JP2010234705A - Foamed polyolefin resin coated compound piping and production process thereof - Google Patents

Foamed polyolefin resin coated compound piping and production process thereof Download PDF

Info

Publication number
JP2010234705A
JP2010234705A JP2009086436A JP2009086436A JP2010234705A JP 2010234705 A JP2010234705 A JP 2010234705A JP 2009086436 A JP2009086436 A JP 2009086436A JP 2009086436 A JP2009086436 A JP 2009086436A JP 2010234705 A JP2010234705 A JP 2010234705A
Authority
JP
Japan
Prior art keywords
polyolefin resin
coated
foamed polyolefin
composite pipe
adhesive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009086436A
Other languages
Japanese (ja)
Inventor
Shigeki Usui
茂樹 臼井
Koji Kasakura
浩二 笠倉
Takeshi Sakamoto
武司 坂本
Tomoya Okegawa
智也 桶川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Showa Denko Materials Techno Service Co Ltd
Tabuchi Corp
Original Assignee
Hitachi Chemical Techno Service Co Ltd
Tabuchi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Chemical Techno Service Co Ltd, Tabuchi Corp filed Critical Hitachi Chemical Techno Service Co Ltd
Priority to JP2009086436A priority Critical patent/JP2010234705A/en
Publication of JP2010234705A publication Critical patent/JP2010234705A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C66/00General aspects of processes or apparatus for joining preformed parts
    • B29C66/70General aspects of processes or apparatus for joining preformed parts characterised by the composition, physical properties or the structure of the material of the parts to be joined; Joining with non-plastics material
    • B29C66/71General aspects of processes or apparatus for joining preformed parts characterised by the composition, physical properties or the structure of the material of the parts to be joined; Joining with non-plastics material characterised by the composition of the plastics material of the parts to be joined

Landscapes

  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide foamed polyolefin resin coated compound piping capable of preventing the mutual separation of the piping during handling and separating without breaking its skin sheet even if branched by peeling a joint in an application. <P>SOLUTION: A peeling load of the joint is set to 43 N or larger in the foamed polyolefin resin coated compound piping which is obtained by mutually cementing the skin sheets in each of plurality of foamed polyolefin resin coated pipes in the longitudinal direction with an adhesive where the foamed polyolefin resin coated pipe is formed by coating the pipe with a foaming heat insulating material and coating the foaming heat insulating material with the skin sheet. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、発泡ポリオレフィン樹脂被覆複合配管及びその製造方法に関するものである。より具体的には、追い焚き配管、エコキュート(登録商標)配管等に使用される三層管、架橋ポリエチレン管、ポリブテン管等の長尺巻樹脂管の外周面に、保温断熱、損傷保護、防振、遮音等の目的のため断熱材及び表皮シートが被覆された発泡ポリオレフィン樹脂被覆配管(以下、「被覆配管」と称す)同士の接着加工技術に関するものである。   The present invention relates to a foamed polyolefin resin-coated composite pipe and a method for producing the same. More specifically, heat insulation and insulation, damage protection and prevention are provided on the outer peripheral surface of long-walled resin pipes such as triple-layer pipes, cross-linked polyethylene pipes, and polybutene pipes used for reheating pipes, Ecocute (registered trademark) pipes, etc. The present invention relates to an adhesion processing technique between foamed polyolefin resin-coated pipes (hereinafter referred to as “coated pipes”) coated with a heat insulating material and a skin sheet for purposes such as vibration and sound insulation.

追い焚き用配管に多く使用される被覆配管は、ボイラーを行き戻り配管にて循環させて湯を温めるため、被覆配管同士が融着された発泡ポリオレフィン樹脂被覆複合配管(以下、「被覆複合配管」と称す)が主流である。   Coated piping that is often used for reheating piping is a polyolefin polyolefin resin-coated composite pipe (hereinafter referred to as “coated composite pipe”) in which the coated pipes are fused together in order to heat the hot water by circulating the boiler in the return pipe. Is the mainstream.

この被覆複合配管を施す工法としては、一般的には、長尺生産された二本以上の被覆配管同士を長さ方向に繰り出しながら、二本の被覆配管同士を隣り合うようにさせ、隣り合う被覆配管の両外面から突き合わせ、この突き合わせ部に高温の熱風を吹き付けて、該突き合わせ部を両外面からロールで加圧し、長さ方向に全長熱融着させる方法である(以下、「熱融着法」と称す)。この熱融着法において、熱融着により二本以上の複合配管が融着された発泡ポリオレフィン樹脂被覆複合配管が形成され、この後、引き取り機を通しながら巻取りを行う。   As a method of applying this coated composite pipe, generally, two or more coated pipes produced in a long length are drawn out in the length direction, and the two coated pipes are made to be adjacent to each other, and are adjacent to each other. This is a method of butting from both outer surfaces of the coated piping, blowing hot hot air to the butting portions, pressurizing the butting portions with rolls from both outer surfaces, and heat-welding the entire length in the length direction (hereinafter referred to as “thermal fusion”). Law "). In this heat-sealing method, a foamed polyolefin resin-coated composite pipe is formed by fusing two or more composite pipes by heat-sealing, and thereafter winding is performed while passing through a take-up machine.

また、上記の方法と同様であるが、被覆配管を長さ方向で熱融着させていき、且つ長さ方向に非融着部を適宜間隔を置いて設ける方法の提案もされている(例えば、特許文献1参照)。   Further, although the same method as described above, there has also been proposed a method in which the coated pipe is thermally fused in the length direction and non-fused portions are provided at appropriate intervals in the length direction (for example, , See Patent Document 1).

このようにして得られる被覆複合配管は、長尺品の生産や断熱材の厚み、断熱材の発泡倍率、色相が変更容易であり、断熱材の表面に設けられる表皮シートの厚み、色相、シボ模様等も変更容易である。また、断熱材として、30〜50倍の高発泡品の採用や、架橋度も容易に変えられること、ならびに耐熱樹脂の使用も可能である。また断熱材の表面に貼り付けられる表皮シートには耐候処方が施されており、屋外配管をしても紫外線劣化が起き難い特徴を有している。   The coated composite pipe thus obtained is easy to change the production of long products, the thickness of the heat insulating material, the expansion ratio of the heat insulating material, and the hue, and the thickness, hue, and texture of the skin sheet provided on the surface of the heat insulating material. The pattern and the like can be easily changed. Further, as the heat insulating material, it is possible to employ a highly foamed product 30 to 50 times, to easily change the degree of crosslinking, and to use a heat resistant resin. Moreover, the weatherproofing is given to the skin sheet affixed on the surface of a heat insulating material, and it has the characteristic that ultraviolet deterioration does not occur easily even if it is outdoor piping.

特開平7−286743号公報JP-A-7-286743

しかし、前記のように熱融着法により得られた従来の被覆複合配管は、例えば搬送時に、融着部の表皮シートが破壊して被覆配管同士が分離することがあり、取り扱い性が悪いという問題が指摘されている。   However, as described above, the conventional coated composite pipe obtained by the heat fusion method may break the skin sheet of the fusion part and separate the coated pipes during transportation, for example, and the handling property is bad. Problems have been pointed out.

また、長尺生産された被覆複合配管は、その配管施工時には、ボイラー等の機器に接続する際に、必要長さにカットし、被覆複合配管の端を機器に接続させるため、被覆複合配管の熱融着部分を端から300mm〜500mm程度剥がし分離させる必要がある。しかし、この施工時の分離作業により、熱融着部分の表皮シートが破損し、断熱材がむき出しとなり、表皮シートによる保護性能が損なわれるという問題が発生している。例えば、雨水の浸入が防げなくなる。特に、表皮シートが耐候処方を施したものであるとき、上記の分離作業で表皮シートが破損し、内部の断熱材(一般に、非耐候性処方品である)が露出されるため、露出した断熱材が紫外線劣化し、やがては配管としての樹脂管そのもの迄も紫外線劣化により亀裂が発生し、樹脂管からの水漏れが発生するという問題が懸念されている。紫外線劣化は、直射日光以外にも地面からの反射光によっても発生する。   In addition, when covering pipes that have been produced in long lengths are cut to the required length when connecting to equipment such as boilers during pipe construction, the ends of the covered composite pipes are connected to the equipment. It is necessary to peel off and separate the heat-sealed portion from the end by about 300 mm to 500 mm. However, the separation work at the time of construction causes a problem that the skin sheet of the heat-sealed portion is damaged, the heat insulating material is exposed, and the protection performance by the skin sheet is impaired. For example, it will not be possible to prevent rainwater from entering. In particular, when the skin sheet is subjected to weathering prescription, the above-mentioned separation work breaks the skin sheet and exposes the internal heat insulating material (generally a non-weather resistant prescription product), so that the exposed heat insulation There is a concern that the material deteriorates with ultraviolet rays, and eventually the resin tube itself as a pipe cracks due to the ultraviolet ray deterioration and water leaks from the resin tube. Ultraviolet degradation is caused not only by direct sunlight but also by reflected light from the ground.

第一に、被覆複合配管には、その取り扱い性を向上させる上で、簡単に分離しないことが要求される。
第二に、配管施工時の分離作業時に表皮シート破損を発生させないことが要求される。従来は表皮シートが破損した箇所については化粧カバー、市販耐候性テープ等で材料費、工賃、手間等を掛けて取り付け、補修等で対応している。しかし、本来、表皮シートの破損が発生しなければ補修作業等は不要である。そのため、配管施工の分離作業時に表皮シートの破損を発生させないことが大きな課題となっている。
First, the coated composite pipe is required not to be easily separated in order to improve its handleability.
Secondly, it is required that the skin sheet is not damaged during the separation work at the time of piping construction. Conventionally, the parts where the skin sheet is damaged are dealt with by attaching, repairing, etc. with material cover, labor cost, labor, etc. with a decorative cover, commercially available weatherproof tape, etc. However, if the skin sheet is not damaged, repair work or the like is not necessary. Therefore, it has become a big subject not to generate | occur | produce the damage of a skin sheet at the time of the separation work of piping construction.

本発明者等は、上記課題を解決すべく鋭意検討を重ねた。
施工時の分離作業により、表皮シートが融着部分で破損し、表皮シートによる保護性能が損なわれる問題を解決するため、まず熱風温度等の改善検討を実施したが、熱融着法では、表皮シート融点以上の熱風温度で熱融着を実施しないと融着強度が弱く、施工前に被覆複合配管が剥がれてしまう不具合が発生することがわかった。
The present inventors have intensively studied to solve the above problems.
In order to solve the problem that the skin sheet was damaged at the fusion part due to separation work during construction, and the protection performance of the skin sheet was impaired, we first studied improvement of hot air temperature, etc. It has been found that if heat fusion is not performed at a hot air temperature equal to or higher than the melting point of the sheet, the fusion strength is weak and a problem occurs that the coated composite pipe is peeled off before construction.

そのため、熱融着法では無く、表皮シート融点温度以下で接着可能な、特定の接着剤を使用しての接着方法を取り入れることで、取り扱い性がよく、さらには配管施工時の分離作業において、融着部分の表皮シートが破損することなく分離できる発泡ポリオレフィン樹脂被覆複合配管を提供できることを見出した。
即ち本発明は、次のものに関する。
Therefore, by adopting an adhesive method using a specific adhesive that can be bonded at a temperature lower than the melting point of the skin sheet, not a heat fusion method, it is easy to handle, and further, in separation work at the time of piping construction, It has been found that a foamed polyolefin resin-coated composite pipe that can be separated without damaging the skin sheet of the fused portion can be provided.
That is, the present invention relates to the following.

(1)配管を発泡断熱材で被覆し、該発泡断熱材を表皮シートによって被覆する発泡ポリオレフィン樹脂被覆配管複数を、接着剤を用いて、各発泡ポリオレフィン樹脂被覆配管の上記表皮シート同士を長手方向で接着することにより得られる発泡ポリオレフィン樹脂複合配管であって、引き剥がし荷重が35N以上である発泡ポリオレフィン樹脂被覆複合配管。 (1) Cover the piping with a foam heat insulating material, and use a plurality of foamed polyolefin resin-coated pipes that cover the foamed heat insulating material with a skin sheet. A foamed polyolefin resin-coated pipe obtained by bonding with a foamed polyolefin resin-coated pipe having a peeling load of 35 N or more.

(2)前記引き剥がし荷重が35〜130Nである上記(1)に記載の発泡ポリオレフィン樹脂被覆複合配管。
(3)前記接着部としての引き剥がし荷重が43〜130Nである上記(1)又は(2)に記載の発泡ポリオレフィン樹脂被覆複合配管。
(4)前記接着部としての引き剥がし強度が、15〜35N/cmである上記(1)〜(3)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管。
(2) The foamed polyolefin resin-coated composite pipe according to (1), wherein the peeling load is 35 to 130 N.
(3) The foamed polyolefin resin-coated composite pipe according to the above (1) or (2), wherein a peeling load as the adhesive portion is 43 to 130N.
(4) The foamed polyolefin resin-coated composite pipe according to any one of (1) to (3), wherein the peel strength as the adhesive portion is 15 to 35 N / cm 2 .

(5)前記発泡ポリオレフィン樹脂被覆配管の表皮シートの表面が、シボ形状を有する上記(1)〜(4)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管。
(6)シボの形状が、最大幅0.5〜10mmで、高さ又は深さ0.1〜5mmの四角錐である上記(1)〜(5)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管。
(5) The foamed polyolefin resin-coated composite pipe according to any one of (1) to (4), wherein the surface of the skin sheet of the foamed polyolefin resin-coated pipe has a textured shape.
(6) The foamed polyolefin according to any one of the above (1) to (5), wherein the embossed shape is a quadrangular pyramid having a maximum width of 0.5 to 10 mm and a height or depth of 0.1 to 5 mm. Resin-coated composite piping.

