JP2008298432A - Display method of tunnel wall surface displacement, and program thereof - Google Patents
Display method of tunnel wall surface displacement, and program thereof Download PDFInfo
- Publication number
- JP2008298432A JP2008298432A JP2007141324A JP2007141324A JP2008298432A JP 2008298432 A JP2008298432 A JP 2008298432A JP 2007141324 A JP2007141324 A JP 2007141324A JP 2007141324 A JP2007141324 A JP 2007141324A JP 2008298432 A JP2008298432 A JP 2008298432A
- Authority
- JP
- Japan
- Prior art keywords
- displacement
- measurement
- displayed
- tunnel
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
本発明は、主に山岳トンネルにおける掘削において、トンネルの壁面変位を表示する方法に係り、詳しくはトンネルの壁面変位の経時的変化状況を二次元的に把握できるようにした表示方法およびそのプログラムに関する。 The present invention mainly relates to a method for displaying a wall displacement of a tunnel in excavation in a mountain tunnel, and more particularly, to a display method and a program for the two-dimensional grasp of a temporal change state of a wall displacement of a tunnel. .
例えば、NATM工法に代表される山岳工事では、発破による掘進後、掘削壁面に対する吹付け工事を行った後、この吹付け壁面に対して最終的なコンクリート覆工を行う。この際、掘進から最終的な覆工が完了するまでの発破に伴う圧力や、また覆工後においても地山の圧力によって、壁面にある程度の変位が生ずる。したがって、掘削壁面に対する吹付けおよび吹付け壁面に対する覆工を出来るだけ均一または平滑な仕上がり面となるようにするには、これらの作業に併行して吹付け前後や覆工前後における壁面の変位を管理できることが望ましい。 For example, in mountain construction represented by the NATM method, after excavating by blasting, after performing spraying work on the excavated wall surface, final concrete lining is performed on the sprayed wall surface. At this time, a certain amount of displacement occurs on the wall surface due to the pressure associated with the blasting from the excavation to the completion of the final lining and the pressure of the natural ground after the lining. Therefore, in order to ensure that the spraying on the excavation wall surface and the lining on the spraying wall surface are as uniform or smooth as possible, the displacement of the wall surface before and after spraying and before and after lining is performed in parallel with these operations. It should be manageable.
かかる内空断面の管理方法としては、図7に示されるように、トンネル31の天端や底盤に設置された光波測距儀32により内空断面33の形状を測定した後、この測定結果をコンピューターに入力し、図8に示されるように、モニタ34上において、各測定断面毎に、設計断面35を表示するとともに、この設計断面35を基準にどの程度変位が生じているかを折れ線図によって表示していた。この場合、前記設計断面35と折れ線との距離が大きいほど変位が多く生じていることを意味するものである。
As shown in FIG. 7, the method for managing the inner air cross section is that after measuring the shape of the inner air cross section 33 with a light
しかしながら、前記従来例に係る方法では、山岳トンネルの各断面毎の概ねの変位量は画面から容易に把握できるけれども、具体的にどの箇所にどの程度の変位が生じているかを平面的(二次元的)に把握することができなかった。その結果、迅速かつ正確に施工に反映させることが困難となり、吹付け厚や覆工厚にムラが生じ、均一または平滑な仕上がり面を得ることができなかったり、補強対策工を行う場合においても、ある一定以上の変位量が発生している箇所について、明確に把握できないために、不経済な必要以上の対策工を講じる結果となっていた。 However, in the method according to the conventional example, the approximate amount of displacement for each cross section of the mountain tunnel can be easily grasped from the screen, but how much displacement is specifically generated in which place is planar (two-dimensional). I could n’t figure out. As a result, it is difficult to quickly and accurately reflect in construction, unevenness in spraying thickness and lining thickness, and even when a uniform or smooth finished surface cannot be obtained, or when reinforcing measures are taken As a result, it is impossible to clearly grasp a location where a certain amount or more of the displacement occurs, and therefore, it has been a result of taking an unnecessarily expensive countermeasure work.
