JP2008297856A - Construction method of foundation structure made of steel pipe - Google Patents

Construction method of foundation structure made of steel pipe Download PDF

Info

Publication number
JP2008297856A
JP2008297856A JP2007147627A JP2007147627A JP2008297856A JP 2008297856 A JP2008297856 A JP 2008297856A JP 2007147627 A JP2007147627 A JP 2007147627A JP 2007147627 A JP2007147627 A JP 2007147627A JP 2008297856 A JP2008297856 A JP 2008297856A
Authority
JP
Japan
Prior art keywords
tube
pipe body
child
rotating tool
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007147627A
Other languages
Japanese (ja)
Inventor
Sanji Genma
燦治 玄間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Chiko Co Ltd
Original Assignee
Nippon Chiko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Chiko Co Ltd filed Critical Nippon Chiko Co Ltd
Priority to JP2007147627A priority Critical patent/JP2008297856A/en
Publication of JP2008297856A publication Critical patent/JP2008297856A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a foundation structure for supporting a large-sized marker post or a multipurpose post, structured not to rotate even when a large-sized marker or the like receives strong wind pressure load or the like and also structured to permit the use of a post erection vehicle to solve a problem of vibration and noise. <P>SOLUTION: This construction method comprises steps of digging a prepared hole beforehand with an auger for a master pipe body mounted to a boring post erection vehicle, inserting a rotating tool inside the master pipe body to install the master pipe body in the upper part of the preceding hole, fitting the rotating tool to a connector of the master pipe body to integrate the master pipe body and the rotating tool, burying the master pipe body by pressing the rotating tool while rotating it, then pulling out the rotating tool, fitting and fixing a connection hole of a connecting structure to the upper end of the master pipe body, inserting a slave pipe body in the connection hole of the connecting structure, fitting a rotating tool to a connector of the slave pipe body to integrate the slave pipe body and the rotating tool, burying the slave pipe body by pressing the rotating tool while rotating it in the integrated state, then pulling out the rotating tool, and fixing the upper end of the slave pipe body to the connecting structure. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、大型標識柱や多目的柱等を支持するのに用いる鋼管製基礎構造であって、支柱に取り付けた大型標識等が強大な風圧等を受けた際に基礎構造が回転しないようにした鋼管製基礎構造の施工方法に関する。   The present invention is a steel pipe foundation used to support large signposts, multipurpose pillars, etc., and prevents the foundation structure from rotating when a large sign attached to the support is subjected to a strong wind pressure, etc. It is related with the construction method of a steel pipe foundation.

従来から道路脇等に多目的柱や信号機や道路標識が設けられているが、標識等が大型になるほど風圧を受けやすく、反復する風圧、または強大な風圧によって地中に埋設された基礎構造が支柱ごと回転するという不都合が生じていた。そのため、従来から基礎構造に何らかの回転防止機能を付加することにより、そのような不都合を防止することが行われていた。   Conventionally, multi-purpose pillars, traffic lights and road signs are provided on the side of the road, but the larger the sign, the more likely it is subjected to wind pressure, and the foundation structure buried in the ground by repeated or strong wind pressure is the pillar The inconvenience of rotating every time occurred. For this reason, conventionally, some inconvenience has been prevented by adding some anti-rotation function to the foundation structure.

そこで、従来の技術を参照すると、特許文献1は、「支柱鋼管の風圧横回転防止構造」と称するものであり、照明灯等の比較的小型の支柱鋼管に風圧横回転が生じることを防止するものである。その構成は、地中に埋設される丸形鋼管の上端のフランジ下面に垂下固定される突片と、該丸型鋼管の横方向所定位置に埋設される補助杭の上端に設けられた突片とに回転防止板の左右両端を固定してなる構造である。具体的には、埋設用丸形鋼管と補助杭とを地中に埋設した後、埋設用丸形鋼管の上端の突片と補助杭の上端の突片とに回転防止板の左右両端がボルトとナットで固定される構造とされている。   Therefore, referring to the prior art, Patent Document 1 is referred to as a “wind pressure lateral rotation prevention structure of a column steel pipe”, and prevents wind pressure lateral rotation from occurring in a relatively small column steel pipe such as an illuminating lamp. Is. The construction consists of a projecting piece fixed to the bottom surface of the flange at the upper end of a round steel pipe buried in the ground, and a projecting piece provided at the upper end of an auxiliary pile buried in a predetermined position in the lateral direction of the round steel pipe. Further, the left and right ends of the rotation prevention plate are fixed to each other. Specifically, after embedding the round steel pipe for burial and the auxiliary pile in the ground, the left and right ends of the anti-rotation plate are bolted to the projecting piece at the upper end of the round steel pipe for burial and the upper end of the auxiliary pile. And is fixed with a nut.

ところが、上記の構造において、埋設用丸形鋼管のフランジの下面に突片をボルトとナットで接続するため、その締結作業が困難であるという問題があった。また、照明灯柱の基礎構造を回転防止の対象としているため、強大な風圧に対する抵抗力を備えるものではなく、突片や回転防止板の部材強度が不足し、強大な風圧に耐える必要のある構造としては強度的な面で問題があった。   However, in the above structure, the projecting piece is connected to the lower surface of the flange of the buried round steel pipe with a bolt and a nut, so that there is a problem that the fastening operation is difficult. In addition, because the basic structure of the lighting pole is targeted for rotation prevention, it does not have resistance against strong wind pressure, but the strength of the members of the projecting pieces and rotation prevention plate is insufficient, and it is necessary to withstand the strong wind pressure. There was a problem in terms of strength as a structure.

また、特許文献2は、「照明灯用支柱の建柱方法」と称するもので、その内容は、埋設用丸形鋼管にフランジを介して補助鋼管を連結固定し、このように連結した両鋼管内にオーガロッドを挿入して該オーガロッドの先端の掻き取り片が埋設用丸形鋼管から突出するように内挿し、補助鋼管とオーガロッドとを回転上一体化させた状態で、オーガロッドを回転押圧することによって埋設用丸形鋼管を埋設するようにした方法である。   Further, Patent Document 2 is referred to as “a column method for a column for an illumination lamp”, and the content thereof is that both auxiliary steel pipes are connected and fixed via a flange to a buried round steel pipe, and the two steel pipes connected in this way. Insert the auger rod into the inside and insert it so that the scraped piece at the tip of the auger rod protrudes from the round steel pipe for embedding. This is a method of burying a round steel pipe for burying by rotating and pressing.

ところが、この文献の構造は、埋設用丸形鋼管にフランジを介して補助鋼管を連結固定し、補助鋼管とオーガロッドとを回転上一体化させた状態にして回転押圧することにより埋設用丸形鋼管を埋設する方法であり、埋設用丸形鋼管と補助鋼管とを連結固定してなる一本の構造体であって、回転防止機能を有するものではなく、また施工上の構造が複雑であり、施工作業も煩雑になるという問題があった。   However, the structure of this document is such that the auxiliary steel pipe is connected and fixed to the buried round steel pipe via a flange, and the auxiliary steel pipe and the auger rod are rotationally integrated into each other and rotated and pressed to rotate the buried round steel pipe. It is a method of embedding a steel pipe, and is a single structure that is constructed by connecting and fixing a round steel pipe for embedding and an auxiliary steel pipe, does not have an anti-rotation function, and has a complicated construction structure. There is a problem that the construction work becomes complicated.

