JP2010278639A - Network communication channel switch method and transmitter/receiver - Google Patents

Network communication channel switch method and transmitter/receiver Download PDF

Info

Publication number
JP2010278639A
JP2010278639A JP2009127763A JP2009127763A JP2010278639A JP 2010278639 A JP2010278639 A JP 2010278639A JP 2009127763 A JP2009127763 A JP 2009127763A JP 2009127763 A JP2009127763 A JP 2009127763A JP 2010278639 A JP2010278639 A JP 2010278639A
Authority
JP
Japan
Prior art keywords
communication
configuration information
communication confirmation
network configuration
network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009127763A
Other languages
Japanese (ja)
Other versions
JP5163595B2 (en
Inventor
Yasuo Take
靖男 武
Takaaki Kawakami
隆明 川上
Satoshi Abe
智 阿部
Kazuo Mizuta
一生 水田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2009127763A priority Critical patent/JP5163595B2/en
Publication of JP2010278639A publication Critical patent/JP2010278639A/en
Application granted granted Critical
Publication of JP5163595B2 publication Critical patent/JP5163595B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To change a communication confirmation channel of a tri-branch path for transmitting and receiving packets for communication confirmation between a transmitter and a receiver without going through a center device in a network communication confirmation channel switch method and a transmitter/receiver. <P>SOLUTION: The transmitter/receiver includes: a storage part 1-1 for storing network configuration information which includes channel information on communication confirmation of an area network divided into unit networks each including a tri-branch path, and communication state information; a communication confirmation part 1-3 for instructing packet transmission for communication confirmation; a communication state determination part 1-6 for receiving the packet for communication confirmation and evaluating an arrival result of the packet; and a communication switch setting part 1-7 which determines whether or not a communication confirmation channel of the tri-branch path is formed in the unit network and, when the communication confirmation channel of tri-branch path is not formed, determines a change destination of the communication confirmation channel so that the communication confirmation channel of the tri-branch path is formed inside each unit network based on the network configuration information and a communication confirmation channel switch principle. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、ネットワークの疎通確認経路を変更するネットワーク疎通経路切替方法及び送受信装置に関する。   The present invention relates to a network communication path switching method and a transmission / reception apparatus for changing a network communication confirmation path.

従来、ネットワーク経路の疎通状態を確認する手法として、ネットワークに配備した各送受信装置の間で疎通確認用のパケットを送受し、該パケットの到達結果から疎通状態を判断する手法が広く用いられている。この手法は、例えば図102に示すようにフルメッシュ状に配備された各送受信装置同士で疎通確認用のパケットを送受するが、送受信装置が多数配備された複雑なネットワークでは、該ネットワークで流通する疎通確認用のパケット量が膨大となり、広大なネットワーク帯域が疎通確認用のパケットで占有されることとなる。   Conventionally, as a method for confirming the communication state of a network path, a method of transmitting and receiving a communication confirmation packet between transmission / reception devices deployed in a network and determining the communication state from the arrival result of the packet has been widely used. . In this method, for example, as shown in FIG. 102, transmission / reception confirmation packets are transmitted / received between transmission / reception devices arranged in a full mesh. However, in a complex network in which a large number of transmission / reception devices are provided, the packets are distributed in the network. The amount of communication confirmation packets is enormous, and a vast network bandwidth is occupied by communication confirmation packets.

また、ネットワークの疎通確認は、早期にネットワーク障害を検知することを目的としているため、短周期で各送受信装置の間で疎通確認用のパケットを送受し、該パケットの到達結果を監視する。このため、各送受信装置は、短時間に複数の送受信装置へ疎通確認用のパケットを送信し、各送受信装置は、短時間に複数の送受信装置から疎通確認用のパケットを受信しなければならず、高性能の送受信装置を用いなければならないといった制約がある。   In addition, since the network communication confirmation is intended to detect a network failure at an early stage, a communication confirmation packet is transmitted and received between each transmitting / receiving device in a short cycle, and the arrival result of the packet is monitored. For this reason, each transmission / reception device must transmit a communication confirmation packet to a plurality of transmission / reception devices in a short time, and each transmission / reception device must receive a communication confirmation packet from a plurality of transmission / reception devices in a short time. There is a restriction that a high-performance transmission / reception apparatus must be used.

また、ネットワーク障害の一つとして例えば数十秒程度の間だけリンクが繰り返し切断される間欠障害と呼ばれる障害があり、こうした障害を検出するには、絶え間なく疎通確認を行わなければならないが、従来の疎通確認の手法では、前述のようなネットワーク帯域や送受信装置の性能の制約から、間欠障害を速やかに検出することは困難であった。   In addition, as one of the network failures, for example, there is a failure called an intermittent failure in which a link is repeatedly disconnected only for several tens of seconds. To detect such a failure, continuous communication confirmation must be performed. In the communication confirmation method, it has been difficult to quickly detect an intermittent failure due to the limitations of the network bandwidth and the performance of the transmitting / receiving device as described above.

フルメッシュ状に配備した送受信装置で疎通確認行う場合、送受信装置の総数をNとすると、疎通確認をN(N−1)/2回行う必要があり、送受信装置が多数存在する場合には、全ての送受信装置の間で疎通確認が終了するまでに多くの時間が掛かり、最終的な疎通確認結果が得られるまでに長大な時間を要することとなる。そのため、実際に障害が発生してから該障害が発覚するまでの遅延時間が長くなり、障害への対応開始が遅れるという問題があった。   When performing communication confirmation with a transmission / reception device deployed in a full mesh, assuming that the total number of transmission / reception devices is N, it is necessary to perform communication confirmation N (N-1) / 2 times, and when there are many transmission / reception devices, It takes a lot of time to complete the communication confirmation between all the transmission / reception devices, and it takes a long time to obtain the final communication confirmation result. For this reason, there is a problem that the delay time from when the failure actually occurs until the failure is detected becomes longer, and the start of the response to the failure is delayed.

これらの問題を解決するために提案された手法について説明する。図103は、ネットワーク障害の発生時に稼動系のネットワーク経路を待機系のネットワーク経路へ変更するようネットワーク経路が二重化され、OSPFプロトコルでパケットを伝播するネットワークの一例を示している。複雑なネットワーク構成の場合は、図103にエリアネットワークA〜Fとして示すようにマルチエリア構成が採られる。   A method proposed to solve these problems will be described. FIG. 103 shows an example of a network in which the network path is duplicated so that the active network path is changed to the standby network path when a network failure occurs, and packets are propagated by the OSPF protocol. In the case of a complicated network configuration, a multi-area configuration is adopted as shown as area networks A to F in FIG.

図103のネットワークの一例は、3分岐路による疎通確認理論に基づいて、ネットワーク全体をエリアネットワークA〜Fに分割している。以下では、エリアネットワークを単にエリアとも記す。各エリアA〜Fは、エリアの境界に位置するエリア境界ルータを基点とした3分岐路が形成される単位ネットワークを構成する。該単位ネットワーク内の3分岐路の端点に配備された送受信装置との間でパケットを送受信して経路の疎通を確認する。   The example of the network in FIG. 103 divides the entire network into area networks A to F based on the communication confirmation theory using three branches. Hereinafter, the area network is also simply referred to as an area. Each area A to F constitutes a unit network in which a three-branch path is formed with an area border router located at the boundary of the area as a base point. A packet is transmitted / received to / from a transmission / reception apparatus provided at an end point of a three-branch path in the unit network to confirm the communication of the path.

3分岐路による疎通確認理論について説明する。図104に示すように、パケットを送受する2つの送受信装置間の区間数をNsとすると、故障パターン数Fsは、正常/異常の2値を区間数Nsの2倍(双方向の区間数)の分だけ乗じ、正常パターン数1を差引いた値となり、以下の式(1)で表される。
Fs=2Ns×2−1 ・・・(1)
The communication confirmation theory using three branches will be described. As shown in FIG. 104, when the number of sections between two transmitting / receiving apparatuses that transmit and receive a packet is Ns, the failure pattern number Fs is the normal / abnormal binary value twice the number of sections Ns (the number of bidirectional sections). Multiply by the amount obtained by subtracting 1 from the number of normal patterns, which is expressed by the following equation (1).
Fs = 2 Ns × 2 −1 (1)

また、パケットを送受する2つの送受信装置間の監視箇所数をNpとすると、疎通結果数Rcは、疎通/不通の2値を監視箇所数Nの中から2つを選ぶ順列の数の分だけ乗じた値となり、以下の式(1)で表される。
Rc=2Np!/(Np−2)! ・・・(2)
Further, if the number of monitoring points between two transmitting / receiving devices that transmit and receive packets is Np, the communication result number Rc is equal to the number of permutations in which two values of communication / disconnection are selected from the number N of monitoring points. It becomes a multiplied value and is represented by the following formula (1).
Rc = 2 Np! / (Np-2)! ... (2)

故障パターン数Fsより疎通結果数Rcの方が大きい、即ち、Fs≦Rcであれば、故障区間を特定することができる。パケットを送受する2つの送受信装置間に介在する中継点が分岐路数Nの分岐モデルである場合、Ns=N,Np=Nとなる。Fs≦Rcの条件式に上記式(1)、式(2)を適用すると、Ns×2≦Np!/(Np−2)!となり、Fs≦Rcの条件式は、
N×2≦N!/(N−2)! ・・・(3)
と置き換えられ、3≦Nが得られる。
If the communication result number Rc is larger than the failure pattern number Fs, that is, if Fs ≦ Rc, the failure section can be specified. When the relay point interposed between two transmission / reception devices that transmit and receive packets is a branch model with N branch paths, Ns = N and Np = N. Applying the above formulas (1) and (2) to the conditional expression of Fs ≦ Rc yields Ns × 2 ≦ Np! / (Np−2) !, and the conditional expression of Fs ≦ Rc is
N × 2 ≦ N! / (N-2)! (3)
And 3 ≦ N is obtained.

即ち、図104に示すように、中継点Xを基点として少なくとも3分岐路の各端点に配備した送受信装置A,B,Cを含む分岐モデル(単位ネットワーク)にネットワークを分割し、各送受信装置A,B,Cの間で相互に疎通確認を行うことにより、ネットワーク全体の疎通を確認することができる。   That is, as shown in FIG. 104, the network is divided into branch models (unit networks) including transmission / reception devices A, B, and C provided at each end of at least three branch paths with the relay point X as a base point. , B, and C, mutual communication confirmation can be performed to confirm communication of the entire network.

図105は、図103の1つのエリア、例えばエリアAに包含されるネットワークを、3分岐路を形成する5つの単位ネットワークに分割した一例を示している。3分岐路の疎通確認理論によるネットワークの疎通確認は、単位ネットワークに包含される送受信装置間でのみ疎通確認用のパケットの送受を行うため、広大なネットワーク帯域が疎通確認用のパケットの送受で占有されることはなく、また、通確認用のパケットの送受は短時間で終了する。また、各送受信装置は少なくとも2つの疎通確認先とパケットを送受すれば良いので、高性能なものでなくてもよい。   FIG. 105 shows an example in which the network included in one area of FIG. 103, for example, area A, is divided into five unit networks that form a three-branch path. Network communication confirmation based on the three-branch communication confirmation theory involves sending and receiving packets for communication confirmation only between transmitting and receiving devices included in a unit network, so a vast network bandwidth is occupied by transmission and reception of packets for communication confirmation. In addition, transmission / reception of the packet for confirmation of communication is completed in a short time. Further, each transmission / reception device only needs to transmit and receive packets to / from at least two communication confirmation destinations.

図106はネットワーク経路の疎通状態を確認するシステムの全体構成例を示す。ここで、エリア境界ルータを中継点ルータ、3分岐路を形成する単位ネットワークをグループと称する。OSPFプロトコルのネットワークの1つのエリアAに包含されるネットワークを、中継点ルータを基点として5つの3分岐路を形成する単位ネットワークG1〜G5に分割する。   FIG. 106 shows an example of the overall configuration of a system for confirming the communication state of the network path. Here, the area border router is referred to as a relay point router, and the unit network that forms the three branch path is referred to as a group. A network included in one area A of the OSPF protocol network is divided into unit networks G1 to G5 that form five three-branch paths with a relay point router as a base point.

中継点ルータ103は、バックボーンエリアルータ104と接続される。センター装置105とユーザ監視装置106は、エッジルータ102を介してバックボーンエリアルータ104と接続される。送受信装置101は、各グループG1〜G5のエッジルータ102に収容される。各送受信装置101で送受される疎通確認用のパケットの到達結果は、センター装置105に通知される。センター装置105は、該到達結果を基に疎通断が検出されたときに疎通経路を変更する処理を一括して行う。   The relay point router 103 is connected to the backbone area router 104. The center device 105 and the user monitoring device 106 are connected to the backbone area router 104 via the edge router 102. The transmission / reception apparatus 101 is accommodated in the edge router 102 of each group G1 to G5. The arrival result of the communication confirmation packet transmitted / received by each transmitting / receiving apparatus 101 is notified to the center apparatus 105. The center device 105 collectively performs a process of changing the communication path when communication disconnection is detected based on the arrival result.

ネットワークの疎通確認の手法として、複数のステーションユニット同士がバス接続されたネットワークシステムにおいて、各ステーションユニットが隣接する他のステーションユニットを呼び出して異常判定を行い、異常発生箇所を効率よく精度良く検出する手法等が提案されている(特許文献1)。   As a network communication confirmation method, in a network system in which a plurality of station units are connected by bus, each station unit calls another station unit adjacent to each other to perform abnormality determination, and detects an abnormality occurrence location efficiently and accurately. A method and the like have been proposed (Patent Document 1).

特開2001−339413号公報JP 2001-339413 A

従来、図106に示すネットワーク構成例において、各送受信装置101における少なくとも3分岐路でのパケットの到達結果を基に疎通状態を監視する。そして疎通断を検出した場合、少なくとも3分岐路の疎通確認経路が形成されるよう、疎通確認経路を変更するが、その変更処理をセンター装置105で一括して行っている。そのため、多数のパケット到達結果を基に疎通確認経路の切替先を判断する処理の負担がセンター装置に大きく掛かり、リソース不足や性能低下の懸念から、複雑なネットワークには充分に対応することができないという課題あった。   Conventionally, in the network configuration example shown in FIG. 106, the communication state is monitored based on the arrival results of packets on at least three branch paths in each transmitting / receiving apparatus 101. When the communication disconnection is detected, the communication confirmation route is changed so that at least three communication confirmation routes are formed, but the change processing is collectively performed by the center device 105. For this reason, the burden of processing for determining the switching destination of the communication confirmation route based on a large number of packet arrival results is greatly imposed on the center apparatus, and it is not possible to sufficiently cope with a complex network due to a lack of resources or a decrease in performance. There was a problem.

また、ネットワークが巨大化するにつれて、膨大な回数の疎通確認を行わなければならず、疎通確認に長時間掛かり、ネットワーク障害を漏れなく検知することが困難となる。本発明は、ネットワークを、中継点を基点とした3分岐路を構成する単位ネットワーク(グループ)に分割し、各分岐路の端点に配備した送受信装置の間で疎通確認用のパケットを送受する少なくとも3分岐路の疎通確認経路を、センター装置105を介さずに変更する手法を提供する。また、ネットワークの障害検出の確度を向上させ、更に、ネットワークの間欠障害の検出精度を高めることを目的とする。   Further, as the network becomes larger, it is necessary to check the communication a huge number of times. It takes a long time to check the communication, and it becomes difficult to detect a network failure without omission. The present invention divides a network into unit networks (groups) that constitute a three-branch path with a relay point as a base point, and transmits / receives a communication confirmation packet between transmission / reception devices arranged at end points of each branch path. Provided is a method for changing the communication confirmation path of the three-branch path without using the center device 105. It is another object of the present invention to improve the accuracy of detecting a network failure and further improve the accuracy of detecting a network intermittent failure.

上記課題を解決する第1の形態としてのネットワーク疎通経路切替方法は、中継点を基点とした3分岐路を含む単位ネットワークに分割されたエリアネットワークの疎通状態を確認する疎通確認経路を変更するネットワーク疎通経路切替方法であって、前記3分岐路の端点に配備された各送受信装置の間で、前記中継点を介する3分岐路の疎通確認経路を通して相互に疎通確認用のパケットを送受し、該パケットの到達結果を基に、当該単位ネットワークの疎通状態を各送受信装置で監視し、該疎通状態を前記エリアネットワーク内の各送受信装置に通知する疎通状態通知工程と、 前記疎通状態の通知を基に、前記単位ネットワーク内に少なくとも3分岐路の疎通確認経路が形成されるか否かを前記各送受信装置で判定し、少なくとも3分岐路の疎通確認経路が形成されない場合、前記単位ネットワークの疎通確認経路を変更するよう、前記各送受信装置で判断する経路変更判断工程と、前記単位ネットワークの疎通確認経路を変更する際に、前記各送受信装置の記憶部に保持した前記エリアネットワークの構成情報、及び前記各送受信装置に共通の疎通確認経路切替法則に基づいて、少なくとも3分岐路の疎通確認経路が各単位ネットワーク内に形成されるよう、前記各送受信装置で疎通確認経路の変更先を決定する変更先決定工程と、を含むものである。   A network communication route switching method as a first embodiment for solving the above-described problem is a network for changing a communication confirmation route for confirming a communication state of an area network divided into unit networks including three branch paths with a relay point as a base point. A communication path switching method, wherein transmission / reception confirmation packets are transmitted / received between the transmission / reception devices provided at the end points of the three branch paths through a communication confirmation path of the three branch paths via the relay points, Based on the arrival result of the packet, the communication state of the unit network is monitored by each transmission / reception device, and the communication state notification step of notifying the communication state to each transmission / reception device in the area network; and based on the notification of the communication state In addition, each transmitting / receiving device determines whether or not a communication confirmation route of at least three branch paths is formed in the unit network, and at least 3 minutes. If a communication confirmation route of a path is not formed, each of the transmission / reception devices determines to change the communication confirmation route of the unit network, and when changing the communication confirmation route of the unit network, Based on the configuration information of the area network held in the storage unit of the transmission / reception device and the communication confirmation route switching rule common to the transmission / reception devices, at least three communication confirmation routes are formed in each unit network. And a change destination determination step of determining a change destination of the communication confirmation path in each of the transmission / reception devices.