そこで本出願人は、下記特許文献1において、測定されたトンネル内空断面測定結果を展開図によって表示するとともに、該展開図において、掘削断面変位、吹付け厚、吹付け壁面変位、覆工厚、覆工壁面変位のいずれかの項目又はこれらの組合せを対象として、その量を図形、記号又はマークの大きさで表示する断面測定結果の表示方法、及び測定されたトンネル内空断面測定結果を展開図によって表示するとともに、該展開図において、掘削断面変位、吹付け厚、吹付け壁面変位、覆工厚、覆工壁面変位のいずれかの項目またはこれらの組合せを対象として、変位量又は基準値に対する偏倚量を等量線により表示するとともに、各等量線の範囲毎に色分け表示することを特徴とする断面測定結果の表示方法を提案した。
しかしながら、上記特許文献1に係る表示方法は、測定時点における内空断面の変位量を二次元的に把握できる点では非常に有効ではあるが、経時的な変化状況についてまでは把握することができなかった。すなわち、上記表示方法では、変位がどのように変化しているかを時間軸で把握することができなかった。
However, the display method according to
そこで本発明の主たる課題は、トンネル壁面の変位量を二次元的かつ経時的にどのように変位が進行しているかまでも把握できるようにしたトンネル壁面変位の表示方法およびそのプログラムを提供することにある。 Therefore, the main problem of the present invention is to provide a tunnel wall displacement display method and program for grasping the amount of displacement of the tunnel wall in two dimensions and how the displacement progresses over time. It is in.
前記課題を解決するために請求項1に係る本発明として、トンネル坑内に設置された測距及び測角が可能な測量機器により、複数の内空断面形状計測箇所を経時的に繰り返して計測を行い、この内空断面測定結果について、初期の内空断面測定値と、その後の内空断面計測値との差分から各計測時における変位量を算出し、モニタ上に、変位量を任意に設定した等量線毎に区分するとともに、各等量線の範囲毎に色分けした展開図によって表示するとともに、該展開図を同一モニタ上において経時的順序で切り換えて表示するようにしたことを特徴とするトンネル壁面変位の表示方法が提供される。
In order to solve the above-mentioned problem, as the present invention according to
ここで、本発明において「等量線」とは、基準値に対する偏倚量を高低差として捉え、ほぼ等しい高低差を有する偏倚量の範囲を「等高線」のように括った線をいう。また、コンピューターソフトの処理で前記等量線を明確にせず、グラデーション処理を行ってもよい。このグラデーション処理も前記等量線の概念に包括されるものである。 Here, in the present invention, an “equal line” refers to a line in which a deviation amount with respect to a reference value is regarded as a height difference, and a range of deviation amounts having substantially equal height differences is bundled as a “contour line”. Further, gradation processing may be performed without clarifying the equivalence line by computer software processing. This gradation process is also encompassed by the concept of the isoline.
上記請求項1に係る発明では、トンネル坑内に設置された測距及び測角が可能な測量機器により、複数の内空断面形状計測箇所を経時的に繰り返して計測を行い、この内空断面測定結果について、初期の内空断面測定値と、その後の内空断面計測値との差分から各計測時における変位量を算出して、トンネル壁面の変位量を定量的に把握するものである。
In the invention according to
本発明においては、モニタ上に、この算出した変位量を等量線毎に区分するとともに、各等量線の範囲毎に色分けした展開図によって表示するとともに、該展開図を同一モニタ上において経時的順序で切り換えて表示するようにしているため、トンネル壁面のどの箇所がどのように、変位が進行しているかまでも容易に把握することが可能となる。 In the present invention, on the monitor, the calculated displacement amount is divided for each equivalence line, and is displayed by a development view that is color-coded for each range of the equivalence line, and the development view is displayed on the same monitor over time. Since the display is switched in the proper order, it is possible to easily grasp which part of the tunnel wall surface and how the displacement is proceeding.
さらに、トンネル坑内に設置された測距及び測角が可能な測量機器により、複数の内空断面形状計測箇所を経時的に繰り返して計測を行っているため、日常的な施工管理のためのA計測を兼ねることができ、施工コストの削減、施工効率の向上等が図れ、かつトンネル内の作業者の安全を確保することができるようになる。 In addition, because the surveying equipment installed in the tunnel mine is capable of ranging and angle measurement, it repeatedly measures a plurality of internal cross-sectional shape measurement points over time, so A for daily construction management It can also be used for measurement, so that construction costs can be reduced, construction efficiency can be improved, and the safety of workers in the tunnel can be ensured.
請求項2に係る本発明として、トンネル坑内に設置された測距及び測角が可能な測量機器により、複数の内空断面形状計測箇所を経時的に繰り返して計測を行い、この内空断面測定結果について、初期の内空断面測定値と、その後の内空断面測定値との差分から各測定時における変位量を算出し、モニタ上に、変位量を図形、記号又はマークの大きさで表した展開図によって表示するとともに、該展開図を同一モニタ上において経時的順序で切り換えて表示するようにしたことを特徴とするトンネル壁面変位の表示方法が提供される。 As a second aspect of the present invention, measurement is performed by repeatedly measuring a plurality of inner-space cross-sectional shape measurement points over time by a surveying instrument installed in a tunnel mine and capable of ranging and angle measurement. For the results, the amount of displacement at each measurement is calculated from the difference between the initial measured value of the inner air cross section and the subsequent measured value of the inner air cross section, and the amount of displacement is displayed on the monitor as a graphic, symbol, or mark size. There is provided a display method of a tunnel wall displacement characterized in that it is displayed by the developed view and the developed view is switched and displayed in the order of time on the same monitor.