(7)前記接着剤が、ポリオレフィン系樹脂を主成分としたオレフィン系樹脂ホットメルト接着剤である上記(1)〜(6)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管。
(8)前記発泡ポリオレフィン樹脂被覆配管同士の接着剤による接着部が、適宜間隔をおいて設けられる上記(1)〜(7)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管。
(7) The foamed polyolefin resin-coated composite pipe according to any one of the above (1) to (6), wherein the adhesive is an olefin resin hot melt adhesive mainly composed of a polyolefin resin.
(8) The foamed polyolefin resin-coated composite pipe according to any one of the above (1) to (7), wherein adhesive portions between the foamed polyolefin resin-coated pipes are provided at appropriate intervals.

(9)前記発泡ポリオレフィン樹脂被覆複合配管を構成する前記発泡ポリオレフィン樹脂被覆配管同士の分離を防止するための、前記発泡ポリオレフィン樹脂被覆複合配管の外周を覆う保持器具を設けた上記(1)〜(8)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管。 (9) The above (1) to (1), wherein a holder for covering the outer circumference of the foamed polyolefin resin-coated composite pipe for preventing separation of the foamed polyolefin resin-coated pipes constituting the foamed polyolefin resin-coated composite pipe is provided. The foamed polyolefin resin-coated composite pipe according to any one of 8).

(10)前記表皮シート同士を長手方向で接着する場合において、接着剤の表皮シートへの塗布時の表面温度が、表皮シートの溶融温度より低い温度である上記(1)〜(9)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管。 (10) In the case where the skin sheets are bonded together in the longitudinal direction, any one of the above (1) to (9), wherein the surface temperature when the adhesive is applied to the skin sheet is lower than the melting temperature of the skin sheet The foamed polyolefin resin-coated composite pipe according to any one of the above.

(11)配管を発泡断熱材で被覆し、該発泡断熱材を表皮シートで被覆する発泡ポリオレフィン樹脂被覆配管を複数用いて、前記表皮シート同士を長手方向で接着して発泡ポリオレフィン樹脂被覆複合配管を製造する方法において、
前記接着が、塗布時の表面温度を前記表皮シートの融点未満に調製した接着剤によりなされ、引き剥がし荷重が35N以上であることを特徴とする発泡ポリオレフィン樹脂被覆複合配管の製造方法。
(11) A plurality of foamed polyolefin resin-coated pipes that cover a pipe with a foam heat insulating material and coat the foam heat insulating material with a skin sheet, and adhere the skin sheets in the longitudinal direction to form a foamed polyolefin resin-coated composite pipe. In the manufacturing method,
The method for producing a foamed polyolefin resin-coated composite pipe, wherein the adhesion is performed with an adhesive prepared so that a surface temperature at the time of application is less than a melting point of the skin sheet, and a peeling load is 35 N or more.

(12)前記接着が、前記接着剤塗布量を制御しながら、前記発泡ポリオレフィン樹脂被覆配管で互いに向かい合う配管のうちの少なくとも一方の表皮シートに、長手方向に塗布し、前記発泡ポリオレフィン樹脂被覆配管同士を圧着することにより行われる上記(11)に記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。
(13)前記長手方向への接着剤の塗布が、適宜間隔をおいて行われる上記(11)又は(12)に記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。
(12) The adhesive is applied in the longitudinal direction to at least one skin sheet of pipes facing each other in the foamed polyolefin resin-coated pipe while controlling the amount of the adhesive applied, and the foamed polyolefin resin-coated pipes are The method for producing a foamed polyolefin resin-coated composite pipe according to the above (11), which is carried out by pressure bonding.
(13) The method for producing a foamed polyolefin resin-coated composite pipe according to the above (11) or (12), wherein the adhesive is applied in the longitudinal direction at appropriate intervals.

(14)前記接着剤の表皮シートへの塗布時の表面温度が、表皮シートの溶融温度より低い温度である上記(11)〜(13)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。
(15)前記引き剥がし荷重が35〜130Nである上記(11)〜(14)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。
(16)接着部としての引き剥がし荷重が43〜130Nである上記(11)〜(15)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。
(17)接着部としての引き剥がし強度が、15〜35N/cmである上記(11)〜(16)のいずれか一つに記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。
(14) The foamed polyolefin resin-coated composite pipe according to any one of (11) to (13), wherein a surface temperature at the time of applying the adhesive to the skin sheet is lower than a melting temperature of the skin sheet. Manufacturing method.
(15) The method for producing a foamed polyolefin resin-coated composite pipe according to any one of (11) to (14), wherein the peeling load is 35 to 130 N.
(16) The method for producing a foamed polyolefin resin-coated composite pipe according to any one of the above (11) to (15), wherein a peeling load as an adhesive portion is 43 to 130N.
(17) The method for producing a foamed polyolefin resin-coated composite pipe according to any one of the above (11) to (16), wherein the peel strength as an adhesive portion is 15 to 35 N / cm 2 .

接着剤を利用した本発明に係る発泡ポリオレフィン樹脂被覆複合配管の個々の被覆配管への引き剥がし荷重及び引き剥がし強度は、熱融着法を利用した発泡ポリオレフィン樹脂被覆複合配管の個々の被覆配管への引き剥がし荷重及び引き剥がし強度よりも大きな値となり、発泡ポリオレフィン樹脂被覆複合配管の接着部が取り扱い中に容易に分離するのを防ぐことができる。従って、本発明に係る発泡ポリオレフィン樹脂被覆複合配管は取り扱い性に優れる。   The peeling load and the peeling strength of the foamed polyolefin resin-coated composite pipe according to the present invention using an adhesive to the individual covered pipes of the foamed polyolefin resin-coated composite pipe using the heat fusion method are as follows. It becomes a value larger than the peeling load and the peeling strength, and it is possible to prevent the bonded portion of the foamed polyolefin resin-coated composite pipe from being easily separated during handling. Therefore, the foamed polyolefin resin-coated composite pipe according to the present invention is excellent in handleability.

さらにその上で、本発明に係る発泡ポリオレフィン樹脂被覆複合配管は、施工時に個々の被覆配管を接着部を引き剥がして分離させる場合又は何らかの力により分離させられる場合であっても、表皮シート等を破壊することなく、個々の被覆配管に分離可能である。
従って、表皮シート破損箇所への化粧カバー取り付け、市販耐候性テープ等での補修等が不要となり、材料費、廃棄物、工賃、作業等が軽減される。
Furthermore, even if the foamed polyolefin resin-coated composite pipe according to the present invention separates the individual coated pipes by peeling off the adhesive portions at the time of construction or is separated by some force, the skin sheet or the like is used. It can be separated into individual coated pipes without breaking.
Therefore, it is not necessary to attach a decorative cover to the damaged part of the skin sheet, repair with a commercially available weather resistant tape or the like, and material costs, waste, labor, work, etc. are reduced.

本発明の発泡ポリオレフィン樹脂被覆複合配管の一つの実施の形態の断面図を示す図である。It is a figure which shows sectional drawing of one embodiment of the foamed polyolefin resin coating composite piping of this invention. 本発明における発泡ポリオレフィン樹脂被覆配管の一つの実施の形態の断面図を示す図である。It is a figure which shows sectional drawing of one embodiment of the foamed polyolefin resin-coated piping in the present invention. 本発明の発泡ポリオレフィン樹脂被覆複合配管におけるシボ形状の一つの実施の形態示す図である。It is a figure which shows one embodiment of the embossed shape in the foaming polyolefin resin coating | coated composite piping of this invention. 本発明の発泡ポリオレフィン樹脂被覆複合配管におけるシボ形状の一つの実施の形態示す図である。It is a figure which shows one embodiment of the embossed shape in the foaming polyolefin resin coating | coated composite piping of this invention. 本発明の発泡ポリオレフィン樹脂被覆複合配管の製造方法の一つを説明する図である。It is a figure explaining one of the manufacturing methods of the foaming polyolefin resin coating composite piping of this invention. 本発明の発泡ポリオレフィン樹脂被覆複合配管に用いられる保持器具の一つの実施の形態を示す図である。It is a figure which shows one Embodiment of the holding fixture used for the foaming polyolefin resin coating composite piping of this invention.

本発明の発泡ポリオレフィン樹脂被覆複合配管(以下、「樹脂被覆複合配管」ともいう)は、配管と、該配管を被覆した発泡断熱材、及び、該発泡断熱材を被覆する表皮シートと、を有する発泡ポリオレフィン樹脂被覆配管(以下、「樹脂被覆配管」ともいう)の複数を、接着剤を用いて、各樹脂被覆配管の前記表皮シート同士を長手方向で接着することで得られる樹脂被覆複合配管であって、引き剥がし荷重が、35N以上である。この引き剥がし荷重は35〜130Nであることが好ましい。また、接着部としての引き剥がし荷重(表皮シート等が損傷することなく接着部が分離するときの引き剥がし荷重)は、43〜130Nであることが好ましい。   The foamed polyolefin resin-coated composite pipe of the present invention (hereinafter also referred to as “resin-coated composite pipe”) has a pipe, a foam heat insulating material covering the pipe, and a skin sheet covering the foam heat insulating material. A resin-coated composite pipe obtained by adhering a plurality of foamed polyolefin resin-coated pipes (hereinafter also referred to as “resin-coated pipes”) in the longitudinal direction with the skin sheets of each resin-coated pipe using an adhesive. The peeling load is 35 N or more. The peeling load is preferably 35 to 130N. Moreover, it is preferable that the peeling load as an adhesion part (peeling load when an adhesion part isolate | separates without damaging a skin sheet etc.) is 43-130N.

引き剥がし荷重が35N以上(好ましくは43N以上)であると、樹脂被覆複合配管を、巻取りや巻き出しの工程、その他の取り扱い中に、樹脂被覆配管同士が剥がれて分離することを防止するのに好ましい。接着部の引き剥がし荷重がこれより小さすぎると、配管接着力が小さくなり、樹脂被覆配管が接着部で容易に分離しやすくなる。
また、引き剥がし荷重が、大きい場合、強度の点では特に問題はないが、例えば、樹脂被覆複合配管端部の接着部を分離したいときに、人力で剥がすように分離することが困難になる傾向がある。しかし、その場合は、樹脂被覆複合配管の端部の接着部の分離を、刃物等を利用して行うこともできる。
When the peeling load is 35 N or more (preferably 43 N or more), it is possible to prevent the resin-coated composite pipes from being separated and separated during the winding and unwinding processes and other handling. Is preferred. If the peeling load of the bonded portion is too small, the pipe adhesive force is reduced, and the resin-coated pipe is easily separated at the bonded portion.
In addition, when the peeling load is large, there is no particular problem in terms of strength. However, for example, when it is desired to separate the adhesive portion of the resin-coated composite pipe end, it tends to be difficult to separate it by human power. There is. However, in that case, separation of the bonded portion at the end of the resin-coated composite pipe can be performed using a blade or the like.

引き剥がし荷重が、大きくなりすぎると上記のように樹脂被覆配管が接着部で容易には分離できなくなるだけでなく、引き剥がし時に表皮シートや断熱材の熱融着部が破壊されやすくなるので、樹脂被覆配管を接着部で分離させることを予定するときは、引き剥がし荷重は、130N以下が好ましい。   If the peeling load becomes too large, the resin-coated pipe cannot be easily separated at the bonded portion as described above, and the heat-sealed portion of the skin sheet and the heat insulating material is likely to be destroyed at the time of peeling, When it is planned to separate the resin-coated piping at the bonded portion, the peeling load is preferably 130 N or less.

本発明に係る樹脂被覆複合配管は、それを構成する複数の樹脂被覆配管が、それぞれに分離された場合に、接着部で分離し、表皮シート、断熱材の熱融着された突き合わせ部(熱融着部)その他の箇所で損傷しないものであることが好ましい。これにより、樹脂被覆複合配管に大きな力が働いたときにも、樹脂被覆配管が接着部で分離し、損傷することがないので好ましい。以上のようなことから、接着部としての引き剥がし荷重は、43〜130Nであることが好ましい。
そのために、また、表皮シートへの塗布時の接着剤の表面温度を該表皮シートの融点未満とすることが好ましい。この塗布時の温度が高すぎると、樹脂被覆配管同士の引き剥がしに対して表皮シートの強度が低下する傾向がある。
In the resin-coated composite pipe according to the present invention, when a plurality of resin-coated pipes constituting the resin-coated composite pipe are separated from each other, they are separated by an adhesive portion, and a heat-sealed butted portion (heat (Fused part) It is preferable that it is not damaged at other places. Thereby, even when a large force is applied to the resin-coated composite pipe, the resin-coated pipe is preferably separated from the bonded portion and is not damaged. From the above, it is preferable that the peeling load as the bonding portion is 43 to 130N.
Therefore, it is preferable that the surface temperature of the adhesive at the time of application to the skin sheet is less than the melting point of the skin sheet. When the temperature at the time of application is too high, the strength of the skin sheet tends to decrease with respect to peeling between the resin-coated pipes.

また、樹脂被覆複合配管の樹脂被覆配管同士の接着部としての引き剥がし強度(表皮シート等が損傷することなく接着部が分離するときの引き剥がし強度)は、35N/cm以下であることが好ましい。引き剥がし強度が大きすぎると、引き剥がし時に表皮シートが破壊されやすくなる。 Moreover, the peeling strength (peeling strength when the bonded portion is separated without damaging the skin sheet or the like) as a bonding portion between the resin-coated piping of the resin-coated composite piping may be 35 N / cm 2 or less. preferable. If the peeling strength is too large, the skin sheet is easily destroyed at the time of peeling.