また、上記課題を解決する第2の形態としての送受信装置は、中継点を基点とした3分岐路を含む単位ネットワークに分割されたエリアネットワークの疎通確認の経路情報を含むネットワーク構成情報及び疎通確認の経路毎の疎通状態情報を記憶する記憶部と、前記記憶部から疎通確認の経路情報を読み出し、疎通確認を行うタイミングのスケジューリングを行う疎通確認スケジューリング部と、前記疎通確認スケジューリング部により指定されたタイミングで疎通確認用のパケット送信の指示を行う疎通確認部と、他の送受信装置からの疎通確認用のパケットを受信し、疎通確認用のパケットの到達結果を評価し、疎通状態を前記記憶部に書き込む疎通状態判断部と、前記単位ネットワーク内に少なくとも3分岐路の疎通確認経路が形成されるか否かを判定し、少なくとも3分岐路の疎通確認経路が形成されない場合、前記記憶部に保持した前記ネットワーク構成情報、及び他の各送受信装置に共通の疎通確認経路切替法則に基づいて、少なくとも3分岐路の疎通確認経路が各単位ネットワーク内に形成されるよう、前記疎通確認経路の変更先を決定する変更先決定し、前記記憶簿のネットワーク構成情報として書き込む疎通切替設定部と、を備えたものである。   In addition, a transmission / reception apparatus as a second mode for solving the above-described problem includes network configuration information and communication confirmation including route information for communication confirmation of an area network divided into unit networks including three branch paths with a relay point as a base point. Specified by the storage unit that stores communication status information for each route, the communication confirmation scheduling unit that reads the communication confirmation route information from the storage unit, and schedules the timing for performing communication confirmation, and the communication confirmation scheduling unit A communication confirmation unit that instructs transmission of a packet for communication confirmation at a timing, and a communication confirmation packet received from another transmission / reception device, evaluates the arrival result of the communication confirmation packet, and stores the communication state in the storage unit A communication status determination unit for writing to the network, and a communication confirmation path of at least three branch paths in the unit network. If the communication confirmation path of at least three branch paths is not formed, based on the network configuration information held in the storage unit and the communication confirmation path switching law common to other transmitting and receiving devices, A communication switching setting unit for determining a change destination for determining a change destination of the communication confirmation route so that a communication confirmation route of at least three branch paths is formed in each unit network, and writing as network configuration information of the storage list; It is provided.

開示のネットワーク疎通確認経路切替は、複雑なネットワークで多数の疎通確認経路を変更する場合でも、処理能力が高い高価で高性能なセンター装置に依らず、ネットワークの端部に配備された処理能力の低い送受信装置であっても、ネットワーク経路の疎通状態を確認して自律的に疎通確認経路を変更することが可能となる。   Disclosed network communication confirmation path switching is the ability of processing capacity deployed at the end of the network, regardless of expensive and high-performance center devices with high processing capacity, even when multiple communication confirmation paths are changed in a complex network. Even a low transmission / reception apparatus can autonomously change the communication confirmation path by confirming the communication state of the network path.

また、疎通確認を行う経路を多重化することで、ネットワーク障害検知の確度を向上させることができ、また、疎通確認を間断なく行ことにより、ネットワークの間欠障害の検出精度を向上させることが可能となる。   In addition, it is possible to improve the accuracy of network failure detection by multiplexing the paths for performing communication confirmation, and it is possible to improve the detection accuracy of intermittent network failures by performing communication confirmation without interruption. It becomes.

送受信装置の機能ブロックを示す図である。It is a figure which shows the functional block of a transmission / reception apparatus. ネットワーク構成情報変更のフローを示す図である。It is a figure which shows the flow of network configuration information change. グループ分割(再編成)の評価の処理フローを示す図である。It is a figure which shows the processing flow of evaluation of group division (reorganization). “重なりなし”のグループ分割の例を示す図である。It is a figure which shows the example of group division of "no overlap". “重なり2”のグループ分割の例を示す図である。It is a figure which shows the example of group division of "overlap 2". “重なり1”のグループ分割の例を示す図である。It is a figure which shows the example of the group division | segmentation of "overlap 1". グループの分割法則の例を示す図である。It is a figure which shows the example of the division | segmentation rule of a group. ネットワーク構成情報のデータ構造の例を示す図である。It is a figure which shows the example of the data structure of network configuration information. 経路多重度3の疎通確認をマルチスレッドで行う一例を示す図である。It is a figure which shows an example which performs the communication confirmation of path | route multiplicity 3 by multithread. 経路多重度3の疎通確認の各スレッドに時間差を設けて起動する例を示す図である。It is a figure which shows the example which provides a time difference and sets each thread of the communication confirmation of path | route multiplicity 3; 2つの異なるグループ分割で疎通確認を行う例を示す図である。It is a figure which shows the example which performs communication confirmation by two different group divisions. 〔1〕運行モードが“重なりなし”の場合の正常動作時の状態の例を示す図である。[1] It is a figure which shows the example of the state at the time of normal operation | movement in case an operation mode is "no overlap." 送受信装置における疎通経路変更のフローを示す図である。It is a figure which shows the flow of the communication path change in a transmission / reception apparatus. 〔1.1〕“重なりなし”疎通断検出時の動作状態の例を示す図である。[1.1] It is a figure which shows the example of the operation | movement state at the time of the "no overlap" communication disconnection detection. 〔1.1〕疎通断検出時のP1におけるネットワーク構成情報(1/3)を示す図である。[1.1] It is a figure which shows the network configuration information (1/3) in P1 at the time of communication disconnection detection. 〔1.1〕疎通断検出時のP1におけるネットワーク構成情報(2/3)を示す図である。[1.1] It is a figure which shows the network configuration information (2/3) in P1 at the time of communication disconnection detection. 〔1.1〕疎通断検出時のP1におけるネットワーク構成情報(3/3)を示す図である。[1.1] It is a figure which shows the network configuration information (3/3) in P1 at the time of communication disconnection detection. 運行モード移行のフローを示す図である。It is a figure which shows the flow of operation mode transfer. 〔1.2〕運行モード移行後のP1におけるネットワーク構成情報(1/3)を示す図である。[1.2] It is a figure which shows the network configuration information (1/3) in P1 after operation mode transfer. 〔1.2〕運行モード移行後のP1におけるネットワーク構成情報(2/3)を示す図である。[1.2] It is a figure which shows the network configuration information (2/3) in P1 after operation mode transfer. 〔1.2〕運行モード移行後のP1におけるネットワーク構成情報(3/3)を示す図である。[1.2] It is a figure which shows the network configuration information (3/3) in P1 after operation mode transfer. 疎通先判定のフロー(1/3)を示す図である。It is a figure which shows the flow (1/3) of a communication destination determination. 疎通先判定のフロー(2/3)を示す図である。It is a figure which shows the flow (2/3) of a communication destination determination. 疎通先判定のフロー(3/3)を示す図である。It is a figure which shows the flow (3/3) of a communication destination determination. 運行モード/疎通先情報の共有のフローを示す図である。It is a figure which shows the flow of sharing of operation mode / communication destination information. 〔1.3〕“重なりなし”疎通経路変更後の動作状態の例を示す図である。[1.3] It is a figure which shows the example of the operation state after the communication path change of "no overlap". 〔1.3〕疎通経路変更後のP1におけるネットワーク構成情報(1/3)を示す図である。[1.3] A diagram showing network configuration information (1/3) in P1 after the communication path is changed. 〔1.3〕疎通経路変更後のP1におけるネットワーク構成情報(2/3)を示す図である。[1.3] A diagram showing network configuration information (2/3) in P1 after the communication path is changed. 〔1.3〕疎通経路変更後のP1におけるネットワーク構成情報(3/3)を示す図である。[1.3] A diagram showing network configuration information (3/3) in P1 after the communication path is changed. 〔2〕運行モードが“重なり2”の場合の正常動作時の状態の例を示す図である。[2] It is a figure which shows the example of the state at the time of normal operation | movement in case an operation mode is "overlap 2". 〔2.1〕“重なり2”非重なり経路の疎通断検出時の動作状態の例を示す図である。[2.1] It is a figure which shows the example of the operation state at the time of the communication disconnection detection of the "overlap 2" non-overlap path | route. 〔2.1〕疎通断検出時のP5におけるネットワーク構成情報(1/4)を示す図である。[2.1] It is a figure which shows the network configuration information (1/4) in P5 at the time of communication disconnection detection. 〔2.1〕疎通断検出時のP5におけるネットワーク構成情報(2/4)を示す図である。[2.1] It is a figure which shows the network configuration information (2/4) in P5 at the time of communication disconnection detection. 〔2.1〕疎通断検出時のP5におけるネットワーク構成情報(3/4)を示す図である。[2.1] It is a figure which shows the network configuration information (3/4) in P5 at the time of communication disconnection detection. 〔2.1〕疎通断検出時のP5におけるネットワーク構成情報(4/4)を示す図である。[2.1] It is a figure which shows the network configuration information (4/4) in P5 at the time of communication disconnection detection. 〔2.2〕運行モード移行後のP5におけるネットワーク構成情報(1/4)を示す図である。[2.2] It is a figure which shows the network configuration information (1/4) in P5 after operation mode transfer. 〔2.2〕運行モード移行後のP5におけるネットワーク構成情報(2/4)を示す図である。[2.2] It is a figure which shows the network configuration information (2/4) in P5 after operation mode transfer. 〔2.2〕運行モード移行後のP5におけるネットワーク構成情報(3/4)を示す図である。[2.2] It is a figure which shows the network configuration information (3/4) in P5 after operation mode transfer. 〔2.2〕運行モード移行後のP5におけるネットワーク構成情報(4/4)を示す図である。[2.2] It is a figure which shows the network configuration information (4/4) in P5 after operation mode transfer. 〔2.3〕“重なり2”非重なり経路の疎通経路変更後の動作状態の例を示す図である。[2.3] It is a figure which shows the example of the operation state after the communication route change of the "overlap 2" non-overlap route. 〔2.3〕疎通経路変更後のP5におけるネットワーク構成情報(1/4)を示す図である。[2.3] A diagram showing network configuration information (1/4) in P5 after the communication path is changed. 〔2.3〕疎通経路変更後のP5におけるネットワーク構成情報(2/4)を示す図である。[2.3] A diagram showing network configuration information (2/4) in P5 after the communication path is changed. 〔2.3〕疎通経路変更後のP5におけるネットワーク構成情報(3/4)を示す図である。[2.3] A diagram showing network configuration information (3/4) in P5 after the communication path is changed. 〔2.3〕疎通経路変更後のP5におけるネットワーク構成情報(4/4)を示す図である。[2.3] A diagram showing network configuration information (4/4) in P5 after changing the communication path. 〔2'.1〕“重なり2”重なり経路の疎通断検出時の動作状態の例を示す図である。[2'.1] “Overlap 2” is a diagram illustrating an example of an operation state at the time of detecting communication interruption of an overlap route. 〔2'.1〕疎通断検出時のP4におけるネットワーク構成情報(1/4)を示す図である。[2'.1] is a diagram showing network configuration information (1/4) in P4 when communication disconnection is detected. 〔2'.1〕疎通断検出時のP4におけるネットワーク構成情報(2/4)を示す図である。[2'.1] is a diagram showing network configuration information (2/4) in P4 when communication disconnection is detected. 〔2'.1〕疎通断検出時のP4におけるネットワーク構成情報(3/4)を示す図である。[2'.1] is a diagram showing network configuration information (3/4) in P4 when communication disconnection is detected. 〔2'.1〕疎通断検出時のP4におけるネットワーク構成情報(4/4)を示す図である。[2'.1] is a diagram showing network configuration information (4/4) in P4 when communication disconnection is detected. 〔2'.2〕運行モード移行後のP4におけるネットワーク構成情報(1/4)を示す図である。[2'.2] It is a figure which shows the network configuration information (1/4) in P4 after operation mode transfer. 〔2'.2〕運行モード移行後のP4におけるネットワーク構成情報(2/4)を示す図である。[2'.2] It is a figure which shows the network configuration information (2/4) in P4 after operation mode transfer. 〔2'.2〕運行モード移行後のP4におけるネットワーク構成情報(3/4)を示す図である。[2'.2] It is a figure which shows the network configuration information (3/4) in P4 after operation mode transfer. 〔2'.2〕運行モード移行後のP4におけるネットワーク構成情報(4/4)を示す図である。[2'.2] It is a figure which shows the network configuration information (4/4) in P4 after operation mode transfer. 〔2'.3〕“重なり2”重なり経路の疎通経路変更後の動作状態の例を示す図である。[2'.3] “Overlap 2” is a diagram illustrating an example of an operation state after the communication route of the overlap route is changed. 〔2'.3〕疎通経路変更後のP4におけるネットワーク構成情報(1/4)を示す図である。[2'.3] is a diagram showing network configuration information (1/4) in P4 after the communication path is changed. 〔2'.3〕疎通経路変更後のP4におけるネットワーク構成情報(2/4)を示す図である。[2'.3] is a diagram showing network configuration information (2/4) in P4 after the communication path is changed. 〔2'.3〕疎通経路変更後のP4におけるネットワーク構成情報(3/4)を示す図である。[2'.3] is a diagram showing network configuration information (3/4) in P4 after the communication path is changed. 〔2'.3〕疎通経路変更後のP4におけるネットワーク構成情報(4/4)を示す図である。[2'.3] is a diagram showing network configuration information (4/4) in P4 after the communication path is changed. 〔2".1〕“重なり2”で“重なりなし”の疎通断検出時の動作状態の例を示す図である。[2 ".1] It is a diagram illustrating an example of an operation state at the time of detecting communication interruption of“ overlap 2 ”and“ no overlap ”. 〔2".1〕疎通断検出時のP1におけるネットワーク構成情報(1/4)を示す図である。[2 ".1] is a diagram showing network configuration information (1/4) in P1 when communication disconnection is detected. 〔2".1〕疎通断検出時のP1におけるネットワーク構成情報(2/4)を示す図である。[2 ".1] is a diagram showing network configuration information (2/4) in P1 when communication disconnection is detected. 〔2".1〕疎通断検出時のP1におけるネットワーク構成情報(3/4)を示す図である。[2 ".1] is a diagram showing network configuration information (3/4) in P1 when communication disconnection is detected. 〔2".1〕疎通断検出時のP1におけるネットワーク構成情報(4/4)を示す図である。[2 ".1] is a diagram showing network configuration information (4/4) in P1 when communication disconnection is detected. 〔2".2〕運行モード移行後のP1におけるネットワーク構成情報(1/4)を示す図である。[2 ".2] It is a figure which shows the network configuration information (1/4) in P1 after operation mode transfer. 〔2".2〕運行モード移行後のP1におけるネットワーク構成情報(2/4)を示す図である。[2 ".2] It is a figure which shows the network configuration information (2/4) in P1 after operation mode transfer. 〔2".2〕運行モード移行後のP1におけるネットワーク構成情報(3/4)を示す図である。[2 ".2] It is a figure which shows the network configuration information (3/4) in P1 after operation mode transfer. 〔2".2〕運行モード移行後のP1におけるネットワーク構成情報(4/4)を示す図である。[2 ".2] It is a figure which shows the network configuration information (4/4) in P1 after operation mode transfer. 〔2".3〕“重なり2”で“重なりなし”の疎通経路変更後の動作状態の例を示す図である。[2 ".3] It is a diagram illustrating an example of an operation state after changing the communication path of“ overlap 2 ”and“ no overlap ”. 〔2".3〕疎通経路変更後のP1におけるネットワーク構成情報(1/4)を示す図である。[2 ".3] Network configuration information (1/4) in P1 after changing the communication path. 〔2".3〕疎通経路変更後のP1におけるネットワーク構成情報(2/4)を示す図である。[2 ".3] is a diagram showing network configuration information (2/4) in P1 after the communication path is changed. 〔2".3〕疎通経路変更後のP1におけるネットワーク構成情報(3/4)を示す図である。[2 ".3] Network configuration information (3/4) in P1 after changing the communication path. 〔2".3〕疎通経路変更後のP1におけるネットワーク構成情報(4/4)を示す図である。[2 ".3] Network configuration information (4/4) in P1 after changing the communication path. 〔3〕運行モードが“重なり1”の場合の正常動作時の状態の例を示す図である。[3] It is a figure which shows the example of the state at the time of normal operation | movement in case an operation mode is "overlap 1". 〔3.1〕“重なり1”非重なり経路の疎通断検出時の動作状態の例を示す図である。[3.1] It is a figure which shows the example of the operation state at the time of the communication disconnection detection of the "overlap 1" non-overlap path | route. 〔3.1〕疎通断検出時のP4におけるネットワーク構成情報(1/4)を示す図である。[3.1] It is a figure which shows the network configuration information (1/4) in P4 at the time of communication disconnection detection. 〔3.1〕疎通断検出時のP4におけるネットワーク構成情報(2/4)を示す図である。[3.1] It is a figure which shows the network configuration information (2/4) in P4 at the time of communication disconnection detection. 〔3.1〕疎通断検出時のP4におけるネットワーク構成情報(3/4)を示す図である。[3.1] It is a figure which shows the network configuration information (3/4) in P4 at the time of communication disconnection detection. 〔3.1〕疎通断検出時のP4におけるネットワーク構成情報(4/4)を示す図である。[3.1] It is a figure which shows the network configuration information (4/4) in P4 at the time of communication disconnection detection. 〔3.2〕運行モード移行後のP4におけるネットワーク構成情報(1/4)を示す図である。[3.2] It is a figure which shows the network configuration information (1/4) in P4 after operation mode transfer. 〔3.2〕運行モード移行後のP4におけるネットワーク構成情報(2/4)を示す図である。[3.2] It is a figure which shows the network configuration information (2/4) in P4 after operation mode transfer. 〔3.2〕運行モード移行後のP4におけるネットワーク構成情報(3/4)を示す図である。[3.2] It is a figure which shows the network configuration information (3/4) in P4 after operation mode transfer. 〔3.2〕運行モード移行後のP4におけるネットワーク構成情報(4/4)を示す図である。[3.2] It is a figure which shows the network configuration information (4/4) in P4 after operation mode transfer. 〔3.3〕“重なり1”で非重なり経路の疎通経路変更後の動作状態の例を示す図である。[3.3] It is a figure which shows the example of the operation state after the communication route change of a non-overlapping route with "overlap 1". 〔3.3〕疎通経路変更後のP4におけるネットワーク構成情報(1/4)を示す図である。[3.3] A diagram showing network configuration information (1/4) in P4 after the communication path is changed. 〔3.3〕疎通経路変更後のP4におけるネットワーク構成情報(2/4)を示す図である。[3.3] A diagram showing network configuration information (2/4) in P4 after the communication path is changed. 〔3.3〕疎通経路変更後のP4におけるネットワーク構成情報(3/4)を示す図である。[3.3] A diagram showing network configuration information (3/4) in P4 after the communication route is changed. 〔3.3〕疎通経路変更後のP4におけるネットワーク構成情報(4/4)を示す図である。[3.3] A diagram showing network configuration information (4/4) in P4 after changing the communication path. 〔3'.1〕“重なり1”重なり経路の疎通断検出時の動作状態の例を示す図である。[3'.1] “Overlap 1” is a diagram illustrating an example of an operation state at the time of detecting disconnection of an overlap route. 〔3'.1〕疎通断検出時のP4におけるネットワーク構成情報(1/4)を示す図である。[3'.1] is a diagram showing network configuration information (1/4) in P4 when communication disconnection is detected. 〔3'.1〕疎通断検出時のP4におけるネットワーク構成情報(2/4)を示す図である。[3'.1] is a diagram showing network configuration information (2/4) in P4 when communication disconnection is detected. 〔3'.1〕疎通断検出時のP4におけるネットワーク構成情報(3/4)を示す図である。[3'.1] is a diagram showing network configuration information (3/4) in P4 when communication disconnection is detected. 〔3'.1〕疎通断検出時のP4におけるネットワーク構成情報(4/4)を示す図である。[3'.1] is a diagram showing network configuration information (4/4) in P4 when communication disconnection is detected. 〔3'.2〕運行モード移行後のP4におけるネットワーク構成情報(1/4)を示す図である。[3'.2] It is a figure which shows the network configuration information (1/4) in P4 after operation mode transfer. 〔3'.2〕運行モード移行後のP4におけるネットワーク構成情報(2/4)を示す図である。[3'.2] It is a figure which shows the network configuration information (2/4) in P4 after operation mode transfer. 〔3'.2〕運行モード移行後のP4におけるネットワーク構成情報(3/4)を示す図である。[3'.2] It is a figure which shows the network configuration information (3/4) in P4 after operation mode transfer. 〔3'.2〕運行モード移行後のP4におけるネットワーク構成情報(4/4)を示す図である。[3'.2] It is a figure which shows the network configuration information (4/4) in P4 after operation mode transfer. 〔3'.3〕“重なり1”で重なり経路の疎通経路変更後の動作状態の例を示す図である。[3'.3] It is a diagram illustrating an example of the operation state after changing the communication route of the overlap route with “overlap 1”. 〔3'.3〕疎通経路変更後のP4におけるネットワーク構成情報(1/4)を示す図である。[3'.3] A diagram showing network configuration information (1/4) in P4 after the change of the communication path. 〔3'.3〕疎通経路変更後のP4におけるネットワーク構成情報(2/4)を示す図である。[3'.3] A diagram showing network configuration information (2/4) in P4 after the change of the communication path. 〔3'.3〕疎通経路変更後のP4におけるネットワーク構成情報(3/4)を示す図である。[3'.3] A diagram showing network configuration information (3/4) in P4 after the change of the communication path. 〔3'.3〕疎通経路変更後のP4におけるネットワーク構成情報(4/4)を示す図である。[3'.3] A diagram showing network configuration information (4/4) in P4 after the change of the communication path. フルメッシュ状の送受信装置の疎通確認の例を示す図である。It is a figure which shows the example of the communication confirmation of the transmission / reception apparatus of a full mesh form. 二重化されたOSPFプロトコルネットワークの一例を示す図である。It is a figure which shows an example of the duplexed OSPF protocol network. 3分岐路による疎通確認理論の説明図である。It is explanatory drawing of the communication confirmation theory by 3 branch paths. 3分岐路を形成する単位ネットワークへの分割例を示す図である。It is a figure which shows the example of a division | segmentation into the unit network which forms 3 branch paths. ネットワークの疎通状態を確認するシステムの全体構成例を示す図である。It is a figure which shows the example of whole structure of the system which confirms the communication state of a network.