上記請求項2に係る発明は、各断面毎の測定点における変位量を図形、記号又はマークの大きさで表した展開図によって表示するとともに、該展開図を同一モニタ上において経時的順序で切り換えて表示するようにしたものである。
The invention according to
請求項3に係る本発明として、前記展開図を同一モニタ上で、手動により切り換え表示するか及び/又はスライドショー機能により所定時間毎に自動的に切り換え表示する請求項1〜2いずれかに記載のトンネル壁面変位の表示方法が提供される。 According to a third aspect of the present invention, the development view is manually displayed on the same monitor and / or automatically displayed at predetermined intervals by a slide show function. A method for displaying tunnel wall displacement is provided.
上記請求項3に係る発明においては、上記請求項1、2で測定した展開図を、同一モニタ上で、手動により切り換え表示するか及び/又はスライドショー機能により所定時間毎に自動的に切り換え表示することによって、トンネル壁面の経時的変化が一目で把握できるようになる。
In the invention according to
請求項4に係る本発明として、前記展開図の縦軸は前記トンネル中心線を基準として展開したトンネル周方向の距離とし、横軸は掘進方向の距離としてある請求項1〜3いずれかに記載のトンネル壁面変位の表示方法が提供される。
As a fourth aspect of the present invention according to
請求項5に係る本発明として、前記測距及び測角が可能な測量機器に代えて、3次元スキャナーを用いて前記内空断面測定を行う請求項1〜4いずれかに記載のトンネル壁面変位の表示方法が提供される。
As the present invention according to
請求項6に係る本発明として、前記測距及び測角が可能な測量機器に代えて、デジタルカメラを用いた精密写真測量により前記内空断面測定を行う請求項1〜4いずれかに記載のトンネル壁面変位の表示方法が提供される。
The present invention according to
請求項7に係る本発明として、コンピューターにおいて、内空断面測定結果について、初期の内空断面測定値と、その後の内空断面計測値との差分から各計測時における変位量を算出し、モニタ上に、変位量を任意に設定した等量線毎に区分するとともに、各等量線の範囲毎に色分けした展開図によって表示するとともに、該展開図を同一モニタ上において経時的順序で切り換えて表示するように実行させるためのトンネル壁面変位の表示用プログラムが提供される。
As the present invention according to
請求項8に係る本発明として、コンピューターにおいて、内空断面測定結果について、初期の内空断面測定値と、その後の内空断面測定値との差分から各測定時における変位量を算出し、モニタ上に、変位量を図形、記号又はマークの大きさで表した展開図で表示するとともに、該展開図を同一モニタ上において経時的順序で切り換えて表示するように実行させるためのトンネル壁面変位の表示用プログラムが提供される。
As the present invention according to
以上詳説のとおり本発明によれば、トンネル壁面の変位量が二次元的かつ経時的に把握できるようになる。また、日常的な施工管理のためのA計測を兼ねることができ、施工コストの削減、施工効率の向上等を図り、かつトンネル内の作業者の安全が確保される。 As described above in detail, according to the present invention, the displacement amount of the tunnel wall surface can be grasped two-dimensionally and with time. In addition, it can also be used for A measurement for daily construction management, so that construction costs can be reduced, construction efficiency can be improved, and the safety of workers in the tunnel can be ensured.
以下、本発明の実施の形態について図面を参照しながら詳述する。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
本トンネル内空断面測定システムでは、図1に示されるように、現場事務所H内に管理用コンピュータ1が設備されるとともに、トンネル坑内に無線通信基地局2を固定配置し、前記管理用コンピュータ1と無線通信基地局2とが情報伝送可能なように通信ケーブル3により接続されている。
As shown in FIG. 1, in this tunnel internal cross-section measurement system, a
一方、切羽付近で掘削作業を行っている坑内作業員等が携帯情報通信端末4を常時携帯し、前記無線通信基地局2と双方向に無線通信可能となっており、前記情報通信端末4から発信された情報が前記無線通信基地局2を経由して前記管理コンピュータ1に伝送されるようになっているとともに、切羽後方にはトータルステーション5が固定配置され、コントローラ6を介して前記無線通信基地局2と接続されている。なお、本例では前記管理コンピュータ1と無線通信基地局2との間の通信を有線通信、無線通信基地局2と携帯情報通信端末4との間の通信を無線通信としたが、各間の通信は無線または有線のいずれであってもよい。
On the other hand, a mine worker or the like performing excavation work near the face always carries the portable
前記トータルステーション5は、図1に示す例ではトンネルの上部側に配設され、トンネル掘進に合わせて順次盛替えるようにしているが、三脚方式により測定時に仮設するようにしてもよい。また、前記トータルステーション5による内空断面の測定は、適宜行うことができるが、所定の時間間隔で定期的に行うようにすることが好ましい。
In the example shown in FIG. 1, the
切羽S近傍では、ホイールジャンボ7、吹付け機8、ホイールローダなどのトンネル施工用重機が配置され、例えば図示される例では、上半及び下半の一括の併行作業により掘削を行うミニベンチ工法により、上半及び下半のそれぞれにおいてロックボルト削孔および装薬孔・装薬を併行して行った後、上半および下半を一気に切り崩し、その後ズリ出し→当り取り→一次吹付け→支保建込み→二次吹付け→ロックボルト打設の手順にて掘削作業が1サイクル毎に行われる。
In the vicinity of the face S, heavy equipment for tunnel construction such as a
前記掘削作業を終え、掘削断面を計測する手順は、先ず、図2(A)に示されるように、予め座標が既知とされる少なくとも2点の基準点A,Bをトータルステーション5により視準し、三角測量の原理を応用した後方交会法によりトータルステーション5の設置座標を算出する。このトータルステーション5の設置座標の特定作業は、設置点が変化している場合もあるため、各種測量が行われる毎に繰り返し行うようにするのが望ましい。なお、同図に示されるように、算出した座標を確認するためのチェック点を設けてもよい。
The procedure for measuring the excavation cross section after finishing the excavation work is as follows. First, as shown in FIG. 2A, the
その後、同図(B)に示されるように、所定時間毎に、又は現場事務所H内に設置された管理用コンピュータ1により若しくは坑内作業員等が携帯する携帯情報通信端末4により、計測開始の指令が出されると、コントローラー6による制御によりトータルステーション5が自動的に複数の、図示例では3つの内空断面形状計測箇所についてトンネル壁面の形状計測を行う。
Thereafter, as shown in FIG. 5B, measurement is started at predetermined time intervals, by the
前記内空断面形状の計測箇所は、坑口から切羽Sにかけて、その数及び間隔などを任意に選定することができる。また、計測箇所の断面数は、計測期間中、固定的なものではなく、掘進に伴って順次断面を追加するようにする。また、坑口側の計測が不要になった断面については順次計測対象から外すようにする。計測対象となる断面については、変位の推移を把握するために、所定の時間間隔で経時的に複数回繰り返して計測が行われる。 The number and interval of the measurement points of the inner air cross-sectional shape can be arbitrarily selected from the wellhead to the face S. In addition, the number of cross sections at the measurement location is not fixed during the measurement period, and cross sections are added sequentially with the progress of the excavation. In addition, the cross section where the measurement on the wellhead side is unnecessary is sequentially removed from the measurement target. For the cross section to be measured, the measurement is repeatedly performed over time at a predetermined time interval in order to grasp the transition of the displacement.
前記計測データは、前記通信システムによって管理コンピュータ1内に自動的に取り込まれるようになっている(同図(C))。なお、計測データは、坑内作業員等が携帯する携帯情報端末4に取り込まれるようにしてもよい。この場合、後述する測定結果の表示形式は、携帯情報端末4に表示されるようにしてもよい。
The measurement data is automatically taken into the
管理コンピュータ1に取り込まれた測定結果は、本発明に従って、所定の表示形式で、管理用コンピュータ1のモニタに表示されるようになっている。以下、第1形態例と第2形態例とに分けて説明する。
The measurement result captured by the
〔第1形態例〕
第1形態例に係る表示形式は、内空断面測定結果について、初期の内空断面測定値と、その後の内空断面計測値との差分から各計測時における変位量を算出し、モニタ上に、変位量を任意に設定した等量線毎に区分するとともに、各等量線の範囲毎に色分けした展開図によって表示するとともに、該展開図を同一モニタ上において、図3から図5の順で示すように、経時的順序で切り換えて表示するようにしたものである。
[First embodiment]
The display format according to the first embodiment calculates the displacement amount at each measurement from the difference between the initial internal cross-section measurement value and the subsequent internal cross-section measurement value with respect to the internal cross-section measurement result. The displacement amount is divided into equality lines that are arbitrarily set, and displayed in a development view that is color-coded for each range of the equivalence lines, and the development views are displayed in the order of FIGS. 3 to 5 on the same monitor. As shown in the figure, the display is switched and displayed in the order of time.