また、上記の接着部としての引き剥がし強度は15N/cm以上であることが好ましい。引き剥がし強度が小さくなると、十分な引き剥がし荷重を得るために、接着剤の塗布面積が大きくなり、製造作業上、また経済的にも、不利に成りやすい。 Moreover, it is preferable that said peeling strength as said adhesion part is 15 N / cm < 2 > or more. When the peeling strength is reduced, the adhesive application area is increased in order to obtain a sufficient peeling load, which tends to be disadvantageous in terms of manufacturing operations and economically.

引き剥がし荷重を調整するには、接着剤の種類、接着剤塗布量、接着剤の塗布温度、接着時に両被覆配管の外面からのロール加圧力等を調整することにより可能である。詳細は後述する。また、引き剥がし強度を調整するには、接着剤の種類、接着剤の塗布温度、接着時に両被覆配管の外面からのロール加圧力等を調整することにより可能である。
なお、引き剥がし荷重及び引き剥がし強度は、実施例に記載する方法により測定される。但し、使用する装置は、テンシロン型引張試験機(型番:AGS−500H((株)島津製作所製))以外のものでもよい。
The peeling load can be adjusted by adjusting the type of adhesive, the amount of adhesive applied, the temperature at which the adhesive is applied, the roll pressure applied from the outer surfaces of both coated pipes during bonding, and the like. Details will be described later. Further, the peel strength can be adjusted by adjusting the type of adhesive, the temperature at which the adhesive is applied, the roll pressure applied from the outer surfaces of the both coated pipes during bonding, and the like.
The peeling load and the peeling strength are measured by the method described in the examples. However, the apparatus to be used may be other than the Tensilon type tensile tester (model number: AGS-500H (manufactured by Shimadzu Corporation)).

また、本発明の樹脂被覆複合配管は、前記長手方向での接着において、非接着部が適宜間隔をおいて設けられていてもよい。これにより、引き剥がし荷重の調整がより行いやすくなり、また、表皮シートへのダメージの軽減に役立つ。   Further, in the resin-coated composite pipe of the present invention, the non-adhered portions may be provided at appropriate intervals in the bonding in the longitudinal direction. This makes it easier to adjust the peeling load and helps reduce the damage to the skin sheet.

本発明の樹脂被覆複合配管には、前記接着部を係止、保持するための、前記樹脂被覆複合配管の外周を覆う保持器具を設けることができる。これにより、搬送時に樹脂被覆複合配管の接着部の補強に利用でき、また、その取付位置を調整することにより、施工時に樹脂被覆複合配管端部の接着部を引き剥がす場合、余分に分離するのを防ぐのに用いることができる。金具の形状、材質等については後述する。   The resin-coated composite pipe of the present invention may be provided with a holding device that covers the outer periphery of the resin-coated composite pipe for locking and holding the adhesive portion. As a result, it can be used to reinforce the adhesion part of the resin-coated composite pipe at the time of transportation, and when the attachment part is adjusted, the adhesive part at the end of the resin-coated composite pipe is peeled off during construction. Can be used to prevent The shape and material of the metal fitting will be described later.

<発泡ポリオレフィン樹脂被覆配管の構成>
まず、本発明の樹脂被覆複合配管の樹脂被覆配管の構成について説明する。
発泡ポリオレフィン樹脂被覆配管は、配管と、該配管を被覆した発泡断熱材及び該発泡断熱材を被覆する表皮シートとを含む。
<Configuration of foamed polyolefin resin-coated piping>
First, the structure of the resin-coated pipe of the resin-coated composite pipe of the present invention will be described.
The foamed polyolefin resin-coated pipe includes a pipe, a foam heat insulating material covering the pipe, and a skin sheet covering the foam heat insulating material.

(1)各構成
(配管)
上記の配管は、ポリエチレン、ポリプロピレン、エチレン−プロピレン共重合体、エチレン−酢酸ビニル共重合体、エチレン−プロピレン−ジエン共重合体等のオレフィン系共重合体のポリオレフィン樹脂等の樹脂から主になるものが好ましい。特に、アルミ箔、銅箔等の金属箔を上記樹脂で挟んだ三層構造を有する配管(「三層管」ともいう)が好ましい。
配管の形状は特に制限はなく、目的に応じた長さ、大きさ、形状とすればよい。
(1) Each configuration (piping)
The above piping is mainly made of a resin such as a polyolefin resin of an olefin copolymer such as polyethylene, polypropylene, ethylene-propylene copolymer, ethylene-vinyl acetate copolymer, ethylene-propylene-diene copolymer. Is preferred. In particular, a pipe (also referred to as “three-layer pipe”) having a three-layer structure in which a metal foil such as an aluminum foil or a copper foil is sandwiched between the above resins is preferable.
There is no restriction | limiting in particular in the shape of piping, What is necessary is just to set it as the length, the magnitude | size, and shape according to the objective.

(発泡断熱材)
発泡断熱材としては、ポリオレフィン樹脂を含む発泡性樹脂組成物を発泡させたものを用いることができる。
ポリオレフィン樹脂としては、ポリエチレン、ポリプロピレン、エチレン−プロピレン共重合体、エチレン−酢酸ビニル共重合体、エチレン−プロピレン−ジエン共重合体等のオレフィン系共重合体が単独物で又は混合物が挙げられる。
(Foam insulation)
As the foam heat insulating material, a foamed resin composition containing a polyolefin resin can be used.
Examples of the polyolefin resin include olefin copolymers such as polyethylene, polypropylene, ethylene-propylene copolymer, ethylene-vinyl acetate copolymer, and ethylene-propylene-diene copolymer alone or in a mixture.

上記の発泡性樹脂組成物には、さらに発泡剤及び架橋剤が含まれ、難燃剤、帯電防止剤、抗菌剤、顔料、充填剤、多官能性モノマー等の架橋促進剤、防蝕剤等が適宜含まれる。   The foamable resin composition further includes a foaming agent and a crosslinking agent. A flame retardant, an antistatic agent, an antibacterial agent, a pigment, a filler, a crosslinking accelerator such as a multifunctional monomer, and a corrosion inhibitor are appropriately used. included.

上記発泡剤としては、例えば、アゾジカルボンアミド、ベンゼンスルホニルヒドラジド、ジニトロソペンタメチレンテトラミン、ヒドラジカルボンアミド等の熱分解型発泡剤を用いることができる。熱分解型発泡剤の添加割合は、所望の発泡倍率に応じて適宜定めることが出来るが、ポリオレフィン樹脂100質量部に対して、2〜50質量部で使用されることが望ましく、さらには、5〜30質量部で使用されることがより好ましい。   As the foaming agent, for example, a thermal decomposition type foaming agent such as azodicarbonamide, benzenesulfonylhydrazide, dinitrosopentamethylenetetramine, hydradicarbonamide, or the like can be used. The addition ratio of the pyrolytic foaming agent can be appropriately determined according to the desired expansion ratio, but is preferably used in an amount of 2 to 50 parts by mass with respect to 100 parts by mass of the polyolefin resin. More preferably, it is used at ˜30 parts by mass.

上記架橋剤としては、ジクミルパーオキサイド、t−ブチルパーオキサイド、2,5−ジメチル−2,5−ジ(t−ブチルパーオキシ)ヘキサン、1,3−ビス(t−ブチルパーオキシイソプロピル)ベンゼン等であり、その添加量は、ポリオレフィン樹脂100質量部に対し、0.1〜3.0質量部が一般的である。   Examples of the crosslinking agent include dicumyl peroxide, t-butyl peroxide, 2,5-dimethyl-2,5-di (t-butylperoxy) hexane, 1,3-bis (t-butylperoxyisopropyl). Benzene or the like, and the addition amount is generally 0.1 to 3.0 parts by mass with respect to 100 parts by mass of the polyolefin resin.

前記発泡性樹脂組成物において、ポリオレフィン樹脂成分中に、高密度ポリエチレン(HDPE)を25質量%以上含有させることにより、より剛性を付与することができ、延伸性を小さくする上で好ましい。また、これにより、表皮シートにシボ模様を加工する際、シボ模様の加熱・加圧による発泡断熱材の変形くずれをより少なくするこができる。
上記HDPEは、前記の発泡性樹脂組成物において、樹脂成分中に、60質量%以下にすることが押出発泡をしやすくする点から好ましい。
In the foamable resin composition, by incorporating 25% by mass or more of high-density polyethylene (HDPE) in the polyolefin resin component, more rigidity can be imparted, which is preferable in reducing stretchability. In addition, this makes it possible to reduce deformation deformation of the foam heat insulating material due to heating and pressurization of the texture pattern when processing the texture pattern on the skin sheet.
In the foamable resin composition, the HDPE is preferably 60% by mass or less in the resin component from the viewpoint of facilitating extrusion foaming.

上記発泡断熱材の架橋度は、耐熱性と製造作業性の観点から、40〜80%が好ましく、さらに50〜75%、60〜70%の範囲が順次好ましい。
ここで言う架橋度(ゲル分率)とは、試料を約0.3g採取、これを沸騰キシレン中(約130℃)で8Hr以上抽出後、風乾にて16Hr以上放置し、更に風乾後の試料を80℃雰囲気にて4Hr以上放置したものを抽出後の質量とし、次式により算出した値である。
「架橋度(ゲル分率)(%)= 抽出後の試料質量/抽出前の試料質量×100」
The degree of cross-linking of the foam insulation is preferably 40 to 80%, more preferably 50 to 75% and 60 to 70% from the viewpoint of heat resistance and manufacturing workability.
The degree of cross-linking (gel fraction) here refers to a sample obtained by collecting about 0.3 g of a sample, extracting it in boiling xylene (about 130 ° C.) for 8 hours or more, leaving it to stand for 16 hours or more by air drying, and further air-drying the sample. Is a value calculated by the following equation, with the mass after extraction being left for 4 hours or more in an 80 ° C. atmosphere.
“Degree of crosslinking (gel fraction) (%) = sample mass after extraction / sample mass before extraction × 100”

発泡倍率については10〜50倍程度のものが使用されるが、断熱性の点で30〜50倍のものが望ましい。
厚みは2〜25mm程度の範囲のものが、保温断熱性、損傷防護性、防振遮音性、経済性、施工性、取り扱い運搬性等の点で好ましい。
A foaming ratio of about 10 to 50 times is used, but 30 to 50 times is desirable in terms of heat insulation.
A thickness in the range of about 2 to 25 mm is preferable in terms of heat insulation and heat insulation, damage protection, vibration and sound insulation, economy, workability, handling and transportability, and the like.

発泡断熱材の製法としては、種々の方法を用いることができるが、前記発泡性樹脂組成物を押出発泡成形することが好ましく、また、シート状に成形することが好ましい。そのために、発泡成形装置として、Tダイを備えた押出機を使用することが好ましい。前記発泡性樹脂組成物としては、架橋剤を含まないものを使用することができるが、この場合には、発泡成形中に、電離性放射線を照射することによって架橋することができる。電離性照射線としては、α線、β線又はγ線が好ましいが、X線や紫外線等を用いても良い。この放射線照射量は架橋促進剤の種類や量によって異なるが、通常5〜20Mradで好ましくは3〜10Mradである。   Various methods can be used as a method for producing the foam heat insulating material, but the foamable resin composition is preferably extrusion-foamed, and preferably formed into a sheet. Therefore, it is preferable to use an extruder equipped with a T die as the foam molding apparatus. As the foamable resin composition, those not containing a crosslinking agent can be used. In this case, the foamable resin composition can be crosslinked by irradiating ionizing radiation during foam molding. As the ionizing radiation, α rays, β rays, or γ rays are preferable, but X rays, ultraviolet rays, or the like may be used. The amount of radiation irradiation varies depending on the type and amount of the crosslinking accelerator, but is usually 5 to 20 Mrad, preferably 3 to 10 Mrad.

(表皮シート)
表皮シートの材料としては、ポリエチレン樹脂、ポリプロピレン樹脂等の非架橋ポリオレフィン樹脂;ポリエステル樹脂;エチレンビニルアクリレート共重合体;ポリ塩化ビニル;等がある。
発泡断熱材として、ポリエチレン樹脂やポリプロピレン樹脂等のポリオレフィン樹脂が使用される場合は、これらとの熱ラミネート作業性の観点と環境性に配慮して、表皮シートの材料としては、ポリエチレン樹脂、ポリプロピレン樹脂等の非架橋ポリオレフィン樹脂が好ましい。
(Skin sheet)
Examples of the material for the skin sheet include non-crosslinked polyolefin resins such as polyethylene resins and polypropylene resins; polyester resins; ethylene vinyl acrylate copolymers; polyvinyl chloride;
When polyolefin resin such as polyethylene resin or polypropylene resin is used as foam insulation, considering the viewpoint of thermal laminating workability with these and environmental properties, the material of the skin sheet is polyethylene resin, polypropylene resin Non-crosslinked polyolefin resins such as are preferred.

