PC steel strands 132 and 134 are disposed along the grooves 110 and 120. Therefore, by adjusting the inclination angle θ (see FIG. 39 (a)) of the grooves 110, 120 with respect to the axis 106 (see FIG. 2) of the tower-like structure 100, the inclination angle θ of the stranded wires 132, 134 from the PC steel is adjusted. It is possible to adjust. And the magnitude | size of the prestress introduce | transduced to the up-down direction and the circumferential direction of the tower-like structure 100 is adjusted by adjusting the inclination angle (theta) of the strands 132 and 134 with respect to the axis | shaft 106 of the tower-like structure 100. can do.

例えば、PC鋼より線132、134は、溝110、120に沿って配置されるので、PC鋼より線132、34(溝110、120)の傾斜角度θ(図39(a)参照)を、塔状構造体100の下側と上側とで異ならせることもできる。例えば、塔状構造体100の下側は曲げ応力が大きいので、上下方向のプレストレスが大きくなるようにPC鋼より線の上下方向に対する傾斜角度θを小さくする(垂直に近くする)。一方、塔状構造体100の上側は曲げ応力が小さいので、上下方向よりも周方向のプレストレスを重視してPC鋼より線の上下方向に対する傾斜角度θを大きくする(水平に近くする)。   For example, since the PC steel stranded wires 132 and 134 are disposed along the grooves 110 and 120, the inclination angle θ (see FIG. 39A) of the PC steel stranded wires 132 and 34 (grooves 110 and 120), The lower side and the upper side of the tower-like structure 100 may be different. For example, since the bending stress is large on the lower side of the tower-like structure 100, the inclination angle θ with respect to the vertical direction of the PC steel is reduced (closed to be perpendicular) so that the prestress in the vertical direction is increased. On the other hand, since the bending stress is small on the upper side of the tower-like structure 100, the inclination angle θ with respect to the vertical direction of the wire is increased (closer to the horizontal) than the PC steel by placing importance on the circumferential prestress rather than the vertical direction.

また、例えば、図7に示すように、PCより線132(溝110)と螺旋方向が同方向であるが、軸106(図2参照)との傾斜角度θが異なるPC鋼より線131(溝114)を、配置してもよい。   Further, for example, as shown in FIG. 7, the PC steel strand 131 (groove) has the same spiral direction as the PC strand 132 (groove 110) but has a different inclination angle θ with respect to the shaft 106 (see FIG. 2). 114) may be arranged.

なお、図7の構成の場合は、PCより線132(溝110)よりもPC鋼より線131(溝114)の方が、傾斜角度θ(図39(a)参照)が大きく設定されている。   In the case of the configuration of FIG. 7, the inclination angle θ (see FIG. 39A) is set larger for the wire 131 (groove 114) than the PC steel than for the wire 132 (groove 110). .

この場合、軸106との傾斜角度θが小さいPCより線132は、上下方向のプレストレスが大きく、軸106との傾斜角度θが大きいPCより線131は、周方向のプレストレスが大きくなる。よって、上下方向のプレストレスと周方向のプレストレスをそれぞれ大きくすることができる。また、それぞれのプレストレスを容易に調整することができる。   In this case, the PC 132 line with a small inclination angle θ with the shaft 106 has a large prestress in the vertical direction, and the PC 131 with a large inclination angle θ with the shaft 106 has a large prestress in the circumferential direction. Therefore, the prestress in the vertical direction and the prestress in the circumferential direction can be increased. Moreover, each prestress can be adjusted easily.

また、PCより線131、132にそれぞれ上下方向に緊張力を付与することで、緊張力を付与する回数を少なくしつつ、上下方向のプレストレスと周方向のプレストレスをそれぞれ大きくし、しかも、それぞれを調整することができる。   Also, by applying tension in the vertical direction to the PC wires 131 and 132, respectively, increasing the prestress in the vertical direction and the prestress in the circumferential direction while reducing the number of times the tension is applied, Each can be adjusted.

なお、図示は省略するが、PC鋼より線131、132による塔状構造体100の捩れを相殺させるために、PC鋼より線131、132と旋回方向と逆方向のPC鋼より線を巻いてもよい(対をなす2組(合計四本)のPC鋼より線を巻いてもよい)。   In addition, although illustration is abbreviate | omitted, in order to cancel the twist of the tower-like structure 100 by the PC steel strands 131 and 132, the PC steel strands 131 and 132 and the PC steel wire in the direction opposite to the turning direction are wound. (Two pairs (four in total) in pairs may be wound with PC steel).

また、本実施形態では、図1などに示すように、PCより線132(溝110)とPC鋼より線134(溝120)とが、プレキャストコンクリートユニット104で、一箇所でのみ交差するように配置されていたが、これに限定されない。図8に示すように、PCより線132、134(溝112、122)を密に配置してもよい。   In the present embodiment, as shown in FIG. 1 and the like, the PC stranded wire 132 (groove 110) and the PC steel stranded wire 134 (groove 120) intersect with each other in the precast concrete unit 104 only at one place. Although arranged, it is not limited to this. As shown in FIG. 8, the PC strands 132 and 134 (grooves 112 and 122) may be densely arranged.

また、図40に示すように、溝110よりも溝120の方が深いので、PC鋼より線132とPC鋼より線134との交差部分が接触しない(段差ができない(干渉しない))。   Further, as shown in FIG. 40, since the groove 120 is deeper than the groove 110, the intersection of the PC steel wire 132 and the PC steel wire 134 does not contact (no step is formed (no interference)).

更に、PC鋼より線132が溝110から突出するように、溝110の深さが設定されている。   Further, the depth of the groove 110 is set so that the strand 132 of PC steel protrudes from the groove 110.

よって、図13に示すように、PC鋼より線132を含めた塔状構造体100の水平断面形状が上下方向に対して一様にならない。また、塔状構造体100の水平断面形状は非対称の形状になる。このため、塔状構造体100の外周面100Aに沿って流れる風Kに乱れが生じる。これにより、塔状構造体100の風下側に発生するカルマン渦等が抑制される。したがって、PC鋼より線132が溝110から突出してない構成と比較し、塔状構造体100に発生する渦励振が抑制又は防止される。   Therefore, as shown in FIG. 13, the horizontal cross-sectional shape of the tower-like structure 100 including the strand 132 made of PC steel is not uniform in the vertical direction. Further, the horizontal cross-sectional shape of the tower-like structure 100 is asymmetric. For this reason, the wind K flowing along the outer peripheral surface 100 </ b> A of the tower-like structure 100 is disturbed. Thereby, the Karman vortex etc. which generate | occur | produce in the leeward side of the tower-like structure 100 are suppressed. Therefore, vortex excitation generated in the tower-like structure 100 is suppressed or prevented as compared with a configuration in which the PC steel strand 132 does not protrude from the groove 110.

また、塔状構造体100はコンクリートで構成されているので、例えば、鋼製の構造体と比べて、錆び発生やボルトの疲労等による耐力の低下が少ないので、耐久性が優れている。   In addition, since the tower-like structure 100 is made of concrete, the durability is excellent because, for example, there is less decrease in yield strength due to rusting, bolt fatigue, and the like compared to a steel structure.

また、塔状構造体100は内部に鉄筋が配されていない無筋コンクリートで構成されているので、鉄筋コンクリートで構成された構造体と比較し、鉄筋の錆び発生に伴う耐久性低下の可能性が小さい。更に、鉄筋コンクリートで構成された構造体と比較し、施工性や生産性が向上する。
なお、鉄筋に錆びを発生させないように、塔状構造体100の表面に塗装を行ったり、防錆性に優れた鉄筋を用いることによって、鉄筋コンクリートで塔状構造体100を構成することも当然可能である。
In addition, since the tower-like structure 100 is made of unreinforced concrete in which no reinforcing bars are arranged, there is a possibility that durability may be reduced due to rusting of the reinforcing bars compared to a structure made of reinforced concrete. small. Furthermore, workability and productivity are improved as compared with a structure composed of reinforced concrete.
Of course, the tower-like structure 100 can be made of reinforced concrete by coating the surface of the tower-like structure 100 or using a reinforcing bar having excellent rust prevention properties so as not to rust the reinforcing bars. It is.

なお、PC鋼より線132、134によって、上下方向にプレストレス(圧縮力)が付与さているので、無筋コンクリートであっても、引張力によるひび割れが抑制される。   In addition, since the prestress (compressive force) is provided to the up-down direction by the strands 132 and 134 from PC steel, even if it is unreinforced concrete, the crack by a tensile force is suppressed.

また、繊維補強コンクリートで構成されているので、コンクリートにひび割れが発生した後、ひび割れ面間をつなぎとめることによって引張力を制御する。よって、引張力によるひび割れが更に抑制される。   Moreover, since it consists of fiber reinforced concrete, after a crack generate | occur | produces in concrete, a tensile force is controlled by connecting between crack surfaces. Therefore, the crack by a tensile force is further suppressed.

また、複数のプレキャストコンクリートユニット104を上下方向に積み上げて構成されているので、施工性が向上する。   Further, since the plurality of precast concrete units 104 are stacked in the vertical direction, the workability is improved.

また、プレキャストコンクリートユニット104を施工現場で製作するのでなく、工場等で大量に製作することによって、プレキャストコンクリートユニット104の品質を向上し、且つコストを低減することが可能とされる。   In addition, the quality of the precast concrete unit 104 can be improved and the cost can be reduced by manufacturing the precast concrete unit 104 in large quantities at a factory or the like instead of manufacturing it at the construction site.

なお、プレキャストコンクリートユニット104を成形する型枠の内壁に設ける突起部材(目地棒)によって溝112、122を形成することができるので、突起部材の位置を変更することによって打設直前に溝112、122の配置(PC鋼より線132、134の配置位置や傾斜角度)を変更することができる。   In addition, since the grooves 112 and 122 can be formed by the protruding members (joint rods) provided on the inner wall of the mold for forming the precast concrete unit 104, the grooves 112 and 122 are formed immediately before placing by changing the position of the protruding members. The arrangement of 122 (the arrangement position and inclination angle of the stranded wires 132 and 134 of the PC steel) can be changed.

ここで、構造物に作用する曲げモーメントの大きさは、構造物の高さが高いほど大きく、また頂部が重いほど大きくなる。   Here, the magnitude of the bending moment acting on the structure increases as the height of the structure increases, and increases as the top is heavier.

一般に、地上に近い低い位置よりも地上から離れた高い位置の方が強い風を安定して受けることができるので、風力発電用タワー98の風車17は高い位置に設置されている。つまり、塔状構造体100は高く、その頂部100Uに風車17が配置されている。更に、風車17には、風荷重がかかる。よって、一般的に風力発電用タワー98には大きな曲げモーメントが発生する。   In general, the wind turbine 17 of the wind power generation tower 98 is installed at a high position because a stronger wind can be received more stably at a higher position away from the ground than at a lower position near the ground. That is, the tower-like structure 100 is high, and the windmill 17 is disposed at the top 100U. Further, a wind load is applied to the windmill 17. Accordingly, a large bending moment is generally generated in the tower 98 for wind power generation.

また、風力発電用タワー98は、強い風が安定して吹く、沿岸部、洋上、山岳部等の風の強い地域に設置されることが多い。更に、風力発電用タワー98の設置基数の増加に伴って、風力発電における風況に適した場所や、風力発電用タワーの建設に適した場所が減少してきており、少ない基数の風力発電用タワーでよって多くの発電量を確保することが望まれている。よって、風力発電用タワー98の風車17のブレード16の径は大きくなる傾向にある。また、多くの風を受けせるために風車はより高い位置に設けられる傾向にある。つまり風力発電用タワー98の高さは高くなる傾向にある。このような理由により、風力発電用タワー98には、更に大きな曲げモーメントが発生する。   In addition, the wind power generation tower 98 is often installed in windy areas such as coastal areas, offshore areas, and mountainous areas where strong winds blow stably. Furthermore, as the number of installed wind power generation towers 98 increases, the number of places suitable for wind conditions in wind power generation and the places suitable for construction of wind power generation towers have decreased. Therefore, it is desired to secure a large amount of power generation. Therefore, the diameter of the blade 16 of the windmill 17 of the tower 98 for wind power generation tends to increase. Moreover, in order to receive many winds, a windmill tends to be provided in a higher position. That is, the height of the tower 98 for wind power generation tends to increase. For this reason, a larger bending moment is generated in the tower 98 for wind power generation.

したがって、曲げモーメントに起因する曲げ破壊に対する耐力が向上した本実施形態のような塔状構造体100を風力発電用タワー98として利用することは好適である。つまり、より大きな風車17をより高い位置に、更により強い風が吹く場所に設置することが可能とされ、その結果、大きな電力を得られる。   Therefore, it is preferable to use the tower-like structure 100 as in this embodiment having improved resistance to bending fracture caused by the bending moment as the tower 98 for wind power generation. That is, it is possible to install a larger windmill 17 at a higher position and a place where a stronger wind blows, and as a result, large electric power can be obtained.

更に、PC鋼より線132、134が塔状構造体100の外周面100Aから視認可能な構成とすることで、PC鋼より線132、134の検査やメンテナンスが容易に行なうことができる。よって、風の強い場所である沿岸部、洋上、山岳部等に設置することが多い風力発電用タワー98として利用することは好適とされる。   Further, by making the PC steel strands 132 and 134 visible from the outer peripheral surface 100A of the tower-like structure 100, the inspection and maintenance of the PC steel strands 132 and 134 can be easily performed. Therefore, it is suitable to use as a tower 98 for wind power generation that is often installed in coastal areas, offshore, mountainous areas and the like where wind is strong.

なお、本実施形態では、塔状構造体100の上下方向及び周方向へのプレストレスの導入方法に、ポストテンション方式を用いた例を示したが、塔状構造体100の上下方向及び周方向へのプレストレスの導入方法に、コンクリートが固まる前にプレストレスを導入するプレテンション方式を用いてもよい。   In the present embodiment, the post-tension method is used as the method for introducing the prestress in the vertical direction and the circumferential direction of the tower-like structure 100. A pre-tension method for introducing pre-stress before the concrete has hardened may be used as a method for introducing pre-stress into the material.

