JP2009096582A - Elevator electric power adjusting device - Google Patents

Elevator electric power adjusting device Download PDF

Info

Publication number
JP2009096582A
JP2009096582A JP2007268916A JP2007268916A JP2009096582A JP 2009096582 A JP2009096582 A JP 2009096582A JP 2007268916 A JP2007268916 A JP 2007268916A JP 2007268916 A JP2007268916 A JP 2007268916A JP 2009096582 A JP2009096582 A JP 2009096582A
Authority
JP
Japan
Prior art keywords
elevator
demand
power
maximum speed
monitoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007268916A
Other languages
Japanese (ja)
Inventor
Osamu Suzuki
修 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP2007268916A priority Critical patent/JP2009096582A/en
Publication of JP2009096582A publication Critical patent/JP2009096582A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Elevator Control (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an elevator electric power adjusting device for operating an elevator so that a demand of an entire office building does not exceed a contract demand. <P>SOLUTION: This elevator electric power adjusting device 1 adjusts power consumption of an elevator via an elevator control panel 11 for controlling an operation of an elevator installed in a building whose demand for receiving power from a commercial system is monitored by a demand monitoring system 5. When a demand alarm issued when a predictive value of the demand for receiving the power from the commercial system is issued, the demand monitoring system commands the elevator control panel to the predetermined highest speed or predetermined acceleration of the elevator, and informs the demand monitoring system of reduction of power consumption due to the operation of the predetermined highest speed or predetermined acceleration. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

この発明は、契約電力を超過しないようエレベータを消費電力を調整するエレベータ電力調整装置に関するものである。   The present invention relates to an elevator power adjustment device that adjusts power consumption of an elevator so as not to exceed contract power.

エレベータを省エネルギーで運転するためのエレベータの運転制御方法は、エレベータを制御する制御盤と、制御盤に接続され商用電源の電流を計測する電流計測部と計測した電流値から電力量を算出する電力量算出部を備え、予め設定された電力量を超えた場合には定格速度及び加減速度の何れかの速度制御定数を変更する(例えば、特許文献1参照)。   The elevator operation control method for operating the elevator with energy saving is a control panel that controls the elevator, a current measurement unit that is connected to the control panel and measures the current of the commercial power supply, and an electric power that calculates the electric energy from the measured current value. An amount calculation unit is provided, and when a preset amount of power is exceeded, either the rated speed or the acceleration / deceleration speed control constant is changed (for example, see Patent Document 1).

特開2007−55700号公報JP 2007-55700 A

しかし、単独でエレベータを省エネルギーで運転しても、デマンド監視システムと連携していないので、オフィスビル全体としてのデマンド量が契約電力を超える恐れがある。   However, even if the elevator is operated with energy saving alone, it is not linked with the demand monitoring system, so the demand amount of the office building as a whole may exceed the contract power.

この発明の目的は、オフィスビル全体としてのデマンド量が契約電力を超えないようにエレベータを運転するエレベータ電力調整装置を提供することである。   An object of the present invention is to provide an elevator power adjustment device that operates an elevator so that the demand amount of the entire office building does not exceed contract power.

この発明に係るエレベータ電力調整装置は、デマンド監視システムにより商用系統から受電するデマンド量が監視されるビルに設置されたエレベータの運転を制御するエレベータ制御盤を介して上記エレベータの消費電力を調整するエレベータ電力調整装置において、上記デマンド監視システムが上記商用系統から受電するデマンド量の予測値が契約電力を超えるとき発せられるデマンド警告が発せられているとき上記エレベータの所定の最高速度または所定の加速度にするよう上記エレベータ制御盤に指令し、且つ上記所定の最高速度または上記所定の加速度で運転されたことによる消費電力の低減を上記デマンド監視システムに報告する。   The elevator power adjustment device according to the present invention adjusts the power consumption of the elevator via an elevator control panel that controls the operation of the elevator installed in a building whose demand amount received from a commercial system is monitored by a demand monitoring system. In the elevator power adjustment device, when a demand warning is issued that is issued when a demand value predicted by the demand monitoring system to receive power from the commercial system exceeds contract power, the elevator is adjusted to a predetermined maximum speed or a predetermined acceleration. The elevator control panel is instructed to report to the demand monitoring system the reduction in power consumption due to operation at the predetermined maximum speed or the predetermined acceleration.