この表皮シートには、材料の樹脂に紫外線吸収剤を混入して、耐光性処方を施しても何ら問題はない。紫外線吸収剤としては、2−[5−クロロ(2H)−ベンゾトリアゾール−2−イル]−4−メチル−6−(tert−ブチル)フェノール,ビス(2,2,6,6−テトラメチル−4−ピペリジル)セバケート、ポリ[{6−(1,1,3,3−テトラメチルブチル)アミノ−1,3,5−トリアジン−2,4−ジイル}{2,2,6,6−テトラメチル−4−ピペリジル}イミノ]ヘキサメチレン{(2,2,6,6−テトラメチル−4−ピペリジル)イミノ}]、コハク酸ジメチルと4−ヒドロキシ−2,2,6,6−テトラメチル−1−ピペリジンエタノールの重合物等が一般的に用いられる。また、上記表皮シートの材料樹脂に酸化防止剤、難燃剤、スリップ剤、密着性向上材、顔料等を、混入しても構わない。   In this skin sheet, there is no problem even if a UV-absorbing agent is mixed into the material resin and light-resistant prescription is applied. Examples of the ultraviolet absorber include 2- [5-chloro (2H) -benzotriazol-2-yl] -4-methyl-6- (tert-butyl) phenol, bis (2,2,6,6-tetramethyl- 4-piperidyl) sebacate, poly [{6- (1,1,3,3-tetramethylbutyl) amino-1,3,5-triazine-2,4-diyl} {2,2,6,6-tetra Methyl-4-piperidyl} imino] hexamethylene {(2,2,6,6-tetramethyl-4-piperidyl) imino}], dimethyl succinate and 4-hydroxy-2,2,6,6-tetramethyl- A polymer of 1-piperidine ethanol is generally used. Moreover, you may mix antioxidant, a flame retardant, a slip agent, an adhesive improvement material, a pigment, etc. into the material resin of the said skin sheet.

上記表皮シートは、形態としては、フィルム状、不織布状、織布状等いずれの形態のものでもよい。   The skin sheet may have any form such as a film form, a nonwoven cloth form, and a woven cloth form.

表皮シートを製造する方法としては、インフレーション法、Tダイ法、キャスティング法等の製膜技術を利用することができる。表皮シートの材料をポリエステルとする場合、発泡断熱材との接着性を高めるために、ポリエステルシートの融着面をプライマー処理したものやポリオレフィンを予めコートしたものを用いても良い。   As a method for producing the skin sheet, a film forming technique such as an inflation method, a T-die method, or a casting method can be used. When the material of the skin sheet is polyester, in order to enhance the adhesiveness with the foamed heat insulating material, a polyester sheet fused surface or a polyolefin coated in advance may be used.

表皮シートの厚みは、取り扱い性、損傷防護性等の点から30〜500μmのものが望ましい。更に、シボ模様の付与と保持の点から50〜300μmのものが好ましく、また、耐候性の点から100以上のものが好ましく、取扱性の点からは、300μm以下がより好ましく、さらに250μm以下が好ましい。   The thickness of the skin sheet is preferably 30 to 500 μm from the viewpoints of handleability and damage protection. Furthermore, the thing of 50-300 micrometers is preferable from the point of provision and holding | maintenance of a wrinkle pattern, and the thing of 100 or more is preferable from the point of a weather resistance, From the point of handling property, 300 micrometers or less are more preferable, Furthermore, 250 micrometers or less are preferable. preferable.

表皮シートの表面には、シボ模様が形成されていることが好ましい。表皮シートの表面にシボ模様が形成されていれば、配管施工時に、曲げ加工を施した箇所のシワ防止や取り扱い性において、また、接触面積が小さくなることから傷が付き難い効果がある。また意匠性の観点からも、表面にシボ模様を有していることが好ましい。
シボの形状は、断面が、三角形、台形、半円形、さい円形、半楕円形その他の形状をとることができる。
また、シボ1個の平面形状は、三角形、四角形、台形、円形、さい円形、楕円形その他の形状をとることができる。
A wrinkle pattern is preferably formed on the surface of the skin sheet. If a wrinkle pattern is formed on the surface of the skin sheet, there is an effect that it is difficult to be damaged due to the prevention of wrinkles and handling of the bent portion at the time of piping construction and because the contact area is reduced. Also, from the viewpoint of design properties, it is preferable that the surface has a texture pattern.
The cross-sectional shape of the texture may be triangular, trapezoidal, semi-circular, dice-shaped, semi-elliptical or other shapes.
Further, the planar shape of one grain can be a triangle, a quadrangle, a trapezoid, a circle, a round circle, an ellipse, or other shapes.

シボの大きさは、最大幅(平面形状が内接する円の直径又は細長い形状であれば、その幅のうち最大の大きさ)が0.5〜10mmが好ましく、1〜5mmがより好ましく、また、高さ又は深さが0.1〜5mmが好ましく、0.5〜3mmがより好ましい。
前記のシボは、必ずしも連続して配置される必要はなく、適宜途中で途切れていてもよい。
The size of the wrinkle is preferably 0.5 to 10 mm, more preferably 1 to 5 mm, and the maximum width (the maximum size of the width if the planar shape is an inscribed circle diameter or an elongated shape) is also preferred. The height or depth is preferably from 0.1 to 5 mm, more preferably from 0.5 to 3 mm.
The wrinkles need not necessarily be arranged continuously, and may be interrupted appropriately.

また、シボとしては、細長く連続した形状のものであってもよく、特に長手方向に長く連続したシボをタテシボという。このような細長く連続したシボのピッチは0.5〜20mmが好ましく、1〜5mmがより好ましい。最大幅は、0.5〜10mmが好ましく、1〜5mmがより好ましく、また、高さ又は深さが0.1〜5mmが好ましく、0.5〜3mmがより好ましい。また、その断面形状は三角形、台形、半円形、さい円形、半楕円形その他の形状をとることができる。   Further, the wrinkles may have a shape that is elongated and continuous, and wrinkles that are long and continuous in the longitudinal direction are called vertical wrinkles. The pitch of such elongated and continuous texture is preferably 0.5 to 20 mm, and more preferably 1 to 5 mm. The maximum width is preferably 0.5 to 10 mm, more preferably 1 to 5 mm, and the height or depth is preferably 0.1 to 5 mm, more preferably 0.5 to 3 mm. Moreover, the cross-sectional shape can take a triangular shape, a trapezoidal shape, a semi-circular shape, a circular shape, a semi-elliptical shape or the like.

上記のシボの形成方法としては、後記する断熱シートの表皮シート表面をバーナー等の加熱手段で加熱溶融し、その表面にシボ模様に対応したシボロールを押圧して冷却し形状を付与固定化する方法がある。
また、樹脂被覆配管又は被覆複合配管を製造する工程で表皮シート付き発泡断熱材の表面に上記と同様の方法でシボを付与固定化してもよい。
さらに、表皮シートを軟化し、続いてエンボスロールで挟んで冷却し、シボ形状を付与してシボ模倣付き表皮シートを得ることができる。このとき、シボ模倣付き表皮シートと断熱材とは、接着剤で貼り合わせることが好ましい。
シボの形状は、具体的には、例えば、図3及び図4に示すようなシボ形状5aやシボ形状5bが挙げられる。
As a method of forming the above-mentioned texture, a surface sheet surface of a heat insulating sheet to be described later is heated and melted by a heating means such as a burner, and a texture roll corresponding to the texture pattern is pressed and cooled on the surface to cool and impart a shape. There is.
In addition, in the process of manufacturing the resin-coated pipe or the coated composite pipe, a texture may be applied and fixed to the surface of the foam heat insulating material with a skin sheet by the same method as described above.
Furthermore, the skin sheet can be softened, then sandwiched between embossing rolls and cooled to give a textured shape to obtain a skin sheet with a textured imitation. At this time, it is preferable that the skin sheet with imitation imitation and the heat insulating material are bonded together with an adhesive.
Specifically, examples of the shape of the embossing include an embossing shape 5a and an embossing shape 5b as shown in FIGS.

配管を被覆するための発泡断熱材と該発泡断熱材を被覆する表皮シートとは、これらを配管の被覆に適用する前に予め一体化して、断熱シートとして使用することが好ましい。この断熱シートは、シート状の発泡断熱材一方の面に表皮シートを接着剤で貼着して、あるいは、融着して作製することができる。融着は、例えば、断熱材の表面をバーナー等で加熱し、その表面を溶融させて、これに表皮シートを加圧ローラーを通して積層することにより行うことができる。この後、引き続き、前記したシボ模様の形成を行うことができる。
後述するが、樹脂被覆配管は、断熱シートを、配管に巻きつけることにより作製することが特に好ましい。
シート状の発泡断熱材と表皮シートとを積層することにより、延伸変形されにくい構造体にすることができる。
It is preferable that the foam heat insulating material for covering the pipe and the skin sheet covering the foam heat insulating material are integrated in advance and used as a heat insulating sheet before they are applied to the pipe covering. This heat insulating sheet can be produced by adhering a skin sheet to one surface of a sheet-like foam heat insulating material with an adhesive or by fusing. The fusing can be performed, for example, by heating the surface of the heat insulating material with a burner or the like, melting the surface, and laminating the skin sheet on this through a pressure roller. Thereafter, the above-described embossed pattern can be formed.
As will be described later, the resin-coated pipe is particularly preferably produced by winding a heat insulating sheet around the pipe.
By laminating the sheet-like foam heat insulating material and the skin sheet, it is possible to obtain a structure that is hardly stretched and deformed.

(2)樹脂被覆配管
樹脂被覆配管は、次のようにして製造することができる。
まず、配管を長手方向に繰り出す一方、上記断熱シートを長手方向に繰り出しながら、該断熱シート配管外周を覆うように湾曲変形させていく。
(2) Resin-coated piping The resin-coated piping can be manufactured as follows.
First, while the pipe is fed out in the longitudinal direction, the heat insulating sheet is fed out in the longitudinal direction, and is curved and deformed so as to cover the outer periphery of the heat insulating sheet pipe.

次に、上記断熱シートのシート幅方向の両端部が突き合うようにし、この突き合わされた両端部に高温(例えば、約200〜250℃)の熱風を吹き付けて、該両端部を製筒機にて熱融着する。これにより配管を包む形で断熱シートで被覆された樹脂被覆配管が作製される。この後、冷却し、樹脂被覆配管の巻取りを行う。   Next, both end portions in the sheet width direction of the heat insulating sheet are abutted, and hot air of high temperature (for example, about 200 to 250 ° C.) is blown to the abutted both end portions, and the both end portions are applied to the cylinder making machine. And heat-seal. As a result, a resin-coated pipe covered with the heat insulating sheet is formed so as to wrap the pipe. Then, it cools and winds up resin-coated piping.

上記の断熱シートの代わりに、シート状発泡断熱材を用いて、発泡断熱材で被覆された配管を作製し、さらに、同様にして表皮シートを発泡断熱材で被覆された配管に、好ましくは、両端部が少し重なるようにして巻き付け、表皮シートの両端部を融着することによっても樹脂被覆配管を作製することができる。この場合、融着する代わりに、表皮シートの内面に接着剤を塗布しておき、表皮シートを発泡断熱材に貼り合わせるようにしてもよい。   Instead of the above heat insulating sheet, using a sheet-like foam heat insulating material, to produce a pipe covered with a foam heat insulating material, and in the same way to a pipe covered with a foam heat insulating material, preferably, The resin-coated pipe can also be produced by winding the two end portions so that they overlap slightly and fusing both end portions of the skin sheet. In this case, instead of fusing, an adhesive may be applied to the inner surface of the skin sheet, and the skin sheet may be bonded to the foam heat insulating material.

樹脂被覆配管の一つの実施の形態を図2に示す。図2は、樹脂被覆配管7の断面図である。配管1が、発泡断熱材3と表皮シート4とを有する断熱シート20で被覆されている。断熱シート20は、シート状のものが、配管1を被覆するように湾曲変形され、シート幅方向の両端部が突き合わされるように熱融着され、熱融着部6を形成している。   One embodiment of the resin-coated piping is shown in FIG. FIG. 2 is a cross-sectional view of the resin-coated pipe 7. The pipe 1 is covered with a heat insulating sheet 20 having a foam heat insulating material 3 and a skin sheet 4. The heat insulating sheet 20 is curved and deformed so as to cover the pipe 1 and is heat-sealed so that both end portions in the sheet width direction are abutted to form the heat-sealing portion 6.

断熱材3を配管1に貼着又は融着させて固定する方法が場合により、有効である。この場合、断熱材3と配管1の接触面全体を貼着又は融着させてもよいが、この場合複合配管が湾曲しにくくなるため、部分的に、より好ましくは、間隔をおいた点状に貼着又は融着させ、隙間2を有していることが好ましい。   In some cases, a method of fixing the heat insulating material 3 by adhering or fusing it to the pipe 1 is effective. In this case, the entire contact surface between the heat insulating material 3 and the pipe 1 may be adhered or fused. In this case, however, the composite pipe is less likely to bend, and therefore, more preferably, a point-like shape with an interval. It is preferable to have a gap 2 by adhering or fusing.

<発泡ポリオレフィン樹脂被覆複合配管>
発泡ポリオレフィン樹脂被覆複合配管は、樹脂被覆配管を複数本接着して一体化したものである。
本発明の樹脂被覆複合配管は、前記樹脂被覆配管を複数用いて、各樹脂被覆配管の表皮シート同士を長手方向で接着する方法によって製造され、上記接着が、上記表皮シートの融点未満に塗布時の表面温度を調製した接着剤を用いて行われる。結果として得られる樹脂被覆複合配管における樹脂被覆配管同士の引き剥がし荷重が、35N以上であることを特徴とする。前記したように引き剥がし荷重は、130N以下が好ましい。また、樹脂被覆配管同士の接着部としての引き剥がし強度は、15〜35N/cmであることが好ましい。引き剥がし荷重、接着部としての引き剥がし荷重、接着部としての引き剥がし強度については、前記の通りである。
<Foamed polyolefin resin-coated composite piping>
The foamed polyolefin resin-coated composite pipe is formed by bonding and integrating a plurality of resin-coated pipes.
The resin-coated composite pipe of the present invention is produced by a method in which a plurality of the resin-coated pipes are used and the skin sheets of the resin-coated pipes are bonded in the longitudinal direction, and the adhesion is applied below the melting point of the skin sheet. The surface temperature is adjusted using an adhesive. The resulting resin-coated composite pipe has a peel load between the resin-coated pipes of 35 N or more. As described above, the peeling load is preferably 130 N or less. Moreover, it is preferable that the peeling strength as an adhesion part of resin-coated piping is 15-35 N / cm < 2 >. The peeling load, the peeling load as the bonding portion, and the peeling strength as the bonding portion are as described above.

