JP2008158559A JP2006343111A JP2006343111A JP2008158559A JP 2008158559 A JP2008158559 A JP 2008158559A JP 2006343111 A JP2006343111 A JP 2006343111A JP 2006343111 A JP2006343111 A JP 2006343111A JP 2008158559 A JP2008158559 A JP 2008158559A
Authority
JP
Japan
Prior art keywords
construction
data
symbol
construction data
contractor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006343111A
Other languages
Japanese (ja)
Inventor
Hidekazu Nanba
秀和 難波
Koyo Hisayasu
弘容 久安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006343111A priority Critical patent/JP2008158559A/en
Publication of JP2008158559A publication Critical patent/JP2008158559A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To efficiently distribute construction data large in the number of items. <P>SOLUTION: On a construction data distribution screen, a builder tab T to which a builder designation is attached and map data where a symbol S set so as to be shaped according to a display color corresponding to the emergency or state of construction and builder conditions is positioned are displayed. When the symbol S is dragged and dropped to the builder tab T by an operator, the construction data corresponding to the symbol S are associated with the builder data corresponding to the builder tab T, and stored in an HDD so that the construction data can be distributed to the builder. Also, when the symbol S is dragged and dropped to the builder tag T which is not pertinent to the builder conditions of the construction data, an error message showing that the data are not distributable is displayed. Furthermore, a display section 114 is selected so that the symbol S to be displayed on the map data can be changed and restricted. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、工事データを施工者に振分けるための工事データ振分け装置に関する。   The present invention relates to a construction data distribution device for distributing construction data to a contractor.

電力会社が受け付けた工事のうち、顧客訪問が必要な工事に関しては、実際に工事を行う施工者に工事を振分ける。この場合、郵便番号などの地理的要素や工事内容を考慮して行うことによって、施工者間における作業量の平準化を図っている。また、委託施工する工事に関しては、工事の内容や場所だけでなく、施工者が顧客宅を訪問するのにかかる時間も考慮して振分けを行っている。この振分け作業は、PC(Personal Computer)などの操作画面上に工事データを表示し、1件ごとに工事データの内容をチェックしながら、進められる。
特開2002−24341号公報
Of the work accepted by the electric power company, for work that requires customer visits, the work is allocated to the installer who actually performs the work. In this case, the amount of work among the builders is equalized by taking into account geographical elements such as a zip code and construction contents. In addition, regarding the work to be commissioned, the distribution is performed in consideration of not only the content and location of the work but also the time it takes for the builder to visit the customer's home. This distribution work is performed while displaying construction data on an operation screen of a PC (Personal Computer) or the like and checking the contents of the construction data for each case.
JP 2002-24341 A

しかしながら、多くの件数が発生する工事データのすべてを1つの操作画面に表示することができない。このため、郵便番号単位に一旦施工者に工事を振分けておき、その後各工事内容を確認しながら、最終的に振分ける工事データを補正するといった操作を行っている。この場合、操作に手間がかかり、特に、その地域の地理に不案内な操作者は、地名を地図帳で確認しながら工事データを振分ける必要がある。   However, it is not possible to display all the construction data for which a large number of cases are generated on one operation screen. For this reason, an operation is performed in which work is once assigned to the builder in units of zip codes, and then the work data to be finally assigned is corrected while checking the contents of each work. In this case, the operation is troublesome. In particular, an operator who is unfamiliar with the geography of the area needs to sort the construction data while checking the place name on the map book.

なお、特許文献1には、作業車両の稼働状況と稼働場所を地図画面上に精度よく表示することで作業車両の稼働管理を迅速容易に行うことができる車両稼働管理システムが開示されているが、工事データの振分けを効率よく行うことについては開示されていない。   Patent Document 1 discloses a vehicle operation management system that can quickly and easily perform operation management of a work vehicle by accurately displaying the operation status and operation location of the work vehicle on a map screen. However, there is no disclosure about efficient distribution of construction data.

本発明は、上記課題を鑑みてなされたものであり、その主たる目的は、件数の多い工事データの振分けを効率よく行うことにある。   The present invention has been made in view of the above problems, and a main object thereof is to efficiently distribute construction data having a large number of cases.

上記課題を解決するために、本発明は、工事データ振分け装置であって、地図データと、工事の緊急度及び位置情報を含む工事データと、施工者名称を含む施工者データと、前記工事の緊急度と、前記工事データに対応するシンボルの形態との対応関係を含むシンボル形態データとを記憶する記憶手段と、前記工事データ及び前記シンボル形態データに基づいて、前記シンボルに前記工事の緊急度に応じた形態を設定し、当該シンボルを前記地図データ上の前記位置情報に該当する位置に位置付ける地図データ編集手段と、前記施工者データに含まれる施工者名称が付された施工者名表示領域及び前記シンボルが位置付けられた地図データを表示する地図表示領域を含む画面を表示する表示手段と、前記画面上で前記シンボルと前記施工者名表示領域とを関係付ける操作が行われると、当該シンボルに対応する前記工事データと、当該施工者名称を含む前記施工者データとを対応付けて、前記記憶手段に記憶する工事データ振分け手段とを備えることを特徴とする。   In order to solve the above-mentioned problems, the present invention is a construction data distribution device, comprising map data, construction data including construction urgency and location information, construction data including a construction name, and the construction data. Storage means for storing urgency and symbol form data including a correspondence relationship between symbol forms corresponding to the construction data, and the urgency of the construction on the symbol based on the construction data and the symbol form data A map data editing means for setting the form according to the map and positioning the symbol at a position corresponding to the position information on the map data, and a contractor name display area to which a contractor name included in the contractor data is attached And display means for displaying a screen including a map display area for displaying the map data where the symbol is positioned, and the symbol and the name of the installer on the screen When an operation relating the display area is performed, the construction data corresponding to the symbol and the construction data sorting means stored in the storage means in association with the construction data including the construction worker name It is characterized by providing.

この構成によれば、工事の緊急度に応じた形態のシンボルが地図上に位置付けられて表示されるので、各工事の緊急度及び位置が視覚的に把握でき、工事の振分けに関する検討作業が容易になる。そして、その工事のシンボルと施工者名表示領域とを関係付ける操作を行うことで、簡便に工事の振分けができる。   According to this configuration, symbols in the form corresponding to the urgency level of the work are positioned and displayed on the map, so the urgency level and position of each work can be visually grasped, and the work related to the assignment of the work can be easily studied. become. Then, by performing an operation for associating the symbol of the construction with the construction name display area, the construction can be easily distributed.

また、本発明は、工事データ振分け装置であって、前記工事データが、工事を振分けるべき施工者の条件である施工者条件をさらに含み、前記シンボル形態データが、前記施工者条件と、前記シンボルの形態との対応関係をさらに含み、前記地図データ編集手段が、前記シンボル形態データに基づいて、前記シンボルに前記施工者条件に応じた形態をさらに設定し、前記工事データ振分け手段が、前記画面上で前記シンボルと前記施工者条件に該当しない前記施工者名表示領域とを関係付ける操作が行われると、当該工事データの振分けはできない旨のメッセージを前記表示手段に表示することを特徴とする。   Further, the present invention is a construction data distribution device, wherein the construction data further includes a contractor condition that is a condition of a contractor to distribute the work, and the symbol form data includes the contractor condition, The map data editing means further includes a form corresponding to the contractor condition based on the symbol form data, and the construction data distribution means further includes a correspondence relationship with a symbol form. When an operation relating the symbol and the contractor name display area not corresponding to the contractor condition is performed on the screen, a message indicating that the construction data cannot be distributed is displayed on the display means. To do.

この構成によれば、工事の施工者条件に応じた形態のシンボルが表示されるので、工事の施工者条件を視覚的に把握できる。また、誤って工事のシンボルと施工者条件に該当しない施工者名表示領域とを関係付ける操作を行っても、振分け不可のメッセージが表示されるというガードがかかるので、オペレータは安心して工事データの振分け作業ができる。   According to this structure, since the symbol of the form according to the construction contractor condition of a construction is displayed, the construction contractor condition of a construction can be grasped visually. In addition, even if an operation relating the construction symbol and the construction name display area that does not correspond to the construction conditions is mistakenly performed, a guard that a message indicating that the distribution cannot be performed will be displayed, so that the operator can safely transfer the construction data. Sorting work is possible.

また、本発明は、工事データ振分け装置であって、前記シンボルを表示すべき工事データの前記緊急度又は前記施工者条件を含む表示条件を取得する表示条件取得手段を備え、前記地図データ編集手段が、取得した前記表示条件に該当する工事データに対応するシンボルを前記地図データ上に位置付けることを特徴とする。   Further, the present invention is a construction data distribution device, comprising: display condition acquisition means for acquiring display conditions including the urgency level of the construction data for which the symbol is to be displayed or the builder conditions; and the map data editing means However, the symbol corresponding to the construction data corresponding to the acquired display condition is positioned on the map data.