また、図5(a)〜(c)に示すように、工場や現場ヤード等で製作する際にプレテンション方式により螺旋方向に個々にプレストレスが導入されているプレキャストコンクリートユニット104同士を、PC鋼より線138によって圧着接合するようにしてもよい。なお、図5(b)は、図5(a)の斜視図のE−E矢視図であり、図5(c)は、図5(a)のF−F矢視図である。   In addition, as shown in FIGS. 5 (a) to 5 (c), precast concrete units 104 in which prestress is individually introduced in the spiral direction by a pretensioning method when manufacturing in a factory or on-site yard, etc. You may make it crimp-bond with the steel strand 138. FIG. 5B is a EE arrow view of the perspective view of FIG. 5A, and FIG. 5C is a FF arrow view of FIG. 5A.

これらの図には、上下方向に対して角度をもって配置されたPC鋼より線138によってプレテンション方式のプレストレスが螺旋方向に個々に導入されたプレキャストコンクリートユニット104同士が接合されている例が示されている。すなわち、プレキャストコンクリートユニット104の外周面104Aに形成された突起部146内に設けられたPC鋼より線138の両端部は、定着具144によって支圧板142を介してプレキャストコンクリートユニット104に定着されている。   These drawings show an example in which precast concrete units 104 into which pre-tension type prestresses are individually introduced in the spiral direction are joined together by PC steel strands 138 arranged at an angle with respect to the vertical direction. Has been. That is, both ends of the PC steel stranded wire 138 provided in the protrusions 146 formed on the outer peripheral surface 104A of the precast concrete unit 104 are fixed to the precast concrete unit 104 via the support plate 142 by the fixing tool 144. Yes.

なお、PC鋼より線138は、突起部146内に設けられていなくてもよい。外周面10Aから視認可能に設けられていてもよい。或いは、外周面100Aに溝を設けその中に配置するようにしてもよい。   Note that the PC steel stranded wire 138 may not be provided in the protrusion 146. It may be provided so as to be visible from the outer peripheral surface 10A. Alternatively, a groove may be provided in the outer peripheral surface 100A and disposed therein.

また、本実施形態では、プレキャストコンクリートユニット104を積み上げることによって、塔状構造体100を形成する例を示したが、他の組み立て方法で行ってもよい。   Moreover, although the example which forms the tower-like structure 100 by piling up the precast concrete unit 104 was shown in this embodiment, you may carry out with another assembly method.

例えば、プレキャストコンクリートユニット104を周方向に分割された複数のプレキャストコンクリート部材(図示略)で構成されていてもよい。更に、プレキャストコンクリート部材同士を、PC鋼より線132、134によって圧着接合するようにしてもよい。この場合、ポストテンション方式によるプレストレスの導入は、工場製作時に行ってもよいし、PC鋼より線によるプレキャストコンクリート部材同士の圧着接合作業の直前に行ってもよい。   For example, the precast concrete unit 104 may be composed of a plurality of precast concrete members (not shown) divided in the circumferential direction. Further, the precast concrete members may be pressure-bonded to each other with PC steel strands 132 and 134. In this case, the introduction of the prestress by the post-tension method may be performed at the time of factory production, or may be performed immediately before the pressure bonding operation between the precast concrete members using the PC steel strands.

また、本実施形態では、必要な高さになるまでプレキャストコンクリートユニット104の積み上げを行った後に、PC鋼より線132、134で塔状構造体100に螺旋方向のプレストレスを導入した例を示したが、螺旋方向のプレストレスを導入するタイミングは適宜決めればよい。例えば、プレキャストコンクリートユニット104を1つ積み上げる毎に螺旋方向のプレストレスを導入してもよいし、プレキャストコンクリートユニット104を所定数、例えば4つ積み上げる毎に、螺旋方向のプレストレスを導入してもよい。   Further, in the present embodiment, an example is shown in which the precast concrete unit 104 is stacked up to a required height, and then a prestress in a spiral direction is introduced into the tower structure 100 with PC steel strands 132 and 134. However, the timing for introducing the prestress in the spiral direction may be determined as appropriate. For example, a prestress in the spiral direction may be introduced every time one precast concrete unit 104 is stacked, or a prestress in the spiral direction may be introduced every predetermined number of precast concrete units 104, for example, four. Good.

また、本実施形態では、プレキャストコンクリートユニット104同士をプレストレスにより圧着接合した例を示したが、他の方法で接合してもよい。   Further, in the present embodiment, an example in which the precast concrete units 104 are pressure-bonded and joined by pre-stress has been shown, but may be joined by other methods.

例えば、塔状構造体100が鉄筋コンクリートで構成されている場合、図6(a)、(b)に示すように、プレキャストコンクリートユニット104に設けられた鉄筋148同士を機械式継ぎ手150等で接続し、プレキャストコンクリートユニット104の接合面同士の間に形成される隙間にグラウトWを充填するようにしてもよい。
また、塔状構造体100の大部分が無筋コンクリートで構成されている場合でも、接合部付近のみ当該ディテールを採用することも可能である。
For example, when the tower-like structure 100 is made of reinforced concrete, as shown in FIGS. 6A and 6B, the reinforcing bars 148 provided in the precast concrete unit 104 are connected to each other with a mechanical joint 150 or the like. The grout W may be filled in a gap formed between the joint surfaces of the precast concrete unit 104.
Further, even when most of the tower-like structure 100 is made of unreinforced concrete, it is possible to adopt the details only in the vicinity of the joint.

図6(a)は、プレキャストコンクリートユニット104同士が接合される前の状態であり、図6(b)は、プレキャストコンクリートユニット104同士が接合された(鉄筋148同士が接続された)状態である。   6A is a state before the precast concrete units 104 are joined together, and FIG. 6B is a state where the precast concrete units 104 are joined together (rebars 148 are connected). .

図6(a)に示すように、シース管152によって形成された収容孔154に、プレキャストコンクリートユニット104の接合面から突出しないように機械式継ぎ手150を収容しておく。   As shown in FIG. 6A, the mechanical joint 150 is accommodated in the accommodation hole 154 formed by the sheath tube 152 so as not to protrude from the joint surface of the precast concrete unit 104.

そして、図6(b)に示すように、プレキャストコンクリートユニット104同士を接合するときに、収容孔154から機械式継ぎ手150を引き出し、シース管158により形成された挿入孔160に挿入して、機械式継ぎ手150を介して鉄筋148同士を接続する。   6B, when joining the precast concrete units 104 to each other, the mechanical joint 150 is pulled out from the accommodation hole 154 and inserted into the insertion hole 160 formed by the sheath tube 158. The reinforcing bars 148 are connected to each other through the expression joint 150.

このようにすれば、水平方向又は横方向にプレキャストコンクリートユニット104を移動させてプレキャストコンクリートユニット104を配置することができる。なお、ボルト156は、載置されるプレキャストコンクリートユニット104のレベル調整のために設けられている。   In this way, the precast concrete unit 104 can be arranged by moving the precast concrete unit 104 in the horizontal direction or the horizontal direction. The bolt 156 is provided for level adjustment of the precast concrete unit 104 to be placed.

また、本実施形態では、深さの異なる二つの溝110と溝120とにPC鋼より線132、134を配置していたが、これに限定されない(図40を参照)。   Moreover, in this embodiment, although PC steel strands 132 and 134 were arrange | positioned in the two groove | channels 110 and the groove | channel 120 from which depth differs, it is not limited to this (refer FIG. 40).

例えば、図9(a)に示すように、深さの異なる三つの溝111、113、115に、PC鋼より線135、137、139を配置してしてもよい。   For example, as shown in FIG. 9A, PC steel strands 135, 137, and 139 may be disposed in three grooves 111, 113, and 115 having different depths.

或いは、図9(b)に示すように、深さの異なる三つの溝121、123、125にPC鋼より線135、137、139を配置してしてもよい。この場合、最も深い溝121にはPC鋼より線135とPC鋼より線137との間、及び、PC鋼より線137とPC鋼より線139との間に、それぞれスペーサ129を挟んで配置する。二番目に深い溝125には、PC鋼より線135とPC鋼より線137との間にスペーサ129を挟んで配置するようにする。   Alternatively, as shown in FIG. 9B, PC steel strands 135, 137, and 139 may be arranged in three grooves 121, 123, and 125 having different depths. In this case, in the deepest groove 121, a spacer 129 is interposed between the PC steel strand 135 and the PC steel strand 137, and between the PC steel strand 137 and the PC steel strand 139, respectively. . In the second deepest groove 125, a spacer 129 is interposed between the PC steel strand 135 and the PC steel strand 137.

また、本実施形態では、塔状構造体100を一定の壁厚を有する円錐状としたが、これに限定されない。塔状構造体100は、円錐形状以外の他の形状の構造体であってもよい。例えば、円筒状であってもよいし、正方形や三角形等の多角形の水平断面を有する角筒状の構造体としてもよい。更に、中空(内部が空洞)でなく、中実であってもよい。   In the present embodiment, the tower-like structure 100 has a conical shape with a constant wall thickness, but is not limited thereto. The tower-like structure 100 may be a structure having a shape other than the conical shape. For example, it may be a cylindrical shape, or may be a rectangular tube-shaped structure having a polygonal horizontal cross section such as a square or a triangle. Further, it may be solid rather than hollow (the inside is hollow).

更に、図10に示すように、外周面101Aが階段状の塔状構造体101であってもよい。この場合、溝119、129は階段状でなく、図10(b)の説明図に示すように溝119、129の底119A、129Aを傾斜面とする。なお、図10(b)は、判りやすく説明するための説明図であり、図10(a)の所定の断面を示すものではない。   Furthermore, as shown in FIG. 10, the outer peripheral surface 101 </ b> A may be a step-like tower-like structure 101. In this case, the grooves 119 and 129 are not stepped, and the bottoms 119A and 129A of the grooves 119 and 129 are inclined surfaces as shown in the explanatory view of FIG. FIG. 10B is an explanatory diagram for easy understanding, and does not show a predetermined cross section of FIG.

なお、このように塔状構造体101の外周面101Aに段差や凹凸がある場合であっても、段差や凹凸を解消するように溝119、129を形成することで、PC鋼より線132、134が段差や凹凸に影響されることなく、塔状構造体101の外周面101AにPC鋼より線が容易に配置される。   Even if there is a step or unevenness on the outer peripheral surface 101A of the tower-like structure 101 in this way, by forming the grooves 119 and 129 so as to eliminate the step or unevenness, the PC steel stranded wire 132, A wire is easily arranged from the PC steel on the outer peripheral surface 101A of the tower-like structure 101 without being affected by steps or unevenness.

<第二実施形態>
つぎに、本発明に係る第二実施形態について図14〜図21を用いて説明する。なお、第一実施形態と同一の部材には同一の符号を付し、重複する説明は省略する。
<Second embodiment>
Next, a second embodiment according to the present invention will be described with reference to FIGS. In addition, the same code | symbol is attached | subjected to the member same as 1st embodiment, and the overlapping description is abbreviate | omitted.

図14の立面図に示すように、風力発電用タワー10は、塔状構造体12の頂部12Uに、ブレード16及びナセル18を備える風車17が設けられた構成とされている。
塔状構造体12は、無筋の繊維補強コンクリート製とされ、地盤14に基礎杭24を介して支持された基礎部26上に立てられている。
As shown in the elevation view of FIG. 14, the wind power generation tower 10 has a configuration in which a windmill 17 including a blade 16 and a nacelle 18 is provided on the top 12U of the tower-like structure 12.
The tower-like structure 12 is made of unreinforced fiber reinforced concrete, and is erected on a foundation portion 26 supported on the ground 14 via foundation piles 24.

塔状構造体12の外周面12Aの上下方向及び周方向には、PC鋼より線54、58(図18参照)と及びPC鋼より線44(図15参照)に配置されている。これらPC鋼より線54、58(図18参照)と及びPC鋼より線44(図15参照)に、緊張力が加えられることにより、塔状構造体12の上下方向及び周方向にプレストレスが導入されている。   In the vertical direction and the circumferential direction of the outer peripheral surface 12A of the tower-like structure 12, they are arranged on PC steel strands 54 and 58 (see FIG. 18) and PC steel strand 44 (see FIG. 15). By applying tension to the PC steel strands 54 and 58 (see FIG. 18) and the PC steel strand 44 (see FIG. 15), prestress is applied in the vertical and circumferential directions of the tower-like structure 12. Has been introduced.

塔状構造体12は、複数のプレキャストコンクリートユニット20、22を交互に積み上げることにより形成されている。   The tower-like structure 12 is formed by alternately stacking a plurality of precast concrete units 20 and 22.

図15、図16に示すように、プレキャストコンクリートユニット22は、一定の壁厚を有し平断面が正八角形状の筒体とされている。また、プレキャストコンクリートユニット22を周方向に分割した複数のプレキャストコンクリート部材28によって構成されている。なお、本実施形態では、プレキャストコンクリートユニット22は周方向に4つに分割されている。つまり、プレキャストコンクリートユニット22は4つのプレキャストコンクリート部材28によって構成されている。   As shown in FIGS. 15 and 16, the precast concrete unit 22 is a cylinder having a constant wall thickness and a regular octagonal cross section. The precast concrete unit 22 is constituted by a plurality of precast concrete members 28 obtained by dividing the precast concrete unit 22 in the circumferential direction. In the present embodiment, the precast concrete unit 22 is divided into four in the circumferential direction. That is, the precast concrete unit 22 is composed of four precast concrete members 28.

また、プレキャストコンクリートユニット20もプレキャストコンクリートユニット2と同様に一定の壁厚を有し水平断面が正八角形状の筒体とされ、周方向に分割された複数のプレキャストコンクリート部材29(図19を参照)によって構成されている。   Similarly to the precast concrete unit 2, the precast concrete unit 20 has a constant wall thickness and has a horizontal octagonal cylindrical body, and a plurality of precast concrete members 29 divided in the circumferential direction (see FIG. 19). ).