図3〜図5に示されるモニタ表示画面10A〜10Cでは、縦軸に前記内空断面の中心線CLを基準として展開した周方向距離を取り、横軸に掘進距離TD(括弧内に掘削サイクル番号)を取った展開図として表示され、初期の内空断面測定値と、その後の内空断面計測値との差分から算出した各計測時における変位量が等量線により表示されるとともに、各等量線の範囲毎に各種の色により色分けされている。
In the
具体的には、凡例に示されるように、変位量を4mm毎にA〜Tの20段階に区分し、等量線により表示するようにし、かつA〜Tの各等量線の区分毎にその範囲を色分けするようにする。前記A〜Tの区分の内、マイナス区分のA〜Jがトンネル空間内方向への増減を示し、プラス区分のK〜Tがトンネル空間外方向への増減を示している。また、図面上に着色表示できないため、都合上アルファベット表示をするに止めているが、実際は区分Aから区分Tに行くに従って、赤→橙→黄→緑→青→群青色のように徐々に色変化させることによって、赤色及び橙色部分、すなわちトンネル空間内方向への変位増大がどの位置にどのような範囲で分布しているかがその量と共に一目で分かるようになっているとともに、青系色部分、すなわちトンネル空間外方向への変位増大がどの位置にどのような範囲で分布しているかがその量と共に一目で分かるようになっている。 Specifically, as shown in the legend, the displacement amount is divided into 20 stages of A to T every 4 mm, and is displayed by an equivalence line, and for each of the equivalence lines of A to T, The range is color-coded. Among the sections A to T, minus sections A to J indicate increase / decrease in the tunnel space direction, and plus sections K to T indicate increase / decrease in the tunnel space outward direction. Also, because it cannot be colored on the drawing, the alphabet is displayed for the sake of convenience. Actually, the color gradually changes from red to orange to yellow to green to blue to ultramarine as it goes from section A to section T. By changing it, the red and orange parts, that is, where the increase in displacement in the tunnel space direction is distributed at which position and in what range can be seen at a glance along with the amount, and the blue color part That is, it is possible to recognize at a glance the amount of displacement increase in the direction outside the tunnel space and in what range and in what range.
前記モニタ表示画面10Aは、右上に表示される日付ボックス15により選択指定された各測定日時の変位量コンター図16が表示されるようになっているともに、前記横軸のTDは、上端付近に表示されているTD選択リストボックス11a、11bにより選択指定されたTD区間のものが表示されるようになっている。
The
モニタ表示の右上には、変位推移ボタン12が設けられているとともに、その下側にはスライドショーボタン13が設けられている。
A
前記変位推移ボタン12をマウスでクリックすると、変位量コンター図16が経時的順序で切り換えられて表示されるようになっている。図4は、前記変位推移ボタン12をクリックして、経時的に次の変位量コンター図16を表示したモニタ画面である。さらに、図5は前記変位推移ボタン12を更にもう一度マウスでクリックして、経時的に次の変位量コンター図16を表示したモニタ画面である。このように、時間的な経過順で変位量コンター図16を順に切り換えて表示することにより、トンネル壁面の変位量を二次元的にかつ経時的にどのように変位が進行しているかまでも容易に把握できるようになる。
When the
また、前記スライドショーボタン13をマウスでクリックした場合には、所定の時間間隔で、図3〜図5の順で自動的に切り換えて表示することができる。
Further, when the
前記モニタ表示画面10A〜10Cの右下端には、印刷ボタン17が設けられ、前記印刷ボタン17をマウスで選択すれば、変位量コンター図16が印刷できるようになっている。
A
〔第2形態例〕
前記モニタ表示画面10A〜10Cの上部には、表示切換えボタン14が設けられており、このボタンをマウスでクリックすると、画面が図6に示される表示形式に切り替わるようになっている。
[Second embodiment]
A
本第2形態例に係る表示形式は、内空断面測定結果について、初期の内空断面測定値と、その後の内空断面測定値の差分から各測定時における変位量を算出し、モニタ上に、変位量を図形、記号又はマークの大きさで表した展開図によって表示するとともに、該展開図を同一モニタ上において経時的順序で切り換えて表示するようにしたものである。 The display format according to the second embodiment calculates the amount of displacement at each measurement from the difference between the initial internal cross-section measurement value and the subsequent internal cross-section measurement value on the internal cross-section measurement result, and displays it on the monitor. The displacement amount is displayed by a development view showing the size of a figure, a symbol, or a mark, and the development view is switched and displayed in the order of time on the same monitor.