この構成によれば、表示すべき緊急度又は施工者条件に該当する工事のシンボルを表示するので、所望の工事だけを視覚的に確認することができる。また、表示された複数のシンボルを選択することで、当該工事データの振分けをまとめて行うことができる。   According to this structure, since the symbol of the construction corresponding to the urgency to be displayed or the contractor condition is displayed, only the desired construction can be visually confirmed. Further, by selecting a plurality of displayed symbols, the construction data can be distributed collectively.

また、本発明は、工事データ振分け装置であって、前記画面上で前記シンボルと前記施工者名表示領域とを関係付ける操作が、ドラッグ&ドロップによって行われることを特徴とする。   Further, the present invention is a construction data distribution device, wherein the operation of associating the symbol and the builder name display area on the screen is performed by drag and drop.

その他、本願が開示する課題及びその解決方法は、発明を実施するための最良の形態の欄、及び図面により明らかにされる。   In addition, the problems disclosed in the present application and the solutions thereof will be clarified by the column of the best mode for carrying out the invention and the drawings.

本発明によれば、件数の多い工事データの振分けを効率よく行うことができる。   According to the present invention, it is possible to efficiently distribute construction data having a large number of cases.

以下、図面を参照しながら、本発明を実施するための最良の形態を説明する。本発明の実施の形態に係る工事データ振分け装置は、工事データを随時取得し、蓄積しながら、ある時点までに蓄積した工事データを施工者に振分けるための装置である。本装置によれば、GUI(Graphical User Interface)を用いて簡単に操作を行うことができるので、工事データの振分けを効率よく行うことができる。   Hereinafter, the best mode for carrying out the present invention will be described with reference to the drawings. The construction data distribution apparatus according to the embodiment of the present invention is an apparatus for distributing construction data accumulated up to a certain point to a contractor while acquiring and storing construction data as needed. According to this apparatus, since operation can be easily performed using a GUI (Graphical User Interface), construction data can be efficiently distributed.

≪装置の構成と概要≫
図1は、工事データ振分け装置の構成を示す図である。工事データ振分け装置1は、ディスプレイ2、マウス3、キーボード4、画像メモリ5、処理部6及びHDD(Hard Disk Drive)7が、バス8を介して相互に通信可能に接続されて構成されている。工事データ振分け装置1は、例えば、PCやサーバなどのコンピュータによって実現される。
≪Device configuration and overview≫
FIG. 1 is a diagram illustrating a configuration of a construction data distribution device. The construction data distribution apparatus 1 includes a display 2, a mouse 3, a keyboard 4, an image memory 5, a processing unit 6, and an HDD (Hard Disk Drive) 7 that are communicably connected to each other via a bus 8. . The construction data distribution apparatus 1 is realized by a computer such as a PC or a server, for example.

ディスプレイ(表示手段)2は、工事データ振分け画面を表示するものであり、LCD(Liquid Crystal Display:液晶ディスプレイ)などによって実現される。マウス3は、ディスプレイ2に表示された工事データ振分け画面を操作するためのものであり、例えば、オペレータは、マウス3を用いて工事を示すシンボルを施工者のタブにドラッグ&ドロップする。キーボード4は、工事データ振分け画面にデータを入力するためのものであり、例えば、オペレータは、キーボード4を用いて取扱店や作業予定日を入力する。   The display (display means) 2 displays a construction data distribution screen and is realized by an LCD (Liquid Crystal Display) or the like. The mouse 3 is used to operate a construction data distribution screen displayed on the display 2. For example, the operator drags and drops a symbol indicating construction on the builder's tab using the mouse 3. The keyboard 4 is used to input data to the construction data distribution screen. For example, the operator uses the keyboard 4 to input a dealer or scheduled work date.

画像メモリ5は、ディスプレイ2が表示する画面のデータの一部又は全部を保持するメモリであり、例えば、工事のシンボルが位置付けられた地図データを格納し、必要に応じてディスプレイ2に提供する。処理部6は、工事データ振分け装置1全体の制御を行うものであり、CPU(Central Processing Unit)が所定のメモリに格納されたプログラムを実行することによって実現される。HDD(記憶手段)7は、処理部6からの指示によりデータを記憶したり、記憶したデータを読み出したりする不揮発性記憶装置である。なお、必ずしもHDDでなくてもよく、フラッシュメモリなどに置き換えてもよい。   The image memory 5 is a memory that holds part or all of the screen data displayed on the display 2. For example, the image memory 5 stores map data in which a construction symbol is positioned, and provides it to the display 2 as necessary. The processing unit 6 controls the entire construction data distribution apparatus 1 and is realized by a CPU (Central Processing Unit) executing a program stored in a predetermined memory. The HDD (storage means) 7 is a non-volatile storage device that stores data according to an instruction from the processing unit 6 and reads the stored data. It is not always necessary to use an HDD, and it may be replaced with a flash memory or the like.

図2は、処理部6の構成を示す図である。処理部6は、全体制御手段61、工事データ設定手段62、地図データ編集手段63、工事データ振分け手段64及び表示条件取得手段65を備える。全体制御手段61は、発生したイベント(例えば、工事データ振分け画面の起動やマウス3によるドラッグ&ドロップなど)に応じて、処理部6内の他の各手段を起動することによって、処理部6全体の処理の流れを制御する。また、ディスプレイ2、マウス3、キーボード4、画像メモリ5及びHDD7と、処理部32内の他の各手段との間のインタフェースを制御することによって、メッセージやデータの受け渡しを行う。全体制御手段61は、いわゆるカーネル又はスケジューラと呼ばれるプログラムモジュールである。   FIG. 2 is a diagram illustrating a configuration of the processing unit 6. The processing unit 6 includes an overall control unit 61, a construction data setting unit 62, a map data editing unit 63, a construction data distribution unit 64, and a display condition acquisition unit 65. The overall control unit 61 activates the other units in the processing unit 6 in accordance with the event that has occurred (for example, activation of a construction data distribution screen or dragging and dropping with the mouse 3), thereby processing the entire processing unit 6 Control the flow of processing. In addition, messages and data are exchanged by controlling an interface between the display 2, the mouse 3, the keyboard 4, the image memory 5 and the HDD 7, and other units in the processing unit 32. The overall control means 61 is a program module called a so-called kernel or scheduler.

工事データ設定手段62、地図データ編集手段63、工事データ振分け手段64及び表示条件取得手段65の各手段は、全体制御部61による制御の下で動作することによって、工事データ振分け装置1の具体的な機能を実現するプログラムモジュールである。工事データ設定手段62は、キーボード4などから取得した工事データに緊急度や施工区分、担当区分を設定する。地図データ編集手段63は、工事のシンボルに工事の緊急度、状態又は施工者条件に応じた形態(例えば、表示色や形状)を設定し、当該シンボルを地図データ上の、工事の位置情報に該当する位置に位置付ける。位置付けの方法には、画像メモリ5に格納された地図データ上にシンボルのデータを重ね合わせるビットマップ方式や、ディスプレイ2に表示される地図データ上のシンボルの位置及び領域を数値として保持するベクトル方式がある。なお、ディスプレイ2に表示される地図データの位置は予め決まっているので、シンボルの位置付けによってディスプレイ2にシンボルが表示される領域の座標範囲が特定される。工事データ振分け手段64は、オペレータが工事データ振分け画面上に表示されたシンボルと施工者タブ(施工者名表示領域)とを関係付ける操作(例えば、ドラッグ&ドロップ)を行った場合、HDD7内の当該シンボルに対応する工事データと、当該施工者タブに付された施工者名称を含む施工者データとを対応付けて記憶する。表示条件取得手段65は、工事のシンボルを工事データ振分け画面に表示する条件を取得するものである。表示条件には、工事の緊急度や施工者条件などがある。   Each unit of the construction data setting unit 62, the map data editing unit 63, the construction data distribution unit 64, and the display condition acquisition unit 65 operates under the control of the overall control unit 61. It is a program module that realizes various functions. The construction data setting means 62 sets the urgency, construction category, and charge category in the construction data acquired from the keyboard 4 or the like. The map data editing means 63 sets a form (for example, display color or shape) according to the urgency level, state, or contractor condition of the construction to the construction symbol, and uses the symbol as construction location information on the map data. Position it at the appropriate position. The positioning method includes a bitmap method in which symbol data is superimposed on the map data stored in the image memory 5, and a vector method in which the position and area of the symbol on the map data displayed on the display 2 are held as numerical values. There is. Since the position of the map data displayed on the display 2 is determined in advance, the coordinate range of the area where the symbol is displayed on the display 2 is specified by the positioning of the symbol. When the operator performs an operation (for example, drag and drop) for associating the symbol displayed on the construction data distribution screen with the installer tab (constructor name display area), the construction data distribution means 64 is stored in the HDD 7. The construction data corresponding to the symbol is stored in association with the construction data including the construction name assigned to the construction tab. The display condition acquisition unit 65 acquires a condition for displaying a construction symbol on the construction data distribution screen. The display conditions include the urgency of the construction and the conditions of the installer.

≪データの構成≫
図3は、HDD7に記憶されるデータの構成を示す図である。HDD7は、地図データ71、工事データ72、施工者データ73、シンボル形態データ74及び工事種別緊急度データ75を含んで記憶する。地図データ71は、工事データ振分け装置1の管轄地域を網羅する地図データであり、緯度及び経度の特定によって工事のシンボルが位置付け可能になっており、予めHDD7に記憶されている。工事データ72は、顧客から依頼された工事の内容を示すデータであり、キーボード4などから取得され、HDD7に記憶され、地図データ71にシンボルとして位置付けられてディスプレイ2の工事データ振分け画面に表示される。施工者データ73は、工事データ72に係る工事を実際に行う施工者(個人又は法人)の名称の一覧データであり、施工区分(電力会社の直営会社/委託会社)及び担当区分(電力会社の社員/直営会社/集金員/工事店)に分類され、工事データ振分け画面には施工区分及び担当区分ごとに表示される。施工者データ73は、予めHDD7に記憶されているが、随時変更(追加、削除、区分の変更など)が行われる。また、施工者データ73は、各施工者が施工可能な日単位の工事の上限件数、又は施工区分若しくは担当区分ごとの施工可能な日単位の工事の上限件数を含むものとする。
<< Data structure >>
FIG. 3 is a diagram illustrating a configuration of data stored in the HDD 7. The HDD 7 stores map data 71, construction data 72, construction data 73, symbol form data 74, and construction type urgency data 75. The map data 71 is map data that covers the jurisdiction of the construction data distribution device 1, and construction symbols can be positioned by specifying the latitude and longitude, and are stored in the HDD 7 in advance. The construction data 72 is data indicating the contents of the construction requested by the customer. The construction data 72 is acquired from the keyboard 4 or the like, stored in the HDD 7, positioned as a symbol in the map data 71, and displayed on the construction data distribution screen of the display 2. The The contractor data 73 is list data of the names of contractors (individuals or corporations) that actually perform the construction related to the construction data 72, and includes the construction classification (directly managed company / consignment company of the electric power company) and the responsible classification (of the electric power company). Employee / directly managed company / collector / construction shop) and displayed on the construction data distribution screen for each construction category and charge category. The contractor data 73 is stored in the HDD 7 in advance, but changes (addition, deletion, classification change, etc.) are made as needed. Further, the builder data 73 includes the upper limit number of daily works that can be executed by each builder, or the upper limit number of daily works that can be executed for each construction category or charge category.

シンボル形態データ74は、地図データ71上に位置付けられる、工事を示すシンボルの形態を示すものであり、工事の緊急度や状態に応じた表示色を示すシンボル色データ74A(図4(b)参照)、施工者条件に応じた形状を示すシンボル形状データ74B(図4(c)参照)を含む。シンボル形態データ74は、予めHDD7に記憶されている。工事種別緊急度データ75は、工事種別コードに応じた工事の緊急度を示すものであり、予めHDD7に記憶されている。   The symbol form data 74 indicates a form of a symbol indicating construction, which is positioned on the map data 71, and symbol color data 74A (see FIG. 4B) showing a display color corresponding to the urgency level and state of the construction. ), Symbol shape data 74B (see FIG. 4C) indicating the shape according to the contractor condition. The symbol form data 74 is stored in the HDD 7 in advance. The construction type urgency data 75 indicates the urgency of construction according to the construction type code, and is stored in the HDD 7 in advance.

図4は、工事データ及びシンボル形態データの構成を示す図である。図4(a)は、工事データ72の構成を示す図である。工事データ72は、受付番号721、工事種別コード722、位置情報723、詳細情報724、緊急度725、状態726及び施工者条件727を含んで構成される。受付番号721は、工事データ振分け装置1が当該工事データ72を受け付けたときに付与する、工事データ72固有の番号である。工事種別コード722は、工事の種別を示すコードである(詳細は後記)。位置情報723は、当該工事が行われる場所の位置情報であり、例えば、緯度及び経度であるが、工事データ振分け装置1が顧客宅の住所を受けて緯度及び経度に変換するようにしてもよい。   FIG. 4 is a diagram showing the configuration of construction data and symbol form data. FIG. 4A is a diagram showing a configuration of the construction data 72. The construction data 72 includes a reception number 721, construction type code 722, position information 723, detailed information 724, urgency 725, state 726, and contractor condition 727. The reception number 721 is a number unique to the construction data 72 that is assigned when the construction data distribution apparatus 1 receives the construction data 72. The construction type code 722 is a code indicating the type of construction (details will be described later). The position information 723 is position information of a place where the work is performed. For example, the position information 723 is latitude and longitude, but the work data distribution device 1 may receive the address of the customer's house and convert it into latitude and longitude. .

詳細情報724は、工事の詳細情報であり、例えば、顧客名、住所、受付個所、契約種別、指定時間・施工予定時間、特記事項、電柱番号、要確認メッセージ、計器容量などである。緊急度725は、工事を実施するにあたっての緊急度を示し、工事データの振分けを行うオペレータが意識すべきものであり、最高、高、中、低がある。ただし、顧客と約束した時刻がある場合には、その時刻を厳守することが緊要となる。状態726は、工事の状態を示すものであり、施工済や未施工などがある。施工者条件727は、当該工事を行うべき施工者の条件を示すものであり、施工区分(直営会社/委託会社)、担当区分などがある。   The detailed information 724 is detailed information about the construction, and includes, for example, a customer name, address, reception location, contract type, designated time / estimated construction time, special notes, utility pole number, confirmation message, instrument capacity, and the like. The urgency level 725 indicates the urgency level for carrying out the construction, and should be conscious of the operator who distributes the construction data, and has the highest, high, medium, and low levels. However, if there is a time promised with the customer, it is important to strictly observe that time. The state 726 indicates the state of the construction, and there are construction completed and unconstructed. The contractor condition 727 indicates a condition of the contractor who should perform the construction, and includes a construction category (direct management company / consignment company), a charge category, and the like.

図4(b)は、シンボル色データ74Aの構成を示す図である。シンボル色データ74Aは、シンボル形態データ74に含まれるデータであり、緊急度・状態74A1及び表示色74A2を含むレコードから構成される。緊急度・状態74A1は、工事の緊急度又は状態を示す。表示色74A2は、緊急度・状態74A1に応じて工事のシンボルに設定される表示色を示す。例えば、「緊急度最高」の工事のシンボルは、「ピンク」の色に表示される。   FIG. 4B is a diagram showing the configuration of the symbol color data 74A. The symbol color data 74A is data included in the symbol form data 74, and is composed of records including the urgency / state 74A1 and the display color 74A2. The urgency / state 74A1 indicates the urgency or status of the construction. The display color 74A2 indicates a display color that is set for a construction symbol in accordance with the urgency level / state 74A1. For example, a construction symbol of “highest urgency” is displayed in a “pink” color.

図4(c)は、シンボル形状データ74Bの構成を示す図である。シンボル形状データ74Bは、シンボル形態データ74に含まれるデータであり、施工者条件74B1及び形状74B2を含むレコードから構成される。施工者条件74B1は、シンボルが示す工事を施工すべき施工者の条件である。形状74B2は、施工者条件74B1に応じて工事のシンボルに設定される形状を示す。例えば、「直営会社」が施工すべき工事のシンボルは、円形状に表示される。   FIG. 4C shows the configuration of the symbol shape data 74B. The symbol shape data 74B is data included in the symbol shape data 74, and is composed of records including the builder condition 74B1 and the shape 74B2. The contractor condition 74B1 is a condition of the contractor who should perform the work indicated by the symbol. The shape 74B2 indicates a shape that is set as a symbol for the work according to the contractor condition 74B1. For example, the symbol of the work to be performed by the “direct company” is displayed in a circular shape.

図5は、工事種別緊急度データの構成を示す図である。工事種別緊急度データ75は、工事種別コード751、工事種別名752及び緊急度753を含むレコードから構成される。工事種別コード751は、工事の種別に固有のコードである。工事種別名752は、工事種別コード751に対応する工事種別の名称である。緊急度753は、当該工事種別の緊急度を示すものであり、最高、高、中、低がある。   FIG. 5 is a diagram illustrating a configuration of construction type urgency data. The construction type urgency data 75 includes a record including a construction type code 751, a construction type name 752, and an urgency level 753. The construction type code 751 is a code unique to the construction type. The construction type name 752 is the name of the construction type corresponding to the construction type code 751. The urgency level 753 indicates the urgency level of the construction type, and is highest, high, medium, or low.

ここで、工事種別コードに対応する工事の内容について説明する。工事種別コード「1C」は、「契約廃止」を示し、需給契約の廃止であって、日割料金を後日精算とする工事をいう。工事種別コード「1B」は、「契約廃止現収」を示し、需給契約の廃止であって、現地で日割料金を受領する工事をいう。工事種別コード「1A」は、「全使撤」を示し、需給契約の廃止と計量器等の設備撤去を同時に行う工事(家の取り壊しなどのケース)をいう。工事種別コード「1T」は、「全使撤現収」を示し、「1A」の工事であって、同時に現地で日割料金を受領する場合をいう。工事種別コード「1D」は、「廃止中設備撤去」を示し、需給契約が廃止済みであって、計量器等の設備撤去を行う工事(転居済みの家の取り壊しなどのケース)をいう。工事種別コード「1E」は、「事前調査全使撤工事メモ」を示し、「1A」、「1T」の工事に対する現地調査(工事に必要な機材の判断や現地の見取り図メモ作成)をいう。   Here, the contents of the construction corresponding to the construction type code will be described. The construction type code “1C” indicates “abolition of contract”, which means abolition of the supply and demand contract, and the daily charge is settled at a later date. The construction type code “1B” indicates “contract abolition current revenue”, which is a construction in which the supply and demand contract is abolished and a daily charge is received locally. The construction type code “1A” indicates “removal of all use”, and refers to construction (case of demolishing a house, etc.) in which the supply-demand contract is abolished and equipment such as measuring instruments is removed at the same time. The construction type code “1T” indicates “acquisition of all evacuation” and is a construction of “1A”, which means that a daily fee is received at the same time. The construction type code “1D” indicates “removal of facilities under abolition”, and refers to a construction in which the supply and demand contract has been abolished and facilities such as measuring instruments are removed (removal of a moved house, etc.). The construction type code “1E” indicates “preliminary survey all-use removal construction memo”, and refers to a field survey (judgment of equipment necessary for construction and creation of a floor plan memo) for “1A” and “1T” construction.

工事種別コード「2A」は、「再使用契約」を示し、電気の使用開始に伴う工事(入居に伴う送電開始)をいう。工事種別コード「2C」は、「計器取付再使用契約」を示し、「2A」の工事であって、計量器の取付を伴う工事をいう。工事種別コード「7A」は、「復活」を示し、農事用電気の使用再開に伴う工事をいう。工事種別コード「7B」は、「休止」を示し、農事用電気の使用停止に伴う工事をいう。工事種別コード「7C」は、「供給停止」を示し、電気料金のお支払がないために送電を停止するための工事をいう。工事種別コード「7D」は、「再接続」を示し、供給停止中契約の再送電を行うための工事をいう。   The construction type code “2A” indicates a “reuse contract”, and refers to construction accompanying the start of use of electricity (start of power transmission accompanying occupancy). The construction type code “2C” indicates “instrument installation / reuse contract”, and is “2A” construction, which is construction involving installation of a measuring instrument. The construction type code “7A” indicates “revival” and refers to construction accompanying the resumption of use of agricultural electricity. The construction type code “7B” indicates “pause” and refers to construction accompanying suspension of use of agricultural electricity. The construction type code “7C” indicates “supply stop” and indicates construction for stopping power transmission because there is no payment of the electricity bill. The construction type code “7D” indicates “reconnection” and refers to construction for performing re-transmission of a contract for which supply is suspended.

≪工事データの取得・蓄積処理≫
図6は、工事データの取得・蓄積処理を示すフローチャートである。工事データ振分け装置1は、工事データを取得し、緊急度や施工区分、担当区分を設定し、HDD7に記憶する。まず、工事データ振分け装置1は、外部から工事データを取得する(S601)。工事データとしては、オペレータがキーボード4に入力した内容を取得してもよいし、携帯端末などからネットワーク(図示せず)を介して取得するようにしてもよい。取得した工事データ72には、工事種別コード722、位置情報723及び詳細情報724が設定されている。
≪Construction data acquisition and storage process≫
FIG. 6 is a flowchart showing construction data acquisition / accumulation processing. The construction data distribution apparatus 1 acquires construction data, sets the urgency level, construction category, and charge category, and stores them in the HDD 7. First, the construction data distribution apparatus 1 acquires construction data from the outside (S601). As the construction data, contents input by the operator to the keyboard 4 may be acquired, or may be acquired from a portable terminal or the like via a network (not shown). In the acquired construction data 72, a construction type code 722, position information 723, and detailed information 724 are set.

次に、工事データ振分け装置1の工事データ設定手段62が、工事データ72に受付番号721及び状態726を設定する(S602)。受付番号721は、工事データを受け付けた順に連番で設定する。状態726は、「未施工」を設定する。そして、工事データ設定手段62が、工事種別緊急度データ75を参照して、工事種別コード722に応じた緊急度725を工事データ72に設定する(S603)。   Next, the construction data setting unit 62 of the construction data distribution apparatus 1 sets the reception number 721 and the state 726 in the construction data 72 (S602). The reception number 721 is set as a serial number in the order in which the construction data is received. The state 726 sets “not constructed”. Then, the construction data setting means 62 refers to the construction type urgency data 75 and sets the urgency 725 corresponding to the construction type code 722 in the construction data 72 (S603).

続いて、工事データ設定手段62が、工事種別コード722や詳細情報724に基づいて施工区分を切分け、工事データ72の施工者条件727に設定する(S604)。具体的には、図7に示す条件により施工区分の切分けを行い、振分け先を直営会社又は委託会社のいずれかに決める。まず、位置情報723や詳細情報724に含まれる住所から、直営会社施工のみの地域か否かを判定する(S701)。直営会社施工のみの地域であれば(S701のY)、振分け先を直営会社にする。直営会社施工のみの地域でなければ(S701のN)、工事種別コード722や詳細情報724から、委託会社が施工不可か否かを判定する(S702)。委託会社が施工不可であれば(S702のY)、振分け先を直営会社にする。委託会社が施工可能であれば(S702のN)、委託会社が受付不可の時間か否かを判定する(S703)。この判定は、当日受付で、かつ、受付時刻が委託先振分けの最終時刻以降か否かで行う。委託会社が受付不可の時間であれば(S703のY)、振分け先を直営会社にする。   Subsequently, the construction data setting means 62 cuts the construction classification based on the construction type code 722 and the detailed information 724, and sets it in the contractor condition 727 of the construction data 72 (S604). Specifically, the construction classification is performed according to the conditions shown in FIG. 7, and the distribution destination is determined as either a directly managed company or a consigned company. First, it is determined from the address included in the position information 723 and the detailed information 724 whether or not it is an area for construction of a directly managed company (S701). If it is an area where only a directly managed company is constructed (Y in S701), the distribution destination is a directly managed company. If it is not an area where only the directly managed company is constructed (N in S701), it is determined from the construction type code 722 and the detailed information 724 whether or not the commissioned company is unable to construct (S702). If the consignment company cannot perform construction (Y in S702), the distribution destination is a directly managed company. If the consignment company is capable of construction (N in S702), it is determined whether or not it is a time when the consignment company cannot accept (S703). This determination is made on the day reception and whether or not the reception time is after the last time of the entrustee distribution. If it is time that the consignment company cannot accept (Y in S703), the distribution destination is set to a directly managed company.

委託会社が受付可能な時間であれば(S703のN)、委託会社が施工可能な時間か否かを判定する(S704)。この判定は、詳細情報724に含まれる指定時間・施工予定時間が8時50分〜委託先振分け最終時刻の間であるか否かで行う。委託会社が施工可能な時間であれば(S704のY)、委託会社が振分け中止中か否かを判定する(S705)。この判定は、HDD7の施工者データ73に予め記憶されている、委託会社が施工可能な工事の日単位の上限件数、又は施工区分若しくは担当区分ごとの施工可能な日単位の工事の上限件数を超えているか否かで行う。委託会社が振分け中止中であれば(S705のY)、振分け先を直営会社とする。委託会社が振分け中止中でなければ(S705のN)、振分け先を委託会社とする。また、委託会社が施工可能な時間でなければ(S704のN)、振分け先を直営会社とする。   If it is time that can be accepted by the consignment company (N in S703), it is determined whether or not it is time that the consignment company can perform construction (S704). This determination is made based on whether or not the designated time / estimated construction time included in the detailed information 724 is between 8:50 and the final assignment time of the consignee. If it is time when the commission company can perform construction (Y in S704), it is determined whether or not the commission company is stopping the distribution (S705). This determination is based on the upper limit number of daily work that can be executed by the contractor, or the upper limit number of daily work that can be executed for each work category or charge category, which is stored in the contractor data 73 of the HDD 7 in advance. It is done by whether or not it exceeds. If the consignment company is canceling the distribution (Y in S705), the distribution destination is the directly managed company. If the consignment company is not in the middle of the distribution suspension (N in S705), the distribution destination is the consignment company. Further, if it is not a time when the commissioned company can perform the construction (N in S704), the distribution destination is a directly managed company.

ここで、S702の委託会社が施工不可か否かの判定は、図8に示す条件により行う。まず、工事種別が契約廃止か否かを判定する(S801)。契約廃止であれば(S801のY)、計器が乗率計器か否かを判定する(S803)。乗率計器であれば(S803のY)、委託会社施工不可とする。乗率計器でなければ(S803のN)、契約の状態が送電お断り中、解約予定又は解約中か否かを判定する(S805)。契約の状態が該当すれば(S805のY)、委託会社施工不可とする。契約の状態が該当しなければ(S805のN)、計器に遠隔制御機器がついているか否かを判定する(S806)。遠隔制御機器がついていれば(S806のY)、委託会社施工不可とする。遠隔制御機器がついていなければ(S806のN)、契約種別が公衆街路灯Aか否かを判定する(S807)。公衆街路灯Aであれば(S807のY)、委託会社施工不可とする。公衆街路灯Aでなければ(S807のN)、契約種別が定額電灯か否かを判定する(S808)。定額電灯であれば(S808のY)、電流制限器の容量がないか否かを判定する(S809)。電流制限器の容量がなければ(S809のY)、委託会社施工不可とする。電流制限器の容量があれば(S809のN)、委託会社施工可能とする。また、契約種別が定額電灯でなければ(S808のN)、委託会社施工可能とする。   Here, the determination of whether or not the contracted company in S702 is unsuccessful is performed according to the conditions shown in FIG. First, it is determined whether the construction type is contract abolition (S801). If the contract is abolished (Y in S801), it is determined whether or not the instrument is a multiplier instrument (S803). If it is a multiplier instrument (Y in S803), the contracted company cannot be constructed. If it is not a multiplicative meter (N in S803), it is determined whether or not the contract is in the state of canceling power transmission, scheduled to be canceled or canceled (S805). If the contract status is applicable (Y in S805), the contracted company cannot be constructed. If the contract status does not apply (N in S805), it is determined whether or not the meter is equipped with a remote control device (S806). If a remote control device is attached (Y in S806), the contracted company cannot be constructed. If the remote control device is not attached (N in S806), it is determined whether or not the contract type is public street light A (S807). If it is a public street light A (Y in S807), the contracted company cannot be constructed. If it is not the public street lamp A (N in S807), it is determined whether or not the contract type is a fixed amount lamp (S808). If it is a fixed charge lamp (Y in S808), it is determined whether or not the current limiter has a capacity (S809). If there is no current limiter capacity (Y in S809), the contracted company cannot be constructed. If there is a current limiter capacity (N in S809), the contracted company can be constructed. If the contract type is not a fixed-price lamp (N in S808), the contracted company can be constructed.

工事種別が契約廃止でなければ(S801のN)、工事種別が再使用契約か否かを判定する(S802)。再使用契約であれば(S802のY)、計器が乗率計器か否かを判定する(S803)。乗率計器であれば(S803のY)、委託会社施工不可とする。乗率計器でなければ(S803のN)、計器の状態が計器取除、ケッチ切断又は計器情報なしか否かを判定する(S804)。該当すれば(S804のY)、委託会社施工不可とする。該当しなければ(S804のN)、契約の状態が送電お断り中、解約予定又は解約中か否かを判定する(S805)。契約の状態が該当すれば(S805のY)、委託会社施工不可とする。契約の状態が該当しなければ(S805のY)、契約種別が公衆街路灯Aか否かを判定する(S807)。この判定以降は、既に説明した通りである。また、工事種別が再使用契約でなければ(S802のN)、委託会社施工不可とする。   If the construction type is not the contract abolition (N in S801), it is determined whether or not the construction type is a reuse contract (S802). If it is a reuse contract (Y of S802), it will be determined whether a meter is a multiplication factor instrument (S803). If it is a multiplier instrument (Y in S803), the contracted company cannot be constructed. If it is not a multiplier instrument (N in S803), it is determined whether or not the instrument status is instrument removal, ketch disconnection, or instrument information (S804). If applicable (Y in S804), the contracted company cannot be constructed. If not applicable (N in S804), it is determined whether or not the state of the contract is power transmission refusal, cancellation plan or cancellation (S805). If the contract status is applicable (Y in S805), the contracted company cannot be constructed. If the contract status does not apply (Y in S805), it is determined whether the contract type is public street light A (S807). The steps after this determination are as already described. Further, if the construction type is not a reuse contract (N in S802), the contracted company cannot be constructed.

図6に戻って、工事データ設定手段62が、工事種別コード722や詳細情報724に基づいて担当区分を切分け、工事データ72の施工者条件727に設定する(S605)。担当区分は、施工区分が直営会社であった場合に、督促に関する工事を担当する集金員による施工可否及び集金員以外の料金担当への振分け可否を示すものである。具体的には、図9に示す条件により担当区分の切分けを行う。まず、工事種別が再使用契約か否かを判定する(S901)。再使用契約であれば(S901のY)、契約の状態が送電お断り中、解約予定又は解約中か否かを判定する(S902)。契約の状態が該当すれば(S902のY)、集金員で施工可能とし、集金員以外の料金担当へ自動振分けとする。該当しなければ(S902のN)、集金員施工不可とし、集金員以外の料金担当へ振分け不可とする。   Returning to FIG. 6, the construction data setting means 62 isolates the division in charge based on the construction type code 722 and the detailed information 724, and sets it in the contractor condition 727 of the construction data 72 (S 605). The division in charge indicates whether or not construction by a collector who is in charge of construction related to dunning and distribution to a charge manager other than the collector in the case where the construction category is a directly managed company. Specifically, the division of charge is performed according to the conditions shown in FIG. First, it is determined whether or not the construction type is a reuse contract (S901). If the contract is a reuse contract (Y in S901), it is determined whether or not the contract is in the state of canceling power transmission, scheduled to be canceled or canceled (S902). If the contract status is applicable (Y in S902), the collector can perform the construction, and automatic distribution to the charge charge other than the collector. If not applicable (N in S902), it is determined that construction of the collector is not possible and distribution to a charge person other than the collector is impossible.

工事種別が再使用契約でなければ(S901のN)、供給停止か否かを判定する(S903)。供給停止であれば(S903のY)、契約種別が低圧契約か否かを判定する(S905)。低圧契約であれば(S905のY)、集金員で施工可能とし、集金員以外の料金担当へ自動振分けとする。低圧契約でなければ(S905のN)、集金員施工不可とし、集金員以外の料金担当へ自動振分けとする。   If the construction type is not a reuse contract (N in S901), it is determined whether or not the supply is stopped (S903). If the supply is stopped (Y in S903), it is determined whether the contract type is a low-pressure contract (S905). If it is a low-pressure contract (Y in S905), construction can be performed by a collector, and automatic distribution to a charge person other than the collector. If it is not a low-pressure contract (N in S905), the construction of the collector is not allowed, and automatic distribution to a charge charge other than the collector is made.

工事種別が供給停止でなければ(S903のN)、再接続か否かを判定する(S904)。再接続であれば(S904のY)、契約種別が低圧契約か否かを判定する(S905)。低圧契約であれば(S905のY)、計器管理がケッチ切断又は計器取除か否かを判定する(S906)。該当すれば(S906のY)、集金員で施工可能とし、集金員以外の料金担当へ自動振分けとする。該当しなければ(S906のN)、集金員施工不可とし、集金員以外の料金担当へ自動振分けとする。   If the construction type is not a supply stop (N in S903), it is determined whether or not a reconnection is made (S904). If it is a reconnection (Y of S904), it will be determined whether a contract classification is a low voltage | pressure contract (S905). If it is a low-pressure contract (Y in S905), it is determined whether the instrument management is ketch cutting or instrument removal (S906). If applicable (Y in S906), the construction can be performed by the collector, and automatic distribution to the charge person other than the collector. If not applicable (N in S906), the construction of the collector is not allowed, and automatic distribution is made to a charge person other than the collector.

契約種別が低圧契約でなければ(S905のN)、集金員施工不可とし、集金員以外の料金担当へ自動振分けとする。また、工事種別が再接続でなければ(S904のN)、集金員施工不可とし、集金員以外の料金担当へ振分け不可とする。   If the contract type is not a low-pressure contract (N in S905), it is determined that construction of the collector is not possible, and automatic allocation is made to a charge person other than the collector. Further, if the construction type is not reconnection (N in S904), it is determined that the collector work cannot be performed, and the charge cannot be distributed to a charge person other than the collector.

図6に戻って、工事データ振分け装置1は、工事データ72をHDD7に記憶する(S606)。工事データ72は、S602〜S605における工事データ設定手段62の動作によって、すべての項目が設定された状態で記憶される。   Returning to FIG. 6, the construction data distribution apparatus 1 stores the construction data 72 in the HDD 7 (S606). The construction data 72 is stored in a state where all items are set by the operation of the construction data setting unit 62 in S602 to S605.

≪工事データの振分け処理≫
図10は、工事データの振分け処理を示すフローチャートである。工事データの振分け処理は、S1000〜S1004の工事データ振分け画面の表示処理と、S1005〜S1011の工事シンボルのドラッグ&ドロップに伴う処理とに分けられる。
≪Construction data distribution process≫
FIG. 10 is a flowchart showing the construction data distribution process. The construction data distribution process is divided into a construction data distribution screen display process in steps S1000 to S1004 and a process associated with dragging and dropping construction symbols in steps S1005 to S1011.

工事データ振分け装置1では、まず、工事データ振分け画面が起動される(S1000)。これは、オペレータが、ディスプレイ2に表示された工事データ振分けのアイコンを、マウス3でクリックすることによって行われ、これをトリガにして各データの設定及びディスプレイ2への画面の表示が行われる。以下に、その詳細を説明する。   In the construction data distribution apparatus 1, first, a construction data distribution screen is activated (S1000). This is done by the operator clicking on the construction data distribution icon displayed on the display 2 with the mouse 3, and using this as a trigger, the setting of each data and the display of the screen on the display 2 are performed. The details will be described below.

最初に、地図データ編集手段63が地図データの編集、設定を行う(S1001)。具体的には、まず、HDD7から地図データ71を読み出し、画像メモリ5に格納する。次に、その時点までにHDD7に蓄積されている工事データ72のうち、状態726が「未施工」のものを抽出する。続いて、シンボル色データ74A(図4(b))及びシンボル形状データ74B(図4(c))を参照して、抽出した工事データ72の緊急度725に応じた表示色及び施工者条件727に応じた形状を、当該工事データ72を示すシンボルに設定する。例えば、緊急度が最高で、かつ、施工者が直営会社であれば、工事のシンボルは、ピンクの円形に設定される。そして、位置情報723に従って、工事のシンボルを画像メモリ5に格納された地図データ71上に位置付ける。この場合、工事のシンボルが位置付けられた領域の範囲と、当該工事データ72とが対応付けられて記憶される。   First, the map data editing means 63 edits and sets map data (S1001). Specifically, first, the map data 71 is read from the HDD 7 and stored in the image memory 5. Next, out of the construction data 72 stored in the HDD 7 up to that point, the data whose status 726 is “Unfinished” is extracted. Subsequently, with reference to the symbol color data 74A (FIG. 4B) and the symbol shape data 74B (FIG. 4C), the display color and the operator condition 727 corresponding to the urgency 725 of the extracted construction data 72 are displayed. The shape corresponding to is set as a symbol indicating the construction data 72. For example, if the degree of urgency is the highest and the contractor is a directly managed company, the construction symbol is set to a pink circle. Then, according to the position information 723, the construction symbol is positioned on the map data 71 stored in the image memory 5. In this case, the range of the area where the symbol of the construction is positioned and the construction data 72 are stored in association with each other.

次に、処理部6が、取扱店、作業予定日、振分区分及び表示区分をディスプレイ2に表示する(S1002)。図11に示す工事データ振分け画面の例によれば、各項目が画面の左上に表示されている。取扱店111は、工事データを振分ける地域範囲を管轄する電力会社の営業所及びサービスセンタである。作業予定日112は、工事データを振分ける日付であり、その日の施工者の作業予定を考慮して、工事データの振分けが行われる。振分区分113は、振分け先の施工者区分を示し、「直営」、「委託」などが選択でき、選択した施工者区分に応じた施工者一覧が表示される。表示区分114は、地図上に表示する工事データの区分を示し、「すべて」、「未振分け」、「振分け済で未施工」、「施工者別」、「緊急度別」、「施工者条件別(施工区分別、担当区分別)」などが選択でき、選択した工事データの区分に応じた工事のシンボルが地図上に表示される。ここで、「施工者別」を選択した場合には、特定の施工者に既に振分けられている(当該施工者の手持ちの)工事データ72を示すシンボルSが表示される。なお、取扱店111及び作業予定日112は、マウス3でカーソル(マウスポインタともいう)を位置付けた後、キーボード4から入力することによって変更することができる。また、振分区分113及び表示区分114は、マウス3を用いてプルダウンメニューから選択することができる。   Next, the processing unit 6 displays the dealer, the scheduled work date, the distribution category, and the display category on the display 2 (S1002). According to the example of the construction data distribution screen shown in FIG. 11, each item is displayed at the upper left of the screen. The dealer 111 is a sales office and service center of an electric power company that has jurisdiction over the area range to which the construction data is distributed. The scheduled work date 112 is a date to which the construction data is distributed, and the construction data is distributed in consideration of the work schedule of the installer on that day. The distribution category 113 indicates a distribution-destination installer category, and “direct management”, “consignment”, and the like can be selected, and a list of installers corresponding to the selected installer category is displayed. The display category 114 indicates the category of the construction data to be displayed on the map. “All”, “Unallocated”, “Already allocated and not yet implemented”, “By installer”, “By urgency”, “Contractor condition” “Segment (by construction category, by responsible category)” can be selected, and a symbol of construction corresponding to the selected construction data category is displayed on the map. Here, when “by contractor” is selected, a symbol S indicating the construction data 72 already assigned to the specific contractor (held by the contractor) is displayed. The dealer 111 and the scheduled work date 112 can be changed by inputting from the keyboard 4 after positioning a cursor (also referred to as a mouse pointer) with the mouse 3. Further, the distribution section 113 and the display section 114 can be selected from a pull-down menu using the mouse 3.

続いて、処理部6が、HDD7に記憶された施工者データ73を、振分区分113に応じてディスプレイ2に表示する(S1003)。施工者データ73の表示には、施工者名称を表示した施工者タブ(施工者名表示領域)Tが上下に並べられ、マウス3でカーソルを施工者タブTに位置付けると、作業予定日112における施工者の作業予定などが表示されるタブスライダ方式が適用される。さらに、処理部6が、画像メモリ5に格納された地図データを、表示区分114に応じた工事のシンボルSを含めて、ディスプレイ2に表示する(S1004)。以上により、工事データ振分け画面全体がディスプレイ2に表示されたことになる。   Subsequently, the processing unit 6 displays the contractor data 73 stored in the HDD 7 on the display 2 according to the distribution category 113 (S1003). In the display of the installer data 73, the installer tabs (installer name display areas) T displaying the installer names are arranged vertically, and the mouse 3 positions the cursor on the installer tab T. A tab slider method that displays the work schedule of the installer is applied. Further, the processing unit 6 displays the map data stored in the image memory 5 on the display 2 including the construction symbol S corresponding to the display section 114 (S1004). As a result, the entire construction data distribution screen is displayed on the display 2.

なお、図11の左側に示すように、直営ボタン115や集金員ボタン116が表示され、オペレータが当該ボタンをマウス3でクリックすることにより、該当の施工者データ73、すなわち、施工者一覧の表示内容を変更することができる。次に、担当区分変更タブ117が表示され、担当区分変更タブ117へシンボルSをドロップすることによって、表示される担当区分選択画面(図示せず)から担当区分を選択後、振分けを行うことができる。また、委託タブ118が表示され、委託タブ118へシンボルSをドロップすることによって、表示される委託先画面(図示せず)から施工者を選択後、振分けを行うことができる。   As shown on the left side of FIG. 11, the direct management button 115 and the collector button 116 are displayed, and when the operator clicks the button with the mouse 3, the corresponding contractor data 73, that is, the display of the list of contractors is displayed. The contents can be changed. Next, the assigned division change tab 117 is displayed, and by dropping the symbol S onto the assigned division change tab 117, the assigned division can be selected after selecting the assigned division from the displayed assigned division selection screen (not shown). it can. In addition, when the commission tab 118 is displayed and the symbol S is dropped on the commission tab 118, the distribution can be performed after selecting a contractor from the commission destination screen (not shown) displayed.

さらに、オペレータがシンボルSをマウス3でダブルクリックすることによって、当該シンボルSに係る工事データ詳細画面がポップアップ表示される。これは、シンボルSの領域の範囲と、工事データ72とが対応付けられて記憶されていることで可能になる。また、複数の工事データ72の位置情報723が近接しているため、対応する複数のシンボルSが重なってしまう場合には、すべてのシンボルSを表示できないので、ある領域で表示されていない工事の件数を表示するようにしてもよい。   Further, when the operator double-clicks the symbol S with the mouse 3, the construction data detail screen related to the symbol S is popped up. This is possible because the range of the area of the symbol S and the construction data 72 are stored in association with each other. In addition, since the position information 723 of the plurality of construction data 72 is close, when the corresponding symbols S overlap, it is not possible to display all the symbols S. Therefore, the construction information that is not displayed in a certain area is displayed. The number of cases may be displayed.

工事データ振分け画面が表示された状態で、振分区分113や表示区分114が変更になった場合には、地図データや施工者データの表示内容が変わるので、S1001、S1003及びS1004の処理を再度実行する。特に、表示区分114が変更になったときには、表示条件取得手段65が取得した表示区分114に応じて地図データ上に表示すべき工事のシンボルを変更することになるが、S1001の地図データの編集、設定で行ってもよいし、S1004の地図データの表示で行ってもよい。   If the distribution section 113 or the display section 114 is changed while the construction data distribution screen is displayed, the display contents of the map data and the contractor data change, so the processing of S1001, S1003, and S1004 is performed again. Execute. In particular, when the display section 114 is changed, the construction symbol to be displayed on the map data is changed according to the display section 114 acquired by the display condition acquisition means 65. However, the editing of the map data in S1001 , It may be performed by setting, or may be performed by displaying the map data in S1004.

工事データ振分け装置1のディスプレイ2に工事データ振分け画面が表示されると、オペレータが工事データを施工者に振分ける作業を行う。オペレータは、マウス3を用いて、所望の工事を示すシンボルSを施工者タブTにドラッグ&ドロップする(S1005)。この場合、マウス3で選択する範囲を指定することによって複数のシンボルSを選択してもよい。それをトリガにして、処理部6の工事データ振分け手段64が処理を開始する。   When the construction data distribution screen is displayed on the display 2 of the construction data distribution apparatus 1, the operator performs an operation of distributing the construction data to the installer. The operator uses the mouse 3 to drag and drop the symbol S indicating the desired construction onto the installer tab T (S1005). In this case, a plurality of symbols S may be selected by designating a range to be selected with the mouse 3. With this as a trigger, the construction data distribution means 64 of the processing unit 6 starts processing.

