JP2009274780A - Hanging implement, method of lifting article, and method of laying paving slab block - Google Patents

Hanging implement, method of lifting article, and method of laying paving slab block Download PDF

Info

Publication number
JP2009274780A
JP2009274780A JP2008125395A JP2008125395A JP2009274780A JP 2009274780 A JP2009274780 A JP 2009274780A JP 2008125395 A JP2008125395 A JP 2008125395A JP 2008125395 A JP2008125395 A JP 2008125395A JP 2009274780 A JP2009274780 A JP 2009274780A
Authority
JP
Japan
Prior art keywords
lifting
rod
hole
jig
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008125395A
Other languages
Japanese (ja)
Inventor
Shoichi Isayama
昌一 諫山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TATEYAMA CONCRETE KK
Original Assignee
TATEYAMA CONCRETE KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TATEYAMA CONCRETE KK filed Critical TATEYAMA CONCRETE KK
Priority to JP2008125395A priority Critical patent/JP2009274780A/en
Publication of JP2009274780A publication Critical patent/JP2009274780A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)
  • Road Paving Structures (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a hanging implement which eliminates the need for a lifting insert previously embedded in an article, while facilitating the operation of engaging or removing the hanging implement with or from the article during lifting. <P>SOLUTION: Two rod-shaped members each having at its top an annular portion formed with an opening through which to pass a hanging wire or the like, and having in its middle a bearing portion formed with a bearing hole, with the directions of the opening and the bearing hole being mutually perpendicular, are arranged with their openings facing each other and at a predetermined interval to each other at their bearing portions. A shaft is passed through the bearing holes in the two rod-shaped members to integrate the members together. The two rod-shaped members are allowed to rotate relative to the shaft. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、コンクリートブロックをはじめとする種々の物品をクレーンなどの揚重機で吊り上げるための吊治具、及びこの吊治具を使用した物品の吊上方法、並びにこの吊治具を使用した舗装板ブロックの敷設方法に関する。   The present invention relates to a hanging jig for lifting various articles including a concrete block with a lifting machine such as a crane, a method for lifting an article using the hanging jig, and a pavement using the hanging jig. The present invention relates to a method for laying plate blocks.

コンクリートブロックなどの物品を吊り上げるための吊治具として一般的なものは、下記特許文献1に示すように、ブロックに吊上用インサートを埋設しておき、吊治具の下部の係合部分をインサートに係合し、吊り上げるものである。吊治具とインサートとの係合は、下記特許文献2に示されるように、螺子によるのが一般的である。
特開2007−98878号公報 特開2002−179381号公報
As a general lifting jig for lifting an article such as a concrete block, as shown in Patent Document 1 below, a lifting insert is embedded in the block, and an engaging portion at the lower part of the hanging jig is set. It engages with the insert and lifts it up. As shown in Patent Document 2 below, the engagement between the hanging jig and the insert is generally by a screw.
JP 2007-98878 A Japanese Patent Application Laid-Open No. 2002-177931

前記従来の吊治具は、ブロックなどの物品中に予め吊上用インサートを埋め込んでおかなければならないので、このための手間と費用を必要としていた。また、吊り上げに際して、吊治具の下部の係合部分をインサートに係合するために、吊治具を多数回回転させてねじ込むなどの作業が必要であり、吊治具を取り外すときも同様の作業が必要で、作業が煩雑となっていた。
本発明は、物品に予め埋め込む吊上用インサートが不要で、吊り上げに際して吊治具を物品に係合し、又は取り外す作業も簡単な吊治具を開発することを課題とするものである。
Since the conventional hanging jig has to embed a lifting insert in an article such as a block in advance, it requires labor and cost for this purpose. Also, when lifting, it is necessary to rotate the hanging jig a number of times and screw it in order to engage the lower engaging part of the hanging jig with the insert. Work was necessary and the work was complicated.
An object of the present invention is to develop a lifting jig that does not require a lifting insert embedded in an article in advance and that can be easily engaged with or removed from a hanging jig when lifting.

〔請求項1〕
本発明は、上部に吊ワイヤーなどを通す開口が形成された円環部を有し、中間部に軸受孔が形成された軸受部を有し、前記開口と前記軸受孔の向きが直角である2本の棒状部材を、前記開口が対向するように、前記軸受部において所定間隔を隔てて配置し、前記2本の棒状部材の軸受孔に軸を挿通して一体化し、前記2本の棒状部材が前記軸に対して回動自在になっていることを特徴とする吊治具である。
[Claim 1]
The present invention has an annular portion in which an opening for passing a suspension wire or the like is formed in the upper portion, a bearing portion in which a bearing hole is formed in an intermediate portion, and the direction of the opening and the bearing hole is a right angle Two rod-shaped members are arranged at a predetermined interval in the bearing portion so that the openings face each other, and a shaft is inserted into and integrated with the bearing holes of the two rod-shaped members. The suspension jig is characterized in that the member is rotatable with respect to the shaft.