さらに、特許文献3は、「打設方式ボール基礎」と称するものであり、大型道路標識用ポールのように強大な回転力を防止するためになされたものである。その構成は、H型鋼の上辺に方形プレートを固着し、このプレートの下面よりねじれ止め板と補助板とを固着すると共に、H型鋼の両側に下端部を斜傾切欠した単一枚の平板による大型拡大面の抵抗板を固着したものである。ところが、このような構造は、大型標識等のように強大な回転力が作用する基礎構造であり、回り止めのための平板状の大型拡大抵抗板をH型鋼に固着してあるため、打込み施工が必要となり、バイブロ式杭打機等のように大型の打込み装置を必要とするうえ、大きな振動や騒音が発生するという問題があった。
実用新案登録第3126465号公報 特開2005−97890号公報 実開平3−13342号公報
Further, Patent Document 3 is referred to as a “placing method ball foundation”, and is made to prevent a strong rotational force like a large road sign pole. The structure is made of a single flat plate having a rectangular plate fixed to the upper side of the H-shaped steel, a torsion stop plate and an auxiliary plate fixed from the lower surface of the plate, and lower end portions obliquely cut off at both sides of the H-shaped steel. A large-sized enlarged resistance plate is fixed. However, such a structure is a basic structure where a large rotational force acts like a large sign, and a flat large expansion resistance plate for detent is fixed to the H-shaped steel. And a large driving device such as a vibro type pile driving machine is required, and a large vibration and noise are generated.
Utility model registration No. 3126465 gazette Japanese Patent Laid-Open No. 2005-97890 Japanese Utility Model Publication No. 3-13342

本発明は、上記の事情に鑑みてなされたもので、大型標識柱や多目的柱等を支持するのに用いる基礎構造であって、支柱に取り付けた大型標識等が強大な風圧荷重等を受けた際にも基礎構造が回転しない構造とし、その施工に建柱車を利用し得る構造とすることによって振動や騒音の問題を解消するようにした鋼管製基礎構造の施工方法を提供することを目的とする。   The present invention has been made in view of the above circumstances, and is a basic structure used to support a large marker column, a multipurpose column, etc., and the large marker attached to the column received a strong wind pressure load, etc. The purpose is to provide a method for constructing a steel pipe foundation that eliminates the problems of vibration and noise by making the foundation structure non-rotating and making it possible to use a construction car for the construction. And

上記の目的を達成するために、本発明における請求項1の鋼管製基礎構造の施工方法は、穴掘建柱車に取り付けた親管体用オーガで下穴を先行掘りする工程と、回転工具を親管体の内部に挿入して先行穴上部に親管体を設置し、該回転工具を親管体の結合具に嵌合することにより親管体と回転工具とを一体化した状態で、回転工具を親管体と共に回転しながら押圧することによって親管体を規定深度まで埋設した後、回転工具を抜く工程と、親管体の上端に接続構造体の親管体用接続穴を嵌合させて固設する工程と、接続構造体の子管体用接続穴に子管体を挿入し、回転工具を子管体の結合具に嵌合することにより子管体と回転工具とを一体化した状態で、回転工具を子管体と共に回転しながら押圧することによって子管体を規定深度まで埋設した後、回転工具を抜く工程と、子管体上端と接続構造体とを固設する工程とによる一連の工程により、風荷重に対する基礎構造の回転を防止するようにしたことを特徴とする。   In order to achieve the above object, the construction method of the steel pipe foundation structure according to claim 1 of the present invention includes a step of pre-digging a pilot hole with an auger for a main pipe body attached to a drilling shaft and a rotary tool. In the state where the main tube and the rotary tool are integrated by inserting the inside of the main tube and installing the main tube in the upper part of the leading hole and fitting the rotary tool to the coupler of the main tube After burying the main pipe body to a specified depth by pressing the rotary tool while rotating with the main pipe body, the step of removing the rotary tool and the connection hole for the main pipe body of the connection structure at the upper end of the main pipe body A step of fitting and fixing, inserting the child tube body into the connection hole for the child tube body of the connection structure, and fitting the rotary tool to the connector of the child tube body, In the integrated state, press the rotating tool while rotating together with the child tube to bury the child tube to the specified depth. After the steps of removing the rotating tool, by a series of steps by a step of fixedly mounted and child tube upper end and the connecting structure, characterized in that so as to prevent rotation of the base structure against wind load.

また、本発明における請求項2の鋼管製基礎構造の施工方法は、請求項1において、接続構造体は親管体用接続穴と子管体用接続穴とからなる2つの円筒形状の接続穴を有し、且つ親管体用接続穴の上部に上部柱を接続するための接続用フランジを有してなる一体構造であることを特徴とする。   In the construction method of the steel pipe foundation structure according to claim 2 of the present invention, the connection structure according to claim 1 has two cylindrical connection holes including a connection hole for a main tube and a connection hole for a child tube. And having a connection flange for connecting the upper column to the upper part of the connection hole for the main tubular body.

さらに、本発明における請求項3の鋼管製基礎構造の施工方法は、請求項1又は2において、穴掘建柱車に備えたオーガ減速機と回転工具のシャフトの上端との間に、折曲げ式ジョイントを挿着した構造であることを特徴とする。   Furthermore, the construction method of the steel pipe foundation structure according to claim 3 of the present invention is the method according to claim 1 or 2, wherein the bending is performed between the auger reduction gear provided in the digging column car and the upper end of the shaft of the rotary tool. It is the structure which inserted the type | formula joint, It is characterized by the above-mentioned.

本発明の施工方法によれば、鋼管製管体からなる2本の管体、即ち親管体と子管体とが穴掘建柱車のアースオーガ又は回転工具により埋設され、このように埋設された親管体と子管体の夫々の上部に接続構造体を結合することによって2本の管体が一体的に連結される基礎構造として施工されるものであり、親管体の上部においては接続構造体に設けられたフランジを介して上部柱が固設され、このような上部柱と親管体との一体構造を子管体が周り止めとして機能するようにした堅牢な構造を得ることが可能となる。   According to the construction method of the present invention, two pipe bodies made of a steel pipe body, that is, a main pipe body and a sub pipe body are buried by an earth auger or a rotary tool of a digging column car, and thus buried. It is constructed as a basic structure in which two pipes are integrally connected by joining a connection structure to the upper part of each of the parent pipe and the child pipe, and in the upper part of the parent pipe Has a solid structure in which the upper column is fixed through a flange provided in the connection structure, and the integrated structure of the upper column and the parent tube body functions as a stopper for the child tube body. It becomes possible.