図16、図17に示すように、各プレキャストコンクリート部材28、29(プレキャストコンクリートユニット20、22)には、周方向に溝30が形成されている。溝30は上下方向に所定の間隔をあけて複数形成されている。また、各プレキャストコンクリート部材28、29(プレキャストコンクリートユニット20、22)には、上下方向にも溝36が形成されている。溝36は周方向に所定の間隔をあけて複数形成されている。   As shown in FIGS. 16 and 17, grooves 30 are formed in the circumferential direction in each precast concrete member 28, 29 (precast concrete unit 20, 22). A plurality of grooves 30 are formed at predetermined intervals in the vertical direction. In addition, a groove 36 is formed in each of the precast concrete members 28 and 29 (precast concrete units 20 and 22) in the vertical direction. A plurality of grooves 36 are formed at predetermined intervals in the circumferential direction.

なお、周方向の溝30は上下方向の溝36よりも深く形成されている。また、図14等では、煩雑になるのをさけるため、溝の図示が省略されている。   The circumferential groove 30 is formed deeper than the vertical groove 36. Moreover, in FIG. 14 etc., illustration of a groove | channel is abbreviate | omitted in order to avoid becoming complicated.

図15〜図17に示すように、周方向の溝30の端部には、支圧板38及び定着具40が設けられるスペースとなる切欠き部42が形成されている。   As shown in FIGS. 15-17, the notch part 42 used as the space in which the pressure bearing plate 38 and the fixing tool 40 are provided is formed in the edge part of the groove | channel 30 of the circumferential direction.

プレキャストコンクリートユニット20、22を製作する場合には、まず、図15、図16、図19(c)に示すように、各プレキャストコンクリート部材28、29を正八角形状に配置する。   When the precast concrete units 20 and 22 are manufactured, first, the precast concrete members 28 and 29 are arranged in a regular octagonal shape as shown in FIGS. 15, 16, and 19 (c).

次に、溝30に、PC鋼より線44を配置する。すなわち、プレキャストコンクリートユニット20、22(塔状構造体12)の周方向にPC鋼より線44を配置する。   Next, the PC steel strand 44 is arranged in the groove 30. That is, the PC steel strand 44 is arranged in the circumferential direction of the precast concrete units 20 and 22 (the tower-like structure 12).

次に、PC鋼より線44の両端を緊張ジャッキ(不図示)により引っ張ってPC鋼より線44に緊張力を加える。そして、PC鋼より線44に緊張力が加えられた状態を保持するように、定着具40によってPC鋼より線44の両端部が支圧板38を介しプレキャストコンクリート部材28に定着される。これにより、塔状構造体12の周方向に配置されるPC鋼より線44によって、塔状構造体12の周方向にプレストレスが導入される。   Next, both ends of the stranded wire 44 of the PC steel are pulled by a tension jack (not shown) to apply tension to the stranded wire 44 of the PC steel. Then, both ends of the PC steel strand 44 are fixed to the precast concrete member 28 via the bearing plate 38 by the fixing tool 40 so as to maintain a state in which tension is applied to the PC steel strand 44. Thus, prestress is introduced in the circumferential direction of the tower-like structure 12 by the PC steel strands 44 arranged in the circumferential direction of the tower-like structure 12.

このようにして、PC鋼より線44により塔状構造体12の周方向にプレストレスを導入し、更に、PC鋼より線44により、プレキャストコンクリート部材28同士が圧着接合されて、一体化したプレキャストコンクリートユニット20、22が構成される。   In this way, prestress is introduced in the circumferential direction of the tower-like structure 12 by the PC steel strand 44, and the precast concrete members 28 are pressure-bonded to each other by the PC steel strand 44, and integrated precast. Concrete units 20 and 22 are configured.

また、このように、塔状構造体12の周方向へのプレストレスの導入方法には、コンクリートが固まった後にプレストレスを導入するポストテンション方式が用いられている。   As described above, as a method for introducing prestress in the circumferential direction of the tower-like structure 12, a post-tension method is used in which prestress is introduced after the concrete is solidified.

図18(a)及び図18(b)に示すように、積み上げられた各プレキャストコンクリートユニット20、22の上端部には凸部46が形成され、下端部にはこの凸部46が挿入される凹部48が形成されている。   As shown in FIGS. 18 (a) and 18 (b), a convex portion 46 is formed at the upper end portion of each of the stacked precast concrete units 20, 22, and this convex portion 46 is inserted at the lower end portion. A recess 48 is formed.

これにより、積み上げられたプレキャストコンクリートユニット20、22を一体化する前の、プレキャストコンクリートユニット20、22を積み上げただけの状態においても、プレキャストコンクリートユニット20、22が脱落することを防ぐことができる。 なお、プレキャストコンクリートユニット20、22の脱落の畏れが無い場合は、凸部46と凹部48がなくてもよい。或いは別の方法で、プレキャストコンクリートユニット20、22の脱落を防止してもよい。   Thereby, it is possible to prevent the precast concrete units 20 and 22 from falling off even when the precast concrete units 20 and 22 are simply stacked before the stacked precast concrete units 20 and 22 are integrated. In addition, when there is no drop of the precast concrete units 20 and 22, the convex portion 46 and the concave portion 48 may be omitted. Alternatively, the precast concrete units 20 and 22 may be prevented from falling off by another method.

なお、説明の都合上、図18(a)、(b)では、プレキャストコンクリートユニット20をプレキャストコンクリートユニット20A〜20Dとし、プレキャストコンクリートユニット22をプレキャストコンクリートユニット22A〜22Dとしている。さらに、積み上げられているプレキャストコンクリートユニット20、22を下から上へ順に、プレキャストコンクリートユニット20A、22A、20B、22B、20C、22C、20D、22Dとしている。また、塔状構造体12の周方向にプレストレスを導入するPC鋼より線44等は省略している。   For convenience of explanation, in FIGS. 18A and 18B, the precast concrete unit 20 is designated as precast concrete units 20A to 20D, and the precast concrete unit 22 is designated as precast concrete units 22A to 22D. Further, the precast concrete units 20 and 22 that are stacked are precast concrete units 20A, 22A, 20B, 22B, 20C, 22C, 20D, and 22D in order from the bottom to the top. Moreover, the wire 44 etc. are abbreviate | omitted from PC steel which introduces prestress to the circumferential direction of the tower-like structure 12. FIG.

図18(a)、(b)に示すように、プレキャストコンクリートユニット20、22の外壁面も溝36の端部には、切欠部52が形成されている。   As shown in FIGS. 18A and 18B, the outer wall surfaces of the precast concrete units 20 and 22 are also formed with notches 52 at the ends of the grooves 36.

図18(a)に示すように、切欠部52は、プレキャストコンクリートユニット20A、22B、20C、22Dに設けられている。   As shown in FIG. 18A, the notch 52 is provided in the precast concrete units 20A, 22B, 20C, and 22D.

溝36にはPC鋼より線54が配置されており、このPC鋼より線54には緊張ジャッキ(不図示)により緊張力が加えられている。そして、PC鋼より線54に緊張力が加えられたこの状態を保持するように、定着具56によってPC鋼より線54の両端部がプレキャストコンクリートユニット20、22に定着されている。   A PC steel stranded wire 54 is arranged in the groove 36, and a tension force is applied to the PC steel stranded wire 54 by a tension jack (not shown). Then, both ends of the PC steel strand 54 are fixed to the precast concrete units 20 and 22 by the fixing tool 56 so as to maintain this state in which tension is applied to the PC steel strand 54.

これにより、プレキャストコンクリートユニット20A、22A、20B、22Bは一体化され(第一構造体60)、プレキャストコンクリートユニット20C、22C、20D、22Dは一体化されている(第二構造体62)。   Thereby, the precast concrete units 20A, 22A, 20B, and 22B are integrated (first structure 60), and the precast concrete units 20C, 22C, 20D, and 22D are integrated (second structure 62).

図18(b)に示すように、切欠部52は、プレキャストコンクリートユニット22A、20B、22C、20Dに設けられ、緊張力が加えられたPC鋼より線58により、プレキャストコンクリートユニット20B、22B、20C、22Cが一体化されている(第三構造体64)。   As shown in FIG. 18 (b), the notch 52 is provided in the precast concrete units 22A, 20B, 22C, and 20D, and the precast concrete units 20B, 22B, and 20C are formed by PC steel strands 58 to which tension is applied. , 22C are integrated (third structure 64).

ここで、第一構造体60と第二構造体62とは、PC鋼より線54の隣に配置されたPC鋼より線58によって導入されるプレストレスにより、圧着接合される。これにより、塔状構造体12の上下方向に配置される上下方向緊張材としてのPC鋼より線54、58によって、塔状構造体12の上下方向にプレストレスが導入される。   Here, the first structure 60 and the second structure 62 are pressure-bonded by prestress introduced by the PC steel strand 58 disposed adjacent to the PC steel strand 54. Thus, prestress is introduced in the vertical direction of the tower-like structure 12 by the PC steel strands 54 and 58 as the vertical tension members arranged in the vertical direction of the tower-like structure 12.

このように、塔状構造体12の上下方向へのプレストレスの導入方法には、コンクリートが固まった後にプレストレスを導入するポストテンション方式が用いられている。   Thus, as a method for introducing prestress in the vertical direction of the tower-like structure 12, a post-tension method is used in which prestress is introduced after the concrete has hardened.

次に、塔状構造体12の構築方法についての一例について説明する。
まず、図19(a)の斜視図に示すように、基礎杭24上に鉄筋コンクリート製の基礎部26を形成する。基礎部26は、塔状構造体12を確実に支持できる構造であれば他の構造であってもよい。例えば、基礎部26をプレストレストコンクリートによって形成してもよいし、鋼製にしてもよい。
Next, an example of a method for constructing the tower structure 12 will be described.
First, as shown in the perspective view of FIG. 19A, a reinforced concrete foundation portion 26 is formed on the foundation pile 24. The base portion 26 may have another structure as long as it can reliably support the tower-like structure 12. For example, the base portion 26 may be made of prestressed concrete or made of steel.

次に、図19(b)の斜視図に示すように、現場の仮組みヤード等において、クレーン等を用いてプレキャストコンクリート部材28を正八角形状に配置する。   Next, as shown in the perspective view of FIG. 19B, the precast concrete member 28 is arranged in a regular octagon shape using a crane or the like in a temporary assembly yard or the like at the site.

次に、図19(c)の斜視図に示すように、プレキャストコンクリートユニット22とほぼ同じ(プレキャストコンクリートユニット22に突起部66が形成されていない)構成のプレキャストコンクリートユニット20を製作する。すなわち、溝30に、PC鋼より線44を配置する。そして、PC鋼より線44に緊張力を加えてプレキャストコンクリートユニット20(塔状構造体12)の周方向にプレストレスを導入し、さらに、PC鋼より線44によって、プレキャストコンクリート部材28同士を圧着接合して一体化したプレキャストコンクリートユニット20を形成する。   Next, as shown in the perspective view of FIG. 19C, the precast concrete unit 20 having the same configuration as the precast concrete unit 22 (the protrusion 66 is not formed on the precast concrete unit 22) is manufactured. That is, the PC steel strand 44 is arranged in the groove 30. Then, tension is applied to the PC steel strand 44 to introduce prestress in the circumferential direction of the precast concrete unit 20 (tower structure 12), and the precast concrete members 28 are crimped together by the PC steel strand 44. The precast concrete unit 20 joined and integrated is formed.

次に、図20(d)の斜視図に示すように、基礎部26上に図19(c)で製作されたプレキャストコンクリートユニット20を載置する。そして、基礎部26にプレキャストコンクリートユニット20を接合する。この接合方法は、塔状構造体12に大きな曲げモーメントが作用した場合においても十分に耐えることができる方法であればよい。第一実施形態と同様の方法を用いて、上下方向緊張材によって基礎部26にプレキャストコンクリートユニット20を圧着接合してもよい。   Next, as shown in the perspective view of FIG. 20D, the precast concrete unit 20 manufactured in FIG. 19C is placed on the foundation portion 26. Then, the precast concrete unit 20 is joined to the foundation portion 26. This joining method may be a method that can sufficiently withstand even when a large bending moment acts on the tower-like structure 12. The precast concrete unit 20 may be pressure-bonded to the base portion 26 with a vertical tension material using the same method as in the first embodiment.

次に、図20(e)の斜視図に示すように、基礎部26上に4つのプレキャストコンクリートユニット20A、22A、20B、22Bを積み上げた状態で、PC鋼より線54によって塔状構造体12の上下方向にプレストレスを導入し、これら4つのプレキャストコンクリートユニット20A、22A、20B、22Bを一体にして第一構造体60を形成する。   Next, as shown in the perspective view of FIG. 20 (e), in the state where four precast concrete units 20A, 22A, 20B, 22B are stacked on the foundation portion 26, the tower-like structure 12 is formed by the PC steel strand 54. Prestress is introduced in the vertical direction, and the four precast concrete units 20A, 22A, 20B, and 22B are integrated to form the first structure 60.

次に、図20(f)の斜視図に示すように、第一構造体60上に次の4つのプレキャストコンクリートユニット20C、22C、20D、22Dを積み上げる。そして、この状態で、PC鋼より線54によって塔状構造体12の上下方向にプレストレスを導入し、4つのプレキャストコンクリートユニット20C、22C、20D、22Dを一体にして第二構造体62(図18(a)参照)を形成する。   Next, as shown in the perspective view of FIG. 20F, the following four precast concrete units 20C, 22C, 20D, and 22D are stacked on the first structure 60. In this state, prestress is introduced in the vertical direction of the tower-like structure 12 by the PC steel strand 54, and the four precast concrete units 20C, 22C, 20D, 22D are integrated into the second structure 62 (FIG. 18 (a)).

次に、図18(b)で示したように、PC鋼より線58によって塔状構造体12の上下方向にプレストレス導入し、第一構造体60と第二構造体62とを圧着接合する。   Next, as shown in FIG. 18B, prestress is introduced in the vertical direction of the tower-like structure 12 by the PC steel strand 58, and the first structure 60 and the second structure 62 are joined by pressure bonding. .