吊り上げに際して、吊ワイヤーなどに吊り上げる物品の重量が作用すると、図7、8に示すように、円環部12、22の間隔が狭まる方向の力(矢印a)が作用し、同時に棒状部材の下部の間隔が拡がる方向の力(矢印b)が作用するので、吊治具と物品の吊上孔とが強く係合し、安全に吊り上げることができる。図6に示すように、吊ワイヤーなどに吊り上げる物品の重量が作用しないときは、円環部12、22の間隔が広がり(又は容易に広げることができ)、棒状部材の下部の間隔が狭まるので、吊治具を吊上孔から容易に抜き取ることができる。
本発明において、開口には吊ワイヤーを直接通してもよいし、吊ワイヤーに装着したフックやシャックルなどの吊上用金具を通してもよい。
本発明における「所定間隔」とは、前記軸の外径と同じか、それよりもやや広い間隔で、吊り上げに際して棒状部材上部の円環部の間隔が狭まったときに、棒状部材の下部の間隔が開いて吊上孔に密着するように、適宜に設定すればよい。
When lifting, if the weight of the article to be lifted acts on a suspension wire or the like, as shown in FIGS. 7 and 8, a force (arrow a) in the direction of narrowing the interval between the annular portions 12 and 22 acts, and at the same time the lower part of the rod-shaped member Since the force (arrow b) in the direction in which the distance between the two is extended acts, the lifting jig and the lifting hole of the article are strongly engaged and can be lifted safely. As shown in FIG. 6, when the weight of the article to be lifted on the hanging wire does not act, the interval between the annular portions 12 and 22 is widened (or can be easily expanded), and the interval between the lower portions of the rod-like members is narrowed. The suspension jig can be easily extracted from the suspension hole.
In the present invention, a suspension wire may be directly passed through the opening, or a lifting bracket such as a hook or a shackle attached to the suspension wire may be passed.
The “predetermined interval” in the present invention is an interval that is the same as or slightly wider than the outer diameter of the shaft. May be set as appropriate so that is open and closely contacts the lifting hole.

〔請求項2〕
また本発明は、前記棒状部材の下部が、前記開口の向いている方向で外側方向に折り曲げられた折曲部となっている請求項1の吊治具である。
[Claim 2]
Further, the present invention is the hanging jig according to claim 1, wherein the lower portion of the rod-shaped member is a bent portion that is bent outward in the direction in which the opening faces.

折曲部を設けることで、吊り上げに際して、棒状部材の下部の間隔が開いたときに、棒状部材下部をテーパ状の吊上孔に完全に密着させることができ(特に吊上孔の径が小さいとき)、吊治具と物品の吊上孔とを非常に強く係合することができる。   By providing the bent portion, when the gap between the lower portions of the rod-shaped members is widened, the lower portion of the rod-shaped members can be completely brought into close contact with the tapered lifting holes (particularly the diameter of the lifting holes is small). The suspension jig and the suspension hole of the article can be engaged very strongly.

〔請求項3〕
また本発明は、前記棒状部材の下端部が、前記開口の向いている方向で外側方向に鈎状に折り曲げられた鈎状部となっている請求項1又は2の吊治具である。
[Claim 3]
Further, the present invention is the hanging jig according to claim 1 or 2, wherein the lower end portion of the rod-shaped member is a hook-like portion bent in a hook shape in the outer direction in the direction in which the opening faces.

吊り上げる物品の吊上孔に、鈎状部に対応する段部を設けることで、吊り上げに際して吊治具の鈎状部と吊上孔の段部とが係合し、きわめて安全に物品を吊り上げることができる。   By providing a step corresponding to the hook-shaped portion in the lifting hole of the article to be lifted, the hook-shaped portion of the lifting jig and the step of the lifting hole are engaged when lifting, so that the article can be lifted extremely safely. Can do.

〔請求項4〕
また本発明は、請求項1又は2の吊治具を、前記2本の棒状部材の開口に揚重機の吊ワイヤーなどを挿通して揚重機で吊り上げ可能としておき、下方の径が上方よりも拡がっている吊上孔を上面に有する物品の該吊上孔に、前記吊治具の2本の棒状部材の下部を挿入した後、前記2本の棒状部材の円環部の間隔を狭めた状態で前記吊治具を上昇させて物品を吊り上げることを特徴とする物品の吊り上げ方法である。
[Claim 4]
Further, the present invention is such that the lifting jig of claim 1 or 2 can be lifted by a lifting machine by inserting a lifting wire of a lifting machine through the openings of the two rod-shaped members, and the lower diameter is higher than the upper one. After inserting the lower part of the two rod-shaped members of the lifting jig into the lifting hole of the article having the expanded lifting hole on the upper surface, the interval between the annular portions of the two rod-shaped members was reduced. A method for lifting an article, wherein the article is lifted by raising the hanging jig in a state.

物品の吊上孔の径が、下方が上方よりも拡がっているので、吊り上げに際して棒状部材の下部が拡がって吊上孔に接触したときに、棒状部材が物品の重量を支え、支持することができる。   Since the diameter of the lifting hole of the article is wider at the lower side than at the upper side, the rod-like member can support and support the weight of the article when the lower part of the rod-like member is expanded and comes into contact with the lifting hole during lifting. it can.

〔請求項5〕
また本発明は、請求項3の吊治具を、前記2本の棒状部材の開口に揚重機の吊ワイヤーなどを挿通して揚重機で吊り上げ可能としておき、下方の径が上方よりも拡がっている段部が形成されている吊上孔を上面に有する物品の該吊上孔に、前記吊治具の2本の棒状部材の下部を挿入して前記鈎状部を前記段部に係合させ、前記2本の棒状部材の円環部の間隔を狭めた状態で前記吊治具を上昇させて物品を吊り上げることを特徴とする物品の吊り上げ方法である。
[Claim 5]
In the present invention, the lifting jig of claim 3 can be lifted by a lifting machine by inserting a lifting wire of the lifting machine through the openings of the two rod-shaped members, and the lower diameter is wider than the upper one. The lower part of the two rod-shaped members of the lifting jig is inserted into the lifting hole of the article having the lifting hole on the upper surface where the stepped part is formed, and the hooked part is engaged with the stepped part. And lifting the article by lifting the hanging jig in a state where the interval between the annular portions of the two rod-like members is narrowed.