上記接着に用いる接着剤には、CR系(溶剤系)接着剤、エマルジョン系接着剤、ホットメルト等を用いることができるが、設備投資、安全性を考慮し、乾燥設備不要、無溶剤で取り扱いが容易なホットメルト接着剤が望ましい。ホットメルト接着剤にも反応系、EVA系、オレフィン系等多種であるが、その中でもオレフィン系に対して接着強度が強く、リサイクル性の高い熱可塑性樹脂(特にポリオレフィン系樹脂)を主成分とするオレフィン系樹脂ホットメルト接着剤がより望ましい。   As the adhesive used for the above bonding, CR (solvent) adhesives, emulsion adhesives, hot melts, etc. can be used. Hot melt adhesives that are easy to handle are desirable. There are various types of hot melt adhesives such as reaction system, EVA system, olefin system, etc. Among them, thermoplastic resin (especially polyolefin resin) with high adhesive strength and high recyclability is the main component. An olefin resin hot melt adhesive is more desirable.

なお、ホットメルト接着剤の融点は、表皮シートの材料として用いられる樹脂の融点未満であることが好ましい。表皮シートの材料として用いられる樹脂の融点以上のホットメルト接着剤を用いた場合、得られた樹脂被覆複合配管の接着部分を作業中に剥がし分離させる場合、表皮シートが破損する恐れがある。オレフィン系樹脂ホットメルト接着剤は、表皮シートの材料を考慮して、適宜選択する。
なお、表皮シートに用いられる樹脂の融点温度は、例えば、示差走査熱量計(DSC)により測定することができる。
The melting point of the hot melt adhesive is preferably less than the melting point of the resin used as the material for the skin sheet. When a hot-melt adhesive having a melting point equal to or higher than the melting point of the resin used as the material for the skin sheet is used, the skin sheet may be damaged when the bonded portion of the obtained resin-coated composite pipe is peeled off during the work. The olefin resin hot melt adhesive is appropriately selected in consideration of the material of the skin sheet.
In addition, melting | fusing point temperature of resin used for a skin sheet can be measured with a differential scanning calorimeter (DSC), for example.

接着剤の塗布時の表面温度の測定法は、日油技研工業(株)製のサーモラベルに溶融した測定対象のホットメルト接着剤を塗布し、塗布面のラベル変色目視により表面温度を測定することができる。   The method of measuring the surface temperature at the time of applying the adhesive is to apply the molten hot melt adhesive to be measured to a thermolabel manufactured by NOF Giken Kogyo Co., Ltd., and measure the surface temperature by visually checking the label discoloration on the coated surface. be able to.

前記オレフィン系樹脂ホットメルト接着剤を前記樹脂被覆配管の隣り合う二本のうちの少なくとも一方の表皮シートに、長手方向で直線上に塗布し、前記樹脂被覆配管同士を圧着させることにより、樹脂被覆複合配管を得ることも好ましい。このとき、接着剤は、塗布量、接着剤の温度は適宜制御しながら、(好ましくは、適正量になるように自動制御しながら)塗布される。   The olefin-based resin hot melt adhesive is applied to at least one of the two adjacent skin sheets of the resin-coated pipe in a straight line in the longitudinal direction, and the resin-coated pipes are pressure-bonded to each other to form a resin coating It is also preferable to obtain composite piping. At this time, the adhesive is applied while preferably controlling the amount of application and the temperature of the adhesive (preferably, automatically controlling the amount to be an appropriate amount).

また、得られた樹脂被覆複合配管は、前記接着部の分離を防止するための、前記樹脂被覆複合配管の外周を覆う保持器具を設けることができる。保持器具は、また、適宜脱着可能なものであることが好ましい。保持器具は、形状、材質等を特に制限されない。   Moreover, the obtained resin-coated composite pipe can be provided with a holding device for covering the outer periphery of the resin-coated composite pipe for preventing separation of the adhesive portion. It is preferable that the holding device is removable as appropriate. The holding device is not particularly limited in shape, material, and the like.

形状の一つの例として、例えば、図6に示すような、樹脂被覆複合配管を外周から覆うように保持できる、断面が長円で且つ樹脂被覆複合配管を挿入するための開口が設けられている形状の保持器具が挙げられる。なお、図6の(a)は正面図であり、図6の(b)は、底面図である。   As an example of the shape, for example, as shown in FIG. 6, the resin-coated composite pipe can be held so as to cover from the outer periphery, and an opening for inserting the resin-coated composite pipe is provided. A shape holding device is mentioned. 6A is a front view, and FIG. 6B is a bottom view.

保持器具の材質としては、アルミ、鉄や、これらの合金等の金属でもよいし、ABS樹脂、AAS樹脂等の樹脂でもよい。樹脂被覆複合配管の脱着がしやすいように、弾力のある材質が好ましい。   The material of the holding device may be a metal such as aluminum, iron, or an alloy thereof, or may be a resin such as ABS resin or AAS resin. An elastic material is preferable so that the resin-coated composite pipe can be easily detached.

二本の配管は、対になっている被覆配管ガイドロール13を通ることにより被覆されて発泡ポリオレフィン樹脂被覆配管9となり、該上記発泡ポリオレフィン樹脂被覆配管9の二本は被覆配管9同士が徐々に隣り合うように、しかし、離間して、該被覆配管の長手方向に同時に連続的に繰り出す。次に、図5に示すように隣り合う被覆配管を接触させるが、その直前に、溶融したホットメルト接着剤をホットメルトノズル12から吹き出して一方の樹脂被覆配管に塗布する。ホットメルト接着剤は、ホットメルトアプリケーターにて溶融(例えば、溶融温度120〜160℃)し、塗布時のホットメルト接着剤表面温度を表皮シートの融点(例えば、100〜130℃)より低い温度(例えば、80〜100℃)に調製する。接着剤の塗布は、被覆配管の長手方向に直線状に適当な塗布幅でかつ適当な塗布量になるように制御される。上記接触部を両外面から対の加圧ロール11で加圧して表皮シート同士を接着させることにより、二本の被覆配管が接着された被覆複合配管10が作製される。このようにして連続して生成する被覆複合配管は、引取装置により引取ながら巻き取ることができる。   The two pipes are coated by passing through a pair of coated pipe guide rolls 13 to form a foamed polyolefin resin-coated pipe 9. It feeds out continuously at the same time in the longitudinal direction of the coated pipes so as to be adjacent but spaced apart. Next, as shown in FIG. 5, adjacent coated pipes are brought into contact, but immediately before that, the molten hot melt adhesive is blown out from the hot melt nozzle 12 and applied to one resin-coated pipe. The hot melt adhesive is melted by a hot melt applicator (for example, a melting temperature of 120 to 160 ° C.), and the surface temperature of the hot melt adhesive at the time of application is lower than the melting point (for example, 100 to 130 ° C.) of the skin sheet ( For example, 80-100 degreeC). The application of the adhesive is controlled so as to have an appropriate application width and an appropriate application amount linearly in the longitudinal direction of the coated pipe. The above-mentioned contact portion is pressed from both outer surfaces with a pair of pressure rolls 11 to adhere the skin sheets to each other, thereby producing a coated composite pipe 10 in which two covered pipes are bonded. The coated composite pipe continuously generated in this way can be wound up while being taken up by the take-up device.

上記した接着剤の塗布幅及び塗布量は、引き剥がし荷重、引き剥がし強度を調節するために適宜決定されるが、塗布幅は0.1〜1.5cm、塗布量は、管の長手方向に0.4〜4g/mが好ましい。塗布幅は0.15〜1.1cm、塗布量は、管の長手方向に0.5〜3.5g/mがそれぞれより好ましい。これらの値が大きすぎても小さすぎても引き剥がし荷重及び引き剥がし強度を上記のように調整することが難しくなる傾向がある。
また、接着部を管の長手方向に適宜間隔をとって設けるために、接着剤を、管の長手方向に、適宜間隔をもって塗布する場合、接着剤塗布の間隔は100mm以下、接着剤の塗布の長さは50mm以上であることが好ましい。間隔が大きすぎたり、塗布幅が小さすぎると、性能の達成上また、製造上困難になる傾向がある。
The application width and application amount of the above-mentioned adhesive are appropriately determined in order to adjust the peeling load and the peeling strength, but the application width is 0.1 to 1.5 cm, and the application amount is in the longitudinal direction of the tube. 0.4 to 4 g / m is preferable. More preferably, the coating width is 0.15 to 1.1 cm, and the coating amount is 0.5 to 3.5 g / m in the longitudinal direction of the tube. If these values are too large or too small, it tends to be difficult to adjust the peeling load and the peeling strength as described above.
Further, in order to provide the adhesive portion with an appropriate interval in the longitudinal direction of the tube, when the adhesive is applied with an appropriate interval in the longitudinal direction of the tube, the adhesive application interval is 100 mm or less, and the adhesive is applied. The length is preferably 50 mm or more. If the interval is too large or the coating width is too small, it tends to be difficult to achieve performance and manufacture.

本発明に係る樹脂被覆複合配管の一例の断面図を、図1に示す。樹脂被覆複合配管10は、配管1と、該配管1を被覆する断熱シート20(断熱シート20は、発泡断熱材3と、該発泡断熱材3を被覆する表皮シート4とを有する)と、を有する樹脂被覆配管7を複数用いて(図1においては、二本)、樹脂被覆配管7の表皮シート同士を長手方向で接着して構成され、樹脂被覆配管7は、接着部8により接着されている。
本発明の樹脂被覆複合配管は、運搬中等に簡単に分離することなく、また、配管施工時の分離作業時に表皮シート破損を発生させずに、分離できるものである。
A cross-sectional view of an example of the resin-coated composite pipe according to the present invention is shown in FIG. The resin-coated composite pipe 10 includes a pipe 1 and a heat insulating sheet 20 that covers the pipe 1 (the heat insulating sheet 20 includes a foam heat insulating material 3 and a skin sheet 4 that covers the foam heat insulating material 3). A plurality of the resin-coated pipes 7 (two in FIG. 1) are used, and the skin sheets of the resin-coated pipes 7 are bonded in the longitudinal direction. The resin-coated pipes 7 are bonded by the bonding portions 8. Yes.
The resin-coated composite pipe of the present invention can be separated without being easily separated during transportation or the like and without causing damage to the skin sheet during separation work during pipe construction.

本発明を更に具体的に説明するために、以下に実施例及び比較例を示すが、本発明は、以下の実施例によって何ら限定されるものではない。   In order to describe the present invention more specifically, examples and comparative examples are shown below, but the present invention is not limited to the following examples.

(1)断熱シートの製造法(片面)
シート状発泡断熱材(ロール状に巻いた化学架橋したポリエチレンフォーム、架橋度:65%、厚さ:10.0mm、発泡倍率:30倍、製品名:ハイエチレンS、日立化成工業(株)製)を繰り出しながらその一方の表面をバーナーで加熱し、その表面を溶融させて、これに表皮シートとしてのLDPEフィルム(厚さ:150μm、ロール状に巻いたもの)を繰り出しながら、シボロール(15℃に冷却しているもの)で加圧下に積層して融着させるとともにその表面にシボを形成し、生成する積層体(すなわち、断熱シート)を巻き取った。シボロールの模様に従って、シボ模様がLDPEフィルム融着面に形成されていた。
(1) Insulation sheet manufacturing method (single side)
Sheet foam insulation (chemically cross-linked polyethylene foam wound in a roll, degree of crosslinking: 65%, thickness: 10.0 mm, expansion ratio: 30 times, product name: Hiethylene S, manufactured by Hitachi Chemical Co., Ltd.) ) Is heated with a burner while the surface is being melted, the surface is melted, and an LDPE film (thickness: 150 μm, wound in a roll shape) as a skin sheet is fed to And the resulting laminate (ie, a heat insulating sheet) was wound up. In accordance with the texture pattern, the texture pattern was formed on the fused surface of the LDPE film.

なお、表皮シートとして用いたLDPEフィルムは、東ソー(株)製のLDPEとチバ・スベシャルティケミカルズ(株)製のTINUVIN326の混合物をインフレーション法にて作製したものである。この融点は、106℃である。   The LDPE film used as the skin sheet is a mixture of LDPE manufactured by Tosoh Corporation and TINUVIN 326 manufactured by Ciba Svecharty Chemicals Co., Ltd. by an inflation method. This melting point is 106 ° C.

(2)シボロールの模様
上記(1)の断熱シートの製造法において、使用したシボロールのシボ模様は、四角錐で、高さ1.4mm、底面が(平面形状で)一辺の長さ2.5mmの四角形、ピッチは3.0mmとなるようにした。
(2) Shibo roll pattern In the manufacturing method of the heat insulating sheet of (1) above, the embossed pattern of the used Shibo roll is a quadrangular pyramid, a height of 1.4 mm, and the bottom surface (in a planar shape) has a side length of 2.5 mm. The square and the pitch were set to 3.0 mm.