<構成>
図1は開示の送受信装置の機能ブロックを示す。記憶部1−1は、中継点を基点とした3分岐路を含む単位ネットワークに分割されたエリアネットワークの疎通確認の経路情報を含むネットワーク構成情報、疎通確認用のパケットの到達結果、疎通状態等、疎通確認経路の切替えに関わる各種情報を記録する。記憶部1−1は、ハードディスクやRAM(Random Access Memory)等の内部記憶装置を用いることができ、またフラッシュメモリ等の外部記録装置を代用することもできる。
<Configuration>
FIG. 1 shows functional blocks of the disclosed transmission / reception apparatus. The storage unit 1-1 includes network configuration information including path information for communication confirmation of an area network divided into unit networks including three branch paths with a relay point as a base point, arrival results of communication confirmation packets, communication status, etc. Various information related to switching of the communication confirmation route is recorded. As the storage unit 1-1, an internal storage device such as a hard disk or a RAM (Random Access Memory) can be used, and an external recording device such as a flash memory can be substituted.

疎通確認スケジューリング部1−2は、疎通確認の経路情報(疎通確認先)を記憶部1−1から読み出し、疎通確認を行うタイミングのスケジューリングを行い、疎通確認部1−3を起動する。疎通確認部1−3は指定されたタイミングに、記憶部1−1から読み出した疎通確認先の送受信装置への疎通確認用のパケット送信の指示を送信部1−4に対して行う。   The communication confirmation scheduling unit 1-2 reads path information (communication confirmation destination) for communication confirmation from the storage unit 1-1, schedules the timing for performing communication confirmation, and activates the communication confirmation unit 1-3. The communication confirmation unit 1-3 instructs the transmission unit 1-4 to transmit a packet for confirming communication to the transmission / reception device that is the communication confirmation destination read from the storage unit 1-1 at a designated timing.

送信部1−4は、疎通確認部1−3からの指示に従い、指定された疎通確認先の送受信装置に対して疎通確認用のパケットを送信する。受信部1−5は、他の送受信装置からの疎通確認用のパケットを受信する。疎通状態判断部1−6は、疎通確認用のパケットの到達結果を評価し、記憶部1−1に評価結果を書き込む。疎通切替設定部1−7は、記憶部1−1からネットワーク構成情報、疎通状態等の疎通確認経路の切替えに関わる各種情報を読み出し、疎通確認経路の変更が必要な場合、疎通確認経路の変更先を記憶部1−1に設定する。   The transmission unit 1-4 transmits a communication confirmation packet to the specified transmission / reception destination transmission / reception device according to the instruction from the communication confirmation unit 1-3. The reception unit 1-5 receives a communication confirmation packet from another transmission / reception device. The communication state determination unit 1-6 evaluates the arrival result of the communication confirmation packet and writes the evaluation result in the storage unit 1-1. The communication switching setting unit 1-7 reads various information related to the switching of the communication confirmation route such as the network configuration information and the communication state from the storage unit 1-1, and when the communication confirmation route needs to be changed, the communication confirmation route is changed. The destination is set in the storage unit 1-1.

<疎通グループ分割動作>
上述の構成の送受信装置の間で疎通確認用のパケットを送受する疎通経路を変更する処理について以下に説明する。ここでは、中継点ルータ、エッジルータ及び送受信装置の物理的な接続構成情報(ネットワークトポロジ)をネットワーク構成情報と称する。図2にネットワーク構成情報変更のフローを示す。
<Communication group division operation>
Processing for changing a communication path for transmitting / receiving a communication confirmation packet between the transmission / reception apparatuses configured as described above will be described below. Here, the physical connection configuration information (network topology) of the relay point router, the edge router, and the transmission / reception device is referred to as network configuration information. FIG. 2 shows a flow of changing the network configuration information.

中継点ルータ、エッジルータ又は送受信装置の増減設工事により、ネットワーク構成情報に変更が生じると(2−1)、センター装置で管理するネットワーク構成情報が変更される(2−2)。センター装置は、ネットワーク構成情報の変更のあったエリアを特定し(2−3)、該エリアに包含される全ての送受信装置に変更後のネットワーク構成情報を配信する(2−4)。   When the network configuration information is changed due to the increase / decrease construction of the relay point router, the edge router or the transmission / reception device (2-1), the network configuration information managed by the center device is changed (2-2). The center device identifies the area where the network configuration information has been changed (2-3), and distributes the changed network configuration information to all the transmission / reception devices included in the area (2-4).

例えば、図106のエリアAのグループG1内の送受信装置の1つが撤去された場合、センター装置からエリアAのグループG1,G2,G3,G4,G5内の全ての送受信装置に、更新後のネットワーク構成情報を配信する。センター装置から各送受信装置へのネットワーク構成情報の配信タイミングは、ネットワーク構成情報に変更が発生するたびに配信する、或いは変更の発生の有無とは無関係に所定周期で配信する、の何れかを運用者が任意に設定する構成とすることができる。   For example, when one of the transmission / reception devices in the group G1 in the area A in FIG. 106 is removed, the updated network is transferred from the center device to all the transmission / reception devices in the groups G1, G2, G3, G4, and G5 in the area A. Deliver configuration information. The distribution timing of the network configuration information from the center device to each transmission / reception device is either distributed every time the network configuration information changes or distributed at a predetermined cycle regardless of whether or not the network configuration information has changed. The configuration can be arbitrarily set by a person.

また、配信されるネットワーク構成情報は、エリアA内の全ての送受信装置にエリアA全域のネットワーク構成情報を配信する、或いはグループを限定したネットワーク構成情報を配信するかの何れであっても良い。送受信装置は、センター装置から配信されたネットワーク構成情報の変更を受信し(2−5)、所属エリアの送受信装置台数を特定する(2−6)。   Further, the network configuration information to be distributed may be either distribution of the network configuration information for the entire area A to all transmitting / receiving apparatuses in the area A or distribution of network configuration information for a limited group. The transmission / reception device receives the change of the network configuration information distributed from the center device (2-5), and specifies the number of transmission / reception devices in the belonging area (2-6).

送受信装置は、所属エリアの送受信装置台数を基に、グループ分割(再編成)を評価する(2−7)。該グループ分割(再編成)の評価の処理フローは図3に示す。グループ分割(再編成)の評価により、グループ再編成の必要の有無を判定し(2−8)、グループ再編成が必要な場合、グループ分割(再編成)を実施する(2−9)。   The transmission / reception device evaluates group division (reorganization) based on the number of transmission / reception devices in the belonging area (2-7). FIG. 3 shows a processing flow for evaluating the group division (reorganization). Based on the evaluation of group division (reorganization), it is determined whether or not group reorganization is necessary (2-8). When group reorganization is necessary, group division (reorganization) is performed (2-9).

グループ分割の評価のフローについて説明する。送受信装置は、配信されたネットワーク構成情報の所属エリアの送受信装置台数から、図3のフローチャートに示すように、後述する運行モードを決定する。所属エリア内の送受信装置台数の3の剰余がゼロの場合、運行モードを“重なりなし”に決定する(3−1)。送受信装置台数の3の剰余が2の場合、運行モードを“重なり1”に決定する(3−2)。送受信装置台数の3の剰余が1の場合、運行モードを“重なり2”に決定する(3−3)。   The flow of group division evaluation will be described. As shown in the flowchart of FIG. 3, the transmission / reception device determines an operation mode to be described later from the number of transmission / reception devices in the belonging area of the distributed network configuration information. When the remainder of 3 of the number of transmission / reception devices in the belonging area is zero, the operation mode is determined as “no overlap” (3-1). When the remainder of 3 of the number of transmission / reception devices is 2, the operation mode is determined as “overlap 1” (3-2). When the remainder of 3 of the number of transmission / reception devices is 1, the operation mode is determined as “overlap 2” (3-3).

例えば、図4に示すように、エリアAに6台の送受信装置P1〜P6が配備されている場合、送受信装置台数6の3の剰余はゼロとなることから、グループG1とグループG2とで“重なりなし”の運行モードになるようグループ分割を行う。また、図5に示すように、エリアAに7台の送受信装置P1〜P7が配備されている場合、送受信装置台数7の3の剰余は1となることから、グループG1とその隣接グループG2とでは“重なりなし”、グループG2とその隣接する末尾グループG3とで“重なり2”の運行モードとなるよう、グループ分割を行う。   For example, as shown in FIG. 4, when six transmission / reception devices P1 to P6 are arranged in the area A, the remainder of 3 of the number of transmission / reception devices 6 is zero. Divide the group so that the operation mode is “no overlap”. Further, as shown in FIG. 5, when seven transmission / reception devices P1 to P7 are arranged in the area A, the remainder of 3 of the number of transmission / reception devices 7 is 1, so that the group G1 and its adjacent group G2 Then, the group division is performed so that the operation mode is “no overlap”, and the group G2 and the adjacent end group G3 thereof are in the “overlap 2” operation mode.

また、図6に示すように、エリアAに8台の送受信装置P1〜P8が配備されている場合、送受信装置台数8の3の剰余は2となることから、グループG1とその隣接グループG2とで“重なりなし”、グループG2とその隣接する末尾グループG3とで“重なり1”の運行モードとなるよう、グループ分割を行う。   Further, as shown in FIG. 6, when eight transmission / reception devices P1 to P8 are arranged in the area A, the remainder of 3 of the number of transmission / reception devices 8 is 2, so that the group G1 and its adjacent group G2 The group division is performed so that the operation mode is “no overlap” and “overlap 1” between the group G2 and the adjacent end group G3.

グループ分割の際、各送受信装置が属するグループは、各送受信装置の識別番号順を用いるなど、所定の分割法則に従って決定することができる。例えば、識別番号の昇順/降順や偶数番/奇数番等を用いて決定することができる。ただし、グループの分割法則は、エリア内の全ての送受信装置に対して共通に適用する。   At the time of group division, the group to which each transmission / reception device belongs can be determined according to a predetermined division rule, such as using the order of identification numbers of each transmission / reception device. For example, it can be determined using ascending / descending order of identification numbers, even number / odd number, or the like. However, the group division rule is commonly applied to all transmission / reception devices in the area.

図7にグループの分割法則の例を示す。図7の(a)は、分割法則の第1例を示す。この例では、送受信装置台数が8で各送受信装置P1〜P8の識別番号を1〜8とする。分割法則の第1例は、送受信装置P1〜P8の識別番号をそのまま利用し、該識別番号順にグループ分けを行う例を示している。この分割法則によれば、グループG1に、P1,P2,P3の送受信装置、グループG2にP4,P5,P6の送受信装置、グループG3にP6,P7,P8の送受信装置が属するようグループ分割している。   FIG. 7 shows an example of group division rules. FIG. 7A shows a first example of the division rule. In this example, the number of transmission / reception devices is 8, and the identification numbers of the transmission / reception devices P1 to P8 are 1 to 8. The first example of the division rule shows an example in which the identification numbers of the transmission / reception devices P1 to P8 are used as they are, and grouping is performed in the order of the identification numbers. According to this division rule, the group G1 is divided into groups such that P1, P2 and P3 transmission / reception devices, group G2 includes P4, P5 and P6 transmission / reception devices, and group G3 includes P6, P7 and P8 transmission / reception devices. Yes.

図7の(b)は、分割法則の第2例を示す。分割法則の第2例は、識別番号に1を加算して巡回させた識別番号順にグループ分けを行う例を示している。この法則によれば、グループG1にP2,P3,P4の送受信装置、グループG2にP5,P6,P7の送受信装置、グループG3にP7,P8,P1の送受信装置が属するようグループ分割している。   FIG. 7B shows a second example of the division rule. The second example of the division rule shows an example in which grouping is performed in the order of identification numbers obtained by adding 1 to the identification number and circulating. According to this rule, the group G1 is divided into groups such that P2, P3, and P4 transmission / reception devices, the group G2 includes P5, P6, and P7 transmission / reception devices, and the group G3 includes P7, P8, and P1 transmission / reception devices.

図8にネットワーク構成情報のデータ構造の例を示す。このネットワーク構成情報の例は、図6に示す“重なり1”のグループ分割で、グループG2とグループG3とに属する送受信装置P6の記憶部で保持されるネットワーク構成情報の中の、自装置に係る情報を抜粋したデータ構造の例を示している。   FIG. 8 shows an example of the data structure of the network configuration information. The example of the network configuration information is related to the own device in the network configuration information held in the storage unit of the transmission / reception device P6 belonging to the group G2 and the group G3 in the group division of “overlap 1” shown in FIG. An example of a data structure in which information is extracted is shown.

送受信装置P6の自装置に係るネットワーク構成情報としては、自装置情報とその識別番号“P6(6)”、所属エリア情報とその台数“A(8)”、所属グループ情報とその優先度“G2(優先度3),G3(優先度1)”を保持する。優先度については後述するが、この優先度の情報は、同一の所属グループの送受信装置の中から経路変更先を決定する際の優先順位として用いられる。   The network configuration information related to the own device of the transmission / reception device P6 includes the own device information and its identification number “P6 (6)”, the belonging area information and the number “A (8)”, the belonging group information and its priority “G2”. (Priority 3), G3 (Priority 1) "are held. Although the priority will be described later, this priority information is used as a priority when determining a path change destination from the transmission / reception apparatuses of the same group.

更に、隣接グループ情報として、所属グループG2に隣接する“G1,G3”、所属グループG3に隣接する“G2”を保持する。また、現在の運行モード情報として隣接グループG1について“重なりなし”、隣接グループG3について“重なり1”、隣接グループG2について“重なり1”を保持する。   Further, “G1, G3” adjacent to the affiliated group G2 and “G2” adjacent to the affiliated group G3 are held as adjacent group information. Also, as the current operation mode information, “no overlap” for the adjacent group G1, “overlap 1” for the adjacent group G3, and “overlap 1” for the adjacent group G2 are held.

隣接グループは、グループ番号の先頭及び末尾のグループでは1つ、グループ番号が先頭と末尾の間のグループでは2つ存在する。従って、所属グループ情報としてG2を設定した箇所では、隣接グループ情報としてG1及びG3の2つが設定される。また、所属グループ情報として末尾グループG3を設定した箇所では、隣接グループ情報としてG2の1つが設定される。   There are one adjacent group in the group at the head and end of the group number, and two in the group between the head and the end of the group number. Therefore, in the place where G2 is set as the belonging group information, two of G1 and G3 are set as the adjacent group information. In addition, in the place where the tail group G3 is set as the belonging group information, one of G2 is set as the adjacent group information.

更に、疎通先とその疎通結果として、所属グループG2について“P4(OK),“P5(OK)”、所属グループG3について“P7(OK),“P8(OK)”を保持する。更に、疎通先台数として、P4,P5,P7,P8の4台分の“4”を保持する。   Furthermore, “P4 (OK),“ P5 (OK) ”for the belonging group G2 and“ P7 (OK), “P8 (OK)” for the belonging group G3 are held as the communication destination and the communication result. Furthermore, “4” corresponding to four of P4, P5, P7, and P8 is held as the number of communication destinations.

グループ分割の形態は、適用する分割法則によって異なるものとなり、複数の形態が存在する。複数の分割法則によるグループ分割を利用して疎通確認を行う場合、各送受信装置は、それぞれの記憶部に上述のネットワーク構成情報を、複数の分割法則による分割形態毎に保持する。以下では、複数の分割法則によるグループ分割での疎通確認経路を多重経路と称し、多重経路の本数を経路多重度と称する。   The form of group division differs depending on the division rule to be applied, and there are a plurality of forms. When communication is confirmed using group division based on a plurality of division rules, each transmission / reception apparatus holds the above-described network configuration information in each storage unit for each division form based on the plurality of division rules. Hereinafter, a communication confirmation path in group division based on a plurality of division rules is referred to as a multipath, and the number of multipaths is referred to as a path multiplicity.

<疎通経路確認動作>
送受信装置の間で疎通確認用のパケットを送受するシーケンスについて説明する。ネットワーク構成情報の配信を受けた送受信装置は、ネットワーク構成情報で示される疎通経路について疎通確認を行う。疎通経路確認は、確度を向上させるために、経路多重度を基に多重経路毎に並列に行う。経路多重度は、予め送受信装置に設定しておいてもよいし、ネットワーク構成情報と共にセンター装置から各送受信装置に配信してもよい。
<Communication path confirmation operation>
A sequence for transmitting and receiving a communication confirmation packet between the transmitting and receiving apparatuses will be described. The transmission / reception apparatus that has received the distribution of the network configuration information confirms the communication on the communication path indicated by the network configuration information. The communication path confirmation is performed in parallel for each of the multiple paths based on the path multiplicity in order to improve the accuracy. The path multiplicity may be set in advance in the transmission / reception device, or may be distributed from the center device to each transmission / reception device together with the network configuration information.

並列処理の手法としては、マルチスレッドやマルチプロセスを用い、又はプログラム内での繰返し処理によって行うことができる。図9は、経路多重度3の場合の疎通確認をマルチスレッドで行う一例を示している。このスレッドは、経路多重度数だけ起動され、第1の多重経路のスレッドと第2の多重経路のスレッドと第3の多重経路のスレッドとで、それぞれ異なる疎通経路について同時に疎通確認を行う。   As a method of parallel processing, it can be performed using multi-threads or multi-processes, or by repeated processing in a program. FIG. 9 shows an example in which communication confirmation in the case of path multiplicity 3 is performed by multithreading. This thread is activated by the path multiplicity, and the first multipath thread, the second multipath thread, and the third multipath thread check the communication paths of the different multipath paths at the same time.

例えば、第1の多重経路のスレッドでは、送受信装置の識別番号順にグループ分割を行った単位ネットワークの疎通経路を用いて疎通確認を行い、第2の多重経路のスレッドでは、識別番号に1を加算して巡回させた識別番号の順にグループ分割を行った単位ネットワークの疎通経路を用いて疎通確認を行い、第3の多重経路のスレッドでは、識別番号に2を加算して巡回させた識別番号の順にグループ分割を行った単位ネットワークの疎通経路を用いて疎通確認を行う。   For example, in the first multipath thread, communication confirmation is performed using the communication path of the unit network that has been divided into groups in the order of the identification numbers of the transmission / reception devices. In the second multipath thread, 1 is added to the identification number. In the third multipath thread, 2 is added to the identification number and the circulation of the identification number is performed in the third multipath thread. Communication check is performed using the communication path of the unit network that has been divided into groups.

ただし、各スレッドの疎通確認でどのグループ分割法則を用いるかは、エリア内の送受信装置全体で共通にして設定しておく。各スレッドの疎通確認は、所定の周期間隔Tで繰り返し実施する構成とすることができる。多重経路により複数の疎通経路についての確認結果を取得することができるため、疎通経路確認結果の確度を向上させることができる。   However, the group division rule to be used for checking the communication of each thread is set in common for all the transmission / reception apparatuses in the area. The communication confirmation of each thread can be repeatedly performed at a predetermined cycle interval T. Since confirmation results for a plurality of communication routes can be acquired by multiple routes, the accuracy of the communication route confirmation results can be improved.

図10は、各スレッドを起動する際に、所定のタイムオフセット値の時間差を設けて各スレッドを起動する疎通確認シーケンスの例を示す。各スレッドの起動タイミングに時間差を設定することにより、第1の多重経路のスレッドと第2の多重経路のスレッドと第3の多重経路のスレッドとで、疎通確認の実施タイミングをずらすことができる。   FIG. 10 shows an example of a communication confirmation sequence for activating each thread with a time difference of a predetermined time offset value when activating each thread. By setting a time difference in the activation timing of each thread, the communication confirmation execution timing can be shifted between the first multipath thread, the second multipath thread, and the third multipath thread.

タイムオフセット値を、疎通確認の所要時間と略同じ値とし、1つのスレッドでの疎通確認の終了時に次のスレッドでの疎通確認が開始されるように設定することにより、疎通確認を間断なく行うことができ、間欠障害を検出することが可能となる。タイムオフセット値は、予め送受信装置に設定しておいてもよいし、ネットワーク構成情報と共にセンター装置から各送受信装置に配信してもよい。   Confirm the communication without interruption by setting the time offset value to be approximately the same as the time required for the communication check and setting the communication check in the next thread to start at the end of the communication check in one thread. And intermittent faults can be detected. The time offset value may be set in advance in the transmission / reception device, or may be distributed from the center device to each transmission / reception device together with the network configuration information.

図11は、2つの異なるグループ分割の疎通経路(経路多重度2)で疎通確認を行う例を示している。図11の(a)は、エッジルータE1,E2,E3が属するグループG1と、エッジルータE4,E5,E6が属するグループG2とにグループ分割した場合を示す。図11の(b)は、エッジルータE1,E2,E6が属するグループG1’と、エッジルータE3,E4,E5が属するグループG2’とにグループ分割した場合を示す。   FIG. 11 shows an example in which communication confirmation is performed using two different group-divided communication paths (path multiplicity 2). FIG. 11A shows a case where the group is divided into a group G1 to which the edge routers E1, E2, and E3 belong and a group G2 to which the edge routers E4, E5, and E6 belong. FIG. 11B shows a case where the group is divided into a group G1 'to which the edge routers E1, E2, and E6 belong and a group G2' to which the edge routers E3, E4, and E5 belong.

ここで、エッジルータE1の分岐路に疎通断の間欠障害が発生している場合、図11の(a)に示すグループ分割での疎通経路(第1の多重経路)では、エッジルータE1,E2間及びエッジルータE1,E3間の疎通確認において、ソフトウェアのバグ等により、エッジルータE1の分岐路の疎通断を検出できない場合が有る。   Here, when an intermittent failure occurs in the branch path of the edge router E1, the edge routers E1 and E2 in the communication path (first multipath) in the group division shown in FIG. In the communication check between the edge routers E1 and E3, there may be a case where the disconnection of the branch path of the edge router E1 cannot be detected due to a software bug or the like.

しかし、図11の(b)に示すように、異なるグループ分割での疎通経路(第2の多重経路)で、エッジルータE1,E2間又はエッジルータE1,E6間の疎通確認を行うことにより、エッジルータE1の分岐路の疎通断が検出される可能性がある。こうすることにより、疎通確認経路の網羅性が上がり、障害検知の精度を向上させることができる。   However, as shown in FIG. 11B, by performing communication confirmation between the edge routers E1 and E2 or between the edge routers E1 and E6 in the communication path (second multiple path) in different group divisions, There is a possibility that the disconnection of the branch path of the edge router E1 is detected. By doing so, the comprehensiveness of the communication confirmation route is improved, and the accuracy of fault detection can be improved.

<疎通経路変更動作>
送受信装置の間で疎通確認のパケットを送受する疎通経路を変更する動作について説明する。グループ分割の運行モードが、“重なりなし”、“重なり2”、“重なり1”(図4、図5、図6参照)の場合のそれぞれについて、疎通経路を変更する動作を順に説明する。以下では、送受信装置P1、送受信装置P2、送受信装置P3等を、単にP1,P2,P3等とも記す。
<Communication path change operation>
An operation for changing a communication path for transmitting and receiving a communication confirmation packet between the transmitting and receiving apparatuses will be described. The operation of changing the communication route will be described in order for each of the group division operation modes of “no overlap”, “overlap 2”, and “overlap 1” (see FIGS. 4, 5, and 6). Hereinafter, the transmission / reception device P1, the transmission / reception device P2, the transmission / reception device P3, and the like are also simply referred to as P1, P2, P3, and the like.

図12は、ケース〔1〕として運行モードが“重なりなし”の場合の正常動作時の動作状態の例を示す。グループG1において、正常動作時、P1はP2,P3と疎通確認のパケットを、P2はP1,P3と疎通確認のパケットを、P3はP1,P2と疎通確認のパケットを送受する。   FIG. 12 shows an example of the operation state during normal operation when the operation mode is “no overlap” as case [1]. In the group G1, during normal operation, P1 transmits and receives communication confirmation packets with P2 and P3, P2 transmits and receives communication confirmation packets with P1 and P3, and P3 transmits and receives communication confirmation packets with P1 and P2.

また、グループG2において、正常動作時、P4はP5,P6と疎通確認のパケットを、P5はP4,P6と疎通確認のパケットを、P6はP4、P5と疎通確認のパケットを送受する。疎通確認のパケットの送受シーケンスについては、前述の<疎通経路確認動作>を参照のこと。   In the group G2, during normal operation, P4 transmits and receives communication confirmation packets with P5 and P6, P5 transmits and receives communication confirmation packets with P4 and P6, and P6 transmits and receives communication confirmation packets with P4 and P5. For the transmission / reception sequence of the communication confirmation packet, see <Communication path confirmation operation> described above.

図13は、送受信装置が疎通断を検出し、疎通経路を変更する動作のフローを示す。送受信装置は疎通確認用のパケットの到達結果から疎通断(疎通結果NG)を検出すると(13−1)、当該送受信装置で送信したパケットの疎通結果が全てNGであるかどうかを確認し(13−2)、全てNGでない場合、運行モードの移行を判断する(13−3)。運行モードの判断の詳細な処理フローは図18に示す。   FIG. 13 shows a flow of an operation in which the transmission / reception apparatus detects a disconnection and changes the communication path. When the transmission / reception device detects communication disconnection (communication result NG) from the arrival result of the communication confirmation packet (13-1), it checks whether all the communication results of the packets transmitted by the transmission / reception device are NG (13). -2) When all are not NG, the shift of the operation mode is determined (13-3). A detailed processing flow for determining the operation mode is shown in FIG.

その後、当該送受信装置が“重なり該当装置”であるかどうかを確認する(13−4)。“重なり該当装置”は、2つのグループに属する装置である。“重なり該当装置”であるかどうかは、ネットワーク構成情報の所属グループ情報が2つ以上あるかどうかで確認することができる。   Thereafter, it is confirmed whether or not the transmission / reception apparatus is an “overlapping applicable apparatus” (13-4). “Overlapping applicable devices” are devices belonging to two groups. Whether or not the device is an “overlapping applicable device” can be confirmed by whether or not there are two or more group information belonging to the network configuration information.

当該送受信装置が“重なり該当装置”でない場合、疎通先(疎通確認経路の切替え先)を判定する(13−5)。疎通先(疎通確認経路の切替え先)の判定の詳細な処理フローは図22〜図24に示す。疎通先(疎通確認経路の切替え先)の判定により、新しい疎通先が決定すると、該新しい疎通先に対する状態確認を行う(13−6)。   If the transmission / reception apparatus is not “overlapping applicable apparatus”, the communication destination (communication confirmation path switching destination) is determined (13-5). The detailed processing flow for determining the communication destination (communication confirmation path switching destination) is shown in FIGS. When a new communication destination is determined based on the determination of the communication destination (communication confirmation path switching destination), the status of the new communication destination is checked (13-6).

該新しい疎通先の状態確認の結果が良好(OK)であれば、該新しい疎通先を、疎通経路確認用の疎通先として設定する(13−7)。該新しい疎通先の設定により、新たな運行モード及び疎通先の情報を他の送受信装置に送信し、それらの情報を他の送受信装置と共有する(13−8)。運行モード及び疎通先の情報の共有については、図25に詳細な処理フローを示す。新たな運行モード及び疎通先の情報の共有化の処理の終了により、疎通先の切替えを完了する(13−9)。   If the result of checking the state of the new communication destination is good (OK), the new communication destination is set as a communication destination for checking the communication path (13-7). By setting the new communication destination, the information on the new operation mode and communication destination is transmitted to another transmission / reception device, and the information is shared with the other transmission / reception device (13-8). FIG. 25 shows a detailed processing flow for sharing the operation mode and communication destination information. By completing the process of sharing the new operation mode and communication destination information, switching of the communication destination is completed (13-9).

前述の処理フロー(13−2)において、当該送受信装置で送信したパケットの疎通結果が全てNGであると判定された場合、及び当該送受信装置が“重なり該当装置”であると判断された場合、新しい疎通先の判定を行うことなく、運行モード及び疎通先の情報の共有化の処理を実施し(13−8)、疎通先の切替えを完了する(13−9)。   In the processing flow (13-2) described above, when it is determined that all the communication results of the packets transmitted by the transmission / reception device are NG, and when it is determined that the transmission / reception device is an “overlap corresponding device”, Without determining the new communication destination, the process of sharing the operation mode and communication destination information is performed (13-8), and the switching of the communication destination is completed (13-9).

以下、運行モードが“重なりなし”、“重なり1”、“重なり2”の場合について、及び当該送受信装置が“重なり該当装置”である場合とそうでない場合について、疎通先の切替えの動作を、具体例を挙げて説明する。   Hereinafter, in the case where the operation mode is “no overlap”, “overlap 1”, “overlap 2”, and when the transmission / reception apparatus is the “overlap corresponding apparatus”, the communication destination switching operation is A specific example will be described.

〔1.1〕“重なりなし”の運行モードで疎通断検出
図14に、“重なりなし”の運行モードで疎通断検出時の動作状態の例を示す。この例は、図12に示す正常動作中に、送受信装置P2と中継点ルータとの間の経路(P2の分岐路)が疎通断となった場合を示している。疎通断はP1,P2,P3で検出される。P1,P3はP2へ送信した疎通確認のパケットに対する応答がP2から来ないことにより、図1の疎通状態判断部にて疎通断と判断する。なお、以下では疎通確認のパケットを単にパケットとも記す。
[1.1] Communication disconnection detection in operation mode “No overlap” FIG. 14 shows an example of an operation state when communication disconnection is detected in the operation mode “No overlap”. This example shows a case where the communication path between the transmission / reception device P2 and the relay point router (the branch path of P2) is disconnected during the normal operation shown in FIG. Communication disconnection is detected at P1, P2, and P3. P1 and P3 determine that the communication is disconnected in the communication state determination unit in FIG. 1 because the response to the communication confirmation packet transmitted to P2 does not come from P2. Hereinafter, the communication confirmation packet is also simply referred to as a packet.

P2はP1,P3へ送信したパケットに対する応答がなく、疎通結果が全てNGとなるため、自身と中継ルータとの間の経路が疎通断であると判断し、疎通経路の変更の処理は行わない。P1はP3へ送信したパケットに対する応答を受信し、P3はP1へ送信したパケットに対する応答を受信する。そのため、P1,P3では疎通結果が全てNGとはならないので、疎通先の変更を行う。   P2 has no response to the packets sent to P1 and P3, and all the communication results are NG. Therefore, it is determined that the path between itself and the relay router is disconnected, and the process of changing the communication path is not performed. . P1 receives a response to the packet transmitted to P3, and P3 receives a response to the packet transmitted to P1. Therefore, since the communication results are not all NG in P1 and P3, the communication destination is changed.

図15〜図17は、ケース〔1.1〕のときのP1の記憶部に保持されたネットワーク構成情報である。図15はP1とP2についてのネットワーク構成情報、図16はP3とP4についてのネットワーク構成情報、図17はP5とP6についてのネットワーク構成情報である。なお、変化したネットワーク構成情報を実線の丸印で囲んで示している。   15 to 17 show network configuration information held in the storage unit P1 in case [1.1]. 15 shows network configuration information about P1 and P2, FIG. 16 shows network configuration information about P3 and P4, and FIG. 17 shows network configuration information about P5 and P6. Note that the changed network configuration information is surrounded by a solid circle.

図18に運行モード移行判断のフローを示す。運行モード移行判断は、前述の図13の処理フロー(13−3)で実施される処理である。送受信装置は、自身の運行モードを判断し、“重なりなし”の場合は運行モードを“重なり1”へ移行させ(18−1)、“重なり1”の場合は運行モードを“重なり2”へ移行させ(18−2)、“重なり2”の場合は運行モードを“重なりなし”へ移行させる(18−3)。   FIG. 18 shows a flow of operation mode transition determination. The operation mode shift determination is a process performed in the process flow (13-3) of FIG. The transmission / reception device determines its own operation mode, and when “no overlap”, the operation mode is shifted to “overlap 1” (18-1), and when “overlap 1”, the operation mode is changed to “overlap 2”. In the case of “overlap 2”, the operation mode is shifted to “no overlap” (18-3).

図14の例の場合、P1,P3は疎通断の検出数が1であり、現在の運行モードが“重なりなし”であるので、“重なり1”の運行モードへ移行するよう、図1の疎通切替設定部1−7にて判断する。図19〜図21は、ケース〔1.2〕として“重なり1”の運行モードへ移行したときのP1の記憶部に保持されたネットワーク構成情報である。   In the case of the example of FIG. 14, P1 and P3 have the detected number of communication interruptions of 1 and the current operation mode is “no overlap”, so that the communication of FIG. This is determined by the switching setting unit 1-7. 19 to 21 are network configuration information held in the storage unit P1 when the operation mode is changed to “overlap 1” as the case [1.2].

図19は、P1とP2についてのネットワーク構成情報、図20はP3とP4についてのネットワーク構成情報、図21はP5とP6についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲んで示し、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   19 shows network configuration information about P1 and P2, FIG. 20 shows network configuration information about P3 and P4, and FIG. 21 shows network configuration information about P5 and P6. Note that the network configuration information changed this time is indicated by a solid circle, and the network configuration information changed last time is indicated by a dotted circle.

図22〜図24に疎通先判定のフローを示す。疎通先判定は、前述の図13の処理フロー(13−5)で実施される処理である。疎通先判定は、疎通断の箇所が“重なり該当装置”の分岐路(重なり箇所)であるかどうかを判定する(22−1)。疎通断の箇所が重なり箇所である場合、隣接グループの識別番号が所属グループの識別番号より若番かどうか判定し(22−2)、隣接グループの識別番号が若番である場合、新しい疎通先を設定しない(22−3)。   22 to 24 show the flow of communication destination determination. The communication destination determination is processing performed in the processing flow (13-5) of FIG. 13 described above. In the communication destination determination, it is determined whether or not the communication disconnection location is a branch path (overlap location) of the “overlap applicable device” (22-1). If the communication disconnection location is an overlap location, it is determined whether the identification number of the adjacent group is smaller than the identification number of the belonging group (22-2). If the identification number of the adjacent group is young, a new communication destination Is not set (22-3).

疎通断箇所が重なり箇所でない場合、隣接グループのうち、より重なり数の多い隣接グループを、疎通先の隣接グループに選択する。上述の処理フロー22−2,22−4の後、運行モード移行後の自身の運行モードが“重なり2”であるかどうかを判定する(22−5)。   If the communication cut-off location is not an overlap location, an adjacent group having a larger number of overlaps is selected from the adjacent groups as a communication destination adjacent group. After the above-described processing flows 22-2 and 22-4, it is determined whether or not the own operation mode after the operation mode shift is “overlap 2” (22-5).

“重なり2”でない場合、疎通先判定1の処理を実施する(22−6)。疎通先判定1の詳細な処理フローは図23に示す。“重なり2”の場合、疎通先判定2の処理を実施する(22−7)。疎通先判定2の詳細な処理フローは図24に示す。新しい疎通先が決定した後、該新しい疎通先に対して疎通状態の確認を実施する(22−8)。   If it is not “overlap 2”, the communication destination determination 1 is executed (22-6). A detailed processing flow of the communication destination determination 1 is shown in FIG. In the case of “overlap 2”, the communication destination determination 2 is performed (22-7). A detailed processing flow of the communication destination determination 2 is shown in FIG. After the new communication destination is determined, the communication state is confirmed for the new communication destination (22-8).

疎通先判定1の処理は、図23に示すように、新疎通先の隣接グループに属し、かつ、最も疎通先の少ない送受信装置を新しい疎通先候補に抽出する。抽出した候補が1つでない場合、該隣接グループの所属グループ情報の優先度を基に、新しい疎通先の送受信装置を1つに決定する。新しい疎通先を決定した後、疎通先判定の処理フローに戻る(23−3)。   As shown in FIG. 23, the process of communication destination determination 1 extracts a transmission / reception apparatus that belongs to the adjacent group of the new communication destination and has the smallest communication destination as a new communication destination candidate. When the number of extracted candidates is not one, a new communication destination transmission / reception apparatus is determined as one based on the priority of group information of the adjacent group. After the new communication destination is determined, the processing flow returns to the communication destination determination process (23-3).

疎通先判定2の処理は、図24に示すように、疎通断箇所が重なり箇所かどうかを判定する(24−1)。疎通断箇所が重なり箇所でない場合、前述の疎通先判定1の処理を実施する(24−2)。疎通断箇所が重なり箇所の場合、自身の所属グループ内で自装置の方が他装置より優先度が低いかどうかを判定する(24−3)。自装置の方が他装置より優先度が高い場合、疎通先判定1の処理を実施する(24−2)。   As shown in FIG. 24, the processing of the communication destination determination 2 determines whether or not the communication interruption location is an overlapping location (24-1). If the communication cut-off location is not an overlap location, the above-described communication destination determination 1 is performed (24-2). If the communication cut-off location is an overlap location, it is determined whether or not the own device has a lower priority than other devices within its own group (24-3). If the own device has a higher priority than other devices, the communication destination determination 1 is performed (24-2).

疎通断箇所が重なり箇所で、かつ、所属グループ内で自装置の方が他装置より優先度が低い場合、隣接グループに属する全ての送受信装置を新しい疎通先候補に抽出する(24−4)。この場合、この送受信装置は、“重なり該当装置”となる。疎通先候補の抽出後、疎通先判定の処理に戻る(24−5)。   When the communication cut-off point is an overlap point and the own device has a lower priority than the other devices in the group to which it belongs, all transmission / reception devices belonging to the adjacent group are extracted as new communication destination candidates (24-4). In this case, this transmission / reception device is an “overlapping applicable device”. After the communication destination candidate is extracted, the process returns to the communication destination determination process (24-5).

ケース〔1〕の具体例で説明すると、P2の分岐路断検出後、P1,P3は、疎通先判定1を実施し、隣接グループG2に属する送受信装置の中で、最も疎通数の少ない送受信装置を新規疎通先候補とする(23−1)。グループG2に属するP4,P5,P6は、何れも疎通先数が2であるので、候補を一つに絞り込むことができない。この場合には、ネットワーク構成情報の所属グループ情報の優先度から判断し、優先度の最も高いP4を新規疎通先候補と決定する(23−2)。   In a specific example of case [1], P1 and P3 perform communication destination determination 1 after detection of a branch path break of P2, and the transmission / reception apparatus with the smallest number of communication among the transmission / reception apparatuses belonging to the adjacent group G2 Is a new communication destination candidate (23-1). Since all of P4, P5, and P6 belonging to the group G2 have two communication destinations, the candidates cannot be narrowed down to one. In this case, determination is made based on the priority of the group information belonging to the network configuration information, and P4 having the highest priority is determined as a new communication destination candidate (23-2).

P1,P3は、疎通状態を把握していないP4に対して、疎通断の状態になっていないかを確認するための状態確認通知を行い(22−8)、P4は疎通断の状態でなければ、疎通断状態でないことをP1,P3に対して応答する(図13の処理フロー(13−6)に該当する)。P1,P3は、P4の疎通状態が断でないことを確認した後、P4を新規疎通先として設定する(図13の処理フロー(13−7)に該当する)。或いは、P1,P3は、P4に対して疎通状態の確認を行うことなく、P4を新規疎通先として設定する構成としても良い。   P1 and P3 send a status confirmation notification to P4 that does not know the communication state to confirm whether the communication is disconnected (22-8), and P4 must be in a communication disconnected state. For example, it responds to P1 and P3 that the communication is not interrupted (corresponding to the processing flow (13-6) in FIG. 13). After confirming that the communication state of P4 is not broken, P1 and P3 set P4 as a new communication destination (corresponding to the processing flow (13-7) in FIG. 13). Alternatively, P1 and P3 may be configured to set P4 as a new communication destination without confirming the communication state with respect to P4.

図25に運行モード/疎通先の情報の共有のフローを示す。送受信装置は、同一エリア内の他の送受信装置と運行モード/疎通先の情報を共有するため、以下の処理を実施する。同一グループの送受信装置で新たな運行モード/疎通先の情報を交換する(25−1)。新しい疎通先は隣接グループに属するか否かを判定する(25−2)。   FIG. 25 shows a flow of information sharing of operation mode / communication destination. The transmission / reception device performs the following processing in order to share information on the operation mode / communication destination with other transmission / reception devices in the same area. Information on a new operation mode / communication destination is exchanged between the transmission / reception devices of the same group (25-1). It is determined whether the new communication destination belongs to the adjacent group (25-2).

新しい疎通先が隣接グループに属する場合、新しい疎通先の送受信装置へ現在の運行モードを通知する(25−3)。新しい疎通先の送受信装置は、同一グループの送受信装置へ運行モードを通知し、疎通先情報の更新を依頼する(25−4)。該依頼により、運行モード/疎通先情報の共有の処理を完了する(25−5)。   When the new communication destination belongs to the adjacent group, the current operation mode is notified to the new communication destination transmitting / receiving device (25-3). The new communication destination transmission / reception apparatus notifies the transmission / reception apparatus of the same group of the operation mode, and requests an update of the communication destination information (25-4). With this request, the operation mode / communication destination information sharing process is completed (25-5).

前述の具体例で説明すると、P1は、同一グループに属するP3へP1自身の運行モード/疎通先情報を通知する。該通知を受信したP3は、P3の記憶部のネットワーク構成情報を更新する。その一方で、P3は、同一グループに属するP1へP3自身の運行モード/疎通先情報を通知する。通知を受信したP1は、P1の記憶部のネットワーク構成情報を更新する。   Explaining in the above specific example, P1 notifies P3 belonging to the same group of P1's own operation mode / communication destination information. Receiving the notification, P3 updates the network configuration information in the storage unit of P3. On the other hand, P3 notifies P1 belonging to the same group of P3's own operation mode / communication destination information. Upon receiving the notification, P1 updates the network configuration information in the storage unit of P1.

P1,P3は、新規疎通先であるP4へ、運行モードが“重なり1”であること通知する。P4は、自身が属するグループG2内の他の送受信装置P5,P6に対して、“重なり1”の運行モードと、P4がP5,P6に加えてP1,P3も疎通先とすることを通知し、運行モードと疎通先情報の更新依頼を行う。   P1 and P3 notify P4 which is a new communication destination that the operation mode is “overlap 1”. P4 notifies the other transmission / reception devices P5 and P6 in the group G2 to which it belongs to the operation mode of “overlapping 1” and that P4 is also the communication destination in addition to P5 and P6. Request update of operation mode and communication destination information.

図26は、ケース〔1.3〕として“重なりなし”の動作状態からの疎通経路変更後の動作状態の例を示している。P1,P3は、“重なりなし”から“重なり1”の運行モードへ移行し、P2の疎通経路をP4へ変更した後の動作状態を示している。図27〜図29は、ケース〔1.3のP1の記憶部に保持されたネットワーク構成情報を示している。図27はP1とP2についてのネットワーク構成情報、図28はP3とP4についてのネットワーク構成情報、図29はP5とP6についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲んで示し、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   FIG. 26 shows an example of the operation state after changing the communication path from the “no overlap” operation state as case [1.3]. P1 and P3 indicate the operation state after the operation mode is changed from “no overlap” to “overlap 1” and the communication route of P2 is changed to P4. 27 to 29 show the network configuration information held in the storage unit P1 in case 1.3. 27 shows network configuration information about P1 and P2, FIG. 28 shows network configuration information about P3 and P4, and FIG. 29 shows network configuration information about P5 and P6. Note that the network configuration information changed this time is indicated by a solid circle, and the network configuration information changed last time is indicated by a dotted circle.

〔2〕“重なり2”の運行モードで疎通断(重なり箇所以外の経路が疎通断)
図30は、ケース〔2〕として運行モードが“重なり2”の場合の正常動作時の動作状態の例を示し、図31にケース〔2.1〕として“重なり2”の運行モードで疎通断検出時の動作状態の例を示している。図30に示すように、“重なりなし”のグループG1内のP1はP2,P3とパケットの送受を、P2はP1,P3とパケットの送受を、P3はP1,P2とパケットの送受を行っている。
[2] Communication disconnection in "overlap 2" operation mode (communication disconnection of routes other than overlapping points)
FIG. 30 shows an example of the operation state during normal operation when the operation mode is “overlap 2” as case [2], and communication is interrupted in the operation mode of “overlap 2” as case [2.1] in FIG. The example of the operation state at the time of detection is shown. As shown in FIG. 30, P1 in the “no overlap” group G1 sends and receives packets with P2 and P3, P2 sends and receives packets with P1 and P3, and P3 sends and receives packets with P1 and P2. Yes.

“重なり2”のグループG2内のP4はP5,P6とパケットの送受を行っている。“重なり2”のグループG2,G3に属するP5はP4,P6,P7とパケットの送受を、P6はP4,P5,P7とパケットの送受を行っている。“重なり2”のグループG3に属するP7はP5,P6とパケットの送受を行っている。   P4 in the “overlap 2” group G2 transmits and receives packets to and from P5 and P6. P5 belonging to the “overlapping 2” group G2, G3 exchanges packets with P4, P6, P7, and P6 exchanges packets with P4, P5, P7. P7 belonging to the “overlap 2” group G3 transmits and receives packets to and from P5 and P6.

この状態で図31に示すように、“重なり2”の運行モードで中継点ルータとP4との間の経路が疎通断となった(重なり箇所以外の経路が疎通断となった)とする(ケース〔2.1〕)。この疎通断は、P4,P5,P6で検出される。P5,P6は、P4へ送信したパケットに対する応答がP4から来ないことにより、疎通状態判断部にて疎通断と判断する。   In this state, as shown in FIG. 31, in the “overlap 2” operation mode, the route between the relay router and P4 is disconnected (the route other than the overlapped portion is disconnected) ( Case [2.1]). This disconnection is detected at P4, P5 and P6. P5 and P6 determine that the communication state is determined to be disconnected by the communication state determination unit because the response to the packet transmitted to P4 does not come from P4.

疎通断の判断は、一度の応答がないことから判断し、或いは予め設定した閾値の回数まで連続して応答がないことから判断し、或いは複数回の応答結果から統計的に判断する構成とすることができる。P4は、P5,P6へ送信したパケットに対する応答がなく、疎通結果が全てNGとなるため、疎通経路の変更は行わない。   The determination of disconnection is made from the fact that there is no response at one time, or from the fact that there is no response continuously up to a preset threshold number of times, or from the response results of multiple times. be able to. P4 does not respond to the packets transmitted to P5 and P6, and all the communication results are NG. Therefore, the communication path is not changed.

P5は、P6へ送信したパケットに対する応答を受信し、P6は、P5へ送信したパケットに対する応答を受信するため、疎通結果が全てNGとはならない。この時点でP5,P6は、疎通経路の変更対象装置となると判断する。図32〜図35は、ケース〔2.1〕のときのP5の記憶部に保持されたネットワーク構成情報である。   Since P5 receives a response to the packet transmitted to P6 and P6 receives a response to the packet transmitted to P5, the communication results are not all NG. At this point, P5 and P6 are determined to be communication path change target devices. 32 to 35 are network configuration information held in the storage unit P5 in case [2.1].

図32はP1とP2についてのネットワーク構成情報、図33はP3とP4についてのネットワーク構成情報、図34はP5とP6についてのネットワーク構成情報、図35はP7についてのネットワーク構成情報である。なお、変化したネットワーク構成情報を実線の丸印で囲んで示している。   32 shows network configuration information for P1 and P2, FIG. 33 shows network configuration information for P3 and P4, FIG. 34 shows network configuration information for P5 and P6, and FIG. 35 shows network configuration information for P7. Note that the changed network configuration information is surrounded by a solid circle.

P5,P6は、現在の運行モードが“重なり2”であるので、図18の運行モード移行のフローチャートにより、“重なりなし”の運行モードへ移行するよう、疎通切替設定部1−7にて判断する。図36〜図39はケース〔2.2〕として、運行モード移行後のP5の記憶部に保持されたネットワーク構成情報である。   Since the current operation mode is “overlap 2” for P5 and P6, the communication switching setting unit 1-7 determines to shift to the “non-overlap” operation mode according to the operation mode transition flowchart of FIG. To do. FIGS. 36 to 39 show network configuration information held in the storage unit P5 after shifting to the operation mode as case [2.2].

図36はP1とP2についてのネットワーク構成情報、図37はP3とP4についてのネットワーク構成情報、図38はP5とP6についてのネットワーク構成情報、図39はP7についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲み、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   36 shows network configuration information about P1 and P2, FIG. 37 shows network configuration information about P3 and P4, FIG. 38 shows network configuration information about P5 and P6, and FIG. 39 shows network configuration information about P7. The network configuration information changed this time is surrounded by a solid circle, and the network configuration information changed last time is surrounded by a dotted circle.

P5,P6は、グループG2,G3の双方に属する送受信装置であり、このような送受信装置を“重なり該当装置”と称している。“重なり該当装置”は、ネットワーク構成情報の所属グループ情報が2つ以上あることから判断される。P5,P6は、“重なり該当装置”であるため、疎通経路の変更は行わない。   P5 and P6 are transmission / reception devices belonging to both groups G2 and G3, and such transmission / reception devices are referred to as “overlap corresponding devices”. The “applicable overlap device” is determined from the fact that there are two or more group information belonging to the network configuration information. Since P5 and P6 are “overlapping applicable devices”, the communication path is not changed.

図25の運行モード/疎通先情報の共有のフローチャートに示すように、P5は同一グループに属するP6,P7へP5自身の運行モード/疎通先情報を通知する。該通知を受信したP6は、P6の記憶部のネットワーク構成情報を更新する。同様に該通知を受信したP7は、P7の記憶部のネットワーク構成情報を更新する(25−1)。   As shown in the operation mode / communication destination information sharing flowchart of FIG. 25, P5 notifies P6 and P7 belonging to the same group of P5's own operation mode / communication destination information. Receiving the notification, P6 updates the network configuration information in the storage unit of P6. Similarly, P7 that has received the notification updates the network configuration information in the storage unit of P7 (25-1).

また、P6は、同一グループに属するP5,P7へP6自身の運行モード/疎通先情報を通知する。該通知を受信したP5は、P5の記憶部のネットワーク構成情報を更新する(25−1)。同様に該通知を受信したP7は、P7の記憶部のネットワーク構成情報を更新する(25−1)。   In addition, P6 notifies P5's own operation mode / communication destination information to P5 and P7 belonging to the same group. Receiving the notification, P5 updates the network configuration information in the storage unit of P5 (25-1). Similarly, P7 that has received the notification updates the network configuration information in the storage unit of P7 (25-1).

図40は、ケース〔2.3〕として、“重なり2”の動作状態からの疎通経路変更後の動作状態の例を示している。P5,P6は“重なり2”から“重なりなし”の運行モードへ移行した後の動作状態を示している。P5,P6,P7の間で疎通経路を形成する。図41〜図44は、ケース〔2.3〕のときのP5の記憶部に保持されたネットワーク構成情報である。   FIG. 40 shows an example of the operation state after changing the communication path from the operation state of “overlap 2” as case [2.3]. P5 and P6 indicate the operation state after the transition from the “overlap 2” to the “no overlap” operation mode. A communication path is formed between P5, P6, and P7. 41 to 44 are network configuration information held in the storage unit P5 in the case [2.3].

図41はP1とP2についてのネットワーク構成情報、図42はP3とP4についてのネットワーク構成情報、図43はP5とP6についてのネットワーク構成情報、図44はP7についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲み、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   41 shows network configuration information for P1 and P2, FIG. 42 shows network configuration information for P3 and P4, FIG. 43 shows network configuration information for P5 and P6, and FIG. 44 shows network configuration information for P7. The network configuration information changed this time is surrounded by a solid circle, and the network configuration information changed last time is surrounded by a dotted circle.

〔2’〕“重なり2”の運行モードで疎通断(重なり箇所の経路が疎通断)
図45は、図30に示した“重なり2”の運行モードで、中継点ルータと“重なり該当装置”の送受信装置P5との間の経路で疎通断(重なり箇所が疎通断)となった場合の動作状態の例(ケース〔2’.1〕)を示している。
[2 '] Communication disconnection in "overlap 2" operation mode (route of overlapping part is disconnected)
FIG. 45 shows a case where communication is interrupted in the route between the relay router and the transmission / reception device P5 of “overlap corresponding device” in the “overlap 2” operation mode shown in FIG. An example of the operation state (Case [2′.1]) is shown.

疎通断は、P4,P5,P6,P7で検出される。P4,P6,P7は、P5へ送信したパケットに対する応答がP5から来ないことにより、疎通状態判断部にて疎通断と判断する。疎通断の判断は、一度の応答がないことにより判断し、或いは予め設定している閾値の回数まで連続して応答が来ないことから判断し、或いは複数回の応答結果から統計的に判断する構成とすることができる。   The disconnection is detected at P4, P5, P6, and P7. P4, P6, and P7 determine that the communication state is determined to be disconnected by the communication state determination unit because the response to the packet transmitted to P5 does not come from P5. Judgment of communication disconnection is based on the absence of a single response, or from the fact that there is no continuous response up to the preset number of thresholds, or statistically determined from multiple response results. It can be configured.

P5は、P4,P6,P7へ送信したパケットに対する応答がなく、疎通結果が全てNGとなるため、疎通経路の変更は行わない。P4は、P6へ送信したパケットに対する応答を受信し、P6はP4へ送信したパケットに対する応答を受信し、P7はP6へ送信したパケットに対する応答を受信するため、疎通結果が全てNGとはならない。この時点でP4,P6,P7は、疎通経路の変更対象装置であると判断する。   P5 does not respond to the packets transmitted to P4, P6, and P7, and all the communication results are NG. Therefore, the communication path is not changed. Since P4 receives a response to the packet transmitted to P6, P6 receives a response to the packet transmitted to P4, and P7 receives a response to the packet transmitted to P6, all the communication results are not NG. At this point, P4, P6, and P7 are determined to be communication path change target devices.

図46〜図49は、ケース〔2’.1〕のときのP4の記憶部に保持されたネットワーク構成情報である。図46はP1とP2についてのネットワーク構成情報、図47はP3とP4についてのネットワーク構成情報、図48P5とP6についてのネットワーク構成情報、図49はP7についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲んで示している。   46 to 49 show the case [2 '. 1] is the network configuration information held in the storage unit of P4. 46 shows network configuration information for P1 and P2, FIG. 47 shows network configuration information for P3 and P4, FIG. 48 shows network configuration information for P5 and P6, and FIG. 49 shows network configuration information for P7. Note that the network configuration information changed this time is indicated by encircled by a solid line.

P4,P6,P7は、疎通断の検出数が1であり、図18の運行モード移行のフローチャートに示すように、現在の運行モードが“重なり2”であるので、“重なりなし”の運行モードへ移行するよう疎通切替設定部1−7にて判断する。図50〜図53は、ケース〔2.2〕として運行モード後のP4の記憶部に保持されたネットワーク構成情報である。   In P4, P6, and P7, the number of detected communication breaks is 1, and the current operation mode is “overlap 2” as shown in the operation mode transition flowchart of FIG. Is determined by the communication switching setting unit 1-7. 50 to 53 are network configuration information held in the storage unit P4 after the operation mode as case [2.2].

図50はP1とP2についてのネットワーク構成情報、図51はP3とP4についてのネットワーク構成情報、図52P5とP6についてのネットワーク構成情報、図53はP7についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲み、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   50 shows network configuration information about P1 and P2, FIG. 51 shows network configuration information about P3 and P4, FIG. 52 shows network configuration information about P5 and P6, and FIG. 53 shows network configuration information about P7. The network configuration information changed this time is surrounded by a solid circle, and the network configuration information changed last time is surrounded by a dotted circle.

P6は“重なり該当装置”であるため、疎通経路の変更は行わない。P4,P7は、“重なり該当装置”ではないので、疎通経路の変更を行う。図22〜図24の疎通判定のフローチャートに示すように、P4は、疎通断箇所が重なり箇所であり、隣接グループG3は所属グループG2より老晩であり、移行後の運行モードは“重なりなし”であるため、疎通先判定1を実施する。疎通先判定1において、隣接するグループG3に属する送受信装置の中で、最も疎通先数の少ない送受信装置を新規疎通先候補とする(23−1)。G3に属するP7は、疎通先数が2で最少であるので、P7を新規疎通先候補と決定する。   Since P6 is an “overlapping applicable device”, the communication path is not changed. Since P4 and P7 are not “overlapping applicable devices”, the communication path is changed. As shown in the communication determination flowcharts of FIGS. 22 to 24, P4 is an overlapping part where the communication is interrupted, the adjacent group G3 is older than the belonging group G2, and the operation mode after the transition is “no overlap”. Therefore, communication destination determination 1 is performed. In the communication destination determination 1, among the transmission / reception devices belonging to the adjacent group G3, the transmission / reception device having the smallest number of communication destinations is set as a new communication destination candidate (23-1). Since P7 belonging to G3 has the smallest number of communication destinations of 2, P7 is determined as a new communication destination candidate.

P7は、隣接グループG2が自身のグループG3よりも若番であるので、新規疎通先を設定しない(22−3)。P4は、疎通状態を把握していないP7に対して、疎通断の状態になっていないかを確認するための状態確認通知を行い、P7は、疎通断の状態でなければ疎通断状態でないことをP4に応答する。P4は、P7の疎通状態を確認した後、P7を新規疎通先として設定する。或いは、P4は、P7に対して疎通状態の確認を行うことなく、P7を新規疎通先として設定する構成としても良い。   P7 does not set a new communication destination because the adjacent group G2 is younger than its own group G3 (22-3). P4 sends a status confirmation notification to P7, which does not know the communication state, to confirm whether the communication is disconnected. P7 is not in a communication disconnected state unless it is in a communication disconnected state. To P4. After confirming the communication state of P7, P4 sets P7 as a new communication destination. Or P4 is good also as a structure which sets P7 as a new communication destination, without confirming a communication state with respect to P7.

図25の運行モード/疎通先情報の共有のフローチャートに示すように、P4は、自身と同一グループに属するP6へ、P4自身の運行モード/疎通先情報を通知する。該通知を受信したP6は、P6の記憶部のネットワーク構成情報を更新する。P4は、新規疎通先であるP7へ“重なりなし”の運行モードであること通知する。P7は、所属するグループG3の他の送受信装置P6に対して、“重なりなし”の運行モードと、P5,P6に加えてP4を疎通先とすることを通知し、運行モードと疎通先情報の更新依頼を行う。   As shown in the operation mode / communication destination information sharing flowchart of FIG. 25, P4 notifies P6 belonging to the same group as itself of P4's own operation mode / communication destination information. Receiving the notification, P6 updates the network configuration information in the storage unit of P6. P4 notifies P7, which is a new communication destination, that the operation mode is “no overlap”. P7 notifies the other transmission / reception device P6 of the group G3 to which it belongs that the operation mode “no overlap” and that P4 is set as the communication destination in addition to P5 and P6. Request update.

図54は、ケース〔2.3〕として“重なり2”(重なり箇所が疎通断)から疎通経路変更後の動作状態の例を示している。P4,P6,P7は、“重なりなし”の運行モードへ移行し、P4は、P7へ疎通経路を変更する。図55〜図58は、ケース〔2.3〕のときのP4の記憶部に保持されたネットワーク構成情報である。   FIG. 54 shows an example of the operation state after changing the communication route from “overlap 2” (overlapping portion is disconnected) as case [2.3]. P4, P6, and P7 shift to the “no overlap” operation mode, and P4 changes the communication path to P7. 55 to 58 show network configuration information held in the storage unit P4 in case [2.3].

図55はP1とP2についてのネットワーク構成情報、図56はP3とP4についてのネットワーク構成情報、図57はP5とP6についてのネットワーク構成情報、図58はP7についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲み、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   55 shows network configuration information about P1 and P2, FIG. 56 shows network configuration information about P3 and P4, FIG. 57 shows network configuration information about P5 and P6, and FIG. 58 shows network configuration information about P7. The network configuration information changed this time is surrounded by a solid circle, and the network configuration information changed last time is surrounded by a dotted circle.

〔2”〕“重なり2”の運行モードで疎通断(“重なりなし”グループの経路が疎通断)
図59は、図30の“重なり2”の運行モードで、中継点ルータと“重なりなし”の送受信装置P2との間の経路が疎通断となった場合の動作状態の例(ケース〔2”.1〕)を示している。この疎通断は、P1,P2,P3で検出される。
[2]] Communication disconnection in "Overlap 2" operation mode (Route of "No overlap" group is disconnected)
FIG. 59 shows an example of an operation state when the communication path between the relay router and the “no overlap” transmission / reception device P2 is disconnected in the “overlap 2” operation mode of FIG. 30 (case [2] .1]) This disconnection is detected at P1, P2 and P3.

P1,P3は、P2へ送信したパケットに対する応答がP2から来ないことにより、疎通状態判断部にて疎通断と判断する。疎通断の判断は、一度の応答がないことから判断し、或いは予め設定している閾値の回数まで連続して応答がないことから判断し、或いは複数回の応答結果から統計的に判断する構成とすることができる。   P1 and P3 determine that the communication state is determined to be disconnected by the communication state determination unit because the response to the packet transmitted to P2 does not come from P2. The determination of communication disconnection is based on the fact that there is no response at one time, it is determined that there is no response continuously up to a preset threshold number of times, or it is determined statistically from the results of multiple responses. It can be.

P2は、P1,P3へ送信したパケットに対する応答がなく、疎通結果が全てNGとなるため、疎通経路の変更は行わない。P1はP3へ送信したパケットに対する応答を受信し、P3はP1へ送信したパケットに対する応答を受信するため、疎通結果が全てNGとはならない。従ってP1,P3は、疎通経路の変更を行う。   P2 does not respond to the packets transmitted to P1 and P3, and all the communication results are NG. Therefore, the communication path is not changed. Since P1 receives a response to the packet transmitted to P3, and P3 receives a response to the packet transmitted to P1, all the communication results are not NG. Therefore, P1 and P3 change the communication path.

図60〜図63は、ケース〔2”.1〕のときのP1の記憶部に保持されたネットワーク構成情報である。図60はP1とP2についてのネットワーク構成情報、図61はP3とP4についてのネットワーク構成情報、図62はP5とP6についてのネットワーク構成情報、図63はP7についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲んで示している。   60 to 63 show network configuration information held in the storage unit P1 in case [2 ".1]. Fig. 60 shows network configuration information for P1 and P2, and Fig. 61 shows P3 and P4. 62 shows the network configuration information for P5 and P6, and Fig. 63 shows the network configuration information for P7, with the network configuration information changed this time surrounded by solid circles.

図18の運行モード移行のフローチャートに示すように、P1,P3は、疎通断の検出数が1であり、現在の運行モードが“重なりなし”であるので、“重なり1”の運行モードへ移行するよう、疎通切替設定部1−7にて判断する。図64〜図67は、ケース〔2”.2〕として運行モード移行後のP1の記憶部に保持されたネットワーク構成情報である。   As shown in the operation mode transition flowchart of FIG. 18, P1 and P3 have a communication disconnection detection number of 1 and the current operation mode is “no overlap”, so the operation mode shifts to “overlap 1” operation mode. Therefore, the communication switching setting unit 1-7 makes the determination. FIGS. 64 to 67 are network configuration information held in the storage unit of P1 after the operation mode transition as the case [2 ".2].

図64はP1とP2についてのネットワーク構成情報、図65はP3とP4についてのネットワーク構成情報、図66はP5とP6についてのネットワーク構成情報、図67はP7についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲み、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   64 shows network configuration information about P1 and P2, FIG. 65 shows network configuration information about P3 and P4, FIG. 66 shows network configuration information about P5 and P6, and FIG. 67 shows network configuration information about P7. The network configuration information changed this time is surrounded by a solid circle, and the network configuration information changed last time is surrounded by a dotted circle.

図22〜図24の疎通先判定のフローチャートに示すように、P1,P3は、疎通先判定1を実施し、隣接するグループG2に属する送受信装置の中で、最も疎通数の少ない送受信装置を新規疎通先候補とする(23−1)。グループG2に属するP4は、疎通先数が2で最少であるので、P4を新規疎通先候補と決定する。   22 and 24, P1 and P3 perform communication destination determination 1, and newly create a transmission / reception device with the smallest communication number among the transmission / reception devices belonging to the adjacent group G2. A communication destination candidate is set (23-1). Since P4 belonging to group G2 has the smallest number of communication destinations of 2, P4 is determined as a new communication destination candidate.

P1,P3は、疎通状態を把握していないP4に対して、疎通断の状態になっていないかを確認するための状態確認通知を行い、P4は疎通断の状態でなければ、疎通断状態でないことをP1,P3に対して応答する。P1,P3は、P4の疎通状態を確認した後、P4を新規疎通先として設定する。或いは、P1,P3は、P4に対して疎通状態の確認を行うことなく、P4を新規疎通先として設定する構成としても良い。   P1 and P3 send a status confirmation notification to P4 that does not know the communication state to confirm whether the communication is disconnected. If P4 is not in the communication disconnected state, the communication disconnected state is indicated. It responds to P1 and P3. After confirming the communication state of P4, P1 and P3 set P4 as a new communication destination. Alternatively, P1 and P3 may be configured to set P4 as a new communication destination without confirming the communication state with respect to P4.

図25の運行モード/疎通先情報の共有のフローチャートにより、P1は自身と同一のグループに属するP3へ、P1自身の運行モード/疎通先情報を通知する。該通知を受信したP3は、P3の記憶部のネットワーク構成情報を更新する。また、P3は、自身と同一のグループに属するP1へ、P3自身の運行モード/疎通先情報を通知する。   According to the operation mode / communication destination information sharing flowchart of FIG. 25, P1 notifies P3 belonging to the same group as P1 of his / her operation mode / communication destination information. Receiving the notification, P3 updates the network configuration information in the storage unit of P3. In addition, P3 notifies P1 belonging to the same group as itself of P3's own operation mode / communication destination information.

該通知を受信したP1は、P1の記憶部のネットワーク構成情報を更新する。P1,P3は、新規疎通先であるP4へ、“重なり1”の運行モードであること通知する。P4は自身が属するグループG2の他の送受信装置P5,P6に対して、“重なり1”の運行モードと、P4はP5,P6に加えてP1,P3も疎通先とすることを通知し、運行モードと疎通先情報の更新依頼を行う。   Receiving the notification, P1 updates the network configuration information in the storage unit of P1. P1 and P3 notify P4, which is a new communication destination, that the operation mode is “overlap 1”. P4 notifies the other transmission / reception devices P5 and P6 of the group G2 to which it belongs to the operation mode of “overlap 1” and that P4 is in communication with P1 and P3 in addition to P5 and P6. Request update of mode and communication destination information.

図68は、ケース〔2”.3〕として“重なり2”の運行モードで“重なりなし”グループの経路が疎通断となったときの経路変更後の動作状態の例を示している。図69〜図72は、ケース〔2”.3〕のときのP1の記憶部に保持されたネットワーク構成情報である。   Fig. 68 shows an example of the operation state after the route change when the route of the "no overlap" group is disconnected in the operation mode of "overlap 2" as case [2 ".3]. 72 shows the case [2 ". 3] is the network configuration information held in the storage unit of P1.

図69はP1とP2についてのネットワーク構成情報、図70はP3とP4についてのネットワーク構成情報、図71はP5とP6についてのネットワーク構成情報、図72はP7についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲み、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   69 shows network configuration information about P1 and P2, FIG. 70 shows network configuration information about P3 and P4, FIG. 71 shows network configuration information about P5 and P6, and FIG. 72 shows network configuration information about P7. The network configuration information changed this time is surrounded by a solid circle, and the network configuration information changed last time is surrounded by a dotted circle.

〔3〕“重なり1”の運行モード
図73に運行モードが“重なり1”の場合の正常動作時の動作状態の例を示している。P1は、P2,P3とパケットの送受を、P2はP1,P3とパケットの送受を、P3はP1,P2とパケットの送受を、P4はP5,P6とパケットの送受を、P5はP4,P6とパケットの送受を、P6はP4,P5、P7、P8とパケットの送受を、P7はP6,P8とパケットの送受を、P8はP6,P7とパケットの送受を行っている。
[3] Operation mode of “overlap 1” FIG. 73 shows an example of an operation state during normal operation when the operation mode is “overlap 1”. P1 sends and receives packets with P2 and P3, P2 sends and receives packets with P1 and P3, P3 sends and receives packets with P1 and P2, P4 sends and receives packets with P5 and P6, P5 sends and receives packets with P4 and P6 P6 transmits and receives packets with P4, P5, P7 and P8, P7 transmits and receives packets with P6 and P8, and P8 transmits and receives packets with P6 and P7.

〔3.1〕“重なり1”の運行モードで非重なり箇所の疎通断
図74は、“重なり1”の運行モードで、中継点ルータと送受信装置P5との間の経路(重なり箇所以外の箇所)で疎通断となった場合の動作状態の例(ケース〔3.1〕)を示している。疎通断は、P4,P5,P6で検出される。P4,P6は、P5へ送信したパケットに対する応答がP5から来ないことにより、疎通状態判断部にて疎通断と判断する。疎通断の判断は、1度の応答がないことから判断し、或いは予め設定している閾値の回数まで連続して応答がないことから判断し、或いは複数回の応答結果から統計的に判断する構成としても良い。
[3.1] Communication disconnection of non-overlapping part in operation mode of “overlap 1” FIG. 74 illustrates a route between the relay point router and the transmission / reception device P5 in the operation mode of “overlap 1” (a part other than the overlapping part). ) Shows an example of an operation state (case [3.1]) when communication is interrupted. The disconnection is detected at P4, P5, and P6. P4 and P6 determine that the communication state is determined to be disconnected by the communication state determination unit because the response to the packet transmitted to P5 does not come from P5. Judgment of communication disconnection is based on the absence of a single response, or is determined based on the absence of a response up to a preset threshold number of times, or is statistically determined from a plurality of response results. It is good also as a structure.

P5はP4,P6へ送信したパケットに対する応答がなく、疎通結果が全てNGとなるため、疎通経路の変更は行わない。P4はP6へ送信したパケットに対する応答を受信し、P6はP4へ送信したパケットに対する応答を受信するため、疎通結果が全てNGとはならない。この時点でP4,P6の両者は、疎通経路の変更対象装置であると判断する。   P5 does not respond to the packets transmitted to P4 and P6, and all the communication results are NG. Therefore, the communication path is not changed. Since P4 receives a response to the packet transmitted to P6 and P6 receives a response to the packet transmitted to P4, the communication results are not all NG. At this point, both P4 and P6 are determined to be communication path change target devices.

図75〜図78は、ケース〔3.1〕のときのP4の記憶部に保持されたネットワーク構成情報である。図75はP1とP2についてのネットワーク構成情報、図76はP3とP4についてのネットワーク構成情報、図77はP5とP6についてのネットワーク構成情報、図78はP7,P8についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲んで示している。   75 to 78 are network configuration information held in the storage unit P4 in case [3.1]. 75 shows network configuration information for P1 and P2, FIG. 76 shows network configuration information for P3 and P4, FIG. 77 shows network configuration information for P5 and P6, and FIG. 78 shows network configuration information for P7 and P8. Note that the network configuration information changed this time is indicated by encircled by a solid line.

P4,P6は疎通断の検出により、図18の運行モード移行のフローチャートに示すように、疎通断の検出数が1であり、現在の運行モードが“重なり1”であるので、“重なり2”の運行モードへ移行するよう、疎通切替設定部1−7にて判断する。図79〜図82は、ケース〔3.1〕として運行モード移行後のP1の記憶部に保持されたネットワーク構成情報である。   As shown in the flowchart of operation mode transition in FIG. 18, P4 and P6 are detected as communication interruption, and the number of detected communication interruptions is 1 and the current operation mode is “overlap 1”. The communication switching setting unit 1-7 determines to shift to the operation mode. 79 to 82 are network configuration information held in the storage unit of P1 after shifting to the operation mode as case [3.1].

図79はP1とP2についてのネットワーク構成情報、図80はP3とP4についてのネットワーク構成情報、図81はP5とP6についてのネットワーク構成情報、図82はP7,P8についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲み、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   79 shows network configuration information for P1 and P2, FIG. 80 shows network configuration information for P3 and P4, FIG. 81 shows network configuration information for P5 and P6, and FIG. 82 shows network configuration information for P7 and P8. The network configuration information changed this time is surrounded by a solid circle, and the network configuration information changed last time is surrounded by a dotted circle.

P6は“重なり該当装置”であるため、疎通経路の変更は行わない。P4は“重なり該当装置”ではないので、疎通経路の変更を行う。図22〜図24の疎通先判定のフローチャートに示すように、P4は、疎通断箇所は重なり箇所でなく、自装置の移行後の運行モードは“重なり2”であるので、疎通先判定2を実施する(22−7)。   Since P6 is an “overlapping applicable device”, the communication path is not changed. Since P4 is not an “overlapping applicable device”, the communication path is changed. As shown in the flowcharts of the communication destination determination in FIGS. 22 to 24, P4 indicates that the communication disconnection location is not the overlap location, and the operation mode after the transition of the own device is “overlap 2”. Implement (22-7).

疎通先判定2において、疎通断箇所は重なり箇所ではないと判定し(24−1)、疎通先判定1を実施する(24−2)。疎通先判定1において、隣接するグループG3に属する送受信装置の中で、最も疎通数の少ない送受信装置を新規疎通先候補とする(23−1)。グループG3に属するP7,P8は、いずれも疎通先数が2であるので、候補を一つに絞り込むことができない。   In the communication destination determination 2, it is determined that the communication interruption location is not an overlapping location (24-1), and the communication destination determination 1 is performed (24-2). In the communication destination determination 1, among the transmission / reception devices belonging to the adjacent group G3, the transmission / reception device having the smallest communication number is set as a new communication destination candidate (23-1). Since P7 and P8 belonging to the group G3 both have two communication destinations, the candidates cannot be narrowed down to one.

この場合には、ネットワーク構成情報の所属グループ情報の優先度から判断し、優先度の最も高いP7を新規疎通先候補と決定する(23−2)。P4は疎通状態を把握していないP7に対して、疎通断の状態になっていないかを確認するための状態確認通知を行い、P7は疎通断の状態でなければ、疎通断状態でないことをP4に対して応答する。   In this case, determination is made based on the priority of the group information belonging to the network configuration information, and P7 having the highest priority is determined as a new communication destination candidate (23-2). P4 sends a status confirmation notification to P7, which does not know the communication state, to confirm whether the communication is disconnected. P7 is not in the communication disconnected state unless it is in the communication disconnected state. Responds to P4.

P4は、P7の疎通状態を確認した後、P7を新規疎通先として設定する。或いは、P4はP7に対して疎通状態の確認を行うことなく、P7を新規疎通先として設定する構成としても良い。図25の運行モード/疎通先情報の共有のフローチャートに示すように、P4は同じグループに属するP6へP4自身の運行モード/疎通先情報を通知する。   After confirming the communication state of P7, P4 sets P7 as a new communication destination. Alternatively, P4 may be configured to set P7 as a new communication destination without confirming the communication state with P7. As shown in the operation mode / communication destination information sharing flowchart in FIG. 25, P4 notifies P6 belonging to the same group of P4's own operation mode / communication destination information.

該通知を受信したP6は、P6の記憶部のネットワーク構成情報を更新する。また、P6は同じグループに属するP4へ、P6自身の運行モード/疎通先情報を通知する。該通知を受信したP4は、P4の記憶部のネットワーク構成情報を更新する。P4は新規疎通先であるP7へ、運行モードが“重なり2”であること通知する。P7は自身が属するグループG3の他の送受信装置P6,P8に対して、運行モードが“重なり2”であることと、P7はP6,P8に加えてP4も疎通先とすることを通知し、運行モードと疎通先情報の更新依頼を行う。   Receiving the notification, P6 updates the network configuration information in the storage unit of P6. P6 notifies P4 belonging to the same group of P6's own operation mode / communication destination information. Receiving the notification, P4 updates the network configuration information in the storage unit of P4. P4 notifies P7, which is a new communication destination, that the operation mode is “overlap 2”. P7 notifies the other transmission / reception devices P6 and P8 of the group G3 to which it belongs that the operation mode is “overlap 2” and that P7 is also a communication destination in addition to P6 and P8. Request update of operation mode and communication destination information.

図83は、ケース〔3.3〕として“重なり1”の運行モードで非重なり箇所の疎通断時に“重なり2”の運行モードへ移行し、P7へ疎通経路を変更した後の動作状態を示している。図84〜図87は、ケース〔3.3〕のときのP4の記憶部に保持されたネットワーク構成情報である。   FIG. 83 shows an operation state after transition to the operation mode of “overlap 2” and change of the communication route to P7 when the communication of the non-overlapping part is interrupted in the operation mode of “overlap 1” as case [3.3]. ing. 84 to 87 are network configuration information held in the storage unit P4 in case [3.3].

図84はP1とP2についてのネットワーク構成情報、図85はP3とP4についてのネットワーク構成情報、図86はP5とP6についてのネットワーク構成情報、図87はP7,P8についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲み、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   84 shows network configuration information about P1 and P2, FIG. 85 shows network configuration information about P3 and P4, FIG. 86 shows network configuration information about P5 and P6, and FIG. 87 shows network configuration information about P7 and P8. The network configuration information changed this time is surrounded by a solid circle, and the network configuration information changed last time is surrounded by a dotted circle.

〔3’.1〕“重なり1”の運行モードで重なり箇所の疎通断
図88は、“重なり1”の運行モードで、中継点ルータと送受信装置P6との間の経路(重なり箇所)が疎通断となった場合の動作状態の例(ケース〔3’.1〕)を示している。疎通断は、P4,P5,P6,P7,P8で検出される。P4,P5,P7,P8は、P6へ送信したパケットに対する応答がP6から来ないことにより、疎通状態判断部にて疎通断と判断する。疎通断の判断は、1度の応答がないことから判断し、或いは予め設定している閾値の回数まで連続して応答がないことから判断し、或いは複数回の応答結果から統計的に判断する構成とすることができる。
[3 '. 1] Communication disconnection of the overlapping part in the operation mode of "overlap 1" FIG. 88 shows that the route (overlapping part) between the relay router and the transmission / reception device P6 is disconnected in the operation mode of "overlap 1". The example of the operation state in the case (Case [3′.1]) is shown. The disconnection is detected at P4, P5, P6, P7, and P8. P4, P5, P7, and P8 determine that the communication state is determined to be disconnected by the communication state determination unit because the response to the packet transmitted to P6 does not come from P6. Judgment of communication disconnection is based on the absence of a single response, or is determined based on the absence of a response up to a preset threshold number of times, or is statistically determined from a plurality of response results. It can be configured.

P6はP4,P5,P7,P8へ送信したパケットに対する応答がなく、疎通結果が全てNGとなるため、疎通経路の変更は行わない。P4はP5へ送信したパケットに対する応答を受信し、P5はP4へ送信したパケットに対する応答を受信し、P7はP8へ送信したパケットに対する応答を受信し、P8はP7へ送信したパケットに対する応答を受信するため、疎通結果が全てNGとはならない。この場合は疎通経路の変更を行う。   P6 does not respond to the packets transmitted to P4, P5, P7, and P8, and all the communication results are NG. Therefore, the communication path is not changed. P4 receives a response to the packet sent to P5, P5 receives a response to the packet sent to P4, P7 receives a response to the packet sent to P8, P8 receives a response to the packet sent to P7 Therefore, all the communication results are not NG. In this case, the communication path is changed.

図89〜図92は、ケース〔3’.1〕のときのP4の記憶部に保持されたネットワーク構成情報である。図89はP1とP2についてのネットワーク構成情報、図90はP3とP4についてのネットワーク構成情報、図91はP5とP6についてのネットワーク構成情報、図92はP7,P8についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲んで示している。   89 to 92 show the case [3 '. 1] is the network configuration information held in the storage unit of P4. 89 shows network configuration information for P1 and P2, FIG. 90 shows network configuration information for P3 and P4, FIG. 91 shows network configuration information for P5 and P6, and FIG. 92 shows network configuration information for P7 and P8. Note that the network configuration information changed this time is indicated by encircled by a solid line.

図18の運行モード移行のフローチャートに示すように、P4,P5,P7,P8は、疎通断の検出数が1であり、現在の運行モードが“重なり1”であるので、“重なり2”の運行モードへ移行するよう、疎通切替設定部1−7にて判断する。図93〜図96は、ケース〔3’.2〕として、“重なり2”の運行モードへ移行後のP4の記憶部に保持されたネットワーク構成情報である。   As shown in the flow chart of operation mode transition in FIG. 18, P4, P5, P7, and P8 have a communication disconnection detection number of 1 and the current operation mode is “overlap 1”. The communication switching setting unit 1-7 determines to shift to the operation mode. 93 to 96 show the case [3 '. 2] is the network configuration information held in the storage unit P4 after shifting to the operation mode of “overlap 2”.

図93はP1とP2についてのネットワーク構成情報、図94はP3とP4についてのネットワーク構成情報、図95はP5とP6についてのネットワーク構成情報、図96はP7,P8についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲み、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   93 shows network configuration information for P1 and P2, FIG. 94 shows network configuration information for P3 and P4, FIG. 95 shows network configuration information for P5 and P6, and FIG. 96 shows network configuration information for P7 and P8. The network configuration information changed this time is surrounded by a solid circle, and the network configuration information changed last time is surrounded by a dotted circle.

図22〜図24の疎通先判定のフローチャートに示すように、P4は、疎通断箇所は重なり箇所と判定し(22−1)、隣接グループG3は自身の所属グループG2より老番であると判定し(22−2)、移行後の自身の運行モードが“重なり2”であると判定し(22−5)、疎通先判定2を実施する(22−7)。   As shown in the flowcharts of the communication destination determination in FIGS. 22 to 24, P4 determines that the communication disconnection location is an overlap location (22-1), and determines that the adjacent group G3 is older than its own group G2. (22-2), it is determined that the operation mode after the transition is “overlap 2” (22-5), and communication destination determination 2 is performed (22-7).

疎通先判定2では、疎通断箇所が重なり箇所であると判定し(24−1)、自装置P4が同一グループのP5より優先度が高いと判定し(24−3)、疎通先判定1を実施する(24−2)。疎通先判定1では、隣接するグループG3に属する送受信装置の中で、最も疎通数の少ない送受信装置を新規疎通先候補とする(23−1)。グループG3に属するP7,P8は、何れも疎通先数が2であるので、候補を一つに絞り込むことができない。この場合には、ネットワーク構成情報の所属グループ情報(優先度)から判断し、優先度の最も高いP7を新規疎通先候補と決定する(23−2)。   In communication destination determination 2, it is determined that the communication disconnection point is an overlapping portion (24-1), it is determined that the own device P4 has higher priority than P5 of the same group (24-3), and communication destination determination 1 is determined. Implement (24-2). In the communication destination determination 1, among the transmission / reception devices belonging to the adjacent group G3, the transmission / reception device having the smallest communication number is set as a new communication destination candidate (23-1). Since P7 and P8 belonging to the group G3 both have two communication destinations, the candidates cannot be narrowed down to one. In this case, it is determined from the group information (priority) of the network configuration information, and P7 having the highest priority is determined as a new communication destination candidate (23-2).

グループG2のP5は、P4と同様に疎通先判定2を実施するが、自身と同一のグループに属するP4より優先度が低いと判定し(24−3)、隣接するグループG3に属する全ての送受信装置(P7,P8)を新規疎通先候補と決定する(24−4)。従って、P5は“重なり該当装置”となる。   P5 of group G2 performs communication destination determination 2 in the same manner as P4, but determines that the priority is lower than P4 belonging to the same group as itself (24-3), and all transmission / reception belonging to adjacent group G3 The devices (P7, P8) are determined as new communication destination candidates (24-4). Therefore, P5 becomes “overlapping applicable device”.

所属グループ情報と隣接グループ情報には、1以上の整数をグループ識別番号として格納し、例えば若番の方を優先度が高いと見做すよう定めておく。P7,P8は、隣接グループG2が自身のグループG3よりも若番であるので、新規疎通先を設定しない(22−2,22−3)。   In the belonging group information and the adjacent group information, an integer of 1 or more is stored as a group identification number. For example, it is determined that the younger number is regarded as having a higher priority. P7 and P8 do not set a new communication destination because the adjacent group G2 is younger than its own group G3 (22-2, 22-3).

P4は疎通状態を把握していないP7に対して、疎通断の状態になっていないかを確認するための状態確認通知を行い、P7は疎通断の状態でなければ疎通断状態でないことをP4に対して応答する。P5は疎通状態を把握していないP7,P8に対して、疎通断の状態になっていないかを確認するための状態確認通知を行い、P7,P8は疎通断の状態でなければ疎通断状態でないことをP5に対して応答する。P7,P8は新規疎通先を設定していないので、新規疎通先への状態確認は行わない。   P4 sends a status confirmation notification to P7, which does not know the communication state, to confirm whether the communication is disconnected. P4 indicates that the communication state is not in the communication state. Respond to. P5 sends a status confirmation notification to P7 and P8, which do not know the communication state, to confirm whether or not the communication is disconnected. If P7 and P8 are not in the communication disconnected state, P7 and P8 are in the communication disconnected state. It responds with respect to P5. Since P7 and P8 do not set a new communication destination, status confirmation to the new communication destination is not performed.

P4はP7の疎通状態を確認した後、P7を新規疎通先として設定する。或いは、P4はP7に対して疎通状態の確認を行うことなく、P7を新規疎通先として設定する構成としても良い。P5はP7,P8の疎通状態を確認した後、P7,P8を新規疎通先として設定する。或いは、P5はP7,P8に対して疎通状態の確認を行うことなく、P7,P8を新規疎通先として設定する構成としても良い。   After confirming the communication state of P7, P4 sets P7 as a new communication destination. Alternatively, P4 may be configured to set P7 as a new communication destination without confirming the communication state with P7. After confirming the communication state of P7 and P8, P5 sets P7 and P8 as new communication destinations. Alternatively, P5 may be configured to set P7 and P8 as new communication destinations without confirming the communication state with respect to P7 and P8.

図25の運行モード/疎通先情報の共有のフローチャートに示すように、P4は同じグループに属するP5へP4自身の運行モード/疎通先情報を通知する。該通知を受信したP5はP5の記憶部のネットワーク構成情報を更新する。また、P5は同じグループに属するP4へP5自身の運行モード/疎通先情報を通知する。該通知を受信したP4はP4の記憶部のネットワーク構成情報を更新する。   As shown in the operation mode / communication destination information sharing flowchart in FIG. 25, P4 notifies P5 belonging to the same group of P4's own operation mode / communication destination information. Receiving the notification, P5 updates the network configuration information in the storage unit of P5. P5 notifies P4 belonging to the same group of P5's own operation mode / communication destination information. Receiving the notification, P4 updates the network configuration information in the storage unit of P4.

P4は新規疎通先であるP7へ運行モードが“重なり2”であること通知し、P5は新規疎通先であるP7,P8へ運行モードが“重なり2”であることを通知する。P7は自身が属するグループG3の他の送受信装置P8に対して、運行モードが“重なり2”であることと、P7はP8に加えてP4,P5も疎通先とすることを通知し、運行モードと疎通先情報の更新依頼を行う。P8はP7に対して、運行モードが“重なり2”であることと、P8はP7に加えてP5も疎通先とすることを通知し、運行モードと疎通先情報の更新依頼を行う。   P4 notifies the new communication destination P7 that the operation mode is “overlap 2”, and P5 notifies the new communication destinations P7 and P8 that the operation mode is “overlap 2”. P7 notifies the other transmission / reception device P8 of the group G3 to which it belongs that the operation mode is “overlap 2” and that P7 is in communication with P4 and P5 in addition to P8. And request to update communication information. P8 notifies P7 that the operation mode is “overlap 2” and that P8 is also a communication destination in addition to P7, and requests to update the operation mode and communication destination information.

図97は、ケース〔3’.3〕として“重なり1”の重なり経路での疎通断時に疎通経路変更後の動作状態を示す。P4,P5は“重なり1”から“重なり2”へ移行し、P4はP7へ、P5はP7とP8へ疎通経路を変更した後の動作状態である。図98〜図101は、ケース〔3’.3〕のときのP4の記憶部に保持されたネットワーク構成情報である。   FIG. 97 shows the case [3 '. 3] shows an operation state after the communication path is changed when the communication is interrupted on the overlapping path "overlapping 1". P4 and P5 shift from “overlap 1” to “overlap 2”, P4 is the operation state after changing the communication path from P7 to P7, and P5 to P7 and P8. 98 to 101 show the case [3 '. 3] is the network configuration information held in the storage unit of P4.