また、本発明の施工方法によれば、大型の打込み装置を必要とせず、穴掘建柱車を用いて施工できるため、道路脇に立てられる大型標識柱や多目的柱等の施工に適し、振動や騒音を大幅に減少させることができ、環境にやさしい工法となる。   In addition, according to the construction method of the present invention, a large driving device can be used without using a large driving device, so it is suitable for construction of large sign pillars and multipurpose pillars that are set up on the side of the road, and vibration. And noise can be greatly reduced, making the method environmentally friendly.

さらに、本発明の施工方法によって得られる構造体は、地中に埋設された親管体の上端と子管体の上端とを堅牢な接続構造体で固設する構造であるため、親管体の上部にフランジを介して固定された上部支柱の大型標識等に大きな風荷重が作用しても充分な抵抗力と部材強度とを発揮することが可能となる。   Furthermore, since the structure obtained by the construction method of the present invention is a structure in which the upper end of the parent tube embedded in the ground and the upper end of the child tube are fixed by a robust connection structure, the parent tube Even if a large wind load acts on a large sign or the like of the upper column fixed to the upper part of the upper column via a flange, it is possible to exhibit sufficient resistance and member strength.

以下、本発明による実施例について、図面を参照しながら説明する。   Embodiments according to the present invention will be described below with reference to the drawings.

本発明の施工方法に関して以下の工程順に説明する。なお、各工程の説明においては、別態様の施工方法についても述べることとし、また各工程に必要とされる部材についても併せて説明する。   The construction method of the present invention will be described in the following order of steps. In the description of each process, a construction method according to another aspect is also described, and members required for each process are also described.

[工程1] まず、工程1として、図1(a)に示すように、穴掘建柱車1のオーガ減速機12の先端に取り付けた親管体用オーガ2で下穴(先行穴3)を先行掘りする。本発明においては、このように先行掘りした下穴を「先行穴3」という。なお、この先行掘りを行う前に、地面に、後述する接続用構造体4の高さよりやや深い床掘10を掘削しておく。   [Step 1] First, as step 1, as shown in FIG. 1 (a), a pilot hole (preceding hole 3) is formed with the auger 2 for the main pipe attached to the tip of the auger speed reducer 12 of the excavated pillar car 1. Dig ahead. In the present invention, the pilot hole dug in advance is referred to as “preceding hole 3”. In addition, before performing this advance digging, the floor digging 10 a little deeper than the height of the connection structure 4 mentioned later is excavated on the ground.

[工程2] 次に、工程2として、図1(b)又は(c)に示すように、上記の先行穴3に親管体5を挿入し、回転工具(具体例として後述するオーガ6の他に鋼管用回転工具7a〜7cを用いる)の先端部を親管体5の結合具に嵌合することにより親管体5と回転工具とを一体化した状態で、回転工具を親管体5と共に回転しながら押圧し、親管体5を規定深度まで埋設した後、回転工具を抜く。これによって、図1(d)に示すように、地中に埋設された親管体5の上端部は床掘10の底面から上方に突出された状態にされる。   [Step 2] Next, as step 2, as shown in FIG. 1 (b) or (c), a main tube 5 is inserted into the preceding hole 3, and a rotary tool (auger 6 described later as a specific example) is inserted. In addition, the rotating tool is connected to the parent tube body in a state in which the parent tube body 5 and the rotating tool are integrated by fitting the tip of the steel tube rotating tool 7a to 7c) to the coupler of the parent tube body 5. 5, while rotating together with the main tube 5, the rotating tool is pulled out. As a result, as shown in FIG. 1 (d), the upper end portion of the main pipe body 5 buried in the ground is made to protrude upward from the bottom surface of the floor digging 10.

この工程2において、図2(a)〜(d)に示すように、回転工具としてオーガ6を使用する場合、図2(a)に示すように、穴堀建柱車のオーガ減速機12に後述する折曲げ式ジョイント13を取付け、オーガ6から分離した状態にし、図2(b)に示すように、ウインチ用フック14にループ状のワイヤ15を掛け、ワイヤ15でオーガ6の略重心位置を吊り下げた状態にして、オーガ6の先端から親管体5の内部に挿入する。このとき、地面に横設した親管体5の端部に枕木16等を敷設し、親管体5を浮かせた状態にしてやや傾斜させることにより、ワイヤ15で吊り下げたオーガ6を親管体5の内部に挿入し易くするとよい。次いで、図2(c)に示すように、親管体5の内部にオーガ6を後端付近まで挿入した後、ウインチ用フック14からワイヤ15を外し、折曲げ式ジョイント13をシャフト9の端部にボルト24aとナット24b(図3(b)参照)で結合し、オーガ6からシャフト9をスライドしてロックピン6aで固定し、図2(d)に示すように、オーガ6の先端が親管体5の先端付近に到達するまで挿入する。親管体5の先端付近の内部には内側の2箇所対向位置に嵌合ピン5a、5aが突出固定され、オーガ6のヘッドに設けられた嵌合ピン受け(不図示)を嵌合ピン5a、5aに嵌合することにより一体化した状態にする。   In this step 2, as shown in FIGS. 2 (a) to 2 (d), when an auger 6 is used as a rotary tool, as shown in FIG. A folding joint 13 to be described later is attached and separated from the auger 6, and a loop-shaped wire 15 is hung on the winch hook 14 as shown in FIG. Is inserted into the main tube 5 from the tip of the auger 6. At this time, a sleeper 16 or the like is laid on the end of the main tube 5 laid horizontally on the ground, and the auger 6 suspended by the wire 15 is slightly inclined with the main tube 5 in a floating state. It is preferable to facilitate the insertion into the body 5. Next, as shown in FIG. 2 (c), after the auger 6 is inserted into the main tube 5 to the vicinity of the rear end, the wire 15 is removed from the winch hook 14, and the folding joint 13 is connected to the end of the shaft 9. The bolts 24a and nuts 24b (see FIG. 3 (b)) are coupled to each other, and the shaft 9 is slid from the auger 6 and fixed with the lock pins 6a. As shown in FIG. Insert until it reaches the vicinity of the tip of the main tube 5. Fitting pins 5a and 5a are protruded and fixed inside the vicinity of the distal end of the main tube 5 at two inner positions, and a fitting pin receiver (not shown) provided on the head of the auger 6 is fitted to the fitting pin 5a. 5a to be integrated.