あとは、必要な高さになるまで図20(e)、(f)の作業を繰り返し行って、塔状構造体12を構築する。   After that, the operations shown in FIGS. 20E and 20F are repeated until the required height is reached, and the tower-like structure 12 is constructed.

このように、図19(a)〜(c)、及び図20(d)〜(f)で示した塔状構造体12の構築方法では、プレキャストコンクリートユニット20、22の組み立て(積み上げ)作業によって合理的に塔状構造体12を構築することができるので、施工コストを低く抑えることができ、工期を短くすることができる。   Thus, in the construction method of the tower-like structure 12 shown in FIGS. 19A to 19C and FIGS. 20D to 20F, the precast concrete units 20 and 22 are assembled (stacked). Since the tower-like structure 12 can be reasonably constructed, the construction cost can be kept low, and the construction period can be shortened.

次に、本実施形態の作用及び効果について説明する。
上下方向に配置された緊張力が付与されたPC鋼より線54、58によって、上下方向のプレストレスが導入され、周方向に配置され緊張力が付与されたPC鋼より線44によって周方向のプレストレスが導入される。これらにより曲げ破壊が起きにくいコンクリート製の塔状構造体12が構築される。
Next, the operation and effect of this embodiment will be described.
The pre-stress in the vertical direction is introduced by the PC steel strands 54 and 58 to which the tensile force arranged in the vertical direction is applied, and the circumferential direction is introduced by the PC steel strand 44 arranged in the circumferential direction and provided with the tensile force. Prestress is introduced. As a result, a concrete tower-like structure 12 that is less susceptible to bending failure is constructed.

溝36は溝30よりも深く形成されているので、PC鋼より線54、58とPC鋼より線44との交差部分が干渉しない。   Since the groove 36 is formed deeper than the groove 30, the intersecting portion between the PC steel strands 54, 58 and the PC steel strand 44 does not interfere.

また、塔状構造体12の上下方向と周方向とに導入するプレストレスを個々に調整できる。すなわち、塔状構造体12の上下方向と周方向とに最適な大きさのプレストレスを導入することができる。   Moreover, the prestress introduced into the up-down direction and the circumferential direction of the tower-like structure 12 can be adjusted individually. That is, it is possible to introduce prestress having an optimum size in the vertical direction and the circumferential direction of the tower-like structure 12.

また、塔状構造体12(プレキャストコンクリートユニット20、22)に導入される周方向のプレストレスを利用して、プレキャストコンクリート部材28同士を圧着接合することができる。   Moreover, the precast concrete members 28 can be pressure-bonded to each other using the circumferential prestress introduced into the tower-like structure 12 (precast concrete units 20 and 22).

なお、本実施形態では、塔状構造体12の上下方向及び周方向へのプレストレスの導入方法に、ポストテンション方式を用いた例を示したが、塔状構造体12の上下方向及び周方向へのプレストレスの導入方法に、コンクリートが固まる前にプレストレスを導入するプレテンション方式を用いてもよい。   In the present embodiment, the post-tension method is used as the method for introducing the prestress in the vertical direction and the circumferential direction of the tower-like structure 12, but the vertical direction and the circumferential direction of the tower-like structure 12 are shown. A pre-tension method for introducing pre-stress before the concrete has hardened may be used as a method for introducing pre-stress into the material.

また、工場や現場ヤード等で製作する際にプレテンション方式により周方向にプレストレスが導入されているプレキャストコンクリート部材28同士を、PC鋼より線44によって圧着接合するようにしてもよい。   Further, when manufactured in a factory, an on-site yard or the like, the precast concrete members 28 into which prestress is introduced in the circumferential direction by a pre-tension method may be bonded by crimping with a PC steel wire 44.

また、図21に示すように、上下方向に沿って形成された溝79に配置されたPC鋼より線78によってプレキャストコンクリート部材28の上下方向にポストテンション方式のプレストレスが導入され、且つ、上下方向に配置されたこのプレキャストコンクリート部材28同士を上下方向に沿って形成された溝81に配置されたPC鋼より線80によって圧着接合してもよい。   Further, as shown in FIG. 21, a post-tension type prestress is introduced in the vertical direction of the precast concrete member 28 by the PC steel strand 78 arranged in the groove 79 formed in the vertical direction, and the vertical direction The precast concrete members 28 arranged in the direction may be pressure-bonded by a PC steel strand 80 arranged in a groove 81 formed in the vertical direction.

この場合、PC鋼より線78によるプレストレスの導入は、プレキャストコンクリート部材28の工場製作時に行ってもよいし、PC鋼より線80によるプレキャストコンクリート部材28同士の圧着接合作業の直前に行ってもよい。   In this case, the introduction of the prestress by the PC steel strand 78 may be performed at the time of factory production of the precast concrete member 28 or may be performed immediately before the crimping and joining operation of the precast concrete members 28 by the PC steel strand 80. Good.

また、工場や現場ヤード等で製作する際にプレテンション方式により上下方向にプレストレスが導入されているプレキャストコンクリート部材28同士を、PC鋼より線によって圧着接合するようにしてもよい。   In addition, precast concrete members 28 into which prestress is introduced in the vertical direction by a pretension method when manufactured in a factory, a site yard, or the like may be pressure-bonded and joined by a PC steel strand.

また、本実施形態では、塔状構造体12を正八角形状の水平断面を有する角筒状の構造体としたが、塔状構造体12は、他の形状の構造体であってもよい。例えば、正方形や三角形等の多角形の水平断面を有する角筒状の構造体としてもよいし、円筒状、角柱状、円柱状、角錐状、又は円錐状の構造体としてもよい。   Moreover, in this embodiment, although the tower-like structure 12 was made into the square cylinder-shaped structure which has a regular octagonal horizontal cross section, the tower-like structure 12 may be a structure of another shape. For example, a prismatic structure having a polygonal horizontal cross section such as a square or a triangle may be used, or a cylindrical, prismatic, columnar, pyramid, or conical structure may be used.

また、本実施形態では、現場の仮組みヤード等で製作されたプレキャストコンクリートユニット20、22を積み上げることによって、塔状構造体12を形成する例を示したが、他の組み立て方法で行ってもよい。例えば、プレキャストコンクリート部材28を1つずつ接合することによって塔状構造体12を形成してもよい。   Further, in the present embodiment, an example in which the tower-like structure 12 is formed by stacking the precast concrete units 20 and 22 manufactured in a temporary assembly yard or the like at the site has been shown. Good. For example, the tower-like structure 12 may be formed by joining the precast concrete members 28 one by one.

また、曲げモーメントが大きくなる塔状構造体12の下部では、周方向に配置されたPC鋼より線44を上部よりも多く配置するようにしてもよい。つまり、PC鋼より線44の周方向の間隔を下部は密にし、上部は下部よりも疎にしてもよい。   Moreover, you may make it arrange | position more wires 44 than the upper part in the lower part of the tower-like structure body 12 where a bending moment becomes large from the PC steel arrange | positioned in the circumferential direction. That is, the circumferential interval of the stranded wire 44 of the PC steel may be denser at the lower part and sparser at the upper part than the lower part.

<第三実施形態>
つぎに、本発明に係る第三実施形態について図22を用いて説明する。なお、第一実施形態及び第二実施形態と同一の部材には同一の符号を付し、重複する説明は省略する。
なお、風力発電用タワー及び塔状構造体の全体図は省略されている。
<Third embodiment>
Next, a third embodiment according to the present invention will be described with reference to FIG. In addition, the same code | symbol is attached | subjected to the member same as 1st embodiment and 2nd embodiment, and the overlapping description is abbreviate | omitted.
In addition, the whole figure of the tower for wind power generation and a tower-like structure is abbreviate | omitted.

本実施形態の風力発電用タワーは、塔状構造体200の頂部に風車17が設けられた構成とされている(図1を参照)。   The tower for wind power generation of this embodiment is configured such that a windmill 17 is provided at the top of the tower-like structure 200 (see FIG. 1).

図22に示すように、円錐状の塔状構造体200は、複数のプレキャストコンクリートユニット204を積み上げることにより構成されている。なお、塔状構造体200(プレキャストコンクリートユニット204)は、後述するように溝とPC鋼より線の配置が異なる以外は、第一実施形態の塔状構造体100(プレキャストコンクリートユニット104)(図2参照)と同様である。   As shown in FIG. 22, the conical tower-like structure 200 is configured by stacking a plurality of precast concrete units 204. The tower-like structure 200 (precast concrete unit 204) is the same as the tower-like structure 100 (precast concrete unit 104) of the first embodiment except that the arrangement of the grooves and the strands of PC steel is different as will be described later. 2).

塔状構造体200の外周面200Aには、上下方向に沿って溝210が形成されると共に、周方向に沿って溝220が形成されている。上下方向の溝210は、周方向に所定の間隔をあけて複数形成され、周方向の溝220は上下方向に所定の間隔をあけて複数形成されている。   On the outer peripheral surface 200A of the tower-like structure 200, grooves 210 are formed along the vertical direction, and grooves 220 are formed along the circumferential direction. A plurality of vertical grooves 210 are formed at predetermined intervals in the circumferential direction, and a plurality of circumferential grooves 220 are formed at predetermined intervals in the vertical direction.

それぞれの溝210、220にPC鋼より線232、234が配置され、PC鋼より線232、234に緊張力を付与することによって、塔状構造体200の上下方向と周方向とにプレストレス(圧縮力)が導入されている。   PC steel strands 232 and 234 are arranged in the respective grooves 210 and 220, and by applying tension to the PC steel strands 232 and 234, prestress ( Compression force) has been introduced.

なお、上下方向に沿った溝210は、周方向に沿った溝220よりも深く形成されている。また、上下方向に沿って配置されたPC鋼より線232は、塔状構造体200の上端部から下端部まで配置されている。   The groove 210 along the vertical direction is formed deeper than the groove 220 along the circumferential direction. Further, the PC steel strands 232 arranged along the vertical direction are arranged from the upper end portion to the lower end portion of the tower-like structure 200.

上下方向に沿って配置されたPC鋼より線232が塔状構造体200の上端部に固定し、且つ、PC鋼より線202に緊張力を付与し上下方向にプレストレスを導入する方法は、第一実施形態のPC鋼より線132、134及び第二実施形態のPC鋼より線54等と同様の方法が適用できるので、ここでは説明を省略する。   A method in which a PC steel strand 232 arranged along the vertical direction is fixed to the upper end of the tower-like structure 200, and a tension is applied to the PC steel wire 202 to introduce prestress in the vertical direction. Since the same method as the PC steel strands 132 and 134 of the first embodiment and the PC steel strand 54 of the second embodiment can be applied, the description thereof is omitted here.

よって、周方向に配置されたPC鋼より線234に緊張力を付与し上下方向にプレストレスを導入する方法の一例について説明する。   Therefore, an example of a method for applying a prestress in the vertical direction by applying tension to the wire 234 from the PC steel arranged in the circumferential direction will be described.

図23(a)に示すように、周方向の溝220の端部には、支圧板38及び定着具40が設けられるスペースとなる切欠部242が形成されている。
周方向の溝220に、PC鋼より線234を配置する。すなわち、塔状構造体200の周方向にPC鋼より線234を配置する。
As shown in FIG. 23A, a notch 242 serving as a space in which the bearing plate 38 and the fixing device 40 are provided is formed at the end of the circumferential groove 220.
A PC stranded wire 234 is disposed in the circumferential groove 220. That is, the PC steel strand 234 is arranged in the circumferential direction of the tower-like structure 200.

次に、PC鋼より線44の両端を緊張ジャッキ(不図示)により引っ張ってPC鋼より線234に緊張力を加える。そして、PC鋼より線234に緊張力が加えられた状態を保持するように、定着具40によってPC鋼より線44の両端部を、支圧板38を介してプレキャストコンクリート部材28に定着する。これにより、塔状構造体200の周方向に配置されるPC鋼より線234によって、塔状構造体100の周方向にプレストレスが導入される。   Next, both ends of the stranded wire 44 of the PC steel are pulled by a tension jack (not shown) to apply tension to the stranded wire 234 of the PC steel. Then, both ends of the PC steel strand 44 are fixed to the precast concrete member 28 via the bearing plate 38 by the fixing tool 40 so as to maintain a state in which tension is applied to the PC steel strand 234. Accordingly, prestress is introduced in the circumferential direction of the tower-like structure 100 by the PC steel strands 234 arranged in the circumferential direction of the tower-like structure 200.

別の方法としては、図23(b)に示すように、PC鋼より線234の両端をターンバックル41で連結して、ターンバックル41でPC鋼より線234に張力を付与するようにしてもよい。   As another method, as shown in FIG. 23B, both ends of the PC steel stranded wire 234 are connected by a turnbuckle 41, and the turnbuckle 41 applies tension to the PC steel stranded wire 234. Good.

なお、本実施形態の作用及び効果は、第一実施形態及び第二実施形態と同様であるので、説明を省略する。   In addition, since the effect | action and effect of this embodiment are the same as that of 1st embodiment and 2nd embodiment, description is abbreviate | omitted.

<第四実施形態>
第一実施形態〜第三実施形態では、塔状構造体の外周面に規制手段として溝を設け、この溝に緊張材としてのPC鋼より線を配置した。これに対して、第四実施形態では、規制手段として凸部が塔状構造体の外周面に設けられた構成について説明する。
なお、第四実施形態では、第三実施形態(第一実施形態の図8も参照)の構成において、外周面に溝でなく凸部が形成された構成として説明する。よって、他の構成部分の説明は省略する。
<Fourth embodiment>
In 1st embodiment-3rd embodiment, the groove | channel was provided in the outer peripheral surface of the tower-like structure as a control means, and the PC steel wire as a tension material was arrange | positioned in this groove | channel. On the other hand, 4th embodiment demonstrates the structure by which the convex part was provided in the outer peripheral surface of the tower-like structure as a control means.
In the fourth embodiment, the configuration of the third embodiment (see also FIG. 8 of the first embodiment) is described as a configuration in which convex portions are formed on the outer peripheral surface instead of grooves. Therefore, description of other components is omitted.