この発明に係るエレベータ電力調整装置の効果は、デマンド監視システムからデマンド警報が発せられているときエレベータの運転状況に対応する速度まで最高速度を遅くするようエレベータ制御盤に指令し、且つ最高速度を遅くして運転することによる消費電力の低減をデマンド監視システムに報告するので、デマンド監視システムはエレベータでの消費電力の低減を加味して適切に他のビル内設備の消費電力を低減することができることである。   The effect of the elevator power adjustment device according to the present invention is that the elevator control panel is instructed to slow down the maximum speed to a speed corresponding to the operating condition of the elevator when a demand alarm is issued from the demand monitoring system, and the maximum speed is set. Since the reduction of power consumption due to slow operation is reported to the demand monitoring system, the demand monitoring system can appropriately reduce the power consumption of other in-building facilities in consideration of the reduction of power consumption in the elevator. It can be done.

図1は、この発明の実施の形態に係るエレベータ電力調整装置の構成図である。図2は、この発明の実施の形態に係るエレベータ電力調整装置が配備されたオフィスビルの構内電力系統の構成図である。
この発明の実施の形態に係るエレベータ電力調整装置1が配備されたオフィスビルには、図2に示すように、商用系統2から受電する受変電設備3、受変電設備3から電力が供給されるビル内設備4および計測したデマンド量から予測したデマンド量の予測値が契約電力を超えないようにビル内設備4を監視するデマンド監視システム5が配備されている。ビル内設備4としては、少なくともエレベータ6があり、それ以外に例えば空調設備7、照明設備8、衛生設備9またはその他の設備10がある。
デマンド監視システム5は、現在のデマンド量と過去のデマンド量履歴とから将来の30分デマンド量を予測し、予測した30分デマンド量が契約電力を超えるときデマンド警報を出力する。
FIG. 1 is a configuration diagram of an elevator power adjustment apparatus according to an embodiment of the present invention. FIG. 2 is a configuration diagram of a premises power system of an office building in which the elevator power adjustment device according to the embodiment of the present invention is provided.
As shown in FIG. 2, power is supplied from the power receiving / transforming equipment 3 and the power receiving / transforming equipment 3 to the office building in which the elevator power regulating apparatus 1 according to the embodiment of the present invention is deployed. A demand monitoring system 5 is provided for monitoring the in-building equipment 4 so that the predicted value of the demand quantity predicted from the in-building equipment 4 and the measured demand quantity does not exceed the contract power. As the in-building equipment 4, there is at least an elevator 6, and there are, for example, an air conditioning equipment 7, a lighting equipment 8, a sanitary equipment 9, or other equipment 10.
The demand monitoring system 5 predicts a future 30-minute demand amount from the current demand amount and the past demand amount history, and outputs a demand alarm when the predicted 30-minute demand amount exceeds contract power.

この発明の実施の形態に係るエレベータ電力調整装置1は、図1に示すように、デマンド監視システム5およびエレベータ制御盤11との間でデータを入出力する伝送インタフェース12、プログラムに従って演算処理を行うCPU13、プログラムを記憶するROM14、演算処理で必要とするデータが記憶されているRAM15および内部時計16を有するコンピュータから構成されている。
エレベータ制御盤11は、所定の時間帯でのエレベータの待ち時間の平均を求め、平均待ち時間としてエレベータ電力調整装置1にデータ送信する。
また、エレベータ制御盤11は、エレベータ電力調整装置1から最高速度の低減率が送られてきたとき、エレベータの運行パターンの最高速度を所定の低減率だけ小さくしてエレベータを運転する。
As shown in FIG. 1, the elevator power adjustment apparatus 1 according to the embodiment of the present invention performs arithmetic processing according to a transmission interface 12 that inputs and outputs data between the demand monitoring system 5 and the elevator control panel 11, and a program. The computer is composed of a CPU 13, a ROM 14 that stores programs, a RAM 15 that stores data necessary for arithmetic processing, and an internal clock 16.
The elevator control panel 11 calculates the average of the elevator waiting time in a predetermined time zone, and transmits data to the elevator power adjustment apparatus 1 as the average waiting time.
Moreover, when the reduction rate of the maximum speed is sent from the elevator power adjustment device 1, the elevator control panel 11 operates the elevator by reducing the maximum speed of the elevator operation pattern by a predetermined reduction rate.