ここで、上記の折曲げ式ジョイント13について説明すると、図3(a)〜(c)に示すように、穴堀建柱車のオーガ減速機12に接続したジョイント48にボルト17aとナット17bで接続する上部シャフト18を有し、この上部シャフト18は折曲げ式ジョイント本体19に設けられた一対のアーム20、20の隙間20aに挿入されると共に、各アーム20には長溝19bが形成され、この長溝19bに上部シャフト18の端部付近に設けられたボルト孔18a(図3(a)参照)に挿通されたボルト22aを回動自在に挿通してナット22aで締結可能する構造とされている。また、折曲げ式ジョイント本体19は上部シャフト18に対して長溝19bの範囲内でスライド可能であり、ボルト22aを中心に回動自在とされている。また、上部シャフト18は折曲げ式ジョイント本体19の挿通穴21に挿入され、上部シャフト18の端部に設けられた丸孔18bに折曲げ式ジョイント本体19に設けられたロックピン23のピン23aが嵌合される構成とされている。さらに、折曲げ式ジョイント本体19の挿通穴21にはオーガのシャフト9の上端が挿通され、ボルト24aとナット24bで締結可能とされている。なお、折曲げ式ジョイント本体19のロックピン23の近傍に固設されているストッパ19aは、折曲げ式ジョイント本体19が回動した際にロックピン23が上部シャフト18に当らないようにするためのものである。   Here, the folding joint 13 will be described. As shown in FIGS. 3A to 3C, a bolt 48 a and a nut 17 b are attached to a joint 48 connected to the auger reduction gear 12 of the borehole column car. It has an upper shaft 18 to be connected, and this upper shaft 18 is inserted into a gap 20a between a pair of arms 20 and 20 provided in a foldable joint body 19, and a long groove 19b is formed in each arm 20, A bolt 22a inserted into a bolt hole 18a (see FIG. 3A) provided near the end of the upper shaft 18 is rotatably inserted into the long groove 19b and can be fastened with a nut 22a. Yes. The folding joint body 19 is slidable within the range of the long groove 19b with respect to the upper shaft 18, and is rotatable about the bolt 22a. The upper shaft 18 is inserted into the insertion hole 21 of the folding joint body 19, and the pin 23 a of the lock pin 23 provided in the folding joint body 19 is inserted into a round hole 18 b provided in the end of the upper shaft 18. Is configured to be fitted. Further, the upper end of the auger shaft 9 is inserted into the insertion hole 21 of the folding joint body 19 and can be fastened with bolts 24a and nuts 24b. The stopper 19a fixed in the vicinity of the lock pin 23 of the foldable joint body 19 prevents the lock pin 23 from hitting the upper shaft 18 when the foldable joint body 19 rotates. belongs to.

このような折曲げ式ジョイント13は、オーガのシャフト9の上端とオーガ減速機12との間に挿入して取り付けられ、上部シャフト18のボルト22aを中心に回動することによって折曲げ式ジョイント本体19を折曲げ式に回動可能としたものであり、図2(d)に示すように、オーガ減速機12の下部に取り付けられた上部シャフト18に対して略直角方向に折曲げ式ジョイント本体19を折曲げることによって該折曲げ式ジョイント本体19にオーガのシャフト9の上端をボルト24aとナット24bで締結可能にしたものである。   Such a foldable joint 13 is inserted and attached between the upper end of the auger shaft 9 and the auger reducer 12, and is turned around the bolt 22a of the upper shaft 18 so as to be foldable. 19 is made to be foldable, and as shown in FIG. 2 (d), the foldable joint body in a direction substantially perpendicular to the upper shaft 18 attached to the lower portion of the auger reducer 12. The upper end of the auger shaft 9 can be fastened to the foldable joint body 19 by bolts 24a and nuts 24b.

このような折曲げ式ジョイント13は、図1(b)に示すように親管体5を先行穴3上部に設置する際、親管体5が4m以上のときに、図2(d)に示すようにオーガ6を親管体5内部に挿入し、一体化するのを簡単に行うために有益となる。   As shown in FIG. 1B, such a foldable joint 13 is shown in FIG. 2D when the parent tube 5 is 4 m or longer when the parent tube 5 is installed above the leading hole 3. As shown, the auger 6 is usefully inserted into the parent tube 5 and integrated easily.

また、この工程においては、親管体5を埋設する際、図4(a)〜(d)に示す各種の鋼管用回転工具7a〜7cを使用することも可能である。なお、これらの鋼管用回転工具7a〜7cは、後述する子管体8の埋設時にも使用することができる。   Moreover, in this process, when embedding the parent pipe body 5, it is also possible to use various rotating tools for steel pipes 7a to 7c shown in FIGS. In addition, these rotary tools 7a-7c for steel pipes can be used also at the time of the embedding of the subtube body 8 mentioned later.

図4(a)に示す鋼管用回転工具7aは、後述する折曲げ式ジョイント13にボルト24aとナット24bで結合されるシャフト25の下端に管体外周嵌合型の鋼管用回転工具7aを結合したものである。この場合、親管体5(又は子管体8)の上端付近の複数個所(図4(a)は2箇所)に貫通穴26を形成すると共に、この貫通穴26に対応して、鋼管用回転工具の外周複数個所(図4(a)は2箇所)にロックピン27を固設するようにする。このロックピン27は、鋼管用回転工具7aの外周に固設した筒体27aの外端に把持部27bを有し、この把持部27bから内方へ突出したピン27cが設けられ、ピン27cは内蔵されたバネ27dによって内方へ付勢されている。そして、バネ27dの付勢力に抗して把持部27bを引くことにより、ピン27cを親管体5(又は子管体8)の貫通孔26から取り外し、把持部27bを離すことによってピン27cを親管体5(又は子管体8)の貫通孔26に挿通係止することによって、鋼管用回転工具7aと親管体5(又は子管体8)とを結合する。   The steel pipe rotary tool 7a shown in FIG. 4 (a) is connected with a pipe outer periphery fitting type steel pipe rotary tool 7a at the lower end of a shaft 25 which is connected to a bending joint 13 to be described later by bolts 24a and nuts 24b. It is a thing. In this case, through holes 26 are formed at a plurality of locations (two locations in FIG. 4 (a)) near the upper end of the parent tube 5 (or the child tube 8), and for the steel pipes corresponding to the through holes 26. Lock pins 27 are fixedly provided at a plurality of locations (two locations in FIG. 4A) on the outer periphery of the rotary tool. The lock pin 27 has a grip portion 27b at the outer end of a cylindrical body 27a fixed to the outer periphery of the steel pipe rotary tool 7a, and a pin 27c protruding inward from the grip portion 27b is provided. It is biased inward by a built-in spring 27d. Then, the pin 27c is removed from the through hole 26 of the parent tube 5 (or the child tube 8) by pulling the grip portion 27b against the biasing force of the spring 27d, and the pin 27c is released by releasing the grip portion 27b. The steel pipe rotary tool 7a and the parent tube body 5 (or the child tube body 8) are joined by being inserted and locked into the through hole 26 of the parent tube body 5 (or the child tube body 8).