図24に示すように、塔状構造体300の外周面300Aには、正面視三角形状の突起部310が設けられている。突起部310は、正面視において上方を頂角310Aとされて配置されている。   As shown in FIG. 24, a protrusion 310 having a triangular shape in front view is provided on the outer peripheral surface 300 </ b> A of the tower-like structure 300. The protrusion 310 is arranged with the apex angle 310A at the top in a front view.

螺旋状に配置されたPC鋼より線132とPC鋼より線134とは、等しい2本の辺310B,310Cに沿って配置されると共に、交差部分が突起部310の頂角310Aの上側に位置するように配置されている。   The spirally disposed PC steel strand 132 and PC steel strand 134 are disposed along two equal sides 310B and 310C, and the intersection is positioned above the apex angle 310A of the protrusion 310. Are arranged to be.

つぎに、本実施形態の作用及び効果について説明する。
第一実施形態〜第三実施形態では、溝によって、緊張材としてのPC鋼より線の位置が規制されることで、所望の位置に正確に配置されていたが、本実施形態では、突起部310によってPC鋼より線132、134の位置が規制されることで、所望の位置に正確に配置されている。
Next, functions and effects of the present embodiment will be described.
In the first embodiment to the third embodiment, the position of the wire from the PC steel as the tension material is regulated by the groove, so that the wire is accurately arranged at a desired position. By restricting the positions of the stranded wires 132 and 134 of the PC steel by 310, they are accurately arranged at desired positions.

これ以外の作用及び効果は、第一実施形態〜第三実施形態と同様であるので、説明を省略する。   Since other operations and effects are the same as those of the first to third embodiments, description thereof will be omitted.

また、本実施形態では、塔状構造体300の外周面300Aに正面視三角形状の突起部310を設けたが、これに限定されない。   In the present embodiment, the protrusion 310 having a triangular shape in front view is provided on the outer peripheral surface 300A of the tower structure 300, but the present invention is not limited to this.

例えば、図25に示すように、正面視円形状の突起部320であってもよい。   For example, as shown in FIG. 25, the protrusion 320 may have a circular shape when viewed from the front.

また、例えば、図26に示すように、突起部322は、円柱状の頭部336と軸部321とで構成され、塔状構造体300の外周面300Aに所定の間隔で、突起部322の軸部321が係合して固定される穴324を複数あけておき、突起部322を所望する位置に配置できるようにしてもよい。これにより、PC鋼より線132、134の配置がより所望する位置や傾斜角度に配置される。また、PC鋼より線132、134の配置位置や傾斜角度を変更することが容易である。   In addition, for example, as shown in FIG. 26, the protrusion 322 includes a columnar head 336 and a shaft 321, and the protrusion 322 has a predetermined interval on the outer peripheral surface 300 </ b> A of the tower structure 300. A plurality of holes 324 in which the shaft portion 321 is engaged and fixed may be formed so that the protruding portion 322 can be disposed at a desired position. Thereby, arrangement | positioning of the strands 132 and 134 of PC steel is arrange | positioned in the position and inclination angle which are more desired. Moreover, it is easy to change the arrangement position and inclination angle of the strands 132 and 134 of PC steel.

また、例えば、図27(d)に示すように、突起部322の頭部336に筒部332、334を挿入することで、頭部の径を変更可能な構成としてもよい。このような構成とすることで、図27(a)、(b)、(c)に示すように、PC鋼より線132の位置を微調整することができる。なお、図示されていないがPC鋼より線134も同様である。   In addition, for example, as shown in FIG. 27D, a configuration in which the diameter of the head can be changed by inserting cylindrical portions 332 and 334 into the head 336 of the protrusion 322 may be adopted. By setting it as such a structure, as shown to Fig.27 (a), (b), (c), the position of the wire 132 can be finely adjusted from PC steel. Although not shown, the same applies to the PC steel strand 134.

また、図28(a)に示すように、塔状構造体300の外周面300Aから大きく突出するようにするため球状の端部340を設け、これによりカルマン渦に起因して生じる渦励振を更に低減させるようにしてよい。また、図28(b)に示すように、側面視三角形状の端部342であってもよい。   In addition, as shown in FIG. 28A, a spherical end 340 is provided so as to largely protrude from the outer peripheral surface 300A of the tower-like structure 300, thereby further vortex excitation caused by Karman vortices is further provided. It may be reduced. Further, as shown in FIG. 28B, it may be an end portion 342 having a triangular shape in a side view.

また、図29に示すように、PC鋼より線132、134の交差部分で、PC鋼より線132とPC鋼より線134とが接触しないような構成とすることもできる。   Moreover, as shown in FIG. 29, it can also be set as the structure where the PC steel strand 132 and the PC steel strand 134 do not contact in the intersection part of PC steel strand 132,134.

すなわち、図29(a)と図29(b)とに示すように、塔状構造体300の外周面300Aには、正面視四角状の板部材350が、所定の間隔をあけて接合されている。この板部材350の側壁350Aと側壁350Aとの間にPC鋼より線132が配置される。   That is, as shown in FIGS. 29 (a) and 29 (b), a rectangular plate member 350 in front view is joined to the outer peripheral surface 300A of the tower-like structure 300 at a predetermined interval. Yes. A PC steel strand 132 is disposed between the side wall 350A and the side wall 350A of the plate member 350.

板部材350の表面には、側壁350Aと交差する方向に沿って溝352が形成されている。この溝352にPC鋼より線134が配置される。   A groove 352 is formed on the surface of the plate member 350 along a direction intersecting the side wall 350A. A PC steel strand 134 is disposed in the groove 352.

図29(b)と図29(c)に示すように、板部材350における外周面300Aとの接合面350Cと溝352の底面352Aとの厚さtは、PC鋼より線132の直径よりも厚くなるように設定されている。したがって、PC鋼より線132、134の交差部分で、PC鋼より線132とPC鋼より線134とが接触しない(図29(a)、図29(b)を参照)。   29 (b) and 29 (c), the thickness t of the joining surface 350C of the plate member 350 with the outer peripheral surface 300A and the bottom surface 352A of the groove 352 is larger than the diameter of the wire 132 of the PC steel. It is set to be thick. Therefore, the PC steel strand 132 and the PC steel strand 134 do not contact each other at the intersection of the PC steel strands 132 and 134 (see FIGS. 29 (a) and 29 (b)).

なお、本実施形態では、第三実施形態(第一実施形態の図8も参照)の塔状構造体の外周面に、溝でなく凸部が形成された構成として説明したが、これに限定されない。今まで説明した他の実施形態及び変形例の塔状構造体に凸部を形成する構成も適用できる。   In addition, although this embodiment demonstrated as a structure by which the convex part instead of the groove | channel was formed in the outer peripheral surface of the tower-like structure of 3rd embodiment (refer FIG. 8 of 1st embodiment), it is limited to this. Not. The structure which forms a convex part in the tower-like structure of other embodiment and modification which were demonstrated until now is also applicable.

例えば、第二実施形態や第三実施形態で説明したような上下方向と周方向とにそれぞれPC鋼より線を配置する構成にも凸部を形成してもよい。   For example, you may form a convex part also in the structure which arrange | positions a strand from PC steel in the up-down direction and the circumferential direction which were demonstrated by 2nd embodiment or 3rd embodiment, respectively.

<第五実施形態>
第一実施形態〜第四実施形態では、塔状構造体の外周面に規制手段として溝又は凸部を設けたが、溝及び凸部のいずれも外周面に設けられてなくてもよい。つまり、規制手段が無い構成であってもよい。
よって、第五実施形態では、第一実施形態の図8の構成において、外周面に溝が設けられていない構成を説明する。なお、溝がない以外の構成は同様であるので、説明を省略する。
<Fifth embodiment>
In 1st embodiment-4th embodiment, although the groove | channel or the convex part was provided as a control means in the outer peripheral surface of the tower-like structure, neither a groove | channel nor a convex part may be provided in the outer peripheral surface. That is, a configuration without a restricting unit may be used.
Therefore, in the fifth embodiment, a configuration in which no groove is provided on the outer peripheral surface in the configuration of FIG. 8 of the first embodiment will be described. Since the configuration other than the absence of the groove is the same, the description thereof is omitted.

図30に示すように、塔状構造体500の外周面500Aに螺旋状にPC鋼より線132、134が配置されている。PC鋼より線132、134の上端部は、塔状構造体500の上端部500Uの近傍に形成された孔502に通され、塔状構造体500の上端部500Uに固定されている。   As shown in FIG. 30, PC steel strands 132 and 134 are spirally arranged on the outer peripheral surface 500 </ b> A of the tower-like structure 500. The upper ends of the stranded wires 132 and 134 of the PC steel are passed through holes 502 formed in the vicinity of the upper end 500U of the tower-like structure 500, and are fixed to the upper end 500U of the tower-like structure 500.

そして、PC鋼より線132、134に緊張力が付与されている。なお、PC鋼より線132、134の固定と緊張力の付与は、ここまで説明した実施形態と同様であるので、説明を省略する。   And tension | tensile_strength is provided to the wires 132 and 134 from PC steel. In addition, since fixing of the strands 132 and 134 of PC steel and provision of tension | tensile_strength are the same as that of embodiment described so far, description is abbreviate | omitted.

つぎに本実施形態の作用及び効果について説明する。
本実施形態でも、ここまで説明した実施形態と同様の作用を果たすので、詳しい説明は省略する。
Next, the operation and effect of this embodiment will be described.
Also in this embodiment, since the same effect as the embodiment described so far is achieved, detailed description is omitted.

なお、PC鋼より線132、134は孔502に通されている部分以外は、外周面500Aから露出し容易に視認可能となっている。このように、PC鋼より線132、134の大部分が塔状構造体500の外周面500Aに露出し視認可能な構成とすることで、PC鋼より線132、134の検査やメンテナンスが容易に行なうことができる。   The stranded wires 132 and 134 of the PC steel are exposed from the outer peripheral surface 500A except for the portions that are passed through the holes 502 and can be easily visually recognized. In this way, most of the PC steel strands 132 and 134 are exposed on the outer peripheral surface 500A of the tower-like structure 500 so as to be visible so that the inspection and maintenance of the PC steel strands 132 and 134 are easy. Can be done.

なお、外周面に規制手段が無い構成の例として本実施形態では、PC鋼より線を螺旋状に配置した例で説明したが、これに限定されない。第二実施形態や第三実施形態で説明したように、上下方向と周方向とにそれぞれPC鋼より線を配置する構成にも適用することができる。   In addition, in this embodiment, although the example which has arrange | positioned the strand from PC steel helically was demonstrated in this embodiment as an example of a structure without an outer peripheral surface, it is not limited to this. As described in the second embodiment and the third embodiment, the present invention can also be applied to a configuration in which a strand of PC steel is arranged in the vertical direction and the circumferential direction.

また、図31に示すように、規制手段として短冊状の固定具510と固定ビス512とでPC鋼より線132、134を外周面500Aに固定してもよい。図31では、PC鋼より線132は省略されているが同様に固定具510と固定ビス512で外周面500Aに固定されている。   In addition, as shown in FIG. 31, PC steel strands 132 and 134 may be fixed to the outer peripheral surface 500 </ b> A with a strip-shaped fixture 510 and a fixing screw 512 as a regulating means. In FIG. 31, the strand 132 of PC steel is omitted, but is similarly fixed to the outer peripheral surface 500 </ b> A with a fixture 510 and a fixing screw 512.

なお、PC鋼より線132、134が短冊状の固定具510で覆われている部分は僅かであり、他の大部分は外周面500Aから露出し容易に視認可能となっている。また、固定具510は固定ビス512で固定されているだけであり、容易に取り外すことができる。よってPC鋼より線132、134が固定具で固定されていても、PC鋼より線132、134の検査やメンテナンスが容易に行なうことができる。   In addition, the part by which the strands 132 and 134 are covered with the strip-shaped fixing tool 510 is slight, and most other parts are exposed from the outer peripheral surface 500A, and can be easily visually recognized. Further, the fixing tool 510 is only fixed by a fixing screw 512 and can be easily removed. Therefore, even if the PC steel strands 132 and 134 are fixed with a fixture, the PC steel strands 132 and 134 can be easily inspected and maintained.

<第六実施形態>
第一実施形態〜第五四実施形態では、塔状構造体の外周面に複数本のPC鋼より線を設けた構成であった。第六実施形態では、緊張材としてPC鋼より線が格子状に編まれた網、或いは、格子状に接合された網を用いる構成について説明する。
<Sixth embodiment>
In 1st embodiment-5th 4th embodiment, it was the structure which provided the wire from the several PC steel in the outer peripheral surface of a tower-like structure. In the sixth embodiment, a configuration in which a net made of PC steel wires knitted in a lattice shape or a mesh joined in a lattice shape will be described as the tendon material.

図32に示す第六実施形態の塔状構造体400は、第一実施形態の塔状構造体100(図2参照)の外周面100Aに溝とPC鋼より線との代わりに、網402と第三実施形態で説明した突起部320が設けられている以外は、同様の構成であるので、詳しい説明は省略する。なお、突起部320の配置箇所は第三実施形態の突起部320の配置位置と異なる。また、図32(b)では突起部320の図示が省略されている。   A tower-like structure 400 of the sixth embodiment shown in FIG. 32 has a mesh 402 instead of grooves and PC steel wires on the outer peripheral surface 100A of the tower-like structure 100 (see FIG. 2) of the first embodiment. Since the configuration is the same except that the protrusion 320 described in the third embodiment is provided, detailed description thereof is omitted. In addition, the arrangement | positioning location of the projection part 320 differs from the arrangement position of the projection part 320 of 3rd embodiment. Further, in FIG. 32B, the protrusion 320 is not shown.