RAM15には、図3に示すエレベータピーク時間帯表と、図4に示すエレベータ最高速度設定表とが記憶されている。エレベータピーク時間帯表には利用者が多いと予想されるピーク時間帯が開始時刻および終了時刻を規定することにより記憶されている。図3では開始時刻8時30分と終了時刻9時00分からなる出勤時、開始時刻12時00分と終了時刻13時00分からなる昼食時、開始時刻17時00分と終了時刻17時30分からなる退勤時の3つのピーク時間帯が決められている。なお、ピークの時間帯の数やそれぞれの時間帯を規定する開始時刻および終了時刻はこれに限るものではなく適宜設定すれば良い。   The RAM 15 stores an elevator peak time zone table shown in FIG. 3 and an elevator maximum speed setting table shown in FIG. In the elevator peak time zone table, a peak time zone expected to have many users is stored by defining a start time and an end time. In FIG. 3, from the start time of 8:30 and the end time of 9:00, the start time of 12:00 and the end time of 13:00, the lunch time of 13:00, the start time of 17:00 and the end time of 17:30 Three peak time zones when leaving the office will be decided. Note that the number of peak time zones and the start time and end time defining each time zone are not limited to this, and may be set as appropriate.

エレベータ最高速度設定表には、電力低減率に対応して最高速度低減率が記憶されている。すなわち、電力を10%低減するためには、最高速度を3.16%低くする必要があり、電力を20%低減するためには、最高速度を4.47%低くする必要があり、電力を30%低減するためには、最高速度を5.4%低くする必要があるということである。なお、電力低減率に対応する最高速度低減率の値は各エレベータにより定めるものであり、上述の値は一例である。   The elevator maximum speed setting table stores the maximum speed reduction rate corresponding to the power reduction rate. That is, to reduce power by 10%, the maximum speed needs to be reduced by 3.16%, and to reduce power by 20%, the maximum speed needs to be decreased by 4.47%. In order to reduce by 30%, it is necessary to reduce the maximum speed by 5.4%. Note that the value of the maximum speed reduction rate corresponding to the power reduction rate is determined by each elevator, and the above value is an example.

次に、この発明の実施の形態に係るエレベータ電力調整装置1で実行されるエレベータ電力調整手順を説明する。図5は、この発明の実施の形態に係るエレベータ電力調整手順を示すフローチャートである。
エレベータが稼動しているときには、所定の周期、例えば5分毎にエレベータ電力調整手順が開始される。
ステップS101で、デマンド警報が発せられたか否かを判断し、デマンド警報が発せられているときステップS102に進み、デマンド警報が発せられていないときエレベータ電力調整手順を終了する。
ステップS102で、エレベータピーク時間帯表を参照して現在の時刻がピーク時間帯に含まれるか否かを判断し、現在の時刻がピーク時間帯内であるときステップS104に進み、現在の時刻がピーク時間帯外であるときステップS103に進む。
ステップS103で、エレベータの平均待ち時間が予め定められた所定値を超えるか否かを判断し、平均待ち時間が所定値を超えるときステップS106に進み、平均待ち時間が所定値以下のときステップS108に進む。
Next, an elevator power adjustment procedure executed by the elevator power adjustment device 1 according to the embodiment of the present invention will be described. FIG. 5 is a flowchart showing an elevator power adjustment procedure according to the embodiment of the present invention.
When the elevator is operating, the elevator power adjustment procedure is started every predetermined period, for example, every 5 minutes.
In step S101, it is determined whether a demand alarm has been issued. When the demand alarm has been issued, the process proceeds to step S102, and when the demand alarm has not been issued, the elevator power adjustment procedure is terminated.
In step S102, it is determined whether or not the current time is included in the peak time zone by referring to the elevator peak time zone table. If the current time is within the peak time zone, the process proceeds to step S104, where the current time is When it is outside the peak time zone, the process proceeds to step S103.
In step S103, it is determined whether or not the average waiting time of the elevator exceeds a predetermined value. If the average waiting time exceeds the predetermined value, the process proceeds to step S106, and if the average waiting time is equal to or less than the predetermined value, step S108. Proceed to