また、図4(b)に示す鋼管用回転工具は、折曲げ式ジョイント13のシャフト25の下端に管体内周嵌合型の鋼管用回転工具7bを結合したものであり、親管体5(又は子管体8)の上端付近には複数個所(図4(b)は2箇所)に貫通穴26が形成され、この貫通穴26に対応して鋼管用回転工具7bの外周にも嵌合穴28が形成され、鋼管用回転工具7bの嵌合穴28と親管体5(又は子管体8)の貫通穴26とを一致させた状態でL字形の固定用ピン29を挿入することによって、鋼管用回転工具7bと親管体5(又は子管体8)とを結合する。   Further, the steel pipe rotary tool shown in FIG. 4 (b) is obtained by joining a pipe inner periphery fitting type steel pipe rotary tool 7b to the lower end of the shaft 25 of the folding joint 13, and the parent pipe 5 ( Alternatively, through holes 26 are formed at a plurality of locations (two locations in FIG. 4B) near the upper end of the child tube body 8), and are fitted to the outer periphery of the steel tube rotary tool 7b corresponding to the through holes 26. An L-shaped fixing pin 29 is inserted in a state in which the hole 28 is formed and the fitting hole 28 of the steel pipe rotary tool 7b is aligned with the through hole 26 of the parent pipe body 5 (or the child pipe body 8). Thus, the steel pipe rotary tool 7b and the parent pipe body 5 (or the child pipe body 8) are coupled.

さらに、図4(c)に示す鋼管用回転工具7cは、折曲げ式ジョイント13のシャフト25の下端に管体内周嵌合型の鋼管用回転工具7cを結合したものであり、親管体5(又は子管体8)の内方の複数個所(図4(b)は2箇所)に嵌合ピン30が固設され、この嵌合ピン30に対応して鋼管用回転工具7cの外周にはL字形の嵌合溝31が形成され、鋼管用回転工具7cの嵌合溝31を親管体5(又は子管体8)の嵌合ピン30に嵌合して微小幅だけ回転することによって係止され、これによって鋼管用回転工具7cと親管体5(又は子管体8)とを結合する。   Further, a steel pipe rotary tool 7c shown in FIG. 4C is obtained by connecting a tubular body circumferential fitting type steel pipe rotary tool 7c to the lower end of the shaft 25 of the folding joint 13, and the parent pipe 5 Fitting pins 30 are fixedly provided at a plurality of locations (or two locations in FIG. 4 (b)) of the inner tube body 8 (or the child tube body 8), and on the outer periphery of the steel pipe rotary tool 7c corresponding to the fitting pins 30. An L-shaped fitting groove 31 is formed, and the fitting groove 31 of the steel pipe rotary tool 7c is fitted to the fitting pin 30 of the parent pipe body 5 (or the child pipe body 8) to rotate by a minute width. Thus, the steel pipe rotary tool 7c and the parent pipe body 5 (or the child pipe body 8) are coupled.

[工程3] 次に、工程3として、図1(d)に示すように、上記の施工によって床掘10の底面から上方へ突出された親管体5の上端部に接続用構造体4の親管体用接続穴32(図5(a)参照)を嵌合させて固設する。   [Step 3] Next, as step 3, as shown in FIG. 1 (d), the connection structure 4 is formed on the upper end portion of the main tubular body 5 protruding upward from the bottom surface of the floor digging 10 by the above construction. The main tube connection hole 32 (see FIG. 5A) is fitted and fixed.

ここで、接続用構造体4について説明すると、図5(a)、(b)に示すように、左右に二つの円筒形状丸鋼管34、35を有し、これらの丸鋼管34、35は互いの軸方向を垂直平行に保ちながら所定距離をあけて上下に配された連結用プレート36、37によって結合されている。   Here, the connection structure 4 will be described. As shown in FIGS. 5 (a) and 5 (b), two cylindrical round steel pipes 34 and 35 are provided on the left and right, and these round steel pipes 34 and 35 are mutually connected. The plates are connected by connecting plates 36 and 37 arranged vertically with a predetermined distance while maintaining the axial direction of each of them vertically parallel.

一方の丸鋼管34(図5(a)又は(b)において左方)は親管体5を嵌合するために設けられたものであり、丸鋼管34の上端外周には接続用フランジ38の大径孔38aが嵌合状態で固設されると共に、接続用フランジ38の下部には丸鋼管34の周囲に45度の間隔をあけて8枚の三角形をなす補強用リブプレート39、39…が固設されている。さらに、接続用フランジ38には大径孔38aの周りであってリブプレート39、39…の上部に相当する位置にボルト孔41、41…が形成されると共に、夫々のボルト孔41に対応するリブプレート39の上部にはボルト頭部40aを収容した切欠き溝39aが形成され、夫々の切欠き溝39aにボルト頭部40aが係止された状態で8本のボルト40が上方を向けて立設されている。   One round steel pipe 34 (left side in FIG. 5 (a) or (b)) is provided for fitting the parent pipe body 5, and a round flange 34 has a connecting flange 38 on the outer periphery of the upper end thereof. The large-diameter hole 38a is fixed in a fitted state, and at the bottom of the connecting flange 38, reinforcing rib plates 39, 39, which form eight triangles at intervals of 45 degrees around the round steel pipe 34. Is fixed. Further, the connection flange 38 is formed with bolt holes 41, 41... Around the large diameter hole 38a and corresponding to the upper portions of the rib plates 39, 39. A notch groove 39a for accommodating the bolt head 40a is formed in the upper part of the rib plate 39, and the eight bolts 40 face upward while the bolt head 40a is locked in each notch groove 39a. It is erected.

さらに、互いに90度をなす関係を有する4枚のリブプレート39、39…にはナット42を収容した切欠き溝39bが形成され、夫々のナット42に対応する丸鋼管34の側部にはボルト孔43が形成されている。この丸鋼管34の内周は親管体用接続穴32とされ、その内周に上記のように地中に埋設された親管体5の上端を嵌合すると共に、親管体5の上端近傍の四方に形成されたボルト孔5cにボルト44を挿通し、各ボルト44を丸鋼管34のボルト孔43に挿通して、リブプレート39側のナット42に締結することにより、親管体5の上端に接続用構造体4が一体的に結合された状態となる。なお、上記の丸鋼管と親管体5とは、ボルト締結の他に、接着剤、固定材、早強セメント等によって固設するようにしてもよい。   Further, the four rib plates 39, 39... Having a relationship of 90 degrees with each other are formed with notched grooves 39b accommodating the nuts 42, and bolts are formed on the side portions of the round steel pipes 34 corresponding to the respective nuts 42. A hole 43 is formed. The inner circumference of the round steel pipe 34 is a connection hole 32 for the main pipe body, and the upper end of the main pipe body 5 buried in the ground as described above is fitted to the inner circumference thereof, and the upper end of the main pipe body 5 is fitted. Bolts 44 are inserted into the bolt holes 5c formed on the four sides in the vicinity, the respective bolts 44 are inserted into the bolt holes 43 of the round steel pipe 34, and fastened to the nuts 42 on the rib plate 39 side. The connection structure 4 is integrally coupled to the upper end of each. In addition, you may make it fix said round steel pipe and the main pipe body 5 with an adhesive agent, a fixing material, a high-strength cement other than bolt fastening.