図6に示される前記モニタ表示画面18では、左側に前記掘削内空断面の展開図19が表示されているとともに、右側に測定対象の内空断面の断面図20が表示され、かつ下側に各掘削内空断面の測定結果の一覧表21が表示されるようになっている。各測定結果は、日付ボックス15により選択指定された各測定日時のものが任意に切り換えて表示されるようになっているともに、前記横軸のTDは、前記コンピューター画面1Aの上端付近に表示されているTD選択リストボックス11a、11bにより選択指定されたTD区間のものが表示されるようになっている。。
In the
前記展開図19は、縦軸に前記内空断面の中心線CLを基準として展開した周方向距離を取り、横軸に掘進距離TD(Total Distance)とStation番号による距離程STAを取った図として表示され、上部側には掘削サイクル数と支保工パターン記号(P−B−H(曲))が夫々表示されている。 FIG. 19 is a diagram in which the vertical axis represents the circumferential distance developed with reference to the center line CL of the inner cross section, and the horizontal axis represents the distance STA (Distance by digging distance TD (Total Distance) and Station number). The number of excavation cycles and the support work pattern symbol (PBH (music)) are displayed on the upper side.
前記展開図19では、マウスにより指定された日付の各断面毎の各測定点における変位量が、円の大きさによって表示されるようになっているとともに、基準断面に対する余掘とアタリとが円内に付した着色によって表示されるようになっている。具体的に図中では、余掘は○(白丸)、アタリは●(赤丸)で表示されるようになっている。なお、前記変位量の表示位置が前記断面位置24,24…に沿って一列に並んで表示されていないものがあるが、これは、トータルステーション5を切羽後方に設置し、斜め方向からの視準によって計測しているため、変位量による凹凸によって計測位置が若干ずれるためである。なお、前記変位量の表示は、前記円以外に、任意の図形、記号またはマークとすることができ、余掘又はアタリの区別の着色は赤色以外に任意の有彩色とすることができる。
In the
一方、前記断面図20では、マウスにより指定した日付及びTD位置の内空断面形状が表示されるようになっている。内空断面形状は、初期の内空断面22を基準に変位量が折れ線23によって表示されるようになっている。前記断面図20の右側上端部にはアタリ表示倍率欄が表示され、指定された任意の倍率により、折れ線23のアタリ部分のみが誇張的に表現されるようになっている。
On the other hand, in the
他方、前記一覧表21には、各内空断面測定結果について左から順に、測定日時、ナンバー、設計上のTD(実TD)、実測によるTD(計測TD)、相対X座標、相対Y座標、相対Z座標、鉛直角、中心からの設計距離、中心からの計測距離、実測アタリ量、修正アタリ量、アタリ区分、変位量が夫々表示されるようになっている。
On the other hand, the
この表示形式においても、前記変位推移ボタン12をマウスでクリックすると、前記展開図19、断面図20、一覧表21が順次、経時的順序で切り換えられて表示されるようになっている。また、前記スライドショーボタン13をマウスでクリックした場合には、所定の時間間隔で自動的に切り換えて表示されるようになっている。
Also in this display format, when the
〔他の形態例〕
(1)前記トータルステーション5に代えて、3次元スキャナーを用いて内空断面測定を行うこともできる。前記トータルステーションは従来から存在する測定機器であるが、近年はセンサー技術の発達により3次元スキャナーが実用化レベルにあり、前記トータルステーション5に代えて3次元スキャナーを用いて面的に内空断面の凹凸計測を行うことができる。前記3次元スキャナーとしては、例えばパルステック社製のTDSシリーズなどを好適に使用することができる。測量誤差はスキャンエリア567×498mmの場合(TDS-1500)で、0.23〜0.83mm(Z方向)の精度が得られる。
(2)更に、前記トータルステーション5に代えて、近年のコンピュータ処理技術の発達に伴って実用化されている精密写真測量によって内空断面測定を行うことができる。前記精密写真測量は、撮影位置を変えて撮影した複数枚のデジタル写真画像の視差の違いから、対象物の3次元座標をパソコンを使い画像処理によって算出するもので、測量誤差は概ね、撮影距離100mで数mmという高い精度が得られている。
[Other examples]
(1) Instead of the
(2) Further, in place of the
1…管理コンピュータ、10A〜10B…モニタ表示画面、2…無線通信基地局、3…通信ケーブル、4…携帯情報通信端末、5…トータルステーション、6…コントローラ、7…ホイールジャンボ、8…吹付け機、11a・11b…TD選択リストボックス、12…変位推移ボタン、13…スライドショーボタン、14…表示切換ボタン、15…日付ボックス、16…変位量コンター図、19…展開図、20…断面図、21…一覧表
DESCRIPTION OF
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2007141324A JP2008298432A (en) | 2007-05-29 | 2007-05-29 | Display method of tunnel wall surface displacement, and program thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2007141324A JP2008298432A (en) | 2007-05-29 | 2007-05-29 | Display method of tunnel wall surface displacement, and program thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2008298432A true JP2008298432A (en) | 2008-12-11 |
Family
ID=40172102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2007141324A Pending JP2008298432A (en) | 2007-05-29 | 2007-05-29 | Display method of tunnel wall surface displacement, and program thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2008298432A (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010217018A (en) * | 2009-03-17 | 2010-09-30 | Sooki:Kk | System for execution support of tunnel excavation using three-dimensional laser scanner |
JP2010217017A (en) * | 2009-03-17 | 2010-09-30 | Sooki:Kk | Method for execution of tunnel excavation construction using three-dimensional laser scanner |
JP2011001698A (en) * | 2009-06-16 | 2011-01-06 | Sooki:Kk | Tunnel excavation wall face development display, display method and display program |
JP2012031594A (en) * | 2010-07-29 | 2012-02-16 | Nishimatsu Constr Co Ltd | Tunnel construction management system |