図32に示すように、塔状構造体400の外周面400Aには、PC鋼より線401が格子状に編まれることによって構成された筒状の網402が設けられている。網402には、上下方向に緊張力が付与された状態で、網402の下部が塔状構造体400の下端部に固定され、網402の上部が塔状構造体400の上端部に固定されている。   As shown in FIG. 32, on the outer peripheral surface 400A of the tower-like structure 400, a cylindrical net 402 formed by braiding PC steel wires 401 in a lattice shape is provided. The net 402 is fixed to the lower end of the tower-like structure 400 with the tension applied in the vertical direction, and the upper part of the net 402 is fixed to the upper end of the tower-like structure 400. ing.

網402に緊張力を付与する方法は、本実施形態では、図32(B)に示すように、筒状の網402の上部をリング404に固定し、このリング404を矢印Uで示すように、塔状構造体400の上端部400Uに対してジャッキ406でジャッキアップして緊張力を付与している。   In this embodiment, as shown in FIG. 32B, the method of applying tension to the mesh 402 is such that the upper portion of the cylindrical mesh 402 is fixed to a ring 404 and the ring 404 is indicated by an arrow U. The tension is applied by jacking up the upper end portion 400U of the tower-like structure 400 with the jack 406.

なお、網402に上下方向に緊張力を付与する方法はどのような方法であってもよい。例えば、筒状の網402の上部を絞り、緊張力を付与してもよい。   Any method may be used to apply tension to the net 402 in the vertical direction. For example, the upper part of the cylindrical net 402 may be squeezed to apply tension.

また、網402を構成するPC鋼より線401の交差部分403の周方向両側には、突起部320が配置されている。   Protrusions 320 are arranged on both sides in the circumferential direction of the intersecting portion 403 of the PC steel strand 401 constituting the net 402.

つぎに、本実施形態の作用及び効果について説明する。
網402に上下方向に緊張力を付与すると、塔状構造体400の上下方向にプレストレスが導入される。更に、筒状の網402の筒径が小さくなるように変形しようとすることで、塔状構造体400の周方向にプレストレスが導入される。このように、網402に上下方向に緊張力を付与することにで、塔状構造体400の上下方向と周方向との両方にプレストレスが導入される。
Next, functions and effects of the present embodiment will be described.
When tension is applied to the mesh 402 in the vertical direction, prestress is introduced in the vertical direction of the tower-like structure 400. Furthermore, prestress is introduced in the circumferential direction of the tower-like structure 400 by trying to deform the cylindrical net 402 so that the cylinder diameter is reduced. Thus, prestress is introduced into both the vertical direction and the circumferential direction of the tower-like structure 400 by applying tension to the mesh 402 in the vertical direction.

なお、図32(a)に示すように、筒状の網402の筒径が小さくなるように変形する際、格子の目が周方向に狭まるように変形する(格子の目が縦長になるように変形する)。このとき、交差部分403には、矢印Qで示すような力Qが働き突起部320に伝達される。そして、突起部320を介して塔状構造体400の周方向にプレストレスが導入される。   As shown in FIG. 32 (a), when the cylindrical mesh 402 is deformed so that the tube diameter is reduced, the lattice mesh is deformed so as to narrow in the circumferential direction (the lattice mesh is elongated vertically). Transformed into). At this time, a force Q as indicated by an arrow Q acts on the intersecting portion 403 and is transmitted to the protruding portion 320. Then, prestress is introduced in the circumferential direction of the tower-like structure 400 through the protrusions 320.

また、突起部320が無い構成の場合、PC鋼より線401の交差部分403にこの力Qに耐えうるだけの強度が必要であるが、本実施形態のように突起部320を設けることで、PC鋼より線401自体の交差部分403に大きな強度が必要とされない構成となるので、好適である。   Further, in the case of the configuration without the protrusion 320, the crossing portion 403 of the PC steel wire 401 needs to be strong enough to withstand this force Q, but by providing the protrusion 320 as in this embodiment, Since the PC steel has a structure that does not require a high strength at the intersection 403 of the wire 401 itself, it is preferable.

なお、筒状の網402の交差部分403に発生する力Qに耐えうるだけの強度を有しているならば、突起部320が無い構造とすることができる。   Note that a structure without the protrusions 320 can be obtained as long as it has a strength sufficient to withstand the force Q generated at the intersecting portion 403 of the cylindrical mesh 402.

また、本実施形態では、網402は、PC鋼より線401が格子状に編まれて構成されていたが、これに限定されない。   Moreover, in this embodiment, although the net | network 402 was comprised by knitting the PC 401 strand 401 in the grid | lattice form, it is not limited to this.

例えば、図33のように、平行に並べたPC鋼より線401をベルト状の接合部材412で交互に繋いで構成された網410であってもよい。   For example, as shown in FIG. 33, it may be a net 410 formed by alternately connecting PC steel stranded wires 401 arranged in parallel by belt-like joining members 412.

或いは、図34(a)に示すように、正面視X字状の管状の接続部材422にPC鋼より線401を通して格子状の網420を構成してもよい。なお、この場合、図34(b)に示すように、接続部材422の角度を変えることで、格子の形状を容易にかえることができる。また、図34(c)に示すように接続部材422の中でPC鋼より線401が交差するように接続部材422に通してもよいし、図34(d)に示すように接続部材422の中でPC鋼より線401が交差しないように接続部材422に通してもよい。   Alternatively, as shown in FIG. 34 (a), a grid-like net 420 may be formed by passing a PC steel strand 401 through a tubular connecting member 422 having an X-shape in front view. In this case, as shown in FIG. 34 (b), the shape of the lattice can be easily changed by changing the angle of the connecting member 422. Moreover, as shown in FIG.34 (c), you may pass through the connection member 422 so that the PC steel strand 401 may cross | intersect in the connection member 422, or as shown in FIG.34 (d), the connection member 422 of FIG. You may let it pass through the connection member 422 so that the wire 401 may not cross | intersect.

なお、本実施形態でも、前述したように外周面に規制手段(突起部)が無い構成としてもよい。   In the present embodiment, as described above, there may be a configuration in which there are no restricting means (projections) on the outer peripheral surface.

<その他>
以上、本発明の実施形態について説明したが、本発明はこうした実施形態に何等限定されるものでなく、各実施形態を組み合わせて用いてもよいし、本発明の要旨を逸脱しない範囲において、種々なる態様で実施し得ることは勿論である。
よって、以下に種々の態様の例を説明する。
<Others>
As mentioned above, although embodiment of this invention was described, this invention is not limited to such embodiment at all, You may use it combining each embodiment, and in the range which does not deviate from the summary of this invention, it is various. Of course, it can be implemented in the following manner.
Therefore, examples of various aspects will be described below.

「規制手段」
上記実施形態では、緊張材としてのPC鋼より線は、規制手段としての溝及び凸部に当接しているが、これに限定されない。緊張材が規制手段に当接されていなくてもよい。つまり、緊張材が所定量以上移動しないように規制する構成であってもよい。
例えば、図41(A)に示すように、溝2の側壁2A、2BにPC鋼より線1が、当接してない構成であってもよい。又は、図41(B)に示すように、凸部3の側壁3AにPC鋼より線1が当接していない構成であってもよい。
また、周方向と上下方向の少なくとも一方への緊張材の移動を規制すればよい。
"Regulatory measures"
In the said embodiment, although the PC steel strand as a tension material is contact | abutting to the groove | channel and convex part as a control means, it is not limited to this. The tendon may not be in contact with the restricting means. That is, the structure which regulates so that a tendon may not move more than predetermined amount may be sufficient.
For example, as shown to FIG. 41 (A), the structure by which the wire 1 from PC steel does not contact | abut to the side walls 2A and 2B of the groove | channel 2 may be sufficient. Alternatively, as shown in FIG. 41 (B), the PC wire 1 may not be in contact with the side wall 3A of the convex portion 3.
Moreover, what is necessary is just to regulate the movement of the tendon to at least one of the circumferential direction and the up-down direction.

「プレストレス」
上記実施形態で示した緊張材により導入するプレストレス量は、構造体に発生する応力状態を考慮して調整すればよい。緊張材により導入するプレストレス量は、緊張ジャッキ等により緊張材に加える緊張力の大きさ、緊張材の断面積の大きさ、緊張材の配置数等を変えることによって調整することができる。
また、これまでに説明した構造体への、様々なプレストレス導入方法を組み合わせて用いてもよい。
"Prestress"
The prestress amount introduced by the tendon shown in the above embodiment may be adjusted in consideration of the stress state generated in the structure. The amount of prestress introduced by the tension material can be adjusted by changing the magnitude of the tension force applied to the tension material by a tension jack or the like, the size of the cross-sectional area of the tension material, the number of the tension materials arranged, and the like.
Moreover, you may use combining the various prestress introduction | transduction methods to the structure demonstrated so far.

「緊張材の螺旋配置」
第一実施形態等において、緊張材(PC鋼より線)は構造体の外周面に螺旋状に巻かれていたが、これに限定されない。平面視で緊張材の捻りが360°未満であってもよい。つまり、構造体に対して上下方向と周方向とにプレストレスが導入されるように、緊張材が上下方向に延設され且つ周方向に傾斜して配置されていればよい。
"Spiral arrangement of tendon"
In the first embodiment and the like, the tendon (PC steel strand) is spirally wound around the outer peripheral surface of the structure, but is not limited to this. The twist of the tendon may be less than 360 ° in plan view. That is, it is only necessary that the tendon is extended in the vertical direction and inclined in the circumferential direction so that prestress is introduced in the vertical direction and the circumferential direction with respect to the structure.

なお、緊張材の上下方向に対する傾斜角度θ(図39(a)を参照)が小さいと(鉛直方向に近いと)、上下方向のプレストレスが大きくなり周方向のプレストレスが小さくなる。逆に緊張材の上下方向に対する傾斜角度θが大きいと(水平方向に近いと)、上下方向のプレストレスが小さくなり、水平方向のプレストレスが大きくなる。   When the inclination angle θ (see FIG. 39A) of the tension material with respect to the vertical direction is small (close to the vertical direction), the prestress in the vertical direction increases and the prestress in the circumferential direction decreases. Conversely, when the inclination angle θ of the tendon material with respect to the vertical direction is large (close to the horizontal direction), the prestress in the vertical direction decreases and the prestress in the horizontal direction increases.

上下方向と周方向とにプレストレスをバランスよく導入するためには、緊張材の上下方向に対する傾斜角度θは10°〜45°が望ましいとされている。
なお、図7に示すような傾斜角度θが異なる複数の緊張材を配置する構成の場合は、傾斜角度θの自由度は大きい。
In order to introduce prestress with good balance in the vertical direction and the circumferential direction, the inclination angle θ of the tension material with respect to the vertical direction is preferably 10 ° to 45 °.
In the case of a configuration in which a plurality of tendons having different inclination angles θ as shown in FIG. 7 are arranged, the degree of freedom of the inclination angle θ is large.

更に、規制手段によって、曲げ応力が大きい構造体の下側は緊張材の傾斜角度θを小さくし、上部に向かうに従って傾斜角度θを大きくすることで、効率よくプレストレスを導入してもよい。このように傾斜角度θを調整することで、傾斜角度θを調整しない構成と比較し、緊張材の数を減らすことができる。   Further, the prestress may be efficiently introduced by reducing the inclination angle θ of the tension material on the lower side of the structure having a large bending stress and increasing the inclination angle θ toward the upper portion by the regulating means. Thus, by adjusting the inclination angle θ, the number of tendons can be reduced as compared with a configuration in which the inclination angle θ is not adjusted.

また、例えば、螺旋状に配置した緊張材(PC鋼より線)、上下方向に配置した緊張材(PC鋼より線)、及び周方向に配置した緊張材(PC鋼より線)の三つを備える構成であってもよい。   Moreover, for example, three of tension material (PC steel strand) arranged in a spiral, tension material arranged in the vertical direction (PC steel strand), and tension material arranged in the circumferential direction (PC steel strand) The structure provided may be sufficient.

「緊張材の配置」
緊張材は構造体の外周面に視認可能に設けられていることが望ましい。このように外周面に視認可能に設けられる構成とすることによって、緊張材がシース管に通される等されて緊張材が視認可能でない構成と比較し、緊張材を容易に外周面に設けることができる。また、目視にて緊張材が確認されるので、例えば、緊張材の検査やメンテナンスが容易に行なうことができる。
"Arrangement of tendon"
It is desirable that the tendon is provided on the outer peripheral surface of the structure so as to be visible. By providing a configuration in which the tension material is visible on the outer peripheral surface in this way, the tension material is easily provided on the outer peripheral surface as compared with a configuration in which the tension material is passed through the sheath tube and the tension material is not visible. Can do. In addition, since the tendon is confirmed visually, for example, inspection and maintenance of the tendon can be easily performed.

なお、「通常は緊張材がカバーで覆われているがメンテ等の際にカバーを外すことで容易に緊張材を視認することができる」ものも「緊張材が構造体の外周面に視認可能に設けられた構成」に含まれる。   In addition, “straining material is usually covered with a cover, but can be easily seen by removing the cover during maintenance etc.” “straining material is visible on the outer peripheral surface of the structure Is included in the “configuration provided in”.

また、緊張材が外周面の溝に配置されている構成も「緊張材が構造体の外周面に視認可能に設けられた構成」に含まれるものとする。   A configuration in which the tendon is disposed in the groove on the outer peripheral surface is also included in the “configuration in which the tendon is provided on the outer peripheral surface of the structure so as to be visible”.

更に、溝に緊張材を配置後(視認可能に配置後)にモルタル等で溝を埋める構成も含まれる。   Furthermore, the structure which fills a groove | channel with mortar etc. after arrange | positioning a tendon in a groove | channel (after arrangement | positioning so that visual recognition is possible) is also included.

「緊張材」
上記実施形態では、緊張材をPC鋼より線とした例を示したが、これに限定されない。PC鋼線であってもよい。或いは、直線状に配置する場合は、PC鋼棒であってもよい。
"Tension"
In the said embodiment, although the example which used the tension material as the strand from PC steel was shown, it is not limited to this. PC steel wire may be used. Or when arrange | positioning linearly, a PC steel rod may be sufficient.