<発泡ポリオレフィン樹脂被覆配管の製造法>
樹脂管〔長尺巻きされたサイズ13A(外径16.0mm)の三層管(中心軸から径方向外側に向かって高耐熱ポリエチレンで形成される内層とアルミニウムで形成される金属中間層と高耐熱ポリエチレンで形成される外層との三層が順に積層された配管)、Uponor製〕を巻出し機にかけて繰り出しながら製筒機(穴の直径25mm、円周長78.5mm、路長20mm)に通した。
一方、82mm幅の前記(1)で製造した断熱シートを繰り出しながら、樹脂管を囲むように、しかも、断熱シートの幅方向両端部を突き合わせるように湾曲させ、製筒機を通過させた。ただし、製筒機の穴を通過する前に、断熱シートの突き合わされた幅方向両端部に240〜250℃の熱風が吹き付けられ、該両端部が熱融着された。
さらに、断熱シートの熱融着された部分が、製筒機を通過させられた直後に、その部分を冷却するために15℃の冷水が吹き付けられた。
このようにして、連続して生成する発泡ポリオレフィン樹脂被覆配管を引取装置により巻き取った。なお、巻き取り速度は15m/分とした。
<Method for producing foamed polyolefin resin-coated piping>
Resin pipe [long-rolled size 13A (outer diameter: 16.0 mm) three-layer pipe (inner layer formed of high heat-resistant polyethylene from the central axis toward the outside in the radial direction, metal intermediate layer formed of aluminum and high (Pipe with three layers of heat-resistant polyethylene and an outer layer formed in order), made by Uponor] on an unwinding machine and fed to a cylinder making machine (hole diameter 25 mm, circumference length 78.5 mm, path length 20 mm) I passed.
On the other hand, while feeding out the heat insulating sheet produced in (1) having a width of 82 mm, the heat insulating sheet was curved so as to surround the resin tube, and both ends of the heat insulating sheet in the width direction were abutted, and passed through the cylinder making machine. However, before passing through the hole of the cylinder-making machine, hot air of 240 to 250 ° C. was blown to both ends of the heat insulating sheet that faced each other, and the both ends were heat-sealed.
Further, immediately after the heat-sealed portion of the heat insulating sheet was passed through the cylinder-making machine, 15 ° C. cold water was sprayed to cool the portion.
Thus, the foamed polyolefin resin-coated piping continuously produced was wound up by a take-up device. The winding speed was 15 m / min.

なお、上記において、断熱シートの幅方向のサイズを、幅方向両端部を熱融着した後の断熱シートと樹脂管との間に、全周に渡り、0.5〜3.0mmの隙間が生じるようなサイズとした。これは、断熱シート幅方向両端部を熱風で熱融着する際に、樹脂管表面に熱風による損傷(漏水の原因)を生じさせないためである。   In addition, in the above, the size of the heat insulating sheet in the width direction is between the heat insulating sheet and the resin tube after heat-sealing both ends in the width direction, and there is a gap of 0.5 to 3.0 mm over the entire circumference. The size was such that it would occur. This is because when the both ends of the heat insulating sheet in the width direction are heat-fused with hot air, the resin tube surface is not damaged by hot air (cause of water leakage).

(実施例1)
<発泡ポリオレフィン樹脂被覆複合配管の製造法>
上記で得られた発泡ポリオレフィン樹脂被覆配管二本(以下、「被覆配管」ともいう)を、被覆配管同士が徐々に隣り合うように、しかし、離間して、該被覆配管の長手方向に同時に連続的に繰り出した。
Example 1
<Method for producing foamed polyolefin resin-coated composite piping>
The two foamed polyolefin resin-coated pipes obtained above (hereinafter also referred to as “coated pipes”) are continuously continuous in the longitudinal direction of the coated pipes so that the coated pipes are gradually adjacent to each other but separated from each other. I paid out.

次に、図5に示すように隣り合う被覆配管を接触させるが、この接触の直前、一方の樹脂被覆配管の表皮シート上に、溶融したホットメルト接着剤をホットメルトノズルから吹き出して塗布した。ホットメルト接着剤は、ホットメルトアプリケーターにて溶融(溶融温度135℃)し、塗布時のホットメルト接着剤表面温度を80℃に調製されたものであった。接着剤の塗布は、被覆配管の長手方向に直線状に塗布幅:0.4cmで塗布量が0.9g/mになるように行なわれ、上記接触部を両外面からロールで加圧して表皮シート同士を接着させることにより、二本の被覆配管が接着された被覆複合配管が作製された。このようにして連続して生成する被覆複合配管は、引取装置により引取ながら巻き取られた。   Next, as shown in FIG. 5, adjacent coated pipes were brought into contact. Immediately before this contact, the molten hot melt adhesive was blown out from the hot melt nozzle and applied onto the skin sheet of one resin-coated pipe. The hot melt adhesive was prepared by melting with a hot melt applicator (melting temperature 135 ° C.) and adjusting the surface temperature of the hot melt adhesive at the time of application to 80 ° C. The adhesive is applied in a straight line in the longitudinal direction of the coated pipe so that the application width is 0.4 cm and the application amount is 0.9 g / m. By bonding the sheets together, a coated composite pipe in which two coated pipes were bonded was produced. The coated composite pipe continuously produced in this way was wound up while being taken up by the take-up device.

なお、実施例1で用いたホットメルト接着剤は、軟化点:135℃(実施例1では、塗布時のホットメルト接着剤表面温度:80℃に調製)であり、約−15℃の低温可とう性を有する日立化成ポリマー(株)製のオレフィン系樹脂ホットメルト接着剤(商品名:ハイボンYH450−1)である。このオレフィン系樹脂ホットメルト接着剤は、短時間に固化し、乾燥工程が不要であり、無溶剤である等の特徴を有する。   The hot melt adhesive used in Example 1 has a softening point of 135 ° C. (in Example 1, the surface temperature of the hot melt adhesive during application is adjusted to 80 ° C.) and can be used at a low temperature of about −15 ° C. It is an olefin resin hot melt adhesive (trade name: Hibon YH450-1) manufactured by Hitachi Chemical Polymer Co., Ltd. having flexibility. This olefin-based resin hot melt adhesive is characterized in that it solidifies in a short time, does not require a drying step, and is solvent-free.

得られた被覆複合配管に対して、下記の評価を行った。
<評価>
(1)伸ばし試験
巻き取られた被覆複合配管を、巻き戻して伸ばしたときの、接着保持状態を目視確認した。
接着部(表皮シートの融着部を包含する、以下同じ)の分離が無い場合及びその他異常のない場合を○とし、接着部の分離が有る場合を×とした。
(2)曲げ試験
被覆複合配管曲げ時の接着保持状態は、90度に曲げた時の接着保持状態を目視確認した。
接着部の分離が無い場合及びその他異常のない場合を○とし、接着部の分離が有る場合を×とした。
The following evaluation was performed on the resulting coated composite pipe.
<Evaluation>
(1) Stretching test When the wound coated composite pipe was rewound and stretched, the adhesion holding state was visually confirmed.
The case where there was no separation of the bonded portion (including the fused portion of the skin sheet, the same applies hereinafter) and the case where there was no other abnormality was marked as ◯, and the case where the bonded portion was separated was marked as x.
(2) Bending test The adhesion holding state at the time of bending the coated composite pipe was visually confirmed for the bonding holding state when bent at 90 degrees.
The case where there was no separation of the bonded portion and the case where there was no other abnormality was rated as ◯, and the case where the bonded portion was separated was marked as x.

(3)剥離試験
(a)分離状態の確認
長さ50mmにカットした被覆複合配管をテンシロン型引張試験機に取り付け、引張速度500mm/分で被覆複合配管を引っ張り、分離された接着部の表皮シートの破損、その他の異常の有無を外観確認した。
表皮シートの破損が無い場合及びその他の異常が無い場合を○とし、表皮シートが破れた場合又は断熱シートの熱融着された突き合わせ部が破壊された場合を×とした。
(3) Peel test (a) Confirmation of separation state The coated composite pipe cut to a length of 50 mm is attached to a Tensilon type tensile tester, and the coated composite pipe is pulled at a pulling speed of 500 mm / min. The appearance was checked for damage and other abnormalities.
The case where there was no damage to the skin sheet and the case where there was no other abnormality was rated as ◯, and the case where the skin sheet was torn or the heat-sealed butted portion of the heat insulating sheet was broken was marked as x.

(b)引き剥がし荷重及び引き剥がし強度の測定法
被覆複合配管を長手方向に50mm幅にカットし、試験片とする。試験片の内径に合った樹脂管を挿入し、テンシロン型引張試験機(型番:AGS−500H((株)島津製作所製))に取り付ける。試験片を上下方向に引張速度500mm/分で引っ張り、二本の樹脂被覆配管が分離するまでの最大荷重を測定し、これを引き剥がし荷重(単位:N)とした。この引き剥がし荷重を、接着剤塗布面積(前記ホットメルト接着剤塗布幅(cm)×5.0(cm))又は融着面積(融着幅(cm)×5.0(cm))で除した値を引き剥がし強度(単位:N/cm)とした。
(B) Measuring method of peeling load and peeling strength The coated composite pipe is cut to a width of 50 mm in the longitudinal direction to obtain a test piece. A resin tube suitable for the inner diameter of the test piece is inserted and attached to a Tensilon type tensile tester (model number: AGS-500H (manufactured by Shimadzu Corporation)). The test piece was pulled in the vertical direction at a pulling speed of 500 mm / min, and the maximum load until the two resin-coated pipes were separated was measured, and this was taken as the peeling load (unit: N). This peeling load is divided by the adhesive application area (the hot melt adhesive application width (cm) × 5.0 (cm)) or the fusion area (fusion width (cm) × 5.0 (cm)). The value obtained was taken as the peel strength (unit: N / cm 2 ).

なお、前記ホットメルト接着剤の塗布幅は、上記試験で剥がれた接着剤(上記の試験において、接着剤は、配管が引き剥がされた場合、一方の配管の表皮シートに残存するので、その接着剤の幅を測定し、最大値と最小値の平均を求め、これを塗布幅とした。また、接着部が破壊されるときも、破壊された一方の表皮が他方の表皮に接着しているので、その接着剤の幅又は融着部の幅を測定し、最大値と最小値の平均を求め、これを塗布幅又は融着幅とした。   The application width of the hot melt adhesive is the adhesive peeled off in the above test (in the above test, the adhesive remains on the skin sheet of one pipe when the pipe is peeled off. The width of the agent was measured, the average of the maximum value and the minimum value was obtained, and this was used as the coating width.Also, when the adhesive part was destroyed, one destroyed skin was adhered to the other. Therefore, the width of the adhesive or the width of the fused portion was measured, the average of the maximum value and the minimum value was obtained, and this was defined as the coating width or the fusion width.

なお、表皮シートの融点温度、ホットメルト接着剤の塗布時の表面温度、塗布量、塗布幅については、下記の方法で行った。
<測定方法>
(4)表皮シート融点温度の測定法
(株)島津製作所製、示差走査熱量計(DSC)により融点温度を測定した。
(5)ホットメルト接着剤表面温度の測定法
日油技研工業(株)製のサーモラベルで溶融したホットメルト接着剤を塗布し、塗布面のラベル変色目視により表面温度を測定した。
In addition, about the melting | fusing point temperature of the skin sheet | seat, the surface temperature at the time of application | coating of a hot-melt-adhesive, application amount, and application | coating width | variety was performed with the following method.
<Measurement method>
(4) Measuring method of melting point temperature of skin sheet Melting point temperature was measured by a differential scanning calorimeter (DSC) manufactured by Shimadzu Corporation.
(5) Method for Measuring Hot Melt Adhesive Surface Temperature A hot melt adhesive melted with a thermolabel manufactured by NOF Giken Kogyo Co., Ltd. was applied, and the surface temperature was measured by visual observation of the label discoloration on the coated surface.

(6)ホットメルト接着剤塗布量の測定方法
上記(2)の剥離状態の確認後の試料片よりホットメルト接着剤を剥がし、量りにて50mm辺りのホットメルト接着剤塗布量を測定し、次の式で1m辺りのホットメルト接着剤塗布量を求めた。
ホットメルト接着剤の塗布量(g/m) =ホットメルト接着剤の塗布量(g/50mm辺り)×20
(6) Measuring method of hot melt adhesive application amount Peel off the hot melt adhesive from the sample piece after confirming the peeled state in (2) above, measure the hot melt adhesive application amount around 50 mm by weighing, The amount of hot melt adhesive applied per meter was determined by the following formula.
Application amount of hot melt adhesive (g / m) = Application amount of hot melt adhesive (g / 50 mm) × 20

剥離試験(分離状態の確認)では表皮シートに破れ発生及びその他の異常は無し、伸ばし試験、曲げ試験では、接着部の分離及びその他の異常は無しであった。   In the peel test (confirmation of the separation state), there was no occurrence of tearing and other abnormalities in the skin sheet, and in the stretching test and bending test, there was no separation of the bonded portion and other abnormalities.

(実施例2)
被覆配管及びホットメルト接着剤は実施例1と同じものを使用し、ホットメルト接着剤を、被覆配管の長手方向に直線状に、塗布量3.0g/m、塗布幅:0.7cmで塗布時のホットメルト接着剤表面温度約80℃で塗布し、被覆複合配管を形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、剥離試験(分離状態の確認)では表皮シートに破れ発生及びその他の異常無し、伸ばし試験、曲げ試験では接着部の分離及びその他の異常無しで良好であった。
(Example 2)
The coated pipe and the hot melt adhesive are the same as those in Example 1, and the hot melt adhesive is applied in a straight line in the longitudinal direction of the coated pipe at a coating amount of 3.0 g / m and a coating width of 0.7 cm. The hot-melt adhesive was coated at a surface temperature of about 80 ° C. to form a coated composite pipe.
The obtained coated composite pipe was evaluated in the same manner as in Example 1. As a result of the peel test (confirmation of separation), the skin sheet was not torn and other abnormalities were observed. Good with no separation and other abnormalities.

(実施例3)
被覆配管及びホットメルト接着剤は実施例1と同じものを使用し、ホットメルト接着剤を、被覆配管の長手方向に直線状に、塗布量1.7g/m、塗布幅:0.3cmで塗布時のホットメルト接着剤表面温度約95℃で塗布し、被覆複合配管を形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、剥離試験(分離状態の確認)では表皮シートに破れ発生及びその他の異常無し、伸ばし試験、曲げ試験では接着部の分離及びその他の異常無しで良好であった。
Example 3
The coated piping and the hot melt adhesive are the same as those in Example 1, and the hot melt adhesive is applied in a straight line in the longitudinal direction of the coated piping at a coating amount of 1.7 g / m and a coating width: 0.3 cm. The resulting hot melt adhesive was applied at a surface temperature of about 95 ° C. to form a coated composite pipe.
The obtained coated composite pipe was evaluated in the same manner as in Example 1. As a result of the peel test (confirmation of separation), the skin sheet was not torn and other abnormalities were observed. Good with no separation and other abnormalities.

(実施例4)
被覆配管及びホットメルト接着剤は実施例1と同じものを使用し、ホットメルト接着剤を、被覆配管の長手方向に直線状に、塗布量3.0g/m、塗布幅:0.2cmで塗布時のホットメルト接着剤表面温度約95℃で塗布し、被覆複合配管を形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、剥離試験(分離状態の確認)では表皮シートに破れ発生及びその他の異常無し、伸ばし試験、曲げ試験では接着部の分離及びその他の異常無しで良好であった。
Example 4
The coated pipe and the hot melt adhesive are the same as those in Example 1, and the hot melt adhesive is applied in a straight line in the longitudinal direction of the coated pipe at a coating amount of 3.0 g / m and a coating width: 0.2 cm. The resulting hot melt adhesive was applied at a surface temperature of about 95 ° C. to form a coated composite pipe.
The obtained coated composite pipe was evaluated in the same manner as in Example 1. As a result of the peel test (confirmation of separation), the skin sheet was not torn and other abnormalities were observed. Good with no separation and other abnormalities.

(実施例5)
被覆配管及びホットメルト接着剤は実施例1と同じものを使用し、ホットメルト接着剤を、被覆配管の長手方向に直線状に、塗布量0.6g/m、塗布幅:0.4cmで塗布時のホットメルト接着剤表面温度約100℃で塗布し、被覆複合配管を形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、剥離試験(分離状態の確認)では表皮シートに破れ発生及びその他の異常無し、伸ばし試験、曲げ試験では接着部の分離及びその他の異常無しで良好であった。
(Example 5)
The coated pipe and the hot melt adhesive are the same as those in Example 1, and the hot melt adhesive is applied in a straight line in the longitudinal direction of the coated pipe at a coating amount of 0.6 g / m and a coating width of 0.4 cm. The hot-melt adhesive was coated at a surface temperature of about 100 ° C. to form a coated composite pipe.
The obtained coated composite pipe was evaluated in the same manner as in Example 1. As a result of the peel test (confirmation of separation), the skin sheet was not torn and other abnormalities were observed. Good with no separation and other abnormalities.

(実施例6)
被覆配管及びホットメルト接着剤は実施例1と同じものを使用し、ホットメルト接着剤を、被覆配管の長手方向に直線状に、塗布量3.0g/m、塗布幅:0.8cmで塗布時のホットメルト接着剤表面温度約100℃で塗布し、被覆複合配管を形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、剥離試験(分離状態の確認)では表皮シートに破れ発生及びその他の異常無し、伸ばし試験、曲げ試験では接着部の分離及びその他の異常無しで良好であった。
(Example 6)
The coated pipe and the hot melt adhesive are the same as those in Example 1, and the hot melt adhesive is applied in a straight line in the longitudinal direction of the coated pipe at a coating amount of 3.0 g / m and a coating width of 0.8 cm. The hot-melt adhesive was coated at a surface temperature of about 100 ° C. to form a coated composite pipe.
The obtained coated composite pipe was evaluated in the same manner as in Example 1. As a result of the peel test (confirmation of separation), the skin sheet was not torn and other abnormalities were observed. Good with no separation and other abnormalities.

(実施例7)
被覆配管及びホットメルト接着剤は実施例1と同じものを使用し、ホットメルト接着剤を、被覆配管の長手方向に直線状に、塗布量4.0g/m、塗布幅:0.7cmで塗布時のホットメルト接着剤表面温度約95℃で塗布し、被覆複合配管を形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、伸ばし試験、曲げ試験では接着部の分離無しであったが、剥離試験(分離状態の確認)では被覆配管の断熱シートの熱融着された突き合わせ部に破れが発生した。
これは、引き剥がし荷重、引き剥がし強度が大きすぎることによると考えられる。
(Example 7)
The coated pipe and the hot melt adhesive are the same as those in Example 1, and the hot melt adhesive is applied in a straight line in the longitudinal direction of the coated pipe at a coating amount of 4.0 g / m and a coating width: 0.7 cm. The resulting hot melt adhesive was applied at a surface temperature of about 95 ° C. to form a coated composite pipe.
When the obtained coated composite pipe was evaluated in the same manner as in Example 1, there was no separation of the bonded portion in the stretch test and the bending test, but in the peel test (confirmation of the separated state), the insulated pipe was insulated. The tear occurred in the heat-sealed butt portion of the sheet.
This is considered to be due to the peeling load and the peeling strength being too large.

(実施例8)
被覆配管及びホットメルト接着剤は実施例1と同じものを使用し、ホットメルト接着剤を、被覆配管の長手方向に直線状に、塗布量6.0g/m、塗布幅:1.1cmで塗布時のホットメルト接着剤表面温度約100℃で塗布し、被覆複合配管を形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、伸ばし試験、曲げ試験では接着部の分離無しであったが、剥離試験(分離状態の確認)では被覆配管の断熱シートの熱融着された突き合わせ部に破れが発生した。
これは、引き剥がし荷重、引き剥がし強度が大きすぎることによると考えられる。
(Example 8)
The coated piping and the hot melt adhesive are the same as those in Example 1, and the hot melt adhesive is applied in a straight line in the longitudinal direction of the coated piping at a coating amount of 6.0 g / m and a coating width: 1.1 cm. The hot-melt adhesive was coated at a surface temperature of about 100 ° C. to form a coated composite pipe.
When the obtained coated composite pipe was evaluated in the same manner as in Example 1, there was no separation of the bonded portion in the stretch test and the bending test, but in the peel test (confirmation of the separated state), the insulated pipe was insulated. The tear occurred in the heat-sealed butt portion of the sheet.
This is considered to be due to the peeling load and the peeling strength being too large.

(実施例9)
被覆配管及びホットメルト接着剤は実施例1と同じものを使用し、ホットメルト接着剤を、被覆配管の長手方向に直線状に、塗布量1.0g/m、塗布幅:0.4cmで塗布時のホットメルト接着剤表面温度約120℃で塗布し、被覆複合配管を形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、伸ばし試験、曲げ試験では接着部の分離無しであったが、剥離試験(分離状態の確認)では表皮シートに破れが発生した。
これは、接着剤塗布時の接着剤が表皮シートの溶融温度よりも高い表面温度であったことによると考えられる。
Example 9
The coated piping and the hot melt adhesive are the same as those in Example 1, and the hot melt adhesive is applied in a straight line in the longitudinal direction of the coated piping at a coating amount of 1.0 g / m and a coating width of 0.4 cm. The hot-melt adhesive was coated at a surface temperature of about 120 ° C. to form a coated composite pipe.
When the obtained coated composite pipe was evaluated in the same manner as in Example 1, there was no separation of the bonded portion in the stretch test and the bending test, but it was broken in the skin sheet in the peel test (confirmation of the separated state). There has occurred.
This is probably because the adhesive at the time of applying the adhesive had a surface temperature higher than the melting temperature of the skin sheet.

(実施例10)
被覆配管及びホットメルト接着剤は実施例1と同じものを使用し、ホットメルト接着剤を、被覆配管の長手方向に直線状に、塗布量0.5g/m、塗布幅:0.4cmで塗布時のホットメルト接着剤表面温度約80℃で塗布し、被覆複合配管を形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、剥離試験(分離状態の確認)では表皮シート破れ発生は無し、伸ばし試験では接着部の分離無しであったが、曲げ試験では接着部の分離が発生した。
(Example 10)
The coated pipe and the hot melt adhesive are the same as those in Example 1, and the hot melt adhesive is applied in a straight line in the longitudinal direction of the coated pipe at a coating amount of 0.5 g / m and a coating width of 0.4 cm. The hot-melt adhesive was coated at a surface temperature of about 80 ° C. to form a coated composite pipe.
When the obtained coated composite pipe was evaluated in the same manner as in Example 1, there was no occurrence of tearing of the skin sheet in the peel test (confirmation of the separation state), and there was no separation of the adhesive portion in the stretching test. In the bending test, separation of the bonded portion occurred.

(実施例11)
被覆配管及びホットメルト接着剤は実施例1と同じものを使用し、ホットメルト接着剤を、被覆配管の長手方向に直線状に、塗布量1.0g/m、塗布幅:0.4cmで塗布時のホットメルト接着剤表面温度約110℃で塗布し、被覆複合配管を形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、伸ばし試験、曲げ試験では接着部の分離無しであったが、剥離試験(分離状態の確認)では表皮シートに破れが発生した。
(Example 11)
The coated piping and the hot melt adhesive are the same as those in Example 1, and the hot melt adhesive is applied in a straight line in the longitudinal direction of the coated piping at a coating amount of 1.0 g / m and a coating width of 0.4 cm. The hot-melt adhesive was coated at a surface temperature of about 110 ° C. to form a coated composite pipe.
When the obtained coated composite pipe was evaluated in the same manner as in Example 1, there was no separation of the bonded portion in the stretch test and the bending test, but it was broken in the skin sheet in the peel test (confirmation of the separated state). There has occurred.

(比較例1)
<発泡ポリオレフィン樹脂被覆複合配管の製造法>
被覆配管は実施例1と同じものを使用し、被覆配管を長手方向に二本同時に繰り出して被覆配管同士が隣り合うように、しかし、離間して、該被覆配管の長手方向に連続的に繰り出した。
(Comparative Example 1)
<Method for producing foamed polyolefin resin-coated composite piping>
Use the same coated pipe as in Example 1 and feed two coated pipes simultaneously in the longitudinal direction so that the coated pipes are adjacent to each other, but are separated and continuously fed in the longitudinal direction of the coated pipe. It was.

次に、図5に示すように隣り合う被覆配管を接触させ、この接触部に、高温の熱風(約200℃)を吹き付けて、該接触部を両外側からロールで加圧し、表皮シート同士を融着させることにより、二本の被覆配管が接着された被覆複合配管が作製された。このようにして連続して生成する被覆複合配管は、引取装置により引取ながら巻き取られた。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、伸ばし試験、曲げ試験では表皮シート間の融着部の分離無しであったが、剥離試験(分離状態の確認)では表皮シートに破れが発生した。
Next, as shown in FIG. 5, adjacent coated pipes are brought into contact with each other, hot hot air (about 200 ° C.) is blown onto the contact portions, the contact portions are pressed with rolls from both outer sides, and the skin sheets are joined together. By fusing, a coated composite pipe in which two coated pipes were bonded was produced. The coated composite pipe continuously produced in this way was wound up while being taken up by the take-up device.
When the obtained coated composite pipe was evaluated in the same manner as in Example 1, there was no separation of the fused portion between the skin sheets in the stretching test and bending test, but the peel test (confirmation of the separated state) Then, tearing occurred in the skin sheet.

(比較例2)
被覆配管は実施例1と同じものを使用し、融着温度を140℃としたこと以外は比較例1と同様にして、被覆複合配管を融着形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、剥離試験(分離状態の確認)では表皮シートに破れが発生無し、伸ばし試験曲げ試験では表皮シートの融着部の分離発生無しも、曲げ試験では表皮シートの融着部の分離が発生した。
(Comparative Example 2)
The same coated pipe as in Example 1 was used, and the coated composite pipe was fused and formed in the same manner as in Comparative Example 1 except that the fusion temperature was 140 ° C.
When the obtained coated composite pipe was evaluated in the same manner as in Example 1, no tearing occurred in the skin sheet in the peel test (confirmation of the separation state), and in the stretch test bending test, Even when no separation occurred, separation of the fused portion of the skin sheet occurred in the bending test.

(比較例3)
被覆配管は実施例1と同じものを使用し、融着温度を120℃としたこと以外は比較例1と同様にして、被覆複合配管を融着形成した。
得られた被覆複合配管に対して実施例1と同様に評価を行ったところ、剥離試験(分離状態の確認)では表皮シートに破れが発生し、伸ばし試験、曲げ試験では表皮シートの融着部の分離が発生した。
これらの結果を表1に示す。
(Comparative Example 3)
The same coated pipe as in Example 1 was used, and the coated composite pipe was fused and formed in the same manner as in Comparative Example 1 except that the fusion temperature was 120 ° C.
When the obtained coated composite pipe was evaluated in the same manner as in Example 1, tearing occurred in the skin sheet in the peel test (confirmation of the separation state), and the fused portion of the skin sheet in the stretch test and the bending test. Separation occurred.
These results are shown in Table 1.

Figure 2010234705
Figure 2010234705

上記表1から明らかなように、実施例1〜11において、接着剤で接着することにより、熱融着で接着した比較例1〜3に比較して、樹脂被覆管の分離に対する強度が増大した。
実施例1〜6においては、樹脂被覆複合配管の分離に際し、接着剤がどちらかの樹脂被覆配管に残った状態でその接着部で分離し、表皮シートの損傷等が無く、うまく分離できた。しかし、引き剥がし荷重が大きすぎる実施例7又は8では、樹脂被覆複合配管が分離しずらくなり、強制的に樹脂被覆複合配管を分離しようとすると断熱材突き合わせ部の熱融着部が破壊された。
実施例9及び10では、引き剥がし荷重は高くなったが、樹脂被覆複合配管を表皮シートの溶融温度より高い表面温度の接着剤で接着したので、樹脂被覆複合配管が分離しやすく、また、樹脂被覆複合配管の分離に際し、表皮シートが破れやすくなっていた。
As is clear from Table 1 above, in Examples 1 to 11, the strength against separation of the resin-coated tube was increased by bonding with an adhesive as compared with Comparative Examples 1 to 3 bonded by thermal fusion. .
In Examples 1 to 6, when the resin-coated composite pipe was separated, the adhesive remained separated in either resin-coated pipe and separated at the bonded portion, and the skin sheet was not damaged and could be separated well. However, in Example 7 or 8, in which the peeling load is too large, the resin-coated composite pipe is difficult to separate, and if the resin-coated composite pipe is forcibly separated, the heat-sealed portion of the heat-insulating material butt portion is destroyed. It was.
In Examples 9 and 10, the peeling load increased, but the resin-coated composite pipe was bonded with an adhesive having a surface temperature higher than the melting temperature of the skin sheet, so that the resin-coated composite pipe was easily separated, and the resin When separating the coated composite pipe, the skin sheet was easily broken.

1 配管
2 配管と断熱シートとの隙間
3 断熱材
4 表皮シート
20 断熱シート
5 シボ
6 断熱シートの熱融着部
7 樹脂被覆配管
8 接着部
10 発泡ポリオレフィン樹脂被覆複合配管
11 加圧ロール
12 ホットメルトノズル
13 被覆配管ガイドロール
DESCRIPTION OF SYMBOLS 1 Piping 2 Crevice between piping and heat insulation sheet 3 Heat insulation material 4 Skin sheet 20 Heat insulation sheet 5 Warp 6 Thermal fusion part 7 of heat insulation sheet Resin-coated pipe 8 Adhesion part 10 Polyolefin resin resin-coated composite pipe 11 Pressure roll 12 Hot melt Nozzle 13 Covered piping guide roll

Claims (17)

配管を発泡断熱材で被覆し、該発泡断熱材を表皮シートによって被覆する発泡ポリオレフィン樹脂被覆配管複数を、接着剤を用いて、各発泡ポリオレフィン樹脂被覆配管の上記表皮シート同士を長手方向で接着することにより得られる発泡ポリオレフィン樹脂複合配管であって、引き剥がし荷重が35N以上である発泡ポリオレフィン樹脂被覆複合配管。   A plurality of foamed polyolefin resin-coated pipes are coated with a foam heat insulating material and the foam heat insulating material is covered with a skin sheet, and the above-mentioned skin sheets of each foamed polyolefin resin-coated pipe are bonded together in the longitudinal direction using an adhesive. A foamed polyolefin resin-coated composite pipe obtained by the above process, wherein the peeling load is 35 N or more. 前記引き剥がし荷重が35〜130Nである請求項1に記載の発泡ポリオレフィン樹脂被覆複合配管。   The foamed polyolefin resin-coated composite pipe according to claim 1, wherein the peeling load is 35 to 130N. 接着部としての引き剥がし荷重が43〜130Nである請求項1又は2に記載の発泡ポリオレフィン樹脂被覆複合配管。   3. The foamed polyolefin resin-coated composite pipe according to claim 1 or 2, wherein a peeling load as an adhesive portion is 43 to 130N. 前記接着部としての引き剥がし強度が、15〜35N/cmである請求項1〜3のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管。 The peel strength of the adhesive portion is foamed polyolefin resin-coated composite pipe according to any one of claims 1 to 3 is 15~35N / cm 2. 前記発泡ポリオレフィン樹脂被覆配管の表皮シートの表面が、シボ形状を有する請求項1〜4のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管。   The foamed polyolefin resin-coated composite pipe according to any one of claims 1 to 4, wherein a surface of the skin sheet of the foamed polyolefin resin-coated pipe has a textured shape. シボの形状が、最大幅0.5〜10mmで、高さ又は深さ0.1〜5mmの四角錐である請求項1〜5のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管。   The foamed polyolefin resin-coated composite pipe according to any one of claims 1 to 5, wherein the shape of the texture is a quadrangular pyramid having a maximum width of 0.5 to 10 mm and a height or depth of 0.1 to 5 mm. 前記接着剤が、ポリオレフィン系樹脂を主成分としたオレフィン系樹脂ホットメルト接着剤である請求項1〜6のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管。   The foamed polyolefin resin-coated composite pipe according to any one of claims 1 to 6, wherein the adhesive is an olefin resin hot melt adhesive mainly composed of a polyolefin resin. 前記発泡ポリオレフィン樹脂被覆配管同士の接着剤による接着部が、適宜間隔をおいて設けられる請求項1〜7のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管。   The foamed polyolefin resin-coated composite pipe according to any one of claims 1 to 7, wherein an adhesive portion between the foamed polyolefin resin-coated pipes is provided at an appropriate interval. 前記発泡ポリオレフィン樹脂被覆複合配管を構成する前記発泡ポリオレフィン樹脂被覆配管同士の分離を防止するための、前記発泡ポリオレフィン樹脂被覆複合配管の外周を覆う保持器具を設けた請求項1〜8のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管。   The holding fixture which covers the outer periphery of the said foaming polyolefin resin coating composite piping for preventing the separation of the said foaming polyolefin resin coating piping which comprises the said foaming polyolefin resin coating composite piping is provided. The foamed polyolefin resin-coated composite piping according to Item. 前記表皮シート同士を長手方向で接着する場合において、接着剤の表皮シートへの塗布時の表面温度が、表皮シートの溶融温度より低い温度である請求項1〜9のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管。   The surface temperature at the time of application | coating to the skin sheet of an adhesive agent is the temperature lower than the melting temperature of a skin sheet, when adhere | attaching the said skin sheets in a longitudinal direction, It is a temperature as described in any one of Claims 1-9. Foamed polyolefin resin-coated composite piping. 配管を発泡断熱材で被覆し、該発泡断熱材を表皮シートで被覆する発泡ポリオレフィン樹脂被覆配管を複数用いて、前記表皮シート同士を長手方向で接着して発泡ポリオレフィン樹脂被覆複合配管を製造する方法において、
前記接着が、塗布時の表面温度を前記表皮シートの融点未満に調製した接着剤によりなされ、引き剥がし荷重が35N以上であることを特徴とする発泡ポリオレフィン樹脂被覆複合配管の製造方法。
A method of manufacturing a foamed polyolefin resin-coated composite pipe by covering a pipe with a foam heat insulating material and using a plurality of foamed polyolefin resin-coated pipes covering the foam heat insulating material with a skin sheet, and bonding the skin sheets in the longitudinal direction. In
The method for producing a foamed polyolefin resin-coated composite pipe, wherein the adhesion is performed with an adhesive prepared so that a surface temperature at the time of application is less than a melting point of the skin sheet, and a peeling load is 35 N or more.
前記接着が、前記接着剤塗布量を制御しながら、前記発泡ポリオレフィン樹脂被覆配管で互いに向かい合う配管のうちの少なくとも一方の表皮シートに、長手方向に塗布し、前記発泡ポリオレフィン樹脂被覆配管同士を圧着することにより行われる請求項11に記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。   The adhesive is applied in the longitudinal direction to at least one skin sheet of the pipes facing each other with the foamed polyolefin resin-coated pipe while controlling the adhesive application amount, and the foamed polyolefin resin-coated pipes are pressure-bonded to each other. The manufacturing method of the foaming polyolefin resin coating composite piping of Claim 11 performed by this. 前記長手方向への接着剤の塗布が、適宜間隔をおいて行われる請求項11又は12に記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。   The method for producing a foamed polyolefin resin-coated composite pipe according to claim 11 or 12, wherein the adhesive is applied in the longitudinal direction at appropriate intervals. 前記接着剤の表皮シートへの塗布時の表面温度が、表皮シートの溶融温度より低い温度である請求項11〜13のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。   The method for producing a foamed polyolefin resin-coated composite pipe according to any one of claims 11 to 13, wherein a surface temperature of the adhesive applied to the skin sheet is lower than a melting temperature of the skin sheet. 前記引き剥がし荷重が35〜130Nである請求項11〜14のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。   The method for producing a foamed polyolefin resin-coated composite pipe according to any one of claims 11 to 14, wherein the peeling load is 35 to 130N. 接着部としての引き剥がし荷重が43〜130Nである請求項11〜15のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。   The method for producing a foamed polyolefin resin-coated composite pipe according to any one of claims 11 to 15, wherein a peeling load as an adhesive portion is 43 to 130N. 接着部としての引き剥がし強度が、15〜35N/cmである請求項11〜16のいずれか一項に記載の発泡ポリオレフィン樹脂被覆複合配管の製造方法。 Peel strength of the adhesive portion, foaming method for producing a polyolefin resin-coated composite pipe according to any one of claims 11 to 16 is 15~35N / cm 2.
JP2009086436A 2009-03-31 2009-03-31 Foamed polyolefin resin coated compound piping and production process thereof Pending JP2010234705A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009086436A JP2010234705A (en) 2009-03-31 2009-03-31 Foamed polyolefin resin coated compound piping and production process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009086436A JP2010234705A (en) 2009-03-31 2009-03-31 Foamed polyolefin resin coated compound piping and production process thereof

Publications (1)

Publication Number Publication Date
JP2010234705A true JP2010234705A (en) 2010-10-21

Family

ID=43089509

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009086436A Pending JP2010234705A (en) 2009-03-31 2009-03-31 Foamed polyolefin resin coated compound piping and production process thereof

Country Status (1)

Country Link
JP (1) JP2010234705A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101733594B1 (en) * 2016-09-20 2017-05-08 (주)엠에스코리아 manufacturing methods of composite pipe for protective tube refrigerant

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51156564U (en) * 1975-04-18 1976-12-13
JPS56135820U (en) * 1980-03-17 1981-10-15
JPH0352491U (en) * 1989-09-28 1991-05-21
JPH07286743A (en) * 1994-04-15 1995-10-31 Sumitomo Light Metal Ind Ltd Covered copper tube for air conditioner and manufacture thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51156564U (en) * 1975-04-18 1976-12-13
JPS56135820U (en) * 1980-03-17 1981-10-15
JPH0352491U (en) * 1989-09-28 1991-05-21
JPH07286743A (en) * 1994-04-15 1995-10-31 Sumitomo Light Metal Ind Ltd Covered copper tube for air conditioner and manufacture thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101733594B1 (en) * 2016-09-20 2017-05-08 (주)엠에스코리아 manufacturing methods of composite pipe for protective tube refrigerant

Similar Documents

Publication Publication Date Title
US5411777A (en) Heat shrinkable protective sheets
US4001065A (en) Cross-linked olefine-ester tapes
EP3715115B1 (en) Heat-resistant bilaminar heat-shrinkable tube and method for covering to-be-covered object
CA2011432A1 (en) Closure device for shrinkwraps
JPS59136245A (en) Closing arranged body of base material
TW200835591A (en) Manufacturing process of composite sheet
JP2010234705A (en) Foamed polyolefin resin coated compound piping and production process thereof
JP5889729B2 (en) Winding liner for rubber band member
JP2004060879A (en) Foamed polyolefin resin heat insulating material and compound heat insulating tube using it
JPH03175019A (en) Thermally contractive protecting sheet and its manufacture
JP4635591B2 (en) Plastic tube with covering material and method for producing the same
CA2061306C (en) Heat shrinkable protective sheets
JP4188797B2 (en) Curing sheet
JP3377358B2 (en) Polyester laminated film or sheet
JP3560971B2 (en) Heat-recoverable articles
JPWO2019131865A1 (en) Separator, and adhesive tape or sheet with separator
KR101924431B1 (en) manufacturing method of decoration film with multi-layer film protecting emboss of the base film under high temperature and pressure pressing process and thereby decoration film
US4225370A (en) Contracted fibrous overwrap method for thermoplastic coated article
JP2008019664A (en) Repairing sheet and repairing method
JP6788985B2 (en) Resin piping repair method and patch sheet used for the repair method
JP3065711B2 (en) Heat-shrinkable article, method for producing the same, and composite sheet
JPS584608B2 (en) Method for manufacturing heat-shrinkable covering sheet
KR101864526B1 (en) Construction method of anti-corrosion sheet for adhesive layer and shrinkable sheet layer
JP2573684B2 (en) Heat shrinkable film
JP2018173602A (en) Stretchable plastic label, container with label, and method for manufacturing container with label

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120206

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130307

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130903

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20140107