なお、接続用プレート38の上部には上部柱45が立設され、図6に示すように、上部柱45の下端部に固設されたフランジ46の各ボルト孔46aに接続用プレート38に立設された8本のボルト40が挿通され、夫々ナット47で締結されることによって、接続用プレート38の上部に上部柱45が固定されることとなる。   An upper column 45 is erected on the upper part of the connection plate 38. As shown in FIG. 6, the upper column 45 is erected on the connection plate 38 in each bolt hole 46a of the flange 46 fixed to the lower end of the upper column 45. The eight bolts 40 provided are inserted and fastened by the nuts 47, whereby the upper column 45 is fixed to the upper part of the connection plate 38.

また、大型標識柱や多目的柱の張出し柱方向と接続用構造体4の長手方向との角度は、4方向のボルトによる固定の場合は、90度毎に回転可能な位置に取り付けることが可能となる。   In addition, the angle between the extending column direction of the large marker column or the multipurpose column and the longitudinal direction of the connecting structure 4 can be attached at a position where it can be rotated every 90 degrees in the case of fixing with bolts in four directions. Become.

一方、他方の丸鋼管35(図5(a)又は(b)において右方)は子管体8を嵌合するために設けられたものであり、子管体8はこの丸鋼管35の内周を子管体用接続穴33とし、該丸鋼管35の内周との間に隙間35aをあけて挿通される。従って、図5(a)に示すように、子管体8の子管体用接続穴33内に子管体8を挿通し埋設した後、子管体8の外周と子管体用接続穴33の内周との間に固定材や早強セメント等の充填材49を充填することによって固設することができる。   On the other hand, the other round steel pipe 35 (to the right in FIG. 5A or 5B) is provided for fitting the child pipe body 8, and the child pipe body 8 is included in the round steel pipe 35. The circumference is set as a connection hole 33 for a child tube body, and a gap 35 a is opened between the round pipe 35 and the inner circumference thereof. Therefore, as shown in FIG. 5 (a), after the child tube body 8 is inserted and embedded in the child tube body connection hole 33 of the child tube body 8, the outer periphery of the child tube body 8 and the child tube body connection hole are inserted. It can be fixed by filling a filler 49 such as a fixing material or early-strength cement between the inner periphery of 33.

[工程4] 次いで、工程4として、図1(e)に示すように、接続用構造体4の子管体用接続穴に子管体8を挿入し、回転工具の先端部を子管体8の結合具に嵌合することにより子管体8と回転工具とを一体化した状態で、回転工具を子管体8と共に回転しながら押圧することによって子管体8を規定深度まで埋設した後、回転工具を抜く。   [Step 4] Next, as step 4, as shown in FIG. 1 (e), the child tube 8 is inserted into the connection hole for the child tube of the connection structure 4, and the tip of the rotary tool is inserted into the child tube. In a state where the sub tube 8 and the rotary tool are integrated with each other by fitting with the coupler 8, the sub tube 8 is buried to a specified depth by pressing the rotary tool while rotating with the sub tube 8. Then, remove the rotating tool.

この工程4において、子管体8の埋設用穴を先行掘りする場合、次の二つの施工例を掲げることができる。一つは、上記のように親管体5の上端に接続用構造体4の親管体用接続穴32を嵌合させて固設した後、接続用構造体4の子管体用接続穴33に子管体用オーガを挿入して下穴を先行掘りし、該オーガを子管体8内部に挿入して先行穴3の上部に子管体8を設置する。次いで、子管体用オーガの先端を子管体8の下端の結合具に嵌合することにより、子管体8と子管体用オーガとを一体化し、子管体8を押圧しながら回転することにより、子管体8を規定深度まで埋設し、該オーガを抜く施工法である。   In this step 4, when the burial hole of the child tube body 8 is dug in advance, the following two construction examples can be listed. One is to connect the main tube body connection hole 32 of the connection structure 4 to the upper end of the main tube body 5 as described above, and then fix the connection to the child tube body connection hole of the connection structure 4. An auger for child tube body is inserted into 33 to dig a pilot hole in advance, and the auger is inserted into the child tube body 8 so that the child tube body 8 is installed above the preceding hole 3. Next, the distal end of the child tube body auger is fitted to the coupler at the lower end of the child tube body 8 so that the child tube body 8 and the child tube body auger are integrated and rotated while pressing the child tube body 8. This is a construction method in which the child tube 8 is buried to a specified depth and the auger is pulled out.

他の一つは、上記のように親管体5を施工した後、子管体用オーガで下穴を先行掘りしてから、親管体5上端に接続用構造体4の親管体用接続穴32を嵌合させて固設した後、接続用構造体4の子管体用接続穴33に子管体用オーガを挿入し、該オーガを子管体8の内部に挿入して先行穴3の上部に子管体8を設置する。次いで、子管体用オーガの先端を子管体8下端の結合具に嵌合することにより、子管体8と該オーガとを一体化し、子管体8を押圧しながら回転することによって子管体8を規定深度まで埋設し、該オーガを抜く施工法である。   The other is that after the main tube 5 is constructed as described above, a pilot hole is dug in advance with the sub tube auger, and then the connection tube 4 is connected to the upper end of the main tube 5. After the connection hole 32 is fitted and fixed, the child tube body auger is inserted into the child tube body connection hole 33 of the connection structure 4, and the auger is inserted into the child tube body 8 to advance. A child tube body 8 is installed above the hole 3. Next, the child tube body 8 and the auger are integrated by fitting the distal end of the child tube body auger to the joint at the lower end of the child tube body 8, and the child tube body 8 is rotated while pressing the child tube body 8. In this construction method, the tubular body 8 is buried to a specified depth and the auger is pulled out.

[工程5] 最後に、工程5として、図1(f)に示すように、子管体8の上端に接続用構造体4の子管体用接続穴33を挿通して固設する。この場合、図5(a)を用いて上記でも説明したように、接続用構造体4の子管用接続穴33と子管体8との隙間に早強セメント等の充填材49を詰めて固設する。   [Step 5] Finally, as step 5, as shown in FIG. 1 (f), the child tube body connection hole 33 of the connection structure 4 is inserted into and fixed to the upper end of the child tube body 8. In this case, as described above with reference to FIG. 5A, a filler 49 such as early-strength cement is packed in the gap between the child tube connection hole 33 and the child tube body 8 of the connection structure 4 and fixed. Set up.

この実施例は、折曲げ式ジョイント13を使用して、子管体8を埋設する方法に関するものであり、親管体5の埋設後、先に子管体8の先行掘りを親管体用オーガで実施する方法となる。この場合、折曲げ式ジョイント13から親管体用オーガ2を取り外し、接続用構造体4を穴堀建柱車1のウインチで吊って、親管体5の上端に接続用構造体4の親管体用接続穴33を嵌合させて固設する。次に、図4(a)〜(c)に示す鋼管用回転工具7a〜7c等を折り曲げ式ジョイント13に連結し、子管体8頭部に鋼管用回転工具を嵌合し、先行穴3の上部に子管体8を配設して上記の鋼管用回転工具で回転し、挿入する。なお、軟い地盤では子管体の先行掘りは不要である。   This embodiment relates to a method of burying the child tubular body 8 using the folding joint 13, and after the parent tubular body 5 is buried, the preceding digging of the child tubular body 8 is first performed for the parent tubular body. It becomes a method to be carried out in the auger. In this case, the main tube auger 2 is removed from the foldable joint 13, the connection structure 4 is hung by the winch of the borehole column 1, and the parent of the connection structure 4 is attached to the upper end of the main tube 5. The tube connection hole 33 is fitted and fixed. Next, the steel pipe rotary tools 7a to 7c and the like shown in FIGS. 4 (a) to 4 (c) are connected to the bendable joint 13, and the steel pipe rotary tool is fitted to the head of the child tube body 8 so that the leading hole 3 The child tube body 8 is disposed on the upper portion of the steel tube, and is rotated and inserted by the above-described steel pipe rotating tool. In soft ground, it is not necessary to dig a tube.

また、折曲げ式ジョイント13を使用しない施工例として、上記の親管体5の先行掘りの次工程において、親管体用オーガ2をブームの格納装置に格納し、ウインチで親管体5を吊り上げ、先行穴3の上部に親管体5を設置して、穴掘建柱車1のブーム先端で押し込み、親管体5が傾かないように安定させる。次に、親管体用オーガ2を格納装置から外し、親管体5内部に挿入して、親管体5の結合具に嵌合し、回転挿入する方法である。   Further, as an example of construction not using the folding joint 13, in the next step of the preceding digging of the main pipe body 5, the main pipe auger 2 is stored in a boom storage device, and the main pipe body 5 is attached by a winch. The main pipe body 5 is installed at the upper part of the leading hole 3 and pushed in at the tip of the boom of the digging column 1 to stabilize the main pipe body 5 so that it does not tilt. Next, the main tube auger 2 is removed from the storage device, inserted into the main tube 5, fitted to the coupler of the parent tube 5, and rotated.

さらに、折り曲げ式ジョイント13と回転工具を使用する場合の施工例として、親管体5及び子管体8共に管体の頭部に上記の鋼管用回転工具7a〜7cを嵌合して、管体を回転挿入する。または、鋼管用回転工具7a〜7cを任意の位置に取り付けた結合具に嵌合して、管体を回転挿入するようにしてもよい。   Furthermore, as an example of construction when using the folding joint 13 and the rotary tool, the steel pipe rotary tools 7a to 7c are fitted to the heads of both the main pipe body 5 and the sub pipe body 8, and the pipe Rotate and insert body. Alternatively, the tubular body may be rotated and inserted by fitting the rotating tools for steel pipes 7a to 7c to a coupler attached at an arbitrary position.

本発明の回転防止機能を有する鋼管製基礎構造の施工方法は、大型標識柱や多目的柱等を支持するのに用いる基礎構造であって、支柱に取り付けた大型標識等が強大な風圧荷重等を受けた際にも基礎構造が回転しない構造とし、その施工に建柱車を利用し得る構造とすることによって振動や騒音の問題を解消するようにした鋼管製基礎構造の施工方法として利用可能である。   The construction method of the steel pipe foundation structure having the anti-rotation function according to the present invention is a foundation structure used to support a large marker column, a multipurpose column, etc., and the large marker attached to the column is subjected to a strong wind pressure load, etc. It can be used as a construction method for a steel pipe foundation structure that eliminates the problems of vibration and noise by making it so that the foundation structure does not rotate when it is received, and the construction can be used for construction work. is there.

(a)〜(f)は、本発明に係る施工工程を示す図である。(A)-(f) is a figure which shows the construction process which concerns on this invention. (a)〜(d)は、本発明に係る施工工程を示す図であり、親管体にオーガを挿入する際の施工例を示す。(A)-(d) is a figure which shows the construction process which concerns on this invention, and shows the construction example at the time of inserting an auger in a parent pipe body. (a)〜(c)は、本発明に係る施工方法に用いる折曲げ式ジョイントを示す側面図である。(A)-(c) is a side view which shows the bending type joint used for the construction method which concerns on this invention. (a)〜(c)は、本発明に係る施工方法に用いる鋼管用回転工具の各種態様を示す側面図であり、(d)は部分側面図である。(A)-(c) is a side view which shows the various aspects of the rotary tool for steel pipes used for the construction method which concerns on this invention, (d) is a partial side view. (a)は本発明に係る施工方法に用いる接続用構造体を示す上面図であり、(b)は側面図である。(A) is a top view which shows the structure for a connection used for the construction method which concerns on this invention, (b) is a side view. (a)は本発明に係る施工方法による基礎構造に大型表示板用の上部支柱を固設した側面図であり、 (b)は異方向から見た側面図である。(A) is the side view which fixedly installed the upper support | pillar for large sized display boards to the foundation structure by the construction method which concerns on this invention, (b) is the side view seen from the different direction.

符号の説明Explanation of symbols

1 穴掘建柱車
2 親管体用オーガ
3 先行穴
4 接続用構造体
5 親管体
6 オーガ
6a ロックピン6a
7a〜7c 鋼管用回転工具
8 子管体
9 シャフト
10 床掘
11 ウインチ
12 オーガ減速機
13 折曲げ式ジョイント
14 ウインチ用フック
15 ワイヤ
16 枕木
17a ボルト
17b ナット
18 上部シャフト
18a ボルト孔
18b 丸孔
19 折曲げ式ジョイント本体
19a ストッパ
19b 長溝
20 アーム
20a 隙間
21 挿通穴
22a ボルト
22b ナット
23 ロックピン
23a ピン
24a ボルト
24b ナット
25 シャフト
26 貫通穴
27 ロックピン
27a 筒体
27b 把持部
27c ピン
27d バネ
28 嵌合穴
29 固定用ピン
30 嵌合ピン
31 嵌合溝
32 親管体用接続穴
33 子管体用接続穴
34、35 円筒形状丸鋼管
36、37 連結用プレート
38 接続用フランジ
38a 大径孔
39 リブプレート
39a 切欠き溝
40 ボルト
40a ボルト頭部
41 ボルト孔
42 ナット
43 ボルト孔
44 ボルト
45 上部柱
45a リブプレート
46 フランジ
46a ボルト孔
47 ナット
48 ジョイント
49 充填材
DESCRIPTION OF SYMBOLS 1 Hole digging pillar 2 Auger for main pipe body 3 Leading hole 4 Structure for connection 5 Main pipe body 6 Auger 6a Lock pin 6a
7a to 7c Steel pipe rotary tool 8 Child tube body 9 Shaft 10 Floor excavation 11 Winch 12 Auger reduction gear 13 Folding joint 14 Winch hook 15 Wire 16 Sleeper 17a Bolt 17b Nut 18 Upper shaft 18a Bolt hole 18b Round hole 19 Fold Bending joint main body 19a Stopper 19b Long groove 20 Arm 20a Clearance 21 Insertion hole 22a Bolt 22b Nut 23 Lock pin 23a Pin 24a Bolt 24b Nut 25 Shaft 26 Through hole 27 Lock pin 27a Cylindrical body 27b Holding part 27c Pin 27d Spring 28 Fitting hole 29 Fixing Pin 30 Fitting Pin 31 Fitting Groove 32 Parent Pipe Connection Hole 33 Child Tube Connection Holes 34, 35 Cylindrical Round Steel Pipes 36, 37 Connection Plate 38 Connection Flange 38a Large Diameter Hole 39 Rib Plate 39a Notch groove 40 Bolt 4 a bolt head 41 bolt hole 42 nut 43 bolt hole 44 bolt 45 upper pillar 45a rib plate 46 flange 46a bolt hole 47 nut 48 joint 49 filler