図98はP1とP2についてのネットワーク構成情報、図99はP3とP4についてのネットワーク構成情報、図100はP5とP6についてのネットワーク構成情報、図101はP7,P8についてのネットワーク構成情報である。なお、今回変化したネットワーク構成情報を実線の丸印で囲み、前回変化したネットワーク構成情報を破線の丸印で囲んで示している。   98 shows network configuration information for P1 and P2, FIG. 99 shows network configuration information for P3 and P4, FIG. 100 shows network configuration information for P5 and P6, and FIG. 101 shows network configuration information for P7 and P8. The network configuration information changed this time is surrounded by a solid circle, and the network configuration information changed last time is surrounded by a dotted circle.

多重経路の疎通確認を行う場合には、疎通断を検知したときに、多重経路のそれぞれの疎通確認経路について、前述の同様の疎通経路の変更動作を多重処理により実行する。   In the case of confirming the communication of the multipath, when the communication disconnection is detected, the above-described change operation of the communication path is executed by the multiprocessing for each communication confirmation path of the multipath.

以上要点をまとめると、疎通確認対象のネットワークを、1つの中継点を基点とした少なくとも3分岐路の単位ネットワークに分割し、その分岐路の端点に配備した送受信装置の間で疎通確認用のパケットを送受する。各送受信装置は、該パケットの到達結果に基づいて、各送受信装置へ疎通状態通知を行う。   In summary, the communication confirmation target network is divided into at least three branch unit networks with one relay point as a base point, and a communication confirmation packet is established between the transmitting and receiving apparatuses deployed at the end points of the branch path. Send and receive. Each transmission / reception device notifies the communication state to each transmission / reception device based on the arrival result of the packet.

各送受信装置は疎通状態通知により、疎通確認用のパケットを送受する疎通経路の変更有無を判断する。該疎通経路の変更が必要と判断した場合には、記憶部に保持するネットワーク構成情報と経路切替ルールに基づいて、疎通経路の変更先を決定する。各送受信装置間での疎通状態通知において、複数のパケットの到達結果と閾値との比較により疎通状態を決定する工程を含む構成とすることができる。   Each transmission / reception device determines whether or not the communication path for transmitting and receiving the communication confirmation packet is changed based on the communication state notification. When it is determined that the communication route needs to be changed, the change destination of the communication route is determined based on the network configuration information stored in the storage unit and the route switching rule. In the communication state notification between the respective transmission / reception devices, it is possible to include a step of determining the communication state by comparing the arrival results of a plurality of packets with a threshold value.

また、各送受信装置間での疎通状態通知において、複数のパケットの到達結果から統計的手法により疎通状態を決定する構成としてもよい。また、前記ネットワーク構成情報は、各送受信装置が配備されたネットワークと同一のネットワークに配備されたセンター装置から、ネットワーク情報の変更があった場合に限って各送受信装置へ転送する工程を含む構成とすることができる。   Further, in the communication state notification between the respective transmitting and receiving apparatuses, the communication state may be determined by a statistical method from the arrival results of a plurality of packets. Further, the network configuration information includes a step of transferring from the center device deployed in the same network as the network in which each transmission / reception device is deployed to each transmission / reception device only when there is a change in network information; can do.

また、前記センター装置から、前記ネットワーク構成情報の転送は、変更が必要な疎通確認経路の候補に限定した限定ネットワーク構成情報のみを各送受信装置へ転送する構成とすることができる。また、前記経路切替ルールは、経路切替の結果に基づいて、疎通確認経路の変更先を決定するときに利用する優先情報を変更する工程をさらに含む構成とすることができる。   Further, the transfer of the network configuration information from the center device may be configured to transfer only the limited network configuration information limited to the communication confirmation path candidates that need to be changed to each transmitting / receiving device. The route switching rule may further include a step of changing priority information used when determining a change destination of the communication confirmation route based on a result of route switching.

また、前記送受信装置が疎通確認経路の変更先の送受信装置へ経路切替確認を行い、その応答に基づいて、経路切替先を決定する工程をさらに含む構成とすることができる。また、前記送受信装置が配備されたネットワークと同一ネットワークに配備されたユーザ監視装置は、前記送受信装置から疎通確認経路情報と疎通確認用のパケットの到達不可の故障推定経路情報を取得し、ネットワーク保守者に視覚的に疎通断の箇所と疎通確認経路の切替先を確認することができるよう表示する構成とすることができる。   The transmission / reception apparatus may further include a step of performing path switching confirmation with the transmission / reception apparatus to which the communication confirmation path is changed, and determining a path switching destination based on the response. In addition, the user monitoring device deployed in the same network as the network in which the transmission / reception device is deployed acquires communication confirmation route information and communication failure estimation route information from which communication confirmation packets cannot be reached from the transmission / reception device. It can be configured to display so that a person can visually confirm the disconnection location and the switching destination of the communication confirmation route.

また、前記ユーザ監視装置より、ネットワーク保守者が故障推定経路の復旧通知を各送受信装置へ行うことにより、各送受信装置は故障推定経路に接続された送受信装置へ疎通確認経路を戻す変更を行う工程をさらに含む構成とすることができる。また、前記センター装置から、前記ネットワーク構成情報に送受信装置が追加されたことを各送受信装置へ通知することにより、各送信装置が疎通確認経路を変更する工程をさらに含む構成とすることができる。   In addition, a step in which each network transceiver performs a change of returning a communication confirmation path to a transceiver connected to the estimated failure path by a network maintenance person from the user monitoring apparatus performing a failure estimation path recovery notification to each transceiver. Can be included. The center device may further include a step of changing the communication confirmation path by notifying each transmitting / receiving device that the transmitting / receiving device has been added to the network configuration information.

また、前記センター装置から、前記ネットワーク構成情報から送受信装置が削除されたことを各送受信装置へ通知することにより、各送受信装置が疎通確認経路を変更する工程をさらに含む構成とすることができる。   The center device may further include a step in which each transmitting / receiving device changes a communication confirmation path by notifying each transmitting / receiving device that the transmitting / receiving device has been deleted from the network configuration information.

また、前記送受信装置間の疎通状態通知において、経路多重度に基づいて複数経路について疎通確認を行うことにより、疎通確認結果の確度を向上させる工程をさらに含む構成とすることができる。また、前記送受信装置間の疎通状態通知において、所定のタイムオフセット値の時間差を設けた疎通確認のスケジューリングを行い、間欠障害の検知を行う工程をさらに含む構成とすることができる。   The communication state notification between the transmitting and receiving apparatuses may further include a step of improving the accuracy of the communication confirmation result by performing communication confirmation for a plurality of paths based on the path multiplicity. The communication state notification between the transmitting and receiving apparatuses may further include a step of performing communication confirmation scheduling with a predetermined time offset value difference and detecting an intermittent failure.

また、前記送受信装置間の疎通状態通知において、所定のタイムオフセット値と経路多重度とに基づいて複数経路について疎通確認のスケジューリングを行う工程をさらに含む構成とすることができる。また、前記送受信装置間の疎通状態通知において、所定の経路多重度に基づいて複数経路について疎通確認を行うことで、疎通確認経路の網羅性を向上させる工程をさらに含む構成とすることができる。   The communication state notification between the transmitting and receiving apparatuses may further include a step of scheduling communication confirmation for a plurality of paths based on a predetermined time offset value and path multiplicity. The communication state notification between the transmitting and receiving apparatuses may further include a step of improving the comprehensiveness of the communication confirmation path by performing communication confirmation on a plurality of paths based on a predetermined path multiplicity.

1−1 記憶部
1−2 疎通確認スケジューリング部
1−3 疎通確認部
1−4 送信部
1−5 受信部
1−6 疎通状態判断部
1−7 疎通切替設定部
1-1 Storage Unit 1-2 Communication Confirmation Scheduling Unit 1-3 Communication Confirmation Unit 1-4 Transmission Unit 1-5 Reception Unit 1-6 Communication State Judgment Unit 1-7 Communication Switch Setting Unit

Claims (4)

中継点を基点とした3分岐路を含む単位ネットワークに分割されたエリアネットワークの疎通状態を確認する疎通確認経路を変更するネットワーク疎通経路切替方法であって、
前記3分岐路の端点に配備された各送受信装置の間で、前記中継点を介する3分岐路の疎通確認経路を通して相互に疎通確認用のパケットを送受し、該パケットの到達結果を基に、当該単位ネットワークの疎通状態を各送受信装置で監視し、該疎通状態を前記エリアネットワーク内の各送受信装置に通知する疎通状態通知工程と、
前記疎通状態の通知を基に、前記単位ネットワーク内に少なくとも3分岐路の疎通確認経路が形成されるか否かを前記各送受信装置で判定し、少なくとも3分岐路の疎通確認経路が形成されない場合、前記単位ネットワークの疎通確認経路を変更するよう、前記各送受信装置で判断する経路変更判断工程と、
前記単位ネットワークの疎通確認経路を変更する際に、前記各送受信装置の記憶部に保持した前記エリアネットワークの構成情報、及び前記各送受信装置に共通の疎通確認経路切替法則に基づいて、少なくとも3分岐路の疎通確認経路が各単位ネットワーク内に形成されるよう、前記各送受信装置で疎通確認経路の変更先を決定する変更先決定工程と、
を含むことを特徴とするネットワーク疎通経路切替方法。
A network communication path switching method for changing a communication confirmation path for confirming a communication state of an area network divided into unit networks including three branch paths with a relay point as a base point,
Between the transmission / reception devices deployed at the end points of the three-branch path, send and receive packets for mutual communication confirmation through the communication confirmation path of the three-branch path via the relay point, and based on the arrival result of the packet, A communication state notification step of monitoring the communication state of the unit network with each transmission / reception device and notifying the communication state to each transmission / reception device in the area network;
When each of the transmission / reception devices determines whether or not a communication confirmation path of at least three branches is formed in the unit network based on the notification of the communication state, and a communication confirmation path of at least three branches is not formed A path change determination step for determining each of the transmission / reception devices so as to change the communication confirmation path of the unit network;
When changing the communication confirmation route of the unit network, at least three branches based on the configuration information of the area network held in the storage unit of each transmission / reception device and the communication confirmation route switching rule common to each transmission / reception device A change destination determination step for determining a change destination of the communication confirmation route in each of the transmission and reception devices so that a communication confirmation route of the path is formed in each unit network;
A network communication route switching method comprising:
前記エリアネットワークを複数の異なる分割法則で前記単位ネットワークに分割し、該異なる分割法則で分割した各単位ネットワークの各疎通確認経路について、前記疎通状態通知工程と前記経路変更判断工程と前記変更先決定工程とを、それぞれ多重処理することを特徴とする請求項1に記載のネットワーク疎通経路切替方法。   The area network is divided into the unit networks by a plurality of different division rules, and the communication state notification step, the route change determination step, and the change destination determination are made for each communication confirmation route of each unit network divided by the different division rules. The network communication path switching method according to claim 1, wherein each of the processes is subjected to multiple processing. 前記エリアネットワークを複数の異なる分割法則で前記単位ネットワークに分割し、該異なる分割法則で分割した各単位ネットワークの各疎通確認経路について、前記疎通状態通知工程と前記経路変更判断工程と前記変更先決定工程とを、それぞれ所定の時間差だけずらして処理することを特徴とする請求項1に記載のネットワーク疎通経路切替方法。   The area network is divided into the unit networks by a plurality of different division rules, and the communication state notification step, the route change determination step, and the change destination determination are made for each communication confirmation route of each unit network divided by the different division rules. 2. The network communication route switching method according to claim 1, wherein the steps are processed while being shifted by a predetermined time difference. 中継点を基点とした3分岐路を含む単位ネットワークに分割されたエリアネットワークの疎通確認の経路情報を含むネットワーク構成情報及び疎通確認の経路毎の疎通状態情報を記憶する記憶部と、
前記記憶部から疎通確認の経路情報を読み出し、疎通確認を行うタイミングのスケジューリングを行う疎通確認スケジューリング部と、
前記疎通確認スケジューリング部により指定されたタイミングで疎通確認用のパケット送信の指示を行う疎通確認部と、
他の送受信装置からの疎通確認用のパケットを受信し、疎通確認用のパケットの到達結果を評価し、疎通状態を前記記憶部に書き込む疎通状態判断部と、
前記単位ネットワーク内に少なくとも3分岐路の疎通確認経路が形成されるか否かを判定し、少なくとも3分岐路の疎通確認経路が形成されない場合、前記記憶部に保持した前記ネットワーク構成情報、及び他の各送受信装置に共通の疎通確認経路切替法則に基づいて、少なくとも3分岐路の疎通確認経路が各単位ネットワーク内に形成されるよう、前記疎通確認経路の変更先を決定する変更先を決定し、前記記憶簿のネットワーク構成情報として書き込む疎通切替設定部と、
を備えたことを特徴とする送受信装置。
A storage unit for storing network configuration information including path information for communication confirmation of an area network divided into unit networks including three branch paths with a relay point as a base point, and communication state information for each path for communication confirmation;
A communication confirmation scheduling unit that reads out the communication confirmation route information from the storage unit and schedules the timing for performing the communication confirmation;
A communication confirmation unit for instructing packet transmission for communication confirmation at a timing specified by the communication confirmation scheduling unit;
A communication state determination unit that receives a communication confirmation packet from another transmission / reception device, evaluates the arrival result of the communication confirmation packet, and writes the communication state in the storage unit;
It is determined whether or not a communication confirmation path of at least three branch paths is formed in the unit network, and when a communication confirmation path of at least three branch paths is not formed, the network configuration information held in the storage unit, and others Based on the communication confirmation path switching rule common to each of the transmission / reception devices, a change destination for determining the change destination of the communication confirmation path is determined so that at least three communication confirmation paths are formed in each unit network. A communication switching setting unit for writing as network configuration information of the storage book;
A transmission / reception device comprising:
JP2009127763A 2009-05-27 2009-05-27 Network communication path switching method and transmission / reception apparatus Active JP5163595B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009127763A JP5163595B2 (en) 2009-05-27 2009-05-27 Network communication path switching method and transmission / reception apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009127763A JP5163595B2 (en) 2009-05-27 2009-05-27 Network communication path switching method and transmission / reception apparatus

Publications (2)

Publication Number Publication Date
JP2010278639A true JP2010278639A (en) 2010-12-09
JP5163595B2 JP5163595B2 (en) 2013-03-13

Family

ID=43425207

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009127763A Active JP5163595B2 (en) 2009-05-27 2009-05-27 Network communication path switching method and transmission / reception apparatus

Country Status (1)

Country Link
JP (1) JP5163595B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013026927A (en) * 2011-07-22 2013-02-04 Nippon Telegr & Teleph Corp <Ntt> Network quality monitoring system and network quality monitoring method
JP2019508975A (en) * 2016-03-01 2019-03-28 テレフオンアクチーボラゲット エルエム エリクソン(パブル) Neighbor monitoring in hyperscale environment
JP2021012658A (en) * 2019-07-09 2021-02-04 株式会社三菱Ufj銀行 System and processing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006094180A (en) * 2004-09-24 2006-04-06 Fujitsu Ltd Network monitoring method and apparatus
WO2007026733A1 (en) * 2005-08-31 2007-03-08 Nec Corporation Network system, server, degraded portion estimation method, and program
JP2008005480A (en) * 2006-05-25 2008-01-10 Oki Electric Ind Co Ltd Network monitor system
JP2008060971A (en) * 2006-08-31 2008-03-13 Fujitsu Ltd Information processing system, information processor, information processing method and program

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006094180A (en) * 2004-09-24 2006-04-06 Fujitsu Ltd Network monitoring method and apparatus
WO2007026733A1 (en) * 2005-08-31 2007-03-08 Nec Corporation Network system, server, degraded portion estimation method, and program
JP2008005480A (en) * 2006-05-25 2008-01-10 Oki Electric Ind Co Ltd Network monitor system
JP2008060971A (en) * 2006-08-31 2008-03-13 Fujitsu Ltd Information processing system, information processor, information processing method and program

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013026927A (en) * 2011-07-22 2013-02-04 Nippon Telegr & Teleph Corp <Ntt> Network quality monitoring system and network quality monitoring method
JP2019508975A (en) * 2016-03-01 2019-03-28 テレフオンアクチーボラゲット エルエム エリクソン(パブル) Neighbor monitoring in hyperscale environment
JP2021012658A (en) * 2019-07-09 2021-02-04 株式会社三菱Ufj銀行 System and processing method

Also Published As

Publication number Publication date
JP5163595B2 (en) 2013-03-13

Similar Documents

Publication Publication Date Title
EP3029893B1 (en) Method, controller, device and system for protecting service path
Moazzeni et al. On reliability improvement of software-defined networks
WO2016192408A1 (en) Fault detection method and apparatus for node in cluster system
US20150055453A1 (en) Detour path calculation method in emergency
JP2007180830A (en) Duplex monitoring control system and redundant switching method of the system
CN103346944B (en) The looped network of multi-point cooperative detection link
JP2014217062A (en) Link failure diagnosis device and method
JP5163595B2 (en) Network communication path switching method and transmission / reception apparatus
JP5106706B1 (en) Network system
US20150098317A1 (en) Linear protection switching method and apparatus for protecting network segmented into multi-domain
CN113364689B (en) Detecting miswiring in a leaf-ridge topology of a plurality of network devices
US20120218907A1 (en) System and method for coordinated discovery of the status of network routes by hosts in a network
CN112543128B (en) Bidirectional forwarding detection control packet for indicating maintenance mode operation
US10516625B2 (en) Network entities on ring networks
JP2009224978A (en) Radio communication apparatus, radio communication system, and network restructuring method of radio communication apparatus
JP2010166328A (en) Communication network system, and method for achieving high reliability of path
EP2750336B1 (en) Inter-loop service protection method and apparatus
CN105812160B (en) A kind of seamless redundant network mode adaptive method and device
Nordbotten et al. A routing methodology for dynamic fault tolerance in meshes and tori
JP6517554B2 (en) Transmission system and transmission station
JP5905358B2 (en) Monitoring path setting method and apparatus for fault link specific system
CN101022389A (en) Elastic packet link point internal connection fault processing method and apparatus
CN105721234A (en) Port aggregation method and apparatus
JP2014137732A (en) Information processing system and control method for information processing system
CN110661663B (en) Interface state synchronization method and device

Legal Events

Date Code Title Description
RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20110915

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120105

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121116

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121120

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121203

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151228

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5163595

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150