棒状部材の下端部に鈎状部を設け、吊り上げる物品の吊上孔に鈎状部に対応する段部を設けることで、吊り上げに際して吊治具の鈎状部と吊上孔の段部とが係合し、きわめて安全に物品を吊り上げることができる。   By providing a hook-shaped portion at the lower end of the rod-shaped member and providing a step corresponding to the hook-shaped portion in the lifting hole of the article to be lifted, the hook-shaped portion of the lifting jig and the step of the lifting hole are Engage and lift items very safely.

〔請求項6〕
また本発明は、請求項1又は2の吊治具を、前記2本の棒状部材の開口に揚重機の吊ワイヤーなどを挿通して揚重機で吊り上げ可能としておき、下方の径が上方よりも拡がっている吊上孔を上面に有する舗装板ブロックの該吊上孔に、前記吊治具の2本の棒状部材の下部を挿入した後、前記2本の棒状部材の円環部の間隔を狭めた状態で前記吊治具を上昇させて舗装板ブロックを吊り上げ、該ブロックを所定位置に敷設するステップと、
前記吊上孔から前記吊治具を抜き取るステップと、
前記吊上孔から地中にアンカーを、その頭部を前記吊上孔内に露出させた状態で打ち込むステップと、
前記吊上孔内に充填硬化材を充填して硬化させるステップを有することを特徴とする舗装板ブロックの敷設方法である。
[Claim 6]
Further, the present invention is such that the lifting jig of claim 1 or 2 can be lifted by a lifting machine by inserting a lifting wire of a lifting machine through the openings of the two rod-shaped members, and the lower diameter is higher than the upper one. After inserting the lower portions of the two rod-shaped members of the suspension jig into the suspension hole of the paving plate block having the expanded lifting holes on the upper surface, the interval between the annular portions of the two rod-shaped members is set. Raising the suspension jig in a narrowed state to lift the paving board block, and laying the block at a predetermined position;
Extracting the suspension jig from the suspension hole;
Driving the anchor from the lifting hole into the ground with its head exposed in the lifting hole;
A method for laying a paving board block, comprising the step of filling the lifting hole with a filling and hardening material and hardening it.

〔請求項7〕
また本発明は、請求項3の吊治具を、前記2本の棒状部材の開口に揚重機の吊ワイヤーなどを挿通して揚重機で吊り上げ可能としておき、下方の径が上方よりも拡がっている段部が形成されている吊上孔を上面に有する舗装板ブロックの該吊上孔に、前記吊治具の2本の棒状部材の下部を挿入して前記鈎状部を前記段部に係合させ、前記2本の棒状部材の円環部の間隔を狭めた状態で前記吊治具を上昇させて物品を吊り上げ、該ブロックを所定位置に敷設するステップと、
前記吊上孔から前記吊治具を抜き取るステップと、
前記吊上孔から地中にアンカーを、その頭部を前記吊上孔内に露出させた状態で打ち込むステップと、
前記吊上孔内に充填硬化材を充填して硬化させるステップを有することを特徴とする舗装板ブロックの敷設方法である。
[Claim 7]
In the present invention, the lifting jig of claim 3 can be lifted by a lifting machine by inserting a lifting wire of the lifting machine through the openings of the two rod-shaped members, and the lower diameter is wider than the upper one. The lower part of the two rod-shaped members of the suspension jig is inserted into the suspension hole of the pavement plate block having the suspension hole formed on the upper surface thereof, and the hook-shaped part is formed into the step part. Engaging, lifting the hanging jig in a state where the interval between the annular portions of the two rod-shaped members is narrowed, lifting the article, and laying the block at a predetermined position;
Extracting the suspension jig from the suspension hole;
Driving the anchor from the lifting hole into the ground with its head exposed in the lifting hole;
A method for laying a paving board block, comprising the step of filling the lifting hole with a filling and hardening material and hardening it.

従来舗装板ブロックを敷設する場合、ブロックの上面に吊上用インサートを埋め込み、さらにブロックをアンカーで地面に固定するための貫通孔を形成し、インサートを利用してブロックを所定の敷設個所に吊上移動した後、貫通孔から地中にアンカーを打ち込み、貫通孔内にモルタルなどの充填硬化材を充填し硬化させ、固定する必要があった。
本発明の場合、ブロックの吊上孔をアンカー固定用の孔としても使用できる。
Conventionally, when laying a paving board block, a lifting insert is embedded in the upper surface of the block, and a through hole is formed for fixing the block to the ground with an anchor. The block is suspended at a predetermined laying position using the insert. After the upward movement, it was necessary to drive an anchor into the ground from the through hole, fill the through hole with a filling and hardening material such as mortar, cure, and fix.
In the case of the present invention, the lifting hole of the block can also be used as an anchor fixing hole.