Claims (3)

穴掘建柱車に取り付けた親管体用オーガで下穴を先行掘りする工程と、
回転工具を親管体の内部に挿入して先行穴上部に親管体を設置し、該回転工具を親管体の結合具に嵌合することにより親管体と回転工具とを一体化した状態で、回転工具を親管体と共に回転しながら押圧することによって親管体を規定深度まで埋設した後、回転工具を抜く工程と、
親管体の上端に接続構造体の親管体用接続穴を嵌合させて固設する工程と、
接続構造体の子管体用接続穴に子管体を挿入し、回転工具を子管体の結合具に嵌合することにより子管体と回転工具とを一体化した状態で、回転工具を子管体と共に回転しながら押圧することによって子管体を規定深度まで埋設した後、回転工具を抜く工程と、
子管体上端と接続構造体とを固設する工程とによる一連の工程により、
風荷重に対する基礎構造の回転を防止するようにしたことを特徴とする鋼管製基礎構造の施工方法。
A process of digging a pilot hole in advance with an auger for a main pipe attached to a drilling pillar,
The rotating tool is inserted into the parent tube, the parent tube is installed at the top of the preceding hole, and the rotating tool is fitted to the coupler of the parent tube to integrate the parent tube and the rotating tool. In the state, after burying the parent tube to a specified depth by pressing the rotating tool together with the parent tube, the step of removing the rotating tool;
A step of fitting and fixing a connection hole for a parent tube of the connection structure to the upper end of the parent tube;
Insert the child tube body into the connection hole for the child tube body of the connection structure, and fit the rotating tool to the connector of the child tube body to integrate the child tube body and the rotary tool. After burying the child tube body to a specified depth by pressing while rotating with the child tube body, removing the rotary tool;
By a series of processes by the process of fixing the upper end of the child tube body and the connection structure,
A construction method of a steel pipe foundation structure characterized by preventing the foundation structure from rotating against wind loads.
接続構造体は親管体用接続穴と子管体用接続穴とからなる2つの円筒形状の接続穴を有し、且つ親管体用接続穴の上部に上部柱を接続するための接続用フランジを有してなる一体構造であることを特徴とする請求項1記載の鋼管製基礎構造の施工方法。 The connection structure has two cylindrical connection holes composed of a connection hole for a main tube and a connection hole for a child tube, and for connecting an upper column to the upper part of the connection hole for the main tube 2. The construction method for a steel pipe foundation structure according to claim 1, wherein the construction method is a monolithic structure having a flange. 穴掘建柱車に備えたオーガ減速機と回転工具のシャフトの上端との間に、折曲げ式ジョイントを挿着した構造であることを特徴とする請求項1又は2記載の鋼管製基礎構造の施工方法。
3. A steel pipe foundation structure according to claim 1 or 2, wherein a folding joint is inserted between the auger reduction gear provided in the digging column car and the upper end of the shaft of the rotary tool. Construction method.
JP2007147627A 2007-06-04 2007-06-04 Construction method of foundation structure made of steel pipe Pending JP2008297856A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007147627A JP2008297856A (en) 2007-06-04 2007-06-04 Construction method of foundation structure made of steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007147627A JP2008297856A (en) 2007-06-04 2007-06-04 Construction method of foundation structure made of steel pipe

Publications (1)

Publication Number Publication Date
JP2008297856A true JP2008297856A (en) 2008-12-11

Family

ID=40171615

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007147627A Pending JP2008297856A (en) 2007-06-04 2007-06-04 Construction method of foundation structure made of steel pipe

Country Status (1)

Country Link
JP (1) JP2008297856A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3084380A1 (en) * 2018-07-30 2020-01-31 Saipem S.A. METHOD FOR INSTALLING A TUBULAR METAL PILE IN A ROCKY SOIL

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3084380A1 (en) * 2018-07-30 2020-01-31 Saipem S.A. METHOD FOR INSTALLING A TUBULAR METAL PILE IN A ROCKY SOIL
WO2020025864A1 (en) * 2018-07-30 2020-02-06 Saipem S.A. Method for installing a tubular metal pile in rocky soil
US11603639B2 (en) 2018-07-30 2023-03-14 Saipem S.A. Method for installing a tubular metal pile in rocky soil

Similar Documents

Publication Publication Date Title
JP2009002082A (en) Excavator for foundation pile
JP2003184078A (en) Cast-in-place concrete pile and its construction method
CN201695949U (en) Casing driver and rotary drilling rig
JP2013079516A (en) Frame base
JP6234626B1 (en) Excavation apparatus and excavation method used for burying underground heat exchange pipe
JP4442443B2 (en) Construction method of ready-made piles
JP3150680U (en) Auger drive
JP2009046832A (en) Pile device for foundation, vertical connecting means for use in it, and method for driving and installing foundation pile
JP2008297856A (en) Construction method of foundation structure made of steel pipe
JP3219554U (en) Pile driving device
JP2011163009A (en) Subsidence prevention structure of foundation steel pipe
JP6513470B2 (en) Foundation pile for installation, foundation pile for installation of solar panels, installation method of foundation pile and installation method of foundation pile for solar panels
JP2007031970A (en) Joining structure of underground steel column structure to pile, burying pipe body and these construction method
JPH11200363A (en) Cast-in-place pile, building method therefor, and steel pipe member with blade used therefor
JP2012112189A (en) Connector and rainwater permeation pit excavation device using the same
JP3839461B1 (en) Steel pipe pole foundation and its foundation method
KR100994374B1 (en) Apparatus for driving pile by rotation and method thereof
JP3827710B1 (en) Construction method of ready-made piles and anchors
JP2009074309A (en) Vertical shaft and its construction method
JP2008174981A (en) Column building-up device and column building-up method
JP2007107276A (en) Repair reinforcement method of existing quaywall and its repair reinforcement structure
JP2013002047A (en) Steel pipe concrete composite pile
JP2009091797A (en) Method of constructing steel pipe single pile by diagonal installation
JP2008202268A (en) Construction method of soil-cement continuous wall, and soil-cement continuous wall
JP2008057229A (en) Enlarged-diameter pipe with end blade and steel pipe pile equipped therewith having end blade