JP2012058167A (en) * | 2010-09-13 | 2012-03-22 | Kajima Corp | Inner space displacement measurement method and inner space displacement measurement system |
JP2014002027A (en) * | 2012-06-18 | 2014-01-09 | Hazama Ando Corp | Method of measuring displacement of space within tunnel |
JP2014098704A (en) * | 2013-12-16 | 2014-05-29 | Kajima Corp | Inner space displacement measuring method and inner space displacement measuring system |
JP2016169496A (en) * | 2015-03-12 | 2016-09-23 | 公益財団法人鉄道総合技術研究所 | Method for measuring deformation of tunnel lining utilizing train wind within tunnel |
JP2017040586A (en) * | 2015-08-20 | 2017-02-23 | 株式会社興和 | Displacement measurement device of wastewater treatment pit, clod movement monitoring method, and wastewater treatment pit monitoring method |
JP2017190587A (en) * | 2016-04-12 | 2017-10-19 | 大成建設株式会社 | Mucking operation management device |
JP2018013333A (en) * | 2016-07-19 | 2018-01-25 | 大成建設株式会社 | Measurement management system |
JP2020090877A (en) * | 2018-12-07 | 2020-06-11 | 株式会社熊谷組 | Shield tunnel construction status display device and construction status display method |
JP2020133118A (en) * | 2019-02-13 | 2020-08-31 | 清水建設株式会社 | Tunnel construction management method |
JP2020134299A (en) * | 2019-02-19 | 2020-08-31 | 株式会社オリエンタルコンサルタンツ | Display device, display method, and nondestructive inspection system |
JP2020197459A (en) * | 2019-06-03 | 2020-12-10 | 三菱電機株式会社 | Tunnel displacement measuring device, tunnel displacement measuring program, and tunnel displacement measuring method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6315135A (en) * | 1986-07-05 | 1988-01-22 | Mazda Motor Corp | Method for measuring air stream of vehicle |
JP2004153462A (en) * | 2002-10-29 | 2004-05-27 | Keyence Corp | Magnifying observation apparatus, operating method of the magnifying observation apparatus, magnifying observation apparatus operating program, and computer-readable recording medium |
JP2005083893A (en) * | 2003-09-09 | 2005-03-31 | Enzan Kobo:Kk | Method for displaying cross section measurement result and its program |
JP2006200987A (en) * | 2005-01-19 | 2006-08-03 | Nikon Corp | Analyzer, microscope, and analysis program |
-
2007
- 2007-05-29 JP JP2007141324A patent/JP2008298432A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6315135A (en) * | 1986-07-05 | 1988-01-22 | Mazda Motor Corp | Method for measuring air stream of vehicle |
JP2004153462A (en) * | 2002-10-29 | 2004-05-27 | Keyence Corp | Magnifying observation apparatus, operating method of the magnifying observation apparatus, magnifying observation apparatus operating program, and computer-readable recording medium |
JP2005083893A (en) * | 2003-09-09 | 2005-03-31 | Enzan Kobo:Kk | Method for displaying cross section measurement result and its program |
JP2006200987A (en) * | 2005-01-19 | 2006-08-03 | Nikon Corp | Analyzer, microscope, and analysis program |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010217018A (en) * | 2009-03-17 | 2010-09-30 | Sooki:Kk | System for execution support of tunnel excavation using three-dimensional laser scanner |
JP2010217017A (en) * | 2009-03-17 | 2010-09-30 | Sooki:Kk | Method for execution of tunnel excavation construction using three-dimensional laser scanner |
JP2011001698A (en) * | 2009-06-16 | 2011-01-06 | Sooki:Kk | Tunnel excavation wall face development display, display method and display program |
JP2012031594A (en) * | 2010-07-29 | 2012-02-16 | Nishimatsu Constr Co Ltd | Tunnel construction management system |
JP2012058167A (en) * | 2010-09-13 | 2012-03-22 | Kajima Corp | Inner space displacement measurement method and inner space displacement measurement system |
JP2014002027A (en) * | 2012-06-18 | 2014-01-09 | Hazama Ando Corp | Method of measuring displacement of space within tunnel |
JP2014098704A (en) * | 2013-12-16 | 2014-05-29 | Kajima Corp | Inner space displacement measuring method and inner space displacement measuring system |