本発明の吊治具及び物品の吊り上げ方法は、物品に予め吊上用インサートを埋め込んでおく必要がないので、インサートを埋め込むための手間と費用が不要となる。
また、吊治具を物品に係合する作業及び物品から取り外す作業がきわめて簡単であるので、物品を吊り上げて移動する作業が容易となる。
本発明の舗装板ブロックの敷設方法は、吊上孔が吊治具とブロックを係合する役割と、ブロックをアンカーで地面に固定する役割を兼ねるので、ブロックにインサートを埋め込むための手間と費用が不要となり、きわめて合理的である。さらに、吊治具をブロックに係合する作業及びブロックから取り外す作業がきわめて簡単であるので、物品を吊り上げて敷設する作業が容易となる。
Since the lifting jig and the method for lifting an article of the present invention do not need to embed a lifting insert in the article in advance, the labor and cost for embedding the insert are not required.
In addition, since the operation of engaging the lifting jig with the article and the operation of removing it from the article are very simple, the operation of lifting and moving the article becomes easy.
In the method for laying a paving board block according to the present invention, the lifting hole serves both to engage the lifting jig and the block and to fix the block to the ground with an anchor. Is no longer necessary and is extremely reasonable. Furthermore, since the work of engaging the lifting jig with the block and the work of removing it from the block are very simple, the work of lifting and laying the article becomes easy.

図1〜3に示す実施例の吊治具Aは、2本の棒状部材1、2を有する。棒状部材1、2は断面が四辺形(円形などでもよい)の金属棒で、それぞれ上部に開口13、23が形成された円環部12、22を有し、中間部に軸受孔16、26が形成された軸受部15、25を有し、下部が折り曲げ部14、24となっている。
円環部12、22は棒状部材の上部を円環状に曲げて形成され、軸受部15、25はU字形の金属部材を溶接固定して形成され、開口13、23と軸受孔16、26の向きは、それぞれ直角となっている。
棒状部材1、2は、軸受部15、25において所定間隔(ボルト30の軸径よりやや大きい間隔)を隔てて対向して配置され(図2)、それぞれの軸受孔16、26に軸であるボルト30を挿通し、ナット31で締め付け一体化している(図1)。符号32はワッシャーである。棒状部材1、2は、ボルト30を軸として回動自在となっているので、棒状部材1、2は、その上端部又は下端部が相互に接触するまでの範囲で回動自在である(図2)。
1-3 has two rod-shaped members 1 and 2 in the embodiment shown in FIGS. The rod-shaped members 1 and 2 are metal bars having a quadrilateral cross section (may be circular or the like), and have annular portions 12 and 22 having openings 13 and 23 formed in the upper portions thereof, respectively, and bearing holes 16 and 26 in the intermediate portions. Are formed, and the lower portions are bent portions 14 and 24.
The annular portions 12 and 22 are formed by bending the upper portion of the rod-like member into an annular shape, and the bearing portions 15 and 25 are formed by welding and fixing a U-shaped metal member, and the openings 13 and 23 and the bearing holes 16 and 26 are formed. Each direction is a right angle.
The rod-shaped members 1 and 2 are arranged to face each other at a predetermined interval (slightly larger than the shaft diameter of the bolt 30) in the bearing portions 15 and 25 (FIG. 2), and are shafts in the respective bearing holes 16 and 26. Bolts 30 are inserted and tightened and integrated with nuts 31 (FIG. 1). Reference numeral 32 denotes a washer. Since the rod-shaped members 1 and 2 are rotatable about the bolt 30, the rod-shaped members 1 and 2 are rotatable within a range until the upper end portions or the lower end portions thereof contact each other (see FIG. 2).

棒状部材1、2の折曲部14、24は、開口13、23の向いている方向(矢印X方向)で、かつ吊治具Aの外側方向に折り曲げられている。折り曲げ角度は、図7に示す物品を吊り上げた状態において、吊上孔43に密着する角度(約10°)となっている。
なお、折曲部は必ずしも必要ではなく、吊上孔の径が大きく、棒状部材1、2の軸受部における間隔を広くした場合は、折曲部を設けなくとも棒状部材の下部を吊上孔に密着できる。
The bent portions 14 and 24 of the rod-like members 1 and 2 are bent in the direction (the arrow X direction) in which the openings 13 and 23 are directed and in the outward direction of the hanging jig A. The bending angle is an angle (about 10 °) in close contact with the lifting hole 43 when the article shown in FIG. 7 is lifted.
It should be noted that the bent portion is not necessarily required. When the diameter of the lifting hole is large and the interval between the bearing portions of the rod-shaped members 1 and 2 is widened, the lower portion of the rod-shaped member is not formed in the lifting hole without providing the bent portion. It can adhere to.

次に、吊治具Aを用いた物品の吊り上げ方法を、舗装板ブロックを敷設する場合を例にして説明する。
舗装板4は、図11に示すように、3枚の鉄筋コンクリート製の舗装板ブロック41、42、42からなる。各舗装板ブロックの大きさは45cm×128cm、厚さは5cmで、舗装板ブロック41は、一端に鉄板を埋め込んだ乗上部41aが設けられている点で舗装板ブロック42と異なる。各舗装板ブロックには4個所の吊上孔43が形成されている。吊上孔は上部の直径が3cm、下部の直径が5cmで、下方の径が上方よりも拡がるテーパ状となっている。
Next, a method for lifting an article using the lifting jig A will be described by way of an example in which a paving board block is laid.
As shown in FIG. 11, the pavement plate 4 includes three reinforced concrete pavement plate blocks 41, 42 and 42. Each paving board block has a size of 45 cm × 128 cm and a thickness of 5 cm, and the paving board block 41 is different from the paving board block 42 in that a riding portion 41 a in which an iron plate is embedded at one end is provided. Each pavement block is formed with four lifting holes 43. The lifting hole has a tapered shape in which the upper diameter is 3 cm, the lower diameter is 5 cm, and the lower diameter is wider than the upper diameter.

