JP2010073121A - Repair work schedule preparation method and repair work schedule preparation system for plant equipment - Google Patents

Repair work schedule preparation method and repair work schedule preparation system for plant equipment

Info

Publication number
JP2010073121A
JP2010073121A JP2008242696A JP2008242696A JP2010073121A JP 2010073121 A JP2010073121 A JP 2010073121A JP 2008242696 A JP2008242696 A JP 2008242696A JP 2008242696 A JP2008242696 A JP 2008242696A JP 2010073121 A JP2010073121 A JP 2010073121A
Authority
JP
Japan
Prior art keywords
repair work
risk level
equipment
repair
schedule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008242696A
Other languages
Japanese (ja)
Inventor
Yusuke Mori
優介 森
Hidekazu Kuniyasu
英一 国安
Yukiyo Fukui
幸代 福井
Norihiko Ikehara
徳彦 池原
Shinya Adachi
真也 足立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Plant Technologies Ltd
Original Assignee
Hitachi Plant Technologies Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Plant Technologies Ltd filed Critical Hitachi Plant Technologies Ltd
Priority to JP2008242696A priority Critical patent/JP2010073121A/en
Publication of JP2010073121A publication Critical patent/JP2010073121A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To support preparation of a schedule of repair work by intuitively and intelligibly displaying the schedule of the repair work based on risk in consideration of not only a lapse of a service life but also an importance level of equipment. <P>SOLUTION: A table showing association of a risk level is held in each repair work year in each equipment that is a target of the repair work based on a risk matrix, and the risk level is separately displayed by using different colors about a block wherein each equipment and the repair work year thereof are associated on a repair work schedule table based on the table when preparing the repair work schedule. A table showing a repair work recommendation period is held in each equipment that is the target of the repair work, and the block is separately displayed by using different colors only for the repair work recommendation period based on the table. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、プラント機器の補修工事スケジュール作成方法、および、補修工事スケジュール作成システムに係り、特に、原子力発電所のように定期点検があり、その定期点検のスケジュールを勘案し、補修工事のスケジュールを調整可能な空調設備などの補助的な機器の補修工事に用いて好適な補修工事スケジュール作成方法、および、補修工事スケジュール作成システムに関する。   The present invention relates to a plant equipment repair work schedule creation method and a repair work schedule creation system, and in particular, there is a periodic inspection like a nuclear power plant. The present invention relates to a repair work schedule creation method and a repair work schedule creation system suitable for use in repair work of auxiliary equipment such as adjustable air conditioning equipment.

原子力発電所などは、大量のプラント機器が存在し、それらの機器に対して、適切な時期に補修工事をおこなうことが必要になる。プラント機器の補修工事、部品の取り換えなどの計画には、コンピュータによるスケジュール作成がおこなわれる。   Nuclear power plants and the like have a large amount of plant equipment, and it is necessary to perform repair work on these equipment at an appropriate time. A schedule is created by a computer for a plan for repairing plant equipment and replacing parts.

例えば、特許文献1には、部品の寿命により部品の交換計画をおこなう技術が開示されている。   For example, Patent Document 1 discloses a technique for performing a part replacement plan based on the life of a part.

特開2005−240776号公報Japanese Patent Laid-Open No. 2005-240776

上記特許文献1は、部品の寿命により発電所の部品を管理し、複数の電力発電所で効率的に部品の運用をおこなうことを目指している。   The above Patent Document 1 aims to manage power plant components based on the lifetime of the components and efficiently operate the components at a plurality of power power plants.

しかしながら、プラントにおいては、同機種であっても属する系統によって重要度が異なり、所定の耐用年数で取り換えるだけではなく、対象のプラント機器が故障した際の被害の大きさを考慮した上で補修工事のスケジュールを立てることが必要であるという問題点がある。このような重要な機器の場合には、所定の使用の割合に達する前に交換する可能性もある。上記特許文献1は、このようにリスクを考慮したスケジュールの作成をおこなうことはできなかった。   However, in the plant, even if it is the same model, the degree of importance differs depending on the system to which it belongs, and it is not only replaced with the specified service life, but also repair work taking into account the magnitude of damage when the target plant equipment fails There is a problem that it is necessary to make a schedule. In the case of such an important device, it may be replaced before the predetermined usage rate is reached. The above-mentioned Patent Document 1 cannot create a schedule in consideration of risks in this way.

本発明は、上記問題点を解決するためになされたもので、その目的は、補修工事スケジュール作成システムにおいて、耐用年数の経過のみならず機器の重要度も加味したリスクを基づいた補修工事のスケジュールを直感的にわかりやすく表示し、補修工事のスケジュールの作成を支援することにある。   The present invention has been made to solve the above-mentioned problems, and its purpose is to provide a repair work schedule based on a risk that takes into account not only the passage of the service life but also the importance of equipment in a repair work schedule creation system. This is to support the creation of repair work schedules.

本発明では、リスクマトリックスを用いたリスクベースメインテナンス(RBM)の管理手法を前提とする。本発明では、リスクマトリックスに基づいた補修工事の対象となる機器ごとに、その補修工事年度ごとに、リスクレベルの対応を示すテーブルを保持しておき、そのテーブルに基づき、補修工事スケジュールを作成するときに、補修工事スケジュール表上に、各機器とその補修工事年度が対応するブロックについて、リスクレベルを色分けして表示する。   In the present invention, a risk-based maintenance (RBM) management method using a risk matrix is assumed. In the present invention, a table indicating risk level correspondence is held for each repair work year for each device to be repaired based on the risk matrix, and a repair work schedule is created based on the table. Occasionally, on the repair schedule table, the risk level is displayed in different colors for each device and the block corresponding to the repair year.

また、補修工事の対象となる機器ごとに、補修工事推奨期間を示すテーブルを保持しておき、そのテーブルに基づき、ブロックを補修工事推奨期間だけ色分けして表示する。   In addition, a table indicating the recommended repair work period is held for each device to be repaired, and blocks are displayed in different colors based on the recommended repair work period based on the table.

本発明によれば、耐用年数の経過のみならず機器の重要度も加味したリスクを基づいた補修工事のスケジュールを直感的にわかりやすく表示し、補修工事のスケジュールの作成を支援することのできる補修工事スケジュール作成システムを提供することができる。   According to the present invention, the repair work schedule based on the risk including not only the passage of the service life but also the importance of the equipment is intuitively displayed in an easy-to-understand manner, and the repair that can support the creation of the repair work schedule A construction schedule creation system can be provided.