まず、工事データ振分け手段64は、シンボルSに対応する工事データ72を、施工者タブTに対応する施工者に振分けることが可能か否かを判定する(S1006)。振分け不可の例には、工事データ72の状態726から工事データの審査が必要で未審査のものを振分けようとした場合、施工者条件727に「直営会社」が設定された工事データ72を委託会社に振分けようとした場合、施工者条件727に「集金員施工不可」が設定された工事データ72を集金員に振分けようとした場合、委託会社で実施できない工事データ72を振分けようとした場合などがある。振分け不可であれば(S1006のN)、工事データ振分け手段64は、工事データ振分け画面上にエラーメッセージを表示し(S1011)、処理を終了する。図12(a)にエラーメッセージの例を示す。   First, the construction data distribution means 64 determines whether or not the construction data 72 corresponding to the symbol S can be distributed to the construction person corresponding to the construction person tab T (S1006). As an example of non-assignment, when the construction data needs to be reviewed from the state 726 of the construction data 72 and an unexamined one is to be sorted, the construction data 72 in which “directly managed company” is set in the contractor condition 727 is entrusted. When trying to distribute to the company, when trying to distribute the construction data 72 that is set to "collector construction impossible" in the contractor condition 727 to the collector, when trying to distribute the construction data 72 that cannot be performed by the consignment company and so on. If distribution is impossible (N in S1006), the construction data distribution unit 64 displays an error message on the construction data distribution screen (S1011), and ends the process. FIG. 12A shows an example of an error message.

次に、工事データ振分け手段64は、工事データの振分けにあたって、オペレータに確認が必要な事項があるか否かを判定する(S1007)。オペレータに確認が必要な例には、委託先受付不可時間や施工不可時間、委託先振分け中止中に工事データを委託先に振分ける場合、工事データの中に顧客の指定時間が短いものがある場合、特殊な資器材(計器やクレーンなど)を必要とする工事がある場合などがある。確認必要事項があれば(S1007のY)、工事データ振分け画面上に注意メッセージを表示する(S1008)。図12(b)に注意メッセージの例を示す。そして、オペレータからの指示が振分け実施(図12(b)で「OK」をクリック)のとき(S1009のY)、又は、確認必要事項がないとき(S1007のN)には、工事データ振分け手段64は工事データの振分けを行う(S1010)。この場合、シンボルSに対応する工事データ72と、施工者タブTに対応する施工者データ73とを対応付けて記憶する。具体的には、工事データ72に施工者名称を追加してHDD7に記憶してもよいし、工事データ72及び施工者データ73から相互に参照できるようにHDD7内の格納位置(相手方へのポインタ)を追加して記憶してもよい。そして、処理を終了する。なお、オペレータからの指示が振分け実施せず(図12(b)で「キャンセル」をクリック)のとき(S1009のN)には、S1010の処理をスキップして終了する。   Next, the construction data distribution means 64 determines whether or not there is an item that needs to be confirmed by the operator when distributing the construction data (S1007). Examples that require confirmation from the operator include unacceptable and unreceivable time for contractors, and when the construction data is distributed to the contractor while the contractor allocation is stopped, some of the construction data has a short customer specified time. In some cases, there are constructions that require special equipment (instruments, cranes, etc.). If there is an item to be confirmed (Y in S1007), a caution message is displayed on the construction data distribution screen (S1008). FIG. 12B shows an example of a caution message. When the instruction from the operator is distribution (click “OK” in FIG. 12B) (Y in S1009), or when there is no confirmation necessary item (N in S1007), the construction data distribution means 64 distributes the construction data (S1010). In this case, the construction data 72 corresponding to the symbol S and the construction data 73 corresponding to the construction worker tab T are stored in association with each other. Specifically, the name of the contractor may be added to the construction data 72 and stored in the HDD 7, or the storage position (pointer to the other party) in the HDD 7 so that the construction data 72 and the contractor data 73 can be referred to each other. ) May be added and stored. Then, the process ends. When the instruction from the operator is not distributed (click “Cancel” in FIG. 12B) (N in S1009), the process of S1010 is skipped and the process ends.

以上本発明の実施の形態について説明したが、図1に示す工事振分け装置1内の各構成要素を機能させるために、処理部6で実行されるプログラムをコンピュータにより読み取り可能な記録媒体に記録し、その記録したプログラムをコンピュータに読み込ませ、実行させることにより、本発明の実施の形態に係る工事振分け装置1が実現されるものとする。なお、プログラムをインターネットなどのネットワーク経由でコンピュータに提供してもよいし、プログラムが書き込まれた半導体チップなどをコンピュータに組み込んでもよい。   Although the embodiment of the present invention has been described above, the program executed by the processing unit 6 is recorded on a computer-readable recording medium in order to make each component in the construction distribution apparatus 1 shown in FIG. 1 function. The construction distribution apparatus 1 according to the embodiment of the present invention is realized by causing the computer to read and execute the recorded program. Note that the program may be provided to the computer via a network such as the Internet, or a semiconductor chip or the like in which the program is written may be incorporated in the computer.

以上説明した本発明の実施の形態によれば、工事データ72の緊急度725や状態726に応じた色が設定されたシンボルSが地図データ上に位置付けられて、ディスプレイ2に表示されるので、各工事の緊急度及び位置が視覚的に把握でき、工事の振分けに関する検討作業が容易になる。そして、その工事のシンボルSを施工者タブTにドラッグ&ドロップすることで、簡便に工事の振分けができる。   According to the embodiment of the present invention described above, the symbol S set in the color according to the urgency 725 and the state 726 of the construction data 72 is positioned on the map data and displayed on the display 2. The urgency and position of each construction can be grasped visually, and the examination work related to the distribution of construction becomes easy. Then, by dragging and dropping the construction symbol S to the installer tab T, the construction can be easily distributed.

また、工事データ72の施工者条件727に応じた形状が設定されたシンボルSが表示されるので、工事の施工者条件を視覚的に把握できる。また、誤って工事のシンボルSを施工者条件に該当しない施工者タブTにドラッグ&ドロップしても、エラーメッセージが表示されるというガードがかかるので、オペレータは安心して工事データの振分け作業ができる。   Moreover, since the symbol S in which the shape according to the builder condition 727 of the construction data 72 is set is displayed, the builder condition of the construction can be visually grasped. In addition, even if the construction symbol S is accidentally dragged and dropped onto the installer tab T that does not meet the conditions of the installer, an error message is displayed, so that the operator can safely distribute the construction data. .

さらに、工事データ72の緊急度725又は施工者条件727に該当する工事のシンボルSを地図上に表示するので、所望の工事だけを視覚的に確認することができる。また、表示された複数のシンボルSを選択することで、当該工事データの振分けをまとめて行うことができる。   Furthermore, since the construction symbol S corresponding to the urgency 725 or the contractor condition 727 of the construction data 72 is displayed on the map, only the desired construction can be visually confirmed. In addition, by selecting a plurality of displayed symbols S, the construction data can be distributed collectively.

以上によれば、工事を振分ける上での操作性の向上や施工者ごとの状況把握の容易性により、突発的に発生する工事(顧客からの急な申出など)に対しても速やかに手配を行うことができるようになる。また、施工順序や施工場所との関係性から、約束時間のない申出の工事に対して問い合わせがあった場合に、おおよその訪問時刻を答えられるようになる。従って、顧客サービスの向上を図ることができる。   Based on the above, due to improved operability in distributing work and ease of grasping the situation of each contractor, arrangements for suddenly occurring work (such as sudden offers from customers) can be made promptly. Will be able to do. In addition, due to the relationship with the construction sequence and construction location, when there is an inquiry about construction with no promised time, the approximate visit time can be answered. Therefore, customer service can be improved.

以上、本発明を実施するための最良の形態について説明したが、上記実施の形態は本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明はその趣旨を逸脱することなく変更、改良され得るとともに、本発明にはその等価物も含まれる。   Although the best mode for carrying out the present invention has been described above, the above embodiment is intended to facilitate understanding of the present invention and is not intended to limit the present invention. The present invention can be changed and improved without departing from the gist thereof, and equivalents thereof are also included in the present invention.

工事データ振分け装置1の構成を示す図である。It is a figure which shows the structure of the construction data distribution apparatus. 処理部6の構成を示す図である。3 is a diagram illustrating a configuration of a processing unit 6. FIG. HDD7に記憶されるデータの構成を示す図である。FIG. 4 is a diagram showing a configuration of data stored in an HDD 7. 工事データ及びシンボル形態データの構成を示す図であり、(a)は工事データ72の構成を示し、(b)はシンボル色データ74Aの構成を示し、(c)はシンボル形状データ74Bの構成を示す。It is a figure which shows the structure of construction data and symbol form data, (a) shows the structure of construction data 72, (b) shows the structure of symbol color data 74A, (c) shows the structure of symbol shape data 74B. Show. 工事種別緊急度データ75の構成を示す図である。It is a figure which shows the structure of the construction classification emergency data 75. FIG. 工事データの取得・蓄積処理を示すフローチャートである。It is a flowchart which shows the acquisition / accumulation process of construction data. 工事データの施工区分の切分け条件と振分け先を示す図である。It is a figure which shows the isolation | separation conditions and distribution destination of the construction classification of construction data. 委託会社の施工可否の判定条件を示す図である。It is a figure which shows the determination conditions of the consumable company's construction availability. 工事データの担当区分の切分け条件と担当区分を示す図である。It is a figure which shows the isolation | separation condition and charge division of the division in charge of construction data. 工事データの振分け処理を示すフローチャートである。It is a flowchart which shows the distribution process of construction data. 工事データ振分け画面の例を示す図である。It is a figure which shows the example of a construction data distribution screen. 工事データ振分け画面に表示されるメッセージの例を示す図であり、(a)はエラーメッセージの例を示し、(b)は注意メッセージの例を示す。It is a figure which shows the example of the message displayed on a construction data distribution screen, (a) shows the example of an error message, (b) shows the example of a caution message.