この舗装板は、図12に例示するように既存の駐車場の緑化に使用されるものである。この駐車場は、全面がアスファルト舗装となっていたものを、中央の通路49にアスファルト舗装を残し、両側の駐車スペースに厚さ5cmの植生ブロック46をアスファルト舗装の上に敷き詰めるが、自動車のタイヤが走行する部分のみ、アスファルト舗装の上に舗装板ブロック4を敷設する。植生ブロック46には、例えばイワダレソウのような背の低い植物が繁茂する。   This pavement board is used for the greening of an existing parking lot as illustrated in FIG. This parking lot has an asphalt pavement on the entire surface, leaving the asphalt pavement in the central passage 49, and laying vegetation blocks 46 of thickness 5 cm on the asphalt pavement in the parking spaces on both sides. The paving board block 4 is laid on the asphalt pavement only in the portion where the vehicle runs. In the vegetation block 46, for example, a short plant such as Iwadareso grows.

舗装板を敷設するにあたり、まず、揚重機(例えばトラックに装備されている小型揚重機)の吊ワイヤーを吊治具Aの開口13、23に挿通して、吊治具Aを揚重機で吊り上げ可能にしておく。次にトラックの荷台に積まれている、又は地面に荷下ろしされている舗装板ブロック41、42を1枚ずつ吊り上げ、敷設場所に移動して吊り降ろす。吊り上げるときは、図6に示すように、吊治具Aを吊上孔43の上に吊り降ろすと、吊ワイヤー33が緩んで棒状部材1、2の円環部12、22の間隔が広がり(又は手で広げ)、棒状部材1、2の下部(折曲部14、24)の間隔が狭まり、吊上孔の中に棒状部の下部を挿入することができる。次に、図7に示すように、棒状部材1、2の円環部12、22の間隔を狭めた状態で(折曲部14、24が吊上孔43に密着する)吊治具Aを上昇させると、吊ワイヤー33にブロックの重さが作用し、棒状部材1、2の円環部12、22の間隔が狭まる方向の力(矢印a)が作用し、棒状部材の下部の間隔が広がる方向の力(矢印b)が作用するので、吊治具A下部とブロックの吊上孔43とが強く係合し、安全に吊り上げることができる。   In laying the pavement board, first, the lifting wire of a lifting machine (for example, a small lifting machine installed in a truck) is inserted into the openings 13 and 23 of the lifting jig A, and the lifting jig A is lifted by the lifting machine. Keep it possible. Next, the paving board blocks 41 and 42 loaded on the truck bed or unloaded on the ground are lifted one by one, moved to the laying place and suspended. When lifting, as shown in FIG. 6, when the lifting jig A is hung down on the lifting hole 43, the hanging wire 33 is loosened and the space between the annular portions 12 and 22 of the rod-shaped members 1 and 2 is increased ( Alternatively, the space between the lower portions (folded portions 14, 24) of the rod-shaped members 1, 2 is narrowed, and the lower portion of the rod-shaped portion can be inserted into the lifting hole. Next, as shown in FIG. 7, the hanging jig A is mounted with the space between the annular portions 12 and 22 of the rod-shaped members 1 and 2 narrowed (the bent portions 14 and 24 are in close contact with the lifting hole 43). When raised, the weight of the block acts on the suspension wire 33, a force (arrow a) in the direction in which the distance between the annular portions 12 and 22 of the rod-like members 1 and 2 is reduced, and the gap between the lower portions of the rod-like members is reduced. Since the force in the spreading direction (arrow b) acts, the lower part of the hanging jig A and the lifting hole 43 of the block are strongly engaged and can be lifted safely.

図9は、舗装板ブロック42を吊り上げた状態である。この場合は、吊治具Aを取り付けた吊ワイヤー2本を揚重機の吊フック34に掛けて使用している。吊治具Aは舗装板ブロック42の対角の2つの吊上孔に係合させている。舗装板ブロックを吊り上げた状態で敷設する場所に移動し、吊り降ろすと、図6に示すように、吊ワイヤー33にブロックの重量が作用しなくなるので、円環部12、22の間隔が広がり(又は容易に広げることができ)、棒状部材1、2の下部の間隔が狭まるので、吊治具Aを吊上孔43から容易に抜き取ることができる。
舗装板ブロック41も、舗装板ブロック42と全く同様に吊り上げ、敷設することができる。
FIG. 9 shows a state in which the paving board block 42 is lifted. In this case, two hanging wires attached with the hanging jig A are hung on the hanging hook 34 of the lifting machine. The hanging jig A is engaged with two diagonal lifting holes of the paving board block 42. When the pavement block is moved to the place where it is laid and suspended, the weight of the block does not act on the suspension wire 33 as shown in FIG. Alternatively, the gap between the lower portions of the rod-like members 1 and 2 is narrowed, so that the lifting jig A can be easily removed from the lifting hole 43.
The paving board block 41 can also be lifted and laid just like the paving board block 42.

