JP2010018947A - Inclination adjusting ring for manhole, adjusting ring assembly, and manhole - Google Patents

Inclination adjusting ring for manhole, adjusting ring assembly, and manhole Download PDF

Info

Publication number
JP2010018947A
JP2010018947A JP2008177526A JP2008177526A JP2010018947A JP 2010018947 A JP2010018947 A JP 2010018947A JP 2008177526 A JP2008177526 A JP 2008177526A JP 2008177526 A JP2008177526 A JP 2008177526A JP 2010018947 A JP2010018947 A JP 2010018947A
Authority
JP
Japan
Prior art keywords
manhole
ring
adjusting ring
hole
inclination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008177526A
Other languages
Japanese (ja)
Inventor
Hideo Takeuchi
英夫 竹内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON SUTETSUPU KOGYO KK
Ebata Corp
Original Assignee
NIPPON SUTETSUPU KOGYO KK
Ebata Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON SUTETSUPU KOGYO KK, Ebata Corp filed Critical NIPPON SUTETSUPU KOGYO KK
Priority to JP2008177526A priority Critical patent/JP2010018947A/en
Publication of JP2010018947A publication Critical patent/JP2010018947A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an inclination adjusting ring which enables a manhole cover to be easily and accurately aligned with a road pavement surface by increasing construction efficiency, an adjusting ring assembly, and a manhole. <P>SOLUTION: A base body portion 10 of the inclination adjusting ring 1, which comprises one surface 11 and the other surface 12, becomes thinner along a direction crossing a thickness direction T. The one surface 11 is inclined in a thickness decreasing direction. A central hole 15 passes through the base body portion 10. An adjusting hole 16 is elongated along an opening edge 150. A protrusion 18 is arranged along the opening edge 150 on the other surface 12. An elevated adjusting ring 3 constituting the manhole has one surface 31 with a recessed groove 371, and is superposed on an opening 20. The inclination adjusting ring 1 has the protrusion 18 movably fitted into the recessed groove 371 in the state of superposition on the one surface 31. A receiving frame 5 is superposed on the one surface 11. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、マンホール用傾斜調整リング、調整リング組立体、及び、マンホールに関する。   The present invention relates to a manhole inclination adjusting ring, an adjusting ring assembly, and a manhole.

通常、下水道などの各種地下施設には、点検作業の作業員が、地上から施設内へ侵入するための人孔(マンホール)が設置されている。この種のマンホールが一般道路に設置される場合、道路舗装面と、道路舗装面上に露出するマンホールの蓋とは、互いの面位置が一致していなければならない。この要請に反し、道路舗装面と蓋面との面位置に高低差が生じている場合、自動車が蓋上を通過した時に騒音が生じたり、又は、通過時の衝撃によって蓋を支える周囲の道路舗装面が破損したり、さらには通過時の衝撃によって蓋が外れ、思わぬ交通事故が発生するなどの不具合が生じる。   Normally, various underground facilities such as sewers are provided with manholes for inspection workers to enter the facility from the ground. When this type of manhole is installed on a general road, the road pavement surface and the manhole cover exposed on the road pavement surface must coincide with each other. Contrary to this requirement, if there is a difference in height between the road pavement surface and the lid surface, noise will be generated when the car passes over the lid, or the surrounding road that supports the lid by the impact during passage The pavement surface may be damaged, or the lid may come off due to impact during passage, causing unexpected traffic accidents.

特に、道路舗装面は、道路の開通場所に応じて縦断勾配、片勾配、さらには雨水の排水性を考慮した水勾配など様々な道路勾配を有している。従って、道路舗装面と蓋面との面位置に高低差が生じないように配置するには、特許文献1で開示されているように、蓋を道路舗装面の勾配に沿って傾斜させる必要がある。   In particular, the road pavement surface has various road gradients such as a longitudinal gradient, a single gradient, and a water gradient in consideration of rainwater drainage depending on the location of the road. Therefore, in order to arrange the surface position of the road pavement surface and the lid surface so as not to cause a height difference, as disclosed in Patent Document 1, it is necessary to incline the lid along the gradient of the road pavement surface. is there.

ところで、道路舗装面と、蓋面との面位置に高低差を確実に解消するには、さらに施工現場において傾斜調整リングの配置方向を微調節し、道路舗装面の傾斜方向と、蓋面の傾斜方向とを正確に一致させる必要がある。   By the way, in order to eliminate the elevation difference between the road pavement surface and the lid surface with certainty, further finely adjust the arrangement direction of the inclination adjustment ring at the construction site, and the inclination direction of the road pavement surface and the lid surface It is necessary to match the inclination direction accurately.

ところが、特許文献1では、上述した傾斜調整リングの配置方向の調節を正確に、且、効率的に行うことができない。
特開平8‐158390号
However, in Patent Document 1, the adjustment of the arrangement direction of the inclination adjusting ring described above cannot be performed accurately and efficiently.
JP-A-8-158390

本発明の課題は、施工効率を向上することができるマンホール用傾斜調整リング、調整リング組立体、及び、マンホールを提供することである。   The subject of this invention is providing the inclination adjustment ring for manholes which can improve construction efficiency, an adjustment ring assembly, and a manhole.

本発明のもう1つの課題は、道路舗装面に対するマンホールの蓋の配置を容易に、且、的確におこなうことができるマンホール用傾斜調整リング、調整リング組立体、及び、マンホールを提供することである。   Another object of the present invention is to provide a manhole inclination adjusting ring, an adjusting ring assembly, and a manhole, which can easily and accurately arrange a manhole cover with respect to a road pavement surface. .

上述した課題を解決するため、本発明に係るマンホール用傾斜調整リング(傾斜調整リング)は、基体部と、中央孔と、調整孔と、複数の凸部とを含む。基体部は、一面と、一面に対して厚み方向に向かい合う他面とを有し、厚み方向に交差する方向に沿って厚みが減少している。基体部の一面は、厚みが減少する方向に傾斜している。中央孔は、基体部を厚み方向に貫通し、一面と、他面とに開口している。調整孔は、長穴であって、基体部を厚み方向に貫通し、且、長径が中央孔の開口縁に沿って伸びている。凸部は、他面において厚み方向に突出し、複数が、中央孔の開口縁に沿って、且、互いに間隔を隔てて配置されている。   In order to solve the above-described problem, the manhole inclination adjusting ring (inclination adjusting ring) according to the present invention includes a base portion, a central hole, an adjusting hole, and a plurality of convex portions. The base portion has one surface and another surface facing the one surface in the thickness direction, and the thickness decreases along the direction intersecting the thickness direction. One surface of the base portion is inclined in a direction in which the thickness decreases. The central hole penetrates the base portion in the thickness direction and opens to one surface and the other surface. The adjustment hole is a long hole, penetrates the base portion in the thickness direction, and has a long diameter extending along the opening edge of the central hole. The convex portions protrude in the thickness direction on the other surface, and a plurality of the convex portions are arranged along the opening edge of the central hole and spaced from each other.

上述した傾斜調整リングは、マンホール基体や、嵩上げ調整リング、受枠、固定具などと組み合わされて、マンホールに用いられる。本発明に係るマンホールを構成する嵩上げ調整リングは、一面にリング状の凹溝を有し、マンホール基体の開口部に積み重ねられている。傾斜調整リングは、他面が、嵩上げ調整リングの一面に積み重ねられ、積み重ねられた状態で凸部が、凹溝に対して移動可能に嵌合されている。受枠は、傾斜調整リングの一面に積み重ねられている。固定具は、棒状であって、嵩上げ調整リング、傾斜調整リングの調整孔、及び、受枠を貫通している。   The inclination adjusting ring described above is used for a manhole in combination with a manhole base, a raising adjustment ring, a receiving frame, a fixture, and the like. The raising adjustment ring constituting the manhole according to the present invention has a ring-shaped concave groove on one surface and is stacked on the opening of the manhole substrate. The other surface of the inclination adjusting ring is stacked on one surface of the raising adjusting ring, and the convex portion is movably fitted to the concave groove in the stacked state. The receiving frame is stacked on one surface of the inclination adjustment ring. The fixture is rod-shaped and passes through the raising adjustment ring, the adjustment hole of the inclination adjustment ring, and the receiving frame.