ステップS104で、電力を10%低減することが可能と判断し、エレベータ最高速度設定表を参照してエレベータ制御盤11に最高速度を3.16%下げるように指令する。
ステップS105で、デマンド監視システム5にエレベータの消費電力を10%低減したと報告しエレベータ電力調整手順を終了する。
ステップS106で、電力を20%低減することが可能と判断し、エレベータ最高速度設定表を参照してエレベータ制御盤11に最高速度を4.47%下げるように指令する。
ステップS107で、デマンド監視システム5にエレベータの消費電力を20%低減したと報告しエレベータ電力調整手順を終了する。
ステップS108で、電力を30%低減することが可能と判断し、エレベータ最高速度設定表を参照してエレベータ制御盤11に最高速度を5.4%下げるように指令する。
ステップS109で、デマンド監視システム5にエレベータの消費電力を30%低減したと報告しエレベータ電力調整手順を終了する。
In step S104, it is determined that the electric power can be reduced by 10%, and the elevator control panel 11 is instructed to lower the maximum speed by 3.16% with reference to the elevator maximum speed setting table.
In step S105, the demand monitoring system 5 is reported that the power consumption of the elevator has been reduced by 10%, and the elevator power adjustment procedure is terminated.
In step S106, it is determined that the electric power can be reduced by 20%, and the elevator control panel 11 is instructed to lower the maximum speed by 4.47% with reference to the elevator maximum speed setting table.
In step S107, the demand monitoring system 5 is reported that the power consumption of the elevator has been reduced by 20%, and the elevator power adjustment procedure is terminated.
In step S108, it is determined that the electric power can be reduced by 30%, and the elevator control panel 11 is instructed to lower the maximum speed by 5.4% with reference to the elevator maximum speed setting table.
In step S109, the demand monitoring system 5 is reported that the power consumption of the elevator has been reduced by 30%, and the elevator power adjustment procedure is terminated.

デマンド監視システム5は、デマンド量の予測値が契約電力を超えるときデマンド警告を発すると、エレベータ電力調整装置1からエレベータのサービス状況に対応したエレベータの消費電力の低減の報告を受けるので、デマンド監視システム5は、エレベータの消費電力の低減の報告を考慮して再度30分デマンド量を予測し、30分デマンド量が契約電力を超えるときエレベータ以外のビル内設備4に電力低減率を指令する。   When the demand monitoring system 5 issues a demand warning when the predicted value of the demand exceeds the contract power, the demand monitoring system 5 receives a report from the elevator power adjustment device 1 that the power consumption of the elevator corresponding to the service status of the elevator is reduced. The system 5 predicts the 30-minute demand amount again in consideration of the report on the reduction of the power consumption of the elevator, and instructs the in-building equipment 4 other than the elevator when the 30-minute demand amount exceeds the contract power.

この発明に係るエレベータ電力調整装置1は、デマンド監視システム5からデマンド警報が発せられているときエレベータの運転状況に対応する速度に最高速度を低減するようエレベータ制御盤11に指令し、且つ最高速度の低減による消費電力の低減をデマンド監視システム5に報告するので、デマンド監視システム5はエレベータでの消費電力の低減を加味して適切に他のビル内設備4の消費電力を低減することができる。   The elevator power regulating apparatus 1 according to the present invention instructs the elevator control panel 11 to reduce the maximum speed to a speed corresponding to the operation state of the elevator when a demand alarm is issued from the demand monitoring system 5 and the maximum speed. Since the power consumption reduction due to the reduction in power consumption is reported to the demand monitoring system 5, the demand monitoring system 5 can appropriately reduce the power consumption of the other in-building equipment 4 in consideration of the power consumption reduction in the elevator. .

なお、上述の実施の形態に係るエレベータ電力調整装置1では、最高速度を下げて消費電力を低減しているが、加速度を小さくして消費電力を低減しても良い。
また、上述では特に言及していないが、1バンク内のエレベータ毎に最高速度または加速度の低減率を設定しても良い。
また、複数バンクのエレベータがあるときには、メインの乗用サービスをしているバンクのエレベータの最高速度より荷物用などのバックヤードのエレベータの最高速度の低減率を大きくするようにしても良い。
また、全てのエレベータの最高速度または加速度の低減率を一致しても良い。
また、上述の実施の形態に係るエレベータ電力調整装置1はエレベータ制御盤11と別であるが、エレベータ制御盤11内に配置しても良い。
In the elevator power adjustment device 1 according to the above-described embodiment, the maximum speed is reduced to reduce the power consumption. However, the acceleration may be reduced to reduce the power consumption.
Although not particularly mentioned in the above description, the maximum speed or acceleration reduction rate may be set for each elevator in one bank.
Further, when there are a plurality of bank elevators, the reduction rate of the maximum speed of the backyard elevator for luggage may be made larger than the maximum speed of the elevator of the bank that performs the main riding service.
Further, the reduction rates of the maximum speed or acceleration of all the elevators may be matched.
The elevator power adjustment device 1 according to the above-described embodiment is separate from the elevator control panel 11, but may be disposed in the elevator control panel 11.