舗装板ブロック41、42を所定位置に吊り降ろした後、図10に示すように、4個所の吊上孔43から地中(アスファルト47、地盤48)にアンカー45を、その頭部を吊上孔43内に露出させた状態で打ち込む。アンカーは鉄筋や鉄杭などである。次に、吊上孔43内にモルタルなどの充填硬化材44を充填して硬化させ、舗装板ブロックをアスファルト舗装の上に固定する。   After the pavement block 41, 42 is suspended at a predetermined position, as shown in FIG. 10, the anchor 45 is suspended from the four lifting holes 43 into the ground (asphalt 47, ground 48) and its head is suspended. Driving in the state of being exposed in the hole 43. The anchor is a reinforcing bar or a steel pile. Next, a filling hardening material 44 such as mortar is filled in the lifting holes 43 and hardened, and the paving board block is fixed on the asphalt pavement.

図8は、棒状部材1’、2’の下端部に鈎状部17、27を設けた吊治具A’の例である。吊治具A’は、鈎状部を有する以外は前記の吊治具Aと同じである。鈎状部17、27は、開口13、23の向いている方向(図2、3の矢印X方向)で、かつ吊治具Aの外側方向に突出ように設けられている。この場合、吊り上げる物品(舗装板ブロック)に形成する吊上孔43’は、下方の径が上方よりも拡がっている段部43aが形成されている。さらに段部43から上方は下方の径が上方よりも拡がるテーパ状となっており、棒状部材1’、2’の下部が吊上孔43’上部内面に密着している。   FIG. 8 shows an example of a hanging jig A ′ in which hook-shaped portions 17 and 27 are provided at the lower ends of the rod-shaped members 1 ′ and 2 ′. The hanging jig A 'is the same as the hanging jig A except that it has a hook-shaped portion. The hook-shaped portions 17 and 27 are provided so as to protrude in the direction in which the openings 13 and 23 are directed (the direction of the arrow X in FIGS. 2 and 3) and outward of the hanging jig A. In this case, the lifting hole 43 ′ formed in the article to be lifted (paving board block) is formed with a stepped portion 43 a having a lower diameter wider than the upper diameter. Further, the upper part from the step part 43 is tapered so that the lower diameter is larger than the upper part, and the lower parts of the rod-like members 1 ′, 2 ′ are in close contact with the upper inner surface of the lifting hole 43 ′.

本発明の吊治具で吊り上げる物品は、舗装板ブロックに限らず、吊上孔を形成できる種々の物品(例えば、種々の建設資材、土木資材、包装材など)とすることができる。本実施例では、吊上孔を貫通孔としているが、舗装板部ブロック以外の物品の場合は吊上孔は必ずしも貫通孔である必要はない。   The article to be lifted by the hanging jig of the present invention is not limited to a paving board block, and can be various articles (for example, various construction materials, civil engineering materials, packaging materials, etc.) capable of forming a lifting hole. In the present embodiment, the lifting hole is a through hole. However, in the case of an article other than the paving board block, the lifting hole is not necessarily a through hole.

吊治具Aの側面図である。It is a side view of the hanging jig A. 吊治具Aの一部切欠正面図である。It is a partially cutaway front view of the hanging jig A. 吊治具Aの平面図である。2 is a plan view of a hanging jig A. FIG. 棒状部材1、2の側面図である。It is a side view of the rod-shaped members 1 and 2. 棒状部材1、2の正面図である。It is a front view of rod-shaped members 1 and 2. 吊治具Aの使用状態の説明図である。It is explanatory drawing of the use condition of the hanging jig | tool A. FIG. 吊治具Aの使用状態の説明図である。It is explanatory drawing of the use condition of the hanging jig | tool A. FIG. 吊治具A’の使用状態の説明図である。It is explanatory drawing of the use condition of hanging jig | tool A '. 吊治具A、A’の使用状態の説明図である。It is explanatory drawing of the use condition of hanging jig | tool A, A '. 舗装板ブロック41、42の固定状態の説明図である。It is explanatory drawing of the fixed state of the pavement board blocks 41 and 42. FIG. 舗装板4の平面図及び側面図である。It is the top view and side view of the pavement board 4. 駐車場の平面図である。It is a top view of a parking lot.

符号の説明Explanation of symbols

1 棒状部材
11 棒状部
12 円環部
13 開口
14 折曲部
15 軸受部
16 軸受孔
17 鈎状部
2 棒状部材
21 棒状部
22 円環部
23 開口
24 折曲部
25 軸受部
26 軸受孔
27 鈎状部
30 ボルト
31 ナット
32 ワッシャー
33 吊ワイヤー
34 吊フック
4 舗装板
41 舗装板ブロック
42 舗装板ブロック
43 吊上孔
44 充填硬化材
45 アンカー
46 植生ブロック
47 アスファルト
48 地盤
49 通路
DESCRIPTION OF SYMBOLS 1 Bar-shaped member 11 Bar-shaped part 12 Ring part 13 Opening 14 Bending part 15 Bearing part 16 Bearing hole 17 Gutter-shaped part 2 Bar-shaped member 21 Bar-shaped part 22 Ring-shaped part 23 Opening 24 Bending part 25 Bearing part 26 Bearing hole 27 鈎Shaped part 30 Bolt 31 Nut 32 Washer 33 Hanging wire 34 Hanging hook 4 Pavement board 41 Pavement board block 42 Pavement board block 43 Lifting hole 44 Filling hardening material 45 Anchor 46 Vegetation block 47 Asphalt 48 Ground 49 Passage