以下、本発明の一実施形態を、図1ないし図15を用いて説明する。
先ず、図1を用いて本発明の一実施形態に係るプラント機器の補修工事スケジュール作成システムのハードウェア構成について説明する。
図1は、本発明の一実施形態に係るプラント機器の補修工事スケジュール作成システムのハードウェア構成図である。
Hereinafter, an embodiment of the present invention will be described with reference to FIGS.
First, the hardware configuration of a plant equipment repair work schedule creation system according to an embodiment of the present invention will be described with reference to FIG.
FIG. 1 is a hardware configuration diagram of a plant equipment repair work schedule creation system according to an embodiment of the present invention.

本発明の一実施形態に係る機器の補修工事スケジュール作成システムのハードウェア構成としては、例えば、図1に示されるような一般的なパーソナルコンピュータ100で実現される。   The hardware configuration of the equipment repair work schedule creation system according to the embodiment of the present invention is realized by, for example, a general personal computer 100 as shown in FIG.

パーソナルコンピュータ100は、CPU(Central Processing Unit)101、主記憶装置102、ネットワークI/F103、グラフィックI/F104、入出力I/F105、補助記憶装置I/F106が、バスにより結合された形態になっている。   The personal computer 100 has a configuration in which a CPU (Central Processing Unit) 101, a main storage device 102, a network I / F 103, a graphic I / F 104, an input / output I / F 105, and an auxiliary storage device I / F 106 are connected by a bus. ing.

CPU101は、パーソナルコンピュータ100の各部を制御し、主記憶装置102にスケジュール作成プログラム60をロードして実行する。   The CPU 101 controls each part of the personal computer 100 and loads and executes the schedule creation program 60 in the main storage device 102.

主記憶装置102は、通常、RAMなどの揮発メモリで構成され、CPU101が実行するスケジュール作成プログラム60、参照するデータが記憶される。   The main storage device 102 is usually composed of a volatile memory such as a RAM, and stores a schedule creation program 60 executed by the CPU 101 and data to be referenced.

ネットワークI/F103は、外部ネットワーク50と接続するためのインタフェースである。   The network I / F 103 is an interface for connecting to the external network 50.

グラフィックI/F104は、LCD(Liquid Crystal Display)などの表示装置20を接続するためのインタフェースである。   The graphic I / F 104 is an interface for connecting a display device 20 such as an LCD (Liquid Crystal Display).

入出力I/F105は、入出力装置を接続するためのインタフェースである。図1の例では、キーボード31とポインティングデバイスのマウス32が接続されている。   The input / output I / F 105 is an interface for connecting an input / output device. In the example of FIG. 1, a keyboard 31 and a mouse 32 of a pointing device are connected.

補助記憶装置I/F106は、HDD(Hard Disk Drive)41やDVDドライブ(Digital Versatile Disk)42などの補助記憶装置を接続するためのインタフェースである。   The auxiliary storage device I / F 106 is an interface for connecting an auxiliary storage device such as an HDD (Hard Disk Drive) 41 or a DVD drive (Digital Versatile Disk) 42.

HDD41は、大容量の記憶容量を有しており、本実施形態を実行するためのプログラム60と、データベース70が格納されている。   The HDD 41 has a large storage capacity, and stores a program 60 and a database 70 for executing the present embodiment.

DVDドライブ42は、DVDやCDなどの光学ディスクにデータを書き込んだり、光学ディスクからデータを読み込んだりする装置である。   The DVD drive 42 is a device that writes data to an optical disk such as a DVD or CD, or reads data from the optical disk.

次に、図2を用いて本発明の一実施形態に係るプラント機器の補修工事スケジュール作成システムのソフトウェア構成について説明する。
図2は、本発明の一実施形態に係るプラント機器の補修工事スケジュール作成システムのソフトウェア構成図である。
Next, the software configuration of the plant equipment repair work schedule creation system according to an embodiment of the present invention will be described with reference to FIG.
FIG. 2 is a software configuration diagram of a plant equipment repair work schedule creation system according to an embodiment of the present invention.

図1に示したスケジュール作成プログラムは、図2に示されるように、リスク経時変化解析モジュール610、リスク経時変化の工程表への表示モジュール620、定期点検工程表示モジュール630、補修工事工程調整モジュール640、年度別予算表示モジュール650からなる。   As shown in FIG. 2, the schedule creation program shown in FIG. 1 includes a risk aging analysis module 610, a risk aging change process table display module 620, a periodic inspection process display module 630, and a repair work process adjustment module 640. And the annual budget display module 650.

リスク経時変化解析モジュール610は、各種データベースから必要な各プラント機器の情報を読み込み、各プラント機器のリスクの経時変化を解析するモジュールである。   The risk aging analysis module 610 is a module that reads necessary plant equipment information from various databases and analyzes the risk aging of each plant equipment.

リスク経時変化の工程表への表示モジュール620は、リスク経時変化解析モジュール610で解析した各プラント機器のリスクの経時変化に基づき、補修工事の工程表を表示するためのモジュールである。   The process module 620 for displaying the change over time in the risk is a module for displaying the process chart for the repair work based on the change over time in the risk of each plant device analyzed by the risk change over time analysis module 610.

定期点検工程表示モジュール630は、プラントの定期点検に関する工程を表示するモジュールである。プラントの定期点検のスケジュールは、予め外部からデータベースとして渡されるものとする。   The periodic inspection process display module 630 is a module that displays processes related to the periodic inspection of the plant. The schedule for the periodic inspection of the plant is assumed to be passed from the outside as a database in advance.

本実施形態では、プラント機器に定期点検のある機器と、その定期点検に応じて補修工事のスケジュールを作成することのできる周辺の機器があることを想定している。例えば、原子力発電所では、定期点検のある機器は、原子炉やその他の発電に関する主要設備を構成する機器であり、周辺の機器とは、原子力発電所の空調設備などである。   In the present embodiment, it is assumed that the plant equipment has equipment that has a periodic inspection and peripheral equipment that can create a repair work schedule according to the periodic inspection. For example, in a nuclear power plant, equipment that has periodic inspections is equipment that constitutes a nuclear power plant and other main facilities related to power generation, and peripheral equipment is air conditioning equipment of the nuclear power plant.

補修工事工程調整モジュール640は、補修工程を合理化して複数の工程を、一つの工程にまとめた工程にしたり、補修工程を定期点検のときにするように調整するためのモジュールである。   The repair work process adjustment module 640 is a module for rationalizing the repair process so that a plurality of processes are combined into one process, or the repair process is adjusted so as to be performed at regular inspections.