この発明の実施の形態に係るエレベータ電力調整装置の構成図である。1 is a configuration diagram of an elevator power adjustment device according to an embodiment of the present invention. FIG. この発明の実施の形態に係るエレベータ電力調整装置が配備されたオフィスビルの構内電力系統の構成図である。1 is a configuration diagram of a premises power system of an office building in which an elevator power adjustment device according to an embodiment of the present invention is deployed. この発明の実施の形態に係るエレベータピーク時間帯表である。4 is an elevator peak time zone table according to the embodiment of the present invention. この発明の実施の形態に係るエレベータ最高速度設定表である。3 is an elevator maximum speed setting table according to the embodiment of the present invention. この発明の実施の形態に係るエレベータ電力調整手順を示すフローチャートである。It is a flowchart which shows the elevator electric power adjustment procedure which concerns on embodiment of this invention.

符号の説明Explanation of symbols

1 エレベータ電力調整装置、2 商用系統、3 受変電設備、4 ビル内設備、5 デマンド監視システム、6 エレベータ、7 空調設備、8 照明設備、9 衛生設備、10 その他の設備、11 エレベータ制御盤、12 伝送インタフェース、13 CPU、14 ROM、15 RAM、16 内部時計。   DESCRIPTION OF SYMBOLS 1 Elevator power adjustment device, 2 Commercial system, 3 Substation equipment, 4 In-building equipment, 5 Demand monitoring system, 6 Elevator, 7 Air-conditioning equipment, 8 Lighting equipment, 9 Sanitary equipment, 10 Other equipment, 11 Elevator control panel, 12 Transmission interface, 13 CPU, 14 ROM, 15 RAM, 16 Internal clock.

Claims (5)

デマンド監視システムにより商用系統から受電するデマンド量が監視されるビルに設置されたエレベータの運転を制御するエレベータ制御盤を介して上記エレベータの消費電力を調整するエレベータ電力調整装置において、
上記デマンド監視システムが上記商用系統から受電するデマンド量の予測値が契約電力を超えるとき発せられるデマンド警告が発せられているとき上記エレベータの所定の最高速度または所定の加速度にするよう上記エレベータ制御盤に指令し、且つ上記所定の最高速度または上記所定の加速度で運転されたことによる消費電力の低減を上記デマンド監視システムに報告することを特徴とするエレベータ電力調整装置。
In the elevator power adjustment device that adjusts the power consumption of the elevator via an elevator control panel that controls the operation of the elevator installed in the building where the demand amount received from the commercial system is monitored by the demand monitoring system,
The elevator control panel is configured so that a predetermined maximum speed or a predetermined acceleration of the elevator is set when a demand warning is issued when a predicted value of a demand amount received by the demand monitoring system from the commercial system exceeds contract power. And a reduction in power consumption due to driving at the predetermined maximum speed or the predetermined acceleration is reported to the demand monitoring system.
上記所定の最高速度または上記所定の加速度は、上記エレベータのサービス状況に対応することを特徴とする請求項1に記載のエレベータ電力調整装置。   The elevator power adjustment apparatus according to claim 1, wherein the predetermined maximum speed or the predetermined acceleration corresponds to a service situation of the elevator. 上記サービス状況は、上記エレベータのサービスのピーク時間帯または平均待ち時間から決まることを特徴とする請求項2に記載のエレベータ電力調整装置。   3. The elevator power adjustment apparatus according to claim 2, wherein the service status is determined from a peak time zone or an average waiting time of the elevator service. 上記所定の最高速度は、1バンク内の上記エレベータにおいては同様であることを特徴とする請求項1に記載のエレベータ電力調整装置。   2. The elevator power adjustment apparatus according to claim 1, wherein the predetermined maximum speed is the same in the elevator in one bank. 上記所定の最高速度は、上記エレベータの使用目的により異なっていることを特徴とする請求項1に記載のエレベータ電力調整装置。   The elevator power adjustment device according to claim 1, wherein the predetermined maximum speed varies depending on a purpose of use of the elevator.
JP2007268916A 2007-10-16 2007-10-16 Elevator electric power adjusting device Pending JP2009096582A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007268916A JP2009096582A (en) 2007-10-16 2007-10-16 Elevator electric power adjusting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007268916A JP2009096582A (en) 2007-10-16 2007-10-16 Elevator electric power adjusting device