Claims (7)

上部に吊ワイヤーなどを通す開口が形成された円環部を有し、中間部に軸受孔が形成された軸受部を有し、前記開口と前記軸受孔の向きが直角である2本の棒状部材を、
前記開口が対向するように、前記軸受部において所定間隔を隔てて配置し、
前記2本の棒状部材の軸受孔に軸を挿通して一体化し、
前記2本の棒状部材が前記軸に対して回動自在になっていることを特徴とする吊治具。
Two rods having an annular part in which an opening for passing a suspension wire or the like is formed in the upper part, a bearing part in which a bearing hole is formed in the middle part, and the direction of the opening and the bearing hole is perpendicular Parts
Arranged at a predetermined interval in the bearing portion so that the openings face each other,
The shaft is inserted into and integrated with the bearing holes of the two rod-shaped members,
The hanging jig, wherein the two rod-like members are rotatable with respect to the shaft.
前記棒状部材の下部が、前記開口の向いている方向で外側方向に折り曲げられた折曲部となっている請求項1の吊治具。   The hanging jig according to claim 1, wherein a lower portion of the rod-shaped member is a bent portion that is bent outward in a direction in which the opening faces. 前記棒状部材の下端部が、前記開口の向いている方向で外側方向に鈎状に折り曲げられた鈎状部となっている請求項1又は2の吊治具。   The hanging jig according to claim 1 or 2, wherein a lower end portion of the rod-like member is a hook-like portion bent in a hook shape in an outer direction in a direction in which the opening faces. 請求項1又は2の吊治具を、前記2本の棒状部材の開口に揚重機の吊ワイヤーなどを挿通して揚重機で吊り上げ可能としておき、下方の径が上方よりも拡がっている吊上孔を上面に有する物品の該吊上孔に、前記吊治具の2本の棒状部材の下部を挿入した後、前記2本の棒状部材の円環部の間隔を狭めた状態で前記吊治具を上昇させて物品を吊り上げることを特徴とする物品の吊り上げ方法。   The suspension jig according to claim 1 or 2, wherein a lifting wire or the like of a lifting machine is inserted into the opening of the two rod-shaped members so that the lifting tool can be lifted by the lifting machine, and the lower diameter is wider than the upper part. After the lower part of the two rod-shaped members of the hanging jig is inserted into the lifting hole of the article having holes on the upper surface, the suspension treatment is performed in a state where the interval between the annular portions of the two rod-shaped members is narrowed. A method for lifting an article, wherein the article is lifted by raising the tool. 請求項3の吊治具を、前記2本の棒状部材の開口に揚重機の吊ワイヤーなどを挿通して揚重機で吊り上げ可能としておき、下方の径が上方よりも拡がっている段部が形成されている吊上孔を上面に有する物品の該吊上孔に、前記吊治具の2本の棒状部材の下部を挿入して前記鈎状部を前記段部に係合させ、前記2本の棒状部材の円環部の間隔を狭めた状態で前記吊治具を上昇させて物品を吊り上げることを特徴とする物品の吊り上げ方法。   The lifting jig according to claim 3 is made to be capable of being lifted by a lifting machine by inserting a lifting wire or the like into the opening of the two rod-like members, and a step portion having a lower diameter wider than the upper side is formed. The lower part of the two rod-shaped members of the lifting jig is inserted into the lifting hole of the article having the lifting hole formed on the upper surface, and the hook-shaped part is engaged with the stepped part. A method for lifting an article, wherein the article is lifted by raising the suspension jig in a state where the interval between the annular portions of the rod-shaped member is narrowed. 請求項1又は2の吊治具を、前記2本の棒状部材の開口に揚重機の吊ワイヤーなどを挿通して揚重機で吊り上げ可能としておき、下方の径が上方よりも拡がっている吊上孔を上面に有する舗装板ブロックの該吊上孔に、前記吊治具の2本の棒状部材の下部を挿入した後、前記2本の棒状部材の円環部の間隔を狭めた状態で前記吊治具を上昇させて舗装板ブロックを吊り上げ、該ブロックを所定位置に敷設するステップと、
前記吊上孔から前記吊治具を抜き取るステップと、
前記吊上孔から地中にアンカーを、その頭部を前記吊上孔内に露出させた状態で打ち込むステップと、
前記吊上孔内に充填硬化材を充填して硬化させるステップを有することを特徴とする舗装板ブロックの敷設方法。
The suspension jig according to claim 1 or 2, wherein a lifting wire or the like of a lifting machine is inserted into the opening of the two rod-shaped members so that the lifting tool can be lifted by the lifting machine, and the lower diameter is wider than the upper part. After inserting the lower part of the two rod-shaped members of the suspension jig into the suspension hole of the pavement plate block having the hole on the upper surface, the space between the annular portions of the two rod-shaped members is reduced. Lifting the lifting jig to lift the paving board block and laying the block in place;
Extracting the suspension jig from the suspension hole;
Driving the anchor from the lifting hole into the ground with its head exposed in the lifting hole;
A method for laying a paving board block, comprising a step of filling and curing a filling and hardening material in the lifting hole.
請求項3の吊治具を、前記2本の棒状部材の開口に揚重機の吊ワイヤーなどを挿通して揚重機で吊り上げ可能としておき、下方の径が上方よりも拡がっている段部が形成されている吊上孔を上面に有する舗装板ブロックの該吊上孔に、前記吊治具の2本の棒状部材の下部を挿入して前記鈎状部を前記段部に係合させ、前記2本の棒状部材の円環部の間隔を狭めた状態で前記吊治具を上昇させて物品を吊り上げ、該ブロックを所定位置に敷設するステップと、
前記吊上孔から前記吊治具を抜き取るステップと、
前記吊上孔から地中にアンカーを、その頭部を前記吊上孔内に露出させた状態で打ち込むステップと、
前記吊上孔内に充填硬化材を充填して硬化させるステップを有することを特徴とする舗装板ブロックの敷設方法。
The lifting jig according to claim 3 is made to be able to be lifted by a lifting machine by inserting a lifting wire of the lifting machine into the openings of the two rod-shaped members, and a step part having a lower diameter wider than the upper part is formed. The lower part of the two rod-shaped members of the suspension jig is inserted into the suspension hole of the paving plate block having the suspension hole formed on the upper surface, and the hook-shaped part is engaged with the step part, Lifting the article by raising the hanging jig in a state where the interval between the annular portions of the two rod-like members is narrowed, and laying the block at a predetermined position;
Extracting the suspension jig from the suspension hole;
Driving the anchor from the lifting hole into the ground with its head exposed in the lifting hole;
A method for laying a paving board block, comprising a step of filling and hardening a filling and hardening material in the lifting hole.
JP2008125395A 2008-05-13 2008-05-13 Hanging implement, method of lifting article, and method of laying paving slab block Pending JP2009274780A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008125395A JP2009274780A (en) 2008-05-13 2008-05-13 Hanging implement, method of lifting article, and method of laying paving slab block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008125395A JP2009274780A (en) 2008-05-13 2008-05-13 Hanging implement, method of lifting article, and method of laying paving slab block