年度別予算表示モジュール650は、スケジュールを実行した場合の年度別の予算を、表やグラフとして表示するためのモジュールである。   The yearly budget display module 650 is a module for displaying the yearly budget when the schedule is executed as a table or a graph.

次に、図3を用いてプラント機器に対するリスクベースメインテナンス管理手法とリスクマトリックスについて説明する。
図3は、リスクマトリックス上の機器の経年変化を表す図である。
Next, a risk-based maintenance management method and a risk matrix for plant equipment will be described with reference to FIG.
FIG. 3 is a diagram showing the secular change of devices on the risk matrix.

本実施形態のプラント機器は、リスクベースメインテナンス(RBM)の管理手法により、管理されているものとする。リスクベースメンテナンスとは、機器に対して損傷が発生する確率と損傷に伴う損失の大きさの積(リスク)をできるだけ小さくすることを目標とするメンテナンスの考え方である。RBMでよく使われるのが、図3に示されるリスクマトリックスである。   It is assumed that the plant equipment of this embodiment is managed by a risk-based maintenance (RBM) management method. Risk-based maintenance is a concept of maintenance that aims to minimize the product (risk) of the probability of damage to equipment and the magnitude of loss accompanying damage. The risk matrix shown in FIG. 3 is often used in RBM.

リスクマトリックスの縦軸には、機器に対する故障、損傷の起こりやすさがとられる。この図の例では、それを機器の劣化度として表現している。劣化度とは、各々の機器に対して、(使用年数/耐用年数)×100%で算出することができる。   On the vertical axis of the risk matrix, the likelihood of equipment failure or damage is taken. In the example of this figure, this is expressed as the degree of device degradation. The degree of deterioration can be calculated by (use years / lifetime) × 100% for each device.

リスクの横軸には、その機器が故障したときの被害の大きさがとられる。被害の大きさとは、修理にかかる費用、その機器の属する系統への影響度、その機器の機能、故障したときの停止期間などを総合的に勘案し、定量的に評価されているものとする。   The horizontal axis of risk is the magnitude of damage when the equipment breaks down. The severity of damage shall be evaluated quantitatively by comprehensively considering the cost of repair, the degree of influence on the system to which the equipment belongs, the function of the equipment, the outage period in the event of failure. .

この図3に示されたリスクマトリックスは、4段階のリスクレベルに分割されており、右上に区分された領域に属する機器がリスクが大きいレベルに属していることになる。例えば、図3(a)の2008年のリスクマトリックスでは、機器(A)は、リスクレベルIVに属しており、それより、リスクの低いリスクレベルIIIには、機器(C)が属している。さらに、リスクレベルIIには、機器(E)、(D)、(B)が属しており、一番、リスクの低いレベルIには、機器(F)が属している。   The risk matrix shown in FIG. 3 is divided into four stages of risk levels, and devices belonging to the area divided in the upper right belong to a high risk level. For example, in the 2008 risk matrix of FIG. 3A, the device (A) belongs to the risk level IV, and the device (C) belongs to the risk level III having a lower risk. Furthermore, equipment (E), (D), and (B) belong to risk level II, and equipment (F) belongs to level I with the lowest risk.

ここで、劣化度は、耐用年数に対する使用年数の割合で計算されるものであり、使用年数が大きくなると増加するために、各機器のリスクは、時間の経過にしたがって上昇する。そのために、図3(b)、(c)に示されるように、時間の経過にしたがってリスクマトリックスが変化する。   Here, the degree of deterioration is calculated by the ratio of the service life to the service life, and increases as the service life increases, so that the risk of each device increases with time. Therefore, as shown in FIGS. 3B and 3C, the risk matrix changes with the passage of time.

図3(b)の2009年のリスクマトリックスでは、リスクレベルIIIに機器(C)と、機器(D)が属することになり、2010年のリスクマトリックスでは、リスクレベルIIIに機器(C)と、機器(D)と、機器(B)が属することになる。ここで、リスクレベルIVと、リスクレベルIIIの機器が、補修工事が必要な機器あるとすると、2008年には、機器(A)と、機器(C)が補修工事が必要であったのが、2009年には、機器(A)と、機器(C)と、機器(D)が補修工事が必要になる。さらには、2010年には、機器(A)と、機器(C)と、機器(D)と、機器(B)が補修工事が必要になる。このように、リスクマトリックスにより、各機器のリスクレベルの上昇と、年度別の補修工事の必要性が把握しやすくなる。   In the 2009 risk matrix of FIG. 3B, the device (C) and the device (D) belong to the risk level III, and in the 2010 risk matrix, the device (C) has the risk level III. Device (D) and device (B) belong. Here, if risk level IV and risk level III equipment is equipment that requires repair work, in 2008, equipment (A) and equipment (C) needed repair work. In 2009, equipment (A), equipment (C), and equipment (D) require repair work. Furthermore, in 2010, equipment (A), equipment (C), equipment (D), and equipment (B) require repair work. In this way, the risk matrix makes it easier to grasp the rise in the risk level of each device and the necessity of repair work by year.

次に、図4ないし図8を用いて本発明の補修工事スケジュール作成システムに用いられるデータ構造について説明する。
図4は、リスクマトリックス表現テーブルの一例を示す図である。
図5は、機器リスクレベル対応テーブルの一例を示す図である。
図6は、リスクレベルと補修工事推奨期間の対応テーブルを示す図である。
図7は、補修工程テーブルの一部を示す図である。
図8は、定期点検スケジュールテーブルの一例を示す図である。
Next, the data structure used in the repair work schedule creation system of the present invention will be described with reference to FIGS.
FIG. 4 is a diagram illustrating an example of a risk matrix expression table.
FIG. 5 is a diagram illustrating an example of the device risk level correspondence table.
FIG. 6 is a diagram showing a correspondence table between risk levels and repair work recommendation periods.
FIG. 7 is a diagram showing a part of the repair process table.
FIG. 8 is a diagram illustrating an example of a periodic inspection schedule table.

リスクマトリックス表現テーブルは、図4に示されるように、リスクを表現するためのテーブルであり、領域ごとに、リスクレベルと、劣化度の下限と上限、被害の大きさの下限と上限が定められている。   As shown in FIG. 4, the risk matrix expression table is a table for expressing risks. For each region, a risk level, a lower limit and an upper limit of the degree of deterioration, and a lower limit and an upper limit of the magnitude of damage are determined. ing.