JP2016169496A (en) * | 2015-03-12 | 2016-09-23 | 公益財団法人鉄道総合技術研究所 | Method for measuring deformation of tunnel lining utilizing train wind within tunnel |
JP2017040586A (en) * | 2015-08-20 | 2017-02-23 | 株式会社興和 | Displacement measurement device of wastewater treatment pit, clod movement monitoring method, and wastewater treatment pit monitoring method |
JP2017190587A (en) * | 2016-04-12 | 2017-10-19 | 大成建設株式会社 | Mucking operation management device |
JP2018013333A (en) * | 2016-07-19 | 2018-01-25 | 大成建設株式会社 | Measurement management system |
JP2020090877A (en) * | 2018-12-07 | 2020-06-11 | 株式会社熊谷組 | Shield tunnel construction status display device and construction status display method |
JP7175733B2 (en) | 2018-12-07 | 2022-11-21 | 株式会社熊谷組 | Shield tunnel construction status display device and construction status display method |
JP2020133118A (en) * | 2019-02-13 | 2020-08-31 | 清水建設株式会社 | Tunnel construction management method |
JP2020134299A (en) * | 2019-02-19 | 2020-08-31 | 株式会社オリエンタルコンサルタンツ | Display device, display method, and nondestructive inspection system |
JP7190138B2 (en) | 2019-02-19 | 2022-12-15 | 株式会社オリエンタルコンサルタンツ | Display device, display method and non-destructive exploration system |
JP2020197459A (en) * | 2019-06-03 | 2020-12-10 | 三菱電機株式会社 | Tunnel displacement measuring device, tunnel displacement measuring program, and tunnel displacement measuring method |
JP7253982B2 (en) | 2019-06-03 | 2023-04-07 | 三菱電機株式会社 | Tunnel displacement measuring device and tunnel displacement measuring method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2008298432A (en) | Display method of tunnel wall surface displacement, and program thereof | |
US20190272676A1 (en) | Local positioning system for augmented reality applications | |
EP1329689B1 (en) | Method and apparatus for surveying the geometry of tunnels | |
JP5213163B2 (en) | Concrete placement management method in tunnel construction | |
JP2009543220A (en) | Method and system for automatically performing a multidimensional space survey | |
JP3842771B2 (en) | Method for displaying cross-section measurement results and program thereof | |
KR101144727B1 (en) | Excavation supporting system using stereo vision technology | |
JP2010085311A (en) | Method of controlling excavation of inverted section | |
JP3449708B1 (en) | Display method of tunnel cross section measurement result and program therefor | |
JP3410465B1 (en) | Survey method and program for displaying result thereof | |
JP3867025B2 (en) | Tunnel control chart, its creation method and system | |
JP2019094666A (en) | Anchor construction position display device and construction method for slope face structure | |
JP2019015040A (en) | Excavation support system | |
JP2023111937A (en) | Tunnel face state display system and tunnel face state display method | |
JP2008298433A (en) | Prediction method for tunnel final displacement | |
JP5182951B2 (en) | Tunneling wall surface display device, display method, and display program | |
JP2021089208A (en) | Excavation support system | |
Hsieh et al. | On-site visual construction management system based on the integration of SLAM-based AR and BIM on a handheld device | |
WO2024047785A1 (en) | Survey system and survey method | |
JP7505957B2 (en) | Measurement method for winding space in tunnel construction | |
JP2017211257A (en) | Displacement information display device | |
JP5097258B2 (en) | Excavator position measurement method | |
EP4332497A1 (en) | Method and device for monitoring/surveying material thickness | |
EP4265880A1 (en) | Drilling sequence data generation device, drilling sequence data generation method, and program | |
JP2018104933A (en) | Construction management device for civil engineering construction work |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20100419 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20121017 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20130226 |