符号の説明Explanation of symbols

1 工事データ振分け装置
2 ディスプレイ(表示手段)
3 マウス
4 キーボード
5 画像メモリ
6 処理部
7 HDD(記憶手段)
8 バス
62 工事データ設定手段
63 地図データ編集手段
64 工事データ振分け手段
65 表示条件取得手段
71 地図データ
72 工事データ
723 位置情報
725 緊急度
727 施工者条件
73 施工者データ
74 シンボル形態データ
S シンボル
T 施工者タブ(施工者名表示領域)
1 Construction data distribution device 2 Display (display means)
3 mouse 4 keyboard 5 image memory 6 processing unit 7 HDD (storage means)
8 Bus 62 Construction data setting means 63 Map data editing means 64 Construction data distribution means 65 Display condition acquisition means 71 Map data 72 Construction data 723 Location information 725 Urgency 727 Contractor conditions 73 Contractor data 74 Symbol form data S Symbol T Construction Tab (constructor name display area)

Claims (4)

地図データと、
工事の緊急度及び位置情報を含む工事データと、
施工者名称を含む施工者データと、
前記工事の緊急度と、前記工事データに対応するシンボルの形態との対応関係を含むシンボル形態データと、
を記憶する記憶手段と、
前記工事データ及び前記シンボル形態データに基づいて、前記シンボルに前記工事の緊急度に応じた形態を設定し、当該シンボルを前記地図データ上の前記位置情報に該当する位置に位置付ける地図データ編集手段と、
前記施工者データに含まれる施工者名称が付された施工者名表示領域及び前記シンボルが位置付けられた地図データを表示する地図表示領域を含む画面を表示する表示手段と、
前記画面上で前記シンボルと前記施工者名表示領域とを関係付ける操作が行われると、当該シンボルに対応する前記工事データと、当該施工者名称を含む前記施工者データとを対応付けて、前記記憶手段に記憶する工事データ振分け手段と、
を備えることを特徴とする工事データ振分け装置。
Map data,
Construction data, including construction urgency and location information;
Constructor data including the name of the installer,
Symbol form data including the correspondence between the urgency level of the construction and the form of the symbol corresponding to the construction data;
Storage means for storing
Based on the construction data and the symbol form data, map data editing means for setting a form corresponding to the urgency of the construction to the symbol and positioning the symbol at a position corresponding to the position information on the map data; ,
Display means for displaying a screen including a contractor name display area to which the contractor name included in the contractor data is attached and a map display area for displaying the map data in which the symbol is positioned;
When an operation relating the symbol and the installer name display area is performed on the screen, the construction data corresponding to the symbol is associated with the installer data including the installer name, Construction data distribution means stored in the storage means;
A construction data distribution device characterized by comprising:
請求項1に記載の工事データ振分け装置であって、
前記工事データは、工事を振分けるべき施工者の条件である施工者条件をさらに含み、
前記シンボル形態データは、前記施工者条件と、前記シンボルの形態との対応関係をさらに含み、
前記地図データ編集手段は、前記シンボル形態データに基づいて、前記シンボルに前記施工者条件に応じた形態をさらに設定し、
前記工事データ振分け手段は、前記画面上で前記シンボルと前記施工者条件に該当しない前記施工者名表示領域とを関係付ける操作が行われると、当該工事データの振分けはできない旨のメッセージを前記表示手段に表示する
ことを特徴とする工事データ振分け装置。
The construction data distribution device according to claim 1,
The construction data further includes a contractor condition that is a condition of a contractor to which the work should be distributed,
The symbol form data further includes a correspondence relationship between the contractor condition and the form of the symbol,
The map data editing means further sets a form according to the contractor condition to the symbol based on the symbol form data,
The construction data distribution means displays a message indicating that the construction data cannot be distributed when an operation relating the symbol and the contractor name display area not corresponding to the contractor condition is performed on the screen. Construction data distribution device characterized by displaying on means.
請求項2に記載の工事データ振分け装置であって、
前記シンボルを表示すべき工事データの前記緊急度又は前記施工者条件を含む表示条件を取得する表示条件取得手段を備え、
前記地図データ編集手段は、取得した前記表示条件に該当する工事データに対応するシンボルを前記地図データ上に位置付ける
ことを特徴とする工事データ振分け装置。
The construction data distribution device according to claim 2,
A display condition acquisition means for acquiring a display condition including the urgency level of the construction data to be displayed the symbol or the contractor condition
The construction data distribution device, wherein the map data editing means positions a symbol corresponding to the construction data corresponding to the acquired display condition on the map data.
請求項1ないし請求項3のいずれか一項に記載の工事データ振分け装置であって、
前記画面上で前記シンボルと前記施工者名表示領域とを関係付ける操作は、ドラッグ&ドロップによって行われる
ことを特徴とする工事データ振分け装置。
A construction data distribution device according to any one of claims 1 to 3,
An operation data distribution apparatus, wherein an operation for associating the symbol and the installer name display area on the screen is performed by drag and drop.
JP2006343111A 2006-12-20 2006-12-20 Construction data distribution device Pending JP2008158559A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006343111A JP2008158559A (en) 2006-12-20 2006-12-20 Construction data distribution device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006343111A JP2008158559A (en) 2006-12-20 2006-12-20 Construction data distribution device

Publications (1)

Publication Number Publication Date
JP2008158559A true JP2008158559A (en) 2008-07-10

Family

ID=39659437

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006343111A Pending JP2008158559A (en) 2006-12-20 2006-12-20 Construction data distribution device

Country Status (1)

Country Link
JP (1) JP2008158559A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010191675A (en) * 2009-02-18 2010-09-02 Chugoku Electric Power Co Inc:The Device and method for managing power distribution information
JP2010237899A (en) * 2009-03-31 2010-10-21 Chugoku Electric Power Co Inc:The Screen operation method in generator/transformer inspection and power service interruption plan support processing
KR20220093605A (en) * 2020-12-28 2022-07-05 에이치디씨랩스 주식회사 Facility Management System and Method for Providing Management Information of Multiple Facilities

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010191675A (en) * 2009-02-18 2010-09-02 Chugoku Electric Power Co Inc:The Device and method for managing power distribution information
JP2010237899A (en) * 2009-03-31 2010-10-21 Chugoku Electric Power Co Inc:The Screen operation method in generator/transformer inspection and power service interruption plan support processing
KR20220093605A (en) * 2020-12-28 2022-07-05 에이치디씨랩스 주식회사 Facility Management System and Method for Providing Management Information of Multiple Facilities
KR102545456B1 (en) 2020-12-28 2023-06-20 에이치디씨랩스 주식회사 Facility Management System and Method for Providing Management Information of Multiple Facilities

Similar Documents

Publication Publication Date Title
US20170220998A1 (en) Automated service management system with rule-based, cascading action requests
US9015207B2 (en) Mobile sales tracking system
US8364513B2 (en) Technician control system
US11935139B2 (en) Communication management systems and methods
US20140278652A1 (en) Hybrid system and method for selecting and deploying field technicians in a facilities management hybrid workforce
US20170109704A1 (en) System and method for scheduling and facilitating waste removal
CN110073384A (en) Personalized adaptive task framework for user&#39;s life event
US20090024957A1 (en) Methods, Systems, and Computer-Readable Media for Providing Contact Information At Turf Level
US9058596B2 (en) Determining availability based on percentage available
US11836772B2 (en) Equipment staging application and platform
US20170032334A1 (en) Method and system for managing service work flow
KR20180096230A (en) Business management system based on workflow
WO2012092560A1 (en) System and method for field services automation
US20140164042A1 (en) Network-based scheduling application
JP2008158559A (en) Construction data distribution device
JP2015103149A (en) Management system and method for controlling management system
US9786004B2 (en) Obtaining missing documents from user
JP6649235B2 (en) Business support system, business support device, and program
US20160307120A1 (en) System and display screen or portion thereof with graphical user interface for managing service operations
US20200333155A1 (en) Client and prospect app
JP4597096B2 (en) Information provision device
JP2019045977A (en) Reservation management device, reservation management method and reservation management program
JP2006139751A (en) Production management apparatus, program, and method
JP2024091203A (en) Processing device, processing program, and processing method
JP2024063313A (en) Processing device, processing program, and processing method