機器とリスクレベル対応テーブルは、図5に示されるように、機器ごとに、そのリスクレベルと、対応するリスクマトリックスの年度を表現するテーブルである。年度のフィールドには、複数の年度を持てるものとする。例えば、一番上のレコードは、年度が、2008、2009、2010のときの、機器(A)のリスクレベルは、IVであることを示している。   As shown in FIG. 5, the device and risk level correspondence table is a table that represents the risk level and the corresponding risk matrix year for each device. The year field shall have multiple years. For example, the top record indicates that the risk level of the device (A) when the year is 2008, 2009, or 2010 is IV.

リスクレベルと補修工事推奨期間の対応テーブルは、図6に示されるように、リスクレベルとそのリスクレベルに該当している機器に対しての補修工事推奨期間を示すテーブルである。   As shown in FIG. 6, the correspondence table between the risk level and the recommended repair work period is a table showing the recommended repair work period for the risk level and the equipment corresponding to the risk level.

本実施形態では、リスクレベルが、IとIIの機器に対しては、補修工事を推奨せず、リスクレベルが、IIIの機器に対しては、補修工事推奨期間を、5年、それより、よりリスクの高いリスクレベルが、IVの機器に対しては、補修工事推奨期間を、2年としている。   In this embodiment, repair work is not recommended for equipment with risk levels I and II, and the recommended repair work period is 5 years for equipment with risk level III. For equipment with a higher risk level, IV, the recommended repair period is 2 years.

補修工程テーブルは、図7に示されるように、対象となる機器と、作業工程、のべ人数、開始日、終了日からなっている。開始日、終了日は、対象となる機器に関連する工程が始まった日からの相対日とする。   As shown in FIG. 7, the repair process table includes target devices, work processes, total number of people, start date, and end date. The start date and the end date are relative days from the date when the process related to the target device starts.

また、対象となる機器が異なる補修機器に対して、それらを合成した工程を作ることができる。例えば、機器(C)の作業6と、機器(D)の作業6とは、ともに搬入工程で、それらを同時におこなった方が、合理的なときには、のべ人数は、二つの工程で、21×2人かかっていたものが、30人に減らすことができる。なお、作業の開始日、終了日の基準は、例えば、合成工程の最初に記述した機器(C)の工程と決めればよい。   Moreover, the process which synthesize | combined them can be made with respect to the repair equipment from which the object apparatus differs. For example, when the operation 6 of the device (C) and the operation 6 of the device (D) are both carried in the carrying-in process and it is more reasonable to perform them simultaneously, the total number of people is 21 in two steps. X What took 2 people can be reduced to 30 people. In addition, what is necessary is just to determine the reference | standard of the start date of work, and the end date, for example, the process of the apparatus (C) described at the beginning of the synthesis process.

定期点検スケジュールテーブルは、図8に示されるように、年度ごとの定期点検のスケジュールを保持している。   As shown in FIG. 8, the periodic inspection schedule table holds a periodic inspection schedule for each year.

次に、図9ないし図15を用いて本発明の一実施形態に係る補修工事スケジュール作成システムの処理について説明する。
図9は、本発明の一実施形態に係る補修工事スケジュール作成システムの処理の概要を示すフローチャートである。
図10は、補修工事工程作成の様子を示す図である。
図11は、補修工事スケジュールを作成するときの補修工事スケジュール表を示す図である。
図12は、補修工事工程を合理化するときの様子を示す図である。
図13は、予算と人員の山積みグラフを示す図である。
図14は、緊急保全による費用増大の警告の表示をおこなう様子を示す図である。
図15は、予算の平準化候補を示す表示の図である。
Next, processing of the repair work schedule creation system according to an embodiment of the present invention will be described with reference to FIGS. 9 to 15.
FIG. 9 is a flowchart showing an outline of processing of the repair work schedule creation system according to the embodiment of the present invention.
FIG. 10 is a diagram showing a state of repair work process creation.
FIG. 11 is a diagram illustrating a repair work schedule table when a repair work schedule is created.
FIG. 12 is a diagram showing a state when the repair work process is rationalized.
FIG. 13 is a diagram showing a pile graph of budget and personnel.
FIG. 14 is a diagram illustrating a state in which a warning for increasing costs due to emergency maintenance is displayed.
FIG. 15 is a display diagram showing budget leveling candidates.

先ず、補修工事スケジュール作成をおこなうために、補修の対象となりうる機器のごとのリスク経時変化のシミュレーションをおこなう(S100)。補修工事計画を作成する対象の期間、機器の被害の大きさ、過去の取替実績や劣化状態などを考慮して、図4ないし図6に示すデータ構造を持つテーブルを作成し、補修工事の対象となる機器、リスクマトリックス、リスクレベルごとの補修推奨期間を明らかにする。このステップの処理は、リスク経時変化解析モジュール610がCPU101により実行されることによりおこなわれる。   First, in order to create a repair work schedule, a risk change with time for each device that can be repaired is simulated (S100). Considering the period for which the repair work plan is to be created, the magnitude of damage to the equipment, past replacement results and deterioration status, etc., a table having the data structure shown in FIGS. Clarify the recommended repair period for each target device, risk matrix, and risk level. The processing in this step is performed when the risk change analysis module 610 is executed by the CPU 101.

次に、S100で補修工事の対象となる機器の補修工事の計画を作成し(S200)、各補修計画対象機器ごとに、図10に示されるように、各作業工程、業者、人数を割り当てる。この図10では、表示装置上に、補修工事の工程の情報を表示している様子を示している。例えば、図10の6番目の項目は、補修工事の対象機器がAの関連工程の作業6に対して、のべ人数が、21人で、作業1が始まった8日目から10目に、7人ずつで作業をおこなうことを示している。   Next, in S100, a repair work plan for the equipment to be repaired is created (S200), and each work process, contractor, and number are assigned to each repair plan target equipment as shown in FIG. FIG. 10 shows a state where information on the repair work process is displayed on the display device. For example, the sixth item in FIG. 10 is that the target device for the repair work is the work 6 of the related process A, the total number of people is 21, and from the 8th day to the 10th day, the work 1 started. It shows that 7 people work.

次に、補修工事スケジュールを作成する(S300)。補修工事スケジュールを作成するにあたっては、図5に示したような補修計画対象機器ごとに、リスクマトリックスに従ったリスクレベル、また、図6に示したようなリスクレベルごとの補修工事推奨期間が参照される。また、図8に示したような定期点検工程に関する情報も参照される。   Next, a repair work schedule is created (S300). In preparing the repair work schedule, refer to the risk level according to the risk matrix for each repair plan target device as shown in FIG. 5 and the recommended repair work period for each risk level as shown in FIG. Is done. In addition, information on the periodic inspection process as shown in FIG. 8 is also referred to.

補修工事スケジュール作成システムでは、補修工事スケジュールを作成するときには、図11に示したような補修工事スケジュール表を、表示装置に表示する。補修工事スケジュール表を表示する際には、リスク経時変化の工程表への表示モジュール620がCPU101により実行される。   In the repair work schedule creation system, when a repair work schedule is created, a repair work schedule table as shown in FIG. 11 is displayed on the display device. When displaying the repair work schedule table, the CPU 101 executes a module 620 for displaying a process table of the risk change with time.

補修工事スケジュール表は、定期点検の工程スケジュールと補修工事の工程スケジュールが並列して表示されている。補修工事の工程スケジュールでは、各補修工事の対象となる機器ごとに、リスクマトリックスに基づいたリスクレベルが色分けして表示される。   In the repair work schedule table, the process schedule for periodic inspection and the process schedule for repair work are displayed in parallel. In the process schedule for repair work, the risk level based on the risk matrix is displayed in different colors for each device to be repaired.

この補修工事スケジュール表は、行方向に、補修工事の機器が表現され、列方向に、補修工事をおこなう年度が表現されている。そして、補修工事の機器ごとに、補修工事をおこなう年度がブロックとして示されており、そのブロック内に補修工事期間を矩形として示される。また、補修工事の機器と、補修工事をおこなう年度に対応するリスクレベルを識別しうるように、ブロックが色分けして、表示される。   In this repair work schedule table, equipment for repair work is represented in the row direction, and the year in which repair work is performed is represented in the column direction. And the year which performs repair work is shown as a block for every apparatus of repair work, and the repair work period is shown as a rectangle in the block. In addition, the blocks are displayed in different colors so that the equipment for repair work and the risk level corresponding to the year in which the repair work is performed can be identified.

この例では、赤のリスクレベルIVと、オレンジのリスクレベルIIIが、補修工事推奨としてが定められているリスクレベルなので、それらのリスクレベルの機器の該当年度が色づけして、表示する対象となる。例えば、機器(A)の2008年度、2009年度は、リスクレベルIVであり、スケジュール表上で、赤で表示される。機器(A)が、2008年度に初めて、リスクレベルIVに属するようになったとすると、補修工事推奨期間は、2年なので、2008年度と、2009年度がリスクレベルIVの赤で、表示される。機器(B)の場合には、2010年度に、初めて、リスクレベルIIIのオレンジ色で表示される。リスクレベルIIIの補修工事推奨期間は、5年なので、図には示していないが、2010年度から2014年度までが、オレンジ色で表示される。ただし、その間に、リスクレベルが変化したときには、変化したリスクレベルが優先して、新しいリスクレベル(リスクレベルが高い)による色づけにより、表示される。   In this example, red risk level IV and orange risk level III are the risk levels that are recommended as repair work, so the relevant fiscal years for those risk level devices are colored and displayed. . For example, the fiscal year 2008 and fiscal 2009 for the device (A) are the risk level IV and are displayed in red on the schedule table. If the device (A) first belongs to the risk level IV in 2008, the recommended repair period is 2 years, so the 2008 and 2009 are displayed in red with the risk level IV. In the case of the device (B), it is displayed in orange of risk level III for the first time in 2010. The recommended repair period for risk level III is 5 years, so it is not shown in the figure, but from 2010 to 2014 is displayed in orange. However, if the risk level changes during that time, the changed risk level is given priority and displayed by coloring with a new risk level (high risk level).

また、補修工事の期間は、定期点検を考慮して定めることが望ましい。例えば、機器(B)が、定期点検工程と同時に補修可能な機器であり、補修工事と定期点検を同時にやることが望ましいときには、2010年度の補修工事期間を、定期点検の工程と重ねあわせておこなうことにしてもよい。これは、例えば、図11に示されるように、2010年度の補修工事期間をあらわす矩形を、マウスなどのポインティングデバイスにより、ドラッグするようなユーザインターフェイスを提供するようにして、スケジュール作成の支援をおこなえるようにする。なお、定期点検の工程を表示するために、定期点検工程表示モジュール630が使われる。   In addition, it is desirable to determine the period of repair work in consideration of regular inspections. For example, when the device (B) is a device that can be repaired at the same time as the periodic inspection process, and it is desirable to perform the repair work and the periodic inspection at the same time, the repair work period of 2010 is overlapped with the periodic inspection process. You may decide. For example, as shown in FIG. 11, it is possible to provide a user interface in which a rectangle representing the repair work period of 2010 is dragged with a pointing device such as a mouse to support schedule creation. Like that. The periodic inspection process display module 630 is used to display the periodic inspection process.

次に、各機器の補修工程の合理化をおこなう(S400)。例えば、図12に示されるように、補修対象の機器(C)の作業工程6と、機器(D)の作業工程6が共に、機器の補修部品などを搬入する工程であり、結合して一つの工程することが合理的であるときには、合理化した工程を作成し、図7に示される補修工程テーブルのデータに従って、のべ人数や補修工程の実施時期を定めることができる。この例では、新たに合理化した作業工程6′により、作業にかかる人数の合理化をおこなことができる。このステップの処理は、補修工事工程調整モジュール640がCPU101により実行されることによりおこなわれる。   Next, the repair process of each device is rationalized (S400). For example, as shown in FIG. 12, the work process 6 of the device (C) to be repaired and the work process 6 of the device (D) are both a process of carrying in a repair part of the device and the like. When it is reasonable to perform one process, a rationalized process can be created, and the total number of persons and the execution time of the repair process can be determined according to the data of the repair process table shown in FIG. In this example, the number of people involved in the work can be rationalized by the newly rationalized work process 6 '. The processing in this step is performed by the repair work process adjustment module 640 being executed by the CPU 101.

次に、これまでの作成してきた補修工程のスケジュールに基づいて、予算・人員の山積み表示、緊急保全費用の表示をおこなう(S500)。予算の表示は、図13(a)に示されるように、各年度の補修工事の予算を棒グラフとして積み上げて表示する。また、各年度の予算に目標があり、各年度の予算が平準化するのが望ましいときには、それについての警告を表示するようにしてもよい。例えば、図15に示される例では、各年度の補修工事予算目標が、1億9千万円から2億5千万円のときに、2010年が予算未達のために、警告を表示している。この年度別の予算表示のために、年度別予算表示モジュール650がCPU101により実行される。   Next, based on the repair process schedule created so far, a pile of budgets and personnel and an emergency maintenance cost are displayed (S500). As shown in FIG. 13A, the budget is displayed by accumulating the budget for repair work for each fiscal year as a bar graph. Further, when there is a target for the budget for each year and it is desirable that the budget for each year should be leveled, a warning about this may be displayed. For example, in the example shown in FIG. 15, when the repair work budget target for each fiscal year is 190 million yen to 250 million yen, a warning is displayed because the budget is not reached in 2010. ing. To display the budget for each year, the CPU 101 executes a budget display module for each year 650.

また、図13(b)に示すように、業者ごとに、各年度の人員の山積みの表示をおこない、人員の確保のために参照することができる。   Moreover, as shown in FIG.13 (b), the pile of the staff of each year can be displayed for every contractor, and it can refer for securing of a staff.

緊急保全費用とは、緊急に機器の保全をしなければならないときに、発生する費用のことである。補修工事推奨期間内に補修をしないときには、緊急保全費用を払わなければならないという危険が増大する。図14の例では、機器(A)が、補修工事推奨期間内の2009年内に補修工事をおこなわないときには、相応の緊急保全費用が発生することを示している。   Emergency maintenance costs are costs that occur when equipment must be maintained urgently. If repairs are not performed within the recommended repair period, the risk of having to pay emergency maintenance costs increases. In the example of FIG. 14, when the device (A) does not perform repair work within 2009 within the repair work recommended period, it indicates that a corresponding emergency maintenance cost is generated.

予算・人員の平準化や、緊急保全費用機器の低減ができているかをチェックし(S600)、目標が達成されたときには、補修工事スケジュール作成は、完了し(S700)、目標が達成されないときには、S300に戻り、補修工事スケジュールを再作成する。   Check whether budget and personnel leveling and emergency maintenance cost equipment have been reduced (S600). When the target is achieved, the repair work schedule creation is completed (S700), and when the target is not achieved, Returning to S300, the repair work schedule is recreated.

本発明の一実施形態に係るプラント機器の補修工事スケジュール作成システムのハードウェア構成図である。It is a hardware block diagram of the repair construction schedule preparation system of the plant apparatus which concerns on one Embodiment of this invention. 本発明の一実施形態に係るプラント機器の補修工事スケジュール作成システムのソフトウェア構成図である。It is a software block diagram of the repair construction schedule creation system of the plant equipment which concerns on one Embodiment of this invention. リスクマトリックス上の機器の経年変化を表す図である。It is a figure showing the secular change of the apparatus on a risk matrix. リスクマトリックス表現テーブルの一例を示す図である。It is a figure which shows an example of a risk matrix expression table. 機器とリスクレベル対応テーブルの一例を示す図である。It is a figure which shows an example of an apparatus and a risk level corresponding | compatible table. リスクレベルと補修工事推奨期間の対応テーブルを示す図である。It is a figure which shows the correspondence table of a risk level and repair work recommendation period. 補修工程テーブルの一部を示す図である。It is a figure which shows a part of repair process table. 定期点検スケジュールテーブルの一例を示す図である。It is a figure which shows an example of a regular inspection schedule table. 本発明の一実施形態に係る補修工事スケジュール作成システムの処理の概要を示すフローチャートである。It is a flowchart which shows the outline | summary of a process of the repair construction schedule preparation system which concerns on one Embodiment of this invention. 補修工事工程作成の様子を示す図である。It is a figure which shows the mode of repair construction process creation. 補修工事スケジュールを作成するときの補修工事スケジュール表を示す図である。It is a figure which shows the repair construction schedule table | surface when creating a repair construction schedule. 補修工事工程を合理化するときの様子を示す図である。It is a figure which shows a mode when rationalizing a repair construction process. 予算と人員の山積みグラフを示す図である。It is a figure which shows a pile graph of a budget and personnel. 緊急保全による費用増大の警告の表示をおこなう様子を示す図である。It is a figure which shows a mode that the warning of the cost increase by emergency maintenance is displayed. 予算の平準化候補を示す表示の図である。It is a figure of the display which shows a budget leveling candidate.

符号の説明Explanation of symbols

100…パーソナルコンピュータ、101…CPU(Central Processing Unit)、102…主記憶装置、103…ネットワークI/F、104…グラフィックI/F、105…入出力I/F、106…補助記憶装置I/F。   DESCRIPTION OF SYMBOLS 100 ... Personal computer, 101 ... CPU (Central Processing Unit), 102 ... Main memory, 103 ... Network I / F, 104 ... Graphic I / F, 105 ... Input / output I / F, 106 ... Auxiliary memory I / F .

31…キーボード、32…マウス、41…HDD(Hard Disk Drive)、42…DVDドライブ(Digital Versatile Disk)、50…外部ネットワーク、60…スケジュール作成プログラム、70…データベース。   DESCRIPTION OF SYMBOLS 31 ... Keyboard, 32 ... Mouse, 41 ... HDD (Hard Disk Drive), 42 ... DVD drive (Digital Versatile Disk), 50 ... External network, 60 ... Schedule creation program, 70 ... Database.

Claims (8)

コンピュータにより実行されるプラント機器の補修工事スケジュール作成方法において、
前記コンピュータは、CPUと、記憶装置と、表示装置とを有し、
前記記憶装置は、補修工事の機器と、補修工事をおこなう年度ごとに、リスクレベルを定める機器リスクレベル対応テーブルを保持し、
前記CPUにより前記機器リスクレベル対応テーブルに基づき演算することにより、スケジュール表の行方向に、補修工事の機器を表現し、列方向に、補修工事をおこなう年度を表現して、補修工事の機器ごとに、補修工事をおこなう年度をブロックとして示すスケジュール表上に、前記ブロック内に補修工事期間を矩形として示し、前記ブロックについて、前記補修工事の機器と、前記補修工事をおこなう年度に対応するリスクレベルを識別しうるように、前記表示装置に表示することを特徴とする補修工事スケジュール作成方法。
In a method for creating a repair schedule for plant equipment executed by a computer,
The computer includes a CPU, a storage device, and a display device.
The storage device holds a device risk level correspondence table that determines the risk level for each year of repair work equipment and repair work,
By calculating based on the equipment risk level correspondence table by the CPU, the repair work equipment is represented in the row direction of the schedule table, and the year in which the repair work is performed is represented in the column direction. In the schedule table showing the year of repair work as a block, the repair work period is shown as a rectangle in the block. A repair work schedule creation method, characterized in that it is displayed on the display device so that it can be identified.
前記リスクレベルの表示は、リスクレベルごとに定められた色分け表示であることを特徴とする請求項1記載の補修工事スケジュール作成方法。   The repair work schedule creation method according to claim 1, wherein the display of the risk level is a color-coded display determined for each risk level. さらに、前記記憶装置は、リスクレベルと補修工事推奨期間の対応テーブルを保持し、
前記リスクレベルの表示は、前記リスクレベルと補修工事推奨期間の対応テーブルに基づき、補修工事の機器ごと定められた補修工事推奨期間だけリスクレベルごとに定められた色分け表示をすることを特徴とする請求項2記載の補修工事スケジュール作成方法。
Furthermore, the storage device holds a correspondence table of risk level and recommended repair work period,
The display of the risk level is based on a correspondence table of the risk level and the recommended repair work period, and is color-coded and displayed for each risk level for the repair work recommended period determined for each repair work device. The repair work schedule creation method according to claim 2.
前記補修工事の機器と同じ行方向に、定期点検工程を表現し、定期点検工程の期間を矩形として、年度ごとに対比して表示することを特徴とする請求項1記載の補修工事スケジュール作成方法。   The repair work schedule creation method according to claim 1, wherein a periodic inspection process is expressed in the same row direction as the equipment of the repair work, and the period of the periodic inspection process is displayed as a rectangle in comparison with each year. . コンピュータにより実行されるプラント機器の補修工事スケジュール作成システムにおいて、
前記コンピュータは、CPUと、記憶装置と、表示装置とを有し、
前記記憶装置は、補修工事の機器と、補修工事をおこなう年度ごとに、リスクレベルを定める機器リスクレベル対応テーブルを保持し、
前記CPUにより前記機器リスクレベル対応テーブルに基づき演算することにより、スケジュール表の行方向に、補修工事の機器を表現し、列方向に、補修工事をおこなう年度を表現して、補修工事の機器ごとに、補修工事をおこなう年度をブロックとして示すスケジュール表上に、前記ブロック内に補修工事期間を矩形として示し、前記ブロックについて、前記補修工事の機器と、前記補修工事をおこなう年度に対応するリスクレベルを識別しうるように、前記表示装置に表示することを特徴とする補修工事スケジュール作成システム。
In the repair schedule creation system for plant equipment executed by a computer,
The computer includes a CPU, a storage device, and a display device.
The storage device holds a device risk level correspondence table that determines the risk level for each year of repair work equipment and repair work,
By calculating based on the equipment risk level correspondence table by the CPU, the repair work equipment is represented in the row direction of the schedule table, and the year in which the repair work is performed is represented in the column direction. In the schedule table showing the year of repair work as a block, the repair work period is shown as a rectangle in the block. A repair work schedule creation system, characterized in that it is displayed on the display device so that it can be identified.
前記リスクレベルの表示は、リスクレベルごとに定められた色分け表示であることを特徴とする請求項5記載の補修工事スケジュール作成システム。   6. The repair construction schedule creation system according to claim 5, wherein the display of the risk level is a color-coded display determined for each risk level. さらに、前記記憶装置は、リスクレベルと補修工事推奨期間の対応テーブルを保持し、
前記リスクレベルの表示は、前記リスクレベルと補修工事推奨期間の対応テーブルに基づき、補修工事の機器ごと定められた補修工事推奨期間だけリスクレベルごとに定められた色分け表示をすることを特徴とする請求項2記載の補修工事スケジュール作成システム。
Furthermore, the storage device holds a correspondence table of risk level and recommended repair work period,
The display of the risk level is based on a correspondence table of the risk level and the recommended repair work period, and is color-coded and displayed for each risk level for the repair work recommended period determined for each repair work device. The repair construction schedule creation system according to claim 2.
前記補修工事の機器と同じ行方向に、定期点検工程を表現し、定期点検工程の期間を矩形として、年度ごとに対比して表示することを特徴とする請求項5記載の補修工事スケジュール作成システム。   6. The repair work schedule creation system according to claim 5, wherein a periodic inspection process is expressed in the same row direction as the equipment of the repair work, and the period of the periodic inspection process is displayed as a rectangle in comparison with each year. .
JP2008242696A 2008-09-22 2008-09-22 Repair work schedule preparation method and repair work schedule preparation system for plant equipment Pending JP2010073121A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008242696A JP2010073121A (en) 2008-09-22 2008-09-22 Repair work schedule preparation method and repair work schedule preparation system for plant equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008242696A JP2010073121A (en) 2008-09-22 2008-09-22 Repair work schedule preparation method and repair work schedule preparation system for plant equipment

Publications (1)

Publication Number Publication Date
JP2010073121A true JP2010073121A (en) 2010-04-02

Family

ID=42204806

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008242696A Pending JP2010073121A (en) 2008-09-22 2008-09-22 Repair work schedule preparation method and repair work schedule preparation system for plant equipment

Country Status (1)

Country Link
JP (1) JP2010073121A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013073048A1 (en) * 2011-11-18 2013-05-23 株式会社日立製作所 Power supply/demand plan generation device and power supply/demand plan generation method
WO2015152317A1 (en) * 2014-04-01 2015-10-08 株式会社テイエルブイ Risk evaluation system for process system, risk evaluation program, and risk evaluation method
JP2019057192A (en) * 2017-09-22 2019-04-11 株式会社日立システムズ Structure inspection support system
WO2020047173A1 (en) * 2018-08-31 2020-03-05 Procore Technologies, Inc. Computer system and method for predicting risk level of punch items
WO2020105151A1 (en) * 2018-11-21 2020-05-28 株式会社日立製作所 Facility maintenance inspection assisting system and order of inspection determination method
CN112183895A (en) * 2020-10-31 2021-01-05 国网河南省电力公司漯河供电公司 Intelligent identification and auxiliary compilation system for regional power grid maintenance plan
CN114638544A (en) * 2022-04-12 2022-06-17 江苏核电有限公司 Safety management method and system for maintenance service of nuclear power plant
JP7154469B1 (en) * 2022-03-09 2022-10-17 三菱電機株式会社 Maintenance plan support system, maintenance plan support method, and maintenance plan support program
WO2023047814A1 (en) * 2021-09-24 2023-03-30 日立Geニュークリア・エナジー株式会社 Integrated component management device and integrated component management method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002123314A (en) * 2000-10-12 2002-04-26 Chiyoda Corp Optimization system for facility maintenance
JP2002297811A (en) * 2001-03-30 2002-10-11 Kansai Electric Power Co Inc:The Equipment maintenance plane preparation support system
JP2004046707A (en) * 2002-07-15 2004-02-12 Ishikawajima Harima Heavy Ind Co Ltd Database for rbm, rbm support device, and method for executing rbm
JP2007200117A (en) * 2006-01-27 2007-08-09 Chugoku Electric Power Co Inc:The Risk evaluation system and risk evaluation method for hydraulic power generation plant, program therefor and recording medium therefor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002123314A (en) * 2000-10-12 2002-04-26 Chiyoda Corp Optimization system for facility maintenance
JP2002297811A (en) * 2001-03-30 2002-10-11 Kansai Electric Power Co Inc:The Equipment maintenance plane preparation support system
JP2004046707A (en) * 2002-07-15 2004-02-12 Ishikawajima Harima Heavy Ind Co Ltd Database for rbm, rbm support device, and method for executing rbm
JP2007200117A (en) * 2006-01-27 2007-08-09 Chugoku Electric Power Co Inc:The Risk evaluation system and risk evaluation method for hydraulic power generation plant, program therefor and recording medium therefor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JPN6012035028; 渡辺 大剛: 'リスクを指標としたボイラの保守計画最適化システム' 年次大会講演資料集 第2005巻 第8号, 20050918, pp.167-168, 一般社団法人日本機械学会 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013073048A1 (en) * 2011-11-18 2013-05-23 株式会社日立製作所 Power supply/demand plan generation device and power supply/demand plan generation method
JPWO2013073048A1 (en) * 2011-11-18 2015-04-02 株式会社日立製作所 Electricity supply and demand plan generation device and electric power supply and demand plan generation method
CN106462152B (en) * 2014-04-01 2019-01-04 Tlv有限公司 Risk Evaluating System, risk assessment program and the risk evaluating method of processing system
JP5884000B1 (en) * 2014-04-01 2016-03-15 株式会社テイエルブイ Risk assessment system for process system, risk assessment program, and risk assessment method
KR20160137621A (en) * 2014-04-01 2016-11-30 가부시키가이샤 티엘브이 Risk evaluation system for process system, risk evaluation program, and risk evaluation method
CN106462152A (en) * 2014-04-01 2017-02-22 Tlv有限公司 Risk evaluation system for process system, risk evaluation program, and risk evaluation method
AU2015242885B2 (en) * 2014-04-01 2017-09-14 Tlv Co., Ltd. Risk evaluation system for process system, risk evaluation program and risk evaluation method
EP3128385A4 (en) * 2014-04-01 2017-11-15 TLV Co., Ltd. Risk evaluation system for process system, risk evaluation program, and risk evaluation method
US10025658B2 (en) 2014-04-01 2018-07-17 Tlv Co., Ltd. Risk evaluation system for process system, risk evaluation program and risk evaluation method
KR101900169B1 (en) * 2014-04-01 2018-09-18 가부시키가이샤 티엘브이 Risk evaluation system for process system, risk evaluation program, and risk evaluation method
WO2015152317A1 (en) * 2014-04-01 2015-10-08 株式会社テイエルブイ Risk evaluation system for process system, risk evaluation program, and risk evaluation method
JP2019057192A (en) * 2017-09-22 2019-04-11 株式会社日立システムズ Structure inspection support system
WO2020047173A1 (en) * 2018-08-31 2020-03-05 Procore Technologies, Inc. Computer system and method for predicting risk level of punch items
WO2020105151A1 (en) * 2018-11-21 2020-05-28 株式会社日立製作所 Facility maintenance inspection assisting system and order of inspection determination method
CN112183895A (en) * 2020-10-31 2021-01-05 国网河南省电力公司漯河供电公司 Intelligent identification and auxiliary compilation system for regional power grid maintenance plan
CN112183895B (en) * 2020-10-31 2022-08-09 国网河南省电力公司漯河供电公司 Intelligent identification and auxiliary compilation system for regional power grid maintenance plan
WO2023047814A1 (en) * 2021-09-24 2023-03-30 日立Geニュークリア・エナジー株式会社 Integrated component management device and integrated component management method
JP7154469B1 (en) * 2022-03-09 2022-10-17 三菱電機株式会社 Maintenance plan support system, maintenance plan support method, and maintenance plan support program
WO2023170833A1 (en) * 2022-03-09 2023-09-14 三菱電機株式会社 Maintenance plan assistance system, maintenance plan assistance method, and maintenance plan assistance program
CN114638544A (en) * 2022-04-12 2022-06-17 江苏核电有限公司 Safety management method and system for maintenance service of nuclear power plant

Similar Documents

Publication Publication Date Title
JP2010073121A (en) Repair work schedule preparation method and repair work schedule preparation system for plant equipment
Keizer et al. Condition-based maintenance for systems with economic dependence and load sharing
US8423397B2 (en) Asset management systems and methods
JP5388713B2 (en) Power distribution facility maintenance support device, power distribution facility maintenance support method, and power distribution facility maintenance support program
AU2017201643A1 (en) Automated expert-system and method for assessing the safety of a process industry plant
JPH0997285A (en) Maintenance period adjusting system of equipment and parts, and method therefor
JP2018063598A (en) Business supporting system and business supporting method
JP2009193294A (en) Nuclear power plant operation management system, nuclear power plant operation management server and nuclear power plant operation management method
KR101419708B1 (en) Method and System For The Business Standardization Work
JP2005085178A (en) System for preparing equipment operation plan
US10475040B2 (en) System and method for service chain visualization and monitoring of reusable commodities
JP2003067043A (en) Process control system having risk monitor and process control method having risk display function
Hugo et al. The strategic value of human factors engineering in control room modernization
JP4309803B2 (en) Maintenance support program
JP2018206000A (en) Production planning system, production planning method and personnel ability calculation method
US20060100891A1 (en) System and method for pricing products and maintenance /administration service cost
WO2020166156A1 (en) Failure risk assessment system and failure risk assessment method
Bakri et al. Systematic Industrial Maintenance to Boost the Quality Management Programs
JP4491684B2 (en) Equipment maintenance risk evaluation system and equipment maintenance risk evaluation method
Boring et al. Baseline Human Factors and Ergonomics in Support of Control Room Modernization at Nuclear Power Plants
JP2017156798A (en) Maintenance history information display device
JP2014115736A (en) Sale expansion support system of boiler fuel conversion
JP2001256421A (en) Optimization system for plant repair plan
Hugo et al. Human factors and modeling methods in the development of control room modernization concepts
JP2013012133A (en) Calculation support system for repair cost of generator and transformer and calculation support method for the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110111

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120629

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120710

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20121106