なお、PC鋼より線などのPC鋼材を用いるのが好ましいが、緊張力を確実に加えられれば、PC鋼材以外の緊張材(線材や軸材)であってもよい。例えば、形鋼、炭素繊維やビニロン繊維などの繊維材料であってもよい。   In addition, although it is preferable to use PC steel materials, such as a wire from PC steel, tension materials (wire material and a shaft material) other than PC steel materials may be used if tension force can be applied reliably. For example, fiber materials such as shaped steel, carbon fiber, and vinylon fiber may be used.

「風力発電用タワーの設置場所」
上記実施形態では、風力発電用タワーは、地盤上に配置されていが、これに限定されない。例えば、海上に設置されていてもよい。
"Location of wind power tower"
In the said embodiment, although the tower for wind power generation is arrange | positioned on the ground, it is not limited to this. For example, it may be installed on the sea.

海上に設置する場合、図37に示すように、海底702に打ち込んだ基礎杭724が基礎部130を支持するように塔状構造体100(風力発電用タワー98)を設置してもよい。   When installing on the sea, as shown in FIG. 37, the tower-like structure 100 (wind power generation tower 98) may be installed so that the foundation pile 724 driven into the sea floor 702 supports the foundation part 130.

或いは、図38に示すように、海面704に浮かせた浮部材710が基礎部130を支持するようにして塔状構造体100(風力発電用タワー98)を設置してもよい。   Alternatively, as shown in FIG. 38, the tower-like structure 100 (wind power generation tower 98) may be installed such that the floating member 710 floated on the sea surface 704 supports the base portion 130.

「風力発電用タワー以外の適用」
風力発電用タワー以外にも本発明を適用することができる。例えば、煙突、送電線塔、飛行場の管制塔、テレビ塔等の他の塔状の構造物に本発明を適用することができる。
更に塔状以外の構造体、例えば、柱、橋脚などにも本発明を適用することができる。
つまり、「直立する構造体」を用いた構造物全般に本発明を適用することができる。
"Application other than towers for wind power generation"
The present invention can be applied to other than the tower for wind power generation. For example, the present invention can be applied to other tower-like structures such as a chimney, a transmission line tower, an airfield control tower, and a television tower.
Furthermore, the present invention can be applied to structures other than towers, such as pillars and piers.
That is, the present invention can be applied to all structures using “upright structures”.

「ユニットの構成」
塔状構造体を構成するユニットは、どのように分割されたものであってもよい。なお、以下の説明では、緊張材の図示が省略されている。
"Unit Configuration"
The units constituting the tower-like structure may be divided in any way. In the following description, illustration of the tendon is omitted.

例えば、図35(a)の立面図に示すように、塔状構造体162を構成するブロックを、塔状構造体162を周方向のみに分割したブロック162Aとしてもよい。   For example, as shown in the elevation view of FIG. 35A, the block constituting the tower-like structure 162 may be a block 162A obtained by dividing the tower-like structure 162 only in the circumferential direction.

また、図35(b)の立面図に示すように、塔状構造体164を構成するブロックを、上方は塔状構造体164を上下に分割したブロック164Aとし、下方は塔状構造体164を上下及び周方向に分割したブロック164Bとしてもよい。   Further, as shown in the elevation view of FIG. 35 (b), the block constituting the tower-like structure 164 is a block 164A obtained by dividing the tower-like structure 164 vertically, and the lower part is the tower-like structure 164. It is good also as a block 164B which divided | segmented up and down and the circumferential direction.

また、図35(c)の立面図に示すように、塔状構造体166を構成するブロックを、下方は塔状構造体166を上下に分割したブロック166Bとし、上方は塔状構造体162を上下及び周方向に分割したブロック166Aとしてもよい。   Further, as shown in the elevation view of FIG. 35 (c), the blocks constituting the tower-like structure 166 are a block 166B in which the tower-like structure 166 is vertically divided and the upper part is a tower-like structure 162. It is good also as the block 166A which divided | segmented up and down and the circumferential direction.

また、例えば、図36に示すような塔状構造体168のように、同一形状に形成されたプレキャストコンクリート部材としての複数の標準部材170と、配置された複数の標準部材170の間に配置される調整部材172とによって、塔状構造体を形成してもよい。   Further, for example, like a tower-like structure 168 as shown in FIG. 36, a plurality of standard members 170 as precast concrete members formed in the same shape and a plurality of standard members 170 arranged are arranged. The adjusting member 172 may form a tower-like structure.

このようにすれば、同一形状の標準部材170の大量生産が可能となるので、低コスト化を図ることができる。   In this way, the mass production of the standard member 170 having the same shape becomes possible, so that the cost can be reduced.

また、調整部材172を配置しないで、配置された複数の標準部材170の間に現場打ちコンクリートを打設してもよい。   Alternatively, the cast-in-place concrete may be placed between the plurality of standard members 170 that are disposed without the adjustment member 172 being disposed.

このようにすれば、標準部材170の製作寸法や配置位置の誤差を、現場打ちコンクリートによって吸収することができるので、標準部材170の製作や配置に、高い精度を必要としない。   In this way, errors in the production dimensions and arrangement position of the standard member 170 can be absorbed by the cast-in-place concrete, so that high accuracy is not required for the production and arrangement of the standard member 170.

また、上記実施形態では、プレキャストコンクリートユニットやプレキャストコンクリート部材によって塔状構造体を形成した例を示したが、現場打ちコンクリートによって塔状構造体を形成してもよいし、プレキャストコンクリートブロックと現場打ちコンクリートを併用して塔状構造体を形成してもよい。   In the above embodiment, an example in which the tower-like structure is formed by the precast concrete unit or the precast concrete member has been shown. A tower-like structure may be formed by using concrete together.

また、プレキャストコンクリートユニットやプレキャストコンクリート部材は、工場で製作してもよいし、現場ヤードで製作してもよい。   Further, the precast concrete unit and the precast concrete member may be manufactured at a factory or may be manufactured at a site yard.

また、上記実施形態では、塔状構造体は無筋の繊維補強コンクリートで構成されていたが、鉄筋コンクリートで構成されていてもよい。
なお、塔状構造体を鉄筋コンクリートで構成する場合、前述したように、鉄筋に錆びを発生させないように、塔状構造体の表面に塗装を行ったり、防錆性に優れた鉄筋を用いることが望ましい。
Moreover, in the said embodiment, although the tower-like structure was comprised with the unreinforced fiber reinforced concrete, you may be comprised with the reinforced concrete.
In addition, when the tower-like structure is composed of reinforced concrete, as described above, the surface of the tower-like structure may be coated or a reinforcing bar with excellent rust prevention properties may be used so as not to generate rust on the reinforcing bars. desirable.

また、塔状構造体が高層になる場合、一般に、塔状構造体に作用する曲げモーメントは大きくなるので、設計応力度も大きな値としなければならない。   In addition, when the tower-like structure is high-rise, generally, the bending moment acting on the tower-like structure is increased, and therefore the design stress level must be a large value.

これに対する対策としては、塔状構造体の水平断面を大きくすることにより塔状構造体に発生する応力を小さくし、これによって設計応力度を小さくすることが考えられる。   As a countermeasure against this, it is conceivable to reduce the stress generated in the tower-like structure by increasing the horizontal section of the tower-like structure, thereby reducing the degree of design stress.

しかし、太い形状にして水平断面を大きくした塔状構造体を複数のプレキャストコンクリートブロック(プレキャストコンクリートユニット又はプレキャストコンクリート部材)の接合によって形成する場合、接合作業の回数を減らして施工を容易にする為に分割数(プレキャストコンクリートブロックの個数)を少なくしようとすると、当然に個々のプレキャストコンクリートブロックの大きさも大きくなってしまう。   However, when a tower-like structure with a large horizontal cross section is formed by joining multiple precast concrete blocks (precast concrete units or precast concrete members), to reduce the number of joining operations and facilitate construction When the number of divisions (number of precast concrete blocks) is reduced, the size of each precast concrete block naturally increases.

よって、工場等で製作したプレキャストコンクリートブロックを現場へ輸送するのが困難になる。特に、山岳地に塔状構造体を構築する場合、プレキャストコンクリートブロックの輸送は大きな課題となる。
さらに、塔状構造体の施工において、大きなプレキャストコンクリートブロックの揚重作業は面倒であり、また、大型クレーン等の大きな揚重設備を必要とするので施工コストが高くなってしまう。
高層の塔状構造体の設計応力度が大きな値となることに対する他の対策としては、許容応力度の高い高強度コンクリート材料を用いて塔状構造体を形成することが考えられる。
しかし、高強度コンクリート材料は、材料コストが高く、普通コンクリートに比べてワーカビリティも低いので施工性が悪くなってしまう。
Therefore, it becomes difficult to transport precast concrete blocks manufactured in factories or the like to the site. In particular, when building a tower-like structure in a mountainous area, transportation of precast concrete blocks is a major issue.
Furthermore, in the construction of the tower-like structure, the lifting work of a large precast concrete block is troublesome, and a large lifting equipment such as a large crane is required, so that the construction cost becomes high.
As another countermeasure against the design stress level of the high-rise tower structure having a large value, it is conceivable to form the tower structure using a high-strength concrete material having a high allowable stress level.
However, a high-strength concrete material has a high material cost and lower workability than ordinary concrete, so that workability is deteriorated.

これらの問題に対して、上記実施形態では、塔状構造体の周方向にプレストレスを導入することにより発揮されるコンファインド効果によって塔状構造体の許容圧縮応力度を大きくすることができるので、同じコンクリート材料が用いられた(同じ圧縮強度を有する)鉄筋コンクリート製の塔状構造体に比べて断面係数(断面)を小さくすることができる。   In view of these problems, in the above embodiment, the allowable compressive stress of the tower structure can be increased by the confining effect exhibited by introducing prestress in the circumferential direction of the tower structure. The section modulus (cross section) can be reduced as compared with a reinforced concrete tower-like structure using the same concrete material (having the same compressive strength).

すなわち、塔状構造体を細い形状にすることが可能となるので、分割数(プレキャストコンクリートブロックの個数)を減らしてもプレキャストコンクリートブロックを小さくすることができる。
これにより、プレキャストコンクリートブロックの輸送や揚重作業が容易になり、小さな揚重設備においても施工が可能となる。
That is, since it becomes possible to make a tower-like structure into a thin shape, even if it reduces the number of divisions (the number of precast concrete blocks), a precast concrete block can be made small.
This facilitates the transportation and lifting work of the precast concrete block, and enables construction even in a small lifting equipment.

また、塔状構造体の周方向にプレストレスを導入することにより発揮されるコンファインド効果によって塔状構造体の許容圧縮応力度を大きくすることができるので、必要とする許容圧縮応力度よりも小さい許容圧縮応力度特性を有するコンクリート材料を用いることができる。すなわち、高強度コンクリートを用いて塔状構造体を形成しなくてもよい。   In addition, the allowable compressive stress level of the tower-like structure can be increased by the confining effect exhibited by introducing prestress in the circumferential direction of the tower-like structure. A concrete material having a small allowable compressive stress characteristic can be used. That is, it is not necessary to form a tower structure using high-strength concrete.

よって、本発明を適用することで、流動性が高く、高強度コンクリートと比べて安価なコンクリートを用いることが可能となるので、ワーカビリティ向上や低コスト化を図ることができる。   Therefore, by applying the present invention, it is possible to use concrete that has high fluidity and is cheaper than high-strength concrete, so that workability improvement and cost reduction can be achieved.

「コンクリート以外の構成」
構造体は、コンクリート以外で構成されていてもよい。例えは、木材、樹脂、金属などで構成されていてもよい。或いは、これらが複合されて構成されていてもよい。
"Compositions other than concrete"
The structure may be made of other than concrete. For example, it may be made of wood, resin, metal or the like. Alternatively, these may be combined.

また、組積材(レンガ、コンクリートブロック、石など)を積み上げた組積造の構造体であってもよい。   Moreover, the structure of the masonry structure which piled up masonry materials (a brick, a concrete block, a stone, etc.) may be sufficient.

10 風力発電用タワー(構造物)
12 塔状構造体(構造体)
12A 外周面
12U 頂部
17 風車
20 プレキャストコンクリートユニット(ユニット)
22 プレキャストコンクリートユニット(ユニット)
28 プレキャストコンクリート部材(分割部材)
30 溝
36 溝
44 PC鋼より線(緊張材)
54 PC鋼より線(緊張材)
58 PC鋼より線(緊張材)
78 PC鋼より線(緊張材)
79 溝
80 PC鋼より線(緊張材)
81 溝
98 風力発電用タワー(構造物)
100 塔状構造体(構造体)
100A 外周面
100U 頂部
101 塔状構造体(構造体)
101A 外周面
104 プレキャストコンクリートユニット(ユニット)
110 溝
111 溝
112 溝
114 溝
120 溝
121 溝
122 溝
125 溝
131 PC鋼より線(緊張材)
132 PC鋼より線(緊張材)
134 PC鋼より線(緊張材)
135 PC鋼より線(緊張材)
137 PC鋼より線(緊張材)
138 PC鋼より線(緊張材)
139 PC鋼より線(緊張材)
162 塔状構造体(構造体)
164 塔状構造体(構造体)
164A ブロック(ユニット)
164B ブロック(分割部材)
166 塔状構造体(構造体)
166A ブロック(分割部材)
166B ブロック(ユニット)
168 塔状構造体(構造体)
170 標準部材(分割部材)
172 調整部材
200 塔状構造体(構造体)
200A 外周面
202 PC鋼より線(緊張材)
204 プレキャストコンクリートユニット(ユニット)
210 溝
220 溝
232 PC鋼より線(緊張材)
234 PC鋼より線(緊張材)
300 塔状構造体(構造体)
300A 外周面
310 突起部(凸部)
320 突起部(凸部)
322 突起部(凸部)
350 板部材(凸部)
400 塔状構造体(構造体)
400A 外周面
401 PC鋼より線(緊張材)
402 網(緊張材)
410 網(緊張材)
420 網(緊張材)
500A 外周面
500 塔状構造体(構造体)
10 Tower for wind power generation (structure)
12 Tower-like structure (structure)
12A outer peripheral surface 12U top part 17 windmill 20 precast concrete unit (unit)
22 Precast concrete unit (unit)
28 Precast concrete parts (split parts)
30 groove 36 groove 44 PC steel stranded wire (tension material)
54 PC steel strand (tension material)
58 PC steel stranded wire (tension material)
78 PC steel strand (tension material)
79 Groove 80 PC steel strand (tension material)
81 Groove 98 Wind power generation tower (structure)
100 Tower-like structure (structure)
100A outer peripheral surface 100U top 101 tower structure (structure)
101A Outer surface 104 Precast concrete unit (unit)
110 groove 111 groove 112 groove 114 groove 120 groove 121 groove 122 groove 125 groove 131 PC steel strand (tensile material)
132 PC steel strand (tension material)
134 PC steel strand (tension material)
135 PC steel strand (tension material)
137 PC steel strand (tension material)
138 PC steel strand (tension material)
139 PC steel strand (tension material)
162 Tower-like structure (structure)
164 Tower-like structure (structure)
164A block (unit)
164B block (divided member)
166 Tower-like structure (structure)
166A block (split member)
166B block (unit)
168 Tower-like structure (structure)
170 Standard member (split member)
172 Adjustment member 200 Tower-like structure (structure)
200A Outer surface 202 Stranded PC steel (tension material)
204 Precast concrete unit (unit)
210 groove 220 groove 232 PC steel strand (tensile material)
234 PC steel strand (tension material)
300 Tower-like structure (structure)
300A Outer peripheral surface 310 Protruding part (convex part)
320 Protrusion (convex)
322 Projection (convex)
350 Plate member (convex part)
400 Tower-like structure (structure)
400A Outer surface 401 PC steel strand (tension material)
402 Net (tension material)
410 Net (tension material)
420 Net (tension material)
500A outer peripheral surface 500 tower-like structure (structure)

