JP2010243111A - Heat pump type water heater - Google Patents

Heat pump type water heater Download PDF

Info

Publication number
JP2010243111A
JP2010243111A JP2009094181A JP2009094181A JP2010243111A JP 2010243111 A JP2010243111 A JP 2010243111A JP 2009094181 A JP2009094181 A JP 2009094181A JP 2009094181 A JP2009094181 A JP 2009094181A JP 2010243111 A JP2010243111 A JP 2010243111A
Authority
JP
Japan
Prior art keywords
heating capacity
tank
heat
storage amount
heat storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009094181A
Other languages
Japanese (ja)
Inventor
Kensaku Hatanaka
謙作 畑中
So Nomoto
宗 野本
Kazuaki Isono
一明 磯野
Kunihiro Morishita
国博 森下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2009094181A priority Critical patent/JP2010243111A/en
Publication of JP2010243111A publication Critical patent/JP2010243111A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To ensure a target heat storage amount in a midnight power time zone by improving an operation time average COP (Coefficient Of Performance) in a boiling-up operation to store the heated hot water in a tank. <P>SOLUTION: This heat pump type water heater includes a refrigerant circuit, a hot water supply circuit for storing the water heated by a water-refrigerant heat exchanger in the tank, a target heat storage amount calculating means for calculating the target heat storage amount to store hot water in the tank, an in-tank heat storage amount detecting means for detecting a heat storage amount stored in the tank, a heating capacity calculating means for calculating a heating capacity of the boiling-up operation, and an operation control means for controlling the boiling-up operation to the tank. The heating capacity calculated by the heating capacity calculating means, is obtained by multiplying a heating capacity obtained by dividing a heat quantity as a result of subtraction of the in-tank heat storage amount detected by the in-tank heat storage amount detecting means from the target heat storage amount calculated by the target heat storage amount calculating means, by a time from a start time to a termination time of the midnight power time zone, by a prescribed constant or adding the prescribed constant to the heating capacity, and the boiling-up operation is started at the start time of the midnight power time zone. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、ヒートポンプ式給湯機に係り、より詳しくは、加熱した温水をタンクに貯湯する沸き上げ運転時の運転時間平均COP(エネルギー消費効率)を向上させたヒートポンプ式給湯機に関する。   The present invention relates to a heat pump type hot water heater, and more particularly, to a heat pump type hot water heater that improves an operating time average COP (energy consumption efficiency) during a boiling operation in which heated hot water is stored in a tank.

ヒートポンプ式給湯機では、タンクに貯湯した温水(残湯量)が少なくなるとヒートポンプ式給湯機の運転を開始し、所定の貯湯量を確保すると運転を停止する。   In the heat pump type hot water heater, the operation of the heat pump type hot water heater is started when the hot water (amount of remaining hot water) stored in the tank is reduced, and the operation is stopped when a predetermined amount of hot water is secured.

従来のヒートポンプ式給湯機は、タンクの残湯量を検知し、必要な熱量を演算し、その熱量に基づき、ヒートポンプ式給湯機のCOPが最大となるような圧縮機周波数で運転する(例えば、特許文献1参照)。   A conventional heat pump type hot water heater detects the amount of remaining hot water in a tank, calculates a necessary amount of heat, and operates at a compressor frequency that maximizes the COP of the heat pump type hot water heater based on the amount of heat (for example, patents) Reference 1).

特開平9−68369号公報JP-A-9-68369

ヒートポンプ式給湯機には、運転開始から冷凍サイクル内の冷媒の状態が安定するまでに数十分の時間を必要とし、過渡状態のCOPや加熱能力などは安定状態のCOPや加熱能力などと比べて低いという特徴がある。ここで、COPとは、エネルギー消費効率のことで、ヒートポンプ式給湯機に投入した入力に対する加熱能力の割合である。   Heat pump water heaters require several tens of minutes from the start of operation until the state of the refrigerant in the refrigeration cycle stabilizes, and transient COP and heating capacity are compared to stable COP and heating capacity. It is characterized by being low. Here, COP is energy consumption efficiency, and is the ratio of the heating capacity to the input supplied to the heat pump type hot water heater.

そのため、ヒートポンプ式給湯機の運転開始から停止までの時間が短いほど、ヒートポンプ式給湯機の合計運転時間に対して、冷凍サイクルの冷媒が安定した状態のCOPや加熱能力と比較し、運転開始直後のCOPや加熱能力の低い運転時間の割合が増加する。そのため、ヒートポンプ式給湯機の運転時間の平均COPや平均加熱能力が低下する。   Therefore, the shorter the time from the start of operation of the heat pump hot water heater to the stop, the COP or heating capacity of the refrigerant in the refrigeration cycle is stable with respect to the total operation time of the heat pump hot water heater. The proportion of operating time with low COP and low heating capacity increases. Therefore, the average COP and the average heating capacity of the operation time of the heat pump type hot water heater are lowered.

特許文献1に記載された従来のヒートポンプ式給湯機は、運転時間の平均COPを向上させるために、深夜電力時間帯の開始時刻から終了時刻まで、圧縮機周波数を変更せずに運転した場合、安定状態に比べて低い、運転開始直後の加熱能力を考慮していないために、深夜時間帯内に必要な熱量を確保できないことになる。   When the conventional heat pump type water heater described in Patent Document 1 is operated without changing the compressor frequency from the start time to the end time of the midnight power time period in order to improve the average COP of the operation time, Since the heating capacity immediately after the start of operation, which is lower than that in the stable state, is not taken into consideration, the necessary amount of heat cannot be secured in the midnight time zone.

本発明は上記の課題を解決するためになされたもので、ヒートポンプ式給湯機で加熱した温水をタンクに貯湯する沸き上げ運転時の運転時間平均COPを向上させることができ、深夜電力時間帯内で必要な貯湯量を確保できるヒートポンプ式給湯機を提供することを目的とする。   The present invention has been made to solve the above-described problems, and can improve the average operating time COP during a boiling operation in which hot water heated by a heat pump type hot water heater is stored in a tank, and is within a midnight power time zone. An object is to provide a heat pump type water heater that can secure the necessary amount of hot water storage.

本発明に係るヒートポンプ式給湯機は、圧縮機、水冷媒熱交換器、膨張弁、及び空気熱交換器が環状に接続された冷媒回路と、水冷媒熱交換器により加熱された水をタンク内に貯湯する給湯回路と、タンクに貯湯する目標蓄熱量を算出する目標蓄熱量算出手段、タンク内の蓄熱量を検出するタンク内蓄熱量検出手段、沸き上げ運転の加熱能力を算出する加熱能力算出手段、及びタンクへの沸き上げ運転を制御する運転制御手段を備え、
加熱能力算出手段により算出される加熱能力は、目標蓄熱量算出手段より算出される目標蓄熱量からタンク内蓄熱量検出手段より検出されるタンク内の蓄熱量を減じた熱量を、深夜電力時間帯の開始時刻から終了時刻までの時間で除した加熱能力に所定の定数を乗じた、もしくは加えた加熱能力であり、沸き上げ運転を制御する運転制御手段は、深夜電力時間帯の開始時刻に沸き上げ運転を開始するようにしたものである。
The heat pump type hot water heater according to the present invention includes a refrigerant circuit in which a compressor, a water refrigerant heat exchanger, an expansion valve, and an air heat exchanger are annularly connected, and water heated by the water refrigerant heat exchanger in the tank. Hot water supply circuit for storing hot water, target heat storage amount calculation means for calculating the target heat storage amount stored in the tank, heat storage amount detection means for detecting the heat storage amount in the tank, heating capacity calculation for calculating the heating capacity of the heating operation Means, and operation control means for controlling the heating operation to the tank,
The heating capacity calculated by the heating capacity calculation means is calculated by subtracting the amount of heat stored in the tank detected by the tank heat storage amount detection means from the target heat storage amount calculated by the target heat storage amount calculation means. The heating capacity divided by the time from the start time to the end time is multiplied by or added to a predetermined constant, and the operation control means for controlling the heating operation is performed at the start time of the midnight power time zone. The lift operation is started.

本発明に係るヒートポンプ式給湯機によれば、沸き上げ運転時に、深夜電力時間帯の開始時刻から終了時刻まで運転することにより、沸き上げ運転の合計運転時間に対する運転開始直後のCOPが低い状態で運転する時間の割合を減少させ、運転時間平均COPを向上させることができ、また、必要な熱量を深夜電力時間帯内に確実に確保することができる。   According to the heat pump type water heater according to the present invention, during the boiling operation, by operating from the start time to the end time of the midnight power time zone, the COP immediately after the start of operation with respect to the total operation time of the boiling operation is low. The operation time ratio can be reduced, the operation time average COP can be improved, and the necessary amount of heat can be reliably ensured within the midnight power hours.

本発明の一実施の形態に係るヒートポンプ式給湯機のシステム回路図である。1 is a system circuit diagram of a heat pump type water heater according to an embodiment of the present invention. 図1のヒートポンプ式給湯機の運転開始からのCOPと加熱能力の時間変化を示す線図である。It is a diagram which shows the time change of COP and a heating capability from the operation start of the heat pump type water heater of FIG. 図1のヒートポンプ式給湯機の沸き上げ運転方法を示すフローチャート図である。It is a flowchart figure which shows the boiling operation method of the heat pump type hot water heater of FIG.

実施の形態.
本発明の一実施の形態に係る図1において、ヒートポンプ式給湯機は、ヒートポンプユニット100とタンクユニット200とを備えている。ヒートポンプユニット100内には、圧縮機1、水冷媒熱交換器2、膨張弁3及び空気熱交換器4を順次環状に接続し、冷媒が循環する冷凍サイクル(冷媒回路)101と、空気熱交換器4に外気を送風するファン5とが搭載されている。一方、タンクユニット200内には、負荷側媒体である水を水冷媒熱交換器2に送水するポンプ6と、ポンプ6により送水されて水冷媒熱交換器2で加熱された水を貯留するタンク7とが搭載されている。そして、水冷媒熱交換器2と、タンク7と、ポンプ6とを、接続配管8a〜8fにより接続して給湯水回路(給湯回路)201が構成されている。なお、ポンプ6は、必ずしもタンクユニット200に設置する必要はなく、ヒートポンプユニット100側に搭載してもよい。
Embodiment.
In FIG. 1 according to an embodiment of the present invention, a heat pump type hot water heater includes a heat pump unit 100 and a tank unit 200. In the heat pump unit 100, a compressor 1, a water refrigerant heat exchanger 2, an expansion valve 3 and an air heat exchanger 4 are sequentially connected in an annular manner, and a refrigeration cycle (refrigerant circuit) 101 in which refrigerant circulates, and air heat exchange. A fan 5 for blowing outside air is mounted on the vessel 4. On the other hand, in the tank unit 200, a pump 6 that supplies water as a load-side medium to the water-refrigerant heat exchanger 2, and a tank that stores water that is supplied by the pump 6 and heated by the water-refrigerant heat exchanger 2. 7 is installed. And the hot water supply water circuit (hot water supply circuit) 201 is comprised by connecting the water-refrigerant heat exchanger 2, the tank 7, and the pump 6 by connection piping 8a-8f. The pump 6 is not necessarily installed in the tank unit 200, and may be mounted on the heat pump unit 100 side.

なお、図1には、給湯水回路201のタンク7に貯留した一定温度のお湯を、例えば風呂などに供給する給湯装置は省略してある。また、給湯水回路201から水を供給する回路なども省略してある。また、圧縮機1から吐出する冷媒の圧力や温度を変化させることができるように、圧縮機駆動装置(図示せず)をインバータ制御のDCブラシレスモータを使用して回転数を可変としたものとするが、複数台の圧縮機1を組合せて、この組合せを切換えて全体の能力を可変としても良い。また、圧縮機1の吸入側に冷媒音を低減させるサクションマフラーのような容器や、圧縮機1の吐出側に流出した潤滑油を回収する装置など、他の目的の構造を付加しても良い。このヒートポンプ式給湯機の冷媒としては、高温出湯ができる冷媒、例えば、二酸化炭素、R410A、プロパン、プロピレンなどの冷媒が適しているが、特にこれらに限定されるものではない。   In FIG. 1, a hot water supply apparatus that supplies hot water having a constant temperature stored in the tank 7 of the hot water supply circuit 201 to, for example, a bath is omitted. A circuit for supplying water from the hot water supply circuit 201 is also omitted. In addition, the compressor drive device (not shown) uses an inverter-controlled DC brushless motor so that the rotation speed is variable so that the pressure and temperature of the refrigerant discharged from the compressor 1 can be changed. However, a plurality of compressors 1 may be combined, and this combination may be switched to make the overall capacity variable. In addition, a structure such as a suction muffler that reduces refrigerant noise on the suction side of the compressor 1 or a device that collects lubricating oil that has flowed out to the discharge side of the compressor 1 may be added. . As a refrigerant of this heat pump type hot water heater, a refrigerant capable of producing high temperature hot water, for example, a refrigerant such as carbon dioxide, R410A, propane or propylene is suitable, but is not particularly limited thereto.

ヒートポンプユニット100内には、給湯水回路201において、入水温度センサー9aが水冷媒熱交換器2の水入口側に設けられ、出湯温度センサー9bが水冷媒熱交換器2の水出口側に設けられており、それぞれ設置場所の水温度を計測する。また、ヒートポンプユニット100の外郭またはその近傍に設けた外気温度センサー9cは、ヒートポンプユニット100の周囲の外気温度を計測する。冷凍サイクル101において、吐出温度センサー9dが圧縮機1の出口側に、吸入温度センサー9eが圧縮機1の入口側に設けられており、蒸発温度センサー9fが蒸発器4の入口から中間部に設けられており、それぞれ配置場所の冷媒温度を計測する。また、タンクユニット200内のタンク7表面には貯湯温度センサー9g〜9jが設けられており、タンク内の水温度を計測する。   In the heat pump unit 100, in the hot water supply circuit 201, the incoming water temperature sensor 9 a is provided on the water inlet side of the water refrigerant heat exchanger 2, and the outgoing hot water temperature sensor 9 b is provided on the water outlet side of the water refrigerant heat exchanger 2. Measure the water temperature at each location. The outside air temperature sensor 9 c provided at or near the outer periphery of the heat pump unit 100 measures the outside air temperature around the heat pump unit 100. In the refrigeration cycle 101, the discharge temperature sensor 9 d is provided on the outlet side of the compressor 1, the suction temperature sensor 9 e is provided on the inlet side of the compressor 1, and the evaporation temperature sensor 9 f is provided on the intermediate portion from the inlet of the evaporator 4. The temperature of the refrigerant at each location is measured. Moreover, hot water storage temperature sensors 9g to 9j are provided on the surface of the tank 7 in the tank unit 200, and measure the water temperature in the tank.

ヒートポンプユニット100内には、制御手段としての計測制御装置10が設けられている。この計測制御装置10は、各温度センサー9a〜9gなどによる計測情報や、ヒートポンプ式給湯機の使用者からリモコン装置などにより指示される運転指令情報の内容に基づいて、圧縮機1の運転方法、膨張弁3の開度、ポンプ6の運転方法、後述の沸き上げ運転などを制御する。   In the heat pump unit 100, a measurement control device 10 as a control means is provided. This measurement control device 10 is based on the measurement information obtained by the temperature sensors 9a to 9g and the content of operation command information instructed by a remote control device or the like from the user of the heat pump hot water heater. The opening degree of the expansion valve 3, the operation method of the pump 6, the boiling operation described later, and the like are controlled.

次に、このヒートポンプ式給湯機における運転動作について説明する。ここでは、沸き上げ運転について説明する。
沸き上げ運転とは、冷凍サイクル101と給湯水回路201とを動作させ、タンク7の底部の取水口7bからポンプ6で低温水を流出させて水冷媒熱交換器2に送水し、水冷媒熱交換器2で冷媒と熱交換することにより沸き上げて、タンク7の上部の貯湯口7aからタンク7内に戻す動作である。
Next, the operation | movement operation | movement in this heat pump type water heater is demonstrated. Here, the boiling operation will be described.
In the boiling operation, the refrigeration cycle 101 and the hot water supply circuit 201 are operated, low temperature water is discharged from the water intake port 7b at the bottom of the tank 7 by the pump 6, and is sent to the water refrigerant heat exchanger 2, where water refrigerant heat The heat exchanger boils up by exchanging heat with the refrigerant in the exchanger 2 and returns to the tank 7 from the hot water storage port 7 a at the top of the tank 7.

ヒートポンプユニット100の冷凍サイクル101において、圧縮機1から吐出された高温高圧のガス冷媒は水冷媒熱交換器2で給湯水回路201側へ放熱(水を加熱)しながら温度低下する。このとき高圧側冷媒圧力が臨界圧以上であれば、冷媒は超臨界状態のまま気液相転移しないで温度低下して放熱する。また、高圧側冷媒圧力が臨界圧以下であれば、冷媒は液化しながら放熱する。つまり、冷媒から放熱された熱を負荷側媒体(ここでは、給湯水回路201を流れる水)に与えることで給湯加熱(沸き上げ)を行う。給湯加熱をして水冷媒熱交換器2から流出した高圧低温の冷媒は、膨張弁3を通過する。   In the refrigeration cycle 101 of the heat pump unit 100, the high-temperature and high-pressure gas refrigerant discharged from the compressor 1 decreases in temperature while radiating heat (heats water) to the hot water supply circuit 201 side in the water refrigerant heat exchanger 2. At this time, if the high-pressure side refrigerant pressure is equal to or higher than the critical pressure, the refrigerant radiates heat at a reduced temperature without undergoing a gas-liquid phase transition in a supercritical state. If the high-pressure side refrigerant pressure is equal to or lower than the critical pressure, the refrigerant radiates heat while liquefying. That is, hot water supply heating (boiling) is performed by applying heat radiated from the refrigerant to a load-side medium (here, water flowing through the hot water supply water circuit 201). The high-pressure and low-temperature refrigerant flowing out of the water-refrigerant heat exchanger 2 through hot water heating passes through the expansion valve 3.

膨張弁3を通過した冷媒は、ここで低圧気液二相の状態に減圧される。膨張弁3を通過した冷媒は空気熱交換器4に流入し、そこで外気の空気から吸熱し、蒸発ガス化される。空気熱交換器4を出た低圧冷媒は圧縮機1に吸入されて循環し、冷凍サイクル101を形成する。   The refrigerant that has passed through the expansion valve 3 is reduced in pressure to a low-pressure gas-liquid two-phase state. The refrigerant that has passed through the expansion valve 3 flows into the air heat exchanger 4 where it absorbs heat from the outside air and is evaporated and gasified. The low-pressure refrigerant that has exited the air heat exchanger 4 is sucked into the compressor 1 and circulated to form a refrigeration cycle 101.

また、給湯水回路201側では、タンク7内の水が、ポンプ6によりタンク7の底部の取水口7bから導かれ、接続配管8d〜8fを通過して水冷媒熱交換器2内に搬送される。そして、ここで冷媒と熱交換して加熱(沸き上げ)され、接続配管8a〜8cを通過してタンク7上部の貯湯口7aからタンク7内に流入する。これにより、タンク7内は、上部が高温水で下部が低温水の状態となる。   On the hot water supply circuit 201 side, the water in the tank 7 is guided by the pump 6 from the water intake 7b at the bottom of the tank 7, passes through the connection pipes 8d to 8f, and is conveyed into the water / refrigerant heat exchanger 2. The Then, it is heated (boiling) by exchanging heat with the refrigerant, passes through the connecting pipes 8 a to 8 c, and flows into the tank 7 from the hot water storage port 7 a at the upper part of the tank 7. As a result, the inside of the tank 7 is in a state of high temperature water at the top and low temperature water at the bottom.

次に、このヒートポンプ式給湯機での運転制御動作について説明する。
まず、回転数等で制御される圧縮機1の運転容量及びポンプ6の回転数は、後述の計測制御装置10で算出される加熱能力に基づいて調整される。つまり、加熱能力及び出湯温度センサー9bで計測検知される水冷媒熱交換器2の水出口における水の温度(出湯温度)が、予め定められた目標値となるように調整制御される。その目標出湯温度は、使用者からリモコンにて指示される運転指令情報から設定されるか、あるいはリモコン内もしくは計測制御装置10に設けられたマイコンにて過去の給湯使用量から算出される蓄熱エネルギー(貯湯量)を確保できるように設定される。また、目標出湯温度は、あらかじめ範囲が決められており、例えば65℃から90℃の範囲に設定されている。
Next, the operation control operation in this heat pump type hot water heater will be described.
First, the operating capacity of the compressor 1 and the rotational speed of the pump 6 controlled by the rotational speed and the like are adjusted based on the heating capacity calculated by the measurement control device 10 described later. In other words, the temperature of the water at the water outlet of the water-refrigerant heat exchanger 2 (the temperature of the hot water), which is measured and detected by the heating capacity and the temperature of the hot water temperature sensor 9b, is adjusted and controlled so as to become a predetermined target value. The target hot water temperature is set from the operation command information instructed by the remote controller from the user, or the heat storage energy calculated from the past hot water use amount in the remote controller or by the microcomputer provided in the measurement control device 10 It is set so that (hot water storage) can be secured. Further, the target hot water temperature has a predetermined range, for example, a range of 65 ° C. to 90 ° C.

そして、目標出湯温度範囲の最大値で所定の加熱能力を確保できれば、目標出湯温度の範囲内で所定の加熱能力を確保できる。したがって、水冷媒熱交換器2の加熱能力である圧縮機1の回転数は、上述したように例えば外気温度と給水温度とに基づき調整することで、どのような目標出湯温度においても所定の加熱能力を確保することができる。言いかえれば圧縮機1の出力は、どのような外部条件に対しても給湯機として要求されるお湯の温度を何時でも確保できる加熱能力を準備しており、この結果、常に所望の温度のお湯が給湯装置として得ることができる。また、圧縮機1の回転数は、圧縮機耐久性の観点から上限回転数および下限回転数が設けられている。   If the predetermined heating capacity can be ensured with the maximum value in the target hot water temperature range, the predetermined heating capacity can be secured within the target hot water temperature range. Therefore, the rotation speed of the compressor 1, which is the heating capacity of the water-refrigerant heat exchanger 2, is adjusted based on, for example, the outside air temperature and the feed water temperature as described above, so that a predetermined heating can be achieved at any target tapping temperature. Capability can be secured. In other words, the output of the compressor 1 is provided with a heating capacity that can ensure the temperature of hot water required as a water heater for any external conditions at any time. Can be obtained as a water heater. Moreover, the rotation speed of the compressor 1 is provided with an upper limit rotation speed and a lower limit rotation speed from the viewpoint of compressor durability.

膨張弁3の開度は、吐出温度を所定値(目標吐出温度)になるように制御される。目標吐出温度は、目標出湯温度を確保できる温度とするため、目標出湯温度より高い温度、すなわち目標出湯温度+α[℃]に設定されている。値αは、例えば外気温度や目標出湯温度の関数とする。このように目標出湯温度に応じた目標吐出温度とすることで、要求された出湯温度を確保することができる。また、圧縮機耐久性や冷凍機油劣化などの観点から、通常、吐出温度には上限温度が設けられている。   The opening degree of the expansion valve 3 is controlled so that the discharge temperature becomes a predetermined value (target discharge temperature). The target discharge temperature is set to a temperature higher than the target hot water temperature, that is, the target hot water temperature + α [° C.] in order to make the target hot water temperature secureable. The value α is, for example, a function of the outside air temperature or the target hot water temperature. Thus, the required hot water temperature can be ensured by setting it as the target discharge temperature according to the target hot water temperature. Also, from the viewpoint of compressor durability and refrigeration machine oil degradation, an upper limit temperature is usually provided for the discharge temperature.

ポンプ6の回転数は、出湯温度が目標出湯温度となるように制御される。膨張弁3で吐出温度が目標出湯温度+α[℃]に制御されるため、即ち冷凍サイクル101側の加熱能力が一定に維持されているため、確実に出湯温度を確保することができる。   The rotation speed of the pump 6 is controlled so that the tapping temperature becomes the target tapping temperature. Since the discharge temperature is controlled to the target hot water temperature + α [° C.] by the expansion valve 3, that is, the heating capacity on the refrigeration cycle 101 side is kept constant, the hot water temperature can be reliably ensured.

次に、本実施の形態のヒートポンプ式給湯機の特徴部分であるヒートポンプユニット100の運転方法について説明する。   Next, an operation method of the heat pump unit 100 which is a characteristic part of the heat pump type hot water heater of the present embodiment will be described.

図2は、ヒートポンプユニット100の運転開始からの経過時間に対するCOPと加熱能力qの変化である。図2に示すように、ヒートポンプユニット100のCOPと加熱能力qは運転開始より数十分経過後に、一定値に近づき安定する。
図2に示すように、COPと加熱能力qが安定するまでに時間を必要とするのは、ヒートポンプユニット100の運転開始直後は、負荷媒体である水を加熱すると同時に、圧縮機1、水冷媒熱交換器2を加熱する必要があるためである。ヒートポンプユニット100の運転開始前は、圧縮機1、水冷媒熱交換器2は外気温度と同等温度にある。ヒートポンプユニット100の運転開始直後は、高温高圧のガス冷媒は水を加熱すると同時に、圧縮機1、水冷媒熱交換器2を加熱する必要がある。そのため、運転開始直後は負荷媒体である水を加熱できる熱量が少なくなり、ヒートポンプユニット100の加熱能力qが小さくなる。ヒートポンプユニット100に投入する電気入力は、運転開始直後と安定時は同等であるため、運転開始直後は安定時に比べCOPが低い運転状態になる。
FIG. 2 shows changes in the COP and the heating capacity q with respect to the elapsed time from the start of operation of the heat pump unit 100. As shown in FIG. 2, the COP and the heating capacity q of the heat pump unit 100 approach a constant value and become stable after several tens of minutes from the start of operation.
As shown in FIG. 2, the time required for the COP and the heating capacity q to stabilize is that immediately after the operation of the heat pump unit 100 is started, water as a load medium is heated, and at the same time, the compressor 1 and the water refrigerant This is because the heat exchanger 2 needs to be heated. Before the operation of the heat pump unit 100 is started, the compressor 1 and the water refrigerant heat exchanger 2 are at a temperature equivalent to the outside air temperature. Immediately after the operation of the heat pump unit 100 is started, the high-temperature and high-pressure gas refrigerant needs to heat the water and simultaneously heat the compressor 1 and the water-refrigerant heat exchanger 2. Therefore, immediately after the start of operation, the amount of heat that can heat the load medium water decreases, and the heating capacity q of the heat pump unit 100 decreases. Since the electric input to be input to the heat pump unit 100 is the same immediately after the start of operation and when it is stable, the COP is in an operation state in which the COP is lower immediately after the start of operation than when it is stable.

特に、家庭用ヒートポンプ式給湯機では、圧縮機1に圧縮した冷媒を圧縮機シェル内に放出する高圧シェルタイプの圧縮機を用い、冷媒として二酸化炭素を用いている場合が多い。冷媒が二酸化炭素である場合、冷凍サイクル101内の高圧側が臨界圧力(約7.4MPa)以上となるため、設計圧力が高くなり、圧縮機シェルの板厚(肉厚)が厚くなる。よって、圧縮機シェルの熱容量が大きくなり、冷媒が圧縮機1を加熱する熱量が他の冷凍機器に比べ大きくなり、COPと加熱能力qが安定するまでに必要となる時間も増加する。   In particular, household heat pump hot water heaters often use a high-pressure shell type compressor that discharges the refrigerant compressed in the compressor 1 into the compressor shell, and often uses carbon dioxide as the refrigerant. When the refrigerant is carbon dioxide, the high pressure side in the refrigeration cycle 101 becomes the critical pressure (about 7.4 MPa) or more, so the design pressure increases and the plate thickness (thickness) of the compressor shell increases. Therefore, the heat capacity of the compressor shell is increased, the amount of heat by which the refrigerant heats the compressor 1 is larger than that of other refrigeration equipment, and the time required until the COP and the heating capacity q are stabilized also increases.

以上のように、運転開始直後のCOPと加熱能力が安定するまでに必要な時間は、ヒートポンプユニット100の運転方法などにより短縮することができるが、省略することはできない。このため、ヒートポンプユニット100の沸き上げ運転時間が短いほど、沸き上げ運転時間に対する運転開始からCOPや加熱能力が安定するまでに必要とする時間の割合が大きくなり、沸き上げ運転時間の平均COP、平均加熱能力が低下することになる。   As described above, the time required for the COP and heating capacity immediately after the start of operation to stabilize can be shortened by the operation method of the heat pump unit 100, but cannot be omitted. For this reason, the shorter the boiling operation time of the heat pump unit 100, the larger the ratio of the time required from the start of operation to the boiling operation time until the COP and the heating capacity are stabilized, and the average COP of the boiling operation time, The average heating capacity will decrease.

さらに、ヒートポンプユニット100の運転中に外気温度が低く、空気熱交換器4を通過する冷媒の温度が0℃以下になると、空気熱交換器4に着霜して加熱能力qが減少するため、除霜運転を実施する必要がある。除霜運転終了後の運転再開時も同様に、ヒートポンプユニット100のCOPと加熱能力qは安定時に比べて低くなる。この除霜運転は沸き上げ運転が終了するまで、所定の条件を満たした場合、例えば蒸発温度センサー9fが所定温度を所定時間検出した場合に実施される。そのため、除霜運転を実施するような外気温度にある場合、除霜運転を実施しない場合に比べ、沸き上げ運転時間の平均COP、平均加熱能力が低下することになる。   Further, when the outside air temperature is low during the operation of the heat pump unit 100 and the temperature of the refrigerant passing through the air heat exchanger 4 becomes 0 ° C. or less, the air heat exchanger 4 is frosted and the heating capacity q decreases. It is necessary to carry out defrosting operation. Similarly, when the operation is resumed after completion of the defrosting operation, the COP and the heating capacity q of the heat pump unit 100 are lower than those at the time of stabilization. This defrosting operation is performed when a predetermined condition is satisfied until the boiling operation ends, for example, when the evaporating temperature sensor 9f detects a predetermined temperature for a predetermined time. Therefore, when it is at the outside air temperature where the defrosting operation is performed, the average COP and the average heating capacity of the heating operation time are lower than when the defrosting operation is not performed.

そこで、本実施の形態では、深夜から早朝にかけて電力料金が割安になる深夜電力時間帯の開始時刻から終了時刻までヒートポンプユニット100を運転することでタンクに所定の貯湯量を確保できる加熱能力qに所定の定数を乗じる、もしくは加えることで増加させた加熱能力q’で、深夜電力時間帯の開始時刻にヒートポンプユニット100の運転を開始する。   Therefore, in the present embodiment, the heating capacity q that can secure a predetermined amount of stored hot water in the tank by operating the heat pump unit 100 from the start time to the end time of the late-night power time period when the electricity rate is cheap from midnight to early morning. The operation of the heat pump unit 100 is started at the start time of the midnight power time zone with the heating capacity q ′ increased by multiplying or adding a predetermined constant.

図3は、本発明の実施の形態に係るヒートポンプユニット100の沸き上げ運転方法を示すフローチャートである。
まず、ステップS−1において、計測制御装置10は、一定時間ごとにタンクユニット200に設置したタンク内蓄熱量算出手段、例えばタンク7に設置した貯湯温度センサー9g〜9jにより検知したタンク7内の水温により、タンク内の蓄熱量(Qr)を算出する。
FIG. 3 is a flowchart showing a boiling operation method of heat pump unit 100 according to the embodiment of the present invention.
First, in step S-1, the measurement control apparatus 10 detects the amount of heat stored in the tank 7 detected by the in-tank heat storage amount calculating means installed in the tank unit 200, for example, the hot water storage temperature sensors 9g to 9j installed in the tank 7. The amount of heat stored in the tank (Qr) is calculated from the water temperature.

次に、ステップS−2において、計測制御装置10は、目標蓄熱量Qを算出する。目標蓄熱量Qの算出は、使用者が決定するヒートポンプ給湯機の運転モードに対応する蓄熱量であっても良いし、計測制御装置10内の記憶手段に記憶された過去数日間の使用熱量から算出されるものであっても良い。   Next, in step S-2, the measurement control device 10 calculates a target heat storage amount Q. The calculation of the target heat storage amount Q may be the heat storage amount corresponding to the operation mode of the heat pump water heater determined by the user, or from the heat usage for the past several days stored in the storage means in the measurement control device 10. It may be calculated.

目標蓄熱量Qの算出後、ステップS−3において、計測制御装置10は、目標出湯温度Taを算出する。
ここで目標出湯温度Taは、タンク7内の沸き上げ可能水量算出手段により検出された沸き上げ可能水量をL[L]、目標出湯温度をTa[℃]、入水温度センサー9aにより検出された水温をTb[℃]、目標蓄熱量をQ[kJ]、タンク内蓄熱量をQr[kJ]、水の比熱をCp[kJ/kg・K]、水の密度をD[kg/m3 ]とし、以下の(式1)を満たし、あらかじめ決められた範囲内の出湯温度とする。
Ta≧Tb+(Q−Qr)/(Cp×D×L) (式1)
ここで、沸き上げ可能水量算出手段とは、例えば貯湯温度センサー9g〜9jにより検知したタンク7内の水温より算出するか、計測制御装置10内の記憶手段に記憶された過去数日間のタンクの使用水量から算出する。
After calculating the target heat storage amount Q, in step S-3, the measurement control device 10 calculates the target hot water temperature Ta.
Here, the target hot water temperature Ta is L [L], the target hot water temperature Ta [° C.] detected by the boiling water volume calculating means in the tank 7, the water temperature detected by the incoming water temperature sensor 9a. Is Tb [° C.], the target heat storage amount is Q [kJ], the tank heat storage amount is Qr [kJ], the water specific heat is Cp [kJ / kg · K], and the water density is D [kg / m 3 ]. The following (Equation 1) is satisfied and the hot water temperature is within a predetermined range.
Ta ≧ Tb + (Q−Qr) / (Cp × D × L) (Formula 1)
Here, the boiling water amount calculating means is calculated from, for example, the water temperature in the tank 7 detected by the hot water storage temperature sensors 9g to 9j, or the tank of the past several days stored in the storage means in the measurement control device 10. Calculate from the amount of water used.

次にステップS−4において、計測制御装置10は、以下の(式2)と(式3)とにより、ヒートポンプユニット100を循環する水の流量Gw[kg/s]と、ヒートポンプユニット100の加熱能力q[kW]を算出する。ここでt[s]は沸き上げ運転時間であり、計測制御装置10が検出した現在時刻から深夜電力時間帯の終了時刻までの時間である。検出時刻が午後10時、終了時刻が午前7時とすれば9時間=32400秒となる。
Gw=(Q−Qr)/{(Ta−Tb)×Cp×t} (式2)
q=Gw×Cp×(Ta−Tb)=(Q−Qr)/t (式3)
運転開始時直後の加熱能力の低い運転状態を考慮した、ヒートポンプユニット100の加熱能力q’[kW]は、(式3)により算出された加熱能力qに所定の定数Cを乗じた値であり、(式4)により算出される。
q’=C×q=(C×Gw)×Cp×(Ta−Tb)=Gw×Cp×((C×Ta)−Tb)) (式4)
(式4)では、所定の定数Cを(式1)で定める目標出湯温度Ta、(式2)で定める水の流量Gwのどちらかに乗じた形で表した。つまり、加熱能力qを所定の定数Cだけ乗じて増加させた加熱能力q’は、目標出湯温度Taか水の流量Gwに定数Cだけ乗じて増加させた値となる。また、(式3)により算出された加熱能力qに所定の定数C’を加えて増加させた加熱能力q’は(式5)により算出される。
q’=C’+q=Gw’×Cp×(Ta−Tb)=Gw×Cp×(Ta’−Tb)
(式5)
(式5)の水の流量Gw’[kg/s]と目標出湯温度Ta’[℃]は以下の(式6)と(式7)により算出される。
Gw’=Gw+C’/{(Ta−Tb)×Cp} (式6)
Ta’=Ta+C’/(Gw×Cp) (式7)
ここで、(式4)で示した所定の定数Cと、(式5)〜(式7)で示した所定の定数C’は一定値としても良いし、外気温度や加熱能力の関数としても良い。
加熱能力q’を算出後、計測制御装置10は、算出された加熱能力q’を満たすように、圧縮機1の運転周波数、膨張弁3の開度、送風ファン5の回転数、ポンプ6の回転数を決定する。
Next, in step S-4, the measurement controller 10 uses the following (formula 2) and (formula 3) to heat the heat pump unit 100 and the flow rate Gw [kg / s] of water circulating through the heat pump unit 100. Capability q [kW] is calculated. Here, t [s] is the boiling operation time, which is the time from the current time detected by the measurement control device 10 to the end time of the midnight power period. If the detection time is 10 pm and the end time is 7 am, then 9 hours = 32400 seconds.
Gw = (Q−Qr) / {(Ta−Tb) × Cp × t} (Formula 2)
q = Gw × Cp × (Ta−Tb) = (Q−Qr) / t (Formula 3)
The heating capacity q ′ [kW] of the heat pump unit 100 in consideration of the low heating capacity operation state immediately after the start of operation is a value obtained by multiplying the heating capacity q calculated by (Equation 3) by a predetermined constant C. , (Equation 4).
q ′ = C × q = (C × Gw) × Cp × (Ta−Tb) = Gw × Cp × ((C × Ta) −Tb)) (Formula 4)
In (Expression 4), the predetermined constant C is expressed by multiplying either the target hot water temperature Ta determined in (Expression 1) or the flow rate Gw of water determined in (Expression 2). That is, the heating capacity q ′ obtained by multiplying the heating capacity q by a predetermined constant C is a value obtained by multiplying the target hot water temperature Ta or the flow rate Gw of water by the constant C. Further, the heating capacity q ′ increased by adding a predetermined constant C ′ to the heating capacity q calculated by (Expression 3) is calculated by (Expression 5).
q ′ = C ′ + q = Gw ′ × Cp × (Ta−Tb) = Gw × Cp × (Ta′−Tb)
(Formula 5)
The water flow rate Gw ′ [kg / s] and the target hot water temperature Ta ′ [° C.] in (Expression 5) are calculated by the following (Expression 6) and (Expression 7).
Gw ′ = Gw + C ′ / {(Ta−Tb) × Cp} (Formula 6)
Ta ′ = Ta + C ′ / (Gw × Cp) (Formula 7)
Here, the predetermined constant C shown in (Equation 4) and the predetermined constant C ′ shown in (Equation 5) to (Equation 7) may be constant values, or as functions of the outside air temperature and the heating capacity. good.
After calculating the heating capacity q ′, the measurement controller 10 adjusts the operating frequency of the compressor 1, the opening of the expansion valve 3, the rotational speed of the blower fan 5, and the pump 6 so as to satisfy the calculated heating capacity q ′. Determine the number of revolutions.

次に、ステップS−5において、計測制御装置10は、時刻が深夜電力時間帯であるかをタイマーなどによって判断する。
深夜電力時間帯が午後11時から午前7時であるとき、検出時刻が午後10時である場合はステップS−1に戻り、検出時刻が午後11時である場合はステップS−6に進む。
Next, in step S-5, the measurement control device 10 determines whether or not the time is in the midnight power time zone using a timer or the like.
When the midnight power time zone is from 11 pm to 7 am, if the detection time is 10 pm, the process returns to step S-1, and if the detection time is 11 pm, the process proceeds to step S-6.

次に、ステップS−6において、計測制御装置10は、ステップS−4で算出された加熱能力q’が、ヒートポンプユニット100の圧縮機1が下限回転数で運転されるときの最低加熱能力qmin以上であるかを判断する。
最低加熱能力qmin以上と判断された場合は、ヒートポンプユニット100の運転を開始する。
Next, in step S-6, the measurement controller 10 determines that the heating capacity q ′ calculated in step S-4 is the minimum heating capacity qmin when the compressor 1 of the heat pump unit 100 is operated at the lower limit rotation speed. It is judged whether it is above.
When it is determined that the minimum heating capacity is qmin or more, the operation of the heat pump unit 100 is started.

加熱能力q’が最低加熱能力qmin以下である場合はヒートポンプユニット100を運転できないため、ステップS−7において、最低加熱能力qminでヒートポンプユニット100を運転した場合に、目標蓄熱量Qを確保できる運転開始時刻を算出する。
運転開始時刻を算出するために、まず、以下の(式8)で、最低加熱能力における運転時間tminを求める。ここで、最低加熱能力での運転時間をtmin[s]、最低加熱能力をqmin[kW]とする。
tmin=(Q−Qr)/qmin (式8)
最低加熱能力で運転した場合も、運転開始直後は、安定時に比べて小さい加熱能力で加熱する時間があるため、目標蓄熱量を確保するためには、tminに所定の定数Bを乗じて運転時間を長くする必要がある。そのため、運転開始時直後の加熱能力の低い運転状態を考慮した最低加熱能力qminでの運転時間tmin’[s]は以下の(式9)で算出する。
tmin’=B×tmin=B×(Q−Qr)/qmin (式9)
また、運転開始時直後の加熱能力の低い運転状態を考慮した最低加熱能力qminでの運転時間tmin’[s]は所定の定数B’を加えても良い。このときの運転時間tmin’[s]は以下の(式10)で算出する。
tmin’=B’×tmin=B’×(Q−Qr)/qmin (式10)
ここで、(式9)で示した所定の定数Bと、(式10)で示した所定の定数B’は一定値としても良いし、外気温度や加熱能力の関数としても良い。
(式9)、または(式10)で算出したtmin’[s]が21600秒=6時間で、深夜電力時間帯の終了時刻が午前7時であるときは、最低加熱能力qmin[kW]における運転開始時刻は午前1時となる。
Since the heat pump unit 100 cannot be operated when the heating capacity q ′ is equal to or less than the minimum heating capacity qmin, when the heat pump unit 100 is operated with the minimum heating capacity qmin in step S-7, an operation capable of securing the target heat storage amount Q. Calculate the start time.
In order to calculate the operation start time, first, the operation time tmin at the minimum heating capacity is obtained by the following (Equation 8). Here, the operation time at the minimum heating capacity is tmin [s], and the minimum heating capacity is qmin [kW].
tmin = (Q−Qr) / qmin (Formula 8)
Even when the operation is performed with the minimum heating capacity, immediately after the operation starts, there is a time for heating with a small heating capacity compared with the stable time. Therefore, in order to secure the target heat storage amount, the operation time is obtained by multiplying tmin by a predetermined constant B. Need to be long. Therefore, the operation time tmin ′ [s] at the minimum heating capacity qmin in consideration of the operation state with a low heating capacity immediately after the start of operation is calculated by the following (Equation 9).
tmin ′ = B × tmin = B × (Q−Qr) / qmin (Formula 9)
Further, a predetermined constant B ′ may be added to the operation time tmin ′ [s] at the minimum heating capacity qmin in consideration of an operation state with a low heating capacity immediately after the start of operation. The operation time tmin ′ [s] at this time is calculated by the following (Equation 10).
tmin ′ = B ′ × tmin = B ′ × (Q−Qr) / qmin (Formula 10)
Here, the predetermined constant B shown in (Equation 9) and the predetermined constant B ′ shown in (Equation 10) may be constant values, or may be functions of the outside air temperature and the heating capacity.
When tmin ′ [s] calculated in (Equation 9) or (Equation 10) is 21600 seconds = 6 hours and the end time of the midnight power time zone is 7:00 am, the minimum heating capacity qmin [kW] The operation start time is 1 am.

最低加熱能力qminにおける運転開始時刻算出後、ステップS−8において、最低加熱能力運転における開始時刻であるかを判断し、開始時刻であれば、ステップS−9において最低加熱能力qminでヒートポンプユニット100の運転を開始する。   After calculating the operation start time at the minimum heating capacity qmin, in step S-8, it is determined whether it is the start time in the minimum heating capacity operation. If it is the start time, the heat pump unit 100 is operated at the minimum heating capacity qmin in step S-9. Start driving.

ヒートポンプユニット100の運転開始後、ステップS−10において、計測制御装置10は所定時間ごと、例えば1時間ごとに、時刻が深夜電力時間帯終了時刻であるかをタイマーなどによって判断する。深夜電力時間帯の終了時刻と判断された場合は、ヒートポンプユニット100の運転を停止させ、沸き上げ運転が終了する。   After the operation of the heat pump unit 100 is started, in step S-10, the measurement control device 10 determines by a timer or the like whether the time is the end time of the midnight power period every predetermined time, for example, every hour. When it is determined that the end time of the midnight power time zone is reached, the operation of the heat pump unit 100 is stopped, and the boiling operation ends.

ここで、ステップS−6からステップS−8までは、ヒートポンプユニット100が最低加熱能力qminを持つ場合に、目標蓄熱量Qを確保することができる手段として有効であるが、圧縮機1に下限回転数がなく、最低加熱能力qminがない場合は必要のない手段であり、ステップS−5からステップS−9に進む。   Here, Step S-6 to Step S-8 are effective as means for ensuring the target heat storage amount Q when the heat pump unit 100 has the minimum heating capacity qmin. If there is no rotation speed and there is no minimum heating capacity qmin, this means is not necessary, and the process proceeds from step S-5 to step S-9.

ヒートポンプユニット100の運転中に除霜運転を実施した場合、除霜運転中はポンプ6が停止して加熱能力が発生しないため、除霜運転終了後にステップS−4で算出した加熱能力q’でヒートポンプユニット100の運転を継続した場合、深夜電力時間帯内に必要貯湯量を確保できなくなる。そこで、除霜運転を実施した場合には、除霜運転終了後にステップS−1に戻り、再度算出した加熱能力q’で沸き上げ運転を継続する。これにより、除霜運転を実施する場合にも必要な貯湯量を確保することができる。   When the defrosting operation is performed during the operation of the heat pump unit 100, the pump 6 is stopped during the defrosting operation and the heating capacity is not generated. Therefore, the heating capacity q ′ calculated in step S-4 after the defrosting operation is completed. When the operation of the heat pump unit 100 is continued, the necessary hot water storage amount cannot be secured within the midnight power time zone. Therefore, when the defrosting operation is performed, the process returns to step S-1 after the defrosting operation is completed, and the boiling operation is continued with the heating capacity q 'calculated again. Thereby, also when implementing a defrost operation, the amount of hot water storage required can be ensured.

また、深夜電力時間帯の開始時刻から終了時刻にかけて外気温度は低下するため、ステップS−4において計測制御装置10により定めた圧縮機1の運転周波数、膨張弁3の開度、送風ファン5の回転数によりヒートポンプユニット100の運転を継続した場合は、加熱能力q’が減少していくことがある。そこで、所定時間ごと、例えば1時間ごとステップS−1に戻り、再度、加熱能力q’を算出し、再度算出した加熱能力q’によりヒートポンプユニット100を運転することで、タンク7内に確実に必要貯湯量を確保することができる。   Further, since the outside air temperature decreases from the start time to the end time of the midnight power time period, the operation frequency of the compressor 1, the opening degree of the expansion valve 3, and the blower fan 5 determined by the measurement control device 10 in step S-4. When the operation of the heat pump unit 100 is continued depending on the number of rotations, the heating capacity q ′ may decrease. Therefore, the process returns to step S-1 every predetermined time, for example, every hour, the heating capacity q ′ is calculated again, and the heat pump unit 100 is operated with the calculated heating capacity q ′ again, so that the inside of the tank 7 is surely obtained. Necessary hot water storage can be secured.

本発明の実施の形態によれば、ヒートポンプ式給湯機でタンク7に貯湯する沸き上げ運転時に、ヒートポンプ式給湯機の加熱能力q’を、目標蓄熱量からタンク7内の蓄熱量を減じた熱量を、深夜電力時間帯の開始時刻から終了時刻までの時間で除した加熱能力に、所定の定数を乗じた、もしくは加えた加熱能力とし、深夜電力時間帯の開始時刻より運転を開始することで、運転時間平均COPを向上させ、必要な熱量を深夜電力時間帯内に確保することができる。   According to the embodiment of the present invention, the heating capacity q ′ of the heat pump water heater is reduced by subtracting the heat storage amount in the tank 7 from the target heat storage amount at the time of boiling operation for storing the hot water in the tank 7 with the heat pump water heater. The heating capacity divided by the time from the start time to the end time of the midnight power time zone is multiplied by or added to a predetermined constant, and the operation is started from the start time of the midnight power time zone. The operating time average COP can be improved, and the necessary amount of heat can be secured within the midnight power hours.

また、本実施の形態のようにヒートポンプ式給湯機を運転すると、短時間に沸き上げ運転を完了する場合に比べ、空気熱交換器4における冷媒圧力が高い状態で運転することができる。すなわち、空気熱交換器4を通過する冷媒温度が高くなるため、空気熱交換器4に着霜しにくくなり、除霜運転を実施する回数を少なくすることができる。そのため、短時間に沸き上げ運転を完了する場合に比べて、ヒートポンプ式給湯機の運転時間平均COPを向上させることができる。   In addition, when the heat pump type hot water heater is operated as in the present embodiment, the operation can be performed in a state where the refrigerant pressure in the air heat exchanger 4 is higher than in the case where the boiling operation is completed in a short time. That is, since the temperature of the refrigerant passing through the air heat exchanger 4 becomes high, frost formation on the air heat exchanger 4 becomes difficult, and the number of times of performing the defrosting operation can be reduced. Therefore, the operation time average COP of the heat pump type hot water heater can be improved as compared with the case where the boiling operation is completed in a short time.

1 圧縮機、2 水冷媒熱交換器、3 膨張弁、4 空気熱交換器、5 送風ファン、6 ポンプ、7 タンク、7a 貯湯口、7b 取水口、8a〜8f 接続配管、9a 入水温度センサー、9b 出湯温度センサー、9c 外気温度センサー、9d 吐出温度センサー、9e 吸入温度センサー、9f 蒸発温度センサー、9g〜9j 貯湯温度センサー、10 計測制御装置、100 ヒートポンプユニット、101 冷凍サイクル。   DESCRIPTION OF SYMBOLS 1 Compressor, 2 Water refrigerant heat exchanger, 3 Expansion valve, 4 Air heat exchanger, 5 Blower fan, 6 Pump, 7 Tank, 7a Hot water inlet, 7b Water intake, 8a-8f Connection piping, 9a Incoming water temperature sensor, 9b Hot water temperature sensor, 9c Outside air temperature sensor, 9d Discharge temperature sensor, 9e Intake temperature sensor, 9f Evaporation temperature sensor, 9g-9j Hot water storage temperature sensor, 10 Measurement control device, 100 Heat pump unit, 101 Refrigeration cycle.

Claims (5)

圧縮機、水冷媒熱交換器、膨張弁、及び空気熱交換器が環状に接続された冷媒回路と、
前記水冷媒熱交換器により加熱された水をタンク内に貯湯する給湯回路と、
前記タンクに貯湯する目標蓄熱量を算出する目標蓄熱量算出手段、前記タンクに貯湯されている蓄熱量を検出するタンク内蓄熱量検出手段、沸き上げ運転の加熱能力を算出する加熱能力算出手段、及び前記タンクへの沸き上げ運転を制御する運転制御手段を備え、
前記加熱能力算出手段により算出される加熱能力は、前記目標蓄熱量算出手段より算出される目標蓄熱量から、前記タンク内蓄熱量検出手段より検出されるタンク内蓄熱量を減じた熱量を、深夜電力時間帯の開始時刻から終了時刻までの時間で除した加熱能力に、所定の定数を乗じた、もしくは加えた加熱能力であり、前記沸き上げ運転を制御する運転制御手段は、深夜電力時間帯の開始時刻に沸き上げ運転を開始することを特徴とするヒートポンプ式給湯機。
A refrigerant circuit in which a compressor, a water refrigerant heat exchanger, an expansion valve, and an air heat exchanger are annularly connected;
A hot water supply circuit for storing water heated by the water refrigerant heat exchanger in a tank;
Target heat storage amount calculation means for calculating a target heat storage amount to be stored in the tank, heat storage amount detection means in the tank for detecting the heat storage amount stored in the tank, heating capacity calculation means for calculating the heating capacity of the boiling operation, And an operation control means for controlling the heating operation to the tank,
The heating capacity calculated by the heating capacity calculator is the amount of heat obtained by subtracting the amount of heat stored in the tank detected by the amount of heat stored in the tank detected from the amount of heat stored in the tank from the target amount of stored heat calculated by the target amount of stored heat. A heating capacity obtained by dividing or adding a predetermined constant to the heating capacity divided by the time from the start time to the end time of the power time zone, and the operation control means for controlling the boiling operation is a midnight power time zone A heat pump type hot water heater characterized by starting a boiling operation at the start time of.
圧縮機、水冷媒熱交換器、膨張弁、及び空気熱交換器が環状に接続された冷媒回路と、
前記水冷媒熱交換器により加熱された水をタンク内に貯湯する給湯回路と、
前記タンクに貯湯する目標蓄熱量を算出する目標蓄熱量算出手段、前記タンクに貯湯されている蓄熱量を検出するタンク内蓄熱量検出手段、沸き上げ運転の加熱能力を算出する加熱能力算出手段、及び前記タンクへの沸き上げ運転を制御する運転制御手段を備え、
前記加熱能力算出手段により算出される加熱能力は、前記目標蓄熱量算出手段より算出される目標蓄熱量から、前記タンク内蓄熱量検出手段より検出されるタンク内蓄熱量を減じた熱量を、深夜電力時間帯の開始時刻から終了時刻までの時間で除した加熱能力に、所定の定数を乗じた、もしくは加えた加熱能力であり、前記加熱能力が前記冷媒回路の最低加熱能力以上である場合は、前記沸き上げ運転を制御する運転制御手段は、深夜電力時間帯の開始時刻に沸き上げ運転を開始し、前記加熱能力が、前記冷媒回路の最低加熱能力より小さい場合は、前記最低加熱能力で目標蓄熱量を確保できる運転時刻を算出し、前記運転開始時刻から最低加熱能力で運転を開始することを特徴とするヒートポンプ式給湯機。
A refrigerant circuit in which a compressor, a water refrigerant heat exchanger, an expansion valve, and an air heat exchanger are annularly connected;
A hot water supply circuit for storing water heated by the water refrigerant heat exchanger in a tank;
Target heat storage amount calculation means for calculating a target heat storage amount to be stored in the tank, heat storage amount detection means in the tank for detecting the heat storage amount stored in the tank, heating capacity calculation means for calculating the heating capacity of the boiling operation, And an operation control means for controlling the heating operation to the tank,
The heating capacity calculated by the heating capacity calculator is the amount of heat obtained by subtracting the amount of heat stored in the tank detected by the amount of heat stored in the tank detected from the amount of heat stored in the tank from the target amount of stored heat calculated by the target amount of stored heat. When the heating capacity divided by the time from the start time to the end time of the power time zone is multiplied by or added to a predetermined constant, and the heating capacity is equal to or higher than the minimum heating capacity of the refrigerant circuit The operation control means for controlling the boiling operation starts the boiling operation at the start time of the midnight power time zone, and when the heating capacity is smaller than the minimum heating capacity of the refrigerant circuit, the minimum heating capacity is An operation time at which a target heat storage amount can be secured is calculated, and the operation is started with the minimum heating capacity from the operation start time.
前記沸き上げ運転開始後、所定時間ごとに加熱能力を算出し、前記加熱能力算出手段で算出した加熱能力に変更して沸き上げ運転を継続することを特徴とする請求項1または2に記載のヒートポンプ式給湯機。   The heating capacity is calculated every predetermined time after the start of the boiling operation, and the heating capacity is changed to the heating capacity calculated by the heating capacity calculation means, and the boiling operation is continued. Heat pump water heater. 前記沸き上げ運転中に除霜運転を行った場合、除霜運転完了後に、前記加熱能力算出手段で算出した加熱能力に変更して沸き上げ運転を継続することを特徴とする請求項1〜3のいずれかに記載のヒートポンプ式給湯機。   The defrosting operation is performed during the boiling operation, and after the defrosting operation is completed, the heating capacity is changed to the heating capacity calculated by the heating capacity calculation means, and the boiling operation is continued. The heat pump type water heater according to any one of the above. 前記目標蓄熱量算出手段は、前記タンクに蓄熱された蓄熱量検出手段と、必要蓄熱量算出手段により構成されることを特徴とする請求項1〜4のいずれかに記載のヒートポンプ式給湯機。   The heat pump type hot water heater according to any one of claims 1 to 4, wherein the target heat storage amount calculation means includes a heat storage amount detection means stored in the tank and a necessary heat storage amount calculation means.
JP2009094181A 2009-04-08 2009-04-08 Heat pump type water heater Pending JP2010243111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009094181A JP2010243111A (en) 2009-04-08 2009-04-08 Heat pump type water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009094181A JP2010243111A (en) 2009-04-08 2009-04-08 Heat pump type water heater

Publications (1)

Publication Number Publication Date
JP2010243111A true JP2010243111A (en) 2010-10-28

Family

ID=43096292

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009094181A Pending JP2010243111A (en) 2009-04-08 2009-04-08 Heat pump type water heater

Country Status (1)

Country Link
JP (1) JP2010243111A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012112568A (en) * 2010-11-24 2012-06-14 Mitsubishi Electric Corp Heat-pump type water heater
WO2012102185A1 (en) * 2011-01-24 2012-08-02 株式会社日本イトミック Hot water supply system
WO2012111063A1 (en) * 2011-02-14 2012-08-23 三菱電機株式会社 Refrigeration cycle device and refrigeration cycle control method
JP2012197968A (en) * 2011-03-22 2012-10-18 Mitsubishi Heavy Ind Ltd Heat pump system
JP2013130349A (en) * 2011-12-22 2013-07-04 Chubu Electric Power Co Inc Refrigerating device
JP2015121403A (en) * 2015-04-02 2015-07-02 ダイキン工業株式会社 Water heater
JP2015161458A (en) * 2014-02-27 2015-09-07 三菱重工業株式会社 Heat pump water heater and control method therefor
JP2017133717A (en) * 2016-01-26 2017-08-03 三菱電機株式会社 Hot water storage type hot water supply system
JP2018091517A (en) * 2016-11-30 2018-06-14 ダイキン工業株式会社 Hot water supply device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01208660A (en) * 1988-02-16 1989-08-22 Takara Standard Kk Boiling control device for electrical hot-water heater
JP2004116891A (en) * 2002-09-26 2004-04-15 Daikin Ind Ltd Heat pump type hot water supply machine
JP2004156847A (en) * 2002-11-07 2004-06-03 Matsushita Electric Ind Co Ltd Hot-water supply device
JP2004257662A (en) * 2003-02-26 2004-09-16 Denso Corp Hot-water storage type hot-water supply device
JP2005049054A (en) * 2003-07-30 2005-02-24 Denso Corp Reservoir type heat pump hot water supply system
JP2005147584A (en) * 2003-11-18 2005-06-09 Matsushita Electric Ind Co Ltd Start-up controller and start-up control method for heat pump hot water supply apparatus
JP2007278656A (en) * 2006-04-11 2007-10-25 Matsushita Electric Ind Co Ltd Heat pump water heater
JP2009162458A (en) * 2008-01-10 2009-07-23 Hitachi Appliances Inc Heat pump hot water supply system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01208660A (en) * 1988-02-16 1989-08-22 Takara Standard Kk Boiling control device for electrical hot-water heater
JP2004116891A (en) * 2002-09-26 2004-04-15 Daikin Ind Ltd Heat pump type hot water supply machine
JP2004156847A (en) * 2002-11-07 2004-06-03 Matsushita Electric Ind Co Ltd Hot-water supply device
JP2004257662A (en) * 2003-02-26 2004-09-16 Denso Corp Hot-water storage type hot-water supply device
JP2005049054A (en) * 2003-07-30 2005-02-24 Denso Corp Reservoir type heat pump hot water supply system
JP2005147584A (en) * 2003-11-18 2005-06-09 Matsushita Electric Ind Co Ltd Start-up controller and start-up control method for heat pump hot water supply apparatus
JP2007278656A (en) * 2006-04-11 2007-10-25 Matsushita Electric Ind Co Ltd Heat pump water heater
JP2009162458A (en) * 2008-01-10 2009-07-23 Hitachi Appliances Inc Heat pump hot water supply system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012112568A (en) * 2010-11-24 2012-06-14 Mitsubishi Electric Corp Heat-pump type water heater
WO2012102185A1 (en) * 2011-01-24 2012-08-02 株式会社日本イトミック Hot water supply system
WO2012111063A1 (en) * 2011-02-14 2012-08-23 三菱電機株式会社 Refrigeration cycle device and refrigeration cycle control method
JP5642207B2 (en) * 2011-02-14 2014-12-17 三菱電機株式会社 Refrigeration cycle apparatus and refrigeration cycle control method
JP2012197968A (en) * 2011-03-22 2012-10-18 Mitsubishi Heavy Ind Ltd Heat pump system
JP2013130349A (en) * 2011-12-22 2013-07-04 Chubu Electric Power Co Inc Refrigerating device
JP2015161458A (en) * 2014-02-27 2015-09-07 三菱重工業株式会社 Heat pump water heater and control method therefor
JP2015121403A (en) * 2015-04-02 2015-07-02 ダイキン工業株式会社 Water heater
JP2017133717A (en) * 2016-01-26 2017-08-03 三菱電機株式会社 Hot water storage type hot water supply system
JP2018091517A (en) * 2016-11-30 2018-06-14 ダイキン工業株式会社 Hot water supply device

Similar Documents

Publication Publication Date Title
JP2010243111A (en) Heat pump type water heater
JP4698697B2 (en) Heat pump water heater
WO2012032787A1 (en) Heat medium circulation type heat pump heater
JP2007198632A (en) Heat pump type water heater
JP3915770B2 (en) Heat pump water heater
JP2002243276A (en) Heat pump water heater
JP3901192B2 (en) Heat pump water heater
JP3737414B2 (en) Water heater
JP4513760B2 (en) Heat pump type hot water supply apparatus and control device for heat pump type hot water supply apparatus
JP3855695B2 (en) Heat pump water heater
JP2011257098A (en) Heat pump cycle device
JP2011075257A (en) Heat pump type water heater
JP5014365B2 (en) Heat pump water heater
JP5948709B2 (en) Heat pump water heater
JP5802514B2 (en) Heat pump water heater
JP2010236825A (en) Heat pump hot water supply system
JP5409474B2 (en) Water heater
JP2015190631A (en) Heat pump type hot water heater and method for controlling heat pump type hot water heater
JP5312444B2 (en) Heat pump water heater
JP5703849B2 (en) Heat pump type water heater
JP2009085476A (en) Heat pump water heater
JP6716333B2 (en) Hot water supply system
JP2009281629A (en) Heat pump water heater
JP2003056907A (en) Heat pump water heater
JP5168344B2 (en) Heat pump water heater

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110926

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20111004

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111205

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20120529