本発明に係るマンホールを構成する傾斜調整リングにおいて、基体部は厚みを有しているから、傾斜調整リングの一面に受枠が積み重ねられた場合に、受枠が、基体部の厚み分だけ嵩上げされた位置に配置される。従って、受枠によって支持される蓋の取り付け位置を、効率的に嵩上げすることができる。   In the tilt adjusting ring constituting the manhole according to the present invention, the base portion has a thickness. Therefore, when the receiving frame is stacked on one surface of the tilt adjusting ring, the receiving frame is raised by the thickness of the base portion. Placed in position. Therefore, the attachment position of the lid supported by the receiving frame can be efficiently raised.

基体部は、厚み方向の一面が、厚みが減少する方向に傾斜しているから、一面に受枠が積み重ねられた場合、受枠は、一面の傾斜に沿って傾いて配置される。従って、予め一面の傾きを調節することにより、受枠、及び、受枠によって支持される蓋を、道路舗装面の傾斜に沿って配置することができる。   Since the one surface of the base portion is inclined in the direction in which the thickness decreases, when the receiving frame is stacked on one surface, the receiving frame is inclined along the inclination of the one surface. Therefore, by adjusting the inclination of one surface in advance, the receiving frame and the lid supported by the receiving frame can be arranged along the inclination of the road pavement surface.

中央孔は、基体部を厚み方向に貫通し、一面と、他面とに開口している。この種の傾斜調整リングにおいて、中央孔が点検作業員の通り抜けが可能な内寸法を有している場合、点検作業員は、傾斜調整リングがマンホール基体の開口部に積み重ねられた状態で、中央孔を通じてマンホール内に侵入し、又は、脱出することができる。   The central hole penetrates the base portion in the thickness direction and opens to one surface and the other surface. In this type of tilt adjustment ring, if the central hole has an internal dimension that allows the inspection worker to pass through, the inspection worker must have the tilt adjustment ring stacked in the opening of the manhole base. It can penetrate into the manhole through the hole or escape.

調整孔は、長穴であって、基体部を厚み方向に貫通し、且、中央孔の開口縁に沿って伸びている。この構成によると、傾斜調整リングは、調整孔に挿通された固定具によって、マンホール基体の開口部に固定(仮止め)された状態で、調整孔の長さの範囲内で軸回転することができるから、傾斜調整リングの配置方向を容易に微調節することができる。   The adjustment hole is a long hole, penetrates the base portion in the thickness direction, and extends along the opening edge of the central hole. According to this configuration, the tilt adjustment ring can rotate about the length of the adjustment hole while being fixed (temporarily fixed) to the opening of the manhole base by the fixture inserted through the adjustment hole. Therefore, the arrangement direction of the inclination adjusting ring can be easily finely adjusted.

しかも、傾斜調整リングは、嵩上げ調整リングに積み重ねられた状態で他面側の凸部が、凹溝に対して移動可能に嵌合されているから、上述した傾斜調整リングの軸回転は、凸部を通じて凹溝による規制を受けながら、凹溝に沿ってなされる。従って、道路舗装面の傾斜方向と、蓋面の傾斜方向とを正確に一致させることができる。   In addition, since the convex part on the other surface side is movably fitted to the concave groove in a state where the inclination adjusting ring is stacked on the raising adjusting ring, the axis rotation of the inclination adjusting ring described above is convex. While being regulated by the concave groove through the part, it is made along the concave groove. Accordingly, the inclination direction of the road pavement surface and the inclination direction of the lid surface can be exactly matched.

以上述べたように、本発明によれば、次のような効果を得ることができる。
(1)本発明の課題は、施工効率を向上することができるマンホール用傾斜調整リング、調整リング組立体、及び、マンホールを提供することができる。
(2)本発明のもう1つの課題は、道路舗装面に対するマンホールの蓋の位置あわせを容易に、且、適正におこなうことができるマンホール用傾斜調整リング、調整リング組立体、及び、マンホールを提供することができる。
As described above, according to the present invention, the following effects can be obtained.
(1) The subject of this invention can provide the inclination adjustment ring for manholes, an adjustment ring assembly, and a manhole which can improve construction efficiency.
(2) Another object of the present invention is to provide a manhole inclination adjusting ring, an adjusting ring assembly, and a manhole that can easily and appropriately align the manhole cover with respect to the road pavement surface. can do.

本発明の他の目的、構成、及び、効果については、添付図面を参照し、更に詳しく説明する。添付図面は、単に、例示に過ぎない。   Other objects, configurations, and effects of the present invention will be described in more detail with reference to the accompanying drawings. The accompanying drawings are merely examples.

図1は本発明の一実施形態に係る傾斜調整リングの斜視図、図2は図1に示した傾斜調整リングの他面側の構造を示す斜視図、図3は図1に示した傾斜調整リングの正面図である。図1乃至図3の傾斜調整リングは、基体部10と、中央孔15と、調整孔16と、第1の凹溝171と、第2の凹溝172と、凸部18を有している。   1 is a perspective view of a tilt adjusting ring according to an embodiment of the present invention, FIG. 2 is a perspective view showing a structure of the other side of the tilt adjusting ring shown in FIG. 1, and FIG. 3 is a tilt adjusting shown in FIG. It is a front view of a ring. The tilt adjustment ring of FIGS. 1 to 3 includes a base portion 10, a center hole 15, an adjustment hole 16, a first concave groove 171, a second concave groove 172, and a convex portion 18. .

基体部10は、好ましくはポリエチレン(PE)、ポリプロピレン(PP)などの合成樹脂材料を主成分とし、より好ましくは再生材料を使用したプラスチックを主成分とし、さらに好ましくは清掃工場のごみ焼却過程等で生じる焼却灰を含んでいる。   The base portion 10 is preferably mainly composed of a synthetic resin material such as polyethylene (PE) or polypropylene (PP), more preferably a plastic using a recycled material as a main component, and more preferably a waste incineration process in a cleaning factory or the like. Incineration ash generated in

基体部10は、リング状の薄板構造であって、一面11と、一面11に対して厚み方向Tに向かい合う他面12とを有している。一面11は、厚み方向Tに交差する差し渡し方向Dに沿って、傾斜角度θ1をもって傾斜している。図3において、差し渡し方向Dが、基体部10の厚みが減少する方向となっている。基体部10は、差し渡し方向Dに沿って厚みが徐々に減少することにより、一面11が、最大差し渡し寸法D10(直径)で向かい合う一方端P1から他方端P2に向かって、一定の傾斜角度θ1で傾斜している。   The base portion 10 has a ring-shaped thin plate structure, and has one surface 11 and another surface 12 facing the surface 11 in the thickness direction T. The one surface 11 is inclined at an inclination angle θ1 along the passing direction D that intersects the thickness direction T. In FIG. 3, the passing direction D is a direction in which the thickness of the base portion 10 decreases. The base portion 10 gradually decreases in thickness along the delivery direction D, so that the one surface 11 has a constant inclination angle θ1 from the one end P1 facing the maximum delivery dimension D10 (diameter) to the other end P2. It is inclined.

傾斜の始点となる一方端P1は、一面11において、基体部10の最大厚み部分T1に相当する部分である。傾斜の終点となる他方端P2は、一面11において、基体部10の最小厚み部分T2に相当する部分である。一方端P1、又は、他方端P2の近傍には、位置あわせ作業を効率的に行うため、凹凸などによって傾斜角度θ1の方向を示す目印19を付しておくことが好ましい。   One end P <b> 1 serving as the starting point of the inclination is a portion corresponding to the maximum thickness portion T <b> 1 of the base portion 10 on the one surface 11. The other end P2 that is the end point of the inclination is a portion corresponding to the minimum thickness portion T2 of the base portion 10 on the one surface 11. A mark 19 indicating the direction of the inclination angle θ1 is preferably attached to the vicinity of the one end P1 or the other end P2 so as to perform alignment work efficiently by unevenness or the like.

基体部10の他面12は、傾斜調整リングが他のマンホール構成部材に設置される場合の基準面となる部分であり、好ましくは軸aに対して水平な平坦面となっている。従って、傾斜角度θ1は、一面11と他面12との交差角度と言い換えることができる。   The other surface 12 of the base portion 10 is a portion serving as a reference surface when the inclination adjusting ring is installed on another manhole constituent member, and is preferably a flat surface horizontal to the axis a. Therefore, the inclination angle θ1 can be restated as an intersection angle between the one surface 11 and the other surface 12.

中央孔15は、人間(点検作業員)の通り抜けが可能な内寸法を有し、基体部10の板面の中央を厚み方向Tに貫通し、一面11と、他面12とに開口する部分が開口縁150となっている。図1、図2に示す中央孔15は、円形であって、基体部10の内側面13によって画定される内寸法が600mm程度となっている。   The central hole 15 has an internal dimension that allows a human (inspection worker) to pass through, and penetrates the center of the plate surface of the base portion 10 in the thickness direction T, and opens to one surface 11 and the other surface 12. Is the opening edge 150. The center hole 15 shown in FIGS. 1 and 2 is circular, and the inner dimension defined by the inner side surface 13 of the base portion 10 is about 600 mm.

調整孔16は、平面から見て長径と短径とを有する長穴であって、基体部10の面内を厚み方向Tに貫通し、一面11と、他面12とに開口している。図1、図2に示す調整孔16は、長径が短径に対して5〜10倍程度、より好ましくは8倍程度の長さとなっており、長径が一点鎖線で示す仮想円C1に沿って伸びていることにより、平面から見て円弧状に湾曲している。   The adjustment hole 16 is a long hole having a major axis and a minor axis when viewed from the plane, and penetrates in the plane of the base portion 10 in the thickness direction T and opens to one surface 11 and the other surface 12. The adjustment hole 16 shown in FIG. 1 and FIG. 2 has a major axis that is about 5 to 10 times as long as the minor axis, and more preferably about eight times. The major axis is along a virtual circle C1 indicated by a one-dot chain line. By extending, it is curved in an arc shape when seen from the plane.

仮想円C1は、好ましくは開口縁150よりも間隔G1の分だけ大径となっており、且、開口縁150と同軸(軸a)の円となる。図1及び図2の傾斜調整リングにも受けられている6つの調整孔16は、仮想円C1上に沿って互いに間隔G3を隔てて配置され、より好ましくは等間隔で配置されている。   The virtual circle C1 is preferably larger in diameter than the opening edge 150 by the distance G1, and is a circle coaxial with the opening edge 150 (axis a). The six adjustment holes 16 that are also received by the inclination adjustment ring of FIGS. 1 and 2 are arranged at a distance G3 along the virtual circle C1, and more preferably at equal intervals.

第1の凹溝171は、一面11において、好ましくは開口縁150よりも間隔G2の分だけ大径となっており、且、開口縁150と同軸(軸a)の円状に開口している。間隔G2は、間隔G1よりも小さくなっており、第1の凹溝171は、開口縁150と、調整孔16との間において、開口縁150に平行して伸びている。   The first concave groove 171 has a larger diameter on the one surface 11 than the opening edge 150 by a distance G2, and opens in a circular shape coaxial with the opening edge 150 (axis a). . The gap G <b> 2 is smaller than the gap G <b> 1, and the first groove 171 extends in parallel with the opening edge 150 between the opening edge 150 and the adjustment hole 16.

第2の凹溝172は、一面11において、第1の凹溝171と、開口縁150との間の一面11に開口し、開口縁150から間隔を隔てて、開口縁150と同軸に配置され、開口縁150に平行して伸びている。   The second concave groove 172 opens on one surface 11 between the first concave groove 171 and the opening edge 150 on one surface 11, and is arranged coaxially with the opening edge 150 at a distance from the opening edge 150. , Extending parallel to the opening edge 150.

凸部18は、他面12において厚み方向Tに突出している。図1及び図2の傾斜調整リングにおいて、凸部18は6つであり、6つの凸部18が、仮想円C2上に沿って、互いに間隔G4を隔てて配置されている。仮想円C2は、開口縁150から間隔G2を隔てており、好ましくは開口縁150と同軸(軸a)となる。即ち、凸部18と、第1の凹溝171とは、厚み方向Tで重なり合う位置に配置されている。   The protrusion 18 protrudes in the thickness direction T on the other surface 12. In the inclination adjusting ring of FIGS. 1 and 2, the number of the convex portions 18 is six, and the six convex portions 18 are arranged along the virtual circle C2 with a gap G4 therebetween. The virtual circle C2 is spaced from the opening edge 150 by a gap G2, and is preferably coaxial with the opening edge 150 (axis a). That is, the convex portion 18 and the first concave groove 171 are arranged at positions that overlap in the thickness direction T.

図4は、本発明の一実施形態に係るマンホールの一部を拡大して示す部分断面図である。また、図5は図4に示した実施形態からマンホールを取り出して示す斜視図、図6は図5に示したマンホールの分解構造を示す斜視図である。図4乃至図6において、図1乃至図4に示した構成部分と同一の構成部分には、同一の参照符号を付す。   FIG. 4 is an enlarged partial sectional view showing a part of a manhole according to an embodiment of the present invention. 5 is a perspective view showing a manhole taken out from the embodiment shown in FIG. 4, and FIG. 6 is a perspective view showing an exploded structure of the manhole shown in FIG. 4 to 6, the same components as those shown in FIGS. 1 to 4 are denoted by the same reference numerals.

図4のマンホールは、地中に埋設された状態であらわされており、図1乃至図3を参照して説明した傾斜調整リング1に加えて、マンホール基体2と、嵩上げ調整リング3と、受枠5と、蓋6と、ボルト7とを有している。以下、図4乃至図6を参照してマンホールを構成する各部材の構造を説明をする。   The manhole shown in FIG. 4 is shown in a state of being buried in the ground. In addition to the inclination adjusting ring 1 described with reference to FIGS. 1 to 3, the manhole base body 2, the raising adjustment ring 3, and the receiving frame 5, a lid 6, and a bolt 7. Hereinafter, the structure of each member constituting the manhole will be described with reference to FIGS.

マンホール基体2は、斜壁部分を有し、斜壁部分に外部に開口する開口部20を有している。開口部20の上端面21には、予め複数のネジ穴22が周方向にそって、互いに間隔を隔てて設けられている。ネジ穴22は、好ましくは、図6に示すようにボルト7の設置数、及び、設置場所に応じて配置される。   The manhole base 2 has an inclined wall portion, and has an opening 20 that opens to the outside in the inclined wall portion. A plurality of screw holes 22 are provided in the upper end surface 21 of the opening 20 in advance along the circumferential direction so as to be spaced apart from each other. The screw holes 22 are preferably arranged according to the number of bolts 7 installed and the installation location as shown in FIG.

嵩上げ調整リング3と、傾斜調整リング1と、受枠5と、蓋6とは、この順序で開口部20の上端面21に積み重ねられている。   The raising adjustment ring 3, the inclination adjustment ring 1, the receiving frame 5, and the lid 6 are stacked on the upper end surface 21 of the opening 20 in this order.

嵩上げ調整リング3は、一面31にリング状の凹溝371を有し、開口部20に積み重ねられている。傾斜調整リング1は、他面12が、嵩上げ調整リング3の一面31に積み重ねられ、積み重ねられた状態で凸部18が、凹溝371に対して移動可能に嵌合されている。   The raising adjustment ring 3 has a ring-shaped concave groove 371 on one surface 31, and is stacked on the opening 20. In the inclination adjusting ring 1, the other surface 12 is stacked on one surface 31 of the raising adjusting ring 3, and the protruding portion 18 is movably fitted to the recessed groove 371 in the stacked state.

受枠5は、傾斜調整リング1の一面11に着脱可能に積み重ねられており、蓋6は受枠5によって支持されている。ボルト7は、嵩上げ調整リング3、傾斜調整リング1の調整孔16、及び、受枠5を貫通し、一端がネジ穴22に螺着され、他端に座金72と、ナット73とが螺着されている。傾斜調整リング1と、嵩上げ調整リング3と、受枠5とは、開口部20に載置した状態でボルト7によって脱落不能に固定されている。   The receiving frame 5 is detachably stacked on one surface 11 of the inclination adjusting ring 1, and the lid 6 is supported by the receiving frame 5. The bolt 7 penetrates the raising adjustment ring 3, the adjustment hole 16 of the inclination adjustment ring 1, and the receiving frame 5, one end is screwed into the screw hole 22, and a washer 72 and a nut 73 are screwed to the other end. ing. The inclination adjustment ring 1, the raising adjustment ring 3, and the receiving frame 5 are fixed so as not to fall off by the bolt 7 while being placed in the opening 20.

傾斜調整リング1と、嵩上げ調整リング3は、上述した積み重ねにより、全体としてリング組立体100を構成する。リング組立体100の構造について、図7乃至図8を参照して説明する。   The inclination adjusting ring 1 and the raising adjusting ring 3 constitute a ring assembly 100 as a whole by the above-described stacking. The structure of the ring assembly 100 will be described with reference to FIGS.

図7は図4に示した実施形態からリング組立体100を取り出して示す斜視図、図8は図7の8−8線に沿った断面図である。図7及び図8において、図1乃至図6に示した構成部分と同一の構成部分には、同一の参照符号を付す。   7 is a perspective view showing the ring assembly 100 taken out from the embodiment shown in FIG. 4, and FIG. 8 is a cross-sectional view taken along line 8-8 in FIG. 7 and 8, the same components as those shown in FIGS. 1 to 6 are denoted by the same reference numerals.

図7及び図8のリング組立体100を構成する傾斜調整リング1は、図1乃至図3を参照して説明したものであるから、詳細は省略する。   The tilt adjusting ring 1 constituting the ring assembly 100 of FIGS. 7 and 8 has been described with reference to FIGS.

他方、嵩上げ調整リング3は、傾斜調整リング1、及び、受枠5の取り付け位置を調節するために用いられるスペーサであって、傾斜角度θ1を有していない以外は、図1乃至図3を参照して説明した傾斜調整リング1と共通する基本的構成を有している。以下簡単に説明すると、嵩上げ調整リング3は、基体部30と、中央孔35と、貫通孔36と、第1の凹溝371と、第2の凹溝372とを有している。   On the other hand, the raising adjustment ring 3 is a spacer used for adjusting the attachment position of the inclination adjustment ring 1 and the receiving frame 5, and see FIG. 1 to FIG. 3 except that it does not have the inclination angle θ 1. It has the basic configuration common to the inclination adjusting ring 1 described above. Briefly described below, the raising adjustment ring 3 includes a base portion 30, a central hole 35, a through hole 36, a first concave groove 371, and a second concave groove 372.

基体部30は、リング状であって、一面31と、一面31に対して厚み方向Tに向かい合う他面32とを有している。他面32は、嵩上げ調整リング3が他のマンホール構成部材に設置される場合の基準面となる部分であり、好ましくは軸aに対して水平な平坦面を構成している。   The base portion 30 has a ring shape and has one surface 31 and another surface 32 facing the one surface 31 in the thickness direction T. The other surface 32 is a portion serving as a reference surface when the raising adjustment ring 3 is installed on another manhole constituent member, and preferably forms a flat surface horizontal to the axis a.

中央孔35は、基体部30の板面の中央を厚み方向Tに貫通し、一面33と、他面32とに開口する部分が開口縁350となっている。中央孔35は、傾斜調整リング1の中央孔15に一致する。   The central hole 35 penetrates the center of the plate surface of the base portion 30 in the thickness direction T, and a portion that opens to the one surface 33 and the other surface 32 is an opening edge 350. The central hole 35 coincides with the central hole 15 of the inclination adjusting ring 1.

貫通孔36は、内側面33と、外側面34とによって画定される基体部30の面内を厚み方向Tに貫通し、一面31と、他面32とに開口している。   The through hole 36 penetrates the surface of the base portion 30 defined by the inner side surface 33 and the outer side surface 34 in the thickness direction T, and opens to the one surface 31 and the other surface 32.

図6に示す嵩上げ調整リング3は、ボルト7の設置数に追従して貫通孔36を3つ有している。貫通孔36は、平面視した形状が円形状となっており、好ましくはボルト7が挿通できる程度の内径を有している。貫通孔36は、調整孔16と連通可能な位置に配置される。   The raising adjustment ring 3 shown in FIG. 6 has three through holes 36 following the number of bolts 7 installed. The through hole 36 has a circular shape in plan view, and preferably has an inner diameter that allows the bolt 7 to be inserted. The through hole 36 is disposed at a position where it can communicate with the adjustment hole 16.

第1の凹溝371は、一面31において、開口縁350と同軸(軸a)の円状に開口している。第2の凹溝372は、一面31において、第1の凹溝371と、開口縁350との間の一面31に開口し、開口縁350と同軸に配置され、開口縁350に平行して伸びている。   The first concave groove 371 opens on the one surface 31 in a circular shape coaxial with the opening edge 350 (axis a). The second concave groove 372 opens on one surface 31 between the first concave groove 371 and the opening edge 350 on one surface 31, is arranged coaxially with the opening edge 350, and extends parallel to the opening edge 350. ing.

嵩上げ調整リング3は、スペーサたる用途に適した構造として、他面32に開口部20の孔に嵌合する凸部38を有する。凸部38は、開口縁350に沿って円形状に配置されており、第1の嵩上げ調整リング3が、開口部20に載置された状態で、開口部20の孔の内縁に嵌合する。この構造によると、第1の嵩上げ調整リング3の配置姿勢が安定化する。   The raising adjustment ring 3 has a convex portion 38 that fits in the hole of the opening 20 on the other surface 32 as a structure suitable for a spacer application. The convex portion 38 is arranged in a circular shape along the opening edge 350, and the first raised adjustment ring 3 is fitted on the inner edge of the hole of the opening portion 20 in a state of being placed on the opening portion 20. . According to this structure, the arrangement posture of the first raising adjustment ring 3 is stabilized.

傾斜調整リング1は、嵩上げ調整リング3の一面31に積み重ねられており、積み重ねられた状態で、互いの中央孔15、35が一致し、且、傾斜調整リング1の凸部18が、嵩上げ調整リング3の第1の凹溝371に凹凸嵌合している。傾斜調整リング1は、図1乃至図3を参照して説明したものであり、調整孔16に3つのボルト7が挿通されることにより、開口部20に着脱可能に積み重ねられている。   The inclination adjusting ring 1 is stacked on one surface 31 of the raising adjustment ring 3, and in the stacked state, the center holes 15 and 35 of each other coincide with each other, and the convex portion 18 of the inclination adjusting ring 1 is raised and adjusted. The concave and convex fitting is carried out in the first concave groove 371 of the ring 3. The inclination adjusting ring 1 has been described with reference to FIGS. 1 to 3, and is detachably stacked in the opening 20 by inserting three bolts 7 through the adjusting hole 16.

さらに、傾斜調整リング1と、嵩上げ調整リング3との面対向領域内には、シール層8が形成されている。シール層8は、例えば、第2の凹溝372にシール材が充填され、傾斜調整リング1と嵩上げ調整リング3との両者間を接着することにより、構造的一体性、止水性を確保する。   Further, a seal layer 8 is formed in a surface facing region between the inclination adjustment ring 1 and the raising adjustment ring 3. For example, the sealing layer 8 is filled with a sealing material in the second concave groove 372 and adheres between the inclination adjusting ring 1 and the raising adjusting ring 3 to ensure structural integrity and water-stopping.

もっとも、シール層8は、傾斜調整リング1と受枠5との間、嵩上げ調整リング3と開口部20との間など、各マンホール構成部材の面対向部分にも配置されている。シール材は、マンホール基体2がコンクリート製の場合にはモルタルが用いられ、マンホール基体2がプラスチックの場合はシリコン系シール材が用いられる。さらに、ブチルゴム製のOリングを第2の凹溝172にはめることにより、シール層8としてもよい。   However, the seal layer 8 is also disposed on the surface facing portion of each manhole constituent member such as between the inclination adjusting ring 1 and the receiving frame 5 and between the raised adjustment ring 3 and the opening 20. As the sealing material, mortar is used when the manhole substrate 2 is made of concrete, and silicon-based sealing material is used when the manhole substrate 2 is plastic. Furthermore, the sealing layer 8 may be formed by fitting an O-ring made of butyl rubber into the second concave groove 172.

図1乃至図3を参照して説明した傾斜調整リング1、及び、図4乃至図8を参照して説明したマンホールによると、傾斜調整リング1の基体部10は、厚みT1、T2を有しているから、一面11に受枠5が積み重ねられた場合に、受枠5が、厚みT1、T2分だけ嵩上げされた位置に配置される。従って、受枠5によって支持される蓋6の取り付け位置を、効率的に嵩上げすることができる。   According to the inclination adjusting ring 1 described with reference to FIGS. 1 to 3 and the manhole described with reference to FIGS. 4 to 8, the base portion 10 of the inclination adjusting ring 1 has thicknesses T1 and T2. Therefore, when the receiving frame 5 is stacked on the one surface 11, the receiving frame 5 is arranged at a position raised by the thicknesses T1 and T2. Therefore, the mounting position of the lid 6 supported by the receiving frame 5 can be efficiently raised.

本発明の特徴の一つは、受枠5を支持する傾斜調整リング1の一面11が傾斜角度θ1を有する点にある。すなわち、マンホールが設置される道路は決して水平ではなく、道路の開通場所に応じて様々な道路勾配θ9を有しているから、蓋6を道路勾配θ9にあわせて配置する必要がある。   One of the features of the present invention is that one surface 11 of the inclination adjusting ring 1 that supports the receiving frame 5 has an inclination angle θ1. That is, the road on which the manhole is installed is never horizontal and has various road gradients θ9 depending on the place where the manhole is opened. Therefore, it is necessary to arrange the lid 6 according to the road gradient θ9.

基体部10の一面11は、上記要請に応えるため、厚みを減少させる方向(D)に傾斜角度θ1をもって傾斜しているから、この傾斜角度θ1を、道路勾配θ9に予め合わせておくことにより、一面11に受枠5が積み重ねられた場合に、受枠6が、一面11の傾斜角度θ1に沿って傾く。その結果、受枠5に支持される蓋6も傾斜角度θ1に沿って傾いた姿勢で配置されるから、蓋6と道路舗装面9との面位置を一致させることができる。   Since one surface 11 of the base body portion 10 is inclined at an inclination angle θ1 in the direction (D) in which the thickness is reduced in order to meet the above request, by adjusting the inclination angle θ1 to the road gradient θ9 in advance, When the receiving frame 5 is stacked on the one surface 11, the receiving frame 6 is inclined along the inclination angle θ <b> 1 of the one surface 11. As a result, since the lid 6 supported by the receiving frame 5 is also arranged in a posture inclined along the inclination angle θ1, the surface positions of the lid 6 and the road pavement surface 9 can be matched.

傾斜調整リング1において、中央孔15は、基体部10の中央を厚み方向Tに貫通し、一面11と、他面12とに開口している。中央孔15が点検作業員の通り抜けが可能な内寸法を有している場合、点検作業員は、傾斜調整リング1が開口部20に積み重ねられた状態で、中央孔15を通じてマンホール内に侵入し、又は、脱出することができる。   In the inclination adjusting ring 1, the central hole 15 penetrates the center of the base body portion 10 in the thickness direction T, and opens to the one surface 11 and the other surface 12. When the central hole 15 has an internal dimension that allows the inspection worker to pass through, the inspection worker enters the manhole through the central hole 15 in a state where the inclination adjusting ring 1 is stacked on the opening 20. Or you can escape.

調整孔16は、長径と短径とを有する長穴であって、基体部10を厚み方向Tに貫通している。調整孔16は、長径が仮想円C1に沿って伸びており、平面から見て円弧状に湾曲している。傾斜調整リング1は、開口部20に立設されたボルト7が調整孔16に挿通されることにより、開口部20に積み重ねられる。この構成によると、傾斜調整リング1は、開口部20に固定(仮止め)された状態で、調整孔16の長さの範囲内で軸回転することができるから、傾斜角度θ1の傾斜の方向を容易に微調節することができる。   The adjustment hole 16 is a long hole having a major axis and a minor axis, and penetrates the base portion 10 in the thickness direction T. The adjustment hole 16 has a major axis extending along the virtual circle C1 and is curved in an arc shape when viewed from the plane. The tilt adjustment ring 1 is stacked on the opening 20 by inserting the bolt 7 erected on the opening 20 through the adjustment hole 16. According to this configuration, the tilt adjusting ring 1 can be rotated in the range of the length of the adjusting hole 16 while being fixed (temporarily fixed) to the opening 20, and therefore, the tilt direction of the tilt angle θ 1. Can be easily fine-tuned.

本発明に係る傾斜調整リング1は、施工条件に応じて必要な態様を採ることができる。具体的には、開口部20から道路舗装面9までの高低差が大きい場合、傾斜調整リング1を所定の高さ位置まで嵩上げするために、嵩上げ調整リング3を用いて、調整用リング組立体100を構成することができる。   The inclination adjusting ring 1 according to the present invention can take a necessary aspect according to construction conditions. Specifically, when the height difference from the opening 20 to the road pavement surface 9 is large, an adjustment ring assembly is used by using the raising adjustment ring 3 to raise the inclination adjusting ring 1 to a predetermined height position. 100 can be configured.

リング組立体100を構成する傾斜調整リング1と、嵩上げ調整リング3とは、厚み方向Tに積み重ねられ、積み重ねられた状態で、互いの中央孔15、35が一致し、調整孔16と貫通孔36とが一致し、且、傾斜調整リング1の凸部18が、嵩上げ調整リング3の凹溝171に着脱可能に凹凸嵌合している。この構成によると、嵩上げ調整リング3の厚みT3の分だけによって傾斜調整リング1が所定の高さ位置まで嵩上げされるから、道路舗装面9に対する蓋6の位置あわせを容易に、且、適正におこなうことができる。   The inclination adjusting ring 1 and the raising adjusting ring 3 constituting the ring assembly 100 are stacked in the thickness direction T, and in the stacked state, the respective center holes 15 and 35 coincide with each other, and the adjusting hole 16 and the through hole are aligned. 36, and the convex portion 18 of the inclination adjusting ring 1 is detachably fitted in the concave groove 171 of the raising adjusting ring 3. According to this configuration, the inclination adjusting ring 1 is raised to a predetermined height position only by the thickness T3 of the raising adjustment ring 3, so that the lid 6 can be easily and properly aligned with the road pavement surface 9. Can be done.

組立体100の利点について、さらに図9を参照して説明する。図9は、図4又は図5に示したマンホールの一部を取り出して示す斜視図である。図9において、図1乃至図8に示した構成部分と同一の構成部分には、同一の参照符号を付す。   The advantages of the assembly 100 will be further described with reference to FIG. FIG. 9 is a perspective view showing a part of the manhole shown in FIG. 4 or FIG. 9, the same components as those shown in FIGS. 1 to 8 are denoted by the same reference numerals.

図9の実施形態では、ボルト7との対応関係をわかりやすく説明するため、図1乃至図8を参照して説明した調整孔16を、便宜上、調整孔161と、調整孔162とに分けて説明する。   In the embodiment of FIG. 9, the adjustment hole 16 described with reference to FIGS. 1 to 8 is divided into an adjustment hole 161 and an adjustment hole 162 for convenience in order to easily explain the correspondence with the bolt 7. explain.

嵩上げ調整リング3は、貫通孔36に、それぞれボルト7が挿通されることにより、挿通された状態で周方向Rへの軸回転R1、R2が防止され、開口部20に確実に固定される。   When the bolts 7 are inserted into the through holes 36 respectively, the raising adjustment ring 3 is prevented from being rotated in the circumferential direction R and is securely fixed to the opening 20.

他方、傾斜調整リング1の調整孔161は、周方向Rに円弧状に伸びる長穴であり、ボルト7に対し所謂ばか穴となる。従って、傾斜調整リング1は、嵩上げ調整リング3に積み重ねられた状態であって、且、調整孔161にボルト7が挿通された状態で、調整孔161が伸びる領域S161の範囲内で、周方向Rに沿って軸回転R1、R2することができる。この構造によると、傾斜角度θ9の方向と、傾斜角度θ1の方向とを正確に一致させることができる。なお、上述した微調整は、3つのボルト7と、調整孔161との全てが連動して行うことができる。   On the other hand, the adjustment hole 161 of the inclination adjustment ring 1 is a long hole extending in an arc shape in the circumferential direction R and is a so-called fool hole with respect to the bolt 7. Accordingly, the inclination adjusting ring 1 is in a state where it is stacked on the raising adjusting ring 3, and the bolt 7 is inserted through the adjusting hole 161. Axis rotation R1, R2 along R can be performed. According to this structure, the direction of the inclination angle θ9 and the direction of the inclination angle θ1 can be exactly matched. The fine adjustment described above can be performed in conjunction with all of the three bolts 7 and the adjustment hole 161.

しかも、傾斜調整リング1は、嵩上げ調整リング3に積み重ねられた状態で、凸部18が、凹溝371に対して移動可能に嵌合されているから、傾斜調整リング1の軸回転は、凸部18を通じて凹溝371による規制を受けながら、凹溝371に沿ってなされる。従って、傾斜角度θ9の方向と、傾斜角度θ1の方向とを正確に一致させることができる。   In addition, the tilt adjustment ring 1 is stacked on the raising adjustment ring 3 and the convex portion 18 is movably fitted to the concave groove 371. Therefore, the shaft rotation of the tilt adjustment ring 1 is convex. While being regulated by the concave groove 371 through the portion 18, it is made along the concave groove 371. Therefore, the direction of the inclination angle θ9 and the direction of the inclination angle θ1 can be exactly matched.

調整孔161、及び、調整孔162は、周方向Rに等間隔で配置されていることにより、軸(a)に対する中心角度が60度になっている。その結果、調整作業の第1工程として、3つのボルト7を、調整孔161と、調整孔162とのいずれに案内するかによって、60度刻みで大まかに傾斜調整リング1の向きを調整し、さらに続いて傾斜調整リング1の向きを軸回転R1、R2させて微調節することができる。従って、道路舗装面9との高低差や道路勾配θ9に的確に対応し、より精度の高い調整を行うことができる。   Since the adjustment hole 161 and the adjustment hole 162 are arranged at equal intervals in the circumferential direction R, the center angle with respect to the axis (a) is 60 degrees. As a result, as the first step of the adjustment operation, depending on whether the three bolts 7 are guided to the adjustment hole 161 or the adjustment hole 162, the direction of the inclination adjustment ring 1 is roughly adjusted in increments of 60 degrees. Further, the direction of the tilt adjusting ring 1 can be finely adjusted by rotating the shafts R1 and R2. Therefore, it is possible to accurately adjust the height difference from the road pavement surface 9 and the road gradient θ9, and to perform adjustment with higher accuracy.

組立体100は、ボルト7で一体的に固定された積層構造である。この構造によると、傾斜調整リング1、嵩上げ調整リング3など個々の構成部材は軽量であるから、運搬、移動、組み立てなどの各作業の効率を向上させることができる。また、ボルト7として、六角穴付ボルト(キャップボルト)を用いることにより、部品点数、及び、組み立て工数を削減することができる。   The assembly 100 has a laminated structure that is integrally fixed with bolts 7. According to this structure, the individual components such as the inclination adjustment ring 1 and the raising adjustment ring 3 are lightweight, so that the efficiency of each operation such as transportation, movement, and assembly can be improved. Further, by using a hexagon socket head cap screw (cap bolt) as the bolt 7, the number of parts and the number of assembly steps can be reduced.

図10は、本発明のもう一つの実施形態に係る調整リング組立体の正面断面図である。図10において、図1乃至図9に示した構成部分と同一の構成部分には、同一の参照符号を付す。   FIG. 10 is a front cross-sectional view of an adjustment ring assembly according to another embodiment of the present invention. 10, the same components as those shown in FIGS. 1 to 9 are denoted by the same reference numerals.

図10のリング組立体100は、傾斜調整リング1の下部に設けられる嵩上げ部分が、第1の嵩上げ調整リング3と、第2の嵩上げ調整リング4との積み重ねによる複数層構造になっている点に特徴がある。   In the ring assembly 100 of FIG. 10, the raised portion provided at the lower portion of the inclination adjusting ring 1 has a multi-layer structure by stacking the first raised adjusting ring 3 and the second raised adjusting ring 4. There is a feature.

第1の嵩上げ調整リング3は、図7及び図8を参照して説明したものでなり、開口部20に直接接触する関係で積み重ねられる基礎部分である。   The first raising adjustment ring 3 is the one described with reference to FIGS. 7 and 8, and is a basic portion that is stacked so as to be in direct contact with the opening 20.

第2の嵩上げ調整リング4は、傾斜調整リング1の取り付け位置を調節するスペーサであり、スペーサとして用いられる用途に合った構造として、一面41及び他面42が水平面を構成している以外は、第1の嵩上げ調整リング3と同じ構成を有している。以下簡単に説明すると、第2の嵩上げ調整リング4は、基体部40と、中央孔45と、貫通孔46と、第1の凹溝471と、第2の凹溝472とを有している。   The 2nd raising adjustment ring 4 is a spacer which adjusts the attachment position of the inclination adjustment ring 1, and as a structure suitable for the use used as a spacer, the one surface 41 and the other surface 42 comprise the horizontal surface, It has the same configuration as the first raising adjustment ring 3. Briefly described below, the second raising adjustment ring 4 has a base portion 40, a central hole 45, a through hole 46, a first concave groove 471, and a second concave groove 472. .

基体部40は、全体として円板状、又は、リング状の薄板構造であって、一面41と、一面41に対して厚み方向Tに向かい合う他面42とを有している。中央孔45は、基体部40の板面の中央を厚み方向Tに貫通している。   The base portion 40 has a disc-like or ring-like thin plate structure as a whole, and has one surface 41 and another surface 42 facing the one surface 41 in the thickness direction T. The central hole 45 penetrates the center of the plate surface of the base body portion 40 in the thickness direction T.

貫通孔46は、基体部40の面内を厚み方向Tに貫通している。図10からは必ずしも明らかではないが、第2の嵩上げ調整リング4は、ボルト7の設置数に追従して3つの貫通孔46を有している。   The through hole 46 penetrates the surface of the base body 40 in the thickness direction T. Although not necessarily clear from FIG. 10, the second raising adjustment ring 4 has three through holes 46 following the number of bolts 7 installed.

第1の凹溝471は、一面41に開口し、開口縁450に平行して伸びている。また、第2の凹溝472は、一面41において、第1の凹溝471と、開口縁450との間の一面41に開口し、開口縁450に平行して伸びている。   The first concave groove 471 opens on the one surface 41 and extends parallel to the opening edge 450. The second groove 472 opens on one surface 41 between the first groove 471 and the opening edge 450 on one surface 41, and extends parallel to the opening edge 450.

傾斜調整リング1は、第2の嵩上げ調整リング4に積み重ねられ、第2の嵩上げ調整リング4は、第1の嵩上げ調整リング3に積み重ねられており、積み重ねられた状態で、中央孔15、35、45が一致し、且、傾斜調整リング1の凸部18が、第2の嵩上げ調整リング4の凹溝471に凹凸嵌合し、第2の嵩上げ調整リング4の凸部48が第1の嵩上げ調整リング3の凹溝371に凹凸嵌合している。この構造によると、道路舗装面9との高低差や道路勾配θ9に追従して第2の嵩上げ調整リング4を用い、又は、用いないことにより、傾斜調整リング1の位置を容易に、且、的確に調節することができる。   The inclination adjustment ring 1 is stacked on the second raising adjustment ring 4, and the second raising adjustment ring 4 is stacked on the first raising adjustment ring 3, and in the stacked state, the center holes 15, 35 are stacked. 45, and the convex portion 18 of the inclination adjusting ring 1 is concavo-convexly fitted into the concave groove 471 of the second raising adjustment ring 4, and the convex portion 48 of the second raising adjustment ring 4 is The concave / convex fitting is carried out in the concave groove 371 of the raising adjustment ring 3. According to this structure, the position of the inclination adjusting ring 1 can be easily adjusted by using or not using the second raising adjustment ring 4 following the height difference from the road pavement surface 9 and the road gradient θ9. It can be adjusted accurately.

通常、第1の嵩上げ調整リング3は、基礎として用いられるものであるから所望の機械的強度を確保し、且、必要最低限の高さを補うため60〜160mm程度の厚みで構成される。一方、第2の嵩上げ調整リング4は、高さ位置を微調節するために用いられるから、第1の嵩上げ調整リング3とは異なり、薄い構造であることが好ましい。例えば、第2の嵩上げ調整リング4は、10〜100mm程度の厚み別に複数準備しておくことにより、細分化された分だけ、様々な施工条件に応じた調節が可能となる。   Usually, since the first raising adjustment ring 3 is used as a foundation, the first raising adjustment ring 3 has a thickness of about 60 to 160 mm to ensure a desired mechanical strength and to make up the necessary minimum height. On the other hand, since the second raising adjustment ring 4 is used for fine adjustment of the height position, unlike the first raising adjustment ring 3, it is preferable that the second raising adjustment ring 4 has a thin structure. For example, by preparing a plurality of second raising adjustment rings 4 for each thickness of about 10 to 100 mm, adjustment according to various construction conditions can be made by the amount of subdivision.

図10のリング組立体100の構造によると、図1乃至図9を参照して説明した利点を全て有することができる。例えば、傾斜調整リング1の向きの微調節は、調整孔16と、これ挿通されるボルト7との関係で行われるから、傾斜調整リング1より下の部分に配置される第1、第2の嵩上げ調整リング3、4の使用枚数が増えたとしても、これに影響されることなく実行することができる。   The structure of the ring assembly 100 of FIG. 10 can have all the advantages described with reference to FIGS. For example, since the fine adjustment of the direction of the inclination adjusting ring 1 is performed by the relationship between the adjusting hole 16 and the bolt 7 inserted therethrough, the first and second parts arranged below the inclination adjusting ring 1 are used. Even if the number of the raised adjustment rings 3 and 4 used increases, it can be executed without being affected by this.

図10に示した、傾斜調整リング1と、第1、第2の嵩上げ調整リング3、4とを組み合わせた3層構造は、説明の都合上の最小単位に過ぎず、例えば、傾斜調整リング1と、第1の嵩上げ調整リング3との間に、厚みの異なる複数の第2の嵩上げ調整リング4を複数介在させることにより、傾斜調整リング1の取り付け位置を細かく調節することができる。   The three-layer structure in which the inclination adjusting ring 1 and the first and second raising adjustment rings 3 and 4 shown in FIG. 10 are only a minimum unit for convenience of explanation. For example, the inclination adjusting ring 1 And the attachment position of the inclination adjustment ring 1 can be finely adjusted by interposing a plurality of second elevation adjustment rings 4 having different thicknesses between the first elevation adjustment ring 3 and the first elevation adjustment ring 3.

本発明の一実施形態に係る傾斜調整リング1、組立体100、及び、これらを用いたマンホールによると図1乃至図10を参照して説明した特有の効果を奏するのに対し、従来技術において、例えば受枠と斜壁との間にモルタルを注入する工法(モルタル工法)では、施工の際、モルタル注入枠が必要となる。従って、施工性が悪く、工数の増加による工事の長期化と、工事資材の増加による施工コストの上昇を招く。   According to the tilt adjusting ring 1, the assembly 100, and the manhole using these according to the embodiment of the present invention, the conventional effects have the specific effects described with reference to FIGS. 1 to 10. For example, in a construction method (mortar construction method) in which mortar is injected between the receiving frame and the inclined wall, a mortar injection frame is required at the time of construction. Accordingly, the workability is poor, and the construction is prolonged due to an increase in the number of man-hours, and the construction cost is increased due to an increase in construction materials.

本発明では、開口部20に立設されたボルト7に対して、傾斜調整リング1、第1、第2の嵩上げ調整リング3、4を落とし込みにより貫通させるだけでよいから施工性に優れ、工数が少なくなる分、早期復旧が可能となり、工事資材が少なくなることにより施工コストの低減が可能となる。しかも、マンホールの嵩上げは、調整リングの組み合わせにより10mm単位で行うことができるから、あらゆる高さと、道路勾配θ9に対応することができる。   In the present invention, the tilt adjusting ring 1, the first and second raising adjustment rings 3 and 4 need only be dropped through the bolt 7 standing in the opening 20, and thus the workability is excellent and the man-hours are increased. As soon as it is reduced, it is possible to recover quickly, and construction costs can be reduced by reducing construction materials. In addition, the manhole can be raised in units of 10 mm by combining the adjustment rings, so that it can correspond to any height and road gradient θ9.

また、従来のモルタル工法では、施工後の高さ調整、及び、傾斜角度θ1の調整は不可能であり、仮に施工後の調整を行う場合にはモルタル解体(破砕)からやり直さざるを得ないから、施工性が悪く、適切な施工が不能であるとともに、作業の熟練性が求められる。   Moreover, in the conventional mortar method, the height adjustment after construction and the adjustment of the inclination angle θ1 are impossible, and if the adjustment after construction is performed, the mortar dismantling (crushing) must be started again. The workability is poor, proper construction is impossible, and skill of work is required.

本発明では、傾斜調整リング1は、ボルト7、座金72、及び。ナット73により着脱可能に固定されており、開口部20から容易に取り外すことができる。従って、施工性に優れ、適切な施工が可能であり、作業の熟練性も不要であるから、施工効率が向上する。   In the present invention, the tilt adjusting ring 1 includes the bolt 7, the washer 72, and the like. The nut 73 is detachably fixed and can be easily removed from the opening 20. Accordingly, the construction efficiency is excellent, the proper construction is possible, and the skill of the work is unnecessary, so that the construction efficiency is improved.

さらに従来のモルタル工法では、衝撃や温度変化によってモルタルにひび割れが生じやすいから、耐久性に問題が生じる。   Further, in the conventional mortar method, cracks are likely to occur in the mortar due to impact or temperature change, which causes a problem in durability.

これに対して、本発明に係る嵩上げ調整リング3は、好ましくは合成樹脂材料で構成されるから、耐衝撃性、耐熱性及び耐寒性など耐久性に優れており、ひび割れ、破損等の不具合を回避しうる。従って、耐久性に優れ、製品寿命が長く、コストの低減に資する。   On the other hand, since the raising adjustment ring 3 according to the present invention is preferably made of a synthetic resin material, it has excellent durability such as impact resistance, heat resistance and cold resistance, and has problems such as cracking and breakage. Can be avoided. Therefore, it is excellent in durability, has a long product life, and contributes to cost reduction.

以上、好ましい実施例を参照して本発明の内容を具体的に説明したが、本発明の基本的技術思想及び教示に基づいて、当業者であれば、種種の変形態様を採り得ることは自明である。   Although the contents of the present invention have been specifically described above with reference to the preferred embodiments, it is obvious that those skilled in the art can take various modifications based on the basic technical idea and teachings of the present invention. It is.

本発明の一実施形態に係る傾斜調整リングの斜視図である。It is a perspective view of the inclination adjustment ring which concerns on one Embodiment of this invention. 図1に示した傾斜調整リングの他面側の構造を示す斜視図である。It is a perspective view which shows the structure of the other surface side of the inclination adjustment ring shown in FIG. 図1に示した傾斜調整リングの正面図である。It is a front view of the inclination adjustment ring shown in FIG. 本発明の一実施形態に係るマンホールの一部を拡大して示す部分断面図である。It is a fragmentary sectional view which expands and shows a part of manhole which concerns on one Embodiment of this invention. 図4に示した実施形態からマンホールを取り出して示す斜視図である。It is a perspective view which takes out and shows a manhole from the embodiment shown in FIG. 図5に示したマンホールの分解構造を示す斜視図である。It is a perspective view which shows the decomposition | disassembly structure of the manhole shown in FIG. 図4に示した実施形態から調整リング組立体を取り出して示す斜視図である。It is a perspective view which takes out and shows an adjustment ring assembly from the embodiment shown in FIG. 図7の8−8線に沿った断面図である。FIG. 8 is a cross-sectional view taken along line 8-8 in FIG. 7. 図4又は図5に示したマンホールの一部を破断して示す平面図である。It is a top view which fractures | ruptures and shows a part of manhole shown in FIG. 4 or FIG. 本発明のもう一つの実施形態に係る調整リング組立体の正面断面図である。FIG. 6 is a front cross-sectional view of an adjustment ring assembly according to another embodiment of the present invention.

符号の説明Explanation of symbols

1 傾斜調整リング
10 基体部
100 調整リング組立体
11、12 一面、他面
15 中央孔
2 マンホール基体
20 開口部
3 第1の嵩上げ調整リング
4 第2の嵩上げ調整リング
5 受枠
DESCRIPTION OF SYMBOLS 1 Inclination adjustment ring 10 Base part 100 Adjustment ring assembly 11, 12 One side, Other side 15 Central hole 2 Manhole base body 20 Opening part 3 1st raising adjustment ring 4 2nd raising adjustment ring 5 Receiving frame

Claims (2)

基体部と、中央孔と、調整孔と、複数の凸部とを含むマンホール用傾斜調整リングであって、
前記基体部は、一面と、前記一面に対して厚み方向に向かい合う他面とを有し、前記厚み方向に交差する方向に沿って厚みが減少しており、
前記一面は、前記厚みが減少する方向に傾斜しており、
前記中央孔は、前記基体部を前記厚み方向に貫通し、前記一面と、前記他面とに開口しており、
前記調整孔は、長穴であって、前記基体部を前記厚み方向に貫通し、且、長径が前記中央孔の開口縁に沿って伸びており、
前記凸部は、前記他面において厚み方向に突出し、複数が、前記開口縁に沿って、且、互いに間隔を隔てて配置されている、
傾斜調整リング。
A manhole inclination adjusting ring including a base portion, a central hole, an adjusting hole, and a plurality of convex portions,
The base portion has one surface and another surface facing the one surface in the thickness direction, and the thickness decreases along a direction intersecting the thickness direction,
The one surface is inclined in a direction in which the thickness decreases,
The central hole penetrates the base portion in the thickness direction, and is open to the one surface and the other surface,
The adjustment hole is a long hole, penetrates the base portion in the thickness direction, and a long diameter extends along an opening edge of the central hole,
The convex portion protrudes in the thickness direction on the other surface, and a plurality of the convex portions are arranged along the opening edge and spaced apart from each other.
Tilt adjustment ring.
マンホール基体と、マンホール用傾斜調整リングと、マンホール用傾斜調整リングと、受枠と、固定具とを含むマンホールであって、
前記嵩上げ調整リングは、一面にリング状の凹溝を有し、前記マンホール基体の開口部に積み重ねられており、
前記傾斜調整リングは、基体部と、中央孔と、調整孔と、複数の凸部とを含み、
前記基体部は、一面と、前記一面に対して厚み方向に向かい合う他面とを有し、前記厚み方向に交差する方向に沿って厚みが減少しており、
前記一面は、前記厚みが減少する方向に傾斜しており、
前記中央孔は、前記基体部を前記厚み方向に貫通し、前記一面と、前記他面とに開口しており、
前記調整孔は、長穴であって、前記基体部を前記厚み方向に貫通し、且、長径が前記中央孔の開口縁に沿って伸びており、
前記凸部は、前記他面において厚み方向に突出し、複数が、前記開口縁に沿って、且、互いに間隔を隔てて配置されており、
前記傾斜調整リングは、前記他面が、前記嵩上げ調整リングの前記一面に積み重ねられ、前記積み重ねられた状態で前記凸部が、前記凹溝に対して移動可能に嵌合されており、
前記受枠は、前記傾斜調整リングの前記一面に積み重ねられており、
前記固定具は、棒状であって、前記嵩上げ調整リング、前記傾斜調整リングの前記調整孔、及び、前記受枠を貫通している、
マンホール。
A manhole including a manhole base, a manhole inclination adjusting ring, a manhole inclination adjusting ring, a receiving frame, and a fixture,
The raised adjustment ring has a ring-shaped concave groove on one surface, and is stacked on the opening of the manhole substrate.
The inclination adjusting ring includes a base portion, a central hole, an adjusting hole, and a plurality of convex portions,
The base portion has one surface and another surface facing the one surface in the thickness direction, and the thickness decreases along a direction intersecting the thickness direction,
The one surface is inclined in a direction in which the thickness decreases,
The central hole penetrates the base portion in the thickness direction, and is open to the one surface and the other surface,
The adjustment hole is a long hole, penetrates the base portion in the thickness direction, and a long diameter extends along an opening edge of the central hole,
The convex portion protrudes in the thickness direction on the other surface, and a plurality of the convex portions are arranged along the opening edge and spaced apart from each other.
The tilt adjustment ring is configured such that the other surface is stacked on the one surface of the raised adjustment ring, and the convex portion is movably fitted to the concave groove in the stacked state.
The receiving frame is stacked on the one surface of the tilt adjustment ring,
The fixture is rod-shaped and penetrates the raising adjustment ring, the adjustment hole of the inclination adjustment ring, and the receiving frame.
manhole.
JP2008177526A 2008-07-08 2008-07-08 Inclination adjusting ring for manhole, adjusting ring assembly, and manhole Pending JP2010018947A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008177526A JP2010018947A (en) 2008-07-08 2008-07-08 Inclination adjusting ring for manhole, adjusting ring assembly, and manhole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008177526A JP2010018947A (en) 2008-07-08 2008-07-08 Inclination adjusting ring for manhole, adjusting ring assembly, and manhole

Publications (1)

Publication Number Publication Date
JP2010018947A true JP2010018947A (en) 2010-01-28

Family

ID=41704115

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008177526A Pending JP2010018947A (en) 2008-07-08 2008-07-08 Inclination adjusting ring for manhole, adjusting ring assembly, and manhole

Country Status (1)

Country Link
JP (1) JP2010018947A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014118706A (en) * 2012-12-14 2014-06-30 Hanex Co Ltd Floating preventive manhole
CN104234084A (en) * 2014-10-09 2014-12-24 香志光 Combined inspection well
JP2015004199A (en) * 2013-06-20 2015-01-08 日本ステップ工業株式会社 Adjusting ring for manhole

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6066747A (en) * 1983-09-20 1985-04-16 凸版印刷株式会社 Heat sterilization of container
JPH0318252A (en) * 1989-06-15 1991-01-25 Furukawa Electric Co Ltd:The Integrally forming method for magnet
JPH0953245A (en) * 1995-08-10 1997-02-25 Haneda Fume Can Kk Height adjusting method of manhole

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6066747A (en) * 1983-09-20 1985-04-16 凸版印刷株式会社 Heat sterilization of container
JPH0318252A (en) * 1989-06-15 1991-01-25 Furukawa Electric Co Ltd:The Integrally forming method for magnet
JPH0953245A (en) * 1995-08-10 1997-02-25 Haneda Fume Can Kk Height adjusting method of manhole

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014118706A (en) * 2012-12-14 2014-06-30 Hanex Co Ltd Floating preventive manhole
JP2015004199A (en) * 2013-06-20 2015-01-08 日本ステップ工業株式会社 Adjusting ring for manhole
CN104234084A (en) * 2014-10-09 2014-12-24 香志光 Combined inspection well
CN104234084B (en) * 2014-10-09 2016-08-31 长沙兴迈通信建设有限公司 A kind of combined inspection shaft

Similar Documents

Publication Publication Date Title
US20030082000A1 (en) Adjustable manhole apparatus
KR102375171B1 (en) Prefabricated pole for street lamp, signal lamp, paint a road sign, tower pole
JP2010018947A (en) Inclination adjusting ring for manhole, adjusting ring assembly, and manhole
JP2011241590A (en) Simple foundation for columnar member
JP2006070692A (en) Manhole with height adjusting function
KR101614021B1 (en) Apparatus for removing manhole cover and maintenance method of manhole cover
US20120199216A1 (en) Drain Cover Adjuster
KR101582316B1 (en) fixing device of post for road facilities installation
US8360679B2 (en) Inflow and infiltration cap and seal barrier
US10301784B2 (en) Bridge cap and fastening unit for fastening a bridge cap
KR101203184B1 (en) Ultra High Performance Concrete Fabricated Cap for Manhole
KR101824838B1 (en) Manhole Lid Assembly
KR100936097B1 (en) Height adjustment device for manhole
JP3171675U (en) Anti-sinking floor slab with maneuvering prevention function
JP5762910B2 (en) Installation structure of elastic columnar body
JP6025170B2 (en) Anti-levitation manhole
JP2009127686A (en) Method and device for connecting branch pipe
KR100700414B1 (en) Synthetic resins pipe assembly for Control valve manhole of Tap water
KR200473326Y1 (en) Structure of manhole for preventing dip of weakness ground
KR200175290Y1 (en) Lock device of pulling up ring a manhole
KR200350364Y1 (en) Manhole for water valve
ES2684106B1 (en) LEVELING DEVICE FOR REGISTRATION BOTTOM COVERS AND ASSOCIATED LEVELING PROCEDURE
JP2005290849A (en) Lining method of water passage
JP4406844B2 (en) Road block and its connection method
JP3171670U (en) Preventing subsidence around the manhole

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100520

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100520

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20100521

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110706

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110713

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20111124