Publications (1)

Publication Number Publication Date
JP2009274780A true JP2009274780A (en) 2009-11-26

Family

ID=41440567

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008125395A Pending JP2009274780A (en) 2008-05-13 2008-05-13 Hanging implement, method of lifting article, and method of laying paving slab block

Country Status (1)

Country Link
JP (1) JP2009274780A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101124608B1 (en) * 2011-09-05 2012-03-20 박건호 Permeability block
KR101197564B1 (en) * 2012-02-07 2012-11-06 주식회사지이티-피씨 Big Sidewalk Block
CN105502147A (en) * 2014-09-26 2016-04-20 东风德纳车桥有限公司 Sling for hoisting of cylindrical stepped hole workpiece
JP2022042485A (en) * 2020-09-02 2022-03-14 淨斯人間志業股▲ふん▼有限公司 Interlocking paving brick assembly
JP7441516B2 (en) 2020-10-08 2024-03-01 哲郎 藤山 Gutter cover holder and how to pull up the gutter cover

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101124608B1 (en) * 2011-09-05 2012-03-20 박건호 Permeability block
KR101197564B1 (en) * 2012-02-07 2012-11-06 주식회사지이티-피씨 Big Sidewalk Block
CN105502147A (en) * 2014-09-26 2016-04-20 东风德纳车桥有限公司 Sling for hoisting of cylindrical stepped hole workpiece
JP2022042485A (en) * 2020-09-02 2022-03-14 淨斯人間志業股▲ふん▼有限公司 Interlocking paving brick assembly
JP7193594B2 (en) 2020-09-02 2022-12-20 淨斯人間志業股▲ふん▼有限公司 interlocking paver brick assembly
US11753776B2 (en) 2020-09-02 2023-09-12 Jing Si Pureland Co., Ltd. Interlocking paving brick assembly
JP7441516B2 (en) 2020-10-08 2024-03-01 哲郎 藤山 Gutter cover holder and how to pull up the gutter cover

Similar Documents

Publication Publication Date Title
CA2880553C (en) Method and apparatus for lifting and leveling a concrete panel
JP2009274780A (en) Hanging implement, method of lifting article, and method of laying paving slab block
JP5937898B2 (en) Construction method of box girder bridge
JP2009097244A (en) Concrete block and locking member for erecting pole
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
JP2008215031A (en) Scaffolding construction method
US20070126249A1 (en) Concrete lifting eye-flexi lift
JP5574338B2 (en) Site precast method for foundation beam
JP2023028167A (en) Timbering installation method and timbering installation device
JP4421421B2 (en) Columnar structure construction method and suspension jig
KR20110116905A (en) Structure for reinforcing head of a steel pipe pile for a construction
JP2009161922A (en) Prefabricated concrete pile and method of manufacturing the same
JP2618800B2 (en) How to lay concrete blocks
KR100705880B1 (en) Hanger for anchor-bolt
KR200348953Y1 (en) A pile head reinforcement structure of precast concrete pile
JP7219574B2 (en) Plumbing adjustment jig and plumbing adjustment method
JP2018178658A (en) Method for constructing structure
JP7037996B2 (en) How to assemble slab rebar
JP2005060959A (en) Grade separation construction method
JP6181001B2 (en) Steel unit level adjuster
JP6013873B2 (en) Equipment burial method and equipment 枡
JP4421420B2 (en) Columnar structure construction method and suspension jig
JP2000328579A (en) Natural ground slope reinforcing method and pressure receiving plate form used for the reinforcing method
KR200375113Y1 (en) Lattice bar deck-shaped precast concrete plate for bridge slab construction
JP2005133351A (en) Hoop flushing method on using rope support implement and rope support implement