Claims (18)

直立する構造体と、
前記構造体の外周面に設けられ、緊張力が付与され、前記構造体の上下方向及び周方向にプレストレスを導入する一本又は複数本の緊張材と、
を備える構造物。
An upright structure,
One or more tension members provided on the outer peripheral surface of the structure, to which tension is applied, and to introduce prestress in the vertical direction and the circumferential direction of the structure;
A structure comprising
前記構造体の外周面に設けられ、前記緊張材の上下方向及び周方向の少なくとも一方の位置を規制する規制手段を備える請求項1に記載の構造物。   The structure according to claim 1, further comprising a restricting unit that is provided on an outer peripheral surface of the structure and restricts at least one position in a vertical direction and a circumferential direction of the tendon. 前記規制手段は、前記外周面に設けられた一つ又は複数の溝とされ、
前記緊張材は前記溝に配置されている請求項2に記載の構造物。
The restricting means is one or a plurality of grooves provided on the outer peripheral surface,
The structure according to claim 2, wherein the tendon is disposed in the groove.
深さの異なる複数の前記溝が交差するように設けられている請求項3に記載の構造物。   The structure according to claim 3, wherein the plurality of grooves having different depths are provided so as to intersect each other. 前記緊張材の少なくとも一部が前記溝から突出するように、前記溝の深さが設定されている請求項3又は請求項4に記載の構造物。   The structure according to claim 3 or 4, wherein a depth of the groove is set so that at least a part of the tendon protrudes from the groove. 前記規制手段は、前記外周面に設けられた一つ又は複数の凸部とされ、
前記緊張材は、前記外周面に配置されている請求項2に記載の構造物。
The restricting means is one or a plurality of convex portions provided on the outer peripheral surface,
The structure according to claim 2, wherein the tendon is disposed on the outer peripheral surface.
前記緊張材は、上下方向に延設され且つ周方向に傾斜して配置されている請求項1〜請求項6のいずれか1項に記載の構造物。   The said tension material is a structure of any one of Claims 1-6 extended in the up-down direction and inclined and arrange | positioned in the circumferential direction. 対をなす前記緊張材が、前記構造体の上下方向を基準に逆向きに傾斜し交差して配置されている請求項7に記載の構造物。   The structure according to claim 7, wherein the tension members forming a pair are disposed so as to incline and intersect in the opposite direction with respect to the vertical direction of the structure. 上下方向と周方向とに沿って、それぞれ前記緊張材が配置されている請求項1〜請求項6のいずれか1項に記載の構造物。   The structure according to any one of claims 1 to 6, wherein the tendon is disposed along a vertical direction and a circumferential direction. 前記緊張材が網状とされている請求項1〜請求項6のいずれか1項に記載の構造物。   The structure according to any one of claims 1 to 6, wherein the tendon is net-like. 前記構造体は、コンクリートで構成されている請求項1〜請求項10のいずれか1項に記載の構造物。   The structure according to any one of claims 1 to 10, wherein the structure is made of concrete. 前記構造体は、内部に鉄筋が配されていない無筋コンクリートで構成されている請求項11に記載の構造物。   The structure according to claim 11, wherein the structure is made of unreinforced concrete in which no reinforcing bars are arranged. 前記構造体は、内部に鉄筋が配されている鉄筋コンクリートで構成されている請求項11に記載の構造物。   The said structure is a structure of Claim 11 comprised with the reinforced concrete by which the reinforcing bar is distribute | arranged inside. 前記構造体は、繊維補強コンクリートで構成されている請求項12又は請求項13に記載の構造物。   The structure according to claim 12 or 13, wherein the structure is made of fiber reinforced concrete. 前記構造体は、複数のユニットを上下方向に積み上げて構成されている請求項1〜請求項14のいずれか1項に記載の構造物。   The structure according to any one of claims 1 to 14, wherein the structure is configured by stacking a plurality of units in a vertical direction. 前記ユニットは、周方向に分割された複数の分割部材によって構成されている請求項15に記載の構造物。   The structure according to claim 15, wherein the unit includes a plurality of divided members divided in the circumferential direction. 前記分割部材は同一形状に形成されると共に、周方向に配置された前記分割部材の間隔を調整する調整部材が前記分割部材の間に配置されている請求項16に記載の構造物。   The structure according to claim 16, wherein the split members are formed in the same shape, and an adjustment member that adjusts an interval between the split members arranged in the circumferential direction is disposed between the split members. 前記構造体の頂部に風車が設けられた請求項1〜請求項17のいずれか1項に記載の構造物。   The structure according to any one of claims 1 to 17, wherein a windmill is provided on a top portion of the structure.
JP2009256389A 2009-11-09 2009-11-09 Structure Expired - Fee Related JP5503253B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009256389A JP5503253B2 (en) 2009-11-09 2009-11-09 Structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009256389A JP5503253B2 (en) 2009-11-09 2009-11-09 Structure

Publications (2)

Publication Number Publication Date
JP2011099299A true JP2011099299A (en) 2011-05-19
JP5503253B2 JP5503253B2 (en) 2014-05-28

Family

ID=44190691

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009256389A Expired - Fee Related JP5503253B2 (en) 2009-11-09 2009-11-09 Structure

Country Status (1)

Country Link
JP (1) JP5503253B2 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101337646B1 (en) * 2011-07-08 2013-12-05 삼성중공업 주식회사 Offshore wind turbine generator, lifting zig for transporting offshore wind turbine generator, system and method for installing offshore wind turbine generator using the same
JP2014526007A (en) * 2011-06-22 2014-10-02 ヴォッベン プロパティーズ ゲーエムベーハー Tower segment manufacturing method
JP2015059364A (en) * 2013-09-19 2015-03-30 株式会社大林組 Precast arch tunnel
JP2016084593A (en) * 2014-10-24 2016-05-19 株式会社Ihi Pre-stressed concrete structure
JP2017145714A (en) * 2016-02-16 2017-08-24 クリーンエナジーファクトリー株式会社 Wind power generator
WO2019093243A1 (en) * 2017-11-08 2019-05-16 Ntn株式会社 Wind power generator-attached lighting equipment
CN110761954A (en) * 2019-11-19 2020-02-07 中国电建集团西北勘测设计研究院有限公司 Prefabricated concrete fan tower cylinder with spiral line connecting seam and connecting method
JP2021188354A (en) * 2020-05-29 2021-12-13 東京製綱株式会社 Precast prestressed concrete foundation structure and its construction method
JP6986646B1 (en) * 2021-03-26 2021-12-22 東電設計株式会社 Tower foundation and its construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5458925A (en) * 1977-10-19 1979-05-12 Mamoru Kawaguchi Tower structure
JP2001123705A (en) * 1999-10-25 2001-05-08 Osamu Takada Multi-stage smokestack
JP2002030615A (en) * 2000-07-18 2002-01-31 Taisei Corp Construction method of tower structure
JP2005155212A (en) * 2003-11-27 2005-06-16 Yoko Akiyama Tensioning system for long fibrous reinforcing material
JP2007120108A (en) * 2005-10-27 2007-05-17 West Japan Railway Co Lifting and falling prevention device and earthquake resisting reinforcement existing pole making use thereof
JP2007120080A (en) * 2005-10-26 2007-05-17 Takenaka Komuten Co Ltd Tower structure
JP2008101363A (en) * 2006-10-18 2008-05-01 Oriental Shiraishi Corp Columnar structure, its construction method, and concrete panel
JP2008537043A (en) * 2005-04-21 2008-09-11 ストラクチャル コンクリート アンド スティール,エス.エル. Prefabricated modular tower

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5458925A (en) * 1977-10-19 1979-05-12 Mamoru Kawaguchi Tower structure
JP2001123705A (en) * 1999-10-25 2001-05-08 Osamu Takada Multi-stage smokestack
JP2002030615A (en) * 2000-07-18 2002-01-31 Taisei Corp Construction method of tower structure
JP2005155212A (en) * 2003-11-27 2005-06-16 Yoko Akiyama Tensioning system for long fibrous reinforcing material
JP2008537043A (en) * 2005-04-21 2008-09-11 ストラクチャル コンクリート アンド スティール,エス.エル. Prefabricated modular tower
JP2007120080A (en) * 2005-10-26 2007-05-17 Takenaka Komuten Co Ltd Tower structure
JP2007120108A (en) * 2005-10-27 2007-05-17 West Japan Railway Co Lifting and falling prevention device and earthquake resisting reinforcement existing pole making use thereof
JP2008101363A (en) * 2006-10-18 2008-05-01 Oriental Shiraishi Corp Columnar structure, its construction method, and concrete panel

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014526007A (en) * 2011-06-22 2014-10-02 ヴォッベン プロパティーズ ゲーエムベーハー Tower segment manufacturing method
KR101337646B1 (en) * 2011-07-08 2013-12-05 삼성중공업 주식회사 Offshore wind turbine generator, lifting zig for transporting offshore wind turbine generator, system and method for installing offshore wind turbine generator using the same
JP2015059364A (en) * 2013-09-19 2015-03-30 株式会社大林組 Precast arch tunnel
JP2016084593A (en) * 2014-10-24 2016-05-19 株式会社Ihi Pre-stressed concrete structure
JP2017145714A (en) * 2016-02-16 2017-08-24 クリーンエナジーファクトリー株式会社 Wind power generator
WO2019093243A1 (en) * 2017-11-08 2019-05-16 Ntn株式会社 Wind power generator-attached lighting equipment
CN110761954A (en) * 2019-11-19 2020-02-07 中国电建集团西北勘测设计研究院有限公司 Prefabricated concrete fan tower cylinder with spiral line connecting seam and connecting method
CN110761954B (en) * 2019-11-19 2024-01-19 中国电建集团西北勘测设计研究院有限公司 Precast concrete fan tower barrel with spiral line connecting seam and connecting method
JP2021188354A (en) * 2020-05-29 2021-12-13 東京製綱株式会社 Precast prestressed concrete foundation structure and its construction method
JP7241050B2 (en) 2020-05-29 2023-03-16 東京製綱株式会社 Precast/prestressed concrete foundation structure and its construction method
JP6986646B1 (en) * 2021-03-26 2021-12-22 東電設計株式会社 Tower foundation and its construction method
JP2022151124A (en) * 2021-03-26 2022-10-07 東電設計株式会社 Steel tower foundation and construction method thereof

Also Published As

Publication number Publication date
JP5503253B2 (en) 2014-05-28

Similar Documents

Publication Publication Date Title
JP5503253B2 (en) Structure
JP5521014B2 (en) Tower-like structure and method for constructing tower-like structure
US10513833B2 (en) Foundation with pedestal and ribs for towers
JP4488745B2 (en) Wind turbine
US9347197B2 (en) Foundation with slab, pedestal and ribs for columns and towers
US9096985B1 (en) Foundation with slab, pedestal and ribs for columns and towers
RU2720210C2 (en) Foundation for wind-driven power plant
US8661752B2 (en) Foundation with slab, pedestal and ribs for columns and towers
JP6067058B2 (en) Pre-cast segment, its laminated structure and derating column
US20170030045A1 (en) Beam and pile anchor foundation for towers
EP3247849B1 (en) Wind turbine tower
US20110061321A1 (en) Fatigue reistant foundation system
JP6638141B2 (en) Basic structure of tower structure
EP2821565A1 (en) Connection between a wind turbine tower and its foundation
EP2857614A1 (en) Concrete tower formed with precast pieces
CN201933825U (en) High-power prestressed five-piece type concrete tower
WO2010117289A9 (en) Truss tower
KR101052732B1 (en) Composite pile using composite plate with shear connector and making method using the same
CN111335270A (en) Prestress reinforcement structure of face rockfill dam and construction method thereof
JP5523926B2 (en) Reinforcement structure of tower structure
KR20140005051A (en) Reinforcement structure for pile and pretensioned spun high strength concrete reinforcement pile: punching steel pipe pile incuding the same
JP6053417B2 (en) Bridge girder and bridge girder construction method
KR102382845B1 (en) Thrust pile with prestress and self-supporting type pile construction using it
JP2011202471A (en) Structural member
JP4909445B1 (en) Ground tank construction method and ground tank

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120921

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130912

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130917

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131023

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140304

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140314

R150 Certificate of patent or registration of utility model

Ref document number: 5503253

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees