JP2009145335A - Channel-lifting tool and method - Google Patents

Channel-lifting tool and method Download PDF

Info

Publication number
JP2009145335A
JP2009145335A JP2008312795A JP2008312795A JP2009145335A JP 2009145335 A JP2009145335 A JP 2009145335A JP 2008312795 A JP2008312795 A JP 2008312795A JP 2008312795 A JP2008312795 A JP 2008312795A JP 2009145335 A JP2009145335 A JP 2009145335A
Authority
JP
Japan
Prior art keywords
lifting
leg
channel
lifting tool
bale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008312795A
Other languages
Japanese (ja)
Inventor
David Francis Wazybok
デイビッド・フランシス・ワァジイボック
David Grey Smith
デイビッド・グレイ・スミス
Edward G Apple
エドワード・ジー・アップル
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Global Nuclear Fuel Americas LLC
Original Assignee
Global Nuclear Fuel Americas LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Global Nuclear Fuel Americas LLC filed Critical Global Nuclear Fuel Americas LLC
Publication of JP2009145335A publication Critical patent/JP2009145335A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/02Details of handling arrangements
    • G21C19/10Lifting devices or pulling devices adapted for co-operation with fuel elements or with control elements
    • G21C19/105Lifting devices or pulling devices adapted for co-operation with fuel elements or with control elements with grasping or spreading coupling elements
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C3/00Reactor fuel elements and their assemblies; Selection of substances for use as reactor fuel elements
    • G21C3/30Assemblies of a number of fuel elements in the form of a rigid unit
    • G21C3/32Bundles of parallel pin-, rod-, or tube-shaped fuel elements
    • G21C3/33Supporting or hanging of elements in the bundle; Means forming part of the bundle for inserting it into, or removing it from, the core; Means for coupling adjacent bundles
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C1/00Reactor types
    • G21C1/04Thermal reactors ; Epithermal reactors
    • G21C1/06Heterogeneous reactors, i.e. in which fuel and moderator are separated
    • G21C1/08Heterogeneous reactors, i.e. in which fuel and moderator are separated moderator being highly pressurised, e.g. boiling water reactor, integral super-heat reactor, pressurised water reactor
    • G21C1/084Boiling water reactors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a channel lifting tool device for lifting a channel from a storage place and fixing the channel while the channel is arranged on a fuel bundle before assembled as a nuclear fuel assembly, and to provide a tool for facilitating arrangement of the channel and promoting removal of the channel from the nuclear fuel assembly without damaging a component of the fuel assembly. <P>SOLUTION: A lifting tool is used for lifting a channel 22 on and off of a nuclear fuel bundle. The lifting tool includes a lifting bail 12 and a leg assembly 14 secured to the lifting bail. The leg assembly has an adjustable width, and is adjustable between a narrower pre-lifting position and a wider lifting position. Lifting legs are engageable with channel clips 20 in the lifting position. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、核燃料集合体と関連して使用するためのツールに関し、特に、核燃料束に対してチャンネルを昇降するチャンネルリフティングツールに関する。   The present invention relates to a tool for use in conjunction with a nuclear fuel assembly, and more particularly to a channel lifting tool that raises and lowers a channel relative to a nuclear fuel bundle.

沸騰水型軽水炉における典型的な核燃料集合体は、下部タイプレート及び上部タイプレートと、種々の長さの密封燃料棒及び水棒のマトリクスとを含む。燃料棒及び水棒は、上部タイプレートと下部タイプレートとの間に支持されたスペーサにより所定の場所に保持される。蒸気を発生するために要求される臨界反応を支援するように、燃料棒は、密封格納状態で核燃料ペレットを収納する。核燃料集合体を構成する上部タイプレート、下部タイプレート、スペーサ、水棒及び燃料棒を包囲するために、チャンネルが使用される。   A typical nuclear fuel assembly in a boiling water reactor includes a lower tie plate and an upper tie plate and various lengths of sealed fuel rods and water rod matrices. The fuel rod and water rod are held in place by a spacer supported between the upper tie plate and the lower tie plate. The fuel rods contain the nuclear fuel pellets in a sealed containment so as to support the critical reaction required to generate steam. Channels are used to surround the upper tie plate, lower tie plate, spacers, water rods and fuel rods that make up the nuclear fuel assembly.

チャンネルの設置は、燃料束の組み立てにおける最終工程の1つである。チャンネル設置プロセスは、燃料束の直上にチャンネルを位置決めすること、及び燃料束に向かってチャンネルを下降させるか又は燃料束をチャンネルの中へ上昇させるかのいずれかを含む。   The installation of the channel is one of the final steps in assembling the fuel bundle. The channel installation process includes positioning the channel directly above the fuel bundle and either lowering the channel toward the fuel bundle or raising the fuel bundle into the channel.

現在、チャンネルを操作するために、端部が丸形に加工され且つIボルトが装着された正方形のステンレス鋼バーが使用されている。Iボルトは、チャンネルの4つの角部のうち対向する2つの角部のみに通常は配置されるチャンネルクリップの下方で角部の間に嵌合する。チャンネル設置プロセスの終了近くに、このツールが上部タイプレートに配置されたハンドルに当接するまで、ツールは十分に機能する。設置終了に近い時点で、リフトバーが除去される間に、1人又は2人の操作員によりチャンネルを手動で昇降し且つ/又は保持しなければならない。下部タイプレート及び上部タイプレートから外れるようにチャンネルを手動で昇降又は保持する作業は、既存のツールを使用した場合に特に問題である。ツールの係合が外れている間にチャンネルが滑ると、操作員の指を押しつぶすか又は切断する危険がある。更に、チャンネルを手動で昇降又は保持する作業においては、上部タイプレートに向かって非常に速く且つ非常に強い力で降下させた場合に、例えばチャンネル表面の傷及び/又は跡、チャンネルのゆがみ、下部タイプレートに装着されたフィンガスプリングの損傷、チャンネルのチャンネルクリップの損傷などの品質に関わる問題が起こる可能性もある。
米国特許第5,251,244号公報 米国特許第5,978,430号公報 米国特許第6,101,231号公報 米国特許第6,125,160号公報 米国特許第6,310,930号公報 米国特許第6,320,922号公報 米国特許第6,333,957号公報
Currently, square stainless steel bars with round ends and I bolts are used to operate the channels. The I-bolts fit between the corners below the channel clip, which is normally located only at the two opposite corners of the four corners of the channel. Near the end of the channel installation process, the tool works well until it abuts a handle located on the upper tie plate. Near the end of installation, the channel must be lifted and / or held manually by one or two operators while the lift bar is removed. The task of manually raising and lowering or holding the channel away from the lower and upper tie plates is particularly problematic when using existing tools. If the channel slips while the tool is disengaged, there is a risk of crushing or cutting the operator's finger. Further, in manually lifting or holding the channel, if it is lowered very quickly and with a very strong force towards the upper tie plate, for example scratches and / or marks on the channel surface, channel distortion, lower part Quality problems such as damage to the finger springs attached to the tie plate and damage to the channel clip of the channel can also occur.
US Pat. No. 5,251,244 US Pat. No. 5,978,430 US Pat. No. 6,101,231 US Pat. No. 6,125,160 US Pat. No. 6,310,930 US Pat. No. 6,320,922 US Pat. No. 6,333,957

従って、格納場所からチャンネルを持ち上げ、核燃料集合体として組み立てる前に燃料束にチャンネルが配置される間チャンネルを固定できるチャンネルリフティングツール装置を提供することが望ましい。また、チャンネルの設置を容易にし且つ燃料集合体の構成要素を損傷することなく核燃料集合体からチャンネルを除去するのを助長するためのツールが望ましい。   Accordingly, it is desirable to provide a channel lifting tool apparatus that can secure a channel while the channel is positioned in the fuel bundle prior to lifting the channel from the storage location and assembling as a nuclear fuel assembly. It would also be desirable to have a tool that facilitates channel installation and helps remove the channel from the nuclear fuel assembly without damaging the fuel assembly components.

一実施形態においては、リフティングツールは、核燃料束に対してチャンネルを昇降するために使用される。リフティングツールは、リフティングベールと、リフティングベールに固着されたレグ構体とを含む。レグ構体は、リフト前の位置とリフト位置との間で選択的に変位可能である。レグ構体は、リフト位置においてロック可能である。リフト前の位置にある場合、レグ構体はチャンネルの内部に挿入可能であり、リフト位置にある場合、レグ構体はチャンネルのチャンネルクリップと係合可能である。   In one embodiment, the lifting tool is used to raise and lower the channel relative to the nuclear fuel bundle. The lifting tool includes a lifting bale and a leg structure secured to the lifting bale. The leg structure can be selectively displaced between the position before the lift and the lift position. The leg structure can be locked in the lift position. When in the pre-lift position, the leg structure can be inserted inside the channel, and when in the lift position, the leg structure can engage the channel clip of the channel.

別の実施形態においては、核燃料束に対してチャンネルを昇降する方法は、(a)リフティングツールをリフト前の位置まで操作するステップと;(b)リフティングツールをチャンネルに挿入するステップと;(c)リフティングツールがチャンネルクリップと係合するように、リフティングツールをリフト位置まで広げるステップと;(d)リフティングツールによってチャンネルを昇降するステップとを含む。   In another embodiment, a method for raising and lowering a channel relative to a nuclear fuel bundle includes: (a) manipulating the lifting tool to a position prior to lifting; (b) inserting the lifting tool into the channel; Expanding the lifting tool to a lift position so that the lifting tool engages the channel clip; and (d) lifting and lowering the channel with the lifting tool.

更に別の実施形態においては、リフティングツールは、リフティングベールと、リフティングベールに固着された1対のリフティングレグとを含む。リフティングレグは調整可能な幅を有し、幅の狭いリフト前の位置と幅の広いリフト位置との間で調整可能である。リフト位置にある場合、リフティングレグはチャンネルクリップと係合可能である。   In yet another embodiment, the lifting tool includes a lifting bale and a pair of lifting legs secured to the lifting bale. The lifting leg has an adjustable width and is adjustable between a narrow pre-lift position and a wide lift position. When in the lift position, the lifting leg is engageable with the channel clip.

図11は、典型的な沸騰水型軽水炉の核燃料集合体及び集合体を構成する多くの種々の構成要素を示す図である。沸騰水型軽水炉における典型的な核燃料集合体は、下部タイプレート15及び上部タイプレート13と、全長密封核燃料棒11及び部分長密封核燃料棒23の双方を含む密封核燃料棒のマトリクスとを含む。核燃料棒は、スペーサ27により所定の位置に保持される。スペーサ27は、上部タイプレート13と下部タイプレート15との間に支持される1対の中央に配置された水棒29を保持するのを助ける。正方形の中空チャンネル22は、核燃料集合体8を構成する上部タイプレート13、下部タイプレート15、スペーサ27、水棒29及び燃料棒11、23を包囲するために使用される。上部タイプレートは、炉心の内部で核燃料集合体8を移動するために使用されるベールハンドル21を有する。正方形の中空チャンネル22には、それぞれ1対のチャンネルクリップ20が装着される。チャンネルクリップ20は、チャンネル22の対向する角部に配置される。2つのチャンネルクリップ20のうち一方のチャンネルクリップは、1つの穴を有するように構成される。この穴があるため、チャンネルファスナは、上部タイプレート13の反対側の角部に配置されたねじ付き支柱31により燃料束に対してチャンネル22を保持できる。   FIG. 11 is a diagram showing a nuclear fuel assembly of a typical boiling water reactor and a number of various components that make up the assembly. A typical nuclear fuel assembly in a boiling water reactor includes a lower tie plate 15 and an upper tie plate 13 and a matrix of sealed nuclear fuel rods including both full length sealed nuclear fuel rods 11 and partially long sealed nuclear fuel rods 23. The nuclear fuel rod is held at a predetermined position by the spacer 27. The spacer 27 helps to hold a pair of centrally located water rods 29 that are supported between the upper tie plate 13 and the lower tie plate 15. The square hollow channel 22 is used to surround the upper tie plate 13, the lower tie plate 15, the spacer 27, the water rod 29, and the fuel rods 11 and 23 that constitute the nuclear fuel assembly 8. The upper tie plate has a bale handle 21 that is used to move the nuclear fuel assembly 8 within the core. A pair of channel clips 20 is attached to each of the square hollow channels 22. The channel clip 20 is disposed at the opposite corner of the channel 22. One of the two channel clips 20 is configured to have one hole. Because of this hole, the channel fastener can hold the channel 22 against the fuel bundle by a threaded strut 31 located at the opposite corner of the upper tie plate 13.

図1〜図5は、核燃料束に対してチャンネルを昇降するチャンネルリフティングツール10の第1の実施形態を示す。チャンネルリフティングツール10は、リフティングベール12と、リフティングベール12に固着されたレグ構体14とを含む。本実施形態においては、レグ構体14は、一端部にリフティングフット17を含む固定レグ16と、一端部にリフティングフット19を含む可動レグ18とを含む。リフティングフット17、19は、燃料束チャンネル22のチャンネルクリップ20と選択的に係合可能である。リフティングフット17、19は、上部タイプレート13のねじ付き支柱31の周囲に嵌合するために二又になるように機械加工されるのが好ましい。チャンネル22の上部にあるチャンネルクリップ20と更に堅固に係合するために、リフティングフット17、19は、図2及び図4に示されるように鍛造及び/又は鋳造されてもよい。リフティングフット17、19は、チャンネル22の内側角領域までチャンネルクリップ22の下方に嵌合するように構成される。チャンネルリフティングツール10のリフティングフットに切欠き(二又構造)が形成されることにより、ツールは、上部タイプレート13に配置され且つチャンネル22を燃料集合体8に固着するために使用される上部タイプレート支柱31を三方から包囲できる。   1 to 5 show a first embodiment of a channel lifting tool 10 that raises and lowers a channel relative to a nuclear fuel bundle. The channel lifting tool 10 includes a lifting bale 12 and a leg structure 14 fixed to the lifting bale 12. In this embodiment, the leg structure 14 includes a fixed leg 16 including a lifting foot 17 at one end and a movable leg 18 including a lifting foot 19 at one end. The lifting feet 17, 19 can be selectively engaged with the channel clip 20 of the fuel bundle channel 22. The lifting feet 17, 19 are preferably machined to be bifurcated to fit around the threaded struts 31 of the upper tie plate 13. In order to more firmly engage the channel clip 20 at the top of the channel 22, the lifting feet 17, 19 may be forged and / or cast as shown in FIGS. Lifting feet 17, 19 are configured to fit below channel clip 22 to the inner corner region of channel 22. By forming a notch (bifurcated structure) in the lifting foot of the channel lifting tool 10, the tool is placed on the upper tie plate 13 and used to secure the channel 22 to the fuel assembly 8. The rate column 31 can be surrounded from three sides.

可動レグ18は、ピボット24を介して固定レグ16に対して回転可能である。ロックレグ25は、可動レグ18に対してほぼ垂直に配置され、可動レグ18に固定される。ピボット24とは反対側のロックレグ25の端部は、ロック機構26を介してリフティングベール12のレグロック部分に対してロック可能である。   The movable leg 18 is rotatable with respect to the fixed leg 16 via a pivot 24. The lock leg 25 is disposed substantially perpendicular to the movable leg 18 and is fixed to the movable leg 18. The end of the lock leg 25 opposite to the pivot 24 can be locked to the leg lock portion of the lifting bail 12 via the lock mechanism 26.

ロック機構26の詳細は図5に示される。当業者には理解されるように、任意のロック機構が使用されてもよいが、好適な構造においては、ロック機構26はばね偏向ロックピン28を含む。ばね偏向ロックピン28は、リフティングベール12のレグロック部分にあるピン開口部30と係合するように偏向される。ロック位置にある場合、ばね偏向ロックピン28はリフティングベール12をほぼ完全に貫通するのが好ましい。リフティングベール12を貫通する開口部がチャンネルリフティングツール10の反対側とほぼ一線に並んでいる場合、開口部を通して、ロックピン28がロック位置にあることを目視で確認できる。ばね偏向ロックピン28を解除する場合、操作員は、リング32又は他の適切な構造を使用して、偏向ばね34の力に抗してばね偏向ロックピン28を引っ張ることができる。解除後、可動レグ18は、リフティングベール12及び固定レグ16に対して回動可能である。例えば図3及び図4を参照。   Details of the locking mechanism 26 are shown in FIG. As will be appreciated by those skilled in the art, any locking mechanism may be used, but in a preferred construction, the locking mechanism 26 includes a spring biased locking pin 28. The spring deflection lock pin 28 is deflected to engage the pin opening 30 in the leg lock portion of the lifting bale 12. When in the locked position, the spring deflection lock pin 28 preferably passes through the lifting bale 12 substantially completely. When the opening passing through the lifting bale 12 is aligned with the opposite side of the channel lifting tool 10, it can be visually confirmed through the opening that the lock pin 28 is in the locked position. When releasing the spring deflection lock pin 28, the operator can use the ring 32 or other suitable structure to pull the spring deflection lock pin 28 against the force of the deflection spring 34. After the release, the movable leg 18 is rotatable with respect to the lifting bale 12 and the fixed leg 16. See, for example, FIGS.

図3及び図4に示されるリフト前の位置においては、可動レグ18が固定レグ16により近接するように回動されているため、チャンネルリフティングツール10の幅は狭くなっている。幅が狭いので、チャンネル22の中へチャンネルクリップ20の下に入るようにチャンネルリフティングツール10を挿入できる。挿入後、図1及び図2に示されるようなリフト位置に可動レグ18をロックするために、ロック機構26がリフティングベール12のピン開口部30(図3)に係合するまで、可動レグ18は回動される(図1及び図2において時計回り方向)。この位置にある場合、リフティングフット17、19の幅は広くなり、リフティングフット17、19はチャンネルクリップ20と係合するので、チャンネル22を安全に昇降できる。チャンネルリフティングツール10の一部として、リフティングベール12のグリップ部分にクレーンなどを固着可能である。   In the position before the lift shown in FIGS. 3 and 4, since the movable leg 18 is rotated so as to be closer to the fixed leg 16, the width of the channel lifting tool 10 is narrow. Since the width is narrow, the channel lifting tool 10 can be inserted into the channel 22 so as to be under the channel clip 20. After insertion, the movable leg 18 is engaged until the locking mechanism 26 engages the pin opening 30 (FIG. 3) of the lifting bale 12 to lock the movable leg 18 in the lift position as shown in FIGS. Is rotated (clockwise direction in FIGS. 1 and 2). When in this position, the lifting feet 17 and 19 are wide, and the lifting feet 17 and 19 engage with the channel clip 20 so that the channel 22 can be raised and lowered safely. As a part of the channel lifting tool 10, a crane or the like can be fixed to the grip portion of the lifting bale 12.

いくつかの構造においては、チャンネル22の上側の2つのチャンネルクリップ20の下方にチャンネルリフティングツール10を配置する前に、チャンネルリフティングツール10の可動レグ18と整列される単一の穴を有するチャンネルクリップ20に対してチャンネルリフティングツール10の向きを規定しなければならない。チャンネル22が空中へ持ち上げられ、燃料束の上方に出てしまうと、チャンネルを燃料束に固着する雄ねじ形の端部プラグを有するチャンネルファスナを使用してチャンネル22を燃料束に固着するために、上部タイプレート13のねじ付き支柱31と整列されなければならない穴を通してチャンネルクリップ20を見ることが困難になるため、リフティングツール10の向きをそのように規定することは好ましい。従って、チャンネルファスナを受け入れるための単一の穴を有するチャンネルクリップ20が配置されることによって、リフト前の位置において、レグ構体14をリフト位置でロック可能であるあらかじめ整列された調整位置で、レグ構体14をチャンネル22の中に挿入可能である。   In some constructions, a channel clip having a single hole that is aligned with the movable leg 18 of the channel lifting tool 10 prior to placing the channel lifting tool 10 below the two channel clips 20 above the channel 22. The orientation of the channel lifting tool 10 relative to 20 must be defined. Once channel 22 is lifted into the air and exits above the fuel bundle, in order to secure channel 22 to the fuel bundle using a channel fastener having an external threaded end plug that secures the channel to the fuel bundle, It is preferable to define the orientation of the lifting tool 10 so that it becomes difficult to see the channel clip 20 through the holes that must be aligned with the threaded struts 31 of the upper tie plate 13. Accordingly, a channel clip 20 having a single hole for receiving a channel fastener is disposed so that the leg assembly 14 can be locked in the pre-aligned adjustment position in the pre-lift position in which the leg structure 14 can be locked in the lift position. The structure 14 can be inserted into the channel 22.

図1及び図3に示されるように、レグ構体14の長さは、核燃料束の上部タイプレート13におけるベールハンドル21の高さを超えているのが好ましい。これにより、チャンネルリフティングツール10は所定の場所にとどまることができ、別の操作員の助けなしにチャンネル22が完全に燃料束に固定されるまでチャンネル22を支持できる。   As shown in FIGS. 1 and 3, the length of the leg structure 14 preferably exceeds the height of the bale handle 21 in the upper tie plate 13 of the nuclear fuel bundle. This allows the channel lifting tool 10 to remain in place and support the channel 22 until it is fully secured to the fuel bundle without the assistance of another operator.

図6〜図10は、チャンネルリフティングツールの別の実施形態を示す。本実施形態においては、チャンネルリフティングツール110は、リフティングベール112及びレグ構体114を同様に含む。レグ構体114は、リフティングレグ116、118を含む。本実施形態においては、リフティングレグ116、118は、共にリフティングベール112に対して不動である。リフティングレグ116、118の末端部には、リフティングフット117及び可動リフティングフット119がそれぞれ同様に設けられる。   6-10 illustrate another embodiment of a channel lifting tool. In this embodiment, the channel lifting tool 110 similarly includes a lifting bale 112 and a leg structure 114. The leg structure 114 includes lifting legs 116 and 118. In the present embodiment, the lifting legs 116 and 118 are both immovable with respect to the lifting bale 112. A lifting foot 117 and a movable lifting foot 119 are similarly provided at the end portions of the lifting legs 116 and 118, respectively.

本実施形態においては、リフティングレグ116、118のうち一方が他方に対して回動可能なのではなく、可動リフティングフット119は、リフト位置(図6及び図7)とリフト前の位置(図8及び図9)との間で摺動などによって変位可能である。   In the present embodiment, one of the lifting legs 116 and 118 is not rotatable with respect to the other, but the movable lifting foot 119 has a lift position (FIGS. 6 and 7) and a position before the lift (FIGS. 8 and 8). 9) and can be displaced by sliding or the like.

可動リフティングフット119は、リフト位置においてロック機構126によりロック可能である。図10を参照すると、ロック機構126は、ばね偏向ロックピン128を含む。ばね偏向ロックピン128は、可動リフティングフット119の開口部130と係合可能である。ばね偏向ロックピン128に解除機構132が固着される。ばね偏向ロックピン128を可動リフティングフット119の開口部130から解放するために、解除機構132を手動で引っ張ることができる。解除後、可動リフティングフット119は、リフティングレグ118に対して摺動可能であるか又は他の運動によって変位可能である。図8及び図9に示されるリフト前の位置にある場合、リフティングレグ116、118は、チャンネルの中に嵌合するのに十分な狭い幅を有する。挿入後、可動リフティングフット119は移動され、チャンネルクリップ20と係合するようにリフト位置でロックされる。ロック後、チャンネルを燃料束の上まで持ち上げるため及び/又は核燃料集合体8からチャンネルを除去するために、リフティングツール110を使用できる。   The movable lifting foot 119 can be locked by the lock mechanism 126 at the lift position. Referring to FIG. 10, the locking mechanism 126 includes a spring deflection lock pin 128. The spring deflection lock pin 128 is engageable with the opening 130 of the movable lifting foot 119. The release mechanism 132 is fixed to the spring deflection lock pin 128. The release mechanism 132 can be manually pulled to release the spring deflection lock pin 128 from the opening 130 of the movable lifting foot 119. After release, the movable lifting foot 119 can slide relative to the lifting leg 118 or can be displaced by other movements. When in the pre-lift position shown in FIGS. 8 and 9, the lifting legs 116, 118 have a narrow enough width to fit into the channel. After insertion, the movable lifting foot 119 is moved and locked in the lift position to engage the channel clip 20. After locking, the lifting tool 110 can be used to lift the channel above the fuel bundle and / or to remove the channel from the nuclear fuel assembly 8.

以上説明されたチャンネルリフティングツールの構造及び方法によって、核燃料集合体を組み立てる際のチャンネル設置プロセスは従来より容易になる。更に、操作員を追加してチャンネルを手動で昇降する作業が不要になるので、操作員の安全性が向上する。また、このツールの使用により、チャンネルの表面に傷がつくこと及び/又は跡が残ることはなくなり、チャンネルをゆがませる危険も回避される。   With the structure and method of the channel lifting tool described above, the channel installation process when assembling the nuclear fuel assembly becomes easier than before. Furthermore, since the operation | work which raises / lowers a channel manually by adding an operator becomes unnecessary, an operator's safety improves. The use of this tool also avoids scratching and / or leaving marks on the surface of the channel and avoids the risk of distorting the channel.

現時点で最も実用的で好適な実施形態であると考えられるものに関連して本発明を説明したが、本発明は、開示された実施形態に限定されてはならず、添付の特許請求の範囲の趣旨の範囲内に含まれる種々の変形及び等価の構造を包含することが意図されると理解すべきである。   Although the invention has been described in connection with what is considered to be the most practical and preferred embodiments at the present time, the invention should not be limited to the disclosed embodiments and the appended claims It should be understood that various modifications and equivalent structures included within the spirit of the present invention are intended to be included.

ロックされたリフト位置にあるリフティングツールの第1の実施形態を示す図である。FIG. 2 shows a first embodiment of a lifting tool in a locked lift position. 図1に示されるように位置決めされたリフティングツールを示す平面図である。FIG. 2 is a plan view showing a lifting tool positioned as shown in FIG. 1. リフト前のロック解除位置にあるリフティングツールを示す図である。It is a figure which shows the lifting tool in the lock release position before a lift. 図3に示されるリフティングツールを示す平面図である。It is a top view which shows the lifting tool shown by FIG. ロック機構の詳細を示すリフティングツールの端面図である。It is an end view of a lifting tool showing details of a lock mechanism. リフトロック位置にある別の実施形態のリフティングツールを示す図である。FIG. 6 shows another embodiment of a lifting tool in a lift lock position. 図6に示されるように位置決めされたリフティングツールを示す平面図である。FIG. 7 is a plan view showing the lifting tool positioned as shown in FIG. 6. リフト前のロック解除位置にある図6のリフティングツールを示す図である。It is a figure which shows the lifting tool of FIG. 6 in the lock release position before a lift. 図8に示されるように位置決めされたリフティングツールを示す平面図である。FIG. 9 is a plan view showing the lifting tool positioned as shown in FIG. 8. リフトロック位置にある別の実施形態のロック機構を示す拡大図である。It is an enlarged view which shows the locking mechanism of another embodiment in a lift lock position. 従来の核燃料集合体及び集合体を構成する多くの種々の構成要素を示す図である。It is a figure which shows many various components which comprise the conventional nuclear fuel assembly and an assembly.

符号の説明Explanation of symbols

8…BWR‐核燃料集合体、10…チャンネルリフティングツール、12…リフティングベール、13…上部タイプレート、14…レグ構体、16…固定レグ、17…リフティングフット、18…可動レグ、19…リフティングフット、20…チャンネルクリップ、22…チャンネル、25…ロックレグ、26…ロック機構、28…ばね偏向ロックピン、30…ピン開口部、110…チャンネルリフティングツール、112…リフティングベール、114…レグ構体、116…リフティングレグ、117…リフティングフット、118…リフティングレグ、119…可動リフティングフット、126…ロック機構、128…ばね偏向ロックピン、130…開口部   8 ... BWR-nuclear fuel assembly, 10 ... Channel lifting tool, 12 ... Lifting bale, 13 ... Upper tie plate, 14 ... Leg structure, 16 ... Fixed leg, 17 ... Lifting foot, 18 ... Movable leg, 19 ... Lifting foot, DESCRIPTION OF SYMBOLS 20 ... Channel clip, 22 ... Channel, 25 ... Lock leg, 26 ... Lock mechanism, 28 ... Spring deflection lock pin, 30 ... Pin opening, 110 ... Channel lifting tool, 112 ... Lifting bale, 114 ... Leg structure, 116 ... Lifting Leg 117, Lifting foot 118, Lifting leg 119 Movable lifting foot 126, Lock mechanism 128, Spring deflection lock pin 130, opening

Claims (10)

複数のチャンネルクリップを含むチャンネルを核燃料束に対して昇降するリフティングツールにおいて、
リフティングベール(12)と;
前記リフティングベールに固着され、リフト前の位置とリフト位置との間で選択的に変位可能であり且つ前記リフト位置でロック可能であるレグ構体(14、114)とを具備し、
前記リフト前の位置にある場合、前記レグ構体は前記チャンネル(22)の中へ挿入可能であり、前記リフト位置にある場合、前記レグ構体は前記チャンネルクリップ(20)と係合可能であるリフティングツール。
In a lifting tool that lifts and lowers a channel including a plurality of channel clips relative to a nuclear fuel bundle,
Lifting bale (12);
A leg structure (14, 114) secured to the lifting bale, selectively displaceable between a pre-lift position and a lift position, and lockable at the lift position;
When in the pre-lift position, the leg structure can be inserted into the channel (22), and when in the lift position, the leg structure is engageable with the channel clip (20). tool.
前記レグ構体(14、114)は、第1のリフティングフット(19、119)が装着された第1の可動レグ(18、118)と、第2のリフティングフット(17、117)が装着された第2の固定レグ(16、116)とを具備する請求項1記載のリフティングツール。 The leg structure (14, 114) is provided with a first movable leg (18, 118) to which a first lifting foot (19, 119) is attached and a second lifting foot (17, 117). 2. Lifting tool according to claim 1, comprising a second fixed leg (16, 116). 前記第1の可動レグ(18)は、前記第2の固定レグ(16)に対して回動可能である請求項2記載のリフティングツール。 The lifting tool according to claim 2, wherein the first movable leg (18) is rotatable with respect to the second fixed leg (16). 前記リフティングベール(12)は、グリップ部分及びレグロック部分を具備し、前記レグ構体(14)は、前記第1の可動レグ(18)に固着されたロックレグ(25)を更に具備し、前記ロックレグは、前記リフト位置にある場合に前記リフティングベールの前記ロック部分に選択的にロック可能である請求項2記載のリフティングツール。 The lifting bale (12) includes a grip portion and a leg lock portion, and the leg structure (14) further includes a lock leg (25) fixed to the first movable leg (18), and the lock leg 3. A lifting tool according to claim 2, wherein the lifting tool is selectively lockable to the locking portion of the lifting bale when in the lift position. 前記ロックレグ(25)は、ばね偏向ロックピンにより前記リフティングベール(12)の前記レグロック部分に選択的にロック可能であり、前記ばね偏向ロックピン(28)は、前記リフティングベールをほぼ完全に貫通し、前記リフティングベールを貫通する開口部(30)が前記チャンネルリフティングツールの反対側とほぼ一線に並んでいる場合、前記開口部(30)を通して、前記ロックピンが前記ロック位置にあることを目視で確認できる請求項4記載のリフティングツール。 The lock leg (25) can be selectively locked to the leg lock portion of the lifting bale (12) by a spring deflection lock pin, and the spring deflection lock pin (28) penetrates the lifting bale almost completely. When the opening (30) passing through the lifting bail is substantially aligned with the opposite side of the channel lifting tool, it is visually confirmed that the lock pin is in the locked position through the opening (30). The lifting tool according to claim 4, which can be confirmed. 前記第1の可動レグ(18)及び前記ロックレグ(25)は、ピボット結合部において前記リフティングベール(12)の前記レグロック部分に回動自在に固着される請求項4記載のリフティングツール。 The lifting tool according to claim 4, wherein the first movable leg (18) and the lock leg (25) are pivotally fixed to the leg lock portion of the lifting bale (12) at a pivot joint. 前記ロックレグ(25)は、ばね偏向ピン(28)により前記リフティングベール(12)のレグロック部分に選択的にロック可能である請求項4記載のリフティングツール。 5. Lifting tool according to claim 4, wherein the locking leg (25) can be selectively locked to a leg lock part of the lifting bale (12) by means of a spring deflection pin (28). 前記レグ構体(114)は、前記リフティングベール(12)に固定された第1のレグ及び第2のレグ(116、118)と、前記第1のレグ及び前記第2のレグの端部にそれぞれ固着された可動リフティングフット(119)及び固定リフティングフット(117)とを具備し、前記可動リフティングフットは、前記第1のレグに対して運動可能である請求項1記載のリフティングツール。 The leg structure (114) is provided at the ends of the first leg and the second leg (116, 118) fixed to the lifting bale (12), and the first leg and the second leg, respectively. The lifting tool according to claim 1, comprising a fixed movable lifting foot (119) and a fixed lifting foot (117), the movable lifting foot being movable relative to the first leg. 前記リフト位置にある場合、前記可動リフティングフット(119)は前記第1のレグ(118)にロック可能である請求項8記載のリフティングツール。 The lifting tool according to claim 8, wherein the movable lifting foot (119) is lockable to the first leg (118) when in the lift position. リフト前の位置及びリフト位置に位置決め可能であるチャンネルリフティングツールによって、複数のチャンネルクリップを含むチャンネルを核燃料束に対して昇降する方法において、
(a)前記リフティングツールを前記リフト前の位置まで操作することと;
(b)前記リフティングツールを前記チャンネル(22)に挿入することと;
(c)前記リフティングツールが前記チャンネルクリップ(20)と係合するように、前記リフティングツールを前記リフト位置まで広げることと;
(d)前記リフティングツールによって前記チャンネルを昇降することとから成る方法。
In a method of raising and lowering a channel including a plurality of channel clips with respect to a nuclear fuel bundle by a channel lifting tool that can be positioned at a position before and at a lift position,
(A) operating the lifting tool to a position before the lift;
(B) inserting the lifting tool into the channel (22);
(C) widening the lifting tool to the lift position so that the lifting tool engages the channel clip (20);
(D) raising and lowering the channel with the lifting tool.
JP2008312795A 2007-12-13 2008-12-09 Channel-lifting tool and method Pending JP2009145335A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/955,701 US20110216871A1 (en) 2007-12-13 2007-12-13 Channel-Lifting Tool and Method

Publications (1)

Publication Number Publication Date
JP2009145335A true JP2009145335A (en) 2009-07-02

Family

ID=40445282

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008312795A Pending JP2009145335A (en) 2007-12-13 2008-12-09 Channel-lifting tool and method

Country Status (5)

Country Link
US (1) US20110216871A1 (en)
EP (1) EP2071582B1 (en)
JP (1) JP2009145335A (en)
ES (1) ES2454241T3 (en)
TW (1) TWI456590B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190025150A (en) * 2017-08-30 2019-03-11 한국원자력연구원 Fixture for processing plate nuclear fuel assembly and processing of plate nuclear fuel assembly using the same

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180161944A1 (en) * 2016-12-09 2018-06-14 Ge-Hitachi Nuclear Energy Americas Llc Systems and methods for nuclear reactor dry tube assembly removal and installation
CN110718311B (en) * 2019-10-10 2020-07-07 中国科学院近代物理研究所 A first mechanism is grabbed in reloading for lead-based reactor fuel assembly

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07159590A (en) * 1993-12-10 1995-06-23 Gootec:Kk Channel box hoisting accessory for assembling nuclear fuel assembly
JPH07159591A (en) * 1993-12-10 1995-06-23 Gootec:Kk Channel box hoisting accessory for assembling nuclear fuel assembly

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5064606A (en) * 1990-03-21 1991-11-12 Gotech, Limited Channel box removing apparatus
US5420899A (en) * 1994-05-23 1995-05-30 Apple, Jr.; Edward G. Grapple for a fuel bundle channel

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07159590A (en) * 1993-12-10 1995-06-23 Gootec:Kk Channel box hoisting accessory for assembling nuclear fuel assembly
JPH07159591A (en) * 1993-12-10 1995-06-23 Gootec:Kk Channel box hoisting accessory for assembling nuclear fuel assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190025150A (en) * 2017-08-30 2019-03-11 한국원자력연구원 Fixture for processing plate nuclear fuel assembly and processing of plate nuclear fuel assembly using the same
KR101987105B1 (en) * 2017-08-30 2019-06-11 한국원자력연구원 Fixture for processing plate nuclear fuel assembly and processing of plate nuclear fuel assembly using the same

Also Published As

Publication number Publication date
EP2071582B1 (en) 2014-02-26
EP2071582A2 (en) 2009-06-17
TWI456590B (en) 2014-10-11
EP2071582A3 (en) 2011-07-20
US20110216871A1 (en) 2011-09-08
ES2454241T3 (en) 2014-04-10
TW200941501A (en) 2009-10-01

Similar Documents

Publication Publication Date Title
TW201327577A (en) Nuclear reactor refueling methods and apparatuses
JP5063513B2 (en) Air spring dismantling device
JP2009145335A (en) Channel-lifting tool and method
GB2036413A (en) Reactor fuel assembly
US7222417B2 (en) Valve tooling system
DE19641326B4 (en) Fuel element without upper grid plate for boiling water reactor
ES2693500T3 (en) Control rod transfer device
JPS61176883A (en) Dismounting device for locking tube for fuel aggregate
ES2666833T3 (en) Apparatus for handling a nuclear fuel assembly
AT520466B1 (en) Portable carrier device for a furnace charge and handling system for the carrier device
US4696784A (en) System for manipulating radioactive fuel rods within a nuclear fuel assembly
KR101227019B1 (en) Control rod drive shaft handling apparatus
JPS61788A (en) Holddown device for fuel aggregate of nuclear reactor
JP4965070B2 (en) Tools and methods for fuel assembly nozzle replacement
JPH01217298A (en) Fuel assembly hoisting apparatus
JPS62116290A (en) Fuel aggregate
JP5432217B2 (en) Test machine and test method for connection strength of cast iron pipe
JPH0850193A (en) Holding device used together with fuel-bundle channel of nuclear reactor
JP4903384B2 (en) Lifting support for a nuclear fuel assembly of a boiling water reactor and a fuel assembly provided with the lifting support
JP4316343B2 (en) Shroud head correction jig
JPS6032839B2 (en) Lift tool for extracting control rods from the core
JPH0352595B2 (en)
US2832649A (en) Scaffolding u-lock
US20030140471A1 (en) Basket assembly fixture
KR820000438B1 (en) Extension shaft latching mechanism for a nuclear reactor control rod life rig

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20110214

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20110217

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111206

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130827

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131126

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131205

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20140805