Publications (1)

Publication Number Publication Date
JP2009096582A true JP2009096582A (en) 2009-05-07

Family

ID=40699945

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007268916A Pending JP2009096582A (en) 2007-10-16 2007-10-16 Elevator electric power adjusting device

Country Status (1)

Country Link
JP (1) JP2009096582A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102020144A (en) * 2009-09-11 2011-04-20 株式会社日立制作所 Energy-saving operation system for elevator
CN103030042A (en) * 2011-09-28 2013-04-10 株式会社日立制作所 Elevator apparatus
JP2013063827A (en) * 2011-09-20 2013-04-11 Hitachi Ltd Energy-saving elevator
JP2013124151A (en) * 2011-12-13 2013-06-24 Hitachi Building Systems Co Ltd Elevator group management control system
JP2014009058A (en) * 2012-06-28 2014-01-20 Hitachi Ltd Elevator group management system
JP2014069955A (en) * 2012-10-01 2014-04-21 Toshiba Elevator Co Ltd Elevator control device and elevator control method
JP2015117118A (en) * 2013-12-19 2015-06-25 株式会社日立製作所 Elevator group management system and elevator group management method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58202268A (en) * 1982-05-21 1983-11-25 三菱電機株式会社 Power-saving operation controller for elevator
JP2001171920A (en) * 1999-12-21 2001-06-26 Hitachi Ltd Elevator system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58202268A (en) * 1982-05-21 1983-11-25 三菱電機株式会社 Power-saving operation controller for elevator
JP2001171920A (en) * 1999-12-21 2001-06-26 Hitachi Ltd Elevator system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102020144A (en) * 2009-09-11 2011-04-20 株式会社日立制作所 Energy-saving operation system for elevator
JP2012184117A (en) * 2009-09-11 2012-09-27 Hitachi Ltd Elevator system
CN104058307A (en) * 2009-09-11 2014-09-24 株式会社日立制作所 Energy-saving Operation System Of Elevator
JP2013063827A (en) * 2011-09-20 2013-04-11 Hitachi Ltd Energy-saving elevator
CN103030042A (en) * 2011-09-28 2013-04-10 株式会社日立制作所 Elevator apparatus
JP2013071825A (en) * 2011-09-28 2013-04-22 Hitachi Ltd Elevator apparatus
JP2013124151A (en) * 2011-12-13 2013-06-24 Hitachi Building Systems Co Ltd Elevator group management control system
JP2014009058A (en) * 2012-06-28 2014-01-20 Hitachi Ltd Elevator group management system
JP2014069955A (en) * 2012-10-01 2014-04-21 Toshiba Elevator Co Ltd Elevator control device and elevator control method
JP2015117118A (en) * 2013-12-19 2015-06-25 株式会社日立製作所 Elevator group management system and elevator group management method

Similar Documents

Publication Publication Date Title
JP2009096582A (en) Elevator electric power adjusting device
JP5816829B2 (en) Power management equipment
JP6522751B2 (en) Fuel cell system, external management device, fuel cell device, and control method of fuel cell device
US10814999B2 (en) Method and apparatus for operating a power distribution system
KR101894634B1 (en) Power management for datacenter power architectures
KR20160052360A (en) Intermediate voltage bus converter with power saving modes
EP2430884A2 (en) Intelligent dimmer for managing a lighting load
JP2008303056A (en) Control device and control method for passenger conveyor
JP6427708B1 (en) Power feeding method and power feeding system
JP2014107923A (en) Demand controller and program
JP2004129322A (en) Predictive control system for power demand
JP2010124539A (en) Method and server for controlling electricity utilization
JP5371925B2 (en) Air conditioning control system
EP3395129B1 (en) Demand responsive lighting control system and method
US11561021B2 (en) Method for responding to electrical power source request
JP2014236579A (en) Demand controller
JP6076651B2 (en) Power consumption feedback lighting control system
KR101443025B1 (en) Apparatus and method for managing power in load
KR101246038B1 (en) Automatic dimmer for discharge lamp and method thereof
JP6690962B2 (en) Power supply adjustment system for station electrical equipment
JP2009277500A (en) Power-saving device of high-pressure discharge lamp
JP6020299B2 (en) Wireless communication device
JP6054442B2 (en) Elevator control device
JP2004104018A (en) Manufacturing system
JP2010088279A (en) Method for controlling receiving power

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100215

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120308

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120313

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20120703